HomeMy WebLinkAbout1639 Corte Orchidia; ; CBR2019-1623; PermitCcityof
Carlsbad
Residential Permit
Print Date: 09/05/2019
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
# Dwelling Units:
Bedrooms:
Project Title:
1639 Corte Orchfdia
BLDG-Residential
2159502800
$4,437.12
Work Class: Alteration
Lot#:
Reference #:
Construction Type:
Bathrooms:
Orig. Plan Check #:
Plan Check#:
Description: CONWAY: REMOVE 3 SLIDERS ANO REPLACE WITH Bl-FOLDING DOORS
Applicant:
JEREMY SANICO
BUILDING PERMIT FEE ($2000+)
BUILDING PLAN CHECK FEE (BLDG)
Owner:
JOHN F CONWAY
ELECTRICAL BLOG RESIDENTIAL NEW/ADDITION/REMODEL
MANUAL BUILDING PLAN CHECK FEE
$B1473 GREEN BUILDING STATE STANDARDS FEE
STRONG MOTION-RESIDENTIAL
Total Fees: $310.07 Total Payments To Date: $310.07
Status:
Applied:
Issued:
Permit
Finaled:
Inspector:
Final
Inspection:
Balance Due:
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction," You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing ln accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
Permit No: CBR2019-1623
Closed -Finaled
06/24/2019
08/20/2019
MColl
9/5/2019 11:03:32AM
$0.00
$70.61
$49.43
$41.00
$147.45
$1.00
$0.58
1635 Faraday Avenue, Carlsbad, CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov
Ccityof
Carlsbad
RESIDENTIAL
BUILDING PERMIT
APPLICATION
B-1
Plan Check
Est. Value
PC Deposit ---~-~---
Date ____,,,,_,_/i_.,,___,,'-J/L.Jfc.,..q_
Job Address I I., ::A Go(~
CT /Project#: IC\ \ !,,O '
Orc.V\ ;J,o-
Lot#: ').'tJ
Suite: ___ APN: 1\ $A50l'6'00
Fire Sprinklers: yes~ Air Conditioning: @/ no
BRIEF DESCRIPTION OF WORK: ~"'°".._( ~\ ~a,,5 o.f :fu,«. lo<Atio\'IS (-1-1,..e ~:½ 1 t..:.vi11~ ,001111-1 M1.!.1V
" btli'ol<\
0 Addition/New: _____ Living SF, ___ Deck SF, ____ Patio SF, ___ Garage SF
Is this to create an Accessory Dwelling Unit? Yes/ No New Fireplace? Yes/ No, if yes how many? __
~ Remodel: lj2 SF of affected area Is the area a conversion or change of use ? Yes,®
0 Pool/Spa: ____ SF Additional Gas or Electrical Features? ___________ _
□ Solar: ___ KW, ___ Modules, Mounted: Roof/ Ground , Tilt: Yes/ No, RMA: Yes/ No, Battery: Yes/ No
Panel Upgrade: Yes/ No
D Reroof: ___________________________________ _
D Plumbing/Mechanical/Electrical Only: ________________________ _
D Other:-----------------------------------
APPLICANT (PRIMARY CONTACT)
Name: ~~~ ~Q~.'c~
Address~ ; &"'S C.-h-15
Citv: u::; ~'cl: State: <--A Zip: 92 (,2j
Phone: (~o.tq) 3~"'\ -(,\'\':i
Email: :W:......,,,~ e t-ot"'tr~fOll:tCP,,16 i111.7 (,Ori\
us. License: _____ _
B IOoooS"l hC,· o-::J~l<'t
(Sec. 7031.5 Business and Professions Code: Any· City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its
issuance, also requires the applicant for such permit to file a signed statement that he/she is licensed pursuant to the provisions of the Contractor's License Law
{Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code} or that he/she is exempt therefrom, and the basis for the alleged
exemption. Any violation of Section 7031.S by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars {$SOD}).
1635 Faraday Ave Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 Email: Building@carlsbadca.gov
B-1 Page 1 of2 Rev. 06118
( OPTION A): WORKERS'COMPENSATION DECLARATION:
I hearby affirm under penalty of perjury one of the following declarations:
□ I have and will maintain a certificate of consent to self~insure for workers' compensation provided by Section 3700 of the labor Code, for the performance of the
work which this permit is issued.
