This form, signed and completed, and all receipts for the recycled materials shall be
submitted to the Bui/ding Inspector prior to Final Inspection.
Site Development Mandatory
5.106.1 Storm water pollution prevention plan. For projects of one acre or less, develop a Storm
Water Pollution Prevention Plan (SWPPP) that has been designed specific to its site, conforming to (X)
the State Storm water NPDES Construction Permit or local ordinance, whichever is stricter, as is
required for projects over one acre. The plan should cover prevention of soil loss by storm water
run-off and/or wind erosion, of sedimentation and/or of dusUparticu\ate matter air pollution.
5.106.4 Bicycle parking and changing rooms. Comply with Sections 5.106.4.1 and 5.106.4.2; or (X)
meet local ordinance, whichever is stricter.
5.106.4.1 Short-Term bicycle parking. If the project is expected to generate visitor traffic, provide
permanently anchored bicycle racks within 200 feet of the visitor's entrance, readily visible to (X)
passers-by, for 5 percent of visitor motorized vehicle parking capacity, with a minimum of one two-
bike capacity rack.
5.106.4.2 Long Term bicycle parking. For buildings with over 10 tenant-occupants, provide secure
bicycle parking for 5 percent of tenant-occupied motorized vehicle parking capacity, with a minimum (X)
of one space.
5.106.5.2 Designated parking. Provide designated parking for any combination of low emitting,
fuel-efficient and carpool/van pool vehicles as shown in Table 5.106.5.3.1. (X)
5.106.8 Light pollution reduction. Comply with lighting power requirements in the California
Energy Code and design interior lighting such that zero direct-beam illumination leaves the building (X)
site. Meet or exceed exterior light levels and uniformity ratios for lighting zones 1-4 as defined in
Chapter 10 of the California Administrative Code, using the following strategies:
1. Shield all exterior luminaries or use cutoff luminaries (X)
2. Contain interior lighting within each source (X)
3. Allow no more than .01 horizontal foot candle 15ft. beyond the site (X)
4. Contain all exterior lighting within property boundaries (X)
Exception: See part 2, Chapter 12, Section 1205.6 for campus lighting requirements for parking
facilities and walkways.
5.106.10 Grading and paving. The site shall be planned and developed to keep surface water
away from buildings. Construction plans shall indicate how site grading or drainage system will (X)
manaoe all surface water flows.
Water Efficiency and Conservation
Indoor Water Use
5.303.1 Meters. Separate meters shall be installed for the uses described in Sections 503.1. 1
through 503.1.3.
(X)
5303.1.1 Buildings in excess of 50,000 square feet. Separate sub-meters shall be installed as
follows: (X) 1. For each individual leased, rented, or other tenant space within the building projected to
consume
more than 100 gal/day.
2. For spaces used for laundry or cleaners, restaurant or food service, medical or dental office,
laboratory or beauty salon or barber shop orojected to consume more than 100 aal/dav.
15.303.1.2 Excess consumption. Any building within a project or space within a building that is I
projected to consume more than 1,000 gal/day. (X)
B-52 Page 1 of 5 Rev. 5/17
I
,
5.303 Percent savings. A schedule of plumbing fixtures and fixture fillings that will reduce the
overall use of potable water within the building by 20 percent shall be provided (Calculate (X)
savings by Water Use Worksheets or utilize Table 5.303.2.3).
5.303.2.1 Multiple showerheads serving one shower. When single shower fixtures are
served by more than one showerhead, the combined flow rate of all the showerheads shall not (X)
exceed the maximum flow rates specified in the 20 percent reduction column contained in
Table 5.303.2.3 or the shower shall be designed to allow only one showerhead to be in
ooeration at a time.
5.303.6 Plumbing fixtures and fittings. Plumbing fixtures (water closets
and urinals) and fittings (faucets and showerheads) shall comply with the requirements listed As applicable
for each type in items listed in Table 5.303.6.
1. Water closets (toilets) -flushometer type (X)
2. Water closets (toilets) -tank type (X)
3. Urinals (X)
4. Public lavatory faucets (X)
5. Public metering self-closing faucets (X)
6. Residential bathroom lavatory sink faucets (X)
7. Residential bathroom lavatory sinks (X)
8. Residential showerheads (X)
9. Sinale shower fixtures served bv more than one showerhead ( X)
Outdoor Water Use
5.304.1 Water Budget. A water budget shall be developed for landscaping irrigation use. (X)
5.304.2 Outdoor potable water use. For new water service, separate meters or submeters
shall be installed for indoor and outdoor potable water use for landscaped areas between
1,000 and 5,000 square feet. (X)
5.304.3 Irrigation design. In new nonresidential projects with between 1,000 and 2,500
square feet of landscaped area (the level at which the MLO applies), install irrigation controllers
and sensors which include the following criteria and meet manufacturer's recommendations.
5.304.1.1 Irrigation controllers. Automatic irrigation system controllers installed at the time of
final inspection shall comply with the following:
1. Controllers shall be weather-or soil moisture-based controllers that automatically adjust
irrigation in response to changes in plant's needs as weather conditions change. (X)
2. Weather based controllers without integral rain sensors or communication systems that As applicable
account for local rainfall shall have separate wired or wireless rain sensors which connects or (X)
communicates with the controller(s). Soil moisture-based controllers are not required to have
rain sensor input.
Construction Waste Management Plan
5.408.1 Construction waste diversion. Establish a construction waste management plan or
(X)
meet local ordinance, whichever is more stringent. (X)
5.408.2 Construction waste management plan. Submit plan per this section to enforcement
authority within the city.
5.408.1.4 Documentation. Provide documentation of the waste management plan (see form (X) B-59) that meets the requirements listed in Section 5.408.1.1 thru 5.408.1.3 and the plan is
accessible to the enforcement authority.
5.408.3 Construction waste. Recycle and/or salvage for reuse a minimum of 50 percent of
nonhazardous construction and demolition debris or meet local ordinance, whichever is more
stringent. (X)
Exceptions:
1. Excavated soil and land-clearing debris
2. Alternate waste reduction methods, developed by working with local agencies if
diversion or recycle facilities capable of compliance with this item do not exist.
5.408.3 Excavated soil and land clearing debris. 100 percent of trees. Stumps, rocks and
associated vegetation and soils resulting primarily from land clearing shall be reused or
recycled.
B-52 Page 2 of 5 Rev. 5/17
•
Building Maintenance and Operation
5.410.1 Recycling by occupants. Provide readily accessible areas that serve the entire
building and are identified for the depositing, storage and collection of nonhazardous materials ( X)
for recycling.
5.410.2 Commissioning. For new buildings 10,000 square feet and over, building (X)
commissioning for all building systems covered by T24, Part 6, process systems and
renewable energy systems shall be included in the design and construction processes of the
building project. Commissioning requirements shall include items listed in Section 5.410.2. -
5.410.26 (X)
5.410.2.1 Owner's Project Requirements (OPR). Documented before the design phase of
the project begins the OPR shall include items listed in Section 5.410.4. ( X)
5.410.2.2 Basis of Design (BOD). A written explanation of how the design of the building
systems meets the OPR shall be completed at the design phase of the building project and
updated periodically to cover the systems listed in Section 5.410.2.2. ( X)
5.410.2.3 Commissioning plan. A commissioning plan describing how the project will be
commissioned shall be started during the design phase of the building project and shall include
items listed in Section 5.410.2.3. (X)
5.410.2.4 Functional performance testing shall demonstrate the correct installation and
operation of each component, system and system-to-system interface in accordance with the ( X)
approved plans and specifications.
5.410.2.5 Documentation and training. A Systems manual and systems operations training
are required. (X)
5.410.2.5.1 Systems manual. The systems manual shall be delivered to the building owner or
representative and facilities operator and shall include the items listed in Section 5.410.2.5.1. ( X)
5.410.2.5.2 Systems operations training. The training of the appropriate maintenance staff
for each equipment type and/or system shall include items listed in Section 5.410.2.5.2. ( X)
5.410.2.6 Commissioning report. A complete report of commissioning process activities
undertaken through the design, construction and reporting recommendations for post
construction phases of the building project shall be completed and provided to the owner or
representative.
5.410.4 Testing and adjusting. Testing and adjusting of systems shall be required for (X)
buildings less
than 10,000 square feet.
5.410.4.2 Systems. Develop a written plan of procedures for testing and adjusting systems. (X)
Systems to be included for testing and adjusting shall include, as applicable to the project, the
systems listed in Section 5.410.3.2. ( X)
5.410.4.3 Procedures. Perform testing and adjusting procedures in accordance with industry
best practices and applicable national standards on each system. ( X)
5.410.4.3 HVAC balancing. Before a new space-conditioned system serving a building or
space is operated for normal use, the system should be balanced in accordance with the
procedures defined by national standards listed in Section 5.410.3.3.1. ( X)
5.410.4.4 Reporting. After completion of testing, adjusting and balancing, provide a final report (X)
of testing signed by the individual responsible for performing those services.
maintenance instructions and copies of guaranties/warranties for each system prior to final
inspection.
5.410.4.5 Operation and maintenance manual. Provide the building owner with detailed
operating and maintenance manual
5.410.4.5.1 Inspection and reports. Include a copy of all inspection verifications and reports
reauired bv the enforcina aaencv.
B-52 Page 3 of 5 Rev. 5/17
,,
Environmental Quality
Fireplaces
5.503.1 Install only a direct-vent sealed-combustion gas or sealed wood-burning fireplace or a (X)
sealed woodstove and refer to residential requirements in the California Energy Code, Title 24,
Part 6, Subchapter 7, Section 150. As Applicable
5.503.1.1 Woodstoves. Woodstoves shall comolv with US EPA Phase II emission limits. ( X)
Weather Resistance and Moisture Management
5.407.1 Weather protection. Provide a weather-resistant exterior wall and foundation envelope
as required by California Building Code Section 1403.2 and California Energy Code Section 150, (X)
manufacturer's installation instruction instructions or local ordinance, whichever is more stringent.
5.407.2 Moisture control. Employ moisture control measured by the following methods:
5.407.2.1 Sprinklers. Prevent irrigation spray on structures. (X)
5.407.2.2 Entries and openings. Design exterior entries and openings to prevent water intrusion (X)
into buildinas.
Pollution Control
5.504.3 Covering of duct openings and protection of mechanical equipment during
construction. At the time of rough installation or during storage on the construction site and until
final start up of the heating and cooling equipment, all duct and other related air distribution (X)
component openings shall be covered with tape, plastic, sheet metal or other methods to reduce
the amount of debris or duct which may collect in the svstem.
5.504.5.3 Filters. In mechanically ventilated buildings, provide regularly occupied areas of the
buildina with outside and return air orior to occunancv that provides at least a MERV of 8.
5.504.4 Finish material pollutant control. Finish materials shall comply with Sections 5.504.4.1
through 5.504.4.6
5.504.4.1 Adhesives, sealants, caulks. Adhesives and sealants used on the project shall meet
the requirements of the following standards: (X)
1. Adhesives, adhesive bonding primers, adhesive primers, sealants, sealant primers and
caulks shall comply with local or regional air pollution control or air quality management
district rules where applicable or SCAQMD Rule 1168 voe limits as shown in Tables
5.504.4.1 and 5.504.4.2.
2. Aerosol adhesives and smaller unit sizes of adhesives and sealant or caulking
compounds (in units of product, less packaging, which do not weigh more than one pound
and do not consist of more than 16 fluid ounces) shall comply with statewide voe
standards and other requirements, including prohibitions on use of certain toxic
compounds, of California Code of Regulations, Title 17, commencing with Section 94507.
