HomeMy WebLinkAbout1502 LAS FLORES DR; ; CB920300; Permit.ue:
2'---
2.50
6.516
4.50
6.50
B U I L D I N G' P E B M I T Permit No: CB920300
04/23/92 16:52
Page 1 of 1
Job Address: 1502 LAS FLORES DR
Permit Type: RESIDENTAL ADD/ALT
Parcel No: 156-110--59--00
Valuation: 53;660
Construction Type: VN
Occupancy Group: R3/111 Class Code:
Description: 728 SF 2S ADD + 48 SF DECK
Appl/Ownr : SCHMUKLE, BRUCE
1502 LAS FLORES DRIVE
CARLSBAD, CA 9200fi-
Project No: A9200761
Development No:
Str: Fl: Ste:
7371 04/23/92 0001 01 02
C-PRHT 355-00
Status: ISSUED
Applied: 03/23/92
Apr/Issue: 04/23/92
Validated By: DC
619 434-3292
Fees Required Fe ~s C
Fees: 74.o&Qi
Adjustments: / .00
Total Fees: I 783,...00 Toal Pa
/ Balan
--- --escriPtion/
Zx
Building Permit
Plan Check
Strong Motion Fee
* BUILDING TOTAL
Enter "Y' for Plum Ang Issue ee
Each Plumbing Fixtuie or Trap 6
Each Building Sewer ICORPORATED /
* PLUMBING TOTAL \ (J 1952
Enter '1" for Electric \s Q'.ç
Enter 'Y' for Remodel N f)P;:1..-c;") * ELECTRICAL TOTAL 0 Enter 'Y' for Mechanical Is Fed$
Each Install/Reloc Appliance Ven 1.
Each Hood/Fireplace > 1
* MECHANICAL TOTAL
ll cted & Credits
.00
439.00
355. 00
Extfee Data ----------------
433.00
281.00
5.00
719.00
7.50 Y
15.00
6.50
29.00
10.00
10.00 Y
20.00
15.00 1
4.50
6.50
26.00
CITY OF CARLSBAD
2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161
PLAN CHECK NO.
ESF.VAL /0
PLAN CK DEPOSIT
VALID. BY
C-PRMT 439.00
PERMIT APPLICATION •
City of CarLsbad Building Department
2075 Las Palmas Dr., CarLsbad, CA 92009 (619) 438-1161
1. PERMIT 1YPE
A - El Commercial I] New Building U Tenant Improvement
B - 0 Industrial 0 New Building 0 Tenant Improvement
C - 09 Residential 0 Apartment 0 Condo 12 Single Family Dwelling 'Addition/AIteration
0 Duplex 0 Demolition 0 Relocation 0 Mobile Home 0 Electrical 0 Plumbing
0 Mechanical 0 Pool 0 Spa 0 Retaining Wall 0 Solar 0 Other__________
2. PRQJEC INFORMAllON FOR OFFICE USE ONLY
or
Nearest Cross Street f 52)2- (z,
LEGAL DESCRIPTION Lot No. Subdivision Name/Number Unit No. Phase No.
CHECK BELOW IF SUBMIITED:
02 Energy Calcs 02 Structural Calcs 02 Soils Report Dl Addressed Envelope
--5
DE5R1VflON OF WORK
I r. 72 r #OF STORIES
.). .J.141 IflS..I rr.np.JJ. 1.11 UISICICIIL I Ulli dpIILdIItJ
NAME 14/10WRLEW !OI) i9,te. ADDRESS 31 Jaiz.ME (A1+ 100
CITY STATE (ft. ZIP CODE 9)-6 5 6 DAY TELEPHONE /7/1/)2O9/ 4. APPLICANT U COklHA1UR U ACENI' FOR WNTHA(JIUR U OWNER Li AGENI F'OkO*FDf
NAME ADDRESS
CITY STATE ZIP CODE DAY TELEPHONE
S. PRUPEY7R e4nie)r/F ADDRESS /5?
V C7TY Cfrs/51c/ STATE e& ZIP CODE DAY TELEPHONE
6. CON CDNTRACTOR
NAME ADDRESS
CITY STATE ZIP CODE DAY TELEPHONE
STATE UC. # LICENSE CLASS CITY BUSINESS UC. #
DESIGNER NAME ADDRESS
CITY STATE ZIP CODE DAY TELEPHONE STATE UC. #
7. WORKERS' WMPENSATION
Workers' Compensation Declaration: I hereby affirm that I have a certificate of consent to sell-insure issued by the Director of Industrial
Relations, or a certificate of Workers' Compensation Insurance by an admitted insurer, or an exact copy or duplicate thereof certified
by the Director of the insurer thereof filed with the Building Inspection Department (Section 3800, Lab. Q.
INSURANCE COMPANY POLICY NO. EXPIRATION DATE
Certificate 01 Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner
so as to become subject to the Workers' Compensation Laws of California.
SIGNATURE DATE
S. OWNER-BUILDER DECLARA11ON
Owner-Builder Declaration: I hereby affirm that I am exempt from the Contractor's License Law for the following reason:
o I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or
offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds
or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended
or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden
of proving that he did not build or improve for the purpose of sale.).
0 1, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions
Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects
with contractor(s) licensed pursuant to the Contractor's License Law).
0 I am exempt under Section Business and Professions Code for this reason:
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish, or repair
any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the
provisions of the Contractor's License Law (Chapter 9, commencing with Section 7000 of Division 3 of the Business and Professions Code)
or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit
subjects the applicant to a civil penalty of not more than five hundred dollars [$500]).
SIGNATURE DATE
COMPLETE THIS SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY:
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and
prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act?
DYES ONO
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district?
DYES 0 N
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site?
DYES 0 N
IF ANY OF THE ANSWERS ARE YES A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED AFItR JULY 1, 1989 UNLESS THE APPLICANT
HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DIS11UCT.
ereby affirm that tflere is a construction lending agency [or the performance of the work For Which this permit is issued (Sec 3097(1) Civil Code).
LENDER'S NAME LENDER'S ADDRESS
10. APPLICANT CERTIFICA11ON -
I certify that I have read the application and state that the above information is correct. I agree to comply with all City ordinances and State laws
relating to building construction. I hereby authorize representatives of the City of Carlsbad to enter upon the above mentioned property for inspection
purposes. I ALSO AGREE TO SAVE INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL L1ABIIJTIES JUDGMENTS COSTS
AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF ThIS PERMIT.
OSHA: An OSHA permit is required for excavations over 5'O" deep and demolition or construction of structures over 3 stories in height.
Expiration. Every permit issued by the Building Official under the provisions of this Code shall expire by limitation and become null and void if the
building or work authorized by such permit is not commenced within 365 days from the date of such permit or if the building or work authorized by
such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days (Section 303(d) Uniform Building Code).
DATE:
• •
JO ADOSS /co •
TIME A.RrtlVE: __________TItE LEAVE:
CD LVL DESCRIPTION ACT COIIIIENTS
AOL _________
PEiUIT
G/1!3/3
INSPECTOR AREA MP
PLANCK# CB920300
0CC GRP R3/Ml
CONSTR. TYPE VN
STR: FL: STE:
619 434-3292
TYPE: RAD
JOB ADDRESS: 1502 LAS FLORES DR
APPLICANT: SCHMUKLE, BRUCE
CONTRACTOR:
OWNER:
REMARKS: MH/BRUCE/434-3292
SPECIAL INSTRUCT:
CITY OF CARLSBAD
INSPECTION REQUEST
PERNIT# CB920300 FOR 11/05/92
DESCRIPTION: 728 SF 2S ADD + 48 SF DECK
PHONE:
PHONE:
PHONE:
INSPECTOR
TOTAL TIME:
CD LVL DESCRIPTION ACT COMMENTS
17 ST Interior Lath/Drywall
INSPECTION HISTORY *****
DATE DESCRIPTION ACT INSP
110292 Interior Lath/Drywall CA NP
101692 Frame/Steel/Bolting/Welding AP MP
101692 Rough/Topout AP MP
101692 Rough Electric AP MP
100692 Roof/Reroof AP NP
091692 Ftg/Foundation/Piers AP NP
080692 Shear Panels/HD's PA NP
062692 Roof/Reroof AP NP
060892 Complaints Investigation AP NP
052092> Frame/Steel/Bolting/Welding PA MP
052092 Rough/Topout PA MP
052092 Rough/Ducts/Dampers PA MP
052092 Gas/Test/Repairs AP MP
051892 Shear Panels/HD's CA NP
051592 Shear Panels/HD's CA NP
051592 Underground/Under Floor CA MP
050192 Ftg/Foundation/Piers PA MP
COMMENTS
BRUCE
NEW SECTION
iDAD FOOTING FOR PORCH
OK TO WRAP
MEETS APP PLANS
OK TO SHEAR EXT 1ST FLR
1ST FLOOR
1ST FLOOR
MARKED ON CARD
0
10/21/93 INSPECTION HISTORY LISTING
- FOR PERMIT# CB920300
DATE INSPECTION TYPE INSP ACT COMMENTS
11/05/92 Interior Lath/Drywall RI RI . MH/BRUCE/434-3292
11/05/92 Interior Lath/Drywall NP AP
11/05/92 Exterior Lath/Drywall, MP AP
11/02/92° Interior Lath/Drywall RI RI MH/BRUCE/434-3292
11/02/92 Interior Lath/Drywall NP CA BRUCE
10/16/92 Fraine/Steel/Bolting/Wel RI RI NH/DAVE/434-3292
10/16/92 Frame/Steel/Bolting/Wel NP AP
10/16/92 Rough/Topout RI RI NH/DAVE/434-3292
10/16/92, Rough/Topout NP AP
10/16/92 Rough Electric . RI RI MH/DAVE/434-3292
10/16/92 Rough Electric . NP AP
10/06/92 Roof/Reroof RI RI MHDAVE/434-3292
10/06/92 Roof/Reroof NP AP NEW SECTION
09/16/92 Ftg/Foundation/Piers NP AP PAD FOOTING FOR PORCH.
08/06/92 Shear Panels/HD's NP PA. OK TO.WRAP
08/06/92 Interior Lath/Drywall RI RI NH/DAVID
08/06/92 Interior Lath/Drywall NP WC
06/26/92 Roof/Reroof RI RI MH/DAVID/434-3292
06/26/92 Roof/Reroof , MP . AP
06/08792 Complaints Investigatio NP AP MEETS APP PLANS
05/20/92 Fraiue/Steel/Bolting/Wel RI RI MH/BRUCE/434-3292
05/20/92 Fraine/Steel/Bolting/Wel MP PA' OK TO SHEAR EXT 1ST FLR
05/20/92 Gas/Test/Repairs MP AP .
05/20/92 Rough/Topout RI RI MH/BRUCE/434-3292
05/20/92 Rough/Topout MP PA. 1ST FLOOR
05/20/92 ' Rough/Ducts/Dampers RI RI . NH/BRUCE/434-'3292
05/20/92 Rough/Ducts/Dampers NP PA 1ST FLOOR
.05/18/92 Shear Panels/HD's RI RI RS/DAVID/434-3292
05/18/92 Shear Pánels/HD's NP' CA
05/15/92 Shear Panels/HD's ' RI RI NH/BRUCE
05/15/92 Shear Panels/HD's ' NP CA -
05/15/92 Underground/Under Floor RI RI NH/BRUCE
05/15/92 Underground/Under Floor NP CA
05/01/92 Ftg/Foundation/Piers RI RI MH/DAVID/434-3292
05/01/92 Ftg/Foundat.ion/Piers NP PA MARKED ON CARD
HIT <RETURN> TO CONTINUE...
