Loading...
HomeMy WebLinkAbout1525 FARADAY AVE; 360; CB032628; Permit10-07-2003 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Commercial/Industrial Permit Permit No: CB032628 Building Inspection Request Line (760) 602-2725 Job Address: 1525 FARADAY AV CBAD St: 360 Permit Type: Tl Sub Type: Parcel No: Lot#: Valuation: $72,480.00 Construction Type: Occupancy Group: Reference #: Project Title: U.A.M.C. 2,416 SF SHELL TO OFFICE COMM 0 NEW Status: ISSUED Applied: 09/23/2003 Entered By: MOP Plan Approved: 10/07/2003 Issued: 10/07/2003 Inspect Areih27 lll!Ki' 'f'l"Z 0002 01 Applicant: Owner: Plan Checl<ff. 'PC03-ii2 C GF• DESIGN CORP STE 175 444 S. CEDROS AVE SOLANA BEACH 92075 858 794-3222 Building Permit Add'I Building Permit Fee Plan Check Add'I Plan Check Fee Plan Check Discount Strong Motion Fee Park Fee LFM Fee Bridge Fee BTD#2 Fee BTD #3 Fee Renewal Fee Add'I Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'I Pot. Water Con. Fee Reel. Water Con. Fee $442.61 $0.00 $287.70 $0.00 $0.00 $15.22 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Meter Size Add'I Reel. Water Con. Fee Meter Fee SDCWAFee CFO Payoff Fee PFF PFF (CFO Fund) License Tax License Tax (CFO Fund) Traffic Impact Fee Traffic Impact (CFO Fund) PLUMBING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Master Drainage Fee Sewer Fee Redev Parking Fee Additional Fees TOTAL PERMIT FEES $0.00 $0.00 $0.00 $0.00 $1,319.14 $0.00 $0.00 $0.00 $936.00 $0.00 $34.00 $60.00 $42.00 $0.00 $3,905.26 $0.00 $0.00 $7,041.93 Total Fees: $7,041.93 Total Payments To Date: $0.00 Balance Due: $7,041.93 Inspector: ~ -- FINAL APPROVAL Date: 1:ij.p:t//J Clearance: ------ NOTICE: Please take NOTICE that approval of your project includes the 'Imposition' of fees, dedications, reservations, or other exactions hereafter collectively referred to as 'fees/exactions.' You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any . . . I Tl · . · . · 02 . . . . UNSCHEDULED BUILDING INSPECTION DATE 1:i/2-i/4-J . INSPECTOR .,_//_. __ . _· :· __ _ . y PERMIT # 1 i-" 0 ~-.· PLAN CHECK.·# -~--- JdB ADDRESS: ___ ./_s-_2 __ r.....;.. ~-")'()-/l-:-.1,(J-r.J._~~)1;....·v{-; _"1~' ___ 6 _______ _ DESCRIPTION ___ ___, ______________ _ CODE. J;)ESCRIPTION ACT CO:MMENTS Inspection List Permit#: CB032628 Type: Tl COMM U.A.M.C. 2,416 SF SHELL TO OFFICE Date Inspection Item Inspector Act Comments 12/23/2003 89 Final Combo RI 12/22/2003 89 Final Combo TP AP 11/19/2003 14 Frame/Steel/Bolting/Weldin TP AP T-CEIL 11/19/2003 34 Rough Electric TP AP CEIL LITES 11/19/2003 44 Rough/Ducts/Dampers TP AP DUCTS, HP S 1 0/24/2003 17 Interior Lath/Drywall TP AP 1 0/23/2003 17 Interior Lath/Drywall TP NS 1 0/22/2003 17 Interior Lath/Drywall TP PA 10/20/2003 14 Frame/Steel/Bolting/Weldin TP AP SEE CARD NOTE 1 0/20/2003 24 Rough/Topout TP AP 10/20/2003 34 Rough Electric TP AP 1 0/16/2003 14 Frame/Steel/Bolting/Weldin TP Pl CONF 1 0/15/2003 14 Frame/Steel/Bolting/Weldin TP co Monday, December 22, 2003 Page 1 of 1