Loading...
HomeMy WebLinkAbout1808 ASTON AVE; 200; CB080785; Permit02-10-2009 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Commercial/Industrial Permit Permit No CB080785 Building Inspection Request Line (760) 602-2725 Job Address Permit Type Parcel No Valuation Occupancy Group Project Title 1808 ASTON AV CBAD St 200 Tl Sub Type 2121200700 Lot# $8,750 00 Construction Referenc SPEC SUITE 2495 SF OFFICE TO OFFICE COMM 0 Applicant PACIFIC BUILDING GROUP STE 150 9752 ASPEN CREEK CT SAN DIEGO, CA 92126 858-552-0600 Status Applied Plan Approved Issued Inspect Area Plan Check* ABANDOND 04/29/2008 Entered By Owner M C R ASTON L L C C/O GUY MCROSKEY 1808 ASTON AVE #295 CARLSBAD CA 92008 KG Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park Fee LFM Fee Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot Water Con Fee Meter Size Add'l Pot Water Con Fee Reel Water Con Fee Green Bldg Stands (SB1473) Fee $10035 Meter Size $0 00 Add'l Reel Water Con Fee $65 23 Meter Fee $0 00 SDCWA Fee $0 00 CFD Payoff Fee $184 PFF (3105540) $0 00 PFF (4305540) $0 00 License Tax (3104193) $0 00 License Tax (4304193) $000 Traffic Impact Fee (3105541) $0 00 Traffic Impact Fee (4305541) $0 00 PLUMBING TOTAL $0 00 ELECTRICAL TOTAL $0 00 MECHANICAL TOTAL $0 00 Master Drainage Fee Sewer Fee $0 00 Redev Parking Fee $0 00 Additional Fees 7? HMP Fee TOTAL PERMIT FEES $000 $000 $000 $000 $000 $000 $000 $000 $000 $000 $3400 $3500 $2400 $000 $000 $000 $000 ?? $260 42 Total Fees $260 42 Total Payments To Date $0 00 Balance Due $260 42 Inspector FINAL APPROVAL Date Clearance NOTICE Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions" You have 90 days from the date this permit was issued to protest imposition of these fees/exactions If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any fees/exactions of which vou have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired.