Loading...
HomeMy WebLinkAbout1610 Faraday Ave; ; CBC2018-0181; Recycle{'cicyof Carlsbad NONRESIDENTIAL GREEN BUILDING CODE STANDARDS MANDATORY MEASURES CERTIFICATION CHECKLIST B-52 :ervices 1g Division day Avenue 0-602-2719 lsbadca.gov This form, signed and completed, and all receipts for the recycled materials shall be submitted to the Bui/ding Inspector prior to Final Inspection. Site Development Mandatory 5.106.1 Storm water pollution prevention plan. For projects of one acre or less, develop a Storm Water Pollution Prevention Plan (SWPPP) that has been designed specific to its site, conforming to (X) the State Storm water NPDES Construction Permit or local ordinance, whichever is stricter, as is required for projects over one acre. The plan should cover prevention of soil loss by storm water run-off and/or wind erosion, of sedimentation and/or of dusUparticu\ate matter air pollution. 5.106.4 Bicycle parking and changing rooms. Comply with Sections 5.106.4.1 and 5.106.4.2; or (X) meet local ordinance, whichever is stricter. 5.106.4.1 Short-Term bicycle parking. If the project is expected to generate visitor traffic, provide permanently anchored bicycle racks within 200 feet of the visitor's entrance, readily visible to (X) passers-by, for 5 percent of visitor motorized vehicle parking capacity, with a minimum of one two- bike capacity rack. 5.106.4.2 Long Term bicycle parking. For buildings with over 10 tenant-occupants, provide secure bicycle parking for 5 percent of tenant-occupied motorized vehicle parking capacity, with a minimum (X) of one space. 5.106.5.2 Designated parking. Provide designated parking for any combination of low emitting, fuel-efficient and carpool/van pool vehicles as shown in Table 5.106.5.3.1. (X) 5.106.8 Light pollution reduction. Comply with lighting power requirements in the California Energy Code and design interior lighting such that zero direct-beam illumination leaves the building (X) site. Meet or exceed exterior light levels and uniformity ratios for lighting zones 1-4 as defined in Chapter 10 of the California Administrative Code, using the following strategies: 1. Shield all exterior luminaries or use cutoff luminaries (X) 2. Contain interior lighting within each source (X) 3. Allow no more than .01 horizontal foot candle 15ft. beyond the site (X) 4. Contain all exterior lighting within property boundaries (X) Exception: See part 2, Chapter 12, Section 1205.6 for campus lighting requirements for parking facilities and walkways. 5.106.10 Grading and paving. The site shall be planned and developed to keep surface water away from buildings. Construction plans shall indicate how site grading or drainage system will (X) manaoe all surface water flows. Water Efficiency and Conservation Indoor Water Use 5.303.1 Meters. Separate meters shall be installed for the uses described in Sections 503.1. 1 through 503.1.3. (X) 5303.1.1 Buildings in excess of 50,000 square feet. Separate sub-meters shall be installed as follows: (X) 1. For each individual leased, rented, or other tenant space within the building projected to consume more than 100 gal/day. 2. For spaces used for laundry or cleaners, restaurant or food service, medical or dental office, laboratory or beauty salon or barber shop orojected to consume more than 100 aal/dav. 15.303.1.2 Excess consumption. Any building within a project or space within a building that is I projected to consume more than 1,000 gal/day. (X) B-52 Page 1 of 5 Rev. 5/17 I , 5.303 Percent savings. A schedule of plumbing fixtures and fixture fillings that will reduce the overall use of potable water within the building by 20 percent shall be provided (Calculate (X) savings by Water Use Worksheets or utilize Table 5.303.2.3). 5.303.2.1 Multiple showerheads serving one shower. When single shower fixtures are served by more than one showerhead, the combined flow rate of all the showerheads shall not (X) exceed the maximum flow rates specified in the 20 percent reduction column contained in Table 5.303.2.3 or the shower shall be designed to allow only one showerhead to be in ooeration at a time. 5.303.6 Plumbing fixtures and fittings. Plumbing fixtures (water closets and urinals) and fittings (faucets and showerheads) shall comply with the requirements listed As applicable for each type in items listed in Table 5.303.6. 1. Water closets (toilets) -flushometer type (X) 2. Water closets (toilets) -tank type (X) 3. Urinals (X) 4. Public lavatory faucets (X) 5. Public metering self-closing faucets (X) 6. Residential bathroom lavatory sink faucets (X) 7. Residential bathroom lavatory sinks (X) 8. Residential showerheads (X) 9. Sinale shower fixtures served bv more than one showerhead ( X) Outdoor Water Use 5.304.1 Water Budget. A water budget shall be developed for landscaping irrigation use. (X) 5.304.2 Outdoor potable water use. For new water service, separate meters or submeters shall be installed for indoor and outdoor potable water use for landscaped areas between 1,000 and 5,000 square feet. (X) 5.304.3 Irrigation design. In new nonresidential projects with between 1,000 and 2,500 square feet of landscaped area (the level at which the MLO applies), install irrigation controllers and sensors which include the following criteria and meet manufacturer's recommendations. 5.304.1.1 Irrigation controllers. Automatic irrigation system controllers installed at the time of final inspection shall comply with the following: 1. Controllers shall be weather-or soil moisture-based controllers that automatically adjust irrigation in response to changes in plant's needs as weather conditions change. (X) 2. Weather based controllers without integral rain sensors or communication systems that As applicable account for local rainfall shall have separate wired or wireless rain sensors which connects or (X) communicates with the controller(s). Soil moisture-based controllers are not required to have rain sensor input. Construction Waste Management Plan 5.408.1 Construction waste diversion. Establish a construction waste management plan or (X) meet local ordinance, whichever is more stringent. (X) 5.408.2 Construction waste management plan. Submit plan per this section to enforcement authority within the city. 5.408.1.4 Documentation. Provide documentation of the waste management plan (see form (X) B-59) that meets the requirements listed in Section 5.408.1.1 thru 5.408.1.3 and the plan is accessible to the enforcement authority. 5.408.3 Construction waste. Recycle and/or salvage for reuse a minimum of 50 percent of nonhazardous construction and demolition debris or meet local ordinance, whichever is more stringent. (X) Exceptions: 1. Excavated soil and land-clearing debris 2. Alternate waste reduction methods, developed by working with local agencies if diversion or recycle facilities capable of compliance with this item do not exist. 5.408.3 Excavated soil and land clearing debris. 100 percent of trees. Stumps, rocks and associated vegetation and soils resulting primarily from land clearing shall be reused or recycled. B-52 Page 2 of 5 Rev. 5/17 • Building Maintenance and Operation 5.410.1 Recycling by occupants. Provide readily accessible areas that serve the entire building and are identified for the depositing, storage and collection of nonhazardous materials ( X) for recycling. 5.410.2 Commissioning. For new buildings 10,000 square feet and over, building (X) commissioning for all building systems covered by T24, Part 6, process systems and renewable energy systems shall be included in the design and construction processes of the building project. Commissioning requirements shall include items listed in Section 5.410.2. - 5.410.26 (X) 5.410.2.1 Owner's Project Requirements (OPR). Documented before the design phase of the project begins the OPR shall include items listed in Section 5.410.4. ( X) 5.410.2.2 Basis of Design (BOD). A written explanation of how the design of the building systems meets the OPR shall be completed at the design phase of the building project and updated periodically to cover the systems listed in Section 5.410.2.2. ( X) 5.410.2.3 Commissioning plan. A commissioning plan describing how the project will be commissioned shall be started during the design phase of the building project and shall include items listed in Section 5.410.2.3. (X) 5.410.2.4 Functional performance testing shall demonstrate the correct installation and operation of each component, system and system-to-system interface in accordance with the ( X) approved plans and specifications. 5.410.2.5 Documentation and training. A Systems manual and systems operations training are required. (X) 5.410.2.5.1 Systems manual. The systems manual shall be delivered to the building owner or representative and facilities operator and shall include the items listed in Section 5.410.2.5.1. ( X) 5.410.2.5.2 Systems operations training. The training of the appropriate maintenance staff for each equipment type and/or system shall include items listed in Section 5.410.2.5.2. ( X) 5.410.2.6 Commissioning report. A complete report of commissioning process activities undertaken through the design, construction and reporting recommendations for post construction phases of the building project shall be completed and provided to the owner or representative. 5.410.4 Testing and adjusting. Testing and adjusting of systems shall be required for (X) buildings less than 10,000 square feet. 5.410.4.2 Systems. Develop a written plan of procedures for testing and adjusting systems. (X) Systems to be included for testing and adjusting shall include, as applicable to the project, the systems listed in Section 5.410.3.2. ( X) 5.410.4.3 Procedures. Perform testing and adjusting procedures in accordance with industry best practices and applicable national standards on each system. ( X) 5.410.4.3 HVAC balancing. Before a new space-conditioned system serving a building or space is operated for normal use, the system should be balanced in accordance with the procedures defined by national standards listed in Section 5.410.3.3.1. ( X) 5.410.4.4 Reporting. After completion of testing, adjusting and balancing, provide a final report (X) of testing signed by the individual responsible for performing those services. maintenance instructions and copies of guaranties/warranties for each system prior to final inspection. 5.410.4.5 Operation and maintenance manual. Provide the building owner with detailed operating and maintenance manual 5.410.4.5.1 Inspection and reports. Include a copy of all inspection verifications and reports reauired bv the enforcina aaencv. B-52 Page 3 of 5 Rev. 5/17 ,, Environmental Quality Fireplaces 5.503.1 Install only a direct-vent sealed-combustion gas or sealed wood-burning fireplace or a (X) sealed woodstove and refer to residential requirements in the California Energy Code, Title 24, Part 6, Subchapter 7, Section 150. As Applicable 5.503.1.1 Woodstoves. Woodstoves shall comolv with US EPA Phase II emission limits. ( X) Weather Resistance and Moisture Management 5.407.1 Weather protection. Provide a weather-resistant exterior wall and foundation envelope as required by California Building Code Section 1403.2 and California Energy Code Section 150, (X) manufacturer's installation instruction instructions or local ordinance, whichever is more stringent. 5.407.2 Moisture control. Employ moisture control measured by the following methods: 5.407.2.1 Sprinklers. Prevent irrigation spray on structures. (X) 5.407.2.2 Entries and openings. Design exterior entries and openings to prevent water intrusion (X) into buildinas. Pollution Control 5.504.3 Covering of duct openings and protection of mechanical equipment during construction. At the time of rough installation or during storage on the construction site and until final start up of the heating and cooling equipment, all duct and other related air distribution (X) component openings shall be covered with tape, plastic, sheet metal or other methods to reduce the amount of debris or duct which may collect in the svstem. 5.504.5.3 Filters. In mechanically ventilated buildings, provide regularly occupied areas of the buildina with outside and return air orior to occunancv that provides at least a MERV of 8. 5.504.4 Finish material pollutant control. Finish materials shall comply with Sections 5.504.4.1 through 5.504.4.6 5.504.4.1 Adhesives, sealants, caulks. Adhesives and sealants used on the project shall meet the requirements of the following standards: (X) 1. Adhesives, adhesive bonding primers, adhesive primers, sealants, sealant primers and caulks shall comply with local or regional air pollution control or air quality management district rules where applicable or SCAQMD Rule 1168 voe limits as shown in Tables 5.504.4.1 and 5.504.4.2. 2. Aerosol adhesives and smaller unit sizes of adhesives and sealant or caulking compounds (in units of product, less packaging, which do not weigh more than one pound and do not consist of more than 16 fluid ounces) shall comply with statewide voe standards and other requirements, including prohibitions on use of certain toxic compounds, of California Code of Regulations, Title 17, commencing with Section 94507. 5.504.4.3 Paint and coatings. Architectural paints and coatings shall comply with Table 5.504.4.3 5.504.4.3.1 Aerosol paints and coatings. Aerosol paints and coatings shall meet the Product- Weighted MIR limits for ROG in Section 94522 (a)(3) and other requirements, including prohibition on use of certain toxic compounds and ozone depleting substances (CCR, Title 17, Section 94520 et seq.). 5.504.4 Carpet systems. All carpet installed in the building interior shall meet the testing and product requirements of one of the standards listed in Section 5.504.4.4. 50504.4.4.1 Carpet cushion. All carpet cushion installed in the building interior shall meet the requirements of the Carpet and Rug Institute Green Label Program. 5.504.4.4.2 Carpet adhesive. All carpet adhesive shall meet the requirements of Table 804.4.1. 5.504.4.5 Composite wood products. Hardwood, plywood, particleboard and medium density fiberboard composite wood products used on the interior or exterior of the building shall meet the requirements for formaldehyde as specified in Table 5.504.4. 5.504.4.5.2 Documentation. Verification of compliance with this section shall be provided as requested by the enforcing agency. Documentation shall include at least one of the following: 1. Product certification and specifications 2. Chain of custody certifications 3. Other methods acceptable to the enforcing agency 5.504.4.6 Resilient flooring systems. Comply with the voe emission limits defined in the 2009 ( X) CHPS criteria and listed on its Low-emitting Materials List (or product registry) or certified under the FloorScore oroaram of the Resilient Floor Coverina Institute. B-52 Page 4 of 5 Rev. 5/17 • Indoor Moisture and Radon Control 5.505.1 Indoor moisture control. Buildings shall meet or exceed the provisions of the California Buildinq Code, Title 24 Part 2, Sections 1203 (Ventilation) Chapter 14.1. (X) Air quality and Exhaust 5.506.1 Outside air delivery. For mechanically or naturally ventilated spaces in buildings, meet the (X) minimum requirements of Section 121 of the California Energy Code, CCR, Title 24, Part 6 and Chapter 4 of CCR, Title 8 or the applicable local code, whichever is more stringent. 5.506.2 Carbon DIOXIDE (CO2) monitoring. For buildings equipped with demand control ventilation, CO2 sensors and ventilation controls shall be specified and installed in accordance with the (X) reauirements of the latest edition of the California Enerav Code, Title 24, Part 6, Section 120.1.(C) (4). Outdoor Air Quality 5.508.1 Ozone depletion and global warming reductions. Installations of HVAC, refrigeration and fire suppression equipment shall comply with Sections 5.508.1.1 and 5.508.1.2. As 5.508.1 CFCs. Install HVAC and refrigeration equipment that does not contain CFCs. applicable 5.508.1.2 Halons. Install fire suppression equipment that does not contain Halons. (X) (X) I, as the professional responsible for this project, certify that, to the best of my knowledge, the mandatory items listed on this form have been incorporated into the project in order to comply with Title 24, Part 11 of the 2016 California Green Building Standards. All receipts for recycled materials have been attached to this form. Project Address: /Clo 5,r.q,r,t,a V Plan Check Number: {! f3 C: 26 J'ef · UI~ "· ' Print Name: JJ/<Jt/JO A. Kl' <J. C SignedG7~ ~ 0 . I License Number: {<;t;qq,;s Date: B.·(-/.5T B-52 Page 5 of 5 Rev. 5117 (city of Carlsbad Owner: WASTE MANAGEMENT PLAN B-59 Contractor: Development Services Building Division 1635 Faraday Avenue 760-602-2719 www .ca rls ba dca.gov Job Address: /Cl{> Fa,rp .n'«p Phone Number: CI o/ '2 c;-'j "! 7 ~ 7 Permit#: {'13 t' Z o 1 ~ -O I & I oe:: Estimated Cost of Project: $,_~2......,3"'---''fr'e;,,-• __,0"-'0c....=CI~. ------- Type Of Project D New Construction a(Remodel or T.I. D Residential D Commercial D Demolition (check all that apply) D Other ------------------------------ Non-hazardous construction waste generated during the course of this project shall be recycled and/or salvaged for re-use at a minimum of 65% per CALGreen Sec. 5.408.1. Failure to comply may result in a penalty fee up to $1,000. For projects which consist of mainly equipment and/or racking, that have a combined weight of new construction disposal that does not exceed 2 lbs per square foot of building area affected by this permit, may be deemed to meet the 65% minimum requirement upon approval of Building Department. ALTERNATIVE FORMS OF COMPLIANCE: (If selected, do not complete Tables 1 & 2 below) D Construction waste shall not exceed 2 lbs. per sf. of area. All receipts shall be provided to the Building Official prior to final. (This option not applicable for most construction projects.) Square feet of construction area X 2 lbs. = lbs. of allowable waste. D I plan on using a WASTE MANAGEMENT roll-off bin. All receipts shall be provided to the Building Official prior to final. Table 1-Estimated Waste (To be filled out prior to permit issuance-refer to example on Page 2.) MATERIALS lbs. of waste to be taken to lbs. of waste to be Waste Hauling Company or Re-Use Method LANDFILL RE-USED or RECYCLED Asphalt/ Concrete ll//1,1.' Brick/ Masonry A) ;~, Cardboard 1110 Joo ,1h ' Drywall ,<'06 ~60 r ~l:,1c, r Landscape Debris II/ J'J Lumber/ Wood 1/000 #()00 caj; __ ,, ~ v { -,_,__/ Metals {i'Z,.00 ·7/\f\ {lo/;.,," r Mixed Waste .JO() q;,, ... ', ~. 'dn r' .4 ,.-- Trash I GarbaQe t..roi:, ~ ,. .. hd..r: .,i ,, <7 A.~ I' , .... ,,,,_. Other: TOTAL lbs: Estimated Percentage to be Re-Used or Recycled __ 5'...,_,.0 ____ % vided herein, to the best of my knowledge, is true and correct. ' 8 -l-16 Contractor or Own Date Official Use Only D Plan Approved D Plan Denied D Project Valuation Approved Reviewed/ Approved by: _________________ _ Page 1of 2 REV.01-2017 • Table 2 -Actual Waste (To be completed after construction.) MATERIALS lbs. of waste taken to lbs. of waste Waste Hauling Company or Re-Use Method LANDFILL RE-USED or RECYCLED (complete only if different than Table 1) Asphalt/ Concrete Brick/ Masonl)I Cardboard Dl)IWall Landscape Debris Lumber/ Wood Metals Mixed Waste Trash I Garba~e Other: TOTAL lbs.: Actual Percentage Re-Used or Recycled. ______ % Official Use Only 0 65% Goal Achieved O 65% Goal Not Achieved D Alternative Compliance Achieved Penalty Paid $ _______ _ Reviewed/ Approved by:. _________________ _ EXAMPLE: Use the following example as a guide to completing this form. MATERIALS lbs. of waste to be taken to lbs. of waste to be LANDFILL RE-USED or RECYCLED Asphalt I Concrete 0 3000 Brick I Masonry 100 'l50 Cardboard 0 150 Drywall 0 50 Landscape Debris 0 120 Lumber I Wood 500 0 Metals 300 200 Mixed Waste 1500 0 Trash I Garbage 300 0 Other: Pool c;uV\,lte 0 900 TOTAL lbs.: 2700 5,3"J-0 Percentage to be Re-Used or Recycled 6 7 % Formula: Total Re-used or Recycled X 100 = % Re-Used or Recycled (Total Combined Waste) Waste Hauling Company or Re-Use Method A '&C rt~ ullvv, Co. WM I Re-w;evl '&rlciz oV\,-slte ,,;isc '-'~ uli.V1,r, Co. A'&C rt~ul[V1,Cj Co. Muld1evl i; Re-usevl OV\,-slte w~ste M~V1,CT/1eV\,CeV\,t WM I ABC rt~ullvcg WM WM 1-{sevl CTs cvusvievl '&~se ovc-slte 5370 X 100 = 67% Re-Used or Recycled (2700 + 5370) Since 67% exceeds the minimum requirement of 65%, this plan complies. Page 2 of 2 PALOMAR TRANSFER STA 5960 EL CAMINO REAL CARLSBAD, CA 92008 06/21/2018 08:38:21 Card# Chp Card: AID: ATC: ARQC: SEQ#: Bat.ch #: INVOICE Approval Code Entry Method: Mode: Tax Amolllt: SAlE AMOUNT CREDIT CARD MC SALE XXXXXXXXXXXiSB01 MasterCard A0000000041010 DUE 5FF6B08FFCDC004C 11 510 11 84777C Ch~ Read Issuer $0.00 $29.55 CUSTOMER COPY Signature: CUSTOMER fH 2 ,1. 00 ~ion ' Scale In Scale Out 100% :,1 Ticket #:1775264 Weighmaster: reyesma3 In: June 21, 2018 Out: June 21, 2018 Vehicle: M23 Ref: BOL: INBOUND CASH Rate Extension $0.00 $29.55 Tax $0.00 Total Paid Change .EDIT CARD-SCALE 8:37 am 8:37 am Total $29.55 $29.55 $29.55 $0.00 me Pl 5' Cl (' PALu"AR IRANmRSTA 5960 EL CAMINO REAL CARLSBAD, CA 9200B 06/19/2018 08:14:06 CREDIT CARD 54 Ticket #: 1774202 Weighmaster: reyesma3 In: June 19, 2018 0( AI Ci MC SALE STOMER Out: June 19, 2018 Vehicle: M23 c, Card# Ch~ Card: AID: ATC: ARQC: SEQ#: Batch #: INVOICE Approval Code: Entry Method: Mode: Tax Amount: SALE AMOUNT XXXXXXXXXXXX5B01 MasterCard A0000000041010 OllD 2 A3D42F633B49E6CC 10 SOB 10 po 73424C I Chip Read rn Issuer i $0,00 : $29.55 CUSTOMER COPY Signature: Ref: BOL: Scale In Scale Out INBOUND 100% CASH Rate Extension $0.00 $29.55 Tax $0.00 Total Paid Change .EDIT CARD-SCALE 8:13 am 8:13 am Total $29.55 $29.55 $29.55 $0.00 MC 54 Ticket#: 1777530 Weighmaster: gomezda PALOMAR TRANSFER s I { 5960 EL CAMINO REAL CARLSBAD, CA 92008 06/26/2018 09:09:15 i In: June 26, 2018 Card# Chip Card: AID: ATC: ARQC: SEQ#: Batrll #: INVOICE ,ljlproval Code: Entry Method: Mode: Tax Amount: CREDIT CARD MC SALE XXXXXXXXXXXX5801 MasterCard A0000000041010 0122 D27480ABF566092C 22 515 23 54472C Ch~ Read Issuer $0.00 SAlE AMOUNT $2955 CUSTOMER COPY Signature: K CUSTOMER FASH 2 I Scale In Out: June 26, 2018 Vehicle: M23 Ref: BOL: i Scale Out INBOUND 1. 00 1 iption I 100% CASH Rate Extension Tax $0.00 $0.00 $29.55 Total Paid Change .EDIT CARD-SCALE 9:08 am 9:08 am Total $29.55 $29.55 $29.55 $0.00 MC