HomeMy WebLinkAbout1680 FAIRLEAD AVE; ; CB130422; Permit04-25-2013
Job Address
Permit Type
Parcel No
Valuation
Occupancy Group
# Dwelling Units
Bedrooms
Project Title
City of Carlsbad
1635 Faraday Av Carlsbad.CA 92008
Residential Permit PermitNc CB130422
Building Inspection Request Line (760) 602-2725
1680 FAIRLEAD AV CBAD
RESDNTL Sub Type CONDO Status ISSUED
2150202839 Lot # 39 Applied 02/21/2013
$167,457 00 Constuction Type 5B Entered By JMA
Reference* CT04010-A Plan Approved 04/25/2013
1 Structure Type IVIF2-4 Issued 04/25/2013
3 Bathrooms 2 5 Inspect Area PB
Ong PC # PC110047 Plan Check* PC130010
VOSCANA (FORMERLY VITALIA)
UNIT 33, PLAN 1, PHASE 4, 1435 SF, 443 SF GAR & 126 SF DECK
Applicant
SHEA HOMES
ATTN SARAH BECKMAN
9990 MESA RIM RD
SAN DIEGO CA 92121
858 526-6554
Owner
Building Permit $962 18 Meter Size
Add1 Building Permit Fee $0 00 Add'l Reel Water Con Fee $0 00
Plan Check $673 53 Meter Fee $0 00
Add'l Plan Check Fee ($200 00) SDCWA Fee $0 00
Plan Check Discount ($53 88) CFD Payoff Fee $2,575 54
Strong Motion Fee $16 75 PFF (3105540) $3,047 72
Park in Lieu Fee $0 00 PFF (4305540) $0 00
Park Fee $0 00 License Tax (3104193) $0 00
LFM Fee $0 00 License Tax (4304193) $0 00
Bridge Fee $0 00 Traffic Impact Fee (3105541) $1,912 00
Other Bndge Fee $0 00 Traffic Impact Fee (4305541) $0 00
BTD #2 Fee $10,920 00 Sidewalk Fee $0 00
BTD #3 Fee $0 00 PLUMBING TOTAL $165 00
Renewal Fee $0 00 ELECTRICAL TOTAL $57 00
Add'l Renewal Fee $0 00 MECHANICAL TOTAL $101 92
Other Building Fee $0 00 Housing Impact Fee $0 00
HMP Fee $0 00 Housing InLieu Fee $0 00
Pot Water Con Fee $0 00 Housing Credit Fee $0 00
Meter Size Master Drainage Fee $0 00
Add'l Pot Water Con Fee $0 00 Sewer Fee $2,576 00
Reel Water Con Fee $0 00 Additional Fees $0 00
Green Bldg Stands (SBl473) Fee $4 00 Fire Spnnkler Fees $0 00
Green Bldg Stands Plan Chk Fee $0 00 Green Bldg Stands Plan Chk Fee
TOTAL PERMIT FEES $22,757 76
Total Fees $22,757 76 Total Payments to Date $22,757 76 Balance Due: $0 00
Inspector
FINAL APPROVAL
Date //-/ra Clearance
NOTICE Please take NOTICE that approval of your project includes ttie "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions" You have 90 days from the date this pemiit was issued to protest imposition of these fees/exactions If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition
You are hereby FURTHER NOTIFIED that your nght to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
fees/exactions of which vou have previously been given a NOTICE similar to this, or as to which the statute of limitations has oreviouslv othew/ise expired
CARLSBAO
Hiding Diybion iNSPECTION RECORD
. INSPECTION RECORD CARD WITH APPROVED
PLANS IVIUST BE ICiPT ON THE JOB
0 CALL BEFORE 3:30 pm. FOH mXT WORK DAY INSPECTION
0 FOR BUILDING INSPECTION CALL: ?60-602-2?25
OR GO TO- www.Carlifaadea.qov/8tiilding AND CLICK ON
"Requesjt Insnectlon"
DATE: f/Z:>'//3
CB130422 1680 FAIRLEAD AV
VOSCANA (FORMERLY VITALIA)
UNIT 33 PLAN 1. PHASE 4 1435 SF 443 SF GAR & 126
SF DECK
RESDNTL CONDO
Lot# 39 SHEA HOMES
RECORD COPY
IF "YES" IS CHEGKiD
IF you HAVE ANY QUE;
ALL REQUIRED APPROV
OR BRINQ IN A COPY
m THAT DIVISION'S APPROVAL IS REQUIRED PRIOR TO REQUESTING A
JS PLEASE CALL THE APPLICABLE DIVISIONS AT THE PHONE NUMBE
ARE SIQNED OFF- FAX TO 760-S02-8S60, EMAIL TO BLDGlNi
•HIS CARD TO: T63S FARADAY AVE.. CARLSBAO, CA 92008. E
JO BETWEEN 7:30 AM - 8:00 AM THE DAY OF YOUR INSPECTION
QMS A FINAL BUILDING
NUMBERS PROVIDED B
IJ»,<31N.S,EE.igllPN S® C AR
NO TES Required Prior to Requesting Building Final If Checked YES Date Inspector Notes
Landscape 760-944-8463 Allow 48 hours
CM&I (Englnecrtng Inspections) 760-438-389 f Call before 2 pm
/ Fire Prevention 76O-602-4A6O Allow 48 hours - •
Type of Inspection Type of Inspection
Date Inspector COOE:* ELECTRICAL Date Inspector
#11 FOUMATION t#3i • ELECTRICUN0ER6R0UND OUFER
#12 REINFORCED SttEL C -1 1 ^ #34 ROUBH ELECTRIC h
•»66 MASONRY PRE QROUT #31 • ELECTRIC SERVICE • TEMPORARY
O OROUT a WML BRAINS #35 PHOTOVOLTAIC
#10 TILT PANELS #39 FINAL
#11 POOR STRIPS
#11 COLUM*! Foowaas #41 UNDERGROUND DUCTS & PIPING
»14 SUBFRAME • FLOOR •CHUNG #44 aOUCTA PLENUM • REF PiPINS
«1S R00FSHEATHm(5 #43 HEAT-AIR COND. SYSTEMS
#13 EXT. SHEAR PANELS m #49 FINAL
#16 INSULATION ' CODB # COIVIBO INSPECTION
#18 BdlRIORlAIH #81 UNDERGBOUUD (11,12,21,31)
#17 INTERIOR LATH &DR¥WAa P #82 DRYWALLEXTLATH, GASTES (17,18,23)
#51 POOLEXCA/STEEl/BOMO/FEfiCE #83 ROOFSHEATING, EXTSHEAR (13,15)
#55 PREPLASTER #84 FRAME ROUGH COMBO (14.24,34,44)
#19 FINAL #89 FINAL OCCUPANCY {19,29,39,49)
wsmmsmmmmmam Date impector
#22 • SEWER & BL/CO O Pl/CO - 6.4*1 FIRE' . ,: Date inspector
#21 ONOERaROUKD DWASTE OWS
«4 TOPOUT OWMTE OWTl A/S UNDERGROUND VISUAL 0k,
#27 TOB& SHOWER PAN
A,„.M,«M„M„
A/SUNDERGROUND HYDRO
#23 ^GASTEST OeASPIPWS A/S UNDERGROUND aUSH M«^.. .
#2S 'WATER HEATER A/S OVERHEAD VISUAL
#28 SOLAR WATER A/S OVERHEAD HYDROSTATIC
#29 FINAL A/S FINAI
F/A ROUGH IN
#600 PRE-CONSTRUCTOB MEETIN6 F/A FINAL ti. h f"f3
* IIS03 FOyiOW UP INSPECTION FIXED EXTINGUISHING SYSTEM ROUGH-IN
1*603 NOTICETO CLEAN FIXED EXTING SYSTEM HYDROSTATIC TEST
#607 WRnfTENWARKWe FJXEO EXTINGUISHING SYSTCM RNAL iM
#609 NOTICE OFVIOLATION MEDICALGAS PRESSURETEST
#610 VERBALWARNWe MEDICAL OAS FINAL
REV10S013 SEE BACK FOR SPECIAL TOTES
Inspection List
Permit* CB130422 Type RESDNTL CONDO VOSCANA (FORMERLY VITALIA)
UNIT 33, PLAN 1, PHASE 4, 1435 SF, 443 S
Date Inspection Item Inspector Act
11/13/2013 89 Final Combo PB AP
11/01/2013 308 Final GR AP
11/01/2013 308 Final GR AP
10/23/2013 39 Final Electncal PB AP
10/09/2013 23 Gas/Test/Repairs PB AP
09/06/2013 17 Interior Lath/Drywall PB AP
09/06/2013 18 Extenor Lath/Drywall PB AP
08/26/2013 84 Rough Combo PB AP
08/21/2013 84 Rough Combo PB NR
08/19/2013 84 Rough Combo PB NR
08/13/2013 13 Shear Panels/HD's PB AP
07/23/2013 15 Roof/Reroof PB AP
07/23/2013 83 Roof Sheathing/Ext Shear PB WC
05/17/2013 81 Underground Combo PB AP
05/09/2013 21 Underground/Under Floor PB AP
Comments
Thursday, November 14, 2013 Page 1 of 1