PROFESSIONAL REGISTERED INSPECTIONS, INC
7895 Convoy Court *15
San Diego, Ca. 92111 1. JOB NO.: 1:889
JOB ADDRESS: 1502 LAS FLORES DRIVE ARCHITECT: WARREN W SCOTT
JOB NAME: SCHMUCKLE RESIDENCE ENGINEER: ANDERSON ENGINEERING
BLDG ALITH: CITY OF CARLSBAD GEN CONTRACTOR: YACKLEY DESIGN
CONSTR. MAT'L: BOLTS CONTRACTOR: YACKLEY DESIGN
PLAN FILE:
DESCRIBE MAT'L: 7/9 DIA., ALL THREAD BOLTS, LIQUID ROCK 300
1
INSPECTION REPORT
5/1 1.. Inspected the install ration of epoxy resin and S holddown bolt.s .
LÀ quid rock 300 replaced hilti HBP resin I---B,2- 1+0 16, Work was
in accordance with plans and manufactur'er 's i nstr'uct ions,
Engineer to approve sustit'jtion for epoxy,
Permit #92-300
(
DALE REGLI SUPERVISOR
INSPECTOR
5/19/92 280
DATE REGISTER *
PROFESSIONAL REGISTERED INSPECTIONS, INC.
7895 Convoy Court #15 S
San Diego, Ca. 92111 1 JOB NO..: 4889
JOBADDRESS 502L :FLogEE DFIVE ARCHITECT WARREN W. SCOTT
JOB NAME: SCHM'JCKLE RESIDENCE ENGINEER: ANDERSON ENGINEERING
BLDG AUTH: CITY OF CARLSBAD GEN CONTRACTOR: YACKLEY DESIGN
CONSTR. MAIL: BOLTS CONTRACTOR: YACKLEY DESIGN
PLAN FILE:
DESCRIBE MAT'L: 7/8" DIA, ALL THREAD BOLTS, LIQUID ROCK 300
INSPECTION REPORT
5/'i. Inspected the installation of epoxy resin and 5 hoiddown bolts.
Liquid rock 300 replaced hilti HBP resin ICBO 4016. Work wa
performed in accordance with plans and manufacturer 's instructions..
Engineer to approve sustitution for epoxy.
Permit #92-300
DALE REGLI SUPERVISOR
INSPECTOR
5/19/92 : 280
DATE REGISTER *
- —s
-
- - - -
ESGIL CORPORATION
9320 CHESAPEAKE DR., SUITE 208
SAN DIEGO, CA 92123
(619)560.1468
DATE: el Pr - 1/; -AP
J1RISDICTI
JURISDICTION: C1L ó JP CKER
II OFILE COPY
PLAN CHECK NO: C - ..3c SET: CUPS
TDESIGNER PROJECT ADDRESS: 25 _L05FIorc r.
PROJECT NAME: 39iz 4d
Ej
.)
The plans transmitted herewith have been corrected where
necessary and substantially comply with the jurisdiction's
building codes.
The plans transmitted herewith will substantially comply
with the jurisdiction's building codes when minor deficien-
cies identified are resolved and
checked by building department staff.
D The plans transmitted herewith have significant deficiencies
identified on the enclosed check list and should be corrected
and resubmitted for .a complete recheck.
fl The check list transmitted herewith is for your information.
The plans are being held at Esgil Corp. until corrected
plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the
jurisdiction to return to the applicantcontact person.
D The applicant's copy of the check list has been sent to:
Esgil staff did not advise the applicant contact person that
plan check has been completed.
Li Esgil staff did advise applicant that the plan check has
been completed. Person contacted:
Date contacted: Telephone #
REMARKS:
By: J1 ',--_)aArL Enclosures:I.Orz
ESGIL CORPORATION
- 9
LGA L:CM
V
ESGIL CORPORATION
9320' CHESAPEAKE DR., SUITE 208
SAN DIEGO, CA 92123
(619)560.1468
DATE: -
JURISDICTION:
11.J
A CA
PLAN CHECK NO: &7 q -5i' SET: -
PROJECT. ADDRESS: L, 'F/prcDr.
PROJECT NAME: ( )
O APPLICANT
;,;
UR DI TI
NHcKER
OFILE COPY
DUPS
F_-DESIGNER
Lj The plans transmitted herewith have been corrected where
necessary and substantially comply with the jurisdiction's
building codes.
Li The plans transmitted -herewith will substantially comply
with the jurisdiction's building codes when minor deficien-
cies identified ' are resolved and
checked by building department staff.
Li The plans transmitted herewith have significant deficiencies
identified on the enclosed check list and should be corrected
and resubmitted for a complete recheck.
The check list transmitted herewith is for your information.
The plans are being held at Esgil Corp. until corrected
plans are submitted for recheck.
fl The 'applicant's copy of the check list is enclosed for the
jurisdiction to -return to the applicant -contact person.
.Theapp1icant's copy of the check list has been'-sent-to:
in Esgil staff didnot advise the applicant contact person that
plan check has been completed..
Li Esgil staff did advise applicant that the plan check' has
been completed. Person contacted:________________________
Dateontacted: ' 'Telephonei______________ Li REMARKS: _
--
By: i,, _3aE,4 Enclosures: ,'-Jô
ESGIL CORPORATION -,
L.JGA 1-7-CM
cr'
€,rt,oks.. c7r1 ,,,c.T1 bcT1. k&kv'.
( 5\o eA -i
c t it t.oC.
2_ al, eeCt
( ) 3/4k' CôerPlpt S T0 1. s
/
T- 24 \ tA(A eJ'ftC. &)'OO (p S
LL ri- pveL)o
TT ct, LAc.
PL 4 (
c'c) fl
() 1))
JJL 'osi 4. /'—' vs
6 (-bo * e. ut ' a \ 7K .
•
_______
3 A r t L)e S L ( K) 5 L a (
Date: Jurisdiction -
Prepared by: Bldg. Dept.
VALUATION AND PLAN CHECK FEE 'sgi1
PLAN CHECK NO. C6 ia-A: ()
BUILDING ADDRESS - '5O2_ br,
APPLICANT/CONTACT v-e PHONE NO. -
BUILDING OCCUPANCY T&i DESIGNER PHONE -
TPE OF CONSTRUCTION -" CONTRACTOR PHONE_________
BUILDING PORTION BUILDING AREA VALUATION
MULTIPLIER
VALUE
Air_ConditioninE
Commercial
Residential
Res. or Comm.
Fire Sprinklers •
.•::
_______________ ___________ ___________________
Total Value E3 40
Building Permit Fee $_ $ L5
Plan Check Fee $ $ 13
COMMENTS • •
SHEET OF OF_____
12/8-7
BUILDING PLANCHECK
ENGINEERING CHECKLIST
DATE: ITEM COMPLETE U.
PLANCHECK NO. (Yi2-OW ITEM INCOMPLETE
NEEDS YOUR ACTION
1 2 3 L4; i. ___ ITEM SELECTED
r729 rNP r Re 0 > fl1 A P tT
C C C PROJECT ID: AN
H H H TgF. VAt-tA-'.
EE E
C C C LEGAL REQUIREMENTS
K/K K Site Plan
1.. Provide a fully - dimensioned site plan drawn to scale.
Show: north arrow, property lines, easements, existing and
/ proposed structures,, streets, existing street improvements,
/ right-of-way width and dimension setbacks.
I!J show on site plan: Finish floor elevations, pad
elevations, elevations of finish grade adjacent to
building, existing topographical lines, existing and
/ proposed slopes, driveway with percent (%) grade and
/ drainage patterns.
Provide legal description and Assessors Parcel Number.
Discretionary Approval Compliance
No Discretionary approvals were required.
Project complies with all Engineering Conditions of
Approval for Project No.________________
4.
6. Project does not comply with the-. following Engineering
Conditions of Approval for Project NO.__________________
Conditions complied with by: _Date:________
Field Review
Field review completed. No issues raised.
Field review completed. The following issues or ,
discrepancies with the site plan were found:.
A. Site lacks adequate public improvements
E
100-111
'-i B. Existing drainage improvements not shown or in
conflict with site plan.
C. Site is served by overhead power lines.
P\D0cs\1OSF0RMS\PRM0010.DH . REV. 02127/91
I
D.
E.
Grading is required to access site, create pad or
provide for ultimate Street improvement.
Site access visibility problems exist. Provide onsite
turnaround or engineered solution to problem.
4
Other: 'tkjLtK M\O( rY
Dedication Reaiuirements
9. No dedication required.
F7 F7 E 10. Dedication required. Please have a registered Civil
Engineer or Land Surveyor prepare the appropriate legal
description together with an 8¼" x 11" plat map and submit
with a title report and the required processing fee. All
easement documentsmust be. approved and signed by owner(s)
prior to issuance of Building Permit. The'description of
the dedication is as follows:_______________________
Dedication completed, Date .
By:_
Improvement P)t) ,14-
.11. No public improvements required. 5PECIAL NOTE: Damao ed or
JTJi!
be reR ired to the satisfaction of the City ins2ector Rrior
12. Public improvements required. This project requires
construction of public improvements pursuant to Section
18.40 of the City Code. Please have a registered Civil
Engineer prepare appropriate improvement plans and submit
for separate plancheck process through the Engineering
Department. Improvement plans must be approved,
appropriate securities posted and fees paid prior to
issuance of permit. The required improvements are:______
Improvement plans signed, Date: by:
P : \DOCS\$1 SFORNS\FRNOOIO .DN • •
REV. 02/27/91
I 13. ImprovementS are required. Construction of the public
improvements may be deferred in accordance with Section
18.40 of the City Code. Please submit a letter requesting
deferral of the required improvements together with a
recent title report on the property and the appropriate
processing fee so we may prepare the necessary Future
Improvement Agreement. The Future Improvement Agreement
must be signed, notarized and approved by the City prior to
issuance of a Building Permit.
Future Improvement Agreement completed, Date:
By:
E E 13a. Inadequate information available on site plan to make a
determination on grading requirements. Please provide more
detailed proposed and existing elevations and contours.
Include accurate estimates of the grading quantities (cut,
fill, import, export).
14. No grading required as determined by. the information
provided on the site plan.
F7 F1 0 15. Grading Permit required. A separate grading plan prepared
by a registered Civil Engineer must be submitted for
separate plan check and approval through the Engineering
Department. NOTE: The Grading Permit must be issued and
grading substantially complete and found acceptable to the
City Insector prior to issuance of Building Permits.
Grading Inspector sign off. Date: by:
Miscellaneous Permits
/
16., Right-of-Way Permit not required.
E 17. Right-of-Way Permit required. A separate Right-of-Way
Permit issued by the Engineering Department is required for
the following:
18. Sewer, Permit is not required.
Sewer Permit is required. A jever Permit is required
/ concurrent with Building Permit issuance. The fee required
/ is noted below in the fees section.
Industrial Waste Permit is not required. •
P:\DOCS\$ISFORMS\FINOOIO.DN •
REV. 02/27/91
21.
4)
Industrial Waste Permit is required. Applicant must
complete Industrial Waste Permit Application Form and
submit for City approval prior to issuance of a Building
Permits. Permits must be issued prior to occupancy.
Industrial Waster Permit accepted -
Date: By:
Fees Reaukred
0 . 27. Park-in-Lieu Fee
Quadrant: Fee per Unit:
Total Fees:
23. Traffic Impact Fee
Fee Per Unit: S Total. Fee: -
0 24. Bridge and Thorough, fare Fee - • . -.
- • Fee Per Unit: ' • Total Fee:
C3 VA .25. Public Facilities Fee required.