5.504.4.3 Paint and coatings. Architectural paints and coatings shall comply with Table 5.504.4.3
5.504.4.3.1 Aerosol paints and coatings. Aerosol paints and coatings shall meet the Product-
Weighted MIR limits for ROG in Section 94522 (a)(3) and other requirements, including prohibition
on use of certain toxic compounds and ozone depleting substances (CCR, Title 17, Section 94520
et seq.).
5.504.4 Carpet systems. All carpet installed in the building interior shall meet the testing and
product requirements of one of the standards listed in Section 5.504.4.4.
50504.4.4.1 Carpet cushion. All carpet cushion installed in the building interior shall meet the
requirements of the Carpet and Rug Institute Green Label Program.
5.504.4.4.2 Carpet adhesive. All carpet adhesive shall meet the requirements of Table 804.4.1.
5.504.4.5 Composite wood products. Hardwood, plywood, particleboard and medium density
fiberboard composite wood products used on the interior or exterior of the building shall meet the
requirements for formaldehyde as specified in Table 5.504.4.
5.504.4.5.2 Documentation. Verification of compliance with this section shall be provided as
requested by the enforcing agency. Documentation shall include at least one of the following:
1. Product certification and specifications
2. Chain of custody certifications
3. Other methods acceptable to the enforcing agency
5.504.4.6 Resilient flooring systems. Comply with the voe emission limits defined in the 2009 ( X)
CHPS criteria and listed on its Low-emitting Materials List (or product registry) or certified under
the FloorScore oroaram of the Resilient Floor Coverina Institute.
B-52 Page 4 of 5 Rev. 5/17
•
Indoor Moisture and Radon Control
5.505.1 Indoor moisture control. Buildings shall meet or exceed the provisions of the California
Buildinq Code, Title 24 Part 2, Sections 1203 (Ventilation) Chapter 14.1. (X)
Air quality and Exhaust
5.506.1 Outside air delivery. For mechanically or naturally ventilated spaces in buildings, meet the (X)
minimum requirements of Section 121 of the California Energy Code, CCR, Title 24, Part 6 and
Chapter 4 of CCR, Title 8 or the applicable local code, whichever is more stringent.
5.506.2 Carbon DIOXIDE (CO2) monitoring. For buildings equipped with demand control ventilation,
CO2 sensors and ventilation controls shall be specified and installed in accordance with the (X)
reauirements of the latest edition of the California Enerav Code, Title 24, Part 6, Section 120.1.(C) (4).
Outdoor Air Quality
5.508.1 Ozone depletion and global warming reductions. Installations of HVAC, refrigeration and
fire suppression equipment shall comply with Sections 5.508.1.1 and 5.508.1.2. As
5.508.1 CFCs. Install HVAC and refrigeration equipment that does not contain CFCs. applicable
5.508.1.2 Halons. Install fire suppression equipment that does not contain Halons. (X)
(X)
I, as the professional responsible for this project, certify that, to the best of my knowledge, the mandatory items
listed on this form have been incorporated into the project in order to comply with Title 24, Part 11 of the 2016
California Green Building Standards. All receipts for recycled materials have been attached to this form.
Project Address: /Clo 5,r.q,r,t,a V Plan Check Number: {! f3 C: 26 J'ef · UI~ "·
'
Print Name: JJ/<Jt/JO A. Kl' <J. C SignedG7~ ~ 0 .
I
License Number: {<;t;qq,;s Date: B.·(-/.5T
B-52 Page 5 of 5 Rev. 5117
(city of
Carlsbad
Owner:
WASTE MANAGEMENT
PLAN
B-59
Contractor:
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www .ca rls ba dca.gov
Job Address: /Cl{> Fa,rp .n'«p Phone Number: CI o/ '2 c;-'j "! 7 ~ 7
Permit#: {'13 t' Z o 1 ~ -O I & I
oe::
Estimated Cost of Project: $,_~2......,3"'---''fr'e;,,-• __,0"-'0c....=CI~. -------
Type Of Project D New Construction a(Remodel or T.I. D Residential D Commercial D Demolition
(check all that apply) D Other ------------------------------
Non-hazardous construction waste generated during the course of this project shall be recycled and/or salvaged for re-use at a
minimum of 65% per CALGreen Sec. 5.408.1. Failure to comply may result in a penalty fee up to $1,000. For projects which
consist of mainly equipment and/or racking, that have a combined weight of new construction disposal that does not exceed 2
lbs per square foot of building area affected by this permit, may be deemed to meet the 65% minimum requirement upon
approval of Building Department.
ALTERNATIVE FORMS OF COMPLIANCE: (If selected, do not complete Tables 1 & 2 below)
D Construction waste shall not exceed 2 lbs. per sf. of area. All receipts shall be provided to the Building Official prior to
final. (This option not applicable for most construction projects.)
Square feet of construction area X 2 lbs. = lbs. of allowable waste.
D I plan on using a WASTE MANAGEMENT roll-off bin. All receipts shall be provided to the Building Official prior to final.
Table 1-Estimated Waste (To be filled out prior to permit issuance-refer to example on Page 2.)
MATERIALS lbs. of waste to be taken to lbs. of waste to be Waste Hauling Company or Re-Use Method LANDFILL RE-USED or RECYCLED
Asphalt/ Concrete ll//1,1.'
Brick/ Masonry A) ;~,
Cardboard 1110 Joo ,1h ' Drywall ,<'06 ~60 r ~l:,1c, r
Landscape Debris II/ J'J
Lumber/ Wood 1/000 #()00 caj; __ ,, ~ v { -,_,__/
Metals {i'Z,.00 ·7/\f\ {lo/;.,," r
Mixed Waste .JO() q;,, ... ', ~. 'dn r' .4 ,.--
Trash I GarbaQe t..roi:, ~ ,. .. hd..r: .,i ,, <7 A.~ I' , .... ,,,,_.
Other:
TOTAL lbs:
Estimated Percentage to be Re-Used or Recycled __ 5'...,_,.0 ____ %
vided herein, to the best of my knowledge, is true and correct.
'
8 -l-16
Contractor or Own Date
Official Use Only
D Plan Approved D Plan Denied D Project Valuation Approved
Reviewed/ Approved by: _________________ _
Page 1of 2 REV.01-2017
•
Table 2 -Actual Waste (To be completed after construction.)
MATERIALS lbs. of waste taken to lbs. of waste Waste Hauling Company or Re-Use Method
LANDFILL RE-USED or RECYCLED (complete only if different than Table 1)
Asphalt/ Concrete
Brick/ Masonl)I
Cardboard
Dl)IWall
Landscape Debris
Lumber/ Wood
Metals
Mixed Waste
Trash I Garba~e
Other:
TOTAL lbs.:
Actual Percentage Re-Used or Recycled. ______ %
Official Use Only
0 65% Goal Achieved O 65% Goal Not Achieved D Alternative Compliance Achieved Penalty Paid $ _______ _
Reviewed/ Approved by:. _________________ _
EXAMPLE: Use the following example as a guide to completing this form.
MATERIALS lbs. of waste to be taken to lbs. of waste to be
LANDFILL RE-USED or RECYCLED
Asphalt I Concrete 0 3000
Brick I Masonry 100 'l50
Cardboard 0 150
Drywall 0 50
Landscape Debris 0 120
Lumber I Wood 500 0
Metals 300 200
Mixed Waste 1500 0
Trash I Garbage 300 0
Other: Pool c;uV\,lte 0 900
TOTAL lbs.: 2700 5,3"J-0
Percentage to be Re-Used or Recycled 6 7 %
Formula:
Total Re-used or Recycled X 100 = % Re-Used or Recycled
(Total Combined Waste)
Waste Hauling Company or Re-Use Method
A '&C rt~ ullvv, Co.
WM I Re-w;evl '&rlciz oV\,-slte
,,;isc '-'~ uli.V1,r, Co.
A'&C rt~ul[V1,Cj Co.
Muld1evl i; Re-usevl OV\,-slte
w~ste M~V1,CT/1eV\,CeV\,t
WM I ABC rt~ullvcg
WM
WM
1-{sevl CTs cvusvievl '&~se ovc-slte
5370 X 100 = 67% Re-Used or Recycled
(2700 + 5370)
Since 67% exceeds the minimum requirement of 65%, this plan complies.
Page 2 of 2
PALOMAR TRANSFER STA
5960 EL CAMINO REAL
CARLSBAD, CA 92008
06/21/2018 08:38:21
Card#
Chp Card:
AID:
ATC:
ARQC:
SEQ#:
Bat.ch #:
INVOICE
Approval Code
Entry Method:
Mode:
Tax Amolllt:
SAlE AMOUNT
CREDIT CARD
MC SALE
XXXXXXXXXXXiSB01
MasterCard
A0000000041010
DUE
5FF6B08FFCDC004C
11
510
11
84777C
Ch~ Read
Issuer
$0.00
$29.55
CUSTOMER COPY
Signature:
CUSTOMER
fH 2
,1. 00
~ion
'
Scale In
Scale Out
100%
:,1 Ticket #:1775264
Weighmaster: reyesma3
In: June 21, 2018
Out: June 21, 2018
Vehicle: M23
Ref:
BOL:
INBOUND
CASH
Rate Extension
$0.00 $29.55
Tax
$0.00
Total
Paid
Change
.EDIT CARD-SCALE
8:37 am
8:37 am
Total
$29.55
$29.55
$29.55
$0.00
me
Pl
5'
Cl
('
PALu"AR IRANmRSTA
5960 EL CAMINO REAL
CARLSBAD, CA 9200B
06/19/2018 08:14:06
CREDIT CARD
54 Ticket #: 1774202
Weighmaster: reyesma3
In: June 19, 2018
0(
AI
Ci
MC SALE STOMER Out: June 19, 2018
Vehicle: M23
c,
Card#
Ch~ Card:
AID:
ATC:
ARQC:
SEQ#:
Batch #:
INVOICE
Approval Code:
Entry Method:
Mode:
Tax Amount:
SALE AMOUNT
XXXXXXXXXXXX5B01
MasterCard
A0000000041010
OllD 2
A3D42F633B49E6CC
10
SOB
10 po
73424C I
Chip Read rn
Issuer i $0,00 :
$29.55
CUSTOMER COPY
Signature:
Ref:
BOL:
Scale In
Scale Out INBOUND
100%
CASH
Rate Extension
$0.00 $29.55
Tax
$0.00
Total
Paid
Change
.EDIT CARD-SCALE
8:13 am
8:13 am
Total
$29.55
$29.55
$29.55
$0.00
MC
54 Ticket#: 1777530
Weighmaster: gomezda
PALOMAR TRANSFER s I {
5960 EL CAMINO REAL
CARLSBAD, CA 92008
06/26/2018 09:09:15 i In: June 26, 2018
Card#
Chip Card:
AID:
ATC:
ARQC:
SEQ#:
Batrll #:
INVOICE
,ljlproval Code:
Entry Method:
Mode:
Tax Amount:
CREDIT CARD
MC SALE
XXXXXXXXXXXX5801
MasterCard
A0000000041010
0122
D27480ABF566092C
22
515
23
54472C
Ch~ Read
Issuer
$0.00
SAlE AMOUNT $2955
CUSTOMER COPY
Signature:
K CUSTOMER
FASH 2
I Scale In
Out: June 26, 2018
Vehicle: M23
Ref:
BOL:
i Scale Out INBOUND
1. 00
1
iption
I
100%
CASH
Rate Extension Tax
$0.00 $0.00 $29.55
Total
Paid
Change
.EDIT CARD-SCALE
9:08 am
9:08 am
Total
$29.55
$29.55
$29.55
$0.00
MC