Loading...
HomeMy WebLinkAbout1635 FARADAY AVE; ; CB991603; PermitCity of Carlsbad 07/01/1999 ‘Commercial/Industrial Permit Permit No: CB991603 Building Inspection Request Line (760) 438-3101 Job Address: 1635 FARADAY AV CBAD Permit Type: TI Sub Type: COMM Parcel No: 2121303100 Lot #: $1,768,000.00 Construction Type: VN” Valuation: Occupancy Group: 28 Reference #: Project Title: CTIY OF CARLSBAD OFFICE TI 68000SF Applicant: Owner: Status: ISSUED 04/27/1999 Applied: Entered By: DT Plan Approved: 06/30/l 999 Issued: 07/01/1999 Inspect Area: LANGAN MARK STE 200 12220 EL CAMINO REAL SAN DIEGO CA 619-793-4777 SSPLAZALLC R~~MNabOl 01 02 02 C-IwfT 142256.05 142256.05 ce Due: 142,258.05 Building Permit Add’1 Building Permit Fee Plan Check Add’1 Plan Check Fee Plan Check Discount Strong Motion Fee Park Fee Park Fee LFM Fee LFM Fee Bridge Fee Bridge Fee BTD #2 Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add’1 Renewal Fee Other Buildina Fee $636.00 $510.00 S400.00 Pot. Water Con. Fee Meter Size Add’1 Pot. Water Con. Fee Master Drainage Fee: Sewer Fee: TOTAL PERMIT FEES $0.00 $70,702.32 $145672.05 FINAL APPROVAL lnspectos Date: e Clearance: NOTICE: Please take NOTICE that approval of your project includes the ‘Imposition’ of fees, dedications, reservations, or other exactions hereafter collectively referred to as ‘fees/exactions.’ You have 90 days from the dale fiis perml was issued to protest imposition of these fees/exactions. If you protest tiem, you must follow the pmtest pmcsdures set fom in Government Code Section 66020(a), and file the protest and any oher required information with the City Manager for processing in accordance with Cadsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review. set aside, void, or annul their impoaidon. You are hereby FURTHER NOTIFIED that your right to protest the specified feeslexactians DOES NOT APPLY to water and sewer cOnnection fees and capacky changes, nor planning, zoning, grading or other similar application pmxssing or service fees in connection with vlis pmjecect NOR DOES IT APPLY to any fees/exactions of which you have previouslv been given a NOTICE similar to this, or as to which tie statute of limitations has previously otherwise expired CITY OF CARLSBAD 2075 Las Palmas Dr., Carlsbad, CA 92009 (760) 438-1161 PERMIT AdPLlCATlON A CITY OF CARLSBAD BUILDING DEPARTMENT 2075 Las Palmas Dr., Carlsbad CA 92009 (760) 438-1161 FOR OFFICE USE ONLY PLAN CHECK N0.(&7c//k”3 EST. VAL. ’ ,900 B)nfl Plan Ck. Deposit ?2 A4 - O.3 Validated By -;>7- Date ISSC. 7031.5 B”*ine5* and Professions Code: Any city 0, county which ,~q”i‘es a; permit to CO”Jtr”Cf, alter. improw3. demolish or repair any St,“CtU‘e, prim to its i.s”a”ce, alEO leq”ireS the applicant for such permit to ‘iIs a signed statement that he is licensed p”rJ”anf f.2 the PloYisio”* Of me Contractor’s License Law mapter 9. commending Wifh section ,000 0‘ Division 3 Of the Business and Pr~tessions code, 0, that he is exempt therefrom. and Ill* basis ‘0, the alleged exemption. Any violafion of Section 7031.5 by any applicant far a permit subject* the applicant to a civil penalty of not more than five hundred dollars 115OCW. lLtuwwl-[+ Name Address city %tdZip Telephone x state Lice”58 x License Class city B”Si”eSS Lice.se x Designer Name Ad&865 city StiSNZip Telephone State License x ln*“ranCe company Policy NO. Expiration Date ,THlS SECTUIN NEED NOT BE COMPLETED IF THE PERMlT IS FOR ONE HUNDRED DOLLARS ,*vm, DR LESS, I hereby affirm fhat I ml BXempt from the CO”traCtOr’S License LBW ‘a tile following maso”: 0 I, as owner of the property w my employees with wages as their sole compensation. will do the work and the *fructwe is not intended or offered fw sale WC. 7044. Businerr and Profesrions Cods: me Co”tl.CfOr’* License Law Gbsr not ?.PPlY to a” owner Of property Who builds or impro”B. thereon, and Who does S”Ch work himself or through his own emplo”eer. provided that rucll implOYmle”f* 818 not intended or Offersd ‘N sale. I‘. however, the building or impIOYeme”t is OOld within one year Of completion. the owner-builder Will have the burden Of proving that he did not build or imprwe to, file p”lpose Of *aleI. la I, 85 owner of the property. am excIu*i~eIy ~ontrming with licensed ~ontra~tcm to COM~~UC~ the project lSee7*44;3usiiessand Pidfe~~iom Code: The CO”fr.Ct.f* License LSW doe* not apply to an owner Of pmperty Who builds 0, imPva”es thereon. and contram for S”Ch projects Wifh CO”tr*CfOr,*, licensed P”rS”anf to the CmtlaCtOr’. License Law,. 0 iqy cted with the lloWln perso” firm, to provid e & k3 lQ.RM e i ddrssr / phone number, COntraCtOrS liCB”SB number,: .,~$owtruupp&fef!f~~ _ '5'; n”mOer, COnlraClOrs llCB”JB “YmOBr,: 5. I will provide mm ot the work, but I have contracted hiredI the following ~erscms to provide thn work indicated hhde name I sddrers i phane number I type Of wow 1 t I . . PROPERTY DWNER SIGNATURE &a.. WLLd DATE 7 ’ 4 ilcli~~~;ticlsaEc~d~~~~~~~~~,~~~~~~~~~r~~~~~~~~~~~~~~~,,,~~~; ,::,/ii;i;:i,: ;ijj:i i ~~li;l.i:iil.-‘:-:~..:l:~:.:!~ :::::z i : ‘; ~ ; ‘,:,‘:, I j’,;g,; ~y$j: 15 the applicant or ‘“twe building OCCUpanf require.3 fO Submit a b”Ii”eSS plan, ac”&-flarardo”s materials registration for or risk management and ple”B”tion program ““CIW ssctiono 25505. 25533 or 25534 Of the Presley-Tanner Hazardo”* SUbStanCe Account Act? 0 YES x NO 1. the applicant or future building occ”pwll required to obtain a permit tram the air pOll”tio” Contml district or air quality management district? 0 YES Is the facility to be constructed within 1.000 feet of the outer boundary of a school site? 0 YES XNO F” IF ANY OF THE ANSWERS ARE YES, A FlNAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPUCANT HAS MET OR IS MEETING THE REDUIREMENTS OF THE OFFEE OF EMERGENCY SERVICES AND THE AIR POLL”TlDN CONTROL DISTRICT. ,~~8i.;li:iie~~~ni~~,~~~~~~~~~~,~,: ~ ;,;;: i;,, ,;;,;,;, ,; ~‘:~:(~l:~,+~~~j f@,“i”.i”: ,: .:‘iY ,..“iii”i .,,.,, ,.. ,,.., i, .‘, ,‘, ,; ::.,, ,: i “‘i: :, ,;, ,. I hereby affirm that there is a COnstr”Ctio” lendi”* agency ‘or the performance offhe work for which this Permit i* issued ,s?c. 3097,i~ civil CO&,. Inspection List Permit#:, CB991603 Type: TI COMM CTIY OF CARLSBAD Date Inspection item Inspector Act Comments 11/3/99 89 Final Combo 10/29/99 89 Final Combo 10/29/99 89 Final Combo 10/28/99 43 AirCondlFumace Set 10/28/99 43 AirCondlFurnace Set 10/26/99 15 RooflReroof 10/26/99 44 Rough/Ducts/Dampers 10/21/99 14 Frame/SteellBoltingNeldin 10/21/99 17 Interior Lath/Drywall 10/19/99 14 FramelSteellBoltingMeldin 10/19/99 34 Rough Electric 10/19/99 44 Rough/Ducts/Dampers 10/4/99 14 FramelSteellBoltingNldin 10/l/99 14 FramelSteellBoltingMeldin 10/l/99 34 Rough Electric IO/l/99 44 Rough/Ducts/Dampers g/30/99 14 FramelSteellBoltingNeldin g/29/99 14 FramelSteellBoltingNldin g/29/99 14 FramelSteellBoltingMldin g/29/99 44 Rough/Ducts/Dampers g/27/99 14 FramelSteellBoltingMeldin g/27/99 34 Rough Electric g/27/99 44 Rough/Ducts/Dampers 9124199 14 FramelSteellBoltingNeldin g/22/99 14 FramelSteellBoltingNldin g/22/99 34 Rough Electric g/22/99 44 Rough/Ducts/Dampers g/21/99 32 Const. Service/Agricultural 9120199 14 Frame/Steel/Bolting/Weldin 9/16/99 14 FramelSteellBoltingNVeldin 9/16/99 34 Rough Electric g/16/99 44 Rough/Ducts/Dampers 9/14/99 14 Frame/SteellBoltingNeldin g/14/99 34 Rough Electric 9114199 44 Rough/Ducts/Dampers g/13/99 14 FramelSteellBoltingNldin g/9/99 14 FramelSteellBoltingNldin g/7/99 14 FramelSteellBoltingNeldin g/7/99 34 Rough Electric 917199 44 Rough/Ducts/Dampers 913199 14 FramelSteellBoltingMeldin g/3/99 34 Rough Electric g/3/99 44 Rough/Ducts/Dampers g/2/99 14 FramelSteellBoltingMldin TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP AP co RI NS RI CA CA WC AP AP AP AP PA AP AP AP NS AP co AP PA PA PA NR AP AP AP PA NR PA PA PA PA PA PA PI NR PA PA PA PA PA PA PA REQUESED A”ROOF UNIT” INSPECTION ELEV. ENCL IST FLR ABOVE CEIL T-BAR CEIL @ COMP. RM CEIL LITES @ COMP RM DUCTS @ COMP RM T-BAR CEiL RM 265, BK RM, TRN RM CEIL LITES RM 265, BK RM. TRN RM DUCTS, PLMNS RM 265, BK RM, TRN RM T-BAR CEIL @ STR 2 CEIL @ BRK RM, COMP & TRN RM DUCTS, DMPRS @ STR 2 2ND FLR l-BAR CEIL N E SECT. 2ND FLR CEIL LITES N E SECT. 2ND FLR DUCTS, PLMNS N E SECT. CEIL 2ND FLR T-BAR CEIL S.E. SECT. CEIL LITES SE. SECT. DUCTS, PLMNS S.E. SECT. SUBS TRANS SEE ATTCH NOTICE CEIL 2ND FLR T-BAR CEIL 2ND FLR S W QTR CEIL LITES 2ND FLR S W QTR DUCTS, PLMNS. H P S 2ND FLR S W QT 2ND FLR T-BAR SW. SECT. CEIL LITES S.W. SECT. CEIL DUCTS, PLMNS SW. SECT. 2ND FLR CEIL T-BAR CEIL CEIL LITES DUCTS, HP S T-BAR CEIL MTN RM. OFFICES CEIL LITES MTN RM, OFFICES DUCTS, H.P.S MTN RM, OFFICES T-BAR CEIL Thursday, November 04,1999 Page 1 Of 3 912199 34 Rough Electric TP g/2/99 44 Rough/Duds/Dampers TP E/27/99 14 FramelSteellBoltingNldin TP 8/27/99, 17 Interior LatblDrywall TP E/27/99 34 Rough Electric TP E/27/99 44 Rough/Ducts/Dampers TP 8/25/99 11 FtglFoundationlPiers TP e/25/99 14 FramelSteellBoltingMldin TP a/24/99 11 FtglFoundationlPiers TP a/24/99 84 Rough Combo TP 8/23/99 14 Frame/SteellBoltingiWeldin TP a/19/99 14 Frame/SteellBoltingNeldin TP 8/18/99 14 FramelSteellBoltingNeldin TP a/17/99 14 FramelSteellBoltingNeldin TP 6/16/99 14 FramelSteellBoltingNYeldin RB e/12/99 14 FramelSteellBoltingMeldin TP e/12/99 14 FramelSteellBoltingMeldin TP e/12/99 34 Rough Electric TP e/12/99 34 Rough Electric TP E/12/99 44 Rough/Ducts/Dampers TP a/10/99 14 FramelSteellBoltingNldin TP MO/99 16 Insulation TP 8/10/99 17 Interior Lath/Drywall TP a/6/99 84 Rough Combo RB a/5/99 14 FramelSteellBoltingMeldin RB 815199 24 Roughflopout RB 014199 14 Frame/SteellBoltingNeldin RB 613199 14 Frame/SteellBoltingNeldin RB a/3/99 14 Frame/SteellBoltingNeldin RB a/2/99 14 FramelSteellBoltingNeldin TP a/2/99 64 Rough Combo TP 7/30/99 14 FramelSteeWBoltingNldin TP 7/30/99 44 Rough/Ducts/Dampers TP 7/29/99 14 Frame/SteellBoltingMeldin TP 7/29/99 34 Rough Electric TP 7128199 14 Frame/SteellBoltingNeldin TP 7126199 14 Frame/SteellBoltingNYeldin TP 7/26/99 14 Frame/Steel/Bolting/Weldin PD 7/26/99 24 Roughfropout PD 7/22/99 14 FramelSteellBoltingMldin TP 7/22/99 43 AirCondlFumace Set TP 7/21/99 14 FramelSteellBoltingMldin TP 7/20/99 14 Frame/SteellBoltingMeldin TP 7/20/99 34 Rough Electric TP 7/19/99 14 Frame/SteellBoltingNeldin TP 7/16/99 14 Frame/SteellBoltingNeldin TP 7/16/99 14 Frame/SteellBolting/Weldin TP 7/16/99 23 GasfresVRepairs TP 7116199 24 RougMopout TP 7116199 34 Rough Electric TP 7/16/99 34 Rough Electric TP PA PA AP WC AP AP WC PA WC CA NR AP NR NR co NR NR NR NR NR co AP WC AP AP CO NR PA AP NR AP co CO PA PA AP AP PA AP NR PA NR PA PA co NR AP AP AP AP NR CEIL LITES DUCTS, HP S MAIN ENT CEIL MAIN ENT CEIL LITES MAIN ENT CEIL DUCTS, UNIT ENT RADIUS SECT ONLY NOT READY FOR CEIL INSP TOP LAYER STR 3 1 HR CEIL CEIL HRD LID @ LOBBY&T BAR IST FLR 2ND FLR SOFFITS @ 244 TO COMP RM T-BAR CEIL IST FLR 2ND FLR SOFFITS @ 244 TO COMP RM T-BAR CEIL @ IST FLR SOFFITS @ MEETING RM PERM FURRED WALLS @2ND FLR RSTRMS SOFFIT AREA 103 OK PROTECT COPPER PIPING (BUSHING) @ HARD LID @ FRNT COUNTER PENETRATION SEAL @ FLR LINE MAIN LOBBY SOFFITS IST FLR REST RMS HARD LID HARD LID @ RESTRMS EXHST DUCT NOT PER PLAN INT OFFICES @ 2ND FLR 1ST FLR SOFFITS @ OFFICES 137 AREA F. CALK @ MTN RM ABOVE CEIL SOFFllT TEST ON 2ND FLR 2ND FLR REST RMS DUCT PRE-WRAP 1ST FLR 2ND FLR N/INCL PLUMB WALLS 2ND FLR N/INCL PLUMB WALLS BRACING FOR LOW WALLS NOT PER PL 2ND FLR WALLS 1ST FLR NllNCL LOW WALLS 24 HR TEST 1ST FLR 1ST FLR N/INCL LOW WALLS 2ND FLR WALLS Thursday, November 04.1999 Page 2 Of 3 7115199 14 Frame/SteellBoltingNldin TP 7115199 23 GaslTest/Repairs TP 7/15/99 24 Rough/Top& TP 7/14/94 14 FramelSteellBoltingMldin TP 7114199 17 Interior Lath/Drywall TP 7H4199 22 Sewer/Water Service TP 7/14/99 24 Rough/Topout TP 7113199 14 Frame/SteellBoltingMldin TP 7113199 24 Roughmopout TP 7/13/99 34 Rough Electric TP 7/12/99 14 Frame/Steel/BoltingMldin TP 7/12/99 34 Rough Electric TP 719199 16 Insulation TP 7/e/99 14 FramelSteellBoltingMldin TP 7/e/99 34 Rough Electric TP 7m99 14 Frame/SteellBoltingNeldin TP 7/7/99 34 Rough Electric TP Thursday.November04.1999 PA PI CO co PA WC co NR NR NR AP AP AP PA PA NR NR RESTROOM WALLS START 24 HR TEST NO TEST RESTROOMS N.W. SECT. OFFICES WATER TEST FAILED REST RMS IST FLR INT OFFICES FURRED WALK (PERM) 1ST FLR FURRED WALLS 8 OFFICES NOT COMP NOT COMP PageSoF City ‘of Inspection Request Permit# CB991603 Title: CTIY OF CARLSBAD Description: OFFICE TI 66000SF Inspector Assignment: TP Type: TI Sub Type: COMM Job Address: 1635 FARADAY AV Suite: Lot 0 Location: APPLICANT LANGAN MARK Owner: FARADAY BUSINESS PLAZA L L C Remarks: Phone: 7609169995 Inspector: & Total Time: CD Description 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Requested By: BRUCE Entered By: CHRISTINE Act Comments # Inspection History Dale Description Act lnsp Comments 1 O/26/99 15 RooWRerooF CA TP 10/26/99 44 Rough/Duck/Dampers CA TP IO/W99 14 Frame/Steel/Bolting/Welding WC TP 1 O/21/99 17 Interior Lath/Drywall AP TP ELEV. ENCL 1ST FLR ABOVE CEIL 10/19/99 14 FramelSteellBoltingNldi~g AP TP T-BAR CEIL @ COMP. RM 10/19/99 34 Rough Electric AP TP CEIL LITES @ COMP RM IO/19199 44 Rough/Duck/Dampers AP TP DUCTS@!COMPRM 10/4/99 14 FramelSteellBoltingNYelding PA TP IO/l/99 14 FramelStaellBoltingelding AP TP T-BAR CEIL RM 265, BK RM, TRN RM 1011199 34 Rough Electric AP TP CEIL LITES RM 265, BK RM, TRN RM IO/l/99 44 Rough/Duck/Dampers AP TP DUCTS, PLMNS RM 265, BK RM, TRN RM S/30/99 14 FramelSteellBoltinglding NS TP 9129199 14 FramelSteellBoltingFlding Co TP CEIL @ BRK RM, COMP & TRN RM S/29/99 14 Frame/Steel/BoltingAelding AP TP T-BAR CEIL @ STR 2 S/29/99 44 Rough/Duck/Dampers AP TP DUCTS, DMPRS @ STR 2 g/27/99 14 FramelSteellBoltingNVelding PA TP 2ND FLR l-BAR CEIL N E SECT. 9/27/99 34 Rough Electric PA TP 2ND FLR CEIL LITES N E SECT. S/27/99 44 Rough/Duck/Dampers PA TP 2ND FLR DUCTS, PLMNS N E SECT. CbofCarltbr~I Final Building Inspection Dept: Building Engineering Planning CMWD St Lite E&a Plan Check#: Date: 10/18/99 4:14:0 Permit #: CB991603 Permit Type: TI Project Name: CTIY OF CARLSBAD Sub Type: COMM Address: 1635 FARADAY AV Lot: 0 Contaot Person: Phone: Sewer Dist: CA Water Dist CA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ...*.... . . . . . n...... . . . . . . . . . . ..a . . . . n...... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . z;ected: 1 !/I ,/gy Approved: 2 Disapproved: - Inspected Date By: inspected: Inspected Date By: inspected: Approved: ~ Disapproved: - Approved: - Disapproved: - Comments: Cff~ of Caris@ad Final BUildinN lIIsP8CtiOn Dept: Building Erfgineering Planning CMWD gle Fire Plan Check #: Penit #: Project Name: CB991603 CTIY OF CARLSBAD Date: 10/18/994:14:0 Permit Type: TI Sub Type: COMM Address: 1635 FARADAY AV Lot: 0 Contact Person: Phone: Sewer Dist CA Water Dist CA Date ved: ;)(, Disapproved: __ Inspected Date By: Inspected: Approved: - Disapproved: ~ Inspected Date By: Inspected: Approved: ~ Disapproved: ~ . . . . . . . . * . . . . . . . . . *.............. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. /,,gg~ggy E~~~lneetfng l Consulting . 7hstlng FINAL REPORT FOR SPECIAL INSPECTION AND MATERIAL TESTING November 22. 1999 PSI Project # 059-80127-67 Building Official City of C&bad Building Inspection Dept 2075 Las Palmas Carlsbad, California 92009-4859 SUBJECT: SATISFACTORY COMI’LETION OF WORK REQUIRING SPECIAL INSPECTION AND MATERIAL TESTING PERMITNO.: 99-128 PROJECT ADDRESS: Faraday Business Plaza 1635 Faraday Carlsbad, California I declare under penalty of perjury that, to the best of my knowledge, all the work requiring special imp&ion, material sampling and testing under the subject permit is in conformance with the approved plans, the inspection and observation program and other construction documents, and the applicable workmanship provisions of the Uniform Building Code. Executed on this 22”d day of November, 1999. Comments: PSI’s Scope of Services included the following: Concrete Special Inspection TESTING LABORATORY OR SPECIAL INSPECTION AGENCY: Professional Service Industries, Inc. 6867 Nancy Ridge Drive, Ste E SanDiego, CA 92121 Eduardo Dizon, RCE State of California Registration Number: 12/31/2001 Professional service l”d”strie*, 1°C.. 6867 Nancy Ridge Drive, suite E. sail niego, CA 9212, . Phone e,9,4ss-0544. Fax 6,9,4SS-,170 FINAL REPORT FOR SPECIAL INSPECTION AND MATERIAL TESTING November 22, 1999 PSI Project # 059-80127-69 Building Official City of Carlsbad Building Inspection Dept 2075 Las Palmas Carlsbad, California 92009-4859 SUBJECT: SATISFACTORY COMPLETION OF WORK REQUIRING SPECIAL INSPECTION AND MATERIAL TESTING PERMIT NO.: CB 99-1603 (Elevator) PROJECT ADDRESS: Faraday Business Plaza 1635 Faraday Carlsbad, California I declare under penalty of perjuly that, to the best of “,y knowledge, all the work requiring special inspection, material sampling and testing under the subject permit is in conformance with the approved plans, the inspection and observation program and other construction documents, and the applicable workmanship provisions of the Uaifom1 Building Code. Executed on this 22”d day of November , 1999. Comments: PSI’s Scope of Services included the following: Welding Inspection TESTING LABORATORY OR SPECIAL INSPECTION AGENCY: 6867 Nancy Ridge Drive, Ste i San Diego, CA 92121 LAG Eduardo Dizon, RCE State of California Registration Number: RCE Expiration Date,: 12/31/2001 Professional Service Industries, Inc. - 6867 Nancy Ridge Drive, Suite E *San Diego, CA 92121 * Phone 619/455-0544 - Fax 6191455-1170 FINAL REPORT FOR SPECIAL INSPECTION AND MATERIAL TESTING November 22,1999 Building Official City of Carlsbad Building Inspection Dept 2075 Las Palmas Carlsbad. California 92009-4859 PSI Project # 059-80127-68 SUBJECT: SATISFACTORY COMPLETION OF WORK REQUIRING SPECIAL INSPECTION AND MATERIAL TESTING PERMITNO.: 98-4150 PROJECT ADDRESS: Faraday Business Plaza 1635 Faraday Carlsbad, California I declare under penalty of perjury that, to the best of my knowledge, all the work requiring special inspection, material sampling and testing under the subject permit is in confonance with the approved plans, the inspection and observation program and other construction documents, and the applicable workmanship provisions of the Uniform Building Code. Executed on this 22’” day of November, 1999. Comments: PSI’s Scope of Services included the following: Concrete, Welding, Ultrasonic and Epoxy Anchorage Inspection TESTING LABORATORY OR SPECIAL INSPECTION AGENCY: Professional Service Industries, Inc. 6867 Nancy Ridge Drive, Ste E San Diego, CA 92121 Eduardo Dizon, RCE State of California Registration Number: RCE 57217 Expiration Date: 12/31/2001 Professional Service Industries, Inc. * 6867 Nancy Ridge Drive, Suite E a San ~iego, CA g2121 - Phone SISM~-0544. FOX ~~W~S.~ 170 ln Tartncdip with $xmnmnt for BuiUirgSafty DATE: 6/W/99 JURISDICTION: Carlsbad PLAN CHECK NO.: 99-1603 SET: III PROJECT ADDRESS: 1635 Faraday Ave. PROJECT NAME: Faraday Business Plaza City offices TI 0 PLAN REVIEWER 0 FILE 0 The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction’s building codes. n The plans transmitted herewith will substantially comply with the jurisdiction’s building codes when minor deficiencies identified below are resolved and checked by building department staff. 0 The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. q The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. 0 The applicants copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. 0 The applicant’s copy of the check list has been sent to: n Esgil Corporation staff did not advise the applicant that the plan check has been completed. 0 Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Telephone #: Date contacted: (by: 1 Fax #: Mail Telephone Fax In Person cl REMARKS: By: Chuck Mendenhall Esgil Corporation Enclosures: I-J GA 0 MB 0 EJ 0 PC phone in tmsmthdot 9320 Chesapeake Drive, Suite 208 l San Diego, California 92123 l (619) 560-1468 + Fax (619) 560-1576 Carlsbad 99-1603 III 6124199 1. Verify that the City Building Official will this project. 2. City to review the attached letter from the area for mixed occupancy building. 3. Verify that the building official has accept 287bl287a. e exiting in Rooms 4. The attached sheets M-l thru M-4 an P-4 must be incorporated into the city set of plans k Carlsbad 99- 1603 111 6124199 1. Verify that the City Building Official will allow the 1997 UBC to be used for this project. bb A 2. City to review the attached letter from the architect regarding the allowable area for mixed occupancy building. lY 3. Verify that the building official has accepted the exiting in Rooms 287bl287a. 4. The attached sheets M-l thru M-4 and P-4 must be incorporated into the city set of plans 6-97- 1999 3 i dB=‘M FROM SMITH-CONSULTING-OUT 6197934787 P. 2 . . SmithConsult ingArchitects May 25,lBBB Mr. Pat Kallsy CITY OF CARLSBAO - BUILDING DEPARTMENT 2075 Las Palmas Cartsbad, California 92009 Ra: Faraday Business Plaza 1635 Faraday Avenue Dear Pat, I am writing to requests raviaw and interpretslion of an ~carpsncy issue for the abowrefarred project. The subjact projed is a two-story office building totaling 66.m sq. ft. with 34,434 sq. fi on the first tlcmr. t am proposing to classify the building as a 8 occupa~Type VN Construction, sprinklerad ?nd with 69’ yards ail wund which will al!ow unlimited aret& There is a component of this building however, that Is an Adoccupancy oh the first floor with an area of 3.674 sqft. Per eeciton 504.3 axteption P2 this A-3 woa could be considered e component of the B occupancy if under ?O% of the area of the fioor where tocated. In this case, the percentage of A-3 to the overall aroa ofthe first floor is 16.67%. I have attached a plan of the proposed A.3 area which can h rafamncad for the following argument I scenario There is a l-hour mtad exit corridor that ndnlss the A-3 occupancy. affectively separating the area from the remainder of the building With two l-hour ratadaeormbias Wending to the second floor. The second floor has 6 r overall of nomwl weight 4ooO psi concrete on 22 gauge x 3’ steel deck above the A-3 oocupancy and although I do not have alisting for this assembly it could be deduced that 3?n’ concratawould lnherentlyueate a rataOusembty. Additionally. the building consfruction and separations wouldallcw classificstion as a Type IIIN with the only possible exception belng a non-combustible arcedeelemant adjacent the A-3 occupancy. Given the above information I sm requesting your consldenbo of an axcaption to allow the proposed A-3 (in the amount of 10.67% of the first floor) to tamaln a component or the B ocw,o~vy, thcnfvre abving uniimitcd areas. Thank you lnpwofl Sincerely, , MLllh 1az10 61 cmd”, ba)ul bit. 100 Sm &p, CA p*w ~‘9.7eW777 6rg.~,.us, A” Em Corporation ln Tartnersliip witfi &wemmentfor !Buil;iingSafety DATE: June 7, 1999 JURISDICTION: Carlsbad PLAN CHECK NO.: 99-1603 PROJECT ADDRESS: 1635 Faraday Ave. 0 APP CANT & 0 PLAN REVIEWER 0 FILE SET: II PROJECT NAME: Faraday Business Plaza City Offices TI 0 The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction’s building codes. [7 The plans transmitted herewith will substantially comply with the jurisdiction’s building codes when minor deficiencies identified below are resolved and checked by building department staff. 0 The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. q The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. 0 The applicants copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. q The applicants copy of the check list has been sent to: Mark Langan 12220 El Camino Real, #200 San Diego 92130 0 Esgil Corporation staff did not advise the applicant that the plan check has been completed. q Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Mark Langan (J.4 Telephone #: (619) 793-4777 Date contacted: 617 1 gq (by:IF/L ) Fax #: -4767 Mail v’ Telephone r/ Fax /In Person IXI REMARKS: Additional sheets received 6/7/99. By: Kurt Culver Esgil Corporation 0 GA 0 MB 0 EJ 0 PC 611 I99 Enclosures:, trnsm!l.dot 9320 Chesapeake Drive, Suite 208 l San Diego, California 92123 l (619) 560-1468 l Fax (619) 560-1576 Carlsbad 99-1603 II June 7, 1999 RECHECK PLAN CORRECTION LIST JURISDICTION: Carlsbad PLAN CHECK NO.: 99-1603 PROJECT ADDRESS: 1635 Faraday Ave. DATE PLAN RECEIVED BY ESGIL CORPORATION: 6/l/99 SET: II DATE RECHECK COMPLETED: June 7, 1999 REVIEWED BY: Kurt Culver FOREWORD (PLEASE READ): This plan review is limited to the technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and disabled access. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department or other departments. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3, 1994 Uniform Building Code, the approval of the plans does not permit the violation of any state, county or city law. A. Please make all corrections on the original tracings and submit two new sets of prints to: ESGIL CORPORATION. B. To facilitate rechecking, please identify, next to each item, the sheet of the plans upon which each correction on this sheet has been made and return this sheet with the revised plans. C. The following items have not been resolved from the previous plan reviews. The original correction number has been given for your reference. In case you did not keep a copy of the prior correction list, we have enclosed those pages containing the outstanding corrections. Please contact me if you have any questions regarding these items. D. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located on the plans. Have changes been made not resulting from this list? q Yes q No Carlsbad 99-l 603 II June 7,1999 4. EsGil Corporation will verify that the building official will allow the 1997 UBC to be used for this project. 6. 7. Nothing was received in response to this item. c) EsGil Corporation will verify that the building official has accepted the exiting in Rooms 287bl287a. 14. Please see below for outstanding PME items. If you have any questions, please contact Kurt Culver of Esgil Corporation at (619) 560-1466. Thank you. PLUMBING, MECHANICAL AND ENERGY CORRECTIONS PLAN REVIEWER: Eric Jensen 1. 2. 3. 4. 5. PLUMBING (1994 UNIFORM PLUMBING CODE) The west %” branch from the 2 %” water supply pipe is undersized. Not revised on the plumbing floorplan. Detail the required clearances from fresh air intakes for the water heater flue (room 262) on the mechanical roof plan. Not shown. Detail curbs at entry to handicapped showers or show shower drain 46 inches from entry or door into the shower stall. UPC Section 410.3 The drain must be below the threshold a minimum of 2” at a maximum slope of W/foot. How is this possible with the layout shown? MECHANICAL (1994 UNIFORM MECHANICAL CODE) The fire rated corridors are not to be used to convey air to or from rooms. UMC 601.1.1 (Rooms 174,175,176) Rooms 175 and 176 only show supply, no return system. How is the air returned without using the corridor? Provide the required independent ventilation or air conditioning system for the elevator equipment room to prevent overheating of the electrical equipment. UBC 3005.1 Not shown. Carlsbad 99-1603 II June 7,1999 6. Detail the required clearances (For AC-4) from fresh air intakes for the water heater flue (room 282) on the mechanical roof plan. ENERGY CONSERVATION 7. The completed and signed ENV-1 form must be imprinted on the plans. + ELECTRICAL PLAN REVIEW + 1993 NEC 1. What is providing alternate power for the exit signs and (emergency) exitway illumination? Note: Non-emergency loads may not be combined with emergency loads in the same panelboards. City approval is necessary to combine “Emergency loads” as defined in “Scope, Article 700 of the NEC with non- emergency loads. This is in conflict with NEC 700-8. Em Corporation ln Tartnersliip witfi &wemment for Icuildng Safety DATE: May 18, 1999 JURISDICTION: Carlsbad PLAN CHECK NO.: 99-1603 SET: I Cl PLAN REVIEWER 0 FILE PROJECT ADDRESS: 1635 Faraday Ave. PROJECT NAME: Faraday Business Plaza TI City Offices 0 The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction’s building codes. 0 The plans transmitted herewith will substantially comply with the jurisdiction’s building codes when minor deficiencies identified below are resolved and checked by building department staff. 0 The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. q The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. 0 The applicants copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. q The applicants copy of the check list has been sent to: Mark Langan 12220 El Camino Real, #200 San Diego 92130 0 Esgil Corporation staff did not advise the applicant that the plan check has been completed. q Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Mark Langan Telephone #: (619) 793-4777 Date contacted:slrcf 199 (by: &) Fax #: -4787 Mail JTelephone Fati In Person 0 REMARKS: By: Kurt Culver Enclosures: Esail Corooration OGA-OMB DEJ q Pc 5/I 7199 tmsmtkdot 9320 Chesapeake Drive, Suite 208 l San Diego, California 92123 + (619) 560-1468 l Fax (619) 560-1576 Carlsbad 99-1603 May l&l999 PLAN REVIEW CORRECTION LIST TENANT IMPROVEMENTS PLAN CHECK NO.: 99-1603 JURISDICTION: Carlsbad OCCUPANCY: B/A3 TYPE OF CONSTRUCTION: V-N ALLOWABLE FLOOR AREA: n/c SPRINKLERS?: Yes REMARKS: DATE PLANS RECEIVED BY JURISDICTION: 4/27/99? DATE INITIAL PLAN REVIEW COMPLETED: May 18, 1999 FOREWORD (PLEASE READ): USE: City Offices ACTUAL AREA: 68,000 STORIES: 2 HEIGHT: n/c OCCUPANT LOAD: -600 DATE PLANS RECEIVED BY ESGIL CORPORATION: 5/17/99 PLAN REVIEWER: Kurt Culver This plan review is limited to the technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Code sections cited are based on the 1994 UBC. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3, 1994 Uniform Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed LID the recheck orocess. please note on this list Ior a copv) where each correction item has been addressed, i.e., elan sheet number, specification section, etc. Be sure to enclose the marked LID list when YOU submit the revised plans. LIST NO, 40, TENANT IMPROVEMENTS WITHOUT SPECIFIC ENERGY DATA OR POLICY SUPPLEMENTS (1994USC) tifom.dot Carlsbad 99-1603 May 18, 1999 1. 2. 3. 4. 5. 6. 7. Please make all corrections on the original tracings and submit two new sets of prints, to: Esgil Corporation, 9320 Chesapeake Drive, Suite #208, San Diego, CA 92123, (619) 560-1468. Each sheet of the plans must be signed by the person responsible for their preparation, even though there are no structural changes. Business and Professions Code. Plans and calculations shall be signed by the California state licensed engineer or architect where there are structural changes to existing buildings or structural additions. Please include the California license number, seal, date of license expiration and date plans are signed. Business and Professions Code. ELEVATOR. The exiting design uses the concept of “hallways” from the 1997 UBC. Please obtain a ruling from the building department as to whether the 1997 edition may be used for this project. Also, what about the UPC and UMC? The cover sheet of the plans lists the 1994 edition of the UBC. Please revise the Project Data on the cover sheet to add “A-3” for the occupancy of the assembly areas. The total amount of A-3 occupancy at the first floor seems to exceed the maximum allowed by UBC Section 504.3, Exception 2. The designer should review and comment on this [potentially major] issue. Please revise the exit analysis as follows: :; Revise the occupant load in Room 278. At Room 278, the exit door at the left-hand side must be shifted northward, so that occupants exit more directly into Room 244. cl Please verify with the building official that the exiting shown in Rooms 287b and 287a is acceptable. 4 The second exit for Room 244 shouldn’t be into Room 220. Rather, the exit should be shown to be into Hallway 241. e) “Exit #I” for Room 220 goes down a hallway before reaching the existing one-hour stairwell. Since “Exit #2” is already through an intervening room, Exit #I can’t pass down a hallway. Rather, that hallway must be shown to comply with the one-hour fire-resistive corridor requirements. Alternately (as had been discussed at our meeting), change the width-to-length ratio of that hallway. Carlsbad 99-1603 May 18, 1999 8. All doors and gates, within the exit path from Group A occupancies to a public way, shall not be provided with latches or locks unless they are equipped with panic hardware. Chapter IO. THIS APPLIES TO THE EXISTING EXTERIOR DOORS THAT ULTIMATELY SERVE AS EXITS FOR THE ASSEMBLY AREAS. 9. IO. 11. 12. 13. 14. 15. 16. Yes There are numerous inferior concrete shear walls shown: Please make it very clear on the plans whether there will be any openings cut into these walls. If so, please provide complete detailing and supporting calculations. Please provide complete structural detailing and calculations for the elevator. Please verify with the original structural engineer that the floor framing was designed to accommodate the live loads associated with the uses shown on sheet TI-A2. The submitted plans had many, many empty reference bubbles and incomplete calloutsldetails. A complete plan review cannot be performed until complete plans are provided. Of particular concern is the Title 24 requirement for accessible countertops/work surfaces. The architect should provide a detailed narrative, explaining how each work station/transaction area will comply with the height provisions of Title 24. Please see the following sheets for plumbing, mechanical, electrical and energy corrections applicable to this project. To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: Cl No Cl The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 619/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Kurt Culver at Esgil Corporation. Thank you. Carlsbad 99-1603 May 18, 1999 PLUMBING, MECHANICAL AND ENERGY CORRECTIONS PLAN REVIEWER: Eric Jensen 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. Each sheet of the plans must be signed by the person responsible for their preparation. Business and Professions Code. PLUMBING (1994 UNIFORM PLUMBING CODE) Provide the site plumbing plans showing the sizes and locations of the gas meter(s), water meter(s); site gas lines, site water lines, storm drainage system, and the sizes, routes, and slopes of the building sewer. Include the floodrim elevation of the next (from the building sewer connection) upstream manhole cover on the site plan. Provide backwater valves on all building drains which serve plumbing fixtures with flood rim elevations below th,e upstream manhole rim elevations. Provide gas line plans and calculations, showing pipe lengths and gas demands. UPC Section 1217.0 (Gas line sizing may not be checked until complete mechanical specifications are provided). The west %” branch from the 2 %” water supply pipe is undersized. The architectural plans are using the 1997 UBC for this project. If the 1997 UPC is also the correct year, the vent sizing shown on the isometrics is undersized per the revised Tables. Please recheck with the City which edition of the Plumbing Code will be enforced on this project. Provide calculations to show compliance with UBC, Appendix 29, (Minimum Plumbing Facilities) as per the City of Carlsbad. Show I/4 inch per 12 inch slope on drain and waste lines. UPC Section 708.0 Show P & T valve on water heater and detail drain line route from P & T valve to the exterior. UPC Section 608.5 (room 241) Provide combustion air for fuel burning water heaters as described in accordance with the Uniform Plumbing Code, Section 507.0 The exhaust fan shown on the mechan.ical roof plan may affect (depending on location and type of exhaust fan) the operation of the water heater flue. (room 241) Carlsbad 99- 1603 Mav 18.1999 12.‘ 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. Detail the required clearances from fresh air intakes for the water heater flue (room 282) on the mechanical roof plan. Detail curbs at entry to handicapped showers or show shower drain 48 inches from entry or door into the shower stall. UPC Section 410.3 MECHANICAL (1994 UNIFORM MECHANICAL CODE) Complete the mechanical plans: equipment schedules, equipment identification, and duct sizing and routing. Provide mechanical ventilation in all rooms capable of supplying outside air at a minimum rate of 15 cubic feet per minute per occupant. UBC 1202.2.1 Provide calculations and show method of supplying outside air. The fire rated corridors are not to be used to convey air to or from rooms. UMC 601.1.1 (Rooms 174,175, 176) Finish the mechanical design in the rated corridor: fire/smoke dampers, ducting routing. Provide the required independent ventilation or air conditioning system for the elevator equipment room to prevent overheating of the electrical equipment. UBC 3005.1 Is the mechanical system installed into the skylights? If so, include on the architectural detail. Detail the required clearances from fresh air intakes for the water heater flue (room 282) on the mechanical roof plan. Is the area above the dropped ceiling used for a return air plenum anywhere in this tenant improvement? If so, specify the areas on the mechanical plans (More corrections to follow). The break room (286) for example, does not show a ducted return. The electrical roof plan is more (mechanically) complete than the mechanical roof plan. Revise to match. More mechanical corrections may be necessary upon submittal of the above requested information. Carlsbad 99- 1603 May 18, 1999 24. Provide smoke detection in supply air duct of ‘air-moving system’ for required shut-off for smoke control as per UMC, Section 608. This is required for almost all HVAC units. 25. 26. 27. 28. 29. 30. 31. An “Air-moving system (see definition in UMC 203) is a system designed to provide heating, cooling, or ventilation in which one &r more air-handling units are used to supply air to a common space or to draw air from a common plenum or space.” ENERGY CONSERVATION Provide complete energy designs for the proposed changes in envelope, lighting, and mechanical systems. Provide the completed ENV-1, ENV-2, ENV-3, LTG-1, LTG-2. MECH-1, MECH-2, MECHJ, and MECH-4 forms showing energy compliance. On the plans clearly show the wall and roof insulation locations, thickness, and R-values, as per the energy design. Provide automatic shut-off controls for lighting as per Title 24, Part 6, Section 131 (d). Show the daylit areas and required daylit area lighting controls for new or relocated lighting in daylit areas. Title 24, Part 6, Section 131 (c). Show bi-level lighting controls as per Title 24, Part 6, Section 131(b). The completed and signed ENV-I, LTG-1 , and MECH-1 forms must be imprinted on the plans. Complete energy plan check will be done when complete corrected energy designs are provided. Carlsbad 99- 1603 May 18, 1999 1. 2. 3. 4. 5. 6. 7. 8. 9. IO. 11. 12. 13. + ELECTRICAL PLAN REVIEW t 1993 NEC Clearly identify what is existing and what is new on the electrical single line diagram. The architectural site sheet TI-AS1 identifies the emergency generator as “existing emergency generator enclosure”. Does that mean the generator shown on the single line diagram is existing? Show the grounding and bonding required at the generator on the single line diagram. Detail, on the prints, the signage necessary adjacent to the service (for the generator and UPS PC, UPS-c, and UPS EPC) and the grounding locations (for the generator) per NEC 700-8 (a & b). Specify the wiring methods to be used at this facility. Note: The City of Carlsbad does not allow AC cable to be installed in this occupancy type. Note 3 on sheet E-6 is incorrect, remove AC cable. Change the feeder schedule to accurately reflect the correct conductor insulation type for underground conduits. Somehow identify which fixtures are to be used for (emergency) exitway illumination on the lighting floorplans. What is providing alternate power for the exit signs and (emergency) exitway illumination? Note: Non-emergency loads may not be combined with emergency loads in the same panelboards. What building steel are the transformers grounding too? Isn’t this an existing tilt- up building? Show the location of all of the equipment shown on the singe line diagram on the electrical floorplans. The “Camp” panel is shown with 50 ampere mains on the panel schedule, 175 ampere on the single line diagram. Please correct. What is a “maintenance bypass”? Secondary conductor protection may not be plan checked at this time as the equipment is not shown on the floorplans. Note, on the single line diagram, that a GFP Device test is required for the service overcurrent device. Carlsbad 99-1603 May 18, 1999 14. Specify the fault current available at the ATS switch (with generator contribution) and at ““EDB”. Specify the minimum AIC rating for both the ATS and distribution board “EDB” on the single line diagram. 15. All receptacle outlets in commercial restrooms are required to be GFCI protected (rooms 116a & 117a) 16. Provide a detail for support of the roof mounted convenience receptacle outlets. Note: If you have any questions regarding this Plumbing, Mechanical, Energy, or Electrical plan review list please contact Eric Jensen at (619) 560-1468. To speed the review process, note on this list (or a copy) where the corrected items have been addressed on the plans. Carlsbad 99- 1603 May 18, 1999 VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad PREPARED BY: Kurt Culver BUILDING ADDRESS: 1635 Faraday Ave. BUILDING OCCUPANCY: B/A3 PLAN CHECK NO.: 99-1603 DATE: May l&l999 TYPE OF CONSTRUCTION: V-N TOTAL VALUE 0 199 UBC Building Permit Fee q Bldg. Permit Fee by ordinance: $ 5248.78 0 199 UBC Plan Check Fee q Plan Check Fee by ordinance: $ 3411.70 Type of Review: q Complete Review 0 Structural Only 0 Hourly 0 Repetitive Fee Applicable 0 Other: Esgil Plan Review Fee: $ 2729.36 Comments: Sheet 1 of 1 macvaluadoc 5196 BUILDING PLANCHECK CHECKLIST DATE: 5-30 -qy PIANCHECK NO.: CB 94 - /L 03 BUILDING ADDRESS: 1637 Fade, Ati, PROJECTDESCRIPTION: Of&‘& 7~ ’ ( y3.cm SF) ASSESSOR’S PARCEL NUMBER: 2\3 - 110. ‘) 1 EST. VALUE: ENGINEERING DEPARTMENT APPROVAL DENIAL The item you have submitted for review has been approved. The approval is based on plans, information and/or specifications provided in your submittal; therefore any changes to these items after this date, including field modifications. must be reviewed by this office to insure continued conformance with applicable codes. Please review carefully all comments attached, as failure to comply with instructions in this report can result in suspension of permit to build. Please se ii? attached report of deficiencies marked wit ake necessary corrections to plans or specifi s for compliance with applicable codes and standards. Submit corrected plans and/or specifications to this office for review. BG> Date: sp,/f? A Right-of-Way permit is required prior to construction of the following improvements: By: Date: By: Date: ATTACHMENTS Dedication Application Dedication Checklist Improvement Application Improvement Checklist Future Improvement Agreement Grading Permit Application Grading Submittal Checklist ENGINEERING DEPT. CONTACT PERSON Name: David Rick City of Carlsbad Address: 2075 Las Palmas Dr., Carlsbad. CA 92009 Phone: (619)436-1161. ext.4324 CFD INFORMATION Parcel Map No: Lots: Right-of-Way Permit Application Right-of-Way Permit Submittal Checklist and Information Sheet Record&ion: Carlsbad Tract: Sewer Fee Information Sheet A-4 !uASP*LLUss”VlBR*RreNO WWIDYIOC8\CHXL8nB “,*l$w Pbms dD RD”.snn’2075 Las ‘Palmas Dr. ‘0 Carlsbad, CA 92009-4576 l (619) 438-1161 - FAX (619) 438-0894 BUILDING PLANCHECK CHECKLIST SITE PLAN e/ I= 2Nw 3RD’ 0 0 1. Provide a fully dimensioned site plan drawn to scale. Show: A. North Arrow D. Property Lines B. Existing & Proposed Structures E. Easements C. Existing Street improvements F. Right-of-Way Width 8 Adjacent Streets / G. Driveway widths 0 0 0 2. Show on site plan: A. Drainage Patterns 1. Building pad surface drarnage must maintain a minimum slope of one percent towards an adjoining street or an approved drainage course. 2. ADD THE FOLLOWING NOTE: “Finish grade will provide a minimum positive drainage of 2% to swale 5’ away from building.” B. Existing 8 Proposed Slopes and Topography 0 / 0 0 3. Include on title sheet: A. Site address B. Assessor’s Parcel Number C. Legal Description For commercial/industrial buildings and tenant improvement projects, include: total building square footage with the square footage for each different use, existing sewer permits showing square footage of different uses (manufacturing, warehouse, oftice, etc.) previously approved. EXISTING PERMIT NUMBER DESCRIPTION DISCRETIONARY APPROVAL COMPLIANCE 4a. Project does not comply with the following Engineering Conditions of approval for Project No. cl 0 Cl 4b. All conditions are in compliance. Date: . . BUILDING PLANCHECK CHECKLIST DEDICATION REQUIREMENTS , ST, 2ND’ 3RD’ 0 0 0 5. Dedication for all street Rights-of-Way adjacent to the building site and any storm drain or utility easements on the building site is required for all new buildings and for remodels with a value at or exceeding $ , pursuant to Carlsbad Municipal Code Section 18.40.030. Dedication required as follows: Dedication required. Please have a registered Civil Engineer or Land Surveyor prepare the appropriate legal description together with an 8 %” x 11” plat map and submit with a title report. All easement documents must be approved and signed by owner(s) prior to issuance of Building Permit. Attached please find an application form and submittal checklist for the dedication process. Submit the completed application form with the required checklist items and fees to the Engineering Department in person. Applications will be accept by mail or fax. Dedication completed by: Date: IMPROVEMENT REQUIREMENTS 0 0 0 6a. All needed public improvements upon and adjacent to the building site must be constructed at time of building construction whenever the value of the construction exceeds $ , pursuant to Carlsbad Municipal Code Section 18.40.040. Public improvements required as follows: Attached please find an application form and submittal checklist for the public improvement requirements. A registered Civil Engineer must prepare the appropriate improvement plans and submit them together with the requirements on the attached checklist to the Engineering Department through a separate plan check process. The completed application form and the requirements on the checklist must be submitted in person. Applications by mail or fax are not accepted. Improvement plans must be approved, appropriate securities posted and fees paid prior to issuance of building permit. Improvement Plans signed by: Date: 0 0 0 6b. Construction of the public improvements may be deferred pursuant to Carlsbad Municipal Code Section 18.40. Please submit a recent property title report or current grant deed on the property and processing fee of $ so we may prepare the necessary Future Improvement Agreement. This agreement must be signed, notarized and approved by the City prior to issuance of a Building permit. Future public improvements required as follows: BUILDING PLANCHECK CHECKLIST 1’ 2”d/ 3*’ cl cl 0 6c. Enclosed please find your Future Improvement Agreement. Please return agreement signed and notarized to the Engineering Department. Future Improvement Agreement completed by: Date: 0 0 0 6d. No Public Improvements required. SPECIAL NOTE: Damaaed or defective imorovements found adiacent to buildina site must be reoaired to the satisfaction of the Citv Inspector prior to occuoancy. GRADING PERMIT REQUIREMENTS The conditions that invoke the need for a grading permit are found in Section 11.06.030 of the Municipal Code. cl cl 0 7a. Inadequate information available on Site Plan to make a determination on grading requirements. Include accurate grading quantities (cut, fill import, export). 0 D, cl 7b. Grading Permit required. A separate grading plan prepared by a registered Civil Engineer must be submitted together with the completed application form attached. NOTE: The Gradina Permit must be issued and rouah aradinq aooroval obtained orior to issuance of a Buildina Permit. Grading Inspector sign off by: Date: a 0 Cl 7c. Graded Pad Certification required. (Note: Pad certification may be required even if a grading permit is not required.) cl 0 Ll 7d.No Grading Permit required. 0 0 R 7e.lf grading is not required, write “No Grading” on plot plan. MISCELLANEOUS PERMITS a cl 5 8. A RIGHT-OF-WAY PERMIT is required to do work in City Right-of-Way and/or private work adjacent to the public Right-of-Way. Types of work include, but are not limited to: street improvements, tree trimming, driveway construction, tieing into public storm drain, sewer and water utilities. Right-of-Way permit required for: 4 Rcr. DwllDl BUILDING PLANCHECK CHECKLIST 9. A SEWER PERMIT is required concurrent with the building permit issuance. The fee is noted in the fees section on the following page. IO. INDUSTRIAL WASTE PERMIT If your facility is located in the City of Carlsbad sewer service area, you need to contact the Carlsbad Municipal Water District, located at 5950 El Camino Real, Carlsbad, CA 92008. District personnel can provide forms and assistance, and will check to see if your business enterprise is on the EWA Exempt List. You may telephone (760) 438-2722, extension 153, for assistance. 11 Industrial Waste permit accepted by: Date: NPDES PERMIT Complies with the City’s requirements of the National Pollutant Discharge Elimination System (NPDES) permit. The applicant shall provide best management practices to reduce surface pollutants to an acceptable level prior to discharge to sensitive areas. Plans for such improvements shall be approved by the City Engineer prior to issuance of grading or building permit, whichever occurs first. 12. Acquired fees are attached r;l No fees required 13. Additional Comments: Qcfayl ~anr~k ad o!rk& (i%tiUMJ WWI t&at4 J- uikc4 , 46 re&-4+ .Y / , . ENGINEERING DEPARTMENT FEE CALCULATION WORKSHEET 0 Estimate based on unconfirmed information from applicant. 0 Calculation based on building plancheck plan submittal. Address: 1637 hi&&j Ad. Bldg. Permit No. mqs- 1663 Prepared by: n .g:C U- Date: r-)o.qq Checked by: Date: EDU CALCULATIONS: List types and square footages for all uses. Types of Use: oCk‘& Sq. Ft./Units: 6f?.aOO EDU’s: 37. 3 &+Types of Use: hbrekuJ5-e Sq. Ft./Units: f&,WO EDU’s: - 13, 6 ADT CALCULATIONS: List types and square footages for all uses. (T: 2Y# I EOD Types of Use: dk~e Sq. Ft./Units: 68000 ADT’s: 1360 v&4 Types of Use: WUreL*dLL Sq. Ft./Units: C;g, ObO ADT’s: -3 40 - FEES REOUIRED: @. 1,020 AnTj WITHIN CFD: is/ ES Ino bridge & thoroughfare fee in District #I. reduced Traffic Impact Fee) 0 NO 4 1. PARK-IN-LIEU FEE PARK AREA & #: &Y TRAZZZAC, FEE X NO. UNITS: =5 cb ADT’slUNITS: 1 I 020 X FEE/ADT: 2 ?- =$ ZL;L.rLfO ZONE TRANSPORTATION ADT’S X $10 1 p 2 0 =$ IO,?-0 0 ,4!?4-3. BRIDGE AND THOROUGHFARE FEE IDIST. #l -/ DIST. #2 - DIST. #3 J) p’+J. @‘?~a ‘7 d ADT’s/UNITS: X FEE/ADT: =gy T- 4. FACILITIES MANAGEMENT FEE ZONE: 5 UNIT/SCl.FT.: X FEE/SQ.~FT.IUNIT: =$ /5. SEWER FEE ,u’ PERMIT No. EDU’s: 7-q. \ X FEE/EDU: \!sy =$ 44jw BENEFIT AREA: t- DRAINAGE BASIN: EDU’s: 2L(. 