Loading...
HomeMy WebLinkAbout1525 FARADAY AVE; 100; CB023424; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 12-27-2002 Commercial/Industrial Permit Permit No: CB023424 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: Project Title: Applicant: DESIGN CORP 1525 FARADAY AV CBAD St: 100 Tl Sub Type: COMM Lot #: 0 Status: $66,030.00 Construction Type: 111 3 Applied: Reference #: :O(;, o..,~ Entered By: EMERALD LAKE CORP CNTR. l ' !t'.t,l/__,, Plan Approved: 2,201 SF Tl SHELL TO OFFICE Issued: Inspect Area: Owner: ISSUED 11/13/2002 SB 12/27/2002 12/27/2002 4398 12/27/02 0002 01 02 SUITE 175 444 S. CEDROS 92075 858-794-3222 Building Permit Add'I Building Permit Fee Plan Check Add'I Plan Check Fee Plan Check Discount Strong Motion Fee Park Fee LFM Fee Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'I Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'I Pot. Water Con. Fee Reel. Water Con. Fee Total Fees: $6,451.33 $419.51 $0.00 $272.68 $0.00 $0.00 $13.87 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Payments To Date: Meter Size Add'I Reel. Water Con. Fee Meter Fee SDCWAFee CFD Payoff Fee PFF PFF (CFD Fund) License Tax License Tax (CFD Fund) Traffic Impact Fee Traffic Impact (CFD Fund) PLUMBING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Master Drainage Fee Sewer Fee Redev Parking Fee Additional Fees TOT AL PERMIT FEES \ $815.72 Balance Due: CGP 5635~61 $0.00 $0.00 $0.00 $0.00 $1,201.75 $0.00 $0.00 $0.00 $825.00 $0.00 $41.00 $160.00 $39.50 $0.00 $3,478.02 $0.00 $0.00 $6,451.33 $5,635.61 CHY of Carlsbad . . · Final Building Inspection Dept: Building Engineering Planning CMWD St Lite '8r.e Plan Check #: PC020053 Date: 02/21/2003 Permit#: C8023424 Permit Type: Tl Project Name: EMERALD LAKE CORP CNTR. Sub Type: COMM 2,201 SF Tl SHELL TO OFFICE Address: 1525 FARADAY AV #100 Lot: 0 Contact Person: NA Phone: 8585831657 Sewer Dist: Water Dist: ·;~:;:~~:? ....................................... ~:~: ........... 3/rl;l·; ...................... ~ ......................... .. By: ;J;l ~, Inspected: 0 Approved: __ Disapproved: __ Inspected Date By: __________ Inspected: ______ Approved: ___ Disapproved: __ Inspected Date By: Inspected: _____ Approved: ___ Disapproved: __ •••••••••••• u, ••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• Comments: ______________________________ _ .- ' lns'pecfion List Permit#: CB023424 Type: Tl COMM EMERALD LAKE CORP CNTR. 2,201 SF Tl SHELL TO OFFICE Date Inspection Item Inspector Act Comments 03/14/2003 89 Final Combo TP AP 03/14/2003 89 Final Combo RI 02/21/2003 89 Final Combo TP NR PNDING SHELL FINAL 02/20/2003 14 Frame/Steel/Bolting/Weldin TP PA T-CEIL 02/20/2003 34 Rough Electric TP PA CEIL LITES 02/20/2003 44 Rough/Ducts/Dampers TP PA DUCTS 02/19/2003 34 Rough Electric TP AP SUB PNLS, TRANS 02/12/2003 14 Frame/Steel/Bolting/Weldin TP AP T-CEIL 02/12/2003 34 Rough Electric TP AP CEIL LITES 02/12/2003 44 Rough/Ducts/Dampers TP AP DUCTS, HP S 02/11/2003 14 F rame/Steel/Bolting/W el din TP co T-CEIL 02/04/2003 17 Interior Lath/Drywall TP AP APRD GEILS 01/31/2003 14 F rame/Steel/Bolting/W el din TP AP HARD CEILINGS 01/31/2003 34 Rough Electric TP AP 01/31/2003 44 Rough/Ducts/Dampers TP AP 01/21/2003 17 Interior Lath/Drywall TP PA MONO COAT PATCH 01/21/2003 18 Exterior Lath/Drywall TP WC 01/10/2003 17 Interior Lath/Drywall TP AP 01/07/2003 14 Frame/Steel/Bolting/Weldin TP AP WALLS 01/07/2003 34 Rough Electric TP AP WALLS 01/06/2003 14 Frame/Steel/Bolting/Weldin TP co 01/06/2003 34 Rough Electric TP co 01/02/2003 14 Frame/Steel/Bolting/Weldin TP co 01/02/2003 21 Underground/Under Floor TP AP 01/02/2003 24 Rough/Topout TP AP 01/02/2003 31 Underground/Conduit-Wirin TP NR Monday, March 17, 2003 Page 1 of 1 • ,I PLANNINC/ENCINEERINC APPROVALS PERMIT NUMBER CB <;) 2 Jlf_J lf ADDRESS / ,),2 5 ~°f ,~ S'fe / 1JO RESIDENTIAL RESIDENTIAL ADDITION MINOR . < < $10,000.00) OTHER PLANNER --------- PLAZA CAMINO REAL CARLSBAD COMPANY STORES VILLACE FAIRE COMPLETE OFFICE BUILDINC DATE ______ _ DATE ENGINEERING DEPARTMENT FEE CALCULATION WORKSHEET D fitimate based on unconfirmed information from applicant. fJ¥""' Calculation based on building plancheck plan submittal. Address: [5;Js ~ t Sk /(JO Bldg. Permit No. C, B O ~ "'31/ :Zf/ Prepared by: err:-:: Date: t ///,26 hJ f;) Checked. by: . Date: ~ ( ----- EDU CALCULATIONS: List types and square ootages for al~uses. (Se.J2 ~~ r----L · Y ~c.8) /lit Types of Use: ______ ....-_·u_ Sq. t. nits: _______ EDU's: , / (l Types of Use:_______ Sq. Ft./Units:. _______ EDU's: _____ _ ADT CALCULATIONS: List types and1sq~a~ footages for all u\es. [S-e.o ~c__ °'O ol,,-Q..Q._(/-hJY ~ J ADT's·. ? <? Types of Use._______ Sq. Ft./\'.Jnits: _______ ~ ..;:) Types of Use: ______ _ Sq. Ft/Units: _______ ADT's: _____ _ FEES REQUIRED: WITHIN CFO: ~ bridge & thoroughfare fee in District #1, reduced Traffic Impact Fee) ONO D 1. PARK-IN-LIEU FEE PARK AREA & #: __ _ . / FEE/UNIT:____ X NO. UNITS: ~-TRAFFIC IMPACT FEE ADT's/UNITS: 5 .5 X FEE/ADT: ,g;i =$ ____ _ D 3. BRIDGE AND THOROUGHFARE FEE (DIST. #1 __ DIST. #2 DIST.#3_) ADT's/UNITS:. ___ _ X FEE/ADT: __ _ D 4. FACILITIES MANAGEMENT FEE ZONE: __ _ / UNIT/SQ.FT.: if 5. SEWER FEE . 17 e? EDU's: ----""' ..... _L__~Q-. BENEFIT AREA: f EDU's: , 78 D 6. SEWER LATERAL ($2,500) D 7. DRAINAGE FEES PLDA'---- ACRES: ____ _ D 8. POTABLE WATER FEES X FEE/SQ.FT./UNIT: __ _ X X FEE/EDU:o2D G,tJ FEE/EDU: r2_2fl 1 HIGH ___ /LOW __ X FEE/AC:. __ _ UNITS CODE CONNECTION FEE METER FEE SDCWAFEE 1 of 2 F:\FEE CALCULATION WORKSHEET.doc =$ ____ _ =$ ____ _ =$ !Cao G,, ev =$ { cg 7(£ .!)Q, =$. ____ _ =$_,--__ _ IRRIGATION Rev. 7 /14/00 V""' ----- )J-o/s01>0 :;:: , <[it ~~ <) ;:/Joo {,~,) ::, ti . /, J~ --~LtvC~8 .73])· ~ ~61)6(?Jo1) -;. y $1 ,- ENGINEERING DEPARTMENT FEE CALCULATION WORKSHEET D 9. RECLAIMED WATER FEES UNITS CODE CONNECTION FEE METER FEE TOTAL OF ABOVE FEES*:$ ________ _ *NOTE: This calculation sheet is liQI a complete list of all fees which may be due. Dedications and Improvements may also be required with Building Permits. 2 of 2 F:IFEE CALCULATION WORKSHEET.doc Rev. 7 /14/00 ,. ... Oll:6BAM FROM-Hope En1inaarlni HOPE ENGINEERING 1301 Third Ave., Ste. 300 San Dieso, CA 92101 i I , J • ; r I ! i ; ! ··· ··-t··-··:·"'···i"" •'J"' --··!-·"· ·) .. i"''"""T"'" !· · .. !""' 1"' -·;· I i i ! i j i ~ : ......... 1 .... ·-r·"' '"\"' ... ·! ..... -~-.. l , ... ·!-..... 1., ,,., .. ,{ ....... t ..... :.... , ... I i ; : ! i j i i i ! ; .. , ..... J .... i ........ :. ..... i" I ...... ~ .... j ... -~---,.: ....... ,I, ..... ..,: ..... ,,..:, .. i ! : ! t ~ ! ! I ! . ···-+-··· -1-··· + I ·kG·i\Q ... + ·--··i ··--·j"" ___ J .... ·I ..... 1... ., .... ~ .. mi .; ..... L.,..! .... ! I I ! ~ I : • j l ! I j • . ----+··· --j--··--\'""'" l · .... j·····+ ··,:! · ·-~!" ;·-.... "1" ......... [,, 1,,,j., .... .,.,1,,,11, .. ;,,., j ....... ,i ....... ,'},,.,, I ,.,,.,t __ .,,j ... , : I t • I ! I I • I ! i I ~ I 1 ! i ! ! •• ,. • , ...... ,, ....... '?' ...... , '1 ' ~ i ••••••• , ........ t· .. , ............ -···' .. i I ! l J : ~ .......... 1 ....... 1 ..... p.,-...... ., ........ j ........ ,... · , ! i 1 i i 1· I I • ' • i ••••••" •• ""i""·-L. .. , j .. , ... , • .... ••••r••••• r : ~ : I i ; i ! ! I I 1 i t : ~ s1g-za6-46TB T•043 P.002/002 F-!112 JOB--"'"~..!:.!~!:.:.Sf.:=;•;:.:2:.t.;t'ftt,1.J:u:..!!!:;__;'-'..,· ~...==-------- Sl£ETNO, ___________ _ CAt.CULATED !~---...;~::...~·------ ~HECl(EIJ l!IY------------- 11,1::ALl! i ..... I .. 1 ...... : ....... 1 •.. ) ... I ; ' • t i i I ... rl . l"r·· ....... ! ........ ! i ' i ! "I I ! i "i"· I i OF,---------'-- DAT!IJ .... ! .. :lP.../ 0 ,g Dil'l'~--------- f··· I •: .. ···- ··l ...... r· ..... L ·t'"'''"" ' : •. i i ·! • ! I I !'"'' crds-mra:a Sf:BLHl.09.l. XVd 6T!91 nHJ, £0/06/60 ~ dB Temp NctWt \:.VA Lcwci Risc·c in lbs A B C 15 .«) 150 275 M.03 32.23 18.05 30 .«) 150 32.5 U.03 32..23 18.05 -4.5 -tt 150 505 32.03 35.73 %3.68 75 ts 150 655 32.03 39.98 %3.68 112.5 -4.5 150 790 35.03 -4.5.98 23.68 150 ts 150 10~ 38.47 47.98 28:93 225 50 150 1370 -12.50 51.75 30.25 ' !00 52 ISO 2500 47.50 58.:58 M.75 15 .(() 115 275 U.03 32.23 18.05 30 <(O us 325 24.03 32.%3 18.05 -4.5 42 115 505 32.05 35.75 23.68 75 45 115 655 SZ.03 39.98 23.68 112.5 -4.5 115 790 35.05 6.98 %3.68 150 -4.5 115 1030 38.47 47.98 28.95 225 so 115 1370 42.50 51.75 30.25 !00 52 115 2500 47.50 58.38 34.75 15 37 80 3~ 2-4..03 32.%3 18.05 • .. 30 37 80 :.·~5; 32.03 35.75. 23.68 45 37 80 655 32.03 39.98 23.68 75 42 80 790. 35.03 -4.5.98 23.68 112.5 ts 80 1030 38.-t7 47.98 28.93 150 -4.5 80 1370 42.50 51.75 30.2.5. l 225 50 80 2500 47.50 58.38 34.75 ' 300· 50 80 2740 47.50 58.38 34.~ . -. D 20..50 20.50 28.50 28.50 31.50 35.00 37.50 -12.50 20.50 20..50 28.50 28.50 51.50 35.00 37.50 -12.50 20.50 28.50 28..50 31.50 35.00 !7.50 42.50 42.50 .. , .. ,., ... ••11.1pw11.111.11• 11~• g::J 1n1;111;1;11•g 1n 1n• 1a01e. 3. Transformers are dry type, Class AA. ventilated enclosure fot Indoor use •. Optional weather kits are available for adapting the unit for Type 3R use without voiding the UL label. -4. Transformers are floor mounted. Wall mouting brack•ts art 1 optional on ratings up to 46 kVA, and ore supl)lie'd as separate accessories. 5. F"or lifting other than with fork truck, remove top cover and use r diameter holes in top of core clamps. 6. Point color ·is ANSI 161 gray. 7. 6" required elearanc• from the walls • Dimensions In lnchcs E F G H K L M p R s 14.00 .438 1.77 1.29 17.63 1.96 21.97 5.75 3.00 16.90 15..50 .-t:58 1.77 1.19 18.63 1.96 21.97 -l.75 3.00 16.90 19.50 .-t:58 1.77 1.29 19.39 l.96 27.60 6.50 3.00 23.86 19.50 .438 1.77 1:.29 20.31 1.96 27.60 6.23 3.00 23.86 19.50 .-t:58 1.77 1.29 21.91 1.96 27.60 6.25 3.00 26.86 22.56 .4:58 "l.74 1.29 23.91 1.96 32.85 8.50 3.00 30..36 27.56 .4.38 2.50 1.18 25;00 1.96 3-U7 6.00 3.00 5-4.36 30.06 .4:58 2.50 1.18 2-1.00 1.96 38.67 6.00 3.00 39..36 14.00 .438 1.77 1.2:9 17.63 1.96 21.97 5.75 3.00 16.90 15.50 .4.38 1.77 1.29 18.63 1.96 21.97 4.75 3.00· 16.90 19.50 .438 1.77 1.29 19.39 1.96 27.60 6.50 3.00 23.86 19.50 .es l.Ti 1.2:9 20.31 1.96 %'7.60 6.Z5 3.00 23.86 19..50 .438 1.77 1.29 21.91 1.96 27.60 us 3.00 26.86 2%..56 .-t:58 1.7-t 1.29 2.!1.91 1.96 32.85 8.50 3.00 · 30.36 27.56 .-t:58 2.50 1.18 25.00 1.96 34-17 6.00 3.00 5-4.36 30.06 .4.38 2.50 1.18 24.00 1.96 ~-67 6.00 3.00 .39.:36 15.50 .438 1.77 1.29 18.63. 1.96 21.97 ~.B 3.00 16.90 19.50 --.-138 1.77 1.29 1.9.39 ·1.96 27.60 6.50 3.00 23.86 19.50 .-t:58 1.77 1.29 20.31 1.96 27.60 6.25 3.00 23.86 19..,50 .ffi 1.77 1.29 21.91 1.96 27.60 6.5 3.00 26.86 22.56 .-1:58 1.74 1.2:9 23.91 1.96 32.85 8.50 3.00 30..36 27.56 .438 2.50 1.18 25.00 1.96 3"-17 6.00 3.00 34..36 30.06 .438 2.50 1.18 24.00 1.96 38.67 6.00 3.00 59..36 30.06 .4:58 2.50 1.18 24.00 1.96 38.67 6.00 3.00 39..36 \ QUANTITY CATALOG VOLTAGE QUANTITY TAPS DRAWING~ NUMBER PRIMARY SECONDARY ~ 4 SF3\/o30BL~~ 4-eo (Zo /Zoe} . R.Art..b L,..."~ Ct1'1t.. I c.,-I<. , CUST. BY DA~A, 1ens Energy &. Automation, Inc. AP~ ~lectrical Apparatus Division APP ' . )'( Record D Other t,E4eo~ 8.,GC!..,T2f C_ ENG. LOC. TITLE General Purpose Transformers was Three-phase 600 Volt class 60 Hz I MFG. LOC. DWG. NO' REV DWG. FILE G-73 0 -- 02/20/2003 THU 8:37 FAX 858 4962542 CED SAN DIEGO PROJECTS~~~ BERG TI • 02/Z0/2003 09: 31 FAX 323 721 0000 L H DO'ITIE -· PARAWEDGE® • Cold Formed Design • UL & FM Approvals • ICBO Approval (Meets new test-cr;teria) !Roll Formed Threads · Stronger than conventional machined threads Full 'rhread Design lncraased versatility for deeper embedments Expansion Cone Parabolic; curve provides positive means of e><panding clip APPLICATIONS r • Steel Shelves • Dack Bumpers • Garage aaors • Hand Rails • Outdoor Signs • Light Fixtures • Guard Rails • B11se Angles ,, Ar;ces.s Ladders • Duct straps • Machinery • Stair Units • Ledgers· • Seatings • • Hydraulic Lifts a-112· ii· -4-1/2' Unique Design Double E:a:pansion Clip Single clip with shear tangs for uniform expansion • Functions as two•piece clip. t 2-112• :r 3-1/2' 4· 4-1/2" s· s-112· (l' a-112 r 1-1tz· a• 11-112'· s-9,1~· 10• 11• 'f>ELECTION & INSTALLATION i . q.(¥,i'i..~~,~. \~ ~ ~~1 ") ,.,~ 0 • • 1V • r. ";:\I : \-,'; ·:1•;!' :,"~):1·· ~fA,: ,.,!,! lo : I of II :i\ 'ii Choosing proper Anchor Leoglh: A. 31ums of nut (appra;r:. 112 bolt d/a,) + , B. Nut & waslJerthtr;Jmess (approx. 1 bait Ula.) + ~ c. Fixture thloknBSs + j D, Mlflimum embedment (min. 4·112 belt dia.) ·'., =: Minimum Anuhor Length . :~ If minimum ~nr.hor lengtfl falls bctween 2 sizes, ~ i ~ use longer size. i : Toe maJimum recommended anchor embe~menl t ~ should be 80% of the base material thickness. If a ~; ij concrete slab is 10" thick, an B" depth would be tile maximum racommende,;I anchor embedmenl Installation Steps: 1. Use a carbide bit (ANS{ - B94.12) the same size as lhe bolt diBmeter. drf/1 hare qeeper than bait emt:Jed- ment (min. 4.5diil,), Do not use core bits. Maintain sccurars hats size. 2. Clean ha/s of debrls. 3. Add washer and thread nut flush with top of bolt, Drive bolt info hale thravg/J item 10 be fs.stenect. 4. To ser, tighten nut 3 to 4 full tums or. consult chart for gvlde. installation tarque. NOTE: Using In canr::ra/!1 . r;urs:/ /e33 lhsn 2.$ ~.I-$ WI7/ g11YJtfy l'E!dlJCfl BIIChor Slrenglh. WAF/N/Nr1: WtAR SAFETY GOGGLES ~ Minimum Concrete Thickness "' -.. 4 <7 " '<I liW/Ramset Trubolt (Typ.) !SAT Seismic Bracket ICBO #PFC 5566 "' 4 ". . .,,. ~ 1' M~ ,~-~ " 4 I ~ -~ <I " ~1\ \:. \__:: Limited To Anchorages AL 1 S and AL4S Only. T Minimum ,.. ·a " .;, ~. ·-,· <I 1'Min.. · <1 . "' " <1 _l Concrete Thi!: ". :4 :-: : .: t:· • <1 ' ~ .ti -... : <1 ITW/Ramset Trubolt (Typ.} ~. 4 .'A,q 4 .... Minimum Drtll-ln Depth ' ~ !SAT Seismic Bracket ICBO #PFC 5566 f_.l __ _ Sing/~ Anchor Connecton: Details AL 1S, AL4S, AL7S Minimum 3,000 psi Light Weight Concrete TRUBOLT by lTW Ramset/Red Head ICBO Report No. 1372 See Page D2S for Minimum Anchor Spacing Requirements. Minimum Brace Anchor Anchor Drill-In Anchorage Qty, Diameter Depth_ &-18--• · 1 ---• --.3l8" ___ --__ __j~112:~--(~~~----------~-.. ---i~~::. ______ 2~~~~---J A P P R O V E D Fixed Equipment Anchorage Office of Statewide HeaJth Planning and Development OPA-0485 ·November 14, 2002 Minimum Concrete Thickness Installation Concrete Metal Deck Torque Slab 11/2" Flute 2" Flute 3" Flute ft-lbs 2-:t/2" 1-1/2" 1-1/2" 1-1/2" 25 3-1/4" 1-3/4" 1-1/2" 1-1/2" 55 l~ 2-1/2" 2" 1-1/2" 90 I. S. A. T. International Seismic Application Technology 6600 Artesia Boulevard, Buena Park, CA 90620 877-999-4728 (U.S.) 714-994-6353 714-523-0845 (fax) www.isatsb.com Rev.1 Nov-02 Page D2.1S ABHWtoRCHW RCHWtoRCHW 2 ea. 1/2' Diameter Hex Bolt Washer and Channel NutTyp, See Note 17, Page 5b. e SEC.A-A ABHWtoABHW ABFtoABF TYPICAL RIGID BRACING BRACKET ASSEMBLY COMBINATIONS t 2.-. 1 ~ SINGLE or DOUBLE CHANNEL A P P R O V E D Fixed Equipment Anchorage Office of Statewide Health Planning and Development R-0485 April. 18, 2001 -~;'SQ ~~ " "" I. S. A. T. International Seismic Application Technology 6600 Artesia Boulevard, Buena Park, CA 90620 sn-999-4728 (U.S.) 714-994-635~ 714'-523-0845 (fax) Original Nov-99 Page £2 .. j' , ... --- ' ~ .. \ Continuous TnreadedRod' Stiffening RequireIT)el)ls, Tnreaded Rod, Page.G2 w ~ 45° Maximum ~ :1 o Sheei Metal ·screws Mai 1 ?-o.c. Mechanicai Eq~ipinent · l '1, -""'"" "ra , . I)' , ,, , _ /-PageG3""' • • (. .. . (!J) ·ii' I !SAT 'ABHW Seismic Bracke~ IGBQ #PF6 5566 P?gef2, . No Sub:jtifutions SECTION '!hru MECHANICAL·EQUIPMENT . . . ' :for BraceSpacing;~gid Brace AsseJTib~, ,1 Threadfl(i Support Raj alJ(l Deck Anchorage ' Requirements, See Bracing Tables . . .MERS-300.\hlµ MERS-3000 Pag_es oi.1 · thniC4.4 . ' ISAT'RCHW'·Seismic __/ Bracket, IGBO #PFC.5566 PageF1, · No ·sutislirulions Rigid Brace Assembly Page E2 f Mechahical Equi~erit m G o • o. • o -._-o o .o • <D I OVERHEAI!) VIEVV (Support Frame Design Beyond Scope of OSHPD Approval) ' MAXIMUM 3,000 LB/UNIT IN-llNE(MECHANICAL. EQUIPMENT 4-WAY SPLA YED:RJGID BRACING t'·· I. S. A. T. A ·p P R O V E D Fixed Equipment Anchorpge Jnterhp_tiol)al Seismic.Application Technology }600 Art~ia Bou)evard, 'l;luena Park, CA-90620 STT-9~9-4728 (U.~.~ 7)4'9,)4-6353 . 714-523-08'l5 (iax) Office bf S1atewide Health Planning and Development R-0485 April 18, 2001 ••• Valid fof'3 Years M,;;<imum·· .. I. (], ~ ! · www.isa.tsb;!'Om · Rev .. 2 Feq-01 Page B19.2 ,I I I, ·f t ~ ~ .., .,. • •1,.J r / cc: PACIFIC BUILDING GROUP 6364 Ferris Square, San Diego, CA 92121 Ph: (858) 552-0600 Fax: (858) 552-0604 LIC. #502376 , Letter of Transmittal: TO: Hope Engineering FROM: Raymond J. Hall 1301 3rd Ave. San Diego CA. 92101 DATE: 20-Feb-03 ATTN: Chuck Hope PHONE: 619-232-4673 RE: Emerald Lake Corporate Centre 1525 Faraday Avenue; Carlsbad, CA 92008 FAX: ~------ WE ARE SENDING YOU Ii] Attached OUnder separate cover via _____ the following: Oshop Drawings OPlans Osamples ospecifications Ocopy of Letter Ochange Order w.lilw.::S:.::::u~bm~itt~a.!