HomeMy WebLinkAbout1808 ASTON AVE; 200; CB080785; Permit02-10-2009
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Commercial/Industrial Permit Permit No CB080785
Building Inspection Request Line (760) 602-2725
Job Address
Permit Type
Parcel No
Valuation
Occupancy Group
Project Title
1808 ASTON AV CBAD St 200
Tl Sub Type
2121200700 Lot#
$8,750 00 Construction
Referenc
SPEC SUITE 2495 SF OFFICE TO
OFFICE
COMM
0
Applicant
PACIFIC BUILDING GROUP
STE 150
9752 ASPEN CREEK CT
SAN DIEGO, CA 92126
858-552-0600
Status
Applied
Plan Approved
Issued
Inspect Area
Plan Check*
ABANDOND
04/29/2008
Entered By
Owner
M C R ASTON L L C
C/O GUY MCROSKEY
1808 ASTON AVE #295
CARLSBAD CA 92008
KG
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park Fee
LFM Fee
Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Pot Water Con Fee
Meter Size
Add'l Pot Water Con Fee
Reel Water Con Fee
Green Bldg Stands (SB1473) Fee
$10035 Meter Size
$0 00 Add'l Reel Water Con Fee
$65 23 Meter Fee
$0 00 SDCWA Fee
$0 00 CFD Payoff Fee
$184 PFF (3105540)
$0 00 PFF (4305540)
$0 00 License Tax (3104193)
$0 00 License Tax (4304193)
$000 Traffic Impact Fee (3105541)
$0 00 Traffic Impact Fee (4305541)
$0 00 PLUMBING TOTAL
$0 00 ELECTRICAL TOTAL
$0 00 MECHANICAL TOTAL
$0 00 Master Drainage Fee
Sewer Fee
$0 00 Redev Parking Fee
$0 00 Additional Fees
7? HMP Fee
TOTAL PERMIT FEES
$000
$000
$000
$000
$000
$000
$000
$000
$000
$000
$3400
$3500
$2400
$000
$000
$000
$000
??
$260 42
Total Fees $260 42 Total Payments To Date $0 00 Balance Due $260 42
Inspector
FINAL APPROVAL
Date Clearance
NOTICE Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions" You have 90 days from the date this permit was issued to protest imposition of these fees/exactions If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
fees/exactions of which vou have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired.