HomeMy WebLinkAbout1650 CHESTNUT AVE; ; CB153797; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
12-14-2015 Residential Permit Permit No: CB153797
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
1650 CHESTNUT AV CBAD
RESDNTL Sub Type: RAD
Lot#: 0
Constuction Type: 58
Reference #:
Status: ISSUED
Applied: 11/04/2015
Entered By: RMA
Parcel No:
Valuation:
2051302500
$28,525.00
Occupancy Group:
# Dwelling Units: 0
0
Structure Type:
Plan Approved: 12/14/2015
Issued: 12/14/2015
Bedrooms: Bathrooms: 0
Orig PC#:
Inspect Area:
Plan Check #:
Project Title: STONER RES-ADD 171 SF MASTER
BATHROOM & WALK-IN CLOSET@ 1ST FLOOR
Applicant:
STONER GENE
300 CARLSBAD VILLAGE DR #1 08A
CARLSBAD CA 92008
858 342-7733
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
HMP Fee
Pot. Water Con. Fee
Meter Size
Add'l Pot. Water Con. Fee
Reel. Water Con. Fee
Green Bldg Stands (SB1473) Fee
Green Bldg Stands Plan Chk Fee
$272.09
$0.00
$190.46
$0.00
$0.00
$3.71
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$2.00
$0.00
Total Fees: $639.32 Total Payments to Date:
Inspector:~ Date:
Owner:
STONER GENE
300 CARLSBAD VILLAGE DR #1 08A
CARLSBAD CA 92008
Meter Size
Add'l Reel. Water Con. Fee
Meter Fee
SDCWA Fee
CFD Payoff Fee
PFF (3105540)
PFF {4305540)
License Tax (31 04193)
License Tax (4304193)
Traffic Impact Fee (31 05541)
Traffic Impact Fee (4305541)
Sidewalk Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing lnlieu Fee
Housing Credit Fee
Master Drainage Fee
Sewer Fee
Additional Fees
Fire Sprinkler Fees
TOTAL PERMIT FEES
$639.32 Balance Due:
Clearance:
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$83.00
$46.00
$42.06
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$639.32
$0.00
NOTlCE: Please take NOTlCE that approval of your project includes the "lrrposition' of fees, dedications, reservations, or other exactions hereafter rollectively
referred to as "fees! exactions." You have 90 days from the date this pemit was issued to protest irrposition of these fees! exactions. If you protest them, you rrust
foil em the protest procedures set forth in G:lvemrrent Ccx:le Section 66020(a), and file the protest and any other required information wth the Oty IIAanager for
processirg in aa;ordancewth Carlsbad Munidpal Ccx:le Section 3.32.030. Failure to tirrelyfoiiCJINthat procedure 'hill bar any sul:sequent legal action to attack,
review, set aside, void, or annul their irrposition.
You are hereby FURTl-ffi NOTlRED that your right to protest the spedfied fees! exactions OOES NOT APPLY to water and 'SeN3r oonnection fees and capacity
changes, nor plannirg, zonirg, gradirg or other sirrilar application processing or service fees in oonnection wth this project. NOR OOES IT APPLY to any
fees! exactions of 'hhich have reviousl been iven a NOTlCE sirrilar to this or as to ich the stat e of I irritations has reviousl other'Aise e ·red.
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
12-14-2015
Storm Water Pollution Prevention Plan (SWPPP) Permit
Permit No:SW150435
Job Address:
Permit Type:
1650 CHESTNUT AV CBAD
SWPPP Status:
Parcel No: 2051302500 Lot#: 0 Applied:
Reference #:
CB#: CB153797
Project Title: STONER RES-BATH ADDITION
Applicant:
STONER GENE
300 CARLSBAD VILLAGE DR #1 08A
CARLSBAD CA 92008
760 221-9803
Emergency Contact:
BOB RUSHOK
619 550-7676
SWPPP Plan Check
SWPPP Inspections
Additional Fees
TOTAL PERMIT FEES
Entered By:
Issued:
Inspect Area:
Tier:
Priority:
Owner:
STONER GENE
300 CARLSBAD VILLAGE DR #1 08A
CARLSBAD CA 92008
ISSUED
11/04/2015
RMA
12/14/2015
1
M
$54.00
$228.00
$0.00
$282.00
Total Fees: $282.00 Total Payments To Date: $282.00 Balance Due:
.l
$0.00
(cicyof
Carlsbad
Building Permit Application
1635 Faraday Ave., Carlsbad, CA 92008
Ph: 760-602-2719 Fax: 760-602-8558
email: building@carlsbadca.gov
www.carlsbadca.gov
SUITE#/SPACE#/UNIT#
#BEDROOMS #BATHROOMS
Plan Check No.
Est. Value
OCC.GROUP
EXISTING USE I PROPOSED USE 'GARAGE (SF) PATIOS (SF) I DECKS (SF) ,.FIREPlACE ,,AIR CONDITIONING II FIRE SPRINKLERS
YESO N<Q YEsONoO YEsDNC
APPUCANT NAME r· -~+01>-i("~ PROPERTY OWNS: NAME
Prtnarv Contact 1' e t-..lt> -P., -A-..,...,_ r:;
ADDRE~1 ~,l A .. .1ew0e
ADDRESS T "J so . -e<4 ~. . .. + Cit Ae.lsL,,c..J ~T}t ZIP CITY STATE ZIP
(i J. 00 S>
PHO~ . 5 <6 3"12-1135 FAX PHONE I FAX
EMAIL 9e"-'e ~ s J\ (k.edv EMAIL
OESIGNPROFESSIONAJ.. (' !).Q. O \l"ff('_ S CurJ.Si\CuC1\ 1 orJ CONTRACTOR BUS. NAME
ADDRESS ADDRESS
CITY STATE ZIP CITY STATE ZIP
PHONE =l b 0., J ~ 1-9 £> 0 ~ FAX PHONE I FAX
EMAIL & b lJ\@ .\)f(. E'S'· Cit-J ..;'. / ' 'I A-~\(,}0, c 0·"'1
EMAIL
I , I~TAJC#§ STATEUC.# rLASS riTY BUS. UC.# s· 4 "~J
(Sec. 7031.5 Bus1ness and Professions Code: Any Ci\Y or Counl;y which reqmres a perm1t to construct. alter, Improve, demolish or repa1r any structure. pnor to its Issuance. also requ1res the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contracto(s License Law !Chapter 9. commending with Section 7000 of Division 3 of the Business and Professions Code) or That he is exempt therefrom. and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penal\)' of not more than five hundred dollars {$500}).
Workers' Compensation Declaration: I hemby affinn under penalty of pe!jwy one of the following declamtions:
81 have and will maintain a certificate of consent to self-Insure for workers' compensation as provided by Section 3700 of the Labor Code, for the pelformance of the work for which this pennn is issued.
I have and will maintain workers' compensation, as required by Section 3700 of the labor Code, for the perfonnance of the work for which this permit is issued. My workers' compensation insurance carrier and policy
number are: Insurance Co. Policy No. Expiration Date---------
Jllii.section need not be completed if the pennit is for one hundred dollars ($100) or less. U Certificate of Exemption: I cerlify that in the petfoonance of the work for which this pennit is issued, I sl!all not Employ any person in any manner so as to become subject to the Workers' Compensation Laws of
California. WARNING: Failure to secure workers' compemllltion coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), In
addition to the cost of compensation, damages as provided for in Section 3706 of the Labor code, interest and attorney's fees.
