Loading...
HomeMy WebLinkAbout1525 WHITE SAGE WAY; ; CB141079; Permit05-27-2014 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Pool Permit Permit No: CB141079 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: Parcel No: Valuation: Reference #: PC #: Project Title: 1525 WHITE SAGE WY CBAD POOL 2150403806 Lot#: 0 $9,773.00 Construction Type: NEW PARKS RES- 240 SF POOL/SPA Status: Applied: Entered By: Plan Approved: Issued: Inspect Area: ISSUED 05/15/2014 RMA 05/27/2014 05/27/2014 Applicant: THE POOL DOCTOR INC Owner: PARKS M SETH&ERIN N 505 ALPINE TRAIL RD ALPINE CA 91901 619 445-4977 1525 WHITE SAGE WAY CARLSBAD CA 92011 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Electrical Fee Plumbing Fee strong Motion Fee Green Bldg Standards (SB1473) Fee Renewal Fee Add'l Renewal Fee other Building Fee Additional Fees $126.87 $0.00 $88.81 $0.00 $33.00 $33.00 $1.00 $1.00 $0.00 $0.00 $0.00 $0.00 TOTAL PERMIT FEES $283.68 Total Fees: $283.68 Total Payments To Date: $283.68 Balance Due: $0.00 Inspector: FINAL APPROVAL Date: ? "51' f S Clearance: NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/fixar.tinns of which vou have oreviouslv been given a NOTICE similar to this, or as to which the statute of limitations has oreviouslv othenwise expired. 05-27-2014 City of Carlsbad 1635 Faraday Av Carlsbad.CA 92008 Storm Water Pollution Prevention Plan (SWPPP) Permit Permit No:SW140158 Job Address: Permit Type: Parcel No: Reference #: CB#: Project Title: 1525 WHITE SAGE WY CBAD SWPPP 2150403806 CB141079 PARKS POOL/SPA Lot #: Applicant: THE POOL DOCTOR INC status: Applied: Entered By: Issued: Inspect Area: Tier: Priority: Owner: PARKS M SETH&ERlN N ISSUED 05/15/2014 RMA 05/27/2014 1 L 505 ALPINE TRAIL RD ALPINE CA 91901 619 445-4977 1525 WHITE SAGE WAY CARLSBADCA 92011 Emergency Contact: DON WAHL 619 445-4977 SWPPP Plan Check SWPPP Inspections Additional Fees $48.00 $57.00 $0.00 TOTAL PERMIT FEES $105.00 Total Fees: $105,00 Total Payments To Date: $105.00 Balance Due: $0.00 FINAL APPROVAL SIGNATURE THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: • PLANNING nENGINEERING • BUILDING • HEALTH • HAZMATfAPCD CITY OF Building Permit Application CARLSBAD 1635 Faraday Ave., Carlsbad, CA 92008 Ph: 760-602-2719 Fax:760-602-8558 email: building@carlsbadca.gov www.carlsbadca.gov It Date y\{S (Cf SWPPP JOB ADDRESS 11— , I \ ^, sum LOTi PHASE# I# OF UNITS |# BI(BjOOMS ^ JESi SUITE«/SPACE«/UNIT*' Sis - Oio --^ -0(^ CT/PROJECT # .THROOMS TENANT BUSINESS NAME CONSTR. TYPE OCC. GROUP DESCRIPTION OF WORK: Include Square Feet of Affected Area(s) EXISTING USI PROPOSED USE GARAGE (SF) PATIOS (SF) DECKS (SF) FIREPLACE YES N0| I AIR CONDITIONING YES j^NO I I FIRE SPRINKLERS YES I |NO| I APPLICANT NAIVIE Prinarv Contact PROPERTY 01 ADDRESS A STA*E T zie ADDRES: CITY 5T/WE ^ ZIP. Cu • ^t^(^t FAX CITY STATE EMAIL / \ * FAX I? IC lUAMC jh.' * . /V DESIGN PROFESSIONAL CONTRAI ADDRESS ADDRESS CITY STATE ZIP CITY GSTATE /• ., PHONE FAX PHONE FAX EMAIL EMAIL ST»]£Jja.#| CITY BUS. LIE* Aii (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, priorto its issJeTrfBe, also recjuiJes the applicant for such permit to flle a signed statement that he is licensed pursuantto the provisions ofthe Contractor's License Law {Chapter 9, ccmmendingwith Sectipn^OOO of Division 3 ofthe Business and Professions Code) orfnat he is exempttherefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit Sibjects the applicant to a civil penalty of not more than five hundred dollars ($500)). WORKERS COMPENSATION Workers' Compensation Declaration: / hereby affimi under penalty ofpeijuiy one ofthe following declarations: 01 have and will maintain a ceitificate of consent to self-Insure for workers' compensation as provided by Section 3700 of the Labor Code, for the perfomiance of the wort( for which this pennit is issued. I have and will maintain |f orkers' compensation, as reguired bv Section 3700 ofthe LaborCode, forthe perfonnanqp^f tl^e vi(oryorwtiigh thispermit isjiu^^y workers' compensatiqjUBsurancexamer and policy number are: Insurance Co! workers compensation, as required bv Section 3700 ot Policy No.. inqe af the workior wtiich this permit is IssuedyMy Expiration Date _ This section need not be completed if the permit is for one hundred dollars ($100) or less. I I Certificate of Exemption: I certify that in the perfomiance of the work for which this pemiit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of Califomia. WARNING: Failure to secure worMTs: compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), In addition to the cost of compensation, damagep as pmvlded for in Section 3706 of th^abor code, interest and attomey's fees. JS^ CONTRACTOR SIGNATURE DATE OWNER-BUILDER DBClARATiON / hereiiy affirm that I am exempt ftom CXintractors License Law for the following reason: [ I I, as owner of the property or my employees with wages as their sole compensation, will do the work and the stmcture is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). I I I, as owner of the property, am exclusively contracting with licensed contractors to constmct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). • I am exempt under Sectkin _ .Business and Professions Code for this reason: 1.1 personally plan to provide the major labor and materials for construction of the proposed property improvement. QYes I iNo 2.1 (have / have not) signed an application for a building pennit for the proposed work. 3.1 have contracted with the following person (firni) to provide the proposed constniction (include name address / phone / contractors' license number): 4.1 plan to provide portions of the wori(, but I have hired the following person to coordinate, supen/ise and provide the major work (include name / address / phone / contractors' license number): 5.1 will provide some of the work, but I have contrxted (hired) the following persons to provide the wori( indicated (include name / address / phone / type of work): PROPERTY OWNER SIGNATURE D S>\iiJ\->^ AGENT DATE :fej:TMlS SECTION FOR NO TT % » ILOING PERMITS ONtr Is the applicant or future building oreupant required to submit a business plan, acutely hazardous materials registration forni or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? • Yes O No Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? O Yes O No Is the facility to be constnicted within 1,000 leet of the outer boundary of a school site? • Yes O No IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT AGENCY I hereby aflirm that there is a construction lending agency for the perfonnance of the work this permit is issued (Sec 3097 (i) Civil Code). Lender's Name Lender's Address iti tie;* NT CERTtFiCAiTIO^N^ I certify that I have read tie applkatkin and state that the above infbimation is conectand that the infbnnation on the plans is accurate. I agree to complywlth all CIfy ordinances and State laws lelating to building construction. 1 hereby aulhorize representative ofthe City of Carlsbad to enter upon the above mentbned property for inspectbn purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CfTY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT OSHA: An OSHA permit is requiied for excavations over 50' deep and demolitbn or constRictbn of stmctures over 3 stories in height. EXPIFWTION: Every pemiit issued by the Building Oflicial under the poovisiqriaof this Code shall expire by limitatbn and become null and void if the building or vrorit aulhorized by such permit is not commenced within 180 days ftom the date of such pemiit or if Ihe buikJing or vwrt( authorized bysgcb^miit is suspended or abandoned at any time after the wort< is commenced for a period of 180 days (Section 106.4.4 Unifomi Building Code). APPLICANT'S SIGNATURE DATE PLAN CHECK Community & Economic CITY OF REVIEW Development Department 1635 Faraday Avenue CARLSBAD TRANSMITTAL Carlsbad CA 92008 wwv(/.carlsbadca.gov DATE: 05/23/14 PROJECT NAME: PARKS RESIDENCE PLAN CHECK NO: 1 SET#: ADDRESS: 1525 WHITE SAGE VALUATION/SCOPE OF WORK: POOL/SPA PROJECT ID: OB 14 1079 APN: This plan check review is complete and has been APPROVED by the Division. By: K LAWRENCE 05/23/14 A Final Inspection by the Division is required Yes / No This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. NOTE: ONLY ITEMS THAT NEED CORRECTION/CLARIFICATION ARE MARKED X. Plan Check Comments have been sent to: CARRIEJONES@HOTIVIAIL.CO!VI You may also have corrections from one or more ofthe divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should Include corrections from all divisions. For questions or clarifications on the attached checklist please contact the following reviewer as marked: PLANNING 760-602-4610 ENGINEERING 760-602-2750 FIRE PREVENTION 760-602-4665 Chris.Sexton@carlsbadca.gov / Kathleen Lawrence 760-602-2741 Kathleen.Lawrence@carlsbadca.gov Gregorv.Rvan@carlsbadca.gov Gina.Ruiz@carlsbadca.gov Linda.Ontiveros@carlsbadca.gov