1 X FEE/EDU: I,01 0 = $ 2s,787 $6. SEWER LATERAL ($2,500) =$ ,& & 7. DRAINAGE FEES PLDA : HIGH /LOW ACRES: X FEE/AC: =$ P TOTAL OF ABOVE FEES+: $ *NOTE: This calculation sheet is NOT a complete list of all fees which may be due. Dedications and Improvements may also be required with Building Permits. P:w0C*wISFORMS!FEE C*LCULATwN WoRK*HEE, REV 4/29/99 PLANNING DEPARTMENT BUILDING PLAN CHECK REVIEW CHECKLIST Plan Check No. CB ?q 1 b 0 3 Address \b?? k&+--r Planner 6 jhfied.7 Phone (619) 438-l 161, extensihn 43Z.S h APN: di2-130 - 3’\ D i E g Type of Project & Use: npPr& Net Project Density: DUlAC d Zoning: (0-H General Plan: P 1 Facilities Management Zone: CFD ‘,i”,la;;J # -Date of participation: Remaining net dev acres: I k i- k z 2 E: ?j p P (For non-residential development: Type of land used created by 0 0 5 this permit: 1 c z g ~ 5 Leaend: [XI Item Complete @I Item Incomplete - Needs your action @ q o Enwironmental Review Required: YES NO ‘& TYPE DATE OF COMPLETION: Compliance with conditions of approval? If not, state conditions which require action. Conditions of Approval: Discretionary Action Required: YES K NO TYPE APPROVALIRESO. NO. DATE PROJECT NO. &JP q=I-Ov OTHER RELATED CASES: Compliance with conditions or approval? If not, state conditions which require action. Conditions of Approval: q u Coastal Zone Assessment/Compliance Project site located in Coastal Zone? YES - No&- CA Coastal Commission Authority? YES- NO- If California Coastal Commission Authority: Contact them at - 3111 Camino Del Rio North, Suite 200, San Diago CA 92108-1725; (619) 521-8036 Determine status (Coastal Permit Required or Exempt): Coastal Permit Determination Form already completed? YES NO -- If NO, complete Coastal Permit Determination Form now. Coastal Permit Determination Log #: Follow-Up Actions: 1) Stamp Building Plans as “Exempt” or “Coastal Permit Required” (at minimum Floor Plans). 2) Complete Coastal Permit Determination Log as needed. q u lnclusionary Housing Fee required: YES (Effective date of lnclusionary Housing Ordinance - May 21,x) Data Entry Completed? YES - NO- IAIPIDs. Activity Maintenance. enter CW, toolbar, Screens. Housing Fees, Consrucf Housing Y/N, Enter Fee. UPDATE!) Site Plan: q u 1. Provide a fully dimensional site plan drawn to scale. Show: North arrow, property lines, easements, existing and proposed~ structures, streets, existing street improvements, right-of-way width, dimensional setbacks and existing topographical lines. q u 2. Provide legal description of property and assessor’s parcel number. / Zoning: F q q 1. @ q q 2. $ q q 3. q q q 4. Setbacks: Front: Required Interior Side: Required Street Side: Required Rear: Required Accessory structure setbacks: Front: Required Interior Side: Required Street Side: Required Rear: Required Structure separation: Required Lot Coverage: Height: Shown Shown Shown Shown Shown Required Shown Required Shown @ q 0 5. Parking: Spaces Required s? k Shown Shown Shown Shown Shown 2’)s Guest Spaces Required Shown 0 op, Additional Comments 5L dlruu;dp cA-M.ition &GlS &Win& I m 42 ScneM;nf eh ‘otic& ff3Ji & u I/Do/ us clloss -se&l&*., 4 44. ‘b u2 3. L&AL-t /pn *o/ s *I ueed q O&b c/s Oh\ k&2!& rcsllb~;~cc Shdb ft c Cimeur;-h 65 u \A olnw 9fdfl~ ,.,w*? OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER DATE <Cakbad Fire Department 990182 2560 Orion Way Fire Prevention Carlsbad, CA 92008 (760) 931-2121 Plan Review Requirements Categoty: Building Plan Date of Report: cs/cs/1sss Reviewed by: / Name: SMITH CONSULT ARCH Address: 12220 EL CAMINO REAL STE 200 City, State: SAN DIEGO CA 92130 Plan Checker: Job Name: City Building TI Job #: 990182 CB991603 Job Address: 1635 Faraday Av Ste. or Bldg. No. IXI Approved The item you have submitted for review has been approved. The approval is based on plans, information and I or specifications provided in your submittal; therefore any changes to these items after this date, including field modifications, must be reviewed by this office to insure continued conformance with applicable codes and standards. Please review carefully all comments attached as failure to comply with instructions in this report can result in suspension of permit to construct or install improvements. 0 Approved Subject to 0 Incomplete The item you have submitted for review has been approved subject to the attached conditions. The approval is based on plans, information and/or specifications provided in your submittal. Please review carefully all comments attached, as failure to comply with instructions in this report can result in suspension of permit to construct or install improvements. Please resubmit to this office the necessary plans and I or specifications required to indicate compliance with applicable codes and standards, The item you have submitted for review is incomplete. At this time, this office cannot adequately conduct a review to determine compliance with the applicable codes and I or standards. Please review carefully all comments attached. Please resubmit the necessary plans and I or specifications to this office for review and approval. Review 1st FD Job # 990182 2nd 3rd Other Agency ID FD File # Carlsbad Fire Department 990182 2560 Orion Way Fire Prevention Carlsbad, CA 92008 (760) 931-2121 Plan Review Requirements Category: Building Plan Date of Report: 07/13/1999 Reviewed by: Name: Mark Langan Address: 12220 El Camino Real 200 City, State: San Diego CA 92130 Plan Checker: Job #: 990182 Job Name: Faraday Business Pla Bldg #: CB991603 Job Address: 1635 Faraday Av Ste. or Bldg. No. !a Approved The item you have submitted for review has been approved. The approval is based on plans, information and / or specifications provided in your submittal; therefore any changes to these items after this date, including field modifications, must be reviewed by this office to insure continued conformance with applicable codes and standards. Please review carefully all comments attached as failure to comply with instructions in this report can result in suspension of permit to construct or install improvements. IJ Approved Subject to 0 Incomplete The item you have submitted for review has been approved subject to the attached conditions. The approval is based on plans, information and/or specifications provided in your submittal. Please review carefully all comments attached, as failure to comply with instructions in this report can result in suspension of permit to construct or install improvements. Please resubmit to this office the necessary plans and I or specifications required to indicate compliance with applicable codes and standards. The item you have submitted for review is incomplete. At this time, this office cannot adequately conduct a review to determine compliance with the applicable codes and I or standards. Please review carefully all comments attached. Please resubmit the necessary plans and I or specifications to this office for review and approval. Review 1st FD Job # 990182 2nd 3rd Other Agency ID FD File # Firouzi Consulting Engineers, Inc. a sfructural ana/ysis and design company STRUCTURAL CALCULATIONS PROJECT NAME: FARADY BUSINESS PLAZA ROOF SCREENS & LOADING REVISIONS DATE: MAY 28,1999 ENGINEER OF RECORD: FIROUZI CONSULTING ENGINEERS, INC. 16959 Bemardo Center Drive, Suite 201, San Diego, CA 92128 (619)485-6227 (619) 485-6201 3 FlROUZl CONSULTING ENGINEERS, INC. 16959 Bemardo Center Drive, Suite 201 San Diego, California 92128 Phone (619) 485-6227, Fax (619) 4856201 Project: FARADAY Job #: Bv: ROOF SCREENS WINDLOAD = 22 PSF TRlBA = (5.671(8') = 45.36 FT"2 P = (45.36)(22) = 998 # LOAD TO BRACE & SUB PURLIN HEIGHT OF BRACE = DIST. TO BRACE = UP LIFT / DOWN FORCE = LOAD TO ANGLE POST 9' 9 (998#)(93 I9 = 998 # w = (22 PSF)(5.671 = 125.0 #/ ' , Firouzi Consulting Title : Job # Engineers Inc. Dsgnr: Date: 16959 Bernard0 Center Drive, 201 San Diego, California 92128 (619) 485-6227 Description : scope : d General Timber Beam 'I Section Name 4x8 Center Span 10.00 n . . . . .LU 0.00 n Beam Width 3.500 in Len Cantilever n , . . . .LU 0.00 n Beam Depth 7.250 in Right Cantilever n . . . . .LU 0.00 n Member Type Sawn DOUGLAS FIR-LARCH, No.1 LL B ST Act Together Fb Allow 1,150.0 psi Load Dur. Factor 1.000 Fv Allow 95.0 psi Beam End Fixity Pin-Pin Fc Allow 1,450.0 psi Wood Density 34.000 pcf E 1,700.0 ksi LUniform Loads I Uniform Loads Over Full Span Center DL Len Cantilever DL wn LL LL 40.00 wft Right Cantilever DL 30.00 wn #In wn LL #In 1 Point Loads Dead Load Live Load 998.0 I Ibs ibs ... distance 5.000 0.000 0.000 0.000 0.000 0.000 0.000 n Beam Design OK I Deflections i, Center Span ... Dead Load Total Load Left Cantilever ... Dead Load Deflection -0.043 in -0.281 in Deflection 0.000 in 0.000 in Total Load ... Location ... LengthlDefl 2,800.0 427.61 5.000 n 5.000 n ... LengthlDefl 0.0 0.0 Right Cantilever ... Deflection ... LengthlDefl 0.000 in 0.0 0.000 in 0.0 Span= lO.WfI, Beam Width = 3.500in x Depth = 7.25in. Ends are Pin-Pin Max Stress Ratio 0.902 : 1 Maximum Moment Allowable Max. Positive Mom Max. Negative Moment 3.44k-ft a 5.000 n 0.OOk-fl a 10.000 R Max @ Len Support 0.OOk-n Max @ Right Support Max. M allow 3.82 fb 1,348.23 psi fv 49.26 psi Len DL O.l& Max 3.4 k-n Maximum Shear 1.5 3.8 k-n Allowable Shear: @ Left Camber: @ Left @ Right 0.00 k-n @ Center Reactions ... @ Right 1.3 k 2.4 k 0.88 k 0.88 k 0.000 in 0.064 in 0.000 in 0.8& Fb 1,495.00 psi Fv 95.00 psi Right DL 0.18 k Max 0.88 k (c) 1983-97 ENERCALC c:L?nercalcVaraday.ecw kW-0602755, V5.0.2, 1-Jun-1997 . Firouzi Consulting Engineers Inc. San Diego, California 92128 16959 Bernard0 Center Drive, 201 (619) 485-6227 Title : Dsgnr: Description : Date: Job # A. Scope : General Timber Beam Bending Analysis Ck 31.181 Rb 0.000 Sxx 30.661 in3 Area 25.375 in2 Cf 1.300 @ Center Max Moment 3.44 k-n Sxx Rea'd 27.65 in3 @ Len support 0.00 k-n @ Right Support 0.00 k-n 0.00 in3 0.00 in3 Shear Analysis Design Shear @ Len support @ Right Support Area Required 13.158 in2 Actual Stress : fv 95.00 psi 13.158 in2 95.00 psi &&@& 1,495.00 psi 1,495.00 psi 1,495.00 psi 1.25 k 1.25 k Bearing @Supports Max. Len Reaction 0.88 k Max. Right Reaction 0.88 k Bearing Length Req'd 0.173 in Bearing Length Req'd 0.173 in 1 Query Values I M. V, 8 D @Specified Locations @ Center Span Location = @ Right Cant. Location = 0.00 n 0.88 k 0.0000 in @ Len Cant. Location = 0.00 k-n 0.00 k 0.00 k-n 0.00 k 0.0000 in 0,0000 in Moment Shear Deflection 0.00 n 0.00 k-n 0.00 n . Firouzi Consulting Engineers Inc. 16959 Bernard0 Center Drive, 201 San Diego, California 92128 (619) 485-6227 TIle : Dsgnr: Description : Date: Job # K scope : 5 I Steel Beam Desian h 1 General Information v Description STEEL ANGLE POST Steel Section L3.SX3.5X3/8 FY Center Span 8.00 ft Bm Wt. Added to Loads Len Cant. 0.00 R LL & ST Act Together Right Cant 0.00 R Lu 0.00 R Pinned-Pinned 36.OOksi Load Duration Factor 1.00 [Distributed Loads #1 #2 #3 #4 #5 #6 #7 I DL LL ST 0.125 Start Location End LocaUon wn wn wn n R Actual Allowable fb : Bending Stress 0.000 ksi 0.000 ksi fb/Fb Moment 1.067 k-ft 0.000 k-n Max. Deflection -0.148 in Length/DL Defl 10,292.3 : 1 0.000 : 1 Length/(DL+LL Defl) 649.8 : 1 Shear 0.534 k 18.900 k fv : Shear Stress 0.407 ksi 14.400 ksi fvl Fv 0.028 : 1 Force 8 Stress Summary <<-These columns are Dead t Live Load DlaCed as noted ->> DL LL LLtST LL Maximum @Center @ Center p Cants @2 Cants LL+ST ~ ~~~~ Max. M + 1.07k-n 0.07 1.07 k-R Max. M - Max. M @ Left Max. M @ Right Shear @ Len 0.53 k 0.03 Shear @ Right 0.53 k 0.03 0.53 k 0.53 k Center Defl. -0.148in -0.009 Len Cant Defl 0.000 0.000in 0.000 -0.148 0.000 0.000 in Right Cant Def 0.000 0.000in 0.000 0.000 0.000 0.000 0.000 in 0.000 0.000 ... Query Defl @ 0.000 in 0.000 in 0.000 0.000 0.000 0.000 0.000 in Reaction @ Len 0.53 0.03 Reaction @ Rt 0.53 0.53 k 0.03 k ~. k-n k-n k-n 0.53 I Section Properties 1 Steel Section L3.5x3.5x3/8 Depth Weight 3.50 in Web Thick I= 0.375 in Width lYY 2.87 in4 Misc 3.500 in Flange Thick SXW 1.153 in3 Area 0.375 in SYY 1.640 in3 8.42 wn r-xx 1.076 in 2.87 in4 r-YY 1.076 in 0.687 in 2.48 in2 (C) 1-97 ENERCALC c:k?nercalcUaraday.ecw KW0602755. V5.0.2, 1-Jun-1997 . Firouzi Consulting Title : Job # Engineers Inc. Dsgnr: Date: 16959 Bemardo Center Drive, 201 San Diego, California 92128 (619) 485-6227 Description : scope : 4 Sinale Span Beam Analysis I General Information I Description : BUILT UP W18x35 w/ WT5x15 AT FLOOR LINE B Center Span Len Cantilever Right Cantilever n Beam End Fixity Pin-Pin I Uniform Loads 15.50 n n Moment of Inertia 1,034.000 in4 Elastic Modulus 28,000 ksi 1 On Center Span ... On Left Cantilever... #1 5.033 wn #1 wn #1 wn On Right Cantilever... Center Location 0.000 n Left Cant 0.000 R Right Cant 0.000 fl 0.00 k-ft 0.00 k-n 0.00 k 0.00 k Moment Shear 0.00 k-n 45.21 k Deflection 0.00000 in 0.00000 in 0.00000 in ~ T- - -. . . . . . -. , Moments ... Max @ Center 175.17 a 7.75n @Len 45.21 k Reactions.. . @ Len Min @ Center 0.00 at 0.oon @ Right 45.21 k @ Right 45.21 k @ Len Cantilever 0.00 Deflections. .. @ Right Cantilever 0.00 @ Center -0.262 in at 7.75n k-fi Shears ... 45.21 k Maximum = 175.11 k-n @ Len Cant. @Right Cant 0.000 in at 0.OOft 0.000 in at 0.00n - (C) 1983-97 ENERCALC c:knercakVaraday.ecw KW4602755. V5.0.2, 1-Jun-1597 . Firouzi Consulting Engineers Inc. 16959 Bernard0 Center Drive, 201 San Diego, California 92128 16191 485-6227 Tile : Dsgnr: Date: Description : scope : Job # 1 I Built-UD Section ProDerties C 1 General Information h Description : Reinforced Wl8x35 1 Steel Shapes t #1: Name W18X35 Angle 0 deg Xcg Depth 17.71 in Width 6.00 in Area 3.00 in Ycg 8.88 in Ixx 513.00 in4 lyy 15.50 in4 Xbar 10.30 in2 0.00 in Ybar 0.00 in Angle 180 deg Xcg 2.91 in Ycg 5.24 in Width 4.14 in 5.81 in Area 4 42 in2 #2: Name W5X15 Depth In 9.28 in4 IYY' 8.35 in4 Xbar ~~ 0.00 in Ybar 12.88 in . . . - . . .- I Summa rv... k 1 I Total Area 14.720 in2 1,034.03 in4 rxx 1.297 in . X cg Dist. 0.00 in 24.78 rw 8.381 Y cg Dist. 3.87 in Edge Distances from CG -X +X 3.000 in S leff -4.135 5.993 in3 +Y 12.721 S right 8.260 -Y -11.914 S bottom 86.791 stop 81.285 (C) 1-97 ENERCALC c:knercalcVaraday.ecw W-0602755, V5.0.2, 1-Jun-1997 6-21-1999 A:&W FROM SMITH_CONSULTING-WT 6197334787 P. 1 SmithConsu ItingArchitects TRANSMITTAL To: BNW Smilb Date: 6/21/99 Company: Lusardi Construction Project No: 98264.1 Project: Faraday Business Plaza CRC Lot 106 -TI ATTACHED: No. Copies Date Description 1 'Sliptroclc Systems' overhead track cut sheet and details 1 'C-H' channel RFI TRANSMlTTEO VIA: €4 FAX (Sheet 1 of 5J 0 Mail 0 Messenger 0 Overnight Delivery 0 Omer fax No. 760-918-9946 0 Foryourappml ACTION 0 For your review and comment As rquerted B For your use I tilts 0 Reviewed as noted No exceptions taken 0 Revise I Resubmit REMARKS: Please find attached the above referenced documents. If you have any questions or comments. please call me. DISTRIBUTION: Wh End. SCA File Jeff Jenco, Lusardi Construction BY: City of CARLSEAD BUILDING DEPT. 4&0m ." - .-- ?*I P WIA WR .- ." ". . 6711-199 A:47pM FROM SMITH-CONSULTING-OUT 619793A787 P. 3 ". "" ^" "- "-..-."-.".," .- ."" .""^ " I- ..-,- 6-21-1999 A:A7PM FGUM SMITH-CONSULTING-OUT 6197936787 P. A KEff.RENCB: &-4/7 QULSTION: 6-21-1999 A:A8PM FROM SMITH-CONSULTING-OUT 6197934787 P. 5 - 8 1. ^. "" "- "^ ~ ._._. -... .".." . .. ."" .""^ " " 8." 11/01/1999 City of Carlsbad Certificate of Occupancy Cert of Occ#:C0990056 Permit Type: COFO Related Bldg Permit#: CB991603 Bldg Address: 1635 FARADAY AV CBAD Parcel No: 2121303100 Occupant Name: CITY OF CARLSBAD Phone#: 760/438-1161 Contact Name: JOHN CAHILL Phone#: 760/438-0894 Building Owner: FARADAY BUSINESS PLAZA L L C SUITE 104 1947 CAMINO VlDA ROBLE CARLSBAD CA 92008 Phone#: 760/431-76>2 ., .,.. ,,. , x . ,i 1, I ,, .. ,,. , , .. ,. .. , . . , ., Description of Use:ADMINISTRATIVE OFFICES . .’’ .. , .~ ., si, : -. , ,. ,, I certify that this building orportiin&nplies with the “iBuilding Codef&the gmup and division of occupancy and the use for which the proposed occupancy is classified, The above Information is true and correct, and I make this statement under penalty of perjury. .. ., ’ .,J-. .. Signature of Building Official FOR DEPARTMENTAL USE ONLY Date Routed Use Zone Occupancy Group: B Construction Type: VN Inspected By Date ‘/<4/9? Approved J Disapproved - Inspected By Date Approved _. Disapproved - Inspected By Date ’ Approved _. Disapproved - CITY OF CARLSBAD 2075 Las Palmas Dr., Carlsbad, CA 92009 (760) 438-1161 FARADAY BUSINESS PLAZA, LLC 1947 Camino Vida Roble, Suite 104 Carlsbad, CA 92008 (760) 431-7612 September 15, 1999 Pat Kelley CITY OF CARLSBAD 2075 Las Palmas Drive Carlsbad. CA 92009-1576 Re: 1635 Faraday Drive, Carlsbad Application for Certificate of Occupancy Building Permit No. CB99-1603 Dear Pat: Attached is a completed Application for a Certificate of Occupancy for 1635 Faraday Drive. As you know, we expect the tenant improvements being constructed under permit No. CB99-1603 to be substantially completed by September 30th except for minor punch list items and the installation of the elevator which is scheduled for the week of October 1 lth. Accordingly, we request that the Certificate of Occupancy be issued effective October 1st so that the City of Carlsbad may begin occupying its new Administrative Center. We are pleased to have been able to serve the City in its expansion and look forward to continuing this service as a landlord to the City. Sincerely, William A. Shirley U copy to: John Cahill Lisa Hildabrand Marty Orenyak John Tworoger CO# APPLICATION FOR CERTIFICATE OF OCCUPANCY City of Carlsbad - Building Department 2075 Las Palmas Drive Carlsbad CA 92009-1576 (760)438-1161 ext. 4403 (760)438-0894 FAX BUILDING ADDRESS 1635 FARADAY Unit # BUILDING PERMIT CB991603 OCCUPANCY GROUP OFFICE CONSTRUCTION "PE VN OWNER FARADAY BUSINESS PLAZA, LLC NAME 1947 CAMINO VIDA ROBLE, SUITE 104 ADDRESS CARLSBAD, CA 92008 CITY, STATE, ZIP (760) 431-7612 (760) 431-8968 FAX PHONE NUMBER OCCUPANT NAME CITY OF CARLSBAD CONTACT NAME JOHN CAHILL CONTACT PHONE (760) 438-1161 (760) 438-0894 FAX DESCRIBE THE EXACT USE OF ALL PORTIONS OF EACH BUILDING AREA OFFICES FOR CITY OF CARLSBAD ADMINISTRATIVE CENTER. 2075 Las Palmas Drive - Carlsbad. California 92009-1 576 - (619) 438-1 161 @ 6-30-1999 11:12AM FROM SMITH-CONSULTING-OUT 6197934787 JUN-3U-YY UW 1U:14 CI'IY ut CAL(LS8RU conn DE FAX No. 43tilit194 - P. A P. 03