85 CONTRACTOR SIGNATURE
I hereby afflnn that I am exempt from Contractor's License Law for the fOllowing reason: 0 I, as owner of the property or my employees Will wages as their sole compensmon, will do the work and the s!rucl!lre is not intended or offen!d for sale (Sec. 7044, Business and Professions Code: The Contractor's
l.icense taw does not apply to an owner of property V<4lo buids or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for
sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the bunlen of proving that he did not btikl or improve for the purpose of sale). 0 I, as owner of the property, am exclusively contracting Will ficensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's Ucense Law does not apply to an owner of
property who builds or improves thereon, and conlrects for such projects with contractor(s) licensed pursuant to the Contractor's License Law).
III I am exempt under Section_ Business and Professions Code for this reason:
1. I personally plan to provide the major labor and materials for construction of the proposed properly improvement [Jv es Qo
2. I~/ have not) signed an application for a building pannn for the proposed work.
3. I have contracted with the following person (finn) to provide the proposed cons!ruction Qnclude name address I phone I contractors' license number):
(D plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major worl< Onclude name I address I phone I contractors' license number):
5.1 will provide some of the worl<, but I have contracted (hired) thefollo\loing persons to providetheworl< indicated Onclude name/ eddress/phone/typeofworl<}: ::J.' Q Cj 0 3 ~-q q [ )_
Is the applicant or future building occupant required to submit a business plan, acutely hazallous mal!l!ids ~on form or risk management and prevention progrem under Sections 25505, 25533 or 25534 of the
Presley-Tanner Hazardous Substance Account Act? 0 Yes 0 No
Is the applicant or future building occupant required to obt!in a permit from the ar pollution control district or ar quality management district? 0 Yes 0 No
Is the facility to be constructed within 1,000 feet of the outerboundaly of a school site? 0 Yes 0 No
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFRCE OF
EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
I hereby affirm !hat lhere is a construction lending agency for lhe performance of the work this pennit is issued (Sec. 3097 (i) Civil Code).
Lender's Name Lender's Address
I certifylflat I have read the application and stale lflatlfle above infonnation is ooneaand lflat the infonnation on lfle plans is accurate. I agmeto oomplywilfl all City ordinances and State laws relating to building oonstruction.
I hereby aulhorize represenfative of the City of Carlsbad to enter upon the above mentioned properly for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD
AGAINST ALL LIABILITIES. JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANYWAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT.
OSHA: An OSHA permit is requred for excavations over 5'0' deep and demolition or construction of slructures over 3 slories in height.
EXPIRATION: Every permit issued by the Building Official under the provisions of this Code shan expi"e by linitation and beoome nun and void if the building or wort< authorized by such permit is not oommenced within
180 days fi"om the date of such permit If e building or rk authorized by permit is suspended or abandoned at any time after the wort< is oommenced for a period of 180 days (Section 106.4.4 Uniform Building Code).
AS' APPLICANT'S SIGNATURE DATE 0 I \
I pecti n Li
Permit#: CB153797 Type: RESDNTL RAD
Date --·----··----Inspection Item Inspector
07/06/2016 89 Final Combo
07/06/2016 89 Final Combo AEK
07/01/2016 89 Final Combo
07/01/2016 89 Final Combo AEK
03/25/2016 17 Interior Lath/Drywall AEK
03/02/2016 24 Rough/Topout AEK
03/02/2016 34 Rough Electric AEK
01/26/2016 13 Shear Panels/HD's AEK
01/26/2016 14 F rame/Steei/Bolting/Weldin AEK
01/26/2016 15 Roof/Reroof AEK
01/15/2016 11 Ftg/Foundation/Piers AEK
01/15/2016 21 Underground/Under Floor AEK
01/15/2016 24 Rough/Topout AEK
Act
Rl
Fl
Rl
NR
AP
AP
AP
AP
AP
AP
AP
AP
AP
STONER RES-ADD 171 SF MASTER
BATHROOM & WALK-IN CLOSET@ 1ST F
Comments
AFTER 11 AM
AFTER 9:00 AM
NO ONE HOME
EsGil Corporation
In (}!artnersliip witli government for c.Bui{aing Safety
DATE: 11/13/15
JURISDICTION: Carlsbad
PLAN CHECK NO.: 15-3797
PROJECT ADDRESS: 1650 Chestnut Ave.
SET: I
PROJECT NAME: Bath Room Addition to Residence
C8J The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's
codes when minor deficiencies identified below are resolved and checked by building
department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
D The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
D The applicant's copy of the check list has been sent to:
cg] EsGil Corporation staff did not advise the applicant that the plan check has been completed.
D EsGil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: · r-/) Telephone #:
Date contacted: .c:..--(b~) Email:
Mail Telephone Fax In Person
D REMARKS:
By: Chuck Mendenhall
EsGil Corporation
0 GA 0 EJ 0 MB 0 PC
Enclosures:
11/5/15
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576
Carlsbad 15-3797
11/13/15
[DO NOT PAY-THIS IS NOT AN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad PLAN CHECK NO.: 15-3797
PREPARED BY: Chuck Mendenhall DATE: 11/13/15
BUILDING ADDRESS: 1650 Chestnut Ave.
BUILDING OCCUPANCY: R3
BUILDING
PORTION
Add'n
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code cb
Bldg. Permit Fee by Ordinance
Plan Check Fee by Ordinance
Type of Review:
0Repetitive Fee
.,... Repeats
AREA Valuation
(Sq. Ft.) Multiplier
171 City Est
By Ordinance
Complete Review
D Other
0 Hourly
EsGil Fee
Reg. VALUE
Mod.
D Structural Only
1------11 Hr @ •
($)
28,525
$272.091
$176.861
$152.371
Comments: N/A In addition to the above fee, an additional fee.of $ is due ( hour@
$ /hr.) for the CaiGreen review.
Sheet 1 of 1
macvalue.doc +
PLAN CHECK
REVIEW
TRANSMITTAL
DATE: PROJECT NAME:
PLAN CHECK NO: 1 SET#: ADDRESS:
VALUATION: SCOPE OF WORK: MASTER
Community & Economic
Development Department
1635 Faraday Avenue
Carlsbad CA 92008
www.carlsbadca.gov
PROJECT ID:CB153797
APN:
WAlK IN
. ~·l~·~~ '1\74 This plan che. ck. review is.com.plet .. e.and has been APP.ROVED by: f .· LAND ~EVE~Q,PMENT ENGINEERING DIVISION .
Final Inspection by Construction Management & Inspection Division is required: Yes No
f9t7. This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
~the attached checklist. Please resubmit amended plans as required.
Plan Check Comments have been sent to:
Remarks:
Chris Glassen
760-602-2784
Chri~topher.Giassen@carlsbadca.gov
Linda Ontiveros
760-602-2773
VaiRay Nelson
760-602-27 41
VaiRay.Marshall@carlsbadca.gov
·'' .•'
1. SITE PLAN
Provide a fully dimensioned site plan drawn to scale. Show:
· North arrow
Existing & proposed structures
Existing street improvements
Property lines (show all dimensions)
:Easements
Right-of-way width & adjacent streets
Show on site plan:
CHECK NO#
Driveway widths
Existing or proposed sewer lateral
Existing or proposed water service
Submit on signed approved plans:
DWG No.
Drainage patterns and proposed site elevations. Show all high points.
Building pad surface drainage must maintain a minimum slope of one percent towards an adjoining
street or an approved drainage course.
·ADD THE FOLLOWING NOTE: "Finish grade will provide a minimum positive drainage of 2% to swale
5' away from building".
Existing & proposed slopes and topography
Size, location, alignment of existing or proposed sewer and water service(s) that serves the project.
Each unit requires a separate service; however, second dwelling units and apartment complexes are an
exception.
Sewer and water laterals should not be located within proposed driveways, per standards.
Include on title sheet:
Site address
: Assessor's parcel number
Legal description/lot number
For commercial/industrial buildings and tenant improvement projects, include: total building
square footage with the square footage for each different use, existing sewer permits
showing square footage of different uses (manufacturing, warehouse, office, etc.) previously
approved.
Show all existing use of SF and new proposed use of SF.
Example:
Tenant improvement for 3500 SF of warehouse to 3500 SF of office.
Lot/Map No.: MAP 1681 TCT 244
Subdivision/Tract: OLD CARLSBAD PART OF THUMLANDS
Reference No(s):
E-36 Page 2 of 6 REV6/D1/12
E-36
PlAN CHECK NO# 1
2. DISCRETIONARY APPROVAL COMPLIANCE
Project does not comply with the following engineering conditions of approval for project no.:
3. DEDICATION REQUIREMENTS
Dedication for all street rights-of-way adjacent to the building site and any storm drain or
utility easements on the building site is required for all new buildings and for remodels with a
value at or exceeding$ 24 000 00 , pursuant to Carlsbad Municipal Code Section 18.40.030.
Dedication required as follows:
4. IMPROVEMENT REQUIREMENTS
All needed public improvements upon and adjacent to the building site must be constructed
at time of building construction whenever the value of the construction exceeds
$120,000.00, pursuant to Carlsbad Municipal Code Section 18.40.040.
, Public improvements required as follows:
Construction of the public improvements must be deferred pursuant to Carlsbad
Municipal Code Section 18.40. Please submit a recent property title report or current grant
deed on the property and processing fee, so we may prepare the necessary Neighborhood
Improvement Agreement. This agreement must be signed, notarized and
approved by the city prior to issuance of a building permit.
. Future public improvements required as follows:
Page 3 of 6 REV 6/01/12
RESIDENCE PlAN CHECK NO# 1
E-36
5. GRADING PERMIT REQUIREMENTS
The conditions that require a grading permit are found in Section 15.16 of the Municipal
Code.
Inadequate information available on site plan to make a determination on grading
requirements. Include accurate grading quantities in cubic yards (cut, fill, import, export and
remedial). This information must be included on the plans. If no grading is proposed
write: "NO GRADING"
.. Grading Permit required. NOTE: The grading permit must be issued and rough grading
approval obtained prior to issuance of a building permit.
Graded Pad Certification required. (Note: Pad certification may be required even if a grading
permit is not required.) All required documentation must be provided to your Engineering
Construction Inspector The inspector will then
provide the engineering counter with a release for the building permit.
No grading permit required.
· Minor Grading Permit required. See additional comments for project-specific requirements.
6. MISCELLANEOUS PERMITS
:RIGHT-OF-WAY PERMIT is required to do work in city right-of-way and/or private work
adjacent to the public right-of-way. Types of work include, but are not limited to: street
improvements, tree trimming, driveway construction, tying into public storm drain, sewer and
water utilities.
Right-of-way permit required for:
Page 4 of 6 REV6/01/12
E-36
PlAN CHECK NO#
7. STORM WATER
Construction Compliance
L Zoject Threat Assessment Form complete.
Enclosed Project Threat Assessment Form incomplete.
·~quires Tier 1 Storm Water Pollution Prevention Plan (E-29). Please complete attached forrr
and return )
Requires Tier 2 Storm Water Pollution Prevention Plan. Requires submittal of Tier 2
SWPPP, payment of processing fee and review by city.
Post-Development (SUSMP) Compliance
~m Water Standards Questionnaire.
· Project is subject to Standard Storm Water Requirements. See city Standard Urban
Storm Water Management Plan (SUSMP) for reference.
Indicate areas of impervious surfaces (patios, walkway, etc. ) and pervious areas (landscaping).
· Project needs to incorporate low impact development strategies throughout in one or
more of the following ways:
Rainwater harvesting (rain barrels or cistern)
Vegetated Roof
Bio-retentions cell/rain garden
Pervious pavement/pavers
• Flow-through planter/vegetated or rock drip line
Vegetated swales or rock infiltration swales
· Downspouts disconnect and discharge over landscape
Other:
Page 5 of 6 REV 6/01112
' STONER
Attachments:
E-36
PlAN CHECK NO# 1
8. WATER METER REVIEW
9. FEES
Domestic (potable) Use
What size meter is required?
Where a residential unit is required to have an automatic fire
extinguishing system, the minimum meter size shall be a 1" meter.
NOTE: the connection fee, SDCWA system capacity charge and the
water treatment capacity charge will be based on the size of the meter
necessary to meet the water use requirements.
For residential units the minimum size meter shall be 5/8", except where
the residential unit is larger than 3,500 square feet or on a lot larger than
one quarter (1/4) acre where the meter size shall be%".
Required fees have been entered in building permit.
Drainage fee applicable
Added square feet
Added square footage in last two years?
Permit No.
Permit No.
Project built after 1980
Impervious surface> 50%
Impact unconstructed facility
yes
yes
,yes
yes
no
no
no
Fire sprinklers required ~~Jyes no (is addition over 150' from center line)
Upgrade yes !no
No fees required
10. ADDITIONAL COMMENTS
Engineering Application Storm Water Form Right-of-Way Application/ Info. Reference Documents
Page 6 of 6 REV 6/01/12
CITY OF
CARLSBAD
STORM WATER
COMPLIANCE
ASSESSMENT
e .. 24
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
I am applying to the City of Carlsbad for the following type(s) of construction permit:
D Building Permit D Right-of-Way Permit
CJ My project is categorically EXEMPT from
the requirement to prepare a storm water
pollution prevention plan (SWPPP} because it
only requires issuance of one or more of the
following permit types:
Patio/Deck
Photo Voltaic
Re-Roofing
Sign
Spa-Factory
Sprinkler
Electrical
Fire Additional
RreAiarm
Fixed Systems
Mechanical
Mobile Home
Plumbing Water Discharge
Project Storm Water Threat Assessment Criteria*
No Threat Assessment Criteria
1:1 My project qualifies as NO THREAT and is exempt from the requirement to prepare a storm water pollution prevention plan (SWPPP) because
it meets the "no threaf' assessment criteria on the City's Project Threat Assessment Worksheet for Determination of Construction SWPPP Tier
Level. My project does not meet any of the High, Moderate or Low Threat criteria described below.
Tier 1 -Low Threat Assessment Criteria
"'ji My project does not meet any of the Significant or Moderate Threat criteria, is not an exempt permit type (See list above) and the project
meets one or more of the following criteria:
• Results in some soil disturbance; and/or
• Includes outdoor construction activities (such as saw cutting, equipment washing, material stockpiling, vehicle fueling, waste stockpiling}.
Tier 2 -Moderate Threat Assessment Criteria
1:1 My project does not meet any of the Significant Threat assessment Criteria described below and meets one or more of the following criteria:
• Project requires a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code); or,
• Project will result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement
removal, equipment storage, refueling and maintenance areas and project meets one or more of the additional following criteria:
• Located within 200 feet of an environmentally sensitive area or the Pacific Ocean, and/or
• Disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical, and/or
• Disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse, and/or
• Construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 3D).
Tier 3 -Significant Threat Assessment Criteria
1:1 My project includes clearing, grading or other disturbances to the ground resulting in soil disturbance totaling one or more acres including any
associated construction staging, equipment storage, stockpiling, pavement removal, refueling and maintenance areas: and/or
1:1 My project is part of a phased development plan that will cumulatively result in soil disturbance totaling one or more acres including any
associated construction staging, equipment storage, refueling and maintenance areas: or,
1:1 My project is located inside or within 200 feet of an environmentally sensitive area (see City ESA Proximity map) and has a significant
potential for contributing pollutants to nearby receiving waters by way of storm water runoff or non-storm water discharge(s}.
I certify to the best of my knowledge that the above
checked statements are true and correct. I understand
and acknowledge that even though this project does
not require preparation of a construction SWPP, I must
still adhere to, and at all times during construction
activities for the permit type(s) check above comply
with the storm water best management practices
pursuant to Title 15 of the Carlsbad Municipal Code
and to Citv Standards.
Project Address: Assessor Parcel No.
/{? r.J C/1.JIA/;;tJr Ct~I2L5idi-JP
*The City Engineer may authorize minor variances from the Storm
Water Threat Assessment Criteria in special circumstances where it
can be shown that a lesser or higher Construction SWPPP Tier Level is
warranted.
B-24 Page 1 of 1
Date:
U · I'Z.. · I
Rev.03/09
~ <;~~·~'> ~ CITY OF
CARLSBAD
STORM WATER
STANDARDS
QUESTIONNAIRE
E-34
Development Service§
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www .carlsbadca.gov
Complete the Questions below regarding your redevelopment project: YES NO
Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than I I
50% of the surface area of the previously existing development?
If you answered "yes," the structural BMP's required for Priority Development Projects apply only to the creation or replacement of
impervious surface and not the entire development. Go to step 4, check the "my project meets PDP requirements" box and
complete applicant information.
If you answered "no," the structural BMP's required for Priority Development Projects apply to the entire development. Go to step 4,
check the "my project meets PDP requirements" box and complete applicant information.
My project meets PRIORITY DEVELOPMENT PROJECT (PDP) requirements and must comply with additional stormwater
criteria per the SUSMP and I understand I must prepare a Storm Water Management Plan for submittal at time of application.
I understand flow control (hydromodification) requirements may apply to my project. Refer to SUSMP for details.
My project does not meet PDP requirements and must only comply with STANDARD STORMWATER REQUIREMENTS per
the SUSMP. As part of these requirements, I will incorporate low impact development strategies throughout my project.
Applicant Information and Signature Box
Address: Accessor's Parcel Number(s):
Applicant Signatu
This Box for City Use Only
City Concurrence: NO
By:
Date:
*Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas
designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the
San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources
Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their
quivalent under the Multi Species Conservation Program within the Cities and County of San Diego; and any other equivalent
environmentally sensitive areas which have been identified by the Copermittees.
E-34 Page 3 of3 Effective 6/27/13
STORM WATER
STANDARDS
QUESTIONNAIRE
E-34
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
To address post-development pollutants that may be generated from development projects, the City requires that new development and
significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMP's) into the project
design per the City's Standard Urban Stormwater Management Plan (SUSMP). To view the SUSMP, refer to the Engineering Standards
(Volume 4, Chapter 2) at www.carlsbadca.gov/standards.
Initially this questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision,
discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that
must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to
'Standard Stormwater Requirements' or be subject to additional criteria called 'Priority Development Project Requirements'. Many
aspects of project site design are dependent upon the storm water standards applied to a project.
Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has
responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire
was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return
of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the City.
If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please
seek assistance from Land Development Engineering staff.
A separate completed and signed questionnaire must be submitted for each new development application submission. Only one
completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently.
In addition to this questionnaire, you must also complete, sign and submit a Project Threat Assessment Form with construction permits
for the project.
Please start by completing Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your
application to the city.
··· .... •·.· .. · .• c : S"l;f:Pti .. : \< •. ··. ··To·aECOW!PL.f;TEPFQR.ALL~ECIS·.··
1. Is your project LIMITED TO constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet
the following criteria: (1) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or
other non-erodible permeable areas; OR (2) designed and constructed to be hydraulically disconnected from
paved streets or roads; OR (3) designed and constructed with permeable pavements or surfaces in
accordance with USEPA Green Streets uidance?
2. Is your project LIMITED TO retrofitting or redeveloping existing paved alleys, streets, or roads that are
designed and constructed in accordance with the USEPA Green Streets guidance?
YES NO
J
If you answered "yes" to one or more of the above questions, then your project is NOT a priority development project and therefore is
NOT subject to the storm water criteria required for priority development projects. Go to step 4, mark the last box stating "my
project does not meet PDP requirements" and complete applicant information.
If you answered "no" to both questions, then go to Step 2.
E-34 Page 1 of3 Effective 6/27/13
CITY OF
CARLSBAD
STORM WATER
STANDARDS
QUESTIONNAIRE
E-34
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www .carlsbadca.gov
To determine if your project is a priority development project, please answer the following questions:
1. Is your project a new development that creates 10,000 square feet or more of impervious surfaces collectively
over the entire project site? This includes commercial, industrial, residential, mixed-use, and public
develooment oroiects on public or private land.
2. Is your project creating or replacing 5,000 square feet or more of impervious surface collectively over the entire
project site on an existing site of 10,000 square feet or more of impervious surface? This includes commercial,
industrial, residential mixed-use, and public develop_tnent oroiects on public or private land.
3. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface
collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared
foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared
foods and drinks for immediate consumption.
4. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface
collectively over the entire project site and supports a hillside development project? A hillside development
project includes development on any natural slope that is twenty-five percent or greater.
5. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface
collectively over the entire project site and supports a parking lot. A parking lot is a land area or facility for the
temporary parking or storage of motor vehicles used personally for business or for commerce.
6. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface
collectively over the entire project site and supports a street, road, highway freeway or driveway? A street,
road, highway, freeway or driveway is any paved impervious surface used for the transportation of
automobiles, trucks motorcvcles, and other vehicles.
7. Is your project a new or redevelopment project that creates or replaces 2,500 square feet or more of
impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive
Area (ESA)? "Discharging Directly to" includes flow that is conveyed overland a distance of 200 feet or less
from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the
project to the ESA (i.e. not commingles with flows from adjacent lands).*
8. Is your project a new development that supports an automotive repair shop? An automotive repair shop is a
facility that is categorized in any one of the following Standard Industrial Classification (SIC) codes: 5013,
5014, 5541, 7532-7534, or 7536-7539.
9. Is your project a new development that supports a retail gasoline outlet (RGO)? This category includes RGO's
that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic (ADT) of
100 or more vehicles per day.
1 O.ls your project a new or redevelopment project that results in the disturbance of one or more acres of land and
are expected to generate pollutants post construction?
11.1s your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of
impervious surface or (2) increases impervious surface on the property by more than 10%?
YES NO
/
/
/
/
If you answered "yes" to one or more of the above questions, you ARE a priority development project and are therefore subject to
implementing structural Best Management Practices (BMP's) in addition to implementing Standard Storm Water Requirements such
as source control and low impact development BMP's. A Storm Water Management Plan (SWMP) must be submitted with your
application(s) for development. Go to step 3 for redevelopment projects. For new projects, go to step 4 at the end of this
questionnaire, check the "my project meets PDP requirements" box and complete applicant information.
If you answered "no" to all of the above questions, you ARE NOT a priority development project and are therefore subject to
implementing only Standard Storm Water Requirements such as source control and low impact development BMP's required for all
development projects. A Storm Water Management Plan (SWMP) is not required with your application(s) for development. Go to step
4 at the end of this questionnaire, check the "my project does not meet PDP requirements" box and complete applicant
information.
E-34 Page 2 of3 Effective 6/27/13
~ ,,,;;r~~
~· CITY OF
CARLSBAD
STORM WATER COMPLIANCE FORM
TIER 1 CONSTRUCTION SWPPP
E-29
STORM WATER COMPLIANCE CERTIFICATE
../ My project is not in a category of permit types exempt from the Construction
SWPPP requirements
../ My project is not located inside or within 200 feet of an environmentally
sensitive area with a significant potential for contributing pollutants to nearby
receiving waters by way of storm water runoff or non-storm water
discharge(s).
../ My project does not require a grading plan pursuant to the Carlsbad
Grading Ordinance (Chapter 15.16 ofthe Carlsbad Municipal Code)
../ My project will not result in 2,500 square feet or more of soils disturbance
including any associated construction staging, stockpiling, pavement
removal, equipment storage, refueling and maintenance areas that meets
one or more of the additional following criteria:
• located within 200 feet of an environmentally sensitive area or the
Pacific Ocean; and/or,
• disturbed area is located on a slope with a grade at or exceeding 5
horizontal to 1 vertical; and/or
• disturbed area is located along or within 30 feet of a storm drain inlet, an
open drainage channel or watercourse; and/or
• construction will be initiated during the rainy season or will extend into
the rainy season (Oct. 1 through April 30).
I CERTIFY TO THE BEST OF MY KNOWLEDGE THAT ALL OF THE ABOVE
CHECKED STATEMENTS ARE TRUE AND CORRECT. I AM SUBMITTING
FOR CITY APPROVAL A TIER 1 CONSTRUCTION SWPPP PREPARED IN
ACCORDANCE WITH THE REQUIREMENTS OF CITY STANDARDS.
I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT BEST
MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION ACTIVITIES
TO THE MAXIMUM EXTENT PRACTICABLE TO MINIMIZE THE
MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO MINIMIZE
THE EXPOSURE OF STORM WATER TO CONSTRUCTION RELATED
POLLUTANTS; AND, (2) ADHERE TO, AND AT ALL TIMES, COMPLY WITH
THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP THROUGHOUT THE
DURATION OF THE CONSTRUCTION ACTIVITIES UNTIL THE
CONSTRUCTION WORK IS COMPLETE AND APPROVED BY THE CITY OF
CARLSBAD.
OWNER(S)/OWNER'S AGENT NAME (PRINT)
OWNER(S)/OWNER'S AGENT NAME (SIGNATURE) DATE
1=-?Cl
STORM WATER POLLUTION PREVENTION NOTES
1. ALL NECESSARY EQUIPMENT AND MATERIALS
SHALL BE AVAILABLE ON SITE TO FACILITATE
RAPID INSTALLATION OF EROSION AND
SEDIMENT CONTROL BMPS WHEN RAIN IS
EMINENT.
2. THE OWNER/CONTRACTOR SHALL RESTORE
ALL EROSION CONTROL DEVICES TO
WORKING ORDER TO THE SATISFACTION OF
THE CITY ENGINEER AFTER EACH RUN-OFF
PRODUCING RAINFALL.
3. THE OWNER/CONTRACTOR SHALL INSTALL
ADDITIONAL EROSION CONTROL MEASURES
AS MAY BE REQUIRED BY THE CITY
ENGINEERING OR BUILDING INSPECTOR DUE
TO UNCOMPLETED GRADING OPERATIONS OR
UNFORESEEN CIRCUMSTANCES WHICH MAY
ARISE.
4. ALL REMOVABLE PROTECTIVE DEVICES SHALL
BE IN PLACE AT THE END OF EACH WORKING
DAY WHEN THE FIVE (5) DAY RAIN
PROBABILITY FORECAST EXCEEDS FORTY
PERCENT (40%). SILT AND OTHER DEBRIS
SHALL BE REMOVED AFTER EACH RAINFALL.
5. ALL GRAVEL BAGS SHALL BE BURLAP TYPE
WITH 3/41NCH MINIMUM AGGREGATE.
6. ADEQUATE EROSION AND SEDIMENT
CONTROL AND PERIMETER PROTECTION BEST
MANAGEMENT PRACTICE MEASURES MUST BE
INSTALLED AND MAINTAINED.
SPECIAL NOTES
PJ:~n.:> 1 nf ':!.
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca .gov
PROJECT INFORMATION
SiteAddress: /650 {/-/!fT1.~/i.J1
Assessor's Parcel Number:--------
Project ID: -------------
Construction Permit No.:--------
Estimated Construction Start Date II -2.'5" -/5"'
Project Duration '-/ Months
Emergency Contact:
Name: J3o /3 !( U 5 il 0 /(
24 hour Phone: 6/9 ~)0 J 6 7 6
Perceived Threat to Storm Water Quality
0 Medium
~ow
If mediU'm box is checked, must attach a site plan
sheet showing proposed work area and location
of proposed structural BMPs
For City Use Only
Approved By: 'o'" 1,.,. ~" 1 rA, r 'v=
Date: , • 1 -1 v
~I=\/ 41~0/1 n
Erosion Control Tracking Non-Storm Water Waste Management and Materials
BMPs Sediment Control BMPs Control Management BMPs Pollution Control BMPs BMPs
c: c: c: -1: 0 c:
"'0 0 .5! ~ Q) "'0 Q) c: ~ ts c: Ol E c: E "'0 t/1 ~ 1;j (0 s s 0 Ol c. m Q) c: Q) E :g .E (0
:1E "'0 8"l Ol ~ Qi c: ·:s '=' Ol 1ii Q) Ol .... c: t/1 t/1 ~ :;::: m c: c:-c. Q) E 2: ·;:: 0" Q) ~ 1ii Best Management Practice c: m ~ ·a "E c: t/1 w .::: c: 0 o!S :s t/1 ~ Dl 0 Q) 8 Q) (.') ! Q) m ""' ~5 (BMP) Description -+ c: E Q) Ol m c: ()o.. t/1 "'0 Qi c: fjl t/1 ~~ 1-Ol Dl l~ t/1 :1E Q) "5 ·e t/1 ~-= "(ij c: "'OOl c: c: 0 ::> Q) t/1 Ci) -m '§ (0 "'0:-, 8~ ~ g Ci) > :::1 Ci) E ~ (.) c: 0 Dl Ol .... 0 G>!:!:! ~ :1E 0 enE 0·-Ci) (0 )J (ij '5. i~ 0 -a 0~ c: Q) 0:: (0 E~ N til ~~ ~~ Ci) "'0 ~ t ~ "'0 Ci) Ci) E .><: Qi Qi :::1 .Q :=t/1 ~~ ::0 -.:n:: ·;:: -" .... "€ .5 u. 0 .... > "'0 ·-Q) ·-"'0 ~ :s! (0 0 ~ 0 c. '5 Q) Q) :::1
,__
.Q .... .em ~ ·-ro 0 c: t ~ ro ~ 0 -Ci) .Q ~ ~~ c: .ae tOO) ci5& -ro .CO>
c75 0 N Ci) (i) Ci) .1: ro ~a: ~0 ro 0 ~ (.') wo (i) en (.) u:: (.') en> en en c.. Ci5.E c.. :1E en. :I: o:
CASQA Designation -+ ...... co til ..... ..... :z "i :z ~ ~ co 0 ..... N ..... "' ...... co i N i .... It) (!) co <.) <.) <.) ..... w w ..... a:. a:. I ch ch I t :: I I ~ I w w w w en en ~ ~ :1E w w w (.) en en en en en en en 1-1-z z z z s: s: Construction Activity w en
Grading/Soil Disturbance #A-X
Trenching/Excavation u .><
StockpHing h X
Drilling/Boring
Concrete/Asphalt Saw
cutting
Concrete flatwork
Paving
Conduit/Pipe Installation
Stucco/Mortar Work
Waste Disposal
Staging/Lay Down Area
Equipment Maintenance
and Fueling
Hazardous Substance
Use/Storage
Dewatering
Site Access Across Dirt
_ Q_ther (list): ---, ____ -
Instructions: Begin by reviewing the list of construction activities and checking the box to the left of any activity that will occur during the proposed construction. Add any other activity descriptions in the
blank activity description boxes provided for that purpose and place a check in the box immediately to the left of the added activity description. For each activity descrribed, pick one or more best
management practices (BMPs) from the list located along the top of the form. Then place an X in the box at the place where the activity row intersects with the BMP column. Do this for each activity that wa
checked off and for each of the selected BMPs selected from the list. For Example-If the project includes site access across dirt, then check the box to the left of "Site Access Across Dirt". Then review
the list for something that applies such as "Stabilized Construction Ingress/Egress" under Tracking Control. Follow along the "Site Access Across Dirt" row until you get to the "Stabilized Construction
Ingress/Egress" column and place an X in the box where the two meet. As another example say the project included a stockpile that you intend to cover with a plastic sheet. Since plastic sheeting is not or
the list of BMPs, then write in "Cover with Plastic" in the blank column under the heading Erosion Control BMPs. Then place an X in the box where the "Stockpiling" row intersects the new "Cover with
Plastic" column.
To learn more about what each BMP description means, you may wish to review the BMP Reference Handout prepared to assist applicants in the selection of appropriate Best Management Practice
measures. The reference also explains the California Stormwater Quality Association (CASQA) designation and how to apply the various selected BMPs to a project.
fj
I=.?CI P:::on.:>? nf~ ~r=\t .t1~n11 n
DATE: 11-12-15
PLANNING DIVISION
BUILDING PLAN CHECK
REVIEW CHECKLIST
P-28
PROJECT NAME: PROJECT ID:
Planning Division
1635 Faraday Avenue
(760) 602-4610
www.carlsbadca.eov
PLAN CHECK NO: CB 15-3797 SET#: 1 ADDRESS: 1650 Chesnut Av APN: 205-130-25-00
D This plan check review is complete and has been APPROVED by the Planning
Division.
By: Chris Sexton
A Final Inspection by the Planning Division is required DYes !S] No
You may a/so have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the issuance of a building permit.
Resubmitted plans should include corrections from all divisions.
~ This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check Comments have been sent to: gene@salk.edu
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
760-602-4624
Chris.Sexton@carlsbadca.gov
0 Gina Ruiz
0
760-602-4675
Gina.Ruiz@carlsbadca.gov
Remarks:
REVIEW#:
1 2 3
[8]00
[8]00
r8JOO
[8]00
IZJOO
[8]00
P-28
Plan Check No. CB 15-3797 Address 1650 Chestnut Av Date 11-12-15 Review# 1
Planner Chris Sexton Phone (760) 602-4624
APN: 205-130-25-00
Type of Project & Use: addition Net Project Density:1.0 DU/AC
Zoning: R-1 General Plan: RLM Facilities Management Zone: 1
CFD (in/out) #_Date of participation: __ Remaining net dev acres: __
(For non-residential development: Type of land use created by this permit: __ )
Legend: [8J Item Complete
Environmental Review Required:
0 Item Incomplete -Needs your action
YES 0 NO 0 TYPE
DATE OF COMPLETION:
Compliance with conditions of approval? If not, state conditions which require action.
Conditions of Approval:
Discretionary Action Required: YES 0 NO 0 TYPE __
APPROVALIRESO. NO. DATE
PROJECT NO.
OTHER RELATED CASES:
Compliance with conditions or approval? If not, state conditions which require action.
Conditions of Approval: __
Coastal Zone Assessment/Compliance
Project site located in Coastal Zone? YES 0 NO 0
CA Coastal Commission Authority? YES 0 NO 0
If California Coastal Commission Authority: Contact them at -7575 Metropolitan Drive,
Suite 103, San Diego, CA 92108-4402; (619) 767-2370
Determine status (Coastal Permit Required or Exempt):
Habitat Management Plan
Data Entry Completed? YES 0 NO 0
If property has Habitat Type identified in Table 11 of HMP, complete HMP Permit application
and assess fees in Permits Plus
(A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, HMP Fees, Enter Acres of
Habitat Type impacted/taken, UPDATE!)
lnclusionary Housing Fee required: YES 0 NO 0
(Effective date of lnclusionary Housing Ordinance-May 21, 1993.)
Data Entry Completed? YES 0 NO 0
(A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, Housing Fees, Construct
Housing Y/N, Enter Fee, UPDATE!)
Housing Tracking Form (form P-20) completed: YES 0 NO 0 N/A 0
Page 2 of 3 07111
Site Plan:
lZIDD
lZIDD
lZIDD
lZIDD
DOD
DOD
lZIDD
000
DOD
Provide a fully dimensional site plan drawn to scale. Show: North arrow, property lines,
easements, existing and proposed structures, streets, existing street improvements, right-of-
way width, dimensional setbacks and existing topographical lines (including all side and rear
yard slopes). Provide legal description of property and assessor's parcel number.
City Council Policy 44 -Neighborhood Architectural Design Guidelines
1. Applicability: YES 0 NO 0
2. Project complies: YES 0 NOD
Zoning:
1. Setbacks:
Front:
Interior Side:
StreetS ide:
Rear:
Top of slope:
Required 20' Shown 20'
Required 6' Shown 6'
Required __ Shown __
Required 1£ Shown 1£
Required __ Shown __
2. Accessory structure setbacks: existing detached office needs 1 0' separation from sfr
Front: Required __ Shown __
Interior Side: Required __ Shown __
Street Side: Required __ Shown __
Rear: Required __ Shown __
Structure separation: Required N Shown __
3. Lot Coverage: Required <40% Shown __
4. Height: Required >30' with min. 3:12 roof pitch Shown >30'
5. Parking: Spaces Required ~ Shown ~
(breakdown by uses for commercial and industrial projects required)
Residential Guest Spaces Required __ Shown __
Additional Comments 1) The new master Bathroom addition needs to be 1 0 feet away from
the existing detached office. 2) Please show the correct lot coverage as in the R-1 zone the
lot coverage cannot exceed 40%. ·
OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER DATE
P-28 Page 3 of 3 07/11
CITY OF
CARLSBAD
PLUMBING,
ELECTRICAL,
MECHANICAL
WORKSHEET
8-18
Development Service~
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
Building@carlsbadca.gov
Project Address: Pennit No.: a jJ J7 7/
Information provided below refers to worl:l being done on the above mentioned permit only.
This form must be completed and returned to the Building Division before the permit can be issued.
Building Dept. Fax: (760) 602-8558
Number of new or relocated fixtures, traps, or floor drains .••••••• 1:. ......................................... __
New building sewer line? ......................................................................................... Yes x· No __
Number of new roof drains? ••••••..••• ::;?. ............................................................................................... .
Y/:5 Install/alter water line? ........................................................................................................................ .
;VJ Number of new water heaters? ............... ~ ....................................................................................... ..
;Vo Number of new, relocated or replaced gas outlets? ................................................................... .
Number of new hose bibs? ........ !. ....................................................................................................... .
Residential Permits: Q
New/expanded service: Num~r of new amps: __ _,.,.._..::::;... __ ~ ·~ Minor Remodel only: Yes__ No __ ~
Commercial/Industrial:
Tenant Improvement: Number of existing amps involved in this oroiect:
Number of new amps involved in this project: -----~
New Construction: Amps per Panel:
Single Phase ............................................................... Number of new amperes _______ <E;--
Three Phase ................................................................. Number of new amperes ______ _
Three Phase 480 ........................................................ Number of new amperes ______ _
Number of new furnaces, A/C, or heat pumps? ..... == ............................................................. __
New or relocated dud worR? •••••... :== ...................................................... Yes No X
Number of new fireplaces? •••••••• :::::::::: ........................................................................................... .
Number of new exhaust fans? ........... /. ............................................................................................... -
Relocate/install vent? ••••••••••. :::::::::: ...................................................................................................... .
Number of new exhaust hoods? .... == ......................................................................................... . w--Number of new boilers or compressors? ........................................................... Number of HP
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
12-14-2015 Plan Check Revision Permit No:PCR15123
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
Parcel No:
Valuation:
Reference #:
PC#:
1650 CHESTNUT AV CBAD
PCR
Lot#: 0 2051302500
$0.00 Construction Type: 58
Status:
Applied:
Entered By:
Plan Approved:
Issued:
Project Title: STONER: REVISED DIMENSIONS OF lns~ect Area:
BATHROOM ADDITION TO ADDRESS PLANNING CORRECTION
Applicant:
STONER GENE
300 CARLSBAD VILLAGE DR #1 08A
CARLSBAD CA 92008
Plan Check Revision Fee
Fire Expedited Plan Review
Additional Fees
Total Fees: $129.00
Inspector:
Owner:
STONER GENE
300 CARLSBAD VILLAGE DR #1 08A
CARLSBAD CA 92008
$129.00
$0.00
$0.00
Total Payments To Date: $129.00 Balance Due:
FINAL APPROVAL
Date: Clearance:
ISSUED
11/17/2015
SLE
12/14/2015
12/14/2015
$0.00
NOTlCE: Please take NOTICE that approval of your project indudes the "lrrposition'' of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this pemit was issued to protest irrposition of these fees/exactions. If you protest them, you rrust
follow the protest prooedures set forth in G:lvemment Code Section 66020(a), and file the protest and any other required information wth the Oty M3nager for
prooessing in accordance wth Carlsbad Munidpal Code Section 3.32.030. Failure to tirrely follow that prooedure wll bar any subsequent legal action to attack,
review, set aside, void, or annul their irrposition.
You are hereby FURTHER NOTIFIED that your right to protest the spedfied fees/exactions DOES NOT APPLY to water and 58\Mlr oonnection fees and capadty
changes, nor planning, zoning, grading or other similar application processing or service fees in oonnection wth this project. NOR DOES IT APPI... Y to any
fees/exactions of which vou have oreviouslv been oiven a NOTlCE sinilar to this or as to which the statute of linitations has oreviouslv otherwise exnired.
PLAN CHECK REVISION
APPLICATION
8-15
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
Plan Checl< Revision No. KJZ \ t;j \2--3 Original Plan Check No. C..6 \5 n'! C{ J
Project Adn .. ess lL SD c~~A..,~ AJ«-Date N" J L +, 2-D l ")
Contact .,_e~ ~0-e.C2-Ph 0 e;:£ 3'i~,_1l3~ Fax -----------------
Email ----+S-"-"--e\J,____e_----'G"--'J__,__s.L-C--t<~--~.-IJc-_<_e_&_u ____________ _
Contact Address ----,S~. '-. A'-+n"----'--e.=--_ __,Ae-::.)_J_Ala~· o=---=l'-"'~e~---City (AO t) ~-AJJ Zip __.9_2-_D_O_~---
GeneraiScopeof~rk __ ~b~~~·~~~~~-~b~~----a~~=J~J~·~;~~~-6_1~ __________________________ _
Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person.
1 . Elements revised:
0, Plans 0 Calculations 0 Soils 0 Energy 0 Other _____________ _
2. . 3.
Describe revisions in detail List page(s) where
each revision is
shown
~ QJ)N\Q\..Sti'e, £z:)ej-)¥
re_}j\ 7)(.) ~r-\ci l.X' 0~ o..dd\11uf\ to
\ .
oc\drfLS5 0\o.X\Y\\m C' f)~ '( \ '(Y'Q f\ t·
('~O.Jdlf\0 \(')' c~ t'Jl. J.m~
'J .,__,) '
5.
6.
7.
8.
Does this revision, in any way, alter the exterior of the project? g Yes
Does this revision add ANY new floor area(s)? 0 Yes
Does this revision affect any fire related issues? 0 Yes
Is this a complete set? ~Yes 0 No
JE:::No
~No
4.
List revised sheets
that replace
existing sheets
0 No
~Signature _______________________________________________________ _
1635 Faraday Avenue, Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 Email: building@carlsbadca.gov
www.carlsbadca.gov
Carlsbad PCR15-123 (15-3797)
12/9/15
EsGil Corporation
In (}!artnersliip witli government for CJ3uiUing Safety
DATE: 12/9/15
JURISDICTION: Carlsbad
D APPLICANT
D JURIS.
D PLAN REVIEWER
D FILE
PLAN CHECK NO.: PCR15-123 (15-3797)
PROJECT ADDRESS: 1650 Chestnut Ave.
SET: REV 1, Set II
PROJECT NAME: Bath Room Addition to Residence
~ The revised plans transmitted herewith have been corrected where necessary and substantially
comply with the jurisdiction's building codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's codes
when minor deficiencies identified below are resolved and checked by building department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
D The Remarks check list below is transmitted herewith for your information. The plans are being
held at Esgil Corporation until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
D The applicant's copy of the check list has been sent to:
cgj EsGil Corporation staff did not advise the applicant that the plan check has been completed.
D EsGil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone #:
Date contacted:
D REMARKS:
By: Chuck Mendenhall
EsGil Corporation
(by: ) Email:
0 GA 0 EJ 0 MB 0 PC
Enclosures:
12/3/15
EsGil Corporation
In CFartnersfiip witfi government for CBuiUing Safety
DATE: 11/25/15
JURISDICTION: Carlsbad
PLAN CHECK NO.: PCR15-123 (15-3797)
PROJECT ADDRESS: 1650 Chestnut Ave.
SET: REV 1, Set I
PROJECT NAME: Bath Room Addition to Residence
PPLICANT
URIS.
0 PLAN REVIEWER
0 FILE
D The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's codes
when minor deficiencies identified below are resolved and checked by building department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
~ The Remarks check list below is transmitted herewith for your information. The plans are being
held at Esgil Corporation until corrected plans are submitted for recheck. Submit 2 sets of
revised plans to either the City or EsGil directly for recheck
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
~ The applicant's copy of the check list has been sent to:
Gene Stoner
e-mail D EsGil Corporation staff did not advise the applicant that the plan check has been completed.
~ EsGil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Gene Stoner 0elephone #: (858) 342-7733
Date contacted: \ l \'30 (by:f\C... /Email: gene@salt.edu
~ REMARKS Check List: A. the size of the addition has changed. The min length of exterior
braced wall panel is 2'-8" long and require a Hold Down at each end of the braced wall panel.
The plans show that you Intend to install 2-24" long braced walls at the right exterior wall
elevation, this does not comply with the code for min. length of 2'-8" with HD's. Submit revised
plans showing code compliance.
By: Chuck Mendenhall
EsGil Corporation
D GA D EJ D MB D PC
Enclosures:
11/19/15
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576
Carlsbad PCR15-123 (15-3797)
11/25/15
[DO NOT PAY-THIS IS NOT AN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad
PREPARED BY: Chuck Mendenhall
PLAN CHECK NO.: PCR15-123 (15-3797)
DATE: 11/25/15
BUILDING ADDRESS: 1650 Chestnut Ave.
BUILDING OCCUPANCY: R3
BUILDING AREA Valuation Reg. VALUE ($)
PORTION ( Sq. Ft.) Multiplier Mod.
Add'n 165 Hrly
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code cb By Ordinance
Bldg. Permit Fee by Ordinance .....
Plan Check Fee by Ordinance ""'
Type of Review: D Complete Review D Structural Only
0Repetitive Fee
.,... Repeats
D Other
EJ Hourly
EsGil Fee
1-----1_.5--tl H rs. @ •
$129.001
* Based on hourly rate
Comments: N/A In addition to the above fee,.an additionaiJee of$ ··is due ( hour@
$ /hr.) for the CaiGreen review.
Sheet 1 of 1
macvalue.doc +
DATE: 11-17-15
PLANNING DIVISION
BUILDING PLAN CHECK
REVIEW CHECKLIST
P-28
PROJECT NAME: PROJECT ID:
Development Services
Planning Division
1635 Faraday Avenue
(760) 602-4610
www.carlsbadca.!wv
PLAN CHECK NO: PCR 15-123 SET#: 1 ADDRESS: 1650 Chestnut Av APN: 205-130-25-00
12SJ This plan check review is complete and has been APPROVED by the Planning
Division.
By: Chris Sexton
A Final Inspection by the Planning Division is required DYes IZ] No
You may also have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the issuance of a building permit.
Resubmitted plans should include corrections from all divisions.
D This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check Comments have been sent to: genesalk.edu
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
Chris Sexton Chris Glassen Greg Ryan
760-602-4624 760-602-2784 760-602-4663
Ch ris.Sexton@carlsbadca.gov Gregory.Ryan@carlsbadca.gov
D Gina Ruiz VaiRay Marshall Cindy Wong
760-602-4675 760-602-27 41 760-602-4662
Gina.Ruiz@carlsbadca.gov VaiRay.Marshall@carlsbadca.gov Cynthia.Wong@carlsbadca.gov
D linda Ontiveros Dominic Fieri
760-602-2773 760-602-4664
lincja.Ontiveros@carlsbadca.gov Dominic.Fieri@carlsbadcUQY
Remarks:
REVIEW#:
1 2 3
rgJOD
rgJOD
rgJOD
rgJOD
rgJOD
rgJOD
P-28
Plan Check No. PCR 15-123 Address 1650 Chestnut Av Date 11-17-15 Review# 1
Planner Chris Sexton Phone (760) 602-4624
APN: 205-130-25-00
Type of Project & Use: addition Net Project Density: 1.0 DU/AC
Zoning: R-1 General Plan: RLM Facilities Management Zone: 1
CFD (in/out) #_Date of participation: __ Remaining net dev acres: __
(For non-residential development: Type of land use created by this permit: __ )
Legend: [g) Item Complete
Environmental Review Required:
0 Item Incomplete -Needs your action
YES D NO D TYPE
DATE OF COMPLETION: __
Compliance with conditions of approval? If not, state conditions which require action.
Conditions of Approval:
Discretionary Action Required:
APPROVALIRESO. NO.
PROJECT NO. __
DATE
OTHER RELATED CASES: __
YES D NO D TYPE--
Compliance with conditions or approval? If not, state conditions which require action.
Conditions of Approval: __
Coastal Zone Assessment/Compliance
Project site located in Coastal Zone? YES 0 NO 0
CA Coastal Commission Authority? YES 0 NO 0
If California Coastal Commission Authority: Contact them at -7575 Metropolitan Drive,
Suite 103, San Diego, CA 92108-4402; (619) 767-2370
Determine status (Coastal Permit Required or Exempt):
Habitat Management Plan
Data Entry Completed? YES D NO D
If property has Habitat Type identified in Table 11 of HMP, complete HMP Permit application
and assess fees in Permits Plus
(A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, HMP Fees, Enter Acres of
Habitat Type impacted/taken, UPDATE!)
lnclusionary Housing Fee required: YES D NO D
(Effective date of lnclusionary Housing Ordinance -May 21, 1993.)
Data Entry Completed? YES D NO D
(A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, Housing Fees, Construct
Housing Y/N, Enter Fee, UPDATE!)
Housing Tracking Form (form P-20) completed: YES D NO 0 N/A 0
Page 2 of 3 07111
~~,
Site Plan:
~DO
~DO
~DO
~DO
~DO
~DO
~DO
~DO
~DO
Provide a fully dimensional site plan drawn to scale. Show: North arrow, property lines,
easements, existing and proposed structures, streets, existing street improvements, right-of-
way width, dimensional setbacks and existing topographical lines (including all side and rear
yard slopes). Provide legal description of property and assessor's parcel number.
City Council Policy 44-Neighborhood Architectural Design Guidelines
1. Applicability: YES D NO D
2. Project complies: YES D NOD
Zoning:
1. Setbacks:
Front:
Interior Side:
Street Side:
Rear:
Top of slope:
Required 20' Shown 20'
Required 6' Shown 6'
Required __ Shown __
Required 1£. Shown 1£.
Required __ Shown __
2. Accessory structure setbacks:
Front: Required __ Shown __
Interior Side: Required __ Shown __
Street Side: Required __ Shown __
Rear: Required __ Shown __
Structure separation: Required 1.[_ Shown 1.[_
3. Lot Coverage: Required >40% Shown 29.3%
4. Height: Required >30' Shown >30'
5. Parking: Spaces Required __ Shown __
(breakdown by uses for commercial and industrial projects required)
Residential Guest Spaces Required __ Shown __
Additional Comments
OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER Chris Sexton DATE 11-17-15
P-28 Page 3 of 3 07/11