HomeMy WebLinkAbout1366 CASSINS ST; ; CB960091; PermitB U I L
03/28/96 15:37
Page 1 of 1
Job Address: 1366 CASSINS ST
Permit Type: SINGLE FAMILY DWLNG
Parcel No: 215-691-51-00
Valuation: 310,305
Occupancy Group:
Description
Appl/Ownr
DING PERMIT CB960091
A9600152
DEV89028
6763 03/28/96 0001 01 02
Permit No:
Project No:
Development No:
Suite:
DETACHED
Lot#: 79
Construction
ferencetf: CT90-36 Status:
3780 SF+675 GAR-f 48 . 8 SF DECK Applied:
PLAN 4,PHASE 4,MARFIORE,TAYLOR WOODROW Apr/Issue:
Entered By:
TAYLOR WOODROW HOMES 714-581-2626
24461 RIDGE ROUTE
LACUNA HILLS,CA 92718
ISSUED
01/16/96
03/28/96
RMA
***
Plan Check Number
Fees Required ***ted & Credits
Fees:
Adjustments:
Total Fees:
Fee description
Number of Bedrooms
Number of Bathrooms
Building Permit
Plan Check
Strong Motion Fee
Enter Number of EDU'
Enter "Y" to Autocalc
or manually enter T.I
Payoff Fee for CFD
* BUILDING TOTAL
Enter "Y" for Plumbing Iss
Each Plumbing Fixture or T
Each Building Sewer
Each Install/Repair Water Line
Each Water Heater and/or Vent
Gas Piping System
Each Vacuum Breaker
* PLUMBING TOTAL
Enter "Y" for Electric Issue Fee >
Single Phase Per AMP >
* ELECTRICAL TOTAL
Enter 'Y' for Mechanical Issue Fee>
Install Furn/Ducts/Heat Pumps >
Each Install Fireplace >
Each Install/Reloc Vent >
* MECHANICAL TOTAL
PLDA D >
***
.00
350.00
15,510.14
Ext fee Data
200
1
1
4
. 29
7. 00
25
9.00
6.50
4. 50
4.
1 3'1378.
896.
31.
2400.
5648.
540.
4666.
15559.
20.
112.
15.
7.
7.
7.
14.
182.
10.
50.
60.
15.
9.
6.
18.
49.
10.
00
50
00
00
00
00
00
00
14
14
00
00
00
00
00
00
00
00
00
00
00
00
00
50
00
00
00
Y
Y
Y
Y
L
CITY OF CARLSBAD
2075 Las Pahnas Dr., Carlsbad, CA 92009
INSfc
APPROVAL
_ DATE 9
03/19/1999
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
Project Title:
City of Carlsbad
Building Permit Permit No:CB960091
Building Inspection Request Line (760) 438-3101
1366CASSINSSTCBAD
SFD Sub Type:
2156915100 Lot#: 79
$310,305.00 Construction Type: NEW
Reference #: CT90-36
3780 SF+675 GAR+48.8 SF DECK
PLAN 4.PHASE 4.MARFIOREJAYLOR WOODROW
Status:
Applied:
Entered By:
Appr/lssued:
Inspect Area:
Applicant:
TAYLOR WOODROW HOMES
24461 RIDGE ROUTE 92718
714-581-2626
Owner:
01/16/1996
RMA
03/28/1996
PD
Total Fees: $15,860.14 Total Payments To Date: $15,860.14 Balance Due:$0.00
Description Fee
* ELECTRICAL TOTAL
* MECHANICAL TOTAL
* PLUMBING TOTAL
Building Permit
Enter Number of EDU's -
Enter Y to Autocalc P.
or manually enter T.I.F
Payoff Fee for CFD
Plan Check
PLDA D
Strong Motion Fee
60.00
49.00
182.00
1,378.00
2,400.00
5,648.00
540.00
4,666.14
896.00
10.00
31.00
FINAL APPROVAL
Inspector:Date:Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as fees/exactions.' You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired.
Inspection List
Permit*:
Date
9/13/96
9/12/96
7/19/96
7/19/96
7/19/96
7/18/96
7/18/96
7/18/96
7/17/96
7/17/96
7/17/96
7/15/96
7/12/96
7/11/96
7/9/96
7/8/96
6/17/96
6/17/96
4/25/96
4/24/96
4/19/96
4/15/96
CB960091 Type: SFD 3780 SF+675 GAR+48.8 SF DECK
PLAN 4.PHASE 4,MARFIORE,TAYLOR WO
Inspection Item Inspector Act Comments
39
39
17
18
23
17
18
23
17
18
23
16
16
16
84
84
13
15
12
12
11
21
Final Electrical
Final Electrical
Interior Lath/Drywall
Exterior Lath/Drywall
Gas/Test/Repairs
Interior Lath/Drywall
Exterior Lath/Drywall
Gas/Test/Repairs
Interior Lath/Drywall
Exterior Lath/Drywall
Gas/Test/Repairs
Insulation
Insulation
Insulation
Rough Combo
Rough Combo
Shear Panels/HD's
Roof/Reroof
Steel/Bond Beam
Steel/Bond Beam
Ftg/Foundation/Piers
Underground/Under Floor
PD
PY
PD
PD
PD
PD
PD
PD
PD
PD
PD
PD
PD
PD
PD
PD
PD
PD
PD
PD
PD
PY
AP
NS
AP
AP
AP
NR
NR
NR
CO
CO
CO
AP
CA PER CONTRACTOR
NR
AP
NR
AP
AP
AP SLAB
CA BYTW
AP
AP
Friday, March 19,1999 Page 1 of 1