HomeMy WebLinkAbout1683 BRADY CIR; ; CB132416; Permit10-16-2013
City of Carlsbad
1635 Faraday Av Carlsbad.CA 92008
Pool Permit Permit No: CB132416
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
Parcel No:
Valuation:
Reference #:
PC #:
Project Title:
1683 BRADY CR CBAD
POOL
2054401000 Lot#:
$33,187.00 Construction Type:
HICKERSON RES: 815 SF POOL/SPA
GAS FOR FIREPIT
0
NEW
Status
Applied
Entered By
Plan Approved
Issued
Inspect Area
ISSUED
10/03/2013
SKS
10/16/2013
10/16/2013
Applicant:
CARRIE JONES
Owner:
HICKERSON LAURENCE J&JILLIAN L
6876 EMBARCADERO LN
CARLSBAD CA 92011
619-884-3891
1683 BRADY CIR
CARLSBAD CA 92008
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee
Electncal Fee
Plumbing Fee
Strong Motion Fee
Green BIdg Standards (SB1473) Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Additional Fees
$337.50
$0.00
$236.25
$0.00
$33.00
$33.00
$3.32
$1.00
$0.00
$0.00
$0.00
$0.00
TOTAL PERMIT FEES $644.07
Total Fees: $644.07 Total Payments To Date: $644.07 Balance Due: $0.00
Inspector:
FINAL APPROVAL
Date: ^V/^'/V Clearance:
NOTICE: Please tal<e NOTICE that approval of your project includes the "Imposition' of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions, Ifyou protest them, you must
follow the protest procedures set forth in Govemment Code Section 66020(a), and file the protest and any other required information with the City IVIanager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030, Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
fees;ex^i;tinns of which vou have oreviouslv been given a NOTICE similarto this, or as In which the statute of limitations has oreviouslv otherwise expired.
10-16-2013
Job Address:
Permit Type:
Parcel No:
Reference #:
CB#:
Project Title:
City of Carlsbad
1635 Faraday Av Carlsbad.CA 92008
Storm Water Pollution Prevention Plan (SWPPP) Permit
Permit No:SW130325
1683 BRADY CR CBAD
SWPPP
2054401000 Lot#:
CB132416
HICKENSON RES - 815 SF POOL/SP
Applicant:
CARRIE JONES
6876 EMBARCADERO LN
CARLSBADCA 92011-3227
619-884-3891
Emergency Contact:
JOHN TYRON
Status: ISSUED
0 Applied: 10/03/2013
Entered By: SKS
Issued: 10/16/2013
Inspect Area:
Tier: 1
Priority: M
Owner:
HICKERSON LAURENCE J&JILLIAN L
1683 BRADY CIR
CARLSBAD CA 92008
760-402-4777
SWPPP Plan Check
SWPPP Inspections
Additional Fees
$52.00
$221.00
$0.00
TOTAL PERMIT FEES $273.00
Total Fees: $273.00 Total Payments To Date: $273.00 Balance Due: $0.00
FINAL APPROVAL
SIGNATURE
VING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: ^gPIAyt<ING t^gfe" INEERING DBUILDING DFIRE OHEALTH DHAZMAT/APCD
^ CITY OF
CARLSBAD
Building Permit Application
1635 Faraday Ave., Carlsbad, CA 92008
Ph: 760-602-2719 Fax: 760-602-8558
email: buildlng@carlsbadca.gov
www.carlsbadca.gov
Plan Check No.
