Loading...
HomeMy WebLinkAbout1366 CASSINS ST; ; CB960091; PermitB U I L 03/28/96 15:37 Page 1 of 1 Job Address: 1366 CASSINS ST Permit Type: SINGLE FAMILY DWLNG Parcel No: 215-691-51-00 Valuation: 310,305 Occupancy Group: Description Appl/Ownr DING PERMIT CB960091 A9600152 DEV89028 6763 03/28/96 0001 01 02 Permit No: Project No: Development No: Suite: DETACHED Lot#: 79 Construction ferencetf: CT90-36 Status: 3780 SF+675 GAR-f 48 . 8 SF DECK Applied: PLAN 4,PHASE 4,MARFIORE,TAYLOR WOODROW Apr/Issue: Entered By: TAYLOR WOODROW HOMES 714-581-2626 24461 RIDGE ROUTE LACUNA HILLS,CA 92718 ISSUED 01/16/96 03/28/96 RMA *** Plan Check Number Fees Required ***ted & Credits Fees: Adjustments: Total Fees: Fee description Number of Bedrooms Number of Bathrooms Building Permit Plan Check Strong Motion Fee Enter Number of EDU' Enter "Y" to Autocalc or manually enter T.I Payoff Fee for CFD * BUILDING TOTAL Enter "Y" for Plumbing Iss Each Plumbing Fixture or T Each Building Sewer Each Install/Repair Water Line Each Water Heater and/or Vent Gas Piping System Each Vacuum Breaker * PLUMBING TOTAL Enter "Y" for Electric Issue Fee > Single Phase Per AMP > * ELECTRICAL TOTAL Enter 'Y' for Mechanical Issue Fee> Install Furn/Ducts/Heat Pumps > Each Install Fireplace > Each Install/Reloc Vent > * MECHANICAL TOTAL PLDA D > *** .00 350.00 15,510.14 Ext fee Data 200 1 1 4 . 29 7. 00 25 9.00 6.50 4. 50 4. 1 3'1378. 896. 31. 2400. 5648. 540. 4666. 15559. 20. 112. 15. 7. 7. 7. 14. 182. 10. 50. 60. 15. 9. 6. 18. 49. 10. 00 50 00 00 00 00 00 00 14 14 00 00 00 00 00 00 00 00 00 00 00 00 00 50 00 00 00 Y Y Y Y L CITY OF CARLSBAD 2075 Las Pahnas Dr., Carlsbad, CA 92009 INSfc APPROVAL _ DATE 9 03/19/1999 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: Project Title: City of Carlsbad Building Permit Permit No:CB960091 Building Inspection Request Line (760) 438-3101 1366CASSINSSTCBAD SFD Sub Type: 2156915100 Lot#: 79 $310,305.00 Construction Type: NEW Reference #: CT90-36 3780 SF+675 GAR+48.8 SF DECK PLAN 4.PHASE 4.MARFIOREJAYLOR WOODROW Status: Applied: Entered By: Appr/lssued: Inspect Area: Applicant: TAYLOR WOODROW HOMES 24461 RIDGE ROUTE 92718 714-581-2626 Owner: 01/16/1996 RMA 03/28/1996 PD Total Fees: $15,860.14 Total Payments To Date: $15,860.14 Balance Due:$0.00 Description Fee * ELECTRICAL TOTAL * MECHANICAL TOTAL * PLUMBING TOTAL Building Permit Enter Number of EDU's - Enter Y to Autocalc P. or manually enter T.I.F Payoff Fee for CFD Plan Check PLDA D Strong Motion Fee 60.00 49.00 182.00 1,378.00 2,400.00 5,648.00 540.00 4,666.14 896.00 10.00 31.00 FINAL APPROVAL Inspector:Date:Clearance: NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as fees/exactions.' You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired. Inspection List Permit*: Date 9/13/96 9/12/96 7/19/96 7/19/96 7/19/96 7/18/96 7/18/96 7/18/96 7/17/96 7/17/96 7/17/96 7/15/96 7/12/96 7/11/96 7/9/96 7/8/96 6/17/96 6/17/96 4/25/96 4/24/96 4/19/96 4/15/96 CB960091 Type: SFD 3780 SF+675 GAR+48.8 SF DECK PLAN 4.PHASE 4,MARFIORE,TAYLOR WO Inspection Item Inspector Act Comments 39 39 17 18 23 17 18 23 17 18 23 16 16 16 84 84 13 15 12 12 11 21 Final Electrical Final Electrical Interior Lath/Drywall Exterior Lath/Drywall Gas/Test/Repairs Interior Lath/Drywall Exterior Lath/Drywall Gas/Test/Repairs Interior Lath/Drywall Exterior Lath/Drywall Gas/Test/Repairs Insulation Insulation Insulation Rough Combo Rough Combo Shear Panels/HD's Roof/Reroof Steel/Bond Beam Steel/Bond Beam Ftg/Foundation/Piers Underground/Under Floor PD PY PD PD PD PD PD PD PD PD PD PD PD PD PD PD PD PD PD PD PD PY AP NS AP AP AP NR NR NR CO CO CO AP CA PER CONTRACTOR NR AP NR AP AP AP SLAB CA BYTW AP AP Friday, March 19,1999 Page 1 of 1