Loading...
HomeMy WebLinkAbout1620 FRAZIER AVE; ; CB161278; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 04-26-2016 Pool Permit Permit No: CB161278 Building Inspection Request Line (760) 602-2725 Job Address:1620 FRAZIER AV CBAD Permit Type:POOL Status:ISSUED Parcel No:1562124200 Lot #:0 Applied:04/01/2016 Valuation:$18,046.00 Construction Type:5B Entered By:JMA Reference #:Plan Approved:04/26/2016 PC #:Issued:04/26/2016 Project Title:DONALDSON: 350 SF POOUSPA Inspect Area: Applicant:Owner: BOYRA POOL & SPAS 1309 HILLSIDE DR FALLBROOK CA 92028 760 723-8820 Building Permit $194.42 Add'I Building Permit Fee $0.00 Plan Check $136.09 Add'I Plan Check Fee $0.00 Electrical Fee $35.00 • Plumbing Fee $35.00 Strong Motion Fee $2.35 Green Bldg Standards (SB1473) Fee $1.00 Renewal Fee $0.00 Add'I Renewal Fee $0.00 Other Building Fee $0.00 Additional Fees $0.00 TOTAL PERMIT FEES $403.86 Total Fees:$403.86 Total Payments To Date:$403.86 Balance Due:$0.00 , --- FINAL/ArPppytLInspector:Date:V Clearance: NOTICE Please take NOTICE that approval of your project indudes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively tele' ied to as "fees/exactions."You have 90 days from the date this permit was issued to protest imposition of these fees/exactions.If you protest them, you must follow the protest procedures set forth in Government (wk.. Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Munidpal Cnrip Section 3.32030.Failure to timely fellow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity thangee, nor planning, zoning, gracing or other similar application processing or service fees in connection with this project.NOR DOES IT APPLY to any fees/exactions of which you have previously been aiven a NOTICE similar to this or as to which the statute of limitations has previously otherwise expired. nmornormillOMPOI OM NI City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Storm Water Pollution Prevention Plan (SWPPP) Permit 04-26-2016 Permit No:SW160156 Job Address:1620 FRAZIER AV CBAD Permit Type:SWPPP Status:ISSUED Parcel No:1562124200 Lot #:0 Applied:04/01/2016 Reference #:Entered By:SLE CB#:CB161278 Issued:04/26/2016 Inspect Area: Project Title:DONALDSON: POOL / SPA Tier:1 Priority:M Applicant:Owner: BOYRA POOL & SPAS 1309 HILLSIDE DR FALLBROOK CA 92028 760 723-8820 Emergency Contact: BOB BOYER 760-458-1048 SWPPP Plan Check $54.00 SWPPP Inspections $228.00 Additional Fees $0.00 TOTAL PERMIT FEES $282.00 Total Fees:$282.00 Total Payments To Date:$282.00 Balance Due:$0.00 FINAL APPROVAL DATE 6 •z SIGNATURE MIMIliniNN muiromommi MN •THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE:0 PLANNING 0 ENGINEERING 0 BUILDING 0 FIRE 0 HEALTH 0 HAZMATIAPCD C'•—•• •Building Permit Application Plan Check No.catto •(278Clty of 1635 Faraday Ave., Carlsbad, CA 92008 Est. Value 760-602-2719Fax: 760-602-8558 Ph:Carlsbad email: building@carlsbadca.gov Plan Ck. Deposit www.carlsbadca.gov Date Lt.1 .1 C.mil - 7—T(Cc ---):—..4 JOB A7).Ess a - SUITEVSPACES/UNIT.APN l --- CT/PROJECI?°LO #PHASE ##OF UNITS #BEDROOMS #BATHROOMS TENANT BUSINESS NAME CONSTR. TYPE OCC. GROUP DESCRIPTION OF WORK:Include Square Feet of Affected Area(s) pool._.4-se 4 3 Scv?( EXISTING USE PROPOSED USE GARAGE (SF)PATIOS (SF)DECKS (SF)FIREPLACE AIR CONDITIONING FIRE SPRINKLERS YESD Nop YES ONO El YESO NOEI APPLICANT NAME 'i3it 7 ''- ov......__pRopEww,NER pa)04 I...40 S717 AlPrimary Contact/sC ADDREn.ADDRESS/lb hi /1...-4.-T/10 dr-:vie CITY STATE ZIP CITY STATE ZIPart "alto og----cA.702 OAF CO /2-S'.tit 0 HONE ....PHON E26C)4548 ) 0 FAX 406 'WY" FAXP EM....735. 07.440N EMAIL pooi_s (f)140 rp./ 4 /L..•OD " DESIGN P CTOR BUS. NAME?:i Llicii -g„.4..-c74007 .F.L.col-s oxi.cioo- ADD7S......e.. ADDRESS/it/.7i/s77.ti 00 --/..so /frii..( vi 0 re..0 . CITY4STATE ZIP CITY STATE ZIP 144A115./M Cr4 .12-07 1242-•Q3-o)-1( PHONE FAX P ONE FAX7 14,650 -6/0 o 65 0-4 r (41 EMAIL EMAIL...wp. P°14L pegOV'S &_.Phrt141 AVG"Ca A4.4....- STATE LIC.#STATE LIC.#CLASS CITY BUS. LIC.# 67 6 s C.S951-e go e-53 A pet' egd(Sec.7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issyan e,'so requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law (Chapter 9, commending with Section 7000 of Division 3 of theBusiness and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500)). WORKERS'COMPENSATION Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following declarations: DI have and will maintain a certificate of consent to self•insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. ElI have and will maintain workers' compensation,as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number am: Insurance Co.Policy No.Expiration Date This need not be completed if the permit is for one hundred dollars ($100) or less. ertificate of Exemption:I certify that in the performance of the work for which this permit is issued,I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of California.WARNING: Failure to secure workers' compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), in addition to the cost of compensati •.•-:--.as •rovid:••'-•••6 of the Labor code, interest and attorney's fees. AS CONTRACTOR SIGNATURE -71•Bieliffr ..,,,,,,,.0 AGENT DATE OWNER -BUILDER DECLARATION Ihereby affirm thatIam exempt from Contractor's License Law for the following reason: O I,as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractors License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale.If,however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). O I,as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractors License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law).0 I am exempt under Section Business and Professions Code for this reason: 1.1 personally plan to provide the major labor and materials for construction of the proposed property improvement.DYes ONo 2.1 (have / have not) signed an application for a building permit for the proposed work. 3.I have contracted with the following person (firm) to provide the proposed construction (include name address / phone /contractors' license number): 4.I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name I address / phone / contractors' license number): 5.I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name / address / phone / type of work): iitcPROPERTY OWNER SIGNATURE DAGENT DATE COMPLETE THIS SECTION FOR NON -RESIDENTIAL BUILDING PERMITS ONLY Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act?0 Yes 0 No Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district?CI Yes 0 No Is the facility to be constructed within 1,000 feet of the outer boundary of a school site?0 Yes 0 No IFANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. CONSTRUCTION LENDING AGENCY I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code). Lender's Name Lender's Address APPLICANT CERTIFICATION Icertifythatlhave read the application and state thatthe above information is conect and that the information on the plans is accurate.Iagree to complywith all City ordinances and State laws relating to building construction. Ihereby authorize representative ofthe CityofCarlsbad to enter upon the above mentioned property for inspection purposes.I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILfTIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAYIN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. OSHA:M OSHA permit is required for excavations over50' deep and demolitbn or construction of structures over 3 stories in height. EXPIRATION: Every permit issued by the Building Official under the provisions ofthis Code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date ofsuch permit •-•s ing or work auth•4 -.such permit is suspended or abandoned at any time after the work is commenced fora period of 180 days (Section 106.4.4 Uniform Building Code). .APPLICANT'S SIGNATURE a%DATE 11 e2 /6 e • STOP `( STOP:THIS SECTION NOT REQUIRED FOR BUILDING PERMIT ISSUANCE. Complete the following ONLY if a Certificate of Occupancy will be requested at final inspection. Fax (760) 602-8560, Email buildinq@carlsbadca.gov or Mail the completed form to City of Carlsbad, Building Division 1635 Faraday Avenue, Carlsbad, California 92008. CO#:(Office Use Only) CONTACT NAME OCCUPANT NAME ADDRESS BUILDING ADDRESS CITY STATE ZIP CITY STATE ZIP Carlsbad CA PHONE FAX •EMAIL OCCUPANT'S BUS. LIC. No. DELIVERY OPTIONS 0 PICK UP:o CONTACT (Listed above)o OCCUPANT (Listed above) o CONTRACTOR (On Pg. 1) o ASSOCIATED CB# 0 MAIL TO:o CONTACT (Listed above)o OCCUPANT (Listed above) o CONTRACTOR (On Pg. 1)o NO CHANGE IN USE/NO CONSTRUCTION 0 MAIL/FAX TO OTHER:o CHANGE OF USE/NO CONSTRUCTION AKAPPLI ANT'S SIGNATURE DATE Inspection List Permit#:CB161278 Type:POOL DONALDSON: 350 SF POOL/SPA Date Inspection Item Inspector Act Comments 06/28/2016 59 Final Pool RI 06/28/2016 59 Final Pool PD AP 06/27/2016 59 Final Pool MC CO NOTICE 06/27/2016 59 Final Pool RI plz call bob after inspec for folw up 06/24/2016 59 Final Pool MC CO NO ACCESS 06/24/2016 59 Final Pool RI 06/17/2016 55 Fence/Pre-Plaster RI 06/17/2016 55 Fence/Pre-Plaster PD AP 06/17/2016 59 Final Pool RI 06/16/2016 55 Fence/Pre-Plaster RI 06/16/2016 55 Fence/Pre-Plaster PD CA 06/16/2016 59 Final Pool RI 06/15/2016 51 Excav/Steel/Bonding/Fence PD CA 06/07/2016 51 Excav/Steel/Bonding/Fence PD AP 05/17/2016 51 Excav/Steel/Bonding/Fence PD AP 05/13/2016 51 Excav/Steel/Bonding/Fence MC CO NO REVISED DETAIL SHEETS AVAILABLE. 05/12/2016 51 Excav/Steel/Bonding/Fence PD CO 05/09/2016 51 Excav/Steel/Bonding/Fence PD CO Tuesday, June 28, 2016 Page 1 of 1 #4.sch*\ ® PLAN CHECK Community & Economic REVIEW Development Department •V CITY OF 1635 Faraday Avenue CAFILSBAD TRANSMITTAL Carlsbad CA 92008 www.carlsbadca.gov DATE: 04-08-2016 PROJECT NAME:DONALDSON RESIDENCE POOL/SPA PROJECT ID: CB16-1278 PLAN CHECK NO:SET#:1 ADDRESS: 1620 FRAZIER AVE.APN: 156-212-42-00 VALUATION/SCOPE OF WORK:$ /This plan check review is complete and has been APPROVED by the ENGINEERING V Division. By:CG 4/8/16 A Final Inspection by the Division is required Yes I No This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. NOTE: ONLY ITEMS THAT NEED CORRECTION/CLARIFICATION ARE MARKED X. Plan Check Comments have been sent to:BOYERPOOLS@HOTMAIL.COM You may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. For questions or clarifications on the attached checklist please contact the following reviewer as marked: r PLANNING ENGINEERING FIRE PREVENTION 760-602-4610 760-602-2750 760-602-4665 Chris Sexton 1 Chris Glassen Greg Ryan 760-602-4624 760-602-2784 760-602-4663 Chris.Sexton@carlsbadca.gov Christopher.Glassen@carlsbadca.gov Gregory.Ryan@carlsbadca.gov Gina Ruiz Linda Ontiveros Cindy Wong 760-602-4675 760-602-2773 760-602-4662 Gina.Ruiz@carlsbadca.gov Linda.Ontiveros@carlsbadca.gov Cynthia.Wong@carlsbadca.gov Dominic Fieri 760-602-4664 Dominic.Fieri@carlsbadca.gov Remarks: 011111111111111110111111111.111111.1111 th. 4. 1 Any outstanding issues will be marked with an 11 Make the necessary correctionsfor compliance with applicable codes and standards.Submit corrected plans and/or specifications to the Building divisionfor re-submittal to the Engineering divisions. Items that conform to permit requirements are marked with M 1.SITE PLAN Provide a fully dimensioned site plan drawn to scale. Show: I North arrow Existing & proposed structures I Property line dimensions 1 I 1 Easements Show on site plan: I Drainage patterns r Existing & proposed slopes Existing topography [Retaining Walls (location and height) 1 1 1 Indicate what will happen with soil excavated from pool area. Include on title sheet: i Site address 1 1 Assessor's parcel number Legal description/lot number I I Grading: Quantities of Cut Fill Import!,I Export... 1 j Project does not comply with the following engineering conditions of approval for project no: L.Conditions were complies with by:Date: LOT NO. 10 MAP NO. 15996 REF. NO. E-37 Page 2 of 4 REV 6/2012 1 2.GRADING PERMIT REQUIREMENTS The conditions that require a grading permit are found in Section 11.06.030 of the Municipal Code. [I ]E -Inadequate information available on site plan to make a determination on grading requirements.Include accurate grading quantities in cubic yards (cut, fill, import, export and remedial).This information must be included on the plans. If no grading is proposed write: "NO GRADING" [Grading Permit required.NOTE:The grading permit must be issued and rough grading approval obtained prior to issuance of a building permit.A separate grading plan prepared a registered civil engineer must be submitted together with the completed application form attached. 1 - 1 EH/j No grading permit required. 3.MISCELLANEOUS PERMITS RW 16-21 RIGHT-OF-WAY PERMIT is required to do work in city right-of-way and/or private work **PLEASE adjacent to the public right-of-way. SUBMIT REQUIRED I .1 Li A separate right-of-way issued by the engineering division is required for the following: INSURANCE** 1 1 Please complete attached right-of-way application form and return to the engineering department together with the requirements on the attached right-of-way checklist, at the time of resubmittal. Right-of-way permit and pool permit will be issued simultaneously. E-37 Page 3 of 4 REV 6/2012 Se1.1010110.11 1111111111011111111011 1 4.STORM WATER Construction Compliance 1 [1 J Project Threat Assessment Form complete[incomplete , n Requires Tier 1 Storm Water Pollution Prevention Plan.Please complete attached form and return (SW 16-156 ) pi Requires Tier 2 Storm Water Pollution Prevention Plan.Requires submittal of Tier 2 SWPPP, payment of processing fee and review by city. Post-Development (SUSMP) Compliance M Storm Water Standards Questionnaire complete [ incomplete Fl E---1 Project is subject to Standard Storm Water Requirements.See city Standard Urban Storm Water Management Plan (SUSMP) for reference. http://www.carlsbadca.qov/businessibuildina/Documents/EnciStandsw-stds-vol4-ch2.0f LJ Project needs to incorporate low impact development strategies throughout in one or more of the following ways: Rainwater harvesting (rain barrels or cistern) L I Vegetated Roof Bio-retentions cell/rain garden Pervious pavement/pavers [LI Flow-through planter/vegetated or rock drip line L Vegetated swales or rock infiltration swales 1 Downspouts disconnect and discharge over landscape other: 5. ADDITIONAL COMMENTS E-37 Page 4 of 4 REV 6/2012 STORM WATER Development Services City "f STANDARDS Land Development Engineering 1635 Faraday Avenue Carlsbad QUESTIONNAIRE E-34 www.c760 -602-2750 arlsbadca.gov INSTRUCTIONS: To address post-development pollutants that may be generated from development projects,the City requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMP's) into the project design per Carlsbad BMP Design Manual (BMP Manual). To view the BMP Manual, refer to the Engineering Standards (Volume 5). This questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision, discretionary permits and/or construction permits).The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project.Depending on the outcome, your project will either be subject to 'STANDARD PROJECT'requirements or be subject to 'PRIORITY DEVELOPMENT PROJECT' (PDP) requirements. Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return of the development application as incomplete.In this case, please make the changes to the questionnaire and resubmit to the City. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff. A completed and signed questionnaire must be submitted with each development project application. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently. PROJECT INFORMATION PROJECT NAME: PROJECT ID: The project is (check one):ElNew Development 1=1 Redevelopment The total proposed disturbed area is:700 ft2 ()acres The total proposed newly created and/or replaced impervious area is:Yap ft2 ()acres If your project is covered by an approved SWQMP as part of a larger development project, provide the project ID and the SWQMP # of the larger development project: Project ID:SWQMP #: Then, go to Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your application to the City. E-34 Page 1 of 4 REV 02/16 •STEP 1 TO BE COMPLETED FOR ALL PROJECTS To determine if your project is a "development project", please answer the following question: YES NipIs your project LIMITED TO routine maintenance activity and/or repair/improvements to an existing building or structure that do not alter the size (See Section 1.3 of the BMP Design Manual for guidance)? If you answered "yes" to the above question, provide justification below then Go to step 5,mark the third box stating "my project is not a 'development project' and not subject to the requirements of the BMP manual" and complete applicant information. Justification/discussion: (e.g. the project includes only interior remodels within an existing building): If you answered "no" to the above question, the project is a 'development project', go to Step 2. STEP 2 TO BE COMPLETED FOR ALL DEVELOPMENT PROJECTS To determine if your project is exempt from PDP requirements pursuant to MS4 Permit Provision E.3.b.(3), please answer the following questions: Is your project LIMITED to one or more of the following: YES NO 1.Constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria:I a)Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non- erodible permeable areas; b)Designed and constructed to be hydraulically disconnected from paved streets or roads; c)Designed and constructed with permeable pavements or surfaces in accordance with USEPA Green Streets guidance? 2.Retrofitting or redeveloping existing paved alleys, streets, or roads that are designed and constructed in accordance with the USEPA Green Streets guidance? 3.Ground Mounted Solar Array that meets the criteria provided in section 1.4.2 of the BMP manual? If you answered "yes" to one or more of the above questions, provide discussion/justification below, then Go to step 5, mark the second box stating "my project is EXEMRT from PDP ..." and complete applicant information. Discussion to justify exemption (e.g. the project redeveloping existing road designed and constructed in accordance with the USEPA Green Street guidance): If you answered "no" to the above questions, your project is not exempt from PDP, go to Step 3. E-34 Page 2 of 4 REV. 02116 STEP 3 TO BE COMPLETED FOR ALL NEW OR REDEVELOPMENT PROJECTS To determine if your project is a PDP, please answer the following questions (MS4 Permit Provision E.3.b.(1)): YES NO 1.Is your project a new development that creates 10,000 square feet or more of impervious surfaces /07collectively over the entire project site?This includes commercial, industrial, residential, mixed-use, and public development projects on public or private land. 2.Is your project a redevelopment project creating and/or replacing 5,000 square feet or more of impervious surface collectively over the entire project site on an existing site of 10,000 square feet or more of impervious surface?This includes commercial, industrial, residential, mixed-use, and public development projects on public or private land. 3.Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a restaurant?A restaurant is a facility that sells prepared foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption (Standard Industrial Classification (SIC) code 5812). 4.Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a hillside development project?A hillside development project includes development on any natural slope that is twenty-five percent or greater. 5.Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a parking lot? A parking lot is a land area or facility for the temporary parking or storage of motor vehicles used personally for business or for commerce. 6.Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a street,road,highway freeway or driveway?A street, road, highway, freeway or driveway is any paved impervious surface used for the transportation of automobiles, trucks, motorcycles, and other vehicles. 7.Is your project a new or redevelopment project that creates and/or replaces 2,500 square feet or more of impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive Area (ESA)?"Discharging Directly to" includes flow that is conveyed overland a distance of 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the project to the ESA (i.e. not commingled with flows from adjacent lands).* 8.Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface that supports an automotive repair shop?An automotive repair shop is a facility that is categorized in any one of the following Standard Industrial Classification (SIC) codes: 5013, 5014, 5541,7532-7534,or 7536-7539. 9.Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious area that supports a retail gasoline outlet (RGO)?This category includes RGO's that meet the following criteria: (a) 5,000 square feet or more or (b)a project Average Daily Traffic (ADT).of TOO or more. ftehicles per day. 10.Is your project a new or redevelopment project that results in the disturbance of one or more acres of land and are expected to generate pollutants post construction? 11.Is your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of impervious surface or (2) increases impervious surface on the property by more than 10%? (CMC 21.203.040) If you answered "yes" to one or more of the above questions, your project is a PDP.If your project is a redevelopment project, Go to step 4.If your project is a new project, Go to step 5, check the first box stating "My project is a PDP ..." and complete applicant information. If you answered "no" to all of the above questions, your project is a 'STANDARD PROJECT', "Go to step 5,check the second box stating "My project is a 'STANDARD PROJECT'..." and complete applicant information. E-34 Page 3 of 4 REV. 02/16 STEP 4 ffi TO BE COMPLETED FOR REDEVELOPMENT PROJECTS THAT ARE PRIORITY. DEVELOPMENT PROJECTS (PDP) ONLY Complete the questions below regarding your redevelopment project (MS4 Permit Provision E.3.b.(2)): YES NO Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than 50% of the surface area of the previously existing development? Complete the percent impervious calculation below: Existing impervious area (A)=sq. ft. Total proposed newly created or replaced impervious area (B)=sq. ft. Percent impervious area created or replaced (B/A)*100 = If yob answered "yes", the structural BMP's required for PDP apply only to the creation or replacement of impervious surface and not the entire development.Go to step 5, check the first box stating "My project is a PDP ..." and complete applicant information. If you answered "no," the structural BMP's required for PDP apply to the entire development.Go to step 5, check the check the first box stating "My project is a PDP ..." and complete applicant information. STEP 5 CHECK THE APPROPRIATE BOX AND COMPLETE APPLICANT INFORMATION 0 My project is a PDP and must comply with PDP stormwater requirements of the BMP Manual.I understand I must prepare a Storm Water Quality Management Plan (SWQMP) for submittal at time of application. CMY project is a 'STANDARD PROJECT' OR EXEMPT from PDP and must only comply with 'STANDARD PROJECT' stormwater requirements of the BMP Manual.As part of these requirements,I will submit a "Standard Project Requirement Checklist Form E-36" and incorporate low impact development strategies throughout my project. Note: For projects that are close to meeting the PDP threshold, staff may require detailed impervious area calculations and exhibits to verify if 'STANDARD PROJECT' stormwater requirements apply. 0 My Project is NOT a 'development project' and is not subject to the requirements of the BMP Manual. Applicant Information and Signature Box Assessor's Parcel Number(s): ApplirVAsms*._AT—/1 --Applicant Title: co 44724K-777 ignature:Date: 17///A / 17/7/A *Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their equivalent under the Multi Species Conservation Program within the Cities and County of San Diego; Habitat Management Plan; and any other equivalent environmentally sensitive areas which have been identified by the City. This Box for City Use Only City Concurrence:YES NO By:c.c1.. Date:"A -1 -(ko Project ID:c % E-34 Page 4 of 4 REV. 02/16 • DETERMINATION OF Development Services .!City of PROJECT'S SWPPP TIER LEVEL AND CONSTRUCTION Land Development Engineering 1635 Faraday Avenue Carlsbad THREAT LEVEL 760-602-2750 www.carlsbadca.govE-32 I'm applying for:0 Grading Permit liBuilding Permit 0 Right-of-way permit 0 Other Project Name:Project ID:DWG it/CB# Address:APN Disturbed Area:Ac Section 1:Determination of Project's SWPPP Tier Level SWPPP (Check applicable criteria and circle the corresponding SWPPP Tier Level, then go to section 2)Tier Level Exempt -No Threat Project Assessment Criteria My project is in a category of permit types exempt from City Construction SWPPP requirements. Provided no significant grading proposed,pursuant to Tablet,section 3.2.2 of Storm Water Standards,the following .permits are exempt from SWPPP requirements:Exempt D Electrical D Patio D Mobile Home D Plumbing D Spa (Factory-Made) D Fire Sprinkler D Mechanical D Re-Roofing D Sign D Roof-Mounted Solar Array Tier 3-Significant Threat Assessment Criteria —(See Construction General Permit (CGP) Section I.B)* O My project includes construction or demolition activity that results in a land disturbance of equal to or greater than one acre including but not limited to clearing, grading, grubbing or excavation; or, O My project includes construction activity that results in land disturbance of less than one acre but the construction activity is part of a larger common plan of development or the sale of one or more acres of disturbed land surface or, O My Project is associated with construction activity related to residential, commercial, or industrial Tier 3 development on lands currently used for agriculture; or CI My project is associated with construction activity associated with Linear Underground/overhead Projects (LUP) including but not limited to those activities necessary for installation of underground