HomeMy WebLinkAbout1642 FAIRLEAD AVE; ; CB131721; PermitCity of Carlsbad
f( ~ 1635 Faraday Av Carlsbad, CA 92008
03-07-2014 Residential Permit Permit No: CB131721
Job Address:
Building Inspection Request Line (760) 602-2725
1642 FAIRLEAD AV CBAD .
Permit Type:
Parcel No:
Valuation:
RESDNTL Sub Type: CONDO
-~ 156202822 Lot #: 22
$178,867.00 Constuctlon Type: 58 _____ ~
Status: ISSUED
Applied: 07/22/2013
Entered By: JMA
Occupancy Group:
# Dwelling Units:
Bedrooms:
1
3
Reference #: (D:04Q4.0A==>
Structure Type: MF2-4
Bathrooms~!;i ~
Plan Approved: 08/30/2013
Issued: 08/30/2013
Inspect Area: PB
0 rig PC #:..BC4-10047-----'
VOSCANA (FORMERLY VITALIA)
Plan Check#: PC 130039
Project Tltle:
UNIT 22, PLAN 3, PHASE 5, 1540 SF, 463 SF GAR & 99 SF DECK
Applicant:
SHEA HOMES
ATIN: SARAH BECKMAN
9990 MESA RIM RD
SAN DIEGO CA 92121
858 526-6554
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park In Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
HMP Fee
Pot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
Reel. Water Con. Fee
Green Bldg Stands (SB1473) Fee
Green Bldg Stands Plan Chk Fee
$1,005.30
$0.00
$703.71
($250.00)
($56.30)
$17.89
$0.00
$0.00
$0.00
$0.00
$0.00
$10,920.00
$0.00
$0.00
$0.00
$0.00
$0.00
$22,771.00
D2
$0.00
$0.00
$4.00
$0.00
Total Fees: $69,960.44 Total Payments to Date:
Owner:
Meter Size
Add'I Reel. Water Con. Fee
Meter Fee
SDCWA Fee
CFO Payoff Fee
PFF (3105540)
PFF (4305540)
License Tax (3104193)
License Tax (4304193)
Traffic Impact Fee (3105541)
Traffic Impact Fee (4305541)
Sidewalk Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing lnUeu Fee
Housing Credit Fee
Master Drainage Fee
Sewer Fee
Additional Fees
Fire Sprinkler Fees
TOTAL PERMIT FEES
$69,960.44 Balance Due:
D2
$0.00
$798.00
$23,358.00
$2,575.54
$3,255.38
$0.00
$0.00
$0.00
$1,912.00
$0.00
$0.00
$179.00
$57.00
$101.92
$0.00
$0.00
$0.00
$0.00
$2,576.00
$32.00
$0.00
$69,960.44
$0.00
Inspector:
FINAL APPROVAL
Date: 't,,tt 'l '( Clearance: ------
NOTICE: Please take NOTICE that approval of your project Includes the 'Imposition' of fees, dedications, reservations, or other exactions hereafter coiectfvely·
referred to as "fees/exactfons.' You have 90 days from the date this pem, It was Issued to protest Imposition of these faes/exactlons. If you protest them, you must
follow the protest procedures set forth In Government Coda Section 66020(a), and fie the protest and any other required Information with the City Maoagar for
processing In accordance with Carlsbad Municipal Code Section 3.32.030. Fallure to tlmely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annu their Im position.
You are hereby FURTHER NOTIFIED that your rtght to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other smllar application processing or service fees In connection wtth this project. NOR DOES IT APPLY to any
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
08-30-2013
Storm Water Pollution Prevention Plan (SWPPP) Permit
Permit No:SW130260
Job Address:
Pennit Type:
Parcel No:
Reference #:
CB#:
Project Trtle:
Applicant
1642 FAIRLEAD AV CBAD
SWPPP
2150202822
CB131721
VOSCANA: PHASE 5/ BLDG.
SHEA HOMES/SARAH BECKMAN
9990 MESA RIM RD
SAN DIEGO CA 92121
858-526-6500
Emergency Contact:
SARAH BECKMAN
760 715-1584
SWPPP Plan Check
SWPPP Inspections ,
Additional Fees
TOTAL PERMIT FEES
Lot#: 0
Owner.
Total Fees: $103.00 · Total Payments To Date:
Status:
Applied:
Entered By:
Issued:
Inspect Area:
Tier:
Priority:
ISSUED
07/22/2013
JMA
08/30/2013
PB
1
L
$47.00
$56.00
$0.00
$103.00
$103.00 Balance Due:
FINAL APPROVAL
$0.00
Inspection List
Pennlt#: CB131721 Type: RESDNTL CONDO
Date ----Inspection Item Inspector Act
04/21/2014 89 Final Combo PB AP
04/21/2014 89 Final Combo RI
04/18/2014 89 Final Combo RI
04/18/2014 89 Final Combo PY AP
04/15/2014 308 Final GR AP
03/06/2014 23 Gas/Test/Repairs PB AP
03/06/2014 29 Final Plumbing PB AP
03/06/2014 39 Final Electrical PB AP
03/05/2014 23 Gas/T esURepairs PB NR
03/05/2014 39. Final Electrical PB NR
03/04/2014 39 Final Electrical PB CA
02/04/'2014 17 Interior Lath/Drywall PB AP
01/24/2014 84 Rough Combo PB AP
01/13/2014 13 Shear Panels/HD's PB AP
12/27/2013 15 Roof/Reroof PB AP
10/21/2013 11 Ftg/Foundation/Plers PB AP
10/09/2013 21 Underground/Under Floor PB AP
Tuesday,Aprll22,2014
VOSCANA (FORMERLY VITAUA)
UNIT 22, PLAN 3, PHASE 5, 1540 SF, 463
Comments
COF
COF
Page 1 of 1
-----------· --.~ .. .t --::..-lo'
-~ (l>Y 01 $ DEFERRED FEES $ CB131721 1642 FAIRLEAD AV
CARLSBAD
_.ding D1vlslon INSPECTION RECORD I VOSCANA (FORMERLY V!T ALIA)
UNIT 22, PLAN 3. PHASE 5, 1540 SF, 46.1 SF GAR & 99 SF
DECK -'
0 INSPECTION RECORD CARD WITH APPROVED
PLANS MUST BE KEPT ON THE JOB ! RESDNTL CONDO
Lot#: 22 SHEA HOMES
@ CALL BEFORE 3:30 pm FOR NEXT WORK DAY INSPECTION
@ FOR BUILDING INSPECTION CALL: 760-602•2725 RECORD COP'
Required Prior to Requesting BuHding Final If Checked YES
Landscape 760-944-8463 Allow 48 hours
CM&I (Engineering Inspections) 760438-3891 call before 2 pm
Fire Prevention 76o-602-4660 Allow 48 hours
I.and Development Engineering 760-602-2750
76o-602-4600
Typo of Inspection
CODIJ # ELECTRICAL Date Inspector
#31 0 a.ECTRIC UNDERGROUND D UFER
1tl2 REINFORCED STE.EL #34 ROUGH ELECTRIC
66 MASONRY PRE GROUT #33 0 El.ECTRIC SERVICE O TEMPORARY
D GROUT OWAUDRAINS #36 PHOTO VOLTAIC
#10 TilTPANElS #39 FINAL
#11 POUR STRIPS coos ,/ MECHANICAL
#11 COLUMN FOOTINGS #41 UNDERGROUND DUCTS & PIPING
#14 SUBFRAME O FLOOR O CEJUNG #44 0 DUCT & PLENUM O REF. PIPING
#15 ROOF SHEATHING #43 HEAT-AIR COND, SYSTEMS
#13 EXT. SHEAR PANELS #49 FINAL
#16 INSULATION Coon " COMBO INSPECTION
#18 EXTERIOR lATH #81 UNDERGROUND (11,12,21,31)
#17 INTERIOR lATH & DRYWAU #82 DRYWA EXTlATii, GASTES(17,18,2.3)
1#51 POOL EX.CA/STEEL/BOND /FENCE #33 ROOFSHEATING, EXTSHEAR 13,1.6)
#55 PREP LASTER #84 FRAME ROUGH COMBO (14,2.4,34,44)
#85 T·BAR (14,24,34,44)
#89 FINAL OCCUPANCY (19,29,39,49)
0 SEWER & Bl/CO D Pl/CO Date Ins ector
UNDERGROUND DWASTE O WfR
#24 TOP OUT O WASTE D WTR A/S UNDERGROUND VISUAL
1121 TUB & SHOWER PAN A/SUNDEROROUNDHYDRO
#23 0 GAS TEST D GAS PIPING A/5 UNDERGROUND FLUSH
1125 WATER HEATER A/S OVERHEAD VISUAL
1128 SOLAR WATER A/S OVERHEAD HYDROSTATIC
#29 FINAL A/SFINAL
CoDatil · STORM WATER . F/A ROUGlf.lN
--,/1600 PRE-CONSTRUCTION MEETING F A FINAL
#603 FOLLOW UP INSPECTION FIXED EXTINGUISHING SYSTEM ROUGH-IN
11605 NOTICE TO CLEAN FIXED EXTING SYSTEM HYDROSTATIC TEST
#607 WRITTEN WARNING FIXED EXTINGUISHING SYSTEM FINAL
#609 NOTICE OFVIOlATION MEOICALGAS PRESSURETEST
#610 VERBAL WARNING MEDICAL OAS FINAL
REV 1Ol'2012 SEE BACK FOR SPECIAL NOTES
·1 i
l
I
'
~ I
I ,
I I
l :
I , I .
I
j