HomeMy WebLinkAbout1415 BUENA VISTA WAY; ; CB151200; Permit04-21-2015
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Plumbing/Mechanical/Electrical (PME) Permit
Permit No:CB151200
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
Parcel No:
Reference #:
PC #:
Project Title:
1415 BUENA VISTA WY CBAD
PME
1562312500 Lot#:
LITTLE RES-REPLACE A/C UNIT
Status: ISSUED
Applied: 04/21/2015
Entered By: RMA
Plan Approved: 04/21/2015
Issued: 04/21/2015
Inspect Area:
Applicant:
EXCEL AIR CORP
STE B
530 OPPER ST
ESCONDIDO CA 92029
760-741-5550
Owner:
Plumbing Fees
Electrical Fees
Mechanical Fees
Other PME Fees
$0.00
$0.00
$160.00
$0.00
TOTAL PERMIT FEES $160.00
Total Fees: $160.00 Total Payments To Date: $160.00 Balance Due: $0.00
Inspector:
FINAL^B
Date:
VAI
Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, resen/ations, or other exactions hereafter collectively
refen-ed to as "fees/exactions." You have 90 days from the date this pemiit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connecfion fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
fees/exactions of which vou have oreviouslv been given a NOTICE similar to this, or as to which the statute of limitations has previously othenwise expired.
THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMITISSUANCE: OPLANNING nENGINEERING nBUILDING nFIRE nHEALTH nHAZMAT/APCD
PlanCheckNo. Qfi/S ( 2^
CITY OF
CARLSBAD
Building Permit Application
1635 Faraday Ave., Carlsbad, CA 92008
Ph: 760-602-2719 Fax: 760-602-8558
email: building@carlsbadca.gov
www.carlsbadca.gov /
Est. Value
Plan Ck. Deposit
>ate SWPPP
JOBADDRESS i , ^ .. SUITE#/SPACE#/UNIT# " APN •
-
# BATHROOMS TENANT BUSINESS NAME CONSTR. Tl'PE OCC GROUP
DESCRIPTION OF WORK: /nclude Square Feet of Affected Area(s)
EXISTING USE PROPOSED USE GARAGE (SF) PATIOS (SF) [ )ECKS (SF) FIREPLACE AIR CONDITIONING FIRE SPRINKLERS
YESri# N0| 1 YES QNO Q YES| j N0| |
APPLICANTNAME (Secondary Contact;
ADDRESS ) ^ • I "A> V, Kllfc ADDRESS
CITY STATE ZIP
Pb|ONE " — . • FAX PHONE FAX
EMAIL
PROPERTVOWNERNAME \) ^ 1 ».\^
V(y\ vjrmC
CONTRACTOR BUS. NAME n, y _\ .f\ r-\
ADDRESS ,
FAX ^ •FAX
EMAIL ~ EMAIL . \
A^v-A. Imrhfloi IA er.\rrrA -Cow ARCH/DESIGNER NAME & ADDRESS STATE LIC. # STA]£J.I0.# ~ 1 I 1 - ~ ~i —» CLASS" • "CITY SDS. LKlf
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, priorto its issuance, also requires the applicantfor such permitto file a signed statement that he is lioensed pursuantto the provisions ofthe Contraotor's License Lavi/{Chapter 9, commendingwith Section 7000 of Division 3 ofthe Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500)).
Workers' Compensation Declaration: / /lereby affirm under penalty of perjury one of ttte following decldrations:
B l have and will maintain a certificate of consent to self-insure for vi/orkers' compensation as provided by Section 3700 of the Labor Code, for the performance of the worit for which this permii is issued.
I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the perfomiance of the work for which this permit is issued. My workers' compensation insurance carrier and policy
numberare: Insurance Co, PolicyNo, Expiration Date
This seclion need not be completed if the permit is for one hundred dollars ($100) or less,
I I Certiticate of Exemption: I certify that in the performance of the work for which this pemiit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of
Califomia, WARNING: Failure to secure workers' compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), In
addition to the cost of campensation,.daFnages js provided for in Section 3706 of the Labor code, interest and attorney's fees.
jg^ CONTRACTOR SIGNATURg''V ^ ft.. I l/Y^VC 0 Q V. "TSASLENT DATE
I hereby affinn that I am exempt from Contractor's License Law for the following reason:
[ I I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's
License Law does nol apply to an owner of property who builds or improves thereon, and who does such wo* himself or through his own employees, provided that such improvements are not intended or offered for
sale. If, however, the building or improvement is sold within one year of completion, the owner-builder wiil have the burtJen of proving that he did not build or improve for the purpose of sale),
[ I I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of
property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's Ucense Law).
I I I am exempt under Section Business and Professions Code for this reason:
1.1 personally plan to provide the major labor and materiais for construction of the proposed property improvement, QYes I iNo
2.1 (have / have not) signed an application for a building permit for the proposed work,
3,1 have contracted with the following person (firm) to provide the proposed construction (inciude name address / phone / contractors' license number):
4.1 plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name / address / phone / contractors' license number):
5,1 will provide some of the work, but I have contracted (hired) the following persons to provide the work indioated (include name / address / phone / type of work):
yglfpROPERTY OWNER SIGNATd DATE
COMPLETE THIS SECTION FOR N O W - R E $ i D E N T I A t BUILDING PERMITS ONLY
Is the applicant or future bullding occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505,25533 or 25534 of the
Presley-Tanner Hazardous Substance Account Act? Yes No
Is the applicant or future building occupant required to obtain a pennit from the air poiiution control district or air quality management district? Yes No
Is the faciiity to be constmcted within 1,000 feet of the outer boundary of a school site? Yes No
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF
EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
mo N ST R U<T.| 0^^,::% tN;D I H G A GE NCW:
I hereby aflirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code).
Lender's Name Lender's Address
PPLICANT CERTIFICATION
I certify that I have lead ttieappiication and state ttiat ttieabove infbnriation Is conect and that the infDimaton on the plans Is accuiate. I agree to complywtt^
I heneby authorize representative of the City of Carisbad to enter upon the above mentioned property for inspectton purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD
AGAINST ALL LIABlLmES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEOJENCE OF THE GRANTING OF THIS PERMIT
OSHA: An OSHA peitnJ is required for excavations over 5'0' deep and demolitton or constructton of structures over 3 stories in height,
EXPIRATION: Every peimit issued by the Building Offcial under the provistons of this Code shall expire by limitation and become null and void if the building or wori< authorized by such permit is not commenced within
180 days liom the date of such pemiit or If the building or wort< authorized by such pemiit is suspended or abandoned at any time after the wDrt< is commenced for a period ot 180 days (Sectton 106,4,4 Unifonn Buiiding Code).
ySTAPPLICANT'S SIGNATURl DATE
STOP: THIS SECTION NOT REQUIRED FOR BUILDING PERMIT ISSUANCE.
Complete the foliowing ONLY if a Certificate of Occupancy will be requested at final inspection.
Fax (760) 602-8560, Email buildinafSlcarlsbadca.qOV or Mali the completed form to City of Carlsbad, Building Division 1635 Faraday Avenue, Carlsbad, Califomia 92008.
C0#: (Office Use Only)
CONTACT NAME OCCUPANT NAME
ADDRESS BUILDING ADDRESS
CITY STATE CITY STATE ZIP
Carlsbad CA
PHONE FAX
EMAIL OCCUPANTS BUS. LIC. No.
DEUVERY OPTIONS
PICKUP: CONTACT (Listed above) OCCUPANT (Listed above)
CONTRACTOR (On Pg. 1)
MAILTO: CONTACT (Listed above)
CONTRACTOR (On Pg. 1)
MAIL / FAX TO OTHER:
OCCUPANT (Listed above) ASSOCIATED CB*-
NO CHANGE IN USE / NO CONSTRUCTION
CHANGE OF USE / NO CONSTRUCTION
vef APPLICANT'S SIGNATURE DATE
Inspection List
Permit*: CB151200 Type: PME LITTLE RES-REPLACE A/C UNIT
Date Inspection Item Inspector Act Comments
09/02/2015 43 AirCond/Furnace Set - Rl AM PLEASE
09/02/2015 43 AirCond/Furnace Set AEK AP
09/02/2015 49 FinalMechanical - Rl AM PLEASE
09/02/2015 49 FinalMechanical AEK Fl
Wednesday, September 02, 2015 Page 1 of 1
STATE OF CALIFORNIA
ALTERATIONS - HVAC
CEC-CF1R-ALT-03-E (Revised 06/14) CALIFORNIA ENERGY COMMiSSION
CERTIFICATE OF COMPUANCE CF1R-ALT-03-E
Alterations - HVAC CZ 1, 3 to 7 and 16 (formerly CF-IR-ALT-HVAC) (Page 1 ofl)
Site Address: 1415 Buena Vista Way - System 2 Enforcement Agency:
City of Carlsbad
Date Prepared:
4/17/15
Permlt#:
Equipment Type Equipment Efficiency New: Ducting, Plenums, Lineset
Required R-value
Conditioned
Floor Area (sq ft) Thermostat
• Packaged System
13 Split System
• Furnace
• Evaporator Coil
Q Condensing Unit
El Lineset
AFUE
13-0 SEER
EER
COP
HSPF
• R-6 (CZ 1,3-7) Ducts
• R-8' (CZ 16) Ducts
• R-6 (all CZ's) Plenums
• R-5 or R7.5 Lineset'
Served by system
1500 soft
B Setback
(If not already
present, must
be installed)
HERS VERIFICATION SUMMARY Installer determines work to be completed and matches to one ofthe options below. At permit application this
form is allowed to be filled out by hand. For final inspection all forms are to be registered (no hand filled forms allowed) and a copy left on site.
B 1. HVAC Changeout/Repair
Can Include new ducting
Required Compliance Documents to be left on site for Final:
All Equipment,
Condenser Unit, Evaporator Coil,
Air Handler/Furnace
CF1R-ALT-02-E
CF2R: MECH-01, IV1ECH-20-HERS
CF3R: MECH-20-HERS
Installer Requirement: Duct leakage (<.15% or, <_10% to outside, or seal all accessible leaks)
Exempted from duct leakage testing if:
• 1. Duct system registered with HERS provider as previously sealed, or Q 2. There is less than 40 linear feet of duct in unconditioned
space, or • 3. Existing duct systems are constructed, insulated or sealed with asbestos (list manufacture date of building )
• 2. New HVAC System Required Compliance Documents to be left on site for Final:
All new equipment and All New Ducts^ CF1R-ALT-02-E
CF2R-MECH-01, MECH-20-HERS, MECH-22-HERS, MECH-(23 or 24)-HERS
CF3R-MECH-20-HERS, MECH-22-HERS, MECH-(23 or 24)-HERS'
Installer Requirement: Duct leakage < 6%, Fan Efficacy (.58W/CFM), Air Flow i 350 CFM/ton (or Standards Table 150.0-C / D alternative)
• 3. All New Ducts with Replacement Required Compliance Documents to be left on site for Final:
Includes replacing or Installing All New
Ducts' and one or more of the following:
Condenser Unit, Evaporator Coil, Furnace
CF1R-ALT-02-E
CF2R-MECH-01, MECH-20-HERS, MECH-(23 or 24)-HERS
CF3R-MECH-20-HERS, MECH-(23 or 24)-HERS
Installer Requirement: Duct leakage < 6%, Air Flow 2 350 CFM/ton (or Standards Table 150.0-C / D alternative)
• Exempted from duct leakage testing I existing duct systems are constructed, insulated or sealed with asbestos.
• 4. New Ducting over 40 feet Required Compliance Documents to be left on site for Final:
Adding or replacing ducts in unconditioned
space but less than All New Ducts'
CF1R-ALT-02-E
CF2R: MECH-20-HERS
CF3R: MECH-20-HERS
Installer Required to: Duct leakage (<.15% or, <.10% to outside, or seal all accessible leaks)
• Exempted from duct leakage testing 1 existing duct systems are constructed, insulated or sealed with asbestos.
' All new ducting R-8 required when more than 40 ft installed and R-6 when less than 40 ft installed. This includes in walls, between floors etc.
' A New Duct system Is when the duct system Is constructed of at least 75 percent new duct material, and up to 25 percent may consist of reused
parts from the dwelling unit's existing duct system (e.g., registers, grilles, boots, air handler, plenums, duct material.
' R-5 (1" thick insulation) for linesets 1" and less. R-7.5 (1.5" thick insulation) for linesets over 1 inch. Most mfg will require Suction line Diameter
with insulation as the following 1.5-21-2%'', 2.5-3T-2V, 3.5 to 4T-2/.", 5T-4>^"
Contractor (Documentation Author's /Responsible Designer's Declaration Statement)
1 certify the following under penalty of perjury, under the laws ofthe State of California:
1. The information provided on this Certificate of Compliance is true and correct.
2. I am eligible under Division 3 of the California Business and Professions Code to accept responsibility for the information on this document.
3. That the energy features and performance specifications for the design Identified on this Certificate of Compliance conform to the
requirements of Title 24, Parts 1 and 6 ofthe California Code of Regulations (CCR).
4. That the energy features and performance specifications, materials, components, and manufactured devices for the building design or
system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 ofthe CCR.
The building design features or system design features identified on this Certificate of Compliance are consistent with the information
provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement
agency for approval with this building permit application.
5.
Responsible Designer Name;
Howard Moxley
Responsible Designer Signature: k Date Signed: License:
847334
Company:
Excel Air, Corp.
Address:
530 Opper St, Suite
City/State/Zip:
Escondido, CA 92029
Phone:
(760)741-5550
For assistance or questions regarding the Energy Standards, contact the Energy Hotline at: 1-800-772-3300
STATE OF CALIFORNIA
ALTERATIONS - HVAC
CEC-CF1R-ALT-03-E (Revised 06/14)
mm
CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPUANCE CF1R-ALT-03-E
Alterations - HVAC CZ 1, 3 to 7 and 16 (formerly CF-IR-ALT-HVAC) (Page 1 of 1)
Site Address: 1415 Buena Vista Way - System 1 Enforcement Agency:
City of Carlsbad
Date Prepared:
4/17/15
Permit*:
Equipment Type Equipment Efficiency New: Ducting, Plenums, Lineset
Required R-value
Conditioned
Floor Area (sq ft) Thermostat
• Packaged System
El Split System
• Furnace
• Evaporator Coil
1:1 Condensing Unit
Q Lineset
AFUE
13-0 SEER
EER
COP
HSPF
• R-6 (CZ 1,3-7) Ducts
• R-8' (CZ 16) Ducts
• R-6 (o//CZ's) Plenums
• R-5 or R7.5 Uneset'
Served by system
1500 soft
13 Setback
(if not already
present, must
be installed)
HERS VERIFICATION SUMMARY Installer determines work to be completed and matches to one of the options below. At permit application this
form is allowed to be filled out by hand. For final inspection all forms are to be registered (no hand filled forms allowed) and a copy left on site.
• 1. HVAC Changeout/Repair
Can include new ducting
Required Compliance Documents to be left on site for Final:
All Equipment,
Condenser Unit, Evaporator Coil,
Air Handler/Furnace
CF1R-ALT-02-E
CF2R: MECH-01, MECH-20-HERS
CF3R: MECH-20-HERS
Installer Requirement: Duct leakage (<.15% or, <.10% to outside, or seal all accessible leaks)
Exempted from duct leakage testing if:
• 1. Duct system registered with HERS provider as previously sealed, or • 2. There is less than 40 linear feet of duct in unconditioned
space, or • 3. Existing duct systems are constructed, insulated or sealed with asbestos (list manufacture date of building )
• 2. New HVAC System Required Compliance Documents to be left on site for Final:
All new equipment and All New Ducts' CF1R-ALT-02-E
CF2R-MECH-01, MECH-20-HERS, MECH-22-HERS, MECH-(23 or 24)-HERS
CF3R-MECH-20-HERS, MECH-22-HERS, MECH-(23 or 24)-HERS'
Installer Requirement: Duct leakage < 6%, Fan Efficacy (.58W/CFM), Air Flow s 350 CFM/ton (or Standards Table 150.0-C / D alternative)
• 3. All New Ducts with Replacement Required Compliance Documents to be left on site for Final:
Includes replacing or installing All New
Ducts' and one or more ofthe following:
Condenser Unit, Evaporator Coil, Furnace
CF1R-ALT-02-E
CF2R-MECH-01, MECH-20-HERS, MECH-(23 or 24)-HERS
CF3R-MECH-20-HERS, MECH-(23 or 24)-HERS
Installer Requirement: Duct leakage < 6%, Air Flow ^ 350 CFM/ton (or Standards Table 150.0-C / D alternative)
• Exempted from duct leakage testing I existing duct systems are constructed, insulated or sealed with asbestos.
• 4. New Ducting over 40 feet Required Compliance Documents to be left on site for Final:
Adding or replacing ducts in unconditioned
space but less than All New Ducts'
CF1R-ALT-02-E
CF2R: MECH-20-HERS
CF3R: MECH-20-HERS
Installer Required to: Duct leakage (<.15% or, <.10% to outside, or seal all accessible leaks)
• Exempted from duct leakage testing I existing duct systems are constructed, insulated or sealed with asbestos.
' All new ducting R-8 required when more than 40 ft installed and R-6 when less than 40 ft installed. This includes in walls, between floors etc.
' A New Duct system is when the duct system is constructed of at least 75 percent new duct material, and up to 25 percent may consist of reused
parts from the dwelling unit's existing duct system (e.g., registers, grilles, boots, air handler, plenums, duct material.
' R-5 (1" thick insulation) for linesets 1" and less. R-7.5 (1.5" thick insulation) for linesets over 1 Inch. Most mfg will require Suction line Diameter
with insulation as the following 1.5-27-2%", 2.5-31-2%", 3.5 to 4T-2y.", 5T-4y."
Contractor (Documentation Author's /Responsible Designer's Declaration Statement)
I certify the following under penalty of perjury, under the laws ofthe State of California:
1. The Information provided on this Certificate of Compliance is true and correct.
2. lam eligible under Division 3 of the California Business and Professions Code to accept responsibility for the information on this document.
3. That the energy features and performance specifications for the design identified on this Certificate of Compliance conform to the
requirements of Title 24, Parts 1 and 6 ofthe California Code of Regulations (CCR).
4. That the energy features and performance specifications, materials, components, and manufactured devices for the building design or
system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part land Part 6 of the CCR.
5. The building design features or system design features identified on this Certificate of Compliance are consistent with the information
provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement
agency for approval with this building permit application.
Responsible Designer Name:
Howard Moxley
Responsible Designer Signature:. Date Signed Ucense:
847334
Company:
Excel Air, Corp.
Address:
530 Opper St, Suite
City/State/Zip:
Escondldo, CA 92029
Phone:
(760) 741-5550
For assistance or questions regarding the Energy Standards, contact the Energy Hotline at: 1-800-772-3300