Loading...
HomeMy WebLinkAbout1808 ASTON AVE; 170; CB140580; Permit05-16-2014 City of Carlsbad 1635 Faraday Av Carlsbad.CA 92008 Commercial/Industrial Permit Permit No: CB140580 Building Inspection Request Line (760) 602-2725 Job Acidress: Permit Type: Parcel No: Valuation: Occupancy Group: Project Title: 1808 ASTON AV CBADSt: 170 Tl Sub Type: INDUST 2121200700 Lot#: 0 $339,834.00 Construction Type: 5B Reference # Status: ISSUED Applied: 03/13/2014 Entered By: JIVIA Plan Approved: 05/16/2014 Issued: 05/16/2014 Inspect Area Plan Check #: VERTICAL SEARCH: 9,155 SF OFF TO SAME//COMBINES STES 155, 160, 165 AND 170. Applicant: TARA NORTON STE 100 5090 SHOREHAM PL SAN DIEGO CA 92122-5934 619-297-1011 Owner: IVI C R ASTON LLC 1808 ASTON AVE #180 CARLSBAD CA 92008 Building Permit $1,636.42 Meter Size Add'l Building Permit Fee $0.00 Add'l Reel. Water Con. Fee $0.00 Plan Check $1,145.49 Meter Fee $0.00 Add'l Building Permit Fee $0.00 SDCWA Fee $0.00 Plan Check Discount $0.00 CFD Payoff Fee $0.00 Strong IVlotion Fee $71.37 PFF (3105540) $0.00 Park Fee $0.00 PFF (4305540) $0.00 LFM Fee $0.00 License Tax (3104193) $0.00 Bridge Fee $0.00 License Tax (4304193) $0.00 BTD #2 Fee $0.00 Traffic Impact Fee (3105541) $0.00 BTD #3 Fee $0.00 Traffic Impact Fee (4305541) $0.00 Renewal Fee $0.00 PLUMBING TOTAL $77.00 Add'l Renewal Fee $0.00 ELECTRICAL TOTAL $264.83 other Building Fee $0.00 MECHANICAL TOTAL $51.90 PoL Water Con. Fee $0.00 Master Drainage Fee $0.00 Meter Size Sewer Fee $0.00 Add'l PoL Water Con. Fee $0.00 Redev Parking Fee $0.00 Reel. Water Con. Fee $0.00 Additional Fees $0.00 Green BIdg Stands (SB1473) Fee $12.00 HMP Fee ?? Fire Expedidted Plan Review $115.00 Green BIdg Standards Plan Chk ?? TOTAL PERMIT FEES $3,374.01 Total Fees: $3,374.01 Total Payments To Date: $3,374.01 Balance Due: $0.00 Inspector: FINAL APPROVAL Date: ^'Z^'/Y Clearance: NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively refen-ed to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth In Govemment Code Section 66020(a), and file the protest and any other required Infomiation with the City Manager for processing In accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their Imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees In connection with this project. NOR DOES IT APPLY to any fees/exactions of which vou have previouslv been given a NOTICE similar to this, or as to which the statute of limitations has oreviouslv othenvise expired. THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE PLANNING catN NGINEERING IZfCll UILDING IRE •HEALTH •HAZMAT/APCD ^ CITY OF CARLSBAD Building Permit Appiication 1635 Faraday Ave., Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 email: buildlng@carlsbadca.gov www.carisbadca.gov PlanCheckNo. Est. Value ^ 33^ ,^3^ Plan Ck. pepo^it Date SWPPP CT/PROJECT # L0T# PHASE* # OF UNITS # BEDROOMS # BATHROOMS TENANT BUSINESS NAME CONSTR. TYPE OCC. GROUP 69 4 Vertical Search Works V-A B JOB ADDRESS 1808 Aston Ave, Cartsbad, CA 92008 SUITEt/SPACEt/UNIT# 170 212 120 07 00 DESCRIPTION OF WORK: /nc/ude Square Feet of Xffected Areais; Tenant improvement to include new partitions, electrical, and mectianical. Area of improvement is 9,155 square feet. Combining suites 155,160,165, and 170 Into a single suite. EXISTING USE Office PROPOSED USE Office GARAGE (SF) 0 PATIOS (SF) 0 DECKS (SF) 0 FIREPLACE YES|~|# N0[7] AIR CONDrriONING YES [7]NO I I FIRE SPRINKLERS YESf/lNOfn APPUCANTNAME (Primary Contact) Tara Norton APPLICANT NAME (Secondary Contact) Ctiris Brandtey ADDRESS 5090 Shoream Place, Suite 100 ADDRESS 5090 Shoream Place, Suite 100 CITY San Dieqo STATE CA ZIP 92122 CITY San Dieqo STATE CA 92122 PHONE „ FAX 619-297-1011 / D PHONE 619-297-1011 EMAIL tnorton^rbn-desiqn .com cbrandtey@rbn-desiqn.com PROPERTY OWNER NAME IVICR Aston LLC CONTRACTOR BUS. NAME Pacific Buildina Group ADDRESS 1808 Aston Ave, Suite 180 ADDRESS 9752 Aspen Creek Court CITY Cartsbad STATE CA 92008 CITY San Dieqo STATE CA ZIP 92126 PHONE 760-929-5020 PHONE 858-334-4103 FAX EMAIL quy@mcrtaw.com EMAIL ARCH/DESIGNER NAME & ADDRESS RBN Desian 502376 B CITY BUS. LIC.# 1207435 (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires the applicantfor such permit to file a signed statement that he is licensed pursuantto the provisions of the Contractor's License Lawichapter 9, commendingwlth Section 7000 of Division 3 of the Business and Professions Code} or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars {$500)). WORKERS' COMPENSATION Workers' Compensation Declaration: / hereby affirm under penalty of perjury one ofthe toiiowing declaratbns: SI have and wiii maintain a certificate of consent to self-insure for woil<ers' compensation as provided by Section 3700 of the Labor Code, for the perfonnance of the work for which this pemiit is issued. I have and wiii maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My woriiers' compensatton insurance carrier and policy number are: Insurance Co._ Lockton Insurance Brokers, LLC Policy No.. A1CG36841307 Expiration Date. 03raiM4 pite sectton need not be completed if the permit is for one hundred dollars ($100) or less. I I Certificate of Exemption: I certify that in the perfomiance of the work for whtoh this pemiit is issued, I shall not employ any person in any manner so as to become sutiject to the Wortieis' Compensatton Laws of Califomia. WARNiNG: Failure to secure workers' compensation coverage is uniawful, and shall subject an empioyer to criminai penaities and civil fines up to one hundred thousand doiiars (&100,000), in addition to the cost of compensatio/ dam^gyirprovided for in Section 37j^ of the Labor code, interest and attomey's fees. >eS'CONTRACTOR SiGNATURE ] (JUi [7]AGENT DATE O W N E R - B U I L D E R DECLARATION / hereby alfinn that I am exempt Hm Confractor's L/cense Law for the following reason: [ I I, as owner of the property or my employees with wages as their sole cqinpeilSalion, will do the worts and the structure is not intended or offered for sale (Sec. 7044, Business and Professtons Code: The Contractor's License Law does not apply to an owner of property who builds pf im|iroves thereon, and who does such wori( himself or through his own emptoyees, provided that such improvements are not intended or offered for sale. If however, the building or improvement is sokj within one year of completton, the owner-builder will have the burden of proving that he dkl not build or impiove for the purpose of sale). I I I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professtons Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). I I I am exempt under Section Business and Professtons Code for this reason: 1.1 personally plan to provide the major labor and materials for constructton of the proposed property improvement. •Yes I INO 2.1 (have / havepdlT signed an application for a building pemiit for the proposed worts. 3.1 havefotrfScted with the following person (firm) to provide the proposed construction (include name address / phone / contractors' license number): 4. Lpwto provide porttons of the wori(, but I have hired the following person to coordinate, supervise and provide the major worts (include name / address / phone / contractors' license number): 1.1 will provide some of the worit, but I have contracted (hired) the following persons to provide the wori( indicated (include name / address / phone / type of worts): I PROPERTY OWNER SiGNATURE •AGENT DATE COMPLETE THIS SECTION FOR NON-RESIOENTIAL BUiLDING PERMITS ONLY Is the applicant or future building occupant requined to submit a business plan, acutely hazardous materials registratton form or risk management and prevention program under Sections 25505,25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? Yes / No Is the applicant or future building occupant required to obtain a permit from the air pollutton control district or air quality management district? Yes / No Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? Yes / No IF ANY OF THE ANSWERS ARE YES, A FiNAL CERTiFiCATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETiNG THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. CONSTRUCTION LENDING AGENCY I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (I) Civil Code). Lender's Name Lender's Address APPLICANT CERTIFICATION 1 (»1i^ that I have lead the appiksatbn and state that the above inforniatkm is conect and that the infb^ Ihensby authorize nspresentaSve of Ihe Cily of Cartetiad toenter upon the above nwSorie^ AGAINST AU LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT OSHA: An OSHA pemiit Is requred for excavations over 50 deep and demolition or constmction of structures over 3 stoiies ii height. EXPIRATION: Every peimit Issued by the Building Ofiicial under the provisions of this Code shall expire by limitatbn and become null and void If the building or worts aulhorized by such peimit is not oommenced within 180 days from the date of such peirnhjor ifthe bwldinMr worts authorized by such permit Is suspended or abandoned at any time after the worts Is commenced for a period of 180 days (Sectbn 106.4.4 Uniform Building Code). >€irAPPLICANT'S SiGNATURE DATE STOP: THIS SECTION NOT REQUIRED FOR BUILDING PERMIT ISSUANCE. Complete the fottowing ONLY If a Certificate of Occupancy will be requested at final inspection. Fax (760) 602-8560, Email buildina(5)carlsbadca.aov or Mall the completed forni to City of Carlsbad, Building Division 1635 Faraday Avenue, Carisbad, Califbmia 92008. C0#: (Office use Only) CONTACT NAME OCCUPANT NAME ADDRESS BUILDING ADDRESS CITY STATE CPTY STATE ZIP Carlsbad CA PHONE FAX EIVIAIL OCCUPANT'S BUS. LIC. No. DELIVERY OPHONS PICK UP: CONTACT (Listed above) OCCUPANT (Listed above) CONTRACrrOR (On Pg. 1) MAILTO: (X)NTACT(Listedabove) OCCUPANT (Listedabove) CONTRACTOR (On Pg. 1) MAIL / FAX TO OTHER: ASSOCIATED CB#.