HomeMy WebLinkAbout143 CHANNEL RD; ; CB011973; Permit12-21-2001
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
06/26/2001
# Dwelling Units:
Bedrooms:
Project Title:
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Residential Permit Permit No:CB011973
Building Inspection Request Line (760) 602-2725
143 CHANNEL RDCBAD
RESDNTL Sub Type: CONDO
2146000100 Lot#: 11
$206,158.00 Construction Type: VN
Reference #: CT990002
1 Structure Type: SFD
3 Bathrooms: 2.5
POINSETTIA COVE-PLN 2261-PHS 8
2261 SF, 437 SF GAR+ 96 SF DECK
Status: ISSUED
Applied: 05/23/2001
Entered By: RMA
Plan Approved:
Issued: 06/26/2001
Inspect Area: GG
OrigPC#: 99-176
PlanCheck#: PC01-47
Applicant:
FIELDSTONE POINSETTIA COVE L L C
5465 MOREHOUSE DR #250 , .
SAN DIEGO CA 92121
Owner:
FIELDSTONE POINSETTIA COVE L L C
5465 MOREHOUSE DR #250
SAN DIEGO CA 92121
Total Fees: $15,239.16 Total Payments To Date: $15,239.16 Balance Due:$0.00
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'l Pot. Water Con. Fee
Reel. Water Con. Fee
$876.12 Meter Size
$0.00 Add'l Reel. Water Con. Fee
$569.48 Meter Fee
$0.00 SDCWA Fee
($45.56) CFD Payoff Fee
$20.62 PFF
$0.00 PFF (CFD Fund)
$0.00 License Tax
$0.00 License Tax (CFD Fund)
$0.00 Traffic Impact Fee
$0.00 Traffic Impact (CFD Fund)
$0.00 Sidewalk Fee
$0.00 PLUMBING TOTAL
$0.00 ELECTRICAL TOTAL
$0.00 MECHANICAL TOTAL
$0.00 Housing Impact Fee
$2,400.00 Housing InLieu Fee
D5/8 Master Drainage Fee
$0.00 Sewer Fee
$0.00 Additional Fees
TOTAL PERMIT FEES
$0.00
$140.00
$2,004.00
$2,760.92
$3,752.08
$0.00
$0.00
$0.00
$480.00
$0.00
$0.00
$161.00
$60.00
$54.50
$0.00
' $0.00
$0.00
$2,006.00
$0.00
$15,239.16
FINAL APPROVAL
Inspector:Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired.
City of Carlsbad
Fine! Building Inspection
Dept: Building En
Plan Check ft PC01-47
Permit ft
Project Name:
LJ.M&
Planning CMWD St Lite Fire
Date: 12/21/2001
CB011973 Permit Type: RESDNTL
POINSETTIACOVE-PLN2261-PHS8 Sub Type: CONDO
2261 SF, 437 SF GAR+ 96 SF DECK
Address:
Contact Person:
Sewer Dist:
Inspected, .,
Bv:(-,-t\([
Inspected
By:
Inspected
By:
Comments:
143CHANNELRD Lot: 11
ROBERT Phone: 7608070921
CA Water Dist: CA
/ ^ate LI\jf\CL Inspected: C^-v^lolO^ Approved:I \
Date
Inspected: Approved:
Date
Inspected: Approved:
Disapproved: A
Disapproved:
Disapproved:
A) ft
On fnou!Or -0
City of Carlsbad Bldg Inspection Request
For: 12/21/2001
Permit# CB011973
Title: POINSETTIA COVE-PLN 2261-PHS 8
Description: 2261 SF, 437 SF GAR+ 96 SF DECK
Inspector Assignment: GG
143 CHANNEL RD
Lot 11
Type:RESDNTL Sub Type: CONDO
Job Address:
Suite:
Location:
APPLICANT FIELDSTONE POINSETTIA COVE L L C
Owner:
Remarks:
Phone: 7608070921
Inspector:
Total Time:
CD Description
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Requested By: ROBERT
Entered By: CHRISTINE
Act Comments
Associated PCRs
Inspection History
Date Description
12/18/2001 39 Final Electrical
12/12/2001 39 Final Electrical
11 /05/2001 82 Drywall/Ext Lath/Gas Test
11/02/2001 82 Drywall/Ext Lath/Gas Test
10/30/2001 16 Insulation
10/29/2001 16 Insulation
10/26/2001 84 Rough Combo
09/18/2001 83 Roof Sheathing/Ext Shear
09/14/2001 83 Roof Sheathing/Ext Shear
09/12/2001 13 Shear Panels/HD's
09/12/2001 15Roof/Reroof
07/20/2001 11 Ftg/Foundation/Piers
07/20/2001 12 Steel/Bond Beam
07/19/2001 11 Ftg/Foundation/Piers
07/19/2001 12 Steel/Bond Beam
07/12/2001 21 Underground/Under Floor
Act Insp Comments
AP GG EMR
NR GG
AP GG
NR GG
AP GG
NR GG
AP GG
AP GG
CA GG
NR GG
NR GG
AP GG
AP GG
NR GG
NR GG
AP GG