Est. Value
Plan Ck. Deposit )OSlt 2^
Date
k. Deposit (-^ \U
JOBADORESS SUITE#/SPACE#/UNIT#
CT/PROJECT # # OF UNITS # BEDROOIUIS # BATHROOMS TENANT BUSINESS NAME CONSTR. TYPE OCC. GROUP
DESCRIPTION OF WORK: /nc/ude Square Feet of A/fected lkrea(s)
DECKS (SF) FIREPLACE AIR CONDITIONING FIRE SPRINKLERS
YES • # NO O YES • NOD YES • NO •
EXISTING USE PROPOSE] EOySE ^ GARAGE (SF) PATIOS (SF)
APPLICANT NAMI APPLICANT NAME (Secondary Contact)
ADDRESS
STATE / ^ ZIP
(V,. \
CITY STATE ZIP
PHONE FAX
EMAIL EIVIAIL
AME ^ PROPER CONTRACTOR
ADDRESS ADDRESB
CITY
rMAll V i EMAIL If ARCH/DESIGNER NAME & ADDRE! STATE LIC. #
(Sec. 7031.5 Business and Professions Code: Any City or County v»hich requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires the applicantfor such permit to file a signed statement that he is licensed pursuant to the provisions ofthe Contractor's License Law (Chapter 9, commendingwlth Section 7000 of Division 3 ofthe Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500)).
W O ft K f ft $ ' \ « O IW P f W $ A T I O N
Worl<ers' Compensation Declaration: / hereby alfirm under penalty ofpeijury one ofthe foilowing deciarations:
I have and will maintain a certificate of consent to self-insure for woriters' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this penn it is issued.
I have and will maintain worl(ers'/(^mn|atipn„a9H;fqulred by Section 3J00 bf the Labor Code, for the performanAxif |he/^r1< fbr which this jjsmut Is Issued. My workers' compeil^i^n liy
Poiicy No. L(0 If^lf l/y? . Expiration Date, number are: Insurance Co..
5'^Cpiyi[^^tion^ai^ulr^by^ti|n^|OI ensation Ifisijrance carriaLanc id policy
This section need not be completed If the permit is for one hundred dollars ($100) or less.
O Certificate of Exemption: I certify that In the perfonnance of the work for which this pemnit is issued, I shall not employ any person In any manner so as to become subject to the Workers' (^mpensatlon Laws of
California. WARNING: Failure to secure workers' corgmnsjlisuoxgr^e Is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), in
addition to the cost of compensationyoi^ftages isj^fmiyefor in Sectlon'SiEQS of the Labor code, interest and attomey's fees.
>6S'CONTRACTOR SIGNATURE V \^ ^ \l/feENT DATE
sn DECLARATI O^M'
/ heieby affinn that i am exempt from Contractor's Ucense Law for the foliowing reason:
• I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for saie (Sec. 7044, Business and Professions Code: The Contractor's
License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for
sale. If, however, the building or improvement Is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or Improve for the purpose of sale).
• 1, as owner of the property, am exclusively contracting with licensed contractors to construct the pnoject (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of
property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law).
• I am exempt under Section Business and Professions Code for this reason:
1.1 personally plan to provide the major labor and materials for construction of the proposed property improvement • Yes • No
2.1 (have / have not) signed an application for a building pennit for the proposed worit.
3.1 have contracted with the foilowing person (fimi) to provide the proposed construction (Include name address / phone / co ntractors' license number):
4.1 pian to provide portions of the wortt, but I have hired the following person to coordinate, supervise and provide the major worit (Include name / address / phone / contractors' license number):
5.1 will provide some of the work, but I have contracted (hired) the follov»ing persons to provide the worit indicated (include name / address / phone / type of worit):
^eTpROPERTY OWNER SIGNATURE •AGENT DATE
COWWXE'TE tH.IS SECTION r O R N O N - ft E S I 0 E N T IA I. B U 11 0 I N G PlE ft Ml T r O M I. Y
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration forni or risk management and prevention program under Sections 25505,25533 or 25534 of the
Presley-Tanner Hazardous Substance Account Act? • Yes • No
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? • Yes • No
Is the facility to be constnjcted within 1,000 feet of the outer boundary of a school site? • Yes O No
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF
EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
CONtf RUCTION LENOING AGENCY
I hereby affirm that there is a construction lending agency for the performance of the work this permit Is issued (Sec. 3097 (i) Civil Code).
Lender's Name Lender's Address
APP iiie A N Ti^;C E W TI# I C A T I O N
I ceili^ that I have read the application and state that the above information is conectand that the Inforniation on the plans Is accurate. I agree to complywith all Cify ordinances and State laws relating to building construction.
I heretiy authorize representative of the City of Cartsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE INDEMNIFY AND KEEP HAFiMLESS THE CITY OF CARLSBAD
AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST &\iD CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT.
OSHA: An OSHA pemiit is requined for excavations over 5'0' deep and demolitbn or construction of stnjctures over 3 stories in height.
EXPIRATION: Every permit issued by the Building Ofiicial under the proviscns of this Code shall expine by limitatfon and become null and void if the buikjing or vmrtt authorized by such pennit is not commenced within
180 days from the date of such permit or ifthe building afwbAauthorized by such peimjUsaiSPaidgdeHibaQ^ned at any time after the wortt Is oommenced Ibr a periqjlgf l4) days (Sectfon 106.4.4 Unifonn Buifoing Code).
APPLICANT'S SIGNATURE DATE f3
Inspection List
Permit#: CB132416 Type: POOL HICKERSON RES: 815 SF POOUSPA
GAS FOR FIREPIT ADD SEWER CONNEC
Date Inspection Item Inspector Act Comments
09/12/2014 59 Final Pool -Rl
09/12/2014 59 Final Pool PB AP
08/19/2014 55 Fence/Pre-Plaster PD AP
08/07/2014 51 Excav/Steel/Bonding/Fence PD AP
07/30/2014 23 Gas/Test/Repairs PD AP
06/02/2014 23 Gas/Test/Repairs PD AP
06/02/2014 51 Excav/Steel/Bonding/Fence PD AP
Tuesday, September 16, 2014 Page 1 of 1
PLAN CHECK Community & Economic
^ CITY OF REVIEW Development Department
1635 Faraday Avenue
CARLSBAD TRANSMITTAL Carlsbad CA 92008
www.carlsbadca.gov
DATE: 10/08/13 PROJECT NAME: HICKERSON RESIDENCE
PLAN CHECK NO: 1 SET#: ADDRESS: 1683 BRADY CIRCLE
VALUATION/SCOPE OF WORK: POOL/SPA/FIRE PIT
PROJECT ID: CB 13-2416
APN: 205-440-04
This plan check review is complete and has been APPROVED by the
Division.
By: KATHLEEN LAWRENCE 10/08/13
A Final Inspection by the Division is required Yes / No
This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the
attached checklist. Please resubmit amended plans as required.
NOTE: ONLY ITEMS THAT NEED CORRECTION/CLARIFICATION ARE MARKED X.
Plan Check Comments have been sent to: CARRIEJONES
You may also have corrections from one or more ofthe divisions listed below. Approval
from these divisions may be required prior to the Issuance of a building permit
Resubmitted plans should include corrections from all divisions.
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
PLANNING
760-602-4610
ENGINEERING
760-602-2750
FIRE PREVENTION
760-602-4665
Chris Sexton
76t>602^4624
Chris.Sexton@carlsbadca.gov
/ Kathleen Lawrence
^ 760-602-2741
Kathleen.Lawrence@carlsbadca.gov
760-602-4663
Gregorv.Rvan@carlsbadca.gov
Gma Ruiz
Glna.Ruiz@carlsbadca.fiov
Unda Ontiveros
Linda.Ontiveros@carlsbadca.gov
Cindy Wong
760-602-4662
Cvnthia.Wong@carlsbadca.gov
DoiTitriic Fieri
7604302-4664
Dominic.Fierl@carlsbadca.gov
Remarks:
Any outstanding issues unll be marked with an I X I .Make tite necessary/ corrections for
compliance unth applicable codes and standards. Submit corrected plans andl or specifications to
the Building division for re-submittal to tlie Engineering divisions.
Items that conforin to permit re(juirements are marked with | ^ |
1. SITE PLAN
Provide a fully dimensioned site plan drawn to scale.
Show:
/ North arrow
/ Existing & proposed structures
/ , Property line dimensions
/ Easements
Show on site plan:
/ Drainage patterns
/ Existing & proposed slopes
/ Existing topography
Retaining Walls (location and height)
Indicate what will happen with soil excavated from pool area.
