HomeMy WebLinkAbout1301 LAUREL TREE LN; ; CB983819; PermitCity of Carlsbad
04/13/1999 Building Permit Permit No:CB983819
Building Inspection Request Line (760) 438-3101
Job Address: 1301 LAUREL TREE LN CBAD
Permit Type: APT Sub Type:
Parcel No: 2120405900 Lot #:
Valuation: $471,661.00 Construction Type:
Occupancy Group: Reference #:
BLDG 23,UNITS 164-166,264-266
VN
SDP95-01
Status: ISSUED
Applied: 05/20/1998
Entered By: RMA
Appr/lssued: 04/13/1999
Inspect Ar11.a: Project Title:
6278 SF+1372 SF PORC,BALC+PATIO-LAUREL T C.,e,{# tI I ~-t./'--f
8541 04/13/99 0001 01
Applicant:
CUATROCORP
1770 4TH AV 92101
619 687-7380
Owner: C-PRMT
LAUREL TREE INVESTMENT CO
4'i+'½'
Total Fees:
i i>o +
$45,227.38. ;Cqtal,Payments To Date;' $0.od 0 lll*ce Due: $45,227.38
Description
* ELECTRICAL TOTAL
* MECHANICAL TOTAL
* PLUMBING TOTAL
Building Permit
0 0 ;
-' , , , , 1, '¾ !'"y' ' .
Fee
110.00
134.00
364.00
1,923.00
02
622i',38
Enter #Units & Code-Pot«
Enter Y to Autocalc P.
or manually enter Bridg
or manually enter T.I.F
Payoff Fee for CFD
5 4.ll.l)_~ I
-~ 8 4 . 0 0 f'i.111
Plan Check
Strong Motion Fee
Inspector:
FINAL APPROVAL
::-,. ,,2. -~ , =---. Date: Z '"'-c:.,_J
C. ~,360.cro· ·
1,944.00
16,111.38
1,250.00
47.00
NOTICE: Please take NOTICE that approval of your project includes the •imposition" of fees, dedicatio ,
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposiM?b ,
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City nag er for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition,
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
fees/exactions of which ou have eviousl been iven a NOTICE similar to this or as to which the statute of limitations has reviousl otherwise ex ired.
CITY OF CARLSBAD
2075 Las Palmas Dr., Carlsbad, CA 92009 (760) 438-1161
.. .,, ...
UNSCHEDULED BUILDING INSPECTION
DATE INSPECTOR _ __,_/ZQ __ _
PERMIT# 9' tr 3~/ 9 . PLAN CHECK# ____ _
1-a u,J / .,,-e_ e_ ,L,.-L.,
CODE DESCRIPTION ACT COMMENTS
City of Carlsbad Bldg Inspection Request
For: 4/27/2000
Permit# CB983819 Inspector Assignment: RB ---
Title: BLDG 23,UNITS 164-166,264-266
Description: 6278 SF+1372 SF PORC,BALC+PATIO-LAUREL T
Type:APT Sub Type:
Job Address:
Suite:
1301 LAUREL TREE LN
Lot
Location:
APPLICANT CUATRO CORP
Owner:
Remarks:
Total Time:
Phone: 7609186733
Inspector: -----
Requested By: BRETT
Entered By: CHRISTINE
CD Description Act Comments
19 Final Structural ..JY:!. ______________ _
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Associated PCRs
lnsi;iection Histo[Y
Date Description Act lnsp Comments
4/21/2000 39 Final Electrical AP RB EMR
4/19/2000 31 Underground/Conduit•Wiring NS DA
2/29/2000 23 Gas/Test/Repairs AP RB
2/24/2000 17 Interior Lath/Drywall NS RB TOO MUCH NR
2/23/2000 84 Rough Combo AP RB COMPLETED
2/16/2000 17 Interior Lath/Drywall NS RB TOO MUCH NR
2/10/2000 17 Interior Lath/Drywall NR RB HAVE BOXES FLUSH W/ DRYWALL
2/9/2000 17 Interior Lath/Drywall NR RB ND BOXES FLUSH BEFORE INSP.
2/8/2000 11 Ftg/Foundation/Piers WC RB
2/8/2000 17 Interior Lath/Drywall PA RB OK @ 1 ST LA YER 2HR AREA
2/4/2000 13 Shear Pane1s/HD's NS RB
2/2/2000 16 Insulation CA RB
2/2/2000 18 Exterior Lath/Drywall AP RB
1/31/2000 84 Rough Combo CA RB DONE
1/28/2000 84 Rough Combo AP RB
1/26/2000 14 Frame/Steel/BoltingM/elding co RB
City of Carlsbad Inspection Request
For: 10/19/99
Permit# CB983819 Inspector Assignment: RB ---
Title: BLDG 23,UNITS 164-166,264-266
Description: 6278 SF+1372 SF PORC,BALC+PATIO-LAUREL T
Type:APT Sub Type:
Job Address:
Suite:
1301 LAUREL TREE LN
Lot
Location:
APPLICANT CUATRO CORP
Owner:
Remarks:
Total Time:
Phone: 7609186733
Inspector:
Requested By: STEVE
Entered By: CHRISTINE
CD Description Act Comments
15 Roof/Reroof c& _______ _
Inspection History
Date Description Act lnsp Comments
10/18/99 15 Roof/Reroof CA RB
10/13/99 15 Roof/Reroof CA RB
10/12/99 15 Roof/Reroof NR RB
10/12/99 24 Rough/Topout WC RB
10/7/99 15 Roof/Reroof NR RB TOO MANY CO ON 1ST ROOF INSP
10/6/99 15 Roof/Reroof NS RB
10/4/99 15 Roof/Reroof CA RB BY STEVE
8/16/99 22 Sewer/Water Service AP DH
7/19/99 11 Ftg/Foundation/Piers AP DH
7/15/99 11 Ftg/Foundation/Piers NR DH NO SPECIAL INSP
6/24/99 21 Underground/Under Floor AP DH
6/21/99 21 Underground/Under Floor co DH PLANS CALL FOR CAST IRON C/O
:
.oct-14-99 10:0GA GOUVIS ENG.-Saead Bakam 17147521115
GO uv1·s ENGINE ER/NG
• C A L I F 0 R N T A
E•MAIL TO• S(.IPJIONJrp/C;u(JJtr.;f;RtJf/Prt>M • SALES@GOVVJSCilf(Jf/PCOM
CAU,O,IIIA
October 13, 1999
Rodriquez + Simon
2359 Fourth Ave .• Suite zoo
San Diego, CA 92101
Attn: Cartos Rodriquez
Re: Laut91 T""' AparlmfJnts
FoRow-up 10 meeting Bl job site
G.E.C. Job No. 20507
•
Pur3uant ro Ille request ol Cuatro Corporation regarding the above captionea project, we su/Jm,t
the followinv:
~ The detail 14'SD.2ia not applicable at the right end of/he roof framing plan on sheet S1.3. It
may Ce omilted. A patfiaJ oopy ol lhe plan is attached for ,ele,vnce.
0' The typical detail for intetiot non-oearlng walls under roof misses is 3/SD.2 and not 2/SD.2 as
· ia called-out on page S-1. 3. See attachsd parlfal oopy of Ille plan.
It is slruc1urally acct1ptal»e to ffJ(Jlace 1M 4x8 bea= at tl)e «fge of the rear d9Ck with a 4x12
continuous oeam. See altach«f pat1ia/ copy of sheat S-1.2. · _,,,
► A J" wide x 16" tall openin& has been c:ut lhmlKh • shear panel in order lo install die bolts from the
HD8A iD the iDierscctiD& wall. We find the cut a,xq,table 1111d the ooly recommendation is to add
shear panel bowulllty oailinl! along the stud which ,s closest to th, opening.
► Typical wtlet8 detail 2/SD.2 is applicable, the 2x6 brace may be waived wt,9n the roof trusses
~ so shallow that the brace cannot b9 installed as shown in the de/a,7
Note. Ptease ver,ty Ille aOove w~h tne bu1ld,ng deportment prior to construct,on.
CRS.·Cll
Alt9chments (3)
#1013998 ·, ··-~"-
P.01
GOUV/SENG/NffRIN(: <:ROI/I' of· COMP.IN/ES WITH OFFICES IN WF.n-STTF WWW GOU~rtCIIO(IP roM
'"(1(1 IAurt1., D•irt. s,,ut. A • NEwl'O•TRT.,t("lr, r .. ,H.IR)ll/111.A ?2660 • (IJ4'J) 751-161!
11 JO F,.;4~rT.utf/fll1:.l CumJN, ~Ullb 51 • P,U,JJ SPtuNGS. l."°.4UFOIJJIA 91:62 • (i60) J2J.J09()
U65M01E110t1,,·1J•1r,._s,,111:100 • S..ND1roo.C.A11RJ11111ufJ2121 • r~J?J62J-9941
FIF./.n OFFt('E:Ji Lu r,,.;,,s (70J) J97-200S • FU (7111) 597-1/YIIS • F,.-, (HO) 714-017 J
• FAX ('l<YJ 7l2-H1 I
• FAX (760) J2S-186J
• FAX (6/9) 621-0276
• F,tX /PW 619-4946
·""'°ii Oct-14-99 10:06A GOUVIS ENG.-SaaGd Bakam 17147621116
• ' .
! ·====::·.:.:.:.::..::.:::.::.:---==:=:= ,:
; : l: ,tQlai. .. : '. : . " ; ' i:
. ; "'°"' ..... ~~ 'IVIKl:D~--.... ~-~Wi:15 ~*--~!!:r--:·~=n
I
HAN.IIM =~---' I
I
@"'"' 1...s;:117
(Q-1---·'\"1
sl.......f-S-l-3
l)Mtr
P.02 ~-o I r, L£
Re ----_, ---,_ -· -_,
""'
R -"""'· ' A (
'
... . '
4'-<?' I
.· ,,,. ,·
I
trJ
, ---
IA
I
I
I
I
I
. ,
-"l.-~ =~-,
P.03
-----·-· .
•'
•' ----··-.
lt'-<7
76
I , . I , .•
'
. r' -----;,·
•
• Oct-14-99 10:06A GOUVIS ENG.-Saaad Bakam 17147521115 P.04
• .. : . . .
--
~1-o.t'b7
10~1~_..,..,
Sha.c.:t-S~l-"2.-
;!iL~i...-r--,.,..++--~Cl: Gaff. I ::V•'xll "1/tJ'
L VL IU'I .JOl5T
~ City Of Carlsbad 113 Final Building Inspection
Dept: Building Engineering Planning CMWD Stlit~
Plan Check#:
Permit#:
Project Name:
Address:
Contact Person:
Sewer Dist:
CB983819
BLDG 23,UNITS 164-166,264-266
6278 SF+1372 SF PORC,BALC+PATIO-LAUREL T
1301 LAUREL TREE LN
Phone:
CA Water Dist: CA
Lot:
Date: 4/25/2000
Permit Type: APT
Sub Type:
············· ............................................................................................................................................ .
Inspected Date 0,/41 By: -J'lt.,!l. Inspected: Approved: ~ Disapproved: __
Inspected Date
By: Inspected: Approved: Disapproved: __
Inspected Date
By: Inspected: Approved: Disapproved: __
Comments: --------------------------------
~ CilY Of Carlsbad 113 Final Building Inspection
Dept: Building Engineering Planning ~ Lite
Plan Check#:
Permit#:
Project Name:
Address:
Contact Person:
Sewer Dist:
lnspectea.,_____,,
CB983819
BLDG 23,UNITS 164-166,264-266
6278 SF+1372 SF PORC,BALC+PATIO-LAUREL T
1301 LAUREL TREE LN
Phone:
Water Dist: CA
Lot:
Fire
Date: 4/25/2000
Permit Type: APT
Sub Type:
By: ___________ Inspected: ______ Approved: ___ Disapproved: __
Inspected Date
By: Inspected: ______ Approved: ___ Disapproved: __ .......................................................................................................................................................... ,
~ Citv DI Carlsbad B3 Final Bui~ing Inspection APR
Dept: Buildin
Plan Check#:
Planning CMWD St Lite Fire
Date: 4/25/2000
Permit#:
Project Name:
Address:
Contact Person:
CB983819
BLDG 23,UNITS 164-166,264-266
6278 SF+1372 SF PORC,BALC+PATIO-LAUREL T
1301 LAUREL TREE LN
Phone:
Lot:
Permitlype: APT
Sub Type:
(i_ifii_;
Sewer Dist: CA ·;:.:;·A Water Dist: CA ·i;;;~· tt··· -~:;:::::4(7~7,;· ··::::~:·· ~~--~-=::::::::· .....
Inspected Date
By: ___________ Inspected: ______ Approved: ___ Disapproved: __
Inspected Date
By: ___________ Inspected: ______ Approved: ___ Disapproved: __ .......................................................................................................................................................... ,
Comments:--------------------------------