HomeMy WebLinkAbout1808 ASTON AVE; 250; CB140904; Permit05-28-2014
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Commercial/Industrial Permit Permit No. CB140904
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
Project Title:
1808 ASTON AV CBADSt: 250
Tl Sub Type: INDUST
2121200700 Lot#: 0
$166,520.00 Construction Type: 58
Reference #
WELLS FARGO: 4,486 SF OFF Tl,
PARTLY AN EXPANSION INTO AREA FORMERLY STE. 270
Status: ISSUED
Applied: 04/22/2014
Entered By: JIVIA
Plan Approved: 05/28/2014
Issued: 05/28/2014
Inspect Area ^
PlanChecl<#: fC, [H-OOlS
Applicant:
TARA NORTON
STE 100
5090 SHOREHAM PL
SAN DIEGO CA 92122-5934
619-297-1011
Owner:
MCR ASTON LLC
1808 ASTON AVE #180
CARLSBAD CA 92008
Building Permit $958.26 Meter Size
Add'l Building Permit Fee $0.00 Add'l Reel. Water Con. Fee $0.00
Plan Check $670.78 Meter Fee $0.00
Add'l Building Permit Fee ($250.00) SDCWA Fee $0.00
Plan Check Discount $0.00 CFD Payoff Fee $0.00
Strong Motion Fee $34.97 PFF (3105540) $0.00
Park Fee $0.00 PFF (4305540) $0.00
LFM Fee $0.00 License Tax (3104193) $0.00
Bridge Fee $0.00 License Tax (4304193) $0.00
BTD #2 Fee $0.00 Traffic Impact Fee (3105541) $0.00
BTD #3 Fee $0.00 Traffic Impact Fee (4305541) $0.00
Renewal Fee $0.00 PLUMBING TOTAL $0.00
Add'l Renewal Fee $0.00 ELECTRICAL TOTAL $65.88
Other Building Fee $0.00 MECHANICAL TOTAL $42.45
Pot. Water Con. Fee $0.00 Master Drainage Fee $0.00
Meter Size Sewer Fee $0.00
Add'l Pot. Water Con. Fee $0.00 Redev Parking Fee $0.00
Reel. Water Con. Fee $0.00 Additional Fees $0.00
Green BIdg Stands (SB1473) Fee $4.00 HMP Fee ??
Fire Expedidted Plan Review $317.50 Green BIdg Standards Plan Chk ??
TOTAL PERMIT FEES $1,843.84
Total Fees: $1,843.84 Total Paynnents To Date: $1,843.84 Balance Due: $0.00
Inspector:
FINAL APBROVAL
Date: l/lll^/uH Clearance:
NOTICE: Please take NOTICE thfet approval of your project includes tiie "Imposition" of i^es, dedications, reservations, or otiier exactions tiereafter collectively
referred to as "fees/exactions." YDU have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Govemment Code Section 66020(a), and file the protest and any other required information with the City l^anager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
fees/exactions of which vou have previouslv been oiven a NOTICE similar to this, or as to which the statute of limitations has oreviouslv othero/ise expired.
Inspection List
Pennlt#: CB140904 Type: Tl INDUST WELLS FARGO: 4,486 SF OFF Tl,
PARTLY AN EXPANSION INTO AREA FOR
Date Inspection^ltem Inspector Act Comments
06/25/2014 89 Finai Combo - Rl AM PLS
06/25/2014 89 Final Combo PY AP
05/30/2014 14 Frame/Steel/BoltlngA/Veldin PB PA
Thursday, June 26, 2014 Page 1 of 1
PLAN CHECK PLAN CHECK Community & Economic
^ CITY OF REVIEW Development Department
1635 Faraday Avenue
CARLSBAD TRANSMITTAL Carlsbad CA 92008
www.carlsbadca.gov
DATE:04/30/14 PROJECT NAME: MCR ASTON LLC
F>LAN CHECK NO: 1 SET#: ADDRESS: 1808 ASTON #250
VALUATION: $ Tl STE 250 MADE FROM STE'S #270
PROJECT ID: CB14-0904
APN: 212-120-07
/ This plan check review is complete and has been APPROVED by the ENGINEERING
Division.
By: KATHLEEN LAWRENCE 04/30/14
A Final Inspection by the Division is required Yes / No
This plan check review is NOTCOMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check Comments have been sent to: TNORTON@RBN-DESIGN.COM
You may also have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the issuance of a building permit
Resubmitted plans should include corrections from all divisions.
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
PLANNING
760-602-4610
ENGINEERING
760-602-2750
FIRE PREVENTION
760-602-4665
Chris.Sexton@carlsbadca.gov
/ Kathleen Lawrence
760-602-2741
Kathleen.Lawrence@carlsbadca.gov Gregorv.Rvan@carlsbadca.fiov
Gina.Ruiz@carlsbadca.gov Linda.Ontiveros@carlsbadca.gov Cvnthla.Wonfi@carlsbadca.gov
Dominic.Fleri@carlsbadca.fiov
Remarks:
NO CHANGE IN USE NO ADDTL ENG FEES