Loading...
HomeMy WebLinkAbout1329 LAUREL TREE LN; ; CB983803; Permit04/13/1999 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: Project Title: Applicant: CUATROCORP City of Carlsbad Building Permit Permit No:CB983803 Building Inspection Request Line (760) 438-3101 1329 LAUREL TREE LN CBAD APT Sub Type: 2120405900 Lot#: $471,661.00 Construction Type: Reference #: BLDG 9,UNITS 125-127,225-227 VN SDP95-01 6278 SF+1372 SF PORC,BALC+PATIO-LAUREL T Owner: Status: Applied: Entered By: Appr/lssued: Inspect Area: ISSUED 05/20/1998 RMA 04/13/1999 (!f,q8 I S'+Lf 8541 04/13/99 0001 01 LAUREL TREE INVESTMENT CO C-l'RHT 02 · .5227,30 1770 4TH AV 92101 619 687-7380 ¾,(o<I-J. 38 Total Fees: $45,227.38 - i 0 0 @ j ,,, 11' /I" 'y ', '4 T Dial P7ayments To Date: ' $0,00 4 ,Elalnce Due: $45,227.38 + 4 \ 4 Description Fee --------------------.,. -~ -... ~ -, --------------... ----------.... ""' ---"I<.,., __ ..,,~ " --------------- * ELECTRICAL TOTAL * MECHANICAL TOTAL * PLUMBING TOTAL Building Permit Enter #Units & Code-Poe~ Enter Y to Autocalc P. or manually enter Bridg or manually enter T.I.F Payoff Fee for CFD Plan Check Strong Motion Fee Inspector: I<. (3 I /' i ' j, \ '$ ~,, 1 t' FINAL APPROVAL 6,.. 3o ~n:;; Date: Clearance: 110.00 134.00 364.00 1,923.00 5,400.00 , I a, sa4. oo b>I-~ 9,360.00 1,944.00 16,111.38 1,250.00 47.00 NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required infonnation with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTlitlED that your right to protest the spec~ied fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any fees/exactions of which vou have oreviouslv been aiven a NOTICE similar to this or as to which the statute of limitations has oreviouslv otheiwise exoired. CITY OF CARLSBAD 2075 Las Palmas Dr., Carlsbad, CA 92009 (760) 438-1161 \ City of Carlsbad Bldg Inspection Request For: 6/29/2000 Permit# CB983803 Inspector Assignment: RB --- Title: BLDG 9,UNITS 125-127,225-227 Description: 6278 SF+1372 SF PORC,BALC+PATIO-LAUREL T Type:APT Sub Type: Job Address: Suite: 1329 LAUREL TREE LN Lot Location: APPLICANT CUATRO CORP Owner: Remarks: Total Time: CD Description Act Comments Phone: 7609186733 Inspector: fl_(> ' Requested By: TOM Entered By: ROBIN 19 Final Structural tre_ 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Associated PCRs lnsriection Histoey Date Description Act lnsp Comments 6/26/2000 89 Final Combo co RB 6/23/2000 89 Final Combo CA RB 6/22/2000 89 Final Combo co RB 5/17/2000 89 Final Combo CA RB ROUTE FINAL 5/11/2000 39 Final Electrical CA RB DONE 5/10/2000 39 Final Electrical AP RB EMR 5/9/2000 39 Final Electrical NS RB 5/8/2000 39 Final Electrical co RB 5/5/2000 39 Final Electrical co RB 5/3/2000 39 Final Electrical NS RB 3/24/2000 23 Gas/Test/Repairs AP RB 2/24/2000 17 Interior Lath/Drywall NS RB TOO MUCH NR 2/23/2000 84 Rough Combo AP RB COMPLETED 2/15/2000 17 Interior Lath/Drywall PA RB OK EXCEPT 2ND LA YER 2/15/2000 18 Exterior Lath/Drywall AP RB 2/10/2000 18 Exterior Lath/Drywall co RB & WALK AFTER DRYWALL INSP ► , . City of Carlsbad Bldg Inspection Request For: 5/10/2000 Permit# CB983803 Inspector Assignment: RB ---- Title: BLDG 9,UNITS 125-127,225-227 Description: 6278 SF+1372 SF PORC,BALC+PATIO-LAUREL T Sub Type: Type:APT Phone: 7609186733 Job Address: Suite: 1329 LAUREL TREE LN Lot Location: APPLICANT CUATRO CORP Owner: Remarks: Total Time: CD Description 39 Final Electrical Associated PCRs lnsgection Histo!)'. Date Description 5/8/2000 39 Final Electrical 5/5/2000 39 Final Electrical 5/3/2000 39 Final Electrical 3/24/2000 23 Gas!TesVRepairs 2/24/2000 17 Interior Lath/Drywall 2/23/2000 84 Rough Combo 2/15/2000 17 Interior Lath/Drywall 2/15/2000 18 Exterior Lath/Drywall 2/10/2000 18 Exterior Lath/Drywall 2/8/2000 16 Insulation 2/8/2000 18 Exterior Lath/Drywall 2/4/2000 84 Rough Combo 2/2/2000 84 Rough Combo 2/1/2000 84 Rough Combo 1/28/2000 34 Rough Electric 1/28/2000 44 Rough/Ducts/Dampers 1/27/2000 34 Rough Electric 1/26/2000 14 Frame/Steel/Bolting/Welding 1/26/2000 44 Rough/Ducts/Dampers 1/25/2000 14 Frame/Steel/Bolting/Welding 1/25/2000 34 Rough Electric 1/25/2000 44 Rough/Ducts/Dampers Inspector: Requested By: TOM Entered By: ROBIN Act Comments /J (0 /; /V( JZ- Act lnsp Comments co RB co RB NS RB AP RB NS RB TOO MUCH NR AP RB COMPLETED PA RB OK EXCEPT 2ND LAYER AP RB co RB & WALK AFTER DRYWALL INSP NS RB NS RB AP RB co RB NS RB NS RB NS RB NS RB CA RB CA RB NR RB co RB co RB ' City of Carlsbad Inspection Request For: 11/30/1999 Permit# CB983803 Inspector Assignment: RB --- Title: BLDG 9,UNITS 125-127,225-227 Description: 6278 SF+1372 SF PORC,BALC+PATIO-LAUREL T Type:APT Sub Type: Job Address: 1329 LAUREL TREE LN Suite: Lot Location: APPLICANT CUATRO CORP Owner: Remarks: Total Time: CD Description Act Comments Phone: 7609189094 Inspector: _-f;;;[3 Requested By: BRAD Entered By: BARBARA 14 Frame/Steel/Bolting/Welding ~-------------------- -C;,_ ____________ 11f/{_'/<-..'g_ __ l3?'J,Mf'E_-~.~"""!11»""""1lE~C~&~. '.!•'.:ii~i~-•~-t;:~:!.;sL-llJ:ff9$'2~;~/10 Associated PCRs lnsgection Histo(¥ Date Description Act lnsp Comments 11/22/1999 13 Shear Panels/HD's NR RB 11/22/1999 15 Roof/Reroof CA RB DONE 11/22/1999 84 Rough Combo we RB 11/19/1999 15 Roof/Reroof AP RB 11/9/1999 15 Roof/Reroof CA RB BY GLEN 11/8/1999 15 Roof/Reroof co RB 11/4/1999 15 Roof/Reroof co RB STOPPED -REWALK EVERYTHING 8/5/1999 11 Ftg/Foundation/Piers AP DH 8/4/1999 11 Ftg/Foundation/Piers AP DH AP ON 8/3 7/30/1999 11 Ftg/Foundation/Piers co DH INT FTGS NOT 18 INCHES 7/28/1999 11 Ftg/Foundation/Piers NR DH 7/16/1999 21 Underground/Under Floor AP DH 7/16/1999 22 Sewer/Water Service AP DH 11/18/999 15 Roof/Reroof NS RB Permit#: Project Name: Address: Contact Person: Sewer Dist: CB983803 BLDG 9,UNITS 125-127,225-227 6278 SF+1372 SF PORC,BALC+PATIO-LAUREL T 1329 LAUREL TREE LN Phone: CA Water Dist: CA Lot: 5/17/2000 Permit Type: APT Sub Type: ·························································································································································· Inspected Date ~hcloo By: '1t~ <:,~~\'\'j;\L,( Inspected: Approved: Xi Disapproved: __ Inspected Date By: Inspected: Approved: Disapproved: __ Inspected Date By: Inspected: Approved: Disapproved: __ ··························································································································································· Comments: _____________________________ _ ~ CltY DI Carlsbad 1J3 Final Building Inspection StlitG Date: Dept: Building Engineering Planning CMWD Plan Check #: 5/17/2000 Permit#: Project Name: Address: Contact Person: Sewer Dist CB983803 BLDG 9,UNITS 125-127,225-227 6278 SF+1372 SF PORC,BALC+PATIO-LAUREL T 1329 LAUREL TREE LN Phone: CA Water Dist: CA Lot: Permit Type: APT Sub Type: ·························································································································································· Inspected~ Date bl:J;/40 ~ D . a, Inspected: Approved: 1sapproved: By: ' t1 ' Inspected Date By: Inspected: Approved: Disapproved: __ Inspected Date By: Inspected: Approved: Disapproved: __ ··························································································································································· Comments: _______________________________ _