and overhead linear facilities (e.g. conduits, substructures, pipelines, towers, poles, cables, wire, towers, poles, cables, wires, connectors, switching, regulating and transforming equipment and associated ancillary facilities) and include but not limited to underground utility mark out, potholing, concrete and asphalt cutting and removal, trenching, excavation, boring and drilling, access road, tower footings/foundation, pavement repair or replacement, stockpile/borrow locations. O Other per CGP _- Tier 2-Moderate Threat Assessment Criteria: My project does not meet any of the Significant Threat Assessment Criteria described above and meets one or more of the following criteria: O Project requires a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code); or, O Project will result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement removal, equipment storage, refueling and maintenance areas and project meets one or more of the additional following criteria:Tier 2 •located within 200 feet of an environmentally sensitive area or the Pacific Ocean; and/or, •disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical; and/or •disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse; and/or •construction will be initiated during the rainy season or will extend into the rainy season (Oct.1 through Apr. 30). Ti9.-el -Low Threat Assessment Criteria le My project does not meet any of the Significant or Moderate Threat criteria above,is not an exempt permit type per above and the project meets one or more of thefollowing criteria:Tier 1•results in some soil disturbance; and/or •includes outdoor construction activities (such as roof framing, saw cutting, equipment washing, material stockpiling, vehicle fueling, waste stockpiling) *Items listed are excerpt from CGP. CGP governs criteria for triggers for Tier 3 SWPPP.Developer/owner shall confirm coverage under the current CGP and any amendments, revisions and reissuance thereof. E-32 Page 1 of 2 Rev. 2/16/16 smaimi • SWPPP Section 2: Determination of Project's Construction Threat Level Tier (Check applicable criteria under the Tier Level as determined in section 1,circle Construction Level the corresponding Construction Threat Level, then complete the Threat Level signature block below) Exempt -Not Applicable -Exempt Tier 3 —High Construction Threat Assessment Criteria: My Project meets one or more of the following: O Project site is 50 acres or more and grading will occur during the rainy season Project site is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA High Soil at site is moderately to highly erosive (defined as having a predominance of soilsTier3with USDA-NRCS Erosion factors kf greater than or equal to 0.4) Site slope is 5 to 1 or steeper CI Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 -April 30). Owner/contractor received a Storm Water Notice of Violation within past two years Tier 3 —Medium Construction Threat Assessment Criteria MediumElAll projects not meeting Tier 3 High Construction Threat Assessment Criteria Tier 2 —High Construction Threat Assessment Criteria: My Project meets one or more of the following: Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA Soil at site is moderately to highly erosive (defined as having a predominance of soils High with USDA-NRCS Erosion factors kf greater than or equal to 0.4) Tier 2 Site slope is 5 to 1 or steeper0Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 -Apr. 30). U Owner/contractor received a Storm Water Notice of Violation within past two years Site results in 10,000 sq. ft. or more of soil disturbance Tier 2 —Medium Construction Threat Assessment Criteria Medium0My project does not meet Tier 2 High Threat Assessment Criteria listed above Tier 1 —Medium Construction Threat Assessment Criteria: My Project meets one or more of the following: Dpwner/contractor received a Storm Water Notice of Violation within past two years Medium01„.Site results in 500 sq. ft. or more of soil disturbanceTier1mConstruction will be initiated during the rainy season or will extend into the rainy season (Oct.1 -April 30) Tier 1 -Low Construction Threat Assessment Criteria Low My project does not meet Tier 1 Medium Threat Assessment Criteria listed above 1 certify to the best of my knowledge that the above statements are true and correct.I will prepare and submit an appropriate tier level SWPPP as determined above prepared in accordance with the City SWPPP Manual.I understand and acknowledge that I must adhere to and comply with the storm water best management practices pursuant to Title 15 of the Carlsbad Municipal Code and to City Standards at all times during construction activities for the permit type(s) checked above. The City Engineer/Building Official may authorize minor variances from the Construction Threat Assessment Criteria in special circumstances where it can be shown that a lesser or higher SWPPP Tier Level is warranted. Owner ers Authorized Agent ..se:Title:City Concurrence:Yes No Jiro 4.3444*(1/4".(For City Use Only) COwner/Owner's Authorized Agent ature:Date:By:Cs' Date:—( Project ID:c ( E-32 Page 2 of 2 Rev. 2/16/16 ---J a)pl 0.•••'N)—C/)o 0 OD C 7 0 7D >D.-130 --I*-<z -L 0 m <J-c-)m c 0 xi -1 -1 _1 Cu -0 ›.>›.m ---.3>>C—C)--I 70 0 CD -1 (7)0 T.->0z_,x)Kr -orTi (_/-)=.e...m o ==m 73 p C-)1 -a>-I'>--II—ZOOS D -r102 -n < r-M CD -0 >5 -I 0 "‹XIPOI%i 1;0 ,_pg,7,2 i:;F.:l 15 :=1 E:M Z C-)(7 o P1 C-)1 -C)...9 -<1—71 -0 Z m 2 a m m >r-c rri z -i 0 7)=0-4 -I -1 -i K Fri ,_KNJco(I)11 (..r"`==t=I co m >(7)rii .--0 (-)v)m m CD s:--'7)=7:1 C)xlM7J-10 1 =x(z)-XI >.zc-)>L) m o 7:J m _1 0 *r__0 *a 0 co m o\\o -/=1 0 NI --I 3>)>(ii -I >_<3:.--1 _1 >3>>0 -4.-____K (i) c -.1 -z 1--__,1 -z I'Ll u)i_Fri -)*-«-)-1 =,--m >0oz ,...,O 1 -x .m 0)c .1 0 7D z 1 -0 rn -1 <2 r---2 0 rr -7. -m •''m -.0 M u)>P1 -P1 M _fl -I -0 __.<m x -1 ti ..z cf)a z o z -1 _i -0 =_, m tri z z I-am m •1 -‘--d >z m --„,-‹m -...„0 3>m M .._7-1 (/)2 =_1 0 0 ±M >•-i -i PIC)Q7 cn CD co X 3>>7D 03xV2CO_r-z o 0vi/-x -a c --1 tz)m o 1 -o ,a CD 0 Z -<3Zi-M )>Cr)V)T>I cD OD M m ---X =CO m a c)(f):'‘b '' )"cp .--,-1 73 0,z)(-)c • •co m -n -c)--r--1 7J =1 -•3>73 -.-.-. -0 Z C),=__I ...-.-C)-1 p .-...r-Z C-) C/1 3>7D ___I0CIDr, T:1 -o (2 (7)1 m 7) -CI (.1)-IP173 -I M C.n M i0 -0 '4\CI)0 3>-‹0 -ti ><)=-R n -I =-7z)K V)>C),-I >m c C) Dr‘ co 0 R o >0 7z)K ___K (i)2 c-)o>,..-,>z r-,---1 ...Z..z 73 -P.>=-I '-'CD C)--I -I-m _RI =_r (f)Z >CD.0 -r -0 "ID-1 p .....•-0 ci ci)1 ----L_....C)C./)>>70 m -1 o co -.K K I-Z z •*z -0 _1 K 0 *r1:1 M co 2 =3>p r-c-)>o 0 3z)* 0oM1 --ri 0 M M -ri m CM3>-I 0 r-10(-.)-1 zKmo>>70 o 0 r.)ai 4.xm c•f)m 3>zi z >zx-I- 1 .-...•*-71 I-A 71 v)M 7:1 <,.,...C) -C)3>cn<K -_i ..--. t=c--)715.(n ---1 C)-I-M M _101-2KM CO m M ''1 r--‹—i m 2.--1 m co (')m 0 o v)m =-I -=i:/-)-=u.z)(1)aKI -n m 73 =m z _zl 0 z m =--(-)=3>0Zo—1 z Z-(-,-,----m =›v.--1 ID -1 M 3>P -1 M -1 (7 >(-3 cD *m-1 co 1 ->0 -r-F)o .=-1 mac co =c-)-<m ›.cn m<--rn I-r-z >pa2oorn73m0-0----3>-H0 n-i 73 Z V) -I c-)M 0 -I -I 13>-1 K030m7)=7Du_i -<73 -1 Z 2 >C --)(-)x7)2 ->7:1 7)71 M K-i 73 =>Z >>,›..v)u Ord 30c1 -cn --1 -1 .„ o 0 -v)(2.=o c..4 1 ---.en .0 2 M V)m -1,_soo --ix c-)2 -1 >--I-1 m ...-cc)--K -I A.M 0 ..„.r-C-)xi -I m <m (-)(---P.7173 M0 o -0 -a 03 mm a =u)>E-n z >0 cn ..±-_-co BCD c-)_i -<o m c -I 7)M 5 m>cnzzmwo -i K L-)c M 7)Z M C7 -.....=° M -ID >Z=7 _i p ..P r-••,_1 ,-0 v)z 1 --=...._._0 0 >"'2 ii"--)coox 'f2iRmo (-)i _1 3>m r----Ha c >73 m _.o 2 X -ID CO CO CD 2 1 -*Ci)•---3>.._C)--1 C =0 _1(i)""">=0 m 5 7.. ----ni= mc°r1>(111 -‹ '21 -1-1 17-1 I-m -I V) ?t -0 ."--7 0 -I xj73°0 >7 DC a7. --.F.=0 ><n -00 i_<_._.L..„=. =0 0 20 M K _1 =mCA-0 M 0mph Z-I -I 73MA=1 - 73 Cr) .0 M __1C M 0>M 1 -IZ)>_, M 1 - >>Ci)ZCp 70M -0Cf)M7) Kc K Z CK <-I--n co <-0 M -0>M ,--n Q 01 >_1 m c...) -1 _.--1 =.--•0 macnn-I m m cn m-0 3>70X--I 0 ,--,°Cn Cr) .....-n -.-.CZ >'--) >2Fnr-3>Z r_ aD 2:.7- 3>C)CC)Z Fri Z Z0z—10-<x (-)0_,,,—MM7J0CnMmZ-1-R C)-I -I 73 -1WM-I M w o o73z)o zZ -,4 N.)7'Xco -,'-'0 V)C)2 PI V)*V)0 -0 0 0 C)V)-I C-)70 0 1 -(-) 0 .-.7:0 0 -0 -.-o CD -.0 =-09 -.a)Ni 5.c 0(.00m<mm_-.o CD 00-30 CD03-.)>.-.--1 -5 0 cc..-1 •-•77 0 t._) C2,a.7 .--.0 ...,0 ..L0 u...........-4 ,-,-........=_.-•to o >-F0 (i)C°cf)=.0 -•s.-...,-•-.- -........=ci)8-a)0-st . •(7)cp 7 C 7 1 -(7*K - ::.-.'CD ,_(1)CO O kto ..cn K cn,-.•CD sin w •-.-0 -00 •-•.,,-CO0 o '77'C/3 -1 15 Ir--'>-,0 .>K 0 0_V)K `"(0 —0 0 V/3')17 =0t 0 0)CD 7 >C 0 C)0 9,r-t--0 .0 0 tZ)0 CD CO ‘C)X 0 Sr .0 -0 -•0 C/).CD = C-)0 0,_,_...,,-**.77,_<cn >cEi cn Da0cC)(i)>...<•-•.-.-.-(,)0 ....7 0 "-=,,,v)0 0 en =-1 0 --,o C CD 0 0 >X.E v)0•0-.c ,_,A _..-o-5--p CD (0) -1 0 .-Z = CD '-':*0 0 -CD 0 •-s--0 -s =0 0rl-0 0 .H 07C00WCD-0o70(T)0 0 --,..cn -4.-.•-..„7 5 R ril 77w0- 8--r1 =. (DO X K_,C'-'7-C 0 0 CD0•mm1CDK(.)5 S eL -0 .0 o __,0m=.0 .)(EC-7 Geotextiles &Mats 0 >._.5 0a-La - o -.0O°0--H0.--EC-8 Wood Mulching rn3 Z M Earth Dikes and coo -0) 3j00-.EC-9 cn .c (7.•W -0CD50,-Ll-Drainage Swales u)0 171 .(-)0--5 0 0 =--,-)-,,-.EC-11 Slope Drains 3 I ,ouo,-,-,5-,,a -in ...o r\)C=a K- CI 0 CO 0700'-'..,--CI o-*<SE-1 Silt Fence coD0-..-_..:m --i -0.,_-.-,.<,cn ___ CAD (77._---.SE-3 Sediment Trap -1 r--.,_, ,,,,., ,_,..--,.co (.)K 0-(---).--SE-4 Check Dam >Z -7.>.=-0 ci)z,,„0 a)O 0 =‘,0 SE-5 Fiber Rolls 0_>e---,7-0 0 •j-.--.--o CD m ()0Co -=0 SE-6 Gravel Bag Berm ..-KD0,•••-•••0 m *MO.0 0 0--.CD Z=0 7 x Street Sweeping and .o x (0 -a SE-7 =r _1..CD Vacuuming -c-.)CD * 0 0 COm 0,0 CD -•a_SE-8 Sandbag Barrierco--.--.m (t)9,.-..o k.J 70-i Cn =0 Storm Drain Inlet c-')0 0 SE-10..7 (/)0 Protection m0.-Cl)0-m-0 0 o a)o_0 -.-‘coCA-,.Stabilized Construction.-t-0 3 TR-10.--0 (.,.,.,--•Ingress/Egress o _,Cl),..,_rn0•.-.-•-e--0 o 0 1 - Stabilized Construction -p.-.1 -11.-<o (7.TR-2 CO 5 (-)`--‹-,--4 ,--Roadway K u:1 7- ,0 '<>C-.- -0*0 CD 00 74 co ;ci 0 Z33' 2co-0 -4-,a)a 0 Water Conservation >---.0 0 0NS -1(-)o an (/)3>NJ =rD cn c-,cn a• COm-=-0.0 =0 0-rri ._..-.Practices CD Cf)o-0 3 M 1- 3 0 -...SI-cp (,)m (.)z m=0-,0 ••••<W 0 Paving and Grinding a)0 ••(13 -0 *e---•NS-3 (.0 6.. 111 c°g-o -- C •o -o (i?.o 0pi--‘Z -._.(-)O -.--,_Operations 0 -3 2,0 -o 0 1-1-1 =1")CD 3K........7 7-v •..NS-7 Potable Water/Irrigation =m 0 .C)0 a -.-o.D >- JOJ7CI- E C - 17 R go -Vehicle and Equipment -i3cDNS-8K05.,--0a 0_K 0 Cleaning (n,,-cr -o (4. CD .-tiO8-7I 0 7C41.0 ocn.0.,Z E '-'• 8-3 g (Wm-1 Material Delivery and7•7 Storage '1/4..)g /WM-2 Material Use W CD w*CD-i .....0 .7 WM-3 Stockpile Management CT)0=*C)C)C v=0 0 Spill Prevention andW o 3Ck'0 /WM-4 =cc. ,..-Z a)Control 0o 0,...o I D /WM -5 Solid Wasteco0).Management aj co = K°- co WM -6 Hazardous Waste - 21 L...'. . Management Fa-m< /WM -8 Concrete Waste . NJ co Management-,, CY) STANDARD PROJECT Development Services City of REQUIREMENT Land Development Engineering CHECKLIST 1635 Faraday Avenue Carlsbad E-36 760-602-2750 www.carlsbadca.gov Project Information Project Name:AZIAL-Oloid Project ID: DWG No. or Building Permit No.: Source Control BMPs All development projects must implement source control BMPs SC-1 through SC-6 where applicable and feasible. See Chapter 4 and Appendix E.1 of the BMP Design Manual for information to implement source control BMPs shown in this checklist. Answer each category below pursuant to the following. •"Yes" means the project will implement the source control BMP as described in Chapter 4 and/or Appendix E.1 of the Model BMP Design Manual. Discussion/justification is not required. •"No" means the BMP is applicable to the project but it is not feasible to implement. Discussion/justification must be provided. •"N/A" means the BMP is not applicable at the project site because the project does not include the feature that is addressed by the BMP (e.g., the project has no outdoor materials storage areas). Discussion/justification may be provided. Source Control Requirement Applied? SC-1 Prevention of Illicit Discharges into the MS4 Yes E No P4A Discussion/justification if SC-1 not implemented: SC-2 Storm Drain Stenciling or Signage E Yes No eA/A Discussion/justification if SC-2 not implemented: SC-3 Protect Outdoor Materials Storage Areas from Rainfall, Run-On, Yes ri No eiVIA Runoff, and Wind Dispersal Discussion/justification if SC-3 not implemented: SC-4 Protect Materials Stored in Outdoor Work Areas from Rainfall, Run -On,ets No E N/A Runoff, and Wind Dispersal Discussion/justification if SC-4 not implemented: SC-5 Protect Trash Storage Areas from Rainfall, Run-On, Runoff, and Wind E Yes CI No er</A Dispersal Discussion/justification if SC-5 not implemented: E-36 Page 1 of 3 REV 02/16 • Site Design BMPs All development projects must implement site design BMPs SD-1 through SD-8 where applicable and feasible. See Chapter 4 and Appendix E.2 thru E.6 of the BMP Design Manual for information to implement site design BMPs shown in this checklist. Answer each category below pursuant to the following. •"Yes" means the project will implement the site design BMPs as described in Chapter 4 and/or Appendix E.2 thru E.6 of the Model BMP Design Manual. Discussion / justification is not required. •"No" means the BMPs is applicable to the project but it is not feasible to implement. Discussion/justification must be provided. •"N/A" means the BMPs is not applicable at the project site because the project does not include the feature that is addressed by the BMPs (e.g., the project site has no existing natural areas to conserve). Discussion/justification may be provided. Site Design Requirement Applied? SD-1 Maintain Natural Drainage Pathways and Hydrologic Features dyes 0 No N/A Discussion/justification if SD-1 not implemented: SD-2 Conserve Natural Areas, Soils, and Vegetation E Yes E No ?<A Discussion/justification if SD-2 not implemented: SD-3 Minimize Impervious Area E Yes CI No f(N/A Discussion/justification if SD-3 not implemented: SD-4 Minimize Soil Compaction o Yes Ll No N/A Discussion/justification if SD-4 not implemented: SD-5 Impervious Area Dispersion 0 Yes E No Discussion/justification if SD-5 not implemented: SD-6 Runoff Collection r]Yes L No /N/A Discussion/justification if SD-6 not implemented: SD-7 Landscaping with Native or Drought Tolerant Species C7 Yes 0 No I/A Discussion/justification if SD-7 not implemented: SD-8 Harvesting and Using Precipitation o Yes 0 No XI/A Discussion/justification if SD-8 not implemented: E-36 Page 3 of 3 REV. 02/16 ." PLANNING DIVISION 4:te0'5 BUILDING PLAN CHECK Development Services Planning Division .411\r•CITY OF APPROVAL 1635 Faraday Avenue CARLSBAD P-29 (760) 602-4610 www.carlsbadca.eov DATE:4-4-16 PROJECT NAME:PROJECT ID: PLAN CHECK NO: CB 16-1278 SET#:1 ADDRESS:1620 Frazier APN:156-21242-00 1X1 This plan check review is complete and has been APPROVED by the Planning Division. By: Chris Sexton A Final Inspection by the Planning Division is required I- 1 Yes ®No You may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. E This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check APPROVAL has been sent to:boyerpools@hotmail.com For questions or clarifications on the attached checklist please contact the following reviewer as marked: PLANNING ENGINEERING FIRE PREVENTION 760-602-4610 760602-2750 760-602-4665 4 Chris Sexton Chris Glassen Greg Ryan 760-602-4624 760-602-2784 760-602-4663 Chris.Sexton@carlsbadca.gov Christopher.Glassen@carlsbadca.gov Gregorv.Rvan@carl badca.gov Gina Ruiz VaiRay Marshall Cindy Wong 760-602-4675 760-602-2741 760-602-4662 Gina.Ruiz@carlsbadca.gov ValRay.Marshall@carlsbadca.gov Cynthia.Wong@carlsbadca.gov Veronica Morones Linda Ontiveros Dominic Fieri 760-602-4619 760-602-2773 760-602-4664 Veronica.Morones@carlsbadca.gov Linda.Ontiveros@carlsbadca.gov Dominic.Fieri@carlsbadca.gov Remarks: