HomeMy WebLinkAbout1385 BUENA VISTA WAY; ; CB920495; PermitBUILDING PERMIT Permit No: CE(920495
06/18/92 15:02 Project Nu: A9100149
Page 1 of 1 Development No:
Job Address: 1385 BUENA VISTA WY Suite : Perm:t Type: SINGLE FAMILY DWLNG - DETACHED 8137 06/18\52 ooo1 01 02
V a 1 ua t i on :
Construction Type: VN
Occupancy Group: RJ/MT Reference#: Status: ISSUED
Description: 2413 SF + 660 SF GAR + 72 SF Appli e? : (I 5/19,’ 2
: DECK Apr/Issue: 06/18/32
I
Parcel No: Lot#: C-PR)IT 10960 00
c\c 3qz 194,785
Validated By: UC
AppUOwnr : PARIZEACI, PAUL 619-434-4994
P.O. BOX 230-822
ENCINITAS, CA 9202,
A** Fees Required ** ......................
Fees :
Adjustments:
Total Fees:
-- Fee --__ ript ---- ion ----
Building Permit
Plan Check
Strong Motion Fee
.Enter Number of ED
Enter “Y“ to Autoc
Enter “Y” to Autoca
* BUI Enter LDING
I’ Y ”
TOT f 01
‘A L
Plum
Each Plumbing Fixture ory-
Each Building Sewer
Each Water Heat,er and/or Ven
Gas Piping System
Each Vacuum Breaker > * PLUMBING TOTAL
Enter “Y” for Electric Issue Fee >
* ELECTRICAL TOTAL
Enter ’Y’ for Mechanical Issue Fee>
Install Furn/Ducts j Each Install/Reloc Appliance Vent >
;k MECHANICAL TOTAL
Single Phase Per AMP >
Each Hood/Fireplace >
1 2.50
2 2.50
0
0
0
0
1 9.00
3 4.50
I 6. 5U
0
200 .25
Credits A**
. (I 0
618.00
10,960.00
Ext fee Data
---------------I
972.00
632. OC?
19.00
2200.00
3545.00 Y
3272. 00
362.fO V
4C8. 00
114”1(3. CO
7 . 5 lJ Y
40.0Cl
6 . 5 (1
2.5e
2.50
5.00
64.00
10.00 Y
50.00
60.00
15.00 Y
9.00
13.50
6.50
44.00
CITY OF CARLSBAD
2075 Las palmas Dr., Carlskl, CA 92009 (619) 438-1161
PERMlT APPUWTION
City of Carlsbad Building Department 2075 Las Palms Dr., Carlsbed, U 92009 (619) 436-1161
i
U Tenant Improvement
0 Tenant Improvement
C -#Residential Apartment DCondo Fgle Family Dwelling 0 Addition/Alteration
0 Duplex 0 Demolition 0 Relocation 0 Mobile Home 0 Electrical 0 Plumbing
0 Mechanical 0 Pwl 0 Spa 0 Retaining Wall 0 Solar 0 Other
2. PRWI"
#OFSTORIES \u 0 -1 rom applicant) 'NAME -rtt ADDRESS
CITY STATE ZIP CODE DAY TELEPHONE
NAME
CITY
ADDRESS
STATE ZIP CODE DAY TELEPHONE
ADDRESS @ 0- bo$ 23 0 gZlL &c+J
\1*) STATE C ZIP CODE qZ0 23 DAY TELEPHONE vby-yq 9
PLAN CHECK NO.
C-rnMT 618.00 CUdQ. q1-~/9 CR- 33q
FOR OFFICE USE ONLY
NAME
CITY
ADDRESS
STATE ZIP CODE DAY TELEPHONE
STATE LIC. # LICENSE CLASS CITY BUSINESS LIC. #
CITY STATE ZIP CODE
Workers' Compensatron Wclaration: I hereby affirm that I have a certiticate ot consent to selt-insure issued by the Director ot Industrial Relations, or a certificate of Workers' Compensation Insurance by an admitted insurer, or an exact copy or duplicate thereof certified by the Director of the insurer thereof filed with the Building Inspection Department (Section 3800, Lab. C).
INSURANCE COMPANY WLICY NO. EXF'IRATION DATE Certlticate of Exemptron: 1 certlty that in the pertormance 01 the work tor which this permit IS ISSU~, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of California.
SIGNATURE DATE
Owner-Builder Declaration: I hereby attirm that 1 am exempt trom the Contractofs License Law tor the following reason:
I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale.).
I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Profgsions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law).
I am exempt under Section
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pumant to the provisions of the Contractor's License Law (Chapter 9, commencing with Section 7000 of Division 3 of the Busings and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars [$500]).
0
0
D Business and Professions Code for this reason:
SIGNATURE DATE
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505,25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act?
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district?
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site?
IF ANYOF THE ANSWERS ARE YES, A FINALCERTWICATE OF OOCUPANCYMAY HAS -OR IS MEEllNGTHE W- OF THE OFFICE OF EMERGENCY SERVICE ANDTHEAIRwIumoNamTRaDIsIRKsI.
1 hereby attirm that there is a construction lending agency tor the pertormance of the work tor which this permit IS issued [Sex
0 YES 0 NO
0 YES 0 NO
0 YES 0 NO BE ISSUED AFIWJULY 1,1989 UNIESS THE-
I Uwl code).
LENDER'S NAME LENDER'S ADDRESS
~ ~~~ ~~
1 certity that 1 have read the application and state that the above intormation IS correct. 1 agree to comply with all City ordinances and State laws relating to building construction. I hereby authorize representativg of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I~~~~~~~~AND~~THE~~~~~~~~~~~ AND EXPENSES WHICH MAY IN ANYWAY ~~~~~ SAID~INooN~opTHEGRANTINGOFTHlS~.
OSHA: An OSHA permit is required for excavations over 5'0" deep and demolition or construction of structures over 3 stories in height.
under the provisions of this Code shall expire by limitation and become null and void if the enced within 365 days from the date of such permit or if the building or work authorized by r the work is commenced for a period of 180 days (Section 303(d)
DATE:
TE. File YELLOW. Applicant PINK: Finance
FINAL BUILDING INSPECTION
DEPT: BUILDING ENGINEERING FIRE PLANNING U/M WATER
PLAN CHECK#: CB920495
PERMIT#: CB920495
PROJECT NAME: 2413 SF + 660 SF GAR + 72 SF
DECK + 188 SF ADDED DECK
DATE: 02/24/93’
PERMIT TYPE: SFD
ADDRESS: 1385 BUENA VISTA WY
CONTACT PERSON/PHONE#: PAUL/434-4994
SEWER DIST: WATER DIST:
DATE
INSPECTED: 5,/s/g3 APPROVED & DISAPPROVED -
INSPECTED DATE
BY: INSPECTED : APPROVED - DISAPPROVED -
INSPECTED DATE
BY: INSPECTED : APPROVED - DISAPPROVED -
FINAL BUILDING INSPECTION
DEPT: BUILDING ENGINEERING FIRE PLANNING U/M WATER
PLAN CHECK#: CB920495
PERMIT#: CB920495
PROJECT NAME: 2413 SF + 660 SF GAR + 72 SF
DECK + 188 SF ADDED DECK
DATE: 02/24/93'
PERMIT TYPE: SFD
ADDRESS: 1385 BUENA VISTA WY
CONTACT PERSON/PHONE#: PAUL/434-4994
SEWER DIST: WATER DIST:
DATE
INSPECTED: 3/?4?3 APPROVED - DISAPPROVED x
FINAL BUILDING INSPECTION
DEPT: BUILDING ENGINEERING FIRE PLANNING U/M WATER
PLAN CHECK#: CB920495
PERMIT#: CB920495
PROJECT NAME: 2413 SF + 660 SF GAR + 72 SF
DECK + 188 SF ADDED DECK
DATE: 02/24/93'
PERMIT TYPE: SFD
ADDRESS: 1385 BWENA VISTA WY
CONTACT PERSON/PHONE# : PAUL/434-4994
SEWER DIST: WATER DIST:
INSPECTED DATE
BY: INSPECTED: APPROVED - DISAPPROVED -
INSPECTED DATE
BY: INSPECTED: APPROVED - DISAPPROVED -
CITY OF CARLSBAD INSPECTION REQUEST PERMIT# CB920495 FOR 03/03/93 INSPECTOR AREA PD DESCRIPTION: 2413 SF + 660 SF GAR + 72 SF PUCK# CB920495
TYPE: SFD CONSTR. TYPE VN JOB ADDRESS: 1385 BUENA VISTA WY STE : LOT: APPLICANT: PARIZEAU, PAUL PHONE: 619-434-4994 CONTRACTOR: OWNER:
REMARKS: MH/PAUL/434-4994 INSPECT
DECK + 188 SF ADDED DECK OCC GRP R3/M1
SPECIAL INSTRUCT:
TOTAL TIME:
--RELATED PERMITS-- PERMIT# TYPE CB910119 =
CD LVL DESCRIPTION
19 ST Final Structural 29 PL Final Plumbing 39 EL Final Electrical 49 ME Final Mechanical
SE920043 SWRSD ISSUED PE292016 GRADING ISSUED CB920940 ELEC ISSUED RW930024 ROW ISSUED CB921143 POOL ISSUED
ACT COMMENTS f
***** INSPECTION HISTORY *****
DATE 012693 012593 121792 121092 121092 120892 120792 112592 110692
110692
092392
092292
092292
091892
091892
091492
091492 091492
DESCRIPTION Ftg/Fouhdation/Piers Gas/Test/Repairs Interior Lath/Drywall Frame/Steel/Bolting/Welding
Insulation Frame/Steel/Boltinq/Welding Frame/Steel/Bolting/Welding
Frame/Steel/Bolting/Welding
Shear Panels/HD's Roof/Reroof
Ftg/Foundation/Piers
Ftg/Foundation/Piers
Underground/Under Floor
Sewer/Water Service
Const. Service/Agricultural
Sewer/Water Service Rough/Topout Const. Service/Agricultural
ACT AP AP AP
AP
AP co co co co
AP
NS
AP
AP AP AP co co co
INSP COMMENTS
PD 3 DECK FTGS PD
PD
PD
PD
PD
PD
PD
PD
PD
PK
PK
PK PD
PD PD PD PD
EXCEPT GARAGE SLAB
UFFER
COPPER
RELEASE TSPB
CITY OF CARLSBAD NOTICE Q
438-3550
BUILDING DEPARTMENT 2075 LAS PALMAS DRIVE
PERMIT NO.
PHONE
CODE ENFORCEMENT OFFICER
FIELD REPORT - LOCATION /3 8C B elm+ c// 97-44 ! ("AYCS BA E)
c j.'AutlZEAL,' CONTRACTOR OWNER
WEATHER TEMP
~~
SUMMARY OF INSPECTION:
DATE / I PROJECT NO. 9 //& z
PROJECT
~~
RECOMMENDATIONS:
JOHN VERNON
R.C.E. 21121 GE 858
PROPERN DEVELOPMENT ENGINEERS. IN
ENGINEERING * SOILS TESTING * SURVEYING
1859 S. ESCONDIW BLVD. ESCONDIDO. CA 62025 EL. (as) 743-8808 \ 1859 S. ESCONDIW BLVD. ESCONDIDO. CA 62025 EL. (as) 743-8808
JOHN VERNON
R.C.E. 21121 GE 858
PROPERN DEVELOPMENT ENGINEERS. IN
ENGINEERING * SOILS TESTING * SURVEYING
SIGNATURE /
* 4- ESGIL CORPORATION
0320 CHESAPEAKE DR., SUITE 208
SAN DIEGO, CA 92 123
(619) 560-1468
DATE : g- rk-92 Y
JURISDICTION:
PLAN CHECK NO: 9,' 4-75 wR SET: 2
PROJECT NAY%: Sf=P -'pe
1E3
cl
0
cf
0
0
lz!
0
0
r
I
U- GFILE COPY
EUPS
DESIGNER
[ KPdl~.] OU )
rhe plans transmitted herewith have been corrected where
necessary and substantially comply with the jurisdiction's milding codes.
The Flans transmitted herewith will substantially comply with the jurisdiction's building codes when ninor deficien- cies identified are resolved and checked by building department staff.
The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected
and resubmitted for a complete recheck.
The check list transmitted herewith is for your information.
The plans are being held at Esgil Cor?. until corrected plans are submitted for recheck.
The applicant's copy of the check list is enclosed for the
jurisdiction to return to the applicant contact person.
The applicant's copy of the check list has been sent to:
Esgil staff did not advise the applicant contact person that plan check has been completed.
Esgil staff - did advise applicant that the plan check has been completed. Person contacted:
Date contacted: Telephone I
REMARKS :
By:' me DOL/Grt)'TE- Enclosures:
ESGIL CORPORATION
OGA D CN 8- //-%-
e
Prepared by 1
)!?-6 by VALUATION AND PLAN CHECK FEE
’ BUILDING PORTION EUILDING AREA
r4Q D/7/-0N f-7 L 72 4& I
-
a Bldg. Dept.
0 Esgil
VALUATION VALUE MULTIPLIER I
Zf, &&of
PLAN CHECK NO. 4 2-4 45 @v, tvi3- 1
BUILDING ADDRESS I SPG wE1J* fIL7* 1”Jby
PHONE NO. (619) CcCg -ZZc)L
DESIGNER PHONE
CONTRACTOR PHONE
I
LA -?a%?-- AP?LXCANT/CONTACT
BUILDING OCCUPANCY
TYPZ OF CONSTRUCTION v-N
- 1 I
I
*.
Building Permit fee $- s 9 0.. 03
Plan Check fee S $ 58857
Air Conditioning Commercial . c!
- Residential @
Res. or Comm.
Fire Sprinklers @
Total Value 6C/OY
I
COMMENTS:
SHEET OF / 12/87
ESGIL CORPORATION
0320 CHESAPEAKE DR., SUlTE 208
SAN DIEGO, CA 92 123
(619) 5-1468
0
0
0
MI
0 w
IXJ
0
0
I
u mFILE COPY
EUPS
DDESIGNER
?he plans transmitted herewith have been corrected where iecessary and substantially comply with the .jurisdiction's
milding codes.
rhe plans transmitted herewith will substantially comply
sith the jurisdicti.on's building codes when minor deficien- zies identified are resolved and
zhecked by building department staff.
rhe plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck.
The check list transmitted herewith is for your information.
The plans are being held at Esgil Corp. until corrected plans are submitted for recheck.
The applicant's copy of the check list is enclosed for the jurisdiction to return to the applicant contact person.
The applicant's copy of the check list has been sent to:
PrSLcC Pr7 RIZm9CA
Esgil staff did not advise the applicant contact person that plan check has been completed.
Esgil staff 7 did advise applicant that the plan check has been completed. Person contacted:
Date contacted: Telephone #
REMARKS :
By: m3e Docr-tardTE Enclosures: ESGIL CORPORATION
OGA OCM
JURISDICTION: Ls t3fi-D Date plans received by plan checker: 6- 21 - 9 2
Plan check is limited to technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and disabled access. The plan check is based on regulations enforced by the Building Inspection Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department or other departments.
The items shown below need clarification, modification or change. All items have to be satisfied before the plans will be in conformance with the cited codes and Per Sec. 303(c), of the Uniform Building Code, the approval of the plans does not permit the violation of any state, county or city law.
regulations.
Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located on the plans.
E5&/C C0/2PU/Zr47/D/d OR Have changes been made to the plans not resulting from this correction list? Please
0 Please make all corrections on the original
and any original plan sets that may have been returned to you by the jurisdiction, to:
6’”” tracings and submit two new sets of prints,
7W? &M/LD/PIL VEPTt check.
To facilitate checking, please identify, next Yes No to each item, the sheet of the plans upon which each correction on this sheet has been made and return this check sheet with the revised plans.
I /
Form No. PCS.41390
Prepared byr mE-
*
VALUATTON AND PLAN CHECK FEE
1 1 I -
a Bldg. Dept.
0 Esgil
PLAN CHECK NO. 9 Z - 49s
BUILDING ADDRESS (4gr mGd* v/47've
APPLTCANT/CONTACT pw Pfle~my PHONE NO. (619) +S+- ~~~~
BUILDING OCCUPANCY P-'3 //.? DES?CNER PHONE
TYPE OF CONSTRUCTION V--N CONTRACTOR PHONE
SUILDING PORTION BUILDING AREA VALUATION VALUE ' '
MULTIPLIER I
1
I 1 1
Air Conditionina I 1
Commercial . I ra
Residential 1 24 80 6, 752
Res. or Corn.
Fire Sprinklers @ I Total Value I /9+ 725- I
d - Quilding Permit Fee $--
Plan Check Fee $ s 6?I,P23
COMMENTS:
SHEET OF - 12/87
BUILDING PLANCHECK ENGINEERING CHECKLIST
NR
D D A.Pr4, \5d-23-70
E ITEM INCOMPLETE
NEEDS YOUR ACTION
- - ITEM SELECTED
ccc PROJECT ID:
HHH E E E LEGAL REOUIREMENTS
an st'' ziovide a fully dimensioned site plan drawn to scale.
Show: north arrow, property lines, easements, existing and
proposed structures I streets I eXist%%j str~ef-iE@rovemen~ -----..-..---- -
right-of-way width and dimension setbacks. /
.i..i"& I----*-- @ nl 2. Show on site plan: Sanish floor ele- pad -- elevations I e~g$g~~na,ao~- finistr grz* -cent to
building, xisting topograpTica TY existing and proposed shes, dr%v%way witR7percent (%) grade and
Provide legal description and Assessors Parcel Number.
'\drainage pat?eTYi% 4
"I*'-".,* --.- ~ - do 3.
nnn 6.
No Discretionary approvals were required.
Project complies with all Engineering Conditions of Approval for Project No.
Project does not comply with the following Engineering
Conditions of Approval for Project No.
Conditions complied with by: Date : Field Review
7. Field review completed. No issues raised.
8. Field review completed. The following issues or discrepancies with the site plan were found:
Site lacks adequate puBlic improvements
conflict with site plan.
A.
B. Existing drainage improvements not shown or in
C. Site is served by overhead power lines.
FRMOOlO. DH REV. 11/27/90
1 OuU D. 5.
II
E.
nun F.
don nou
Grading is required to access site, create pad or provide for ultimate street improvement.
Site access visibility problems exist.
turnaround or engineered solution to problem. Provide onsite
Other:
Dedication Reauirements
9. No dedication required.
10. Dedication required. Please have a registered Civil
Engineer or Land Surveyor prepare the appropriate legal
description together with an 8%" x 1l1I plat map and submit with a title report and the required processing fee. All easement documents must be approved and signed by owner (s) prior to issuance of Building Permit. The description of the dedication is as follows:
Dedication completed, Date By:
Imnrovement Reauirements
11. No public improvements required. SPECIAL NOTE: Damaaed ox
be reDaired to the satisfaction of the City insDector m5oy to OccuDanw.
12. Public improvements required. This project requires
construction of public improvements pursuant to Section
18.40 of the City Code. Please have a registered Civil Engineer prepare appropriate improvement plans and submit for separate plancheck process through the Engineering Department. Improvement plans must be approved, appropriate securities posted and fees paid prior to issuance of permit.
2
The required improvements are:
FRM0010.DH
Improvement plans signed, Date: by:
REV. 11/27/90
CURB GL(7TEh I siN3JAl-L ’. 13. Improdements are required. Construction of the public
c
improvements may be deferred in accordance with Section
18.40 of the City Code. Please submit a letter requesting deferral of the required improvements together with a recent title report on the property and the appropriate
processing fee so we may prepare the necessary Future Improvement Agreement. The Future Improvement Agreement must be signed, notarized and approved by the City prior to
issuance of a Building Permit.
Future Improvement Agreement completed, Date: %
By:
13a. Inadequate information available on site plan to make a determination on grading requirements. Please provide more
detailed proposed and existing elevations and contours.
Include accurate estimates of the grading quantities (cut, fill, import, export) .
nod. No grading required as determined by the information
provided on the- site plan.
15. Grading Permit required. A separate grading plan prepared
by a registered Civil Engineer must be submitted for
separate plan check and approval through the Engineering
Department. NOTE: The Gradinu Permit must be issued and aradina substantiallv complete and found acceptable to the City Inspector Drior to issuance of Buildinu Pe rmits.
Grading Inspector sign off. Date: by:
Miscellaneous Permits
‘moo 16.
17.
Right-of-way Permit not required.
Right-of-way Permit required. A separate Right-of-way Permit issued by the Engineering Department is required for the following:
18. €mJn 19.
cmn 20.
Sewer Permit is not required.
Sewer Permit is required. A sewer Permit is required
concurrent with Building Permit issuance. The fee required is noted below in the fees section.
Industrial Waste Permit is not required.
FRM0010.DH REV. 11/27/90
21. Industrial Waste Permit is required. Applicant must complete Industrial Waste Permit Application Form and
Permits. Permits must be issued prior to occupancy.
Industrial Waster Permit accepted -
, .
Y submit for City approval prior to issuance of a Building
Date: By:
Fees Rewired
El 23.
cl d/A 24.
m 25.
0 26.
m 27.
0 28.
Park-in-Lieu Fee Quadrant : Fee per Unit: Total Fees:
Traffic Impact Fee Per Unit: %%O,b'lt Total Fee
Bridge and Thorough fare Fee Fee Per Unit: Total Fee:
Public Facilities Fee required.
Facilities Management Fee Zone: 1 Fee: Wluk
Sewer Fees Permit No. "M2d% EDU's I PQu X\@io Fee: *\69\0, c
Sewer Lateral Required:
Fee:
El 29.
ISBUE PERMIT
DATE: s2Bq%
ZYZ 666 000 411
APN: -230 -72,
Type of Project and Use se- h/ DLwz?& pt/# Gad 37
. Zone @-A/ Facilities Management Zone /
Item Complete
Item Incomplete - Needs your action
1, 2, 3 Number in circle indicates plancheck number where deficiency was
identified
do EnvL.onmental Review Required: yEs - NO%mE
DATE OF COMPLETION:
Compliance with conditions of approval? If not, state conditions which require action.
Conditions 9f Approval
APPROVWRESO. NO. DATE:
PROJECI' NO.
OTHER RELATED CASES:
Compliance with conditions of approval? If not, state conditions which require action. I
Conditions of Approval
Pdt Required: YES - NOS .. do0 californiacoastalComrmsslon
DATE OF APPROVAL:
San Diego Coast District, 3111 Camino Del No North, Suite 200, San Diego, CA. 92108-1725
Compliancewith conditions of approval? If not, state conditions which require action. Conditions of Approval
(619) 521-8036
&a LandscapePlanRequired:YES NO$(
See attached submittal requirements for landscape plans
Site Plan: / do 0
.. .: ,
1.
2.
3.
4.
1
Provide a fully dimensioned site plan drawn to scale. Show: North
arrow, property lines, easements, existing and proposed structures,
streets, existing street improvements, right-of-way width and
dimensioned setbacks.
Show on Site Plan: Finish floor elevations, elevations of finish grade
adjacent to building, existing topographical lines, existing and proposed
slopes and driveway.
Provide legal description of property.
Provide assessois parcel number.
1. Setbacks:
Front:
Int. Side:
Street Side:
Rear:
2. Lot coverage:
3. Height:
4. Parking:
Required zd Shown 7&* Required zJ+ Shown lzT
Required cp-Shown ;te-
Required /Ft Shown JBJ'
Required dW% Shown Ze
Required L30' Shown 27'
Spaces Required 2-- Shown 3
Guest Spaces Required Shown
Additional Comments
OK TO [SSUE AND ENTERED APPROVAL tNT0 COMPUTER ' $L DATE s--zLq 7
PWCECFRM
-.
3'
c
z.!!!P-.BEsE@N,cerIE519 GOVERNING CODE 1988 LJNIFORM BUILDING CODE
SIESMIC ZCINE 4, V = (ZIC/RW)W = .lt33W
WIND ZONE 70 MPti, EXPOSURE C
RAFTERS AND JOIST8...............NO. 2
HIDEES...........................NU. 2
HERDERS RND POSTS.. .............. .NO. 1
STIJDS..II.............r...........~~NSTRUCTIOt~
LiEfiMS. ........................... SEL-ECT STRUCT'lJRfiL.
tIIPS AND Vfil ... L-EYS. ............... .NO. 1
GI..CtL..AMS .. SIMPLE.: GF'AN. ........... 24F .. V4 flF/Dl-
CnNTIl ... EVER. ............ 24F - vu DF/DF'
..
NEER x
INSPECTION
NG
41€392 ENTERPRISE CIRCLE SO, STE. Ei:
TEMECULA, Clrr, 92390
BLlS: (714) 676-1844 FAX: (714) 6Y4--6O26
.-
' \
c
.. 0.
e
*.
w n L.1-8
ROCIF LIVE LORD -- 20 PSF FUR 3/12 PITCH OF LESS
GYPSLJM ;DUTt4 s I IIES. .................. 5.0 P6F zx 8TL.II)S.. 1 . 0 F:SF
MLSC.,....'.......................... 1 . 0 P6FT
16 PSF FOR 4/12 PITCH TO 8/12
..........................
-.I---...---- ----- -.-
7.0 PSF INT'ERIOR WALL.. - -.
STIJCCCJ. ............................. 12. 0 F%F
INS\JL,RTION.. ........................ 1. . 0 PSF
GYPSUM.............................. 2. 5 P6F
MISC.....w.......I...............m.. 0. 5 C'SF
2X STLIDS.. .......................... 1 . 0 f.:'C;F
17.0 PSF EXTEfi 1: CJR W0l-L.
F'LC30RING.. .......................... 1.0 PSF
.PLYWOOD............................... 1.5 PSF
2X JOIST............................ 2.5 PSF
E3LEC7-R I CAL. MID MECHRN I CRL.. ........... 0.5 FSF
I NSUL.Al 1 ON. ......................... 1 . 0 PSF"
GYPSlJM: ............................. 2.5 PSF
MISC.;.............""....,.......... 1.0 PSF
TILED AREA WITH MORTAR.. ............ 12.0 PSF
I i
!
22.0 PSF, AWL ICABLE
-TILED AREA
t
3'
LATERAL FORCE. DISTRIBUTION FOR SI~SMIC CALCULATIONS
DIRECTION = ................................................................
FLOOR 82168.5 8 657348 .6092971 12122.09 2.201591
SUM OF WxHx = 1078863
SUM OF Wx = 106963.5
SUM OF % = 1 .................................................................
......................................................
FLOOR .186 15283.34 2.876594
.................................................................... -_--_---------------_________I__________-------------------------
'
c
i
'
-
..
d
I
2
=
..
I ..
. .... ' . . ... .. . ,.
.. ', ._..' - . _.-:.. @---I!
I
A b c
.. ... .. .7. .... .. ,. c . . :. *.
1
..
. ::
.. . '. .A.
......... . e.
.. ... ..... ,.. :. ..? .. ., .. .. .. .. ..
...... .. .... I.. ...... .. ...... ;.:. -0. .. .. ,'. ., _.,
s'
'.. 3 ..... .,:..-. ....... ..
_.. .. ' . . ,.. ,. I ., ., '
.. ... .. _.
. .: , .. . 9..
...
... , ..
.. ..
..
I
A
I.
,I , 'i .,: ....... ... ... .... .. , 1. . ... .. .' . . __. . .-. ,.*. . , .. ..
i,
2
I
. . ' :. .. ..... . '. .... , .. .... ..... .... ...
t
Y***Y*Y**Y*******Y***************************X***************~***~*******
LATERAL ANALYSIS ALONG LINE A AT SECOND FLOOR
SEISMIC FORCE = ( 4732.425 1 BASED'ON FOLLOWING:
................................................................
WIND FORCE = 2943.75 ) BASED ON FOLLOWING:
PROJECTED AREA METHOD
FORCE 0 - 20 FT HGT = 20.3
FORCE 20 - 40 FT HGT = 22
TOTAL FORCE = WIND*PRESSURE X TRIB AREA + FORCE FROM OTHER LEVELS
TOTAL 0 - 20 HGT 20 - 40 HGT FORCE FROM
FORCE TRIB AREA TRIB AREA OTHER LEVELS
2943.75 112.50 30.00 0.00
__--_----- ---------- -------------
NUMBER OF SHEARWALL PANELS SELECTED = 3
TOTAL LINEAR FEET USED IN CALCS = 33.2
MAX UNIT SHEAR = 142.5429
-----I--------______--------------------------
-
SHEAR UPLIFT - DEAD = TOTAL RATIO HOLDDOWN
PANEL# W H LOAD UPLIFT H/W MARK ------- ------- -------- ............................ ------ --_-_---
IC - 1.0 14.0 8.0 1140.3 2352.0 -1211.7 0.6
2.0 6.0 8.0 1140.3 1008.0 132.3 1.3
3.0 13.2 8.0 1140.3 2217.6 -1077.3 0.6 I
(MARKS, SEE.SCHEDULES) .............................
EXTERIOR SH EARWALL *' 3 >*
>*
>*
.......................
INTERIOR SHEARWALL ----- *- ....................... *3 SHEARWALL CONNECTIONS
--I-------------------- .............................
..........................................................................
.......................................................................... . PROJECT.. ... BUENA VISTA** ENGINEER ...... DGU** DATE .... 1-3-91 .
*tft*~*****X***XX***Xt*********X**tX**X********X*************************
LATERAL ANALYSIS ALONG LINE B AT'SECOND FLOOR .
................................................................
SEISMIC FORCE = ( 4732.425 BASED ON FOLLOWING:
TOTAL DICSPHRAGM UNIT FORCE FORCE FROM
FORCE (=) TRIB AREA (X) PSF (+) OTHER LEVELS
4732 I 43 607.50 7.79 0.00
-------- -...-------- ---------- ------------
WIND FORCE = ( 2943.75 ) BASED ON FOLLOWING:
PROJECTED AREA METHOD
FORCE 0 - 20 FT HGT = 20.3
FORCE 20 - 40 FT HGT = 22
TOTAL FORCE = WIND PRESSURE X TRIB AREA + FORCE FROM OTHER LEVELS
TOTAL 0 - 20 HGT 20 - 40 HGT FORCE FROM
FORCE TRIB AREA TRIB AREA OTHER LEVELS
2943.75 112.50 30.00 0.00
----------- --.-------- ----------
NUMBER OF SHEARWALL PANELS SELECTED = 2
TOTAL LINEAR FEET USED IN CALCS = 20.1
MAX UNIT SHEAR = 235.444 -
-------------I--------------------------------
SHEAR UPLIFT - DEAD = TOTAL RATIO HOLDDONN
PANEL# W H LOAD UPLIFT H/W MARK
1.0 7.8 8.0 1883.6 1310.4 573.2 l..O a
2.0 12.3 8.0 1883.6 2066.4 -182.8 0.7 -
------- ------- -------- ............................ ------ -----cI-
(MARKS, SEE SCHEDULES) .............................
*3
*'I
EXTERIOR SHEARWALL >*
INTERIOR Sti EARWALL -.-I-- * >*
SHEARWALL CONNECTIONS >*
.......................
.......................
....................... .............................
3
..........................................................................
PROJECT ..... BUENA VISTA** ENGINEER ...... DGU** DATE .... 1-3-91 ..........................................................................
.........................................................................
LATERAL ANALYSIS ALONG LINE 1 AT SECOND FLOOR
SEISMIC FORCE = ( 2103.3 ) BASED ON FOLLOWING:
................................................................
TOTAL DIAPHRAGM UNIT FORCE FORCE FROM
FORCE (=) TRIB AREA (X) PSF (+) OTHER LEVELS
2103.30 270.00 7.79 0.00
-------- ---------- ---------- ------------
WIND FORCE = 1766.25 1 BASED ON FOLLOWING:
PROJECTED AREA METHOD
FORCE 0 - 20 FT HGT = 20.3
FORCE 20 - 40 FT HGT = 22
TOTAL FORCE = WIND PRESSURE X TRIB AREA + FORCE FROM OTHER LEVELS
-TOTAL 0 - 20 HGT 20 - 40 HGT FORCE FROM
FORCE TRIB AREA TRIB AREA OTHER LEVELS
1766.25 67.50 18.00 0.00
----------- ---------- ---------- ----I--------
NUMBER OF SHEARWALL PANELS SELECTED = 2
TOTAL LINEAR FEET USED IN CALCS = 13.5
MAX UNIT SHEAR = 155.8
(MARKS, SEE SCHEDULES) .............................
EXTERIOR SHEARWALL
INTERIOR SHEARWALL ----- *
SHEARWALL CONNECTIONS
> *- .......................
"0 >* ----------------I------ ***************************%*
NOTE: PLYWOOD WALLS WITH H/W RATIO > 2 TO 1 TO BE BLOCKED
NOTE: PLYWOOD WALLS MAX H/W RATIO IS 3.5 TO 1
t************~***************************~********************************
PROJECT ..... BUENA VISTA** ENGINEER ...... DGU** DATE. ... 1-3-91 ...........................................................................
c
.........................................................................
LATERAL ANALYSIS ALONG LINE 2 AT SECOND FLOOR ................................................................
SEISMIC FORCE = ( 5608.8 BASED ON FOLLOWING:
TOTAL D I RPH RAGM UNIT FORCE FORCE FROM
FORCE (=) TRIB AREA (X) PSF (+I OTHER LEVELS
5608.80 720.00 7.79 0.00
-------- ---------- ---------- ------------ __
WIND FORCE = 4886 ) BASED ON FOLLOWING:
PROJECTED AREA METHOD
FORCE 0 - 20 FT HGT = 20'.3
FORCE 20 - 40 FT HGT = 22
TOTAL FORCE = WIND PRESSURE X TRIB AREA
NUMBER OF SHEARWALL PANELS SELECTED = TOTAL LINEAR FEET USED IN CALCS - -
+ FORCE FROM OTHER LEVELS
3
17.2
Sti EAR UPLIFT - DEAD = TOTAL RATIO HOLDDOWN
PANEL# W H. LOAD UPLIFT H/W MARK ------- ------- -------- ............................ ------ --------
1.0 7.0 0.0 2608.7 896.0 1712.7 "1ST4f) -c 2.0 3.6 8.0 2608.7 460.8 2147.9 2.2
3.0 6.6 8.0 2608.7 844.8 1763.9 1.2
(MARKS, SEE SCHEDULES) .............................
EXTERIOR SHEARWALL * >*
INTERIOR SHEARWALL ----- >* SHEARWALL CONNECTIONS *
.......................
*: 4 .......................
> *g ....................... ..............................
NOTE: PLYWOOD WALLS WITH H/W RATIO > 2 TO 1 TO BE BLOCKED
NOTE-: PLYWOOD WALLS MAX H/W RATIO IS 3.5 TO 1
..........................................................................
PROJECT... ..BUENA VISTA** ENGINEER ...... DGU** DATE .... 1-3-91 ............................................................................
c
.........................................................................
LATERAL ANALYSIS ALONG LINE 3 AT SECOND FLOOR
SEISMIC FORCE = ( 3505.5 ) BASED ON FOLLOWING:
................................................................
TOTAL DIAPHRAGM UNIT FORCE FORCE FROM
FORCE (=) TRIB AREA (X) PSF (+) OTHER LEVELS
3505.50 450.00 7.79 0.00
-------- ---------- ---------- ------------
WIND FORCE = ( 2943.75 ) BASED ON FOLLOWING:
PROJECTED AREA METHOD
FORCE 0 - 20 FT HGT = 20.3
FORCE 20 - 40 FT HGT = 22
TOTAL FORCE = WIND PRESSURE
TOTAL 0 - 20 HGT
FORCE TRIB AREA
2943.75 112.50
----------- -I--------
X TRIB AREA
20 - 40 HGT
TRIB AREA ------..----
30.00
NUMBER OF SHEARWALL PANELS SELECTED = TOTAL LINEAR FEET USED IN CALCS - -
+ FORCE FROM OTHER LEVELS
2
12.4
(MARKS, SEE SCHEDULES) .............................
*4
*8
EXTERIOR SHEARWALL >* INTERIOR SHEARWALL ----- *
SHEARWALL CONNECTIONS
.......................
> *d .......................
>* ....................... .............................
NOTE: PLYWOOD WALLS WITH H/W RATIO > 2 TO 1 TO BE BLOCKED
NOTE: PLYWOOD WALLS MAX H/W RATIO IS 3.5 TO 1
..........................................................................
PROJECT ..... BUENA VISTA** ENGINEER ...... DGU** DATE .... 1-3-91 ..........................................................................
,
...........................................................................
LATERAL ANALYSIS ALONG LINE A AT FIRST FLOOR
SEISMIC FORCE = 6636.22 1 BASED ON FOLLOWING:
................................................................
TOTAL DIAPHRAGM UNIT FORCE FORCE FROM
FORCE (=) TRIB AREA (X) PSF (4-1 OTHER LEVELS
6636.22 835.00 2.28 4732.42
I------.- ---------- ---------- ----c-------
WIND FORCE = ( 5532 ) BASED ON FOLLOWING:
PROJECTED AREA METHOD
FORCE 0 - 20 FT HGT = 20.3
FORCE 20 - 40 FT HGT = 22
TOTAL FORCE = WIND PRESSURE X TRIB AREA f FORCE FROM OTHER LEVELS
TOTAL 0 - 20 HGT 20 - 40 HGT FORCE FROM
FORCE TRIB AREA TRIB AREA OTHER LEVELS ----------- ---------- -_-------.- ,-------------.
'5532.00 127.50 0.00 2943.75
NUMBER OF SHEARWALL PANELS SELECTED = 4
TOTAL LINEAR FEET USED IN CALCS = 40.7
MAX UNIT SHEAR = 163.0521
- ----I-----------------------------------------
SHEAR UPLIFT - DEAD = TOTAL RATIO HOLDDOWN
PANEL# W H LOAD UPLIFT H/W MARK ------- ------- -------- --------I------------------- ------ --------
0.3 1.0 23.0 8.0 1304.4 5014.0 -3709.6
2.0 8.0 8.0 1304.4 1744.0 -439.6 1.0
3.0 2.4 8.0 1304.4 523.2 781.2 3.3 -
4.0 7.3 8.0 1304.4 1591.4 -287.0 1.1 - -
(MARKS, SEE SCHEDULES) .............................
*4
SHEARWALL CONNECTIONS *'I
EXTERIOR SHEARWALL
INTERIOR SHEARWALL ----- * - >*
>*
>*
.......................
.......................
....................... .............................
NOTE: PLYWOOD WALLS WITH H/W RATIO > 2 TO 1 TO BE BLOCKED
NOTE: PLYWOOD WALLS MAX H/W RATIO IS 3.5 TO 1
..........................................................................
PROJECT ..... BUENA VISTA** ENGINEER ...... DGU** DATE. ... 1-3-91 ..........................................................................
.
.........................................................................
LATERAL ANALYSIS OLONG LINE B AT FIRST FLOOR
SEISMIC FORCE = ( 7110.46 BASED ON FOLLOWING:
................................................................
TOTAL DIAPHRAGM
FORCE (=) TRIB AREA (X)
7110.46 1043.00
--------
.WIND FORCE = ( 6912.4 ) BASED
PROJECTED AREA METHOD
FORCE 0 - 20 FT HGT = 20.3
FORCE 20 - 40 FT HGT = 22
TOTAL FORCE = WIND PRESSURE X
UNIT FORCE FORCE FROM
PSF (+) OTHER LEVELS
2.28 4732.42
---------- ------------
ON FOLLOWING:
TRIB AREA -1- FORCE FROM OTHER LEVELS
TOTAL 0 - 20 HGT 20 - 40 HGT FORCE FROM
FORCE. TRIB AREA TRIB AREA OTHER LEVELS
6912.40 195.50 0.00 2943.75
----------- ---------- -_--------
NUMBER OF SHEARWALL PANELS SELECTED = 3
TOTAL LINEAR FEET USED IN CALCS = 21.3 -
MAX UNIT SHEAR = 333-8244
..............................................
SHEAR UPLIFT - DEAD TOTAL RATIO HOLDDOW
PANEL# W H LOAD UPLIFT H/W MARK -...----- ------- --___-_- ____---I------------_^______ ------ -------
3.1 1.0 2.6 8.0 2670.6 566.8 2103.8
2.0 14.7 8.0 2670.6 3204.6 -534.0 0.5
3.0 4.0 8.0 2670.6 872.0 1798.6
c
(MARKS, SEE SCHEDULES) ..............................
"4 EXTERIOR SHEARWALL >*
INTERIOR SHEARWALL ----- * >*
SHEARWALL CONNECTIONS
.......................
.......................
>: Jg ....................... .............................
NOTE: PLYWOOD WALLS WITH H/W RATIO > 2 TO 1 TO BE BLOCKED
NOTE: PLYWOOD WALLS MAX H/W RATIO IS 3.5 TO 1
..........................................................................
PROJECT ..... BUENA VISTA** ENGINEER ...... DGU** DATE .... 1-3-91 ...........................................................................
.
.
.........................................................................
LATERAL ANALYSIS ALONG LINE C AT FIRST FLOOR
SEISMIC FORCE = ( 988 ) BASED ON FOLLOWING:
................................................................
TOTAL DIAPHRAGM UNIT FORCE FORCE FROM
FORCE (=) TRIB AREA (X) PSF (+, OTHER LEVELS -------- ---------- ---------- ------------
988.00 208.00 4.75 0.00
WIND FORCE = ( 1380.4 1 BASED ON FOLLOWING:
PROJECTED AREA METHOD
FORCE 0 - 20 FT HGT 2 20.3
FORCE 20 - 40 FT HGT = 22
TOTPL FORCE = WIND PRESSURE X TRIB AREA + FORCE FROM OTHER LEVELS
TOTAL 0 - 20 HGT 20 - 40 tiGT FORCE FROM
-FORCE TRIB AREA TRIB AREA OTHER LEVELS
1380.40 68.00 0.00 0.00
----------- -----___-_ ------_--- -----_-__----
NUMBER OF SHEARWALL PANELS SELECTED = 1
TOTAL LINEAR FEET USED IN CALCS = 22.6
MAX UNIT SHEAR = 61.07964
-_--------------_-I---------_----.-------------
(MARKS, SEE SCHEDULES) ..............................
"3 EXTERIOR SHEARWALL
INTERIOR SHEARWALL ----- * e
>* .......................
-"-------------_-----__I SHEARWALL CONNECTIONS > ;.. 7 >* I---------------------- .............................
NOTE: PLYWOOD WALLS WITH H/W RATIO > 2 TO 1 TO BE BLOCKED
AOTE: PLYWOOD WALLS MAX H/W RATIO IS 3.5 TO 1
..........................................................................
PROJECT ..... BUENA VISTA** ENGINEER ...... DGU** DATE. ... 1-3-91
t********X************************X*****************~***X*XX*t******~****~
. I4
.
.........................................................................
LATERAL ANALYSIS ALONG LINE 2 AT FIRST FLOOR
SEISMIC FORCE = ( 8322 ) BASED ON FOLLOWING:
................................................................
TOTAL DIAPHRAGM UNIT FORCE FORCE FROM
FORCE (=) TRIB AREA (X) PSF (+) OTHER LEVELS
8322.00 1190.00 2.28 5608.80
-------- ---------- ---------- ------------
WIND FORCE = ( 10488.8 ) BASED ON FOLLOWING:
PROJECTED AREA METHOD
FORCE 0 - 20 FT HGT = 20.3
FORCE 20 - 40 FT HGT = 22
TOTAL FORCE = WIND PRESSURE X TRI8 AREA 4 FORCE FROM OTHER LEVELS
0 .TOTAL 0 - 20 HGT 20 - 40 HGT FORCE FROM
FORCE TRI8 AREA TRIB AREA OTHER LEVELS ----------- ---__-__-_ ---------- -------------
10488.80 276.00 0.00 4886.00
NUMBER OF SHEARWALL PANELS SELECTED = 4
TOTAL LINEAR FEET USED IN CALCS = 25.7
MAX UNIT SHEAR = 408.1245
..............................................
SHEAR UPLIFT - DEAD = TOTAL RATIO HOLDDOWN
PANEL# W H LOAD UPLIFT H/W MARK > _______ --__-__ _--_---- ............................ ------ --------
1.0 7.6 8.0 3265.0 1352.8 1912.2 1.1
3.0 7.6 8.0 3265.0 1352.8 1912.2
4.0 3.0 8.0 3265.0 534.0 2731.0 2.7
2.0 7.5 8.0 3265.0 1335.0 1930.0 1.1. m99*P .L
(MARKS, SEE SCHEDULES) .............................
EXTERIOR SHEARWALL *.c >* \, --------------------__I
INTERIOR SHEARWALL ----- *b I >*
>*
----------I------------ *s SHEARWALL CONNECTIONS ....................... .............................
MOTE: PLYWOOD WALLS WITH H/W RATIO > 2 TO 1 TO BE BLOCKED
MOTE: PLYWOOD WALLS MAX H/W RATIO IS 3.5 TO 1
,\
f*************************************************************************
;PROJECT.....BUENA VISTA** ENGINEER. ..... DGU** DATE .... 1-3-91 ..........................................................................
. .........................................................................
LATERAL ANALYSIS ALONG LINE 3 AT FIRST FLOOR
SEISMIC FORCE = 5261.1 1 BASED bN FOLLOWING:
................................................................ .
TOTAL DIAPHRAGM UNIT FORCE FORCE FROM
FORCE (=I TRIB AREA (X) PSF (+I OTHER LEVELS
5261.10 770.00 2.28 3505. SO
---------- ---------- ------------ --------
WIND FORCE = ( 5968.45 ) BASED ON FOLLOWING:
PROJECTED AREA METHOD
FORCE 0 - 20 FT HGT = 20.3
FORCE 20 - 40 FT HGT = 22
TOTAL FORCE = WIND-PRESSURE X TRIB AREA + FORCE FROM OTHER LEVELS
TOTAL 0 - 20 HGT 20 - 40 HGT FORCE FROM
FORCE TRIB AREA TRIB AREA OTHER LEVELS
5968.45 149.00 0.00 2943.75
----------- ----------
NUMBER OF SHEARWALL PANELS SELECTED = 4
TOTAL LINEAR FEET USED IN CALCS = 21.4
----------------------------------------.------
MAX UNIT SHEAR = 278.8995
_.
SHEAR UPLIFT - DEN) = TOTAL RATIO HOLDDOWN
PANEL# w ti LOhD UPLIFT ti/W MARK ------- ------- ---.._-_-_ ............................. ______ -------__
1.0 1 9.7 8.0 2231.2 2114.6 116.6 0.8
2.0 3.2 8.0 223l.2 697.6 1533.6 2.5
3.0 5.0 8.0 2231.2 1090.0 1141.2 1.6
4.0 3.5 8.0 2231.2 763.0 1468.2 2.3 YnPAYR
(MARKS, SEE' SCHEDULES) .............................
*4
*8
EXTERIOR SHEARWALL >*
INTERIOR SHEARWALL ----- *:
SHEARWALL CONNECTIONS
.......................
> *-
>*
-------------I---------
....................... .............................
NOTE: PLYWOOD WALLS WITH H/W RATIO > 2 TO 1 TO BE BLOCKED
NOTE: PLYWOOD WALLS MAX H/W RATIO IS 3.5 TO 1
..........................................................................
PROJECT ..... BUENA VISTA** ENGINEER. ..... DGU** DATE .... 1-3-91 ...........................................................................
,
SHEAR bfAU IbCHEOlR.€
l/e GYP* 60 -4 0- C. BLOCKED EN B FN 0x-16 0.C. FRAMINO
l/e GYP* 60 -4 0- C. BLOCKED EN B FN 0x-16 0.C. FRAMINO @ .I
. ._.
.. I..
0.
.'
.. .. 908 I10 DIA A.B. I60 - 6 0. e. I60 - 6 O.C. 86 0.c. ea PLATf -KINO 08 uUDsiu I 8
I66 - 6 O.C. IILDIA A.B. l6d - 60.c. sz O.C. tr MUDSILL Pa PLATE OS BLOCKIN0
812 IMDIA A.D. 160 - 4 O.C. 166- 4 O.C. $!I 0.C. Or RATE @ ' .& MUDSILL m IILOC~~INO .
468 1/4 DIA A.B. 160 0 9.6 0.C.U AS5F * I2 O.C. 16 O.C. Pa PLATE et FRAMINO '- Pt MUDSILL . (ORAWF-I2 0.C) ..
1 625 I/O DJA A.B. m - to.c.6 ~WF- 8 O.C. I2 O.C. Ia PLATE et FRAMWQ 4a MUDSILL (OR ASSF-6 O*C*l
~- -~~- ~ ~__ !
! W8DIA A.B. IS$ *O Q.c.* ASP-8 0.C. i. i 16 QoC. PI PLATE La FRAMINO 21 MUDSILL (OR Albf-6 O.C 8
W8 DIA A.8. Ab5Fm 6 0. C. ASK-6o.e. , I2 0.C. It PLATE Oa FRAMINO .. I- 21 MflDSILL
. -. - ._ c
0.
@ . . 41 MUDSILL
@ 4r MUOSlLL
985. 6/8 DIA A. B., AtbF - 6 0.C. A33F - 6 O.C. b FRAMINO i !
. . I6 0.C. a PLATE ..
i into 518 PIA A.B. ASSF- 8 0. t. ASSF- 8 O.C. BOTH SIOES BOTH SIDES 41 BWCKINO I2 0. e. P mAMJNQ c
1 * I66 AT 8 ' 0. e. OR LESS REQUIRES I8 JOlST&R RlBeON PLATE AS MlNlMlkl'THICKNESS.
.... 8;. ... ... .... .. ..... ... .: .:
.- .- .. #.-. ................... ..!.:,,..n.....,.... .. ........... ,,;. I
.. .....................................................
BEAM DESIGN HIP
DESIGN PARAMETERS, Fb = 1300 Fv' = : 85 LDF = 1.25. E =
USING DRESSED LUMBER
FOR A BEAM SPAN = 19
LOADING
TRIANGULAR LOAD AT R1, W = 0 PLF, R2 = 434 PLF
.....................................................
k7
---------
BEAM REACTIONS R1 = 1374.333 R2 = 2748.667 BEAM SPAN =
MAX SHEAR = 2748.667
MAXIMUM MOMENT OCCURS AT 11 FEET FROM R1
MOMENT = 10050.53-
AREA REQ'D = l.S*V/(LDF*Fv) = 38.80471
SECTION MODULUS REQ'D = 12*M/(LDF*Fb) = 74.21927
INERTIA REQUIRED (1/2 DL + LL) = 279.4864
8 8
1800000
19
......................................... *** USE 6 X 10 *** ...................... *** A = 50.875 *** Sx = 78.4323 *** I = 362.7494 ..........................................
-----------------_-______________I______----------------------- - .................................................................
PROJECT .... BUENA VISTA ** DATE .... 1-3-91 ** ENGINEER .... DGU ................................................................
*.
t*t**tt***tt*******t*******~**************************** *** PROGRAM WOOD STRUCTURE ANALYSIS *** ........................................................
TYPICAL FLOOR JOISTS AT
GIVEN THE FOLLOWING CRITERIA:
CONCENTRATED LOAD = 0
DEAD LOAD = 10 LIVE LOAD = 40 THUS W = 66.66667
FOR INERTIA CALCULATION .5 X DL + LL IS USED FOR W
Fb x LDF = 1450 X 1.00
Fv = 95
16 oc MA'XIMUM ALLOWABLE SPAN.
_-------------------________________^___----------------
14
THE FORMULA USED (UNIFORM LOADING) ARE:
MAX L BASED ON BENDING STRESS, L = SQT((€3XSxXFbXLDF)/(lZXW))
SHEAR AREA IS CHECKED Ar = (~.SXWXL-~D)/(~XLDFXFV)
INERTIA IS ALSO CHECKED Ir = (5X1728XWXLEO4)/(384XEmXL/240)
L IS ADJUSTED FOR GOVERNING CONDITION
USING 2 X 12 MEMBER DF-L N0.2
.......................................................
............................
ALL0WABL.E L BASE0 ON Sx, L = 23.94734 WITH Sx = SXr
ALLOWABLE L BASED ON Ar, L = 23.94734 WITH At- = 9.521686
ALLOWABLE L BASED ON It-, L = 21.94734 WITH Ir = 167.9038
c
X*~t~tt**Y*f******X***X***X***Y*XX*X*********X*X~*Y***** *** PROGRAM WOOD STRUCTURE ANALYSIS **a:
f*f*Y**t**t***********X*******XX**f********X*****X**X**
TYPICAL ROOF RAFTERS AT 16 oc MAXIMUM ALLOWABLE SPAN.
GIVEN THE FOLLOWING CRITERIA:
DEAD LOAD = 20 LIVE LOAD = 16 THUS W = 48
FOR INERTIA CALCULATION .5 X DL + LL IS USED FOR W
Fb x LDF = 1450 X 1.25
Fv = 95
............................................
THE FORMULA USED (UNIFORM LOADING) ARE:
MAX L BASED ON BENDING STRESS, L = SQT((8XSxXFbXLDF)/(lZXW))
SHEAR AREA IS CHECKED Ar = (~.~XWXL-~D)/(~XLDFXFV)
INERTIA IS ALSO CHECKED Ir = (5X1728XWXLEO4)/(384XEmXL/240) L IS ADJUSTED FOR GOVERNING CONDITION
USING 2 X 8 MEMBER DF-L N0.2
........................................................
............................
ALLOWABLE L BASED ON Sx, L = 18.18739 WlTH Sx = SXr
ALLOWABLE L BASED ON Ar, L = 18.18739 WITH Ar = 5.263041
ALLOWABLE L BASED ON Ir. L = 17.18739 WITH Zr = 46.5914
...................................... * MAXIMUM SPAN (FT) = 17.18739 y .......................... * Sx = 13.14 - * A = 10.875 * I = 47.635 ......................................
\
........................................................ *** PROGRAM WOOD STRUCTURE ANALYSIS *** ........................................................
TYPICAL ROOF RAFTERS AT 24 oc MA'XIMUM ALLOWABLE SPAN.
GIVEN THE FOLLOWING CRITERIA:
DEAD LOAD = 20 LIVE LOAD = 16 THUS W = 72
FOR INERTIA CALCULATION .5 X DL + LL IS USED FOR W
Fb x LDF = 1450 X 1.25
Fv = 95
THE FORMULA USED (UNIFORM LOADING) ARE:
MAX L BASED ON BENDING STRESS, L = SQT((8XSxXFbXLDF)/(lZXW))
SHEAR AREA IS CHECKED Ar = (~.~XWXL-~D)/(~XLDFXFV)
INERTIA IS ALSO CHECKED Ir = (sX1728XWXLE04)/(384XEmXL/240)
L IS ADJUSTED FOR GOVERNING CONDITION
USING 2 X 8 MEMBER OF-L N0.2
.......................................................
----------------------------.
ALLOWABLE L- BASED ON Sx. L = 14.84994 WITH Sx = SXr
ALLOWABLE L BASED ON Ar, L = 14.84994 WITH Ar = 6.376901
ALLOWABLE L BASED ON Ir. L = 14.84994 WITH Ir = 45.07559
...................................... * MAXIMUM SPAN (FT) = 14.84994 * -__----------------------- * Sx = 13.14 - * A = 10.875 * I = 47.635 ......................................
-------I------^----__________I__________-------------------------
USING 2 X 6 MEMBER DF-L N0.2 -------------------_________
ALLOWABLE L BASED ON Sx, L = 11.26612 WITH Sx = SXr
ALLOWABLE L BASED ON At-, L = 11.26612 WITH Ar = 4.81996
ALLOWABLE L BASED ON Ir. L = 11.26612 WITH Ir = 19.68292
...................................... * MAXIMUM SPAN (FT) = 11.26612
* Sx = 7.563 *: A = 8.25 * I = 20.797 ......................................
* __--___-----------I-------
..
........................................................ *** PROGRAM WOOD STRUCTURE ANALYSIS *** ........................................................
TYPICAL CEILING JOIST AT 16 OC MAXIMUM ALLOWABLE SPAN
GIVEN THE FOLLOWING CRITERIA:
DEAD LOAD = 15 LIVE LOAD = 16 THUS W = 41.33334
FOR INERTIA CALCULATION .5 X DL + LL IS USED FOR W
Fb x LDF = 1450 X 1.25
Fv = 95
THE FORMULA USED (UNIFORM LOADING) ARE:
MAX L BASED ON BENDING STRESS, L = SQT((8XSxXFbXLDF)/(12XW)) '
SHEAR AREA IS CHECKED Ar = (~.SXWXL-~D)/(~XLDFXFV)
INERTIA IS ALSO CHECKED It- = (5X1728XWXLEO4)/(384XEmXL/240)
L IS ADJUSTED FOR GOVER-NING CONDITION
USING 2 X 8 MEMBER DF-L N0.2
............................................
\cI /$ ,,> !l,fL $ j,. /'/' 1 /2'
"1 /
i I- 'tL &' r
3
.......................................................
--------------------________
\ALLOWABLE L BASED ON Sx, L = 19.59931 WITH Sx = SXr
ALLOWABLE L SASED 014 Ar, L = 19.59931 WITH At- = 4.900649
ALLOWABLE L BASED ON Ir, L = 17.59931 WITH Ir = 45.21237
....................................... * MAXIMUM SPAN (FT) = 17.59931
* Sx = 13.14
*: A = 10.875 * I = 47.635 ......................................
*
-~ x
USING 2 X 6 MEMBER DF-L N0.2 - -----_ ----- __--- - ---_--_____
RLLOWABLE L_ BASED ON Sx, L = 14.86929 WITH Sx = SXr
ALLOWABLE L BASED ON Ar. L = 14.86929 WITH Ar = 3.707632
ALLOWABLE L BASED ON It-, L = 12.86929 WITH Ir = 17.67803
*************:*************************: * MAXIMUM SPAN (FT) = 12.86929 * _____--_-----I------------ * Sx = 7.563 * R = 8.25 *: I = 20.797 ......................................
LIVE LOAD = 16 DERD LOAD = 15
MAXIMUM SPAN BASED ON BENDING STRESS SXr = 21.39 IS L = 19.39034 FT
MAXIMUM SPAN BASED ON SHEAR AREA At- = 13.44617 IS L = 13.39034 FT
MAXIMUM SPAN BASED ON DEFLECTION Ir = 66.20348 IS L =' 13.39034 FT
...................................... * MAXIMUM SPAN (FT) = 13.39034
* sx = 21.39 * A = 13.875 * I = 98.932 ......................................
* ..........................
-----------------_-,---------------------------------------------
USING 4 X 10 MEMBER DF-L N0.1
CALCULATION FOR MAX SPAN FOR HIP OR VALLEY APPLICATION
WIlW Fb = 1500 X 1.25. Fv = 95. Em = 1,800,000
WITH TRIANGULAR LOADING
-.-----------------------------------------------------------------
I----------------------
__ LIVE LOAD = 16 DEAD LOAD = 15
MAXIMUM SPAN BASED ON BENDING STRESS SXr = 49.911 IS L = 17.76043 FT
MAXIMUM SPAN BASED ON SHEAR AREA Ar = 24.92601 IS L = 17.76045 FT
MAXIMUM SPAN BASED ON DEFLECTION Ir = 204.8935 IS L = 17.76043 FT
........................................ * MAXIMUM SPAN IFT) = 17.76043
* Sx = 49.911 * A = 32.375 * I = 230.84 ......................................
7. BEAM DESIGN H3 !.
DESIGN PARAMETERS. Fb = 1300 Fv = : 85 LDF = 1.25 E = 1800000
USING DRESSED LUMBER
FOR A BEAM SPAN = 19
.....................................................
LOADING
TRIANGULAR LOAD AT R1. W = 0 PLF, R2 = 412 PLF
---------
BEAM REACTIONS R1 = 1304.667 R2 = 2609.333 BEAM SPAN = ,19
MAX SHEAR = 2609.333
MAXIMUM MOMENT OCCURS AT 11 FEET FROM R1
MOMENT = 9541.054
AREA REQ’D = 1.5*V/(LDF*Fv) = 36.83765
SECTION MODULUS REQ’D = 12*M/(LDF*Fb) = 70.45701
INERTIA REQUIRED (1/2 DL t LL) = 265.3188
.......................................... *** USE 6 X 10 *** ____-__--I------------ *** A = 50.875 *** Sx :: 78.4323 *** I = 362.7494 ..........................................
.................................................................
PROJECT .... BCJENA VISTA ** DATE .... 1-9-9@ **: ENGINEER .... dau ..................................................................
BEAM DESIGN H4
DESIGN PARAMETERS. Fb = 1500 Fv = : 95 LDF = 1.25 E = 1800000
USING DRESSED LUMBER
FOR A BEAM SPAN = 15
_.
.....................................................
-------------------------------------------.---------.-
LOADING
TRIANGULAR LOAD AT R1. W = 0 PLF, R2 = 215 PLF
---------
BEAM REACTIONS R1 = 537.5 R2 = 1075 BEAM SPAN = 15
MAX SHEAR = 1075
MAXIMUM MOMENT OCCURS AT 8.6875 FEET FROM R1
MOMENT = 3103.212
AREA REQ’D = 1.5*V/(LDF*Fv) = 13.57895
SECTION MODULUS REQ’O = 12*M/(LDF*Fb) = 19.86055
INERTIA REQUIRED (1/2 DL t LL) = 68.12748
.......................................... *** USE 4 X 10 *** -------I------------__ *** A = 32.375 *.** SX = 49.91146 *** I = 230.8405 .......................................... -------------------_____________________----------------------- ................................................................
PROJECT .... BUENA VISTA **: DATE .... 1-9-9e ** ENGINEER .... dgU .................................................................
........................................................ *** PROGRAM WOOD STRUCTURE ANALYSIS **x ........................................................
TYPICAL ROOF RAFTERS AT 24 oc MA~IMUM ALLOWABLE SPAN.
GIVEN THE FOLLOWING CRITERIA:
DEAD LOAD = 15 LIVE LOAD = 16 THUS W = 62
FOR INERTIA CALCULATION .5 X DL + LL IS USED FOR W
Fb x LDF = 1450 X 1.25
Fv = 95
............................................
THE FORMULA USED fUNIFORM LOADING) ARE:
MAX L BASED ON BENDING STRESS, L = SQT((8XSxXFbXLDF)/(12XW))
SHEAR AREA IS CHECKED Ar = (~.SXWXL-~D)/(~XLDFXFV)
INERTIA IS AL-SO CHECKED Ir = (SX1728XWXLE04)/(384XEmXL/240)
L IS ADJUSTED FOR GOVERNING CONDITION
USING 2 X 8 MEMBER DF-L N0.2
--------------------_______I____________---------------
............................
ALLOWABLE L BASED ON Sx. L = 16.00277 WTTH Sx = SXr
ALLOWABLE L BASED ON kr. L = 16.00277 WITH Ar = 5.942643
ALLOWABLE L BASED ON It-. L = 15.00277 WITH Ir = 42.01225
***********************hi**:*************: * MAXIMUM SPAN (FT) = 15.00277
* Sx = 3.3.14 - * A = 10.875 * I = 47.635 *:************************.*************
* ---------.--_--------------
lJSING 2 X 6 MEMBER DF-L N0.2
--------------------_--------.
ALLOWABLE L BASED ON Sx. L = 12.14072 WITH Sx = SXr
ALLOWABLE L BASED ON At-. L = 12.14072 WITH Ar = 4.493
GJLLOWABLE L BASED ON Ir. 1. = 11.14072 WITH Ir = 17.2029
....................................... * MAXIMUM SPAN (FT) = 1l.14072
* Sx = 7.563 * A = 8.25 * 1 = 20.797
......................................
*: - - - - - - - - - - - - - -. - - - - - - -. - - - - -
........................................................ *** PROGRAM WOOD STRUCTURE ANALYSIS *** ........................................................
TYPICAL ROOF RAFTERS AT 16 oc MA~IMUM ALLOWABLE SPAN.
GIVEN THE FOLLOWING CRITERIA:
DEAD LOAD = 15 LIVE LOAD = 16 THUS W = 41.33334
FOR INERTIA CALCULATION -5 X DL + LL IS USED FOR W
Fb x LDF = 1450 X 1.25
Fv = 95
THE FORMULA USED (UNIFORM LOADING) ARE:
MAX L BASED ON BENDING STRESS, L = sQT((8XSxXFbXLDF)/(lZXWJ)
SHEAR AREA IS CHECKED Ar = (1.5XWXL-2D)/(2XLDFXFv)
INERTIA IS ALSO CHECKED Ir = (5X1728XWXLEO4)/(384XErnXL/240)
L IS ADJUSTED FOR GOVERNING CONDITION
USING 2 X 8 MEMBER DF-L N0.2
.......................................................
--------------------_______I
ALLOWABLE L BASED ON Sx. L = 19.59931 WITH Sx = SXr
ALLOWABLE L BASED ON Ar, L = 19.59931 WITH Ar = 4.900649
ALLOWABLE L BASED ON Ir. L = 17.59931 WITH Ir = 45.21237
* * * * * * * * * * *: * * * * x * * x * 1: * x * * 1: * * * * * * Y: L ** * * * MAXIMUM SPAN (FT) = 17.59931 * .......................... * Sx = 13.14 .- * A = 10.875 * 1 = 47.635 * *. *x**** *** ** ** ** * x * * * * 1: * * * LX* * * * *****: .................................................................
USING 2 X 6 MEMBER DF-L N0.2 -----------------_----------.
ALLOWARLE L BASED ON Sx. L = 14.86929 WITH Sx = SXr
OLLOWABLE L BASED ON Ar. L = 14.86929 WITH fir = 3.707632
ALLOWABLE L BASED ON Ir, L = J.2.86929 WITH Tr = 17.67803
...................................... * MAXIMUM SPAN (FT) 12.86929
* sx = 7.563 * A = 8.25 * I = 20.797 ......................................
* ..........................
..
. .....................................................
BEAM DESIGN RH1
DESIGN PARAMETERS, Fb = 1500 Fv = : 95 LDF = 1.25 E = 1800000
USING DRESSED LUMBER
FOR A BEAM SPAN = 5
.....................................................
LOADING
A POINT LOAD (LBS) = 540 AT 2.5 FEET FROM R1
---------
BEAM REACTIONS R1 = 270 R2 = 270 BEAM SPAN = 5
MAX SHEAR = 270
MAXIMUM MOMENT OCCURS AT 2.5 FEET FROM R1
MOMENT = 675
AREA REQ’D = l.S*V/(LDF*Fv) = 3.410526
SECTION MODULUS REQ’D = 12*M/(LDF*Fb) = 4.32
.......................................... *** USE 4 X 12 *** ...................... *** A = 39.375 *** sx = 73.82813 *** T = 415.2832 *******************#.********************** -
................................................................
PROJECT .... BUENA VISTA ** DATE .... 1-9-90) ** ENGINEER .... UGU ..................................................................
BEAM DESIGN RH2
DESIGN PARAMETERS, Fb = 1500 Fv = : 95 LDF = 1.25 E = 1800000
USING DRESSED LUMBER
FOR fi BEAM SPAN = 6
.....................................................
--------------------___I________________-------------
LOADING ---------
UNIFORM LOAD ON MEMBER (PLF) = 310
BEAM REACTIONS R1 = 930 R2 = 930 BEAM SPAN = 6
MAX SHEAR = 930
MAXIMUM MOMENT OCCURS AT 3 FEET FROM R1
NOMENT = 1395
&REA REQ’D = l.S*V/(LDF*Fv) = 8.728948
SECTION MODULUS REQ’D = 12xM/(LDF*Fb) = 8.928001
......................................... *** USE 4 X 10 *** ...................... *** A = 32.375 *** Sx = 49.91146 *** I = 230.8405 .......................................... ............................................................... ................................................................
PRnJFCT.--. RIJFNA VTSTA ** DhTF .... 1-9-9& ** ENGINEER .... DGU
;+
‘3.
.. BEAM DESIGN RH3
DESIGN PARAMETERS, Fb = 1500 Fv = : 95 LDF = 1.25 E = 1800000
USING DRESSED LUMBER
FOR A BEAM SPAN = 4
..................................................... .
LOADING
UNIFORM LOAD ON MEMBER (PLF) = 200
---------
BEAM REACTIONS R1 = 400 R2 = 400 BEAM SPAN = 4
MAX SHEAR = 400
MAXIMUM MOMENT OCCURS AT 2 FEET FROM R1
MOMENT = 400
AREA REQ’D = l.S*V/(LDF*Fv) = 3.526316
SECTION MODULUS REQ’D = 12*M/(LDF*Fb) = 2.565
......................................... *** USE 4 X $.@@ *** __---_--------------I_ *** A = 25.375 *** Sx = 30.66146 *** 1’ = 111.14713
***************x**************************
................................................................
PROJECT .... BUENA VISTA ** DATE .... 1-9-9q ** ENGINEER .... DGU ..................................................................
bEAM DESIGN RH4
DESIGN PARAMETERS. Fb = 1500 Fv = : 95 LDF = 1.25 E = 1800000
USING DRESSED LUMBER
FOR A BEAM SPAN = 4
.....................................................
LOADING
UNIFORM LOAD ON MEMBER (PLF) = 150
REAM REACTIONS R1 = 300 R2 = 300 BEAM SPAN = 4
MAXIMUM MOMENT OCCURS AT 2 FEET FROM R1
MOMENT = 300
AREA REQ’D = l.S*V/(LDF*Fv) = 2.921053
SECTION MODULUS REQ’D = 12*M/(LDF*Fb) = 1.92
rqAx SHEAR = 300
......................................... *** USE 4 X 6 *** ...................... *** A = 19.25 *** Sx = 17.64583
.......................................... *** r = 48.52605
............................................................... ................................................................
PROJECT .... BUENA VISTA ** DATE .... 1-9-94 ** ENGINEER .... DGU ..................................................................
... ' . .hi: .. I .......... ... *. . ...... .... ......... ... .. .... ...... .. ;.. .: ;,. .::.. .... .. ....
.. ,.
.. ... ..... :
Sb ..
.. .. , .. .. "... ..
... ..
LOAD IN G
UNIFORM LOAD ON MEMBER (PLF) = 150
---------
BEAM REACTIONS R1 = 375 R2 = 375 BEAM SPAN = 5
MAX SHEAR = 375 .
MAXIMUM MOMENT OCCURS AT 2.5 FEET FROM R1
MOMENT = 468.75
QREA REQ'D = 1.5*V/(LDF*Fv) = 3.592105
SECTION MODULUS REQ'D = 12*M/(LDF*Fb) = 3
LOADING
UNIFORM LOAD ON MEMBER (PLF) = 150
---------
BEAM REACTIONS R1 = 450 R2 = 450 BEAM SPAN = 6
MAX SHEAR = 450
MAXIMUM MOMENT OCCURS AT 3 FEET FROM R1
MOMENT = 675
AREA REQ'D = l.S*V/(LDF*Fv) = 4.223685 SECTION MODULUS REQ'D = 12*M/(LDF*Fb) = 4:JZ
*************t**~*f**~****************f*~ - *** USE 4 X 10 *** ---------------------- *** A = 32.375 *** Sx = 49.91146 *** I = 230.8405 .......................................... ---------------__--_-------------------------------------------
**************************************************************X*
PROJECT .... BUENA VISTA ** DATE .... 1-9-91 ** ENGINEER .... DGU *x**x*tS**********X************************x*******~*************
3
_L---------------------- ............................................................... ’ ................................................................
PROJECT .... BUENA VISTA ** DATE ..... 1-9-90 ** ENGINEER .... DGU ................................................................
LOADING
A POINT LOAD (LBS) = 2800 AT 3 FEET FROM R1
REAM REACTIONS R1 = 1400 R2 = 1400 BEAM SPAN = 6
MAX SHEAR = 1400
MAXIMUM MOMENT OCCURS AT 3 FEET FROM R1
MOMENT = 4200
AREA REQ’D = 1.5*V/(LDF*Fv) = 17.68421
SEC-TION MODULUS REQ’D = 12*M/(LDF*Fb) = 26.88
---------
***************************************** *** USE 4 X 12 *** ___---_-----------I--- *** A = 39.375 *** Sx = 73.82813 - ***E I = 415.2832 ..........................................
----------------I--________I____________----------------------- .................................................................
PROJECT .... BUENA VISTA ** DATE .... 1-9-9qi ** ENGINEER .... DGU ..................................................................
BEAM DESIGN RH8
.....................................................
.....................................................
DESIGN PARAMETERS, Fb = lS00 Fv = : 95 LDF- = 1.25 E = 1800000
USING DRESSED LUMBER
FOR A BEAM SPAN = 3
L.OADING
A POINT LOAD (LBS) = 1200 AT 2 FEET FROM R1
---------
BEAM REACTIONS R1 = 400 R2 = 800 BEAM SPAN = 3
MAX SHEAR = 800
MXIMUM MOMENT OCCURS AT 2 FEET FROM R1
‘WMENT = 800
#%REA REQ’D = l.S*V/(LDF*Fv) = 10.10524
SECTION MODULUS REQ’D = 12*M/(LDF*Fb) = 5.12
......................................... *** USE 4 X 12 *** ...................... *** A = 39.375 *** Sx = 73.82813 *** I = 415.2832 .......................................... ............................................................... ................................................................
hl,l-,,A l,CIIL .... * r..-- . c -. . . -....-.*--- nnn-rrn-r
DESIGN PARAMETERS, Fb = 1500 Fv = : 95 LDF = 1.25 E = 1E300000
USING DRESSED LUMBER
FOR A BEAM SPAN = 16
LOADING
UNIFORM LOAD ON MEMBER (PLF) = 100
A POINT LOAD (LBS) = 1500 AT 8 FEET FROM R1 ’
---------
BEAM REACTIONS R1 = 1550 R2 = 1550 BEAM SPAN = 16
MAX SHEAR = 1550
MAXIMUM MOMENT OCCURS AT 8 FEET FROM R1
MOMENT = 9200 AREA REQ’D = l.S*V/(LDF*Fv) = 18.39474
SECTION MODULUS REQ’D = 12*M/(LDF*Fb) = 58-88
INERTIA REQUIRED (1/2 OL + LL) = 192
......................................... *** USE 4 X 12
*** A = 39.375 *** Sx = 73.82813 *** I = 415.2832 ..........................................
*** ____---_------_-------
..................................................................
PROJECT .... BUENA VISTA **: DATE .... 1-9-91 ** ENGINEER .... DGU .................................................................
BEAM DESIGN GH2
DESIGN PARAMETERS, Fb = 1500 Fv = : 95 LDF = 1.25 E = 1800000
USING DRESSED LUMBER
FOR A BEAM SPAN = €3
L. 0 AD I N G
UNIFORM LOAD ON MEMBER (PLF) = ZOO
---------
BEAM REACTIONS R1 = 800 R2 = 800 BEAM SPAN = 8
MAX SHEAR = 800
MAXIMUM MOMENT OCCURS AT 4 FEET FROM R1
MOMENT = 1600
RREA REQ’D = l.S*V/(LOF*Fv) = 8.157895
SECTION MODULUS REQ’D = 12*M/(LDF*Fb) = 10.24
......................................... *** USE 4 X 10 *** ...................... *** A = 32.375 *** Sx = 49.91146 *** I = 230.8405 .......................................... ............................................................... ................................................................
PROJECT .... BUENA VISTA ** DATE. ... 1-9-91 ** ENGINEER .... DGU ..................................................................
33
LOADING
UNIFORM LOAD ON MEMBER (PLF) = 520
A POINT LOAD ILBS).= 1550 AT 6 FEET FROM R1
---------
BEAM REACTIONS R1 = 5713.333 R2 = 5196.667 REAM SPAN
MAX SHEAR = 5713.333 *
MAXIMUM MOMENT OCCURS AT 8.062S FEET FROM R1
MOMENT = 25965.86
AREA REQ'D = 1.5*V/(LDF*Fv) = 47.23.212
SECTION MODULUS REQ'U = 12*M/(LDF*Fb) = 129.8293
INERTIA RE-QUIRED 11/2 DL 1- LL) = 719.28
1800000
= 18
:i: **: * * *: ** * * * * * * *. ** *. *. * * *** * * * * ** * *. * * * * * * **.* * * * ** *** * * ** * *. *** ***** *
PROJECT . - . BlJENA VTSTA ** DATE. . - . 1-9-%.*;%.* -'ENGINEER . . . . dgu
y. ** * *: * * * * *** * * * t. *: *: * * * * *. ** **. * * * * * * 1: * ** ** * *'* * * * ** * *** * * ** * * * *** * * *
LOADING
UNIFORM LOAD OtJ MEMBER (PLF) = 520
---------
. BEAM REACTIONS R1 = 2860 R2 = 2860 BEAM SPAN = 11
MAX-SHEAR = . 2860
MAXIMUM MOMENT OCCURS AT 5.5 FEET FROM R1
MOMENT = 7865
AREn REQ'D = l.S*V/(LDF*Fv) = 41.86765
SECTION MODULUS REGI'D = 12*M/(LDF*Fb) = 72.6
......................................... *** USE 6 X 12 *** ...................... *** A = 61.875 *** Sx = 116.0156 *** I = 652.5879
~~**,,,~Y**YY~~IYY**~*~~Y~~~~***~~~~~***~*
**,*********************~*~*****************~***************~**~*
PRO.i.ECT. :. . BUENA VISTA ** DATE.. . . 1-9-90 ** ENGINEER . . . .dgu ................................................................
BEAM DESIGN F6M3
DESIGN PARAMETERS. Fb = 1500 Fv = : 95 LDF = 1 E =
USING DRESSED LUMBER
FOR A BEAM SPAN = 11
____________-____________^______________-------------
LOADING
UNIFORM LOAD ON MEMBER (PLF) = 275
BEAM REACTIONS R1 = 1512.5 R2 = 1512.5 BEAM SPAN =
MAX SHEAR = 1512.5
MAXIMUM MOMENT OCCURS AT 5.5 FEET FROM RI
MOMENT = 4159.375
AREA REQ’D = I.~*V/(LDF*FV) = 19.81086
SECTION MODULUS REQ’D = 12*M/(LDF*Fb) = 33.275
---------
1800000
11
*************~***~**********************~ *** USE 4 X 12
*** A = 39.375
*** I = 415.2832
*********Y*******X*l**********************
*** __-__---___------------ -
*** Sr = 73.82813 __
1: * * * ** *: * * * * * * * * * ** ***: * ** * * *: * * * *** * * * * * * * * * *’ * * * ***** * * * * * ** * * ** * *
PROJECT.. . . BUE~~O VISTA **: DATE.. -. i-9-9a8 ** ENGINEER . . . . dau
*: ** *: * ** * * * * * * * * * %* *** * * * * *: *. * * t * * * * **. * f ** * *: t: * x **x** *** x * * * ** .t: * * * *
LOAD I NG
UNIFORM LOAD ON MEMBER CPLF) = 300
-- - - - - - -. -
BEAM REACTIONS R1 = 1800 R2 = 1800 BEAM
MAX SHEAR = 1800
MAXIMUM MOMENT OCCURS AT 6 FEET FROM R1
MOMENT = 5400
AREA REQ’D = l.S*V/(LDF*Fv) = 23.98026
SECTION MODULUS REQ’D = lZ*M/(LDF*Fb) = 43
......................................... *** USE 4 X 12 *** --------------I------- *** A = 39.375 *** Sx = 73.82813 *** I = 415.2832 .......................................... -----------_____________________________----------------------- ................................................................
PROJECT ~ RllChi~ $/Tern ** nATC 1-Q-Oh 1) CMCTNFCO drl* t
. .-.
---__-______________-------------.--------------------
BEAM DESIGN FBM5
DESIGN PARAMETERS. Fb = 1500 FV = : 95 LDF = 1 E = 1800000
USING DRESSED LUMBER
.....................................................
FOR A BEAM SPAN = 14
LOADING ---------
UNIFORM LOAD ON MEMBER (PLF) = 300
BEAM REACTlONS R1 r: 2100 R2 = 21.00 BEAM SPAN = 14
MAX SHEAR = 2100
MAXIMUM MOMENT OCCURS AT 7 FEET FROM R1
MOMENT = 7350
AREA REQ’D = l.S*V/(LDF*Fv) = 28.71711
SECTION MODULUS REQ’D = 12*M/(LDF*Fb) = 58.E3
INERTIA REQUIRED (1/2 DL 1- LL) = 154.35
* * * * * * * * * * * * x * * x * 1: * * * 1. * * * * * *: 1: **:*cy: * *: * * * * 1 * *** CJSE 4 X 1%
***: 0 = 39.375
***: Sx = 73.82813 *** I = 415.2832
*: 1. ** * ***** * *: 1 * * ** ** * * * t *. * * 1: s * ** x ** x x * * x * **
*** ----_-------I I - -” --.---I. --
-
*: * * * * x. *. * 1: * * * * * *. * ** * * * * * x * * * x** * * * t *** ** * * 1: x * * * x ** * * * * *** * * * *x* **
PROJECT.. . . BUENA VISTh **. DATE.. . 1-9-90. *cy: ENGINEER . . . .dgu
1 * *** * *: * * * * * * ** * *: * 1. * x. * x *. * * 1: * * ** * * * ** * x**. * x * * *. * * t ** * * * * ** * *** * ** *
LOADING
UNIFORM LOAD ON MEMBER (PLF) = 85
---------
BEAM REACTIONS R1 = 680 R2 = 680 BEAM SPAN = 16
MAX SHEAR = 680
. MAXIMUM MOMENT OCCURS AT 8 FEET FROM R1
MOMENT = 2720
AREA REQ’D = l.S*V/{LDF*Fv) = 9.478619
SECTION MODULUS REQ’D = 12*M/(LDF*Fb) = 21.76
INERTIA REQUIRED (1/2 DL 4- LL) = 65.28
.......................................... *** USE 4 X 12 *** ...................... *** A = 39.375 *** Sx = 73.82813 *** I = 415.2832 .......................................... ...............................................................
4__._ * . . .
PROJECT .... BUENA VISTA ** DATE .... 1-9-90 ** ENGINEER .... dau ................................................................
.
LOADING
UNIFORM LOAD ON MEMBER (PLF) = 350
---------
BEAM REACTIONS R1 =: 875 R2 = 875 BEAM SPAN = 5
MAX SHEAR = 875
MAXIMUM MOMENT OCCURS AT 2.5 FEET FROM R1
MOMENT = 1093.75
AREA REQ’D = l.S*V/(LDF*Fv) = 8.634869
SECTION MODULUS REQ’D = 12*M/(LDF*Fb) = 8.75
*. * 1: * * :c *:* * * * * *. *: * x: * * * *I x Y: * * v***x*.** ** * ** * * * *** USE 4 X 12 *** ____-_-- ------ - ------ *** A = 39.375 *** sx = 73.132813 __
**t I = 415.283%
******Y *****************I*****************
* * ** .* * * * **: .* ** * * * * * * * *** * * * * * * x * * * * * x t. x * * t. * ** L * * * *. * * * * * *. * ** * * ** *
PROJECT. . . . BCJENA VISTA **. DATE.. -. 1-9-94 **. ENGINEER . . . .dgU
+. * * *: %:k * * it ** * * * 4. * * * * *. * L * * *: ;h * *. 1. x * t Y. x * t * * * * * 1. * .y* * * * * ** *.* ** ** ** ****
REAM DESIGN FRM8
DESIGN PARAMElERS. Fb = 1500 Fv = : 95 LDF = 1 E = 1800000
USING DRESSED LUMBER
FOR A BEAM SPAN = 3
___----_c--------__-------- -.--.------. ------ ----I-------
L. 0 AD I N G
UNIFORM LOAD ON MEMBER IPLF) = 350
---------
BEAM REACTIONS R1 = 525 R2 = 525 BEAM SPAN = 3
MAX SHEAR = 525
MAXIMUM MOMENT OCCURS fiT 1.5 FEET FROM R1
MOMENl = 393.75
AREA REQ’D = l.S*V/(LDF*Fv) = 4.950658
SECTION MODULUS REQ’D = 12*M/(LDF*Fb) = 3.15
.........................................
*** *** A = 25.375 *** Sx = 30.66146 *** I = 111.1478 ..........................................
*** USE 4 x $.Bo - -_- - _-_ ---- ------- -- - --
................................................................ - .. - e., ,r,, n *IT^-.. - - rIL74-l~ I7 f-l T
LOADING
CJNIFORM LOAD ON MEMBER fPLF) = 600
___------
BEAM REACTIONS R1 = 2400 R2 = 2400 BEAM SPAN = 8
MAX SHEAR = 2400
MAXIMUM MOMENT OCCURS AT 4 FEET FROM R1
MOMENT = 4800
AREA REQ’D = l.S*V/(LDF*Fv) = 29.01316
SECTION MODULUS REQ’D = 12*M/(LDF*Fb) = 38.4
......................................... *** USE 4 x 12
***: A = 39.375 *** Sx = 73.82813
#:*#: 1 = 415-2832) ...........................................
*** _________---------.--.--
$*~*~%**********X***********~**~********************************
PROJECT .... RCJENA VISTA ** DnTC .... 1-9-90 ** ENGINEER .... dgu
k***.*****~***************~~*************************$**********~.
OEAM DESIGN FbMlO
DESIGN PARAMETERS. Fb = 1500 Fv = : 95 LDP = 1 E = 1800000
IJSING DRESSED LUMBER
FOR fl BEAM SPAN = 5
--------I-----_. -I--- ---- ----- ----.-------------------
LOADING
UNIFORM LOAD ON MEMBER (PLF) = 300
A POINT LOAD (LBS) = 1800 fiT 2.5 FEET FROM R1
---------
REAM REACTIONS R1 = 1650 H2 = 1650 BEAM SPAN = 5
MAX SHEAR = 1650
MAXIMUM MOMENT OCCURS AT 2.5 FEET FROM R1
MOMENT = 3187.5
AREA REQ’D = 1.5*V/(LDF*Fv) = 21.61184
SECTION MODULUS REQ’D = lZ*M/(LDF*Fb) = 25.5
......................................... *** USE 4 X 12 *** ...................... *** A = 39.375 *** Sx = 73.82813
*******************************%********** *** I = 415.2832
----------------________________________----------------------- ................................................................
PROJECT .... BUENA VISTA ** DATE.. .. 1-9-96 ** ENGINEER .... dgu ................................................................
3f
BEAM DESIGN FOMll
DESIGN PARAMETERS. Fb = ' 1300 FV = : 85 LDF = 1.25
USING DRESSED LUMBER
FOR A BEAM SPAN = 16
.....................................................
LOADING
UNIFORM LOAD ON MEMBER (PLF) = 66
A POINT LOAD (LBS) = 1050 AT 12 FEET FROM R1
BEAM REACTIONS R1 = 790.5 R2 = 1315.5 BEAM SPAN =
MAX SHEAR = 1315.5
MAXIMUM MOMENT OCCURS AT 12 FEET FROM R1
MOMENT = 4734
AREA REQ'D = l.S*Vy(LDF*Fv) = 17.69824
SECTION MODULUS REQ'D = 12*M/(LDF*Fb) = 34.95877
INERTIA REQUIRED (1/2 DL + LL) = 605.184
E = 1800000
16
* yr * * *** * *** * * * *********I: * * * * * * * * * *: * * * * *** *** USE 6 x 1.2 *** _____._---I-------.- _-- ----.. *** A = 6l.875 *.** SX = 116.01.56 *** I = 652.5879
************I*********.********************
______________________._,_.__I___-___C---- ............................. * w. * * x * * * x * *. * * *: *: t * t x* * * * ** * * * x * * * * * x * * * * * * * * * * **********xi'* ** * ***:*
PROJECT.. - - BUENA VISTA ** DATE.. -. 1-9-94! **: ENGINEER . . . .dqu
'E. * * ** * * * *: *. Y. *: *: * * * ** * * * * * * 4: *: * * * 1 *: * * * * * * * * Y: * 1: * * * * * * * * ** * * *. * * ** * * ** *
BEAM DESIGN FBM12
DESIGN PARAMETERS. Fb = 1500 Fv = : 95 LDF = 1.25 E = 1800000
USING ROUGH SAWN LUMBER
FOR A BEAM SPAN = 16
____________________________II__________-------------
-"-- -._.____._______I_,______.____._L__-_ ------- -- -----------
LOADING ---_-----
UNIFORM LOAD ON MEMBER (PLF) = 66
A POINT LOAD (LBSI = 800 AT 8 FEET FROM R1
BEAM REACTIONS R3 = 928 H2 = 928 BEAM SPAN = 16
MAX SHEAR = 928
MAXIMUM MOMENT OCCURS AT 8 FEET FROM H1
MOMENT = 5312
AREA REQ'D = 1.5*V/(LDF*Fv) = 10.92316
SECTION MODULUS REQ'D = 12*M/(LDF*Fb) = 33.9968
INERTIA REQUIRED (1/2 DL + LL) = 112.128
........................................... *** USE 3 X 11.5 *** ----c-------___---____ *** A = 34.5 *** Sx = 66.125 *** I = 380.2188 ..........................................
