Loading...
HomeMy WebLinkAbout1680 CORTE ORCHIDIA; ; CB021087; Permit (2)01-08-2009 Job Address Permit Type Parcel No Valuation Occupancy Group 05/08/2002 # Dwelling Units Bedrooms Project Title City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Residential Permit Permit No CB021087 Building Inspection Request Line (760) 602-2725 1680 CORTE ORCHIDIA CBAD RESDNTL Sub Type SFD 2159501900 Lot# 19 $315,17100 Construction Type VN Reference* CT98-17 1 Structure Type 5 Bathrooms ENCANTADA- PHS 6- PLN 3-HADLEY 3476 SF, 659 SF GAR, 54 SF PORCH SFD 325 Status FINAL Applied 03/13/2002 Entered By RMA Plan Approved Issued 05/08/2002 Inspect Area PY Ong PC# PCOO-73 Plan Check* PC020013 Applicant RYLAND HOMES OF CALIFORNIA STE 200 5740 FLEET ST CARLSBAD CA 92008 760 603-8001 Owner Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee HMP Fee Pot Water Con Fee Meter Size Add'l Pot Water Con Fee Reel Water Con Fee Green Bldg Stands (SB1473) Fee $1,21184 Meter Size $0 00 Add'l Reel Water Con Fee $787 70 Meter Fee $0 00 SDCWA Fee ($63 02) CFD Payoff Fee $31 52 PFF (3105540) $0 00 PFF (4305540) $000 License Tax (3104193) $0 00 License Tax (4304193) $000 Traffic Impact Fee (3105541) $000 Traffic Impact Fee (4305541) $6 020 00 Sidewalk Fee $0 00 PLUMBING TOTAL $0 00 ELECTRICAL TOTAL $0 00 MECHANICAL TOTAL $0 00 Housing Impact Fee " Housing InLieu Fee $3 420 00 Housing Credit Fee D3/4 Master Drainage Fee $0 00 Sewer Fee $0 00 Additional Fees 9? TOTAL PERMIT FEES $000 $16000 $2 004 00 $3,946 54 $5 736 11 $000 $000 $000 $61000 $000 $000 $238 00 $6000 $5650 $000 $000 $000 $000 $3 287 00 $000 $27 506 19 Total Fees $27,506 19 Total Payments To Date $27,506 19 Balance Due $000 Inspector FINAL APPROVAL Date Clearance NOTICE Please take NOTICE that approval of your project includes the Imposition of fees dedications reservations or other exactions hereafter collectively referred to as fees/exactions You have 90 days from the date this permit was issued to protest imposition of these fees/exactions If you protest them you must follow the protest procedures set forth in Government Code Section 66020(a) and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent legal action to attack, review set aside void or annul their imposition You are hereby FURTHER NOTIFIED that your nght to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes nor planning zoning grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired