HomeMy WebLinkAbout1475 CHESTNUT AVE; ; CB021121; Permit1
,05-10-2002
3ob Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
# Dwelling Units:
Bedrooms:
Project Title:
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Residential Permit Permit No: CB021121
Building Inspection Request Line (760) 602-2725
1475 CHESTNUT AV CBAD
RESDNTL Sub Type:
2052207400 Lot #:
$49,440.00 Construction Type:
Reference #:
0 Structure Type:
0 Bathrooms:
ALLEN - FAMILY ROOM 480 SF
RAD
0
VN
Status:
Applied:
Entered By:
Plan Approved:
Issued:
Inspect Area:
Orig PC#:
Plan Check*:
ISSUED
04/12/2002
JM
05/10/2002
05/10/2002
Applicant:
WRIGHT SAM
2911 STATE STREET
CARLSBAD CA 92008
760-
Owner:
ALLEN-BAINES REX V&DIANE C
1475 CHESTNUT AVE
CARLSBAD CA 92008
6878 05/10/02 0002 01 02
CGP 398.63
Total Fees:$628.85 Total Payments To Date:$230.22 Balance Due:$398.63
;• Building Permit
?; Add'l Building Permit Fee
' Plan Check
,j Add'l Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFMFee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Pot. Water Con. Fee
.< Meter Size
I Add'l Pot. Water Con. Fee
£, Reel. Water Con. Fee
$354.19
$0.00 .
$230.22
$0.00
$0.00
$4.94
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Meter Size
Add'l Reel. Water Con. Fee
Meter Fee
SDCWA Fee
CFD Payoff Fee
PFF
PFF (CFD Fund)
License Tax
License Tax (CFD Fund)
Traffic Impact Fee
Traffic Impact (CFD Fund)
Sidewalk Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing InLieu Fee
Master Drainage Fee
Sewer Fee
Additional Fees
TOTAL PERMIT FEES
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$20.00
$19.50
$0.00
$0.00
$0.00
$0.00
$0.00
$628.85
Inspector:D
INAL APPROV
ate: /^2z Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as lees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has oreviouslv QthBrwise_8XBired
PERMIT APPLICATION
CITY OF CARLSBAD BUILDING DEPARTMENT
1635 Faraday Ave., Carlsbad, CA 92008
1.
FOR OFFICE USE ONLY
PLAN CHECK
EST. VAL.
Plan Ck. Depasi
Validated
Date
Address (include Bldg/Suite #)Business Name (at this address)
Description of Work SQ. FT.#of Stories # of Bedrooms # of Bathrooms
2. CONTACT PERSON (if different from icant)
U
Name Address City
3. APPLICANT Q Contractor Q Agent for Contractor jgy Owner Q Agent for Owner
State/Zip Telephone #Fax #
Name
4. PROPERTY OWNER
Address
City
State/Zip
State/Zip
Telephone #
Telephone #Name
5. CONTRACTOR - COMPANY NAME
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its
issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law
[Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code] or that he is exempt therefrom, and the basis for the alleged
exemption. Any violation of Section 7031.5 by_ariy applicant for a permit subjects the applicant to a civil penalty of not,morerthanjive hundred dollars [$500]).
Name
State License #
Address
License Class ///c
City State/Zip
City Business License #
Telephone #
Designer Name Address City State/Zip Telephone
State License #
6. WORKERS'COMPENSATION : ;
Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following declarations:
l~l I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance
of the work for which this permit is issued.
O I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is
issued. My worker's compensation insurance carrier and policy number are:
Insurance Company • Policy No. Expiration Date
(TH1SSECTION NEED NOT BE COMPLETED IF THE PERMIT IS FOR ONE HUNDRED DOLLARS [$100] OR LESS)
pH CERTIFICATE OF EXEMPTION: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as
to become subject to the Workers' Compensation Laws of California.
workers' compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred
lition to the cost of compensation, damages as provided for in Section 3706 of the Labo/code, interest and attorney's fees.
DATE ^
WARNING: Failure,
thousand dollai
SIGNATURE
7,OWNER-BUjktj§F0ECLARATION
I hereby affirm that I am exempt from the Contractor's License Law for the following reason:
l~l I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale
(Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does
such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is
solo>jvithin one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
*!Bs, I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The
Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed
pursuant to the Contractor's License Law).
l~l I am exempt under Section Business and Professions Code for this reason:
1. I personally plan to provide the major labor and materials for construction of the proposed property improvement. O YES I~"|NO
2. I (have / have not) signed an application for a building permit for the proposed work.
3. I have contracted with the following person (firm) to provide the proposed construction (include name / address / phone number / contractors license number):
4. I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name / address / phone
number / contractors license number): ~.
5. I will provide some of the wook, but I have rfoffl racj edjplred) the following persons to provide the work indicated (include name / address / phone number / type
of work): 1 f—~\ 1 \ ""^ L ,
DATE ^7 f Q/ CSPROPERTY OWNER SIGNATURE
COMPLETlTHIS SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention
program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? EH YES Q NO
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? CD YES CD NO
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? Q YES Q NO
IF ANY OF THE ANSWERS ARE YES. A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE
REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
8, CONSTRUCTION LENDING AGENCY - \ '
I hereby affirm that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 3097(i) Civil Code).
LENDER'S NAME LENDER'S ADDRESS
9. APPLICANT CERTIFICATION
I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all
City ordinances and State laws relating to building construction. I hereby authorize representatives of the City of Carlsbad to enter upon the above mentioned
property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES,
JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANYWAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT.
OSHA: An OSHA permit is required for excavations over BXryegpJod demolition or construction of structures over 3 stories in height.
EXPIRATION: Every permit issued by theJMilding Offic^uKSer the provisions of this Code shall expire by limitation and become null and void if the building or work
authorized by such permit is not commence within lagn^s from the crate of such permit or if the building or work authorized by such permit is suspended or abandoned
at any time after the work is commenc^cMbr a perio/oWiO/ia^ (Sei»on-*e6.4.4 Uniform Building Code).
/ /A*MS /sfj* //7/ /
APPLICANT'S SIGNATURE DATE
YELLOW: Applicant PINK: Finance
Inspection List
Permit*: CB021121 Type: RESDNTL RAD
Date Inspection Item Inspector Act
11/21/2002 89
07/09/2002 19
07/09/2002 29
07/09/2002 39
07/09/200249
07/08/2002 89
06/11/2002 17
06/11/2002 18
06/10/2002 17
06/10/2002 18
06/06/2002 16
06/05/2002 14
06/05/2002 18
06/05/2002 34
06/04/2002 13
06/04/2002 14
06/04/2002 34
05/23/2002 13
' 05/23/2002 15
05/13/2002 11
Final Combo
Final Structural
Final Plumbing
Final Electrical
Final Mechanical
Final Combo
Interior Lath/Drywall
Exterior Lath/Drywall
Interior Lath/Drywall
Exterior Lath/Drywall
Insulation
Frame/Steel/Bolting/Weldin
Exterior Lath/Drywall
Rough Electric
Shear Panels/HD's
Frame/Steel/Bolting/Weldin
Rough Electric
Shear Panels/HD's
Roof/Reroof
Ftg/Foundation/Piers
RF
RF
RF
RF
RF
RF
RGB
RGB
RGB
RGB
RGB
RGB
RGB
RGB
RGB
RGB
RGB
RGB
RGB
RGB
AP
CO
AP
AP
AP
NR
AP
AP
CO
CO
AP
AP
we
AP
AP
we
we
we
AP
AP
ALLEN - FAMILY ROOM 480 SF
Comments
4FT HIGH R.W. NO PERMITS - STEPS 6
RISE NO LANDING OR HANDRAIL
\
FLOORING MUST BE INSTALLED,
OWNER NOT HOME
DID NOT SEAL SILL PLATE PROPERLY
SPEC INSP REPORT FOR H.D. BOLTS
FILED
OK TO WRAP
OK TO COVER
OK TO POUR
Thursday, November 21, 2002 Page 1 of 1
City of Carlsbad Bldg Inspection Request
For: 07/09/2002
Permit# CB021121
Title: ALLEN - FAMILY ROOM 480 SF
Description:
Type:RESDNTL Sub Type: RAD
Job Address: 1475 CHESTNUT AV
Suite: Lot 0
Location:
APPLICANT WRIGHT SAM
Owner: ALLEN-BAINES REX V&DIANE C
Remarks:
Total Time:
Inspector Assignment: RF
Phone: 7604341203
Inspector: /X /
Requested By: JOE
CD
19
29
39
49
Description
Final Structural
Final Plumbing
Final Electrical
Final Mechanical
Act Cfirnments
Co &' hJah
A f \S+*/>s £
AP
AP
Entered By: CHRISTINE
J J ' I 1
3
Associated PCRs/CVs
Inspection History
Date
06/11/2002
06/11/2002
06/10/2002
06/10/2002
06/06/2002
06/05/2002
06/05/2002
06/05/2002
06/04/2002
06/04/2002
06/04/2002
05/23/2002
05/23/2002
05/13/2002
Description
17 Interior Lath/Drywall
18 Exterior Lath/Drywall
17 Interior Lath/Drywall
18 Exterior Lath/Drywall
16 Insulation
14 Frame/Steel/Bolting/Welding
18 Exterior Lath/Drywall 'v
34 Rough Electric
13 Shear Panels/HD's
14 Frame/Steel/Bolting/Welding
34 Rough Electric
13 Shear Panels/HD's
15 Roof/Reroof
1 1 Ftg/Foundation/Piers
Act
AP
AP
CO
CO
AP
AP
we
AP
AP
we
we
we
AP
AP
Insp
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
Comments
DID NOT SEAL SILL PLATE PROPERLY
SPEC INSP REPORT FOR H.D. BOLTS FILED
OK TO WRAP
OK TO COVER
OK TO POUR
CITY OF CARLSBAD
BUILDING DEPARTMENT
NOTICE
DATE 7/4/3 32-
LOCATION
PERMIT NO.
/ /i/
(760) 602-2700
1635 FARADAY AVENUE
TIME
zMo*;
3.
%- 3.6 . Met.
\
.
as
yj C*i/( T&1
FOR INSPECTION CALL (760) 602-2725. RE-INSPECTION FEE DUE? I I YES
FOB FURTHER
PHONE
BUILDING INSPECTOR CODE ENFORCEMENT OFFICER ®
City of Carlsbad Bldg Inspection Request
For: 07/08/2002
Permit* CB021121
Title: ALLEN - FAMILY ROOM 480 SF
Description:
Type:RESDNTL Sub Type: RAD
Job Address: 1475 CHESTNUT AV
Suite: Lot 0
Location:
APPLICANT WRIGHT SAM
Owner: ALLEN-BAINES REX V&DIANE C
Remarks:
Total Time:
Inspector Assignment: RGB
Phone: 7604341203
Inspector:
CD Description
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Requested By: JOE
Entered By: CHRISTINE
Act Comments
7
Associated PCRs/CVs
Inspection History
Date
06/11/2002
06/11/2002
06/10/2002
06/10/2002
06/06/2002
06/05/2002
06/05/2002
06/05/2002
06/04/2002
06/04/2002
06/04/2002
05/23/2002
05/23/2002
05/13/2002
Description
17
18
17
18
16
14
18
34
13
14
34
13
15
11
Interior Lath/Drywall
Exterior Lath/Drywall
Interior Lath/Drywall
Exterior Lath/Drywall
Insulation
Frame/Steel/Bolting/Welding
Exterior Lath/Drywall
Rough Electric
Shear Panels/HD's
Frame/Steel/Bolting/Welding
Rough Electric
Shear Panels/HD's
Roof/Reroof
Ftg/Foundation/Piers
Act
AP
AP
CO
CO
AP
AP
we
AP
AP
we
we
we
AP
AP
Insp
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
Comments
DID NOT SEAL SILL PLATE PROPERLY
SPEC INSP REPORT FOR H.D.
OK TO WRAP
OK TO COVER
OK TO POUR
BOLTS FILED
-
CITY OF CARLSBAD
BUILDING DEPARTMENT
DATE
NOTICE (760) 602-2700
1635 FARADAY AVENUE
7/3/0-2-
LOCATION
PERMIT NO.
~r f cyr/
Ts •L
FOR INSPECTION CALL (760) 602-2725. RE-INSPECTION FEE DUE?
FOR FURTHER INFORMATION. CONTACT
YES
PHONE
BUILDING INSPECTOR CODE ENFORCEMENT OFFICER
City of Carlsbad Bldg Inspection Request
For: 06/05/2002
Permit# CB021121
Title: ALLEN - FAMILY ROOM 480 SF
Description:
Inspector Assignment: RGB
Sub Type: RAD
1475 CHESTNUT AV
Lot 0
Type: RESDNTL
Job Address:
Suite:
Location:
APPLICANT WRIGHT SAM
Owner: ALLEN-BAINES REX V&DIANE C
Remarks: EMJBLEASE
4
Total Time:
CD Description
18 Exterior Lath/Drywal I
Act Comments
Phone: 7608054329
Inspector:
Requested By: JOE
Entered By: CHRISTINE
Associated PCRs
Inspection History
Date Description Act Insp Comments
05/23/2002 13 Shear Panels/HD's WC RC
05/23/2002 15 Roof/Reroof AP RC OK TO COVER
05/13/2002 1 1 Ftg/Foundation/Piers AP RC OK TO POUR
MPY-31-£882' 66:39 A FROM: 768 7E8 S875 TO:7205257
SenSpec
.*. *J I . .» S ^*Building Consultants
Tel: (760) 720-7125
Fax; (760) 720-2875
May 23,2002 < ,
! "".• '!' '?*.''.
Joe Moore Construction
Carlsbad, CA 92008
Re: Special Inspection
1475 Chestnut
Carlsbad, CA
Dear Sirs,
The installation of two (2) 5/8" threaded rods 7 1/2" into the foundation was
observed at 8:30 a.m. on Thursday, May 23, 2002. The installation was done in
accordance with the instructions on the tube of Simpson epoxy I.C.B.O.
&ERS279 and standard building practices.
Should you have questions regarding this matter please contact me at
760.720.7125.
Sincerely,
Bill Van Tassel, C8O #2832
Si20523i
EsGil Corporation
In Partnership with government for 'BuiCding Safety
DATE: April 25, 2002 a^APgyCANT
JURISDICTION: Carlsbad
a FILE
PLAN CHECK NO.: 02-1121 SET.-.I
PROJECT ADDRESS: 1475 Chestnut Avenue
PROJECT NAME: SFD Addition for Baines
The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes. ^
,X] The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
The applicant's copy of the check list has been sent to:
Esgil Corporation staff did not advise the applicant that the plan check has been completed.
Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone #:
^DBte-c^ntacted: (by: ) Fax #:
Fax In Person
EMARKSil Please have the designer shcjlw^m&Tollowing on the plans: 1) Beam 2 as
recblnmenj|ed should be parallam instead of GLB. 2) The CF-1R form signed by the
owner/de*>jgner and imprinted on the plans.
Domingo Enclosures:
Esgil Corporation
D GA Q MB Q EJ Q PC 4/15/02 trnsmtl.dot
9320 Chesapeake Drive, Suite 208 4 San Diego, California 92123 + (858)560-1468 + Fax (858) 560-1576
VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad PLAN CHECK NO.: 02-1121
PREPARED BY: Bert Domingo DATE: April 25, 2002
BUILDING ADDRESS: 1475 Chestnut Avenue
BUILDING OCCUPANCY: R3 TYPE OF CONSTRUCTION: VN
BUILDING
PORTION
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code
AREA
( Sq. Ft.)
cb
Rlrla. Permit Fee hv Ordinance *T
Valuation
Multiplier
By Ordinance
Reg.
Mod.
VALUE ($)
49,440
49,440
$345.06
Plan Check Fee by Ordinance
Type of Review:
I Repetitive FeeRepeats
Complete Review
D Other
,—i Hourly
fj Structural Only
Hour
Esgil Plan Review Fee
Comments:
$224.29
$193.23
Sheet 1 of 1
macvalue.doc
DATE:
BUILDING ADDRESS:
PROJECT DESCRIPTION:
ASSESSOR'S PARCEL NUMBER:
of Carlsbad
Public Works — Engineering
BUILDING PLANCHECK CHECKLIST
PLANCHECK NO.: CB QQ
ENGINEERING DEPARTMENT
APPROVAL
The item you have submitted for review has been
approved. The approval is based on plans,
information and/or specifications provided in your
submittal; therefore any changes to these items after
this date, including field modifications, must be
reviewed by this office to insure continued
conformance with applicable codes. Please review
carefully all comments attached, as failure to comply
with instructions in this report can result in
suspension of permit to build.
D A Right-of-Way permit is required prior to
construction of the following improvements:
EST. VALUE:
DENIAL
Please see the attached report of deficiencies
marked with D. Make necessary corrections to plans
or specifications for compliance with applicable
codes and standards. Submit corrected plans and/or
specifications to this office for review.
By:
By:
By:
Date:
Date:
Date:
By:
FOR OFFICIAL USE ONLY
/ ENGINEERINOAUTHORIZATION TO ISSUE BUILDING PERMIT:
Date:
ATTACHMENTS
D Dedication Application
D Dedication Checklist
D Improvement Application
D Improvement Checklist
D Future Improvement Agreement
D Grading Permit Application
D Grading Submittal Checklist
D Right-of-Way Permit Application
[] Right-of-Way Permit Submittal Checklist
and Information Sheet
D Sewer Fee Information Sheet
ENGINEERING DEPT. CONTACT PERSON
Name: KarervSftUJ
City of Carlsbad
Address: 1635 Faraday Avenue, Carlsbad, CA 92008
Phone: (760)'602-2775
CFD INFORMATION
Parcel Map No:
Lots:
Recordation:
Carlsbad Tract:
H:\oe.€k>plifiS6ii£oEaeieyaft»aaiit0>i«bhGa£lslaacl, CA 920OSr7314 • (760) 602-2720 • FAX (76O) 602i85fia
BUILDING PLANCHECK CHECKLIST
SITE PLAN
3RD
1. Provide a fully dimensioned site plan drawn to scale. Show:
North Arrow
Existing & Proposed Structures
Existing Street Improvements
Property Lines
Easements
Right-of-Way Width & Adjacent Streets
Driveway widths
Existing or proposed sewer lateral
Existing or proposed water service
Existing or proposed irrigation service
D D 2. Show on site plan:
.,
Z.
Drainage Patterns ,
1 . Building pad surface drainage must maintain a minimum slope of one
percent towards an adjoining street or an approved drainage course.
2. ADD THE FOLLOWING NOTE: "Finish grade will provide a minimum positive
drainage of 2% to swale 5' away from building."
B. Existing & Proposed Slopes and Topography
Size, type, location, alignment of existing or proposed sewer and water service
(s) that serves the project. Each unit requires a separate service, however,
, second dwelling units and apartment complexes are an exception.
\p. Sewer and water laterals should not be located within proposed driveways, per
standards.
3. Include on title sheet:
Site address
essor's Parcel Number
) Legal Description
For commercial/industrial buildings and tenant improvement projects, include:
total building square footage with the square footage for each different use,
existing sewer permits showing square footage of different uses (manufacturing,
warehouse, office, etc.) previously approved.
EXISTING PERMIT NUMBER DESCRIPTION
H:\WORmDOCS\CHKLSTiBuilding Plancteck CMst Form (Generic).*c
BUILDING PLANCHECK CHECKLIST
1ST 2ND 3rd DISCRETIONARY APPROVAL COMPLIANCE
ED D CH 4a. Project does not comply with the following Engineering Conditions of approval for
Project No.
D D D 4b. All conditions are in compliance. Date:
DEDICATION REQUIREMENTS
D D D 5. Dedication for all street Rights-of-Way adjacent to the building site and any storm
drain or utility easements on the building site is required for all new buildings and
for remodels with a value at or exceeding $15.000. pursuant to Carlsbad
Municipal Code Section 18.40.030.
Dedication required as follows:
Dedication required. Please have a registered Civil Engineer or Land Surveyor
prepare the appropriate legal description together with an 8 Ya" x 11" plat map
and submit with a title report. All easement documents must be approved and
signed by owner(s) prior to issuance of Building Permit. Attached please find an
application form and submittal checklist for the dedication process. Submit the
completed application form with the required checklist items and fees to the
Engineering Department in person. Applications will not be accept by mail or fax.
Dedication completed by: Date:
IMPROVEMENT REQUIREMENTS
D D D 6a. All needed public improvements upon and adjacent to the building site must be
constructed at time of building construction whenever the value of the
construction exceeds $75.000. pursuant to Carlsbad Municipal Code Section
18.40.040.
Public improvements required as follows:
Attached please find an application form and submittal checklist for the public
improvement requirements. A registered Civil Engineer must prepare the
appropriate improvement plans and submit them together with the requirements
on the attached checklist to the Engineering Department through a separate plan
check process. The completed application form and the requirements on the
H:\WORD\DOCS\CHKLST\BuiMino Planchecfc Cklst Form (RIDDLE - HARVEY 7-12-00) doc
., ST pND 3RD
BUILDING PLANCHECK CHECKLIST
checklist must be submitted in person. Applications by mail or fax are not
accepted. Improvement plans must be approved, appropriate securities posted
and fees paid prior to issuance of building permit.
Improvement Plans signed by: • ' " Date:
CD D d 6b. Construction of the public improvements may be deferred pursuant to Carlsbad
Municipal Code Section 18.40. Please submit a recent property title report or
current grant deed on the property and processing fee of $310 so we may
prepare the necessary Future Improvement Agreement. This agreement must be
signed, notarized and approved by the City prior to issuance of a Building permit.
Future public improvements required as follows:
CH D 6c. Enclosed please find your Future Improvement Agreement. Please return
agreement signed and notarized to the Engineering Department.
Future Improvement Agreement completed by:
Date:
D ' D 6d. No Public Improvements required. SPECIAL NOTE: Damaged or defective
improvements found adjacent to building site must be repaired to the satisfaction
of the City Inspector prior to occupancy.
GRADING PERMIT REQUIREMENTS
The conditions that invoke the need for a grading permit are found in Section
11.06.030 of the Municipal Code.
D 7a. Inadequate information available on Site Plan to make a determination on grading
requirements. Include accurate grading quantities (cut, fill import, export).
n 7b. Grading Permit required. A separate grading plan prepared by a registered Civil
Engineer must be submitted together with the completed application form
attached. NOTE: The Grading Permit must be issued and rough grading
approval obtained prior to issuance of a Building Permit.
Grading Inspector sign off by: Date:
D D D 7c. Graded Pad Certification required. (Note: Pad certification may be required even
if a grading permit is not required.)
H:\WORD\DOCS\CHKLS7\Building Planduck Ckjst Form (Generic 7-14-00) doc A Rev 7/14/00
3RD
D
D D
D D
BUILDING PLANCHECK CHECKLIST
7d .No Grading Permit required.
7e. If grading is not required, write "No Grading" on plot plan,
MISCELLANEOUS PERMITS
8. A RIGHT-OF-WAY PERMIT is required to do work in City Right-of-Way and/or
private work adjacent to the public Right-of-Way. Types of work include, but are
not limited to: street improvements, tree trimming, driveway construction, tying
into public storm drain, sewer and water utilities.
Right-of-Way permit required for:
D DO
ODD
D
a a a
9. INDUSTRIAL WASTE PERMIT If your facility is located in the City of Carlsbad
sewer service area, you need to contact the Carlsbad Municipal Water District,
located at 5950 El Camino Real, Carlsbad, CA 92008. District personnel can
provide forms and assistance, and will check to see if your business enterprise is
on the EWA Exempt List. You may telephone (760) 438-2722, extension 7153,
for assistance.
Industrial Waste permit accepted by:
Date:
10.NPDES PERMIT
Complies with the City's requirements of the National Pollutant Discharge
Elimination System (NPDES) permit. The applicant shall provide best
management practices to reduce surface pollutants to an acceptable level prior to
discharge to sensitive areas. Plans for such improvements shall be approved by
the City Engineer prior to issuance of grading or building permit, whichever
occurs first.
1 1 . Q Required fees are attached
No fees required
WATER METER REVIEW
12a. Domestic (potable) Use
Ensure that the meter proposed by the owner/developer is not oversized.
Oversized meters are inaccurate during low-flow conditions. If it is oversized, for
the life of the meter, the City will not accurately bill the owner for the water used.
• All single family dwelling units received "standard" 1" service with 5/8" service.
H:\WORD\DOCS\CHKLST\Bulldlng Plancheck CWst Form (Generic).**
BUILDING PLANCHECK CHECKLIST
1ST •>ND RD
ODD
• If owner/developer proposes a size other than the "standard", then
owner/developer must provide potable water demand calculations,
which include total fixture counts and maximum water demand in gallons
per minute (gpm). A typical fixture count and water demand worksheet is
attached. Once the gpm is provided, check against the "meter sizing
schedule" to verify the anticipated meter size for the unit.
• Maximum service and meter size is a 2" service with a 2" meter.
• If a developer is proposing a meter greater than 2", suggest the
installation of multiple 2" services as needed to provide the anticipated
demand, (manifolds are considered on case by case basis to limit
multiple trenching into the street).
12b. Irrigation Use (where recycled water is not available)
All irrigation meters must be sized via irrigation calculations (in gpm) prior
to approval. The developer must provide these calculations. Please follow
these guidelines:
1. If the project is a newer development (newer than 1998), check the recent
improvement plans and observe if the new irrigation service is reflected on
the improvement sheets. If so, at the water meter station, the demand in
gpm may be listed there. Irrigation services are listed with a circled "I",
and potable water is typically a circled "W". The irrigation service should
look like:
STA 1+00 Install 2" service and
2.
3.
1.5: meter (estimated 100 gpm)
If the improvement plans do not list the irrigation meter and the
service/meter will be installed via another instrument such as the building
plans or grading plans (w/ a right of way permit of course), then the
applicant must provide irrigation calculations for estimated worst-case
irrigation demand (largest zone with the farthest reach). Typically, Larry
Black has already reviewed this if landscape plans have been prepared,
but the applicant must provide the calculations to you for your use. Once
you have received a good example of irrigation calculations, keep a set for
your reference. In general the calculations will include:
Hydraulic grade line
Elevation at point of connection (POC)
Pressure at POC in pounds per square inch (PSI)
Worse case zone (largest, farthest away from valve
Total Sprinkler heads listed (with gpm use per head)
Include a 10% residual pressure at point of connection
In general, all major sloped areas of a subdivision/project are to be
irrigated via separate irrigation meters (unless the project is only SFD with
no HOA). As long as the project is located within the City recycled water
H:\WORD\DOCS\CHKLST\BuHding Planchei* CWst Form (Generic).doc Rev. 7/14/00
BUILDING PLANCHECK CHECKLIST
3RD
service boundary, the City intends on switching these irrigation
services/meters to a new recycled water line in the future.
Q 12c. Irrigation Use (where recycled water is available)
1 . Recycled water meters are sized the same as the irrigation meter above.
2. If a project fronts a street with recycled water, then they should be
connecting to this line to irrigate slopes within the development. For
subdivisions, this should have been identified, and implemented on the
improvement plans. Installing recycled water meters is a benefit for the
applicant since they are exempt from paying the San Diego County Water
Capacity fees. However, if they front a street which the recycled water is
there, but is not live (sometimes they are charged with potable water until
recycled water is available), then the applicant must pay the San Diego
Water Capacity Charge. If within three years, the recycled water line is
charged with recycled water by CMWD, then the applicant can apply for a
refund to the San Diego County Water Authority (SDCWA) for a refund.
However, let the applicant know that we cannot guarantee the refund, and
they must deal with the SDCWA for this.
D D D 13- Additional Comments:
H:\WORD\DOCS\CHKLST\Building Plandieck CMst Form (Genenc).doc
RJ COdd
.a .Q .o
T- CM CO
o o
(D ^0
CL 0.
D
PLANNING DEPARTMENT
BUILDING PLAN CHECK REVIEW CHECKLIST
Plan Check No. CB Address
Planner Brandon Nichols
APN:
Phone (760) 602- 4625
Type of Project & Use:
Zoning: £•- * General Plan:_
CFD (in/out) #_Date of participation^
Net Project Density:DU/AC
Facilities Management Zone:
Remaining net dev acres:
circle One non-residential development: Type of land used created by this
permit: _ _ ___ _ )
Legend: JAJ Item Complete
Environmental Review Required:
DATE OF COMPLETION: _
Item Incomplete - Needs your action
YES NO i/ TYPE
Compliance with conditions of approval? If not, state conditions which require action.
Conditions of Approval:
Discretionary Action Required:
APPROVAL/RESO. NO.
PROJECT NO.
YES NO TYPE
DATE
OTHER RELATED CASES:
Compliance with conditions or approval? If not, state conditions which require action.
Conditions of Approval:
Coastal Zone Assessment/Compliance
Project site located in Coastal Zone? YES
CA Coastal Commission Authority? YES
If California Coastal Commission Authority: Contact them at - 7575 Metropolitan Drive, Suite
103, San Diego CA 92108-4402; (619) 767-2370
Determine status (Coastal Permit Required or Exempt):
Coastal Permit Determination Form already completed? YES NO
If NO, complete Coastal Permit Determination Form now.
Coastal Permit Determination Log #:
D
Follow-Up Actions:
1) Stamp Building Plans as "Exempt" or "Coastal Permit Required" (at minimum Floor Plans).
2) Complete Coastal Permit Determination Log as needed.
Inclusionary Housing Fee required:YES NO
(Effective date of Inclusionary Housing Ordinance - May 21, 1993.)
Data Entry Completed? YES NO
(A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, Housing Fees, Construct Housing
Y/N, Enter Fee, UPDATE!)
H:\ADMIN\COUNTER\BldgPlnchkRevChklsl Rev 9/01
Site Plan:
I I 1. Provide a fully dimensional site plan drawn to scale. Show: North arrow, property lines,
easements, existing and proposed structures, streets, existing street improvements, right-
of-way width, dimensional setbacks and existing topographical lines (including all side and
rear yard slopes).
[I] 2. Provide legal description of property and assessor's parcel number.
Q'
O
D
D
D
0^
0 D
Policy 44 - Neighborhood Architectural Design Guidelines
1. Applicability: YES NO /"
2. Project complies YES NO
Zoning:
1.
2.
Setbacks:
Front:
Interior Side:
Street Side:
Rear:
Top of slope:
Accessory structure
Front:
Interior Side:
Street Side:
Rear:
Structure separation
Required Si£>
Required ^
Required
Required \(p
Required
setbacks:
Required
Required
Required
Required
: Required
Shown ^(/
Shown yS*
Shown
Shown &>^v
Shown
Shown
Shown
Shown
Shown
Shown
3. Lot Coverage:
4. Height:
Required
Required
HC>Shown 1-7
Shown <!.
D
5. Parking:Spaces Required Shown
(breakdown by uses for commercial and industrial projects required)
Residential Guest Spaces Required Shown
Additional Comments
OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER DATE
H:\ADMIN\COUNTER\BldgPlnchkRevChklst Rev 9/01
i n n jI j[ Edward W. Marshall, P.E. C38462 ;
i j 2044 Hildharse Lane, Big Bear City CA 92314-9024
800.337.7083 * 909.584.1190 * Fax 877.639.8375.
Licensed by the Board for Professional Engineers and Land Surveyors
Client: Allen*Baines
Project Type: Addition to SFD
Project Address: 1475 Chestnut AV, Carlsbad
revised 2002.04.11 16:31 v v
Contents:
1) General structural design & analysis
2) Near-Source Fault Map
3) Lateral analysis schematic(s)
4) Lateral analysis
5) Title 24 Energy Compliance Documentation
An Adobe Acrobat File of this document is available for use by Building
& Safety personnel or their agent(s) or both in conjunction with a permit
application review of this information for the above project. It may be
downloaded from:
http://www.edwardxarshall.com/calcs.htm
Passphrase: tire+chains
•M'-fl-M Structural Calculations
|| Edward W. Marshall, P.E.
| 2044 Wlldhorse Lane, Big Bear City CA 92314-6024
800337.7083 * 909.584.11SO * FAX 877.639.8375
SFD addition Projecl
1475 Chestnut AV, Carlsbad Situs
A!len*3aines Owner
Samuel B. Wright Designer
Loads Balcony 60
FDL 10
Evaluate controlling load duration factor:
Cssal 24.4 (CDL+RDL)
FLL 40
Floor 50
Case il controls
"(1/.9) Case II
RDL 15
CDL 7
30.4 (CDL+RDL+RLL)*<1/1
Wall 56
RLL 16
Roof 38
25)
Abbreviations B Beam
Bed Bedroom
C Caiiing
D Dormer
Fern Family rocm
F Floor
H Header
Hip Hip rafter
Kit Kitchen
Liv Living room
Mbath Master bath
Master Master BR
R Rafter
Ridge Ridge baam
Rstc Rustic
Sel Select
UB Unbalanced
U Uniform
V Valley
Pram+ : Premium strength GLB by Williamette Industries, Inc., "Premier Plus 2.1E !JC"
Report: None.
Footing callcutin beams sxample: 24 (2x=32)
Allowables, bearing: 1,000paf Lateral:
(24 = square size in inches of single reaction, 32 = square size for double reaction)
n/aSoil
Location:
Fault
Report: None.
Footing calloutin beams sxample:
Entire residence
Roae Canyon
So tree Type
Table 16-S(Na; A
B
C
Source Type
Table 16-T(Nv) A
Eq. 30 4/W
Eq. 30-5 /W
Eq. 30-6 W
Eq. 30-7/VV
B
C
Location:
I. Table 16-K
R, Table 16-N; 16-R
Height, uppermost
T, Section 1630.2.2
Z, Table 16-1
Cvl/'(RT)
2,5Cal/(R)(Limitcneq. 304)
0.11Cal
0.82Nvl/{R)
Controlling coefficient
Basic Wind speed, exposure:
Table 16-F 70 mph
Wind stagnation pressure BO mph
90 mph
100 mph
Calculation:
Allowables, bearing:
24 {2x=32|
1,000paf Lateral:n/a
(24 = square size in inches of single reaction, 32 = scuaie size for double reaction)
Lateral Design & Analysis rev 2.2
Type:
<=2km
1.5
1.3
1
<=2 km
2
1.6
1
Typical
1
5.5
20
0.189
0.4
0.701
0200
0.048
0.066
0.200
70 mph, exp.
126
16.4
208
25.6
Height
15
25
30
40
B
5km
1.2
1
1
5km
1.6
1.2
1
C
Table 16-F
Ce.T. 16-G
1.06
1.13
1.23
1.31
Distance:
>= 10km
1
1 .
1
10km
1.2
1
1
6.5 km
>• 15 km
1
1
1
I
Map Page:
Na:
Nv:
0.440
0.020
0.730
0-36
1.000
1.140
Ca, T. 16-Q
Ct, 1630.2.2
Cv. 16-R
Wind Load determination, ver 1.5|
Height
15
25
30
40
CqT. 16-H
1.3
1.3
1.3
1.3
D
1.39
1.45
1.54
1.62
qsT. 16-F
12.6
12.6
126
12.6
C
1.06
1.13
1.23
1.31
Iw T. 16-K
1
1
1
1
B
0.62
0.67
0.76
0.84
Wind Pres.
17.36
18.51
20.15
21.46
Ai!eriBainesQPrawb3 1of2 11-Apr 04-.36PM
| Reference: Resisting vertical weight, with and without snow
Location Bearing, existing
Tributary roof span 17.0
floor span 0
Wall loading 56
RDL 15
CDL 7
FDL 10
Snow @ 75% 0
Total w/o snow 430
" with snow 430
Factored total w/o snow 387
" with snow 387
Calc segment: Various joists, girders, beams, etc
Reference: R1 B1
Plan sheet* N/a N/a
Location: Rafter Ridge
Span: 15.0 16.0
Spaced/Trib: 2.0 15.0
#ofPlys / /
Load types: Roof Roof
Uniform, total: 38 38
Dead/total: 58% 58%
Point load: 0 0
P.L. station: 7.50 8.00
Index* 4 318
Member 2rWDFL#2 5.125x15 G/b
Defl. criteria: 240 240
Detl., allowable: 0.75 0.80
Deflection: 0.57 0.38
LDF: 1.25 1.25
Distr.load: 76 570
Footing: 12(2x=16) 28(2x=40)
End reaction: 570 4,560
FB 875 2,400
FV 95 165
RMF 1.15 1
ldf*rmf*cf*f-l: 1.58 1.25
FB'/Fb 1.11 2.56
FV'/Fv 2.16 2.76
D/d 1.32 2.13
B 0.6 1.4
(R)~1200 ft
B2
N/a
Ridge support
18.0
20.0
/
Roof, B1
38
58%
4,560
11.00
2004
Prenn-3.5xia/2.1EI.
240
0.90
0.78
1.25
760
40(2x=56)
9,627
3,000
270
1
1.19
1.15
1.67
1.15
4.4
Adjustment factor: 90% Revised 29 April, 2000 15:16 1
Bearing, addition
8.0
0
• 56
15
7
10
0
232
232
209
209
H1
N/a
B1 support
6.0 '
5.0
/
Roof, B1
38
58%
4,560
3.00
302
3.125x9 Gib
240
0.30
0.14
1.25
190
24(2x=32)
2,850
2,400
165
1
1.25
1.37
1.43
2.21
1.5 '
(R)~500 ft
Point & Uniform Load A & D, LS001 Rev. 5.3
H2
N/a
Typ. headers @ new
6.0
5.0
/
Roof
38
58%
0
3.00
7
4x6DFL#2
240
0.30
0.07
1.25
190
12 (2x=16)
570
875
95
1
1.63
2.39
3.17
4.11
0.3
AllenBainesQPro.wbS 2 of 2 11-Apr 04:36 PM
LOF1
LOF2
LOF3 LOF4
LATERAL ANALYSIS SCHEMATIC
[ ][ Edward'W. Marshall. P.E. C38462
[- ] 2044 .Wildhoree Larie, Big Bear City CA 92314-9024
3CO.j37.7D83 * 9D9.S84.1190 * Fax 877.639.8375;he Beard far Professional Engineers anc! Land Surveyors
Allen'Baines Add lion
U75 Chestnut, Carlsbad, CA
revised 2002.04.11 08:58
>1 "j^'jiltPf?reject: Alleu*Baines SFD addition Section 0
Ml Edward W. Marshall, P.E. 2002.Apr. 11 10:05
L J 2044 Wildhorse Lane, Big Bear City CA 92314-9024 (c) 2001 E W Marshall
800.337.7083 * 909.584.1190 * Fax 877.639.8375 (toll free)
Licensed by the Board For Professional Engineers and Land Surveyors
Lateral Design Segment Table of Contents:
SECTION DESCRIPTION
1 Shear panel & holddown summary.
2 Diaphragm, reliability factor, & line of force details.
3 Shear panel detail, wind & EQ forces.
4 Input data file.
5 Shear schedule, tie dovm reference tables.
VM- J L'fJProject: Allen*Baines SFD addition
L JL Edward W. Marshall,. F.E.
L J 2044 Wildhorse Lane, Big Bear City CA 92314-9024 (c)
- 800.337.7083 * 909.584.1190 * Fax 877.639.8375 (toll free)
Licensed by the Board for Professional Engineers and Land Surveyors
Section 1
2002.Apr.11 10:05
2001 E W Marshall
Shear Panel & HD Summary
Length
ID Lvl Gross Net
0
0
0
0
0
0
4.0
9.5
4.0
9.5
16.0 16.0
4.0 4.0
4.0 4.0
16.0 16.0
EQ/
Wind
Wind
Wind
Wind
Wind
Wind
Wind
Max Max Shear A.B./ [Hold
V Uplift Sched. Mudsill AB
Down Options]
ST min ST max Straps
1,373
3,262
3,385
694
694
3,385
Corner Tiedovvn Combinations
COMBOS
ID A B Uplift
1,973 B 48/2x HTT16' STHD8 STHD8 MSTC40
908 B 48/2x HTT16' LSTHD8 LSTHD8 LSTA36
21 A 60/2x - -
1,269 A 60/2x HTT16' LSTHD8 LSTHD8 MSTC40
1,269 A 60/2x HTT161 LSTHD8 LSTHD8 MSTC40
21 A 60/2x ---
[Hold Down Options]
AB ST min ST max Straps
A
B
3
5
4
6
1,269
1.269
HTT16
HTT16
LSTHD8
LSTHD8
LSTHD8
LSTHD8
MSTC40
MSTC40
Section 1 notes:
1. Tiedown allowables based on 2x4 walls.
2. HTT16 is an HTT16 installed on a 2x stuci.
3. ST min is for ST straps installed within 1/2" of corner.
4. ST max requires 2 x le minimum From corner. 24" maximum.
5. Simpson Strongwall panel per PFC-5485.
6. Tiedown corner combinations calculated by SRSS method.
7. ID prefix key:
None Shear panel, typical.
"-" Panel not included in calculations.
"s/+" Steel or concrete element. LRFD adjusted. Design calculations for
element included in main body of structural calculations.
8. ID suffix:
"+" Shear transfer strap detail required at adjacent opening.
L'J'L" J1;' J-Project: Allen*Baines SFD addition Section 2
I j[ Edward W. Marshall, P.E. 2002.Apr.11 10:05
1 J 2044 Wildhorse Lane, Big Bear City CA 92314-9024 (c) 2001 E W Marshall
800.337^7083 * 909.584.1190 * Fax 877.639.8375 (toll free)
Licensed by the Board for Professional Engineers and Land Surveyors
Diaphragm Detail
Length Wind Exposure OA Gross LOF Sums
ID-Story N/S E/W N/S E/W Area Weight N/S E/W
A 0 34.0 40.0 11.0 9.0 1.360 27,200 0 50
B " 0 16.0 30.0 10.0 13.0 480 9,600 100 100
Reliability Factor Detail
(Story Shear)(Max Unit Shear)(Shear Ratio)
Story N/S E/W N/S E/W N/S E/W
0 384 928 60 192 1.562 2.067
Reliability factors, N/S = 1.500 E/W = 1.500 (See notes below)
Line of Force Detail
Alignment Net Panel
ID
1
2
3
4
Story
0
0
0
0
Accel
20.0%
20.0%
20.0%
20 .. 0%
N/S
0%
0%
100%
100%
E/W
100%
100%
0%
0%
Avail
13.5
8.0
16.0
16.0
Shear
Wind
4,635
1,389
3,385
3.385
Raw
Shear
EQ
3.680
960
960
960
ASD
Shear
EQ
2,629
686
686
686
Rho
Shear
Rho
1.500
1.500
1.500
1.500
3
L
1
I
EQ
,943
,029
,029
,029
Seerion 2 notes:
1. Reliabilility/Redundacy factor calculated per 1997 UBC Section 1630. See formula
(30-3), Sec 1630.1.1. Refer to Sec. 1628 for notations.
2. ASD Shear factor = 1/1.4 per Sec. 1612.3.1.
3. Total EQ panel shear on a single line of force equals Rho-Shear-EQ value.
•hJiU'J-lji'JProject: Allen*Baines SFD addition
I 'jl, Edward W. Marshall,^P'.E.
[ j 2044 Wildhorse Lane, Big Bear City CA 92314-9024 (c)
800.337.7083 * 909.584.1190 * Fax 877.639.8375 (toll free)
Licensed by the Board for Professional Engineers and Land Surveyors
Shear panel Detail. Wind
Section 3
2002.Apr.11 10:05
2001 E W Marshall
Length
ID Gross- Net
1 4.0
2 9.5
3 16.0
4 4.0
5 4.0
6 16.0
4.0
9.5
16.0
4.0
4.0
16.0
Level LOF
0
0
0
0
0
0
Shear panel Derail ,
1 4.0
2 9.5
3 16.0
4 4.0
5 4.0
6 16.0
4.0
9.5
16.0
4.0
4.0
16.0
0
0
0
0
0
0
1
1
4
2
2
3
Pier
Hgt.
8.0
8.0
8.0
8.0
3.0
8.0
Unit
V
343
343
212
174
174
212
Vert .
plf
387
387
209
60
60
209
OT
10.987
26 , 094
27,082
5,555
5,555
27,082
RJ1
3,096
17,463
26,752
480
480
26.752
Net
OT
7,891
8,631
330
5.075
5,075
330
Solo Composite
Uplift Uplift
1,973
908
21
1,269
1,269
21
1,973
908
21
1,269
1,269
21
Earthquake
1
1
4
2
2
3
8.0
8.0
8.0
8.0
8.0
8.0
292
292
64
129
129
64
387
387
209
60
50
209
9,346
22,197
8,229
4,114
4,114
8,229
3,096
17,463
26,752
480
480
26,752
6,250
4.733
-18,523
3,634
3.634
-18,523
1,563
498
-1,158
909
909
-1, 158
1,563
498
-1,158
909
909
-1,158
[ ][ ][ ]Project: Allen*Baines SFD addition Section 5
[ ][ Edward W. Marshall, P.E. 2002.Apr.11 10:05
[ ] 2044 Wildhorse Lane, Big Bear City CA 92314-9024 (c) 2001 E W Marshall
800.337.7083 * 909.584.1190 * Fax 877.639.8375 (toll free)
Licensed by the Board for Professional Engineers and Land Surveyors
Shear Schedule, Tie Down Table
revised 2002.04.01 21:52
Allowable Shear for Wind or Seismic Forces, Structural I Panels,
Table 23-II-I-1 Values, 1997 UBC (notes 1, 2, 3)
Shear
Framing
15/32" APA member
Panel Shear
Callout
A
B
C
0
E
F
D-D 1
E-E 1
F-F 1
Vmax
280
350
430
550
730
870
,100
,460
,740
Struct. I thickness
Sheathing (note
8d*-6"o.c.
8d*-4"o.c.
8d*-4"o.c.(8)
8d*-3"o.c.(8)
8d*-2"o.c.(8)
10d-2"o.c.(8)
8d*-3"o.c.(8)
8d*-2"o.c.(8)
10d-2"o.c.(8)
2,4)
2x
2x
3x
3x
3x
3x
3x
3x
3x
[---REQUIRED SPACING, INCHES---]
5/8" Sill
A.B.LTP4
(note 5) (note 6)
60
48
36
32
24
18
16 (8)
12 (8)
9 (8)
18
16
12
9
7
6
4
--(9)
--(9)
LS50 Nailing
(note 7)
48
48
24
16
10
8
8
--(9)
--(9)
16d
8
5
5
4
3
3
4 (10)
3 (10)
3 (10)
Use 10d nails when nailing through fire wall (when required).
NOTES:
1. Panel edges blocked, 16" stud spacing, common, not sinker, nails or gal-
vanized box nails. See table for minimum member thickness at panel edges.
2. 5/8" T1-11 nailed through 5/8" section may be used. 3x members at joints.
3. 12" o.c. spacing in field, typical all callouts.
4. Foundation sill plates & all framing members receiving edge nailing from
abutting panels. Common sill plates, with a single panel, 2x member O.K.
5. 2 x 2 x 3/16 plate washers are required at all anchor bolts.
6. Rim to plate connection, as required.
7. Eave block to plate. (1) H1 seismic tie required at each truss/rafter.
8. Staggered.
9. See plan for specific detail.
10. (2) rows at table spacing. Double blocking/double rim.
Allow. Tension, Simpson StrongTie Holddowns, Straps, Catalog 02002(11,12,13,14)
=== 2x4 nominal dimension walls ===
Anchor Threaded
T max Holdown Stud Bolt CL SO Rod T max Strap Stud
2,416 HTT16'(15) 2x4 SSTB24 1-3/8 1/2 (16) 5/8 1,000 LSTA36 2x
2,609 HTT16 3x4 SSTB24 1-3/8 1/2 (16) 5/8 2,145 MSTC40 4x
5,190 HTT22 3x4 SSTB24 1-3/8 1/2 (16) 5/8 3,375 MSTC52 4x
9,368 HDQ8 4x4 SSTBL28 1-1/4 23/8 7/8 5,035 MSTC66 4x
11,080 HD14a (17) 6x4 1 X 42 2-3/16 5/8 1 5,855 MSTC78 4x
NOTES: 11. See Simpson StrongTie Catalog for manufacturer's written instructions.
12. Washers are required under stud bolt nuts.
13. SO = Min. plate standoff height, CL = Stud face to bolt centerline.
14. 4x6 & 6x6 studs shall be DFL #2 or Construction grade or better.
15. 16d sinkers assumed.
16. Estimated.
17. Use threaded rod with two nuts and a washer embedded 36" minimum.
1 i :•• Reference: Resisting vertical weight ivitn and without snow
. • .- Location Bearing, existing
Tributary roof span 1 7.0
' floor span 0
Wall loading 56
RDL 15
CDL 7
FDL 10
Snow @ 75% 0
' • Total w/o snow 430
" with snow 430
Factored total w/o snow 387
" " with snow 387
Calc cegment: Various joists, girdars, beams, etc
Rsfarence: R1 B1
PlanshseW; IM/a IM/a
Location: Rater Ridge
Span: 15.0 18.0
SpacadiTrtb: 2.0 15.0
#ofPlys / /
Loadtypas: Roof Roof
Uniform, total: 38 38
DsadAotal: 58% 58%
Point load: 0 0
P. L. station: 7.50 8.00
Index # 4 318
Member 2rt6DFU>2 5,12Ml5£/b
Del criteria: 240 240
Dad, allowable: 0.75 0.30
Deflection: 3.57 0.38
LDF: 1.25 1.25
Distr. load: 76 570
Footing: 12(2x»16) 28(2xMO!
End'reaciion: 570 4,580
£B 875 2,400
FV 95 165
RMF 1.15 1
IdfrmfVf.i: 1.58 1.25
FBVFb 1.11 2.58
FV/Fv 2.16 2.7S
Old 1.32 2.13
B 0.5 1.4
— (Rj-1200 tt
B2
IM/a
Ridge support
18.0
20.0
/
Roof, 61
38
58%
4,550
11.00
2004
r>fan»3.Sx18/3.1ei.
240
0.90
0.78
1.25
760
40 (2x°56j
9,627
3,000
27C
1
1.19
1.15
1.67
1.15
4.4
Adjustment factor 90% Revised 29 Apr'!. 2000 15:16 1
Bearing, addition
8.0
0
56
15
7
10
C
232
232
209
209
HI
M'a
B1 support
6.0
5.0
1
Roof. 61
38
58%
4,560
3.00
302
'.MiixOG/k
240
0.30
0.14
1.25
190
24(2x^32)
2,850
2,400
165
i
1.25
1.37
1.43
2.21
1.5
(R)-SOO ft
Point & Uniform Load A 4 D, L3001 Rev. 5.3
H2
IM/a
Typ. headers @ new
8.0
5.0
1
Roof
38
58%
C
3.00
7
4r6DFLia
240
0.30
0.07
1.25
190
12{2*=16)
570
875
95
1
1.63
2.39
3.17
4.11
C.3
AllGnBainesGPro.wbS 2 of 2 11-Apr 04:36 PM
Fault: Rose Canyon
Type: "B"
Distance: 6.5 km
Map page #: O-36
Na:1.00
Nv: 1.14
Soil Profile: "D"
;r Edward VV. MarshalL.'P.E. C38462
] 2044 Wildhorse Lane. 'Big Bear City CA 92314-9024
800.337.7033 * 909.584.1190 * Fax 877.639.6375
>ycenscd cy tne Board for Professional Engineers and Land Surveyors
Allen*Baines Addition
1475 Chestnut, Carlsbad, CA
revised 2002.04.11 08:58
' l'j!h Jl^JPrqject: Allen'Baines SFD addition Section 5
. L-J-L Edward W. Marshall, P.E. 2002.Apr. 11 10:05
[ J 2044 Wildhorse Lane, Big Bear City CA 92314-9024 (c) 2001 E W Marshall
800'.'337.7083 * 909.584.1190 * Fax 877.639.8375 (toll free)
Licensed by the Board For Professional Engineers and Land Surveyors
Shear Schedule, Tie Down Table
revised 2002.04.01 21:52
Allowable Shear for Wind or Seismic Forces, Structural I Panels,
Table 23-II-I-L Values, 1997 UBC (notes 1, 2, 3)
Framing [---REQUIRED SPACING, INCHES---]
Shear 15/32" APA member 5/8" Sill
Panel Shear Struct. I thickness A.B. LTP4 LS50 Nailing
Callout Vnax Sheathing (note 2,4)(note 5)(note 6)(note 7) I6d
A
B
C
D
E
F
D-D
E-E
F-F
280
350
430
550
730
870
1.100
1,460
1 , 740
8d*-6
8d*-4
8d*-4
8d*-3
8d*-2
lOd-2
8d*-3
8d*-2
10d-2
"o .c
"a .c
"o . c
"o .c
"o .c
"o .c
"a.c
"o.c
"o .c
.(8)
.(8)
.(8)
.(8)
.(8)
.(8)
.(8)
2x
2x
3x
3x
3x
3x
3x
3x
3x
60
48
36
32
24
18
16
12
9
(8)
(8)
(8)
18
16
12
9
7
6
4
-f9)
--C9)
48
48
24
16
10
8
8
--C9)
--C9)
8
5
5
4
3
3
4
3
3
(10)
(10)
(10)
* Use lOd nails when nailing through Fire wall (when required).
NOTES:
1. Panel edges blocked, 16" stud spacing, common, not sinker, nails or gal-
vanized box nails. See table for minimum member thickness at panel edges.
2. 5/8" Tl-11 nailed through 5/8" section may be used. 3x members at joints.
3. 12" o.c. spacing in field, typical all callouts.
4. Foundation sill plates & all framing members receiving edge nailing from
abutting panels. Common sill plates, with a single panel, 2x member O.K.
5. 2 x 2 x 3/16 plate washers are required ar all anchor bolts.
6. Rim to plate connection, as required.
7. Eave block to plate. (1) HI seismic tie required at each truss/rafter.
8. Staggered.
9. See plan for specific detail.
10. (2) rows at: table spacing. Double blocking/double rim.
Allow. Tension, Simpson StrongTie Holddowns, Straps, Catalog C2002(11,12,13,14)
== 2x4 nominal dimension walls .-==
Anchor Threaded
T max Holdown Stud Bolt CL SO Rod T max Strap Stud
2,416
2,609
5.190
9,368
11,080
HTT16
HTT16
HTT22
HDQ8
HD14a
'(15)
(17)
2x4
3x4
3x4
4x4
6x4
SSTB24
SSTB24
SSTB24
SSTBL28
1 x 42
1-3/8
1-3/8
1-3/8
1-1/4
2-3/16
1/2
1/2
1/2
2 3/8
3/8
(16)
(16)
(16)
5/8
5/8
5/8
7/8
1
1,000
2,145
3,375
5,035
5,855
LSTA36
MSTC40
MSTC52
MSTC66
MSTC78
2x
4x
4x
4x
4x
NOTES: 11. See Simpson StrongTie Catalog for manufacturer's written instructions.
12. Washers are required under stud bolt nuts.
13. SO = M-in:;.%late standoff height, CL = Stud face to bolt cenrerline.
14. 4x6 & 6xd studs shall be DFL #2 or Construction grade or better.
15. 16d sinkers assumed.
16. Estimated.
17. Use threaded rod with two nuts and a washer embedded 36" minimum.
[ ][ Edward W. Marshall, P.E. C38462
[ ] 2044 Wildhorse Lane, Big Bear City CA 92314-9024
800.337.7083 * 909.584.1190 * Fax 877.639.8375
Licensed by the Board for Professional Engineers and Land Surveyors
Client: Allen*Baines
Project Type: Addition to SFD
Project Address: 1475 Chestnut AV, Carlsbad
revised 2002.04.11 16:31
f*s Contents:
1) General structural design & analysis
2) Near-Source Fault Map
3) Lateral analysis schematic(s)
4) Lateral analysis
5) Title 24 Energy Compliance Documentation
Structural Calculations[ II II 1
[ ]'[ Edward W. Marshall, P.E.
[ ] 2044 Wildhorse Lane, Big Bear City CA 92314-9024
800.337.7083 * 909.584.1190 * FAX 877.639.8375
Loads
Evaluate controlling load duration factor: Case II controls
Case I 24.4 (CDL+RDL) * (1/.9) Case I
SFD addition Project
1475 Chestnut AV, Carlsbad Situs
Allen'Baines Owner
Samuel B. Wright Designer
Balcony 60
FDL 10
FLL 40
Floor 50
RDL 15
CDL 7
Wall 56
RLL 16
Roof 38
30.4 (CDL+RDL+RLL)*(1/1.25)
Abbreviations
Soil
B Beam
Bed Bedroom
C Ceiling
D Dormer
Fam Family room
Prem+ : Premium strength GLB
Report: None.
Footing callout in beams example:
F Floor
H Header
Hip Hip rafter
Kit Kitchen
Liv Living room
Mbath Master bath
Master Master BR
R Rafter
Ridge Ridge beam
Rstc Rustic
Sel Select
UB Unbalanced
U Uniform
V Valley
by Williamette Industries, Inc., "Premier Plus 2.1 E IJC"
Allowables, bearing: 1 ,000 psf Lateral: n/a
24 (2x=32) (24 = square size in inches of single reaction, 32 = square size for double reaction)
Location: Entire residence Lateral Design & Analysis rev 2.2
Table
Table
Eq.
Eq.
Eq.
Eq.
I
Fault Rose Canyon Type: B
Source Type <= 2 km 5 km
16-S(Na) A 1.5 1.2
B 1.3 1
C 1 1
Source Type <= 2 km 5 km
16-T(Nv) A 2 1.6
B 1.6 1.2
C 1 1
Location: Typical
I. Table 16-K 1
R, Table 16-N, 16-R 5.5
Height, uppermost 20
T, Section 1630.2.2 0.189 | |
Z, Table 16-1 0.4
. 30-4/W Cvl/(RT) 0.701
30-5/W 2.5 Cal/(R) (Limit on eq. 30-4) 0.200
30-6/W 0.11Cal 0.048
30-7/W 0.8ZNvl/(R) 0.066
Controlling coefficient 0.200
Basic Wind speed, exposure: 70 mph, exp. C
Table 16-F 70 mph 12.6 Table 16-F
Wind stagnation pressure 80 mph 16.4
90 mph 20.8
100 mph 25.6
Distance:
>= 10 km
1
1
1
10km
1.2
1
1
I
Height
15
25
30
40
6.5 km Map Page: O-36
| Na: 1.000 |
>=15km | Nv: 1.140 |
1 0.440 Ca, T. 16-Q
1 0.020 Ct, 1630.2.2
1 0.730 Cv, 16-R
I
Wind Load determination, ver 1.5|
D C B
1.39 1.06 0.62
1.45 1.13 0.67
1.54 1.23 0.76
1.62 1.31 0.84
Calculation:Height Ce, T. 16-G CqT. 16-H qsT. 16-F IwT. 16-K Wind Pres.
15
25
30
40
1.06
1.13
1.23
1.31
1.3
1.3
1.3
1.3
12.6
12.6
12.6
12.6
1 17.36
1 18.51
1 20.15
1 21.46
AllenBainesQPro.wbS of2 11-Apr 04:36 PM
Fault: Rose Canyon
Type: "B"
Distance: 6.5 km
Map page #: O-36
Na:1.00
Nv:1.14
Soil Profile: "D"
[ ][ Edward W. Marshall, P.E. C38462
[ ] 2044 Wildhorse Lane, Big Bear City CA 92314-9024
800.337.7083 * 909.584.1190 * Fax 877.639.8375
^Licensed by the Board for Professional Engineers and Land Surveyors
Allen'Baines Addition
1475 Chestnut, Carlsbad, CA
revised 2002.04.11 08:58
LOF1
LOF2
LOF3 LOF4
LATERAL ANALYSIS SCHEMATIC
[ ][ Edward W. Marshall, P.E. C38462
[ ] 2044 Wildhorse Lane, Big Bear City CA 92314-9024
800.337.7083 * 909.584.1190 * Fax 877.639.8375
\Ljcensed by the Board for Professional Engineers and Land Surveyors
AllerfBaines Addition
1475 Chestnut, Carlsbad, CA
revised 2002.04.11 08:58
[ ][ ][ JProject: Allen*Baines SFD addition Section 0
[ ][ Edward W. Marshall, P.E. 2002.Apr.11 10:05
[ ] 2044 Wildhorse Lane, Big Bear City CA 92314-9024 (c) 2001 E W Marshall
800.337.7083 * 909.584.1190 * Fax 877.639.8375 (toll free)
Licensed by the Board for Professional Engineers and Land Surveyors
Lateral Design Segment Table of Contents:
SECTION DESCRIPTION
1 Shear panel & holddown summary.
2 Diaphragm, reliability factor, & line of force details.
3 Shear panel detail, wind & EQ forces.
4 Input data file.
5 Shear schedule, tie down reference tables.
[ ][ ][ JProject: Allen*Baines SFD addition
[ ][ Edward W. Marshall, P.E.
[ ] 2044 Wildhorse Lane, Big Bear City CA 92314-9024
Section 1
2002.Apr.11 10:05
(c) 2001 E W Marshall
800.337.7083 * 909.584.1190 * Fax 877.639.8375 (toll free)
Licensed by the Board for Professional Engineers and Land Surveyors
Shear Panel & HD Summary
Length Ed/
ID Lvl Gross Net Wind
Max Max Shear A.B./ [Hold Down Options]
V Uplift Sched. Mudsill AB ST min ST max Straps
1 0
2
3
4
5
6
4.0 4.0
9.5 9.5
16.0 16.0
4.0
4.0
4.0
4.0
16.0 16.0
Wind
Wind
Wind
Wind
Wind
Wind
1,373
3,262
3,385
694
694
3,385
1,973
908
21
1,269
1,269
21
B 4
B 4
A 6
A 6
A 6
A 6
48/2x HTT161 STHD8 STHD8 MSTC40
48/2x HTT161 LSTHD8 LSTHD8 LSTA36
60/2X
60/2X HTT161 LSTHD8 LSTHD8 MSTC40
60/2X HTT161 LSTHD8 LSTHD8 MSTC40
60/2X
Corner Tiedown Combinations
ID
COMBOS
A B Uplift
[Hold Down Options]
AB ST min ST max Straps
A
B
3
5
1,269 HTT161 LSTHD8 LSTHD8 MSTC40
1,269 HTT161 LSTHD8 LSTHD8 MSTC40
Section 1 notes:
1. Tiedown allowables based on 2x4 walls.
2. HTT16' is an HTT16 installed on a 2x stud.
3. ST min is for ST straps installed within 1/2" of corner.
4. ST max requires 2 x le minimum from corner. 24" maximum.
5. Simpson Strongwall panel per PFC-5485.
6. Tiedown corner combinations calculated by SRSS method.
7. ID prefix key:
None Shear panel, typical.
Panel not included in calculations.
"s/ + " Steel or concrete element. LRFD adjusted. Design calculations for
element included in main body of structural calculations.
8. ID suffix:
"+" Shear transfer strap detail required at adjacent opening.
[ ][ ][ JProject: Allen*Baines SFD addition Section 3
[ ][ Edward W. Marshall, P.E. 2002. Apr. 11 10:05
[ ] 2044 Wildhorse Lane, Big Bear City CA 92314-9024 (c) 2001 E W Marshall
800.337.7083 * 909.584.1190 * Fax 877.639.8375 (toll free)
Licensed by the Board for Professional Engineers and Land Surveyors
Shear panel Detail, Wind
Length
ID Gross
1 4.0
2 9.5
3 16.0
4 4.0
5 4.0
6 16.0
Net
4.0
9.5
16.0
4.0
4.0
16.0
Level
0
0
0
0
0
0
Shear panel Detail,
1 4.0
2 9.5
3 16.0
4 4.0
5 4.0
6 16.0
4.0
9.5
16.0
4.0
4.0
16.0
0
0
0
0
0
0
Pier
LOF Hgt.
1 8.0
1 8.0
4 8.0
2 8.0
2 8.0
3 8.0
Earthquake
1 8.0
1 8.0
4 8.0
2 8.0
2 8.0
3 8.0
Unit
V
343
343
212
174
174
212
292
292
64
129
129
64
Vert.
plf
387
387
209
60
60
209
387
387
209
60
60
209
OT
10,987
26,094
27,082
5,555
5,555
27,082
9,346
22,197
8,229
4,114
4,114
8,229
RM
3,096
17,463
26,752
480
480
26,752
3,096
17,463
26,752
480
480
26,752
7,
8,
5,
5,
6,
4,
-18,
3,
3,
-18,
Net
OT
891
631
330
075
075
330
250
733
523
634
634
523
i
Solo Composite
Uplift
1,973
908
21
1,269
1,269
21
1,563
498
-1,158
909
909
-1,158
Uplift
1,973
908
21
1,269
1,269
21
1,563
498
-1,158
909
909
-1,158
[ ][ ][ ]Project: Allen*Baines SFD addition Section 5
[ ][ Edward W. Marshall, P.E. 2002.Apr.11 10:05
[ ] 2044 Wildhorse Lane, Big Bear City CA 92314-9024 (c) 2001 E W Marshall
800.337.7083 * 909.584.1190 * Fax 877.639.8375 (toll free)
Licensed by the Board for Professional Engineers and Land Surveyors
Shear Schedule, Tie Down Table
revised 2002.04.01 21:52
Allowable Shear for Wind or Seismic Forces, Structural I Panels,
Table 23-II-I-1 Values, 1997 UBC (notes 1, 2, 3)
Framing [---REQUIRED SPACING, INCHES---]
Shear 15/32" APA member 5/8" Sill
Panel Shear Struct. I thickness A.B. LTP4 LS50 Nailing
Callout Vmax Sheathing (note 2,4)(note 5)(note 6)(note 7) 16d
A 280 8d*-6"o.c. 2x 60 18 48 8
B 350 8d*-4"o.C. 2x 48 16 48 5
C 430 8d*-4"o.C.(8) 3x 36 12 24 5
D 550 8d*-3"o.c.(8) 3x 32 9 16 4
E 730 8d*-2"o.C.(8) 3x 24 7 10 3
F 870 10d-2"o.c.(8) 3x 18 6 83
D-D 1,100 8d*-3"o.c.(8) 3x 16 (8) 4 8 4 (10)
E-E 1,460 8d*-2"o.c.(8) 3x 12 (8) --(9) --(9) 3 (10)
F-F 1,740 10d-2"O.C.(8) 3x 9 (8) --(9) --(9) 3 (10)
* Use 10d nails when nailing through fire wall (when required).
NOTES:
1. Panel edges blocked, 16" stud spacing, common, not sinker, nails or gal-
vanized box nails. See table for minimum member thickness at panel edges.
2. 5/8" T1-11 nailed through 5/8" section may be used. 3x members at joints.
3. 12" o.c. spacing in field, typical all callouts.
4. Foundation sill plates & all framing members receiving edge nailing from
abutting panels. Common sill plates, with a single panel, 2x member O.K.
5. 2 x 2 x 3/16 plate washers are required at all anchor bolts.
6. Rim to plate connection, as required.
7. Eave block to plate. (1) H1 seismic tie required at each truss/rafter.
8. Staggered.
9. See plan for specific detail.
10. (2) rows at table spacing. Double blocking/double rim.
Allow. Tension, Simpson StrongTie Holddowns, Straps, Catalog 02002(11,12,13,14)
=== 2x4 nominal dimension walls ===
Anchor Threaded
T max Holdown Stud Bolt CL SO Rod T max Strap Stud
2,416
2,609
5,190
9,368
11,080
HTT16
HTT16
HTT22
HDQ8
HD14a
'(15)
(17)
2x4
3x4
3x4
4x4
6x4
SSTB24
SSTB24
SSTB24
SSTBL28
1 X 42
1-3/8
1-3/8
1-3/8
1-1/4
2-3/16
1/2
1/2
1/2
2 3/8
5/8
(16)
(16)
(16)
5/8
5/8
5/8
7/8
1
1,000
2,145
3,375
5,035
5,855
LSTA36
MSTC40
MSTC52
MSTC66
MSTC78
2X
4X
4x
4x
4X
NOTES: 11. See Simpson StrongTie Catalog for manufacturer's written instructions.
12. Washers are required under stud bolt nuts.
13. SO = Min. plate standoff height, CL = Stud face to bolt centerline.
14. 4x6 & 6x6 studs shall be DFL #2 or Construction grade or better.
15. 16d sinkers assumed.
16. Estimated.
17. Use threaded rod with two nuts and a washer embedded 36" minimum.
-V TITLE 24 REPORT
Title 24 Report for:
AllerVBaines !
1475 Chestnut |
Carlsbad, CA 92008
Project Designer:
Samuei B. Wright
1287 BUENA VISTA WY
CARLSBAD, CA 92008-1534
760.720.7631
Report Prepared By:
E. W. Marshall, P.E.
Edward W. Marshall, P.E.
| 2044 Wild horse Lane I
! Big Bear City, CA 92314-9024 !
I 909.584.1190 l
Job Number:
020410
Date:
4/10/02 ji . !
The tnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is |
authorized by the California Energy Commission for use with both the Residential and Nonresldemlal 2001 Building Energy Efficiency Standards.
i This program developed by Gabel Dodd/EnergySoft, LLC (415) 383-5900.
Enersvrra 3.1 By Energy-Sot) Job Number: 020410 User Number: 5437
jcwQj
CDO i- cr £ z••S t ft < 5 5K. "= Q *- u <
. z = uj a. x < -^5 S z < H 5 --
UJ
LL
&
V) tE_ u
UJ OfaO CD
fc^
5 go
S «°g^SsiSo S _i i ? ui0°OOSUL.
liisSla. UJ w O a. CQ
S3CEO.
I- <