□ I have and wilf maintain worker's compensation, as required by Section 3700 of the Labor Code, for the perform
Policy No. W O \VU Expiration Date: ;:l.:11 ;2.C)
My workers' com ensation insurance JiiJ,Q'ie and policy number are: Insurance C"f'tany f me: ;
I
□ Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to be come
subject to the workers' compensation Laws of California. WARNING: Failure to secure workers compensation coverage Is unlawful, and shall subject an employer to
criminal penalties and civil fines up to $10 .00, in addition the to the cost of comp~nsation, damages as provided for in Section 3706 of the Labor Code,
interest and attorney's fees.
( OPTION B ): OWNER-BUILDER DECLARATION:
I hereby affirm that I am exempt from Contractor's License Law for the following reason:
□ I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec.
7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work
himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within
one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
□ I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The
Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed
pursuant to the Contractor's License Law).
□ I am exempt under Section ________ Business and Professions Code for this reason:
1. I personally plan to provide the major labor and materials for construction of the proposed property improvement. □ Yes □ No
2. I (have/ have not) signed an application for a building permit for the proposed work.
3. I have contracted with the following person (firm) to provide the proposed construction (include name address/ phone/ contractors' license number):
4. I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name/ address/ phone/
contractors' license number):
5. I will provide some of the work, but I have contracted {hired) the following persons to provide the work indicated (include name/ address/ phone/ type of work):
OWNER SIGNATURE: __________________ □AGENT DATE: _____ _
CONSTRUCTION LENDING AGENCY. IF ANY:
I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 {i) Civil Code).
lender's Name=--------~-------------lender's Address: _____________________ _
ONLY COMPLETE THE FOLLOWING SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY:
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention
program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? □ Yes □ No
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? □ Yes □ No
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? □ Yes □ No
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE
REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
APPLICANT CERTIFICATION:
I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all
City ordinances and State laws relating to building construction.
I hereby authorize representative of the Cityof carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP
HARMLESS THE CITY OF CARlSBADAGAINST ALL UABILmES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF
THE GRANTING OF THIS PERMIT.OSHA: An OSHA permit is required for excavations over 5'0' deep and demolition or construction of structures over 3 stories in height.
EXPIRATION: Every permit issued by the Building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work authorized
by such permit is not commenced within 180 days from the date of such Permit or if the building or work authorized by such permit is suspended or abandoned at any time
after the work is commenced for a period of ays (Section 106.4.4 Unifor Building Colle).
APPLICANT SIGNATURE: --~~~~~--"'~~=:!_ ______ DATE: -~r.....+,1-'~'--'l.f...,/~/ _.'f __
1635 Faraday Ave Carlsbad, CA 92
B-1
0-602-2719 Fax: 760-602-8558
Page 2 of2
Email: Building@carlsbadca.gov
Rev. 06/18
PERMIT INSPECTION HISTORY REPORT (CBR2019-1623)
Permit Type: BLDG-Residential Application Date: 06/24/2019 Owner: JOHN CONWAY
Work Class: Alteration Issue Date: 08120/2019 SUbdivision: CARLSBAD TCT#98-17 HADLEY
PROPERTY
Status: Closed -Finaled Expiration Date: 02/24/2020 Address: 1639 Corte Orchidia
Carlsbad, CA 92011-4064
IVR Number: 19960
Scheduled Actual
Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector Re Inspection Complete
08122/2019 08/22/2019 BLDG-84 Rough 101667-2019 Passed Michael Collins Complete
Combo(14,24,34,44)
Checklist Item COMMENTS Passed
BLDG-14 New header at Living Rm only. See card. Yes
Frame-Steel-Bolting-Welding
(Decks)
08/23/2019 08/23/2019 BLbG-17 Interior 101830-2019 Failed Paul York Reinspection Complete
LathfDrywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
BLDG-18 Exterior 101829-2019 Failed Paul York Reinspection Complete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
08/26/2019 08/26/2019 BLDG-14 101978-2019 Cancelled Michael Collin• Relnspection Complete
Frame/Steel/Boltlng/
Welding (Deck•)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Wrong code, cancelled No
BLDG-18 Exterior 101977-2019 Pasaed Michael Collins Complete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Lath at 3 new cantina doors only. Yes
09/05/2019 09/05/2019 BLDG-Final 103019-2019 Passed Chris Renfro Complete
Inspection
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-Plumbing Final Yes
BLDG-Mechanical Final Yes
BLDG-Structural Final Yes
BLDG-Electrical Final Yes
September 05, 2019 Page 1 of1
LEO BURKE ENGINEERING, INC.
34167 Pacific Coa:,t Highway, Suite D • Dana Point, CA 92629
PIIONE: (949) 226-7130
Re: Conway Residence
1639 Corte Orchidia
Carlsbad, CA
Date: August 22, 2019
Subject: Inspection of Epoxy Installation
To Whom It May Concern:
This letter has been written to address the following issue at the request of the contractor:
The header in the Master Bedroom shall not be required to be changed as the new door that
replaces the existing door in narrower in width (therefore shortening the span) and no new
loads are imposed on the header with the new structural plan.
If there are any other questions or concerns, please call me at (949) 226-7130.
RECORD COPY
LEO BURKE ENGINEERING, INC.
34167 Pacific Coast Highway, Su.ite D • Dana Point, CA 92629
PHONE: (949) 226-7130
Re: Conway Residence
1639 Corte Orchidia
Carlsbad, CA
Date: August 22, 2019
Subject: Inspection of Epoxy Installation
To Whom It May Concern:
This letter has been written to confirm that the inspection of Epoxy installation has been performed by
the office of Leo Burke Engineering, Inc. for the inspection of anchor bolts.
The installation of Simpson 'SET-XP' Epoxy for (2) anchor bolts (for (2) Simpson "ABU") has
been completed correctly and is sufficient to satisfy all structural requirements.
If there are any other questions or concerns, please call me at (949) 226-7130.
RECORD COPY
✓• EsG1I
;\ S:\~tJHJ,lt Comp :ny
DATE: July 29, 2019
JURISDICTION: Carlsbad
0 APPLICANT
0 JURIS.
PLAN CHECK#.: CBR2019-1623 SET II
PROJECT ADDRESS: 1639 Corte Orchidia
PROJECT NAME: Remodel for Conway Residence
□
□
□
□
□
~
□
□
The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
The plans transmitted herewith will substantially comply with the jurisdiction's
codes when minor deficiencies identified below are resolved and checked by building
department staff.
The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
The check list transmitted herewith is for your information. The plans are being held at EsGil
until corrected plans are submitted for recheck.
The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
The applicant's copy of the check list has been sent to:
EsGil staff did not advise the applicant that the plan check has been completed.
EsGil staff did advise the a plicant that the plan check has been completed.
Person contacted: Telephone#:
(b$\) Date contacted:
Mail Telephone
REMARKS:
By: Abe Doliente
EsGil
Fax ~n
Email:
Enclosures:
7/22/19
9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576
(.
DATE: July 8, 2019
JURISDICTION: Carlsbad
PLAN CHECK#.: CBR2019-1623
✓• EsG1I
A SAFEbuilt'Company
SET: I
PROJECT ADDRESS: 1639 Corte Orchidia
PROJECT NAME:
□ APPLICANT
□ JURIS.
D The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's
codes when minor deficiencies identified below are resolved and checked by building
department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
~ The check list transmitted herewith is for your information. The plans are being held at EsGil
until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
~ The applicant's copy of the check list has been sent to:
Jeremy Sanico
D EsGil staff did not advise the applicant that the plan check has been completed.
~ EsGil staff did advise the applicant that the plan check has been completed.
Person contacted: Jeremy Sanico
Date contacted:
Mail Telephone
0 REMARKS:
By: Abe Doliente
EsGil
(by: )
Fax In Person
6/27/19
Telephone#: 949-339-6194
Email: jeremy@cornerstoneopening.com
Enclosures:
9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576
Carlsbad CBR2019-1623
July 8, 2019
GENERAL PLAN CORRECTION LIST
JURISDICTION: Carlsbad
PROJECT ADDRESS: 1639 Corte Orchidia
DATE PLAN RECEIVED BY
ESGIL: 6/27/19
REVIEWED BY: Abe Doliente
FOREWORD (PLEASE READ):
PLAN CHECK#.: CBR2019-1623
DATE REVIEW COMPLETED:
July 8, 2019
This plan review is limited to the technical requirements contained in the International Building
Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state
laws regulating energy conservation, noise attenuation and disabled access. This plan review
is based on regulations enforced by the Building Department. You may have other corrections
based on laws and ordinances enforced by the Planning Department, Engineering Department
or other departments.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. The approval of
the plans does not permit the violation of any state, county or city law.
• Please make all corrections, as requested in the correction list. Submit FOUR new
complete sets of plans for commercial/industrial projects (THREE sets of plans for residential
projects). For expeditious processing, corrected sets can be submitted in one of two ways:
1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad
Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will
route the plans to EsGil and the Carlsbad Planning, Engineering and Fire Departments.
2. Bring TWO corrected set of plans and calculations/reports to EsGil, 9320 Chesapeake
Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans
and calculations/reports directly to the City of Carlsbad Building Department for routing to their
Planning, Engineering and Fire Departments.
NOTE: Plans that are submitted directly to EsGil only will not be reviewed by the City
Planning, Engineering and Fire Departments until review by EsGil is complete.
• To facilitate rechecking, please identify, next to each item, the sheet of the plans upon
which each correction on this sheet has been made and return this sheet with the
revised plans.
• Please indicate here if any changes have been made to the plans that are not a result of
corrections from this list. If there are other changes, please briefly describe them and where
they are located on the plans. Have changes been made not resulting from this list?
D Yes D No
Carlsbad CBR2019-1623
July 8, 2019
1. Non-structural plans must be signed by the person responsible for their preparation.
Signatures on the final sets of plans will be verified before they are approved.
2. Structural plans must be signed by the architect or engineer of record. Signatures on the
final sets of plans will be verified before they are approved.
3. Make the plans agree with the structural calculations. Show all the beams on the plans
and recheck the corresponding designations.
4. Note on the plans that the locations of the existing smoke alarms and carbon monoxide
alarms will be field verified by the City Building Inspector.
5. The jurisdiction has contracted with EsGil, located at 9320 Chesapeake Drive, Suite 208,
San Diego, California 92123; telephone number of 858/560-1468, to perform the plan
review for your project. If you have any questions regarding these plan review items,
please contact Abe Doliente at Esgil. Thank you.
Carlsbad CBR2019-1623
July 8, 2019
[DO NOT PAY -THIS IS NOT AN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad
PREPARED BY: Abe Doliente
PLAN CHECK#.: CBR2019-1623
DATE: July 8, 2019
BUILDING ADDRESS: 1639 Corte Orchidia
BUILDING OCCUPANCY: R3/U
BUILDING
PORTION
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code cb
1997 UBC Buildin Permit Fee g -----r·]•~nl>T:-------·-
1997 UBC Plan Check Fee
I ·c:\t !ti :
Type of Review: □
AREA Valuation
(Sq.Ft.) Muliplier
By Ordinance
·1
... I
Complete Review
□ other
Reg. VALUE
Mod.
□ Structural Only
□ Repetitiwe Fee Repeats .... Gl Hourly
&Gil Fee
.__ ___ 1_.--151 Hrs. @ *
$105.00_
• Based on hourly rate
Comments:
($)
$157.501
Sheet 1 of 1
,
J
C City of
Carlsbad
PURPOSE
CLIMATE ACTION PLAN
CONSISTENCY CHECKLIST
8-50
Development Services
Building Division
1635 Faraday Avenue
(760) 602-2719
www .ca rlsbadca .gov
This checklist is intended to assist building permit applicants identify which Climate Action Plan (CAP) ordinance
requirements apply to their projects. Unless none of the requirements apply, the completed checklist must be
included' in the building permit application. It may be necessary to supplement the completed checklist with
supporting materials, calculations or certifications, to demonstrate full compliance with CAP ordinance
requirements. For example, projects that propose or require a performance approach to comply with energy-
related measures will need to attach to this checklist separate calculations and documentation as specified by
the ordinances.
A If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum required
by ordinance, an explanation must be provided to the satisfaction of the Building Official.
A Details on CAP ordinance requirements are available on the city's website.
,~~•~ •• P·, ~.,• ,:: -,'••:-1 ~ ,,.I"' • I • ' '.: I I., ,,• •' • ""' ~ ..-• r.,:, ~•r -"I;. . ~ ' . ' ' it:; 1•-• , ),.-1 ~ , '.i.~. r :_::• '1.£·_, __ :.,·, -. : .. ~ ..... ~ .... , .. _: . .. --)~~,.: ... :;..,.. . -~i
Project Name/Building
Permit No.:
Property Address/APN:
Applicant Name/Co.:
Applicant Address:
Contact Phone:
H 1cr k/A s Lo("\xf:
7
Contact information of person completing this checklist (if different than above):
Name:
Company
name/address:
8-50
Applicant Signature~,_,l,w\p ~
Page 1 of 3 Revised 04/19
City of Carlsbad Climate Action Plan Consistency Checklist
Use the table below to determine which sections of the Ordinance Compliance checklist are applicable to your project.
For residential alterations and additions to existing buildings, contact the building counter for the building permit valuation.
Building Permit Valuation (BPV) $ ___________ _
ContlrucllonType Con"8te Secdon(t) Notes:
D Residential
D New construction 1A
D Alterations: D exempt
D BPV;;: $60,000
D Electrical service panel upgrade
1A
1A
1-2 family dwellings and townhouses with attached garages
only
D BPV <!: $200,000 1A
Multi-family dwellings only where interior finishes are removed
and significant site work and upgrades to structural and
mechanical, electrical, and/or plumbing systems are proposed
D Nonresidential
D New construction 18 and 2
D Alterations 2
1. Electric Vehicle Charging
A D Residential New construction and major alterations (or electric panel upgrade)*
Please refer to Carlsbad Ordinance CS-349 when completing this section.
D One and two-family residential dwelling or townhouse with attached garage:
D One EVSE ready parking space required D Exception :
□ Multi-family residential· □ Exception ·
Total Parking Spaces EVSE Spaces
Proposed Capable I Ready
I
Calculations: Total EVSE spaces = .10 x Total parking (rounded up to nearest whole number)
EVSE Installed = Total EVSE Spaces x .50 (rounded up to nearest whole number)
EVSE other= Total EVSE spaces -EVSE Installed
(EVSE other may be "Capable," "Ready" or "Installed.")
Installed I Total
I
*Major alterations are: (1) for one and two-family dwellings and townhouses with attached garages, alterations have a building permit valuation~ $60,000 or
include an electrical service panel upgrade; (2) for multifamily dwellings (three units or more without attached garages), alterations have a building permit valuation
~ $200,000, interior finishes are removed and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed.
,·
B. D Nonresidential new construction (includes hotels/motels) □ Exception ·
Total Parking Spaces EVSE Spaces
Proposed Capable I Ready I Installed I Total
I I l
Calculation: Refer to the table below:
Total Number of Parking Spaces provided Number of reauired EV Spaces Number of required EVSE Installed Spaces
□ 0-9 1 1
□ 10-25 2 1
□ 26-50 4 2
□ 51-75 6 3
□ 76-100 9 5
□ 101-150 12 6
□ 151-200 17 9
□ 201 and over 10 percent of total 50 percent of Required EV Spaces
Updated 4/12/2019 2
'
I
City of Carlsbad Climate Action Plan Consistency Checklist
2. D Transportation Demand Management (TDM)
A. List each proposed nonresidential use and gross floor area (GFA) allocated to each use.
B. Employee ADT/1,000 square feet is selected from the table below.
Use GFA Employee ADT for first Employee ADT for each
1,000 S.F. subsequent 1,000 S.F.
Total
If total employee ADT is greater than or equal to 110 employee ADT, a TOM plan is required.
TOM plan required: Yes □ No □
Updated 4/12/2019
Employee ADT Estimation for Various Commercial Uses
AD T for first
1,000 s.f.
EmpADTI
1000 s.f.1
Office (all)2 20
Restaurant 11
Retaib 8
Industrial 4
Manufacturing 4
Warehousin 4
1 Unless otherwise noted, rates estimated from !TE Trip
Generation Manual, 1rJhEdition
20
11
4.5
3.5
3
1
2 For all office uses, use SANDAG rate of 20 ADT/1,000 sf to
calculate employee ADT
3 Retail uses include shopping center, variety store, supermarket,
gyms, pharmacy, etc.
Other commercial uses may be subject to special
consideration
Sample calculations:
Office: 20,450 sf
1. 20,450 sf/ 1000 x 20 = 409 Employee ADT
Retail: 9,334 sf
1. First 1,000 sf= 8 ADT
2. 9,334 sf -1,000 sf = 8,334 sf
3. 8,334 sf/ 1,000 x 4.5 + 8 = 46 Em lo ee ADT
Total Employee ADT
3