Include on title sheet:
/ J Site address
/ Assessor's parcel number
/ Legal description/lot number
Grading: Quantities of
Gut Fill Import; Export
Project does not comply with the following engineering conditions of approval
for project no:
Gonditions were complies with by: Date:
LOTNO, 10
MAPNO. CT98-12
REF. NO,
E-37 Page 2 of 4 REV 6/2012
2. GRADING PERMIT REQUIREMENTS
The conditions that require a grading permit are found in Section 11.06.030 of the Municipal
Code.
Inadequate information available on site plan to make a determination on grading
requirements. Include accurate grading quantities in cubic yards (cut, fill, import, export and
remedial). This information must be included on the plans. If no grading is proposed
write: "NO GRADING"
Grading Permit required. NOTE: The grading permit must be issued and rough grading
approval obtained priorto issuance of a buildinq permit. A separate grading plan prepared a
registered civil engineer must be submitted together with the completed application form attached.
/ No grading permit required.
3. MISCELLANEOUS PERMITS
/ i RIGHT-OF-WAY PERIVIIT is required to do work in city right-of-way and/or private work
adjacent to the public right-of-way.
A separate right-of-way issued by the engineering division is required forthe following:
Please complete attached right-of-way application form and return to the engineering
department together with the requirements on the attached right-of-way checklist, at
the time of resubmittal.
Right-of-way permit and pool permit will be issued simultaneously.
E-37 Page 3 of 4 REV 6/2012
4. STORM WATER
Construction Compliance
/ Project Threat Assessment Form complete 7 j incomplete
/ Requires Tier 1 Storm Water Pollution Prevention Plan. Please complete attached fomn
and return (SW 13-325 )
Requires Tier 2 Storm Water Pollution Prevention Plan. Requires submittal of Tier 2
SWPPP, payment of processing fee and review by city.
Post-Development (SUSMP) Compliance
/ Storm Water Standards Questionnaire complete / incomplete
Project is subject to Standard Storm Water Requirements. See city Standard Urban
Storm Water Management Plan (SUSMP) for reference.
http://www.carlsbadca.qov/business/buildinq/Documents/EnqStandsw-stds-vol4-ch2.pdf
Project needs to incorporate low impact development strategies throughout in one or
more of the following ways:
Rainwater harvesting (rain barrels or cistern)
Vegetated Roof
Bio-retentions cell/rain garden
Pervious pavement/pavers
Flow-through planter/vegetated or rock drip line
Vegetated swales or rock infiltration swales
Downspouts disconnect and discharge over landscape
Other:
5. ADDITIONAL COMMENTS
E-37 Page 4 of 4 REV 6/2012
Cm
CITY OF
CARLSBAD
STORM WATER COMPLIANCE FORM
TIER 1 CONSTRUCTION SWPPP
E-29
This form is required for all pools, retaining walls or whenever a building footprint is enlarged.
Development Services
Land Development Engineering
1635 FaradayAvenue
760-602-2750
www.carlsbadca.gov
STORM WATER COMPLIANCE CERTIFICATE
My project is not In a category of permit types exempt from the Construction
SWPPP requirements
My project is not located inside or within 200 feet of an environmentally
sensitive area with a significant potential for contributing pollutants to nearby
receiving waters by way of storm water runoff or non-storm water
discharge(s).
<^ My project does not require a grading plan pursuant to the Carlsbad
Grading Ordinance (Chapter 15.16 ofthe Carlsbad Municipal Code)
My project will not result in 2,500 square feet or more of soils disturbance
including any associated construction staging, stockpiling, pavement
removal, equipment storage, refueling and maintenance areas that meets
one or more of the additional following criteria:
• located within 200 feet of an environmentally sensitive area or the
Pacific Ocean; and/or,
• disturbed area is located on a slope with a grade at or exceeding 5
horizontal to 1 vertical; and/or
• disturbed area is located along or within 30 feet of a storm drain inlet, an
open drainage channel or watercourse; and/or
• construction will be initiated during the rainy season or will extend into
the rainy season (Oct. 1 through April 30).
I CERTIFY TO THE BEST OF MY KNOWLEDGE THAT ALL OF THE ABOVE
CHECKED STATEMENTS ARE TRUE AND CORRECT. I AM SUBMITTING
FOR CITY APPROVAL A TIER 1 CONSTRUCTION SWPPP PREPARED IN
ACCORDANCE WITH THE REQUIREMENTS OF CITY STANDARDS.
I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT BEST
MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION ACTIVITIES
TO THE MAXIMUM EXTENT PRACTICABLE TO MINIMIZE THE
MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO MINIMIZE
THE EXPOSURE OF STORM WATER TO CONSTRUCTION RELATED
POLLUTANTS; AND, (2) ADHERE TO, AND AT ALL TIMES, COMPLY WITH
THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP THROUGHOUT THE
DURATION OF THE CONSTRUCTION ACTIVITIES UNTIL THE
CONSTRUCTION WORK IS COMPLETE AND APPROVED BY THE CITY OF 3NSTRUCTI0h
CARlS^D.
\iyM/c 3ovu$^
OWNER(S)/OWNER'S AG^bELNAME (PRINT)
OWNER(S)/OWNER'S AGENT NAME (SIGNATURE) DA Cfi
STORM WATER POLLUTION PREVENTION NOTES
1. ALL NECESSARY EQUIPMENT AND MATERIALS
SHALL BE AVAILABLE ON SITE TO FACILITATE
RAPID INSTALLATION OF EROSION AND
SEDIMENT CONTROL BMPS WHEN RAIN IS
EMINENT.
2. THE OWNER/CONTRACTOR SHALL RESTORE
ALL EROSION CONTROL DEVICES TO
WORKING ORDER TO THE SATISFACTION OF
THE CITY ENGINEER AFTER EACH RUN-OFF
PRODUCING RAINFALL.
3. THE OWNER/CONTRACTOR SHALL INSTALL
ADDITIONAL EROSION CONTROL MEASURES
AS MAY BE REQUIRED BY THE CITY
ENGINEERING OR BUILDING INSPECTOR DUE
TO UNCOMPLETED GRADING OPERATIONS OR
UNFORESEEN CIRCUMSTANCES WHICH MAY
ARISE.
4. ALL REMOVABLE PROTECTIVE DEVICES SHALL
BE IN PLACE AT THE END OF EACH WORKING
DAY WHEN THE FIVE (5) DAY RAIN
PROBABILITY FORECAST EXCEEDS FORTY
PERCENT (40%). SILT AND OTHER DEBRIS
SHALL BE REMOVED AFTER EACH RAINFALL.
5. ALL GRAVEL BAGS SHALL BE BURLAP TYPE
WITH 3/4 INCH MINIMUM AGGREGATE.
6. ADEQUATE EROSION AND SEDIMENT
CONTROL AND PERIMETER PROTECTION BEST
MANAGEMENT PRACTICE MEASURES MUST BE
INSTALLED AND MAINTAINED.
SPECIAL NOTES
JFORMATION . . PROJECT INFORMATION
Site Address
Assessor's Parcel Numbi
Project ID: ( 3^3
Construction Permit No.:
Estimated Construction Start Date
3 Project Duration
Emergency Contact:
Name:
Months
/on
24 hour Phoner\ (/?0 ^ ^^'^ ^'l^l ^
Perceived Threat to Storm Water Quality
edium
r~l Low
If medium box is checked, must attach a site plan
sheet showing proposed work area and location
of proposed structural BMPs
For City Use Only
CITY OF CARLSBAD
STANDARD TIER 1
Approved By:
Date
E-29 Page 1 of 3 REV 4/30/10
Erosion Control
BMPs Sediment Control BMPs
Tracking
Control
BMPs
Non-Storm Water
Management BMPs
Waste Management and Materials
Pollution Control BMPs
Best Management Practice
(BMP) Description Geotextiles & Mats Wood Mulching Earth Dikes and Drainage Swales Slope Drains Silt Fence Sediment Trap Check Dam Fiber Rolls Gravel Bag Berm Street Sweeping and Vacuuming Sandbag Banier Storm Drain Inlet Protection Stabilized Construction Ingress/Egress Stabilized Construction Roadway Water Conservation Practices Paving and Grinding Potable Water/Irrigation Vehicle and Equipment Cleanina Material Delivery and Storaae Material Use Stockpile Management Spill Prevention and Control Solid Waste Manaaement Hazardous Waste Concrete Waste Manaaement CASQA Designation ->
Construction Activity /EC-7 EC-8 EC-9 EC-11 SE-1 SE-3 SE-4 U)
UJ
OT SE-6 SE-7 SE-8 SE-10 TR-1 TR-2 NS-1 NS-3 NS-7 NS-8 WM-1 WM-2 WM-3 WM-4 WM-5 CO WM-8 Grading/Soil Disturbance
Trenching/Excavation
Stockpiling —'—
Drilling/Boring
Concrete/Asphalt Saw
cutting
Concrete flatwork
Paving
Conduit/Pipe Installation
Stucco/Mortar Work « ^
Waste Disposal P Staging/Lay Down Area
Equipment Maintenance
and Fueling
Hazardous Substance
Use/Storage
Dewatering
Site Access Across Dirt
Other (list):
Instructions: Begin by reviewing the list of constmction activities and checking the box to the left of any activity that will occur during the proposed construction. Add any other activity descriptions in the
blank activity description boxes provided for that purpose and place a check in the box immediately to the left of the added activity description. For each activity descrribed, pick one or more best
management practices (BMPs) from the list located along the top ofthe form. Then place an X in the box at the place where the activity row intersects with the BMP column. Do this for each activity that was
checked off and for each of the selected BMPs selected from the list. For Example - If the project includes site access across dirt, then check the box to the left of "Site Access Across Dirt". Then review
the list for something that applies such as "Stabilized Construction Ingress/Egress" under Tracking Control. Follow along the "Site Access Across Dirt" row until you get to the "Stabilized Construction
Ingress/Egress" column and place an X in the box where the two meet. As another example say the project included a stockpile that you intend to cover with a plastic sheet. Since plastic sheeting is not on
the list of BMPs, then write in "Cover wnth Plastic" in the blank column under the heading Erosion Control BMPs. Then place an X in the box where the "Stockpiling" row intersects the new "Cover with
Plastic" column.
To learn more about what each BMP description means, you may wish to review the BMP Reference Handout prepared to assist applicants in the selection of appropriate Best Management Practice
measures. The reference also explains the California Stonnwater Quality Association (CASQA) designation and how to apply the various selected BMPs to a project.
E-29 Page 2 of 3 REV 4/30/10
PLANNING DIVISION Development Services
Planning Division BUILDING PLAN CHECK Development Services
Planning Division
CITY OF APPROVAL 1635 FaradayAvenue
CARLSBAD P-29 (760) 602-4610
www.carLsbsdca.eov
DATE: 10/3/13 PROJECT NAME: POOL/SPA/FIREPIT PROJECT ID:
PLAN CHECK NO: CB132416 SET#: ADDRESS: 1683 BRADY CR APN:
3 This plan check review Is complete and has been APPROVED by the PLANNING
Division.
By: GINA RUIZ
A Final Inspection by the PLANNING Division is required • Yes ^ No
You may also have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the issuance of a building permit
Resubmitted plans should include corrections from all divisions.
Q This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check APPROVAL has been sent to: CARRIEJ0NEJ5@H0TMAILC0IVI
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
PLANNING
760-602-4610
ENGINEERING
760-602-2750
FIRE PREVENTION
760-602-4665
Chris Sexton
760-602-4624
Chrls.Sexton@carlsbadca.gov
Kathleen Lawrence
760-602-2741
Kathleen.Lawrence@carlsbadca.gov
n Greg Ryan
760-602-4663
Gregorv.Rvan@carlsbadca.gov
[~] Gina Ruiz
760-602-4675
Gina.Rulz@carlsbadca.|Sov
1 Linda Ontiveros
760-602-2773
Linda.Ontiveros@carlsbadca.gov
1 1 Cindy Wong
760-602-4662
Cvnthia.Wong@carlsbadca.gov
• 1 1 Dominic Fieri
760-602-4664
Dominic.Fieri@carlsbadca.gov
Remarks: