HomeMy WebLinkAbout1648 BRADY CIR; ; CB020432; Permitc City of Carlsbad
I 1 1635 Faraday Av Carlsbad, CA 92008
Building Inspection Request Line (760) 602-2725
02-25-2002 Residential Per mi t Permit No:CB020432
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
02/25/2002
# Dwelling Units:
Bedrooms:
Project Title:
1648 BRADY CR CBAD
RESDNTL Sub Type:
2054400300 Lot #:
$244,972.00 Construction Type:
Reference #:
1 Structure Type:
4 Bathrooms:
MAGNOLIA GARDENS - PHASE 2
PLAN 1 - SFD 2660 SF, GAR 670 SF
SFD Status:
3 Applied:
VN Entered By:
CT98-12
SFD Issued:
2.5 Inspect Area:
Orig PC#:
Plan Check#:
ISSUED
02/11 /2002
JM
Plan Approved:
02/25/2002
NF
PCO1-18
PCO2-08
Applicant:
PACIFIC SCENE HOMES
220
2505 CONGRESS STREET
SAN DIEGO CA 921 10
61 9-299-51 12
Total Fees: $21,288.59 Total Payments To Date: $0.00 Balance Due: $21,288.59
Building Permit $993.1 6 Meter Size Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee Other Building Fee
Pot. Water Con. Fee
Meter Size Add'l Pot. Water Con. Fee
Recl. Water Con. Fee
$0.00
$645.55
$0.00
($51.64) $24.50
$3,251 .OO
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$2,400.00
$0.00
$0.00
D5/8
Add'l Recl. Water Con. Fee
Meter Fee
SDCWA Fee
CFD Payoff Fee
PFF
PFF (CFD Fund)
License Tax
License Tax (CFD Fund)
Traffic Impact Fee
Traffic Impact (CFD Fund)
Sidewalk Fee PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing InLieu Fee
Master Drainage Fee
Sewer Fee
Additional Fees TOTAL PERMIT FEES
$0.00
$1 40.00
$2,004.00
$0.00 $4,458.49
$4,115.53
$0.00
$0.00
$441.80
$498.20
$0.00 $1 68.00
$60.00
$61 .OO
$0.00
$0.00 $0.00
$2,079.00
$0.00
$21,2aa.59
FINAL APPROVAL
Inspector: 2!2& Date: 3/- LClearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as feedexactions." You have 90 days from the date this permit was issued to protest imposition of these feedexactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified feedexactions DOES NOT APPLY to water and sewer connection fees and capactiy
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
feedexactions of which vou have previously been qiven a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired.
..
. Clu of Carlsbad
Final Building Inspection
Dept: Building Engineering Planning CMWD St Lite Fire
Plan Check #: PCO2-08
Permit #: CB020432
Project Name: MAGNOLIA GARDENS - PHASE 2
PLAN 1 - SFD 2660 SF, GAR 670 SF
Address: 1648 BRADY CR
Date: 0711 612002
Permit Type: RESDNTL
SubType: SFD
Lot: 3
Contact Person: Phone:
Sewer Disk CA Water Dist: CA
Inspected Date
By: all^ Q&TF 5 Inspected: 7//s/B z Approved: Disapproved:
Inspected Date
By: Inspected: Approved: Disapproved:
Inspected Date
By: Inspected: Approved: Disapproved:
.......................................................................................................................................................
..................................................... ......................................................................................................
Comments:
City of Carlsbad Bldg Inspection Request
For: 07/30/2002
Permit# CB020432 Inspector Assignment: RB
Title: MAGNOLIA GARDENS - PHASE 2
Description: PLAN 1 - SFD 2660 SF, GAR 670 SF
Type: RESDNTL SubType: SFD
Job Address: 1648 BRADY CR
Suite: Lot 3
Location:
APPLICANT PACIFIC SCENE HOMES
Owner:
Remarks:
Total Time:
CD Description
19 Final Structural
Phone: 61 99542887
Inspector:
Requested By: THAD
Entered By: CHRISTINE
ZP Comments
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Associated PCRs/CVs
Date
0711 112002
0711 012002
07/09/2002
05/20/2002
05/20/2002
05/20/2002
0511 712002
0511 512002
05/10/2002
05/09/2002
05/08/2002
05/08/2002
05/08/2002
05/08/2002
0411 712002
0411 512002
InsDection History
Description
39 Final Electrical
39 Final Electrical
39 Final Electrical
17 Interior LathlDrywall
18 Exterior LathlDrywall
23 GasmesURepairs
82 DrywalVExt LathlGas Test
17 Interior LathIDrywall
16 Insulation
16 Insulation
14 FramelSteellBoltingNelding
24 Roughmopout
34 Rough Electric
44 RoughlDuctslDampers
83 Roof SheathinglExt Shear
83 Roof Sheathing/Ext Shear
Act lnsp Comments
AP RB EMR
CO RB AGAIN
CO RB
AP PS
AP PS
NR PS
NR PY SCRAPOUT
PA NF GARlSTLAYER
AP PY
NS PY NOTIME
AP PY NEED ROOF AND SHEAR PER NICK
AP PY
AP PY
AP PY
CO NF
NR NF
Inspection List
Permit#: CB020432 Type: RESDNTL SFD
Date Inspection Item Inspector Act
07/30/2002 89
07/30/2002 89
07/29/2002 23
0712912002 89
07/29/2002 89
0711 112002 39
0711 012002 39
07/09/2002 39
05/20/2002 17
05/20/2002 18
05/20/2002 23
0511 712002 82
0511 512002 17
0511 012002 16
05/09/2002 16
05/08/2002 14
05/08/2002 24
05/08/2002 34
05/08/2002 44
0411 712002 83
0411 512002 83
0411 012002 83
0311 312002 1 1
03/08/2002 21
03/08/2002 22
03/07/2002 21
03/0712002 22
Final Combo
Final Combo
GasTTestlRepairs
Final Combo
Final Combo
Final Electrical
Final Electrical
Final Electrical
Interior Lath/Drywall
Exterior LathIDrywall
GasTTest/Repairs
DrywalllExt Lath/Gas Test
Interior LathIDrywall
Insulation
Insulation
Frame/Steel/BoltingNVeldin
Roug hnopout
Rough Electric
Roug h/Ducts/Dampers
Roof SheathingIExt Shear
Roof SheathingIExt Shear
Roof SheathinglExt Shear
FtglFoundationlPiers
UndergroundIUnder Floor
SewerNVater Service
UndergroundIUnder Floor
SewerNVater Service
RB
RB
RB
RB
RB
RB
PS
PS
PS
PY
NF
PY
PY
PY
PY
PY
PY
NF
NF
RB
RCB
NF
NF
RCB
RCB
AP
RI
AP
RI
co
AP
co
co
AP
AP
NR
NR
PA
AP
NS
AP
AP
AP
AP
co
NR
wc
AP
AP
AP
NR
NR
MAGNOLIA GARDENS - PHASE 2
PLAN 1 - SFD 2660 SF, GAR 670 SF
Comments
ON 5/31/02
EMR
AGAl N
SCRAP OUT
GAR 1ST LAYER
NO TIME
NEED ROOF AND SHEAR PER NICK
WRONG LOT
OK TO POUR - SOILS REPORT FILED
RAIN WIWATER IN FTGS
Wednesday, July 31,2002 Page 1 of 1