HomeMy WebLinkAbout1525 FARADAY AVE; 360; CB032628; Permit10-07-2003
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Commercial/Industrial Permit Permit No: CB032628
Building Inspection Request Line (760) 602-2725
Job Address: 1525 FARADAY AV CBAD St: 360
Permit Type: Tl Sub Type:
Parcel No: Lot#:
Valuation: $72,480.00 Construction Type:
Occupancy Group: Reference #:
Project Title: U.A.M.C.
2,416 SF SHELL TO OFFICE
COMM
0
NEW
Status: ISSUED
Applied: 09/23/2003
Entered By: MOP
Plan Approved: 10/07/2003
Issued: 10/07/2003
Inspect Areih27 lll!Ki' 'f'l"Z 0002 01
Applicant: Owner:
Plan Checl<ff. 'PC03-ii2 C GF•
DESIGN CORP
STE 175
444 S. CEDROS AVE
SOLANA BEACH 92075
858 794-3222
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park Fee
LFM Fee
Bridge Fee
BTD#2 Fee
BTD #3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
Reel. Water Con. Fee
$442.61
$0.00
$287.70
$0.00
$0.00
$15.22
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Meter Size
Add'I Reel. Water Con. Fee
Meter Fee
SDCWAFee
CFO Payoff Fee
PFF
PFF (CFO Fund)
License Tax
License Tax (CFO Fund)
Traffic Impact Fee
Traffic Impact (CFO Fund)
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Master Drainage Fee
Sewer Fee
Redev Parking Fee
Additional Fees
TOTAL PERMIT FEES
$0.00
$0.00
$0.00
$0.00
$1,319.14
$0.00
$0.00
$0.00
$936.00
$0.00
$34.00
$60.00
$42.00
$0.00
$3,905.26
$0.00
$0.00
$7,041.93
Total Fees: $7,041.93 Total Payments To Date: $0.00 Balance Due: $7,041.93
Inspector: ~ --
FINAL APPROVAL
Date: 1:ij.p:t//J Clearance: ------
NOTICE: Please take NOTICE that approval of your project includes the 'Imposition' of fees, dedications, reservations, or other exactions hereafter collectively
referred to as 'fees/exactions.' You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any . . . I Tl · . · . ·
02
. . . .
UNSCHEDULED BUILDING INSPECTION
DATE 1:i/2-i/4-J . INSPECTOR .,_//_. __ . _· :· __ _
. y
PERMIT # 1 i-" 0 ~-.· PLAN CHECK.·# -~---
JdB ADDRESS: ___ ./_s-_2 __ r.....;.. ~-")'()-/l-:-.1,(J-r.J._~~)1;....·v{-; _"1~' ___ 6 _______ _
DESCRIPTION ___ ___, ______________ _
CODE. J;)ESCRIPTION ACT CO:MMENTS
Inspection List
Permit#: CB032628 Type: Tl COMM U.A.M.C.
2,416 SF SHELL TO OFFICE
Date Inspection Item Inspector Act Comments
12/23/2003 89 Final Combo RI
12/22/2003 89 Final Combo TP AP
11/19/2003 14 Frame/Steel/Bolting/Weldin TP AP T-CEIL
11/19/2003 34 Rough Electric TP AP CEIL LITES
11/19/2003 44 Rough/Ducts/Dampers TP AP DUCTS, HP S
1 0/24/2003 17 Interior Lath/Drywall TP AP
1 0/23/2003 17 Interior Lath/Drywall TP NS
1 0/22/2003 17 Interior Lath/Drywall TP PA
10/20/2003 14 Frame/Steel/Bolting/Weldin TP AP SEE CARD NOTE
1 0/20/2003 24 Rough/Topout TP AP
10/20/2003 34 Rough Electric TP AP
1 0/16/2003 14 Frame/Steel/Bolting/Weldin TP Pl CONF
1 0/15/2003 14 Frame/Steel/Bolting/Weldin TP co
Monday, December 22, 2003 Page 1 of 1