Loading...
HomeMy WebLinkAbout129 MAPLE AVE; ; CB022865; PermitCity of Carlsbad 1635 FaradayAv Carlsbad, CA 92008 02-28-2003- Residential Permit Permit No: CB022865 - Building Inspection Request Line (760) 602-2725 Job Address: 129 MAPLE AV CBAD Permit Type: RESDNTL SubType: RAD Status: ISSUED Parcel No: 2042331600 Lot #: 0 Applied: 09/24/2002 Valuation: $32,676.00 Construction Type: VN Entered By: RMA Occupancy Group: Reference #: Plan Approved: 02/28/2003 # Dwelling Units: 0 Structure Type: Issued: 02/28/2003 Bedrooms: 0 Bathrooms: 0 Inspect Area: Project Title: BOWMAN RES-262 SF ADD-1 ST &2N Orig PC#: STORY ADD & 250 SF REMODEL Plan Check#: Applicant: Owner: MARK MCKINNEY BOWMAN TOD C&DONNAS 129 MAPLE AVE 6564 CON EFLOWER DR 92009 CARLSBAD CA 92008 ' 760 434-5816 7' Building Permit $259.67 Meter Size -' Add'I Building Permit Fee $0.00 Add'I Red. Water Con. Fee ' $0.00 Plan Check $168.79 Meter Fee $0.00 Add'I Plan Check Fee $0.00. -, SDCWA Fee' :'• $0.00 Plan Check Discount $0.00 CFD Payoff Fee $0.00 Strong Motion Fee ' $3.27 PFF ' $0.00 Park in Lieu Fee $0.00 PFF (CFD Fund) $0.00 Park Fee - $0.00 License Tax $0.00 LFM Fee $0.00 License Tax (CFD Fund) $0.00 Bridge Fee $0.00 Traffic Impact Fee $0.00 Other Bridge Fee $0.00 Traffic Impact (CFD Fund) , $0.00 - BTD #2 Fee $0.00.- Sidewalk Fee $0.00 BTD #3 Fee $0.00- PLUMBING TOTAL $90.00 Renewal Fee $0.00 , ELECTRICAL TOTAL $20.00 Add'I Renewal Fee ' $0.00 MECHANICAL TOTAL., / $43.50 Other Building Fee "\. $0.0O." Housing Impact Fee ' $0.00 Pot. Water Con. Fee $0.00\ '. Housing InLieu Fee $0.00 Meter Size '. Ti ; '-i'- Master Drainage Fee $0.00 Add'I Pot. Water Con. Fee $0.00 Sewer Fee $0.00 Recl. Water Con Fee $000 10AdditionaI Fees $000 TOTAL PERMIT FEES $585.23 Total Fees $58523 Total Payments To Date $147.10 Balance Due $438.13 - I - 9247 02/28/03 0002 01 02 COP 4384$ Wh DAdCLEARAH SIGNATURE._-____--- FOR OFFICE USE ONLY PERMIT APPLICATION AI PLAN CHECK NO.C/J02245 CITY OF CARLSBAD BUILDING DEPARTMENT EST. VAL. 1635 Faraday Ave., Carlsbad, CA 92008 ,. Plan Ck. Deposit 4 Pi' 7.10 Validated 114, Date_________ 1' 1 PROJECT INFORMATION 2- YvVc /vdF ckqtc,P?t Ck qsompb Address (include Bldg/Suite #) Business Name (at this address) -v Legal Description Lot No. Subdivision Name/Number 09/2 f9 7O02 0j0ta1 units 2o .1 c Assessor's Parcel # Existing Use 144 ,,,q,V (%, Proposed Use z rr z 't'i Description of Work SQ. FT. #of Stories / # of 11edrooms it of Bathrooms CONTACT PEON (if different from applicant) 7 74 I 33 P(\Q i1AShJJJ £5Lz4 Ptot)2-Q. (P1 (A Name Address City State Zip \ Telephone # Fax # 31 APPLICANT 0 Contractor 0 Agent for Contractor [-]-Owner Agent for Owner 'ScMc /5 /r2A.f. Name Address City State/Zip Telephone # 4 PROPERTY OWNER i $- DcW—$'k i YgwLg. 'k'Je- JQ- cCJ Name Address City State/Zip Telephone # S CONTRACTOR COMPANY NAME (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law [Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code] or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars [$5001). Name Address City State/Zip Telephone # State License # License Class City Business License # - - Designer Name Address City State/Zip Telephone State License # 6 WORKERS COMPENSATION Workers Compensation Declaration: I hereby affirm under penalty of perjury one of the following declarations: 0 I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 0 I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My worker's compensation insurance carrier and policy number are: Insurance Company Policy No. Expiration Date__________________ (THIS SECTION NEED NOT BE COMPLETED IF THE PERMIT IS FOR ONE HUNDRED DOLLARS [$100] OR LESS) o CERTIFICATE OF EXEMPTION: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of California. WARNING: Failure to secure workers' compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars ($100.000), in addition to the cost of compensation, damages as provided for in Section 3706 of the Labor code, interest and attorney's fees. SIGNATURE DATE J. OWNEFt BUILDER DECLARATION I hereby affirm that I am exempt from the Contractors License Law for the following reason: C3 i, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). I, as owner of the property, am exclusively contracting with licensed Contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). 0 I am exempt under Section Business and Professions Code for this reason: I personally plan to provide the major labor and materials for construction of the proposed property improvement. 0 YES ONO I (have / have not) signed an application for a building permit for the proposed work. I have contracted with the following person (firm) to provide the proposed construction (include name / address / phone number / contractors license number): I plan to provide portions of the work, but I have hired the following person to Coordinate, supervise and provide the major work (include name / address I phone number / contractors license number): I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name I address / phone number / type of work): - PROPERTY OWNER SIGNATURE DATE OMPLETE T1ISEhON FOR NON RESIDENTIAL BUILDING PERMITS ONLY . I Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardobs Substance Account Act? 0 YES 0 NO Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? 0 YES 0 NO Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? 0 YES 0 NO IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. 8 CONSTRUCTION LENDING AGENCY I hereby affirm that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 30970) Civil Code). LENDER'S NAME LENDER'S ADDRESS__________________________________________________________ 9. APPLICANT CERTIFICATION I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building construction. I hereby authorize representatives of the Cit' of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. OSHA: An OSHA permit is required for excavations over 5'0" deep and demolition or construction of structures over 3 stories in height. EXPIRATION: Every permit issued by the building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a eriod of 18 days (Section 106.4.4 Uniform Building Code). APPLICANT'S SIGNATURE 1TY1 _LLA_ DATE .o2 WHITE: File LL W: Applicant PINK: Finance A0 SkIX City of Carlsbad Bldg Inspection Request For: 04/28/2004 Permit# CB022865 Inspector Assignment: JM Title: BOWMAN RES-262 SF ADD-1 ST & 2N Description: STORY ADD & 250 SF REMODEL Type: RESDNTL Sub Type: RAD Phone: 7605256151 Job Address: 129 MAPLE AV Suite: Lot 0 Location: Inspector: APPLICANT MARK MCKINNEY Owner: BOWMAN TOD C&DONNA S Remarks: tSLLNSRLEASJ Total Time: Requested By: N/A Entered By: ROBIN CD Description Act Comment 19 Final Structural I5 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Associated PCRs/CVs PCR04029 ISSUED BOWMAN RES-STRUCT. REVISIONS; FOOTINGS, BEAMS & TRUSS ROOF Inspection History Date Description Act lnsp comments 04/23/2004 89 Final combo co JM SEE LIST 03/26/2004 17 Interior Lath/Drywall AP JM 1ST & 2ND STORY ADDON 03/26/2004 18 Exterior Lath/Drywall AP JM 03/24/2004 16 Insulation AP JM OK TO DRYWALL 1ST & 2ND STORY ADDON 03/23/2004 18 Exterior Lath/Drywall wc JM 03/23/2004 84 Rough combo AP JM OK TO INSULATE 03/22/2004 17 Interior Lath/Drywall PA JM UPSTAIRS BATH 03/22/2004 18 Exterior Lath/Drywall PA JM OK TO SHEAR UPSTAIRS INTERIOR WALL 03/19/2004 16 Insulation PA JM UPSTAIRS BATH 03/17/2004 11 Ftg/Foundation/Piers WC JM 03/17/2004 18 Exterior Lath/Drywall PA JM DECK FLOOR OK 03/12/2004 13 Shear Panels/HD's PA JM EXTERIOR SHEAR OK TO WRAP 03/12/2004 14 Frame/Steel/Bolting/Welding WC JM 03/12/2004 15 Roof/Reroof AP JM 03/09/2004 11 Ftg/Foundation/Piers AP JM OK TO POUR STEM WALL 03/09/2004 14 Frame/Steel/Bolting/Welding WC JM ' 1 EsGil Corporation In Partnership with government for Buifiding Safety DATE: January 8, 2003 0 LICANT JURIS. JURISDICTION: Carlsbad U PLAN REVIEWER U FILE PLAN CHECK NO.: 02-2865 SET: III PROJECT ADDRESS: 129 Maple Avenue PROJECT NAME: Bowman Addition The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. I The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. LI The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: I Esgil Corporation staff did not advise the applicant that the plan check has been completed. LII Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Telephone #: Date contacted: (by: ) Fax # Mail Telephone Fax In Person I REMARKS: OK to issue with these three items. 1. OK to 1' completed special inspction program for the epoxy anch Deputy, see attached. The applicant shall mark all outl The applicant shall idtify the remodel square foota By: lya~uppiger 2 Enclosu Esgil Corporation El GA F1 MB DEJ DPC LOG is '3 the applicant submitting a to the Building Official or his ts in the island as GFCI protected. on the title sheet. res: tmsmthdot 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576 .3: EsGil Corporation in Partnership with Government for Bui&Iing Safety DATE: December 16, 2002 O)RLtCANT JURISDICTION: Carlsbad LI PLAN REVIEWER LI FILE PLAN CHECK NO.: 02-2865 SET: II PROJECT ADDRESS: 129 Maple Avenue PROJECT NAME: Bowman Addition The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. LI The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. LI The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck LI The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: Mark McKinney 6564 Coneflower Drive Carlsbad CA 92009 LI Esgil Corporation staff did not advise the applicant that the plan check has been completed. Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Mark McKinney Telephone #: 760 804 1383 Date contacted: '/)/oz(by:(\>c) Fax #: 760 804 2758 Mail —Telephone Fax' In Person LI REMARKS: By: Bryan Zuppiger Enclosures: Esgil Corporation GA EMB DEJ 171 PC 12/09/02 trnsmthdot 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576 Carlsbad 02-2865 December 16, 2002 RECHECK PLAN CORRECTION LIST JURISDICTION: Carlsbad PROJECT ADDRESS: 129 Maple Avenue DATE PLAN RECEIVED BY ESGIL CORPORATION: 12/09/02 REVIEWED BY: r PLAN CHECK NO.: 02-2865 SET: II DATE RECHECK COMPLETED: December 16, 2002 FOREWORD (PLEASE READ): This plan review is limited to the technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and disabled access. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department or other departments. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3, 1997 Uniform Building Code, the approval of the plans does not permit the violation of any state, county or city law. . . Please make all corrections on the original tracings and submit two new sets of prints to: ESGIL CORPORATION. To facilitate rechecking, please identify, next to each item, the sheet of the plans upon which each correction on this sheet has been made and return this sheet with the revised plans. . The following items have not been resolved from the previous plan reviews. The original correction number has been given for your. reference. In case you did not keep a copy of the prior correction list, we have enclosed those pages containing the outstanding corrections. Please contact me if you have any questions regarding these items. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located on the plans. Have changes been made not resulting from this list? IYes . UNo Carlsbad 02-2865 December 16, 2002 . PLANS NOTE: The items listed below refer to the item numbers from previous list. These remaining items have not been adequately addressed. The notes in bold at the end of or contained within each item are to emphasize the remaining problem. Please make all corrections on the original tracings, as requested in the correction list. Submit three sets of plans for commercial/industrial projects (two sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858)560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. The person responsible for their preparation must sign all final sheets of plans. (California Business and Professions Code). This may be a leftover item. Only the effected sheets need be submitted I will insert them into the plans. Final plans, specifications and calculations for designs deviating from conventional wood frame construction shall be signed and sealed by the engineer or architect licensed by the State of California who is responsible for their preparation. Specify expiration date of license. (California Business and Professions Code). This may be a leftover item. Only the effected sheets need be submitted I will insert them into the plans. Specify on the Title Sheet of the plans the gross floor area of each element of this project, including dwelling remodel. Section 106.3.3. 6. When special inspection is required, the architect or engineer of record shall prepare an inspection program which shall be submitted to the building official for approval prior to issuance of the building per Please review Section 106.3.5. Please complete the attached form. A copy must be burned into the title sheet. Carlsbad 02-2865 December 16, 2002 ROOFING I Specify on the plans the following information for the tile roof and balcony materials, per Section 106.3.3: a) Manufacturer's name. b). Product name/number. ICBO approval number, or equal. Balconies and decks exposed to the weather and sealed underneath shall be sloped a minimum of % inch per foot for drainage. Section 1402.3. ELECTRICAL (NATIONAL ELECTRICAL CODE) 49. Show on the plan that all 125-volt, single-phase, 15- and 20- ampere receptacles installed at all kitchen counters comply with the ground-fault circuit-interrupter protection specified in NEC Art. 210-8. Including the island. To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Bryan Zuppiger at Esgil Corporation. Thank you. EsGil Corporation In Partnership u'itIi Governmentfor fBui1(ing Safety DATE: October 2, 2002 JURISDICTION: Carlsbad PLAN CHECK NO.: 02-2865 SET: I PROJECT ADDRESS: 129 Maple Avenue PROJECT NAME: Bowman Addition U APPL CANT JURIS. U PLAN REVIEWER U FILE The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. I The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. I The applicant's copy of the check list has been sent to: Mark McKinney 6564 Coneflower Drive Carlsbad CA 92009 EIIJ Esgil Corporation staff did not advise the applicant that the plan check has been completed. I Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Mark McKinney &. Telephone #: 760 804 1383 Date (by: P.u*) Fax #: 760 804 2758 Mail v' Telephone...— Fax.— In Person El REMARKS: By: Bryan Zuppiger Enclosures: Esgil Corporation El GA MB 0 EJ D PC 9/26/02 trnsmtLdot 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576 Carlsbad 02-2865 October 2, 2002 PLAN REVIEW CORRECTION LIST SINGLE FAMILY DWELLINGS AND DUPLEXES PLAN CHECK NO.: 02-2865 JURISDICTION: Carlsbad PROJECT ADDRESS: 129 Maple Avenue FLOOR AREA: See Below Additions 262' Remodel 250' REMARKS: DATE PLANS RECEIVED BY JURISDICTION: DATE INITIAL PLAN REVIEW COMPLETED: October 2, 2002 STORIES: 2 HEIGHT: 23' at south elev. page 3 DATE PLANS RECEIVED BY ESGIL CORPORATION: 9/26/02 PLAN REVIEWER: Bryan Zuppiger FOREWORD (PLEASE READ): This plan review is limited to the technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinance by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Present California law mandates that residential construction comply with the 1998 edition of the California Building Code (Title 24), which adopts the following model codes: 1997 UBC, 1997 UPC, 1997 UMC and 1996 NEC (all effective 7/1/99). The above regulations apply to residential construction, regardless of the code editions adopted byordinance - - The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3, 1997 Uniform Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet number, specification section, etc. Be sure to enclose the marked up list when you submit the revised plans. Carlsbad 02-2865 October 2, 2002 . PLANS Please make all corrections on the original tracings, as requested in the correction list. Submit three sets of plans for commercial/industrial projects (two sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. 2. The person responsible for their preparation must sign all final sheets of plans. (California Business and Professions Code). Final plans, specifications and calculations for designs deviating from conventional wood frame construction shall be signed and sealed by the engineer or architect licensed by the State of California who is responsible for their preparation. Specify expiration date of license. (California Business and Professions Code). Specify on the Title Sheet of the plans the gross floor area of each element of this project, including dwelling remodel. Section 106.3.3. Provide a statement on the Title Sheet of the plans stating that this project shall comply with the 1998 edition of the California Building Code (Title 24), which adopts the 1997 UBC, UMC and UPC and the 1996 NEC. When special inspection is required, the architect or engineer of record shall prepare an inspection program which shall be submitted to the building official for approval prior to issuance of the building permit. Please review Section 106.3.5. Please complete the attached form. Show on the title sheet all structures, pools, walls, etc. included under this application. Any portion of the project shown on the site plan that is not included with the building permit application filed should be clearly identified as "not included." Section 106.3.3. Carlsbad 02-2865 October 2, 2002 FIRE PROTECTION 8. Show locations of permanently wired smoke detectors with battery backup: a) On each story. NOTE: Detectors shall sound an alarm audible in all sleeping areas of the unit. Section 310.9.1. 9. When the valuation of a room addition or repair exceeds $1,000, or when sleeping rooms are created, smoke detectors shall be provided per the above, except that smoke detectors added at existing construction need only be battery powered. Section 310.9.1.2. GENERAL RESIDENTIAL REQUIREMENTS 10. Glazing in the following locations should be of safety glazing material in accordance with Section 2406.4 (see exceptions): a) Doors and enclosures for hot tubs, whirlpools, saunas, steam rooms, bathtubs and showers and in any portion of a building wall enclosing these compartments where the bottom exposed edge of the glazing is less than 60 inches above a standing surface and drain inlet. EXITS, STAIRWAYS, AND RAILINGS 11. Provide spiral stairway details, per Section 1003.3.3.8.3: Minimum run is 7-1/2 inches measured at a point 12 inches from where the treads are the narrowest. Maximum rise is 9-1/2 inches. Maximum clear opening between risers is 4 inches. Minimum headroom is 6 feet 6 inches. The tread must provide a clear walking area measuring at least 26 inches from the outer edge of the supporting column to the inner edge of the handrail. 12. Provide I.C.B.O. Research Report and number for metal stairway, or submit plans and calculations and approved fabricator registered with the building department or note that the stairway fabrication plans shall be submitted to and approved by the building official prior to installation. ROOFING 13. Specify on the plans the following information for the tile roof and balcony materials, per Section 106.3.3: Manufacturer's name. Product name/number. ICBO approval number, or equal. Carlsbad 02-2865 October 2, 2002 14. Balconies and decks exposed to the weather and sealed underneath shall be sloped a minimum of 1/4 inch per foot for drainage. Section 1402.3. 15. Show the required ventilation for attics (or enclosed rafter spaces formed where ceilings are applied directly to the underside of roof rafters). The minimum vent area is 1/150 of attic area (or 1/300 of attic area if at least 50% of the required vent is at least 3 feet above eave vents or cornice vents). Show area required and area provided. Section 1505.3. 16. Where eave vents are installed, insulation shall not block the free flow of air. A minimum of 1" of air space shall be provided between the insulation and the roof sheathing. To accommodate the thickness of insulation plus the required 1" clearance, member sizes may have to be increased for rafter-ceiling joists. Section 1505.3. 17. Note on the plans: "Attic ventilation openings shalt be covered with corrosion-resistant metal mesh with mesh openings of 1/4-inch in dimension." Section 1505.3. 18. Provide skylight details to show compliance with Sections 2409 and 2603, or specify on the plans the following information for the skylight(s), per Section 106.3.3: Manufacturer's name. Model name/number. ICBO approval number, or equal. . FOUNDATION REQUIREMENTS 19. Please assign the appropriate details to the new footing. 20. Show foundation sills to be pressure treated, or equal. Section 2306.4. 21. The following footing requirements shalt apply in Seismic Zones 3 and 4, per Section 1806.7: a) Foundations with stemwalls shall be provided with a minimum of one No. 4 bar at the top of the wall and one No. 4 bar at the bottom of the footing. 22. Dimension foundations per U.B.C. Table 18-I-C: Floors Footing Supported* Thickness Width Depth Stemwall 1 6" 12" 12" 6" *Foundations may support a roof in addition to the floors. Where only a roof is supported, use foundation for one floor. Carlsbad 02-2865 October 2, 2002 23. Show foundation bolt size and spacing. Foundation bolt size and spacing for shear walls must be clearly shown on the foundation plan. Section 1806.6. 24. The following anchor bolt requirements shall apply in Seismic Zones 3 and 4, per Section 1806.6.1: The minimum nominal anchor bolt diameter shall be 5/8-inch (for Seismic Zone 4 only). Note: This will require a minimum distance from the ends of sill plates to be 4-3/8" (and a maximum of 12"). Plate washers (minimum size of 2" x 2" x 3/16") shall be used on each anchor bolt. 25. Show size, embedment and location of hold down anchors on foundation plan. Section 106.3.3. 26. Note on plan that hold down anchors must be tied in place prior to foundation inspection. Section 108.5.2. 27. Show minimum 18" clearance from grade to bottom of floor joists and minimum 12" clearance to bottom of girders. Section 2306.3. 28. Show minimum underfloor access of 18" x 24". Section 2306.3. 29. Show minimum underfloor ventilation equal to 1 sq. ft. for each 150 sq. ft. of underfloor area. Openings shall be as close to corners as practical and shall provide cross ventilation on at least two approximately opposite sides. Section 2306.7. FRAMING 30. Specify 2 nd story holdowns on the plans. 31. Please label and cross-reference the beams on the plans to the calculations. Without the labeling and cross-referencing, I can not effectively determine code compliance or consistency between the plans and the calculations. 32. Detail the strapping around openings at Line I & 2 on page 11. 33. Specify nail size and spacing for all shear walls, floor and roof diaphragms. Indicate required blocking. Maintain maximum diaphragm dimension ratios. Sections 2315 and 2513. Specify plywood and/or particle board thickness, grade and panel span rating. Table 23-II-E-1. 34. Show location of attic access with a minimum size of 22"x30", unless the maximum vertical headroom height in the attic is less than 30". Access must be provided to each separated attic area, shall be located in a hallway or other readily accessible location and 30" headroom clearance is required above the opening. Section 1505.1. 35. Provide truss details and truss calculations for this project. Specify truss identification numbers on the plans. The City of Carlsbad does not defer trusses. Carlsbad 02-2865 October 2, 2002 36. Per UBC Section 2321.4, provide the following note on the plans if trusses are used: "Each truss shall be legibly branded, marked or otherwise have permanently affixed thereto the following information located within 2 feet of the center of the span on the face of the bottom chord: Identity of the company manufacturing the truss. The design load. The spacing of the trusses." 37. The structural consultant shall review and approve the truss design through manual signature. . MECHANICAL (UNIFORM MECHANICAL CODE) 38. Show the location, type and size (BTU's) of all heating and cooling appliances or systems. 39. Every habitable room within a dwelling unit shall be provided with heating facilities capable of maintaining a room temperature of 70 degrees F at 3 feet above the floor in all habitable rooms. Show basis for compliance. UBC, Sec. 310.11. 40. Note on the plans that the FAU closet or alcove must be 12 inches wider than the furnace or furnaces being installed. UMC Section 304.7. 41. Show minimum 30" deep unobstructed working space in front of furnace Section 307, UMC. 42. Note that passageway to the mechanical equipment in the attic shall be unobstructed, not less than 30" high and 30" wide and have continuous solid flooring not less than 24 inches wide, not more than 20 feet in length through the attic. Section 307.3.2, UMC. 43. Show permanent electrical outlet and lighting fixture controlled by a switch for furnace located in attic or underfloor space. Sections 306.3 and 306.4, UMC. 44. Specify on the plans the following information for the fireplace(s), per Section 106.3.3: Manufacturer's name. Model name/number. ICBO approval number, or equal. Show height of chimney above roof per l.C.B.O. approval or UBC Table 31-B. Note on the plans that approved spark arrestors shall be installed on all chimneys. UBC, Section 3102.3.8. Carlsbad 02-2865 October 2, 2002 . ELECTRICAL (NATIONAL ELECTRICAL CODE) Show on the plan the amperage of the electrical service, the location of the service panel and the location of any sub-panels. If service is over 200 amps, submit single line diagram, panel schedule and load calculations. For a single-family dwelling unit, show that at least one receptacle outlet accessible at grade level will be installed outdoors at the front and back of the dwelling. NEC Art. 210-52 (e). This receptacle must be GFCI protected. Note on the plans that bathroom receptacle outlets shall be supplied by a minimum of one 20-ampere branch circuit. Such circuits shall have no other outlets. This circuit may serve more than one bathroom. NEC Art. 210-52(d). Show on the plan that receptacle outlets in hallways comply with NEC Art. 210-52(h), which reads as follows: For hallways of 10 feet or more in length at least one receptacle outlet shall be required. Show on the plan that all 125-volt, single-phase, 15- and 20- ampere receptacles installed at all kitchen counters comply with the ground-fault circuit-interrupter protection specified in NEC Art. 210-8. . ENERGY CONSERVATION Provide fluorescent general lighting (40 lumens per watt minimum) in kitchen(s) and bathrooms (containing a tub or shower). Note on the plans: "The manufactured windows shall have a label attached certified by the National Fenestration Rating Council (NFRC) and showing compliance with the energy calculations." To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Bryan Zuppiger at Esgil Corporation. Thank you. J'U -L'Uj WI) Ub: r AX Mi. (U we Ub .,* u Carlsbad 03-2865 Januaxy a, 2003 -CI Cily ot ,9 t BUILDING DEPARTMtNT OTICEOF REOV1RKMk(T FORSflC1ALIt4SPECTIoN Do Not Remove From Plaits Piers Check No. 024865 Job Address or Legal Descnption 139 Maple Avenue Oer QOtt#ddress You are hereby notdied that in addition to the inspection of constructior. provided by the Building Department, an approved Registered Speca1 Inspector is required to provide continuous inspection during the performance of the phases of constructofl indicated on the reverac side of this sheet. The R.cgsslcred Special Inspector shall be approved by the City ot'Carlsbad Building Department prior to the issuance of the building permit. Special Inspectors having a current certification from the City of San Diego, Los Angeles, or ICØO are approved as Special Inspectors for the type of construction for which they are certified. The inspections by a Special inspector do not change the requirements for inspections by personnel of the City of Carlsbad building department. The inspections by a Special Inspector are in addition to the inspections normally required by the County Building Code. The Special Inspector is not authopzed to inspect and approve any work other than that for which he/she is specifically, assiSned to inspect. The Special Inspector is not authorized to accept alternate materials, structural changes, or any requests for plan changes- The Special Inspector is required to submit written reports to the City of Carlsbad building dqtsdmenr of all work that he/she inspected and approved. The final inspection approval will not be given until all Special Inspection reports have been received and approved by the City of Carlsbad building 4epsrtment. Please submit the names of the inspectors who will perform the special inspections on each of the ins indicated, on the reverse side of this sheer. (over) O 39'd A3NNDOW 89L'089LI I:9T EB/E/g r JW-082003 WED 05:37 PM 0RLSBAD ENGINEERiNG FA)( NO, 780 802 1052 P. 04 Carlsbad 02.2865 January 8, 2003 SPECIAL INSPECTION PROGRAM ADDRESS OR LEGAL DESCRIPTION. 24 . k. Pt$ CHECK NUMBER: C61) VNEWS NAME; I. as the owner, or agent of the owner (contractors may at employ the special inspector), certify that I, or the arcrdtsct/engineer of record. will be responsible for employing the special inspector(a) as required by Uniform Building Code (UBC) Section t7011 for the n*ucbon project lOCated at the ane listed above. UPC Section 106.3.5. I, is the engir*eer/arch*cct orecor4, certify that I have prepared the foflowing special inspection proaxn as ieuized by IJBC Section I O6.3.5 for the co*uCUon project located at the site listed above. Signed - cflM rçc P~Wimor 1. List of work requiring special Inspection: R Pr.strvssed Concrete D.slgnOr Specified Expa114Iors/E1tuIi Other Name(s) of Individual(s) or firm(*) responsible for th. special Inspections listed above: A. E4L4i C. Duti.s of the epeclil inspectors forth, work feted above: A. lNet P P' . . a- --.. - I $ Wpsdws shall * in WO va City and pr5n1 fhelf ars4somia for apprays I;ftjj beginning ( on Ihi ob site, £0 3Ed ANNI>1n. 89Ut'0809Lt :9 £007,/EI/g Carlsbad 02-2865 October 2, 2002 VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad PLAN CHECK NO.: 02-2865 PREPARED BY: Bryan Zuppiger DATE: October 2, 2002 BUILDING ADDRESS: 129 Maple Avenue BUILDING OCCUPANCY: R3 TYPE OF CONSTRUCTION: VN BUILDING PORTION AREA (Sq. Ft.) Valuation Multiplier Reg. Mod. VALUE ($) addition 262 98.00 25,676 remodel 250 28.00 7,000 Air Conditioning Fire Sprinklers TOTAL VALUE 32,676 Jurisdiction Code Icb IBY Ordinance I Bldg. Permit Fee by Ordinance Plan Check Fee by Ordinance V I $259.671 I $168.791 Type of Review: I Complete Review LI Structural Only E Repetitive Fee L 1'1 Repeats LI Other LI Hourly I Hour* Esgil Plan Review Fee I $145.421 Comments: Sheet of macvalue .doc City of Carlsbad BUILDING PLANCHECK CHECKLIST DATE: f()-.- 1 0 PLANCHECK NO.: CB BUILDING ADDRESS: j9'? Md0 L ,4_ PROJECT DESCRIPTION: __ ASSESSOR'S PARCEL NUMBER: Ot/ EST. VALUE: qqt ENGINEERING DEPARTMENT APPROVAL The item you have submitted for review has been approved. The approval is based on plans, information and/or specifications provided in your submittal; therefore any changes to these items after this date, including field modifications, must be reviewed by this office to insure continued conformance with applicable codes. Please review carefully all comments attached, as failure to comply with instructions in this report can result in suspension of permit to build. El A Right-of-Way permit is required prior to construction of the following improvements: I-, V1 Please see the attached report of deficiencies marked with 0. Make necessary corrections to plans or specifications for compliance with applicable codes and standards. Submit corrected plans and/or specifications to this office for review. By: Date: By: Date: By: Date: FOR OFFICIAL USE ONLY ENG NEERING AUTHORIZATION TO ISSUE BUILDING PERMIT: 0 By: 1W Date: /0 El Dedication Application El Dedication Checklist El Improvement Application El Improvement Checklist El Future Improvement Agreement El Grading Permit Application El Grading Submittal Checklist El Right-of-Way Permit Application ENGINEERING DEPT. CONTACT PERSON• Name: TAN IYA BARROWS City of Carlsbad Address: 1635 Faraday Avenue, Carlsbad, CA 92008 Phone: (760) 602-2773 CFD INFORMATION Parcel Map No: Lots: Recordation: El Right-of-Way Permit Submittal Checklist Carlsbad Tract: and Information Sheet El Sewer Fee Information Sheet 1635 Faraday Avenue • Carlsbad, CA 92008-7314 • (760) 602-2720 • FAX (760) 602-8562 F:\BUI WING PLANCHECK CKLST PORM.d0C Rev. 7/14/00 BUILDING PLANCHECK CHECKLIST SITE PLAN 3RD 1. Provide a fully dimensioned site plan drawn to scale. Show: A. North Arrow F. Right-of-Way Width & Adjacent Streets B. Existing & Proposed Structures G. Driveway widths C. Existing Street Improvements H. Existing or proposed sewer lateral D. Property Lines I. Existing or proposed water service E. Easements J. Existing or proposed irrigation service 2. Show on site plan: A. Drainage Patterns Building pad surface drainage must maintain a minimum slope of one percent towards an adjoining street or an approved drainage course. ADD THE FOLLOWING NOTE: "Finish grade will provide a minimum positive drainage of 2% to swale 5' away from building." B. Existing & Proposed Slopes and Topography C. Size, type, location, alignment of existing or proposed sewer and water service (s) that serves the project. Each unit requires a separate service, however, second dwelling units and apartment complexes are an exception. D. Sewer and water laterals should not be located within proposed driveways, per standards. 3. Include on title sheet: Site address Assessor's Parcel Number Legal Description For commercial/industrial buildings and tenant improvement projects, include: total building square footage with the square footage for each different use, existing sewer permits showing square footage of different uses (manufacturing, warehouse, office, etc.) previously approved. EXISTING PERMIT NUMBER DESCRIPTION F:5UILDING PLANCHECK CKLST FORMA= Rev. 7/14100 BUILDING PLANCHECK CHECKLIST 1ST 2" 3" DISCRETIONARY APPROVAL COMPLIANCE O 0 0 4a. Project does not comply with the following Engineering Conditions of approval for ProjectNo.