- NO CHANGE IN USE / NO CONSTRUCTION CHANGE OF USE / NO CONSTRUCTION >«• APPLICANT'S SIGNATURE DATE Inspection List Permit*: CB140580 Type: Tl Date Inspection Item 08/28/2014 89 Final Combo 08/28/2014 89 Final Combo 08/04/2014 17 Interior Latti/DiTwall 07/30/2014 84 Rougli Combo 07/16/2014 19 Final Structural 07/10/2014 85 T-Bar 07/09/2014 85 T-Bar 06/16/2014 17 Interior Lath/Drywall 06/11/2014 14 Frame/Steel/Bolting/Weldin 06/11/2014 31 Underground/Conduit-Wirin INDUST Inspector Act -Rl PB AP PB AP PD AP PB PA PB AP PB NR PB AP PB PA PB AP VERTICAL SEARCH: 9,155 SF OFF TO SAME//COMBINES STES 155, 160, 165 Comments COF Friday, August 29, 2014 Page 1 of 1 INSPECTION RECORD luilding Division ^ INSPECflON ftECORD CARD WITH APPROVED PLANS MUST BE KEPT ON THE JOB ^ CALL BEFORE 3:30 pm FOR NEXT WORK DAY INSPECTION sr FOR BUiLDING INSPECTION CALL: 760-602-2725 OR GO TO: www.Carlsbadca.qov/Buildlnq AND CUCK ON "RequestJ >ATE: CB140580 1808 ASTON AV 170 VERTICAL SEARCH: 9,155 SF OFF TO SAME//COMBINES STES 155, 160, 165 AND 170. Tl INDUST Lot#: TARA NORTON i^ECORD COPY IF "YES" IS CHECKED BELOW THAT DIVISION S APPROVAL IS REQUIRED PRIOR TO REQUESTING A FlNAL BUILDING INSPECTION. IF YOU HAVE ANY QUESTIONS PLEASE CALL THE APPLICABLE DIVISIONS AT THE PHONE NUMBERS PROVIDED BELOW. AFTER ALL REQUIRED APPROVALS ARE SIGNED OFF- FAX TO 760-602-8560. EMAIL TO BLDGINSPECTIONS@CARLSBADCA.GOV OR BRING iN A COPY OF THIS CARD TO: 1635 FARADAY AVE.. CARLSBAD. CA 9200S, BUILDING INSPECTORS CAN BE REACHED AT 760-602-2700 BETWEEN 7:30 AM - 8;00 AM THE DAY OF YOUR INSPECTION. YES Required Prior to Requesting Building Finai If Checiced YES Date Inspector Notes Planning/Landscape 760-944-8463 Allow 48 hours y / ' CM&I (Engineering Inspections) 760-438-3891 Call before 2 pm Fire Prf.vention 760-602-4660 Allow 48 hours 1 Type of Inspection Type of Inspection 1 CODE # BUILDING 1 Oate Inspector CODE /* ELECTRICAL 1 Date Inspector #11 FOUNDATION #31 • ELECTRIC UNDERGROUND • UFER #12 REINFORCED STEEL #34 ROUGH ELECTRIC #66 MASONRY PRE GROUT #33 • ELECTRICSERVICE • TEMPORARY • GROUT • WALL DRAINS #35 PHOTOVOLTAIC #10 TILTPANELS #39 FINAL #11 POURSTRIPS COD. # MECHANICAL #11 COLUMN FOOTINGS #41 UNDERGROUND DUCTS & PIPING #14 SUBFRAME • FLOOR • CEILING #44 • DUCT & PLENUM • REF. PIPING #15 ROOFSHEATHING #43 HEAT-AIR COND. SYSTEMS #13 EXT. SHEAR PANELS #49 FINAL #16 INSULATION CODE # COMBO INSPECTION #18 EXTERIORUTH #81 UNDERGROUND (11,12,21,31) #17 INTERIOR UTH & DRYWALL #82 DRYWALL,EXT UTH, GAS TES (17,18,23) #51 POOLEXCA/STEEL/BOND/FENCE #83 ROOF SHEATING, EXT SHEAR (13,15) #55 PREPLASTER/HNAL #84 FRAME ROUGH COMBO (14,24,34,44) #19 FINAL #85 T-Bar (14,24,34,44) CODE # PLUMBING Oate Inspector #89 FINAL OCCUPANCY (19,29,39,49) #22 • SEWER & BL/CO • PL/CO FIRE Oate Inspector #21 UNDERGROUND DWASTE • WTR #24 TOPOUT • WASTE DWTR A/S UNDERGROUND VISUAL ^ \ #27 TUB & SHOWER PAN A/S UNDERGROUND HYDRO #23 DGASTEST • GAS PIPING A/S UNDERGROUND FLUSH #25 WATER HEATER lA/S OVERHEAD VISUAL • /h- #28 SOURWATER A/S OVERHEAD HYDROSTATIC n #29 FINAL A/S FINAL i Z^-Zislif 2^ CODE # STORM WATER F/AROUGH-IN X \ #600 PRE-CONSTRUCTION MEETING F/A RNAL \ #603 FOLLOW UP INSPECTION FIXED EXnNGUISHING SYSTEM ROUGH-IN \ \ #605 NOTICETO CLEAN FIXED EXHNG SYSTEM HYDROSTATICTEST \ \ #607 WRITTEN WARNING FIXED EXTINGUISHING SYSTEM FINAL \ ^ \ #609 NOTICEOFVIOUTION MEDICAL GAS PRESSURETEST \ #610 VERBALWARNING MEDICAL GAS FINAL \ SEE BACK FOR SPECIAL NOTES Section 5416. Health and Safety Code, State of California (a) There sh/Qii be not less than one water closet for each 20 employees or fractional part thereof worK;ng at a constructiSffjob site. The water closet shall consist of a patented chemical type toilet. (b) For the purpose of this section the term construction site shall mean the location on which actual construction of a building is in progress. (c) A violation of this section shall constitute a misdemeanor. All cohstruction or work for which a permit is required shall be subject to inspection and all such construction or work shall remain accessible and exposed for inspection purposes until approved by the inspector. Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the inspector. DATE ADDITIONAL NOTES .'/•/Z •/</ l/U, (UiJo,if- i^iH-l/'fjP-lilC.j-riC oD'T EsGil Corporation In (Partnersliip witH government for (BuiUing Safety DATE: 5/14/14 • APPLICANT • JURIS. JURISDICTION: City of Carlsbad • PLAN REVIEWER • FILE PLANCHECKNO.: 14-0580 SET III PROJECT ADDRESS: 1808 Aston Ave Suite 170 PROJECT NAME: Vertical Search Works - TI X| The plans transmitted herev\/ith have been corrected where necessary and substantially comply with the jurisdiction's building codes. I I The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. I I The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. I I The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. I I The applicant's copy of the check list has been sent to: |X| EsGil Corporation staff did not advise the applicant that the plan check has been completed. I I EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Telephone #: Date contacted: (by: ) Email: Fax #: Mail Telephone Fax In Person • REMARKS: By: Doug Moody Enclosures: EsGil Corporation • GA • EJ • MB • PC Log 9320 Chesapeake Drive, Suite 208 • San Diego, Califomia 92123 • (858) 560-1468 • Fax (858) 560-1576 EsGil Corporation In (Partnersfiip witfi government for (Builifing Safety DATE: 4/10/14 • APPLICANT ^(S^JURIS. JURISDICTION: City of Carlsbad • PLAN REVIEWER • FILE PLANCHECKNO.: 14-0580 SET II PROJECT ADDRESS: 1808 Aston Ave Suite 170 PROJECT NAME: Vertical Search Works - TI I I The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. I ] The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. 3 The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. I I The applicant's copy of the check list is enclosed for the jurisdiction to fonward to the applicant contact person. I ] The applicant's copy of the check list has been sent to: I I EsGil Corporation staff did not advise the applicant that the plan check has been completed. ^ EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Tara Norton Telephone #:_ Date contacted: (by: ) Email: tnorton@rbn-design.com Fax #: Mail v^Telephone-^^v$^ax In Person • REMARKS: ' By: Doug Moody Enclosures; EsGil Corporation • GA • EJ • MB • PC 4/4/14 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576 City of Carlsbad 14-0580 4/10/14 Please make all corrections on the original tracings, as requested in the correction list. Submit three sets of plans for commercial/industrial projects (two sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. These corrections are in response to items not fully addressed or as the result of information provided, the text in bold print indicates the unresolved issue. 2. Provide a section view of all new interior glazed partitions. Show: a) Specify manufacturer and ICC approval number. No information provided for the Wilson Partition system b) Method of attaching top and bottom plates to structure. (NOTE: Top of partition must be secured to roof or floor framing, unless suspended ceiling has been designed for partition lateral load). No Information shown in detail 3 on sheet TI-9. c) Show height of partition and suspended ceiling, and height from floor to roof framing or floor framing. 3. Please provide notes on the plans to show the suspended ceilings in Seismic Design Categories D, E & F comply with ASCE 7-05 Section 13.5.6.2.1 as follows: a) Ceiling areas over 2500 ft.^ must have seismic separation joints or full height partitions that break the ceiling into areas not exceeding 2500 ft.=^. Please provide the joint detail on the plans and show the location of the joints on the reflected ceiling plan. Please correct sheet TI-7 to reference the correct detail for the location of the seismic separation joints. To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. City of Carlsbad 14-0580 4/10/14 Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: Yes • No • The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Doug Moody at Esgil Corporation. Thank you. EsGil Corporation In (partnersliip with government for (BuiCcCing Safety DATE: 3/26/14 • APPLICANT • JURIS. JURISDICTION: City of Carlsbad • PLAN REVIEWER • FILE PLANCHECKNO.: 14-0580 SET I PROJECT ADDRESS: 1808 Aston Ave Suite 170 PROJECT NAME: Vertical Search Works - TI r~] The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. I I The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. I I The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. I I The applicant's copy of the check list has been sent to: I I EsGil Corporation staff did not advise the applicant that the plan check has been completed. 1^ EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Tara Norton Telephone #: ' Date contactedS^I(by:^)*^^ Email: tnorton(a)rbn-desiqn.com Fax #: Mail ^Telephone Fax In Person • REMARKS: By: Doug Moody Enclosures: EsGil Corporation • GA • EJ • MB • PC 3/17/14 9320 Chesapeake Drive, Suite 208 • San Diego, Califomia 92123 • (858) 560-1468 • Fax (858) 560-1576 City of Carlsbad 14-0580 3/26/14 PLAN REVIEW CORRECTION LIST TENANT IMPROVEIVIENTS PLANCHECKNO.: 14-0580 JURISDICTION: City ofCarlsbad OCCUPANCY: B USE: Office TYPE OF CONSTRUCTION: VA ACTUAL AREA: 9155sf ALLOWABLE FLOOR AREA: STORIES: 1 HEIGHT: SPRINKLERS?: Yes OCCUPANT LOAD: 120 REMARKS: DATE PLANS RECEIVED BY JURISDICTION: 3/13/14 DATE PLANS RECEIVED BY ESGIL CORPORATION: 3/17/14 DATE INITIAL PLAN REVIEW COMPLETED: 3/26/14 PLAN REVIEWER: Doug Moody FOREWORD (PLEASE READ): This plan review is limited to the technical requirements contained in the California version of the International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Code sections cited are based on the 2013 CBC, which adopts the 2012 IBC. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of the 2012 International Building Code, the approval ofthe plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e.. plan sheet number, specification section, etc. Be sure to enclose the marked up list when vou submit the revised plans. City of Carlsbad 14-0580 3/26/14 Please make all corrections on the original tracings, as requested in the correction list. Submit three sets of plans for commercial/industrial projects (two sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. 1. Please provide a statement on the Title Sheet of the plans to show compliance with the current Codes. The following are the correct current Codes: a) The 2013 edition ofthe California Building Code (CBC) adopts the 2012 International Building Code (IBC) and the 2012 California Amendments. b) The 2013 edition of the California Electrical Code (CEC) adopts the 2011 National Electrical Code (NEC) and the 2012 California Amendments. c) The 2013 edition of the California Mechanical Code (CMC) adopts the 2012 Uniform Mechanical Code (UMC) and the 2012 California Amendments. d) The 2013 edition of the California Plumbing Code (CPC) adopts the 2012 Uniform Plumbing Code (UPC) and the 2012 California Amendments. e) The 2010 edition of the California Energy Efficiency Standards. 2. Provide a section view of all new interior glazed partitions. Show: a) Specify manufacturer and ICC approval number. b) Method of attaching top and bottom plates to structure. (NOTE: Top of partition must be secured to roof or floor framing, unless suspended ceiling has been designed for partition lateral load). c) Show height of partition and suspended ceiling, and height from floor to roof framing or floor framing. 3. Please provide notes on the plans to show the suspended ceilings in Seismic Design Categories D, E & F complywith ASCE 7-05 Section 13.5.6.2.1 as follows: a) Ceiling areas over 2500 ft.^ must have seismic separation joints or full height partitions that break the ceiling into areas not exceeding 2500 ft.^. City of Carlsbad 14-0580 3/26/14 Please provide the joint detail on the plans and show the location of the joints on the reflected ceiling plan. 4. Glazing in the following locations should be of safety glazing material in accordance with Section 2406.3. Show on the window schedule, d) Fixed or operable panels adjacent to a door where the nearest exposed edge ofthe glazing is within a 24-inch arc of either vertical edge ofthe door in a closed position. And where the bottom exposed edge ofthe glazing is less than 60 inches above the walking surface. 5. Exit doors shall swing in the direction of exit travel when serving a room containing an occupant load of 50 or more persons. Section 1008.1.2. 6. When additional doors are provided for egress purposes, they also shall conform to the requirements of Section 1008 (width, swing, hardware, etc.). Section 1008.1. 7. Please revise the plans to show the outside air connection to the new HP-9 and HP-10. 8. On the mechanical plans clearly show the limits of ceiling space used as duct or plenum. f) Clearly show that all material exposed within the plenum complies with UMC Section 604.2. "Materials shall have a mold-, humidity-, and erosion-resistant face that meets the requirements of UL 181." g) Combustibles within the plenum space must comply with UMC Section 601.3. Flame-spread index of not more than 25 and a smoke-developed rating of not more than 50. h) Environmental duct systems and product conveying duct systems shall not extend into or through ducts or plenums. UMC Section 504.1. and UMC Section 505.1. 9. Please revise the single line diagram to show the grounding of the new transformer to be per section 250-30 A (4) of the NEC. Indicate the location on the plans. 10. Please correct the panel schedule for panel HI70 to show the correct over- current device feeding the new transformer. (50 amp and not 100 amp). 11. Please revise the plumbing plans to show the required clean-outs per section 707 of the UPC at the new sink. 12. NON-RESIDENTIAL GREEN BUILDING STANDARDS (Additions and Alterations) The California Building Standards Commission (BSC) has adopted the Green Building Standards Code which became effective January 1, 2011, and must be enforced by the City of Carlsbad 14-0580 3/26/14 local building official. The Green Building Standards apply to nonresidential additions or tenant improvements throughout California. These standards applv to nonresidential additions of 1,000 sa. ft. or larger or alterations (tenant improvements) with a value of $200,000 or more. CGC Section 301.3. Provide a sheet on the plans labeled "Green Building Code Requirements" and include the following notes as applicable. 13. Bicycle parking. Note on the plans that bicycle parking for projects shall comply with CGC Section 5.106.4. The specific details must be submitted and approved by the Planning Department 14. Low-emitting, fuel-efficient and carpool/van pool parking. Note on the plans that fuel-efficient vehicle parking will be provided in accordance with CGC Section 5.106.5.2. The specific details for the parking must be submitted and approved by City Planning Department. 15. Waste management. Note on the plans that the contractor must submit to the Engineering Department or other Agency that regulates construction waste management a Waste Management Plan that outlines the items listed in CGC Section 5.408.1.1. 16. Recycling. Note on the plans that a minimum of 50% of construction waste is to be recycled. CGC 5.408.1. Documentation shall be provided to the enforcing agency which demonstrates compliance. CGC Section 5.408.1.4. 17. Waste reduction. Note on the plans that 100% of trees, stumps, rocks, and associated vegetation and soils primarily from the construction will be reused or recycled. CGC 5.408.3. 18. Recycling. Note on the plans that an identified, readily accessible area shall be provided that serves the entire building for collecting recycling, such as paper, cardboard, glass, plastics, metals, etc. CGC Section 5.410.1. 19. Documentation. Note on the plans that a building "Systems Manual" as listed in CGC Section 5.410.2.5 shall be delivered to the building owner or representative and the facilities operator. Further, note on the plans that the "Systems Manual" shall contain the required features listed in CGC Section 5.410.2.5.1. 20. Pollutant control. Note on the plans that during construction, ends of duct openings are to be sealed, and mechanical equipment is to be covered. CGC 5.504.3. 21. Pollutant control. Note on the plans that VOCs must comply with the limitations listed in Section 5.504.4 and Tables 4.504.1, 5.504.4.1 5.504.4.2, 5.504.4.3 and 5.504.4.5 for: Adhesives, Sealants, Paints and Coatings, Carpet and Composition Wood Products. CGC 5.504.4. City of Carlsbad 14-0580 3/26/14 22. Pollutant control. Note on the plans that mechanically ventilated buildings shall provide regularly occupied areas with air filtration media for outside and return air that provides at least a Minimum Efficiency Reporting Value (MERV) of 8. MERV 8 filters shall be installed prior to occupancy. CGC Section 5.504.5.3. 23. Pollutant control. Note on the plans that where outdoor areas are provided for smoking, such areas are prohibited within 25' of building entries, windows and outdoor air intakes. Signage shall be posted to inform occupants ofthe prohibitions. CGC Section 5.504.7. 24. Environmental comfort. Note on the plans that wall and floor assemblies separating tenant spaces (and tenant spaces from public spaces) shall have an STC of at least 40. CGC Section 5.507.4.3. 25. Environmental comfort. Wall and roof assemblies exposed to noise sources shall have an STC rating of at least 50, with exterior windows having a minimum STC of 40 in the following locations, per CGC Section 5.507.4.1: b) Within the 65 CNEL noise contour of a freeway, railroad or industrial source, as determined by the jurisdiction's Noise Element ofthe General Plan. c) Within the 65 CNEL noise contour of an airport. d) Note on the plans whether or not this addition or tenant improvement is located within the areas listed above. 26. Outdoor air quality. Note on the plans that installations of HVAC, refrigeration and fire suppression systems will not contain CFC's or Halons, per CGC 5.508.1. 27. Water reduction. Show on the plans the following maximum fixture flow rates from Table 5.303.2.3 and Section 5.303.3, as shown below. Revise general notes, plumbing plans, etc. to match. CGC 5.303. For additions or alterations, this only applies to new fixtures. MAXIMUM FIXTURE FLOW RATES FIXTURE TYPE MAXIMUM FLOW RATE Showerheads 2 gpm @ 80 psi Lavatory faucets- nonresidential 0.5 gpm @60 psi Kitchen faucets 1.8 gpm @ 60 psi Metering faucets 0.2 gallons/cycle Water closets 1.28 gallons/flush Urinals 0.5 gallons/flush City of Carlsbad 14-0580 3/26/14 28. Note on the plans that prior to final inspection the licensed contractor, architect or engineer in responsible charge of the overall construction must provide to the building department official written verification that all applicable provisions from the Green Building Standards Code have been implemented as part ofthe construction. CGC 102.3. To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: Yes • No • The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Doug Moody at Esgil Corporation. Thank you. City of Carlsbad 14-0580 3/26/14 [DO NOT PAY- THIS IS NOTAN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: City of Carlsbad PLANCHECKNO.: 14-0580 PREPARED BY: Doug Moody DATE: 3/26/14 BUILDING ADDRESS: 1808 Aston Ave Suite 170 BUILDING OCCUPANCY: B TYPE OF CONSTRUCTION: VA BUILDING PORTION AREA ( Sq. Ft.) Valuation Multiplier Reg. Mod. VALUE ($) Tl 9155 37.12 339,834 Air Conditioning Fire Sprinklers TOTAL VALUE 339,834 Jurisdction Code cb By Ordinance BIdg.Permit Fee by Ordinanoe • Plan Check Fee by Ordinance • Type of Review: GD Complete Review $1,636.42 $1,063.67 • Structural Only [^Repetitive Fee ^ Repeats • Other j—j Hourly EsGil Fee Hr. @ * $916.40 Comments: Sheet 1 of 1 macvalue.doc + PLAN CHECK PLAN CHECK Community & Economic CITY OF REVIEW Development Department 1635 Faraday Avenue CARLSBAD TRANSMITTAL Carlsbad CA 92008 wwv\/.carlsbadca.gov DATE: 03/18/14 PROJECT NAME: MCR ASTON LLC PLAN CHECK NO: 1 SET#: ADDRESS: 1808 ASTON VALUATION: $339,834 PROJECT ID: CB14-0580 APN: 212-120-07 / This plan check review is complete and has been APPROVED by the ENGINEERING Division. By: KATHLEEN LAWRENCE 03/18/14 A Final Inspection by the Division is required Yes / No This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to: You may also Iiave corrections from one or more ofthe divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. For questions or clarifications on the attached checl^list please contact the following reviewer as marl<ed: PLANNING 760-602-4610 ENGINEERING 760-602-2750 FIRE PREVENTION 760-602-4665 Chtis Sexton Chris.Sexton@carlsbadca.gov / Kathleen Lawrence ^ 760-602-2741 Kathleen.Lawrence@carlsbadca.gov Gregorv.Ryan@carlsbadca.gov Gina.Ruiz@carlsbadca.gov Linda.Ontiveros@carlsbadca.gov Cvnthla.Wong@carlsbadca.gov Dominic.Fieri@carlsbadca.gov Remarks: NO ADDITIONAL ENG. FEES NO CHANGE IN USE COMBINED STE'S 155.160,165. AND 170 ALREADY PAID AS OFFICE CITY OF CARLSBAD PLANNING DIViSION BUILDING PLAN CHECK APPROVAL P-29 Development Services Planning Division 1635 FaradayAvenue (760) 602-4610 www.carlsbadca.eov DATE: 3/17/14 PROJECT NAME: INTERIOR Tl ONLY - SEE REMARKS BELOW FOR CONDITION OF APPROVAL PROJECTID: PLAN CHECK NO: CB140580 SET#: ADDRESS: 1808 ASTON AV APN: ^ This plan check review is complete and has been CONDITIONALLY APPROVED by the PUNNING Division. By: GINA RUIZ A Final Inspection by the PLANNING Division is required • Yes ^ No You may also have corrections from one or more ofthe divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. [J This plan check review Is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check APPROVAL has been sent to: TNORTON@RBN-DESIGN.COM For questions or clarifications on the attached checklist please contact the following reviewer as marl<ed: PLANNING 760-602-4610 ENGINEERING 760-602-2750 FIRE PREVENTION 760-602-4665 Chris Sexton 760-602-4624 Chris.Sexton@carlsbadca.gov 1 1 Kathleen Lawrence 760-602-2741 Kathleen.Lawrence@carlsbadca.gov Q Greg Ryan 760-602-4663 Gregorv.Rvan@carlsbadca.gov Gina Ruiz 760-602-4675 Gina.Ruiz@carlsbadca.gov Linda Ontiveros 760-602-2773 Linda.Ontiveros@carlsbadca.gov 1 Cindy Wong 760-602-4662 Cvnthia.Wong@carlsbadca.gov • • 1 1 Dominic Fieri 760-602-4664 Dominic.Fieri@carlsbadca.gov Remarks: NO NEW ROOF IVI OUNTED EQUIPMENT SHOWN ON PLANS AND NOT APPROVED AS PART OF THIS PERIVIIT ^ CITY OF CARLSBAD PLAN CHECK REVIEW TRANSMITTAL i . 1: ' J Community & Economic Development Department 1635 Faraday Avenue Carlsbad CA 92008 www.carlsbadca.gov DATE: 04/12/2014 PROJECT NAME: VERTICAL SEARCH PROJECT ID: CB140580 PLAN CHECK NO: 1 SEr#: 1 ADDRESS: 1808 ASTON AV APN: • This plan check review Is complete and has been APPROVED by the FIRE Division. By: GR A Final Inspection by the FIRE Division is required ^ Yes • No This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to: RBN DESIGN - T. NORTON Vou may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. For questions or clarifications on the attached checklist please contact the foilowing reviewer as marked: • 1—, . : PLANNING ENGINEERING 76&«02-2750 FIRE PREVENTION 760402-4665 1 1 Chris Sexton 760-602-4624 Chris.Sexton@carlsbadca.gov 1 1 Kathleen Lawrence 760-602-2741 Kathleen.Lawrence@carlsbadca.gov X Greg Ryan 760-602-4663 Gregory.Rvan@carlsbadca.gov 1 1 Gina Ruiz 760-602-4675 Gina.Ruiz@carlsbadca.gov 1 1 Linda Ontiveros 760-602-2773 Linda.Ontiveros@carlsbadca.gov 1 1 Cindy Wong 760-602-4662 Cvnthia.Wong@carlsbadca.gov • 1 1 Dominic Fieri 760-602-4664 Dominic.Fierl@carlsbadca.gov Remarks: See Attached BUILDING DEFf Carlsbad Fire Department r^i^PY Plan Review Requirements Category: Tl, INDUST Date of Report: 04-12-2014 Reviewed by: ^ Name: TARA NORTON Address: 5090 SHOREHAM PL STE 100 SAN DIEGO CA 92122-5934 Permit #: CB140580 Job Name: VERTICAL SEARCH: 9,155 SF OFF Job Address: 1808 ASTON AV CBAD St: 170 Please review carefully all comments attached. Conditions: CITY OF CARLSBAD FIRE DEPARTMENT - APPROVED: W/ Requirement THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUANCE OF BUILDING PERMIT. THIS APPROVAL IS SUBJECT TO FIELD INSPECTION AND REQUIRED TEST, NOTATIONS HEREON, CONDITIONS IN CORRESPONDENCE AND CONFORMANCE WITH ALL APPLICABLE REGULATIONS. THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE THE VIOLATION OF ANY LAW. At or prior to Final Fire and Building inspection an Emergency lighting facilities test shall be conducted by CFD personnel during pre-dawn or dusk hours when ambient light is at 0.00 Lux or 0.0 Foot-candle. This test shall be conducted to test the initial loss of power reading of illumination that is at least an average of 1 foot candle (11 lux) and a minimum of 0.1 foot-candle (1 lux) measured along the path of egress at the floor level. And tested after 60-minutes to 0.6 fc (6 lux). Failure to provide sufficient lighting in egress aisles, corridors, exit enclosures, exit passageways and stair enclosures is the AOR's responsibility. CFCCh. 10, Sec. 1006. Entry: 04/12/2014 By: GR Action: AP Carlsbad Fire Department Plan Review Requirements Category: TI, INDUST Date of Report: 03-26-2014 Reviewed by: Name: TARA NORTON Address: 5090 SHOREHAM PL STE 100 SAN DIEGO CA 92122-5934 Permit #: CB140580 Job Name: VERTICAL SEARCH: 9,155 SF OFF Job Address: 1808 ASTON AV CBAD St: 170 INCOMPLETE The item you have submitted for review is inconq)lete. At this time, this office cannot adequately conduct a review to determine conqiliance with the applicable codes and/or standards. Please review carefully all comments attached. Please resubmit the necessary plans and/or specifications, with changes "clouded", to this office for review and approval. Conditions: Cond: CON0007148 [NOT MET] 1. Revise fire protection notes to reflect current (2013) Cahfornia Fire code numeration. ^jj;^ 2. Provide note that key access is required wherever a card reader is provided. Card readers alone are not permissible access. J'^^rS^rovide a photometric plan for emergency lighting. This plan shall demonstrate that the proposed hghting plan ^•^^"'^shall provide adequate lighting along all paths of the means of egress. ;b'l* 4. Add a note on both TI-1 and E-2 that a photometric test shall be conducted diuing pre-dawn hours to measure the ^ foot candles at the walking surface. RECEIVED Entry: 03/26/2014 By: GR Action: CO APR 0 4 2014 CITY OF CARLSB.AD BUiLDING DIVISION BUILDING ENERGY ANALYSIS REPORT PROJECT: Vertical Search 1808 Aston Ave, Ste 170 Carlsbad, CA Project Designer: RBN Design 1010 University Ave Ste C203 San Diego , Ca 92103 619-297-1011 Report Prepared by: Greater San Diego Air Conditioning Co. Inc. 3883 Ruffin Rd Ste C San Diego , CA 92123 619-469-7818 RECEIVED MAR 2 5 2014 CITY OF CARLSBAD BUILDING DIVISION Job Number: Date: 3/7/2014 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC-www.energysoft.com. EnergyPro 5.1 by EnergySoft User Number: 6272 RunCode, '34)7X13:32:56 ID: TABLE OF CONTENTS Cover Page 1 Table of Contents 2 Form IVIECH-I-C Certificate of Compliance 3 Form MECH-2-C Air & Water System Requirements 13 Form MECH-3-C Mechanical Ventilation 17 Form MECH-4-C HVAC Misc. Prescriptive Requirements 19 EnergyPro 5.1 by EnergySoft Job Number: ID: User Number: 6272 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Parti of5) MECH-1 C Project Name Vertical Search Date 3/7/2014 Project Address 1808 Aston Ave, Ste 170 Carlsbad Climate Zone Total Cond. Floor Area 8,869 Addition Floor Area n/a GENERAL INFORMATION Building Type: • Nonresidential • High-Rise Residential • Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School BIdg. IZ Conditioned Spaces P, Unconditioned Spaces *-* (affidavit) Phase of Construction: • New Construction • Addition • Alteration Approach of Compliance: • Component l-l Overall Envelope Energy TDV • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Equipment^ Inspection Criteria Meets Criteria or Requirements Equipment^ Inspection Criteria Pass Fall - Describe Reason^ Item or System Tags (i.e. AC-1, RTU-1, HP-1) (E) HP-2 • • Equipment Type^: Packaged DX • • Number of Systems 1 • • Max Allowed Heating Capacity^ 41,565 Btu/hr • • Minimum Heating Efficiency' 7.70 HSPF • • Max Allowed Cooling Capacity' 87,272 Btu/hr • • Cooling Efficiency' 13.0 SEER/11.4 EER • • Duct Location/ R-Value Attic, Ceiling Ins, unvented/4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • Equipment^ Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Equipment^ Inspection Criteria Pass Fall - Describe Reason^ Item or System Tags (i.e. AC-1, RTU-1, HP-1) (E) HP-1 • • Equipment Type^: Packaged DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 21,963 Btu/hr • • Minimum Heating Efficiency' 7.70 HSPF • • Max Allowed Cooling Capacity' 67,140 Btu/hr • • Cooling Efficiency' 13.0 SEER/11.4 EER • • Duct Location/ R-Value Attic, Ceiling Ins, unvented/4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number: 6272 RunCode: 2014-03-07713:32:56 ID: Page 3 of 29 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Parti of5) MECH-1 C Project Name Vertical Search Date 3/7/2014 Project Address 1808 Aston Ave, Ste 170 Carlsbad Climate Zone Total Cond. Floor Area 8,869 Addition Floor Area n/a GENERAL INFORMATION Building Type: • Nonresidential • High-Rise Residential • Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School BIdg. 121 Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: • New Construction • Addition • Alteration Approach of Compliance: • Component Overall Envelope Energy TDV • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Equipment^ Inspection Criteria Meets Criteria or Requirements Equipment^ Inspection Criteria Pass Fail - Describe Reason^ Item or System Tags (i.e. AC-1, RTU-1, HP-1) (E) HP-3 • • Equipment Type^: Packaged DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 10,186 Btu/hr • • Minimum Heating Efficiency' 7.70 HSPF • • Max Allowed Cooling Capacity' 43,007 Btu/hr • • Cooling Efficiency' 13.0 SEER/11.4 EER • • Duct Location/ R-Value Attic, Ceiling Ins, unvented/4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • Equipment^ Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Equipment^ Inspection Criteria Pass Fail - Describe Reason^ Item or System Tags (i.e. AC-1, RTU-1, HP-1) (E) HP-4 • • Equipment Type^: Packaged DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 38,668 Btu/hr • • Minimum Heating Efficiency' 7.70 HSPF • • Max Allowed Cooling Capacity' 115,755 Btu/hr • • Cooling Efficiency' 13.0 SEER/11.4 EER • • Duct Location/ R-Value Attic, Ceiling Ins, unvented/4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or. Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number: 6272 RunCode: 2014-03-07713:32:56 ID: Page 4 of 29 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Parti of5) MECH-1 C Project Name Vertical Search Date 3/7/2014 Project Address 1808 Aston Ave, Ste 170 Carlsbad Climate Zone Total Cond. Floor Area 8,869 Addition Floor Area n/a GENERAL INFORMATION Building Type: Bl Nonresidential • High-Rise Residential • Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School BIdg. • Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: • New Construction • Addition • Alteration Approach of Compliance: • Component Overall Envelope TDV Energy • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Equipment^ Inspection Criteria Meets Criteria or Requirements Equipment^ Inspection Criteria Pass Fail - Describe Reason^ Item or System Tags (i.e. AC-1, RTU-1, HP-1) (E) HP-5 • • Equipment Type^: Packaged DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 9.322 Btu/hr • • Minimum Heating Efficiency' 7.70 HSPF • • Max Allowed Cooling Capacity' 18,572 Btu/hr • • Cooling Efficiency' 13.0 SEER/11.4 EER • • Duct Location/ R-Value Attic, Ceiling Ins, unvented/4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • Equipment^ Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Equipment^ Inspection Criteria Pass Fail - Describe Reason^ Item or System Tags (i.e. AC-1, RTU-1, HP-1) (E) HP-6 • • Equipment Type^: Packaged DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 11,115 Btu/hr • • Minimum Heating Efficiency' 7.70 HSPF • • Max Allowed Cooling Capacity' 42,857 Btu/hr • • Cooling Efficiency' 13.0 SEER/11.4 EER • • Duct Location/ R-Value Attic, Ceiling Ins, unvented/4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to Include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number: 6272 RunCode: 2014-03-07113:32:56 ID: Page 5 of 29 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Parti of5) MECH-1 C Project Name Vertical Search Date 3/7/2014 Project Address 1808 Aston Ave, Ste 170 Carlsbad Climate Zone Total Cond. Floor Area 8,869 Addition Floor Area n/a GENERAL iNFORMATION Building Type: • Nonresidential • High-Rise Residential • Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School BIdg. EZI Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: • New Construction • Addition • Alteration Approach of Compliance: • Component Overall Envelope Energy TDV • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Ocfeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Equipment' Inspection Criteria Meets Criteria or Requirements Equipment' Inspection Criteria Pass Fail - Describe Reason' Item or System Tags (i.e. AC-1, RTU-1, HP-1) (E) HP-7 • • Equipment Type^: Packaged DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 39,025 Btu/hr • • Minimum Heating Efficiency' 7.70 HSPF • • Max Allowed Cooling Capacity' 115,877 Btu/hr • • Cooling Efficiency' 13.0 SEER/11.4 EER • • Duct Location/ R-Value Attic, Ceiling Ins, unvented/4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • Equipment^ Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Equipment^ Inspection Criteria Pass Fail - Describe Reason' Item or System Tags (i.e. AC-1, RTU-1, HP-1) (E) HP-8 • • Equipment Type^: Packaged DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 9,232 Btu/hr • • Minimum Heating Efficiency' 7.70 HSPF • • Max Allowed Cooling Capacity' 30,658 Btu/hr • • Cooling Efficiency' 13.0 SEER/11.4 EER • • Duct Location/ R-Value Attic, Ceiling Ins, unvented/4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or. Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number: 6272 RunCode: 2014-03-07713:32:56 ID: Page 6 of 29 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Parti of5) MECH-1 C Project Name Vertical Search Date 3/7/2014 Project Address 1808 Aston Ave, Ste 170 Carlsbad Climate Zone Total Cond. Floor Area 8,869 Addition Floor Area n/a GENERAL INFORMATION Building Type: El Nonresidential • High-Rise Residential • Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School BIdg. 121 Conditioned Spaces i-i Unconditioned Spaces *-* (affidavit) Phase of Construction: • New Construction • Addition • Alteration Approach of Compliance: • Component • Overall Envelope Energy TDV • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Equipment' Inspection Criteria Meets Criteria or Requirements Equipment' Inspection Criteria Pass Fall - Describe Reason' Item or System Tags (i.e. AC-1, RTU-1, HP-1) HP-9 • • Equipment Type^: Packaged DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 12,305 Btu/hr • • Minimum Heating Efficiency' 15.70 HSPF • • Max Allowed Cooling Capacity' 21,545 Btu/hr • • Cooling Efficiency' 13.0 SEER/11.4 EER • • Duct Location/ R-Value Attic, Ceiling Ins, unvented/4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • Equipment' Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Equipment' Inspection Criteria Pass Fail - Describe Reason' Item or System Tags (i.e. AC-1, RTU-1, HP-1) HP-10 • • Equipment Type^: Packaged DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 11,306 Btu/hr • • Minimum Heating Efficiency' 15.70 HSPF • • Max Allowed Cooling Capacity' 19,986 Btu/hr • • Cooling Efficiency' 13.0 SEER/11.4 EER • • Duct Location/ R-Value Attic, Ceiling Ins, unvented/4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or. Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number: 6272 RunCode: 2014-03-07713:32:56 ID: Page 7 of 29 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Parti of5) MECH-1 C Project Name Vertical Search Date 3/7/2014 Project Address 1808 Aston Ave, Ste 170 Carlsbad Climate Zone Total Cond. Floor Area 8,869 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential • Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School BIdg. 121 Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: • New Construction • Addition • Alteration Approach of Compliance: • Component Overall Envelope Energy TDV • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Equipment' Inspection Criteria Meets Criteria or Requirements Equipment' Inspection Criteria Pass Fail - Describe Reason' Item or System Tags (i.e. AC-1, RTU-1, HP-1) (E) AH-1 • • Equipment Type^: Split DX • • Number of Systems 1 • • Max Allowed Heating Capacity' -2,229 Btu/hr • • Minimum Heating Efficiency' n/a • • Max Allowed Cooling Capacity' 84,434 Btu/hr • • Cooling Efficiency' 13.0 SEER/11.0 EER • • Duct Location/ R-Value Attic, Ceiling Ins, unvented/4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • Equipment' Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Equipment' Inspection Criteria Pass Fail - Describe Reason' Item or System Tags (i.e. AC-1, RTU-1, HP-1) • • Equipment Type^: • • Number of Systems • • Max Allowed Heating Capacity' • • Minimum Heating Efficiency' • • Max Allowed Cooling Capacity' • • Cooling Efficiency' • • Duct Location/ R-Value • • When duct testing is required, submit MECH-4A & MECH-4-HERS • • Economizer • • Thermostat • • Fan Control • • 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to Include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number: 6272 RunCode: 2014-03-07713:32:56 ID: Page 8 of 29 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 2 of 5) MECH-1 C Project Name Vertical Search Date 3/7/2014 Discrepancies: EnergyPro 5.1 by EnergySoft User Number: 6272 RunCode: 2014-03.07713:32:56 ID: Page 9 of 29 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 3 of 5) MECH-1 C Project Name Vertical Search Date 3/7/2014 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the applicable boxes by all acceptance tests that apply and listed all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems. The NA number designates the Secfion in the Appendix of the Nonresidential Reference Appendices Manual that describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: Systems Acceptance: Before occupancy permit is granted for a newly constructed building or space, or a new space-conditioning system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. Systems Acceptance: Before occupancy permit is granted. All newly installed HVAC equipment must be tested using the Acceptance Requirements. The MECH-1 C form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. The equipment requiring testing, person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted. The following checked-off forms are required for ALL newly installed equipment. In addition a Certificate of Acceptance fonns shall be submitted to the building department that certifies plans, specifications, installation, certificates, and operating and maintenance information meet the requirements of §10-103(b) and Title-24 Part 6. The building inspector must receive the properly filled out and signed forms before the building can receive final occupancy. TEST DESCRIPTION MECH-2A MECH-3A MECH-4A MECH-5A MECH-6A MECH-7A MECH-8A MECH-9A MECH-1 OA MECH-11A Equipment Requiring Testing or Verification Qty. Outdoor Ventilation For VAV & CAV Constant Volume & Single-Zone Unitary Air Distribution Ducts Economizer Controls Demand Control Ventilation DCV Supply Fan VAV Valve Leakage Test Supply Water Temp. Reset Hydronic System Variable Flow Control Automatic Demand Shed Control Carrier 50PCH018 2 • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • EnergyPro 5.1 by EnergySoft User Number: 6272 RunCode: 2014-03.07713:32:56 ID: Page 10 of 29 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 4 of 5) MECH-1 C Project Name Date Vertical Search 3/7/2014 TEST DESCRIPTION MECH-12A MECH-13A MECH-14A MECH-15A Equipment Requiring Testing Qty. Fault Detection & Diagnostics for DX Units Automatic Fault Detection & Diagnostics for Air & Zone Distributed Energy Storage DX AC Systems Thermal Energy Storage (TES) Systems Test Perfonned By: Canrier 50PCH018 2 • • • • Rv MECHANICAL CONTRACTOR • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • EnergyPro 5.1 by EnergySoft User Number: 6272 RunCode: 2014-03-07713:32:56 ID: Page 11 of 29 CERTIFICATE OF COMPLIANCE (Part 5 of 5) MECH-1 C Project Name Vertical Search Date 3/7/2014 Documentation Author's Declaration Statement I certify that this Certificate of Compliance documentation is accurate and complete. Name RQSS BAILLARGEON Signature Company Greater San Diego Air Conditioning Co. Inc. Date 3/7/2014 Address 3883 Ruffin Rd Ste C CEA# CEPE# City/State/Zip san Diego, CA 92123 Phone 619-469-7818 The Principal Mechanical Designer's Declaration Statement • I am eligible under Division 3 of the California Business and Professions Code to accept responsibility for the mechanical design. • This Certificate of Compliance identifies the mechanical features and performance specifications required for compliance with Title-24, Parts 1 and 6 ofthe California Code of Regulations. • The design features represented on this Certificate of Compliance are consistent with the information provided to document this design on the other applicable compliance forms, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. Signature ^g;;^^ Name Ross Baillargeon Company Greater San Diego Air Conditioning Inc Date :^/7/?ni4 Address 3883 Ruffin Rd Ste C License # 437153 City/State/Zip san Diego. CA 92123 Phone 619-469-7818 Mandatory Measures Indicate location on building plans of Note Block for Mandatory Measures. MECHANICAL COMPLIANCE FORMS & WORKSHEETS (check box If woricsheet is included) For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, please refer to the 2008 Nonresidential Manual. Note: The Enforcement Agency may require all forms to be incorporated onto the building plans. • MECH-1 C Certificate of Compliance. Required on plans for all submittals. • MECH-2C Mechanical Equipment Summary is required for all submittals. • MECH-3C Mechanical Ventilation and Reheat is required for all submittals with mechanical ventilation. EZI MECH-4C Fan Power Consumption is required for all prescriptive submittals. EnergyPro 5.1 by EnergySoft User Number: 6272 RunCode: 2014-03-07713:32:56 ID: Page 12 of 29 AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date Vertical Search 3/7/2014 item or System Tags (i.e. AC-1, RTU-1, HP-1) Indicate Air Systems Type (Central, Single Zone, Packag e, VAV, or etc..) item or System Tags (i.e. AC-1, RTU-1, HP-1) (E) HP-2 (E) HP-1 (E) HP-3 Number of Systems 1 1 1 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation l\^echanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value Indicate Page Reference on Plans or Sciiedule and indicate tlie applicabie exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation l\^echanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sections MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation l\^echanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 7.70 HSPF 7.70 HSPF 7.70 HSPF MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation l\^echanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 13.0 SEER/11.4 EER 13.0 SEER/11.4 EER 13.0 SEER/11.4 EER MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation l\^echanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(b), 112(c) Yes Yes Yes MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation l\^echanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(c), 115(a) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation l\^echanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation l\^echanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) 174 cfm 68 cfm 227 cfm MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation l\^echanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation l\^echanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation l\^echanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Programmable Switch Programmable Switch Programmable Switch MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation l\^echanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Setback Required Setback Required Setback Required MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation l\^echanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(f) Auto Auto Auto MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation l\^echanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(g) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation l\^echanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 123 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation l\^echanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 124 Art/c, Ceiling Ins. unvented/4.2 \ttic, Ceiling Ins. unvented / 4.^ Attic. Ceiling Ins, unvented/4.2 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 41,565 Btu/hr 21,963 Btu/hr 10.186 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 41.615 Btu/hr 23.026 Btu/hr 41,615 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 61.091 Btu/hr 46,998 Btu/hr 30,105 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 29.440 Btu/hr 17,835 Btu/hr 28.842 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Constant Volume Constant Volume Constant Volume Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Yes Yes Yes Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(d) No No No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(e) No Economizer No Economizer No Economizer Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(Q) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(i) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(k) No No No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat Is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number 6272 RunCode: 2014-03-07713:32:56 ID: Page 13 of 29 AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date Vertical Search 3/7/2014 item or System Tags (i.e. AC-1, RTU-1, HP-1) Indicate Air Systems Type (Central, Single Zone, Package, VAV, or etc..) item or System Tags (i.e. AC-1, RTU-1, HP-1) (E) HP-4 (E) HP-5 (E) HP-6 Number of Systems 1 1 1 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value Indicate Pa( ' e Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sections MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 7.70 HSPF 7.70 HSPF 7.70 HSPF MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 13.0 SEER/11.4 EER 13.0 SEER/11.4 EER 13.0 SEER/11.4 EER MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(b), 112(c) Yes Yes Yes MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(c), 115(a) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) 125 cfm 186 cfm 231 cfm MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Programmable Switch Programmable Switch Programmable Switch MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Setback Required Setback Required Setback Required MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(f) Auto Auto Auto MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(g) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 123 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 124 little. Ceiling Ins, unvented / 4.2 Iff/c, Ceiling Ins. unvented/4.', Attic, Ceiling Ins, unvented / 4.2 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 38,668 Btu/hr 9.322 Btu/hr 11,115 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 46,817 Btu/hr 17.212 Btu/hr 32,168 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 81.028 Btu/hr 13,001 Btu/hr 30,000 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 31,917 Btu/hr 11,581 Btu/hr 27,434 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Constant Volume Constant Volume Constant Volume Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Yes Yes Yes Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(d) No No No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(e) No Economizer No Economizer No Economizer Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(g) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(1) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(k) No No No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number: 6272 RunCode: 2014-03-07713:32:56 ID: Page 14 of 29 AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date Vertical Search 3/7/2014 item or System Tags (i.e. AC-1, RTU-1, HP-1) Indicate Air Systems Type (Central, Single Zone, Packag e, VAV, or etc..) item or System Tags (i.e. AC-1, RTU-1, HP-1) (E) HP-7 (E) HP-8 HP-9 Number of Systems • 1 1 1 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value Indicate Pai 36 Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sections MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 7.70 HSPF 7.70 HSPF 15.70 HSPF MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 13.0 SEER/11.4 EER 13.0 SEER/11.4 EER 13.0 SEER/11.4 EER MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(b), 112(c) Yes Yes Yes MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(c), 115(a) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) 122 cfm 188 cfm 235 cfm MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Programmable Switch Programmable Switch Programmable Switch MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Setback Required Setback Required Setback Required MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(f) Auto Auto Auto MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(g) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 123 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 124 Attic. Ceiling Ins. unvented / 4.2 Iff/c, Ceiling Ins, unvented / 4.: Attic. Ceiling Ins. unvented/4.2 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 39.025 Btu/hr 9,232 Btu/hr 12.305 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 46,817 Btu/hr 26.469 Btu/hr 17.518 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 81.114 Btu/hr 21.460 Btu/hr 15.082 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 31.926 Btu/hr 18.681 Btu/hr 11.074 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Constant Volume Constant Volume Constant Volume Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Yes Yes Yes Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(d) No No No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(e) No Economizer No Economizer No Economizer Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(g) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(1) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(k) No No No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number: 6272 RunCode: 2014-03-07713:32:56 ID: Page 15 of 29 AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date Vertical Search 3/7/2014 Item or System Tags (i.e. AC-1, RTU-1, HP-1) Indicate Air Systems Type (Central, Single Zone, Packas e, VAV, or etc..) Item or System Tags (i.e. AC-1, RTU-1, HP-1) HP-10 (E) AH-1 Number of Systems nrjpi ' _ IIL l> III 1 1 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value indicate Pa( je Reference on Plans or Scheduie and indicate the applicable exceptlon(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sections MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 15.70 HSPF n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 13.0 SEER/11.4 EER 13.0 SEER/11.0 EER MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(b), 112(c) Yes n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(c), 115(a) n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) 217 cfm Ocfm MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Programmable Switch Programmable Switch MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Setback Required Setback Required MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(f) Auto Auto MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(g) n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 123 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 124 Attic, Ceiling Ins, unvented / 4.2 Iff/c, Ceiling Ins, unvented/4.: PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 11,306 Btu/hr -2,229 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 17,518 Btu/hr 0 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 13,990 Btu/hr 59,104 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 10,873 Btu/hr 43,370 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Constant Volume Constant Volume Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Yes Yes Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(d) No No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(e) No Economizer No Economizer Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(g) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(i) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(k) No No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number: 6272 RunCode: 2014-03-07713:32:56 ID: Page 16 of 29 MECHANICAL VENTILATION AND REHEAT MECH-3C Project Name Vertical Search Date 3/7/2014 MECHANICAL VENTILATION (§121(b)2) REHEAT LIMITATION (§144(d)) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B c D E F G H 1 J K L M N Zone/System Condition Area (ft^) CFM per ft' Min CFM By Area BXC Number Of People CFM per Person Min CFM by Occupant EXF REQ'D V.A. Max of D orG Design Ventilation Air CFM 50% of Design Zone Supply CFM BXO.4 CFM / ft' Max. of Columns H, J, K, 300 CFM Design Minimum Air Setpoint Transfer Air Zone 1 1,157 0.15 174 174 174 (E) HP-2 Total 174 174 Zone 1 454 0.15 68 68 68 (E) HP-1 Total 68 68 Zone 1 1,514 0.15 227 227 227 (E) HP-3 Total 227 227 Zone 1 832 0.15 125 125 125 (E) HP-4 Total 125 125 Zone 1 310 0.15 47 47 186 (E) HP-5 Total 4i 186 Zone 1 1,542 0.15 231 231 231 (E) HP-6 Total 231 231 Zone 1 810 0.15 122 122 122 (E) HP-7 Total 122 122 Zone 1 1,256 0.15 188 188 188 Totals Column 1 Total Design Ventilation Air C Minimum ventilation rate per Section §121, Table 121-A. E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load for egress purposes for spaces without fixed seating. H Required Ventilation Air (REQ'D V.A.) is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS (Column D or G). 1 Must be greater than or equal to H, or use Transfer Air (column N) to make up the difference. J Design fan supply CFM (Fan CFM) x 50%; or the design zone outdoor airflow rate per §121. K Condition area (ft^) x 0.4 CFM / ft^; or L Maximum of Columns H, J, K, or 300 CFM M This must be less than or equal to Column L and greater than or equal to the sum of Columns H plus N. N Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air (Column H) and the Desiqn Minimum Air (Column M), Column H minus M. EnergyPro 5.1 by EnergySoft User Number: 6272 RunCode: 2014-03-07713:32:56 ID: Page 17 of 29 MECHANICAL VENTILATION AND REHEAT MECH-3C Project Name Vertical Search Date 3/7/2014 MECHANICAL VENTILATION (§121(b)2) REHEAT LIMITATION (§144(d)) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B C D E F G H 1 J K L M N Zone/System Condition Area (ft') CFM per ft' Min CFM By Area BXC Number Of People CFM per Person Min CFM by Occupant EXF REQ'D V.A. Max of DorG Design Ventilation Air CFM 50% of Design Zone Supply CFM BXO.4 CFM/ft' Max. of Columns H, J, K, 300 CFM Design Minimum Air Setpoint Transfer Air (E) HP-8 Totai 188 188 Zone 1 392 0.15 59 59 235 HP-9 Total 59 235 Zone 1 362 0.15 54 54 217 HP-10 Total 54 217 Zone 1 240 0.15 36 36 0 36 (E) AH-1 Total 36 0 Totals Column 1 Total Design Ventilation Air C Minimum ventilation rate per Section §121, Table 121-A. E Beised on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load for egress purposes for spaces without fixed seating. H Required Ventilation Air (REQ'D V.A.) is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS (Column D or G). 1 Must be greater than or equal to H, or use Transfer Air (column N) to make up the difference. J Design fan supply CFM (Fan CFM) x 50%; or the desiqn zone outdoor airflow rate per §121. K Condition area (ft') x 0.4 CFM / ft'; or L Maximum of Columns H, J, K, or 300 CFM M This must be less than or equal to Column L and greater than or equal to the sum of Columns H plus N. N Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air (Column H) and the Desiqn Minimum Air (Column M), Column H minus M. EnergyPro 5.1 by EnergySoft User Number: 6272 RunCode: 2014-03-07713:32:56 ID: Page 18 of 29 FAN POWER CONSUMPTION MECH-4C Project Name Vertical Search Date 3/7/2014 NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c). B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) (E) HP-2 - Supply Fan 0.500 76.0 % 99.0 % 1.0 496 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 496 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 1,400 A) If filter pressure drop (SPa) Is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) Is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 4) SPa A) If filter pressure drop (SPa) Is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 5) SP, B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1 -( SPa - 1) / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.354 W/CFM 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems. EnergyPro 5.1 by EnergySoft User Number 6272 RunCode: 2014-03-07713:32:56 ID: Page 19 of 29 FAN POWER CONSUMPTION MECH-4C Project Name Vertical Search Date 3/7/2014 NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c). B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) (E) HP-1 - Supply Fan 0.200 60.0% 99.0% 1.0 251 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 25) FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 800 A) If filter pressure drop (SPa) Is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) Is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 4) SPa A) If filter pressure drop (SPa) Is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 5) SP, B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1 -( SPa -1) / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Une 3 x Line 6)' 0.314 W/CFM 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems. EnergyPro 5.1 by EnergySoft User Number 6272 RunCode: 2014-03-07713:32:56 ID: Page 20 of 29 FAN POWER CONSUMPTION MECH-4C Project Name Vertical Search Date 3/7/2014 NOTE: Provide one copy of this worksheet for each fan system with a lotal fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c). B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) (E) HP-3 - Supply Fan 0.500 76.0% 99.0% 1.0 496 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 496 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 1,400 A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 4) SPa A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 5) SP, B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1-( SPa - 1) / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.354 W/CFM 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems. EnergyPro 5.1 by EnergySoft User Number 6272 RunCode: 2014-03-07713:32:56 ID: Page 21 of 29 FAN POWER CONSUMPTION MECH-4C Project Name Vertical Search Date 3/7/2014 NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c). B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) (E) HP-4 - Supply Fan 0.400 66.0% 99.0 % 1.0 457 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 457 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 1,600 A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 4) SPa A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 5) SP, B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1-( SPa-1)/SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.285 W/CFM 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems. EnergyPro 5.1 by EnergySoft User Number 6272 RunCode: 2014-03-07713:32:56 ID: Page 22 of 29 FAN POWER CONSUMPTION MECH-4C Project Name Vertical Search Date 3/7/2014 NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c). B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) (E) HP-5 - Supply Fan 0.150 55.0 % 99.0% 1.0 206 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 206 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 600 A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 4) SPa A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 5) SP, B) Calculate Fan Adjustment and enter on line 6. 8) Fan Adjustment = 1 -( SPa - 1) / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 8)' 0.343 W/CFM 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems. EnergyPro 5.1 by EnergySoft User Number 6272 RunCode: 2014-03-07713:32:56 ID: Page 23 of 29 FAN POWER CONSUMPTION MECH-4C Project Name Vertical Search Date 3/7/2014 NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c). B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) (E) HP-6 - Supply Fan 0.300 64.0% 99.0% 1.0 353 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 353 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 7,200 A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 4) SPa A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 5) SP, B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1 -( SPa - 1) / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.294 W/CFM 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems. EnergyPro 5.1 by EnergySoft User Number 6272 RunCode: 2014-03-07713:32:56 ID: Page 24 of 29 FAN POWER CONSUMPTION MECH-4C Project Name Vertical Search Date 3/7/2014 NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c). B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) (E) HP-7 - Supply Fan 0.400 66.0% 99.0% 1.0 457 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 457 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 1.600 A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 4) SPa A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 5) SP, 6) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1-( SPa-1)/SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.285 W/CFM 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems. EnergyPro 5.1 by EnergySoft User Number: 6272 RunCode: 2014-03-07713:32:56 ID: Page 25 of 29 FAN POWER CONSUMPTION MECH-4C Project Name Vertical Search Date 3/7/2014 NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c). B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) (E) HP-8 - Supply Fan 0.200 60.0% 99.0 % 1.0 251 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 251 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 1.000 A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 4) SPa A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 5) SP, B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1-( SPa-1)/SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.251 W/CFM 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems. EnergyPro 5.1 by EnergySoft User Number 6272 RunCode: 2014-03-07713:32:56 ID: Page 26 of 29 FAN POWER CONSUMPTION MECH-4C Project Name Vertical Search Date 3/7/2014 NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c). B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) HP-9 - Supply Fan 0.100 49.0 % 99.0% 1.0 154 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 154 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 600 A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 4) SPa A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 5) SP, B) Calculate Fan Adjustment and enter on line 8. 6) Fan Adjustment = 1 -( SPa - 1) / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.256 W/CFM 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems. EnergyPro 5.1 by EnergySoft User Number 6272 RunCode: 2014-03-07713:32:56 ID: Page 27 of 29 FAN POWER CONSUMPTION MECH-4C Project Name Vertical Search Date 3/7/2014 NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c). B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) HP-10-Supply Fan 0.100 49.0 % 99.0% 1.0 154 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 154 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 600 A) If filter pressure drop (SPa) Is greater than 1 Inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) Is greater than 1 Inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 4) SPa A) If filter pressure drop (SPa) Is greater than 1 Inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 5) SP, B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1 -( SPa - 1) / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.256 W/CFM 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems. EnergyPro 5.1 by EnergySoft User Number 6272 RunCode: 2014-03-07713:32:56 ID: Page 28 of 29 FAN POWER CONSUMPTION MECH-4C Project Name Vertical Search Date 3/7/2014 NOTE: Provide one copy of fhis worksheet for each fan system with a total fan sysfem horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c). B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) (E) AH-1 - Supply Fan 0.400 66.0% 99.0% 1.0 457 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A In §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 457 FILTER PRESSURE ADJUSTMENT Equation 144-A In §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 7,850 A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 4) SPa A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 5) SP, B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1-( SPa-1)/SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.247 W/CFM 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems. EnergyPro 5.1 by EnergySoft User Number 6272 RunCode: 2014-03-07713:32:56 ID: Page 29 of 29 PLUMBING, Development Services ELECTRICAL, Building Division v*^^'^ Hiippu AKlip Al 1635 Faraday Avenue ^ ^'TY OF tAiTxLirCU^ 760 602-2719 Ani CD A Pi WORKSHEET wwv^.carlsbadca.gov v-./Ar\LOD/ALy B-18 Building@carlsbadca.eov Project Address: Permit No.: Information provided below refers to worb being done on the above mentioned permit only. This form must be completed and returned to the Building Division before the permit can be issued. Building Dept. Fox: (760) 602-8558 Number of new or relocated fixtures, traps, or floor drains 0 New building sewer line? Ves No )C Number of new roof drains? 0 Install/alter water line? 0 Number of new water heaters? ^ Number of new, relocated or replaced gas outlets? 0 Number of new hose bibs? n Residential Permits: New/expanded service: Number of new amps: Minor Remodel on/y: Ves No Commercial/Industrial: to Tenant Improvement: Number of existing amps involved in this project: Number of new amps involved in this project: New Construction: Amps per Panel: Single Phase Number of new amperes Three Phase Number of new amperes_ Three Phase 480 Number of new amperes_ Number of new furnaces, A/C, or heat pumps? ^ New or relocated duct worb? .-. Ves No Number of new fireplaces? c? Number of new exhaust fans? o Relocate/install vent? Number of new exhaust hoods? Number of new boilers or compressors? Number of HP o B-18 Page 1 of 1 Rev. 03/09 ^ PLUMBING, Development Services ELECTRICAL, Building Division ^ CITY OF MECHANICAL I635 Faraday Avenue CARLSBAD ^^''B^IS^^^ wwwcansbadcagov VERTICAL SEARCH WORKS o o leogASTONAVE8UITE170 Project Address: Permit No.: CARLSMP CA 92008 Information provided below refers to wort: being done on the above nnentioned permit only. This form must be completed and returned to the Buildinq Division before the permit tan be issued. Building Dept. Fax: (760) 602-8558 Number of new or relocated fixtures, traps, or floor drains New building sewer line? Ves ^ No Number of new roof drains? _NONE Install/alter water line? .1...!9^M.I'?JJ?!!? Number of new water heaters? L!?!.?Tl!f..?.PI.. Number of new, relocated or replaced gas outlets? NONE Number of new hose bibs? ^ONE Residential Permits: New/expanded service: Number of new amps: Minor Remodel on/y: Ves No Commercial/industrial: Tenant Improvement: Number of existing amps invo/ved in this project: Number of new amps involved in this project: New Construction: Amps per Panel: Single Phase Number of new amperes Three Phase Number of new amperes Three Phase 480 Number of new amperes Number of new furnaces, A/C, or heat pumps? , New or relocated duct worb? Ves No Number of new fireplaces? Number of new exhaust fans? Relocate/install vent? Number of new exhaust hoods? Number of new boilers or compressors? Number of HP B-18 Page 1 of 1 Rev. 03/09 INDUSTRIAL WASTEWATER DISCHARGE PERMIT SCREENING SURVEY Date Business Name_ Street Acldress_ Email Address Vertical Search Works 1808 Aston Ave, Suite 170, Carlsbad, CA 92008 PLEASE CHECK HERE IF YOUR BUSINESS IS EXEMPT: (ON REVERSE SIDE CHECK TYPE OF BUSINESS) Check all below that are present at your facility: Acid Cleaning Assembly Automotive Repair Battery Manufacturing Biofuei Manufacturing Biotech Laboratory Bulk Chemical Storage Car Wash Chemical Manufacturing Chemical Purification Dry Cleaning Electrical Component Manufacturing Fertilizer Manufacturing Film / X-ray Processing Food Processing Glass Manufacturing Industrial Laundry Ink Manufacturing Laboratory Machining / Milling Manufacturing Membrane Manufacturing (i.e. water filter membranes) Metal Casting / Forming Metal Fabrication Metal Finishing Electroplating Electroless plating Anodizing Coating (i.e. phosphating) Chemical Etching / Milling Printed Circuit Board Manufacturing Metal Powders Forming Nutritional Supplement/ Vitamin Manufacturing Painting / Finishing Paint Manufacturing Personal Care Products Manufacturing Pesticide Manufacturing / Packaging Pharmaceutical Manufacturing (including precursors) Porcelain Enameling Power Generation Print Shop Research and Development Rubber Manufacturing Semiconductor Manufacturing Soap / Detergent Manufacturing Waste Treatment/Storage SIC Code(s) (if known): Brief description of business activities (Production / Manufacturing Operations): Description of operations generating wastewater (discharged to sewer, hauled or evaporated): Bscriptii Estimated volume of industrial wastewater to be discharged (gal / day): /^^/^ List hazardous wastes generated (type/volume): Date operation began/or will begin at this location: Have you applied for a Wastewater Discharge Permit from the Encina Wastewater Authority? Yes No Ifyes, when: Site Contai -if' Title Phone No. Signature ENCINA WAST^ATER AUTHORITY, 6200 Avenida Encinas Carlsbad, CA 92011 (760)438-3941 F/\X: (760)476-9852 SAN DIEGO REGIONAL HAZARDOUS MATERIALS QUESTIONNAIRE OFFICE USE ONLY UPFP# HV# BP DATE / / ^siness Name . i , Business Contact Telephone # ( ^ ®%S%ft C^U- I/O City State Zip Code/ APN# 7l2-/7rJ-07-oc) Klailing Address City State Zip Code Plan Filer Project Contact Telephone # i/.h The following questions represent the facility's activities, NOT the specific project description. PART I: FiRE DEPARTMENT - HAZARDOUS MATERIALS DIVISION: OCCUPANCY CLASSIFICATION: Indicate by circling the item, whether your business will use, process, or store any of the following hazardous materials. If any of the items are circled, applicant must contact the Fire Protection Agency with jurisdiction prior to plan submittal. Facility's Square Footage (including proposed project): Occupancy Rating: 1. Explosive or Blasting Agents 5. Organic Peroxides 9. Water Reactives 13. Corrosives 2. Compressed Gases 6. Oxidizers 10. Cryogenics 14. Other Health Hazards 3. Flammable/Combustible Liquids 7. Pyrophorics 11. Highly Toxic or Toxic Materials 15. None of These. 4. Flammable Solids 8. Unstable Reactives 12. Radioactives PART II: SAN DIEGO COUNTY DEPARTMENT OF ENVIRONMENTAL HEALTH - HAZARDOUS MATERIALS DIVISIONS (HMD): Ifthe answer to anv ofthe questions is yes, applicant must contact the County of San Diego Hazardous Materials Division, 5500 Overiand Ave., Suite 110, San Diego, CA 92123. Call (858) 505-6700 prior to the issuance of a building permit. FEES ARE REQUIRED. YES • • • • • • • NO n 0 Project Completion Date: / / Expected Date of Occupancy:. / / (for new construction or remodeling projects) Is your business listed on the reverse side ofthis form? (check all that apply). Will your business dispose of Hazardous Substances or Medical Waste in any amount? Will your business store or handle Hazardous Substances in quantities equal to or greater than 55 gallons, 500 pounds, 200 cubic feet, or carcinogens/reproductive toxins in any quantity? Will your business use an existing or install an underground storage tank? Will your business store or handle Regulated Substances (CalARP)? Will your business use or Install a Hazardous Waste Tank System (Title 22, Article 10)? Will your business store petroleum in tanks or containers at your facility with a total storage capacity equal to or greater than 1,320 gallons? (California's Aboveground Petroleum Storage Act). • CalARP Exempt I Date Initials • CalARP Required I Date Initials • CalARP Complete i Date Initials PART III: SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT: If the answer to any of the questions below is yes, applicant must contact the Air Pollution Control District (APCD), 10124 Old Grove Road, San Dlego, CA 92131-1649, telephone (858) 586-2600 prior to the issuance of a building or demolition permit. Note: if the answer to questions 4 or 5 is yes, applicant must also submit an asbestos notification form to the APCD at least 10 working days prior to commencing demolition or renovation, except demolition or renovation of residential structures of four units or less. Contact the APCD fbr more information. Will the subject facility or construction activities include operations or equipment that emit or are capable of emitting an air contaminant? (See the APCD factsheet at http://www.sdaDcd.orq/info/facts/permits.pdf. and the list of typical equipment requiring an APCD permit on the reverse side of this from. Contact APCD if you have any questions). (ANSWER ONLY IF QUESTION 1 IS YES) Will the subject fecility be located within 1,000 feet of the outer boundary of a school (K through 12)? (Search the California School Directory at http://vww.cde.ca.aov/re/sd/ for public and private schools or contact the appropriate school district). Has a survey been performed to determine the presence of Asbestos Containing Materials? Will there be renovation that involves handling of any friable asbestos materials, or disturbing any material that contains non-friable asbestos? Will there be demolition involving the removal of a load supporting structural member? YES NO 1. • 2. • • 3. • 4. • 5. • 0 Briefly describe business activities: Briefly describe proposed project: I declare under penalty of perjury that to the best of my knowledge and belior tharaMMBsc^ Name of Owner or Authorized Agent gacle hereibari a^d correct. SignatuK of Owner 4x Authorized Agent 0^1 h I 14 Date '~ FIRE DEPARTMENT OCCUPANCY CLASSIFICATION.. BY; FOR OFFICIAL USE ONLY: DATE: EXEMPT OR NO FURTHER INFORMATION REQUIRED RELEASED FOR BUILDING PERMIT BUT NOT FOR OCCUPANCY RELEASED FOR OCCUPANCY COUNTY-HMD* APCD COUNTY-HMD APCD COUNTY-HMD APCD *A stamp in this box onlv exempts businesses from completing or updating a Hazardous Materials Business Plan. Other permitting requirements may still apply. HM-9171 (02/11) County ofSan Diego-DEH-Hazardous Materials Division CB140580 1808 ASTON AV 170 VERTICAL SE/\RCH: 9,155 SF OFF ^^jN fX^^i^ cu^r^ ^ l-^^A c^T-/ ^tx^ rot-^u^O-^ Final Inspection required by: • Plan • CM&I SW •ISSUE) • y acv. Approved Date BUILDING PLANNING ENGINEERING FIRE Exped! DIGfTAL FILES Required? 3 tequired? V N 1^ By '^/i^'Y ^6 HazMat APCD Health Forms/Fees Sent Reed Encina Fire HazHealttiAPCD PE&M School Sewer Stormwater Special Inspection CFD: Y LandUse: Due? By Y N Density: ImpArea: FY: Annex: Fartor: PFF: y IE Comments Date Date Date Date Building Planning Engineering Fire Need? • Done • Done • Done