0 26. Facilities Management Fee Zone: Fee:
0 27. Sewer Fees Permit No.
,
EDU's_______
Benefit Area:_______________ Fee:_______________
0 28. Sewer Lateral Required:
Fee:____________ S
S
0 29. .REMARKS: -
ENGINEERING AUTBORIThTION TO' ISSUE PERMIT..
BY _ DATE:'
P:\OOCS\MISFORMS\FRMOOIO.DH • S
REV. 02/27/91
1j
' ) ) 4 I
U U U
C C C
. 0. 0.
PLANNING CHECKLIST
Plan Check No. 70—Jc9D Address I S22- 4A5é2ah-r
Planner I/' Phone 438-1161 ext.
(Name)
APN: S
Type of Project and Use
Zone - Facilities Management Zone I
Legend
/
Item Complete
0 Item Incomplete - Needs your action
1, 2, 3 Number in circle indicates plancheck number where deficiency was
identified
ao C3 Environmental Review Required: YES NO TYPE
DATE OF COMPLETION:
Compliance with conditions of approval? If not, state conditions which re-quire-'action.
Conditions of Approval
S
tionary Action Required: YES -. NO TYPE
APPROVAL¼/RESO. NO. DATE:
PROJECT NO.
OTHER RELATED CASES:
Compliance with conditions of approval? If not, state conditions which require action.
Conditions of Approval - -
California Coastal Commission Permit Required: YES - NO 2~
DATE OF APPROVAL:
San Diego Coast District,'3 111 Camino Del Rio North, Suite 200, San Diego, CA. 92108-1725
(619) 521-8036 S S
Compliance with conditions of approval? If not, state conditions which require action.
Conditions of Approval S S
I
0 0 Landscape Plan Required: YES _ NO
See attached submittal requirements for landscape plans . :
Site Plan:
.. :
0 1. Provide a fully dimensioned site plan drawn to scale.. Show: North ,
arrow, 'property dines, easements, existing and proposed structures,
streets, 'existiig' street improvements, right-of-way width and
dimensioned setbacks. -
0 2. Show on Site Plan: Finish floor elevations, elevations of finish grade
adjacent to building, existing topographical lines, existing and proposed
slopes and driveway. S
0 3. Provide legal description of property.
0 4. Provide assessor's parcel number.
Zoning: • •
•
/
0 1., Setbacks: '
/IOP) to
510
Front: •
Side: •
Required
Required
2(7'
(0
Shown
Shown Int.
Street Side:
.
Shown '-6- Required v_-
Rear: Required 00" / Shown 6
0 2. Lot coverage: Required Shown Z 2
1113 0 3. Height: Required / Shown Z-
'
0 4. Parking: Spaces Required ?--Shown 2-
Guest Spaces Required Shown
0iEE 0 Additional Comments A.b I'i'P A ,, i, pv- 5 al/ ''- T G1 A WIbaO.
OK TO fSSUE AND ENTERED APPROVAL INTO COMPUTER C' 4'4 DATE
PLNCK.FRM
LI
PRELIMINARY GEOTECHNICAL INVESTIGATION
Single Family Residence
Second story addition
Site: 1502 Las Flores
Carlsbad, CA
21 February 1992
Owner
Mr. Bruce Schmuck-le
PROPERTY DEVELOPMENT ENGINEERS, INC.
1859 S. Escondido Blvd.
Escondido, CA 92025
-1--
INDEX
General Information .3 of 5
NaturalTerrain............................................3 of 5
Seismic Activity ...........................................3 of 5
Field Investigation & Test Results .........................4 of 5
Recommendations............................................4 of 5
Conclusion.................................................5 of 5
APPENDIX
Appendix "A" - Site Map
Fault Location Map
Unified Soil Classification Chart
Appendix "B" - Standard Specifications for Compacted
Filled Ground
Homeowners Maintenance Guidelines
- 2 -
PROPERTY DEVELOPMENT ENGINEERS, INC.
1859 S. ESCONDIDO BLVD., ESCONDIDO, CA 92025
JOHN E. VERNON, PRESIDENT, RCE 21121, GE 858
CHARLES W. DAVIS, VICE PRESIDENT, RCE 21719
BARRY L. MUNSON, PROJECT ENGINEER, RCE 40980
FREDERICK F. BRONSON, CHIEF OF SURVEYS, LS 5085
DELBERT C. DANIELS, CHIEF OF MAPPING, LS 3351
February 21, 1992
Mr. Bruce Schmuckle
1502 Las Flares
Carlsbad, CA 92024
PRELIMINARY GEOTECHNICAL REPORT
Site: 1502 Las Flores
Carlsbad, CA 92024
To whom it may concern:
Our firm has completed a visual and limited underground survey
of the native soils at the above referenced site.
A second story addition is planned over the existing house.
Existing footings are at locations shown on the attached plat
map. These footings measured approximately 12" deep and 12" wide
into cemented sand subsoil. No seepage was in evidence during
the site inspection.
There are no known faults located close to the site (Elsinore
fault is approximately 27 miles NE). (Rose Canyon fault is 10 mi±
SW). It is our opinion that the site could be subjected to
moderate to severe ground shaking in the event of a major
earthquake along either of these faults, however, the seismic
risk at the site is not considered significantly greater than
that of the surrounding area. Construction in accordance with
the minimum standards of the most recent edition of the Uniform
Building Code should minimize potential damage as a result of
seismic activity.
The native soil is 'a brown silty sand (SM) and is not
detrimentally expansive (Carlsbad Sand USDA). An allowable soil
bearing pressure of 1500 psf may be used for design purposes. If
the proposed design requirements exceed 1500 psf, additional
footing work will be required. Active and passive fluid
pressures of 40 (60 for restrained or sloping backfill) 300 pcf
and a friction factor of .4 should be used for wall design. A
PROPERTY DEVELOPMENT ENGINEERS, INC.
ENGINEERING • SOILS TESTING • SURVEYING
TEL. (619) 743-8808 FAX (619) 743-7466
lateral bearing of 300 psf/ft may be used for pole design using
flagpole formula (UBC 2907g). All foundations should be founded
in firm natural soil or properly compacted embankment. The soils
engineer shall review any added footing excavations prior to
concrete placement to ensure adequate foundation support. All
slabs should be placed on a granular nonexpansive sub-basè at
least 12" thick. Driveway subgrades should be certified before
surface is placed If additional driveway work is accomplished.
TEST AND ANALYSES of the prevailing subgrade soils indicated
the following engineering properties:
Unified Soil Classification SM
Soil Type silty sand
In-place Density 127 pcf
Maximum Dry Density 131 pcf
Optimum moisture content 9.4 %
Active Soil Pressure 40 pcf
(Restrained or sloping bkfill) 60 pcf
Passive Soil Pressure 300 pcf
Design Bearing Value 1500 psf
Friction Factor .4
Any driveway grading should be done in accordance with the
Grading Ordinance of the County of San Diego, City of Carlsbad,
and the attached Standard Specifications for the Placement of
Compacted Filled Ground. Special care should be taken to provide
and maintain proper drainage away from all footings.
- 4 -
The conclusions and recommendations herein have been based on
the observations and/or testing as noted as well as our
experience. No other warranty, expressed or implied, is made.
Property Development Engineers, Inc.
John E. Vernon
RCE 21121, GE 858
Exp. 9/30/93
LJ No.858
\t\
ExP..3o.3J
02
No. C21T21
CI VIV
- 5 - -
APPENDIX tA"
1oo'.o
fkNUCJLE 1ES V1DD/TIUN
Lfl5 FLtE3 DR.
f 194
RIVERSIDE LIT: ANGELES
1918
146
j
S
I9O
A A
6çACI1 -. 0 R A H C E R I .. V •.. .R S
\
~ lNOREN \Q; SS\
lNOO to ci k I8IZ
•
1937 1933
1910 e,j
1954
ROSE CAWOI'4-;~' 1966
FAULT ZONZE 6.5
4çyN)
COOAOO6AUKS •.
FAULT ZONE ¶ I G 0
I5SS I94
CPLQ
I 4 —
---—-------------
(I t.OU(T( It S .
I .
L1itCS .
L 7 • .
: -- ... ,• .•. - ',.
- —' I \
'--- C /
t_..-,.--c OC I.- •• I.lIII.
rb.. C-.. ..4 . IQS2 M77
E-& .,.oc P13 pIood ...p.od I. I'I..CC C I
Codc b7 i$c r' — I I a cr M • 73/ -.
FAULT LOCATION MAP _____
PROPERTY DEVELOPMENT ENGINEERS, INC.
1859 SOUTH ESCONDIDO BOULEVARD
ESCONDIDO. CAIJFORNIA92025 . ....
PROPERTY DEVELOPMENT ENGINEERS, INC.
1859 S. ESCONDIDO BLVD., ESCONDI DO, CA 92025
JOHN E. VERNON, PRESIDENT, RICE 21121, GE 858
CHARLES W. DAVIS, VICE PRESIDENT, RICE 21719
BARRY L. MUNSON, PROJECT ENGINEER, RCE 40980
FREDERICK F. BRONSON, CHIEF OF SURVEYS, LS 5085
DELBERT C. DANIELS, CHIEF OF MAPPING, LS 3351
UNIFIED SOIL CLASSIFICATION
MAJOR DIVISIONS GROUP
SYMSOL TYPICAL NAMES
CLEAN GW well glided gli.cI. gi CI-Litld tfl41t4Kc. kttic of - GRAVELS GRAVELS Iwe.
U) cc o MORE THAN IrCALf cicss IKAN GP ?Oofly glided gravcls 01 gfavcl-sand imIu,c1. ttik Of —I UI o OF COARSE 5% FIN(S) - ,.
GRAVEL GM Sit y g'ga and -till mi,tufc's. non-pl31tC hreg. U) a FRACTION IS
C w a LARGER THAN WITH
Z NO. 4 SIEVE FINES GC CI3rcy gticI. gca.cI-ird-cIay plall.0 lAef.
< -JI <,. UI > SANDS CLEAN SW Well gidcd IJAd) Q1i1CIIy r4g• IItIc 01 no lines.o 1 c SANDS
SF °°'1r glided ,.inds 01 g(ilcII. &ar,dg. I(IIe no
ZUI U)
U) MORE THAN HALF (LESS THAN
OF COARSE 5% FIN(S)
SANDS SM 5r ". nO(çJI1$IC fiews. FRACTION IS L)
SMALLER THAN WITII
SC CLiycy Landt. i.j4-cIa,' r&IIUICI pZilc fnc. NO. 4 SIEVE 111455
ML LA3I9aIUC 1II1 id c'y (e 1,rdg, rock iloul. IIy 01
c- (I. .agg o cia,'c'y LItS w,II il9hI pligl.CC,.. SILTS ND CLAYS
CL
(
I'-.n.0 cli,s o( Io.. I.) mcdk'n pIdlCIy, Qi'cI o U) u. < LI0JD 1I..;r IS C-.yg, ct.1 y. I;Iy CII ,. kin cli yc.
OIL O'p' OIL ar tt' cLs ol Lw p!I:tCly. o LE.S THAN
w (.1 0 = SILTS AD CJ..I'S t'I 11 m<ic d crJcc-3 (n i.iy c'
. Ill,. 10.l dllglC 1Ig E°
w . UGU3 LIMIT IS CH of h.h p tcly. 1,1 CLay1.
OH O.a,s< CII( of m dki'n [a h½1 pIIcIy.o'QC 01g.
— GREATER TIC1 SO..
17 HIGHLY SOILS JN Pc.t arj 0Ir lgIIy OVgnC 1IL.
GRAIN SIZE
U.S. ST.NOARD SERIES SIEVE I- CLEAR SQUARE SIEVE OPENINGS
200 40 10 4 3/.' 3" 12,
SILTS AND CLAYS
SAND . GRAVEL
COBBLES BOULDERS FINE MEDIUM COARSE FINE j
,
COARSE
RELATIVE DENSITY
SANDS.GRAVELS At(
NON-PLASTIC SILTS BLOWS/FOOT
VERY LOOSE 0 - 4
LOOSE 4 —to
MEDIUM DENSE 10 -30
DENSE 33-SO
VERY DENSE O'ER SO
CONSISTENCY
CLAYS AND
PLASTIC SILTS STRENGTH BLOWS/FOOT
VERY SOFT 0-114 -0-2
SOFT 1/4-1,2 2-4
FIRM V - I 4 -8
STIFF I -2 8 -16
VERY STIFF 2 — 4 16 732
HARD OVER 4 OVER 32
Water level at time of excavation or as indicated
/ Undisturbed driven ring or chunk sample
El Disturbed bulk sample
PROPERTY DEVELOPMENT ENGINEERS, INC.
ENGINEERING • SOILS TESTING • SURVEYING
TEL i'619 74.q-RRnA FAY 1Q\ 7d1.7dAR
APPENDIX "B"
PROPERTY DEVELOPMENT ENGINEERS, INC.
1859 S. ESCONDIDO BLVD., ESCONDIDO, CA 92025
JOHN E. VERNON, PRESIDENT, RCE 21121, GE 858
CHARLES W. DAVIS, VICE PRESIDENT, RCE 21719
BARRY L. MUNSON, PROJECT ENGINEER, ACE 40980
FREDERICK F. BRONSON, CHIEF OF SURVEYS, LS 5085
DELBERT C. DANIELS, CHIEF OF MAPPING, LS 3351
STANDARD SPECIFICATIONS FOR PLACEMENT
OF COMPACTED FILLED GROUND
Objective:
Obtain filled ground which is uniform and has adequate internal
strength to support any structures proposed. The method by which
this is obtained is described herein.
Preliminary Procedures:
Permits - Owner shall ascertain the grading permit
requirements of the agency whose jurisdiction covers the
land on which the grading is to be performed and shall be
responsible for complying with them.
Water - An adequate water supply shall be provided so that
compaction of filled ground will not be delayed.
Soils Engineer - A soils engineer shall be retained to
provide direction in grading, testing for compaction and
certification that the grading complies with grading
ordinances and with approved grading plans.
Grading:
Clearing-and Gub_ig - All natirai surfacewhich - is to be
covered by filled ground, excavated or needed for brow
ditches, swales or other grading appurtenances shall be
cleared and grubbed. Trees, shrubs and grass, as well as
organic overburden shall be removed from the area to be
graded. Cleared material may be disposed of as approved by
the local controlling agency. No embankment shall consist
of trees, shrubs or other organic material.
2. Natural Ground Preparation - Natural ground shall be
excavated from beneath embankment areas to solid material,
the exact depth as determined by the' soils engineer. This
material shall be brought to proper moisture content and
_ recompacted to not less than 90% maximum density as
- determined by A.S.T.M. D-1557-70.
/r\
PROPERTY DEVELOPMENT ENGINEERS, INC.
ENGINEERING • SOILS TESTING • SURVEYING
TEL. (619) 743-8808 FAX (619) 743-7466
Any existing fill, which has not been certified must be
removed and recompacted.
If the slope of the existing ground exceeds 1' vertical
in 6' horizontal, a bench cut level, 10' wide shall be
excavated at the toe of the fill. This will allow the
embankment to be placed on a horizontal base for more
uniform compaction.
Embankment Placement - Fill material should consist of
native or imported material which has been brought to the
optimum moisture content. Material to be used for
embankments may have rocks with diameters greater than 12"
providing they are evenly distributed in the soil mixture
and are at least 3' below finish grade. Fill slopes shall
not consist of, or be founded on, large rocks. Although
rocks may be placed along the outside of the toe of the
fill slopes. Rock placement in embankments shall be under
direct supervision of the soils engineer.
Embankment material shall be placed in layers varying
from 6" to 12" deep depending on soil type, and compacted
by suitable compactive effort to a density or not less than
90% of the maximum density as determined by A.S.T.M.
D-157-70. Moisture content and depth of layers shall be
determined by the soil engineer at the time of grading, and
shall be updated whenever embankment soil types change.
As the embankment increases in elevation, new benches
shall be cut into original ground. Benches shall be at
east 6' -horizontally into natural-ground, be level - and
shall occur at intervals to be determined by the soils
engineer at the time of grading.
Compaction may be obtained by the use of any combination
of equipment which will result in an embankment that is
properly compacted, uniform in moisture and properly
finished to the line and grades shown on the plans or to
those set forth in the applicable grading ordinance.
Additional Grading - Cut slopes shall be cut to the lines
and grades as shown on the plans or set forth in the
applicable grading ordinance.
Cut slopes shall be protected from erosion by brow ditches.
Brow ditches shall be either earthen or lined with erosion
resistant material as shown on the plans or as recommended by the
engineer.
- 2 -
Embankments shall be protected from erosion by placing an
earthen. berm along the top of slope for the entire perimeter of
the fill. Where drainage is brought down the slope, the drainage
way shall be lined with erosion resistant material to prevent
loss of embankment slopes.
Where eaves are located, less than 5' horizontally from top of
ill slopes, eaves troughs shall be provided to prevent weakening
of slope due to water intrusion.
All areas of the building pad must be well drained. Drainage
swales shall have a minimum slope of 1' vertical in loot
horizontal unpaved or 1' vertical in 200' horizontal paved with
concrete. • Drainage shall be provided to ensure foundations will
not be subjected to ponded water.
-.3-
PROPERTY DEVELOPMENT ENGINEERS, INC.
1859 S. ESCONDIDO BLVD., ESCONDIDO, CA 92025
JOHN E. VERNON, PRESIDENT, RCE 21121, GE 858
CHARLES W. DAVIS, VICE PRESIDENT, RCE 21719
BARRY L. MUNSON, PROJECT ENGINEER, RCE 40980
FREDERICK F BRONSON, CHIEF OF SURVEYS, LS 5085
DELBERT C. DANIELS, CHIEF OF MAPPING, LS 3351
MAINTENANCE GUIDELINES FOR HOME OWNERS
Homesites, in general, and hillside lots, in particular, need
maintenance to continue to function and retain their value. Many
homeowners are unaware of this and allow deterioration of their
property. It is important to familiarize homeowners with some
guidelines for maintenance of their properties and make them
aware of the importance of maintenance.
Some governing agencies require hillside property developers to
utilize specific methods of engineering and construction to
protect those investing in improved lots or constructed homes.
For example, the developer may be required to grade the property
in such a manner that rainwater will be drained away from the lot
and to plant slopes so that erosion will be minimized. He may
also be required to install permanent drains.
However, once the lot is purchased, it is the buyer's
responsibility to maintain these safety features by observing a
prudent program of lot care and maintenance. Failure to make
regular inspection and maintenance of drainage devices and
sloping areas may cause severe financial loss. In addition to
his own property damage, he may be subject to civil liability for
damage occuring to neighboring properties as a result of his
negligence.
The following maintenance guidelines are provided for the
protection of the homeowner's investment.
Surface drainage must be directed away from structural
foundations to prevent ponding of storm waters or
irrigation adjacent to footings.
Care should be taken that slopes, terraces, berms (ridges
at crown of slopes) and proper lot drainage are not
disturbed. Surface drainage should be conducted from the
rear yard to the street through the side yard, or to
natural drainage ways within the property boundary.
In general, roof and yard runoff should be conducted to
either the street or storm drain by nonerosive devices such
as sidewalks, drainage pipes, ground gutters and
driveways. Drainage systems should not be altered without
expert consultation.
PROPERTY DEVELOPMENT ENGINEERS, INC.
ENGINEERING • SOILS TESTING • SURVEYING
TEL. (619) 743-8808 FAX (619) 743-7466
4. All.drains should be kept cleaned and unclogged, including
gutters and downspouts. Terrace drains or gunite ditches
should be kept free of debris to allow proper drainage.
During heavy rain periods, performance of the drainage
system should be inspected. Problems, such as gullying and
ponding, if observed, should be corrected as soon as
possible.
5. Any leakage from pools, waterlines, etc. or bypassing of
drains should be repaired as soon as practical.
6. Animal burrows should be eliminated since they may cause
diversion of surface runoff, promote accelerated erosion
and even trigger shallow soil flowage.
7. Slopes should not be altered without expert consultation.
Whenever an owner plans a significant topographic
modification of the lot or slope, a qualified soils
engineering consultant should be contacted.
8. If the owner plans modification of cut or natural slopes
within his property, a soil engineering consultant should
be consulted. Any oversteeping may result in a need for
expensive retaining devices. Undercutting of a
toe-of-slope would reduce the safety factor of the slope
and should not be undertaken without expert consultation.
9. If unusual cracking, settling or earth slippage occurs on
the property, the owner should consult a qualified soils
engineer or an engineering geologist immediately.
10. The most common causes of slope erosion and shallow slope
failures are as follows:
-
Gross Neglect of the care and maintenance of the
slopes and drainage devices.
Inadequate and/or improper planting. (Barren areas
should be replanted as soon as Possible.)
Excessive or insufficient irrigation or diversion
of runoff over the slope.
11. Owners should not let conditions on. their property create a
problem for their neighbors. Cooperation with neighbors
could prevent problems, promote slope stability, adequate
drainage, proper maintenance, and also increase the
aesthetic attractiveness of the community.
- 2 -
CERTIFICATION OF COMPLIANCE
CITY OF CARLSBAD Plan Check No. 9'. 3d.p
DEVELOPMENT PROCESSING SERVICES DIVISION -
2075 LAS PALMAS DR., CARLSBAD, CA 92009
(619) 1138-1161
(
This form shall be used to determine the amount of school fees for a project and to verify
that the project applicant has complied with the school fee requirements. No building
permits for the projects shall be issued until the certification is signed by the appropriate
school district and returned to the City of Carlsbad Building Department.
SCHOOL DISTRICT:
/' _____ Carlsbad Unified San Marcos Unified
801 Pine Avenue 1290 West San Marci,s Blvd.
Carlsbad, CA 92009 (434-0610) San Marcos, CA 92024 (744-4776)
Encinitas Union San Dieguito Union High School
101 South Rancho Santa Fe Rd. 710 Encinitas Boulevard
Encinitas, C& 92024 (619) 944-430U Encinitas, CA .92024 (753-6491)
Project Applicant! cc44L.zoo 1!4AZ g, APN:
Project Address': b
RESIDENTIAL: 'SQ. FT. of living area number of dwelling units____________
'\ SQ. FT. of covered area SQ. FT. of garage area_____________
COMMERCIAL/ IN STRIAL: SQ. FT. AREA
Date Prepared by
-------------------------------------------------------------------------------------------
FEE CERTIFICATION
(To be completed by the School District)
Applicant has complied with fee requirement sunder Government Code 53080
Project is subject to an existing fee agreement
Project is exempt from Government Code 53080
_____Final Map approval and construction started before September 1, 1986.
(other school fees paid)
Other
Residential Fee Levied: $_J/SO./basd on 72 sq. ft. @ / S
Cordm/In ust-Fp4p Levied:$__based-on sq. ft. @______________
'Schol District Official Title Date '1
AB 2926 and SB 201 fees are capped at $1.58 per square foot for residential..
AB 2926 is capped at -.26C per square foot for commercial /industrial.,