Loading...
HomeMy WebLinkAbout1455 CHESTNUT AVE; ; 83-14-A; PermitDECLARATIONS LENDER f 11° * Mi3 fl; WORKER'S COMPENSATION OWNER/BUILDER CONTRACTOR ISTRUCTION, WHETHER SPECIFIED HEREIN OR NOT, 1 ALSO AGREE TO SAVE INDEMNIFY AND ~KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS ANDEXPENSES WHICH MAY IN 'ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THEGRANTING OF THIS PERMIT.APPLICANT'S SIGNATURE * /* OWNER D CONTRACTOR^TT/^/^^Sb^tO^ JTHONe A( ^ **.^ T) lot^y^nt s9 -c to f /^ b ^* r* O ^ ^rf CAREFULLY EXAMINED THE COMPLETED "APPLICATION "AMD PERMIT" AND DOIfY UNDER PENALTY OF PERJURY THAT ALL INFORMATION HEREON INCLUDARATIONS ABE TRUE AND CORRECT AND 1 FUBTHER CERTIFY AND ASfiEE *F A FED; TO COMPLY WITH ALL CITY, COUNTY AND STATE LAWS GOVERNING BUILD" >•if Expiration, EvejjHfwiHft issued by the BuiltoQ£|eShall_y£p*f8 by limitation and becomeautmSl l/WToy such permit is not commencetpermit, or if the building or work author!abandoned at any time after trie work is conlitii8*??3Ida ! under theid void. If the180 days fromsuch permitd tor a periodprovisions of thissuilding or workthe date of suchs suspended orof 180 dftv*,.._i_* AN OSM* PERMIT IS REQUIRED FOR EXCAVATIONS WE•5' 0" DEEP AND DEMOLITION OR CONSTRUCTION OfSTRUCTURES OVER 3 STORIES IN HEIGHT»TOTAL ELECTRICAL\ o—1 c^—o ro \TOTAL FEES PAYABLE£ ^ \TEMP OCCUPANCY (30 DAYS)' ^•=C ^ > ^ 0 m 33 O0 S \ ^3 ^»» S. \ -N, fW ^ P A /S *•»•» 1 j TEMP POLE 200 AMPS"\ % \C ^ » 0 10m o..a' mr- t—-Hm 33, ••om o nc—i i — o mC3, mm \ » ?»- •c \i - C/)'tu EU OS °COro ro CDCJl CO X OJ ID X d -a \ ; -.. O)IU OS'CO£= o" °COro ro oCJl CO EXIST BLDG EA AMP/SWT/BKRROCK S'TORAGEm•3o SJ" CO COro roro oCJl CO •-aX CO X *STORAGE TANKSoCa c/T I cbro ro 0CJl CO NEW.CONST EA AMP/SWT/BKR 1 @0 ft$COLLECTORSSCHOOL FEE - DCrt— i o—\ D • : ELECTRICAL PERMIT - ISSUEt\ O SOLAR -w cm BRIDGE FEE^ White — Inspector Green — (1) Finance (2]PUBLIC FACr——i ES FEE 32-00-00-8923| . TOTAL PLUMBING\ ••* -f TOTAL MECHANICAL0 A FIRE SPRINKLERS 01-00-00-8227C/5-HDO0 CD O—1 O COo CO IV) CO03 OOi CD e~ m OIE 3DOO aID C/Jo 3) O OO § » XJOl \ s — jm3) O-n-H m RELOCATON OF EA FURNACE/HEATERMOBILEHOME PARK INSPEACH VACUUM BREAKERMECH EXHAUST - HOOO/DUCTSoCD I—m 0Sm 0 § CDO CO r«oCJl EACH INSTAI... ALTER, REPAIR WATER PIPEr-(,, mZ— t Tl OO Z CTr—m O C O •£ )MEGHANo r~ o oos OOro "X.Q \ «EACH GAS SYSTEM 5 OR MORE•*x» m i — ~n -oi — 0m 0« \ELECTRICAL 01CO90o COroroCO tf b \ •x.Si3~U.no fc 01 I W31SAS SVO HOV3r" '3 BOILER/COMPRESSOR 315 HP1 TJ C ro CT> O § o900rororo \ -»v EACH WATER HEATER AND/OR VENT&BOILER/COMPRESSOR UP TO 3 HP| O m 0 § COcp COOOCOCO ^J r r0 ^EACH BUILDING SEWERr* cv OVER 100,000 BTUSIGN PERM—i o 8 O900roro * "•^ 03 EACH FIXTURE TRAPii INSTALL FURN. DUCTS UP TO 100,000 BTUBUILDING PERMo 8 O co roO V5--t \ O PLUMBING PERMIT - ISSUE\i AQ D ' 'MECHANICAL PERMIT - ISSUEr SUMMARY/ACCOUNT NUMBER^ / iCENSUS TRACTOTJ r Z O Cenm m TJ 54 . T> Ofn m H DX O NG PERMITYd N CSSUEDJREDEVELOPMENTAREAvD r)^i! ono r• o D -< ""a = f ! • rr *p a ^ 2 D •nr3} mrm "^oo ~z. m 3J IT 'Hot Valid Unless Machine CertifiedS I \ \J\ T\(y L &• \| "s, £^1DESCRIPTION OF WORKJ . j*»J QESIGNEB'SADDBESS1 DESIGNEB'S PHONEG3 '-^'6!•*-g If S|\ BLOCKCCD "xS 51 ASSESSOR PARCEL NO.I DESIGNERLICENSE #STANDARD PLAN #BUILDING SO. FOOTAGEATM*Sv *" </l E fc 0* oW o ^sl S^a 3 v\LICENSE NO.PLAN I.O. #BLOG USE CODE^i^j IG- i i\ 1 Z/ 5 /" n. N H LV t ^t! Is 11CONTRACTORS PHONE # 1-*>-!« -S~-,^JN m ;jp:->€— o i 1 Jafc ^t rS** ^*<Pw DATE OF APPLICATIONnc T3» 5 ^C m O Zwm S •--^ s^ 3\ s — ~ H \ 0m i 12 m 3)LSBAD BUILDING DEPARTMENT APPLICATION & PEFIm, Carlsbad, California 92008-1989 (619)438-5525 /H L*WData Process, Yellow — Assessor Pink — AppWcafgl Gold — Temporary File M-« CERT OF OCCUPANCY ISSUEDV ITr >r rO 2 D - O2M _BUILDING* C ' • •' • - •" /:ELECTRICALMECHANICALGASQ» 'ft \,-l\\ '' \t\•, $ If" f'- f i- i '; .- -•• / .-;.. * ,' '' \" "'"PLUMBINGc?N>N \ \CALL FOR FINAL INSPECITEMS ABOVEJOB SITE FINAL>• ^iSo ^^.^;.00, a: T); rp| ^:-^ r-5j jj. 0 ^"x T3rn 3Q». . » | \£* • ,"• i • tt t i1 • : t -' ''"'"',VENTILATING SYSTEMS-.- ' /! "•'- "'-• ' ' *. '','. .^"'"' . V HEAT — AIR COND. — SOLARCO m.Z, C/5 I "-* ' ; r. . - .-•• *( >•'"•" .":. i •i A)i *.i^ T -1 ... •* '"« " ,. )t c J* . V" '•'" ' • ac BP r~ Tl TJm Tl TJ 2 O ._ ^ &*J MECHANICAL_ * . •<- \. P Tl 1 O m Om mO OTJ "\ - * '.''••'"<•••'*'".": * r,\BONDING*ELECTRIC SERVICE„••'• i i ' '-;'' •• H ."•• j j ROUGH ELECTRIC^ \/5i**** ~ * ' .••\ 'i" • •-' 'ELECTRIC UNDERGROUNDELECTRICALTEMPORARY POWER•H -.< „' ": ... »A -;,j'' •'"*- . f t ; / " i' ^^'' .',-•• • •:"(' o CO Hm 32 m ./CAISSONSH CD 2O •CO im TJ TJ 2 1 'PLUMBING TOP OUT3^>"V* * Vl \ in mO IAL MASONRY'•~! i ' •*, >PLUMBINGSEWER AND BL/COPI IIMRINf! IINnFRRRDUND•^x ~-~~«F* \ CD I °o H I STRENGTHSF VVELDING *„ *i ," 'INTERIOR LATH & DRYWALI' O "D00 n -<TENSIONED:RETEEXTERIOR LATH INSULATIONO T3 PRESSED;RETETl 30 > T •V. ^ H ^ O en< Hm 33 3) C N) 9o -1 0 33 T) >in i- 0OzO33m— (m S> Tlr r-•n o > 0 i •BP 7> Om 0 co CD Tl TJ 51 1 1 GUNITE OR GROUT"n "o in O33Q Z -n CO COMPLIANCI1 TODATION INSP< 1 1 MASONRYINSPECTIQ'Iz /' O < m rn 00 m TI0 2 TJ ^TJ ~^ I§>o w o m TJ TJ 2Tl 0 TJ Tl => 3 Tl 71 N ^T" ^ \ { f Dm 0 33mO a> mO > z mO-I O Zw .' '„•' .I4 "$ '"t \ ' ,s\...--'". :j '";' ' ,•" • ••} V"' ' / «- , r f *; zC/3 13mo o CO zoHmw ,-• nD Z 3> H 5z / \^-NO Nfs( 03 Fg Z C N Tl mi —.D INSPECTIZ Im onc INSPECTION TYPEO m zenT3S"I , _. & t. INTERDEPARTMENTAL INFORMATION SHEET BUILDING DEPARTMENT BUILDING ADDRESS: A.P.N: * * * * ft £ A- j^A -A A A A it A A A A ft A A A * ft * * A A A A~iT% ft * A bfe A A A A'A Ajp% A jfft A A A A A A A A A ECEIVED JAN 19 1983 C.T:CITY OF CARLSBADTrending .Department PLANNING DEPARTMENT ZONE: Qj\ SCHOOL FEES: SAN DIEGUITO ENCINITAS__ CARLSBAD >£ A/ft •UNITS REQ'D: SAN MARCOS PROVIDED: ^.COVERAGE ALLOWED: I1MRKING SPACES REQ'D: _. PROVIDED: PROVIDED: IILDING HEIGHT REQ'D: FRONT SETBACK ALLOWED: PROVIDED: SIDE SETBACK REAR SETBACK PROVIDED: INTRUSIONS: RE-DEVELOPMENT APPROVAL REQ'D: LANDSCAPE § IRRIGATION PLAN COMMENTS: ENVIRONMENTAL PROTECTION REQ ADDITIONAL COMMENTS: OK TO ISSUE:DATE: \OK TO FINAL:DATE : * * * ft * A- A A A -A- * * A A * -A- A A ft ft ***** A ft *'ft * A A A A A ft ft * A A * * •£* A * A ?.- * A A A A ft :': A -A A -A- -A A A A A A * ft INEERING DEPARTMENT . W : IMPROVEMENTS : PUBLIC FACILITIES FEE: ADDITIONAL COMMENTS: /q i h SEWER CONNECTION: DRIVEWAY LOCATION(S): -GRADING PERMIT: EASEMENTS: LEGAL DESCRIPTION: MMENTS: o\T\ -£j? Xvw/V *CHECK IF ENGINEERING INSPECTION REQ'D. ON FINAL: OK TO ISSUE: DATE: PWI: OK TO FINAL: DATE: TA^A A- A -k A A"FA A A A A A A A A A A~ft~A :V A A A A A * O: A_-.TA~A .A A A~A A A A A A FFA'-FA~FA A A A_A" * IF THIS ITEM IS NOT CHECKED, BUILDING DEPARTMENT WILL MAKE FINAL INSPECTION. .7 # J ^1 .) ' I , . "*•i : *< i '•f < o/ry o/ oar/soaa ^ ^ t iviiowtLLAiNtuLP^^* 1200 ELM, CARLSBAD, CA 92008 • TEL (714) 438-5525 RECEIPT / ^ddress)^^ G&O^^Z^ 'Owner ''.•'. • • . Mailing . ( .' •Address tg/^fj*1" /t«£> , ' (^tf-Szr/tyf—XJ'TJfJf^ ^7^" City ' . Zip . Tel. . / Contractor -^_ .. ' ^ . ' ' J ' ':/ Address . . ' . ' ' . ''.'.. . '• ' . . City . • • Zip Tel. State Lie. . . City S..CIassif. " . . , ''••'.•' Lie. No. COMPLETE FOR PLAN CHECK ONLY LEGAL DESCRIPTION fL^fj^T'^i &£&, &? 7 $ & Sb T^A^T ^4W, MAP^f^^^ ASSESSORS PARCEL NO, .^^^ - ^z.- X* DESCRIPTION OF WORK ^ t^Q,. ^ M> . . <£>AJ£F • ^-yT^z?/^ 'V '£?*&'•, 7*- • d::? *<3-/£* 7^ Qzr £=? . • '- -.'•''..:.-•••,•-..;:,• .;"• ' '.". ' ;; PLAN ID NO. ejT 3"~' /• • ><"" DESIGNER ADDRESS ^AX/ -^y.^fejS^ '&•'&. ^Z /<=><? ...'•• -' • ••• ' ' pHONE-.c^*727<f /•: -jzj'^sp, ^^y?"^^-. . ' '"'•~^'" " 7 •- / '' • _— — -^X' CONTACT PERSON /AX^y/l>;^=r -^L^/4 L^/^^ '-4^^^/-^^T '•' ' Signature of Applicant / f /fy/^&^fl^ riate / // tf / 'f-% \ S ' ^ * . .'/' MISCELLANEOUS FEE REC^'T.S/^ai |b PI 'PLAN CHECK FEE . ': • D VALUATION €^C*y # <s?< /? • PI DEMOLITION " ' • ' • ' PI HOUSE MOVING ' PI PARKS AND RFCRFATION FFF C~l PHRI 1C FACII ITIFR FFE 1 1 SCHOOL FEE - DISTRICT 1 1 - Harlsharl 1 1 Enninitas . . l~l San Diego F~l San Marnos D • " • '• • • ' ' D • "D' • • • -ft n \ \V n *• ^ - \ ^ n iLfl^y ^^ n .-. ••.. ! { ^^ • n ' '^X<^ ' • n ^ ^ • n ' . •' '• - '• D\ ' "', ' ' ' ': ; ' ' . TOTAL FEE , 1 / Q^- 'V'^C. '$ 4^5 7J,, •WARNING: PLAN CHECK FEES. WHERE NO ACTION IS TAKEN BY THE APPLICANT IN 180 DAYS AND NO BUILDING PERMIT IS ISSUED, FEE ARE FORFEITED TO THE CITY. COMMENTS: White — Applicant Yellow — File ' Pink — (1) Finance (2) Data Process . Gold — Assessor 1I CITY COPY I| PLAN CHECKER COPY dtp of Cartebab JURISDICTION:DATE PROJECT ADDRESS: TO: PLAN CORRECTION SHEET SINGLE FAMILY AND DUPLEX DWELLINGS Plan Check No. cS 3> ~ ' /" _ Date plans received by jurisdiction _(sVCz2s // ' fi Date plans received by plan checker f^/^/ '/ g£i[ Date initial plan check completed FOREWORD: PLEASE READ '•' Plan check is limited to technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the handicapped. The plan check is based on regulations enforced by the Building Inspection Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department or other departments. The items circled below need clarification, modification or change. All circled items have to be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 303 (c), 1979 Uniform Building Code, the approval of the plans does not permit the violation of any state, county or city. law. PLANS Please make all corrections on the original tracings and submit two new sets of prints, and any original plan sets that may have been returned to you by the jurisdiction, to: To facilitate rechecking, please identify, next to each circled item, the sheet of the plans upon which each correction on this sheet has been made and return this check sheet with the revised plans. Indicate on plans the name of the legal owner and name of person responsible for the preparation of the plans. Sec. 302(b) Submit fully dimensioned plot plan drawn to scale showing location size, and use of all existing and proposed structures on the lot. Identify property lines and show lot dimensions and all easements. Show location of all cut- or fill slopes and approximate finish floor elevations for all structures and show elevations at all corners. Sec. 302(b)7. Indicate distance from center-line of street or alley to property line and distance from curb to property line. Sec. 302(b)7 Plans, specifications and calculations shall be signed by a California State licensed engineer or architect. (California Business and Professions Code) B. FIRE PROTECTION Walls closer than 3 feet to property lines shall be one-hour fire-rated construction, have no openings, and shall have 30 inch parapets when the building floor area exceeds 1,000 square feet on any floor. (Table 5-A Sec. 1709(a) Projections, including eaves, may not extend more than 12 inches into the 3 foot setback from the property line. Sec. 1710 and Sec. 504(b) Projections, including eaves,shall be one- hour fire-resistive construction, heavy timber or of non-combustible material if they project into the 3" setback area from the property line. Sec. 1710 Show location of permanently wired smoke detector. Sec. 1210 C. ROOM SIZES, LIGHT, VENTILATIONS AND GLAZING One room must contain a minimum of 150 square feet of superficial floor area. Sec. 1207(b) Habitable rooms, other than kitchens, shall contain at least 70 square feet of floor nrea. Sec. 1207(b) Window area must be at least 1/10 of the area and a minimum of 10 square feet ec. 1207(a). Appears to be deficient Openable window area must be 1/20 of the _^ floor area and a minimum of 5 square feetA bathrooms, laundry rooms and similar cms. ^Minimum is 1.5 sq.ft. (Sec.l205(a)0\=i SK»Trt V^ii 1>t«\jiHJOj — I_X»»U>{T "y' - • - -- —*- —•" be •half of all required window area must openable in "S>\vv»>V\XT ~Uto>AQ /• Provide mechanical ventilation capable of providing five air changes per hour in bathrooms, water closet compartments, laundry rooms and similar rooms if required windows are not provided. Sec. 1205(a) No habitable room, other than a kitchen, shall be less than 7'Q" in any dimension. Sec. 1207(c) Show that ceiling height for habitable rooms is a minimum of 7'6". Sec. 1207(a) X /• ^X X 3fo. Show ceiling height for laundry rooms, hallways, corridors, and bathrooms is a minimum of 7'0". Sec. 1207(a) Provide 30" clear width for water closet compartments and 24" clearance in front of-water closet. Sec. 1711(b) No cooking room shall be used for sleeping purposes, unless complying as an efficiency living unit. Sec. 1208 Specify safety glazing for glazing in hazardous locations such as glass doors, glazing adjacent to such doors and glazing adjacent to walking surfaces. Sec. 5406 Glazing in shower and tub enclosures (including windows) shall be tempered, laminated or approved plastic. Sec. 1711 (f)(g) Sleeping rooms shall have a window or exterior door for emergency exit. Sill height shall not exceed 44" above the floor. The window must have an openable area of at least 5.7 square feet with the minimum openable width 20" and the minimum openable height 24". Sec. 1204 Eaves and cornices may not project into a required yard more than 2 inches for each foot of yard width if required windows open into the yard. Sec. 1206(d) A mezzanine is an intermediate floor and may not have a floor area exceeding 33 1/3 percent of the total floor area in the room below, and the mezzanine floor must have a clear height of 7 feet, above and below,and must have 65% of the long side open to the room below. ;The loft you show does not comply as a mezzanine floor and is, by Building Code definition, a story 0. EXITS, STAIRWAYS, AND RAILINGS yf. Floors above the second story shall have not less than 2 exits. Sec. 3302(a) Required exit doorways shall be not less than 36" in width and not less than 6'-8" in height, and shall be capable of opening at least 90 degrees. Sec. 3303(e) Provide 36" high protective railing for porches, balconies, and open sides of landings. Maximum opening between railings shall be less than 9". Sec. 1716 Show how guardrail connection details are adequate to support 20 pounds per lineal foot at a right angle to the top rail. Table 23-B Provide stairway and landing details. Sec. 3305(b) & (c) a. Maximum rise 8° and minimum run is 9". b. Minimum head room is 6'-6". c. Minimum width is 30". 5<f. Handrails shall satisfy the following: a. Provide handrail for stairways over 30" high when serving a single dwelling. Title 24, Sec. T25-22(b) b. Handrail shall be 30* to 34" above the nosing of treads. Sec. 3305(j) c. Handrail projecting from a wall shall have a space not less than 1 1/2" between the wall and the handrail. The hand grip portion of handrail, shall be not less than 1 1/4" nor more than 2" in cross-sectional dimension. Sec. 3305(j) (see attached) gl. Every stairway landing shall have a dimension, measured in the direction of travel, at least equal to the stairway width. Sec. 3305(g) p2. A door may open over a stairway landing provided the door, in any position, does not reduce the clear area of the landing, in the direction of stairway travel, to less than one-half the required width of the stairway. Sec. 3305(g) ,63. A door may open inward at the top step of a stairway provided the top step is not more than 7 1/2" lower than the floor level. Sec. 3303(i)2 Provide details of winding stairway. a. Minimum tread is 6 inches at any point , and minimum 9 inches at a point 12 inches from the side of the stairway. b. Maximum rise is 9 inches. c. Minimum width is 30 inches. Sec. 3305(d) (see attached) Provide spiral stairway details: a. Minimum run is 7 1/2 inches at a point from where the tread is the narrowest. b. Maximum rise is 9 1/2 inches. c. Minimum headroom is 6 feet 6 inches. Sec. 3305(f) (see attached) Spiral stairways may not be used for required exits when the area served is greater than 400 sq. ft. Sec. 3305(f) Spiral stairways must have a clear walking space of 26 inches between the column and handrail. Sec. 3305(f) Provide I.C.B.O. Reasearch Report and Number for metal stairway, or submit plans and calculations and approved fabricator registered with the Building Department or note that the stairway fabrication shall be done under special inspection per the approved fabrication plans. Sec. 306(a)4B and Sec. 306(f) In buildings over 2 stories in height, provide 3/4 hour fire-rated assemblies for all openings in the exterior wall below or within 10 feet horizontally of an exterior stair- way. An exit balcony with 2 separated stairways is exempt. Sec. 3305 Exterior stairways shall not project into the 3 foot setback from the property lines. Sec. 3305(n) X The walls and soffits of the enclosed usable space under interior stairs shall be protected on the enclosed side as required for one-hour fire-resistive construction. Sec. 3305(m) Minimum construction specifications shall be made a part of the approved plans. (See attached) E. ROOFING f. Specify roof pitch. Roof pitch is not adequate for roof type specified. Specify minimum pitch of Specify roof material and application. Specify I.C.B.O. approval number for roof materials not covered in UBC. 74. Specify roof slope for drainage or design to support accumulated water. Sec. 3207(a) ^5. Show roof drains and overflows. Sec. 3207(a) TJ?. Provide skylight details to show compliance with Sections 3401 and 5207 or provide ICBO approval number. /Provide plastic roof panel details to show compliance with Section 5206 or provide ICBO number. Show attic ventilation. Minimum vent area is 1/150 of attic area or 1/300 of attice area if at least 50% of the required vent is at least 3 feet above ceiling joists. Sec. 3205(c) H. MASONRY Provide fireplace construction details or note construction to be per attached fireplace standard drawing. Sec. 3707 Show veneer support and connections comply with Sec. 3002, 4,5,6, and Sec. 2516(a) regarding ties and #9 wire in horizontal joints or note construction to be per attached sheets 30-1 or 30-2. 8. Show height and construction details of all masonry walls. Chapter 24 Note that cleanout openings shall be"provided at the bottom of all cells to be grout filled over 4' in a single pour. Cleanout shall be sealed before grouting, after inspection. Sec. 2415 Show floor and roof connections to masonry walls. Connection shall resist 200 pounds per lineal foot or the actual design load, whichever is greater. Sec. 2310 Provide material specifications for mortar, grout, masonry and reinforcing steel. 'Sec. 2403 2. Show 1 3/8" solid core self-closing door for openings between garage and dwelling. Sec. 503(d) 1X54 M$6 1&6. AX Show how masonry house walls retaining earth are to be waterproofed. Provide detail. Note that special inspection of the masonry will be required for G. GARAGE AND CARPORTS^* .Garage requires one-hour fire protection on the garage side of walls and ceilings common to the dwelling. Table 5-B Sec.503(b) elements supporting floor above garage to have one-hour fire-resistive protection on the garage side. Sec. 503. Beams and posts, not within the wall or ceiling con- struction, must comply with UBC, Table 43-A, or be minimum 6" dimension beam and minimum 8" by 8" post. Garages are not permitted to open into a room used for sleeping purposes. Sec. 1104 Openings between carport and residence require self-closing doors and stationary windows. Sec. 1214 Show garage framing section, size of header over garage opening, lateral cross bracing at plate line and method of bracing garage front. Chapter 23 NOTE: Minimum plywood diaphragm ratio is 3 1/2 to 1 or 2'8". Table 24-1 Doors between dwellings and attached garages may swing in either direction provided the difference in floor elevation between the dwelling and garage does not exceed 7 1/2 inches and provided the door is not used as the primary means of egress from the building. If the difference in floor elevation exceeds 7 1/2 inches, or if the door is used as the primary means of egress from the building, additional steps or landing must be provided in accordance with stairway requirements, and the door must not swing over the depressed level. (see 3303(i)2 and 3305 (g). Provide 18" raised platforms for any FAU, water heater, or any other device which may generate a flame or spark. Note that continuous fire wall protection shall be installed behind raised platform(s) prior to framing platform. H. FOUNDATION REQUIREMENTS Note on plans that"A soils engineer shall evaluate any unanticipated uncompacted fill or expansive soil or other soil problems disclosed during construction". Sec.306(a)12. Submit soils classification determination by a licensed engineer or architect based on observation, tests, borings, or excavations, and containing comments on the degree of expansiveness, compressibility and bearing value. Sec. 2905 Note on the plan the soils classification, whether or not the soil is expansive, and note the allowable bearing value. Sec. 2905 The foundation plan does not comply with the soil report recommendation for this project i Provide notes on the foundation plan listing the soils report recommendations for foundations. slab and building pad preparation. .hat "Prior to the Contractor requesting a Building Department foundation inspection, the Is engineer shall advise the Building Official in writing that: 1. the building pad was prepared in accor- dance with the soils report: 2. the utility trenches have been properly backfilled and compacted, and: 3. the foundation excavations, forming and reinforcement comply with the soils report and approved plan." Provide spread footings for concentrated loads designed for 1,000 PSF soil bearing or per bearing value as determined by an engineer or architect. Chapter 29 yt. i^o,. Show height of all foundation walls. Chapter 23 LZ/. Show height of retained earth on all foundation ' walls. Chapter 23 }f"- ' Show distance of foundation to edge of cut or fill slopes and show steepness and i heights of cuts/and fills. Chapter 29 A< that wood shall be 6" Sec. 2417(c) 7. above 131. that surface water will drain ding and show drainage pattern ' ons. Sec. 2905(f) (00l\? n per Table 29A TABLE NO. 29-A—FOUNDATIONS FOR STUD BEARING WALLS—MINIMUM REQUIREMENTS NUMBER OF STORIES 1 2 3 THICKNESS OF FOUNDATION WALL (Inches) CONCRETE 6 8 10 UNIT MASONRY 6 8 10 WIDTH OF FOOTING (Inches) 12 15 18 THICKNESS OF FOOTING (Inches) 6 7 8 DEPTH OF FOUNDATION BELOW NATURAL SURFACE OF GROUND AND FINISH GRADE (Inches) 12 18 24 NOTES: Where unusual condition* or frost conditions are found, footings andfoundations shall be as required in Section 2907 (a). The ground under the floor may be excavated to the elevation of thetop of the footing. Show foundation sills to be pressure treated, or equal. Sec. 2517(c) 3. Show foundation bolt size and spacing. Sec. 2907(e) Specify size, ICBO number and manufacturer of power driven pins. Show edge and end distance and spacing. Sec. 306(f) 135. Show size, imbedment and location of hold down anchors on foundation plan. Sec. 2312(f) 13*. Note on plan that hold down anchors must * be tied in place prior to foundation inspection.XSec. 2312(f) Show adequate footings under all shear walls. Sec. 2311(e) Show stepped footings for slopes steeper than 1:10. Sec. 2907(c) Show minimum 18" clearance from grade to bottom of floor joists and minimum 12" clearance to bottom of girders. Sec. 2517 Show pier size, spacing and depth into undisturbed soil. Table 29-A Show minimum under floor access of 18"x Sec. 2517 Show minimum under floor ventilation equal to 1 1/2 sq. ft. for each 25 lineal feet ' of exterior foundation with openings as close to corners as practicable to provide cross ventilation on at least two approximate ly opposite sides. Sec. 2517 I. FRAMING X- y. Note cross bridging or blocking. Floor joists and rafters more than 12" in depth and spanning more than 8 feet shall be supported laterally by bridging at intervals not exceeding 8 feet. Sec. 2506(g) Show blocking at ends and at supports of floor joists, and for rafters at exterior walls. Sec. 2506(g) Show solid blocking at ridge line and at exterior walls on trussed roofs. Sec. 2506(g) Show double joists. Floor joists shall be doubled under bearing partitions running parallel with the joists. Sec. 2518(d) 5 1 Show rafter ties. Rafter ties shall be spaced not more than 4 feet on center where rafters and ceiling joists are not parallel. Sec. 2518(h) Show rafter purlin braces to be not less than 45 degrees to the horizontal.Sec. 2518(n) Show 1/2" minimum clearance between top plate of interior partitions and bottom chord of trusses. (To ensure loading will be as designed.) Show double top plate with minimum 48" lap splice. Sec. 2518(g)4 170. Show nailing will be in compliance with Table 25-P. Provide fire stops between stories, between top story and roof space, at ceilings and floor levels in interior and exterior walls, in mansard roof or eyebrow so no concealed or furred space is greater than 10' horizontally or vertically, between stair stringers at top and bottom and between studs along and in line with stair run adjoining stud walls and partitions, at perimeter of sliding door pockets, between chimney and wood frame using metal or incombustibles for the fire stop and at other places that could afford passage of flame. Sec. 2517(f) Show stud size and spacing. Maximum allow- able stud heights: 2"x4"@ 16" is 14'; 3"x4"42"x6"? 16"o.c. is 20'. Sec. 2518(g)2 Note an A.I.T.C. Certificate of Compliance for glued laminated wood members shall be given to the Building Inspector prior to erection. Sec. 306(f) Detail all post to beam and post to footing onnections. Sec. 2517(c) 4 Specify nail size and spacing for all shear walls, floor and roof diaphragms. Indicate required blocking. Maintain maximum diaphragm dimension ratios. (Tables I,J,K). Show 3"x4" or 2"x6" studs in first story of three story building. Sec.2518(f) truss details and truss calculations.- TOTCProvide roof "framing planT Sec. Provide framing sections through_ Show all joists, rafters, beams, and posts 2" to 4" thick to be No. 2 Grade Douglas Fir-Larch or better. All posts and beams 5" and thicker shall be No. 1 Grade Douglas Fir-Larch or better. (Table 25-A-l) Show wall bracing. Every exterior wood stud wall and main-cross partition shall be braced at each end and at least every 25 feet of length with 1x4 diagonal let-in brace or equivalent. Sec. 2518(g15 - Section 302(a) 7 LOT. Specify all header sizes for opening over ' 4' wide. Sec. 2518(g) 7 Lai. Provide calculations for S ection 302(a) 7 In areas subject to water splash and in exterior locations, wood columns and posts shall be supported by piers projecting at least 2" above the finished grade and shall bear on a metal base plate or treated wood unless the columns or posts are foun- dation grade redwood or cedar. Sec. 2517(c)4 7 Show location of attic access with minimun size 22" x 30". Sec. 3205 . Show draft separation for attic areas in excess of 3,000 sq.ft. Sec. 3205 . Show draft separation, for space between dropped ceilings and floor above in excess of "l',000 sq.ft. Sec. 2517 . Specify plywood grade and panel indenti- fication index. Table 25-J . When roof pitch is less than 3:12, design ridge as a beam. Sec. 2518 (h) 188>l Wood shear walls shall not be used to ^^ resist horizontal forces contributed by masonry in buildings over one story in height. Sec. 2516(b) 1&9U Gypsum lath and plaster, gypsum sheathing ' board and gypsum wallboard shall not be used in vertical diaphragms to resist forces imposed by masonry or concrete construction. Table 47-1 If cripple wall studs are less than 14", framing shall be solid blocking. Sec.2518(g) Cripple wall studs exceeding 4 feet in height shall be 3 inch by 4 inch or 2 inches by 6 inches when supporting 2 stories! ec. 2513(g)6 Show plywood sheathing over exposed eaves, or other weather exposed areas, is exterior grade. Sec. 2517(g) 3 Show a weep screed at the foundation plate line on all exterior stud walls to be stuccoed. Sec. 4706(e) Provide an approved waterproof building paper under wood siding. Sec. 1701(a) Specify an approved flashing for exterior openings and parapet walls. Sec. 3208 Show corridor width to be minimum 36". Sec. 3304(b) Specify truss layout for 30" x 30" attic access. Ridges, hips, and valleys shall be at least one size larger than supported rafters. Sec. 2518(h) 3 Provide metal straps across ridge beam and rafters. Show access to the attic or under floor furnace to be minimum 30 inches by 30 inches. Sec. 708 & 709 UMC Note that passageway to the attic furnace shall be unobstructed and have continuous solid flooring not less than 24 inches wide. Sec 708 UMC Show permanent electrical outlet and lighting fixture controlled by a switch for the attic furnace. Sec. 708 UMC Show details to comply with Section ^09 for furnace under the floor. Section 708 for attic furnace, or Section 710 for roof or outside furnace. Note on plan, gas vents and non-combustible piping passing through three floors or less shall be effectively draft stopped t each floor or ceiling. UBC Sec. 1706(a)6 ELECTRICAL (National Electrical Code) wiring shall comply with the National Electrical Note on the plan the amperage of electrical service. the electrical installation is more 200 amperes, show panel location provide a single line diagram and load calculations including: \9ft.' X ^& Wiring method employed. Sizes of all conductors, switches, circuit breakers, fuses, and conduits. Approximate length of service feeders. Provide plot plan showing services, all panel locations, circuit arrangement and load distribution on panel busses. Provide typical panel schedule!s). 11 ings require minimum 100 amp service. tion of all electrical receptacles. ctrical receptacle locations and/or spacing is not adequate in 2X/A ^ r X X: J. MECHANICAL All heating, ventilating, and cooling systems and appliances shall comply with the Uniform Mechanical Code. Show the size, location and type of all heating and cooling appliances or systems. Show source of combustion air for furnace will comply with Chaper 6, U.M.C. 2. Every dwelling unit shall be provided with heating facilities capable of maintain- ing a room temperature of 70° F. at 3 feet above the floor in all habitable rooms. Show basis for compliance. UBC Sec. 1211 Show minimum 30" deep unobstructed working space in front of furnace. Note on plans,clearances to be per manufac- turers listing. Sec. 704 UMC Furnace shall not be installed under any stairway. Sec. 704 UMC Furnace shall not be installed in any bedroom, bathroom, closet, or in confined space with access only through such room, unless specified as direct vent appliance, enclosed furnace or electric heating appliance. Sec. 704 UMC '7. Show ICBO approval for prefab fireplace and provide approved installation instructions at job site. At least one receptacle shall be installed outdoors, in basements and attached garages, other than laundry outlets. Art. 210-25(b) Show minimum dwellinr lighting (NEC Art. 210-26(i) and iiFI'S in garage, baths and Outdoors. NEC Art. 210-8(a). Note "UFER" ground to be provided (NEC). Art. 250-81 L. PLUMBING (Uniform Plumbing Code) All plumbing shall comply with the Uniform Plumbing Code. 236. 