HomeMy WebLinkAbout1727 Calavo Ct; ; CBR2017-2499; Permit(city of
Carlsbad
Residential Permit
Print Date: 10/04/2018 Permit No: CBR2017-2499
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
II Dwelling Units:
Bedrooms:
1727 Calavo Ct
BLDG-Residential
2073600900
$31,434.00
Work Class:
Lot II:
Reference #:
Construction Type:
Bathrooms:
Orig. Plan Check It:
Pool Status:
Applied:
Issued:
Permit
Finaled:
Inspector:
Closed -Finaled
10/18/2017
10/26/2017
CRenf
Plan Check #:
Project Title:
Final
Inspection: 10/4/2018 11:10:59AM
Description: WILSON: 600 SF POOL & SPA// GAS TO FIREPIT
Applicant:
SUE MONGOVEN
197 Woodland Pkwy, Suite 104
SAN MARCOS, CA 92069-3021
760-271-1618
BUILDING PERMIT FEE ($2000+)
BUILDING PLAN CHECK FEE (BLDG)
Owner:
MARK WILSON
1727 Calavo Ct
CARLSBAD,CA 92008
ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL
SB1473 GREEN BUILDING STATE STANDARDS FEE
STRONG MOTION-RESIDENTIAL
SWPPP INSPECTION FEE TIER 1 -Medium BLDG
SWPPP PLAN REVIEW FEE TIER 1-MEDIUM
Total Fees: $897.45 Total Payments To Date: $897.45
Co-Applicant:
SUN DANCER POOLS INC
197 Woodland Pkwy
San Marcos, CA 92069-3020
760-802-8842
Balance Due:
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
$0.00
1635 Faraday Avenue, Carlsbad, CA 97008-7314 I 760-602-2700 I 760-602-8560 f I w ww.carlsbadca.gov
$290.80
$203.56
$41.00
$62.00
$2.00
$4.09
$238.00
$56.00
./ ' ,,. (_ Cicyof
Carlsbad
/
EXISTING USE
APPLICANT NAME (Prima
ADDRESS
CITY
PHONE
EMAIL
CITY
EMAIL
Building Permit Application
1635 Faraday Ave., Garlsbad, CA 92008
Ph: 780-602~719 Fax: 760-602-8558
email: bullding@carlsbadca.gov
www.carlsbadca.gov
SUITE#/SPACE#/UNIT#
Plan Check No.
Est. Value
Plan Ck. Deposit
Date
# BATHROOMS TENANT BUSINESS NAME
EMAIL
STATE UC.# CLASS •-cs
OCC. GROUP
FIRE SPRINKLERS
YES O NOD
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, Improve, demolish or repair any structure, prior to ,ts issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law (Chapter 9, commending with Section 7000 of Division 3 of the
Business and Professions Code) or !hat he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subJects the applicant to a civil penalty of not more than five hundred dollars ($5001).
Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of lhe following declaralions:
D I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the labor Code, for the performance of the work for which this permit is issued.
'l)t have and will maintain worker • c9m nsati as ll(lu· ed by · n 3700 of the Labor Code, for the performa~;z; ~ permit is i~ljjid. "It workers' compensati_o~~~ra'Jf~~r and policy
/-number are: Insurance Co._t).'.£J.',k_(c_-:).~~~~~__,e;_~5. ______ Policy No. () fl/ ':f_/ Expiration Dale _ _.t_;c-,'D-Pl~-"'-'=....,UJ__. ______ _
This section need not be completed if the permit is for one hundred dollars ($100) or less.
D Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as lo become subject lo the Workers· Compensation Laws of
Cal!forma WARNING: Failure to secure workers· compensation coverage is unlawful, and shall subject an employer to criminal pcnall!es and civil fines up to one undred thousand dollars (&100,000), in
addition to the cost or compensation, da as provi ed for in Secti 3706 oft Labor code, interest and attorney's fees. /
~ CONTRACTOR SIGNATURE ~,U~~ie,.,L--. AGENT DATE /0 ~ ~/
I hereby affirm 1ha1 I am exempl from Con1racux·s License Law for lhe following reason:
• I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's
License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees. provided that such improvements are not intended or offered for
sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
• t. as owner of the property, am exclusively contracting wilh licensed contractors to construct the project (Sec. 7044. Business and Professions Code: The Contractofs License Law does not apply lo an owner of
property who builds or improves thereon. and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law).
D I am exempt under Section _____ Business and Professions Code for this reason:
1. I personally plan lo provide the major labor and materials for construction of the proposed property improvement. • Yes • No
2 I (have/ have not) signed an application for a building permit for the proposed work
3. I have contracted wilh the following person {firm) lo provide the proposed construction (include name address /phone / contractors' license number):
4. I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name / address/ phone I contractors' license number):
5. I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name/ address I phone I type of work):
~ PROPERTY OWNER SIGNATURE •AGENT DATE
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the
Presley-Tanner Hazardous Substance Account Act? D Yes D No
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? • Yes • No
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? D Yes • No
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF
EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
I certify that I have read the application and state that the above infoITTiation is correct and that the infoITTiation on the plans Is accurate. I agree to comply with all City ordinances and State laws relating to building construction.
I hereby authorize representative of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CllY OF CARLSBAD
AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANYWAY ACCRUE AGAINST SAID CllY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT.
OSHA: An OSHA peITTitt is required for excavations over 5'0' deep and demolition or construction of strucb.Jres over 3 stones in height
EXPIRATION: Every permit issued by the Building Official under the provisions of this Code shall expire by limitation and become null and void rr the building or wor1I authorized by such permit is not commenced within
180 days from the date of such peITTiit or rr the buildingi authorized by such permtt is suspended or abandoned at any time after the wor1I is commenced for a riod of 1 days (Section 106.4.4 Unttorm Building Code). ,,
..@S' APPLICANT'S SIGNATURE .• · DATE ;0
t~:~wr;li_ ~ l'~ ~~:~~','1~'~• l ,. ~ "':', t:r'{; ~ ,:11• <' ~ •' ' ' • ~z.:;;~~\.:,:;: ")t\; /·V:::.>.: \,t,P,E~~iT INSPECTION HISTORY REPORT (CBR2017-2499)
Permit Typo· BLDG-Residential Application Date: 10/18/2017 Owner: MARK WILSON
Work Class· Pool Issue Date: 10/26/2017 Subdivision: CARLSBAD TCT#74-06
Status Closed -Finaled Expiration Dato: 02/25/2019 Address: 1727 Calavo Ct
Carlsbad, CA 92008-4252
IVR Number: 7054
Scheduled Actual
Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete
11/06/2017 11106/2017 BLDG-SW-Pre-Con 039673-2017 Passed Chris Renfro Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
1210412017 12/0412017 BLDG-51 042146-2017 Passed Chris Renfro Complete
Excav/Steel(Pools)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-52 Pool 042147-2017 Failed Chris Renfro Reinspectlon Complete
Plumbing
BLDG-53 042148-2017 Passed Chris Renfro Complete
Elec/Conduit/Wiring(
Pools)
12105/2017 1210512017 BLDG-52 Pool 042300-2017 Passed Chris Renfro Complete
Plumbing
0412012018 04/20/2018 BLDG-54 055611-2018 Passed Chris Renfro Complete
Equipotential
Bond(Pools)
0812812018 08/28/201 8 BLDG-55 068366-2018 Passed Chris Renfro Complete
Fence/Preplaster
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
10/0412018 10104/2018 BLDG-Final 071963-2018 Passed Chris Renfro Complete
Inspection
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-Plumbing Final Yes
BLDG-Structural Final Yes
BLDG-Electrical Final Yes
October 04, 201 8 Page 1 of 1
STORM WATER POLLUTION PREVENTION NOTES
1. ALL NECESSARY EQUIPMENT AND MATERIALS SHALL BE
AVAILABLE ON SITE TO FACILITATE RAPID INSTALLATION
OF EROSION AND SEDIMENT CONTROL BMPs WHEN RAIN
IS EMINENT.
2. THE OWNER/CONTRACTOR SHALL RESTORE ALL EROSION
CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION
OF THE CITY INSPECTOR AFTER EACH RUN-OFF PRODUCING
RAINFALL.
3. THE OWNER/CONTRACTOR SHALL INSTALL ADDITIONAL EROSION
CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY
INSPECTOR DUE TO INCOMPLETE GRADING OPERATIONS OR
UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE.
4. ALL REMOVABLE PROTECTIVE DEVICES SHALL BE IN PLACE
AT THE END OF EACH WORKING DAY WHEN THE FIVE (5)
DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PECENT
( 40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER
EACH RAINFALL.
5. ALL GRAVEL BAGS SHALL CONTAIN 3/4 INCH MINIMUM
AGGREGATE.
6. ADEQUATE EROSION AND SEDIMENT CONTROL AND PERIMETER
PROTECTION BEST MANAGEMENT PRACTICE MEASURES MUST
BE INSTALLED AND MAINTAINED.
7. THE CITY INSPECTOR SHALL HAVE THE AUTHORITY TO ALTER
THIS PLAN DURING OR BEFORE CONSTRUCTION AS NEEDED
TO ENSURE COMPLIANCE WITH CITY STORM WATER QUALITY
REGULATIONS.
OWNER'S CERTIFICATE:
I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT
BEST MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION
ACTIVITIES TO THE MAXIMUM EXTENT PRACTICABLE TO AVOID
THE MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO
AVOID THE EXPOSURE OF STORM WATER TO CONSTRUCTION
RELATED POLLUTANTS; AND (2) ADHERE TO, AND AT ALL TIMES,
COMPLY WITH THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP
THROUGHOUT THE DURATION OF THE CONSTRUCTION ACTIVITIES
UNTIL THE CONSTRUCTION WORK IS COMPLETE AND APPROVED
BY THE CITY OF CARLSBAD.
Lltih /)W);6Zfl/ t:7V
iVNER'S AGENT NAME (PRINT) 1/oiVN ' -t//4tri~~-
OWNER(S)/OWNER'S AGENT .NAME (SIGNATURE
E-29
fiJ/471?
DATE /
STORM WATER COMPLIANCE FORM
TIER 1 CONSTR.UCTION SWPPP
BEST MANAGEMENT PRACTICES (BMP) SELECTION TABLE
tBR
d/2iJl7 1._~qq
Erosion Control Sediment Control BMPs Tracking Non-Storm Water Waste Management and Materials
BMPs Control BMPs Management BMPs Pollution Control BMPs
"' -"' "' 0 -0 0 :;:; "' "' "C :;:; :;:; O' 0
., "C ., "C "' "' " " "' "' O' E "' E "' -0 -:, :, 0 '5 ·.::: a_ 0 0 0 E ., L L :g L ':, >, .,
"" "C "' O' L --"' '-O' "' ., L "' -~ c "'"' "' ·.::: er L 0 "' O' a_ ., -"'"' "' > L ., 0 Best Management Practice* <Id "' Oo 0 ·a_ L <.O ., "-' > "' "' CD L 0 ., 0 ., ., 0 :;:; -.c "'., "' >'= E
., 0 "' (.) L (.) "' c "C ., "' "" "' ., "' (BMP) Description • "' " ., VJ ·e ., "' O' ., O' CD •o C O' "' 'O "' ;;:: "' Cl ::, §! -., ., =i ~ Q.) -0 0 ., "' LO ~~ "C >, 0"' "'"' 0 gi E :;:; " "' Cl 0 CD VJ•-O' CJ,_ (.) ., Oo O' ., .,
"" Cl o, Cl "' ., a,: E 0 -Nu, i!lo en:;:; ., ~ 8, 0 L-;;:: ., X ., E~ " ~-~ a_ a_ 0 ., 0 ., LL E -"' ., -:, .0 = rn = 3.: L'-"'0 :0 " "' LO ·.::: -"' L O' -"C .c "' " L ., :, "C ·-., ·-"C 21:> ., "C 0 -·-a_ '5 ., > L-.0 L .0 0 •-L 0 ·-0 Q) L " --0 0 L 0 0 -., e ., " "' 00 0 O' .Bo 00 ~g -.c ., -o -0 = C: ·-"' ., ~ OL ., .c £! .!ao 0 -L -"' ;;:: a:: 0 ~u o_ 0 -a_o oo
<.O "-' Cl vi vi VJ (.) LL <.O VJ> VJ VJ a_ VJ -VJ a,: a_o a_ ::;; VJ ::::. VJ VJ(.) VJ""
CASQA Designation • r--00 0, "' .... U') "' r--00 0 N "' r--00 N "' .... U')
I I I 'T 'T I I I I I I I I I I I I I I I I I I
(.) (.) (.) (.) "-' "-' "-' "-' "-' "-' "-' "-' a,: ~ VJ VJ VJ VJ i i i i i Construction Activity "-' "-' "-' "-' VJ VJ VJ VJ VJ VJ VJ VJ f-z z z z
Gr•dina /Soil Disturbance -::,,.. .....,,, '::-;;,_ ><. y .><.. )'-__
Trenchina /Excavation .
Stockoilina
Drillina /Borinq
Concrete/ Asphalt Sawcuttinq
Concrete Flatwork
Pavinq
Conduit/Pioe Installation
Stucco/Mortar Work
Waste Disposal
Staaina/Lav Down Area
Eauipment Maintenance and Fuelina
Hazardous Substance Use/Storaae
Dew•terina
Site Access Across Dirt
other (iistl:
Instructions:
1. Check the box to the left of •II applicable construction activity (first column) expected to occur during construction.
2. Located along the top of the BMP Table is a list of BMP's with it's corresponding California Stormwater Quality Association (CASQA) designation number. Choose one
or more BMPs you intend to use during constructioc from the list. Check the box where the chosen activity row intersects with the BMP column.
3. Refer to the CASQA construction handbook for information and details of the chosen BMPs and how to apply them to the project.
Page 1 of 1
PROJECT INFORMATION
Site Address: /'JZ:1 WUjt/0 er
Assessor's Parcel Number: ,;;;_.t 1-· 7/;,~ __ () 9 ' Emergency Contact: _
Name· fj,J;J/2£--{_ ~<{_.
24 Hour Phone: 76c?,,fC.1 /---,Sf?{/;;..--
Construction Threat to Storm Water Quality
(Check Box)
• MEDIUM PLOW
I
., -., "' -0 "' .::-o-"' ;;:: "' "' ., .,
:, E " E 0 ., -., "C O' f' O' i:;o " 0 N cc "'"' 00 0 0 :,::::::;; u::::.
"' 00
I I
i i
7--~
REV 02/16