HomeMy WebLinkAbout1340 CORVIDAE ST; ; CB950681; PermitBUILDINGPERMIT06/27/95 11-44
Page 1 of 1
Job Address: 1340 CORVIDAE ST "
Permit Type. SINGLE FAMILY DWLNG - DETACHED
Parcel No: 215-691-33-00
Valuation. 310,307
Construction Type: VN
Occupancy Group- R3/M1
Suite:
Lot# 39
Permit No.
Project No.
Development No:
CB950681
A9500980
Description
Appl/Ownr
Reference* • CT90-36
PLAN 4 3781+675 SF GAR+49 DECK
MARFIORE, PHASE 3, PC-950576
: TAYLOR WOODROW HOMES
26461 RIDGE ROUTE
714 581-2626
Status:
Applied.
Apr/Issue
Entered By
ISSUED
11/16/94
06/27/95
RMA
' -'^ 06/27/95 0001 01 02
Plan Check Number > 94-1167 C-PRMT 15511 ..H
*** Fees Required *** *** Fees Collected & Credits ***
Fees- 15,861 14
Adjustments- .00
Total Fees: 15,861.14
Fee description
Building Permit
Plan Check
Strong Motion Fee
Enter Number of EDU's - Water Fee >
Enter "Y" to Autocalc P.F F. >
Enter "Y" to Autocalc T.I.F . >
Payoff Fee for CFD >
* BUILDING TOTAL
Enter "Y" for Plumbing Issue Fee >
Each Plumbing Fixture or Trap >
Each Building Sewer >
Each Install/Repair Water Line >
Each Water Heater and/or Vent >
Gas Piping System >
Each Vacuum Breaker >
* PLUMBING TOTAL
Enter "Y" for Electric Issue Fee >
Single Phase Per AMP >
* ELECTRICAL TOTAL
Enter 'Y' for Mechanical Issue Fee>
Install Furn/Ducts/Heat Pumps >
Each Install Fireplace >
Each Install/Reloc Vent >
* MECHANICAL TOTAL
PLDA D >
Total Credits.
Total Payments •
Balance Due:
Units Fee/Unit
1.00
4666. 14
16
1
1
1
1
2
200
1
1
4
. 31
r '
;!N8I
JP| 1C.
. 00
350.00
15,511.14
Ext fee Data
1378.00
896.00
31.00
2400.00
5648.00 Y
7
15
7
7
7
7
9
6
4
/?•{m
\ DA 1X1 K•mHlm
.00
. 00
.00
. 00
. 00
. 00
25
00
. 50
sn
$
A.
T
\IAI
^Jjr
540
4666
15559
20
112
15
7
7
7
14
*1 O OJ. O £.*
10
50
60
1 5
9
6
18
49
11
'A,/ '«%Pf / &
00 Y
14
14
. 00 Y
. 00
. 00
. 00
00
. 00
00
r\ r\U U
00 Y '
00\J \J
00
00 Y
00
50•J \f
on\j \j
00
00 L
Vff;
, ^
rrttf-s*-}
1
CITY OF CARLSBAD
2075 Las Palmas Dr , Carlsbad, CA 92009 (619) 438-1161
r FINAL BUILDING INSPECTION
DEPT: BUILDING ENGINEERING FIRE PLANNING U/M WATER
PLAN CHECK*: CB950681 DATE: 04/11/96
PERMIT*: CB950681 ,—PERMIT_T.YPE; SFD
PROJECT NAME: PLAN 4 3781+675 SF GAR+49 DECK
MARFIORE, PHASE 3, PC-950576
ADDRESS: 1340 CORVIDAE ST LOT* 39 APR I 2 1996
CONTACT PERSON/PHONE*: BJN/930-0296 j cirToTcwsSAT
SEWER DIST: CA WATER DIST: CA Lgllfil&EiglNGJiEPARTMENT
INSPECTED x-\,/O DATE ,BY: /#&: INSPECTED: y-/F-/y APPROVED v DISAPPROVED
INSPECTED DATE
BY: INSPECTED: APPROVED DISAPPROVED
INSPECTED DATE
BY: INSPECTED: APPROVED DISAPPROVED
COMMENTS:
FINAL BUILDING INSPECTION
DEPT: BUILDING ENGINEERING FIRE PLANNING U/M
PLAN CHECK*: CB950681
PERMIT^: CB950681
PROJECT NAME: PLAN 4 3781+675 SF GAR+49 DECK
MARFIORE, PHASE 3, PC-950576
ADDRESS: 1340 CORVIDAE ST LOT# 39
CONTACT PERSON/PHONE#: BJN/930-0296
SEWER DIST: CA WATER DIST: CA
WATER
DATE: 04/11/96
PERMIT TYPE: SFD
INSPECTE0/
BY: V-^
INSPECTED
BY:
INSPECTED
BY:
COMMENTS :
) s~) ^ DATE i .
J^-s ^—- INSPECTED: <7/(y<'
f /
DATE
INSPECTED:
DATE
INSPECTED:
V APPROVED „P
APPROVED
APPROVED
' DISAPPROVED
DISAPPROVED
DISAPPROVED
DEPT: BUILDING
FINAL BUILDING INSPECTION
ENGINEERING FIRE PLANNING U/M
PLAN CHECK*: CB950681
PERMIT^: CB950681
PROJECT NAME: PLAN 4 3781+675 SF GAR+49 DECK
MARFIORE, PHASE 3, PC-950576
ADDRESS: 1340 CORVIDAE ST LOT# 39
CONTACT PERSON/PHONE|: BJN/930-0296
SEWER DIST: CA WATER DIST: CA
WATER
DATE: 04/11/96
PERMIT TYPES SFD
INSPECTED
BY:
rTfToTCARLSBADCll!^r,^ncPARTMENT
X-
INSPECTED
BY:
INSPECTED
BY:
DATE
INSPECTED:
DATE
INSPECTED:
DATE
INSPECTED:
APPROVED
APPROVED
APPROVED
DISAPPROVED
DISAPPROVED
DISAPPROVED
COMMENTS:
FINAL BUILDING INSPECTION
DEPT: BUILDING ENGINEERING FIRE PLANNING U/M
PLAN CHECK*: CB950681
PERMIT*: CB950681
PROJECT NAME: PLAN 4 3781+675 SF GAR+49 DECK
MARFIORE, PHASE 3, PC-950576
ADDRESS: 1340 CORVIDAE ST LOT# 39
CONTACT PERSON/PHONEf: BJN/930-0296
SEWER DIST: CA WATER DIST: CA
WATER
DATE: 04/11/96
PERMIT TYPE: SFD
INSPECTED
BY:
INSPECTED
BY:
INSPECTED
BY:
COMMENTS :
DATE
INSPECTED:
DATE
INSPECTED:
DATE
INSPECTED:
APPROVED DISAPPROVED
APPROVED DISAPPROVED
APPROVED DISAPPROVED
- Me
DEPT: BUILDING
FINAL BUILDING INSPECTION
ENGINEERING FIRE PLANNING U/M
PLAN CHECK*: CB950681
PERMIT!: CB950681
PROJECT NAME: PLAN 4 3781+675 SF GAR+49 DECK
MARFIORE, PHASE 3, PC-950576
ADDRESS: 1340 CORVIDAE ST LOT* 39
CONTACT PERSON/PHONE*: BJN/930-0296
SEWER DIST: CA WATER DIST: CA
WATER
DATE: 04/11/96
PERMIT TYPE: SFD
APR 16 19S6 j
By.
INSPECTED-
BY: r
DATE /
INSPECTED: V't APPROVED
INSPECTED
BY:
INSPECTED
BY:
DATE
INSPECTED:
DATE
INSPECTED:
APPROVED
APPROVED
DISAPPROVED
DISAPPROVED
DISAPPROVED
COMMENTS:
PERMIT* CB950681
DESCRIPTION: PLAN
TYPE: SFD
JOB ADDRESS!
APPLICANT:
CONTRACTOR:
OWNER:
CITY OF CARLSBAD
INSPECTION REQUEST
FOR 04/11/96
4 3781+675 SF GAR+49 DECK
MARFIORE, PHASE 3, PC-950576
1340 CORVIDAE ST
TAYLOR WOODROW HOMES PHONE:
PHONE:
PHONE:
INSPECTOR AREA PD
PLANCK# 94-1167
OCC GRP R3/M1
CONSTR. TYPE VN
STE: LOT: 39
714 581-2626
REMARKS: BJN/930-0296
SPECIAL INSTRUCT:
INSPECTO:
TOTAL TIME:
CD LVL DESCRIPTION
19
29
39
49
ACT COMMENTS
ST Final Structural
PL Final Plumbing
EL Final Electrical
ME Final Mechanical
***** INSPECTION HISTORY *****
DATE DESCRIPTION
013096 Gas/Test/Repairs
013096 Exterior Lath/Drywall
013096 Interior Lath/Drywall
012296 Insulation
011696 Rough Combo
011596 Rough Combo
121195 Shear Panels/HD's
120795 Shear Panels/HD's
120595 Roof/Reroof
113095 Roof/Reroof
083195 Ftg/Foundation/Piers
082295 Ftg/Foundation/Piers
082195 Ftg/Foundation/Piers
081795 Underground/Under Floor
081695 Underground/Under Floor
ACT
AP
AP
AP
AP
AP
CO
AP
CO
AP
NS
AP
CO
CO
AP
AP
INSP
PD
PD
PD
PY
PD
PD
PK
PD
PD
PD
PK
PD
PD
PD
PD
COMMENTS
OK TO WRAP
SLAB-NO DOWELS
AUG«2l-»S WON 94:15 PM COUVIS 47523321 r e
IS D,U V
N S W
August 21,1998
Taylor Woodrow
24401 RMgaroute Drive
Laguna Hlilt, CA 92683
Attn: Charlie VSficktlffo
Re: Marfflorsj
Clarlfteelion to the-plans
OC Job f 11932
Dear Ch«/1l«,
Purtuint to your request regarding th« abov* c«pion«d project por our phono
conversation on August 21,1996, we submit the following:
As • clarification to the foundation dstaBs for 2-pour system, the dowels between the
slab and the footing are not structurally required and may be omitted provided that the
soils engineer of record does not require that the slab be attached to the footings
If you have any questions, please do not hesitate to contact this office
Sincerely,
OOUVIS ENGINEERING
Christina R. Siva
Viet President
CS:cb
* 11932260
4400 CAMPUS OAlVt • MCWBOIfT 8EAC" :AUCORNIA 38860 • J714) 7S8-141Q • FAX(71«|
8190 IA»T TAHOUITZ CANYON, 19 • BALM 8PBINOO CAWiFOM*JiA •<••& • iei9) 383-9OBO •1747 HANCOCK BTRfcr surrt * • SAN OIESO CA^IFOPNIA «eioi «rtiBje»s-si74 «
) LA8 VIOA8 • (TOR) B«? BOOB • FAX C'OBI 907 OflOB • *UEAS*NTON • (51O! »W-«SO6 • 'AX (510) 4B&O739
39/22/1395 LEI3HTON-3PN OIE33 ****£192923771 31
UtGHTON AND ASSOQA
PROJECT HEHOftAhOUH
DATE 8-22-95
Into Footings
u. h«r«ln a>aift«to mir recomntndatlons for the two-pour system of slab construction
foy tha Mar Efara project. For lots with very low expansion potential (less than
ffl p»r I«C H<^ to do not recommend dowtlls from the footings to the slab.
Par lot i with MOM axptnston pot<ntU1 ( from 21-50 per UBC !8-2)» we recommand
tht footings to tha sUb on 4 foot c»nt»rs. For lots with
potential (from 51-90 per UBC I8-Z). w» rfcommend No. 4 dowel is
?n 2 foot cinttrt.
L«lQhton i Anodttei
3«MAMPHVCMM9NMM(«JITI HOS. SAN OUOO CAUKXMA 9312);«191 2W-W30 • ,600) 447MX (6i9)
. 01
CITY OF CARLSBAD - COMMUNITY FACILITIES DISTRICT NO. 1
SPECIAL TAX CALCULATION WORKSHEET
FOR THE DEVELOPMENT OF RESIDENTIAL PROPERTY
•• PLEASE PRINT •• ONE PER EACH BUILDING PERUIT •••
BUILDING INITIALS .JfUj^^ ENGINEERING INITIALS
PLANNING INITIALS .7\hJ&j£z. J FINANCE INITIALS
DRAFT FINAL
REQUIRED INFORMATION
BUILDING
A) PLAN CHECK
B)
C)
NUMBER AND/OR
PROPERTY OWNER(S)
ASSESSOR S
DESCRIPTION
PARCEL
BUILDING PERMIT NUMBER ^ 5/'~ *) / b ( $* /\ ~ <-/ •S ~ 9-
AS LISTED ON TITLE
NUMBER (S)OR APN
Tft\i / fifi ^Or.ToflfaL,) HfimfH flMAeC.
" t />
AND LOT NO S FROM RECORDED FINAL MAP L/W Q 2 1
OF WORK f ^.. jSfcfi H/fy**/\ — A/vt?/fp
\
^ >
A
'£ftr -fij\&
^fah
4^
£?£>o -\
PLANNING
E) DATE OF INITIAL PARTICIPATION IN CFD
F) GENERAL PLAN DESIGNATION(S) /-^ ,&
G) NET DEVELOPABLE ACREAGE THAT WILL
H) PROJECT DENSITY (CHECK ONE)
1) NUMBER OF UNITS (^
HIM 71i j -
REMAIN BY GEN
O O TO 4 0 D U
<Hl
/^~\5RAL PLAN USE AFTER THIS UNIT(S) IS aUILl '~f / USE/AC
/A C * 41 AND GREATER 0 U /A C '
ENGINEERING
J) IMPROVEMENT AREA (CHECK ONE)
WITHIN THE BTD - IMPROVEMENT AREA I ( ^ OUTSIDE THE BTD - IMPROVEMENT AREA II (/^-____ WITHIN THE HID - IMPHOV
U) LEGAL DESC^UPflON (REQUIRED ONtYW
DAarci ; for finar-i c nuc\JL.—ll ^ nc 01
WHEN G ABOVE IS ZERO (0) )
PARCEL/(OTJCIHCLE ONE)4f/L^l OF PARCEL MAP __[_3_l f/ IN THE CITY OF CARLSBAD, COUNTY OF SAN DIEGO, STATE OF
CALIFORNIA FILED IN THE OFICE 0~F THE SAN OIEGO~COUNTY R~ECOHDER ON ^L.f1£Z.C'±L_35./jS. /_<g_,
(IF THE ABOVE IS NOT ADEQUATE A FULL LEGAL DESCRIPTION MUST BE ATTACHED)
BUILDING FAX TO BARBARA HALE 296-3783
FINANCE
L) SPECIAL DEVELOPMENT TAX - ONE-TIME RATE PER DWELLING UNIT /, , .
(FROM SPECIAL TAX TABLE) S "/ , /n bb , ' 7
" J
M) SPECIAL TAX - ONE-TIME (IX L)
TOTAL PAYOFF: (L
DISTRIBUTION OF PREPAYMENT
ACCOUNT NO 430-810-1340-8033
$ TOTAL PAYOFF
/NOTE 1
NOTE 1
FUTURE OBLIGATION PROPERTY WHICH IS ISSUED A PERUIT AFTER MARCH 1 OF ANY FISCAL YEAR HAS CREATED A
OBLIGATION FOR THE UPCOMING FISCAL YEAR THIS AND ALL OUTSTANDING OBLIGATIONS MUST BE PAID BY THE
DEVELOPER (NOT THE HOMEOWNER) BEFORE THE SPECIAL TAX HEN WILL BE RELEASED .
BUILDING
N) OBTAIN THE SIGNATURE OF PROPERTY OWNER ON THE RESIDENTIAL CERTIFICATE BEFORE ISSUING A BUILDING PERMIT
DISTRIBUTION
A COPY OF FINAL CALCULATION SHEET, BUILDING PERMIT, AND SIGNED CERTIFICATE CFD NO 1 INCOMING BOX
A COPY OF FINAL CALCULATION SHEET, BUILDING PERMIT. AND SIGNED CERTIFICATE FINACE (HELGA)
A COPY OF FINAL CALCUALTION SHEET AND SIGNED CERTIFICATE PROPERTY OWNER
t ALL ORIGINALS BUILDING PERMIT FILE
FEBRUARY 10,1994 ~~ ~~ ' " ~ "
VALID UNTIL