2-37. 238. 2'39. Show water heater size, type and location on plans. Show method of providing combustion air to fuel burning water heater. Sec. 1307 Fuel combustion water heater shall not be installed in bath or bedroom or in a closet opening into bath or bedroom. Sec. 1309 Provide adequate barrier to protect water- heater from vehicle damage. Sec. 1310 240. Show T and P valve on water heater and show route of discharge line to exterior v Sec. 1007(e) 242. Provide dryer vent to outside. UMC Sec. 1903 Note on the plan that hose bibbs and lawn sprinkler systems shall have approved backflow prevention devices. Sec. 1003 244. Shower stall shall accomodate a 30"circle ' and have a minimum floor area of 900 sq.in. UPC 909(d) NOISE INSULATION (DUPLEXES) 2/6. Show details of duplex common (party) walls S and floor/ceiling assemblies to achieve a Sound Transmission Class (STC) rating in walls of 50 decibles and an Impact Insulation Class (IIC) rating on floor/ ceiling of 50 decibles. Title 25 Show how penetration of assemblies for piping, electrical devices, recessed cabinets, bathtubs, soffits, or heating ventilating, or exhaust ducts shall be sealed, lined, or insulated to maintain required sound transmission rating. Title 25 Provide insulation in walls and ceiling to achieve STC of 50 between garage and living area if garage use is not controlled by resident Title 25. ENERGY CONSERVATION All additions to existing residential buildings must comply with Title 24 energy regulations. Additions exceeding 30% of the existing building requires the existing and addition to have R-19 ceiling -insulation if the existing ceiling area is accessible for insulation installation (T20-140KO . fa. Specify the insulation R values for walls, roof and ceiling. (R-ll for walls: R-19 for ceilings, or provide details and analysis for alternate design. T20-1403 Table A & 2B. Specify the gross floor area or heated portions of the dwelling, and the area of glazed openings on the plan. (T20-1430) Provide an analysis justifying increasing the single glazed area beyond 16% of the gross floor area. Show method to reduce heat loss to that which would occur with basic glazing, (T20-1402,def.) Provide energy analysis to show that the bonnet capacity of the gas central furnace does not exceed the building design heat loss by more than 30%. (Exceptions: 48,000 BTU Hr, output furnace. See also California Efficiency Adjustment.) T24-1404 Note on plan that all tranverse ducts, plenums, and fitting joints of HVAC system shall be sealed with pressure sensitive tape or mastic to prevent air loss. T20-1404 Note on plan that insulation of ducts shall conform to UMC Section 1005. (T20-1404) Outdoor pools with fossil fuel heaters require pool covers as well as other energy saving devices such as time clocks, etc. T20-1406 MISCELLANEOUS Show a minimum 2" air space and flashing between planter and building walls. Sec. 2517(e) Specify material to be used under the shower tile. Sec. 1707U) Specify lath and plaster to comply with Chapter 47, UBC. Wl^. o 3/4" copper pipes must be installed rom water heater location to convenient location of future solar panels (City Ord.) ovide sleeves (roof jacks) in roof for ture 3/4" copper pipes to convenient ation of future solar panels (City Ord.) ote that solar water piping is to be insulated in areas that are not heated or cooled. (City Ord.) See attachment for roofing requirements. NOTE; The plans were reviewed based on the information shown on the plans. If the plans are in error, or changed during construction, the permittee shall contact the Building Department for review and prior approval before proceeding with the work: D Building plans are substantially correct and complete. Bys. Note on plan that all doors and windows to the exterior or to unconditioned areas shall be fully weather striped per ANSI Standard. (T20-1403). Note on plan that back draft dampers are required on all fan systems exhausting air from the building. T20-1403 Electrical resistance space heating shall not be used unless: a. 60* of heating/cooling is supplied by a nondepletable source. b. supplements a heat pump system. c. less-than 10% of total heating system. d. life cycle cost analysis justifies. T20-1404 Note on plan that all heating and cooling equipment efficiencies shall conform to Title 20-Chapter 2, Subchapter 4, Article 4. (75% for forced air furnaces). Note on plan that no natural gas, central heating plant may be installed without an Intermittent Ignition Device. T20-1405 Electric resistance water heating is not permitted unless verfied as cost effective by a life cycle cost analysis. T20-1406 -NDate: /jaluild Vx^_Xand c uilding plans would be substantially correct complete if minor corrections are made at counter. // D D Date: Building plans require major corrections and complete plan recheck, by plan check engineer, is required. By:. Date: If you have any questions regarding this plan check, please call at . We would also be pleased to meet with you, at no charge, if additional assistance is needed. I DEVELOPMENTAL SERVICES D Assistant City Manager (714) 438-5596 D Building Department (714) 438-5525 D Engineering Department (714) 438-5541 O Housing & Redevelopment Department (714)438-5611 D Planning Department (714)438-5591 1200 ELM AVENUE CARLSBAD, CALIFORNIA 92008 RESIDENTIAL VALUATION CHART EFF: 7/1/82 SFD LIVING AREA ATTACHED UNITS-3 OR MORE GARAGE AREA COVERED PORCH COVERED PATIO BALCONIES/STAIRS EACH BATHROOM OVER 3 EACH FIREPLACE OVER 2 RETAINING WALLS POOLS SPAS AIR CONDITIONING 47.00 70, X 40.00 _X 12.00 X 4.50 X 4.50 X 7.50 X 2200.00 X 1760.00 X 9. 00 X 19.00 X 2.40 MOBILE OR MODULAR ON S.F. LOT(Jj OF BLDG . PER FT) X TOTAL VALUATION PLAN CHECK FEE( 65% OF BUILDING PERMIT FEE) $ $ 4000.00 " vs> CARVER Engineering 174 Village Green Road Encinitas, CA 92024 (619)753-6198 Sheet No. / of Job No. 83-03 4. ?<:f' } - / c''6- " &"> PK.F- F/j/3> Ttf^f^E^ i-V oT>JirAA: V CARVER Engineering Sheet No. 2. of Job No. 83- V 3 //. •jf 2 " 3*7 / -<5 fz^^ CARVER Engineering Sheet No. 3 of Job No. -x r' 4 ^ 37, ~-7376 •-/7',* /-# »H« \ Wf, V<y^e£W Vs4>/ffc. <€> 3-2.'/o/v <"/f>frl8 folQ'0UUJL'<y. £W*3 Sheet No. 4" ol CARVER Engineering Job No. f T. 57 !s) 5r 33- SAN DIEGUITO SOILS, INC. .9.DS 7173 4407 MANCHESTER AVE., SUITE 107 ENCINITAS, CA 92024 May 13, 1983 (619)753-8997 City of Carlsbad 1200 Elm Avenue Carlsbad, CA 92008 Attention: Mr. Carter, Building Inspection Dept. REPORT OF FOUNDATION EXCAVATION INSPECTION PARCELS 1, 2, and 3, PARCEL MAP NO. 11391. Gentlemen: At the request of Mr. Thomas D. Elliott we have observed the removal of uncompacted fill and colluvium at the subject site, and observed and tested the fills placed on the property earlier this month. Our final report of May 11, 1983 indicates that the grading was done in accordance with the recommendations made by Geocon, Incorporated in their Soil Investigation report dated September 21, 1981, and that the tests indicate that the fills have been compacted to 90 percent or more of the maximum laboratory density. In addition we have inspected the footing'excavations for the 3 residences and it is our opinion that the excavations have been made in conformance with the plans for the project with respect to depth and width. Groundwater was encountered by Geocon at a depth of approximately 9 feet below the previously existing ground surface. We don't believe that the presence of water at that depth will adversely affect the performance of the foundations for these residences. The soil within 3 feet of rough grade has been inspected and tested and is determined to be non-expansive. Therefore it is our opinion that no special precautions are necessary to compensate for the expansive characteristics of the finish grade soils. SDS 7173 May 13, 1983 Page 2 If you have any questions regarding the above, please do not hesitate to contact this office. , Sincerely, SAN DIEGUITO SOILS, INC., By Bill K. Bramble,RCE 8102 BKB/js cc: (2) Thomas D. Elliott 2445 Garfield St. Carlsbad, CA 92008 SAN DIEGUITO SOILS, INC. CONSULTING GEOTECHNICAL ENGINEERS SAN DIEGUITO SOILS, INC. 4407 MANCHESTER AVE., SUITE 107 ENCINITAS, CA 92024 (714) 753-8997 SDS 7173 May 11, 1983 Thomas D. Elliott 2445 Garfield Street Carlsbad, California 92008 FINAL REPORT OF ENGINEERING OBSERVATION OF GRADING AND TESTING OF COMPACTED FILL, PARCELS 1, 2, AND 3, PARCEL MAP NO. 11391. Dear Mr. Elliott: In accordance with your request, we have provided observatibn and testing services in conjunction with the grading of the subject site. SCOPE OF WORK Our services included: /--••• " " i1) Periodic engineering observation of the grading operation. 2) Periodic observation of the excavation and removal of colluvium and uncompacted fill in the areas noted in the Soil Investigation report by Geocon, Incorporated, dated September 21, 1981. 3) Periodic observation of the general preparation of areas to receive fill. 4) Taking field density tests in the placed and compacted fill. 5) Performing laboratory tests on representative samples of the materials used for fill. SDS 7173 May 11, 1983 Page 2 SUMMARY OF GENERAL EARTHWORK AND TESTING Site preparation, compaction, and testing were done between May 3 and May 10, 1983. It is our opinion, based on our observation and testing, that the work performed during that period was in general conformance with the recommendations made by Geocon, Incorporated/Soil Investigation and Geologic Reconnaissance report dated September 21, 1981. Fill was placed, compacted and tested on three parcels and driveway as shown on attached site plan. The grading operation essentially consisted of the preparation of the area to receive fill, including excavation of loose fill, colluvium, and surficial soils, scarifying and compacting surfaces to receive fill, and making cuts and fills to design grades. As the site grading progressed, compaction procedures were observed and field density tests were made to evaluate the <~ relative compaction of the fill in place. Field observations and field density test results indicate that the fills have been compacted to 90 percent or more of the maximum laboratory density. 'j ' • • - - For reference, the approximate location of field density tests and the limits of compacted fill have been recorded on the attached site plan. The results of field density tests, expressed as a percentage of the maximum laboratory density, are given on the attached forms. Laboratory tests to evaluate moisture-density relationships, maximum dry density and optimum moisture content and swell characteristics were performed on representative samples of the materials used for fill. The results of the laboratory tests are attached. Compactions tests shown as finish grade (FG) tests correspond to the elevations shown on the grading plan, prepared by Patrick O'Day, SDS 7173 ,May 11, 1983 Page 3 Oceanside, California, except that the upper pad on parcel 3 was lowered from 107.6 to approximately 102.6. Elevations and locations given in this report are based on field surveys established by others. SUMMARY OF FINISH GRADE SOIL CONDITIONS Laboratory tests and inspection indicates that soils within 3 feet of rough grade are of low expansive potential. RECOMMENDATIONS Foundation recommendations for this site were made by Geocon, Incorporated in their report dated September 2-1, 1981. Slopes Newly constructed fill slopes are approximately 2 to 1 (horizontal to vertical) and approximately 4 feet maximum in height. Newly constructed fill slopes were backrolled with a sheepsfoot compactor, and trimmed with a slope blade. j We recommend that structures that will not tolerate differentialf' ' ' settlements (such as foundations, swimming pools, concrete decks, walls, etc.) not be located within 5 feet of the top of the slope. Footings located closer than 5 feet from the top of a slope . should be extended in depth until' the outer bottom edge of the footing is 5 feet horizontally from the outside face of the slope. Exterior Slabs Exterior slabs should be not less than 4 inches in thickness. Walks or slabs 5 feet or less in width need not be reinforced. Those exceeding 5 feet in width should be reinforced with 6" x 6" 10/10 welded wire mesh positioned at the center of the slab cross-section. Weakened plane joints consisting of grooves 1/8" to 1/4" wide and 1 1/4" deep should be provided for all exterior slabs as recommended in the figure below. SDS 7173 Page 4 ;roiwrr<,(g> fo' Additional Fill and Utility Trenches This report discusses the fill placed under our observation and during the dates specified herein. We recommend that any additional fill placed after these dates, as well as the back- fill in utility trenches located within 5 feet of a building and greater than 12 inches deep, or in any trench 5 feet or more from a building and in excess of 5 feet in depth be compacted under the observation of this office and tested to assure compaction to not less than 90 percent of the maximum laboratory density. This office should be contacted at least 24 hours prior to the backfilling operations. - Drainage We recommend that positive measures be taken to properly finish grade these parcels after the structures and other improvements are in place, so that drainage waters from the parcels and adjacent properties are directed off i:he parcels and away from building foundations, floor slabs, and top of slopes. Even with these provisions, experience has shown that a shallow or surface ground water condition can and may develop in areas where no such condition existed prior to development; this is particularly true in developments where a substantial increase in surface water infiltration results from landscape irrigation. SDS 7173 May 11, 1983 Page 5 LIMITATIONS The inspections of fill foundation preparation, types of materials, and soil placement and compaction made during the period of our services on the subject site, were in accordance with local acceptable standards at this time. The conclusions or opinions drawn from the tests and site inspections apply to our work with respect to grading, and represent conditions at the date of our final inspection. We will accept no responsibility for any subsequent changes made to this site by others, or by uncontrolled action of water, or by failure of others to properly repair damage caused by uncon- trolled action of water. If you have any questions regarding this letter, please do not hesitate to contact, us. Sincerely, SAN DIEGUITO SOILS, INC., BY BILL K. BRAMBLE, RCE 8102 BKB/LC/tlk SAN DIEGUITO SOILS, INC. CONSULTING GEOTECHNICAL ENGINEERS CHESTNUT A.VE1NUE.Oo LINE STR.CJC.TIJR.E.S IN THIS AR.E1A. E.XISTIN<3 L.EG.ENJD . TE.ST L-OCAxTlON FILL SLOPE ( Y CUT SLOPE (2'-O LE.GAL PCU. I ( 2. «i 3 QF PARCEL. MAP I CITY Q THOMAS ELL>OTT 2^^-S GAR.FlE.LC5 ST. CARLS BAD , CA. 9ZOOS> SAN 4-4O~7 SUITE SOLS, INIC. AVE. io~7 CA. SDS -71-73 * * - 8a , PL* 1 z !M i 3 M[i, fno S<•^S§ S CO - 6 wz>o M M H H W Aj O0 M PL, to H VM0 O- H CO S wQ Q/I-1J ^ 3 S-5 .0 U^3 « HZ•™j ro r»TM w J PL] ./) M H W OZH SO O>-l H 2 ZW OH 3 M COH W W Ct, W ZoM oo rJ feo HWen** j H W<HQ Hco ow z H in ••* vo w o> O*N C^ CJ\ ^ C^ r*H CN OQ CN rH a\ t- <r> ^P o\ r~i ^H F~I r™i ^^ ^^* CO CO ^D lO n H n H I-H rH rH H rH rH . ' ' O O O O O o^ i — i ro in r**co c^ cr^ o\ crv u 1 rd rH (1) £a) 73 a) 0 1 > M = = H :H (d 3 M PH .OP n ; na> co ^ >^ •. m. _\ \ - -. ..•=3* in • \ \m in rH CN f) ^ in CO ' ' • '• ' ' • ' : z j fa <Moo-*o>m.in«ob**o S en S S o\ en ° en S • S • S ON CS H rH C, - rH CM. N C, H H rH r^ oo ^o ^^ CN c^^ ^H '^H co • CN ^3 ^D CN CO t"^ ^^ ^O CN G\ ^H 00 VO CO CN " • ' inmooovD~«r-b\«*co.f>co ^ tH cr\ o^ ^J* • o r** CN cr^ r^* oo cr\ iH H H H ' H oin-oomoomoo-ovo 0^ CT^ CT\ CT\ O\ CJ\ CJN O^ C^ C^ CT\ CTi 0 i id dJ ^ rH T3 Q) Q) - 1 > 0 rH-HM= = = = = = = = =3 M idU P Pw mco '-co n oo 00 00 CO X <J3 I^ CTi rH in m in m VJD r^oo <y> o rH CN n ^ in \or^ H H H H rH H rH rH c = •* 0 S S- 0 CO H H CS f. CO CO VO VD c^ *^~_?c^ ^^ z s -J •_ » rjo cr> H H r- WEH CO <Q Jcn en n •d 4J oo CM H 0o. X S< w r~ • H wQ CO Sg O EHS JsH O EH UCM O ^ ro CN <T^DESCRIPTION•H 0COao itic(0w -PrH -HW O XI ^ (0 Q ^1I— 1 -P ^•H H range-brown ssandMO >iQ) (0 rH Q 0 iJ W H P< O >H 10 EH . APPENDIX A LABORATORY TESTS The materials observed during construction were evaluated with respect to expansive potential, dry density, moisture content, and compaction characteristics. 1) Maximum:dry density tests were performed on represen- tative samples returned to the laboratory. The purpose of these tests was to provide a basis of comparison for compacted fill conditions to County Grading Ordinance Standards. The results of the tests performed in accordance with A.S.T.M. Test Method D-1557-78, are as follows: Sample Number 1 2 Maximum Dry Density (pcf) 119.7 131.7 Optimum Moisture (%•) 12.4 9.3 2) Expansion Potential The Expansion Potential of representative recompacted samples of soil was determined by allowing the samples to swell against a surcharge of 150 psf when brought into contact with water. The results of the tests are as follows: Sample Location Typical . finish grade material Sample Initial Conditions Compacted to 90% of MDD Saturated Moisture (%) 20.0 % Swell 0.0% County or ban Diego - communuy services Agency Department of Land Use and Environmenal Regulation I SO Chesapeake Drive 837 Williamston Street 200 -LEut Main ia Diego CA 9212J • Vista, CA 92083 El Cajon. CA 92020 65-5920 (Zenith 7-OK88) 726-7920 (Zenith 7-2001) 579-4511 (Zenith 7-1398) froject .Location C V-ie.qVr-tt \ A.ve. _ *ww of Fenlttoo r\\ oP C^v-UWaA _ Grading Pwnait Mo. Tfeie report form for • "ninoV griding project !• to be completed and signed by the Registered Civil Engineer (or Architect) who has been designated on the Grading Plan end Pemit as the engineer who will furnish the cocpectlon report for work authorized by « grading pemlt laaued by the Dept. of Land U*e and EnvlroMseatal Kagulatloe. The latent of the foraat la to provide information to the Depart»enx of L.U.E.R. aa to grading coapUsACe with the approved Grading Flan and Permit. Whore the questions below refer to location, configuration <?r quantity of cut and/or fill areas, It la underatood that your response will not nomaUy be baaed on an actual land aurvey or detailed earthwork quantity calculation*. It ahould be noted, however, that the Department la particularly concerned where there are poaelble interaction* with reapw:t to overvteepened slopes, enoroachiMnta ot required •attacks, unco»pact«id fill* placed, or where the quantity ot' fill placed dlffera aubstaatiaUy from that authorised. Tbe Department of L.U.E.R. require* that all fill* authorized by a Grading Permit be coapacted to a KlnijauBi of 90.X of Molmua denalty with the exception that nut aore than 12" of unaompaeted and uoteated fllla May be diaporaeit over the land parcel. The neoil to coapact all I'tLla that are l>eyond the prea«»t Ualte of the preiieitt propoaed conatructlun 'lu to Inaure that future propoe-J conutru»:tlon of roua adtlltlone or awimlng poo la or almllar atructurea will not require that uncompactiid fills be reoovtxl or recoopoctuJ, or that extenalva fouodatloa work be Installed. Compaction raporra will not be accepted unl«au this form la completed and signed by the reglatcred pejntoa. A. COMPATIBILITY WITH CRADIHG PUN AND PEKKIT 1. Uaa the contacted fill placed only In the approximate looationa designated on the grading ve« X Ho _ pltn aa areas to bo filled? "~** 2. Odd the quantity of fill material placed dpproxiioacely conform to the grading plan? , Yea X No ___ 'J. Douc cue V6<; or I'ill or Um tup ol cuv app«or to cm:ru«cli wittu'ii tho px'tiscribeJ setback (l.S1 tor fiU; 3.0' for cuts)? Yea _ Ho X 4. Wr« the flniiihtd fill alupet steeper than 1 horizontal to 1 vertical? Yea No "x 5. If the fill material wau obtained by cuts on the site, were the cuts made in the proper location and to the proper slope approximately aa shown on the approved grading plan? Yea X No 6. Were brow ditches jonatructed approximately ae uhuwn on the grtdin^ plan? Yea X No B. I^DCATIQK AKD AxOUW Or OOH FACTION TESTS' 1. Have you attached ,t ^Icetcli an I data ihuwim; the. Lu.ratl ai anil re.lative nlovacloii for all compioti.Ki touca? Yea _X. No _ 2. W*« a corep»i!CIon test made so that theru ia at least orte test in each 2' thic): lena of ceaptctad ia*t-»ri<iJ.? . > y^, \/ ^ 3. .la indicated by inkpectlons, obien'artons and compaction tost reoalts, was the fill, ••eluding the top 1.0', cix»p**:ted to at l«*»t 90X oi; waxluun dry density? YM ~)S Uo 0 . illlALITY OF Fi:x COM PACT I OH OPERATION ', 1. Was the area to receive fill proporly prrtparert in eonna of l.runh ren«val, benchin*, w«rtlng, of noiKMpactod fill or dtibrla and related itunu? . y^^ ^ ^0 -. Does the fl 5.1 contain •lutrincntally expansive sail within 3' ot finish grade? Yea • £5 V 3. H*v« vau.atia<:h«ii * copy of your curve showing tho relatloimhlp between optioiufe moisture content and •*»<i»nn density? yM yo *)/ •4. W«r« any boulders or other oversize (over 12") particles pUcud in the fill? Yea X No 5. If your answer to (4) sbove is yes, Is sny portion of this fill not suitable for support of structures? Vea ___ Wo X 6. W%»re thi.T* Any j-rcja on i lit aite that appcai'bd to liav«* dxiatiii^ fi Lla tliat weru nor rt- ' cuu|j-Act«iJ du.rn.^ tliu up*j|*.iciott tlteit Ik Uabid i»'f iliiti rui>oft? Y»ei Uo S^ IUv. I147S LUtR »73 ft. STATISTICAL DATA . . 1. Dataa the grading work waa perforated: M^A/ 3 — M^y \O / 1965 >,:. 2. ItetM your npnMntktlvB was on aita and ntntMtf of hour* on ait* for aack data, and MUM of r«pt*»«ntativ«: Lr. 4..fS • S-T-ftV L.G ft.o _ .s-9-fi3 LP 3. Did a R«giat«x«d £ji^in*«r vlait th« ait* during or 8ube«qu«it to the collation of tli« grading .oporation? • .- • V** __ ^ 4. M4 you pcrtozm any taiting ••rvicaa on this project prior to a»cert*inin^ that a valid D*ndt Uad b««o i««uad for the work? ' ' • :5fM _ Mo ^>< E. AS-flUIU DATA 1. If th« fill plaeavwnt k«a riot in accordance with th« approved grading plan, did you notify tb« p*r»itt»« to obtain approval for deviation fixnt tha plan b«for* proc««din|{ with additional fill pUc««*nt? . YM _ Mo 2. If th« approved grading plan do«a not r«fl»ct the actual location, deptti and type of fill, have you aulwittad for review and approval an aa-built plan? Y«« . Mo NA CBrriPICATIOH ( I hereby certify, under penalty of perjury, that the 'Information provided in thin certification is mid to the beat of ny kuowleilge and ballet ._ Signature &^< ^ ' ^ ' f^^'' " ^ Date 5 (To be signed and dated by a Registered Engineer or Architect } '. . Regltrtrrtlon or Certifioatjt.iu Huuber Adfltese 44Q7 Mainel-ier- Ave. S^g. O7 Telephone Nunber RD4AU3: _ _ ' __ <=< SOIL INVESTIGATION AND GEOLOGIC RECONNAISSANCE for P.3.P. PROPERTY Carlsbad, California For P.J.P. ENTERPRISES Oceanside, California By GEOCON, INCORPORATED San Diego, California September, 1981 GEOCON INCORPORATED ENGINEERS AND GEOLOGISTS • CONSULTANTS IN THE APPLIED EARTH SCIENCES File No. D-2579-T01 September 21, 1981 P.3.P. Enterprises 315 North Clementine Street Oceanside, California 9205<f Attention: Mr. Pat O'Day Subject: Gentlemen: P.J.P. Property Chestnut Avenue Carlsbad, California SOIL INVESTIGATION AND GEOLOGIC RECONNAISSANCE In accordance with your request, we have performed a soil investigation and geologic reconnaissance for the subject project. We submit herewith the report of our investigation. The accompanying report presents the findings of our investigation and includes our conclusions and recommen- dations based on those findings. If you have any questions regarding the report or if we may be of further service, please do not hesitate to contact the undersigned. . Very truly yours, GEOCON, INCORPORATED Michael: W. Hart CEG 706 Thomas V. Langrfap Michael S. Chapin Staff Geologist MSC:TVL:lm copies:addressee 9530 DOWDY DRIVE • SAN DIEGO, CALIFORNIA 92126 • PHONE (714) 695-2880 File No. D-2579-TO1 September 21, 1981 SOIL INVESTIGATION AND GEOLOGIC RECONNAISSANCE Purpose and Scope The purpose of this soil investigation and geologic reconnaissance was to observe and sample the prevailing soil conditions at the site, to evaluate possible geologic hazards to the site and to provide recommendations for foundation design and other geotechnical aspects of site development. The investigation was performed on July 15, 1981 and consisted of a site reconnaissance :by our staff geologist and the drilling of three small- diameter exploratory borings. In addition, available geologic literature was reviewed to evaluate the presence of previously mapped geologic hazards such a faults or ancient landslides which may exist in the vicinity of the site. Laboratory tests were performed on soil samples from the site to determine various physical properties of the soil types encountered. The conclusions and recommenations presented herein are based on engineering analysis of the results of our field investigation and laboratory tests. Site and Project Description • The 1.1 acre, L-shaped site is located on the south side of Chestnut Avenue, east of Highland Drive in Carlsbad, California. The southern end -1- GEOCON INCORPORATED File No. D-2579-TO1 September 21, 1981 of the site slopes gently down to the east, while the northern portion of the site has been filled to a relatively flat-lying configuration. An elevation differential of approximately 18 feet exists between the highest point of the site, which is located near the southwest property corner, and the lowest portion of the site, along the east property line. Vegetation consists of moderate to light growths of native weeds and grasses and scattered trees. Based on the "Grading Plan, Parcels 1, 2 and 3 of P.M. 11391" prepared by O'Day Consultants and dated June 15, 1981, the site will be graded to level building pads with proposed 2:1 and 3:1 cut and fill slopes less than 10 feet high. It is our understanding that each of the three parcels will receive a wood-frame single-family residence and that foundation loads will be rela- tively light. Field Investigation The field portion of the investigation was performed on 3uly 15, 1981 and consisted of a site reconnaissance by our staff geologist and the drilling of three six-inch-diameter borings, 10 to 11 feet in depth. -2- GEOCON INCORPORATED File September. 21,1981.^ W': '-.^ •••.•'•"" '•'-,;' .': ' ' -•' ' • ~ *"*'-'•"'.'' -• --. • • " •" The borings7 were drilled by means of a truck-mounted rotary drill rig equipped with six-inch-diameter cohtinous flight auger. As drilling pro- ceeded, relatively undisturbed soil samples were obtained at various depths by driving a three-inch O.D. split-tube sampler into the undisturbed soil mass with blows from a 140-pound hammer falling 30 inches. The sampler was internally equipped with one-inch-high by two and three-eighths-inch- diameter brass sampler rings to facilitate sample removal and testing. Dis- turbed bulk samples were also obtained. The approximate locations of the borings are shown on the attached Site Plan, Figure 1. Logs of the test borings are presented on Figures 2 and 3 of Appendix A. The logs depict the depth and description of the various soil types encountered and include the depths at which samples were obtained. Laboratory Tests Laboratory tests were performed in accordance with generally accepted test methods of the American Society for Testing and Material (ASTM) and other suggested procedures. Selected relatively undisturbed drive samples were tested for their in-place dry density, moisture content, shear strength and expansive potential. -3- . ; . •••/- -...• -•.••'••-.: GEOCOST INCORPORATED File No.: P September 21, 1981 CH E ST N UT AV E N U E APPROX. SETBACK LINE FUTURE PROPERTY LINE FOR STREET LEGEND Oof. UNCOMPACTED FILL QC -COLLUVIUM Of. MARINE TERRACE DEPOSITS A APPROXIMATE LOCATION OF TEST BORING NO STRUCTURES IN CROSS-HATCHED AREA UNLESS COLLUVIUM ( Oc) REMOVED AND RECOMPACTED TO DEPTH OF FIVE FEET BELOW EXISTING GROUND ELEVATION SITE PLAN. AND LOCATION OF TEST BORINGS P.J.P. PROPERTY Carlsbad, California FIGURE GEOCON, INCORPORATED PAGE GEOCON INCORPORATED - v C ^ File No. D-2579-TO1 ' - "' September 21, 1981 The maximum dry density and optimum moisture content of a disturbed bulk sample were determined in accordance with ASTM Dl557-70, Method A. The results of our laboratory tests are summarized in tabular form in Appendix A. Moisture-density results are also presented on the Logs of Test Borings. Soil and Geologic Conditions Four general soil types were encountered in our borings: uncompacted fill, topsoils, colluvium and Quaternary Marine Terrace Deposits. Each of the soil types encountered is discussed below. Uncompacted Fill. A significant amount of uncompacted, end- dumped fill is present over the northern portion of the site (see Figure 1). The depth of fill encountered in Boring 3 was approximately four feet, however, the fill depth probably increases toward the eastern portion of the fill which was inaccessible to our drill rig. We estimate fill depths to be on the order of six to eight feet in that area. The fill material is charac- terized by loose, silty and clayey sands with scattered asphalt and concrete chunks. It will be necessary to remove and recompact the existing fill soils during grading operations. -5- GEOCON INCORPORATED File No. D-2579-TO1 : , : ^ September 21, 1981. ' !:• : v ;; '; Topsoil. The majority of the site is overlain by a one- to two-foot- thick layer of topsoil which consists of medium loose to loose silty sands. Recompaction of the topsoils will be necessary in areas to be graded. Colluvium. Loose colluvial material consisting of very moist, silty sand was encountered in Boring 2 to a depth of approximately seven feet. The approximate areal extent of the colluvium is delineated on Figure 1. Some removal and recompaction of the colluvial material will be necessary if fill is to be placed in the affected area. Marine Terrace Deposits. The Terrace Deposits encountered in our borings are characterized by dense, silty and clayey sand. A layer of sandy clay was encountered at a depth of approximately nine and one-half feet in Boring 2, however, we do not expect the clay to present a significant hazard to site development since it is well below the elevation of anti- cipated grading operations. Geologic Hazards No active faults or ancient landslides are known to exist at or in the imme- diate vicinity of the site and none were encountered in the course of our investigation. The nearest known active faults are the Elsinore Fault and -6- GEOGON INCORPORATED File No. D-2579-T01 September 21, 1981 the San Jacinto Fault which lie approximately 23 and 46 miles, respec- tively, to the northeast. In addition, the mapped offshore trace of the potentially active Rose Canyon Fault Zone (Map No. 1, California Division of Mines and Geology) lies approximately five miles southwest of the site. It is our opinion that the site could be subjected to moderate to severe ground shaking in the event of a major earthquake along any of the above mentioned faults, however, the seismic risk at the site is not significantly greater than that of the immediately surrounding developments. Groundwater Groundwater was encountered in Boring 2 near the southeast corner of the property and at a depth of approximately nine and one-half feet below the existing ground surface. We do'not anticipate the groundwater to present a significant hazard to the site due to its depth below expected development elevations. Although no groundwater was encountered at higher elevations of the site, it is possible that some seepage may occur in cut slopes along the western side of the property. If seepage is encountered during grading, we should be notified so that corrective measures can be determined and implemented at that time. GEOCON I N C O R P O B A TED File No. D-2579-TO1 September 21, 1981 CONCLUSIONS AND RECOMMENDATIONS : General -1. It is our opinion that the site is suitable for the proposed residential development provided the recommendations of this report are carefully followed. 2. It will be necessary to remove and recompact all existing fill at the site during grading operations. In addition, removal and recompacted of some of the loose coiluvial soils near the southeast portion of the site will like- wise be necessary. Grading 3. All grading should be performed in accordance with the Grading Ordinance of the City of Carlsbad and the "Recommended Grading Specifi- cations" presented in Appendix B. Where the recommendations of this section of the report conflict with those of Appendix B, this section of the report takes precedence. 4. Site preparation should begin with the removal and exportation of all debris and vegetation designated for removal. -8- GEOCON I N C Q R P O R A.T E D File No. D-2579-TOI September 21, 1981 5.. All existing fill should be removed until firm natural soils are exposed. A representative of this office should observe the overexcavated area to verify that the required depth has been attained. In addition, the area of loose colluvium delineated on Figure 1 should be overexcavated to a depth of at least two feet below the existing ground surface in areas where no structures are planned. Wherever structures will be constructed, the colluvium should be removed to a depth of at least five feet below the existing ground surface for a distance of 10 feet beyond the perimeter of the proposed structure. It is our understanding that a cul-de-sac will be constructed as part of a new public street at the southeast corner of the site. The proposed cul-de-sac extends onto the subject property (see Figure 1) and - is underlain by colluvium. The colluvial soils underlying the proposed cul-de-sac should be removed to a depth of two feet prior to the placement of new fill. After the loose materials have been removed, the bottom .of the excavations should be scarified to a depth of 12 inches, moisture conditioned to near optimum moisture content and recompacted to at least 90 percent of maximum dry density. 6. Loose topsoils.! present in areas to be filled should be removed and recompacted to at least 90 percent relative compaction. -9-r GEOCON IN C O R P O RAT E O File No. D-2579-TO1 September 21, 1981 7. Foundations founded partially on cut and partially in fill soils are not recommended due to the tendency of cut and fill soils to compress or consolidate differently. Where such a condition occurs, it is recommended that the cut portion of the building area be undercut a depth of at least one foot below the bottom of proposed footings and replaced with properly compacted, nondetrimentally expansive fill soils. 8. All fill and backfill should be compacted to at least 90 percent of maxi- mum dry density as determined by ASTM Test Procedure D1557-70, Method A or C. Foundations 9. For one- or two-story residential structures, conventional spread foot- ings are recommended. Such footings should be at least 12 inches wide and should extend at least 12 inches below lowest adjacent pad grade into dense formational soils or properly compacted fill. Excavations for the founda- tions should be observed by a representative of this office prior to the placement of concrete forms and reinforcing steel. -10- GEOCON INCORPORATED File No. D-2579-T01 "• September 21, 1981 10.. We recommend minimum footing reinforcement to consist of two continuous No. ^ steel reinforcing bars placed horizontally in the footings, one near the top and one near the bottom. This recommendation is based on soil support characteristics and is not intended to be in lieu of steel necessary for structural considerations. 11. The allowable bearing capacity for foundations constructed as recom- mended above is 2,000 psf. This value is for dead plus live loads and may be increased by one-third when considering transient loads due to wind or seismic forces. 12. The above foundation recommendations assume that potentially expan- sive soils will not be present within 2.5 feet of finished pad grade. Concrete Slabs-on-Grade 13. Concrete slabs-on-grade should be underlain by dense, natural soils or properly compacted fill. Slabs should have a minimum nominal thickness of four inches and should be underlain by two inches of clean sand. Where .t moisture sensitive floor coverings are anticipated, a visqueen moisture barrier should be provided. -11- GEOCON I N C O R P O R_A T B D File No. D-2579-TO1 September 21, 1981 1*. Slab reinforcement should consist of 6x6-10/10 welded wire mesh throughout. Care should be taken during the placement of concrete slabs to ensure that the mesh is not forced to the bottom of the slab. Slope Stability 15. Cut and fill slopes constructed of onsite materials should be stable with respect to deep-seated failure to heights of at least 15 feet if con- structed at slope ratios of two horizontal to one vertical, or flatter. Our analysis is based on a factor of safety of 1.5 under static conditions. Drainage 16. Adequate site drainage provisions are imperative. Under no circum- stances should water be allowed to pond adjacent to footings. The site should be fine-graded such that irrigation excess and storm runoff drain away from structures and into swales or other controlled drainages. 17. If groundwater seeps are exposed during grading, the project soil engi- neer or engineering geologist should be notified so that appropriate mea- sures may be provided. GEOOON INCORPORATED FiieNb. D-2579-TO1 September 21, 1981 , LIMITATIONS, AND UNIFORMITY OF CONDITIONS .-;..-- 1. The recommendations of this report pertain only to the site investigated and are based upon the assumption that the soil conditions do not deviate from those disclosed in the borings. If any variations or undesirable condi- tions are encountered during construction, or if the proposed construction will differ from that planned at the present time, Geocon, Incorporated should be notified so that supplemental recommendations can be given. 2. This report is issued with the understanding that it is the responsibility of the owner, or of his representative, to ensure that the information and recommendations contained herein are brought to the attention of the architect and engineer for the project and incorporated into the plans, and that the necessary steps are taken to see that the contractor and subcon- tractors carry out such recommendations in the field. 3. The findings of this report are valid as of the present date. However, changes in the conditions of a property cari occur with the passage of time, whether they be due to natural processes or the works of man on this or adjacent properties. In addition, changes in applicable or appropriate standards may occur, whether they result from legislation of the broad- -''r'- ••'".•'!'••*:'* -''•' ;'V"/:Vv*v--,. GEOCON .I.N.C ORPORATED File No. D-2579-TO1 September 21, 1981 ening of knowledge. Accordingly, the findings of this report may be invali- dated wholly or partially by changes outside our control. Therefore, this report is subject to review and should not be relied upon after a period of three years. GBOCX)N INCORPORATED File No. D-2579-T01 September 21, 1981 TABLE I Summarv of In-Place Moisture-Densitv and'Direct Shear: Test Results Sample No. 1-1 1-2 2-1 2-2 2-3 3-1 Sample No. 3-2 Sample No. . 3-1 Depth ft. 2 5 3 7 10 5 Summary Depth ft. 6-10 Summary Description Red-brown, . '''•• Dry •-.: Moisture : .;'-• _,:; Unit ' .'.-, Density ./"Content ; .Cohesion j?cf 7o psf 117.1 : 4.9 116.9 8.7 103.0 7.5 117.8 10.3 109.3 17.5 121.2 6.9 TABLE II • • 660 . - — -•- — — . . Angle: of Shear Resistance Degrees 35 — —_ _ .. * * * of Laboratory Compaction Test Results A.S.T.M. D1557-70 Description Red-brown, Clayey SAND TABLE III of Laboratory Expansion Tes Moisture Content Before After Test Test Depth ft . % % Max . Dry Density pcf 130.0 t Results Dry , Density^ pcf 5 6.9 11.9 121. 2 ; Optimum Moisture % dry wt. 9.6 Expansion (+) or Settlement(^) Surcharge % psf +1.1 150 Clayey SAND GEOCON :•'; ^File No/ b-2579-TOl ...': •" ' • :' September" 21, 1981' : • DEPTH in fEET o • 2. • . •" • 4-1 . 6. - 8- - . - .in.IU • ' • . 0. • 2- • 4- . • 6' - 8- •10- •12- • :. • :.'••'""'< SAUPLf HUMBER 1-1 1-2 < 1-3 2-1 2-2 9-^*.— j LOG O LOCATION or SAMPLE • •I;IM- vi;.i:i- .'.1 -1: 1". • V: ;' pj;l.'; ..|-l:| ; m$^'•i-:M •I'l'l-'.'•'! :.''J'.- :;i:i:r. I':''-.!:.Ill: •:-J:!-r- • .1. !•!.. |::i';: '.!.-•'... •r§B. ,x% • p**»a,o» fimita** Blows/ft 50/ 8" 50/ 9" ^--*" 12 ^L"9~ To/" 10" DESCRIPTION ...' •''.'" BORING NO. 1 TOPSOIL A Medium loose, dry, brown, Silty \ SAND ^ "V — becomes orange -brown \ . MARINE .TERRACE DEPOSITS ^ Medium dense, humid, orange- \ brown, Silty medium SAND ^ — becomes moist, slightly Clayey 1 — becomes very dense '/ — not recoveredj BORING TERMINATED AT 10.0 FEET BORING NO. 2 TOPSOIL/COLLUVIUM ~\ Medium loose, humid, dark brown, \ Silty medium SAND > — becomes moist /MARINE TERRACE DEPOSITS / Medium dense, very moist, dark ^ orange-brown, Silty, medium to \ coarse SANDv- becomes wet -r--?-- Water Table _ Very stiff, saturated, orange- y brown, Sandy CLAY BORING TERMINATED AT 11.0 FEET /*-, Off DENSITY AC.' 117.1 116.9 NO RE 103.0 117.8 i no oiuy . j LACE UOISTUHC CONTENT % Or, wt 4.9 8.7 :OVF,RY 7.5 10.3 n e. 5 Figure, 2, Log of ,Test /Borings 1 and 2 ,• :••'" " •'>•'. • ;.. •• -, •':•'••.•.•'..'•'.'• ...'.'"' .•""•'• .[ •".".." •'•, ...'•• • .'''--'1 "'~'x-if •• • '•" ••"'• '• •'..•>" •"• '••'''' ''"' '• '''•' '"'"~ '' ""• r''".•.•.' '" -. GBOCCT4 INCORPORATED File No. D-2579-T01 September 21, 1981 DEPTH IN FEET o • . 2. • . -« 4 . 6- . • 8- » • • • ' - SAUPLC Nuuae/t 3-1 3-2 ~-~... LOS a LOCATION OF SAMPLE :\ M: 'ill .III -•1 1 1 .1 l.-l • -I 1 •! t-.v III "• " 1 '-' 111 • "'• If '•/' ftmrot.an RtSistanot Btewt/H 7" -. OeSC/HPTIOM-1 ^ r ~ BORING NO. 3 '-- ; FILL ;- Loose, humid, orange-brown", Silty SAND with debris TOPSOIL\x A • 1 • 4- J i i- \ rieuj-uni jioose, moisc, udJ-K utowti, Silty SAND MARINE TERRACE DEPOSITS Dense, moist, red-brown, Clayey SAND BORING TERMINATED AT 10 . 0 FEET • Wr^ oar DENSITY «.ef 121.2 BULK LACC.\ MOISTU»E CONTENT% *',« 6.9 SAMPLE Figure 3,. Log of Test Boring, 3 A-3 GEOCX3N _. INCORPORATED til 'V'- v ' File No. D-2579-TO1 4 September 21, 1981 RECOMMENDED GRADING SPECIFICATIONS f or'^ :•:';.?::<:;,...!*" •••-;:.;'v':'. ^:;^|;;" '', •.; '.•"''., " .'. " P.J.P. PROPERTY : "?; Carlsbad, California - 1. ... General Description 1.1 These specifications have been prepared for grading and site development of the P.3.P. Property located on Chestnut Avenue in Carlsbad, California. Geocon, Incorporated, hereinafter described as the soil engineer, should be consulted prior to any site work connected with site development to ensure compliance with these specifications. These specifications shall only be used in conjunction with the soil report of which they are a part. 1.2 This item consists of clearing and grubbing, preparation of land to be filled, filling of the land, spreading, compaction and control of the fill, and any subsidiary work necessary to complete the grading of the filled areas to conform with the lines, grades and slopes as shown on the accepted plans. 1.3 The soil engineer will test and observe all grading operations. In the event that any unusual conditions not covered by the special provisions are encountered during the grading operations, the soil engineer should be contacted for further information. 2. Tests The standard test used to define maximum density of the fill soil will be the ASTM Test Procedure D1557-78,Method A or C. All densities will be expressed as a relative compaction in terms of the maximum density obtained in the laboratory by the foregoing standard procedure.. 3. Clearing, Grubbing, and Preparing Areas to be Filled 3.1 Any trees not utilized in landscaping, structures, weeds, and other rubbish shall be removed, piled, or otherwise disposed of so as to leave the areas that have been disturbed with a neat and finished appearance, free from unsightly debris. INCORPORATED File No. D-2579-TO1 September 21, 1981 3.2 Septic tanks, if encountered, and debris must be removed from the site prior to any building, grading or fill operations. Septic tanks, including all connecting drain fields and other lines, should be totally removed and the resulting depressions properly backfilled and compacted. 3.3 Water wells on the site should be capped according to the require- ments of the San Diego County Health Department. The strength of the cap should be at least equal to the adjacent soil. The final elevation of the top of the well casing should be at least three feet below adjacent grade prior to grading of fill operations. 3.4 Buried tanks, if encountered, should be removed and the resulting depressions properly backfilled and compacted. 3.5 Vegetable matter and soil designated as unsuitable by the soil engineer should be removed under the direction of the soil engineer. The then exposed surface shall then be plowed or scarified to a depth of at least eight inches and until the surface is free from ruts, hummocks, or other uneven features which would tend to prevent uniform compaction by the equipment to be used. 3.6 The original ground upon which the fill is to be placed should be plowed or scarified deeply, and where the slope ratio of the original ground is steeper than 6.0 horizontal to 1.0 vertical, the bank should be stepped or benched. At the toes of the major fills and on the sideslope fills, the base key should be, as described elsewhere in this report, at least 10 feet in width, cut at least three feet into the undisturbed or native soil, and sloped back into the hillside at a gradient of not less than two percent. Subsequent keys should be cut into the hillside as the fill is brought up the slope. The construction of subsequent keying operations should be determined by the soil engineer during grading operations. In general, the depth of the initial bench key, as well as subsequent keys, should be such that topsoils are removed and keying occurs within the underlying formational soils. Ground slopes which are flatter than 6 to 1 should be benched when considered necessary by the soil engineer. 3.7 After the foundation for the fill has been cleared, plowed, or scarified, it should be disced or bladed until it is uniform and free from large clods; brought to the proper moisture content by adding water or aerating; and compacted to a relative compaction of not less than 90 percent. r 1I* ' f f * * • • K- v*.,i ^ ^ B-2 GEOCON INCORPORATED File No. D-2579-TO1 September 21, 1981 *• Materials 4.1 Native soil, free of organic material and undesirable deleterious material, may be used as fill. Native soil which is expansive should not be placed on the top two feet of building pads without the approval of the soil engineer. 4.2 The materials for fill should be approved by the soil engineer before commencement of grading operations. Any imported material must be approved for use before being brought to the site. The materials used should be free from vegetable matter and other deleterious material, and be nonexpansive. Expansive soil is defined as soil which expands more than three percent when saturated at 90 percent relative compaction and optimum, moisture content under a surcharge of 150 psf. 5. Placing, Spreading, and Compacting Fill Material 5.1 Fill material should be placed in layers which, when compacted, would permit adequate bonding and compaction. Each layer shall be spread evenly and shall be thoroughly blade mixed during the spreading to provide uniformity of materials in each layer. 5.2 When the moisture content of the fill material is below that specified by the soil engineer, water should be added until the moisture content is as specified. When the moisture content of the fill material is above that specified by the soil engineer, the fill material shall be aerated by blading or other satisfactory methods until the moisture content is as specified. 5.3 After each layer has been placed, mixed, and spread evenly, it should be thoroughly compacted to a relative compaction of not less than 90 percent. 5.4 When fill material includes rock, no rocks should be allowed to "nest", and all voids should be filled and properly compacted. No rocks larger than six inches in diameter should be permitted in the fill except as specified under Section 6.1 "Disposal of Over- sized Rock". 5.5 Compaction should be by sheepsfoot rollers, multiple-wheel pneumatic-tired rollers, or other types of acceptable compacting rollers. Rollers should be of such design that they will be able to compact the fill to the specified moisture content range. Rolling of each layer should be continuous over its entire area and until the required density has been achieved. B-3 - ~ - GEOCON INCORPORATED !<> } I 3-* ' -'I'' ; (•* "*/ I * t > File No. D-2579-TO1 September 21, 1981 5.6; "Field density tests shall be made by the soil engineer. Where ' { sheepsfoot rollers are used, the soil may be disturbed to a depth ^ •! of several inches. Density tests should be taken in compacted : ': • material below the disturbed surface. When these tests indicate that the density of any layer of fill, or portion thereof, is below the required 90 percent relative compaction, the particular layer, or portion thereof, should be reworked until the required relative compaction has been obtained. 5.7 The fill operation shall be continued in compacted layers, as specified above, until the fill has been brought to the finished slopes and grades as shown on the accepted plans. 5.8 Fill slopes should be compacted by 'means of sheepsfoot rollers, "track walking", or other suitable equipment. Compaction operations should be continued until the slopes are properly com- pacted (i.e., field density tests indicate a relative compaction of at least 90 percent at a horizontal distance of two feet from the slope face). 5.9 Earthmoving and working operations should be controlled to prevent water from running into excavated areas. Any water should be promptly removed and the site kept dry. 6. Disposal of Oversized Rock 6.1 Oversized rock should be either exported from the site, used for landscaping purposes, or placed in designated fill areas described in this report or as approved by the soil engineer and/or appro- priate governing agency. 6.2 Oversized rock should not exceed four feet in greatest dimen- sion, should be placed in lifts not exceeding four feet in thickness, and should be placed in a manner that will not produce "nesting" of the rock. The voids between the rocks should be completely filled with fine granular material. 7. Engineering Observation Field observations by the soil engineer should be made during the fill and compaction operations so that he can express his opinion regarding the conformance of the grading with the accepted specifications. GEOCON INCORPORATED File No. D-2579-TO1 September 21, 1981 8. Seasonal Limits - __ ---- T...iim--[iii_LjiiM. T- No fill material should be placed^ spread, or rolled while it is at an unsuitably high moisture content, nor during unfavorable weather conditions.- When the work is interrupted by heavy rain, fill operations should not be resumed until field tests by the soil engineer indicate that the moisture content and density of fill are as previously specified. GEOCCN INCORPORATED