Loading...
HomeMy WebLinkAbout1695 BASSWOOD AVE; ; 71-1052; PermitI 1 BUILDING PERMIT APPLICATION I10 Change of use from I Change of use to A I" NOTICE SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMB- I ING, HEATING, VENTILATING OR AIR CONDITIONING. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUC- TION AUTHORIZED IS NOT COMMENCED WITHIN 60 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A MENCED. PERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS COM- TOR OR AUTHORIZED AGENT (DATE) PLAN CHECK FEE I I Typeof - Const. 4- :G Division Size of Bldg. No. of (Total) Sq. Ft. Stories Max. i Occ. Load Fire Sprinklers Zone Required UYes UNO OFFSTREET PARKING SPACES: No. of Uncovered SDecial ADDrOValS Reauired Received Not Reauired ZONING HEALTH DEPT. /' / /-i FIRE DEPT. 1 i SOIL REPORT OTHER (Specify) i \ I \ \ SIGNATURE OF OWNER (IF OWNER BUILDER) (DATE) WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT PLAN CHECK VALIDATION CK. M.O. CASH PERMIT VALIDATION CK. M.O. CASH Form 1nn.l 9-69 INSPECTOR REORDER FROM: INTERNATIONAL CONFERENCE OF BUILDING OFFICIALS 0 50 SO. LOS ROBLES 0 PASADENA, CALIFORNIA 91101