HomeMy WebLinkAbout1525 FARADAY AVE; 110; CB023550; PermitCity of Carlsbad ,.
12-27-2002
1635 Faraday Av Carlsbad, CA 92008
Commercial/Industrial Permit Permit No: CB023550
Building Inspection Request Line (760) 602-2725
Job Address: 1525 FARADAY AV CBAD St: 110
Permit Type: Tl Sub Type: COMM
Parcel No: Lot#: 0 Status:
Valuation:
Occupancy Group:
$63,600.00 Construction Type: NEW 2..
Reference #: {yJ OJ.a£_,;
EMERALD LAKE CORP CNTR 2120 SF 1 1._.;
Applied:
Entered By:
Project Title:
12/27/2002
Applicant:
DESIGN CORP
SUITE# 175
Tl SHELL TO OFFICE
444 S. CEDROS 92075
858-794-3222
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park Fee
LFM Fee
Bridge Fee
BTD#2 Fee
STD #3 Fee
Renewal Fee
Add'! Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'! Pot. Water Con. Fee
Reel. Water Con. Fee
$407.96
$0.00
$265.17
$0.00
$0.00
$13.36
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Issued:
Inspect Area:
Owner:
Meter Size
Add'I Reel. Water Con. Fee
Meter Fee
SDCWAFee
CFD Payoff Fee
PFF
PFF (CFD Fund)
License Tax
License Tax (CFD Fund)
Traffic Impact Fee
Traffic Impact (CFD Fund)
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Master Drainage Fee
Sewer Fee
Redev Parking Fee
Additional Fees
TOTAL PERMIT FEES
Total Fees: $6,248.35 Total Payments To Date: $0.00 Balance Due:
ISSUED
11/25/2002
SB
Plan Approved:
12/27/2002
$0.00
$0.00
$0.00
$0.00
$1,157.52
$0.00
$0.00
$0.00
$775.00
$0.00
$41.00
$160.00
$39.50
$0.00
$3,388.84
$0.00
$0.00
$6,248.35
$6,248.35
4398 12/27/02 0002 01 02
CGP 6248-35
,-CHY of Carlsbad
· Final Building Inspection
Dept: Building Engineering Planning CMWD St Lite •F-ir-l:P
Plan Check #:
Permit#:
Project Name:
PC020053
CB023550
EMERALD LAKE CORP CNTR 2120 SF
Tl SHELL TO OFFICE
Address: 1525 FARADAY AV #110
Contact Person: NA Phone: 8585831657
Sewer Dist: Water Dist:
Date: 02/21/2003
Permit Type: Tl
Sub Type: COMM
Lot: 0
..........................................................................................................................................................
ln~pec4 + Date ~/43 Approved: ~sapproved: __ Inspected: By. -.
Inspected Date
By: Inspected: Approved: Disapproved: __
Inspected Date
By: Inspected: Approved: Disapproved: __ .......................................................................................................................................................... ,
Comments: -------------------------------
! •
City·ot Carlsbad Bldg Inspection Request
For: 03/14/2003
Permit# CB023550
Title: EMERALD LAKE CORP CNTR 2120 SF
Description: TI SHELL TO OFFICE
Type: Tl
Job Address:
Sub Type: COMM
1525 FARADAY AV
Suite: 110 Lot 0
Location:
APPLICANT DESIGN CORP
Owner: EMERALD LAKE CORPORATE CENTRE L L C
Remarks:
Total Time:
CD Description Act Comment
19 Final Structural A/J ,
Inspector Assignment: TP
Phone: 8585831657
Inspector~
Requested By: PETE
Entered By: CHRISTINE
29 Final Plumbing
39 Final Electrical =t=---
49 Final Mechanical
Associated PCRs/CVs
lnsgection Histoty
Date Description Act lnsp Comments
02/21/2003 89 Final Combo NR TP PNDING SHELL FINAL
02/20/2003 14 Frame/Steel/Bolting/Welding PA TP T-CEIL
02/20/2003 24 Rough/Topout PA TP
02/20/2003 34 Rough Electric PA TP CEIL LITES
02/20/2003 44 Rough/Ducts/Dampers PA TP DUCTS
02/19/2003 34 Rough Electric AP TP. SUB PNLS, TRANS
02/12/2003 14 Frame/Steel/Bolting/Welding AP TP T-CEIL
02/12/2003 34 Rough Electric AP TP CEIL LITES
02/12/2003 44 Rough/Ducts/Dampers AP TP DUCTS, HP S
01/21/2003 14 Frame/Steel/Bolting/Welding PA TP MONO COAT PATCH
01/21/2003 18 Exterior Lath/Drywall WC TP
01/10/2003 17 Interior Lath/Drywall AP TP
01/02/2003 14 Frame/Steel/Bolting/Welding AP TP WALLS
01/02/2003 21 Underground/Under Floor AP TP
01/02/2003 24 Rough/Topout AP TP
01/02/2003 34 Rough Electric AP TP WALLS
/..,,-t ..,
PLANNINC/ENCINEERINC APPROVALS
PERMIT NUMBER CB ();2 35c;)O DATE 11/¥8-
ADDRESS /:J,fl.,"f ~ /2-ve..-; S'fe. 1/V
RESIDENTIAL
RESIDENTIAL ADDITION MINOR
< < $10,000.00)
OTHER
TENANT IMPROVEMENT
AMINO REAL
CARLSBAD COMPANY STORES
VILLACE FAIRE
COMPLETE OFFICE BUILDINC
-------------------
PLANNER DATE
~ DATE ~~/4,,,9
bf~~~
H:/Development servlces/Masters/Appllcatlons-counter/Plannlng engineering Approvals
I
,.. . ENGINEERING DEPARTMENT
FEE CALCULATION WORKSHEET
0 ...,.Estimate based on unconfirmed information from applicant.
la"' Calculation based on building plancheck plan submittal.
Address: J,5';25 Gvz-~1 ,z~ fl.o Bldg. Permit No. C\? 0d 3550
Prepared by: ~ ~; u/4?~/4cfJ Checked by: _____ Date: ( -----
EDU CALCU~T~ONS: L:ist types and sq~are fo ta .~s for all uses,)
TypesofUse:~~ ~~q. t./Urnts: (9...-~ EDU's: , 70
Types of Use:_______ Sq. Ft./Units: _______ EDU's: _____ _
ADT CALCULATIONS:, List types and squ,are fopta~s for all uses.'\
[_.s~ ~~ d-t) ~ nY cchJJ 3/ Types of Use._______ Sq. Ft/Units: _______ ADT's: --~---
Types of Use: ______ _ Sq. Ft./Units: _______ ADT's: _____ _
FEES REQUIRED:
WITHIN CFO: 4 bridge & thoroughfare fee in District #1, reduced Traffic Impact Fee) ONO
D 1. PARK-IN-LIEU FEE
/FEE/UNIT:
c;i.-1." TRAFFIC IMPACT FEE
PARK AREA & #: __ _
X NO. UNITS: __ _
ADT's/UNITS: ___ '6~(-X FEE/ADT: ,£5
D 3. BRIDGE AND THOROUGHFARE FEE (DIST. #1 __ DIST. #2
ADT's/UNITS: X FEE/ADT:
D 4. FACILITIES MANAGEMENT FEE ZONE:
~ UNIT/SQ.FT.: X FEE/SQ.FT./UNIT:
SEWER FEE
EDU's: ~·71;_ X FEE/EDU:~t?
BENEFIT AREA: e
EDU's: p7G X FEE/EDU: rJ-37'J
D 6. SEWER LATERAL ($2,500)
D 7. DRAINAGE FEES PLDA HIGH /LOW
ACRES: X FEE/AC:
D 8. POTABLE WATER FEES
=$ ____ _
=$_____...7~7-=-$-
DIST.#3 __ )
=$ ____ _
=$ ____ _
=$ /.5('l(, ~ b
=$ l 8.23 .J,'f
=$ ____ _
=$ ____ _
UNITS CODE CONNECTION FEE METER FEE SDCWAFEE IRRIGATION
1 of 2
F:IFEE CALCULATION WORKSHEET.doc Rev. 7 /14/00
~ ,_ ..
ENGINEERING DEPARTMENT ,,,. ,,
1 FEE CALCULATION WORKSHEET
D 9. RECLAIMED WATER FEES
UNITS CODE CONNECTION FEE METER FEE
TOTAL OF ABOVE FEES*:$ ________ _
*NOTE: This calculation sheet is NOT a complete list of all fees which may be due.
Dedications and Improvements may also be required with Building Permits:
2 of 2
F:\FEE CALCULATION WORKSHEET.doc Rev. 7/14/00