Loading...
HomeMy WebLinkAbout1631 OAK AVE; ; CB153835; PermitCity of Carlsbad 1635 FaradayAv CarIsbad, CA 92008 11-25-2015 . Pool Permit Permit No: CB153835 Building Inspection Request Line (760) 602-2725 Job Address: 1631 OAK AV CBAD ; Perrnit Type: .. , POOL . C -• Status: ISSUED Parcel No: 1562123600 Lot#: 0 Applied: . 11/06/2015 Valuation: $15,468.00 Construction Type: NEW Entered By: RMA Reference#: . Plan Approved: 11/25/2015 PC #: , -' , . 'Issued:' 11/25/2015. Project Title: BYER RES-300 SF GUNITE POOL & , , Inspect Area: SPA Applicnt: . . Owner: - SEASCAPE POOLS HAL BYER . STE 113 . . 9265 DOWDY DR . SAN DIEGO CA 92126 .. 619-566-2811 ' 858 558-4209 Building Permit - . . ' $167.81 Addi Building Permit Fee . . - . $0.00 Plan Check -: ' . $117.47 Addi Plan Check Fee . . . . , . $0.00 Electrical Fee .. - . $3500 Plumbing Fee : ,. .. . ,. . . $35.00 • Strong Motion-Fee . . . $2.01 Green Bldg Standards (SB1473) Fee - . . . $1.00 Renewal Fee - . -" $0.00 AddI Renewal Fee ' , . $0.00 Other Building Fee . . . . $0.00 Additional Fees ' . . . $0.00 TOTAL PERMIT FEES,. . . ., . . . $358.29 Total Fees: $358.29 Total Payments To Date:: . $3è8.29 Balance Due: $0.00 - r H FINAL AR PJOV/L Inspector: Date: 7 V Clearance NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to tinely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition - You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this prect. NOR DOES IT APPLY to any - fees/exactions of which you have oreviouslv been given a NOTICE similar to this, or as to wtiid-r the statute of limitations has oreviouslv otherwise expired, City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Storm Water Pollution Prevention Plán5(SWPPP) Permit 11-25-2015 S Permit No:SW150438 Job Address: 1631 OAK AV CBAD Permit Type: SWPPP . Status: ISSUED Parcel No: 1562123600 Lot #: 0 'Applied: 11/06/2015 Reference #: . Entered By: RMA CB#:. CB153835. Issued: 11/25/2015 5 5 , •• Inspect Area: Project Title: BYER POOL & SPA . Tier: 1 S Priority: M Applicant: Owner: SEASCAPE POOLS • . S STE 113 • - 9265 DOWDY DR •. ,S . S SAN'DIEGO CA 92126 • . . .• • - 619-566-2811 5 S Emergency Contact: S JOHN CHATFIELD • S S S S S 858 354-3335 S • S • S S • • S S SWPPP Plan Check S S • $54.00 SWPPP Inspections S S\ S • $228.00 • S Additional Fees • S $0.00 TOTAL PERMIT FEES S S • • • $282.00 Total Fees: - $282.00 Total Payments To Date: $282.00 Balance Due: $0.00 S S 5 ANAL APPROVAL S • S DATE 3• S S • -.•• SIGNATURE S THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: 0 PLANNING - 0 ENGINEERING - BUILDING ,0 FIRE HEALTH HAZMAT!APCD BiiIding Permit Application an Check No. I Est. Value City of 1635 Faraday Ave., Carlsbad, CA 92008 Carlsbad Ph 7606022719 Fax 7606028558 Plan Ck 94Po,u? email: building@carlsbadca.gov f1( (I I .carIbadca.gov. ylate JOB ADDRESS 161ILdAg 4V&1 SUITEC/SPACEC/UNITU APN CT/PROJECT U .. LOT U PROSE # U OF UNITS eBEDROOMS U BATHROOMS TENANT BUSINESS NAME. CONSTR. TYPE 0CC. GROUP DESCRIPTION OF WORK: Include Square Feet of Affected Area(s) ,00 th P:z:' E/J?Z7 -L EXISTING USE PROPOSED USE GARAGE (SF) PATIOS (SF) DECKS (SF) FIREPLACE AIR CONDITIONING FIRE SPRINKLERS YESO# NO YES YESI1 NO' APPLICANT NAME flnaryContact 'Y/] F&1J2 PROPERTY OWNER NAME - - 44 JyQ ADDRESS 12 ô ALP Yfl Jek . //- ADDRESS CITY - - STATE ,. ZIP ,, CITY ,. STATE ZIP A- fQ949 . PH9NE / FAX . PH N a E ()') — - FAX E1AIL • - , ..- se1iocot1?' EMAIL DESIGN PROFESSIONAL , CONTRACTOR BUS. NAME - ADDRESS . . - - ADDRESS . . CITY '(ATE .. ZIP CITY . .. .,STATE . ZIP PHONE FAX FAX . - PH E FAX EMAIL v'' . .. . EMAIL - , gpo Oi5 STATE LIC. a STATE LICe CLASS CITY BUS. LICe (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law (Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500)). Workers' Compensation Declaration: (hereby affirm under penally of perjury one of the following declarations: - [:11 have and will maintain a certificate of,consent to self-insure for workers' éompensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. JIj have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance oarrier and policy number are: Insurance Co. f/lp Policy No. f 5f 1 /ç" Expiration Date /'//' /6' This section need not be completed if the permit is for one hundred dollars ($100) or less. []Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of California. WARNING: Failure to secure workers' compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), in addition to the Cost of compensation, damages as provided for in Section 3706 of the Labor code, interest and attorney's fees. , CONTRACTOR SIGNATURE . ' ''-T' ~JAGIENT DATE / hereby affirm that lam exempt from Contractor's License Law for the following reason: [J I, as owner of the proerty or my employees with wages as their sole compensation, will do the work and the structu not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work self or through his own employees, provided that such improvements are not intended or offered for sate. If, however, the building or improvement is sold within one year of completion, the owner-buiIder will e the burden of proving that he did not build or improve for the purpose of sate). [] 1, as owner of the property, am exclusively contracting with licensed contractors to construct the,p ct (See. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(sj!ceflsed pursuant to the Contractor's License 1.0w). El I am exempt under Section ______________Business and Professions Code for thisjee: I personally plan to provide the major labor and materials for constructi9p4(the proposed properly improvement, 0Yes DNo L - I (have (have not) signed an application for a building permit for e-Øposed work. I have contracted with the following person (firm) to provid)heroposed construction (include name address / phone (contractors' license number): I plan to provide portions of the work, but I have hired)roiollowing person to coordinate, supervise and provide the major work (include name/address/phone (contractors' license number): .5. I will provide some of the work, but I have cont __te'(hired) the following persons to provide the work indicated (include name I address (phone / type of work): PROPERTY OWNER SIGNATURE []AGENT DATE I Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? 0 Yes 0 No - Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? 0 Yes 0 No Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? 1 0 Yes 0 No - - IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. CT ' I hereby affirm that there is a construction lending agency for the perforhiance of the work this permit is issued (Sec. 3097 (i) Civil Code). Lenders Name Lenders Address I certify that l have read theariplicalion and state that the above Information is correct and that the information on the plans is accurate. I agree tocomptywtth all City ordinances and State lawn inlatingte buitdingconstr-uction. I hereby authorize representative of the City of Carlsbad to enter upon the above mentioned prDerty for inspection purses. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANYWAY ACCRUE AGAINST SAID C11't IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. OSHA: An OSHA permit in' required for excavations over 50' deep and demolition or construction of structures over 3 stories in height. EXPIRATION: Every permit issued by the Building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180days horn the date of such permitorif the buildingorworic authorized bysuth permit is suspendedorãbandoned at anytime afte the work is commenced fora period of 180 days (Section 106.4.4 Uniform Building Code). ir .APPLICANT'S SIGNATURE ' DATE Inspection List Pemiit#: CB153835 Type: POOL BYER RES-300 SF GUNITE POOL & SPA Daté Inspection Item - Inspector Act Comments 0311 0/2016 55 Fence/Pre-Plaster - Ri - 03/10/2016.55 Fene/Pré-PIaster PD AP - 03/10/2016 59 Final Pool - RI 03/10/2016 59 Final Pool Pb AP. • , 02/03/2016 51 Excav/Steel/Bonding/Fence PY AP - èco bond - 01/12/2016 23 Gas/Test/Repairs PD AP - 01/12/2016 31 Underground/Conduit-Wirin PD • AP 12/21/2015 51 Excav/Steel/Bonding/Fence PD AP • • • - c- • - - • - - - r - - -. - -.5-- • $ 0 - • . - * • -5 1' - S50$S - S • - S 0S• • _, - - - 4 - E Friday, March11, 2016 . . 0 $ - - Page 1 of 1 ' t • . • r . PLAN CHECK , Community &Economic REVIEW %I - Development Department CITY OF .1635 Faraday Avenue CARLSBAD , TRANSMITTAL Carlsbad CA 92008 . www.carlsbadcã.gov DATE: 11/17/2015 PROJECT NAME: BYER RESIDENTIAL POOL PROJECT ID: CB153835, PLAN CHECK NO 1 SET# 1 ADDRESS 1631 OAK AVE APN 1562123600 VALUATION/SCOPE OF WORK 15,468 300SF POOL 'ZiflhIs plan check review IS complete and has been APPROVED by the ENGINEERING [4 iviSiOfl. . . . By: VALRAY NELSON - A Final Inspection by the ENGINEERING Division is required f Yes 0,4 No This plan check review isiINQT,'CLQMP,11'Eir Ei Items missing or incorrect are listed on the _ attached checklist Please resubmit amended plans as required NOTE: ONLY ITEMS-THAT NEED CORRECTlON/CLARlFlCATION1iRE MARKED X. Plan Check Comments have been sent to: SEASCAPEPOOLS1974@GMAIL.COM . . You may also ha ve'corrections from oinore of th divisions listed beIäWApdtTa!, froñi thie dik:â Tnaybe:requivid höTFt 51t 11ë%s ãWeeoffjiTh!d:pg 7eThiIt 1Rësi,b,ttëd plài h?iüld For questions or clarifications on the attached checklist piease'contact the following reviewer as marked: -'....... --.. PLANNING I - - 760 602 4610 :3J ..• ,-p' • .- " ENGINEERING - ' '. r r - • -02--2750'• .. C ••iV•:.! t: '.: .:':.; FIRE PREVENTION Y ._ rr C -.. 760 602 4665 . . 't ,1--i' ] Chris Sexton . fl Kathleen Lawrence....T Greg.Ryan L_J 760-602-4624 .. L_.J 760-602-2741 L---. 760-602-4663 Chris.Sexton@carlsbadca.gov . . KathIeeii.Lawrence.carisbadcaov I Gina Ruiz 760-602-4675 . Gina.Ruiz@carIsbadca.gov [j LindaOntiveros . - 760-602-2773 indá.Qnjivero?carIsbadgy . 1 Cindy Wong. i . -. 760-602-4662 Cynthia.Wong@carlsbadca.gov • . - il Marsha ll .1! va ray iviarsria : 760-602-2741 - . . . . - Dominic Fieri L.J 760-602-4664 1 ValRay.Marshall@carlsbadca.gov • Dorninic.Fieri@carIsbadca.gov ( t .- -i , Any'outs1cinding'issues will he marked with all= Make the ,1leessary corrections for complianct with applicable codt and standards Submit corrected plans and/oi peciftca ti ons to the Buildingdivisionfore-sithmittal to the Engineering divisions. Items that conform to pt rinmt requirements are marked with - - .... . .'.'5• - I SITE PLAN - THERE IS A 5/ 'provide a fullydumensioned sitepin drawn to scale EASEMEN/ Show ALONG/RONT OF North arrow - .- PROP/RTY NOT IIJ Existing & proposed structures I ) ACTED BY 7 Poperty line dimensions - P 1 EjJ Easements - - S • -9 ,- .. 4Z' • .. . • -S. • • ..-. .: Show on site plan - / INDICAyE ON LJ ZJ Drainage patterns SI .Ih(AN SOIL "Existing & proposedsIope' - . ;5•.• .- N7IE El r: Existing topography L11 EZI Retaining Walls (location and height) E1 L.1 Indicate what will happen with soil excavated from pool area 5, 7 . • S. ç .4 9 - -. -.. S ••% * t_(-- - - S • .1 1- . -. •'•. .9 - •- •.. : -- C - •\4 *t 9 S - - • .- r -. S 54 Include on title sheet - • I • • .•.j E] [] Site address ' 4 El [T Assessor's parcel number L..J LLJ Legal description/lot number - ., •. -. . LIII 1 .• S --- [IIII Grading Quantities of / 9. .5.. Cut El FillEIIJ ImportEl ExortEl El Lilil Project does not comply with the following engineering conditions of approval for project no El a, .- El Conditions were complies with by pate - • --' - . -•- • - . . ,. - .1 . 5- S - .. ,_ .'1' •-. •1.. • . . S. S. 4.. -. ' 5_•_ .. - --:-- -S. 1 - , LOT NO 4 4 MAP NO 15996 1 94 C ) - .i. __S • , _. REF. NO. 9. 5 -. . J. / . . .,• . ... 'S . •- • - -- S S I . •__ .,: - ,,- 4 . - 9 S F l I .. S.-- - S •'S . .- - - - - -5- 4. ¼ -i - •- . - _ -. . . -. - E-37 Page 2 of 4 - . 5. .• - S - . S / '4. - . . . - REV 6/2012 * - • . . 1 (. 2. GRADING PERMIT REQUIREMENTS The conditions that require a grading permit are found- in Sectioh11.06.030 of the Municipal Code. EEl EEl Inadequate information, available On, site plan to make a determination on grading requirements. Include accurate grading quantities in cubic yards (cut, fill, import, export and remedial). This information must be included on the plans. If no grading is proposed write: "NO GRADING" • , Grading Permit required. NOTE: The grading permit. must be issued and rough grading approval obtained prior to issuanceof a building permit. A separate -grad ing plan prepared a registered civil engineer miistbe submitted together with the completed application form' attached. s- No grading permit required. 3. MISCELLANEOUS PERMITS INDICATE O RIGHT-OF-WAY PERMIT is required to do work in city right-of-way and/or private work SITE PLA(ALL adjacent to the public right-of-way. WORK,AQUIP,& ' ' • ' . ' MAT IALS A separate right-of-way issued by the engineering division is required for the following: M'FREMAIN • • '' •' ' • '. • . ' ' • . 0 OF THE PViBLIC ROW • ' • • • . EEl EEl Please complete attached right-of-way application form 'and return to the engineering department together with the requirements on the attached right-of-way checklist, at the time of resubmittal. • 0 • . Right-of-way penn it and pool .perm it will be issued simultaneously. E-37 ' - • Page 3 of 4 • - • • REV 6/2012 5 5. -f - 10 11 us] LI F-11 KOJ 5 , 5 ! ;S S - - S S '. .5. • I. S - - 1 . .. 4. STORM WATER - . Construction Compliance: t - S -- - S . ITl IIZI Project Threat Assessment Form complete=incomplete EJ E1 . Requires Tier 1 Storm Water Pollution Prevention Plan. Please complete attached form and return(SW 15-438 ) - El EJ Requires Tier 2 Storm Water Pollution Prevention Plan. Requires submittal of Tier 2 SWPPP, payment of processing fee and review by city., 5- 5 . Post-Development (SUSMP) Compliance •. El 5171 Storm Water Staidárds Questionnaire complete [2]- incomplete .' El Project is subject to Standard Storm Water Requirements. See city Standard Urban - . . . . Storm Water Management Plan (SUSMP)for reference. S htt://www.carlsbadca.qov/business/buiIding/Documents/EngStandsw-StdS-VOl4-Ch2.Pdf El El Project needs to incorporate low impact development strategies throughout Jn one or more of the fo11ow1n4 ways: i: Rainwater harvesting (rain barrels or cistern) ' =Vegetated Roof, Bioretentidns cell/rain garden. -. . F7-], Pervious pavement/pavers .• . . E11 Flow-through planter/vegetated or rock drip line El Vegetated swales or rock infiltration swalés . . 1 Downspouts disconnect and discharge-over landscape . . S EjOther D '[II D - E-37 • S S •• . Page 40f4 - * , 5' -- . REV 6/2012 STORM WATER Deve!opmentServices 4111k . COMPLIANCE Building Division CITY O F CARLSBAD :ASSESSMENT 1635 160-602-2719 B-24 www.carlsbadca.gov I am applying to)tie City of Carlsbad for the following type(s) of construction permit: Building Permit ' Right-of-Way Permit / U My projptt i Electrical Patio/Decks categorically EXEMPT from = ' Fire Additional Photo Voltaic the requirement to prepare a storm water Fire Alarm Re Roofing pollution prevention plan (SWPPP) because it . Fixed Systems Sign only requires issuance of one or more of the Mechanical Spa Factory following permit types: Mobile Home Sprinkler - Plumbing Water Discharge Project Storm Water Threat Assessment Criteria* No Threat Assessment Criteria . -. 0 My project qualifies as NO THREAT and is exempt from the requirement to prepare a storm water pollution prevention plan (SWPPP) because it meets the "no threat" assessment criteria on the City's Project Threat Assessment Worksheet for Determination of Construction SWPPP Tier Level. My prOject does not meet any of the High, Moderate or Low Threat criteria described below. . Tier I Low Threat Assessment Criteria . My project does not meet any of the Significant or Mbderate Threat criteria, is not an exempt permit type (See list above) and the project meets one or more of the following criteria: Results in some soil disturbance; and/or Includes outdoor construction activities (such as saw cutting, equipmentwashing, material stockpiling, vehicle fueling, waste stockpiling). Tier 2 - Moderate Threat Assessment Criteria O My project does not meet any of the Significant Threat assessment Criteria described below and meets one or more of the following criteria: Project requires a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code); or, Project will result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement removal, equipment storage, refueling and maintenance areas and project meets one or more of the additional following criteria: . Located within 200 feet of an environmentally sensitive area or the Pacific Ocean, and/or Disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical, and/or Disturbed area is located along or within 30 feet of a storm drain inlet, an open drainag&channel or watercourse, and/or Construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). Tier 3 Significant Threat Assessment Cnter/a U My project includes clearing, grading or other disturbances to the ground resulting in soil disturbance totaling one or more acres including any associated construction staging, equipment storage, stockpiling, pavement removal, refueling and maintenance areas: and/or 0' My project is part of a phased development plan that will cumulatively result in soil disturbance totaling one or more acres including any associated construction staging, equiprrient storage, refueling and maintenance areas: or, U My project is located inside or within 200 feet of an environmentally sensitive area (see City ESA Proximity niap) and has a significant potential for contributing pollutants to nearby receiving waters by way of storm water runoff or non-storm water discharge(s). r I certify to the best of my knowledge that the above checked statements are true and correct. I understand and acknowledge that even though this project does not require preparation of a construction SWPP, I must still adhere to, and at all times during construction activities for the permit type(s) öheck above comply with the storm wafer best management practices pursuant to Title 15 of the Carlsbad Municipal Code and to City Standards. "The City Engineer may authorize minor variances from the Storm Water Threat Assessment Criteria in special circumstances where it can be shown that a lesser or higher Construction SWPPP Tier Level is warranted. Project Address: . Assessor Parcel No. Owner/Owners Authorized Agent Name: Title: Owner/Owner's Authorized Agent Signature: Date: Ci Concurrence: ONO JES By: J Date: . fl. 1' Project ID: CR15 A2 r B-24 Page 1 of 1 Rev.03/09 CONSTRUCTION THREAT ASSESSMENT WORKSHEET FOR Development Services X 0* DETERMINATION OFPROJECT'S Land DeveIoprnent Engineering CITY OF PERCEIVED.THREAT TO 163 Faraday Avenue CARLSBAD STORM WATER QUALITY 760-602-2750 E-33 www.carlsbadca.gov Construction Perceived Threat to SWPPP Tier . Construction Threat Assessment Criteria* Storm Water Level Quality Tier 3 - High Construction Threat Assessment Criteria LI Project site is 50 acres or more an&grading will occur during the rainy season LI Project site is 1 acre or more in size and is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or within 200 feet of an environméntàlly sensitive area (ESA) or discharges directly to an ESA High LI Soil at site is moderately to highly erosive (defined as having a predominance of soils with Tier 3 USDA-NRCS Erosion factors kt greater than or equal to 0.4) LI Site slope is 5 to 1 or steeper . . LI Construction is initiated during the rainy season or will extend into the rainy season (Oct. .1 through April 30). LI Owner/contractor received a Storm Water Notice of Violation within past two years Tier 3— Medium Construction Threat Assessment Criteria / Medium. U . All projects not meeting Tier 3 High Construction -Threat Assessment Criteria Tier 2 High Construction Threat Assessment Criteria LI Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA LI Soil at site is moderately to highly erosive (defined as having a predominance of soils with USDA-NRCS Erosion factors k1 greater than or equal to 0.4) - High LI Site slope is 5 to 1 or steeper Tier 2 LI Construction is initiated during the rainy season or will extend into the rainy season (Oct 1 through April 30). . LI Owner/contractor received a Storm Water Notice of Violation within past two years U Site results in one half acre or more of soil disturbance Tier 2 - Medium Construction Threat Assessment Criteria - r T Medium LI All projects not meeting Tier 2 High Construction Threat Assessment Criteria Tier 1 Medium Inspection Threat Assessment Criteria LI Project is located within the Buena Vista or Agua Hedionda Lagoon watershed within or directly adjacent to an environmentally sensitive area (ESA) or discharges directly to an ESA1 LI Soil at site is moderately to highly erosive (defined as having a predominance of soils wiifi USDA-NRCS Erosion factors kf greater than or equal to 0.4) \ Medium . LI Site slope is 5 to 1 or steeper - - Tier 1 Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 . through April 30). 1. LI Owner/contractor received a Storm 'Water Notice of Violation within past two years LI Site results in one half acre Or more of soil disturbance Tier 1 - Low Inspection Threat Assessment Criteria Low All projects not meeting Tier 1 Medium Construction Threat Assessment Criteria Exempt Not Applicable Exempt *The city engineérmáy authorize minorvariances from the construction threat assessmentcritéria in special circumstances where it can be shown that a lesser or higher amount of storm water compliance inspection is warranted in the opinion of the city engineer . . . -- I -, - - I E-33 - Page 1 oft , REV 4/30/10 ( V.. STORM WATER STANDARDS Development Services IT Y 0 F QUESTIONNAIRE Land Development Engmneng *. . 1635 Faraday Avenue C. CARLSBAD - E-34 760-602-2750 V www.carisbadca.gov V V 'INSTRUCTlONS To address post-development pollutants.that may be generatedfrom development projects, the City requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMP's). into the project design per the City's Standard Urban Stormwàter Mànagément Plan (SUSMP). To view the SUSMP, refer to the Engineering Standards (Volume 4 Chapter 2) at www.carlsbadca.gov/standafds. - •V V., VV V _ V Initially-this questionnaire must be completed by the applicant in advance .of.submitting for a development application (subdivision, discretionary permits and/or construction permits) -The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project Depending on the outcome your project will either be subject to Standard Stormwater Requirements or be subject to additional criteria called Priority Development Project Requirements Many aspects of project site design are dependent upon the storm water standards applied to aprojêct. Your responses to the questionnaire represent an initial assessment of the proposed project conditions,!nd impacts. City staff has responsibility for making the final assessment after submission of the development application If staff determines that the questionnaire was incorrectly filled out and is subject to mOre stringent storm water standards than initially assessed by you, this,will result in the return of the development application as incomplete In this case please make the changes to the questionnaire and resubmit to the City. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions please seek assistance from Land Development Engineering staff A separate completed and signed questionnaire must be submittei for each new development application, submission Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently. In addition to this questionnaire you must also conplete sign and submit a Project Threat Assessment Form with construction permits for the project. Please start by completing Step I and follow the instructions When completed sign the form at the end and submit this with your application to the city. r/ 31TO BE COMPLETED FOR ALLPROJECTS4 n ) To determine if your project is a priority development project, please answer the following questions: V V YES NO V - - -. V • - V •V -. - V. - ____ ____ 1 Is your project LIMITED TO constructing new or retrofitting paved sidewalks bicycle lanes or trails that meet the following criteria: (1) Designed and constructed to direct storm water runoff to adjaôent vegetated areas; or other non erodible permeable areas OR (2) designed and constructed to be hydraulically disconnected from paved streets or roads; 'OR (3) designed and constructed with permeable pvementsor surfaães in . V accordance with USEPA Green Streets guidance?. 2 Is your project LIMITED TO retrofitting or redeveloping existing paved alleys streets or roads that are designed and constructed in accordance with the USEPA Green Streets guidance? If you answered yes to one or more of the aboveque'stio'n'"s, then your project is NOT 'a priority development project and therefore is NOT subject to the storm water criteria required for priority development projects Go to step 4 mark the last box stating my project does not meet PDP reqUirements" and complete applicant information. If you answered no to both questions then go to Step 2 I :r-- - E-34 - Page 1 of 3 . Effective 6/27/13 154 2 j' BE -COMPLETED FORALL"NEW OR REDEVELOPM ENT, PROJECT.. To determine if your project is a priority development l5roj6ct, please answer the following questions.. . E'S NO Is your project anew development that creates 10000 square feet orrnore of impervious 'surfaces collectively. over the entire project site? This includes commercial industrial residential mixed use and public development projects on public or private land. . .. Is your project creating'or replacing 5,000 square feet or more of impervious surface collectively over the entire' project site on an existing site of 10,000 square feet or more of impervious surface?. This includes commercial, industrial, residential, mixed-use, and public development projects on publicor private land. Is your project a new or redevelopment project that creates 5,000 square feet or rnorebf imperviojs surface collectively overthe entire project site and supports a restaurant? 'A restaurant is a facility that sells prepared foods'and drinks for, consumption, including stationary lunch counters and refreshment stands selling prepared . foods and'drinks for immediate consumption. - . . . . Is you(project a new or redevelopment project thatcreates '5,000 square feet or more of impervious surface collectively over the entire project site and suports a hillside development project? A hillside develcpmenf ' project includes development on any natural slope that is twenty-fl ye' percent or. greater. '- -•. '- 'I •. 1. •'' Is your' project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a parking lot. A parking lot is a land area or facility for the temporary parking or storage of motor vehicles used personally forbusiness Or for commerce. - Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a street, road, highway freeway or driveway? A street, road highway, freeway or driveway is any paved impervious surface used for the transportation of automobiles, trucks, motorcycles, and other vehicles Is your project a new or redevelopment project' that 'creates or replaces 2,500 square feet or more of impervious surface collectively over the entire site and discharges directly to an Environmentaly Sensitive ( Area (ESA)? "Discharging Directly to" includes flow that is conveyed overland a distance of 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any disfanceas an isolated flow from the project to the ESA (i.e. not commingles with" flows from adjacent lands).' .- . . Is your project a new development that supports an automotive repair shop? An automotive repair shop is a 'that Standard Industrial Clssiflcatios'i 5013, facility is cafe gorized.in any one of the following (SIC) codes: -' 5014, 5541, 7532-7534, or 7536-7539. -. . . . ' . 9 Is your project a new development that supports a retail gasoline outlet (RGO)? This category incPides RGO 5 that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic (ADT) of 100 or more vehicles per day 10 Is your project a new or redevelopment project that results in the disturbance of one or more acres of land and are expected to generate pollutants post construction'? ,-- 11 Is your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square fee or more of impervious surface or (2) increases impervious surface on the property by more thahlO%? If you answered yes to one'* more of the above questions you ARE a priority development project and are therefore subject to implementing structural Best Management Practices (BMP 5) in addition to implementing Standard Storm Water Requirements such as source control and low impact development BMP's.. A Storm Water Management Plan (SWMP)mustbe submitted with'our application(s) for development. Go to step 3 for redevelopment projects. For new projects; go to step 4 at the end of this questionnaire, check the "my project meets PDP requirements" box and complete applicant information. If you answered no to all of the above questions, you ARE NOT a priority development project and are therefore subject to implementing only Standard Storm Water Requirements such as source control and low impact development BMP's required for all development projects: A Storm Water Management Plan (SWMP) is not required with your application(s) for development. Go to step 4 at the end of this questionnaire, check the "my project does not meet POP requirements" box and complete applicant information. / .. AQN STORK WATER. Development Services STANDARDS l Land Development Engineering I T Y 0 F QUESTIONNAIRE 1635 Faraday Avenue 760-602-2750 CARLSBAD E-34 16 .. c E-34 Page 2- of - I - Effective 6/27/13 1 c , STORM WATER TANDARD Development Services .:.: Land Development Engineering CITY OF QUESTIONNAIRE . 1635 Faraday Avenue - 760-602-2750 CARLSBAD E-34 ............................. I • - ¼- - -, - ,- - • -- .- V / V - ~ASTEP_3,~~,-~ f'TO BE COMPLETED FOR REDEVELOPMENTfPROJECTSLTHAT ARE PRIORITY DEVELOPEMENT PROJECTS ONLY/ Complete the questions below regarding your redevelopment project: - - - - - YES NO Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than ">.( 50% of the surface area of the previously existing development? 