________________________________________________________ O 0 0 4b. All conditions are in compliance. Date: DEDICATION REQUIREMENTS j\ dfl 0 0 5. Dedication for all street Rights-of-Way adjacent to the building site and any storm drain or utility easements on the building site is required for all new buildings and for remodels with a value at or exceeding $_15,000 , pursuant to Carlsbad Municipal Code Section 18.40.030. Dedication required as follows: Dedication required. Please have a registered Civil Engineer or Land Surveyor prepare the appropriate legal description together with an 8 1/2" x 11" plat map and submit with a title report. All easement documents must be approved and signed by owner(s) prior to issuance of Building Permit. Attached please find an application form and submittal checklist for the dedication process. Submit the completed application form with the required checklist items and fees to the Engineering Department in person. Applications will not be accept by mail or fax. Dedication completed by: Date: IMPROVEMENT REQUIREMENTS 0 0 6a. All needed public improvements upon and adjacent to the building site must be constructed at time of building construction whenever the value of the construction exceeds $_75,000 , pursuant to Carlsbad Municipal Code Section 18.40.040. Public improvements required as follows: Attached please find an application form and submittal checklist for the public improvement requirements. A registered Civil Engineer must prepare the appropriate improvement plans and submit them together with the requirements on the attached checklist to the Engineering Department through a separate plan check process. The completed application form and the requirements on the F:\BUILDING PLANCHECK CKL.ST FORMA= 3 Rev. 7/14100 BUILDING PLANCHECK CHECKLIST 1ST 2ND 3RD checklist must be submitted in person. Applications by mail or fax are not accepted. Improvement plans must be approved, appropriate securities posted and fees paid prior to issuance of building permit. Improvement Plans signed by: Date: D 6b. Construction of the public improvements may be deferred pursuant to Carlsbad Municipal Code Section 18.40. Please submit a recent property title report or current grant deed on the property and processing fee of $310 so we may prepare the necessary Neighborhood Improvement Agreement. This agreement must be signed, notarized and approved by the City prior to issuance of a Building permit. Future public improvements required as follows: 0 0 0 6c. Enclosed please find your Neighborhood Improvement Agreement. Please return agreement signed and notarized to the Engineering Department. Neighborhood Improvement Agreement completed by: Date: O 0 0 6d. No Public Improvements required. SPECIAL NOTE: Damaged or defective improvements found adlacent to building site must be repaired to the satisfaction of the City Inspector prior to occupancy. GRADING PERMIT REQUIREMENTS The conditions that invoke the need for a grading permit are found in Section 11.06.030 of the Municipal Code. 0 0 0 7a. Inadequate information available on Site Plan to make a determination on grading requirements. Include accurate grading quantities (cut, fill import, export). 0 0 0 7b. Grading Permit required. A separate grading plan prepared by a registered Civil Engineer must be submitted together with the completed application form attached. NOTE: The Grading Permit must be issued and rough grading approval obtained prior to issuance of a Building Permit. Grading Inspector sign off by: Date: 0 0 0 7c. Graded Pad Certification required. (Note: Pad certification may be required even if a grading permit is not required.) F:\BUILDING PLANCHECK CKLST FORM.doc 4 Rev. 7/14/00 BUILDING PLANCHECK CHECKLIST /'D3RD El El 7d .No Grading Permit required. El El El 7e. If grading is not required, write "No Grading" on plot plan. MISCELLANEOUS PERMITS El El El 8. A RIGHT-OF-WAY PERMIT is required to do work in City Right-of-Way and/or private work adjacent to the public Right-of-Way. Types of work include, but are not limited to: street improvements, tree trimming, driveway construction, tying into public storm drain, sewer and water utilities. Right-of-Way permit required for: El El El 9. INDUSTRIAL WASTE PERMIT If your facility is located in the City of Carlsbad sewer service area, you need to contact the Carlsbad Municipal Water District, located at 5950 El .Camino Real, Carlsbad, CA 92008. District personnel can provide forms and assistance, and will check to see if your business enterprise is on the EWA Exempt List. You may telephone (760) 438-2722, extension 7153, for assistance. Industrial Waste permit accepted by: Date: El El El 10. NPDES PERMIT Complies with the City's requirements of the National Pollutant Discharge Elimination System (NPDES) permit. The applicant shall provide best management practices to reduce surface pollutants to an acceptable level prior to discharge to sensitive areas. Plans for such improvements shall be approved by the City Engineer prior to issuance of grading or building permit, whichever occurs first. El 11. E1 Required fees are attached IVNo fees required WATER METER REVIEW El El El 12a. Domestic (potable) Use Ensure that the meter proposed by the owner/developer is not oversized. Oversized meters are inaccurate during low-flow conditions. If it is oversized, for the life of the meter, the City will not accurately bill the owner for the water used. All single family dwelling units received "standard" 1" service with 5/8" service. F:\BUI WING PLANCHECI( CXLST FORM.doc 5 Rev. 7/14100 1 BUILDING PLANCHECK CHECKLIST 1ST 2ND 3RD If owner/developer proposes a size other than the "standard", then owner/developer must provide potable water demand calculations, which include total fixture counts and maximum water demand in gallons per minute (gpm). A typical fixture count and water demand worksheet is attached. Once the gpm is provided, check against the "meter sizing schedule" to verify the anticipated meter size for the unit. Maximum service and meter size is a 2" service with a 2" meter. If a developer is proposing a meter greater than 2", suggest the installation of multiple 2" services as needed to provide the anticipated demand. (manifolds are considered on case by case basis to limit multiple trenching into the street). 0 0 12b. Irrigation Use (where recycled water is not available) All irrigation meters must be sized via irrigation calculations (in gpm) prior to approval. The developer must provide these calculations. Please follow these guidelines: If the project is a newer development (newer than 1998), check the recent improvement plans and observe if the new irrigation service is reflected on the improvement sheets. If so, at the water meter station, the demand in gpm may be listed there. Irrigation services are listed with a circled "I", and potable water is typically a circled "W". The irrigation service should look like: ,- STA 1+00 Install 2" service and T '- 1.5: meter (estimated 100 gpm) If the improvement plans do not list the irrigation meter and the service/meter will be installed via another instrument such as the building plans or grading plans (w/ a right of way permit of course), then the applicant must provide irrigation calculations for estimated worst-case irrigation demand (largest zone with the farthest reach). Typically, Larry Black has already reviewed this if landscape plans have been prepared, but the applicant must provide the calculations to you for your use. Once you have received a good example of irrigation calculations, keep a set for your reference. In general the calculations will include: Hydraulic grade line Elevation at point of connection (POC) Pressure at POC in pounds per square inch (PSI) Worse case zone (largest, farthest away from valve Total Sprinkler heads listed (with gpm use per head) Include a 10% residual pressure at point of connection 3. In general, all major sloped areas of a subdivision/project are to be irrigated via separate irrigation meters (unless the project is only SFD with no HOA). As long as the project is located within the City recycled water F:BUILDING PLANCHECK CKLST FORMA= Rev. 7/14/00 BUILDING PLANCHECK CHECKLIST 1ST 2ND 3RD service boundary, the City intends on switching these irrigation services/meters to a new recycled water line in the future. E E El 12c. Irrigation Use (where recycled water is available) Recycled water meters are sized the same as the irrigation meter above. If a project fronts a street with recycled water, then they should be connecting to this line to irrigate slopes within the development. For subdivisions, this should have been identified, and implemented on the improvement plans. Installing recycled water meters is a benefit for the applicant since they are exempt from paying the San Diego County Water Capacity fees. However, if they front a street which the recycled water is there, but is not live (sometimes they are charged with potable water until recycled water is available), then the applicant must pay the San Diego Water Capacity Charge. If within three years, the recycled water line is charged with recycled water by CMWD, then the applicant can apply for a refund to the San Diego County Water Authority (SDCWA) for a refund. However, let the applicant know that we cannot guarantee the refund, and they must deal with the SDCWA for this. El El El 13. Additional Comments: F:\BUILOING PLANCHECI( CKLST FORM.doc Rev. 7/14/00 PLANNING DEPARTMENT BUILDING PLAN CHECK REVIEW CHECKLIST A% now Plan Check No. CB Vr 3l'9t' Address I ae7 ,4C'( Planner Greg Fisher Phone (760) 602-462 APN: D)Ipf%J!3) /C ?Ot"?3 'it Type of Pr •ect & Use et Project Density: DU/AC Zoning: General Plan: Facilities Management Zone: CFD (in/out) #_Date of participation: Remaining net dev acres:______ Circle One (For non-residential development: Type of land used created by this permit:________________________________________________ Legend: Item Complete Item Incomplete - Needs your action Environmental Review Required: YES - TYPE DATE OF COMPLETION: Compliance with conditions of approval? If not, state conditions which require action. Conditions of Approval: Discretionary Action Required: YES NO TYPE APPROVAL/RESO. NO. DATE PROJECT NO. OTHER RELATED CASES: Compliance with conditions or approval? If not, state conditions which require action. Conditions of Approval:_____________________________________________________ E 0 Coastal Zone Assessment/Compliance Project site located in Coastal Zone? YES NO CA Coastal Commission Authority? YES_ NOV If California Coastal Commission Authority: Contact them at - 7575 Metropolitan Drive, Suite 103, San Diego CA 92108-4402; (619) 767 Determine status (Coastal Permit Required Coastal Permit Determination Form already If NO, complete Coastal Permit Determination For now Coastal Permit Determination Log #: I 14 Cf Follow-Up Actions: Stamp Building Plans as "Exempt" or "Coastal Permit Required" (at minimum Floor Plans). Complete Coastal Permit Determination Log as needed. Inclusionary Housing Fee required: YES - ; yo (Effective date of lnclusionary Housing Ordinance - 21, 1993.) Data Entry Completed? YES - NO - (A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, Housing Fees, Construct Housing Y/N, Enter Fee, UPDATE!) H:\ADMIN\COUNTER\BldgPlnchkRevChklst Rev 9/01 Site Plan: Provide a fully dimensional site plan drawn to scale. Show: North arrow, property lines, easements, existing and proposed structures, streets, existing street improvements, right- of-way width, dimensional setbacks and existing topographical lines (including all side and rear yard slopes). Provide legal description of property and assessor's parcel number. Policy 44 - Neighborhood Architectyralesign Guidelines Applicability: YES NO)L.. Project complies YES_ _N Zoning: Shown Setbacks: Front: Required 7V Interior Side: Required SW Shown Street Side: Required Shown Rear: Required IIII.2IIIII Shown Top of slope: Required Shown Accessory structure setbak-s '' Front: ,, 4 Reuired Shown Required Shown Interior Sid. Stree*ide: Required Shown r. Required Shown ,/ i Structure separation: Required Shown Lot Coverage: Required Shown Height: Required Shown Parking: Spaces Required Show (breakdown by uses for commercial and industrial projects required) Residential Guest Spaces Required 'ihown Additional Comments OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER óPY L DAT/ Rev 9/01 H:\ADMIN\COUNTER\BldgPlnchkRevChklSt ffl. City of Carlsbad 1635 FaradayAv Carlsbad, CA 92008 " 03-08-2004 Plan Check Revision Permit No: PCR04029 Building Inspection Request Line (760) 602-2725 Job Address: 129 MAPLE AV CBAD Permit Type: PCR Status: ISSUED Parcel No: 2042331600 Lot #: 0 Applied: 02/12/2004 Valuation: $0.00 Construction Type: NEW Entered By: KMT Reference #: C3022865 Plan Approved: 03/08/2004 Issued: 03/08/2004 Project Title: BOWMAN RES-STRUCT. REVISIONS Inspect Area: FOOTINGS, BEAMS & TRUSS ROOF Applicant: Owner: BOWMAN TOD C&DONNA S BOWMAN TOD C&DONNA S 129 MAPLE AVE 129 MAPLE AVE CARLSBAD CA 92008 CARLSBAD CA 92008 Plan Check Revision Fee $120.00 Additional Fees $0.00 Total Fees: $120.00 Total Payments to Date: $0.00 Balance Due: $120.00 I / f11 I I 6977 03/08/04 0002 0? 02 COP .i2000 'S f FINAL APPROVAL Inspector: Date: Clearance: NOTICE: Please take NOTICE that approval of your project includes the"Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any ,,n,, nr,,,,, ,I,, ni,,,n M(TI(' *n +hi ,,r., I,, th .f. ,,f I f,tnn nr,,in, ,I,, CA 0 4'IFo Business Name (at this address) PERMIT APPLICATION CITY OF CARLSBAD BUILDING DEPARTMENT 1635 Faraday Ave., Carlsbad, CA 92008 1. ~tincl.dBldgl'S.itT.'O#'~"sAd FOR OFFICE USE ONLY PLAN CHECK NO.00Z EST. VAL. Plan Ck. Deposit Validated By vim Date Legal Description Lot No. Subdivision Name/Number Unit No. Phase No. Total # of units 2 CONTACT PERSON (If different from applicant) --Elm JOCWL,(. X ame V Address - City State/Zip Telephone # Fax # 31 APPLICANT Contractor Agent for Contractor fl Owner E Agent for Owner ttta A t- Name Address City StateZip Telephone Name Address City State/Zip Telephone # WF CONTRACTOR COMPANY NAME (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law [Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars [$5001). Name Address City State/Zip Telephone # State License # License Class. City Business License # Designer Name Address City State/Zip Telephone State License # 6 WORRS COMPENSATION Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following declarations: I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 0 I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My worker's compensation insurance carrier and policy number are: Insurance Company Policy No. Expiration Date__________________ (THIS SECTION NEED NOT BE COMPLETED IF THE PERMIT IS FOR ONE HUNDRED DOLLARS [$1001 OR LESS) CERTIFICATE OF EXEMPTION: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of California. WARNING: Failure to secure workers' compensation coverage Is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars ($100,000). In addition to the cost of compensation, damages as provided for in Section 3706 of the Labor code, interest and attorney's fees. SIGNATURE DATE A]RAT194. I hereby affirm that I am exempt from the Contractor's License Law for the following reason: I as owner of the property or my employees with wages as their sole compensation will do the work and the structure is not intended or offered for sale (Sec 7044 Business and Professions Code The Contractor's License Law does not apply to an owner of property who builds or improves thereon and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year-of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). I, as owner of the property, am exclusively contracting with licensed Contractors to construct the project (Sec. 7044, Business and Professions Code: The :'Contractor's. License Law does not apply to an owner of property who builds or improves thereon and contracts for such projects with contractor(s) licensed pursuant to the contractor's License Law). 0 I am exempt under Section Business and Professions Code for this reason: I personally plan to provide the major labor and materials for construction of the proposed property improvement. 0 YES ONO - I (have / have not) signed an application for a building permit for the proposed work. - I have contracted with the following person (firm) to provide the proposed construction (include name / address / phone number / contractors license number): - I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name / address / phone number I contractors license number): - I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name I address / phone number / type of, work): PROPERTY OWNER SIGNATURE DATE COMPLETE THIS SECTION FOR NON RfiSIDfNTIAL BUiLDING PERMITS ONLY Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? 0 YES 0 NO Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? 0 YES 0 NO Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? 0 YES 0 NO IF ANY OF THE ANSWERS ARE YES, A-FINAL- CERTIFICATE OF OCCUPANCYMAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. 8 CONSTRUCTION LEf(DjG AtNCY I hereby affirm that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 3097(i) Civil Code). LENDER'S NAME LENDER'S ADDRESS_______________________________________________________ 9. APPLICAIMTCERTIFICAifION - I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building construction. I hereby authorize representatives of the Cit' of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANYWAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. OSHA An OSHA permit is required for excavations over 5 deep and demolition or construction of structures over 3 stories in height EXPIRATION: Every permit issued by ti buildi ifi I und the provisions of this Code shall expire by limitation and become null and void if the building or work authorized by such permit is not commed with 0 ays f m the date of such permit or if the building or work authorized by such permit is suspended or abandoned - at any time after the work is com,d_fi_ d 1 ays Sec n 106.4.4 Uniform Building Code). - APPLICANT'S SIGNATURE / DATE - WHITE: File YELLOW: Applicant PINK: Finance EsGil Corporation In Partnership with Government for Building Safety DATE: February 23, 2004 JURISDICTION: Carlsbad PLAN CHECK NO.: 02-2865 REV (PCR04029) SET: I PROJECT ADDRESS: 129 Maple Avenue PROJECT NAME: Bowman Addition LI APPLICANT JUN 0—FIAN REVIEWER LI FILE LI The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. LI The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. III The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. I The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. LI The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: Mark McKinney 6564 Coneflower Drive Carlsbad CA 92009 Lii Esgil Corporation staff did not advise the applicant that the plan check has been completed. I Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Mark McKinney Telephone #: 760 804 1383 Date contacted: 2/23/1 (by:EP,) Fax #: 760 804 2758 Mail'—Telephone Fax -' In Person LII REMARKS: By: Bryan Zuppiger Esgil Corporation LI GA LI MB [] EJ Li PC 02/13/04 Enclosures: trnsmtl.dot 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576 Carlsbad 02-2865 REV (PCR04029) February 23, 2004 . PLANS Please make all corrections on the original tracings, as requested in the correction list. Submit three sets of plans for commercial/industrial projects (two sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. 2. The person responsible for their preparation must sign all final sheets of plans. (California Business and Professions Code). Final plans, specifications and calculations for designs deviating from conventional wood frame construction shall be signed and sealed by the engineer or architect licensed by the State of California who is responsible for their preparation. Specify expiration date of license. (California Business and Professions Code). The plans are not very legible, please clean up and simplify. . FOUNDATION & FRAMING REQUIREMENTS Some of the shear wall lengths differ from plans to calculations, please adjust. Unable to locate the Simpson Strongwall® 48x8 from the calculations on the plans. Please label and cross-reference all beams on the plans to the calculations, without the labeling and cross-referencing, I can not effectively determine code compliance or consistency between the plans and the calculations. Show the back span on the cantilevered section. The structural consultant shall provide a letter of review for the truss plans and calculations. Carlsbad 02-2865 REV (PCR04029) February 23, 2004 To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Bryan Zuppiger at Esgil Corporation. Thank you. Carlsbad 02-2865 REV (PCR04029) February 23, 2004 VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad PLAN CHECK NO.: 02-2865 REV (PCR04029) PREPARED BY: Bryan Zuppiger DATE: February 23, 2004 BUILDING ADDRESS: 129 Maple Avenue BUILDING OCCUPANCY: R3 TYPE OF CONSTRUCTION: VN BUILDING PORTION AREA (Sq. Ft.) Valuation Multiplier Reg. Mod. VALUE ($) Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code ICb IBY Ordinance Plan Check Fee by Ordinance Type of Review: LII Complete Review LI Structural Only F-1 Other F-1 RepetitiveFee pjRepeats Hourly ii Hour " Esgil Plan Review Fee * Based on hourly rate Comments: I I I $120.001 I $96.00I macvalue.doc