Loading...
HomeMy WebLinkAbout1634 FAIRLEAD AVE; ; CB133126; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 01-30-2014 Residential Permit Permit No: CB133126 Job Address: Building Inspection Request Line (760) 602-2725 1634 FAIRLEAD AV CBAD Pem,it Type: Parcel No: Valuation: Occupancy Group: # Dwelling Units: Bedrooms: RESDNTL 2"150202S21' • $175,963.00 1 3 Sub Type: CONDO Lot#: 20 Constuctlon Type: 58 Reference #: fil~ICJ Structure Type: 5+ Bathrooms: 2.5 Status: ISSUED Applied: 12/02/2013 Entered By: RMA Project Title: Orig PC ~iDD47==-:J VOSCANA (FORMERLY VITALIA) Plan Approved: 01/30/2014 Issued: 01/30/2014 Inspect Area: PB Plan Check#: PC130061 UNIT 56, BLDG# 3, PLAN 2, PHASE 6, 1500 SF, 431 SF GAR, 210 SF DECK Applicant: SHEA HOMES ATIN: SARAH BECKMAN 9990 MESA RIM RD SAN DIEGO CA 92121 858 521:H>554 Building Pem,it Add'l'Building Pem,it Fee Plan Check Add'! Plan Check Fee Plan Check Discount Strong Motlon Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'I Renewal Fee Other Building Fee HMP Fee Pot. Water Con. Fee Meter Size Add'I Pot. Water Con. Fee Reel. Water Con. Fee Green Bldg Stands (SB1473) Fee Green Bldg Stands Plan Chk Fee $993.54 $0.00 $695.48 ($222.22) ($55.64) $17.60 $0.00 $0.00 $0.00 $0.00 $0.00 $10,928.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $4.00 $0.00 Total Fees: $22,989.32 Total Payments to Date: Owner: Meter Size Add'I Reel. Water Con. Fee Meter Fee SDCWA Fee CFO Payoff Fee PFF (3105540) PFF (4305540) License Tax (3104193) License Tax (4304193) Traffic Impact Fee (3105541) Traffic Impact Fee (4305541) Sidewalk Fee PLUMBING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Housing Impact Fee Housing lnlleu Fee Housing Credit Fee Master Drainage Fee Sewer Fee Additional Fees Fire Sprinkler Fees TOTAL PERMIT FEES $22,989.32 Balance Due: $0.00 $0.00 $0.00 $2,575.54 $3,202.53 $0.00 $0.00 $0.00 $1,944.00 $0.00 $0.00 $166.00 $59.00 $105.49 $0.00 $0.00 $0.00 $0.00 $2,576.00 $0.00 $0.00 $22,989.32 $0.00 Inspector: FINAL APPROVAL Date: f-lJ ,jy' Clearance: ------ N OTl CE: Please take NOTl CE that approval of your project I ndudes the 'I mposltlon' ex fees, dedlcatloos, reservations, or other exactloos hereafter coUe clfvely referred to as 'fees/exactloos.' You have 90 clays from the date this permit was Issued to protest Imposition of these fees/exactions. If you protest them, you must foUow the protest procedures set forth In Goverm1ent Code Section 66020(a), and file the protest and any other required Information with the City Manager for processing In accordance with Carlsbad M unlc!pal Code Section 3 .32. 030. F al ure to timely follow that procedure w1U bar any subseql.lElnt legal action to attack, review, set aside, void, or aru,u their Imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor plannlng, zoning, grading or other sinllar application procasslng or service fees In coonectlon with this project NOR DOES IT APPLY to any E i; '\;; Inspection List Pennlt#: CB133126 Type: RESDNTL CONDO VOSCANA (FORMERLY VIT ALIA) UNIT 56, B,LDG # 3, PLAN 2, PHASE 6, 150 Date Inspection Item Inspector Act Comments 09/16/2014 89 Final Combo RI 09/16/2014 89 Final Combo PB AP 09/02/2014 23 Gas/Test/Repairs PB NR 07/17/2014 17 Interior Lath/Drywall PB AP 07/10/2014 82 Drywall/Ext Lath/Gas Test PB AP 06/26/2014 84 Rough Combo PB AP 06/16/2014 13 Shear Panels/HD's PB AP 06/13/2014 13 Shear Panels/HD's PB NR 05/28/2014 15 Roof/Reroof PB AP I 03/24/2014 11 Ftg/Foundatlon/Plers PB AP 03/21/2014 11 Ftg/Foundation/Piers PB NR 03/07/2014 21 Underground/Under Floor PB AP Wednesday, September 17, 2014 Page 1 of 1 Sep-15·2014 09:32 AM Maravi lla by Shea Homes (619)267·2197 <{_~ -~ CITY 0~ .. ' .. INSPECTION RECORC CB13312b jj,834 F'AIRLEADAV VOSCANA (FORMERLY VITALIA) 6/7 CARLSBAD Building Dlvl,ton f.i 'SP!CTION RICORD CARD WJTH APPROVID • ..ANS MUST IIE KEPT ON THI JOI UNIT 56, BLDG# 3, PLAN 2, PHASE 6, 1500 SF, 431 SF GAR, 210 SF DECK RESDNTL CONDO Lot#: 20 SHEA HOMES Ii:! CALL IIIIPOR• IIIQ pm FOR NEXT WORK DAY INSl'!CflON la POii BUiLDiNG INSPICTION CALLr 760-602•2725 OR GO TO, www.QrlfMAAl,IOJVIMlldlaa AND CLICK ON "ReqUNI I •.e.•ct(o~ ' RECORD COPY DATIi t 60\ 11 Required Prior to hequesang Building Fln•f If Chec:f,•d YES J1J•nnlng/Landscap1 7 6D-94+.8463 Allow 49 hours CMl,I (lf119ln11t1n9 ln,p1Ct!on1J C.11 b.t'ore 2 pm 1/re '7cvcntlon 76o.602-4660 .Allow ff hours 1)pe of ln1pectlon ,· .. ,, ., t:::Ll::C l"HIC AL Date ln1 ecitor #U CJ EliCTlUC UNDERGROUND D UFSR MASONRY PRE OROUT #93 0 !1.!CJl'RIC S!RVIOE D TEMPORARY CJ GROUT CJ WALL DRAINS fli PHOTO VOLTAIC t;.,,r. MECHANICAL #11 COLUMN FOOTINGS 141 UNDERGROUND DUCTS & PIPING #14 SUBFRAME CJ FLOOR tJ CEILING #44 D DUCT l PLENUM CJ REP. PIPING #11 ROOF&HEATHINCI HEAT-AIR COND. SYSTEMS #1S !XI', IHEAR PANW #18 INSULATION #11 IXTIRIDR LATH #17 INTl!RIOII LATH & DRYWALL #24 TOP OUT D WASTE D WTR S UND!RQROUND VISUAL #27 TUI HHOW•k l'AN W CJ GAS TUT D GAS PIPING #211 WATiR HEATER *28 SOLAK WAT!R A/SOV!JIH!AD HYDROSTATIC #29 PINAL A/SFINAL r.,,,,, ST011M WA.11°1{ F AROUOH·IN '110 PRE•OONSTRUCTION MEETING F AFINAL . .413 FOLLOW UP INSPECTION FIXED EXTINGUISH I NO SYSTEM ROUGH-IN #IOI NOTICITO CliAN FIXED EXTINO SYSTEM HYDROSTATIC TEST #807 WftlTml WARNING FIXED EXTINQUIIHINGSYSTEM FINAL #809 NOTICEOFVIOLATION MEDICAL GAS PRESSURET!ST #1110 WRIAL WARNING MEDICAL OAS FINAL