Loading...
HomeMy WebLinkAbout1808 ASTON AVE; 250; CB140904; Permit05-28-2014 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Commercial/Industrial Permit Permit No. CB140904 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: Project Title: 1808 ASTON AV CBADSt: 250 Tl Sub Type: INDUST 2121200700 Lot#: 0 $166,520.00 Construction Type: 58 Reference # WELLS FARGO: 4,486 SF OFF Tl, PARTLY AN EXPANSION INTO AREA FORMERLY STE. 270 Status: ISSUED Applied: 04/22/2014 Entered By: JIVIA Plan Approved: 05/28/2014 Issued: 05/28/2014 Inspect Area ^ PlanChecl<#: fC, [H-OOlS Applicant: TARA NORTON STE 100 5090 SHOREHAM PL SAN DIEGO CA 92122-5934 619-297-1011 Owner: MCR ASTON LLC 1808 ASTON AVE #180 CARLSBAD CA 92008 Building Permit $958.26 Meter Size Add'l Building Permit Fee $0.00 Add'l Reel. Water Con. Fee $0.00 Plan Check $670.78 Meter Fee $0.00 Add'l Building Permit Fee ($250.00) SDCWA Fee $0.00 Plan Check Discount $0.00 CFD Payoff Fee $0.00 Strong Motion Fee $34.97 PFF (3105540) $0.00 Park Fee $0.00 PFF (4305540) $0.00 LFM Fee $0.00 License Tax (3104193) $0.00 Bridge Fee $0.00 License Tax (4304193) $0.00 BTD #2 Fee $0.00 Traffic Impact Fee (3105541) $0.00 BTD #3 Fee $0.00 Traffic Impact Fee (4305541) $0.00 Renewal Fee $0.00 PLUMBING TOTAL $0.00 Add'l Renewal Fee $0.00 ELECTRICAL TOTAL $65.88 Other Building Fee $0.00 MECHANICAL TOTAL $42.45 Pot. Water Con. Fee $0.00 Master Drainage Fee $0.00 Meter Size Sewer Fee $0.00 Add'l Pot. Water Con. Fee $0.00 Redev Parking Fee $0.00 Reel. Water Con. Fee $0.00 Additional Fees $0.00 Green BIdg Stands (SB1473) Fee $4.00 HMP Fee ?? Fire Expedidted Plan Review $317.50 Green BIdg Standards Plan Chk ?? TOTAL PERMIT FEES $1,843.84 Total Fees: $1,843.84 Total Paynnents To Date: $1,843.84 Balance Due: $0.00 Inspector: FINAL APBROVAL Date: l/lll^/uH Clearance: NOTICE: Please take NOTICE thfet approval of your project includes tiie "Imposition" of i^es, dedications, reservations, or otiier exactions tiereafter collectively referred to as "fees/exactions." YDU have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Govemment Code Section 66020(a), and file the protest and any other required information with the City l^anager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which vou have previouslv been oiven a NOTICE similar to this, or as to which the statute of limitations has oreviouslv othero/ise expired. Inspection List Pennlt#: CB140904 Type: Tl INDUST WELLS FARGO: 4,486 SF OFF Tl, PARTLY AN EXPANSION INTO AREA FOR Date Inspection^ltem Inspector Act Comments 06/25/2014 89 Finai Combo - Rl AM PLS 06/25/2014 89 Final Combo PY AP 05/30/2014 14 Frame/Steel/BoltlngA/Veldin PB PA Thursday, June 26, 2014 Page 1 of 1 PLAN CHECK PLAN CHECK Community & Economic ^ CITY OF REVIEW Development Department 1635 Faraday Avenue CARLSBAD TRANSMITTAL Carlsbad CA 92008 www.carlsbadca.gov DATE:04/30/14 PROJECT NAME: MCR ASTON LLC F>LAN CHECK NO: 1 SET#: ADDRESS: 1808 ASTON #250 VALUATION: $ Tl STE 250 MADE FROM STE'S #270 PROJECT ID: CB14-0904 APN: 212-120-07 / This plan check review is complete and has been APPROVED by the ENGINEERING Division. By: KATHLEEN LAWRENCE 04/30/14 A Final Inspection by the Division is required Yes / No This plan check review is NOTCOMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to: TNORTON@RBN-DESIGN.COM You may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit Resubmitted plans should include corrections from all divisions. For questions or clarifications on the attached checklist please contact the following reviewer as marked: PLANNING 760-602-4610 ENGINEERING 760-602-2750 FIRE PREVENTION 760-602-4665 Chris.Sexton@carlsbadca.gov / Kathleen Lawrence 760-602-2741 Kathleen.Lawrence@carlsbadca.gov Gregorv.Rvan@carlsbadca.fiov Gina.Ruiz@carlsbadca.gov Linda.Ontiveros@carlsbadca.gov Cvnthla.Wonfi@carlsbadca.gov Dominic.Fleri@carlsbadca.fiov Remarks: NO CHANGE IN USE NO ADDTL ENG FEES