HomeMy WebLinkAbout168 MAPLE AVE; ; CB132214; Permit10-31-2013
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
# Dwelling Units:
Bedrooms:
Project Title:
City of Carlsbad
1635 Faraday Av Carlsbad.CA 92008
Residential Permit Permit No: CBI32214
Building Inspection Request Line (760) 602-2725
168 MAPLE AVCBAD
RESDNTL Sub Type: SFD Status: ISSUED
2042340500 Lot#: 0 Applied: 09/13/2013
$301,115,00 Constuction Type: VN Entered By: SKS
Reference*: Plan Approved: 10/31/2013
1 Structure Type: Issued: 10/31/2013
4 Bathrooms: 4 Inspect Area:
Orig PC #: Plan Check #: PCI 30048
LEWIS RES -DEMO EX-SFR/2DU/GAR
BUILD NEW 2,488 SF 2-STORY SFD / 310 SF PATIO /130 SF
DECKS ON FL2 /1 FIREPLACE
Applicant:
SAMANTHA TOSTI
STE 100
2333 STATE ST
CARLSBAD CA 92008-1691
760-729-3470
Owner:
LEWIS BARBARA 0 TRUST 09-21-07
823 FURLONG DR
LIBERTYVILLE IL 60048
Building Permit $1,487,46 Meter Size FSI
Add'l Building Permit Fee $0,00 Add'l Reel, Water Con, Fee $0,00
Plan Check $1,041,22 Meter Fee $317,00
Add'l Plan Check Fee $0.00 SDCWA Fee $0,00
Plan Check Discount $0,00 CFD Payoff Fee $0.00
Strong Motion Fee $30,11 PFF (3105540) $5,480,29
Park in Lieu Fee $0,00 PFF (4305540) $5,058,73
Park Fee $0,00 License Tax (3104193) $0,00
LFM Fee $0,00 License Tax (4304193) $0.00
Bridge Fee $0,00 Traffic Impact Fee (3105541) $0.00
Other Bridge Fee $0,00 Traffic Impact Fee (4305541) $0.00
BTD #2 Fee $0.00 Sidewalk Fee $0,00
BTD #3 Fee $0,00 PLUMBING TOTAL $201,00
Renewal Fee $0,00 ELECTRICAL TOTAL $95.00
Add'l Renewal Fee $0,00 MECHANICAL TOTAL $90.26
Other Building Fee $0.00 Housing Impact Fee $0.00
HMP Fee $0.00 Housing InLieu Fee $0,00
Pot. Water Con. Fee $0.00 Housing Credit Fee $0,00
Meter Size FSI Master Drainage Fee $668,80
Add'l Pot, Water Con, Fee $0,00 Sewer Fee $0,00
Red. Water Con, Fee $0,00 Additional Fees $0,00
Green Bldg Stands (SB1473) Fee $12.00 Fire Sprinkler Fees $0,00
Green Bldg Stands Plan Chk Fee $0,00
TOTAL PERMIT FEES $14,481.87
Total Fees: $14,481,87 Total Payments to Date: $14,481.87 Balance Due: $0.00
Inspector
FINAL APPROVAL
Date: /A/f-// Clearance:
NOTICE: Please take NOTICE that approval of your project includes ttie "Imposition" of fees, dedications, reservations, or ottier exactions tiereafter collectively
refenred to as "fees/exactions," You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follovK the protest procedures set forth in Govemment Code Section 66020(a), and file the protest and any other required infonnation with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
fees/exactions of which vou have oreviouslv been given a NOTICE similar to this, or as to which the statute of limitations has previously othenvise expired.
10-31-2013
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Storm Water Pollution Prevention Plan (SWPPP) Permit
Permit No:SW130300
Job Address:
Permit Type:
Parcel No:
Reference #:
CB#:
Project Title:
Priority:
168 MAPLE AVCBAD
SWPPP
2042340500
CB132214
Lot#:
LEWIS RES - DEM EXISTING SFR/
2DU/GAR & REPLACE W/ NEW SFR/2DU/GAR
M
Applicant:
SAMANTHA TOSH
STE 100
2333 STATE ST
CARLSBADCA 92008-1691
760-729-3470
Status
Applied
Entered By
Issued
Inspect Area
Tier
Owner:
LEWIS BARBARA 0 TRUST 09-21-07
823 FURLONG DR
LIBERTYVILLE IL 60048
ISSUED
09/13/2013
SKS
10/31/2013
1
Emergency Contact:
SAMANTHA TOSTI
617-816-2708
SWPPP Plan Check
SWPPP Inspections
Additional Fees
$52.00
$221,00
$0.00
TOTAL PERMIT FEES $273,00
Total Fees: $273,00 Total Payments To Date: $273.00 Balance Due: $0.00
FINAL APPROVAL
SIGNATUR
Inspection List
Permit*: CB132214 Type: RESDNTL SFD
Date Inspection Item
11/14/2014 89 Final Combo
11/13/2014 89 Final Combo
06/10/2014 17 Interior Lath/Drywall
05/30/2014 82 Drywall/Ext Lath/Gas Test
05/21/2014 22 Sewer/Water Service
05/09/2014 84 Rough Combo
05/02/2014 13 Shear Panels/HD's
04/03/2014 15 Roof/Reroof
03/18/2014 33 Service Change/Upgrade
03/05/2014 24 Rough/Topout
02/19/2014 11 Ftg/Foundation/Piers
02/06/2014 66 Grout
01/29/2014 11 Ftg/Foundation/Piers
01/27/2014 21 Underground/Under Floor
11/19/2013 32 Const, Service/Agricultural
Inspector Act
PB AP
PB NR
PB AP
PD AP
PB AP
PD AP
PB AP
PB AP
PB AP
PB PA
PB CA
PB AP
PB AP
PB PA
PB AP
LEWIS RES - DEMO 998 SF SFD/
449 SF ACCESSORY BLDG / 244 SF GAR
Comments
Ttiursday, March 05, 2015 Page 1 of 1
GEOTECHNICAL EXPLORATION, INC.
SOIL & FOUNDATION ENGINEERING
GROUNDV\/ATER • ENGINEERING GEOLOGY
FIELD REPORT ON OBSERVATION OF FOUNDATIONS DATE:\/^U
TIME: •AM
CLIENT JOB NO.
PROJECT NAME:
PROJECT ADDRESS: HfepU-^^l;
sf
•
•
•
The footing excavations listed below were bottomed on material for which the bearing values
recommended in the foundation report are applicable.
The cast-in-place drilled friction piles listed below penetrated material for which the
allowable supporting capacities recommended in the foundation report are applicable. The
piles were excavated to diameters at least as large as specified and the excavations extended
at least to the depths indicated on the Foundation Plans.
The excavations for the cast-in-place belled piers listed below were bottomed on material for
which the bearing values recommended in the foundation report are applicable. The
excavations were at least as large as specified on the Foundation Plans.
The driven piles listed below were observed to be driven to the specified lengths and/or
driving resistances to obtain the supporting capacities recommended in the foundation
report.
Based upon observations, it is our opinion that the foundation recommendations presented in the
report of the foundation investigation, Job No. - l a'T -^-a, dated (^i^(are
not) applicable to the conditions observed. Foundation Plans by VAc^v^i- <~^4-*-^^<- ,
dated HpltZ were used as a reference for our observations.
•t-*-*' twj^. w^4> ^<:< l^"'«^i>-«i^$ •'•y^>ri...^-^4dAi^ t.'ss^-^i» '-f 4- '"
\
NOTE:
1.
2.
3.
The observations reported above do not constitute an approval of foundation location,
footing size or depth, reinforcement, or foundation design.
Loose, soft, or disturbed soils must be removed prior to placement of reinforcement or
concrete.
The opinions and recommendations presented in this report were based upon our observa-
tions and are presented in accordance with generally accepted professional engineering
practice. We make no other warranty, either express or implied.
BY:
7420 Trade St. San Diego, Ca. 92121 • (858) 549-7222 • FAX: (858) 549-1604
j^ss^m...Mis^..f.:iiiri^^^ ^,i.^^^^,^i£f.ji^^>.^j:.>ij-^. .......