Loading...
HomeMy WebLinkAbout1301 LAUREL TREE LN; ; CB983819; PermitCity of Carlsbad 04/13/1999 Building Permit Permit No:CB983819 Building Inspection Request Line (760) 438-3101 Job Address: 1301 LAUREL TREE LN CBAD Permit Type: APT Sub Type: Parcel No: 2120405900 Lot #: Valuation: $471,661.00 Construction Type: Occupancy Group: Reference #: BLDG 23,UNITS 164-166,264-266 VN SDP95-01 Status: ISSUED Applied: 05/20/1998 Entered By: RMA Appr/lssued: 04/13/1999 Inspect Ar11.a: Project Title: 6278 SF+1372 SF PORC,BALC+PATIO-LAUREL T C.,e,{# tI I ~-t./'--f 8541 04/13/99 0001 01 Applicant: CUATROCORP 1770 4TH AV 92101 619 687-7380 Owner: C-PRMT LAUREL TREE INVESTMENT CO 4'i+'½' Total Fees: i i>o + $45,227.38. ;Cqtal,Payments To Date;' $0.od 0 lll*ce Due: $45,227.38 Description * ELECTRICAL TOTAL * MECHANICAL TOTAL * PLUMBING TOTAL Building Permit 0 0 ; -' , , , , 1, '¾ !'"y' ' . Fee 110.00 134.00 364.00 1,923.00 02 622i',38 Enter #Units & Code-Pot« Enter Y to Autocalc P. or manually enter Bridg or manually enter T.I.F Payoff Fee for CFD 5 4.ll.l)_~ I -~ 8 4 . 0 0 f'i.111 Plan Check Strong Motion Fee Inspector: FINAL APPROVAL ::-,. ,,2. -~ , =---. Date: Z '"'-c:.,_J C. ~,360.cro· · 1,944.00 16,111.38 1,250.00 47.00 NOTICE: Please take NOTICE that approval of your project includes the •imposition" of fees, dedicatio , referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposiM?b , follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City nag er for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition, You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any fees/exactions of which ou have eviousl been iven a NOTICE similar to this or as to which the statute of limitations has reviousl otherwise ex ired. CITY OF CARLSBAD 2075 Las Palmas Dr., Carlsbad, CA 92009 (760) 438-1161 .. .,, ... UNSCHEDULED BUILDING INSPECTION DATE INSPECTOR _ __,_/ZQ __ _ PERMIT# 9' tr 3~/ 9 . PLAN CHECK# ____ _ 1-a u,J / .,,-e_ e_ ,L,.-L., CODE DESCRIPTION ACT COMMENTS City of Carlsbad Bldg Inspection Request For: 4/27/2000 Permit# CB983819 Inspector Assignment: RB --- Title: BLDG 23,UNITS 164-166,264-266 Description: 6278 SF+1372 SF PORC,BALC+PATIO-LAUREL T Type:APT Sub Type: Job Address: Suite: 1301 LAUREL TREE LN Lot Location: APPLICANT CUATRO CORP Owner: Remarks: Total Time: Phone: 7609186733 Inspector: ----- Requested By: BRETT Entered By: CHRISTINE CD Description Act Comments 19 Final Structural ..JY:!. ______________ _ 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Associated PCRs lnsi;iection Histo[Y Date Description Act lnsp Comments 4/21/2000 39 Final Electrical AP RB EMR 4/19/2000 31 Underground/Conduit•Wiring NS DA 2/29/2000 23 Gas/Test/Repairs AP RB 2/24/2000 17 Interior Lath/Drywall NS RB TOO MUCH NR 2/23/2000 84 Rough Combo AP RB COMPLETED 2/16/2000 17 Interior Lath/Drywall NS RB TOO MUCH NR 2/10/2000 17 Interior Lath/Drywall NR RB HAVE BOXES FLUSH W/ DRYWALL 2/9/2000 17 Interior Lath/Drywall NR RB ND BOXES FLUSH BEFORE INSP. 2/8/2000 11 Ftg/Foundation/Piers WC RB 2/8/2000 17 Interior Lath/Drywall PA RB OK @ 1 ST LA YER 2HR AREA 2/4/2000 13 Shear Pane1s/HD's NS RB 2/2/2000 16 Insulation CA RB 2/2/2000 18 Exterior Lath/Drywall AP RB 1/31/2000 84 Rough Combo CA RB DONE 1/28/2000 84 Rough Combo AP RB 1/26/2000 14 Frame/Steel/BoltingM/elding co RB City of Carlsbad Inspection Request For: 10/19/99 Permit# CB983819 Inspector Assignment: RB --- Title: BLDG 23,UNITS 164-166,264-266 Description: 6278 SF+1372 SF PORC,BALC+PATIO-LAUREL T Type:APT Sub Type: Job Address: Suite: 1301 LAUREL TREE LN Lot Location: APPLICANT CUATRO CORP Owner: Remarks: Total Time: Phone: 7609186733 Inspector: Requested By: STEVE Entered By: CHRISTINE CD Description Act Comments 15 Roof/Reroof c& _______ _ Inspection History Date Description Act lnsp Comments 10/18/99 15 Roof/Reroof CA RB 10/13/99 15 Roof/Reroof CA RB 10/12/99 15 Roof/Reroof NR RB 10/12/99 24 Rough/Topout WC RB 10/7/99 15 Roof/Reroof NR RB TOO MANY CO ON 1ST ROOF INSP 10/6/99 15 Roof/Reroof NS RB 10/4/99 15 Roof/Reroof CA RB BY STEVE 8/16/99 22 Sewer/Water Service AP DH 7/19/99 11 Ftg/Foundation/Piers AP DH 7/15/99 11 Ftg/Foundation/Piers NR DH NO SPECIAL INSP 6/24/99 21 Underground/Under Floor AP DH 6/21/99 21 Underground/Under Floor co DH PLANS CALL FOR CAST IRON C/O : .oct-14-99 10:0GA GOUVIS ENG.-Saead Bakam 17147521115 GO uv1·s ENGINE ER/NG • C A L I F 0 R N T A E•MAIL TO• S(.IPJIONJrp/C;u(JJtr.;f;RtJf/Prt>M • SALES@GOVVJSCilf(Jf/PCOM CAU,O,IIIA October 13, 1999 Rodriquez + Simon 2359 Fourth Ave .• Suite zoo San Diego, CA 92101 Attn: Cartos Rodriquez Re: Laut91 T""' AparlmfJnts FoRow-up 10 meeting Bl job site G.E.C. Job No. 20507 • Pur3uant ro Ille request ol Cuatro Corporation regarding the above captionea project, we su/Jm,t the followinv: ~ The detail 14'SD.2ia not applicable at the right end of/he roof framing plan on sheet S1.3. It may Ce omilted. A patfiaJ oopy ol lhe plan is attached for ,ele,vnce. 0' The typical detail for intetiot non-oearlng walls under roof misses is 3/SD.2 and not 2/SD.2 as · ia called-out on page S-1. 3. See attachsd parlfal oopy of Ille plan. It is slruc1urally acct1ptal»e to ffJ(Jlace 1M 4x8 bea= at tl)e «fge of the rear d9Ck with a 4x12 continuous oeam. See altach«f pat1ia/ copy of sheat S-1.2. · _,,, ► A J" wide x 16" tall openin& has been c:ut lhmlKh • shear panel in order lo install die bolts from the HD8A iD the iDierscctiD& wall. We find the cut a,xq,table 1111d the ooly recommendation is to add shear panel bowulllty oailinl! along the stud which ,s closest to th, opening. ► Typical wtlet8 detail 2/SD.2 is applicable, the 2x6 brace may be waived wt,9n the roof trusses ~ so shallow that the brace cannot b9 installed as shown in the de/a,7 Note. Ptease ver,ty Ille aOove w~h tne bu1ld,ng deportment prior to construct,on. CRS.·Cll Alt9chments (3) #1013998 ·, ··-~"- P.01 GOUV/SENG/NffRIN(: <:ROI/I' of· COMP.IN/ES WITH OFFICES IN WF.n-STTF WWW GOU~rtCIIO(IP roM '"(1(1 IAurt1., D•irt. s,,ut. A • NEwl'O•TRT.,t("lr, r .. ,H.IR)ll/111.A ?2660 • (IJ4'J) 751-161! 11 JO F,.;4~rT.utf/fll1:.l CumJN, ~Ullb 51 • P,U,JJ SPtuNGS. l."°.4UFOIJJIA 91:62 • (i60) J2J.J09() U65M01E110t1,,·1J•1r,._s,,111:100 • S..ND1roo.C.A11RJ11111ufJ2121 • r~J?J62J-9941 FIF./.n OFFt('E:Ji Lu r,,.;,,s (70J) J97-200S • FU (7111) 597-1/YIIS • F,.-, (HO) 714-017 J • FAX ('l<YJ 7l2-H1 I • FAX (760) J2S-186J • FAX (6/9) 621-0276 • F,tX /PW 619-4946 ·""'°ii Oct-14-99 10:06A GOUVIS ENG.-SaaGd Bakam 17147621116 • ' . ! ·====::·.:.:.:.::..::.:::.::.:---==:=:= ,: ; : l: ,tQlai. .. : '. : . " ; ' i: . ; "'°"' ..... ~~ 'IVIKl:D~--.... ~-~Wi:15 ~*--~!!:r--:·~=n I HAN.IIM =~---' I I @"'"' 1...s;:117 (Q-1---·'\"1 sl.......f-S-l-3 l)Mtr P.02 ~-o I r, L£ Re ----_, ---,_ -· -_, ""' R -"""'· ' A ( ' ... . ' 4'-<?' I .· ,,,. ,· I trJ , --- IA I I I I I . , -"l.-~ =~-, P.03 -----·-· . •' •' ----··-. lt'-<7 76 I , . I , .• ' . r' -----;,· • • Oct-14-99 10:06A GOUVIS ENG.-Saaad Bakam 17147521115 P.04 • .. : . . . -- ~1-o.t'b7 10~1~_..,.., Sha.c.:t-S~l-"2.- ;!iL~i...-r--,.,..++--~Cl: Gaff. I ::V•'xll "1/tJ' L VL IU'I .JOl5T ~ City Of Carlsbad 113 Final Building Inspection Dept: Building Engineering Planning CMWD Stlit~ Plan Check#: Permit#: Project Name: Address: Contact Person: Sewer Dist: CB983819 BLDG 23,UNITS 164-166,264-266 6278 SF+1372 SF PORC,BALC+PATIO-LAUREL T 1301 LAUREL TREE LN Phone: CA Water Dist: CA Lot: Date: 4/25/2000 Permit Type: APT Sub Type: ············· ............................................................................................................................................ . Inspected Date 0,/41 By: -J'lt.,!l. Inspected: Approved: ~ Disapproved: __ Inspected Date By: Inspected: Approved: Disapproved: __ Inspected Date By: Inspected: Approved: Disapproved: __ Comments: -------------------------------- ~ CilY Of Carlsbad 113 Final Building Inspection Dept: Building Engineering Planning ~ Lite Plan Check#: Permit#: Project Name: Address: Contact Person: Sewer Dist: lnspectea.,_____,, CB983819 BLDG 23,UNITS 164-166,264-266 6278 SF+1372 SF PORC,BALC+PATIO-LAUREL T 1301 LAUREL TREE LN Phone: Water Dist: CA Lot: Fire Date: 4/25/2000 Permit Type: APT Sub Type: By: ___________ Inspected: ______ Approved: ___ Disapproved: __ Inspected Date By: Inspected: ______ Approved: ___ Disapproved: __ .......................................................................................................................................................... , ~ Citv DI Carlsbad B3 Final Bui~ing Inspection APR Dept: Buildin Plan Check#: Planning CMWD St Lite Fire Date: 4/25/2000 Permit#: Project Name: Address: Contact Person: CB983819 BLDG 23,UNITS 164-166,264-266 6278 SF+1372 SF PORC,BALC+PATIO-LAUREL T 1301 LAUREL TREE LN Phone: Lot: Permitlype: APT Sub Type: (i_ifii_; Sewer Dist: CA ·;:.:;·A Water Dist: CA ·i;;;~· tt··· -~:;:::::4(7~7,;· ··::::~:·· ~~--~-=::::::::· ..... Inspected Date By: ___________ Inspected: ______ Approved: ___ Disapproved: __ Inspected Date By: ___________ Inspected: ______ Approved: ___ Disapproved: __ .......................................................................................................................................................... , Comments:--------------------------------