7 If you answered yes the structural BMP s required for Priority Development Projects apply only to the creation or replacement of impervious surface and not the entire development. 'Go to step 4, check the "my project meets PDP requirements" box and complete applicant information If you answered no the structural BMP s required for Priority Development Projects apply to the entire development Go to step 4 check the 'my poject meets POP requirements" box and complete applicant information. - - t . Z CHECK THE APPROIRIATE BOX AND COMPUETEAPPLICANTINFORMATlON ' My project meets PRIORITY DEVELOPMENT PROJECT (PDP) requirements and must comply with additional ,stormwater criteria per the SUSMP and l understand,l must prepare a Storm Water Management Plan for submittal at time of application I understand flow control (hydromodification) requirements may apply to my project Refer to SUSMP for details . L My project does not meet PDP requirements and must only comply with STANDARD STORMWATER REQUIREMENTS per the SUSMP. As part of these requirements, lwifl incorpOrate low impact development strategies throughout my project. Applicant Information and Signature Box Address j AccessorcelNye Applicant Name: - -' -- - -'• .•. - Applicant Title, - 2-1-J,9 4-0-L's 6,V - - - / Applicant Sig~.": Date This Box for City Use Only City Concurrence: - YES NO By: JdE3 -- Date: Project ID: ç j - : - . . -- • .. -, ,- * Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas - •designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the'. San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources ContrOl Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); ar'eas designated as preserves or their quivalent under the Multi Species Conservation Program within the Cities and County of San Diego and any other equivalent environmentally sensitive areas which have been identified b the Côperrnittees. -• - V - ¼ . V... - - -. V I. - V - - •. V\r - -- V - - • - STORM WATER POLLUTION PREVENTION NOTES ALL NECESSARY EQUIPMENT AND MATERIALS SHALL BE AVAILABLE ON SITE TO FACILITATE RAPID INSTALLATION OF EROSION AND SEDIMENT CONTROL BMPS WHEN RAIN I$ EMINENT. THE OWNER/CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL. THE OWNER/CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEERING OR BUILDING INSPECTOR DUE TO UNCOMPLETED GRADING OPERATIONS OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. ALL REMOVABLE -PROTECTIVE DEVICES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT, (40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. 5.. ALL GRAVEL BAGS SHALL BE BURLAP TYPE WITH 3/4 INCH MINIMUM AGGREGATE. 6. ADEQUATE EROSION AND SEDIMENT CONTROL AND PERIMETER PROTECTION BEST MANAGEMENT PRACTICE MEASURES MUST BE INSTALLED AND MAINTAINED. SPECIAL NOTES For City Use Only - CITY OF CARLSBAD STANDARD TIER 1 SWPPP Approved By: kJUJ Poi I Aj5}L., Date: II (f PROJECT INFORMATION - Site Address: ( 0,411 A-Lie Assessor's Parcel Number: Project ID: $'k On 1c5OL1 ) Construction Permit No.: 'I I Estimated Construction Start Date roject Duration Months Emergency Contact: Name:lvvm 24 hour Phone: 'e.) Perceived Threat to Storm Water Quality Medium :: cvvv If medium box is checked, must attach a site plan sheet showing proposed work area and location of proposed structural BMPs /j STORM WATER COMPLIANCE FORM Development Services C ITY OF TIER I CONSTRUCTION SWPPP 1635 Faraday Avenue Land Development Engineering CARLSBAD E-29 760-602-2750 ! - - www.carlsbadca.gov STORM WATER COMPLIANCE CERTIFICATE / My project is not in a category of permit types exempt from the Construction SWPPP requirements V My project is not located inside or within 200 feet of an environmentally sensitive area with a significant potential for contributing pollutants to nearby receiving waters by way of storm water runoff or non-storm water discharge(s). V My project does not require a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code) v' My project will not result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement removal, equipment storage, refueling and maintenance areas that meets one or more of the additional following criteria: located within 200 feet of an environmentally sensitive area or the Pacific Ocean; and/or, disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical; and/or disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse; and/or construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). I CERTIFY TO THE BEST OF MY KNOWLEDGE THAT ALL OF THE ABOVE CHECKED STATEMENTS ARE TRUE AND CORRECT. I AM SUBMITTING FOR CITY APPROVAL A TIER 1 CONSTRUCTION SWPPP PREPARED IN ACCORDANCE WITH THE REQUIREMENTS OF CITY STANDARDS. I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT BEST MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION ACTIVITIES TO THE MAXIMUM EXTENT PRACTICABLE TO MINIMIZE THE MOBILIZATION OF POLLUTANTS SUCH ASSEDIMENT AND TO MINIMIZE THE EXPOSURE OF STORM WATER TO CONSTRUCTION RELATED POLLUTANTS; AND, (2) ADHERE TO, AND AT ALL TIMES, COMPLY WITH THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP THROUGHOUT THE DURATION OF . THE CONSTRUCTION ACTIVITIES ' UNTIL THE CONSTRUCTION WORK IS COMPLETE AND APPROVED BY THE CITY OF CARLSBAD. 2GO OWNER(S)/OWNER'S AGENT NAME (PRINT) OWNER(S)/OWNER'S AGENT NAME (SIGNATURE) DATE E-29 Page 1 of 3 REV 4/30/10 Erosion Control Tracking Non-Storm Water Waste Management and Materials • BMPs Sediment Control BMPs. Control Management BMPs Pollution Control BMPs BMPs C C o - - f • t V C o ' E V C 0) C - V - Co .2 .2' CO CD w BestManagementPractice CL C Z5 E -E W (BMP) Description -* . &' i E a, S C: 0 , 0 V CO 1) 0 0 C '.w COCco0. a, V> : L Oc a UjC • 0 a,o u- - 0 > U V Q) 5) 2 a'o. C i c co .! CO CO 2 I co WO (I) U) C/) . 0 ii.. C!) .2 (l)>(/) U)0.. (O.E-C1) 000 C QC0 >L ( i: o CASQA Designation -* r- CO '0) C? ' It) CO C. CO,0 . .7 .7 ? C? '7 ? U? ? C? o o 0 W W W W Iii W LU 0 ) (n :U) ()) LU LU W 0 (/) (I) C/) Cl) Cl) Cl) Cl) W I— I— Z Z Z Z - Construction Activity. W, - (1) Grading/SoilDisturbance - Trenching/Excavation - — — — - - - Concrete/Asphalt Saw cutting Drilling/Boring --- - - Concrete flatwork .- - - Paving . . \• . _: — ConduitlPipelnstallation Stucco/Mortar Work Waste Disposal . --- - Staging/Lay Down Area Stockpiling --- . Equipment Maintenance and Fueling Hazardous Substance Use/Storage Dewatering . Site Access Across Dirt - Other (list): Instructions: "'Begin by reviewing the list- of construction activities and checking the box to the left of any activity that will occur during the proposed construction. Add any other activity descriptions in the blank activity description boxes provided for that purpose and place a check in the box immediately to the left of the added activity description. For each activity descrribed, pick one or more best management practices (BMPs) from the list loèated along the top of the form. Then place an X in the box at the place where the activity row in'ersects with the BMP column. Do this for each activity that was checked off and for each of the selected BMPs selected from the list. For Example - If the project includes site access across dirt, then check the box to the left of "Site Access Across Dirt". Then review the list for something that applies such as "Stabilized Construction Ingress/Egress" under Tracking Control. Follow along the "Site Access Across Dirt" row until you get to the "Stabilized Construction Ingress/Egress" column and place an X in the box where the two meet. As another example say the project included a stockpile that you intend to cover with a plastic sheet. Since plastic sheeting is not on the list of BMPs, then write in "Cover with Plastic" in the blank column under the heading Erosion Control BMPs. Then place an X in the box where the "Stockpiling" row intersects the new "Cover with Plastic" column. To learn more about what each BMP description means, you may wish to review the BMP Reference Handout prepared to assist applicants in the selection of appropriate Best Management Practice measures. The reference also explains the California Stormwater Quality Association (CASQA) designation and how to apply the various selected BMPs to a project. E-29 . Page 2 of 3 • REV 4/30/10 4- 9 11 4 P'LANNINGDI VISION Development Services BUILDING PLAN CHECK,Planning Division CiTY OF APPROVAL 1635FaradayAvenue CARLSBAD P-29 5, DATE: -11/09/2015 PROJECT NAME: POOLAND SPA PROJECT ID: . . 9 . -5 4 5.._ • -i PLAN CHECK NO CB153835 SET# I ADDRESS:.1631 OAK AVE APN This plan check review IS complete and has been APPROVED by the PLANNING 5- 41 P By VERONICA MORONES p 9. A Final Inspection by thePLANNING Division is required IJ Yes Z.No, You may also have c6rre9ctions from one or, more of the divisions listed below. Approval from thee divisions may be required prior to the issuance of a building permit Resubmitted plans should include corrections from all divisions This plan check review is NOT COMPLETE Items missing or incorrect are listed on the attached checklist Please resubmit amended plans as required I I . 5 -. • S •1.,. - -. .. - - - - S • - S - - Plan Check APPROVAL has beeh sent to se"capppoolsl974@gmall.com For questions or clarifications on the attached checklist please contact the following reviewer as marked PLANNING ENGINEERING FIRE PREVENTION 7606024610 'c 7606022750 7606024665 5, - •t. . 9.4 4. - . . • • .( - • 5.. 5... ril -,. Chris Sexton . . Chris Glassen. Greg Ryan., 760-602-4624 , . 760-602-2784 r :- 760-602-4663 - Chris.Sexton@carlsbadca.gov ChristoiTher.Giassen@carlsbadca.gov Gregory.Ryan@carisbadca.6v Gina Ruiz' El.VàlRay Marshall . Cindy Wong 760602L4675 . . 760-602-2741- . - 7606024662 - Gina.Ruiz@carisbadca.gov . -. iyM.xshaIjcarisbadcagov Cvnthia.Wong@carisbadcaov Ver6nicaMorones T71 . Linda Ontiveros. - . Dominic Fieri 7606024619 -•. . 760-602-2773 •.I - 760-6024664 Veronic6.Morones@carlsbadca'.gov Linda Ontiveros'carIsbadca gov Dominic Fieri@carisbadca ov 4 9 I. I Remarks: ADDITION OF 300 SF POOL AND SPA. MEETS-REQUIRED SETBACKS PER . 'SECTION 2145090 NOT ABOVE GRADE 9 1 4 } - -, - S - • '. • . -s-S 4 9 .5 5 - 4 9 1 4