Loading...
HomeMy WebLinkAbout1347 SAVANNAH LN; ; CB154406; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 05-25-2016 Residential Permit Permit No: CB154406 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: Parcel No: Valuation: 1347 SAVANNAH LN CBAD RESDNTL Sub Type: RAD Lot#: 0 Constuction Type: 58 Reference #: 2157101300 $52,879.00 Status: ISSUED Applied: 12/14/2015 Entered By: JMA Occupancy Group: # Dwelling Units: 0 0 Structure Type: Plan Approved: 05/25/2016 Issued: 05/25/2016 Bedrooms: Bathrooms: 0 Orig PC#: Inspect Area: Plan Check#: Project Title: CHU: 317 SF ADD TO 1ST & 2ND FLOORS Applicant: ROBERT SEEHASE APTG 2949 UNICORNIO ST CARLSBAD CA 92009-4442 619-818-6491 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee HMP Fee Pot. Water Con. Fee Meter Size Add'l Pot. Water Con. Fee Reel. Water Con. Fee Green Bldg Stands (SB1473) Fee Green Bldg Stands Plan Chk Fee $418.85 $0.00 $293.20 $0.00 $0.00 $6.87 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3.00 $0.00 Total Fees: $802.92 Total Payments to Date: Inspector: /)rf/t- Owner: CHU FAMILY TRUST 11-20-03 1347 SAVANNAH LN CARLSBAD CA 92011 Meter Size Add'l Reel. Water Con. Fee Meter Fee SDCWA Fee CFD Payoff Fee PFF (31 05540) PFF (4305540) License Tax (3104193) License Tax (4304193) Traffic Impact Fee (31 05541) Traffic Impact Fee (4305541) Sidewalk Fee PLUMBING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Housing Impact Fee Housing lnLieu Fee Housing Credit Fee Master Drainage Fee Sewer Fee Additional Fees Fire Sprinkler Fees TOTAL PERMIT FEES $802.92 Balance Due: Clearance: $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $46.00 $35.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $802.92 $0.00 NOTlCE: Please take NOTlCE that awwal ci ywr prqed includes the "lrrpa;ition" ci fees, dedcatiCllS, reservatkrs, or cther exaliCllS hereafter cdledively referrro to as "fees/exadiCllS." You have 00 days fran the date this perrrit was isst.ed to prctest irrpa;itioo ci these feeslexaliOI'lS. If yw prctest them, yw rrust folloothe prctest p-ocecilres set forth in GMmrent COOe Sedioo 60020(a), ard file the prctest ard arry cther rff!UrOO infOI'Tl'Btioo v.ith the Oty 1\t\:nlger for puressi~ in ac:cxrda1re v.ith Ca'lsba:l Mllidp:ll COOe Sedioo3.32.03J. Fail1.re to tirrely folloothat JY(Xlld1.re v.ill ta ar?f Sl.b;eq.Jent legal cdioo to attack, review, set aside, vtid, or aTi.JI their irrposition. You ere heret1y FlRTl-£R NOTlRED that your ri~ to prctest the specified feeslexadiCllS IXES NOT APR.. Y to water ard ~ amectioo fees and ~ty dlanges, nor pla'lri~. zori~. gad~ or cther sirrila-appicatioo puressi~ or servire fees in amectioo v.ith tns prqed. NOR IXES IT APR.. Y to arry f 0 0 0 0 'rril t t 's 'ch r 0 i 0 0 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 05-25-2016 Storm Water Pollution Prevention Plan (SWPPP) Permit Permit No:SW150484 Job Address: Permit Type: Parcel No: Reference #: CB#: Project Title: Applicant: ROBERT SEEHASE APTG 1347 SAVANNAH LN CBAD SWPPP 2157101300 CB154406 CHU: 317 SF ADDITION 2949 UNICORNIO ST CARLSBAD CA 92009-4442 619-818-6491 Emergency Contact: NEAL CHU 760-310-3607 SWPPP Plan Check SWPPP Inspections Additional Fees TOTAL PERMIT FEES Status: Lot#: 0 Applied: Entered By: Issued: Inspect Area: Tier: Priority: Owner: CHU FAMILY TRUST 11-20-03 1347 SAVANNAH LN CARLSBAD CA 92011 ISSUED 12/14/2015 JMA 05/25/2016 1 L $49.00 $59.00 $0.00 $108.00 Total Fees: $108.00 Total Payments To Date: $108.00 Balance Due: FINAL APPROVAL DATE.CLEARANCE. __ _ SIGNATURE.__.__:~::JL,.L..~------ $0.00 THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: 0 PLANNING D ENGINEERING 0BUILDING OFIRE 0HEALTH D HAZMATIAPCD (cicyof Carlsbad Building Permit Application 1635 Faraday Ave., Carlsbad, CA 92008 Ph: 76Q-602-2719 Fax: 76Q-602-8558 Plan Check No. C6 ( S-{1 t1 Oh Est. Value f52, g-1 CJ Plan Ck. Deposit email: building@car1sbadca.gov -.carlsbadca.gov Date l~f I '-II r s lsWPPP I £ .. 'i84_ JOB ADDRESS 1347 SAVANNAH LANE N/A IAPN 215 -710 -23 -00 CT /PROJECT # 1 LOT # 1 PHASE # r OF UNITS r BEDROOMS #BATHROOMS J TENANT BUSINQS NAME I CONSTR. lYPE J occ. GROUP DESCRIP110N OF WORK: Include Square Feet of Affected Area(s) A NEW TWO STORY ADDITION TO AN EXISTING TWO STORY, SINGLE FAMILY RESIDENCE. 3l/ SP EXISTING USE l PROPOSED USE I GARAGE {SF) PATIOS {SF) I DECKS {SF) A REPLACE YES(]# I AIR CONDffiONING I FIRE SPRINKLERS N<CJj YES0NoDI YES0No[ZJ APPUCANTNAME Y7 b .J. L I ~ PROPERTYOWNERNAME MR. AND MRS. NEAL CHU -·IVConmd ~~ & er'· t .,....."(,;;:<-= 114 ~ 'C_-=="'----~-=-=c=------------------------l ADDRESS ~ ~. ADDRESS ;?q~q-Gr L.Jpj (';.C:';z.;t.//0 ? 0 1347 SAVANNAH LANE CllY ;....,. ~ ~ L..:-At2L~~&"7 EMAIL S~TE /1 ~ "'·· ,.(...HPCIIl:J~AOI:.GOM ~ DaHQNPR~~ FULL PERSPECTIVE ADDRESS I 2949-G UNICORNIO STREET CllY I STATE CARLSBAD CA ZIP PHONE t 619-818-6491 I FAX NONE EMAIL \_, ROBERT@FULLPERSPECTIVE ISTATEUC.# CllY STATE ZIP CARLSBAD CA PHONE EMAIL NPCHU@AOL.COM CONTRACJOR BUS. NAME ADDRESS CllY STATE ZIP 92001 PHONE I FAX EMAIL STATEUC.# 'ClASS I CITY BUS. UC.# 92011 {Sec. 7031.5 Busmess and Professions Code: Any City or County wh1ch reqwres a perm1t to construct, alter, 1mprove, demolish or repa1r any structure, pnor to its issuance, also requ1res the applicant for such permit to file a signed statement ttiat he is licensed pursuant to the provisions of the Contractor's License Law !Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code} or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicamfor a permit subjects the applicant to a civil penalty of not more than five hundred dollars [$500}). WORKERS' COMPENSATION Workers' Compensation Dedaratlon: I henlby affitm under penally of petjury one of the following declatatlons: 0 I have and wll maintain a certilicate of consent to self.insure for workers' compensation as provided by Section 3700 of the labor Code, lor the performance of the work lor which this permit is issued. 0 I have and will maintain WOI1cers' COIIIII8flsation. as required bv Section 3700 of the labor Code, lor the performance of the work for which this perm~ is issued. My workers' compensation insurance carrier and policy number are: Insurance Co. Pdicy No. Expiration Date-------- Jbi§.section need not be completed if the perm~ is for one hundred dollars [$100) or less. U Certificate of Exemption: I certify that in the performance of the work lor which this perm~ is issued, I shaD not employ any person in any manner so as lo become subject to the Workers' Compensation Laws of california. WARNING: Failure to secure workers' compensation c:ovarage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand doDars (&100,000), in addition to the cost of compensation, damages as provided for in Section 3706 of the Labor code, Interest and attorney's fees. Ji:S CONTRACTOR SIGNATIJRE 0 AGENT DATE D D allitm that I am exempt from Contractor's License Law for the following reason: I, as owner of the property or my employees with wages as their sole compensation, wJ do the work and the slructure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply lo an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvemenls are not intended or offered for sale. If, however, the building or improvemenl is sold within one year of completion, the owner-builder wJ have the burden of proving that he did not buid or improve for the purpose of sale). I, as owner of the property, am exdusively contracting with Dcensed contractors lo construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). I am exempt under Section Business and Professions Code for this reason: 1. I personaAy plan to provide the major labor and materials for construction of the proposed properly improvemenl OVes []No 2. I {have I have not) signed an application for a buDding permR for the proposed work. 3. I have contracted with the following person (firm) 1o provide the proposed construction (inckJde name address I phone I contractols' license number): 4. I plan 1o provide pottions of the work, but I have hired the folowing person lo coordinate, supervise and provide the major work (indude name I addl8ss I phone I contractors' license number): 5. I will provide some of the work, but I have contracted (hired) the fdlowing persons lo provide the work indicated {include name I address I phone I type of work): Ji:S PROPERTY OWNER SIGNATIJRE 0AGENT DATE fj COMPLETE THIS SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY Is the applicant or future building occupant required to submit a business plan, acutely hazardoos materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 d the Presley-Tamer Hazardous Substance Account Act? CJ Yes CJ No Is lhe applicant or future blilding occupant required to obtain a permit from the air polution control district or air quality management district? CJ Yes CJ No Is lhe facility to be constructed within 1,000 feet of the outer boondary of a schod site? CJ Yes CJ No IF ANY OF THE ANSWERS ARE YES, A ANAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPUCANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTlON CONTROL DISTRICT. I certify that I have llllld the application and siiiiBthatthe abcMI information isCOI'IIICtand that the infanmdion on the plans is accurate. I atii!Bto CIIII1Jiywllh ~ atronlnlmas and StaiB laws llllafillglD butingllOIISinldion. I hereby authorize repmsentaiNe rl1he Cily cl Catsbad 1D enlllrupon 1he above lllllllbled propelly br lnspecliJn JUPOSeS.I ALSO AGREE TO SAVE,INOatiiFY ANO KEEP HARt.t.ESS THE CITY OF CARLSBAD AGAINST ALL LIABlmES, JlDGMENTS, COSTS ANO EXPENSES WHICH MAY IN ANYWAY ACaruE AGAINST SAD CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERm. OSHA: An OSHA perml is ~ br exc:avaOOns r:Nf!l5'0' deep and demolition or CCilSirudion rJ structures r:Nf!l3 siDries in height EXPIRATION: EVIllY pemll issued by 1he ~ Olficiallllderlhe provisions of this Code shaD expire by lirila1ixl and beoome nul and wid W1he buldi"Q ori'Ok authorized by sudl pemit is not commenced withi1 180 days from 1he dale ri sudl penni! or W the bttitg is suspended or abandoned at any tine afW1he I'Ok is commenced bra perild rl180 days (Secliln 106.4A lk1ibm Buildi"Q Code~ DATE I -'"7--/~-:? Inspection List CB154406 RESDNTL RAD CHU: 317 SF ADD TO 1ST & 2ND Date Inspection Item Inspector Act Comments FLOORS Permit#: Type: 17 Interior Lath/Drywall AEK AP09/09/2016 18 Exterior Lath/Drywall AEK AP08/30/2016 18 Exterior Lath/Drywall AEK NR08/29/2016 84 Rough Combo AEK AP08/29/2016 13 Shear Panels/HD's AEK AP08/18/2016 13 Shear Panels/HD's AEK CO08/10/2016 STRAPS//HARDWARE 15 Roof/Reroof AEK AP08/10/2016 11 Ftg/Foundation/Piers AEK AP06/21/2016 Monday, November 21, 2016 Page 1 of 1 PERMIT INSPECTION HISTORY REPORT (CB154406) BLDG-Residential 12/14/2015Application Date:Permit Type:Owner:TRUST CHU FAMILY TRUST 11-20-03 Subdivision:Addition 05/25/2016Work Class:Issue Date: 1347 Savannah Ln Carlsbad, CA 92009 Address:Issued - Active 03/08/2017Expiration Date:Status: IVR Number: 711203 Scheduled Date Inspection Type Inspection No.Inspection Status Primary Inspector Reinspection CompleteActual Start Date 11/04/2016 BLDG-Final Inspection 002189-2016 Passed Andy Krogh Complete COMMENTS PassedChecklist Item BLDG-Building Deficiency Yes BLDG-Plumbing Final Yes BLDG-Mechanical Final Yes BLDG-Strutural Final Yes BLDG-Electrical Final Yes November 21, 2016 Page 1 of 1 DATE: May 19, 2016 JURISDICTION: Carlsbad PLAN CHECK NO.: 15-4406 EsGil Corporation In Cl'artnersliip witli qo11ernment for CBuiCaing Safety SET: II PROJECT ADDRESS: 1347 Savannah Lane PROJECT NAME: Two Story Room Addition for Cbu Residence Q APE.l-ICANT dl--10Rfs. CJ PLAN REVIEWER CJ FILE ~ The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. D The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. D The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. D The applicant's copy of the check list has been sent to: ~ EsGil Corporation staff did not advise the applicant that the plan check has been completed. D EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contactE(d: · 1\ F:J Telephone #: Date contacted: ---= (d:>() U) Email: Mail Telephone Fax In Person D REMARKS: By: Abe Doliente (for R.F.) EsGil Corporation 0 GA 0 EJ 0 MB 0 PC Enclosures: 5/16/16 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 DATE: 12/28/15 JURISDICTION: Carlsbad PLAN CHECK NO.: 15-4406 EsGil Corporation In Cl'artnersliip witli government for (]Jui(aing Safety SET: I PROJECT ADDRESS: 1347 Savannah Lane PROJECT NAME: Two Story Room Addition for Chu Residence Q~PPLICANT A JURIS. Q PLAN REVIEWER Q FILE D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. D The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. [8J The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. I:8J The applicant's copy of the check list has been sent to: Full Perspective D EsGil Corporation staff did not advise the applicant that the plan check has been completed. ~ EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Robert Seehase Telephone#: (619) 818-6491 ~ate co~acted: \'7-{vl::) (byY\C-1 Email: robert@fullperspective.com ~ail /Telephone Fax In Person D REMARKS: By: Ray Fuller Enclosures: EsGil Corporation 0 GA 0 EJ 0 MB 0 PC 12/17/15 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 Carlsbad 15-4406 12/28/15 PLAN REVIEW CORRECTION LIST SINGLE FAMILY DWELLINGS AND DUPLEXES PLAN CHECK NO.: 15-4406 JURISDICTION: Carlsbad PROJECT ADDRESS: 1347 Savannah Lane FLOOR AREA: Additions 317 REMARKS: DATE PLANS RECEIVED BY JURISDICTION: 12/14/15 DATE INITIAL PLAN REVIEW COMPLETED: 12/28/15 FOREWORD (PLEASE READ): STORIES: 2 HEIGHT: 21 ft per CRC DATE PLANS RECEIVED BY ESGIL CORPORATION: 12/17/15 PLAN REVIEWER: Ray Fuller This plan review is limited to the technical requirements contained in the California version of the International Residential Code, International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinance by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Present California law mandates that construction comply with the 2013 edition of the California Code of Regulations (Title 24), which adopts the following model codes: 2012 IRC, 2012 IBC, 2012 UPC, 2012 UMC and 2011 NEC. The above regulations apply, regardless of the code editions adopted by ordinance. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of the 2012 International Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet number, specification section, etc. Be sure to enclose the marked up list when you submit the revised plans. Carlsbad 15-4406 12/28/15 1. Please make all corrections, as requested in the correction list. Submit THREE sets of plans for residential projects. For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. 2. Verify final sets of architectural sheets will be signed by designer and that the structural sheets and any new calculations will be stamped and signed by engineer of record also. Architectural sheets were not signed by designer and structural sheets were not stamped or signed. 3. The City of Carlsbad requires soils report for two story addition. Provide a copy of the project soil report. The report shall include foundation design recommendations based on the engineer's findings and shall comply with Section R401.4. Please verify report is current (as most reports expire after one to three years). Provide copies of any updated reports and verify soils report addresses current code parameters (IBC and not UBC) liquidation potential etc 4. If applies: The soils engineer recommended that he/she review the foundation excavations. Note on the foundation plan that "Prior to the contractor requesting a Building Department foundation inspection, the soils engineer shall advise the building official in writing that • The building pad was prepared in accordance with the soils report, • The utility trenches have been properly backfilled and compacted, and • The foundation excavations, the soils expansive characteristics and bearing capacity conform to the soils report." 5. Provide a letter from the soils engineer confirming that the foundation plan. and specifications have been reviewed and that it has been determined that the recommendations in the soils report are properly incorporated into the construction documents (when required by the soil report). 6. Where expansive or collapsible soils are known to exit, show on the plans a controlled method of water disposal from roofs that will collect and discharge roof drainage to the ground surface at least 5' from the foundation. Section R801.3 Carlsbad 15-4406 12/28/15 7. The energy calculations are requiring a new water heater (taking 12% credit) and could not locate where this was to be placed? 8. The elevations do not appear to match the plans. For example the windows at the study are noted to be 4060's and 3060's . The elevations reflect them to be 5ft high? Please clarify. 9. If 6 ft high windows at study then the following would seem to apply : Where a window sill is more than 6' above the finished grade, the lowest part of the window shall be at least 24" above the finished floor of the room. Glazing between the floor and a height of 24" shall be fixed or have openings such that a 4" sphere cannot pass through. Section R312.2. 10. Plans should reflect minimum R-19 at portion of deck being converting to habitable. 11. Recheck outlet spacing. Must show outlets within 6ft of any opening and not to exceed 12 apart. Any isolated wall 2 ft or wider to have outlets. See dining room for example. 12. Specify on the plans the following information for the roof materials, per Section R106.1.1: Manufacturer's name and ICC approval number, or equal. Some examples of tile are: US TILE BORAL ESR-1647, EAGLE ESR-1900, REDLAND ESR-1489 MONIER ESR 3284 etc. 13. Show the required ventilation for attics. The minimum vent area is 1/150 of attic area (or 1/300 of attic area if at least 40% (but not more than 50%) of the required vent is located no more than 3' below the ridge). Show on the plans the area required and area provided. Section R806.2 14. Not necessarily a correction but could not determine why RH1 on S3 was designed top span 3 ft when floor plan reflects windows to be 4 ft? In addition plans are reflecting this beam to be a 3 1/3 x? Cannot read what appears to be 11 7/8" as ridge line cuts thru the 11? 15. Please verify that all hold down locations reflect an appropriate detail i.e. from floor to floor, floor to beams, floor to rim joist where applicable. Verify overturning load path to continue to foundation. 16. Specify on the plans that any existing smoke alarms that are more than 10 years old will be replaced. Section R314.3.2. • CITY of CARLSBAD REQUIREMENTS 17. If special inspection is required, the designer shall complete the city's "Special Inspection Agreement". Carlsbad 15-4406 12/28/15 18. All new residential buildings, including additions, require a soils report. An update letter is required if the report is more than 3 years old. If a room addition is less than 500 sq. ft. in area and only one story, then a soils report is not required. The maximum allowable soil bearing value used in any design must be 1 000 psf for this exception. Calculations have note 1500 psf. • Note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. • Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. • Have changes been made to the plans not resulting from this correction list? Please indicate: Yes ( ) No ( ) • The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Ray Fuller at Esgil Corporation. Thank you. Carlsbad 15-4406 12/28/15 SPECIAL INSPECTION AGREEMENT B-45 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www .carlsbadca .gov In accordance with Chapter 17 of the California Building Code the following must be completed when work being performed requires special inspection, structural observation and construction material testing. 'roject/Permit: Project Address:_ A. THIS SECTION MUST BE COMPLETED BY THE PROPERTY OWNER/AUTHORIZED AGENT. Please check if you are Owner-Builder c:J. (If you checked as owner-builder you must also complete Section B of this agreement.) Name: (Please print) (MI) (Last) Mailing Address...._: ______________________________ . ____ _ Email_·------------------------Phone: __________ _ I am: DProperty Owner DProperty Owner's Agent of Record DArchitect of Record OEngineer of Record State of California Registration Numbe · Expiration Date: _______ _ AGREEMENT: I, the undersigned, declare under penalty of perjury under the laws of the State of California, that I have read, understand, acknowledge and promise to comply with the City of Carlsbad requirements for special inspections, structural observations, construction materials testing and off-site fabrication of building components, as prescribed in the statement of special inspections noted on the approved plans and, as required by the California Building Code. Signatur'<...._ ______________________ Date: ___________ _ 8. CONTRACTOR'S STATEMENT OF RESPONSIBILITY (07 CBC, Ch 17, Section 1706). This section must be completed by the contractor I builder I owner -builder. Contractor's Company Name: ___________________ Please check if yoo are OWner-Builder o Name: (Please print)-----------------------------------(MI) (Last) Mailing Address: ___________________________________ _ Email: _________________________ Phone: ___________ _ State of California Contractor's License Number: __________ Expiration Date: • I acknowledge and, am aware, of special requirements contained in the statement of special inspections noted on the approved plans; • I acknowledge that control will be exercised to obtain conformance with the construction documents approved by the building official; • I will have in-place procedures for exercising control within our (the contractor's) organization, for the method and frequency of reporting and the distribution of the reports; and • I certify that I will have a qualified person within our (the contractor's) organization to exercise such control. • I will provide a final report I letter in compliance with esc Section 1704.1.2 prior to requesting final inspection. Signature~: ______________________ Date: __________ _ B-45 Page 1 of 1 Rev. 08/11 Carlsbad 15-4406 12/28/15 [DO NOT PAY-THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad PLAN CHECK NO.: 15-4406 PREPARED BY: Ray Fuller DATE: 12/28/15 BUILDING ADDRESS: 1347 Savannah Lane BUILDING OCCUPANCY: R3 TYPE OF CONSTRUCTION VB BUILDING AREA Valuation Reg. VALUE ($) PORTION (Sq. Ft.) Multiplier Mod. Addition 317 166.81 52,879 Air Conditioning Fire Sprinklers TOTAL VALUE 52,879 Jurisdiction Code cb By Ordinance sldg. P~-rm~-Fe_;b~Ordi~~n-; --..,, $414·391 Pla~Ch-~~k!~eb~-O~din:;~~e m------~ $269.351 Type of Review: D Repetitive Fee ---;-Repeats 0 Complete Review D Other D Hourly EsGil Fee D Structural Only 1----~!Hr @ • $232.061 Comments: In addition to the above fee, an additional fee of $43 is due (.5 hour@ $86/hr.) for the CaiGreen review. Sheet 1 of 1 macvalue.doc + .. PLAN CHECK REVIEW TRANSMITTAL Community & Economic Development Department 1635 Faraday Avenue Carlsbad CA 92008 www.carlsbadca.gov DATE: 12/23/2015 PROJECT NAME: CHU RESIDENTIAL REMODEL AND ADD PROJECT ID:CB15-4403 PLAN CHECK NO: 1 SET#: 1 ADDRESS: 1347 SAVANNAH LANE APN: 2157102300 VALUATION: $52,879 SCOPE OF WORK: 317 SF ADDITION AND REMODEL D This plan check review is complete and has been APPROVED by: LAND DEVELOPMENT ENGINEERING DIVISION Final Inspection by Construction Management & Inspection Division is required: Yes No X This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to: ROBERT@FULLPERSPECTIVE.COM To determine status by one of the divisions listed below, please contact 760-602-2719. 760-602-4624 Cllris.Sexton@carlsbadca.gov Gregory. Rya n@carlsbadca.gov Gina Ruiz 760-602-4675 Gina.Ruiz@carlsbadca.gov Linda Ontiveros 760-602-2773 Linda.Ontiveros@carlsbadca.gov VaiRay Nelson 760-602-27 41 VaiRay.Marshall@carlsbadca.gov Cindy Wong 760-602-4662 Cyntllia.Wong@carlsbadca.gov Dominic Fieri 760-E>02-4664 Dominic.Fieri@carlsbadca.gov .. CHU RESIDENTIAL REMODEL AND ADD PLAN CHECK NO# 1 Please Read Instructions: Outstanding issues are marked with X Items that conform to permit requirements are marked with .f or have intentionally been left blank. 1. SITE PLAN Provide a fully dimensioned site plan drawn to scale. r .. {. l North arrow , ... ~ .. { ; Existing & proposed structures ' ~··· ' .f : Existing street improvements Property lines (show all dimensions) :Easements Right-of-way width & adjacent streets Show on site plan: Show: L Driveway widths Existing or proposed sewer lateral Existing or proposed water service .. Submit on signed approved plans: DWG No. i Drainage patterns and proposed site elevations. Show all high points . . :Building pad surface drainage must maintain a minimum slope of one percent towards an adjoining street or an approved drainage course. 'ADD THE FOLLOWING NOTE: "Finish grade will provide a minimum positive drainage of 2% to swale 5' away from building". , Existing & proposed slopes and topography .. , Size, location, alignment of existing or proposed sewer and water service(s) that serves the project. Each unit requires a separate service; however, second dwelling units and apartment complexes are an exception. L . . ... ; Sewer and water laterals should not be located within proposed driveways, per standards. Include on title sheet: Site address Assessor's parcel number : Legal description/lot number For commercial/industrial buildings and tenant improvement projects, include: total building square footage with the square footage for each different use, existing sewer permits showing square footage of different uses (manufacturing, warehouse, office, etc.) previously approved. Show all existing use of SF and new proposed use of SF. Example: Tenant improvement for 3500 SF of warehouse to 3500 SF of office. LoUMap No.: 13202 LOT 13 Subdivision/Tract: CT 90-34 Reference No(s): E-36 Page 2 of6 REV 6/01/12 CHU RESIDENTIAL REMODEL AND AB PLAN CHECK NO# 1 N/ A N/A N/A E-36 2. DISCRETIONARY APPROVAL COMPLIANCE Project does not comply with the following engineering conditions of approval for project no.: 3. DEDICATION REQUIREMENTS Dedication for all street rights-of-way adjacent to the building site and any storm drain or utility easements on the building site is required for all new buildings and for remodels with a value at or exceeding $ 24 000 00 , pursuant to Carlsbad Municipal Code Section 18.40.030. Dedication required as follows: 4. IMPROVEMENT REQUIREMENTS · :All needed public improvements upon and adjacent to the building site must be constructed ·at time of building construction whenever the value of the construction exceeds $120.000.00, pursuant to Carlsbad Municipal Code Section 18.40.040. · Public improvements required as follows: · Construction of the public improvements must be deferred pursuant to Carlsbad Municipal Code Section 18.40. Please submit a recent property title report or current grant deed on the property and processing fee, so we may prepare the necessary Neighborhood Improvement Agreement. This agreement must be signed, notarized and approved by the city prior to issuance of a building permit. • Future public improvements required as follows: Page 3 of 6 REV6/01/12 CHU RESIDENTIAL REMODEL AND ADD PLAN CHECK NO# 1 E-36 5. GRADING PERMIT REQUIREMENTS The conditions that require a grading permit are found in Section 15.16 of the Municipal Code. ilnadequate information available on site plan to make a determination on grading requirements. Include accurate grading quantities in cubic yards (cut, fill, import, export and remedial). This information must be included on the plans. If no grading is proposed write: "NO GRADING" , Grading Permit required. NOTE: The grading permit must be issued and rough grading approval obtained prior to issuance of a building permit. . Graded Pad Certification required. (Note: Pad certification may be required even if a grading permit is not required.) All required documentation must be provided to your Engineering Construction Inspector The inspector will then provide the engineering counter with a release for the building permit. I No grading permit required. Minor Grading Permit required. See additional comments for project-specific requirements. 6. MISCELLANEOUS PERMITS i RIGHT -OF-WAY PERMIT is required to do work in city right-of-way and/or private work adjacent to the public right-of-way. Types of work include, but are not limited to: street improvements, tree trimming, driveway construction, tying into public storm drain, sewer and water utilities. Right-of-way permit required for: *MUST PULL PERMIT FOR ANY WORK, MATERIALS, OR EQUIPMENT IN THE PUBLIC RIGHT OF WAY* Page 4 of 6 REV6/01/12 CHU RESIDENTIAL REMODEL AND ADD PLAN CHECK NO# 1 E-36 7. STORM WATER Construction Compliance ;:>< Project Threat Assessment Form complete. Enclosed Project Threat Assessment Form incomplete. Requires Tier 1 Storm Water Pollution Prevention Plan (E-29). Please complete attached form and return (SWlS-484 ) Requires Tier 2 Storm Water Pollution Prevention Plan. Requires submittal of Tier 2 SWPPP, payment of processing fee and review by city. Post-Development (SUSMP) Compliance •· X Storm Water Standards Questionnaire. Project is subject to Standard Storm Water Requirements. See city Standard Urban Storm Water Management Plan (SUSMP) for reference. Indicate areas of impervious surfaces (patios, walkway, etc. ) and pervious areas (landscaping). Project needs to incorporate low impact development strategies throughout in one or more of the following ways: Rainwater harvesting (rain barrels or cistern) Vegetated Roof , Bio-retentions cell/rain garden Pervious pavemenUpavers ... Flow-through planter/vegetated or rock drip line Vegetated swales or rock infiltration swales Downspouts disconnect and discharge over landscape ·Other: Page 5 of 6 REV6/01/12 CHU RESIDENTIAL REMODEL AND ADD PLAN CHECK NO# 1 N/A Attachments: E-36 8. WATER METER REVIEW Domestic (potable) Use i ~YI 9. FEES What size meter is required? Where a residential unit is required to have an automatic fire extinguishing system, the minimum meter size shall be a 1" meter. NOTE: the connection fee, SDCWA system capacity charge and the water treatment capacity charge will be based on the size of the meter necessary to meet the water use requirements. For residential units the minimum size meter shall be 5/8", except where the residential unit is larger than 3,500 square feet or on a lot larger than one quarter (1/4) acre where the meter size shall be%". Required fees have been entered in building permit. Drainage fee applicable Added square feet Added square footage in last two years? Permit No. Permit No. Project built after 1980 Impervious surface > 50% Impact unconstructed facility yes yes yes yes ;no no no Fire sprinklers required :yes no (is addition over 150' from center line) Upgrade yes no l No fees required 10. ADDITIONAL COMMENTS Engineering Application Storm Water Form Right-of-Way Application/Info. Reference Documents Page 6 of 6 REV 6/01/12 • *** Fee Calculation Worksheet *** ENGINEERING DIVISION Prepared by: Date: GEO DATA: LFMZ: I B&T: Address: Bldg. Permit #: Fees Update by: Date: Fees Update by: Date: EDU CALCULATIONS: List types and square footages for all uses. Types of Use: Sq.Ft./Units EDU's: Types of Use: Sq.Ft./Units EDU's: Types of Use: Types of Use: Sq.Ft./Units Sq.Ft./Units ADT CALCULATIONS: List types and square footages for all uses. Types of Use: Types of Use: Types of Use: Types of Use: FEES REQUIRED: Sq.Ft./Units Sq.Ft./Units Sq.Ft./Units Sq.Ft./Units EDU's: EDU's: ADT's: ADT's: ADT's: ADT's: Within CFD: YES (no bridge & thoroughfare fee in District #1, reduces Traffic Impact Fee) NO 1. PARK-IN-LIEU FEE:, ]NW QUADRANT ; NE QUADRANT ... SE QUADRANT L]W QUADRANT ADT'S/UNITS: I X FEE/ADT: I =$ 2.TRAFFIC IMPACT FEE: ADT'S/UNITS: IX FEE/ADT: I =s 3. BRIDGE & THOROUGHFARE FEE: L 1 DIST. #1 .DIST.#2 f ·DIST.#3 (USE SANDAG)ADT'S/UNITS IX FEE/ADT: I =s 4. FACILITIES MANAGEMENT FEE ZONE: ADT'S/UNITS: IX FEE/SQ. FT./UNIT: I =s 5. SEWER FEE EDU's IX FEE/EDU: I =s BENEFIT AREA: EDU's IX FEE/EDU: I =s 6. DRAINAGE FEES: PLDA: :HIGH MEDIUM 'LOW ... ... J ACRES: IX FEE/AC: I =s 7. POTABLE WATER FEES: UNITS CODE CONN. FEE METER FEE SDCWA FEE TOTAL ***This may not represent a comprehensive list of fees due for this project. Please contact the Building division at (760) 602·2719 for a complete listing of fees*** (City of Carlsbad DETERMINATION OF PROJECT'S SWPPP TIER LEVEL AND CONSTRUCTION THREAT LEVEL E-32 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov I'm applying for: [J Grading Permit Project Name: Chu Addition Address: 1347 Savannah Lane Ill Building Permit [J Right-of-way permit [J Other Project ID: --------DWG #/CB# l5YY 0 to APN 215-710-13 Disturbed Area: 150 s.f. Ac Section 1: Determination of Project's SWPPP Tier Level (Check applicable criteria and circle the corresponding SWPPP Tier Level, then go to section 2) Exempt -No Threat Project Assessment Criteria My project is in a category of permit types exempt from City Construction SWPPP requirements. Provided no significant grading proposed, pursuant to Table1, section 3.2.2 of Storm Water Standards, the following permits are exempt from SWPPP requirements: ~ Electrical ~ Patio ~ Mobile Home ~ Plumbing ~ Spa (Factory-Made) ~ Fire Sprinkler ~ Mechanical ~ Re-Roofing ~ Sign ~ Roof-Mounted Solar Array Tier 3-Significant Threat Assessment Criteria-(See Construction General Permit (CGP) Section I.B)* 0 My project includes construction or demolition activity that results in a land disturbance of equal to or greater than one acre including but not limited to clearing, grading, grubbing or excavation; or, 0 My project includes construction activity that results in land disturbance of less than one acre but the construction activity is part of a larger common plan of development or the sale of one or more acres of disturbed land surface or, 0 My Project is associated with construction activity related to residential, commercial, or industrial development on lands currently used for agriculture; or 0 My project is associated with construction activity associated with Linear Underground/overhead Projects (LUP) including but not limited to those activities necessary for installation of underground and overhead linear facilities (e.g. conduits, substructures, pipelines, towers, poles, cables, wire, towers, poles, cables, wires, connectors, switching, regulating and transforming equipment and associated ancillary facilities) and include but not limited to underground utility mark out, potholing, concrete and asphalt cutting and removal, trenching, excavation, boring and drilling, access road, tower footings/foundation, pavement repair or replacement, stockpile/borrow locations. 0 Other per CGP Tier 2-Moderate Threat Assessment Criteria: My project does not meet any of the Significant Threat Assessment Criteria described above and meets one or more of the following criteria: 1:1 Project requires a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code); or, 0 Project will result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement removal, equipment storage, refueling and maintenance areas and project meets one or more of the additional following criteria: • located within 200 feet of an environmentally sensitive area or the Pacific Ocean; and/or, • disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical; and/or • disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse; and/or • construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through Apr. 30). Tier 1-Low Threat Assessment Criteria tl My project does not meet any of the Significant or Moderate Threat criteria above, is not an exempt permit type per above and the project meets one or more of the following criteria: • results in some soil disturbance; and/or • includes outdoor construction activities (such as roof framing, saw cutting, equipment washing, material stockpiling, vehicle fueling, waste stockpiling) SWPPP Tier level Exempt Tier3 Tier2 Tier 1 * Items hsted are excerpt from CGP. CGP governs cntena for tnggers for T1er 3 SWPPP. Developer/owner shall confirm coverage under the current CGP and any amendments, revisions and reissuance thereof. E-32 Page 1 of2 Rev. 2/16/16 ! XX 0 XX ~------· SCALE- -BMP's are subject to field inspection- XX XX [XISnNG SJNGL[ FAMILY f~ES!O[NC£ W/BA5[M£NT IJAJN FF=J2.84 BASEMENT FF""2J 83 PROPOSfD MAIN FT=JJ.OB BASEMENT ff,.22 0 I I 12'2 >(JR 6' SOLiD ., \ ,_p, ~)~ \~ veil 0 v ~ LEGEND --~·--- p,r:;:!]p[RTV L 1!'1[ SiLl F"E.::JC[ F!BE.R POL!_ PRESERVAT"I0.~-.1 or [XiSr!N(; iNL[T PROTECTION GRAVEL BAG BERM/BARRIER Q!,RECTION/CCURS[ OF FLOW • DWG.NO. S£-··1 SE-·'5 EC--2 5[-10 SE-6 HYDRAUUC MULCH/1-iYOROSEEJ EC-1. f('-4 STABILIZED CONSTRUCTION ENTPA.'VCE TR-1 MATERIALS DEUV[RY AND STO.RAG[ AREA WM-1 TEMPORAR)' TRASH/SOLID WA.'>T[ WM ·5 HAZARDOUS AND CONCRU£ WM-6, WM-8 WASTE MANAGEMENT SANITARY WASTE WM -9 (PORTABLE TO/LU) SYMBOL N45.45'45"W ---------- x---x~ x---x- === ~ MJ C;oC:)C;C:.Y~ ~ me I WM-~ [-,;-:::;--, ·---·-_j ~ l WM-8_~! ,.~ ! WM-9 i -'~~ CAN BE FOUND AT Til£ (CASOA) WEBSITE _q_l!Al'i'I!'I'L STORM WATER COMPLIANCE FORM TIER 1 CONSTRUCTION SWPPP CB \5t+-\0o E-29 SW 15_ -4K 4 STORM WATER POLLUTION PREVENTION NOTES BEST MANAGEMENT PRACTICES (BMP) SELECTION TABLE Erosion Control Sediment Control BMPs Tracking Non-Storm Water Waste Ma~agement and Materials 1. ALL NECESSARY EQUIPMENT AND MATERIALS SHALL BE BMPs Control BMPs Management BMPs Pollulton Control BMPs AVAILABLE ON SITE TO FACILITATE RAPID INSTALLATION c: OF EROSION AND SEDIMENT CONTROL BMPs WHEN RAIN '0 .§ .§ ,g 5j '0 "2 IS EMINENT. .!3 6 ..... 2u -2u 5 .~ .~ [ 5 ~ "§ o E Q) :.;:::; "'0 t: ·->-v 2. THE OWNER/CONTRACTOR SHALL RESTORE ALL EROSION "" "' § ~ c. a; .~ .~ :E ;;; !il ;;; g ~ '-$ a; g l5 ] ~ CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION Best Management Practice' ~ ~ , ~ ~ ,g m & 5 .E S:!! .§ ~ ~ '0 ~ :X ~ ~ ., <: 30 <: ~ c_ OF THE CITY INSPECTOR AFTER EACH RUN-OFF PRODUCING (BMP) Description --7 ~ ~ ~ ~ ·e ~ <: ~ ~ .[ ~ .~ ~ J$ .§ il~ il ~ 8 ill § § 30 5 "' :: = ..!!! ~ ] ~ ~ E ~ E RAINFALL j ! ~ g ~ ~ e tt ': l t> ~ :@ E ~ ~ fi ~ ~ ~ :fl .~~ ~ ~ -~ -~ ~ -~ ~ ~] ! ~ ~ ~ ~ ~ 3. THE OWNER/CONTRACTOR SHALL INSTALL ADDillONAL EROSION ~ ~ ~~ ~ ffi ~ 6 ~ & ~g ~ ~£ ~ ~ ~~ ;i~ ~8-~ ~~ ~~ ~ ~ ~8 ~~ ~~ 8~ CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY INSPECTOR DUE TO INCOMPLETE GRADING OPERATIONS OR CASOA Designation --7 r-co "' --..., ..,. "' "' r-co :2 -N -..., r-'f I ";' 7 'f '? 'f 'f UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. . . 6 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ !£ ~ ~ ~ ~ i ~ ~ Construction ActiVIty "" 4. ALL REMOVABLE PROTECTIVE DEVICES SHALL BE IN PLACE H-=Gr~o~di:;Jng~lSo;;ii~D~is~tu7'rb~o~nc~e'-----+-l-t--l-+-+-+-+---!~+-+-+-+-+-+-+--l-+--l--+-l--+---t--+---l-t---t--+-+--t-1 AT THE END OF EACH WORKING DAY WHEN THE FIVE (5} H-='Tr~en~c~hi:!!:ngu.l1/..=1Ex~c~ov~o~tio~n'------+-l-t--l-+-+-+-+---!~+-+-+-+-+-+-+----t-+----t--+---t--+---t--+--t-t---t--+-+--t-1 DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PECENT Stockpiling (40%}. SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER H7'Dr7.ill~ini!.!Ql./=IBolLr:-inq-------+--t---!r---+-+---!r--+-+-+-+--t-+-+-+-+-+---t---!l--+-+-+--+-+-l-+-+--l--+-+-t----l EACH RAINFALL. H-::C~on~c~re7teeJ.l/.,siA.e~sp~lh~ol7t~S~ow~c,_ut!.!or!!!,nglL..._-+-+-+-+-+--+-+-+-+---t-+--+-+-+-+-+-+-+-+-+-+-+-+-+--+-l--t--t--+-+-l 5 ALL GRAVEL BAGS SHALL CONTAIN 3/4 INCH MINIMUM H.;ECo~n~.cr~e~te...!Fl.!!o~tw~o~rk,__ ____ -+-l-+--l-+-+-+-+~~+-+-+-+-+-+-+----t-+----t--+---l--t---l--+---l-t---t--+-+-t-1 · Pov111g AGGREGATE. H~C~on~d~ui~t/P~'iip-,e~ln-s7ta~ll~at~io-n----+-+-+-+-+-+-t-+-+---t-+--+-+-+-+-+-+-+-+-+-+-+-+-+-t-l--t--t--r-+-l 6. ADEQUATE EROSION AND SEDIMENT CONTROL AND PERIMETER H~Stu;"'-7cc~o~;M·o~rt~or~Wo:::crk~----+-+-+-+-+-+-l-+-+-+-l--+-l--+---t--+-+-t-+-+-+-+-+-+-+--+--h..-t---t--+-t PROTECTION BEST MANAGEMENT PRACTICE MEASURES MUST Waste Disposal Y BE INSTALLED AND MAINTAINED. H~St~o~gii~ng~/ILa~yD~o!!!wn!...!:!;Ar~eo~--:-::--::--+-+-+-+-+-+-1-+-+-+---!--+-l--+---t--+-+-+-+-+-+-+-+-+-+-+-+--t---t--+-t Equipment Maintenance and Fuelinq 7. THE CITY INSPECTOR SHALL HAVE THE AUTHORITY TO ALTER H~H~oz~o~rd~ou~s~Su~b~st~o'.!'nc:=e...!U'"'s~e/t..:~S~to~r~og:c;'e'--+-+-+-+-+-+-+-+-+-l-+--+-+-+-+-+-+-+-+-+-+-+-+-+-t-l--t--+--+-+-1 THIS PLAN DURING OR BEFORE CONSTRUCTION AS NEEDED Dewatering TO ENSURE COMPLIANCE WITH CITY STORM WATER QUALITY H-=s~ite=A~cc~es:t..s-A7c-ro-s-s""'D~ir7t----+-+-+-+-+-+-l-+-+-l-+--+-+-+-+-+--+-+-+-+-+-+-+-+-+-l---t--+--+-+-l REGULA TIONS. Other (list): J( X Instructions: 1. Check the box to the left of oil applicable construction activity (first column) expected to occur during construction. 2. Located along the top of the BMP Tobie is o list of BMP's with it's corresponding California Stormwoter Quality Association (CASQA) designation number. Choose one or more BMPs you intend to use during construction from the list. Check the box where the chosen activity row intersects with the BMP column. 3. Refer to the CASQA construction handbook for information and details of the chosen BMPs and how to apply them to the project. OWNER'S CERTIF1CATE: I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT BEST MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION PROJECf INFORMATION ACTIVITIES TO THE MAXIMUM EXTENT PRACTICABLE TO AVOID THE MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO O H oc·•TJO SO ALL CHOSEN MP ABO E Site Address: 1347 SAVANNAH LANE AVOID THE EXPOSURE OF STORM WATER TO CONSTRUCTION SH W T E L " N F B S Vi RELATED POLLUTANTS; AND (2} ADHERE TO, AND AT ALL TIMES, ON THE PROJECTS SITE PLAN/EROSION CONTROL PLAN. Assessor's Parcel Number. 215-710-13 COMPLY WITH THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP SEE THE REVERSE SIDE OF THIS SHEET FOR A SAMPLE THROUGHOUT THE DURATION OF THE CONSTRUCTION ACTIVITIES EROSION CONTROL PLAN UNTIL THE CONSTRUCTION WORK IS COMPLETE AND APPROVED 1 ' • Nome: BY THE CITY OF CARLSBAD. _ __:;=.,...:.-,="'-'""-""------:::--- Mr. and Mrs. Neal Chu -BMP's are subject to field inspection-24 Hour Phone:_.<..!loi&A.o<......:...LL~---""""'~ OWI'IER(S)/OWNER'S AGENT NAME (PRINT) Construction Threat to Storm Water Quality (Check Box) OWI'IER(S)/OWNER'S AGENT NAME (SIGNATURE) DATE 0 MEDIUM W E-29 Poge 1 of 1 REV 02/16 ----~ SWPPP Section 2: Determination of Project's Construction Threat Level Tier (Check applicable criteria under the Tier Level as determined in section 1, circle Construction Level the corresponding Construction Threat Level, then complete the Threat Level signature block below) Exempt -Not Applicable -Exempt Tier 3-High Construction Threat Assessment Criteria: M~ Project meets one or more of the following: D Project site is 50 acres or more and grading will occur during the rainy season D Project site is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA High D Soil at site is moderately to highly erosive (defined as having a predominance of soils Tier3 with USDA-NRCS Erosion factors kf greater than or equal to 0.4) D Site slope is 5 to 1 or steeper D Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 -April 30). D Owner/contractor received a Storm Water Notice of Violation within past two years Tier 3 -Medium Construction Threat Assessment Criteria Medium D All projects not meeting Tier 3 High Construction Threat Assessment Criteria Tier 2 -High Construction Threat Assessment Criteria: M~ Project meets one or more of the following: D Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA D Soil at site is moderately to highly erosive (defined as having a predominance of soils High with USDA-NRCS Erosion factors kt greater than or equal to 0.4) Tier2 D Site slope is 5 to 1 or steeper D Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1-Apr. 30). D Owner/contractor received a Storm Water Notice of Violation within past two years D Site results in 1 0,000 sq. ft. or more of soil disturbance Tier 2 -Medium Construction Threat Assessment Criteria Medium D My project does not meet Tier 2 High Threat Assessment Criteria listed above Tier 1 -Medium Construction Threat Assessment Criteria: M~ Project meets one or more of the following: D Owner/contractor received a Storm Water Notice of Violation within past two years Medium D Site results in 500 sq. ft. or more of soil disturbance Tier 1 D Construction will be initiated during the rainy season or will extend into the rainy season (Oct.1-April 30) Tier 1 -Low Construction Threat Assessment Criteria Low IX My project does not meet Tier 1 Medium Threat Assessment Criteria listed above I cert1fy to the best of my knowledge that the above statements are true and correct. I Will prepare and submit an appropnate tier level SWPPP as deterrmned above prepared in accordance with the City SWPPP Manual. I understand and acknowledge that I must adhere to and comply with the storm water best management practices pursuant to Title 15 of the Carlsbad Municipal Code and to City Standards at all times during construction activities for the permit type(s) checked above. The City Engineer/Building Official may authorize minor variances from the Construction Threat Assessment Criteria in special circumstances where it can be shown that a lesser or higher SWPPP Tier Level is warranted. Owner/Owner's Authorized Agent Name: Title: City Concurrence: Yes No Owner (For City Use Only) Owner/Owner's Authorized Agent Signature: Date: By: Date: Project ID: Page 2 of2 Rev. 2/16/16 I . (._ Ctty of Carlsbad /INSTRUCTIONS: STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www .carlsbadca .gov To address post-development pollutants that may be generated from development projects, the City requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMP's) into the project design per Carlsbad BMP Design Manual (BMP Manual). To view the BMP Manual, refer to the Engineering Standards (Volume 5). This questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision, discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to 'STANDARD PROJECT' requirements or be subject to 'PRIORITY DEVELOPMENT PROJECT' (PDP) requirements. Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the City. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff. A completed and signed questionnaire must be submitted with each development project application. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted tl concurren 1y. PROJECT INFORMATION PROJECT NAME: Chu Addition PROJECT ID: The project is (check one): D New Development II Redevelopment The total proposed disturbed area is: 150 ft2 ( ) acres The total proposed newly created and/or replaced impervious area is: 0 ft2 ( ) acres If your project is covered by an approved SWQMP as part of a larger development project, provide the project ID and the SWQMP # of the larger development project: Project ID: SWQMP#: Then, go to Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your application to the City. E-34 Page 1 of4 REV 02/16 -__ " _________________ _ STEP.1 TO BE COMPLETED FOR ALL PROJECTS To determine if your project is a "development project", please answer the following question: YES NO Is your project LIMITED TO routine maintenance activity and/or repair/improvements to an existing X building or structure that do not alter the size (See Section 1.3 of the BMP Design Manual for guidance)? If you answered "yes" to the above question, provide justification below then Go to step 5, mark the third box stating "my project is not a 'development project' and not subject to the requirements of the BMP manual" and complete applicant information. Justification/discussion: (e.g. the project includes only interior remodels within an existing building): lf_you answered "no" to the above question, the project is a 'development~oject',_go to Step 2. STEP2 TO BE COMPLETED FOR ALL DEVELOPMENT PROJECTS To determine if your project is exempt from PDP requirements pursuant to MS4 Permit Provision E.3.b.(3), please answer the following questions: Is your project LIMITED to one or more of the following: YES NO 1. Constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria: a) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non- erodible permeable areas; b) Designed and constructed to be hydraulically disconnected from paved streets or roads; X c) Designed and constructed with permeable pavements or surfaces in accordance with USEPA Green Streets guidance? 2. Retrofitting or redeveloping existing paved alleys, streets, or roads that are designed and constructed in accordance with the USEPA Green Streets guidance? X 3. Ground Mounted Solar Array that meets the criteria provided in section 1.4.2 of the BMP manual? X If you answered "yes" to one or more of the above questions, provide discussion/justification below, then Go to step 5, mark the second box stating "my project is EXEMPT from PDP ... " and complete applicant information. Discussion to justify exemption (e.g. the project redeveloping existing road designed and constructed in accordance with the USEPA Green Street guidance): If you answered "no" to the above questions, your project is not exempt from POP, go to Step 3. E-34 Page 2 of4 REV. 02/16 STEP3 TO BE COMPLETED FOR ALL NEW OR REDEVELOPMENT PROJECTS To determine if your project is a PDP, please answer the following questions (MS4 Permit Provision E.3.b.(1 )): YES NO 1. Is your project a new development that creates 10,000 square feet or more of impervious surfaces collectively over the entire project site? This includes commercial, industrial, residential, mixed-use, X and public development projects on public or private land. 2. Is your project a redevelopment project creating and/or replacing 5,000 square feet or more of impervious surface collectively over the entire project site on an existing site of 10,000 square feet or X more of impervious surface? This includes commercial, industrial, residential, mixed-use, and public development projects on public or private land. 3. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a restaurant? A restaurant X is a facility that sells prepared foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption (Standard Industrial Classification (SIC) code 5812). 4. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a hillside development project? A hillside X development project includes development on any natural slope that is twenty-five percent or greater. 5. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a parking lot? A parking lot X is a land area or facility for the temporary parking or storage of motor vehicles used personally for business or for commerce. 6. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a street, road, highway X freeway or driveway? A street, road, highway, freeway or driveway is any paved impervious surface used for the transportation of automobiles, trucks, motorcycles, and other vehicles. 7. Is your project a new or redevelopment project that creates and/or replaces 2,500 square feet or more of impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive Area (ESA)? "Discharging Directly to" includes flow that is conveyed overland a distance X of 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the project to the ESA (i.e. not commingled with flows from adjacent lands).* 8. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface that supports an automotive repair shop? An automotive X repair shop is a facility that is categorized in any one of the following Standard Industrial Classification (SIC) codes: 5013, 5014, 5541, 7532-7534, or 7536-7539. 9. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious area that supports a retail gasoline outlet (RGO)? This category X includes RGO's that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic (ADT) of 100 or more vehicles per day. 1 0. Is your project a new or redevelopment project that results in the disturbance of one or more acres of X land and are expected to generate pollutants post construction? 11. Is your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of impervious surface or (2) increases impervious surface on the property by more than 10%? (CMC X 21.203.040) If you answered "yes" to one or more of the above questions, your project is a PDP. If your project is a redevelopment project, Go to step 4. If your project is a new project, Go to step 5, check the first box stating "My project is a PDP ... " and complete applicant information. If you answered "no" to all of the above questions, your project is a 'STANDARD PROJECT', "Go to step 5, check the second box stating "My project is a 'STANDARD PROJECT' ... " and complete applicant information. E-34 Page 3 of4 REV. 02/16 STEP4 TO BE COMPLETED FOR REDEVELOPMENT PROJEeTS THAT ARE PRIORITY DEVELOPMENT PROJECTS (PDP)ONLY . Complete the questions below regarding your redevelopment project (MS4 Permit Provision E.3.b.(2}): YES NO Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than 50% of the surface area of the previously existing development? Complete the percent X impervious calculation below: Existing impervious area (A) = sq. ft. Total proposed newly created or replaced impervious area (B)= sq. ft. Percent impervious area created or replaced (B/A)*100 = % If you answered "yes", the structural BMP's required for PDP apply only to the creation or replacement of impervious surface and not the entire development. Go to step 5, check the first box stating "My project is a PDP ... " and complete applicant information. If you answered "no," the structural BMP's required for PDP apply to the entire development. Go to step 5, check the check the first box stating "My project is a PDP ... " and complete applicant information. STEPS CHECK THE APPROPRIATE BOX AND COMPLETE APPLICANT INFORMATION 0 My project is a PDP and must comply with PDP stormwater requirements of the BMP Manual. I understand I must prepare a Storm Water Quality Management Plan (SWQMP) for submittal at time of application. Ill My project is a 'STANDARD PROJECT' OR EXEMPT from PDP and must only comply with 'STANDARD PROJECT' stormwater requirements of the BMP Manual. As part of these requirements, I will submit a "Standard Project Requirement Checklist Form E-36" and incorporate low impact development strategies throughout my project. Note: For projects that are close to meeting the PDP threshold, staff may require detailed impervious area calculations and exhibits to verify if 'STANDARD PROJECT' stormwater requirements apply. 0 My Project is NOT a 'development project' and is not subject to the requirements of the BMP Manual. Applicant Information and Signat~r-1 Box / ! Assessor's Parcel Number(s)/ / 215-710-13 / / Applicant Name: / / / Mr. Neal Chu 1 / Applicant Signature: !{! / ) Applicant Title: Owner Date: .\.----'/ *Environmentally Sens1t1ve Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their equivalent under the Multi Species Conservation Program within the Cities and County of San Diego; Habitat Management Plan; and any other equivalent environmentally sensitive areas which have been identified by the City. This Box for City_ Use Only City Concurrence: L YES I NO I I By: Date: Project 10: E-34 Page 4 of4 REV.02/16 (City of Carlsbad Project Name: Chu Addition Project ID: DWG No. or Building Permit No.: STANDARD PROJECT REQUIREMENT CHECKLIST E-36 Project Information Source Control BMPs Development Services land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov All development projects must implement source control BMPs SC-1 through SC-6 where applicable and feasible. See Chapter 4 and Appendix E.1 of the BMP Design Manual for information to implement source control BMPs shown in this checklist. Answer each category below pursuant to the following. • "Yes" means the project will implement the source control BMP as described in Chapter 4 and/or Appendix E.1 of the Model BMP Design Manual. Discussion/justification is not required. • "No" means the BMP is applicable to the project but it is not feasible to implement. Discussion/justification must be provided. • "N/A" means the BMP is not applicable at the project site because the project does not include the feature that is addressed by the BMP (e.g., the project has no outdoor materials storage areas). Discussion/justification may be provided. Source Control Requirement I .Ap~led? SC-1 Prevention of Illicit Discharges into the MS4 I DYes I ~No I D N/A Discussion/justification if SC-1 not implemented: SC-2 Storm Drain Stenciling or Signage I DYes I ~No I ON/A Discussion/justification if SC-2 not implemented: SC-3 Protect Outdoor Materials Storage Areas from Rainfall, Run-On, I DYes I M:No I ON/A Runoff, and Wind Dispersal Discussion/justification if SC-3 not implemented: SC-4 Protect Materials Stored in Outdoor Work Areas from Rainfall, Run-On, I o Yes Runoff, and Wind Dispersal I XNo I ON/A Discussion/justification if SC-4 not implemented: SC-5 Protect Trash Storage Areas from Rainfall, Run-On, Runoff, and Wind I DYes I ~No I D N/A Dispersal Discussion/justification if SC-5 not implemented: E-36 Page 1 of3 REV 02116 Source Control Requirement .Applied? SC-6 Additional BMPs based on Potential Sources of Runoff Pollutants must answer for each source listed below and identify additional BMPs. (See Table in Appendix E.1 of BMP Manual for guidance). D On-site storm drain inlets DYes X No D N/A D Interior floor drains and elevator shaft sump pumps DYes ~No D N/A D Interior parking garages DYes X No o N/A D Need for future indoor & structural pest control DYes >fl No D N/A D Landscape/Outdoor Pesticide Use DYes ~No D N/A D Pools, spas, ponds, decorative fountains, and other water features DYes ~No D N/A D Food service DYes X No D N/A D Refuse areas DYes ~No [J N/A D Industrial processes DYes X No D N/A D Outdoor storage of equipment or materials DYes RNo D N/A D Vehicle and Equipment Cleaning DYes KNo D N/A D Vehicle/Equipment Repair and Maintenance DYes §tNo D N/A D Fuel Dispensing Areas DYes ~No D N/A D Loading Docks DYes §tNo D N/A D Fire Sprinkler Test Water DYes KNo D N/A D Miscellaneous Drain or Wash Water DYes X! No D N/A D Plazas, sidewalks, and parking lots DYes ~No D N/A For "Yes" answers, identify the additional BMP per Appendix E.1. Provide justification for "No" answers. E-36 Page 2 of3 REV. 02116 Site Design BMPs All development projects must implement site design BMPs SD-1 through SD-8 where applicable and feasible. See Chapter 4 and Appendix E.2 thru E.6 of the BMP Design Manual for information to implement site design BMPs shown in this checklist. Answer each category below pursuant to the following. • "Yes" means the project will implement the site design BMPs as described in Chapter 4 and/or Appendix E.2 thru E.6 of the Model BMP Design Manual. Discussion I justification is not required. • "No" means the BMPs is applicable to the project but it is not feasible to implement. Discussion/justification must be provided. • "N/A" means the BMPs is not applicable at the project site because the project does not include the feature that is addressed by the BMPs (e.g., the project site has no existing natural areas to conserve). Discussion/justification may be provided. Site Desian Requirer~MKJt 1 ADDiied? SD-1 Maintain Natural Drainage Pathways and Hydrologic Features I DYes I rXNo I D N/A Discussion/justification if SD-1 not implemented: SD-2 Conserve Natural Areas, Soils, and Vegetation I DYes I XNo I D N/A Discussion/justification if SD-2 not implemented: SD-3 Minimize Impervious Area I DYes I ~No I D N/A Discussion/justification if SD-3 not implemented: SD-4 Minimize Soil Compaction I DYes T )(l No I D N/A Discussion/justification if SD-4 not implemented: SD-5 Impervious Area Dispersion I DYes I Xl No I D N/A Discussion/justification if SD-5 not implemented: SD·6 Runoff Collection I DYes I ~No I D N/A Discussion/justification if SD-6 not implemented: SD-7 Landscaping with Native or Drought Tolerant Species 1 DYes 1 XI No I D N/A Discussion/justification if SD-7 not implemented: SD-8 Harvesting and Using Precipitation 1 DYes I vNo I D N/A Discussion/justification if SD-8 not implemented: '£ E-36 Page 3 of3 REV. 02/16 «~f' ~ CITY OF CARLSBAD PLANNING DIVISION BUILDING PLAN CHECK APPROVAL P-29 DATE: 12/17/15 PROJECT NAME: ADDITION PROJECT ID: Development Services Planning Division 1635 Faraday Avenue {760) 602-4610 www.carlsbadca.e:ov PLAN CHECK NO: CB154406 SET#: ADDRESS: 1347 SAVANNAH LN APN: [gl This plan check review is complete and has been APPROVED by the PLANNING Division. By: GINA RUIZ A Final Inspection by the PLANNING Division is required DYes ~No You may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. D This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check APPROVAL has been sent to: ROBERT@FULLPERSPECTIVE.COM For questions or clarifications on the attached checklist please contact the following reviewer as marked: PLANNING ENGINEERING FIRE PREVENTION 76o-602-4610 760-602-2750 760-602·4665 D Chris Sexton D Chris Glassen D Greg Ryan 760-602-4624 760-602-2784 760-602-4663 Chris.Sexton@carlsbadca.gov Christogher.Giassen@carlsbadca.gov Gregory.Ryan@carlsbadca.gov D Gina Ruiz D VaiRay Marshall D Cindy Wong 760-602-4675 760-602-27 41 760-602-4662 Gina.Ruiz@carlsbadca.gov VaiRay.Marshall@carlsbadca.gov Cynthia.Wong@carlsbadca.gov D Veronica Morones D Linda Ontiveros D Dominic Fieri 760-602-4619 760-602-2773 760-602-4664 Veronica.Morones@carlsbadca.gov Linda.Ontiveros@carlsbadca.gov Dominic.Fieri@carlsbadca.gov Remarks: HEIGHT=25'-10" (30' MAX PER AVIARA MP PA 27) COVERAGE=16.2% (40% MAX) T.O.S.=39' (18' REQ'D)