>::ls ________________ _ COPIES DATE NO. DESCRIPTION 1 ea. received 2-20-03 1 Water source heat pump unit installation detail. THESE ARE TRANSMITTED as checked below: l!)For Approval OApproved as submitted OForward copies for resubmittal OFor your use OApproved as noted l!)submit _ copies for distribution OAs requested OReturn for corrections OReturn corrected prints OFor review and comment OAs Requested OFOR BIDS DUE _________ --1,O....i.:..P..:..R.;;.;IN_;_T:..::S:...;R..:.:E=..:T...::U_;_R:..:..:N~E:;;;_D_;_A:.:...F_;_TE:::.:R_;_:;;;_LO::..:A....::.N_;_T..:_O::_=.U-=.S __ REMARKS: Sorry for the short notice. We are trying to get Tenant Improvement work final inspection on the subject 1st floor Tl's tomorrow. The inspector has requested a signed, stamped detail approving the installation detail for the water source heat pump units. This is a similar condition to that of the electrical transformers that you should have received separate documentation on from Nick @ Bergelectric. The attached detail is stamped and signed by a Civil engineer for the mechanical engineer (the mech. eng. says that a Civil is approvable for structural details on commercial bldgs -I don't know if the inspector will buy that). Pis. FAX 858-552.0604 your stamped, signed approval of this detail. I will follow-up w/ a phone call later today. I hope you can help. Randy R.-Greater San Diego Air Conditioning Pete Hamilton w/ trans. SIGNED:~ ay Hall, Project Manager fuu..-~~6--Sf3 '=> -1 o 'I'\ ,, F,RDM L~NDMARK MECHANICAL . ' FAX ND. +279 1559 Feb. 20 2003 01:48PM Pl RECEIVED FEB 2 0 2003 \__1 5/8"x1 .5/ll")d 5/E'" 12 GA. GALVANIZED DOUBLE NUi- UNIS1RUT TYPE" CHANNEL (TYPICAL 1WO EA. UNIT) PRE-FORMED lifETAl CHANNEL •-EX?ANSON ANCHOR BOLl(n'P) ICBO I ER3631 \_;·BEAM a 12' 0,C. SPRJNG ISOLATOR._/ HEAT PUMP l,IASON JON G JZEl) GALVANIZED lHRE'ADED ROD J/ff FOR UNllS UP TO 2 TO/i, 1/2" FOR UNITS 2 1/2 TON AND OVER. MAX. Wi;JGHT:526 1.B. -MANUF'AGTIJRER'S IJRACKET, ATTACHl!'.D TO UNl'I & CHANNEL {TYP. OF' 4} 30• -------/ BEAM CLAMP BC17A ONE AT EAOl fcND, GOOD FOR U? 'ro 1200 LB$ - I BE'.MI · , •. PRE~FORMED METAL CHANN!..I. I> •• 0 6 ~ i,.1>i,. a ,g I> '------1-1 5/8"x1 5/s"xl 5/8"' 12 GA, GALVANIZED UNISTRUT t'/PE CHANNEi (TYPICAL lWO EA UNIT) • j. • ,. TRANSMISSION VERIFICATION REPORT DATE,TIME FAX NO./NAME DURATION PAGE(S) RESULT MODE PACIFIC BUILDING GROUP 02/20 14:41 16192354675 00:00:47 02 OK STANDARD ECM TIME 02/20/2003 14:41 NAME PACIFIC BUILDING GRP FAX 8585520604 TEL 8585520600 SER.# BROF2J487546 El::184 Ferris Square, San Diego, CA 92121 F'h: (85B) 552-0800 Fax: (B58) 552..0604 I.IC, #50~76 Letter of Transmittal: TO: Hope Engineering 1301 3rd Ave, San Diego CA 92101 ATTN: Chuck Hope RE: Emerald Lake Coreorate Centre FROM: Raymond J_ Hall DATE: 20-Feb"03 PHONE: 619M232-4673 1525 Faraday Avenue; Carlsbad, CA 92008 FAX: ~------ WE ARE SENDING YOU IE) Attached 0Under separate cover via -~-~the following: 0Shop Drawings 0Plans osamptes CISpecitications f.Jcopy of Letter Ochange Order li]IIM,nll.ZOSall.lub,:.,.m1,1,1,itta."lila~1s-. ______________ _ COPIES DATE NO, DESCR•PTION 1 ea. received 2M20-03 1 Water source heat pump unit Installation detail. THESE ARE TRANSMITTED as checked below: ----4 ,...._ ---=-... ,:..,,.._ ...... -... ~-•••-r