HomeMy WebLinkAbout1329 LAUREL TREE LN; ; CB983803; Permit04/13/1999
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
Project Title:
Applicant:
CUATROCORP
City of Carlsbad
Building Permit Permit No:CB983803
Building Inspection Request Line (760) 438-3101
1329 LAUREL TREE LN CBAD
APT Sub Type:
2120405900 Lot#:
$471,661.00 Construction Type:
Reference #:
BLDG 9,UNITS 125-127,225-227
VN
SDP95-01
6278 SF+1372 SF PORC,BALC+PATIO-LAUREL T
Owner:
Status:
Applied:
Entered By:
Appr/lssued:
Inspect Area:
ISSUED
05/20/1998
RMA
04/13/1999
(!f,q8 I S'+Lf
8541 04/13/99 0001 01
LAUREL TREE INVESTMENT CO C-l'RHT
02
· .5227,30
1770 4TH AV 92101
619 687-7380
¾,(o<I-J. 38
Total Fees: $45,227.38 -
i 0 0
@ j ,,, 11' /I" 'y ',
'4
T Dial P7ayments To Date:
'
$0,00 4 ,Elalnce Due: $45,227.38 + 4 \ 4
Description Fee
--------------------.,. -~ -... ~ -, --------------... ----------.... ""' ---"I<.,., __ ..,,~ " ---------------
* ELECTRICAL TOTAL
* MECHANICAL TOTAL
* PLUMBING TOTAL
Building Permit
Enter #Units & Code-Poe~
Enter Y to Autocalc P.
or manually enter Bridg
or manually enter T.I.F
Payoff Fee for CFD
Plan Check
Strong Motion Fee
Inspector: I<. (3 I
/' i ' j, \ '$
~,, 1 t'
FINAL APPROVAL
6,.. 3o ~n:;; Date: Clearance:
110.00
134.00
364.00
1,923.00
5,400.00 ,
I a, sa4. oo b>I-~
9,360.00
1,944.00
16,111.38
1,250.00
47.00
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required infonnation with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTlitlED that your right to protest the spec~ied fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
fees/exactions of which vou have oreviouslv been aiven a NOTICE similar to this or as to which the statute of limitations has oreviouslv otheiwise exoired.
CITY OF CARLSBAD
2075 Las Palmas Dr., Carlsbad, CA 92009 (760) 438-1161
\
City of Carlsbad Bldg Inspection Request
For: 6/29/2000
Permit# CB983803 Inspector Assignment: RB ---
Title: BLDG 9,UNITS 125-127,225-227
Description: 6278 SF+1372 SF PORC,BALC+PATIO-LAUREL T
Type:APT Sub Type:
Job Address:
Suite:
1329 LAUREL TREE LN
Lot
Location:
APPLICANT CUATRO CORP
Owner:
Remarks:
Total Time:
CD Description Act Comments
Phone: 7609186733
Inspector: fl_(>
'
Requested By: TOM
Entered By: ROBIN
19 Final Structural tre_
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Associated PCRs
lnsriection Histoey
Date Description Act lnsp Comments
6/26/2000 89 Final Combo co RB
6/23/2000 89 Final Combo CA RB
6/22/2000 89 Final Combo co RB
5/17/2000 89 Final Combo CA RB ROUTE FINAL
5/11/2000 39 Final Electrical CA RB DONE
5/10/2000 39 Final Electrical AP RB EMR
5/9/2000 39 Final Electrical NS RB
5/8/2000 39 Final Electrical co RB
5/5/2000 39 Final Electrical co RB
5/3/2000 39 Final Electrical NS RB
3/24/2000 23 Gas/Test/Repairs AP RB
2/24/2000 17 Interior Lath/Drywall NS RB TOO MUCH NR
2/23/2000 84 Rough Combo AP RB COMPLETED
2/15/2000 17 Interior Lath/Drywall PA RB OK EXCEPT 2ND LA YER
2/15/2000 18 Exterior Lath/Drywall AP RB
2/10/2000 18 Exterior Lath/Drywall co RB & WALK AFTER DRYWALL INSP
► , .
City of Carlsbad Bldg Inspection Request
For: 5/10/2000
Permit# CB983803 Inspector Assignment: RB ----
Title: BLDG 9,UNITS 125-127,225-227
Description: 6278 SF+1372 SF PORC,BALC+PATIO-LAUREL T
Sub Type: Type:APT
Phone: 7609186733
Job Address:
Suite:
1329 LAUREL TREE LN
Lot
Location:
APPLICANT CUATRO CORP
Owner:
Remarks:
Total Time:
CD Description
39 Final Electrical
Associated PCRs
lnsgection Histo!)'.
Date Description
5/8/2000 39 Final Electrical
5/5/2000 39 Final Electrical
5/3/2000 39 Final Electrical
3/24/2000 23 Gas!TesVRepairs
2/24/2000 17 Interior Lath/Drywall
2/23/2000 84 Rough Combo
2/15/2000 17 Interior Lath/Drywall
2/15/2000 18 Exterior Lath/Drywall
2/10/2000 18 Exterior Lath/Drywall
2/8/2000 16 Insulation
2/8/2000 18 Exterior Lath/Drywall
2/4/2000 84 Rough Combo
2/2/2000 84 Rough Combo
2/1/2000 84 Rough Combo
1/28/2000 34 Rough Electric
1/28/2000 44 Rough/Ducts/Dampers
1/27/2000 34 Rough Electric
1/26/2000 14 Frame/Steel/Bolting/Welding
1/26/2000 44 Rough/Ducts/Dampers
1/25/2000 14 Frame/Steel/Bolting/Welding
1/25/2000 34 Rough Electric
1/25/2000 44 Rough/Ducts/Dampers
Inspector:
Requested By: TOM
Entered By: ROBIN
Act Comments
/J (0 /; /V( JZ-
Act lnsp Comments
co RB
co RB
NS RB
AP RB
NS RB TOO MUCH NR
AP RB COMPLETED
PA RB OK EXCEPT 2ND LAYER
AP RB
co RB & WALK AFTER DRYWALL INSP
NS RB
NS RB
AP RB
co RB
NS RB
NS RB
NS RB
NS RB
CA RB
CA RB
NR RB
co RB
co RB
' City of Carlsbad Inspection Request
For: 11/30/1999
Permit# CB983803 Inspector Assignment: RB ---
Title: BLDG 9,UNITS 125-127,225-227
Description: 6278 SF+1372 SF PORC,BALC+PATIO-LAUREL T
Type:APT Sub Type:
Job Address: 1329 LAUREL TREE LN
Suite: Lot
Location:
APPLICANT CUATRO CORP
Owner:
Remarks:
Total Time:
CD Description Act Comments
Phone: 7609189094
Inspector: _-f;;;[3
Requested By: BRAD
Entered By: BARBARA
14 Frame/Steel/Bolting/Welding ~--------------------
-C;,_ ____________ 11f/{_'/<-..'g_ __ l3?'J,Mf'E_-~.~"""!11»""""1lE~C~&~. '.!•'.:ii~i~-•~-t;:~:!.;sL-llJ:ff9$'2~;~/10
Associated PCRs
lnsgection Histo(¥
Date Description Act lnsp Comments
11/22/1999 13 Shear Panels/HD's NR RB
11/22/1999 15 Roof/Reroof CA RB DONE
11/22/1999 84 Rough Combo we RB
11/19/1999 15 Roof/Reroof AP RB
11/9/1999 15 Roof/Reroof CA RB BY GLEN
11/8/1999 15 Roof/Reroof co RB
11/4/1999 15 Roof/Reroof co RB STOPPED -REWALK EVERYTHING
8/5/1999 11 Ftg/Foundation/Piers AP DH
8/4/1999 11 Ftg/Foundation/Piers AP DH AP ON 8/3
7/30/1999 11 Ftg/Foundation/Piers co DH INT FTGS NOT 18 INCHES
7/28/1999 11 Ftg/Foundation/Piers NR DH
7/16/1999 21 Underground/Under Floor AP DH
7/16/1999 22 Sewer/Water Service AP DH
11/18/999 15 Roof/Reroof NS RB
Permit#:
Project Name:
Address:
Contact Person:
Sewer Dist:
CB983803
BLDG 9,UNITS 125-127,225-227
6278 SF+1372 SF PORC,BALC+PATIO-LAUREL T
1329 LAUREL TREE LN
Phone:
CA Water Dist: CA
Lot:
5/17/2000
Permit Type: APT
Sub Type:
··························································································································································
Inspected Date ~hcloo By: '1t~ <:,~~\'\'j;\L,( Inspected: Approved: Xi Disapproved: __
Inspected Date
By: Inspected: Approved: Disapproved: __
Inspected Date
By: Inspected: Approved: Disapproved: __
···························································································································································
Comments: _____________________________ _
~ CltY DI Carlsbad 1J3 Final Building Inspection
StlitG
Date:
Dept: Building Engineering Planning CMWD
Plan Check #: 5/17/2000
Permit#:
Project Name:
Address:
Contact Person:
Sewer Dist
CB983803
BLDG 9,UNITS 125-127,225-227
6278 SF+1372 SF PORC,BALC+PATIO-LAUREL T
1329 LAUREL TREE LN
Phone:
CA Water Dist: CA
Lot:
Permit Type: APT
Sub Type:
··························································································································································
Inspected~ Date bl:J;/40 ~ D . a, Inspected: Approved: 1sapproved: By: ' t1 ' Inspected Date
By: Inspected: Approved: Disapproved: __
Inspected Date
By: Inspected: Approved: Disapproved: __
···························································································································································
Comments: _______________________________ _