--------c----___________________________-----------------------
L***************************************************************
PROJECT .... BUENA VISTA ** DATE .... 1-9-961 ** ENGINEER .... dgu ................................................................
.. .. 39
LOADING
UNIFORM LOAD ON MEMBER (PLF) = 66
A POINT LOAD (LBS) = 1400 AT 12 FEET FROM R1
---------
BEAM REACTIONS R1 = 1017.5 R2 = 1537.5 BEAM SPAN = 17.5
MAX SHEAR = 1537.5
MAXIMUM MOMENT OCCURS AT 12 FEET FROM R1
MOMENT = 7458
AREA REQ’D = 1.5*V](LOF*Fv) = 10.70182
SECTION MODULUS REQ’D = 12*M/(LDF*Fb) = 29.832
INERTIA REQUIRED (1/2 OL + LL) = 982.1054
............................................. *** USE 8.75 X 12 *** ____I-----------------..
x** fi = 105 *** sx = 210 *** I = 1260 *** MIN CAMBER = .6820176
*************Y***********************X****
x*********************************~********X****************.****
PROJECT. . . - BLJENA VISTA **: DATE.. . . 1-9-94) ** ENGINEER . . . .dgtl
~.*****f*.*x~***X***~*~***********~************.f*f*X************~*
.. .....................................................
BEAM DESIGN FBMl4
DESIGN PARAMETERS. Fb = 1500 Fv = : 95 LDF = 1.25 E = 1800000
USING ROUGH SAWN LUMBER
FOR A BEAM SPAN = 16
1.0 AD I N G
UNIFORM LOAD ON MEMBER (PLF) 66
---------
A POINT LOAD (LBS) = 1100 AT 2 FEET FROM R1
REAM REACTIONS R1 = 1490.5 R2 = 665.5 BEAM SPAN = 16
MAX SHEAR = 1490.5
MAXIMUM MOMENT OCCURS AT 5.9375 FEET FROM R1
MOMENT = 3355.215 AREA REQ’D = l.S*V/(LDF*Fv) = 18.02842
SECTION MODULUS REQ’D = 12*M/(LDF*Fb) = 21.4733E3
INERTIA REQUIRED (1/2 DL + LL) = 67.584
.......................................... *** USE 3 x 11.5
*** fi = 34.5 ***: Sx = 66.125 *** I = 380.2188
X********.*******.*******%******************
*** ---I._----------- --- ----
................................................................ *: * ** * ** ***.*. * ** ** ** * * * * *** *. * * 1: * ** * * * * *** ** ** *** * ** * * *** * * * ** * ****
PROJECT .... E3C)ENA VISTA ** DATE .... 1-9-94 **; ENGINEER .... dgu
:t: * ** *** * t: * *. * * * ** *: * ** * ** * l’Y t * * * * * 1: 1: * * * * * % ** k * * * * **: * ** * *** * *. * * *** *
BEAM DESIGN FBMl5
DESIGN PARAMETERS. Fb = 1500 Fv = : 95 LDF = 1.25 E = 1800000
USING ROUGH SAWN LUMBER
FOR A BEAM SPAN = 11
----____-_-_________----------.-----------------------
- ._-^l_____l______________________l_l____ ---I.--.-- --
L.OAD I N G ----_-___
UNIFORM LOAD ON MEMBER (PLF) = 66
A POINT LOAD (LBS) z 300 AT 4 FEE? FROM R3.
fi POINT LOAD (LBS) = 300 A-r 6 FEET FROM RI
EEAM REACTIONS R1 = 690.2727 R2 = 635,7273 BEnM SPAN = 11 rmx SHEAR = 690.2727
MAXIMUM MOMENT OCCURS AT 5.9375 FEET FROM Rl
MOMENT = 2353.865
AREA REQ’D = 1.5*V/(LDF*Fv) = 7.920287
SECTION MODULUS REQ’D = 12*:M/(LDF*Fb) = 15.06474
......................................... *** USE 3 X 11.5 *** ---__-------I---------- *** A = 34.5 *** SX = 66.125 *** I = 380.2188 ..........................................
--------_---_____________________I______-----------------------
PROJECT .... BUENfi VISTA ** DATE .... 1-9-96 ** ENGINEER .... dgu
~:y***********************************************~**************
y***************************************~**********~************
.. . * *. .. . ,.
'. .. ..
,. .....-... .. ..
. Ii'.... ....... ..
........................................................ *** PROGRAM WOOD STRUCTURE ANALYSIS *** .........................................................
TYPICAL FLOOR JOISTS AT 16 OC MAXIMUM ALLOWABLE SPAN
GIVEN THE FOLLOWING CRITERIA:
CONCENTRATED LOAD = 0
DEAD LOAD = 10 LIVE LOAD = 40 THUS W = 66.66667
FOR INERTIA CALCULATION -5 X DL f LL IS USED FOR W
Fb x LDF = 1450 X 1.00
Fv = 95
------------c-------------------------------------------
THE FORMULA USED (UNIFORM LOADING) ARE:
MAX L BASED ON BENDING STRESS, L = SQT((8XSxXFbXLDF)/(lZXW))
SHEAR AREA IS CHECKED At- = (l.SXWXL-2D)/(2XLOFXFv)
INERTIA IS ALSO CHECKED Ir = (5X1728XWXLE04)/(384XEmXL/Z40)
L IS ADJUSTED FOR GOVERNING CONDITION
USING 2 X 12 MEMBER DF-L N0.2
- -- ----I---------------_________cI___I_____----------------
............................
ALLOWABLE L BASED ON Sx, L = 23.94734 WITH Sx = SXr
ALLOWABLE L RASED ON At-, L = 23.94734 WITH Ar = 9.521686
ALLOWABLE L BASED ON Ir, L = 21.94734 WITH Ir = 167.9038
...................................... * MAXIMUM SPAN (FT) = 21.94734 * c-c-__-------------------- * Sx = 31.64 * A = 16.875 * I = 177.97 ......................................
.... ...
8. ...... ... ... .. ..
..
... ........ .. .... .. ,. .
... '.:. .. _. ,. .. ... .. ., ,. .. ..,.. ..... . ,., . . .... .. .. .. ' .. .:
..
..
.. . . .. '. .
.I.' . .. \. . .. ' ..
I
P
.. .. .. .i : . ':._'. ., , .. . I
'.# . . 8 .._
.. 43 .. - .. ..
.
- &fL
A
..
FOOTING WIDTH REQUIRED = 446 /( 1500 - 150 = .3303704 FT
CODE REQUIRED MINIMUM: WIDTH DEPTH THICKNESS ------- -------
12 12 6
............................ *** USE UBC MINIMUM CRITERIA *** WITH #4 T&B MINIMUM ............................
ROOF WEIGHT = 310
WALL WEIGHT = 136
FLOOR WEIGHT = 400
---I---------------------
TOTAL DL t LL = 846
FOOTING WIDTH REQUIRED = 846 /( 1500 - 225 = .6635294 FT
***%************************ *** USE U8C MINIMUM CRITERIA *** WITH #4 T&8 MINIMUM ............................ ************************************%***********************%****
ALLOWABLE POINT LOAD ON FOOTING
RZBAR 3 INCHES FROM BOTTOM (#4 T&B) 7HEREFOR D = 15
I-DAD SUPPORTED BY 4X MINIMUM
PllLLOWABLE LOAD = 4449.219 lbs ...............................................................
...............................
PAD FOOTING F1
TOTAL DL+LL = 2250
FACTORED LOAD = 3600
TRIAL SIZE = 2.5 X 1.5 X 1 FEET
SOIL PRESSURE = 1150
PUNCHING SHEAR STRESS = 5.588735 < ALLOWABLE = 152.0526
WIDE BEAM SHEAR STRESS = 0 < ALLOWABLE = 76.02631
USE REINFORCING = 4.901961E-03 SQ IN/FT
.................................... *** USE PAD FOOTING = 1.5 X 1.5 *** X 12 INCHES THICK *** WITH #4 AT 12 INCHES OC .....................................
***x**************~**********************************************
TRIAL SIZE = 2.25 X 2.25 X 1 FEET
SOIL PRESSURE = 1285.803
PUNCHING SHEAR STRESS = 17.70572 < ALLOWABLE = 152.0526
WIDE BEAM SHEAR STRESS = 2.410075 < ALLOWABLE = 76.02631.
USE REINFORCING = 2.227064E-02 SQ IN/F-T ._
1: * * * *. * x * ****** 1: * * * * * * * *: * 1 * ** ** * ***** *** USE PAD FOOTING = 2.25 X 2.25 *** X 12 INCHES THICK *** WITH #4 A1 12 INCHES OC .....................................
*******x******************~*x****************~*x*****************
PAD FOOTING F3
.............................................................
--_--___
TOTAL DL-tLL = 8350
FACTORED LOAD = 13360
'TRIAL SIZE = 2.5 X 2.5 X 1 FEET
SOIL PRESSURE = 1486
PUNCHING SHEAR STRESS = 26.46744 < ALLOWABLE = 152.0526
UIDE BEAM SHEAR STRESS = 4.381173 < ALLOWABLE = 76.02631
USE REINFORCING = 3.565577E-02 SQ IN/FT
.................................... *** USE PAD FOOTING = 2.5 X 2.5 ' *** X 12 INCHES THICK *** WITH #4 AT 12 INCHES OC .....................................
L***~************************************1***********************
... I.
..
, ..
.. .
r
n,
I' w
PAGE 470~47
PROJECT MANNING ENGINEERING
ENGR 41890 ENTERPRISE CIRCLE SO., STE. E
TEMECULA, CA 92390 - - . . - ._ -
PAGE / OF
PROJECT MANNihlG ENGINEERING
ENGR ..-
nATc
41890 ENTERPRISE CtRCLE SO., STE. 8
TEMECULA, CA 92390
bUAkIC /7.lA\ C7C 4OAb
.... .... .. .. .. .. .. .. .. ............... ~.. ..... ...... ..... .. ,> ; .$ .. ..
.. .. ,..
.. .. ..
PROJECT MANNING ENGINEERING
ENGR 41890 ENTERPRISE CIRCLE SO., STE. E
TEMECULA, CA 92390 - -- --- -
'.
PAGE / OF 2,
MANNING ENGINEERING
41890 ENTERPRISE CIRCLE SO., ST
TEM ECU LA, CA 92390
C
PAGE 2 OF
PROJECT MANNING ENGINEERING
41890 ENTERPRISE CIRCLE SO., STE. B
TEMECULA, CA 92390 ENGR
PHONE (714) 676-1844
I . .. I e,. .. . #! . 1. *_ _I 1. r s . 4, ,*
IDATE
September 15, 1992
Paul Parizeau
P.O. Box 230822
Encinitas, CA 92023-0495
RE: 1385 BUENA VISTA WAY - CB920495
I have reviewed the addendum to your preliminary geotechnical investigation and its attached
grading report prepared for you by Property Development Engineers, Inc. Based upon the
information and statements provided therein the building permit for the above residence is
reinstated. You may proceed with construction. Please note all drainage features contained in
the report and the approved grading plan which must be in place prior to finish grading
approval. Please note also on the sketch provided by PDE an area on the property which
contains non-structural landscape fill. This is an area not suitable for construction of any
structure without a subsequent soils investigation and the recommendations of a civil engineer.
This information should be disclosed in the event the property changes ownership.
Thank you for your cooperation in dealing with the issues raised during the grading plan review
process.
. PAT KELLEY
Principal Building Inspector
PK/mh
@ 2075 Las Palmas Drive - Carlsbad, California 92009-1 576 - (61 9) 438-1 161
a
,
PROPERTY DEVELOPMENT ENGINEERS, INC.
1859 S. ESCONDIDO BLVD., ESCONDIDO, CA 92025
JOHN E. VERNON, PRESIDENT, RCE 21121, GE 858
CHARLES W. DAVIS, VICE PRESIDENT, RCE 21719
BARRY L. MUNSON, PROJECT ENGINEER, RCE 40980
FREDERICK F. BRONSON, CHIEF OF SURVEYS, LS 5085
DELBERT C. DANIELS, CHIEF OF MAPPING, LS 3351
September 15, 1992
Paul Parizeau
P.O. Box 230822
Encinitas, CA 92023-0822
Site: 1385 Buena Vista Ave., Carlsbad, CA
APN 156-230-70
To whom it may concern:
This is to address the City's request for additional
information with regards to soil conditions at the subject site.
We reviewed the imported soil conditions both prior and during
subgrade preparation and assessed the quality to be in
conformance with requirements of it's intended use and the
Preliminary Geotechnical Reports criteria.
The import soil was of equal or better quality than the native
material criteria used for design and we would recommend it's
acceptance and visual classification with no further testing
procedures required.
Property Developme Engineers, Inc. ?-3
RCE 21719
Exp . 9/30/93
\ PROPERTY DEVELOPMENT ENGINEERS, INC. I ENGINEERING SOILS TESTING SURVEYING TEL. (619) 743-8808 FAX (619) 743-7466
c
s
TRELIMINARY GEOTECHNICAL INVESTIGATION
Parizeau Residence
Site: 1385 Buena Vista Ave.
Carlsbad, CA
APN 156-230-70
Prepared at the Request of
Paul Par lzeau
Prepared by
PROPERTY DEVELOPMENT ENGINEERS, INC.
1859 S. Escondido Blvd.
Escondido, CA 92025
1 of 6
INDEX
General Information ........................................ 3 of 6
Lot Description ............................................. 3 of 6
Natural Terrain ............................................ 3 of 6
Seismic Activity ........................................... 3 of 6
Proposed Construction ...................................... 4 of 6
6
Recommendations & Conclusions .......................... 5 & 6 of 6
Field Investigation & Test Results ..................... 4 & 5 of
APPENDIX
Plate
Appendix "A" . Test Location Map ................................ 1
Unified Soil CLassification Chart ................ 2
Standard Specifications for Compacted ............ 3
Filled Ground
Homeowners Maintenance Guidelines ................ 4
Slab Crack Information ........................... 5
Note to Contractors .............................. 6
Log of Test Pits ................................. 7
2 of 6
PROPERTY DEVELOPMENT ENGINEERS, INC.
1859 S. ESCONDIDO BLVD., ESCONDIDO, CA 92025
JOHN E. VERNON, PRESIDENT, RCE 21121, GE 858
CHARLES W. DAVIS, VICE PRESIDENT, RCE 21719
BARRY L. MUNSON. PROJECT ENGINEER, RCE 40980
FREDERICK F. BRONSON. CHIEF OF SURVEYS, LS 5085
DELBERT C. DANIELS, CHIEF OF MAPPING, LS 3351
July 30, 1992
Paul Parizeau P.O. Box 230822
Encinitas, CA 92023-0822
PRELIMINARY GEOTECHNICAL REPORT
Site: 1385 Buena Vista Ave., Carlsbad, CA
APN 156-230-70
To whom it may concern:
This is to verify that we have investigated the footing soils
conditions and reviewed potential development plans for the above
referenced site to assure 90% relative compaction in all footing
areas.
The native soil is a light brown silty sand (SM) and is not
detrimentaily expansive (Carlsbad soils per USDA Soil Survey). It
extends to a de;?th of o~le to three feet except in natural swale
areas where it car, extend from 6' to IO' in depth. The top soil
is loose In its natural state ar?d should be recompacted to a 2'
depth after the organic topsoil layer is removed to affor2
acceptable foundation material for the proposed construction. It
is metasedamentary and becomes more dense with depth. No ground
water should be or was encountered on this lot.
There are no known faults located close to the site (Elsinore
fault is approximately 25 miles NE). (Xose Canyon potentially
active fault is 12 mi+ SW). It is our opinion that the site could
5e subjected to modeyate to seveye ground shakinr; in the event of
a majo=. earthquake along either of these faazlts, howeve:, the
seismic :isk at t5e site Is n~t co-sldered slgnlficantly greater
than that of the sirrouc?ing area. Constrnction irz accordance
with the mininuz standayds of the sost recent edition of the
'Jnfform %ifding Cod9 should minkize potential darriage as a
~esult of seSsinic activity. To minimize the potential for
differential settlement, natural ground should be over-excavated
to a minimum de2th of 3 feet below fizished grade and replaced
with compacted flll.
ENGINEERING SOILS TESTING SURVEYING TEL. (619) 743-8808 FAX (619) 743-7466 2 nf 6
The proposed construction as shown on DWG 829-5A consists of a
single family residence on a fill pad which can be accomplished
quite satisfactorily on the site, as regards soil adequacy. Any
footings which step down slopes should be a minimum of 2' deep
below original ground. All drainage should be directed away from
these footings. Foundations should be founded in firm natural
soil, or properly compacted embankment. The soils engineer shall
review the footing excavations prior to concrete placement to
ensure adequate foundation support. We recommend that the
continuous footings of the structure be reinforced with at least
two #4 bars top and two bottom (total of 4) as minimum
reinforcemert and that the slabs be reinforced with #3 bars at
24" on center each way and be ?laced ca-efully @ mid-slab height
OE a clear, 4'' conpacted and Eoisturized saR2 Slanket. A vapor
barrier of E xi? viscpeer, is yecomnended to be sazdwlched In t5-e
san2 blanket uader all indoor slabs. Ar: allowable soil bearixg
pressure of 1500 psf nay be used for desigr: of footing sizes.
Active and passive flxi5 pressures of 40 (60 for Testrained or
sloping backfill) and 425 pcf, and a frictlon factor of .4 s?_ould
be use2 fc=. wall design. A lateral bearing of 300 psf/ft ixay Se
used for ?,ole dislg~ .;si?g flagpole formula jYBC 2907 5). AI?
foundatians skall havs a ?.:?-:xz?. size 2s clete,-;..ined by Table 29-A
de?:".
Settlezext s'nsuld be wltkin US:: to?e;.ance >~gv:<:xg that goo?
constrxctlon sractices aye fsllowed.
f. .. -. _I-..... 3: the 'J~lforn! 3~iIdi~s Code and be 13" ." n 2, ,..U,,, ..
TEST AXD ANALYSES of the prevailing foundatioz soiis irdicateC
t5e following engineering properties:
Tests were run in accordance with ASTM: D1557 with visual
classification used fo=. design criteria.
Active Soil ?ressuTe [AST!?: 33080) 43 psf!ft
:3estrained h slo2ing Sackfill] 53 ?Sf/ft
Fassive Soil Pressure (ASTM: 93080) 300 psflft
4 of 6
Coefficient if Friction (ASTM: D3080) .4
Expansive Factor Very low
Bearing design value 1500 psf
We emphasize that it is the responsibility of the contractor to
insure that the slab reinforcement is placed at mid-height of the
slab. Experience indicates that use of reinforcement in slabs
and foundations will generally reduce the potential for drying
and shrinkage cracking. However, some cracking should be
expected as the concrete cures. Minor cracking is considered
normal, however, it is often aggravated by a loose sand bedding,
a high water/cement ratio, high concrete temperature at the time
of placement, small nominal aggregated size, and rapid moisture
loss at time of placement, due to hot, dry, and/or windy weather
conditions during placement and curing (footing trenches and slab subgrade should be thoroughly moisturized before concrete is
cast). Cracking due to temperature and moisture fluctuations can
also be expected. The use of low slump concrete not exceeding 4
inches at the time of placement is recommended. The contractor
should take appropriate curing precautions during the placement
of concrete to minimize cracking of slabs. We recommend that a
slipsheet or Semco Tile Set, Nobleseal or equivalent be ctilized
If crack-sensitive flooring (such as sarble tile or Mexican
pavers) is planned directly on the concrete slab. All slabs
should be designed in accordance with structural considerations
and sawed or weakened by I' deep troweled joints or zip-strips $3
12-15' strategic intervals if random cracks are unacceptable.
Patio slabs, driveway slabs or A.C. paving placed closer than 5'
to fill or natural slopes are susceptible to edge settlement and
cracking if proper precautions are not made for lateral support.
All slabs should be placed on a granular nonexpansive sub-base at
least 12" thick. Driveway subgrades should be certified before
surface is placed.
The conclusions azd recommendations herein have beer based on
the observations anc?/or testing as noted as well as ou1:
experience. ?.lo other warrazty, expressed or implled, is nade.
5 of 6
The grading should be done in accordance with the Grading
Ordinance of the City of Carlsbad and the attached Standarc!
Specifications for the Placement of Compacted Filled Ground.
Special footing design will be recommended if necessary at time
grading is completed and footing trenches are excavated.
We will be available for prejob conference and certification
testing upon prior notification when the grading work is
scheduled, and at time footing excavations are made.
hohn E. Vernon
RCE 21121, GE 858
Exp. 9/30/93
6 of 6
APPENDIX "A"
PLATE " 1 "
* >-
PLATE 2
SILTS AN0 CLAYS
FRatTlON IS
LARGER TM
. NO. 4 SIEVE
SAND GRAVEL
I COBBLES BOULDERS FINE MEDIUM COnAy FINE CCWIUE
PROPERTY DEVELOPMENT ENGINEERS, INC.
1859 S. ESCONDIDO BLVD., ESCONDIDO, CA 92025
JOHN E. VERNON, PRESIDENT, RCE 21121, GE 858
CHARLES W. DAVIS, VICE PRESIDENT, RCE 21719
BARRY L. MUNSON, PROJECT ENGINEER, RCE 40980
FREDERICK F. BRONSON, CHIEF OF SURVEYS, LS 5085
DELBERT C. DANIELS. CHIEF OF MAPPING, LS 3351
1
uAM AND STRENGTH BLDWS/FOOT SANOS.GRAVELS
NON-PLASTIC 9% BUNYS'FOC)T PLASTIC SILTS
VERY LOOSE 0- 4 VERY Uxf 0 - I/* 0-2
SOFl r/4 - v2 2 -4
FIRM v2-1 4-8
SrIFf 1-2 8 -l6
LOOSE 4 -10
MfDIUM OEM€ 10 -30
OENSE a-so vERr STIFF 2-4 16 -32.
(MR 50 HnRO OVER 4 OVER l-2 VERY OENSE -
SANDS
MORE TWN HALF
OF CCKRSE
FRncTlON IS
SMALLER THAN
No. 4 SIEVE
Water level at time of excavation or as indicated A Undisturbed driven ring or chunk sample 0 Disturbed .bulk sample
ENGINEERING SOILS TESTING SURVEYING TEL. (619) 743-8808 FAX (619) 743-7466
PLATE 3
PROPERTY DEVELOPMENT ENGINEERS, INC.
1859 S. ESCONDIDO BLVD., ESCONDIDO, CA 92025
JOHN E. VERNON, PRESIDENT, RCE 21121, GE 858
CHARLES W. DAVIS, VICE PRESIDENT. RCE 21719
BARRY L. MUNSON. PROJECT ENGINEER, RCE 40980
FREDERICK F. BRONSON, CHIEF OF SURVEYS, LS 5085
DELBERT C. DANIELS, CHIEF OF MAPPING, LS 3351
STANDARD SPECIFICATIONS FOR PLACEMENT
OF COMPACTED FILLED GROUND
Objective:
Obtain filled ground whieh is uniform and has adequate internal
strength to support any structures proposed. The method by which
this is obtained is described herein.
Preliminary Procedures:
1. Permits - Owner shall ascertain the grading permit
requirements of the agency whose jurisdiction covers the
land on which the grading is to be performed and shall be
responsible for complying with them.
2. Water - An adequate water supply shall be provided so that
compaction of filled ground will not be delayed.
3. Soils Engineer - A soils engineer shall be retained to
provide direction in grading, testing for compaction and
certification that the grading complies with grading
ordinances and with approved grading plans.
Grading:
1.
2.
Clearing and Grubbing - All natural surface which is to be
covered by filled ground, excavated or needed for brow
ditches, swales or other grading appurtenances shall be
cleared and grubbed. Trees, shrubs and grass, as well as
organic overburden shall be removed from the area to be
graded. Cleared material may be disposed of as approved by
the local controlling agency. No embankment shall consist
of trees, shrubs or other organic material.
Natural Ground Preparation - Natural ground shall be
excavated from beneath embankment areas to solid material,
the exact depth as determined by the soils engineer. This
material shall be brought to proper moisture conteht and
recompacted to not less than 90% maximum density as
determined by A.S.T.M. D-1557-70.
PROPERTY DEVELOPMENT ENGINEERS, INC.
ENGINEERING SOILS TESTING SURVEYING TEL. (619) 743-8808 FAX (619) 743-7466
3.
Any existing fill which has not been certified must be
removed and recompacted.
If the slope of the existing ground exceeds 1' vertical in 6' horizontal, a bench cut level, 10' wide shall be
excavated at the toe of the fill. This will allow the
embankment to be placed on a horizontal base for more
uniform compaction.
Embankment Placement - Fill material should consist of
native or imported material which has been brought to the
optimum moisture content. Material to be used for
embankments may have rocks with diameters greater than 12"
providing they are evenly distributed in the soil mixture
and are at least 3' below finish grade. Fill slopes shall
not consist of, or be founded on, large rocks. Although
rocks may be placed along the outside of the toe of the
fill slopes. Rock placement in embankments shall be under
direct supervision of the soils engineer.
Embankment material shall be placed in layers varying
from 6" to 12" deep depending on soil type, and compacted
by suitable compactive effort to a density or not less than
90% of the maximum density as determined by A.S.T.M.
D-157-70. Moisture content and depth of layers shall be
determined by the soil engineer at the time of grading, and
shall be updated whenever embankment soil types change.
As the embankment increases in elevation, new benches
shall be cut into original ground. Benches shall be at
least 6' horizontally into natural ground, be level and
shall occur at intervals to be determined by the soils
engineer at the time of grading.
Compaction may be obtained by the use of any combination
of equipment which will result in an embankment that is
properly compacted, uniform in moisture and properly
finished to the line and grades shown on the plans or to
those set forth in the applicable grading ordinance.
4. Additional Grading - Cut slopes shall be cut to the lines
and grades as shown on the plans or set forth in the
applicable grading ordinance.
Cut slopes shall be protected from erosion by brow ditches.
Brow ditches shall be either earthen or lined with erosion resistant material as shown on the plans or as recommended by the
engineer.
-2-
Embankments shall be protected from erosion by placing an
earthen berm along the top of slope for the entire perimeter of the fill. Where drainage is brought down the slope, the drainage way shall be lined with erosion resistant material to prevent
loss of embankment slopes.
Where eaves are located, less than 5' horizontally from top of
fill slopes, eaves troughs shall be provided to prevent weakening
of slope due to water intrusion.
All areas of the building pad must be well drained. Drainage
swales shall have a minimum slope of 1' vertical in 100'
horizontal unpaved or 1' vertical in 200' horizontal paved with
concrete. Drainage shall be provided to ensure foundations will not be subjected to ponded water.
-3-
PLATE 4
PROPERTY DEVELOPMENT ENGINEERS, INC.
1859 S. ESCONDIDO BLVD., ESCONDIDO, CA 92025
JOHN E. VERNON, PRESIDENT, RCE 21121, GE 858
CHARLES W. DAVIS, VICE PRESIDENT, RCE 21719
BARRY L. MUNSON, PROJECT ENGINEER, RCE 40980
FREDERICK F. BRONSON, CHIEF OF SURVEYS, LS 5085
DELBERT C. DANIELS, CHIEF OF MAPPING. LS 3351
YAINTENANCE GUIDELINES FOR HOME OWNERS
Yomesites, in general, and hillside lots, in particular, need
maintenance to continue to function and retain their value. Many
homeowners are unaware of this and allow deterioration of their
property. It is important to familiarize homeowners with some
guidelines for naintenance of their properties and make them
aware of the importance of maintenance.
Some governing agencies require hillside property developers to
utilize specific methods of engineerins anc? constructioc to
protect those investing in improved lots or constructed homes.
For example, the developer may be required to grade the property
In such a manner that r3inwater will be drained away from the lot
arid to plant slopes so that erosion will be minimizee. He niay
also be required to install permanent drains.
However, once the lot is purchasecl, it is the buyer's
responsibility to maintain these safety features by observing a
2rudent Frogram of lot care and maintenance. Failure to make
zegular inspectio:: and maintenance of drainage devices an2
sloping areas may cause severe financial loss. In addition to
his own property damage, he may be subject to civil liability fo?
damage occuring to neighboring properties as a result of his
negligence.
The following maintenance guidelines are provided for the
protection of the homeowner's investment.
.l A.
2.
3.
Surface drainage nust be directed away from structural
foundations to prevent ponding of storx waters OT
irrigation adjacent to footings.
Ca~e shz~uld bi taker? that slopes, terraces, Serms (ridges
at crown of slopes) and proper lot drainage are not
disturbei!. Surface draicage should be condxctee fron; the
rear yard to the street through the side yard, or to
natural dFainage ways withir, the property boundary.
In general, yoof and yard runoff should be conducted to
either the street or storm drair, by nonerosive devices suck
as sidewalks, drainage ?ipes, ground gutters and
driveways. Drainage systems should not be altered without
expert consultation.
' TEL. (619) 743-8808 FAX (619) 743-7466
1.
5.
6.
7.
a.
9.
10.
11.
All.drains should be kept cleaned and unclogged, IncluCting
gutters and downspouts. Terrace drains or gunite ditches
should be kept free of debris to allow proper drainage.
During heavy rain periods, performance of the drainage
system should be inspected. Problems, such as gullying and
ponding, if observed, should be corrected as soon as possible.
Any leakage from pools, waterlines, etc. or bypassing of
'drains should be repaired as soon as practical.
Animal burrows should be eliminated since they may cause
diversion of surface runoff, promote accelerated erosior,
and even trigger shallow soil flowage.
Slopes should not be altered without expert consultation.
Whenever an owner plans a significant topographic
modification of the lot or slope, a qualified soils
engineering consultant should be contacted.
If the owner plans modification of cut or natural slopes
within his property, a soil engineering consultant should
be consulted. Any oversteeping may result in a need for
expensive re t a in ing devices. Undercutting of a
toe-of-slope would reduce the safety factor of the slope
and should not be undertaken without expert consultation.
If unusual cracking, settling or earth slippage occurs on
the property, the owner should consult a qualified soils
engineer or an engineering geologist immediately.
The most common causes of slope erosion and shallow slope
failures are as follows:
A. Gross Neglect of the care and maintenance of the
slopes and drainage devices.
B. Inadequate and/or improper planting. (Barren areas
should be replanted as soon as Possible.)
C. Excessive or insufficient irrigation or diversion
of runoff over the slope.
Owners should not let conditions on their property create a
problem for their neighbors. Cooperation with neighbors
could prevent problems, promote slope stability, adequate
drainage, proper maintenance, and also increase the
aesthetic attractiveness of the community.
-2-
PLATE 5
PROPERTY DEVELOPMENT ENGINEERS, INC.
1859 S. ESCONDIDO BLVD., ESCONDIDO, CA 92025
BARRY L. MUNSON, PROJECT ENGINEER, RCE 40980
JOHN E. VERNON, PRESIDENT, RCE 21121, GE 858
CHARLES W. DAVIS, VICE PRESIDENT, RCE 21719
FREDERICK F. BRONSON, CHIEF OF SURVEYS, LS 5085
DELBERT C. DANIELS, CHIEF OF MAPPING, LS 3351
SLAB CRACK INEDEMATION 61 SPECIFICATIONS
1. All sawed joints should be completed as soon as m raveling
occurs and before cooler evening temperatures occur.
2. Contraction joints should be provided perpendicular to all
re-entrant corners around columns as shclwn in (a).
3. If isolation joints are used around the columns, they
should be diamond shaped as shown in (b). If no isolation
joints are used around colmns, or if the corners of the
isolation joints do not meet the contraction joints, radial
cracking as Shawn in (c) may occur (referace ACI) . Similar
cracking may occur from re-entrant corners along perimeter
of slab as shckvn in (a).
-1-
ENGINEERING SOILS TESTING SURVEYING
(revised 05/22/92)
4.
5.
6.
7.
8.
9.
10.
In order to control cracking at the re-entrant corners
(2270' comrs), provide reinforcenent as sham h (c) and
(dl
Re-entrant comr reinforcem3t sham herein is prwided as
a general guideline only and is subject to verification and
changes by the project architect and/or structural engineer
based upon slab geometry, location, and other engineering
and construction .factors. Further recommendations will
also be made by the Eslgineer due to soils or
other conditions at any time prior to pour.
Geotechnical
We recomnd 4" slump concrete be used for all
structural applications to minimize initial shrinkage.
wter added at job site should be within design limits.
residential
Any
Panels over 12'-15' in size will likely crack at random
locations.
Narrower slabs such as sidewalks and pool decks will likely
crack at intervals equal to the slab width, in addition to
"bottleneck" or "hour-glass" type restrictions.
Wakened plan "T" joints at adjacent slabs will likely
induce at random into the extended stem area if
construction joints are not constructed properly.
If we are considered or held responsible in any way for
concrete random cracks occuring in any slab construction,
we require being in attendance when subgrade is made,
moisturized, concrete is delivered, slwp is checked, water
content is chxked, and weakend plane sawing is completed
in accordaxe with ow recomndations. We would qct to
5e paid for our tine aid service in accordance with our
ccrent rate sheet of char-ges for all tirne expended on this
control engineering.
-2-
ELATE 6
PROPERTY DEVELOPMENT ENGINEERS, INC.
1859 S. ESONDIDO BLVD., ESCONDIDO, CA 92025
JOHN E, VERNON, PRESIDENT, RCE 21121. GE 858
CHARLES W. DAVIS, VICE PRESIDENT, RCE 21719
BARRY L. MUNSON, PROJEm ENGINEER, RCE 40980
FREDERICK F. BRONSON, CHIEF OF SURVEYS, LS 5085
DELBERT C. DANIELS, CHIEF OF MAPPING, LS 3351
CONCRETE PLAC~NT INSTRUCTIONS TO CONTRACTORS,SUBCONTRACTORS AND OWNERS:
A COPY OF THE COMPACTION/GRADING REPORT SHOULD BE Oh' SITE ALL TIMES & ESPECIALLY WHEN FOOTING WORK IS IN PROGRESS!
We emphasize that it is the responsibility of the contractor to ensure that the proper steel reinforcement be placed at mid-height in the that the bedding be properly prepared, and that the concrete is properly cared for during placement and curing.
While cracking of concrete is guaranteed and minor cracking up to 1/8" opening must be expected on any pour as a normal occurance, it can be minimized if the proper steps are taken. Cracking is often aggravated by loose bedding, high water/cement ratio, high concrete temperature at time of placement, small nominal aggregate size, and rapid loss of moisture due to weather conditions during lacement and
potential for drying and shrinkage cracking but this is just one of many important considerations.
All slabs should be placed on a granular, non-expansive, compacted sub-base at least 12" thick. placed prior to pour must also be compacted. Proper steel reinforcement must be blocked to mid-height, with extra steel placed at all re-entrant corners. All sub rade should be thoroughly moisturized prior to casting of concrete. We recammen: the use of low slump concrete (not exceeding 4") for4,all pours. A concrete additive such as Fiber Yesh", which minimizes shrinkage, can further minimize cracking if used per manufacturers specifications.
The contractor should take. appropriate curing precautions durin and after placement of concrete to minimize cracking of slabs. All slabs shouli be provided with sawed, troweled or zip-strip weakened plane oints at 1;-15' strategic intervals where random cracks may occur to allow for straig l t line, designed" cracks in lieu of random cracks. Sawin should be done the same day as the pour and not before it can be accomplished widout raveling. Slabs should be sprayed down several times each day for several days during hot, dry weather. We recommend that a sli sheet, "Semco" tile set. "Nobleseal" or equivalent such as hardwood flooring, marble. ceramic tiles or mexican pavers] is planned 6 irectly on the concrete slab. Slab cracks under all finish floors shou d be filled with mastic crack sealer.
Patio slabs. driveway slabs or A.C. paving within 5' of lower fill, cut or steep native slopes are susceptible to edge settlement and cracking if proper precautions are not made for lateral support. All auxiliary slab and driveway subgrades should be inspected by the Geotechnical Engineer immediately prior to placement of surfacing. Xasonry walls should have designed cracks provided at 12' to 30' intervals during construction to minimize random shrinkage cracks.
slab.
Experience indicates that use of reinforcement in slabs wi P 1 generally reduce t e
All bedding materials
Additives may be necessary for workability.
be utilized if crack-sensitive f P ooring
Some settlement of compacted fill is considered normal and should be anticipated. In our opinion, the total and/or differential settlement expected for the proposed structures is considered to be within tolerable limits, however, unexpected saturation of the fill soils can lead to excessive differential settlement. Therefore, it is .important to provide proper surface drainage and prevent excessive subsurface water intrusion from sources such as over-irrigation, inadequate drainage, or leakage of subsurface utility pipes.
ENGINEERING SOILS TESTING SURVEYING
PLATE 7
'i
5 1
TEST PIT NO. E LEVATl ON
LOO OF TEST PaTS
;OJECT NO. a/fl9/ du I FIGURE NO.
PROPERTY DEVELOPMENT ENGINEERS, INC.
Project Location /3BS BUE-NA VISTA
CAnLSBAD
Grading Permit No.
A. COMPATIBILITY WITH GRADING PLAN AND PERMIT
1. Was the compacted fill placed only in the approximate Yes / No-
locations designated on the grading plan as areas to be
filled?
2. Did the quantity of fill material placed approximate- Yes / No- ly conform to the grading plan?
3. Did the toe of fill or the top of cut appear to meet Yes / No-
the prescribed property line setback (1.5' for fill: 3.0'
for cuts)?
4. Were the finished fill slopes equal to or less than 2'Yes 1/ No- horizontal to 1 vertical?
5. If the fill material was obtained by cuts on the Yes J NO-
site, were the cuts made in the proper location and to the
proper slope approximately as shown on the approved
grading plan?
6. Were brow ditches constructed approximately as shown Yes J No-
on the grading plan? D/7A/A/ME F.€NffhE 5 TO l3E CBMPLET&A PhlUfL
I
TO FIN/SH GRADIAf6 hPP/70VAL. B. LOCATION AND AMOUNT OF COMPACTION TESTS
1. Have you attached a sketch and data showing the Yes J NO- location and relative elevation for all compaction tests?
2. Was a compaction test* made so that there is at least Yes / No-
one test in each 2' thick lens of compacted material?
3. As indicated by inspections, observations and com- Yes 1/ No- paction test results, was the fill, excluding the top l.O',
compacted to at least 90% of maximum dry density?
C. QUALITY OF FILL COMPACTION OPERATION
1. Was the area to receive fill properly prepared in Yes J NO- terms of brush removal, benching, wetting, removal of
noncompacted fill or debris and related items?
2. Was all detrimentally expansive soil placed in the Yes r/ No- fill at 3' or more below finish grade?
3. Have you attached a copy of your curve showing the Yes No-
relationship between optimum moisture content and max-
imum density?
*Field and maximum density tests were performed using test methods
A.S.T.M. 01556 and D1557 or by A.S.T.M. D2922 and D3017.
OWNER: PAUL PARI Z EAU
Sarnpl e
c o NTRAC TO R :
GRADER :
LOCATION: / 3 B Z- l3UENA \//57A
CA RLS DALL. fAL.
Description Soi 1 Optimum Maximum
Type Moist. Density
(PCF)
2iILTY SANII A- 9 /zs SANb - IMPDRT 13 9 /2 4
I 1 !
-- I
I
I
PROPERTY DEVELOPMENT ENGINEERS, INC.
iixs SOUTH ESCONDtOO BOULNARD
ESCONDIDO, umNLA'O2025
EL. 61fJ/7438808
FIELD DENSITY TEST RESULT SUMMARY:
1 I I
I
b I
MAXIMUM DENSITY AND OPTIMUM MOISTURE CONTEPT:
I Re1 ative
.ComDac t ion
I
L __-
TEST LOCA 7/0/1/5
PROPERTY DEVELOPMENT ENGINEERS, INC.
1859 S. ESCONDIDO BLVD., ESCONDIDO, CA 92025
JOHN E. VERNON, PRESIDENT, RCE 21121, GE 858
CHARLES W. DAVIS, VICE PRESIDENT, RCE 21719
BARRY L. MUNSON, PROJECT ENGINEER, RCE 40980
FREDERICK F. BRONSON, CHIEF OF SURVEYS, LS 5085
DELBERT C. DANIELS, CHIEF OF MAPPING, LS 3351
SLAB CRACK INFORMATION & SPECIFICATIONS
1. All sawed joints should be completed as soon as no ravellng occurs and
before cooler evening temperatures occur.
2. Contraction joints should be provided perpendicular to all re-entrant
corners around columns as shown in (a).
3. If Isolation joints are used around the columns, they should be diamond
shaped as shown in (b). If no isolation joints are used around columns, or
if the corners of the isolation joints do not meet the contraction joints,
radial cracking as shown in (c) may occur (reference ACI). Similar
cracking may occur from re-entrant corners along perimeter of slab as
shown in (d).
ENGINEERING SOILS TESTING SURVEYING
Rev. 08/11/92
TEL. (619) 743-8808 FAX (619) 743-7466
4. In order to control cracking at the re-entrant corners (2270' corners),
provide reinforcement as shown in (c) and (d).
5. Re-entrant corner reinforcement shown herein is provided as a general
guideline only and is subject to verification and changes by the project
architect and/or structural engineer based upon slab geometry, location,
and other engineering and construction factors. Further recommendations
will also be made by the Geotechnical Engineer due to soils or other
conditions at any time prior to pour.
6. We recommend 4" slump concrete be used for all residential structural
applications to minimize initial shrinkage. Any water added at jobsite
should be within design limits.
7. Panels over 12'-15' in size will likely crack at random locations
8. Xarrower slabs such as sidewalks and pool decks will likely crack at
intervals equal to the slab width. in addition to "bottleneck" or
" hour - g 1 as s " type rest r i c t i on s .
9. Weakened plan "T" joints at adjacent slabs will likely induce at randon;
into the extended stem area if construction joints are not constructed
properly.
10. Steps in slabs will induce contraction cracks at riser junction with lower
Slab A weakened.
11. If we are considered or held responsible in any way for concrete random
cracks occuring in any slab construction, we require being in attendance
when subgrade is made, moisturized, concrete is delivered, slump is
checked, water content is checked, and weakend plane sawing is completed
in accordance with our recommendations. We would expect to be paid for
our time and service in accordance with our current rate sheet of charges
for all time expended on this control engineering.
12. These requirements apply to all slabs, including but not limited to
driveway, steps, walkways, pool decks, patio, garage and house slabs.
PROPERTY DEVELOPMENT ENGINEERS, INC.
1859 S. ESCONDIDO BLVD., ESCONDIDO, CA 92025
JOHN E. VERNON, PRESIDENT, RCE 21121, GE 858
CHARLES W. DAVIS, VICE PRESIDENT, RCE 21719
BARRY L. MUNSON, PROJECT ENGINEER, RCE 40980
FREDERICK F. BRONSON, CHIEF OF SURVEYS, LS 5085
DELBERT C. DANIELS, CHIEF OF MAPPING, LS 3351
YAINTENANCE GUIDELINES FOR HOME OWNERS
Yomesites, in general, and hillside lots, In particular, need
maintenance to continue to function and retain their value. Many
homeowners are unaware of this and allow deterioration of their
property. It is important to familiarize homeowners with some
guidelines for aaintenance of their properties and make them
aware of the importance of maintenance.
Some governing agencies require hillside property developers to
utilize specific methods of engineerin5 and construction to
2rotect those investing in improved lots or constructed homes.
For example, the developer may be required to grade the property
In such a manner that rainwater will be drained away from the lot
and to plant slopes so that erosion will be minimizec?. He may
also be required to install permanent drains.
However, Once the lot is purchasee, it is the buyer's
yesponsibility to maintain these safety features by observing a
2rudent program of lot care and maintenance. Failure to make
regular inspection and maintenance of drainage devices and
sloping areas may cause severe financial loss. In addition to
his own property damage, he may be subject to civil liability for
damage occuring to neighboring properties as a result of his
negligence.
The following maintenance guidelines are provided for the
protection of the homeowner's investment.
1 A.
2.
3.
Surface drainage nust be directed away from structural
foundations to prevent pondin5 of storm waters or"
irrigation adjacent to footings.
Care should be taken that slopes, terraces, berms (ridges at crown of slopes) and proper lot drainage are aot
disturbed. Surface drainage should be condircte6 from the
rear yard to the street through the side yard, or to
natural drainage ways within the property boundary.
In general, roof and yard runoff should be conducted to
either the street or storm drair, by nonerosive devices suck: as sidewalks, drainage pipes, ground gutters and
driveways. Drainage systems should not be altered without
expert consultation.
ENGINEERING SOILS TESTING SURVEYING
PROPERTY DEVELOPMENT ENGINEERS, INC. I TEL. (619) 743-8808 FAX (619) 743-7466
4.
5.
6.
7.
a.
9.
All drains should be kept cleaned and unclogged, including
gutters and downspouts. Terrace drains or gunite ditches
should be kept free of debris to allow proper drainage.
During heavy rain periods, performance of the drainage
system should be inspected. Problems, such as gullying and
ponding, if observed, should be corrected as soon as
possible.
Any leakage from pools, waterlines, etc. or bypassing of
drains should be repaired as soon as practical.
Animal burrows should be eliminated since they may cause
diversion of surface runoff, promote accelerated erosior,
and even trigger shallow soil flowage.
Slopes should not be altered without expert consultatioc.
Whenever an owner plans a significant topographic
modification of the lot or slope, a qualified soils
engineering consultant should be contacted.
If the owner plans modification of cut or natural slopes
within his property, a soil engineering consultant should
be consulted. Any oversteeping may result in a need for
expensive retaining devices. Undercutting of a
toe-of-slope would reduce the safety factor of the slope
and should not be undertaken without expert consultation.
If unusual cracking, settling or earth slippage occurs on the property, the owner should consult a qualified soils
engineer or an engineering geologist immediately.
10. The most common causes of slope erosion and shallow slope
failures are as follows:
A. Gross Neglect of the care and maintenance of the
slopes and drainage devices.
B. Inadequate and/or improper planting. (Barren areas
should be replanted as soon as Possible.)
C. Excessive or insufficient irrigation or diversion
of runoff over the slope.
11. Owners should not let conditions on their property create a problem for their neighbors. Cooperation with neighbors could prevent problems, promote slope stability, adequate drainage, proper maintenance, and also increase the aesthetic attractiveness of the community.
-2-
PROPERTY DEVELOPMENT ENGINEERS, INC.
1859 S. ESCONDIDO BLVD., ESCONDIDO, CA 92025
JOHN E. VERNON, PRESIDENT, RCE 21121, GE 858
CHARLES W. DAVIS, VICE PRESIDENT, RCE 21719
BARRY L. MUNSON, PROJECT ENGINEER, RCE 40980
FREDERICK F. BRONSON, CHIEF OF SURVEYS, LS 5085
DELBERT C. DANIELS, CHIEF OF MAPPING, LS 3351
July 30, 1992
Paul Parizeau
P.O. Box 230822
Encinitas, CA 92023-0822
PRELIMINARY GEOTECHNICAL REPORT
Site: 1385 Buena Vista Ave., Carlsbad, CA
APN 156-230-70
To whom it may concern:
This is to verify that we have investigated the footing soils
conditions and reviewed potential development plans for the above
referenced site to assure 90% relative compaction in all footing
areas.
The native soil is a light brown silty sand (SM) and Is cot
detrimentally expansive (Carlsbad soils per 'JSDA Soil Survey). It
extends to a depth of one to three feet except in natural swale
areas where It car, extend. from 5' to IO' in depth. The top soil
Is loose In Its natural state and should be recompacted to a 2'
depth after the organic topsoil layer is removed to afforZ
acceptable foundation material for the proposed construction. It
is metasedamentary and becomes more dense with depth. No ground
water should be or was encountered on this lot.
There are no known faults located close to the site (Elsinore
fault is approximately 25 miles NE). (Xose Canyon potentially
active fault is 12 mi+ SW). It is our opinion that the site co~ld
5e subjected to moderate to severe gl-ound shaklxg in the event of
a major earthquake along either of these fanlts, howeve?, the
seismic: risk at the site Is not cozsidered significantly gyezte?
than tha: of the sirro~~?<ag area. Construction in accordance
with tke miaiaux standards of the rnost recent edition of the
'Jniform Building Code should miniKize potextial damage as a
r~sul: of seismic activity. To xirrlmize the potential for
lifferential settlement! natura: ground should be over-excavated
to a minimum depth of 3 feet below flzished cpade and replaced
with compacted fill.
SURVEYING \ PROPERTY DEVELOPMENT ENGINEERS, INC.
3 of 6 TEL. (619) 743-8808 FAX (619) 743-7466
The proposed construction as shown on DWG 829-5A consists of a
single family residence on a fill pad which can be accomplished
quite satisfactorily on the site, as regards soil adequacy. Any
footings which step down slopes should be a minimum of 2' deep
below original ground. All drainage should be directed away from
these footings. Foundations should be founded in firm natural
soil, or properly compacted embankment. The soils engineer shall
review the footing excavations prior to concrete placement to
ensure adequate foundation support. We recommend that the continuous footings of the structure be reinforced with at least
two #4 bars top and two bottom (total of .4) as minimum
reinforcement and that the slabs be reinforced with #3 bars at
24" on center each way and be placed carefully @ mid-slab height
on a clean, 4'' compacted and moisturized sand blanket. A vapor
barrier of 6 mil visqueen is reconmended to be sandwiched In the
sand blanket under all lndoor slabs. An allowable soil bearizs
pressure of 2500 psf may be used for design of footlng sizes.
Active and passive fluid presscres of 40 (60 for restrained or
sloping backfill) and 425 pcf, and a friction factor of .4 should
be used foy wall design. A lateral bearing of 300 psf/ft may be
ased for pole deslcp using flagpole formula (UBC 2907 f). All
foundations shall have a xi~imux size as deterxined by Table 29-A
3: the Uniform Building Code and be 18" minixurn depth. Settlement should be within VSC tolerance providing that goo2
construction practices are followed.
TEST AND ANALYSES of the prevailing foundation soils indicate6
the following engineering properties:
Tests were run in accordance with ASTM: D1557 with visual
classification used for design criteria.
Unified Classification SM
Yaxiaum Dry DeEslty (ASTM: 31557) 123 pcf
9.4%
Active Soil Pressure (ASTM: 33080) 40 psf/ft
(Restrained h sloping backfill) 60 ?sf/ft
Passive Soil Pressure (ASTM: D3080) 300 psf/ft
4 of 6
,
Coefficient if Friction (ASTM: D3080) .4
Expansive Factor Very low
Bearing design value 1500 psf
We emphasize that it is the responsibility of the contractor to
insure that the slab reinforcement is placed at mid-height of the
slab. Experience indicates that use of reinforcement in slabs
and foundations will generally reduce the potential for drying-
and shrinkage cracking. However, some cracking should be
expected as the concrete cures. Minor cracking is considered
normal, however, it is often aggravated by a loose sand bedding,
a high water/cement ratio, high concrete temperature at the time
of placement, small nominal aggregated size, and rapid moisture
loss at time of placement, due to hot, dry, and/or windy weather conditions during placement and curing (footing trenches and slab subgrade should be thoroughly moisturized before concrete is cast). Cracking due to temperature and moisture fluctuations can also be expected. The use of low slump concrete not exceeding 4
inches at the time of placement is recommended. The contractor should take appropriate curing precautions during the placement
of concrete to minimize cracking of slabs. We recommend that a slipsheet or Semco Tile Set, Nobleseal or equivalent be utilized
if crack-sensitive flooring (such as marble tile or Mexican pavers) is planned directly on the concrete slab. All slabs
should be designed in accordance with structural considerations
and sawed or weakened by 1' deep troweled joints or zip-strips 8
12-15' strategic intervals if random cracks are unacceptable.
Patio slabs, driveway slabs or A.C. paving placed closer than 5'
to fill or natural slopes are susceptible to edge settlement and
cracking if proper precautions are not made for lateral support.
All slabs should be placed on a granular nonexpansive sub-base at
least 12" thick. Driveway subgrades should be certified before
surface is placed.
The conclusions and recommendations herein have been based on
the observations and/or testing as noted as well as our
experience. No other warranty, expressed or implied, is made.
5 of 6
The grad;ng should be done in accordance with the Grading
Ordinance of the City of Carlsbad and the attached StandarC! Specifications for the Placement of Compacted Filled Ground.
Special footing design will be recommended if necessary at time
grading is completed and footing trenches are excavated.
We will be available for prejob conference and certification
testing upon prior notification when the grading work is
scheduled, and at time footing excavations are made.
bohn E. Vernon
RCE 21121, GE 858
Exp. 9/30/93
6 of 6
APPENDIX "A"
PLATE 2
VERY LOOSE
LOOSE
HfDlUM DEME
DENSE
VERY OENSE
PROPERTY DEVELOPMENT ENGINEERS, INC.
1859 S. ESCONDIDO BLVD., ESCONDIDO, CA 92025
JOHN E. VERNON, PRESIDENT, RCE 21121, GE 858
CHARLES W. DAVIS, VJCE PRESIDENT, RCE 21719
BARRY L. MUNSON, PROJECT ENGINEER, RCE 40980
FREDERICK F. BRONSON. CHIEF OF SURVEYS, LS 5085
DELBERT C. DANIELS, CHIEF OF MAPPING, LS 3351
0- 4
4 - 10
K) -30
33-59
(MR M
RELATlVE DENSITY
I SANDS.GRAVELS I CON StSTENCY
CLAYS AND
PLASTIC SILTS
VERY SoFr
SOFT
FIRM
STIFF
VERY srw
nw
STRENGTH
0 - u4
114 - l/Z
v2-1
1-2
2-4
OvER 4
& Water level at time of excavation or as indicated A Undisturbed driven ring or chunk sample
Disturbed ,bulk sample
ENGINEERING SOILS TESTING SURVEYING
3LOwYFOOT
0-2
2-4
4-8
8 -16
16 -P
(MR 32 ..
TEL. (619) 743-8808 FAX (619) 743-7466
PLATE 3
PROPERTY DEVELOPMENT ENGINEERS, INC.
1859 S. ESCONDIDO BLVD., ESCONDIDO, CA 92025
JOHN E. VERNON, PRESIDENT, RCE 21121, GE 858
CHARLES W. DAVIS, VICE PRESIDENT, RCE 21719
BARRY L. MUNSON, PROJECT ENGINEER, RCE 40980
FREDERICK F. BRONSON, CHIEF OF SURVEYS, LS 5085
DELBERT C. DANIELS, CHIEF OF MAPPING, LS 3351
STANDARD SPECIFICATIONS FOR PLACEMENT OF COMPACTED FILLED GROUND
Objective:
Obtain filled ground which is uniform and has adequate internal
strength to support any structures proposed. The method by which
this is obtained is described herein.
Preliminary Procedures:
1. Permits - Owner shall ascertain the grading permit
requirements of the agency whose jurisdiction covers the
land on which the grading is to be performed and shall be
responsible for complying with them.
2. Water - An adequate water supply shall be provided so that
compaction of filled ground will not be delayed.
3. Soils Engineer - A soils engineer shall be retained to
provide direction in grading, testing for compaction and
certification that the grading complies with grading
ordinances and with approved grading plans.
Grading:
1. Clearing and Grubbing - All natural surface which is to be
covered by filled ground, excavated or needed for brow
ditches, swales or other grading appurtenances shall be
cleared and grubbed. Trees, shrubs and grass, as well as
organic overburden shall be removed from the area to be
graded. Cleared material may be disposed of as approved by
the local controlling agency. No embankment shall consist
of trees, shrubs or other organic material.
2. Natural Ground Preparation - Natural ground shall be
excavated from beneath embankment areas to solid material,
the exact depth as determined by the soils engineer. This
material shall be brought to proper moisture contetlt and
recompacted to not less than 90% maximum density as
determined by A.S.T.M. D-1557-70.
ENGINEERING SOILS TESTING SURVEYING TEL. (619) 743-8808 FAX (619) 743-7466
3.
Any existing fill which has not been certified must be
removed and recompacted.
If the slope of the existing ground exceeds 1' vertical
in 6' horizontal, a bench cut level, 10' wide shall be
excavated at the toe of the fill. This will allow the
embankment to be placed on a horizontal base for more
uniform compaction.
Embankment Placement - Fill material should consist of
native or imported material which has been brought to the
optimum moisture content. Material to be used for
embankments may have rocks with diameters greater than 12"
providing they are evenly distributed in the soil mixture
and are at least 3' below finish grade. Fill slopes shall
not consist of, or be founded on, large rocks. Although rocks may be placed along the outside of the toe of the
fill slopes. Rock placement in embankments shall be under
direct supervision of the soils engineer.
Embankment material shall be placed in layers varying
from 6" to 12" deep depending on soil type, and compacted
by suitable compactive effort to a density or not less than
90% of the maximum density as determined by A.S.T.M.
D-157-70. Moisture content and depth of layers shall be
determined by the soil engineer at the time of grading, and
shall be updated whenever embankment soil types change.
As the embankment increases in elevation, new benches
shall be cut into original ground. Benches shall be at
least 6' horizontally into natural ground, be level and
shall occur at intervals to be determined by the soils
engineer at the time of grading.
Compaction may be obtained by the use of any combination
of equipment which will result in an embankment that is
properly compacted, uniform in moisture and properly
finished to the line and grades shown on the plans or to
those set forth in the applicable grading ordinance.
4. Additional Grading - Cut slopes shall be cut to the lines
and grades as shown on the plans or set forth in the
applicable grading ordinance.
Cut slopes shall be protected from erosion by brow ditches.
Brow ditches shall be either earthen or lined with erosion resistant material as shown on the plans or as recommended by the
engineer.
-2-
Embankments shall be protected from erosion by placing an
earthen berm along the top of slope for the entire perimeter of
the fill. Where drainage is brought down the slope, the drainage
way shall be lined with erosion resistant material to prevent loss of embankment slopes.
Where eaves are located, less than 5' horizontally from top of
fill slopes, eaves troughs shall be provided to prevent weakening
of slope due to water intrusion.
All areas of the building pad must be well drained. Drainage
swales shall have a minimum slope of 1' vertical in 100'
horizontal unpaved or 1' vertical in 200' horizontal paved with
concrete. Drainage shall be provided to ensure foundations will
not be subjected to ponded water.
-3-
PLATE 4
PROPERTY DEVELOPMENT ENGINEERS, INC.
1859 S. ESCONDIDO BLVD., ESCONDIDO, CA 92025
JOHN E. VERNON, PRESIDENT, RCE 21121, GE 858
CHARLES W. DAVIS, VICE PRESIDENT, RCE 21719
BARRY L. MUNSON, PROJECT ENGINEER, RCE 40980
FREDERICK F. BRONSON, CHIEF OF SURVEYS, LS 5085
DELBERT C. DANIELS, CHIEF OF MAPPING, LS 3351
YAINTENANCE GUIDELINES FOR HOME OWNERS
Yomesites, in general, and hillside lots, in particular, need
maintenance to continue to function and retain their value. Many
5omeowners are unaware of this and allow deterioration of their
property. It is important to familiarize homeowners with some
guidelines for aaintenance of their properties and make them
aware of the importance of maintenance.
Some governing agencies require hillside property developers to
utilize specific methods of engineering and construction to
2rotect those investing in improved lots or constructed homes.
For example, the developer may be require6 to grade the property
in such a manner that rainwater will be drained away from the lot
and to plant slopes so that erosion will be minimizee. He may
also be required to install permanent drains.
However, Once the lot is purchasee, it is the buyer's
responsibility to maintain these safety features by observing a
2rudent program of lot care and maintenance. Failure to make
regular inspection and maintenance of drainage devices ani!
sloping areas may cause severe financial loss, In addition to
his own property damage, he may be subject to civil liability for
damage occuring to neighboring properties as a result of his
negligence.
The following maintenance guidelines are provided for the
protection of the homeowner's investment.
1. Surface drainage aust be directed away from structural
foundations to prevent ponding of storm waters or
irrigation adjacent to footings.
2. Care should be taken that slopes, terraces, berms (ridges
at crown of slopes) and ;?roper lot drainage are not
disturbed. Surface drainage should be conductec: fron; the
rear yard to the street through the side yard, or to
natural drainage ways within the property boundary.
3. In general, roof and yard runoff should be conducted to
either the street or storm drain by nonerosive devices suck
as sidewalks, drainage pipes, ground gutters and
driveways. Drainage systems should not be altere6 without
expert consultation.
PROPERTY DEVELOPMENT ENGINEERS, INC.
ENGINEERING SOILS TESTING SURVEYING TEL. (619) 743-8808 FAX (619) 743-7466
1.
5.
6.
7.
8.
9.
10.
11.
All drains should be kept cleaned and unclogged, including
gutters and downspouts. Terrace drains or gunite ditches
should be kept free of debris to allow proper drainage.
During heavy rain periods, performance of the drainage system should be inspected. Problems, such as gullying and
ponding, if observed, should be corrected as soon as
possible.
Any leakage from pools, waterlines, etc. or bypassing of
'drains should be repaired as soon as practical.
Animal burrows should be eliminated since they may cause
diversion of surface runoff, promote accelerated erosion
and even trigger shallow soil flowage.
Slopes should not be altered without expert consultation.
Whenever an owner plans a significant topographic
modification of the lot or slope, a qualified soils
engineering consultant should be contacted.
If the owner plans modification of cut or natural slopes
within his property, a soil engineering consultant should
be consulted. Any oversteeping may result in a need for
expensive retaining devices. Undercutting of a toe-of-slope would reduce the safety factor of the slope
and should not be undertaken without expert consultation.
If unusual cracking, settling or earth slippage occurs on
the property, the owner should consult a qualified soils
engineer or an engineering geologist immediately.
The most common causes of slope erosion and shallow slope
failures are as follows:
A. Gross Neglect of the care and maintenance of the
slopes and drainage devices.
B. Inadequate and/or improper planting. (Barren areas
should be replanted as soon as Possible.)
C. Excessive or insufficient irrigation or diversion
of runoff over the slope.
Owners should not let conditions on their property create a
problem for their neighbors. Cooperation with neighbors
could prevent problems, promote slope stability, adequate
drainage, proper maintenance, and also increase the aesthetic attractiveness of the community.
-2-
PLATE 5
PROPERTY DEVELOPMENT ENGINEERS, INC.
1859 S. ESCONDIDO BLVD., ESCONDIDO, CA 92025
JOHN E. VERNON, PRESIDENT, RCE 21121, GE 858
CHARLES W. DAVIS, VICE PRESIDENT, RCE 21719
BARRY L. MUNSON, PROJECT ENGINEER, RCE 40980
FREOERICK F. BRONSON, CHIEF OF SURVEYS, LS 5085
DELBERT C. DANIELS, CHIEF OF MAPPING, LS 3351
SLAB CRACK INEDRMATION & SPECIFICATIONS
I. All sawed joints should be completed as soon as no raveling
occurs and before cooler evening temperatures occur.
2. Contraction joints should be provided perpendicular to all
re-entrant corners around columns as sham in (a).
3. If isolatian joints are used around the columns, they
should be diamond shaped as shown in (b). If no isolation
joints are used around columns, or if the corners of the
isolation joints do not meet the contraction joints, radial
cracking as shrmn in (c) may occur (reference XI). Similar
cracking may occur from re-entrant corners along perimeter
of slab as sham in (a).
-1-
ENGINEERING SOILS TESTING SURVEYING
(revised 05/22/92)
TEL. (619) 743-8808 FAX (619) 743-7466
4.
5.
6.
7.
8.
9.
10.
In order tocontrol crackingat the re-entrant corners
(2270' corners), provide reinfor-t as sham in (c) and (a -
Re-entrant corner reinforcement sham herein is provided as
a general guideline only and is subject to verification and
changes by the project architect and/or structural engineer
based upon slab -try, location, and other engineering
and construction .factors. Further recomndations will
also be made by the Geotechnical Ehgineer due to soils or
other conditions at any time prior to pour.
We recommend 4" slump concrete be used for all
structural applications to minimize initial shrinkage.
water added at job site should be within design limits.
residential
Any
Panels over 12'-15' in size will likely crack at random
locat ions.
Narrower slabs such as sidewalks and pool decks will likely
crack at intervals equal to the slab width, in addition to
"bottleneck" or "hour-glass" type restrictions.
Weakened plan "T" joints at adjacent slabs will likely
induce at random into the extended stem area if
construction joints are not constructed properly.
If we are considered or held responsible in any way for
concrete random cracks occuring in any slab construction,
we require being in attendance when subgrade is made,
moisturized, concrete is delivered, slump is checked, water
content is chc~ked, and w3akend plane sawing is completed
in accordance with our recomndations. We would expect to
be paid for our time and service in accordance with our
arrent rate sheet of charges for all time expended on this
control engineering.
-2-
'
1
PROPERTY DEVELOPMENT ENGINEERS, INC.
2 * RLATE 6 1859 S. ESONDIDO BLVD., ESCONDIDO, CA 92025
JOHN E. VERNON, PRESIDENT, RCE 21121. GE 858
CHARLES W. DAVIS, VICE PRESIDENT, RCE 21719
BARRY L. MUNSON, PROJECT ENGINEER, RCE 40980
FREDERICK F. BRONSON, CHIEF OF SURVEYS, LS 5085
DELBERT C. DANIELS, CHIEF OF MAPPING, LS 3351
CONCRETE PLACEMENT INSTRUCTIONS TO CONTRACTORS,SUBCONTRACTORS AND OWNERS:
A COPY OF THE COMPACTION/GRADING REPORT SHOULD BE OM SITE ALL TIMES & ESPECIALLY WHEN FOOTING WORK IS IN PROGRESS!
We emphasize that it is the responsibility of the contractor to ensure that the proper steel reinforcement be placed at mid-height in the slab, that the bedding be properly prepared, and that the concrete is properly cared for during placement and curing.
While cracking of concrete is guaranteed and minor cracking up to 1/8" opening must be expected on any pour as a normal occurance, it can be minimized if the proper steps are taken. Cracking is often aggravated by loose bedding, high water/cement ratio, high concrete temperature at time of placement, small nominal aggregate size, and rapid loss of moisture due to weather conditions during lacement and curin Experience indicates that use of reinforcement in slabs wiyl generally reduce tEe potential for drying and shrinkage cracking but this is just one of many important considerations.
All slabs should be placed on a granular, non-expansive, compacted sub-base at least 12" thick. placed prior.to pour must also be compacted. Proper steel reinforcement must be blocked to mid-height, with extra steel placed at all re-entrant corners. All sub rade should be thoroughly moisturized pSior to casting of concrete. We recornmen8 the use of low slump concrete (not exceeding 4") for all pours. A concrete additive such as "Fiber Mesh", which minimizes shrinkage, can further minimize cracking if used per manufacturers specifications.
The contractor should take appropriate curing precautions durin and after placement of concrete to minimize cracking of slabs. All slabs shoulz be provided with sawed, troweled or zip-strip weakened plane oints at 12-15' strategic intervals where random cracks may occur to allow for straig i t line, "designed" cracks in lieu of random cracks. Sawin should be done the same day as the pour and not before it can be accomplished witiout raveling. Slabs should be sprayed down several times each day for several days during hot, dry weather. We recommend that a sli sheet, "Semco" tile set, "Nobleseal" or be utilized if crack-sensitive ffooring ceramic tiles or mexican pavers1 is planned d irectly on the concrete slab. Slab cracks under all finish floors shou d be filled with mastic crack sealer.
Patio slabs, driveway slabs or A.C. paving within 5' of lower fill, cut or steep native slopes are susceptible to edge settlement and cracking if proper precautions are not made for lateral support. All auxiliary slab and driveway subgrades should be inspected by the Geotechnical Engineer immediately prior to placement of surfacing. Masonry walls should have designed cracks provided at 12' to 30' intervals during construction to minimize random shrinkage cracks.
All bedding materials
Additives may be necessary for workability.
equivalent such as hardwood flooring, marble,
Revised 04/01/92
TEL. (619) 743-8808 FAX (619) 743-7466
Some settlement of compacted fill is considered normal and should be anticipated. In our opinion, the total and/or differential settlement expected for the proposed structures is considered to be within tolerable limits, however, unexpected saturation of the fill soils can lead to excessive differential settlement. Therefore, it is .important to provide proper surface drainage and prevent excessive subsurface water intrusion from sources such as over-irrigation, inadequate drainage, or leakage of subsurface utility pipes.
ENGINEERING SOILS TESTING SURVEYING
I
1300 Buena Vista Blk Residence Carlsbad Climate Zone #7
Lloyd & Associates
Title 24 Energy Calculations Compliance Method - CALPAS 4
January 8, 1991
Haynal and Company
425 N. Date, Suite A
Escondido, CA 92025
(619) 743-5408 ,/ (619) 295-9225
Contractor's License #467907
Plan Check No. yA* %?/ CERTIFICATION OF COMPLIANCE CITY OF CARLSBAD
DEVELOPMENT PROCESSING SERVICES DIVISION
2075 LAS PALMAS DR., CARLSBAD, CA 92009
(619) 438-1161
This form shall be used to determine the amount of school fees for a project and to verify
that the project applicant has complied with the school fee requirements.
permits fof the projects shall be issued until the certification is signed by the appropriate
school district and returned to the City of Carlsbad Building Department.
No building
SCHOOL DISTRICT:
Carlsbad Unified
801 Pine Avenue
Carlsbad, CA 92009 (434-0610)
San Marcos Unified
,1290 West SanMarcDs Elud.
San Marcos, CA 92024 (744-4776)
Encinitas Union San Dieguito Union High School
101 South Rancho Santa Fe Rd. . 71 0 Encinitas Boulevard
Endnitas, CA- 92024 (619) sqr-~soa Encinitas, CA 92024 (753-6491 1
Project Applicant: 4AAl2-a~ APN: [s -&9- 7a
Project Address : /=s /3 uckA ~4/>7P W#Y
RES I DENT I AL : SQ. FT. of living area a$//& number of dwelling units
SQ. FT. of covered area SQ. FT. of garage area 6 b B
COMME RC I A L/ I N DUST RI A L : SQC
Prepared by Date
FEE CERTIFICATION
(To be completed by the School District)
I/ Applicant has complied with fee requirement under Government Code 53080
Project is subject to an existing fee agreement
Project is exempt from Government Code 53080
Final Map ap roval and construction started before September 1, 1986. (other schoo P fees paid)
Other
Residential Fee Levied: $3 ?%\ 0 q b based on 2, 4 la.. sq. ft. @ &. SK
CommIlndust Fee Levied:$ based on sq. ft. @
Titlh Date
CommIlndust Fee Levied:$ based on sq. ft. @ I
AB 2926 and SB 201 fees are capped at $1.58 per square foot for residential.
AB 2926 is capped at .26C per square foot for cornmercial/industrial.
i
i
L s ,m
BUILDING PERMIT PCR No: PCR92052 08/24/92 08:15 Project No: A9100149
Page 1 of 1 Development No:
Job Address: 1385 BUENA VISTA WY Suite:
Permit Type: PLAN CHECK REVISION 8487 08/24/92 Oooi 01 02
Parcel No: Lot#: . c-9R)TT 146.00 Valuation: 6,408
Construction Type: VN
Occupancy Group: R3/M Reference#: 92-495 e's Status: ISSUED
Description: ADD 72 SF TO OFFICE Applied: 08/10/92
Apr/Issue: 08/24/92
Validated By: KZH
Appl/Ownr : PARIZEAN, PAUL 619-434-4994 P.O. BOX 822
ENCIN
Adju
Tot
Fe
Plan
-----
Fees R --------
Fees :
stments:
a1 Fees:
e descri
Check R
- - - - - - - ption
.evisi
.oo .oo 146.00 Ext fee Qata
146.00
i
BUILDING
0 FOUNDATION
17 APPROVED PLANS SHALL BE ON JOB SITE
SHEATHING
0 FRAME.
.. . 0 UNDERGROUND PLUMBING
0 UNDERGROUND WATER
0
0
0
0 n
0
0
U
MISCELLANEOUS
0 PLENUM AND DUCTS
0 CONDITIONED AIR SYSTEMS
0 SOLAR
0 GRADING
0 POOL
0 PATIO
0 SIGN
0 OTHER
a COMBUSTION AIR
.
RAFTERS AND JOISTB...............NU. 2
RIDGES...........................NO. 2
t.iEXI)ERS AND POSTS. .............. .NO. 1
BEAMS, ........................... SELECT STHUCTURAI..
HIPS fiND VALL..EYS.. .............. .NO. 1
i3LI.II ... AMS .. S1llPL.E.: SPAN. ........... 24F .. V4 DF/DF
C::ANTIL..EVER.. .......... .24F - VU DF/DF
ST~.~~............................~~NST~UCT~N
SC) X 1. -- RLI-C1WABl-E BEAR I N13 1500 P9F PER CINI FORM B1J LLD T NG CODE
F7E'T'rrS I N I NG WALI.,.S 30 PSF EQU I Vf4LENT FLU 11) PRESSURE
FCllJNDAT 1 ClN WALLS 56 F'SF EBU I VAI..ENT Fl-IJ ID FRESSLJRE
M RSDF.4 Fi Y -. f 'ro = 1500 PSI NO SPECIfiL INSPECTION
MORTAR TYPE S
MANN I NO 'ENG I NEER 1 NG
41892 ENTERPRISE CIRCLE SO, STE. E
TEMECIJLA , CA. 92390
BLlS: (714) 676-1844 FAX: (714) 6Y4--hC)26
i
3 L C?"." LaA !?S ROOF DL RClOFING TILE......................... 10.0 PSF
FELT................................... 1.0 PSF
PLYWOnD................................ 1.5 F'SF
2x WAFIERS.. ........................ 2.0 FSF . MISC.:..................~."......... I 0.5 PSF -----------...- 1---
15.0 PSF LOAD TO RAFTER . .( 2X JOIQT.....L...............r......... 1 . (3 FSF
INSULATION............................ 1.0 PSF
EL..ECIRICAL AND MECHANICAL. .......... 0.5 PSF
EiYPSLJM.. ............................ 2.5 PSF
-.------------.--.-L
20.0 PSF TOTAL. ROCIF
ROOF LIVE LOAD = 20 PSF FOR 3/12 FITCH OF LESS
5= 16 PSF FOR 4/12 PITCH TO 8/12
GYPSIJM BUTI-4 SIDES. .................. 5.0 PSF
2x s-rims.. .......................... 1 . 0 PSF
MISi:...I..'............................. 1.0 PSF ,-..----------------
7.0 FSF INTERIOR WfiLL..
F'Li.0 R
STIJCCN. ............................. 12.0 PSF
2x STUI')S.. .......................... l..O PSF
I NSlJI.,AT 1 ON. .......................... 1.0 PSF
GYPSUM"............."................ 2.5 PSF
MXSC.......... ...................... 0.5 PSF I-----------------.
17.0 PSF EXTER I CIR WALL.
FLC30RING.. .......................... 1.0 PSF
,PL..YWOOD. .................. 7'. .. I'. .... 1.5 PSF
2X JC')IST.m....... ................... 2.5 PSF
ELECTRICAL. AND MECHA~XCAL. .......... 0. 5 PSF
1.0 PSF INSULfiTION..................'.........
GYPSUM: ........... .................. 2.5 PSF
MIX.; ............r.................. 1.0 PSF
I.
---------I-------
10m.0 PSF TYPICAL FLOOR
TILED WEA WITH MORTAR.............. 12.0 PSF' *
I----------------
22.0 PSF APPLICABLE
-TILED AREA
.
3
FLOOR 82168.5 a ,657348... . .6092971 12122.09
SUM OF WxHx = 1078863
SUM OF Wx = 106963.5
Z;UM OF % = 1 ..................................................................
-----------1-------1_______I____________--------------
2.281591
, . ... .'.. ..
, -. .. . .. .
..
ub+ __---
I
A
, ....' - .. .* .. .
..
i r,
.. . . .i .. .. , ..
I , , I
-- 3
I
A
I
0
.........................................................................
LATERAL ANALYSIS ALONG LINE A AT SECOND FLOOR
SEISMIC FORCE = ( 4732.425 1 BASED ON FOLLOWING:
~.---------------------------------------------------------------
TOTAL DIAPHRAGM UNIT FORCE FORCE FROM
FORCE (=I TRIB AREA (XI PSF (4-1 OTHER LEVELS
4732.43 607.50 7.79 0 -00)
-. - - - - - - - ---------- ---------- ---L------”..-
c U FORCE = ( 2943.75 ) BASED ON FOLLOWING:’
PROJECTED AREA METHOD
FORCE 0 - 20 FT HGT = 20.3
FORCE 20 - 40 FT HGT = 22
i I
TOTAL FORCE = WIND PRESSURE X TRIB AREA + FORCE FROM OTHER LEVELS
TOTAL 0 - 20 HGT 20 - 40 HGT FORCE FROM
FORCE TRIB AREA TRIB AREA OTHER LEVELS
2943.75 112.50 30.00 0.00
----------- ---------- ---------- -------------
NUMBER OF SHEARWALL PANELS SELECTED = 3
TOTAL LINEAR FEET USED IN CALCS = 33.2
MAX UNIT SHEAR = 142.5429
SHEAR UPLIFT - OEAD = TOTAL RATIO i-1OLOOOWN
PANEL# W li LOAD UPLIFT H/W MARK ------- ------- -------- --------------------______I_ ---I-- --------
e - 1.0 14.0 8.0 1140.3 2352.0 -1211.7 0.6
2.0 6.0 8.0 1140.3 1008.0 132.3 1.3
3.0 13.2 8.0 1140.3 2217.6 -1077.3 0.6 -
(MARKS, SEE SCHEDULES) .............................
*3 EXTERIOR SHEARWALL >*
>*
>*
.......................
INTERIOR SHEARWALL ----- *d
*? SHEARWALL CONNECTIONS ....................... .............................
-6
, ..........................................................................
PROJECT ..... BUENA VISTA** ENGINEER... ... DGU** DATE .... 1-3-91 ...........................................................................
3
******************~*~**************xxx*x*x************x~******x*x*x******
LATERAL ANALYSIS ALONG LINE 8 AT SECOND FLOOR
SEISMIC FORCE = ( 4732.425 I BASED ON FOLLOWING:
................................................................
TOTAL DIAPHRAGM UNIT FORCE FORCE FROM
FORCE (=I TRI8 AREA (XI PSF (+) OTHER LEVELS -------- ------+--- ---------- ------------
4732.43 4' 607.20 7.79 0.00
WIND FORCE = ( 2943.75 1 BASED ON FOLLOWING:
PROJECTED AREA METHOD
FORCE 0 - 20 FT HGT = 20.3
FORCE 20 - 40 FT HGT = 22
TOTAL FORCE = WIND PRESSURE X TRIB AREA + FORCE FROM OTHER LEVELS
TOTAL 0 - 20 HGT 20 - 40 HGT FORCE FROM
FORCE TRIB AREA TRIB AREA OTHER LEVELS
2943 I75 112.50 30.00 0.00 I
----------- ---------- ---------- -------------
NUMBER OF SHEARWALL PANELS SELECTED = 2
TOTAL LINEAR FEET USED IN CALCS = 20.1 ..............................................
I MAX UNIT SHEAR = 235.444 i
1.0 7.8 8.0 1883.6
2.0 12.3 8.0 1883.6
1310.4 573.2 l.,O
2066.4 -182.8 0.7 -
(MARKS, SEE SCHEDULES) .............................
*3 *
* **!7
* *
.............................
..........................................................................
PROJECT ..... BUENA VISTA** ENGINEER ...... DGU** DATE .... 1-3-91
***************************************************X**********************
i
.........................................................................
LATERAL ANALYSIS ALONG LINE 1 AT SECOND FLOOR
SEISMIC FORCE = ( 21913.3 ) BASED ON FOLLOWING:
--------------------________________I___-----~---------------~--
TOTAL DIAPHRAGM UNIT FORCE FORCE FROM
FORCE (=) TRIB AREA (X) PSF .(+I OTHER LEVELS
2103.30 270.00 7.79 0.00
-------- ----I----- ---------- ---3--------
WIND FORCE = ( 1766.25 ) BASED ON FOLLOWINQ:
! PROJECTED AREA METHOD
FORCE 0 - 20 FT HGT = 20.3
FORCE 20 - 40 FT HGT = 22
TOTAL FORCE = WIND PRESSURE x TRIB REA
TOTAL 0 - 20 HGT 20 -840 HGT
FORCE TRIB AREA TRIB AREA
1766.25 67.50 18.00
----------- ----------
NUMBER OF SHEARWALL PANELS SELECTED = TOTAL LINEAR FEET USED IN CALCS - -
+ FORCE FROM OTHER LEVELS
I
FORCE FROM
OTHER LEVELS -------------
0.00
2
13.5
SHEAR UPLIFT - DEAD = TOTAL RATIO HOLDDOWN
PANEL# W H LOAD UPLIFT H/W MARK --_---- ----I-- ............................ ------ --------
1.0 6.5 8.0 1246.4 1092.0 154.4 1.2 -
2.0 7.0 8.0 1246.4 1176.0 70.4 1.1 -
(MARKS,. SEE SCHEDULES)
t*****X*******tX*************
*; 3 EXTERIOR SHEARWALL >*
INTERIOR SHEARWALL ----- *
SHEARWALL CONNECTIONS
.......................
> *- .......................
*tl >* -------------I--------- .............................
NOTE: PLYWOOD WALLS WITH H/W RATIO > 2 TO 1 TO BE BLOCKED
NOTE: PLYWOOD WALLS MAX H/W RATIO IS 3.5 TO 1
*************Y************************************************************
PROJECT ..... BUENA VISTA** ENGINEER.. .... DGU** DATE .... 1-3-91 ..........................................................................
3
.........................................................................
LATERAL ANALYSIS ALONG LINE 2 AT SECOND FLOOR
SEISMIC FORCE = ( 5608.8 ) BASED ON FOLLOWING:
--------------------I___________________------------------------
TOTAL " DIAPHRAGM UNIT FORCE FORCE FROM
FORCE (=) TRIB AREA (X) PSF (+) OTHER LEVELS
5608.80 720.00 7.79 0.00
P
-------- --I------- ------_--- v ------------
WIND FORCE = 4886 1 BASED ON FOLLOWING:
PROJECTED AREA METHOD
FORCE 0 - 20 FT HGT = 20.3
FORCE 20 - 40 FT HGT = 22
TOTAL FORCE = WIND PRESSURE X TRIB AREA + FORCE FROM OTHER LEVELS
TOTAL 0 - 20 HGT 20 - 40 HGT FORCE FROM 9
FORCE TRIB AREA TRIB AREA OTHER LEVELS
4886.00 180.00 56.00 0.00
I NUMBER OF SHEARWALL PANELS SELECTED = 3
TOTAL LINEAR FEET USED IN CALCS = 17.2
MAX UNIT SHEAR = 326.093
..............................................
Sti EAR UPLIFT - DEAD = TOTAL RATIO HOLDOOWN
PANEL# W H LOAD UPLIFT H/W MARK ------- ------- -------- ............................ ------ --...-----
1.0 7.0 8.0 2608.7 896.0 1712.7 ~SI '"ST46 2.0 3.6 8.0 2608.7 460.8 2147.9 2.2
3.0 6.6 8.0 2608.7 844.8 1763.9 1.2 L
..
NOTE:
NOTE: PLYWOOD WALLS MAX H/W RATI0,IS 3.5 TO 1
PLYWOOD WALLS WITH H/W RATIO ,G '2 TO 1 TO BE BLOCKED
..........................................................................
PROJECT ..... BUENA VISTA** ENGINEER... ... DGU** DATE....1-3-91 ..........................................................................
TOTAL DIAPHqCIGM UNIT FORCE FORCE FROM
FORCE (&'I TRIB AREA (X) PSF (+) OTHER LEVELS
3505.50 450.00 7.79 .15 0.00
-------- ---------- ------_--- ---------I--
WIND FORCE = 2943.75 ) BASED ON FOLLOWING:
PROJECTED AREA METHOD
FORCE 0 - 20 FT HGT = 20.3
FORCE 20 -. 40 FT HGT = 22
TOTAL FORCE = WIND PRESSURE X TRIB AREA + FORCE FROM OTHER LEVELS
TOTAL 0 - 20 HGT 20 - 40 HGT FORCE FROM
FORCE TRIB AREA TRIB AREA OTHER LEVELS
2943.75 112.50 30.00 0.00
-----I----- --------I- ---------- --------I----
NUMBER OF SHEARWALL PANELS SELECTED ,= 2
TOTAL LINEAR FEET USED IN CALCS = 12.4
MAX UNIT SHEAR = 282.7016
---------.-------------------------------------
(MARKS, SEE SCHEDULES) .............................
EXTERIOR SHEARWALL = 4 1' >* .......................
INTERIOR SHEARWALL ----- X*
x*******************x********
NOTE: PLYWOOD WALLS WITH H/W RATIO > 2 TO 1 TO BE BLOCKED
NOTE: PLYWOOD WALLS MAX H/W RATIO IS 3.5 TO 1
..........................................................................
PROJECT ..... BUENA VISTA** ENGINEER ...... DGU** DATE .... 1-3-91 **********************************************x*x*************************
.........................................................................
LATERAL ANALYSIS ALONG LINE A AT FIRST FLOOR
SEISMIC FORCE = 6636.22 > BASED ON FOLLOWING:
................................................................
TOTAL DIAPHRAGM UNIT FORCE FORCE FROM
FORCE (=I TRIB ?REA (X) PSF (+) OTHER LEVELS , -------- ----I...---- ---------- ------------
6636.22 835.00 2.28 4742.42
WIND FORCE = ( 5532 ) BASED ON FOLLOWING: PROJECTED AREA METHOD ',
FORCE 0 - 20 FT HGT = 20.3
FORCE 20 - 40 FT HGT = 22
TOTAL FORCE = WIND PRESSURE x TRIB AREA + FORCE FROM OTHER LEVELS
TOTAL 0 - 20 HGT 20 - 40 HGT FORCE FROM
FORCE TRIB AREA TRIB AREA OTHER LEVELS
5532.00 127.50 0.00 2943.75
----_------ ----I----- ---------- ------------L
NUMBER OF SHEARWALL PANELS SELECTED = 4
TOTAL LINEAR FEET USED IN CALCS ,= 40.7
MAX UNIT SHEAR = 163.0521
------------------_--.-------------------------
SHEAR UPLIFT~ - DEAD = TOTAL RATIO HOLDDOWN
PANEL# W H LOAD UPLIFT H/W MARK
1.0 23.0 8.0 1304.4 5014.0 -3709.6 0.3 4
2.0 8.0 8.0 1304.4 1744.0 -439.6 1.0 -
3.0 2.4 8.0 1304.4 523.2 781.2 3.3 -
4.0 7.3 8.0 1304.4 1591.4 -287.0 1.1 -
------- ------- ----....--- ............................ ------ --------
(MARKS, SEE SCHEDULES) .............................
"4
SHEARWALL CONNECTIONS *'7
EXTERIOR SHEARWALL > *.
>*
>*
I----------------------
INTERIOR SHEARWALL ----- * - .......................
....................... .............................
NOTE: PLYWOOD WALLS WITH H/W RATIO > 2 TO 1 TO BE BLOCKED
NOTE: PLYWOOD WALLS MAX H/W RATIO IS 3.5 TO 1
............................................................................
PROJECT ..... BUENA VISTA** ENGINEER ..,... DGU** DATE .... 1-3-91 ..........................................................................
r' .........................................................................
LATERAL ANALYSIS ALONG LINE B AT FIRST FLOOR
SEISMIC FORCE = (' 7110.46 1 BASED,ON FOLLOWING:
................................................................
WIND FORCE = ( 6912.4 1 BASED ON FOLLOWING:
PROJECTED AREA METHOD
FORCE 0 - 20 FT HGT = 20.3
FORCE 20 - 40 FT HGT = 22
TOTAL FORCE = WIND PRESSURE X TRIB AREA + FORCE FROM OTHER LEVELS
TOTAL 0 - 20 HGT 20 - 40 HGT FORCE FROM
FORCE TRIB AREA TRIB AREA OTHER LEVELS
6912.40 195.50 0.00 2943.75
----------- ---------- ---------- -------------
NUMBER OF SHEARWALL PANELS SELECTED ,= 3
TOTAL LINEAR FEET USED IN CALCS = 21.3
MAX UNIT SHEAR = 333.8244
--------------------____I_______________------
i
3.1 ynPAHO
3.0 4.0 8.0 2670.6 872.0 1798.6 2.0 vqpuI)
L
1.0 2.6 8.0 2670.6 566.8 2103.8
2.0 14.7 8.0 2670.6 3204.6 -534.0 0.5
(MARKS. SEE SCHEDULES)
******X**t******************X
** 4 EXTERIOR SHEARWALL >*
INTERIOR SHEARWALL ----- * .......................
SHEARWALL CONNECTIONS * >* '0 ....................... .............................
NOTE: PLYWOOD WALLS WITH H/W RATIO > 2 TO 1 TO BE BLOCKED
NOTE: PLYWOOD WALLS MAX H/W RATIO IS 3.5 TO 1
***********************************~***************X*~*********X**********
PROJECT. .... BUENA VISTA** ENGINEER ...... DGU** DATE....l-3-91
****************************************************************X*********
WIND FORCE = ( 1380.4 BASED ON FOLLOWING: '
PROJECTED AREA METHOD
FORCE 0 - 20 FT HGT = 20.3
FORCE 20 - 40 FT HGT = 22
TOTAL FORCE = WIND PRESSURE X TRIB AREA + FORCE FROM OTHER LEVELS
TOTAL 0 - 20 HGT 20 - 40 HGT FORCE FROM '
FORCE TRIB AREA TRIB AREA OTHER LEVELS
1380.40 68.00 0.00 0.00
I NUMBER OF SHEARWALL PANELS SELECTED = 1
TOTAL LINEAR FEET USED IN CALCS = 22.6
MAX UNIT SHEAR = 61.07964
(MARKS, SEE SCHEDULES)
I ************x*******t***t*XXt
>*
>*
>*
'*3
SHEARWALL CONNECTIONS *';7
EXTERIOR SHEARWALL
INTERIOR SHEARWALL ----- *' e
.......................
.............................
NOTE: PLYWOOD WALLS WITH H/W RATIO > 2 TO 1 TO BE BLOCKED
NOTE: PLYWOOD WALLS MAX H/W RATIO IS 3.5 TO 1
**********************~****~X******~*******xx**************~********x****~
PROJECT ..... 8UENA VISTA** ENGINEER. ..... DGU** DATE .... 1-3-91
***~****~******~******~*~~*****X***~**********************************~**~
.........................................................................
LATERAL ANALYSIS ALONG LINE 2 AT FIRST FLOOR
SEISMIC FORCE = ( 8332 BASED ON FOLLOWING:
................................................................
TOTAL DIAPHRAGM UNIT FORCE FORCE FROM
FORCE (=) THIB AREA (X) PSF .(+I OTHER LEVELS
8322.00 1190.00 2.28 5608.80
WIND FORCE = ( 10488.8 ) BASED ON FOLLOWING:
PROJECTED AREA METHOD
FORCE 0 - 20 FT HGT = 20.3
FORCE 20 - 40 FT HGT = 22
TOTAL FORCE = WIND PRESSURE X TRIB AREA f FORCE FROM OTHER LEVELS
!
TOTAL 0 - 20 HGT 20 - 40 HGT FORCE FROM
FORCE TRIB AREA TRIB AREA OTHER LEVELS ---------- ---------- -------------
10488 I 80 276.00 0.00 ~ 4886.00 3
NUMBER OF SHEARWALL PANELS SELECTED = 4
TOTAL LINEAR FEET USED IN CALCS = 25.7
Sti EAR UPLIFT - DEAD = TOTAL RATIO HOLDDOWN
PANEL# W H LOAD UPLIFT H/W MARK _------ -..,----- ............................ ------
1.0 7.6 8.0 3265.0 1352.8 1912.2 1.1
3.0 7.6 8.0 3265.0 1352.8 1912.2
4.0 3.0 8.0 3265.0 534.0 2731.0 2.7.
2.0 7.5 8.0 3265.0 1335.0 1930.0 1.1 rnQA+W
()ilARKS, SEE SCHEDULES) .............................
EXTERIOR SHEARWALL *rr >*
>*
.......................
*& INTERIOR SHEARWALL -----
SHEARWALL CONNECTIONS
--_-----------------_I_
>* *s ....................... .............................
NOTE: PLYWOOD WALLS WITH H/W RATIO > 2 TO 1 TO BE BLOCKED
NOTE: PLYWOOD WALLS MAX H/W RATIO IS 3.5 TO 1
..........................................................................
PRQJECT.....BUENA VISTA** ENGINEER ...... DGU** DATE .... 1-3-91
*************************************************************************X
****‘****~**u***********************,**************************************
LATERAL ANALYSIS ALONG LINE 3 AT ,FIRST FLOOR
_-_--------_--__----_l__________l_______------------------------
SEISMIC FORCE = ( 5261.1 1 BASED ON FOLLOWING:
TOTAL DIAPHRAGM UNIT FORCE FORCE FROM
FORCE (=I THIB AREA (X) PSF (+I OTHER LEVELS
5261.10 770.00 2.28 3505. SO
-------- ------I--- ---------- ------------
t WIND FORCE =’( 5968.45 ) BASED ON FOLLOWING:
PROJECTED AREA METHOD
FORCE 0 - 20 FT HGT = 20.3 *-
FORCE 20 - 40 FT HGT = 22
TOTAL FORCE = WIND PRESSURE X TRIB AREA + FORCE FROM OTHER LEVELS
TOTAL 0 - 20 HGT 20 - 40 HGT FORCE FROM
FORCE TRIB AREA TRIB AREA OTHER LEVELS
5960.45 149.00 0.00 2943.75
SHEAR UPLIFT - DEAD = TOTAL RATIO HOLDDOWN
PANEL# W H LOAD UPLIFT H/W MARK
1.0 9.7 8.0 2231.2 2114.6 116.6 0.8 e
2.0 3.2 8.0 2231.2 697.6 1533.6 2.5 ’
3.0 5.0 8.0 2231.2 1090.0 1141.2 1.6
------- ------- --------- ............................ --------
4.0 3.5 8.0 2231.2 763.0 1468.2 2.3 YhPAttP
(MARKS, SEE SCHEDULES) .............................
*4 EXTERIOR SHEARWALL >* -------------------I---
.............................
NOTE: PLYWOOD WALLS WITH H/W RATIO > 2 TO 1 TO BE BLOCKED
NOTE: PLYWOOD WALLS MAX ti/W RATIO IS 3.5 TO 1
...........................................................................
PROJECT ..... BUENA VISTA** ENGINEER ...... DGU** DATE .... 1-3-91 *****************************************************************u*******~
I’
- -~
860 718 STUOOO Noell OA OR UNBLOCKED PER ICBO NO.16 QA 91-16 O.C. 8 O.C.€N(LFN FRAMIMO
bS2 8/8 PLY 804 0.C EN BLOCKEO I2 o.c.FN ' 411-18 O.C. Q f RAMlNO
7212 8/0 PLY 6d-L O.C*+l) BLOCKD STAQOER EN 811-16 O.C. '* I2 O.C* FN FRAHINO
e70 I/O PLY 80-0 0.c.w BLOCKED , STAOOER EN Sx -16 O.C. 19 O.C. FN FRAMINQ ,
9 I
60 I/2 GYP 66- 7 0. c , UNBWCK€O I
, : @ -1 EN 8 FN S?II-l6 O.C. FRAMINQ
I : 62 l/2 OYP 60- 4 0.C. UNBLOCKED
I 01 EN e FN . Pr-&o.c.
: 7b If2GYP 6d-40.C. BLOCKEO
-A
I @I EN 8 FN 2II*16O*C. .
FRAMINO
I
Q.
L I I05 '1/2 GYP* 5d-4 0.C. UNBLOCKED . I EN 8 FN 91- 16 0. C A FRAMINQ
I/2 GYP, 5d-4 O.C. BLOCKED EN e FN oX-16 0.C. FRAMINO
IC
.. .. ... .. ?
... -. ,
. _. .
.. . .. ..
r
.* .
..
..
.-
'I..
... . .,
..
I SHEAR WALL CONNECTION SCHEDULE
' 165 112 DIA A.9. I66 - 8 O.C. 164 - e O.C. 48 O.C. Zm PLATE 9s BLOCKINO . @ f* Or MUDSILL
118 DIA A.9. 166 - 7 0.0. I66 - 7 O.C. 42 0.t. Or PLATE 9s BWCKIW 9a MuoslU
908 110 PIA A.8. 166 0 6 0. C. 16d - 6 O.C. 86 O.C. 2r PLATE PI BLOCKIN0 Lx MUSILL I a
1 ~__ ~ I 110 DIA A.B. I60 - 6 O.C. 16d 6 0.C. a2 O.C. Or PLATE PI BLOCKIN0 OK MUDSILL
E4 0.C. , Lr PLATE @ ' .& MUDSlLL a DLOCMINQ .
-- -. 468 I12 DIA A.B. 166 - e.6 0.C.C ASSF - 12 O.C. 16 O.C. Z8 PLATE 28 )'RAMIN0 . 28 MUDSILL - 4ORA3bF-IL 0. CJ
I 698 I12 OIA A.B. Bd - 00.C.s AS5F- 8 O.C. I I2 O.C. OK PLATE PsFRAMW 1' 21 MUDSILL (OR AlSP-8 0.c.)
..
...
..
.I.
...
- - ~- -. 988. 5f8 DIA A. 8.. ASbF - 8 0.C. ASSF - 6 O.C. 16 0.C. PLATE b FRAMINO @ .. 411 MUDSILL i i ..
i I to 618 OIA A.9. AtSF - 8 0. C. AUF- 6 O.C.
I2 0. c. BOTH SIDES BOTH SIDES 4# MUDSILL fr FRAMINO 4 BLOCKINO
..
..,
..
1860 ' 814 MA A.B. hBF- 80.0. ASIF- 6 O.C.
' I2 0. c. BOTH SIDES BOTH SIOES .
+$ MUDSILL 4xBLWKINO 4x BLOCKINO
... ..
... . .'
BEAM DESIGN HIP
DESIGN PARAMETERS, Fb = 1300 Fv = : 85 LDF = 1.25 E = 1800000
USING DRESSED LUMBER
FOR A BEAM SPAN = 19
LOADING
TRIANGULAR LOAD AT RQ, W = 0 PLF, R2 =
------------------_______I______________-------------
I L.
.)
---------
43b PLF
BEAM REACTIONS R1 = 1374.333 R2 =,I 2748.667 BEAM SPAN = 19
MAX SHEAR = 2748.667 ..
MAXIMUM MOMENT OCCURS AT 11 FEET FROM R1
MOMENT = 10050.53
AREA REQ’D = 1.5*V/(LDF*Fv) = 38.80471
SECTION MODULUS REQ’D = 12*M/(LDF*Fb) = 74.21927
INERTIA REQUIRED (1/2 DL + LL) = 279.4864
......................................... *** USE 6 X 10 *** ...................... I *** A = 50.875 *** Sx = 78.4323 *** I = 362.7494
**********a****?************************** ............................................................... ................................................................
PROJECT .... BUENA VISTA ** DATE .... 1-3-91 ** ENGINEER .... DGU
************l***************************************************
2 ........................................................ *** PROGRAM WOOD STRUCTURE ANALYSIS *** ........................................................
TYPICAL FLOOR JOISTS AT 16 OC MAXIMUM ALLOWABLE SPAN
GIVEN THE FOLLOWING CRITERIA:
CONCENTRATED LOAD = 0
DEAD LOAD = 10 LIVE LOAD = 40 THUS W = 66.66667
FOR INERTIA CALCULATION .5 X DL f LL IS USED FOR W
Fb x LDF = 1450 X l.’;Pp
Fv = 95
........................................................
,
THE FORMULA USED (UNIFORM LOADING) ARE: ..*
MAX L BASED ON BENDING STRESS, L = SQT((8XSxXFbXLDF)/(12XW))
SHEAR AREA IS CHECKED Ar = (~.~XWXL-~D)/(~XLDFXFV)
INERTIA IS ALSO CHECKED Ir = (5X1728XWXLE04)/(384XEmXL/240)
L IS ADJUSTED FOR GOVERNING CONDITION
USING 2 X 12 MEMBER DF-L N0.2 ............................
ALLOWABLE L BASED ON Sx, L = 23.94734 WITH Sx = SXr
ALLOWABLE L BASED ON Ar, L = 23.94734 WITH Ar = 91521686
ALLOWABLE L BASED ON Ir, L = 21.94734 WITH Ir = 167.9038
...................................... * MAXIMUM,SPAN (FT) = 21.94734
* Sx = 31.64 * A = 16.875
...................................... * I = 177.97
, .;
........................................................ *** PROGRQM WOOD STRUCTURE ANALYSIS *** ........................................................
TYPICAL ROOF RAFTERS AT 16 OC MAXIMUM ALLOWABLE SPAN
GIVEN THE FOLLOWING CRITERIA:
DEAD LOAD = 20 LIVE LOAD = 16 THUS W = 48
FOR INERTIA CALCULATION .5 X OL + LL IS USED FOR W
Fb x LDF = 1450 X 1.25
Fv = 95
............................................
I II;
THE FORMULA USED (UNIFORM LOADING) ARE:
MAX L BASE0 ON BENDING STRESS, L = sQT((,8XsxXFbXLDF)/(12XW))
SHEAR AREA IS CHECKED At- = (~.SXWXL-~D)/(~XLDFXFV)
INERTIA IS ALSO CHECKED Ir = (5X1728XWXLEO4)/(384XEmXL/240)
L IS ADJUSTED FOR GOVERNING CONDITION
USING 2 X 8 MEMBER OF-L N0.2
---------_--------__________I___________---------------
ALLOWABLE L BASED ON Sx, L = 18.18739 WITH Sx = SXr
ALLOWABLE L BASED ON At-, L = 18.18739 WITH Ar = 5.263041
ALLOWABLE L BASED ON Ir, L = 17.18739 WITH Ir = 46.5914
...................................... * MAXIMUM SPAN (FT) = 17.18739 * ..........................
........................................................
........................................................ *** PROGRAM WOOD STRUCTURE ANALYSIS I ***
TYPICAL ROOF RAFTERS AT 24 OC MAXIMUM ALLOWABLE SPAN
GIVEN THE FOLLOWING CRITERIA:
DEAD LOAD = 20 LIVE LOAD = 16 THUS W = 72
FOR INERTIA CALCULATION .5 X DL + LL IS USED FOR W
Fb x LDF = 1450 X 1.25
Fv = 95
THE FORMULA USED (UNIFORM LOADING) ARE:
MAX L BASED ON BENDING STRESS, L = SQT((t3XSxXFbXLDF)/(12XW))
SHEAR AREA IS CHECKED Ar = (~.~XWXL-~D)/(~XLDFXFV)
INERTIA IS ALSO CHECKED Ir = (5X1728XWXLE04)/(384XEmXL/240)
L IS ADJUSTED FOR GOVERNING CONDITION
--------------------_1____________3___1_----
4 i:
IJSING 2 X 8 MEMBER DF-L N0.2
ALLOWABLE L BASED ON Sx, L = 14.84994 WITH Sx = SXr
ALLOWABLE L BASED ON Ar, L = 14.84994 WITH Ar = 6.376901
ALLOWABLE 1- BASED ON It-, L = 14.84994 WITH Ir = 45.07559
...................................... * MAXIMUM SPAN (FT) = 14.84994 * .......................... * Sx = 13.14 * A = 10.875 * I = 47.635 ......................................
USING 2 X 6 MEMBER DF-L N0.2
ALLOWABLE L BASED ON Sx, L = 11.26612 WITH Sx = SXr
ALL.OWABLE L BASED ON Ar, L = 11.26612 WITH Ar = 4.81996
ALLOWABLE L BASED ON Ir, L = 11.26612 WITH Ir = 19.68292
...................................... * MAXIMUM SPAN (FT) = 11.26612
* Sx = 7.563 * A = €3.25 * I = 20.797 ......................................
* ..........................
........................................................
........................................................
TYPICAL CEILING JOIST AT 16 OC MAXIMUM ALLOWABLE SPAN
GIVEN THE FOLLOWING CRITERIA:
DEAD LOAD = 15 LIVE LOAD = 16 THUS W = 41.33334
FOR INERTIA CALCULATION .5 X DL + LL IS USED FOR W
Fb x LDF = 1450 X 1.25
Fv = 95
THE FORMoLA 'USED (UN?L=ORM LOADING) ARE:
MAX L BASED ON BENDING STRESS, L = SQT((8XSxXFbXLDF)/(12XW))
SHEAR AREA IS CHECKED Ar = (1.5XWXL-2D)/.(2XLDFXFv)
INERTIA IS ALSO CHECKED Ir = (5X1728XWXLEO4)/(384XEmXL/240)
L IS ADJUSTED FOR GOVERNING CONDITION
USING 2 X 8 MEMBER DF-L N0.2
**:'PROGRAM WOOD STRUCTURE ANALYSIS ***
_-------------------_______I____________----
.......................................................
............................
ALLOWABLE L BASED ON Sx, L = 19.59931 WITH Sx = SXr
ALLOWABLE L BASED ON Ar, L = 19.59931 WITH At- = 4.900649
ALLOWABLE L BASED ON Ir, L = 17.59931 WITH It- = 45.21237
......................................
' * MAXIMUM SPAN (FT) = 17.59931 * .......................... * Sx = 13.14 * A = 10.875 * I = 47.635 ......................................
USING 2 X 6 MEMBER DF-L N0.2 i
ALLOWABLE L BASED ON Sx, L = 14.86929 WITH Sx = SXr
ALLOWABLE L BASED ON Ar, L = 14.86929 WITH At- = 3.707632
ALLOWABLE L BASED ON Ir, L = 12.86929 WITH Ir = 17.67803
...................................... * MAXIMUM SPAN (FT) = 12.86929
* Sx = 7.563 * A = 8.25 * I = 20.797 ......................................
I'
'I
LIVE LOAD = 14 DEAD LOAD = 15
MAXIMUM SPAN BASED ON BENDING STRESS SXr = 21.39 IS L = 13.39034 FT
MAXIMUM SPAN BASED ON SHEAR AREA fir = 13.44617 IS L = 13.39034 FT
MAXIMUM SPAN' BASED Oh DEFLECTION Ir = 66.20348 IS L = 13.39034 FT
...................................... * MAXIMUM SPAN (FT) = 13.39034
* sx = 21.39 * A = 13.875 * I = 98.932 ......................................
* ..........................
.................................................................
USING 4 X 10 MEMBER DF-L NO.1
CALCULATION FOR MAX SPAN FOR HIP OR VALLEY APPLICATION
WITH Fb = 1500 X 1.25. Fv = 95, Em = 1,800,,000
-.---------I----_----______I_____________-------------------------
WITH TRIANGULAR LOADING !
I
3.
LIVE LOAD = 14 DEAD LOAD = 15 '
MAXIMUM SPAN BASED ON BENDING STRESS SXr = 49.911 IS L = 17.76043 FT
MAXIMUM SPAN BASED ON SHEAR AREA ' At- = 24.92601 IS L = 17.76043 FT
MAXIMUM SPAN BASED ON DEFLECTION Ir = 204.8935 IS L = 17.74043 FT
******************~*~************XX*** * MAXIMUM SPAN (FT) = 17.76043 * --------------------__I___ * fix = 49.911 * A = 32.375 * I = 230.84 ......................................
LOADING
TRIANGULAR LOAD AT R1, W = 0 PLF, R2 = 412 PLF
---------
BEAM REACTIdNS R1 = ''1304.667 R2 = 2609.333 BEAM SPAN =
MAX SHEAR = 2609.333
MOMENT = 9541.054
AREA REQ'D = l.S*V/(LDF*Fv) = 36.83765
SECTION MODULUS REQ'D = 12*M/(LDF*Fb) =
INERTIA REQUIRED (1/2 DL + LL) = 265.3188
MAXIMUM MOMENT OCCURS AT 11 FEET FROM Rl.
$0.45701
1800000
19
......................................... *** USE 6 X 10 *** ---,,--L,---,,,------- *** A = 50.875 I *** Sx = 78.4323 *** I = 362.7494 .......................................... ............................................................... ................................................................
PROJECT .... BUENA VISTA ** DATE .... 1-9-99 ** ENGINEER .... dgu ................................................................ .....................................................
BEAM DESIGN H4
DESIGN PARAMETERS, Fb = 1500 Fv = : 95 LDF = 1.25 E =
USING DRESSED LUMBER
FOR A BEnM SPAN = 15
.....................................................
LOADING
TRIANGULAR LOAD AT R1, W = 0 PLF, R2 = 215 PLF
BEAM REACTIONS R1 = 537.5 R2 = 1075 BEAM SPAN = 15
MAX SHEAR = 1075
MAXIMUM MOMENT OCCURS AT 8.6875 FEET FROM R1
MOMENT = 3103.212
AREA REQ'D = l.S*V/(LDF*Fv) = 13.57895
SECTION MODULUS REQ'D = 12*M/fLDF*Fb) = 19.86055
INERTIA REQUIRED (1/2 DL + LL) = 68.12748
---------
1800000
**********************x****************** *** USE 4 X 10 *** ...................... *** A = 32.375 *** Sx = 49.91146 *** I = 230.8405 .......................................... ............................................................... ................................................................
PROJECT .... BUENA VISTA ** DATE .... 1-9-99 ** ENGINEER .... dgu ................................................................
I .......................................................... *** PROGRAM WOOD STRUCTURE ANALYSIS *** ........................................................
TYPICAL ROOF RAFTERS AT 24 OC MAXIMUM ALLOWABLE SPAN
GIVEN THE FOLLOWING CRITERIA:
DEAD LOAD = 15 LIVE LOAD = 16 THUS W = 62
FOR INERTIA CALCULATION .5 X DL + LL IS USED FOR W
Fb x LDF = 1450 X 1.25
Fv = 95
THE FORMULA USED (UNIFORM LOADING) ARE:
MAX L BASED ON BENDING STRESS, L = SQT((8XSxXFbXLDF)/(12XW))
SHEAR AREA IS CHECKED Ar = (~.~XWXL-~D)/(~XLDFXFV)
INERTIA IS ALSO CHECKED fr = (5X1728XWXLE04)/(384XEmXL/240~ L IS ADJUSTED FOR GOVERNLNG CONDITION
USING 2 X 8 MEMBER DF-L N0.2
............................................
f i"
.......................................................
------------------I---------
ALLOWABLE L BASED ON Sx, L = 16.00277 WITH Sx = SXr
ALLOWABLE L BASED ON Ar, L = 16.00277 WITH Ar = 5.942643
ALLOWABLE L BASED ON Ir, L = 15.00277 WITH Ir = 42.01225
...................................... * MAXIMUM SPAN (FT) = 15.00277
* Sx = 13.14 * A = 10.875 * I = 47.635 ......................................
_-_-___-___-I-------_________________I__-------------------------
USING 2 X 6 MEMBER DF-L N0.2 ............................
ALLOWABLE L BASED ON Sx, L = 12.14072 WITH Sx = SXr
ALLOWABLE L BASED ON Ar. L = 12.14072 WITH Ar = 4.493
ALLOWABLE L RASED ON It-, L = 11.14072 WITH Ir = 17.2029
...................................... * MAXIMUM SPAN (FT) = 11.14072
* sx = 7.563 * A = 8:25 * 7: = 20.797 ......................................
* ..........................
,* i**.****i************************%*********************** *** PROGRAM WOOD STRUCTURE ANALYSIS *** ........................................................
TYPICAL ROOF RAFTERS AT 16 OC MAXIMUM ALLOWABLE SPAN
GIVEN THE FOLLOWING CRITERIA:
DEAD LOAD = 15 LIVE LOAD = 16 THUS W = 41.33334
FOR INERTIA CALCULATION .5 X DL + LL IS USED FOR W
Fb x LDF = 1450 X 1.25
Fv .= 95
THE FORMULA USED (UNIFORM LOADING) ARE:
MAX L BASED ON BENDING STRESS, L = SQT((SXSxXFbXLDF)/(12XW))
SHEAR AREA IS CHECKED At- = (~.SXWXL-~D)/(~XLDFXFV)
INERTIA IS ALSO CHECKED Ir = (SX1728XWXLE04)/(384XEmXL/240)
L IS ADJUSTED FOR GOVERNING CONDITION
# 6
USING 2 X 8 MEMBER DF-L N0.2
ALLOWABLE L BASED ON Sx, L = 19.59931 WITH Sx = SXr
ALLOWABLE L BASED ON Ar, L = 19.59931 WITH Ar = 4.900649
ALLOWABLE L BASED ON It-. L = 17.59931 WITH Ir = 45.21237
............................
...................................... * MAXIMUM SPAN (FT) = 17.59931 * .......................... * Sx = 13.14 * A = 10.875 * I = 47.635 ...................................... .................................................................
USING 2 X 6 MEMBER DF-L N0.2 ............................
ALLOWABLE L BASED ON Sx. L = 14.86929 WITH Sx = SXr
ALLOWABLE L BASED ON Ar, L = 14.86929 WITH Ar = 3.707632
ALLOWABLE L BASED ON Ir. L = 12.86929 WITH Ir = 17.67803
..................................... * MAXIMUM SPAN (FT) = 12.86929 * .......................... * Sx = "7.563 * A =, 8.25 * I z 20.797 ****************%*********************
.....................................................
BEAM DESIGN RH1
DESIGN PARAMETERS, Fb = 1500 Fv = : 95 LDF = 1.25 E = 1800000
IJSING DRESSED LUMBER
FOR A BEAM SPAN = 5
.....................................................
LOADING
A POINT LOAD (LBS) = 540 AT 2.5 FEET FROM R1
---------
BEAM REACTIONS R1 = 270 R2 = 270 BEAM SPAN = 5
MAX SHEAR = 270
MAXIMUM MOMENT OCCURS AT 2.5 FEET FROM R1
MOMENT = 675
AREA REQ’D = l.S*V/(LDF*Fv) = 3.410526
SECTION MODULUS REQ’D = 12*M/CLDF*Fb) = 4.32
.........................................
*** ...................... * *** USE 4 X 12
*** A = 39.375 *** Sx = 73.82813 ., *** I = 415.2832 .......................................... ............................................................... .................................................................
................................................................ , PROJECT .... BUENA VISTA ** DATE .... 1-9-94 ** ENGINEER .... DGU
BEAM DESIGN RH2
DESIGN PARAMETERS, Fb = 1500 Fv = E 95 LDF = 1.25 E = 1800000
USING DRESSED LUMBER
FOR A BEAM SPAN = 6
--------------------__________________^_-------------
LOADING --------- I UNIFORM LOAD ON MEMBER (PLF) = 310
BEAM REACTIONS R1 = 930 R2 = 930 BEAM SPAN = 6
MAX SHEAR = 930
MAXIMUM MOMENT OCCURS AT 3 FEET FROM R1
MOMENT = 1395
AREA REQ’D = l.S*V/CLDF*Fv) = 8.728948
SECTION MODULUS REQ’D,= 12*M/(LDF*Fb) = 8.928001
., t ......................................... *** USE 4 X 10 *** --------_I------------ *** A = 32.375 *** Sx = 49.91146 *** I = 230.84Q5 ...........................................
8. ?
............................................................... ................................................................
PROJECT .... BUENA VISTA ** DATE .... 1-9-99 ** ENGINEER .... DGU ................................................................
-. _. ._- - .. - - -~ -
LOADING
UNIFORM LOAD ON MEMBER (PLF) = 200
BEAM REACTIdNS R1 = 400 R2 = 400 BEAM SPAN = 4
MAX SHEAR = 400
MOMENT = 400
AREA REQ’D = l.S*V/(LDF*Fv) = 3.526316 SECTION MODULUS REQ’D = 12*M/(LDF*Fb) = 2.56
8
MAXIMUM MOMENT OCCURS AT 2 FEET FROM Rl
......................................... *** USE 4 x $.bo *** -------I-------------- *** A = 25.375 *** Sx = 30.66146 I *** I = 111.1478 .......................................... ............................................................... ................................................................
PROJECT .... BUENA VISTA ** DATE .... ‘1-9-9e ** ENGINEER .... DGU ................................................................
BEAM DESIGN RH4
DESIGN PARAMETERS, Fb = 1500 FV = : 95 rLDF = 1.25 E = 1600000
-_--_-_--_-^-----_--___I________________-------------
.....................................................
USING DRESSED LUMBER 9
FOR A BEAM SPAN = 4
LOADING ---...-----
UNIFORM LOAD ON MEMBER (PLF) = ‘150
BEAM REACTIONS R1 = 300 R2 = 300 BEAM SPAN = 4
MAX SHEAR = 300
MAXIMUM MOMENT OCCURS AT 2 FEET FROM R1
MOMENT = 300
AREA REQ’D z l.S*V/(LDF*Fv) = 2.921053
SECTION MODULUS REQ’D = 12*M/(LDF*Fb) = 1.92
......................................... *** USE 4 X 6 *** ...................... *** A = 19.25 *** Sx = 17.64583 *** I = 48.52605 .......................................... ............................................................... ................................................................
PROJECT .... BUENA VISTA ** DATE .... 1-9-94 ** ENGINEER .... DGU ................................................................
... *** A = 39.375 *** Sx = 73.02813 *** I = 415.2832 ..........................................
--------------------________I___________----------------------- ................................................................
PROJECT .... BUENA VISTA ** DATE .... 1-9-90 ** ENGINEER .... DGU
~******X**t**~~X*Y~~~Y~~~~~******x*X~xx*~~x~~~~~~~~~~*xx*~~~~~
BEAM REACTIONS R1 = 375 R2 = 375 BEAM SPAN = 5
MAX SHEAR = 375
MAXIMUM MOMENT OCCURS AT 2.5 FEET FROM @l
MOMENT = 468.75
AREA REQ'D = l.S*V/(LDF*Fv) = 3.592105
SECTION MODULUS REQ'D = 12*M/(LDF*Fb) = 3
,
.......................................... *** USE 4 Xr 8,ub *** ...................... *** A = 25.375 *** Sx = 30.66146 *** I = 111.1478 ..........................................
USING DRESSED LUMBER ,
FOR A BEAM SPAN = 6
LOADING
UNIFORM LOAD ON MEMBER (PLF) = 150
---------
BEAM REACTIONS R1 = 450 R2 = 450 BEAM SPL,~ = 1
MAX SHEAR = 450
MAXIMUM MOMENT OCCURS AT 3 FEET FROM R1
MOMENT = 675
AREA REQ'D = l.S*V/(LDF*Fv) = 4.223685 SECTION MODULUS REQ'D = 12*M/(LDF*Fb) = 4:32
......................................... *** USE 4 X 10 *** ...................... *** A = 32.375
3- -.,,I,'
____ - ----__ ...............................................................
**************************************x******x*x******x*********
PROJECT .... BUENA VISTA ** DATE. ... 1-9-90 ** ENGINEER .... DGU ************%***************************************************
BEAM DESIGN RW7
DESIGN PARAMETERS, Fb = 1500 Fv = : 95! LDF = 1.25 E = 1800000
USING DRESSED LUMBER
FOR A BEAM,SPAN = 6
7------------ ........................................
LOADING ---------
A POINT LOAD (LBS) = 2800 AT 3 FEET FROM R1
BEAM REACTIONS R1 = 1400 R2 = 1400 8EAM SPAN = 4
MAX SHEAR = 1400
MAXIMUM MOMENT OCCURS AT 3 FEET FROM R1
MOMENT = 4200
AREA REQ’D = l.S*V/(LDF*Fv) = 17.68421
SECTION MODULUS REQ’D = 12*M/(LDF*Fb) = 26.88 I
......................................... *** USE 4 X 12 *** --------I------------- *** A = 39.375 *** Sx = 73.82813 *** I = 415.2832 **************************xxx**x********** ...............................................................
*********************************xxx****************************
PROJECT .... BUENA VISTA ** DATE .... 1-9-90 ** ENGINEER .... DGU ********************************************x****************x**
BEAM DESIGN RH8
DESIGN PARAMETERS, Fb = 1500 Fv = : 95 LDF = 1.25 E = 1800000 USING DRESSED LUMBER ..
FOR A BEAM SPAN = 3
LOADING
A POINT LOAD (LBS) = 1200 AT 2 FEET FROM R1
----------.-------------------------------------------
......................................................
---------
BEAM REACTIONS R1 = 400 R2 = 800 BEAM SPAN = 3
MAX SWEAR = 800
MAXIMUM MOMENT OCCURS AT 2 FEET FROM R1
MOMENT = 800
AREA REQ’O = 1.5*V/(LDF*Fv) = 10.10526
SECTION MODULUS REQ’D = 12*M/(LDF*Fb) = 5.12
......................................... *** USE 4 X 12 *** ...................... *** A = 39.375 *** Sx = 73.82813 *** I = 415.2832 ..........................................
_____-_-------------_________________I__-----------------------
*********************************************X******************
PROJECT.. . . RlJENA VTSTA ** DnTF 7-9-96 ** FNGTVFlrP hrl I
-------------.----------------------------------------
I.
BEA’M DEiIlGN RH9
DESIGN PARAMETERS, Fb = 1500 Fv = : 95 LDF = 1.25 E = 1800000
USING DRESSED LUMBER
FOR A BEAM SPAN = 12
.....................................................
LOADING
A POINT LOAD (LBS) = 600 AT 6 FEET FROM R1
BEAM REACTIONS R1 = ’ 300 R2 = 300 BEAM SPAN = 12
MAX SHEAR = 300
MAXIMUM MOMENT OCCURS AT 6 FEET FROM R1
MOMENT = 1800
AREA REQ’D = 1.5*V/(LDF*Fv) = 3.789474
SECTION MODULUS REQ’D = 12*M/(LDF*Fb) = 11.52
......................................... *** USE 4 X 12 *** ...................... *** A = 39.375 *** Sx = 73.82813 I *** I = 415.2832 .......................................... ............................................................... ................................................................
PROJECT .... SUENA VISTA ** DATE.. .. 1-9-91 ** ENGINEER .... DGU ................................................................
LOADING
UNIFORM LOAD ON MEMBER (PLF) = 403
-------I-
BEAM REACTIONS R1 = 2216.5 R2 = 2216.5 BEAM SPAN =
MAX SHEAR = 2216.5
MAXIMUM MOMENT OCCURS AT 5.5 FEET.FROM R1
MOMENT = 6095.375
AREA REQ’D = 1.5*V/(LDF*Fv) = 23.22553
SECTION MODULUS REQ’D = 12*M/(LDF*Fb) = 39.0104
E = 1800000
I
......................................... *** USE 4 X 12 *** ---------------I------ *** A = 39.375 *** Sx = 73.82813 *** I = 415.2832 ..........................................
................................................................
PROJECT .... BUENA VISTA ** DATE .... 1-9-91 ** ENGINEER .... DGU ................................................................
3’
LOADING
UNIFORM LOAD ON MEMBER CPLF) = 100
A POINT LOAD (LBS) =$ 1500 AT 8 FEET FROM R1 ’
BEAM REACTIONS R1 = 1550 R2 = 1550 BEAM SPAN = 16
MAX SHEAR = 1550
MAXIMUM MOMENT OCCURS AT 8 FEET FROM’krl
MOMENT = 9200 AREA REQ’D = l.S*V/(LDF*Fv) =- 18.39474
SECTION MODULUS REQ’D = 12*M/(LDF*Fb) = 58.88
INERTIA REQUIRED (1/2 DL + LL) = 192
---------
,
......................................... *** USE 4 X 12 *** ...................... *** A = 39.375 *** Sx = 73.82813 *** I = 415.2832 ..........................................
1
............................................................... ................................................................
PROJECT .... BUENA VISTA ** DATE .... 1-9-91 ** ENGINEER .... DGU ................................................................
LOADING ---------
UNIFORM LOAD ON MEMBER (PLF) = ZOO
BEAM REACTIONS H1 = 800 R2 = 800‘ BEAM SPAN = 8
MAX SHEAR = 800
MAXIMUM MOMENT OCCURS AT 4 FEET FROM R1,
AREA REQ’D = l.S*V/(LDF*Fv) = 8.157895
SECTION MODULUS REQ’D = lZ*M/(LDF*Fb,) = 10.24
MOMENT = 1600 !
......................................... *** USE 4 I X 10
*** A = 32.375 *** Sx = 49.91146 *** I = 230.8405 ..........................................
*** ......................
-_------_-_-----_---__________________I_----------------------- ................................................................
PROJECT .... BUENA VISTA ** DATE .... 1-9-91 ** ENGINEER .,..DGU ................................................................
33
DESIGN PARAMETERS. Fb = 2400 Fv = : 165 LDF = 1 E = 1800000
USING GLULAM
FOR A BEAM SPAN = li$
LOADING --------- f.* **
UNIFORM LOAD ON MEMBER IPLF) = 520
A POINT LOAD (LBS) = 1550 AT 6 FEET FROM R1
BEAM REACTIONS R1 = 5713.333 R2 = 5196.667 BEAM SPAN = 18
MAX SHEAR = 5713.333
MAXIMUM MOMENT OCCURS AT 8.0625 FEET FROM R1
MOMENT = 25965.86
AREA REQ’D = 1.5*V/(LDF*Fv) = 47.21212
SECTION MODULUS REQ’D = 12*M/(LDF*Fb) = 129.8293 ’
INERTIA REQUIRED (1/2 DL f LL) = 719.28
......................................... *** USE 6.75 :X 12 . *** ------I--------------- *** A = 81 *** Sx = 162 *** I = 972, *** MIN CAMBER = -666 4 .......................................... 1
................................................................
PROJECT. . . . BlJENA VISTA ** DATE. . I . 1-9~2.?.* *ENGINEER . . . . dgU ......................................... ......................
REAM DESIGN FB2 1
.....................................................
-----------------------------,------------------------
DESIGN PARAMETERS, Fb = 1300 Fv = : 85 ‘LDF = 1
USING DRESSED LUMBER
FOR A BEAM SPAN = 11
LOADING
lJNIFORM LOAD ON MEMBER (PLF) = 520
---------
BEAM REACTIONS R1 = 2860 R2 = 2860 BEAM SPAN =
MAX SHEAR = 2860
MAXIMUM MOMENT OCCURS AT 5.5 FEET FROM R1 ’
MOMENT = 7865
AREA REQ’D = l.S*V/(LDF*Fv) = 41.86765
SECTION MODULUS REQ’D = 12*M/(LDF*Fb) = 72.6
E = 1800000
11
......................................... *** USE 6 X 12 *** ...................... *** A = 61.875 *** Sx = 116.0156 *** I = 652.5879
************Y***********X*****************
*************************~************************~*~*xxxx~~*~~~
PROJECT .... EjUtNA VISTA ** DATE .... 1-9-90 ** ENGINEER .... dgu
t******t~Ys*~*Y,~********************~******************
LOADING
UNIFORM LOAD ON MEMBER (PLF) = 275
----- I--- ...* ,
BEAM REACTIONS R1 = 1512.5 R2 = 1512.5 BEAM SPAN =
MAX SHEAR = 1512.5
MAXIMUM MOMENT OCCURS AT 5.5 FEET FROM R1
MOMENT = 4159.375
AREA REQ’D = 1.5*V/ILDF*Fv) = 19.81086
SECTION MODULUS REQ’D = 12*M/(LDF*Fb) = 33.275
1800000
11
......................................... *** USE 4 X 12
*** A = 39.375 *** Sx = 73.82813 *** I = 415.2832 ..........................................
*** ......................
................................................................
PROJECT .... BUENA VISTA ** DATE .... 1-9-94 ** ENGINEER .... dgu ................................................................
BEAM DESI’GN FBM4
DESIGN PARAMETERS, Fb = 1500 Fv = : 95 LDF = 1 E = 1800000
USING DRESSED LUMBER
FOR A BEAM SPAN = 12
--------------------___I________________-------------
..................................................... I.
LOADING
UNIFORM LOAD ON MEMBER (PLF) = 300
---------
BEAM REACTIONS R1 = 1800 R2 = 1800 BEAM SPAN = 12
MAX SHEAR = 1800
MAXIMUM MOMENT OCCURS AT 6 FEET FROM R1
MOMENT = 5400
AREA REQ’D = l.S*V/CLDF*Fv) = 23.98026
SECTION MODULUS REQ’D = 12*M/CLDF*Fb) = 43.2
......................................... *** USE 4 X 12 *** ...................... *** A = 39.375 *** Sx = 73.82813 *** I = 415.2832 .......................................... ............................................................... ................................................................
PROJECT .... BUENA VISTA ** DATE .... 1-9-9b .** ENGINEER .... dQu
,I,,,,,, I
.....................................................
BEAM DESIGN FBMS
DESIGN PARAMETERS, Fb = 1500 Fv = : 95 LDF = 1 E = 1800000
lJSING DRESSED LUMBER
FOR A BEAM SPAN = 14
LOADING --------- ,I, 8 --
(JNIFORM LOAD ON MEMBER (PLF) = 300
.....................................................
BEAM REACTIONS R1 = 2100 R2 = 2100 BEAM SPAN = 14
MAX SHEAR = 2100
MAXIMUM MOMENT OCCURS AT 7 FEET FROM R1
MOMENT = 7350
AREA REQ’D = l.S*V/(LDF*Fv) = 28.71711
SECTION MODULUS REQ’D = 12*M/CLDF*Fb) = 58.8
INERTIA REQUIRED (1/2 DL + LL) = 154.35 I
......................................... *** USE 4 X 12 *** ...................... *** A = ’ 39.375 *** Sx = 73.82813 *** r = 415.2832 ..........................................
................................................................
PROJECT. ... BUENA VISTA ** DATE .... 1-9-94 ** ENGINEER ..., dgu ................................................................
SEAM DESIGN FBM6
DESIGN PARAMETERS, Fb = 1500 Fv = : 95 LDF = 1 E = 1800000
USING DRESSED LUMBER
FOR A BEAM SPAN = 16
.....................................................
LOADING
UNIFORM LOAD ON MEMBER (PLF) = 85
---------
BEAM REACTIONS R1 = 680 R2 = 680 BEAM SPAN = 16
MAX SHEAR = 680
MAXIMUM MOMENT OCCURS AT 8 FEET FROM R1
MOMENT = 2720
AREA REQ’D = L.S*V/(LDF*Fv) = 9.478619
SECTION MODULUS REQ’D = 12*M/(LOf*Fb) = 21.76
INERTIA REQUTHED (1/2 DL + LL) = 65.28
.........................................
*** ...................... *** USE 4 X 12
*** A = 39.375 *** Sx = 73.82Ej13 *** I = 415.’2832 ..........................................
!’
PROJECT .... BUENA VISTA ** DATE .... 1-9-90 ** ENGINEER .... dgu
*******LC~~*~*4C*~************~~*************~~**~*,~************
"., LOADING
UNIFORM LOAD ON MEMBER (PLF) = 350
i.*C ---------
BEAM REACTIONS R1 = 875 R2 = 875 BEAM SPAN = 5
MAX SHEAR = 875
MAXIMUM MOMENT OCCURS AT 2.5 FEET FROM R1
MOMENT = 1093.75
AREA REQ'D = 1.5*V/(LDF*Fv) = 8.634869
SECTION MODULUS REQ'D = 12*M/(LDF*Fb) = 8.75
I ......................................... *** USE 4 X 12 *** ...................... *** A = 39.375 *** Sx = 73.82813 *** I = 415.2832 ..........................................
!'
............................................................... ................................................................
PROJECT .... BUENA VISTA ** DATE: ... 1-9-99 ** ENGINEER .... dgu ................................................................
LOADING
UNIFORM LOAD ON MEMBER (PLF) = 350
---------
BEAM REACTIONS R1 = 525 R2 = 525 BEAM SPAN = 3
MAX SHEAR = 525
MAXIMUM MOMENT OCCURS AT 1.5 FEET FROM R1
MOMENT = 393.75
AREA REQ'D = l.S*V/(LDF*Fv) = 4.950658
SECTION MODULUS REQ'D = 12*M/(LDF*Fb) = 3.15
......................................... *** USE 4 X $.g1f) *** ...................... *** A = 25.375 *** Sx = 30.66146 *** I = 111.1478 .......................................... ............................................................... ................................................................
PROJECT .... BUENA VISTA ** DATE .... 1-9-9q ** ENGINEER .... dgu
* ,* 1
LOADING
UNIFORM LOAD ON MEMBER (PLF) = 600
BEAM REACTIONS R1 2 ’2400 R2 = 2400 BEAM SPAN = 8
MAX SHEAR = 2400
MOMENT = 4800
AREA REQ’D = l.S*V/(LDF*Fv) = 29.01316
SECTION MODULUS REQ’D = 12*M/(LDF*Fb) = 38.4
---------
MAXIMUM MOMENT OCCURS AT 4 FEET FROM R1-8-
I .........................................
*** A = 39.375
*** USE 4 X 12 *** ----------L,------,,,,
*** Sx = 7j.82813 I *** I = 4‘15.2832 ..........................................
---------_---------I_________I__________----------------------- ................................................................
PROJECT .... BUENA VISTA ** DATE .... ‘1-9-9@ ** ENGINEER .... dgu ................................................................
BEAM DESIGN FBMlO
DESIGN PARAMETERS, Fb = 1500 Fv = : 95 LDF = 1 E = 1800000
USING DRESSED LUMBER
FOR A BEAM SPAN = 5
, .....................................................
LOADING
UNIFORM LOAD ON MEMBER (PLF) = 300
A POINT LOAD (LBS) = 1800 AT 2.5 FEET FROM R1
BEAM REACTIONS R1 = 1650 R2 = 1650 BEAM SPAN = 5
MAX SHEAR = 1650
MAXIMUM MOMENT OCCURS AT 2.5 FEET FROM R1
MOMENT = 3187.5
AREA REQ’D = l.S*V/(LDF*Fv) = 21.61184
SECTION MODULUS REQ’D = 12*M/(LOF*Fb) = 25.5
......................................... *** USE 4 X 12 *** ...................... *** A = 39.375 *** Sx = 73.82813 *** I = 415.2832 ..........................................
................................................................
PROJECT .... BUENA VISTA ** DATE .... 1-9-96 ** ENGINEER .... dgu ................................................................
LOADING
UNIFORM LOAD ON MEMBER (PLF) = 66
A POINT LOAD ILBS) =@ 1050 AT 12 FEET FROM Rl
BEAM REACTIONS R1 = 790.5 R2 = 1315.5 BEAM SPAN =
MAX SHEAR = 1315.5 <.- MAXIMUM MOMENT OCCURS AT 12 FEET FROM‘R1
MOMENT = 4734
AREA REQ’D = 1.5*V/(LDF*Fv) = 17.69824
SECTION MODULUS REQ’D = 12*M/(LDF*Fb) = 34.95877
INERTIA REQUIRED 11/2 DL f LL) = 605.184
---------
4
E = 1800000
16
.......................................... *** USE 6 X 12 *** ...................... *** A = 61.875 *** Sx = 116.0156 *** I = 652.5879 ..........................................
I
---------------------------------------------------------------- ................................................................
PROJECT .... BUENA VISTA ** DATE .... 1-9-99 ** ENGINEER .... dgu ................................................................
BEAM DESIGN F8M12
DESIGN PARAMETERS, Fb = 1500 Fv = : 95 LDF = 1.25 E = 1800000
USING ROUGH SAWN LUMBER
FOR A BEAM SPAN = 16
.....................................................
.....................................................
LOADING
UNIFORM LOAD ON MEMBER (PLF) = 66
A POINT LOAD (LBS) = 800 AT 8 FEET FROM R1
---------
BEAM REACTIONS R1 = 928 R2 = 928 BEAM SPAN = 16
MAX SHEAR = 928
MAXIMUM MOMENT OCCURS AT 8 FEET FROM R1
MOMENT = 5312
AREA REQ’D = l.S*V/(LDF*Fv) = 10.92316
SECTION MODULUS REQ’D = 12*M/(LDF*Fb) = 6.9968
INERTIA REQUIRED (1/2 DL f LL) = 112.128 3
*************************x*************** *** USE 3 X 11.5 *** ......................
*** Sx = 66.125 *** I = 380.2188 ..........................................
*** A = 34.5
............................................................... ................................................................
PROJECT .... BUENA VISTA ** DATE .... 1-9-9Q ** ENGINEER .... dg!~ ................................................................
39
LOADING
lJNIFORM LOAD ON MEMBER (PLF) = 66
A POINT LOAD (LBS) =p 1400 AT 12 FEET FROM R1
BEAM REACTIONS Rl = 1017.5 R2 = 1537.5 BEAM SPAN = 17.5
MAX SHEAR = 1537.5 ll.i
MAXIMUM MOMENT OCCURS AT 12 FEET FROM R1
MOMENT = 7458
AREA REQ'D = l.S*V/ILDF*Fv) = 10.70182
SECTION MODULUS REQ'D = 12*M/ILDF*Fb) = 29.832
INERTIA REQUIRED (1/2 OL f LL) = 982.1054
......................................... *** USE 8.75 X 12 *** I--------------------- *** A = 105 *** sx = 210 *** I = 1260 *** MIN CAMBER = .6820176 ..........................................
I
................................................................
PROJECT.,.. BUENA VISTA ** DATE .... 1-9-94 ** ENGINEER .... dgu ................................................................
DESIGN PARAMETERS, Fb = 1500 Fv = : 95 LDF = 1.25
USING ROUGH SAWN LUMBER
FOR A BEAM SPAN = 16
LOADING ------_--
UNIFORM LOAD ON MEMBER (PLF) = 66 1
A POINT LOAD ILBS) =if 1100 AT 2 FEET F~OM RI
BEAM REACTIONS R1 = 1490.5 R2 = 665.5 BEAM SPAN =
MAX SHEAR = 1490.5 ’..> MAXIMUM MOMENT OCCURS AT 5.9375 ‘FEET FROM R1
MOMENT = 33.55.215
AREA REQ’O 2 1.5*V/ILDF*Fv) = 18.02842
SECTION MODULUS REQ’D = 12*M/(LDF*Fb) = 21.47338
TNERTIA REQlJTRED (1/2 DL + LL) = 67.584
a
,
E = 1800000
16
......................................... *** USE 3 X 11.5 *** ...................... *** A = 34.5 *** Sx = 66.125 *** I = 380.2188 ..........................................
1
\
--------------------____I_______________----------------------- ................................................................
PROJECT .... BUENA VISTA ** DATE .... 1-9-90 ** ENGINEER .... dgu ................................................................ .....................................................
BEAM DESIGN FE3M15
DESIGN PARAMETERS, Fb = 1500 Fv = : 95 LDF = 1.25 E =
USING ROUGH SAWN LUMBER
FOR A BEAM SPAN = 11
.....................................................
LOAD IN G
UNIFORM LOAD ON MEMBER (PLF) =” 66
A POINT LOAD (LBS) = 300 AT 4 FEET FROM R1
A POINT LOAD (LBS) = 300 AT 6 FEET FROM R1
---------
BEAM REACTIONS R1 = 690.2727 R2 = 635.7273 BEAM SPAN =
MAX SHEAR = 690.2727
MAXIMUM MOMENT OCCURS AT 5.9375 FEET FROM R1
MOMENT = 2353.865
AREA REQ’D = 1.5*V/(LDF*Fv) = 7.920287
SECTION MODULUS REQ’D = lZ*M/(LDF*Fb) = 15.06474
1800000
11
.......................................... *** USE 3 X 11.5 *** ...................... *** A = 34.5 *** Sx = 66.125 *** I = 380.2188 ..........................................
................................................................
PROJECT.. .. BUENA VISTA ** DATE .... 1-9-96 ** ENGINEER .... dgu *************x*tt*tx***tt***x*x*~t**~**~~t***~x*x~xt************
... ....... ....... .... .. ......... .. u/
.... I. .
I .. .. . ._ I. ..... '.,.,. .......... ,. . , ,., . , .,: . ............ .. ......... ._ : ..... ...
........................................................ *** PROGRAM WOOD STRUCTURE ANALYSIS *** ........................................................
TYPICAL FLOOR JOISTS AT 16 OC MAXIMUM ALLOWABLE SPAN ........................................................
GIVEN THE FOLLOWING CRITERIA:
CONCENTRATED LOAD = 0
DEAD LOAD = 10 LIVE LOAD = 40 THUS W = 66.66667
FOR INERTIA CALCULATION .5 X DL f LL IS USED FOR W
Fb x LDF = 1450 X 1.00
Fv = 95
THE FORMULA USED (UNIFORM LOADING) ARE:
MAX L BASED ON BENDING STRESS, L = SQT((8XSxXFbXLDF)/(12XW))
SHEAR AREA IS CHECKED Ar = (~.SXWXL-~D)/(~XLDFXFV)
INERTIA IS ALSO CHECKED Ir = (5X1728XWXLEO4)/(384XEmXL/240)
L IS ADJUSTED FOR GOVERNING CONDITION
I
--------------------_______I____________---------------
USING 2 X 12 MEMBER DF-L N0.2 ............................
ALLOWABLE L BASED ON Sx, L = 23.94734 WITH Sx = SXr
ALLOWABLE L BASED ON At-, L = 23.94734 WITH Ar = 9.521686
ALLOWABLE L BASED ON Ir. L = 21.94734 WITH Ir = 167.9038
...................................... * MAXIMUM SPAN (FT) = 21.94734 * .......................... * Sx = 31.64 * A = 16.875 * I = 177.97 ......................................
.. -. -
..
- ..
... ..... .. . .' ... .. ..
..... ... ... .... .. .. .. .. .. ..
..
..
..
I'
t
.. .,. , , . . . .. . ..
.
(4
ROOF WEIGHT = 310
WALL WEIGHT = 136
TOTAL DL + LL = 446
.........................
FOOTING WIDTH REQUIRFD = 446 /( 1500 - 150 ) = .3303704 FT
CODE REQUIRED MINIMUM: WIDTH DEPTH THICKNESS
!'
------- ------- --------- ,* 12 12 6
............................ *** USE UBC MINIMUM CRITERIA *** WITH #4 T&B MINIMUM ............................ .................................................................
ALLOWABLE POINT LOAD ON FOOTING I
REBAR 3 INCHES FROM BOTTOM 1#4 T&B) THEREFOR D = 9
LOAD SUPPORTED BY 4X MINIMUM
ALLOWABLE LOAD = 2418.75 lbs ...............................................................
FOOTING DESIGN - CONTINUOUS
ALLOWABLE SOIL BEARING = 1500 PSP
...............................
...........................................................
..............................................
ROOF WEIGHT = 310
WALL WEIGHT = 136
FLOOR WEIGHT = 400
TOTAL DL + LL = 846
--------_--------I-------
FOOTING WIDTH REQUIRED = 846 /( 1500 - 225 ) = -6635294 FT .
CODE REQUIRED MINIMUM: WIDTH DEPTH THICKNESS ------- ------- -------,..--
15 18 8
............................ *** USE UBC MINIMUM CRITERIA *** WITH #4 T&B MINIMUM ............................ .................................................................
ALLOWABLE POINT LOAD ON FOOTING
REBAR 3 INCHES FROM BOTTOM (#4 T&B) THEREFOR D = 15
LOAD SUPPORTED BY 4X MINIMUM
ALLOWABLE LOAD = 4449.219 lbs ................................................................
f ' -.------------------------------
8
TRIAL SIZE = 1.5 X 1.5 X 1 FEET
SOIL PRESSURE = 1150
PUNCHING SHEAR STRESS = 5.588735 < ALLOWABLE = 152.0526
WIDE BEAM SHEAR STRESS = 0 < ALLOWABLE = 76.02631
USE REINFORCING = 4$>901961E-03 SQ IN/FT
I .................................... *** USE PAD,FOOTING = 1.5 X 1.5 *** X 12 INCHES THICK *** WITH #4 AT 12 INCHES OC .....................................
I
TRIAL SIZE = 2.25 X 2.25 X 1 FEET
SOIL PRESSURE = 1285.803
PUNCHING SHEAR STRESS = 17.70572 < ALLOWABLE = 152.0526
WIDE BEAM SHEAR STRESS = 2.410075 < ALLOWABLE = 76.02631
USE REINFORCING = 2.227064E-02 SQ IN/FT
.................................... *** USE PAD FOOTING = 2.25 X 2.25 *** X 12 INCHES THICK *** WITH #4 AT 12 INCHES OC .....................................
**********X*****************************************************~
PAD FOOTING F3
TOTAL DL+LL = 8350
FACTORED LOAD = 13360
.............................................................
..........................
TRIAL SIZE = 2.5 X 2.5 X 1 FEET
SOIL PRESSURE = 1486
PUNCHING SHEAR STRESS = 26.46744 < ALLdWABLE = 152.0526
WIDE BEAM SHEAR STRESS = 4.381173 < ALLOWABLE = 76.02631
USE REINFORCING = 3.565577E-02 S,Q IN/FT
~Xt*~tft***f***t~~ftfX*****Xtttftft* *** 'USE PAD FOOTING = 2.5 X 2.5 *** X 12 INCHES THICK *** WITH #4 AT 12 INCHES OC ..................................... .................................................................
-. .I
c
I1 ' .
PAGE 47OF47
PROJECT
ENGR
DATE
MANNING ENGINEERING
41890 ENTERPRISE CIRCLE SO., STE. E
TEMECULA, CA 92390
PHONE (714) 676-1844
PAGE / OF 2
PROJECT
ENGR
DATE
MANNING ENGINEERING
41890 ENTERPRISE CIRCLE SO., STE. B
TEMECULA, CA 92390
PHONE (714) 676-1844
PAGE 2 OF ..
PROJECT
ENGR
DATE
MANNING ENGINEERING
41890 ENTERPRISE CIRCLE SO., STE. B
TEMECULA, CA 92390
PHONE (714) 676-1844