HomeMy WebLinkAbout1643 FRAZIER AVE; ; CB150109; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008•
02-1 -2016 Residential Permit Permit No: CB150109
Building Inspection Request Line (760) 602-2725
Job Address:1643 FRAZIER AV CBAD
Permit Type:RESDNTL Sub Type: SFD Status:ISSUED
Parcel No:1562124900 Lot #:17 Applied:12/20/2013
Valuation:$537,382.00 Constuction Type: 5B Entered By: RMA
Occupancy Group:Reference #: CT120007 Plan Approved: 02/19/2016
# Dwelling Units:1 Structure Type: SFD Issued: 02/19/2016
Bedrooms:5 Bathrooms:4.5 Inspect Area:
Orig PC #: PC130070 Plan Check #:
Project Title:CARLSBAD 17-PLAN 3-PHASE 1
& BUILDOUT, 4365 SF, 652 SF GAR, 137 SF PORCH
Applicant:Owner:
CITY VENTURES
1900 QUAIL ST
NEWPORT BEACH CA 92660
858 248-7010
Building Permit $2,151.26 Meter Size FS3/4
Add'I Building Permit Fee $0.00 Add! Red. Water Con. Fee $0.00
Plan Check $1,505.88 Meter Fee $317.00
Add'I Plan Check Fee $0.00 SDCWA Fee $4,800.00
Plan Check Discount ($120.47)CFD Payoff Fee $0.00
Strong Motion Fee $69.86 PFF (3105540)$9,780.35
Park in Lieu Fee $0.00 PFF (4305540)$9,028.02
Park Fee $0.00 License Tax (3104193)$0.00
LFM Fee $0.00 License Tax (4304193)$0.00
Bridge Fee $0.00 Traffic Impact Fee (3105541)$3,100.00
Other Bridge Fee $0.00 Traffic Impact Fee (4305541)$0.00
BTD #2 Fee $0.00 Sidewalk Fee $0.00
BTD #3 Fee $0.00 PLUMBING TOTAL $0.00
Renewal Fee $0.00 ELECTRICAL TOTAL $0.00
Add'I Renewal Fee $0.00 MECHANICAL TOTAL $0.00
Other Building Fee $0.00 Housing Impact Fee $0.00
HMP Fee $0.00 Housing InLieu Fee $0.00
Pot. Water Con. Fee $5,604.00 Housing Credit Fee $0.00
Meter Size F53/4 Master Drainage Fee $0.00
Add'I Pot. Water Con. Fee $0.00 Sewer Fee $842.00
Red. Water Con. Fee $0.00 Additional Fees $306.00
Green Bldg Stands (SB1473) Fee $22.00 Fire Sprinkler Fees $0.00
Green Bldg Stands Plan Chk Fee $0.00
TOTAL PERMIT FEES $37,405.90
Total Fees:$37,405.90 Total Payments to Date:$37,405.90 Balance Due:$0.00
FINAL PROVAL
Inspector:Date:Clearance:
NOTICE:Please take NOTICE that approval of your project includes the Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions."You have 90 days from the date this permit was issued to protest imposition of these fees/exactions.If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030.Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project.NOR DOES IT APPLY to any
fees/exactions of which vou have oreviouslv been aiven a NOTICE similar to this. or as to which the statute of limitations has previously otherwise expired.
1001.00.11.11.11%1 NM
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Storm Water Pollution Prevention Plan (SWPPP) Permit
02-19-2016 Permit No:SW150040
Job Address:1643 FRAZIER AV CBAD
Permit Type:SWPPP Status:ISSUED
Parcel No:1562124900 Lot #:17 Applied:12/20/2013
Reference #:CT120007 Entered By:RMA
CB#:Issued:02/19/2016
Inspect Area:
Project Title:CARLSBAD 17 -PHASE 1 & BUILD Tier:1
OUT Priority:M
Applicant:Owner:
CITY VENTURES
858 248-7010
Emergency Contact:
ANDY GERBER
858 248-7010
SWPPP Plan Check $0.00
SWPPP Inspections $224.00
Additional Fees $0.00
TOTAL PERMIT FEES $224.00
Total Fees:$224.00 Total Payments To Date:$224.00 Balance Due:$0.00
FINAL APPROVAL
(A";E-RANCE
SIGNA 1 tiRF
nil MI
Inspection List
Permit#:CB150109 Type:RESDNTL SFD CARLSBAD 17-PLAN 3-PHASE 1
& BUILDOUT, 4365 SF, 652 SF GAR, 137 S
Date Inspection Item Inspector Act Comments
09/14/2016 89 Final Combo PB AP
09/13/2016 89 Final Combo PB NR
09/13/2016 89 Final Combo RI DO NOT RELEASE TO SDGE!! SEE
RACHEL
09/02/2016 39 Final Electrical MC AP EMR E-MAILED TO SDGE.
09/02/2016 39 Final Electrical RI METER RELEASE/ PETES JOB
08/12/2016 33 Service Change/Upgrade PD AP
06/23/2016 82 Drywall/Ext Lath/Gas Test PD AP
06/16/2016 16 Insulation PD AP
06/13/2016 84 Rough Combo PD AP
06/09/2016 84 Rough Combo PD NR
05/25/2016 13 Shear Panels/HD's PD AP
05/16/2016 13 Shear Panels/HD's PD NR
05/11/2016 15 Roof/Reroof PD AP
05/10/2016 15 Roof/Reroof PD NR
03/28/2016 11 Ftg/Foundation/Piers PD AP
03/14/2016 21 Underground/Under Floor PD AP
03/14/2016 22 Sewer/Water Service PD AP
Thursday, September 15, 2016 Page 1 of 1