Cvnthia.Wong@carlsbadca.gov Dominic.Fieri@carlsbadca.gov Remarks: Any oulstuiuling issues will bc marked with nn I X I Make the necessury correclions for compliance with iipplicuble codes and standards. Siihinii corrected plans and/or specifications to the Building division for re-sntniiittal to Ihe Engineering diinsions. Items ihal coufonn to pemit rerpiirements are marked ivilh | ^ | 1. SITE PLAN Provide a fully dimensioned site plan drawn to scale. Show: / North arrow / Existing & proposed structures / Property line dimensions / Easements Show on site plan: / Drainage patterns / Existing & proposed slopes / Existing topography Retaining Walls (location and height) Indicate what will happen with soil excavated from pool area. Include on title sheet: / Site address / Assessor's parcel number / Legal description/lot number Grading: Quantities of Cut Fill Import Export Project does not comply with the following engineering conditions of approval for project no: Conditions were complies with by: Date: LOT NO. 23 MAP NO. REF. NO.CT 06-27 E-37 Page 2 of 4 REV 6/2012 2. GRADING PERMIT REQUIREMENTS The conditions that require a grading permit are found in Section 11.06.030 of the Municipal Code. Inadequate information available on site plan to make a determination on grading requirements. Include accurate grading quantities in cubic yards (cut, fill, import, export and remedial). This Information must be included on the plans. If no grading is proposed write: "NO GRADING" Grading Permit required. NOTE: The grading permit must be Issued and rouqh grading approval obtained priorto issuance of a building permit. A separate grading plan prepared a registered civil engineer must be submitted together with the completed application form attached. / No grading permit required. 3. MISCELLANEOUS PERMITS ALL EQUIP OUT OF ROW PER APPLICANT / RIGHT-OF-WAY PERMIT is required to do work in city right-of-way and/or private work adjacent to the public right-of-way. A separate right-of-way issued by the engineering division is required for the following: Please complete attached right-of-way application form and return to the engineering department together with the requirements on the attached hght-of-way checklist, at the time of resubmittai. Right-of-way permit and pool permit will be issued simultaneously. E-37 Page 3 of 4 REV 5/2012 4. STORM WATER Construction Compliance / Project Threat Assessment Form complete / incomplete / Requires Tier 1 Storm Water Pollution Prevention Plan. Please complete attached form and return (SW w-iss ) Requires Tier 2 Storm Water Pollution Prevention Plan. Requires submittal of Tier 2 SWPPP, payment of processing fee and review by city. Post-Development (SUSMP) Compliance "/ Storm Water Standards Questionnaire complete / incomplete Project is subject to Standard Storm Water Requirements. See city Standard Urban Storm Water Management Plan (SUSMP) for reference. http://www.carlsbadca.qov/business/buildinq/Documents/EnqStandsw-stds-vol4-ch2.pdf Project needs to incorporate low impact development strategies throughout in one or more of the following ways: Rainwater harvesting (rain barrels or cistern) Vegetated Roof Bio-retentions cell/rain garden Pervious pavement/pavers Flow-through planter/vegetated or rock drip line Vegetated swales or rock infiltration swales Downspouts disconnect and discharge over landscape Other: 5. ADDITIONAL COIVIMENTS E-37 Page 4 of 4 REV 6/2012 ^ CITY OF CARLSBAD STORM WATER COMPLIANCE ASSESSMENT B-24 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov I am applying to the City of Carlsbad for the following type(s) of construction permit: • Building Permit • Right-of-Way Permit • My project is categorically EXEMPT from the requirement to prepare a storm water pollution prevention plan (SWPPP) because it only requires issuance of one or more of the following permit types: Electrical Fire Additional Fire Alarm Fixed Systems Mechanical Mobile Home Plumbing Patio/Decl( Photo Voltaic Re-Roofing Sign Spa-Factory Sprinkler Water Discharge Project Storm Water Threat Assessment Criteria* No Threat Assessment Criteria • My project qualifies as NO THREAT and is exempt fronn the requirement to prepare a storm water pollution prevention plan (SWPPP) because it meets fhe "no threaf assessment criteria on the City's Project Threat Assessment Worksheet for Determination of Construction SWPPP Tier Level. My project does not meet any of the High, Moderate or Low Threat criteria described below. Tierl - Low Threat Assessment Criteria • My project does not meet any of the Significant or Moderate Threat criteria, is not an exempt pennit type (See list above) and the project meets one or more ofthe following criteria: • Results in some soil disturbance; and/or • Includes outdoor construction activities (such as saw cutting, equipment washing, material stockpiling, vehicle fueling, waste stockpiling). Tier 2 - Moderate Threat Assessment Criteria • My project does not meet any of the Significant Threat assessment Criteria described below and meets one or more of the following criteria: • Project requires a grading plan pursuantto the Carlsbad Grading Ordinance (Chapter 15.16 ofthe Carisbad Municipal Code); or, • Project will result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement removal, equipment storage, refueling and maintenance areas and project meets one or more ofthe additional following criteria; • Located within 200 feet of an environmentally sensitive area or the Pacific Ocean, and/or • Disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical, and/or • Disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse, and/or • Construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). r;er3 - Significant Threat Assessment Criteria • My project includes clearing, grading or other disturiDances to the gnjund resulting in soil disturbance totaling one or more acres including any associated construction staging, equipment storage, stockpiling, pavement removal, refueling and maintenance areas: and/or • My project is part of a phased devetopment plan that will cumulatively result in soil disturbance totaling one or more acres including any associated construction staging, equipment storage, refueling and maintenance areas: or, • My project is located inside or within 200 feet of an environmentally sensitive area (see City ESA Proximity map) and has a significant potential for contributing pollutants to nearisy receiving waters byway of stomi water runoff or non-storm waler discharge(s). / certify to the best of my knowledge that the above checked statements are true and correct I understand and acknowledge that even though this project does not require preparation of a construction SWPP, I must still adhere to, and at all times during construction activities for the permit type(s) check above comply with the storm water best management practices pursuant to Title 15 of the Carlsbad Municipal Code and to City Standards. "The City Engineer may authorize minor variances from the Slomi Water Threat Assessment Criteria in special circumstances where it can be shown that a lesser or higher Constmction SWPPP Tier Level is warranted. Project Address: Assessor Parcel No. Owne'r/Owners Authorized Agent Name: {) Title: p Owner/Owner's^^onzed Agent Signature: Date: Citvpdncurrence: A >By; 1//' / D|ta: / i ^YES QNO (^-^^-^^/(in B-24 Page 1 of 1 Rev.03/09 CITY OF CARLSBAD CONSTRUCTION THREAT ASSESSMENT WORKSHEET FOR DETERMINATION OF PROJECT'S PERCEIVED THREAT TO STORM WATER QUALITY E-33 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov Construction SWPPP Tier Level Construction Threat Assessment Criteria* Perceived Threat to Storm Water Quality Tiers Tier 3 - Hiah Construction Threat Assessment Criteria High Tiers • Project site is 50 acres or more and grading will occur during the rainy season • Project site is 1 acre or more in size and is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA • Soil at site is moderately to highly erosive (defined as having a predominance of soils with USDA-NRCS Erosion factors kf greater than or equal to 0.4) • Site slope is 5 to 1 or steeper • Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). • Owner/contractor received a Storm Water Notice of Violation within past two years High Tiers Tier 3 - Medium Construction Threat Assessment Criteria Medium Tiers • All projects not meeting Tier 3 High Construction Threat Assessment Criteria Medium Tier 2 Tier 2 Hiah Construction Threat Assessment Criteria • Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA • Soil at site is moderately to highly erosive (defined as having a predominance of soils with USDA-NRCS Erosion factors kf greater than or equal to 0.4) • Site slope is 5 to 1 or steeper • Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). • Owner/contractor received a Storm Water Notice of Violation within past two years • Site results in one half acre or more of soil disturbance High Tier 2 Tier 2 - Medium Construction Threat Assessment Criteria • All projects not meeting Tier 2 High Construction Threat Assessment Criteria Medium Tierl Tier 1 - Medium Inspection Threat Assessment Criteria • Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, within or directly adjacent to an environmentally sensitive area (ESA) or discharges directly to an ESA • Soil at site is moderately to highly erosive (defined as having a predominance of soils with USDA-NRCS Erosion factors kf greater than or equal to 0.4) • Site slope is 5 to 1 or steeper • Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). • Owner/contractor received a Storm Water Notice of Violation within past two years • Site results in one half acre or more of soil disturbance Medium Tierl Tier 1 - Low Insoection Threat Assessment Criteria • All projects not meeting Tier 1 Medium Construction Threat Assessment Criteria Low Exempt - Not Applicable -Exempt *The city engineer may authorize minor variances from the constmction threat assessment criteria in special circumstances where it can be shown that a lesser or higher amount of stomn water compliance inspection is warranted in the opinion of the city engineer E-33 Page 1 of 1 REV 4/30/10 '^\wp-> STORM WATER Development Services Land Development Engineering '^\wp-> STANDARDS Development Services Land Development Engineering CITY OF QUESTIONNAIRE E-34 1635 Faraday Avenue 760-602-2750 CZ A,R. L.SOA.[D QUESTIONNAIRE E-34 www.carlsbadca.gov INSTRUCTIONS: To address post-development pollutants that may be generated from development projects, the City requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMP's) into the project design per the City's Standard Urban Stormwater Management Plan (SUSMP). To view the SUSMP, refer to the Engineering Standards (Volume 4, Chapter 2) at www.carisbadca.qov/standards. Initially this questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision, discretionary pennits and/or construction permits). The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to 'Standard Stonnwater Requirements' or be subject to additional criteria called 'Priority Development Project Requirements'. Many aspects of project site design are dependent upon the storm water standards applied to a project. Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent stonn water standards than initially assessed by you, this will result in the return of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the City. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff. A separate completed and signed questionnaire must be submitted for each new development application submission. Only one completed and signed questionnaire is required when multiple development applications forthe same project are submitted concurrently. In addition to this questionnaire, you must also complete, sign and submit a Project Threat Assessment Form with construction permits for the project. Please start by completing Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your application to the city, STEP1 TO BE COMPLETED FOR ALL PROJECTS 1 To determine if your project is a priority development project, please answer the following questions: YES NO 1. Is your project LIMITED TO constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria: (1) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non-erodible permeable areas; OR (2) designed and constructed to be hydraulically disconnected from paved streets or roads; OR (3) designed and constructed with penneable pavements or surfaces in accordance with USEPA Green Streets guidance? 2. Is your project LIMITED TO retrofitting or redeveloping existing paved alleys, streets, or roads that are designed and constructed in accordance with the USEPA Green Streets guidance? If you answered "yes" to one or more ofthe above questions, then your project is NOT a priority development project and therefore is NOT subject to the stornn water criteria required for priority development projects. Go to step 4, mark the last box stating "my project does not meet PDP requirements" and complete applicant information. If you answered "no" to both questions, then go to Step 2. E-34 Page 1 of 3 Effective 6/27/13 CITY OF CARLSBAD STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov r: . . «««««« .M .£^4n^ „B&,&.^. * . - To determine if your project is a priority development project, please answer the following questions: YES NO 1. Is your project a new development that creates 10,000 square feet or more of impervious surfaces collectively over the entire project site? This includes commercial, industrial, residential, mixed-use, and public development projects on public or private land. 2. Is your project creating or replacing 5,000 square feet or more of impervious surface collectively over the entire project site on an existing site of 10,000 square feet or more of impervious surface? 77i/s includes commercial, industrial, residential, mixed-use, and public development projects on public or private land. 3. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption. 4. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a hillside development project? A hillside development project includes development on any natural slope that is twenty-five percent or greater 5. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a parking lot. A parking lot is a land area or facility for the temporary parking or storage of motor vehicles used personally for business or for commerce. 6. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a street, road, highway freeway or driveway? A street road, highway, freeway or driveway is any paved impervious surface used for the transportation of automobiles, trucks, motorcycles, and other vehicles. 7. Is your project a new or redevelopment project that creates or replaces 2,500 square feet or more of impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive Area (ESA)? "Discharging Directly to" includes flow that is conveyed overland a distance of 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the project to the ESA (i.e. not commingles with flows from adjacent lands).* 8. Is your project a new development that supports an automotive repair shop? An automotive repair shop is a facility that is categorized in any one of the following Standard Industrial Classification (SIC) codes: 5013, 5014, 5541, 7532-7534, or 7536-7539. 9. Is your project a new development that supports a retail gasoline outlet (RGO)? This category includes RGO's that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic (ADT) of 100 or more vehicles per day. 10. Is your project a new or redevelopment project that results in the disturtDance of one or more acres of land and are expected to generate pollutants post construction? 11.1s your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of impervious surface or (2) increases impervious surface on the property by more than 10%? If you answered "yes" to one or more of the above questions, you ARE a priority development project and are therefore subject to implementing structural Best Management Practices (BMP's) in addition to implementing Standard Storm Water Requirements such as source control and low impact development BMP's. A Storm Water Management Plan (SWMP) must be submitted with your application(s) for development. Go to step 3 for redevelopment projects. For new projects, go to step 4 at the end of this questionnaire, check the "my project meets PDP requirements" box and complete applicant information. If you answered "no" to all of the above questions, you ARE NOT a priority development project and are therefore subject to implementing only Standard Storm Water Requirements such as source control and low impact development BMP's required for all development projects. A Stonn Water Management Plan (SWMP) is not required with your application(s) for development. Go to step 4 at the end of this questionnaire, checic the "my project does not meet PDP requirements" box and complete applicant information. E-34 Page 2 of 3 Effective 6/27/13 STORM WATER Development Services Land Development Engineering STANDARDS Development Services Land Development Engineering ^ CITY OF CARLSBAD QUESTIONNAIRE E-34 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov TO BE COMPLETED FOR REPEVELOPIDIENT PROJECTS THAT ARE PRIORITY PEVELOPgiWiNT PRqjECTS ONLY Complete the questions below regarding your redevelopment project: YES NO 2' Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than 50% of the surface area ofthe previously existing development? If you answered "yes," the structural BMP's required for Priority Development Projects apply only to the creation or replacement of impervious surface and not the entire development Go to step 4, check the "my project meets PDP requirements" box and complete applicant information. If you answered "no," the structural BMP's required for Priority Development Projects apply to the entire development. Go to step 4, check the "my project meets PDP requirements" box and complete applicant information. STEP4 CHECK THE APPROPRIATE BOX AND COMPLETE APPLICANT INFORMATION • (f My project meets PRIORITY DEVELOPMENT PROJECT (PDP) requirements and must comply with additional stonnwater criteria per the SUSMP and 1 understand 1 must prepare a Storm Water Management Plan for submittal at time of application. I understand flow control (hydromodification) requirements may apply to my project Refer to SUSMP for details. My project does not meet PDP requirements and must only comply with STANDARD STORMWATER REQUIREMENTS per the SUSMP. As part of these requirements, 1 will incorporate low impact development strategies throughout my project. Applicant Information and Signature Box Applicant Narpe: '• ~Z \. 0~ Applicant Title Applicant Signature: Date: This Box for City Use Only ProjectlD:^^<^^^Q^ c) * Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the F?ARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their quivalent under the Multi Species Conservation Program within the Cities and County of San Diego; and any other equivalent environmentally sensitive areas which have been identified by the Copermittees. E-34 Page 3 of 3 Effective 6/27/13 CITY OF CARLSBAD STORM WATER COMPLIANCE FORM TIER 1 CONSTRUCTION SWPPP E-29 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov STORM WATER COMPLIANCE CERTIFICATE My project is not in a category of permit types exempt from the Construction SWPPP requirements My project is not located inside or within 200 feet of an environmentally sensitive area with a significant potential for contributing pollutants to nearby receiving waters by way of stomri water runoff or non-sform water clischarge(s). ^ My project does not require a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 ofthe Carlsbad Municipal Code) My project will not result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement removal, equipment storage, refueling and maintenance areas that meets one or more ofthe additional following criteria: • located within 200 feet of an environmentally sensitive area or the Pacific Ocean; and/or, • disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical; and/or • disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse; and/or • construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). I CERTIFY TO THE BEST OF MY KNOWLEDGE THAT ALL OF THE ABOVE CHECKED STATEMENTS ARE TRUE AND CORRECT. I AM SUBMITTING FOR CITY APPROVAL A TIER 1 CONSTRUCTION SWPPP PREPARED IN ACCORDANCE WITH THE REQUIREMENTS OF CITY STANDARDS. 1 UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT BEST MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION ACTIVITIES TO THE MAXIMUM EXTENT PRACTICABLE TO MINIMIZE THE MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO MINIMIZE THE EXPOSURE OF STORM WATER TO CONSTRUCTION RELATED POLLUTANTS; AND, (2) ADHERE TO, AND AT ALL TIMES, COMPLY WITH THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP THROUGHOUT THE DURATION OF THE CONSTRUCTION ACTIVITIES UNTIL THE CONSTRUCTION WORK IS COMPLETE AND APPROVED BY THE CITY OF CARLSBAD. OWNE9^)/OWNER'S AGENT NAME (PRINT) OWNERlS)/OWNER'S AGENT NAME (SIGNATURE) STORM WATER POLLUTION PREVENTION NOTES 1. ALL NECESSARY EQUIPMENT AND MATERIALS SHALL BE AVAILABLE ON SITE TO FACILITATE RAPID INSTALLATION OF EROSION AND SEDIMENT CONTROL BMPS WHEN RAIN IS EMINENT. 2. THE OWNER/CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL. 3. THE OWNER/CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEERING OR BUILDING INSPECTOR DUE TO UNCOMPLETED GRADING OPERATIONS OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. 4. ALL REMOVABLE PROTECTIVE DEVICES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH FIAINFALL. 5. ALL GRAVEL BAGS SHALL BE BURLAP TYPE WITH 3/4 INCH MINIMUM AGGREGATE. 6. ADEQUATE EROSION AND SEDIMENT CONTROL AND PERIMETER PROTECTION BEST MANAGEMENT PF^ACTICE MEASURES MUST BE INSTALLED AND MAINTAINED. SPECIAL NOTES PROJECT INFORMATION Site Address: \<,^<; j^k ^ ^ Assessor's Parcel Numl$ir?i S^" 0^0 '^^'QL Project ID: _ Constmction Pennit No.: ^--^^ /^l/ ^ Estimated Constmction Start Date 5 Project Duration. Months Emergency Contact: Name: 24 hour Phone: Perceived Threat to Storm Water Quality Q Medium n^Low If mediumT)ox is checked, must attach a site plan sheet showing proposed work area and location of proposed structural BMPs For City Use Only CITY STAND Approved By: Date: IAD IWPPP <6A-7//y E-29 Page 1 of 3 REV 4/30/10 Erosion Control BMPs Sediment Control BMPs Tracking Control BMPs Non-Storm Water Management BMPs Waste Management and Materials Pollution Control BMPs Best Management Practice (BMP) Description Geotextiles & Mats Wood Mulching Earth Dikes and Drainage Swales Slope Drains Silt Fence Sediment Trap Check Dam Fiber Rolls Gravel Bag Berm Street Sweeping and Vacuuming Sandbag Barrier Storm Drain Inlet Protection Stabilized Construction Ingress/Egress Stabilized Construction Roadway Water Conservation Practices Paving and Grinding Ooerations Potable Water/Irrigation Vehicle and Equipment Cleanina Material Delivery and Storaae Material Use Stockpile Management Spill Prevention and Control Solid Waste Manaoement Hazardous Waste Manaoement Concrete Waste Manaoement CASQA Designation Construction Activity EC-7 EC-8 EC-9 EC-11 i SE-1 SE-3 SE-4 SE-5 SE-6 SE-7 SE-8 SE-10 TR-1 TR-2 NS-1 NS-3 NS-7 NS-8 WM-1 WM-2 WM-3 WM-4 WM-5 WM-6 WM-8 V Grading/Soil Disturbance Y- ' Trenching/Excavation r ' Stockpiling Drilling/Boring Concrete/Asphalt Saw cutting -Concrete flatwork -Paving V'--p Conduit/Pipe Installation T Stucco/Mortar Work L Waste Disposal Staging/Lay Down Area Equipment Maintenance and Fueling Hazardous Substance Use/Storage Dewatering Site Access Across Dirt Other (list): Instructions: Begin by reviewing the list of construction activities and checking the box to the left of any activity that will occur during the proposed constmction. Add any other activity descriptions in the blank activity description boxes provided for that pun)ose and place a check in the box immediately to the left of the added activity description. For each activity descmbed, pick one or more best management practices (BMPs) from the list located along the top of the form. Then place an X in the box at the place where the activity row intersects with the BMP column. Do this for each activity that was checked off and for each of the selected BMPs selected from the list. For Example - If the project includes site access across dirt, then check the box to the left of "Site Access Across Dirt". Then review the list for something that applies such as "Stabilized Constmction Ingress/Egress" under Tracking Control. Follow along the "Site Access Across Dirt" row until you get to the "Stabilized Constmction Ingress/Egress" column and place an X in the box wiiere the two meet. As another example say the project included a stockpile that you intend to cover with a plastic sheet. Since plastic sheeting is not on the list of BMPs, then write in "Cover with Plastic" in the blank column under the heading Erosion Control BMPs. Then place an X in the box where the "Stockpiling" row intersects the new "Cover with Plastic" column. To leam more about what each BMP description means, you may wish to review the BMP Reference Handout prepared to assist applicants in the selection of appropriate Best Management Practice measures. The reference also explains the Califomia Stormwater Quality Association (CASQA) designation and how to apply the various selected BMPs to a project. E-29 Page 2 of 3 REV 4/30/10 CITY OF CARLSBAD PLANNING DIVISION BUILDING PLAN CHECK APPROVAL P-29 Development Services Planning Division 1635 Faraday Avenue (760) 602-4610 www.carlsbadca.eov DATE: 5-15-14 PROJECT NAIVIE: PROJECTID: PLAN CHECK NO: CB 14-1079 SET#: 1 ADDRESS: 1525 White Sage Way APN: ^ This plan check review is complete and has been APPROVED by the Division. By: Chris Sexton A Final Inspection by the Planning Division is required • Yes ^ No You may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. Q This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check APPROVAL has been sent to: carriejones@hotmail.com For questions or clarifications on the attached checklist please contact the following reviewer as marked: PLANNING 760-602-4610 ENGINEERING 760-602-2750 FIRE PREVENTION 760-602-4665 X Chris Sexton 760-602-4624 Chris.Sexton@carlsbadca.gov 1 1 Kathleen Lawrence 760-602-2741 Kathleen.Lawrence@carlsbadca.fiov 1 1 Greg Ryan 760-602-4663 Gregorv.Rvan@carlsbadca.fiov 1 1 Gina Ruiz 760-602-4675 Glna.Ruiz@carlsbadca.fiov 1 Linda Ontiveros 760-602-2773 Linda.Ontlveros@carlsbadca.fiov Q Cindy Wong 760-602-4662 Cvnthia.Wonfi@carlsbadca.gov • • 1 1 Dominic Fieri 760-602-4664 Dominic.Fierl@carlsbadca.fiov Remarks: