HomeMy WebLinkAbout1808 ASTON AVE; STRUCTURAL CALCS; PCR01026; Permit0411 312001
Job Address:
Permit Type:
Parcel No:
Valuation:
Reference #:
Project Title:
Applicant:
WYER KIETH
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Plan Check Revision Permit No:PCRO1026
Building Inspection Request Line (760) 602-2725
1808 ASTON
PCR .
2121200700
$0.00
CBOO-3345
AV CBAD
Status: ISSUED
Lot #: 0 Applied: 01/25/2001
.~.. .. ~ Plan Approved: 04/12/2001
Issued: 0411 3/2001 ASTON VIEWS Inspect Area:
Construction Type: NEW Entered By: MDP
DEFERRED ROOF & FLOOR SUBMITTAL
Owner:
ASTON VIEWS L L C
4370 LA JOLLAWLLAGE DmQ4/13/01 0002 01 02
SAN DlEGO CA 92122 COP 327.00 13 760 744-3133’1
Total Fees: $327.00 Total Payments To Date: $0.00 Balance Due: $327.00
Plan Check Revision Fee
Additional Fees
$327.00
$0.00
FINAL APPROVAL
Inspector: Date: Clearance:
NOTICE Please take NOTICE that apvoval of your project includes the‘lmpobikm’ of fees, dedications, reservaMns, or other exadons hereafter WlkcOvely
referred to as ’feeslexactbns.” You have 90 days from the date this permhwas issued to protest imposition of these feeslexactions. If you protest them, you must
follow the pmtest procedures set forth in Government Code Section 660ZO(a), and file the protest and any other required information with the City Manager for
processing in amrdance with Carlsbad Municipal Code Section 3.32.030. Failure to bnelyfollowthat procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their impasition.
You are hereby FURTHER NOTIFIED that your right to protest the specified feeslexxtbns DOES NOT APPLY towater and sewer mnneclion fees and CaWCW
changes, nor planning, zoning, grading or othersirnilarapplicalmn pmzssing or serfice fees in wnnection with this pmject NOR DOES IT APPLY to any
feedexactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previouslv otherwise expired.
FOR OFFICE USE ONLY
PLAN CHECK NO.-% PERMIT APPLICATION
CITY OF CARLSBAD BUILDING DEPARTMENT
1635 Faraday Ave., Carlsbad, CA 92008
EST. VAL.
Plan Ck. Deposit
Validated By I
Date
#WK$hlW&V(oN I W
_/w A&.-) Atc Address lincluds BldglSYits XI
Legal Description Lot No. Subdivision NameINumber Unit No. Phase No. Total I Of Units
Business Nams Iat this address1
Existing Use Propared Use
k.LcI.rrd.5 L
Description ofwork SO. FT. tot stories 11 of Bbdr00ms X of Bathrooms
, ., :. , ,, .. , ,,
Name Address city StatelZip Telephone I Fax #
Name Address City State/Zip Telephone #
7031.5 Business and Professions Co
issuance. 8150 requires the applicant for such permit to file a signed Statement that he is licensed PUIsUant to the provisions of the Contractor'$ License Law
[Chapter 9. commending with Section 7000 of Division 3 of the Business and PrOfe5siOnS Code1 or that hs is exempt therefrom. and the basis for the alleged
exemption. Any violation of Section 7031.5 by my applicant for a Permit subjects the applicant to a civil penalty Of not more than fi B hundred dollars l850011.
Name
State License X -&LzS'+ License Class A{K City Business License X 22 Y80,-,
Designer Name Address City StatelZip Telephone
State License X
Workers' Compensation Declaration: I hereby affirm under penalty of perjury 008 of the foliowing dedamtiorn:
of the work for which this Permit is issued.
0 issued. MY worker's compensation insurance carrier and ~ollcv number are:
s,-eId /rum Jl'i179 6+ ek-.#w-= 5 %m\7Lcu - 3 I J 5 Lu2LW.x CZ., Address City StatelZip TelZphoneX
, ,,, ,. .,.I . . ,.. , . ..,
I have and will maintain a Certificate of consent tO self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance
I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is
Insurance Company Policy No. Expiration Oats
(THIS SECTION NEED NOT BE COMPLETED IF THE PERMIT IS FOR ONE HUNDRED DOLLARS 181001 OR LESS)
to become subject to the Workers' Compensation Laws of California.
WARNING.
thousand dollars IP100.000). in addition to the cost of compensation. damagsr as provided for In Section 3706 of the Labor Code. interest and attorney's fees.
SIGNATURE DATE
I hereby affirm that I am exempt from the Contractor's License Law for the following reason:
I, 81 owner of the property or my employees with wages as their sole COmpmSation, will do the work and the Structure is not intended or offered far sa18 ISec. 7044, Business and Professions Code: The COntraCtOr'S License Law does not apply to on owner of property who builds or improve$ thereon. and who does
such work himself or through his own employees, provided that such improvements are not intendsd 01 Offered for $818. If, however. the building or improvement is
sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of salei.
0 I, as owner of the property, am exclusively contracting with licensed Contractors to construct the project ISec. 7044, Business and Professions Code: The
Contractor's License Law does not apply to an owner of P~OPBRV who builds or improves thereon. and Contracts far such projects with ~ontr~~t~rl~l licensed
pursuant to the Contractor's License Lawl.
CERTIFICATE OF EXEMPTION: I Cenify that in the performance of the work for which this permit is issued, i shall not employ any person in any manner so as
Failure to secure workers' compensation coverage IS unladd. and shall subject an employer to crlmlnal Penalties and Civil flnes up to one hundred
.. J WgUILM&ECWh&lON ,.
I am exempt under Section
I personally plan to provide tho major labor and mateiids for construction Of the proposed property improvement. 0 YES UNO
I (have I have not1 signed an application for a building permit for the proposed work.
I have contracted with the following pereon (firm) to provide the proposed construction (include name I address I Phone number I contractors license number):
Business and Professions Code for this reason:
1.
2.
3.
4.
number I Contractors licensw number):
5.
I plan to provide portions of the Work, but I have hired the following person to coordinate. supervise and provide the major work (include name I address I phone
I will orovide some of the work. but I have contracted (hired) the foll0win(l mrsons to Drovide the work indicated (include name I address I Dhone number I tVDe
Is the applicant or future building occupant required to submit a business plan. acutely hazardous materials registiation form or risk management and prevention
program under Sections 25505. 25533 or 25534 of the Preslev-Tanner Hazardou Substance Account Act? YES 0 NO
is the applicant or future building occupant required to obtain a permit from the air pollution Control district or air quality management district? YES NO
1s the facility to be constructed within 1,000 feet of the outer boundary Of a school site? YES NO
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE
REOUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AN0 THE AIR POLLUTION CONTROL DISTRICT.
,, ,
I hereby affirm that there is B Construction lending agency for the performance of the work for which this Permit is issued 1Sec. 3097lil Civil Code).
LENDERS ADDRESS
,, . ,,, ' ,. LENDERS NAME
,. , ,, ..
I cenify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all
City ordinances and State laws relating to building constwction. I hereby authorize representatives Of the City Of Carlsbad to enter upon the above mentioned
propmy for inspection PU~POSQS. I ALSO AGREE TO SAVE. INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES,
JUDGMENTS, COSTS AN0 EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SA10 CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT.
OSHA An OSHA permit is required for excavations over 5'0" deep and demolition or construction of Structures over 3 Stories in height.
EXPIRATION: Every permit issued by the building Ofiicial under the provisions of this Code shall expire by limitation and become null and void if the building or work
authorized by Such permit is not commenced within 180 days from the date of such permit or if the building or Work authorized by such permit is suspended or abandoned
at any time after the work is corn
APPLICANT'S SIGNATURE DATE .
-WHITE File YELLOW: Applicant PINK: Finance
EGl - Corporation
Zn Tartncrsfiip witfi @mnmnt for !Bui&iiy Safety
DATE: April 11,2001
JURISDICTION : Carlsbad
0 FILE
PLAN CHECK NO.: 00-3345 REV (PCR01-26) SET IV
PROJECT ADDRESS: 1808 Aston Ave.
PROJECT NAME: Deferred Floor/Roof Framing Submittal; Aston Views
0 The plans transmitted herewith have been corrected where necessary and substantially comply
H The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
0 The plans transmitted herewith have significant deficiencies identified on the enclosed check list
0 The check list transmitted herewith is for your information. The plans are being held at Esgil
0 The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
0 The applicant's copy of the check list has been sent to:
with the jurisdiction's building codes.
and should be corrected and resubmitted for a complete recheck.
Corporation until corrected plans are submitted for recheck.
contact person.
H Esgil Corporation staff did not advise the applicant that the plan check has been completed.
0 Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone #:
Fax #: f Date contacted: (by: 1
Mail Telephone Fax In Person
[XI REMARKS: Each sheet of these plans must signedlsealed by the engineer responsible for
Enclosures: City-approved plans
their preparation.
By: Kurt Culver
Esgil Corporation 17 GA 0 MB 0 EJ 0 PC 4/5/01 tmsrntl.dot
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576
EZT - Corporation
ln Tartncrskip witK ~ovemmcnt for @uiUi@afcy
DATE: March 23,2001
JURISDICTION: Carlsbad 0 FILE
PLAN CHECK NO.: 00-3345 REV (PCR 01-26) SET 111
PROJECT ADDRESS: 1808 Aston Ave.
PROJECT ADDRESS: 1808 Aston Ave.
PROJECT NAME: Deferred Floor/Roof Framing Submittal; Aston Views Cog. Ctr.
0 The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
0 The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
0 The plans transmitted herewith have significant deficiencies identified on the enclosed check list
[XI The check list transmitted herewith is for your information. The plans are being held at Esgil
0 The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
[XI The applicant's copy of the check list has been sent to:
and should be corrected and resubmitted for a complete recheck.
Corporation until corrected plans are submitted for recheck.
contact person.
Lusardi Const. 1570 Linda Vista Dr. San Marcos, CA 92069
0 Esgil Corporation staff did not advise the applicant that the plan check has been completed.
Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Keith
Date contacted: dzb (bl (by: hk)
Telephone #: (760) 744-3133 x 1113
Fax #: -9064
Mail &phone Fax/ In Person
[7 REMARKS:
By: Kurt Culver Enclosures:
Esgil Corporation
GA 0 ME 0 EJ 0 PC 311 910 1 trnsrntl.dot
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 Fax (858) 560-1576
c Carlsbad 00-3345 REV (PCR 01-26)
March 23, 2001
RECHECK PLAN CORRECTION LIST
llJURlSDlCTlON1 PLAN CHECK NO.: 00-3345 REV
(PCR 01-26)
PROJECT ADDRESS: 1808 Aston Ave. SET: 111
DATE PLAN RECEIVED BY
ESGIL CORPORATION: 3/19/01
DATE RECHECK COMPLETED:
March 23,2001
FOREWORD (PLEASE READ):
This plan review is limited to the technical requirements contained in the Uniform Building Code,
Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws
regulating energy conservation, noise attenuation and disabled access. This plan review is
based on regulations enforced by the Building Department. You may have other corrections
based on laws and ordinances enforced by the Planning Department, Engineering Department
or other departments.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3,
1997 Uniform Building Code, the approval of the plans does not permit the violation of any
state, county or city law.
A. Please make all corrections on the original tracings and submit two new sets of prints to:
ESGIL CORPORATION.
B. To facilitate rechecking, please identify, next to each item, the sheet of the plans upon
which each correction on this sheet has been made and return this sheet with the
revised plans.
C. The following items have not been resolved from the previous plan reviews. The original
correction number has been given for your reference. In case you did not keep a copy of
the prior correction list, we have enclosed those pages containing the outstanding
corrections. Please contact me if you have any questions regarding these items.
D. Please indicate here if any changes have been made to the plans that are not a result of
corrections from this list. If there are other changes, please briefly describe them and where
they are located on the plans. Have changes been made not resulting from this list?
OYes ONo
Carlsbad 00-3345 REV (PCR 01-26)
March 23, 2001
I. THE BUBBLES HAVE
BEEN COMPLETED, BUT NOW THE PLANS AREN’T SIGNED/SEALED BY THE ENGINEER
RESPONSIBLE FOR THEIR PREPARATION.
Please fill in the empty reference bubbles throughout the plans.
2. Please revise the plans as directed by the engineer-of-record (Prime Structural
Engineers). Then. resubmit to them for further reviewlaooroval.
4. Why are so many sheets missing from the set??
SHEETS 7,8,9, ETC. ARE MISSING.
NO RESPONSE RECEIVED.
The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite
208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan
review for your project. If you have any questions regarding these plan review items, please
contact Kurt Culver at Esgil Corporation. Thank you.
0 Obviously, more effort must be made before you resubmit next
time!
Please provide an itemized response to each outstanding item
from above. Someone just dropped off the plans with no
transmittal, explanation letter, etc. Please provide assistance to
the plan checker if you are interested in obtaining approval in a
timely manner!!
0 Correction 1 is still outstanding: The plans are now signed, but
someone “turned off” the layers with the reference bubbles! For
example, sheet 1 now has NO DETAILS shown on it. Please take
extra time in reviewing the plans before you resubmit next time.
0 Correction 2 is still outstanding: The set you resubmitted
apparently was not reviewed by Prime Structural Engineers.
Please have them reviewlstamp the plans BEFORE you resubmit
to the building department.
0 No response was received for Correction 4, so it is still
outstanding.
Em Corporation
~
ln ~artncrsfiip with Government for BdZg Safety
DATE: March 5, 2001
JURIS D I CTI 0 N : Carlsbad MEVIEWER
0 FILE
PLAN CHECK NO.: 00-3345 REV (PCR 01-26) SET: I1
PROJECT ADDRESS: 1808 Aston Ave.
PROJECT NAME: Deferred Floor/Roof Framing Submittal; Aston Views Corp. Ctr.
0 The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
0 The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
0 The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
0 The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
(XI The applicant's copy of the check list has been sent to:
contact person.
Lusardi Const. 1570 Linda Vista Dr. San Marcos, CA 92069
0 Esgil Corporation staff did not advise the applicant that the plan check has been completed.
Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Keith
Date contacted: 3-64 (by:&) Fax #: -9064
Telephone #: (760) 744-31 33 x 1 1 13
Mail A Telephone Fax/ In Person
REMARKS:
By: Kurt Culver Enclosures:
Esgil Corporation 0 GA MB 0 EJ 0 PC 2/27/01 tmsmtl.dot
9320 Chesapeake Drive, Suite 208 San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576
- Carlsbad 00-3345 REV (PCR 01-26)
March 5,2001
RECHECK PLAN CORRECTION LIST - JURISDICTION: Carlsbad PLAN CHECK NO.: 00-3345 REV
(PCR 01-26)
PROJECT ADDRESS: 1808 Aston Ave. SET: I1
DATE PLAN RECEIVED BY
ESGlL CORPORATION: 2/27/01
DATE RECHECK COMPLETED:
March 5, 2001
FOREWORD (PLEASE READ):
This plan review is limited to the technical requirements contained in the Uniform Building Code,
Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws
regulating energy conservation, noise attenuation and disabled access. This plan review is
based on regulations enforced by the Building Department. You may have other corrections
based on laws and ordinances enforced by the Planning Department, Engineering Department
or other departments.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3,
1997 Uniform Building Code, the approval of the plans does not permit the violation of any
state, county or city law.
A. Please make all corrections on the original tracings and submit two new sets of prints to:
ESGlL CORPORATION.
B. To facilitate rechecking, please identify, next to each item, the sheet of the plans upon
which each correction on this sheet has been made and return this sheet with the
revised plans.
C. The following items have not been resolved from the previous plan reviews. The original
correction number has been given for your reference. In case you did not keep a copy of
the prior correction list, we have enclosed those pages containing the outstanding
corrections. Please contact me if you have any questions regarding these items.
D. Please indicate here if any changes have been made to the plans that are not a result of
corrections from this list. If there are other changes, please briefly describe them and where
they are located on the plans. Have changes been made not resulting from this list?
OYes ONo
Carlsbad 00-3345 REV (PCR 01-26)
March 5,2001
1. THE BUBBLES HAVE
BEEN COMPLETED, BUT NOW THE PLANS AREN’T SIGNEDKEALED BY THE ENGINEER
RESPONSIBLE FOR THEIR PREPARATION.
Please fill in the empty reference bubbles throughout the plans.
2. Please revise the plans as directed by the engineer-of-record (Prime Structural
Engineers). Then. resubmit to them for further reviewlamroval.
4. Why are so many sheets missing from the set??
SHEETS 7,8,9, ETC. ARE MISSING.
NO RESPONSE RECEIVED.
The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite
208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan
review for your project. If you have any questions regarding these plan review items, please
contact Kurt Culver at Esgil Corporation. Thank you.
c
E~GL Corporation
DATE: February 2,2001
J URl SDl CTl ON: Carlsbad 0 PLAN REVIEWER
0 FILE
PLAN CHECK NO.: 00-3345 REV (PCR 01-26) SET: I
PROJECT ADDRESS: 1808 Aston Ave.
PROJECT NAME: Deferred Floor/Roof Framing Submittal; Aston Views Corp. Ctr.
0 The plans transmitted herewith have been corrected where necessary and substantially comply
0 The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
0 The plans transmitted herewith have significant deficiencies identified on the enclosed check list
The check list transmitted herewith is for your information. The plans are being held at Esgil
0 The applicant's copy of the check list is enclosed for the jurisdiction to foward to the applicant
The applicant's copy of the check list has been sent to:
with the jurisdiction's building codes.
and should be corrected and resubmitted for a complete recheck.
Corporation until corrected plans are submitted for recheck.
contact person.
Lusardi Const. 1570 Linda Vista Dr. San Marcos, CA 92069
Esgil Corporation staff did not advise the applicant that the plan check has been completed.
Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Keith
Date contacted: 'd> (by:E) Fax #:-go64
Telephone #: (760) 744-31 33 x 1 1 13
Mail ,Telephone Fax- In Person 0 REMARKS:
By: Kurt Culver Enclosures:
Esgil Corporation 0 GA 0 MB EJ 0 PC 1/29/01 trnsmtl.do1
9320 Chesapeake Drive, Suite 208 San Diego, California 92123 (858) 560-1468 Fax (858) 560-1576
Carlsbad 00-3345 REV (PCR 01-26)
February 2, 2001
GENERAL PLAN CORRECTION LIST
JURISDICTION: Carlsbad PLAN CHECK NO.: 00-3345 REV (PCR 01-26)
PROJECT ADDRESS: 1808 Aston Ave.
DATE PLAN RECEIVED BY
ESGIL CORPORATION: 1/29/01
DATE REVIEW COMPLETED:
February 2,2001
REVIEWED BY: Kurt Culver
FOREWORD (PLEASE READ):
This plan review is limited to the technical requirements contained in the Uniform Building Code,
Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws
regulating energy conservation, noise attenuation and disabled access. This plan review is
based on regulations enforced by the Building Department. You may have other corrections
based on laws and ordinances enforced by the Planning Department, Engineering Department
or other departments.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3,
1997 Uniform Building Code, the approval of the plans does not permit the violation of any
state, county or city law.
Please make all corrections on the original tracings and submit two new complete sets of
prints to: ESGIL CORPORATION.
To facilitate rechecking, please identify, next to each item, the sheet of the plans upon
which each correction on this sheet has been made and return this sheet with the
revised plans.
Please indicate here if any changes have been made to the plans that are not a result of
corrections from this list. If there are other changes, please briefly describe them and where
they are located on the plans. Have changes been made not resulting from this list?
0 Yes 0 No
Carlsbad 00-3345 REV (PCR 01-26)
February 2,2001
1. Please fill in the empty reference bubbles throughout the plans.
2. Please revise the plans as directed by the engineer-of-record (Prime Structural
Engineers). Then, resubmit to them for further reviewlapproval.
No structural calculations were provided. Please submit complete sets.
Why are so many sheets missing from the set??
3.
4.
5. The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake
Drive, Suite 208, San Diego, California 92123; telephone number,of 8581560-1468, to
perform the plan review for your project. If you have any questions regarding these plan
review items, please contact Kurt Culver at Esgil Corporation. Thank you.
Carlsbad 00-3345 REV (PCR 01-26)
February 2,2001
VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad PLAN CHECK NO.: 00-3345 REV (PCR 01-26)
PREPARED BY: Kurt Culver
BUILDING ADDRESS: 1808 Aston Ave.
DATE: February 2,2001
Air Conditioning - Fire Sprinklers
TOTAL VALUE
BUILDING OCCUPANCY: TYPE OF CONSTRUCTION:
1994 UBC Building Permit Fee . V
1994 UBC Plan Check Fee v
Type of Review: Zomplete Review Structural Only
0 Repetitive Fee . /rlRepeats
Other
I $326.81 I
J Hour I 31 Hours*
Esgll Plan Review Fee
* Based on hourly rate
Comments: Review of deferred roofhloor framing: Esgil fee = 3 hrs. @ $87.1 5/hr.
Sheet1 of 1
macvalue.doc
, //q
I
Ryan, 1
,
~ haw a response tomorrow.
Attached is the sheet that I included with the last deferred submittal. It explained the corrections that we made. If
you have any questions please call. I am currently reviewing the latest sheet from the building department. I will
1,7970 Earhart Awenue, Suite 210 ahbum, California 95602-9022 - 530-899-2979 Fa= 530-999-5671 0 39500 Stevenson Place. Suite 104 Frcmont, California 94539-3101 510-494-0741 -Fax 510494-0745
1521 Chico Awe, South El Monte. California 91733-2996.626-573-7170= Fuzz 626-401-9376
P. 0. BOX 82657.2049 Kuru St. San Diego, California 92138-2657 619-295-3153 Faa 619-295-3625
TO: Lusardi Construction
AlTN: Ryan
CC:
FACSIMILE COVER LETTER
DATE: 3-27-01
PH.:
FAX: 760-744-9064
REGARDING: Aston View
JD2 INC. JOB #
Thanks Ross
FROM: Tracy Cody, General Manager I Ext. 203 Thank You for your attention on this matter.
Total number of pages including this page IS
If yon do not receive the number of sheets shown above, please dl sender at 619-2
I
CALIFORNIA CONTRACTORS LICENSE No. 674925 NEVADA CONTRACTOR5 LlCEN5E NO. 455885
7. THE BUBBLES HAVE BEEN COMPLETED, BUT NOW THE PLANS AREN'T SlGNEDlSEALED BY THE ENGINEER Please fill In the empty referetxfi bubbles ttlroughout the plans.
6LE FOR THEIR PREPARATION. 3"
2. Please rsvise the plana as dlfeded by the engcneerot--record (Ptlrne Structural
fnglnesl
ED P WL c%&d6
NO RESPONSE RECEIVED. 4.
SHEETS 7,%. 9, €IC. ARE MISSING. Why ate so many sheets missing from the set??
MI SS/d6 5-7s Azgr ,,DeelL/& Cas
The junsdidlon hae contraded with Esgil Corporatlon located at 9320 Chesapeake Drlve. Solte 208. San Dlego, California 92123; telephone number af858/560-1468, to perftym the plan
review for your project If you have any questions regarding these plan review ibrne. please contad ZTurt mer at Esgil Cnrpdreuon. Thank yeu.
12970 Eurhurtilvenue, Suite 21 0 4 Auburn. California 95602-9022 530-889-2973 -Pas 530-889-5671
39500 Swenson Place. Suite 104 Fmnonc, California 34539-3101 510-494-0741 Fa, 510491.074j
P. 0. Box 82657. 20-19 Kuru SC. *Sun Diego, Cal&miu 92138-2657 619-295-3113 .Fax 619-295-3&g
1531 Chic0 he, 9 South El Monte, California 91 733-2996-626-579-71 70. Fas 626-401-9576
8
TO: Lurardi Construction
ATTN: Ryan
cc:
FACSIMILE COVER LETTER
DATE: 3-28-01
PH.:
FAX: 760-744-9064
REGARDING: Aston View
JD2 INC. JOE X
1
Ryan,
Amched is the latest response from the building department.
lkm A - No response required.
em 6 - See attached transntittal and this fax
Item C -The drawing layers have been turned Off because my JD2 engineer will not sign for the building design.
He is only signing for the design of the joist. By signing tho joists shop drawings without the design information
he is varifying the Joist design and Placement. If my engineer signed the shop drawings with all the layer turned on
he would be stamping that the build design is correct. The overall building deslgn is the engineer of record‘s job.
The joist shop drawings are for Joist placement only and not design a document My engineer verifies that the
io& are designed and fabricated per the contract drawings and the calculation matches that design.
Rem D - Lusardi has to get Prime Structure’s approval stamp before submitting. Not by JD2.
bm E -The missing drawings are the deck drawings and are not pad of the joist submittal.
FROM: Ross Jeffrey, Project Manager I EA 208 Thank You for your attention on this matter.
Total number of pages including this page iS Page of
Uyou do not receive the number ofiheets shown above, please call sender at 619-295-3153.
CALIFORNIA COMRACTORS LICENSE NO. 674925 NEVAUA CONTRACTOW5 LICENSE M3.45585
I JDz, /NEm a WZ-ZAZA- “Innovative Steel Solwtiom”
TO: Lusardi Constructlon Co.
1814 Aston Ave.
Carlsbad CA 92008
Aflr4:Lance Rlernan I Ryan Measher
0 12970 Earhart Awenue, Suite 210 *.4ubuin, California 9560-3-3022 530-889-2979 Pau 53 -889-5671 0 39500 S(evensoii Place, Suite 104 *tkmonc, California 945393101 510-494-0741 *Fw d?O-m-O745
,7049 Kuru Et, P. 0. Bar 82657 Son Diego. California 92138-26.57 619-235-3153 ~FRX 61p-2955626 n 1521 Chic0 he. So. EIMmtc. California 91 733-2996 6-36-579-71 70 *Fax 626.401~9576
DATE: 3-14-01
PROJECT; Aston View5 Plaza
JOB NO.: 00-364 1
CUSTOMER’S #: 2539 I
-- TRANSMITTAL
COPY TO: Fila WITH -PRINTS.
GENTLEMEN:
WE ARE TRNJSMI~TING THE FOLLOWING: VIA: a PRINTS 0 REPRODUCIBLES 0 Cal OVNT 0 u. s. MplL
0 BILLS OF MATERIAL 0 SPECIFICATIONS UPS OVNT HAND-DELIV.
0 APPROVAL (PLEASE CHECK AND RETURN - PRINT BY PLEASE NOTE DELAY IN RETURN
OF APPROVALS MAY RESULT IN A
DELAY IN SHIPMENT.
YOUR USE
c] FOR FABRICATION
REVIEW AND ADVISE
Defsred SubmLl
SIGNED: Dennis Cody, ProM Manager I Ed. 205
C-A CDNTRACTORS LICENSE No. 674925 * NEVADA CONTRACTOR’S LICENSE NO. 45585
Fehruluy 19,2001
commeals mad
SAN DIEGO, CA 921 10-2014
//ATTENTION: DENNIS CODY
JOIST GIRDER MARKS as shown on the: *ad for performing all work in a safe and
satisfactory manner.
PRIME STRUCTURAL ENGINEERS
SEOUENCE
RED
BLU
r
r
GRN
YEL
WHI
ORG
THESE JOISTS ARE AS MARKED ON THE JOIST PLACEMENT PLANS. The bridging is to be in place and
anchored as required by the SJI Specifications & Technical Digests. The work was prepared under the supervision
of Valley Joist-West’s Mr. Walter Worthley, PE, Chief Engineer. If there are any questions, please feel free to
contact Mr. Walter Worthley, Chief Engineer at the above address.
The joist designations and special loads were designed by the engineer-of-record, not by the joist
manufacturer nor by RICHARD A. PHANEUF, P.E. MR. RICHARD A. PHANEUF, P. E. IS NOT THE
engineer-of-record; Mr. Phanenf is the steel joist component engineer whereby Mr. Phaneufs scope is limited
to the design of the members in the steel joists. Mr. Phaneufs scope does not include the complete structure
nor the coordination of the components within the structure as clarified by the May 1996 California Board of
Registration Annual Report.
THE PROFESSIONAL ENGINEERS SEAL AFFIXED HERETO INDICATES THAT THE STEEL JOISTS
WERE DESIGNED IN ACCORDANCE WITH THE STEEL JOIST INSTITUTE’S STANDARD
SPECIFICATIONS TO SUPPORT THE LOADS furnished and approved by the owner’s engineer of record. THE
SEAL IS NOT INTENDED TO CERTIFY OR IMPLY THAT THE BUILDING DOES OR DOES NOT
CONFORM TO ANY NATIONAL, STATE OR LOCAL BUILDING CODES.
VALLEY JOIST IS A CERTIFIED, ACTIVE MEMBER OF THE STEEL JOIST INSTITUTE. THE STEEL
ANGLE SHAPES AND ROUND BARS USED FOR THE CHORDS AND WEBS WAS 50-KSI MINIMUM
YIELD STRENGTH PER THE SJI SPECIFICATIONS. The joist material sizes were designed
shown on the calculations. Valley Joist’s ICBO Number is FA-363.
RICHARD A. PHANEUF, PE #24975
DIRECTOR of ENGINEERING
VALLEY JOIST / EBSCO INDUSTRIES, INC.
CACALC VJ ON02915
CCI LEA MERKLEN-VJ-WEST
CCI WALTER WORTHLEY, PE-VJ-WEST
- 7 43-0)
Vallev Joist West Page 1 V1.71
7 Job #ON02915 - 07 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR RED
GlOl 4 - 28G4N31.4/17.27 x 27'11.500 Special Crimped
angle Parallel chord Girder
- End Lenqth Depth Slope Holes TOD Chord Ext BCX Holdback Pitch EP/#lL 83.750 Tag 6.000 6.000 Y 2 0' 4.750
Opp 6.000 6.000 Y 2 0' 4.750 83.750
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
TC conc loads: Load SDacinq Location Point T\/13e
31400 6'11-3/4 6111-3/4 U4 SJI
14130 6'11-3/4 U4 Dead 6'11-3/4 U4 Live 17270
31400 7'0 13'11-3/4 U8 S JI
14130 13'11-3/4 U8 Dead
17270 13'11-3/4 U8 Live
31400 7'0 20'11-3/4 U12 SJI
14130 20'11-3/4 U12 Dead 20'11-3/4 U12 Live
P
6'11-3/4
TC HOLES BE 7/0" X 5" GAUGE @I 1-3/4"
KEEP CLEAR FOR KNIFE PLATE 7" @ BE End loads: SJINtUr,Dead*EaukWind
Left TC axial load: 0.0 0.0 0.0 0.0 31.8 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 31.8 0.0 Kips
28.000 in Deep 331.500 in Design length 11775 # Minimum Shear
25.633 in Effective Depth 2486 in4 Ix 0 in4 Minimum Ix
20.000 in Clear Depth L/ 773 Live Defl L/ 425 SJI Defl
5252100 in-#Moment 1.000 in Chord gap 0.318 in Camber
42.000 in Interior Panel 18.937 in Left End 18.937 in Right End 8 Web Vees 48100 # SJI reaction 48100 # SJI reaction
TOP Chord: 2-L L4x4x.500 A = 7.500 Y = 1.183 Fy = 50000 Q = 1.000
Center: L = 21.000 P =-191979 Paz=-206506 M = 0 No Fillers Ix= 11.123 Iy= 32.375 RX = 1.218 Ry = 2.078 RZ 0.782
Chord shear: V = 20200 C = 0 fv = 11995 fc = 0 f = 11995
*Chord: 2-L L4x4x.500 A = 7.500 Y = 1.183 Fy = 50000 Q = 1.000
-
Ix= 11.123 Iy= 32.375 Rx = 1.218 Ry = 2.078 Rz = 0.782
Center: L = 42.000 P = 204893 Pa = 225000
Chord shear: V = 20200 T = 74637 fv = 11995 ft = 9952 f = 12986
Page 2 V1.71 Valley Joist West
Job #ON02915 - 07 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR RED
GlOl 4 - 28G4N31.4/17.27 x 27'11.500 Special Crimped
angle Parallel chord Girder
- Web Anql Lnsth Shear Force Member , Area - R
T 1 57.3 47.4 47980 88728 2L L3x3x.313 3.560 0.922~
V 1 39.2 33.1 -1000 -1291 lLL1-1/4X.109 0.261 0.2472
C 1 0.0 25.6-47980 -47980 2L L2X2X.248 1.861 0.609X
V 2 0.0 25.6 -1000 -1000 lLLlxlX.109 0.206 0.1962
C 2 39.2 33.1-47853 -61788 2LL3X3X.250 2.875 0.93OX
T 2 39.2 33.1 47917 61869 2LL2-1/2x.230 2.194 0.772~
T 3 39.3 33.1 16390 21188 1LL2x2x.187 0.713 0.3942
V 3 0.0 25.6 -1000 -1000 1LLlXlX.109 0.206 0.1962
C+ 39.3 33.1-16327 -21106 1LL2-1/2X.212 1.015 0.4932
V 4 0.0 25.6 -1000 -1000 1LLlXlX.109 0.206 0.1962
T 39.3 33.1 16263 21024 1LL2x2x.187 0.713 0.3942
C 4 39.3 33.1-16200 -20942 lLL2-1/2x.212 1.015 0.4932
-- Pa Weld
106802 9.5
-2160 0.4
-47524 6.5
-1803 0.3
-73278 0.3
21391 3.8
-1803 0.3
-21265 3.4
-1803 0.3 -21265 3.3
65826 9.1
21391 3.8
T - AVl W - B
11.1/11.1
3.6/ 4.0
8.9/ 8.9
9.2/ 9.2
3.0/ 3.0
9.3/ 9.3
4.3/ 4.7
3.0/ 3.0
4.3/ 4.7
4.8/ 5.2
4.8/ 5.2
3.0/ 3.0
Page 3 V1.71 Valley Joist West
Job #ON02915 - 07 By ASM Entered 6/20/00 Revised 2/13/01 7
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR RED
G102 4 - 28G4N40.0/22.0 x 27' 6.750 Special Crimped angle
Parallel chord Girder
- End Lenath Depth SloDe Holes TOP Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 6.000 Y 2 0' 1.500 79.500
83.250 Opp 6.000 6.000 Y E 0' 0.500 2 0' 4.750
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
TC conc loads: Spacinq Location Point Tme
18000 6'7-1/2 U4 Dead
22000 6'7-1/2 U4 Live
40000 6'7-1/2 617-1/2 u4 S JI -
40000 110 13'7-1/2 U8 S JI
18000
22000
"' 13'7-1/2 U8 Dead !,:: 13'7-1/2 U8 Live
20'7-1/2 U12 SJI 40000
18000 20'7-1/2 U12 Dead
20'7-1/2 U12 Live 22000 6'11-1/4
I'U
TC HOLES RE 7/8" x 5" GAUGE @ 1-3/4"
KEEP CLEAR FOR KNIFE PLATE 7" @ BE
7" MAX SEAT WIDTH @ LE
End loads: SJIIDeadLiveEaukWind
Left TC axial load: 0.0 0.0 0.0 0.0 43.6 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 43.6 0.0 Kips
28.000 in Deep 326.750 in Design length 15000 # Minimum Shear
24.450 in Effective Depth 5157 in4 Ix 0 in4 Minimum Ix
16.000 in Clear Depth L/1305 Live Defl L/ 718 SJI Defl
6522886 in-#Moment 1.000 in Chord gap 0.309 in Camber
42.000 in Interior Panel 17.875 in Left End 18.813 in Right End
8 Web Vees 61689 # SJI reaction 60311 # SJI reaction
Tov Chord: 2-LL6xbx.750 A = 16.875 Y = 1.775 Fy = 50000 Q = 1.000
Ix= 56.310 Ip143.648 RX = 1.827 Ry = 2.918 RZ = 1.173
Chord shear: V = 20200 C~= 0 fv = 6841 fc = 0 f = 6841 Center: L = 21.000 p =-250153 Paz=-481227 M = 0 No Fillers
P - BC Zhord: 2-LLbx6x.750 A = 16.875 Y = 1.775 Fy = 50000 Q = 1.000
Ix= 56.310 Ip143.648 RX = 1.827 Ry = 2.918 RZ = 1.173
Center: L = 42.000 P = 266785 Pa = 506250
Chord shear: V = 20200 T = 95067 fv = 6841 ft = 5634 f = 7399
Valley Joist West Page 4 V1.71
Job #ON02915 - 07 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR RED
G102 4 - 28G4N40.0/22.0 x 27' 6.750 Special Crimped angle
Parallel chord Girder
.Web Anql Lnqth Shear T 157.1 45.0 61573
V 139.1 31.5 -1000 C 1 0.0 24.5-61573 T 2 39.1 31.5 61512
V 2 0.0 24.5 -1000
C 2 39.1 31.5-61451
T 3 40.7 32.2 21387
V 3 0.0 24.5 -1000
CA 40.7 32.2-21323 T 40.7 32.2 21259 V 4 0.0 24.5 -1000
C 4 40.7 32.2-21194
Force Member Area- R, -- Pa Weld 113265 2L L3X3X.340 3.849 0.918~ 11546411.2
-1289 lLL1-1/4X.109 0.261 0.2472 -2383 0.4
-61573 2LL2-1/2X.250 2.375 0.769~ -63961 8.3
-1000 lLLlXlX.109 0.206 0.1962 -1982 0.3 -79193 2L L3X3X.313 3.560 0.922~ -94768 8.5
-1000 1LLlxlX.109 0.206 0.1962 -1982 0.3
-28108 2L L2X2X.163. 1.251 0.621X -28879 5.8
-1000 lLLlxlX.109 0.206 0.1962 -1982 0.3
-27939 2L L2X2X.163 1.251 0.621X -28879 5.8
79272 2LL3X3x.250 2.875 0.930~ 8625010.7
28193 1L L2X2X.248 0.930 0.3912 27915 3.8
28024 1L L2X2X.248 0.930 0.3912 27915 3.8
T - AVl W - B
17.3/17.3
3.6/ 3.9
12.9/12.9
13.6/13.6
3.0/ 3.0
13.6/13.6
3.0,' 3.0
13.7/13.7
3.0/ 3.0
13.7/13.7
4.3/ 4.7
4.3/ 4.7
Vallev Joist West Page 5 V1.71
Job #ON02915 - 07 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR RED
G103 1 - 36G5N42.6/23.43 x 36' 1.000 Special Crimped
angle Parallel chord Girder
End Lenqth Demh SloDe Holes Tov Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 6.000 2 0' 1.500 79 .875
Opp 6.000 6.000 Y 2 0' 1.500 85.000
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
TC conc loads: Load Svacinq Location Point Tvoe
42600 6'7-7/8 617-7/8 U2 S JI
19170 6'7-7/8 U2 Dead
23430 6'7-7/8 U2 Live
42600 7'5-3/8 14'1-1/4 U4 SJI
19170 14'1-1/4 U4 Dead
23430 14'1-1/4 U4 Live
42600 7'5-3/8 21'6-5/8 U6 S JI
19170 21'6-5/8 U6 Dead
F
21'6-5/8 U6 Live
19170 n,n 29'0 U8 Dead
U'U 23430 715-3/8 29'0 U8 S JI 0'0 42600
29'0 U8 Live U'U
7'1 23430
NO TC HOLES
9" MAX SEAT WIDTH 6%' LE, 7" MAX WIDTH @ RE
KEEP CLEAR FOR KNIFE PLATE 7" @ RE
End loads: SJI NtUv Dead Live Eauk Wind
Left TC axial load: 0.0 0.0 0.0 0.0 43.6 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 43.6 0.0 Kips
36.000 in Deep 429.000 in Design length 21300 # Minimum Shear
32.791 in Effective Depth 6983 in4 Ix 0 in4 Minimum Ix
25.000 in Clear Depth L/ 764 Live Defl L/ 420 SJI Defl
10806640 in-#Moment 1.000 in Chord gap 0.533 in Camber
89.375 in Interior Panel 37.938 in Left End 40.500 in Right End
5 Web Vees 87218 # SJI reaction 85182 # SJI reaction
Page 6 V1.71 Vallev Joist West
Job #ON02915 - 07 By ASM Entered 6/20/00 Revised 2/13/01 P
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR RED
G103 1 - 36G5N42.6/23.43 x 36’ 1.000 Special Crimped
angle Parallel chord Girder
TOD Chord: 2-LL6x6x.625 A = 14.219 Y = 1.730 Fy = 50000, Q = 1.000
Ix= 48.315 Iy=119.029 RX = 1.843 Ry = 2.893 Rz = 1.178
Center: L = 44.688 P =-328302 Paz=-371391 M = 0 No Fillers Chord shear: V = 20200 C =-lo0531 fv = 11605 fc = -7070 f = 12131
Bot Chord: 2-L L5X5X.625
Center: L = 89.375
Chord shear: V = 20200 - Wp.L Ansl Lnsth Shear Force
T . 50.7 51.7 87125 137426
Ix= 27.156
V 1 3.6 32.9 -1000 -1002
C 1 49.1 50.1-87036-132973 T 2 53.7 55.4 44332 74936
V 2 0.0 32.8 -1000 -1000
C 2 53.7 55.4-44228 -74760 T 3 53.7 55.4 21300 36004
V 3 0.0 32.8 -1000 -1000
A = 11.719 Y = 1.479 Fy = 50000
Iy= 73.059 Rx = 1.522 Ry = 2.497
T = 106279 fv = 13940 ft = 9069
Member Area- R -__ Pa Weld
2L L3X3X.416 4.646 0.908~ 13937711.1
1LLlxlX.109 0.206 0.1962 -1097 0.3
2L L4X4X.375 5.719 1.235X-14726311.9
2LL3X3x.250 2.875 0.930~ 8625010.1 lLLlxlx.109 0.206 0.1962 -1102 0.3
2L L2x2x.156 1.199 0.622~ 35980 7.8
P = 329564 Pa = 351563
2L L3X3X.313 3.560 0.922~ -80790 8.0
1LLlXlX.109 0.206 0.1962 -1102 0.3
Q = 1.000 Rz = 0.978
f = 14659
T - AVl W - B
15.8/12.7
3.0) 3.0
15.6/12.5
16.9/13.5
3.0/ 3.0
16.9/13.5
17.1/13.8
3.0/ 3.0
Valley Joist West Page 7 V1.71
Job #ON02915 - 07 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Pro] ect : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR RED
G104 1 - 36G5N31.2/17.16 x 36' 5.250 Special Crimped angle Parallel chord Girder
End Lenath Devth Slove Holes Tow Chord Ext . BCX Holdback Pitch ,EP/#IL
Tag 6.000 6.000 2 0' 1.500 79.875
Opp 6.000 6.000 Y 2 0' 4.750 89.250
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of 1000# may occur at any top chord panel point.
TC conc loads: Load Spacinq Location Point Tme
31200 6'7-7/8 617-7/8 u2 S JI
14040 6'7-7/8 U2 Dead 6'7-7/8 U2 Live 17160
31200 7'5-3/8 14'1-1/4 U4 S JI
14040 14'1-1/4 U4 Dead
17160 14'1-1/4 U4 Live
31200 7'5-3/8 21'6-5/8 U6 SJI
14040 21'6-5/8 U6 Dead
17160 7 I5-3/8 21'6-5/8 U6 Live
29'0 U8 S JI
29'0 U8 Dead
31200
29'0 U8 Live
14040
t
0'0
0'0 I7l6O 715-1/4
TC HOLES RE 7/8" x 5" GAUGE @ 1-3/4"
KEEP CLEAR FOR KNIFE PLATE 7" @ RE
End loads: SJI-adLiveEquku
Left TC axial load: 0.0 0.0 0.0 0.0 31.8 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 31.8 0.0 Kips
36.000 in Deep 433.250 in Design length 15600 # Minimum Shear
33.154 in Effective Depth 4936 in4 Ix 0 in4 Minimum Ix
26.000 in Clear Depth L/ 719 Live Defl L/ 395 SJI Defl
8099030 in-#Moment 1.000 in Chord gap 0.543 in Camber
89.375 in Interior Panel 37.938 in Left End 42.625 in Right End
5 Web Vees 64750 # SJI reaction 62050 # SJI reaction
Job
Customer:
Project:
Comments :
G104
Vallev Joist West
ON02915 - 07 By ASM Entered
JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014 619/295-3153 FAX# 609/295-3628 PO# 00-364
ASTON VIEWS
CARLSBAD, CA
UBC 1997
TAG COLOR RED
1 - 36G5N31.2/17.16 x 36' 5.250 Special
angle Parallel chord Girder
Tow Chord: 2-LL5x5x.500 A = 9.500 Y = 1.434
IX= 22.501 Iy= 58.042 RX = 1.539
Center: L = 44.688 P =-242575 Pax=-259075
Fourth: L = 44.688 P =-196267 Paz=-237898
Chord shear: V = 20200 C = -65975 fv = 12914
Bot Chord: 2-LL5x5x.438 A = 8.376 Y = 1.412 Ix= 20.061 Iy= 50.675 RX = 1.548
Center: L = 89.375 P = 244285 Pa = 251289 Pvrd shear: V = 20200 T = 85798 fv = 14760 wt- Ansl T 153.0 v 1 10.4
C 145.6
T 2 53.4 v 2 0.0 c 2 53.4 T 3 53.4 v 3 0.0
Page 8 V1.71
6/20/00 Revised 2/13/01
Crimped
Fy = 50000 Q = 1.000
Ry = 2.472 RZ = 0.983
M= 0
fc = -6945 f = 13373
Fy = 50000 Q = 0.979
Ry = 2.460 RZ = 0.986
ft = 10243 f = 15623
2 Fillers
No Fillers
Lnsth
55.1
33.7
47.4-
55.6
33.2
55.6
33.2
55.6-
Shear
64649
-1000
,64571
33267
-1000
,33164
15600
-1000
Force
107428
-1017
-92315
55833
-1000
-55660
26182
-1000
Member
2L L3X3X.313
1LLlXlX.lO9 2L L3X3X.340
2L L2X2X.248
1LLlXlX.lO9
2LL3X3X.250
1L L2X2X.248
1LLlXlX.109
Area
3.560
0.206
3.849
1.861
0.206
2.875
0.930
0.206
-- Pa Weld
0.922~ 10680211.6
R -
0.1962 -1043 0.3
0.918~ -92732 9.1
0.1962 -1078 0.3
0.930~ -63392 7.5
0.1962 -1078 0.3
0.609~ 55830 7.6
0.3912 27915 3.6
T - AVl W - B
13.6/13.6
3.0/ 3.1
12.5/12.5
14.1/14.1
13.9/13.9
5.1/ 5.8
3.0/ 3.0
3.0/ 3.0
Page 9 V1.71 Valley Joist West - Job #ON02915 - 07 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR RED
TlOl 1 - 18LH1006/596 x 10' 7.500 Special Crimped angle
- End Lenqth Depth Slope Holes TOP Chord Ext BCX Holdback Pitch EP/#lL
Parallel chord Longspan
Tag 6.000 5.000 34.000
Opp 6.000 5.000 34.000
Uniform Live load 596 #/ft full length
Uniform SJI load 1006 #/ft full length
Uniform Dead load 410 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
HWLIP @ 5'5" FTE OAL
End loads: __ S JI
Left TC axial load: 0.0
Right TC axial load: 0.0 18.000 in Deep
16.999 in Effective Depth
14.500 in Clear Depth
204821 in-#Moment
59.500 in Interior Panel
2 Web Vees
mmLiveEaukWind
0.0 KiDs 0.0 0.0 0.0 8.2 -2. ~
0.0 0.0 0.0 8.2 0.0 Kips
123.500 in Design length 1294 # Minimum Shear
145 in4 Ix 0 in4 Minimum Ix
L/3453 Live Defl L/2046 SJI Defl
1.000 in Chord gap 0.044 in Camber
30.875 in Left End 30.875 in Right End
6177 # SJI reaction 6177 # SJI reaction
Top Chord: 2-L L2x2x.216 A = 1.635 Y = 0.579 Fy = 50000 Q = 1.000
Bridg c 211" Ix= 0.615 Iy= 2.520 Rx = 0.613 Ry = 1.242 Rz = 0.392
Center: L = 30.875 P = -12049 Paz= -28359 M = 5708 No Fillers
Tag end panl: L = 30.875 P = -12049 Paz= -28359 M = 5708 No Filler
First point: P = -12049 Pa = -44137 M = 8562
Chord shear: V = 20200 C = -3140 fv = 2077 fc = -1921 f = 2288
Bot Chord: 2-LL1-1/2x.125 A = 0.719 Y = 0.421 Fy = 50000 Q = 0.961
Ix= 0.156 Iy= 0.765 Rx = 0.465 Ry = 1.032 Rz = 0.296
Center: L = 59.500 P = 11218 Pa = 21563
Chord shear: V = 20200 T = 8703 fv = 12329 ft = 12109 f = 13735 - Web Anql Lnqth Shear Force Member Area- R -- Pa Weld T-AvlW-B
T 1 62.0 36.2 4623 9855 2LLlxlx.109 0.412 0.307~ 12367 3.0 6.4/ 4.7
V 1 3.8 17.0 -3648 -3656 2LLlXlX.109 0.412 0.307~ -10447 1.1 4.4/ 3.6
C L60.3 34.3 -1794 -3616 lLL1-3/4X.125 0.422 0.3472 -4482 1.0 4.3/ 4.2
Valley Joist West Page 10 V1.71
Job #ON02915 - 07 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR RED
T102 1 - 18LH1044/619 x 10' 7.000 Special Crimped angle
End Lenqth DeDth Holes Tor, Chord Ext BCX Holdback Pitch EP/#~L
Tag 6.000 5.000 38.000
Opp 6.000 5.000 Y 38.000
Parallel chord Longspan
Uniform Live load 619 #/ft full length
Uniform SJI load 1044 #/ft full length
Uniform Dead load 425 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
"LIP @ 5'5" FTE OAL
End loads: SJImwLiveEqukWind
Left TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
18.000 in Deep 123.000 in Design length 1338 # Minimum Shear
16.988 in Effective Depth 150 in4 Ix 0 in4 Minimum Ix
14.500 in Clear Depth L/3491 Live Defl L/2070 SJI Defl
223736 in-#Moment 1.000 in Chord gap 0.044 in Camber 51.000 in Interior Panel 30.750 in Left End 30.750 in Right End
2 Web Vees 6351 # SJI reaction 6351 # SJI reaction
Tor, Chord: 2-L L2X2X.248 A = 1.861 Y = 0.591 Fy = 50000 Q = 1.000
Bridg c 212" Ix= 0.691 Iy= 2.905 Rx = 0.609 Ry = 1.250 Rz = 0.391
Center: L = 30.750 P = -13170 Paz= -32309 M = 5876 No Fillers
Tag end panl: L = 30.750 P = -13170 Paz= -32309 M = 5876 No Filler
First point: P = -13170 Pa = -50247 M = 8814
Chord shear: V = 20200 C = -2758 fv = 1852 fc = -1482 f = 1995
Bot Chord: 2-LL1-1/2x.125 A = 0.719 Y = 0.421 Fy = 50000 Q = 0.961
Ix= 0.156 Iy= 0.765 RX = 0.465 Ry = 1.032 RZ = 0.296
Center: L = 51.000 P = 11495 Pa = 21563
Chord shear: V = 20200 T = 10003 fv = 12587 ft = 13917 f = 14383
Web Anal Lnath Shear Force Member Area- R -- Pa Weld T-Av1W-B
T 1 64.7 39.8 4720 11061 2LLlxlx.109 0.412 0.307~ 12367 3.4 6.8/ 5.0
V 1 17.2 17.8 -3738 -3913 2LLlxlx.109 0.412 0.307~ -10332 1.2 4.2j 3.5~
C L56.3 30.6 -1838 -3314 lLL1-1/2~.125 0.359 0.2962 -3482 0.9 3.7/ 3.5
Valley Joist West Page 11 V1.71
Job #ON02915 - 07 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR RED
T103 1 - 18LH1044/619 x 6' 4.750 Special Crimped angle
Parallel chord Longspan
- End Lenqth Depth Slope Holes TOV Chord Ext BCX Holdback Pitch EP/#IL
Tag 6.000 5.000 Y 26.375
Opp 6.000 5.000 26.375
Uniform Live load 619 #/ft full length
Uniform SJI load 1044 #/ft full length
Uniform Dead load 425 #/ft full length An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
"LIP @ 2'11" FTE OAL
7 AX SEAT WIDTH @ LE
SHORT BEARING 3-1/2" @ LE
End loads: SJI-DeadmEQukWind
Left TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
18.000 in Deep 72.750 in Design length 791 # Minimum Shear
17.095 in Effective Depth 114 in4 Ix 0 in4 Minimum Ix
14.750 in Clear Depth L/12765 Live Defl L/7568 SJI Defl
161372 in-#Moment 1.000 in Chord gap 0.015 in Camber
12.000 in Interior Panel 12.188 in Left End 12.188 in Right End
3 Web Vees 4165 # SJI reaction 4165 # SJI reaction
Top Chord: 2-LL1-3/4x.125 A = 0.844 Y = 0.484 Fy = 50000 Q = 0.897
Bridg < 191" Ix= 0.251 Iy= 1.068 Rx = 0.546 Ry = 1.125 Rz = 0.347
Center: L = 12.188 P = -9440 Paz= -18222 M = 930 No Fillers
Tag end panl: L = 12.188 P = -9440 Paz= -18222 M = 930 No Filler
First point: P = -9440 Pa = -22781 M = 1371
Chord shear: V = 20200 C = 0 fv = 5118 fc = 0 f = 5118
Bot Chord: Z-LL1-1/2x.125 A = 0.719 Y = 0.421 Fy = 50000 Ix= 0.156 Iy= 0.765 Rx = 0.465 Ry = 1.032
Center: L = 12.000 P = 3949 Pa = 21563
Chord shear: V = 20200 T = 4704 fv = 8798 ft = 6545
Web Anql Lnqth Shear Force Member Area- R -- Pa Weld
T 1-55.0 29.8 3299 5746 2LLlXlX.109 0.412 0.307~ 12367 1.8
V 35.5 21.0 -2099 -2577 2LLlXlX.109 0.412 0.307~ -9809 0.8
C 1 0.0 17.1 -2239 -2239 lLL1-1/4X.109 0.261 0.2472 -4727 0.7
T 2 35.1 20.9 1022 1249 lLL1-1/4x.109 0.261 0.2472 7819 0.4
V 2 0.0 17.1 -2091 -2091 1LLlXlX.109 0.206 0.1962 -4490 0.6
Q = 0.961 Rz = 0.296
f = 9387
T - AVl W - B
4.9/ 4.1
4.1/ 3.5
2.3/ 2.0
2.3/ 2.3
2.0/ 1.8
Vallev Joist West Page 12 V1.71 - Job #ON02915 - 07 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014 619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR RED
T104 1 - 18LH1006/596 x 6' 9.000 Special Crimped angle
Parallel chord Longspan
End Lenqth DeDth Slope Holes TOD Chord Ext BCX Holdback Pitch. EP/#lL
Tag 6.000 5.000 28.500
Opp 6.000 5.000 28.500
Uniform Live load 596 #/ft full length
Uniform SJI load 1006 #/ft full length
Uniform Dead load 410 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
HMLIP 62 3'3" FTE OAL
End loads: - SJI wDead*&kWind
Left TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
18.000 in Deep 77.000 in Design length 807 # Minimum Shear
17.095 in Effective Depth 114 in4 Ix 0 in4 Minimum Ix
14.750 in Clear Depth L/11181 Live Defl L/6624 SJI Defl
168171 in-#Moment 1.000 in Chord gap 0.017 in Camber
12.000 in Interior Panel 13.250 in Left End 13.250 in Right End
3 Web Vees 4228 # SJI reaction 4228 # SJI reaction
Top Chord: 2-LL1-3/4x.125 A = 0.844 Y = 0.484 Fy = 50000 Q = 0.897
Bridg e 191" Ix= 0.251 Iy= 1.068 Rx = 0.546 Ry = 1.125 Rz = 0.347
Center: L = 13.250 P = -9837 Paz= -17961 M = 1049 No Fillers
Tag end panl: L = 13.250 P = -9837 Paz= -17961 M = 1049 No Filler
First point: P = -9837 Pa = -22781 M = 1582
Chord shear: V = 20200 C = 0 fv = 5068 fc = 0 f = 5068
Bot Chord: 2-LL1-1/2x.125 A = 0.719 Y = 0.421 Fy = 50000 Q = 0.961
Ix= 0.156 Iy= 0.765 RX = 0.465 Ry = 1.032 RZ = 0.296
Center: L = 12.000 P = 4298 Pa = 21563
Chord shear: V = 20200 T = 5159 fv = 8875 ft = 7178 f = 9573
Web Ansl Lnqth Shear Force Member Area- R -- Pa Weld T-AvlW-B
T 157.2 31.5 3328 6139 2LLlxlx.109 0.412 0.307~ 12367 1.9 5.11 4.2
V 1 37.8 21.6 -2150 -2720 2LLlXlX.109 0.412 0.307~ -9701 0.8 4.1/ 3.5
C J- 0.0 17.1 -2217 -2217 lLL1-1/4X.109 0.261 0.2472 -4727 0.7 2.3/ 2.0
T 35.1 20.9 1003 1225 lLL1-1/4X.109 0.261 0.2472 7819 0.4 2.3/ 2.3
V 2 0.0 17.1 -2054 -2054 1LLlXlX.109 0.206 0.196Z -4490 0.6 2.0/ 1.8
Vallev Joist West Page 13 V1.71
Job #ON02915 - 07 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002 2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR RED
T105 12 - 32LH928/543 x 25'10.250 Special Crimped angle
Parallel chord Longspan
End Lenqth Depth Slope Holes Top Chord Ext BCX Holdback Pitch EP/#1L
Tag 6.000 5.000 46.000 46.000 Opp 6.000 5.000
Uniform Live load 543 #/ft full length
Uniform SJI load 928 #/ft full length
Uniform Dead load 385 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
HWLIP 6' 12'11" FTE OAL
SI. .T BEARING 3-1/2" @ RE End loads: SJINtUpDeadmEcJ&Wind
Left TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
32.000 in Deep 306.250 in Design length 2960 # Minimum Shear
30.692 in Effective Depth 985 in4 Ix 0 in4 Minimum Ix
27.500 in Clear Depth L/1688 Live Defl L/ 988 SJI Defl
983190 in-#Moment 1.000 in Chord gap 0.271 in Camber
48.000 in Interior Panel 28.563 in Left End 28.563 in Right End
6 web Vees 12842 # SJI reaction 12842 # SJI reaction
TOR Chord: 2-LL2-1/2x.250 A = 2.375 Y = 0.717 Fy = 50000 Q = 1.000
Bridg c 245" Ix= 1.406 Iy= 4.924 Rx = 0.769 Ry = 1.440 Rz = 0.491
Center: L = 24.000 P = -31460 Paz= -62454 M = 1845 No Fillers
Tag end panl: L = 28.563 P = -18797 Paz= -49240 M = 4461 No Filler
First point: P = -18797 Pa = -64125 M = 6850
Chord shear: V = 20200 C = -3995 fv = 7474 fc = -1682 f = 7521
Bot Chord: 2-L L2X2X.248 A = 1.861 Y = 0.591 Fy = 50000 Q = 1.000 Ix= 0.691 Iy= 2.905 RX = 0.609 Ry = 1.250 RZ = 0.391
Center: L = 48.000 P = 32034 Pa = 55830
Chord shear: V = 20200 T = 16621 fv = 11687 ft = 8931 f = 12511
Valley Joist West Page 14 V1.71
Job #ON02915 - 07 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997 TAG COLOR RED
T105 12 - 32LH928/543 x 25'10.250 Special Crimped angle
Parallel chord Longspan
- Web
T 1 55.1
V 1 26.7
C 123.2
T 2 38.0 v 2 0.0
C 2 38.0
T 3 38.0 v 3 0.0
C2-38.0
Lnqth
53.6
34.4
33.4
39.0
30.7
39.0
39.0
30.7
39.0
Shear
11594
-3293
-9342
-2986
-5297
3362
-3013
-2960
7231
Force Member Area- R
20265 2LL1-3/4~.143 0.960 0.543X
-3686 lLL1-1/2x.109 0.315 0.2972
9179 lLL1-1/2~.109 0.315 0.2972
-10160 lLLZXZX.187 0.713 0.3942
-2986 lLL1-1/4X.109 0.261 0.2472
-6724 1LL1-3/4~.125 0.422 0.3472
4268 lLL1-1/4x.109 0.261 0.2472
-3013 lLL1-1/4X.109 0.261 0.2472
-3758 lLL1-1/2~.109 0.315 0.2972
_- Pa Weld
28803 4.8
-5279 1.1
-10201 1.8
9454 2.8
-4188 0.9
-7212 1.8
7819 1.3
-4188 0.9
-4610 1.2
T - AVl W - B
6.9/ 5.1
3.3) 3.0
3.8/ 3.4
3.5/ 3.3
3.0/ 2.5
3.8/ 3.5
3.3/ 3.0
3.0/ 2.5
3.5/ 3.3
Vallev Joist West Page 15 V1.71
Job #ON02915 - 07 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #loo02
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR RED
T106 2 - 32LH983/573 x 25'10.250 Special Crimped angle
- End Lensth Death Slor,e Holes Tor, Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 50.000
Opp 6.000 5.000 50.000
Parallel chord Longspan
Uniform Live load 573 #/ft full length
Uniform SJI load 983 #/ft full length
Uniform Dead load 410 #/ft full length An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
HWLIP @ 12'11" FTE OAL
SI .T BEARING 3-1/2" @ RE
End loads: SJImwLiveL&Wind
Left TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
32.000 in Deep 306.250 in Design length 3136 # Minimum Shear
30.597 in Effective Depth 867 in4 Ix 0 in4 Minimum Ix
27.000 in Clear Depth L/1409 Live Defl L/ 821 SJI Defl
1036923 in-#Moment 1.000 in Chord gap 0.271 in Camber
64.000 in Interior Panel 44.563 in Left End 44.563 in Right End
4 Web Vees 13543 # SJI reaction 13543 # SJI reaction
Tou Chord: 2
Bridg < 277"
Center :
-L L3x3x.227 A = 2.621 Y = 0.834 Fy = 50000 Q = 0.922
Ix= 2.285 Iy= 6.949 RX = 0.934 Ry = 1.628 RZ 0.594
L = 32.000 P = -32463 Paz= -62840 M = 3689 No Fillers
Tag end panl: L = 44.563 P = -20115 Paz= -44706 M = 11380 No Filler
First point: P = -20115 Pa = -70765 M = 17907
Chord shear: V = 20200 C = -10453 fv = 5710 fc = -3988 f = 6048
Bot Chord: 2-LL2x2x.187 A = 1.426 Y = 0.569
Ix= 0.544 Iy= 2.173 RX = 0.617
Center: L = 64.000 P = 33890 Pa = 42782
Chord shear: V = 20200 T = 18138 fv = 15457
Web Ansl Lnsth Shear Force Member w- R T 157.5 56.9 11562 21509 2LL1-3/4X.143 0.960 0.543X
V +-6.4 30.8 -4750 -4780 lLL1-1/2X.109 0.315 0.2972
C 3.4 51.3 -7777 -13028 2LL1-3/4X.125 0.844 0.546X
T 2 46.3 44.3 4536 6564 lLL1-1/4X.109 0.261 0.2472
V 2 0.0 30.6 -3784 -3784 lLL1-1/4X.109 0.261 0.2472
C 2 46.3 44.3 -3136 -4538 lLL1-3/4X.125 0.422 0.3472
Fy = 50000
Ry = 1.234
ft = 12719 -- Pa Weld
28803 5.1
-5760 1.5
-15854 3.5
7819 2.0
-4203 1.2
-6356 1.2
Q = 1.000
Rz = 0.394
f = 16714 T - AVl W - B
9.1/ 5.5
3.5/ 2.8
8.5/ 5.3
3.9/ 3.4
3.3/ 2.5
4.4/ 3.9
Vallev Joist West Page 16 V1.71 - Job #ON02915 - 07 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002 2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR RED
T107 2 - 32LH983/573 x 25'10.250 Special Crimped angle
End Lenqth Depth SloDe Holes Top Chord Ext BCX Holdback Pitch EP/#1L
Tag 6.000 5.000 50.000
Opp 6.000 5.000 50.000
Parallel chord Longspan
Uniform Live load 573 #/ft full length
Uniform SJI load 983 #/ft full length
Uniform Dead load 410 #/ft full length An additional SJI load of 2000# may occur at any top chord panel point.
An additional Dead load of 2000# may occur at any top chord panel point.
HWLIP @ 12'11" FTE OAL
SI .T BEARING 3-1/2" 6' RE
End loads: - SJI Dead Live a Wind
Left TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
32.000 in Deep 306.250 in Design length 3136 # Minimum Shear
30.597 in Effective Depth 867 in4 Ix 0 in4 Minimum Ix
27.000 in Clear Depth L/1409 Live Defl L/ 821 SJI Defl
1113486 in-#Moment 1.000 in Chord gap 0.271 in Camber
64.000 in Interior Panel 44.563 in Left End 44.563 in Right End
4 Web Vees 14543 # SJI reaction 14543 # SJI reaction
TOD Chord: 2-L L3x3x.227 A = 2.621 Y = 0.834 Fy = 50000 Q = 0.922
Bridg c 277" Ix= 2.285 Iy= 6.949 Rx = 0.934 Ry = 1.628 Rz = 0.594
Center: L = 32.000 P = -34856 Paz= -62840 M = 3689 No Fillers
Tag end panl: L = 44.563 P = -21438 Paz= -44706 M = 11380 No Filler
First point: P = -21438 Pa = -70765 M = 17907
Chord shear: V = 20200 C = -11406 fv = 6230 fc = -4352 f = 6599
Bot Chord: 2-LL2x2x.187 A = 1.426 Y = 0.569
Ix= 0.544 Iv= 2.173 RX = 0.617
Center: L = 64.000 Pa= 36392 Pa = 42782
Chord shear: V = 20200 T = 19460 fv = 16584 - Web Anql Lnqth Shear Force Member Area- R
T 1 57.5 56.9 12405 23078 2LL1-3/4X.143 0.960 0.543X
C i3.4 51.3 -8486 -14216 2LL1-3/4X.125 0.844 0.546X
T 2 46.3 44.3 5141 7439 lLL1-1/4X.109 0.261 0.2472
V 2 0.0 30.6 -4796 -4796 lLL1-1/2X.109 0.315 0.2972
C 2 46.3 44.3 -3136 -4538 lLL1-3/4X.125 0.422 0.3472
V 1. 6.4 30.8 -5757 -5793 lLL1-1/2~.109 0.315 0.2972
Fy = 50000
Ry = 1.234
ft = 13646
28803 5.4
-5760 1.8
-15854 3.8
-5786 1.5
-6356 1.2
-- Pa Weld
7819 2.3
Q = 1.000 RZ = 0.394
f = 17933 T - AVl W - B
9.1/ 5.5
3.5/ 2.8
3.9/ 3.4
3.5/ 2.8
4.4/ 3.9
0.5/ 5.3
Valley Joist West Page 17 V1.71
Job #ON02915 - 07 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS CARLSBAD, CA
Comments: UBC 1997 TAG COLOR RED
T108 1 - 32LH1016/591 x 25' 9.750 Special Crimped angle
End Lenqth Depth Slope Holes Top Chord Ext BCX Holdback Pitch EP/#lL
Parallel chord Longspan
Tag 6.000 5.000 Y 50.000
Opp 6.000 5.000 50.000
Uniform Live load 591 #/ft full length Uniform SJI load 1016 #/ft full length
Uniform Dead load 425 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point. An additional Dead load of lOOO# may occur at any top chord panel point.
HVLIP @ 12'11" FTE OAL
SI .T BEARING 3-1/2" @ RE
End loads: - SJI NJ?J~Dead&mWind
Left TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
32.000 in Deep 305.750 in Design length 3236 # Minimum Shear
30.597 in Effective Depth 867 in4 Ix 0 in4 Minimum Ix
27.000 in Clear Depth L/1372 Live Defl L/ 798 SJI Defl
1065800 in-#Moment 1.000 in Chord gap 0.270 in Camber
64.000 in Interior Panel 44.437 in Left End 44.437 in Right End
4 Web Vees 13943 # SJI reaction 13943 # SJI reaction
Tor, Chord: 2-L L3x3x.227 A = 2.621 Y = 0.834 Fy = 50000 Q = 0.922
Bridg c 277" Ix= 2.285 Iy= 6.949 Rx = 0.934 Ry = 1.628 Rz = 0.594
Center: L = 32.000 P = -33307 Paz= -62840 M = 3810 No Fillers
Tag end panl: L = 44.437 P = -20581 Paz= -44789 M = 11698 No Filler First point: P = -20581 Pa = -70765 M = 18401
Chord shear: V = 20200 C = -10700 fv = . 5880 fc = -4082 f = 6225
Bot Chord: 2-LL2x2x.187 A = 1.426 Y = 0.569 Fy = 50000
Ix= 0.544 Iy= 2.173 Rx = 0.617 Ry = 1.234
Center: L'= 64.000 P = 34833 Pa = 42782
Chord shear: V = 20200 T = 18677 fv = 15916 ft = 13097
Web Ansl Lnqth Shear Force Member Area- R -- Pa Weld
T 1 57.5 56.9 11905 22148 2LL1-3/4X.143 0.960 0.543X 28803 5.2
~V 1, 6.6 30.8 -4865 -4897 lLL1-1/2~.109 0.315 0.2972 -5759 1.5
T 2 46.3 44.3 4669 6756 lLL1-1/4x.109 0.261 0.2472 7819 2.1 C ' 73.2 51.1 -8009 -13365 2LL1-3/4X.125 0.844 0.546X -15892 3.6
V 2 0.0 30.6 -3876 -3876 lLL1-1/4X.109 0.261 0.2472 -4203 1.2
C 2 46.3 44.3 -3236 -4682 lLL1-3/4X.125 0.422 0.3472 -6356 1.3
Q = 1.000 Rz = 0.394
f = 17211 T - AVlW - B
9.1/ 5.5
3.5/ 2.8
8.5/ 5.3
3.9/ 3.4
3.3/ 2.5
4.4/ 3.9
Vallev Joist West Page 18 V1.71
Job #ON02915 - 07 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR RED
T109 4 - 32LH928/543 x 25' 9.750 Special Crimped angle
Parallel chord Longspan
End Lenqth DeDth ,Slolse Holes TOP Chord Ext BCX Holdback Pitch EP/#lL
Taq 6.000 5.000 Y 50.000
Opp 6.000 5.000 50.000
Uniform Live load 543 #/ft full length
Uniform SJI load 928 #/ft full length
Uniform Dead load 385 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point
HFLIP @ 12'11" FTE OAL
Sh .T BEARING 3-1/2" @ RE End loads: - SJI mDead-&LlkWind
Left TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 KiDs
Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
32.000 in Deep 305.750 in Design length 2956 # Minimum Shear
30.578 in Effective Depth 978 in4 Ix 0 in4 Minimum Ix
27.000 in Clear Depth L/1683 Live Defl L/ 985 SJI Defl
980107 in-#Moment 1.000 in Chord gap 0.270 in Camber
64.000 in Interior Panel 44.437 in Left End 44.437 in Right End
4 Web Vees 12822 # SJI reaction 12822 # SJI reaction
TOR Chord: 2-LL3X3x.250 A = 2.875 Y = 0.842 Fy 50000 Q = 0.961
Bridg < 278" Ix= 2.488 Iy= 7.669 Rx = 0.930 Ry = 1.633 Rz = 0.592
Center: L = 32.000 P = -30943 Paz= -71461 M = 3480 No Fillers
Tag end panl: L = 44.437 P = -19292 Paz= -50401 M = 10685 No Filler
First point: P = -19292 Pa = -77625 M = 16807
Chord shear: V = 20200 C = -9861 fv = 4918 fc = -3430 f = 5208
Bot Chord: 2-L L2x2x.216 A = 1.635 Y = 0.579 Fy = 50000 Q = 1.000
Ix= 0.615 Iy= 2.520 Rx = 0.613 Ry = 1.242 RZ = 0.392
Center: L = 64.000 P = 32053 Pa = 49041
Chord shear: V = 20200 T = 17184 fv = 12670 ft = 10512 f = 13717 Pa Weld T-AvlW-B
T 1 57.5 56.9 10947 20375 2LL1-1/2x.125 0.719 0.465~ 21563 5.5 9.1/ 5.5
-- Web Anql Lnqth Shear Force Member Area- R
V L- 6.6 30.8 -4532 -4563 lLL1-1/2~.109 0.315 0.2972 -5761 1.4 3.5/ 2.8
C . >3.2 51.0 -7377 -12315 2LL1-1/2X.125 0.719 0.465~ -12502 3.3 8.5/ 5.2
T 2 46.3 44.3 4317 6248 lLL1-1/4x.109 0.261 0.2472 7819 1.9 3.9/ 3.4
V 2 0.0 30.6 -3629 -3629 lLL1-1/4x.109 0.261 0.2472 -4207 1.1 3.3/ 2.5
C 2 46.3 44.3 -2956 -4278 1LL1-1/2~.125 0.359 0.2962 -4272 1.2 4.2/ 3.6
Vallev Joist West Page 19 V1.71
Job #ON02915 - 07 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR RED
TllO 2 - 32LH928/543 x 26' 3.750 Special Crimped angle
Parallel chord Longspan
End Lenqth Depth Slope .Holes TOR Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 Y 50.000
Opp 6.000 5.000 Y 50.000
Uniform Live load 543 #/ft full length
Uniform SJI load 928 #/ft full length
Uniform Dead load 385 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
HFLIP @ 13'0" FTE OAL
Sh ... T BEARING 3-1/2" @ LE
MAX SEAT WIDTH 7" @ LE
End loads: SJI-mLivewWind
Left TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
32.000 in Deep 311.750 in Design length 3014 # Minimum Shear
30.578 in Effective Depth 978 in4 Ix 0 in4 Minimum Ix
27.000 in Clear Depth L/1588 Live Defl L/ 929 SJI Defl
1017422 in-#Moment 1.000 in Chord gap 0.281 in Camber
64.000 in Interior Panel 45.938 in Left End 45.938 in Right End
4 Web Vees 13054 # SJI reaction 13054 # SJI reaction
TOR Chord: 2-LL3X3x.250 A = 2.875 Y = 0.842 Fy = 50000 Q = 0.961
Bridg < 278" Ix= 2.488 Iy= 7.669 Rx = 0.930 Ry = 1.633 Rz = 0.592
Center: L = 32.000 P = -31994 Paz= -71461 M = 3514 No Fillers
Tag end panl: L = 45.938 P = -19530 Paz= -49215 M = 11400 No Filler
First point: P = -19530 Pa = -77625 M = 17998
Chord shear: V = 20200 C = -10662 fv = 4954 fc = -3709 f = 5290
Bot Chord: 2-L L2x2x.216 A = 1.635 Y = 0.579
Ix= 0.615 Iv= 2.520 RX = 0.613
Center: L = 64.000 Pa= 33273 Pa = 49041
Chord shear: V = 20200 T = 17462 fv = 12875
Web Anql Lnsth Shear Force Member Area- R
T 2-57.5 56~.9 11124 20704 2LL1-3/4x.143 0.960 0.543~
V . 3.9 30.6 -4650 -4660 lLL1-1/2~.109 0.315 0.2972
C 155.1 53.5 -7431 -12996 2LL1-3/4X.125 0.844 0.546X
T 2 46.3 44.3 4315 6245 lLL1-1/4x.109 0.261 0.2472
V 2 0.0 30.6 -3635 -3635 lLL1-1/4X.109 0.261 0.2472
C 2 46.3 44.3 -3014 -4362 lLL1-3/4X.125 0.422 0.3472
Fy = 50000 Ry = 1.242
ft = 10682 -- Pa Weld
28803 4.9
-5779 1.4
-15423 3.5
7819 1.9
-4207 1.1
-6358 1.2
Q = 1.000
Rz = 0.392
f = 13939 T -AV1W - B
9.0/ 5.4 3.5/ 2.8
8.7/ 5.3
3.9/ 3.4
3.3/ 2.5
4.4/ 3.9
Vallev Joist West Page 20 V1.71
Job #ON02915 - 07 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURT2 ST SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR RED
Tlll 2 - 32LH928/543 x 26' 7.500 Special Crimped angle
Parallel chord Longspan
- End Lenqth Deuth Slope Holes, TOD Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 Y 50.000
Opp 6.000 5.000 Y 50.000
Uniform Live load 543 #/ft full length
Uniform SJI load 928 #/ft full length
Uniform Dead load 385 #/ft full length An additional SJI load of lOOO# may occur at any top chord panel point. An additional Dead load of lOOO# may occur at any top chord panel point.
HFLIP 63 13'4" FTE OAL
End loads: SJImDeadLiveukWind
Left TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kios
Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips 32.000 in Deep 315.500 in Design length 3050 # Minimum Shear
30.578 in Effective Depth 978 in4 Ix 0 in4 Minimum Ix
27.000 in Clear Depth L/1532 Live Defl L/ 896 SJI Defl
1041097 in-#Moment 1.000 in Chord gap 0.288 in Camber
64.000 in Interior Panel 46.875 in Left End 46.875 in Right End
4 Web Vees 13199 # SJI reaction 13199 # SJI reaction
TOD Chord: 2-LL3X3x.250 A = 2.875 Y = 0.842 Fy = 50000 Q = 0.961
Bridg < 278" Ix= 2.488 Iy= 7.669 Rx = 0.930 Ry = 1.633 Rz = 0.592
Center: . L = 32.000 P = -32660 Paz= -71461 M = 3537 No Fillers
Tag end panl: L = 46.875 P = -19679 Paz= -48463 M = 11860 No Filler
First point: P = -19679 Pa = -77625 M = 18761
Chord shear: V = 20200 C = -11168 fv = 4976 fc = -3885 f = 5342
Bot Chord: 2-L L2x2x.216 A = 1.635 Y = 0.579 Fy = 50000 Q = 1.000 Ix= 0.615 Iy= 2.520 RX = 0.613 Ry = 1.242 Rz = 0.392
Center: L = 64.000 P = 34047 Pa = 49041
Chord shear: V = 20200 T = 17636 fv = 13003 ft = 10788 f = 14078
Pa Weld T-AvlW-B -__ Web Anql Lnqth Shear Force Member Area- R
T 1 57.5 56.9 11235 20910 2LL1-3/4X.143 0.960 0.543X 28803 4.9 9.0/ 5.4
V 1 2.1 30.6 -4723 -4727 1LL1-lj2x.109 0.315 0.2972 -5785 1.5 3.5; 2.8
C 5-56.2 55.0 -7465 -13433 2LL1-3/4~.125 0.844 0.546~ -15117 3.6 8.8/ 5.3
T -6.3 44.3 4313 6244 lLL1-1/4X.109 0.261 0.2472 7819 1.9 3.9/ 3.4
V 2 0.0 30.6 -3638 -3638 lLL1-1/4X.109 0.261 0.2472 -4207 1.1 3.3/ 2.5
C 2 46.3 44.3 -3050 -4415 lLL1-3/4X.125 0.422 0.3472 -6358 1.2 4.4/ 3.9
Valley Joist West Page 21 V1.71
Job #ON02915 - 07 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR RED
T112 11 - 32LH928/543 x 26' 8.500 Special Crimped angle
Parallel chord Longspan
End Lensth Deuth Sloue Holes TOU Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 50.000
Opp 6.000 5.000 50.000
Uniform Live load 543 #/ft full length
Uniform SJI load 928 #/ft full length
Uniform Dead load 385 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
HFLIP @ 13'4" FTE OAL
End loads: - SJI NtUp~aEqukm
Left TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips 32.000 in Deep 316.500 in Design length 3059 # Minimum Shear
30.587 in Effective Depth 945 in4 Ix 0 in4 Minimum Ix
27.000 in Clear Depth L/1467 Live Defl L/ 858 SJI Defl
1047457 in-#Moment 1.000 in Chord gap 0.290 in Camber
64.000 in Interior Panel 47.125 in Left End 47.125 in Right End
4 Web Vees 13238 # SJI reaction 13238 # SJI reaction
Top Chord: 2-L L3x3x.227 A = 2.621 Y = 0.834 Fy = 50000 Q = 0.922
Bridg c 277" Ix= 2.285 Iy= 6.949 Rx = 0.934 Ry = 1.628 Rz = 0.594
Center: L = 32.000 P = -32845 Paz= -62840 M = 3543 No Fillers
Tag end panl: L = 47.125 P = -19714 Paz= -42981 M = 11984 No Filler
First point: P = -19714 Pa = -70765 M = 18967
Chord shear: V = 20200 C = -11301 fv = 5487 fc = -4312 f = 5896
Bot Chord: 2-L L2x2x.216 A = 1.635 Y = 0.579 Fy = 50000 Ix= 0.615 Iy= 2.520 Rx = 0.613 Ry = 1.242
Center: L = 64.000 P = 34246 Pa = 49041
Chord shear: V = 20200 T = 17677 fv = 13037 ft = 10814
Web Ansl Lnsth Shear Force Member Area- R -__ Pa Weld
T 157.5 56.9 11264 20961 2LL1-3/4X.143 0.960 0.543X 28803 4.9
V 1 1.6 30.6 -4743 -4-745 lLL1-1/2X.109 0.315 0.2972 -5785 1.5
C 7-56.5 55.4 -7474 -13549 2LL1-3/4X.125 0.844 0.546~ -15033 3.6
T . 16.3 44.3 4313 6242 lLL1-1/4x.109 0.261 0.2472 7819 1.9
V 2 0.0 30.6 -3639 -3639 lLL1-1/4X.109 0.261 0.2472 -4205 1.1
C 2 46.3 44.3 -3059 -4428 lLL1-3/4X.125 0.422 0.3472 -6357 1.2
Q = 1.000 Rz = 0.392
f = 14114
T - AVl W - B
9.1/ 5.4
3.51 2.8
9.0/ 5.4
3.9/ 3.4
3.3/ 2.5
4.4/ 3.9
Vallev Joist West Page 22 V1.71
Job #ON02915 - 07 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR RED
T113 1 - 32LH928/543 x 26' 8.500 Special Crimped angle
Parallel chord Longspan
End Lenqth DeDth Slope Holes TOD Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 50.000
Opp 6.000 5.000 50.000
Uniform Live load 543 #/ft full length
Uniform SJI load 928 #/ft full length
Uniform Dead load 385 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
Hl-LIP @ 3'3, 13'4", & 21'6" FTE OAL
End loads: SJImJ-EaukWind
Left TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
32.000 in Deep 316.500 in Design length 3059 # Minimum Shear
30.575 in Effective Depth 1020 in4 Ix 0 in4 Minimum Ix
27.000 in Clear Depth L/1584 Live Defl L/ 927 SJI Defl
1047457 in-#Moment 1.000 in Chord gap 0.290 in Camber
64.000 in Interior Panel 47.125 in Left End 47.125 in Right End
4 Web Vees 13238 # SJI reaction 13238 # SJI reaction
TOD Chord: 2-L L3x3x.227 A = 2.621 Y = 0.834 Fy = 50000 Q = 0.922
Bridg c 277" Ix= 2.285 Iy= 6.949 Rx = 0.934 Ry = 1.628 Rz = 0.594
Center: L = 32.000 P = -32858 Paz= -62840 M = 3543 No Fillers
Tag end panl: L = 47.125 P = -19720 Paz= -42981 M = 11984 No Filler
First point: P = -19720 Pa = -70765 M = 18967
Chord shear: V = 20200 C = -11305 fv = 5487 fc = -4313 f = 5896
Bot Chord: 2-L L2X2X.248 A = 1.861 Y = 0.591 Fy = 50000 Q = 1.000
Ix= 0.691 Iy= 2.905 Rx = 0.609 Ry = 1.250 Rz = 0.391
Center: L = 64.000 P = 34259 Pa = 55830
Chord shear: V = 20200 T = 17684 fv = 11355 ft = 9502 f = 12309 Web Anql Lnqth Shear Force Member Area- R -- Pa Weld T-AvlW-B
T 157.5 56.9 11264 20967 2LL1-3/4X.143 0.960 0.543X 28803 4.9 9.1/ 5.3
V 1 1.6 30.6 -4743 -4745 lLL1-1/2X.109 0.315 0.2972 -5787 1.5 3.5/ 2.8
C b56.5 55.4 -7474 -13552 2LL1-3/4X.125 0.844 0.546~ -15034 3.7 9.0/ 5.2
T . 46.3 44.3 4313 6243 lLL1-1/4X.109 0.261 0,2472 7819 1.9 3.9/ 3.4
V 2 0.0 30.6 -3639 -3639 lLL1-1/4x.109 0.261 0.2472 -4207 1.1 3.3/ 2.5
C 2 46.3 44.3 -3059 -4429 1LL1-3/4X.125 0.422 0.3472 -6358 1.2 4.4/ 3.9
Page 23 V1.71 Vallev Joist West - Job #ON02915 - 07 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR RED
T114 2 - 32LH983/573 x 26' 8.500 Special Crimped angle
Parallel chord Longspan
- End Lenqth Depth Slope Holes TOR Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 50.000
Opp 6.000 5.000 50.000
Uniform Live load 573 #/ft full length
Uniform SJI load 983 #/ft full length
Uniform Dead load 410 #/ft full length
An additional SJI load of 1000# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
HI-CLIP @ 13'4" FTE OAL
End loads: SJINtYp-Liveuu
Left TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
32.000 in Deep 316.500 in Design length 3241 # Minimum Shear
30.597 in Effective Depth 867 in4 Ix 0 in4 Minimum Ix
27.000 in Clear Depth L/1276 Live Defl L/ 744 SJI Defl
64.000 in Interior Panel 47.125 in Left End 47.125 in Right End
1104847 in-#Moment 1.000 in Chord gap 0.290 in Camber .
4 Web Vees 13963 # SJI reaction 13963 # SJI reaction
TOD Chord: 2-L L3x3x.227 A = 2.621 Y = 0.834 Fy = 50000
Bridg c 277" Ix= 2.285 Iy= -6.949 Rx = 0.934 Ry = 1.628
Center: L = 32.000 P = -34633 Paz= -62840 M = 3753
Tag end panl: L = 47.125 P = -20545 Paz= -42981 M = 12694
First point: P = -20545 Pa = -70765 M = 20091
Chord shear: V = 20200 C = -11904 fv = 5782 fc = -4542
Bot Chord: 2-LL2x2x.187 A = 1.426 Y = 0.569 Fy = 50000 Ix= 0.544 Iy= 2.173 RX = 0.617 Ry = 1.234
Center: L = 64.000 P = 36110 ?a = 42782
Chord shear: V = 20200 T = 18639 fv = 15884 ft = 13071
Q = 0.922
R2 = 0.594 No Fillers No Filler
f = 6212
Q = 1.000
Rz = 0.394
f = 17176
C 1-56.5 55.5 -7875 -14273 2LL1-3/4X.125 0.844 0.546~ -15032 3.8
V 2 0.0 30.6 -3794 -3794 lLL1-1/4~.109 0.261 0.2472 -4203 1.2
C 2 46.3 44.3 -3241 -4689 1LL1-3/4X.125 0.422 0.3472 -6356 1.3
T ,' 6.3 44.3 4533 6559 lLL1-1/4x.109 0.261 0.2472 7819 2.0
Web Ansl Lnqth Shear Force Member Area- R -- Pa Weld T-AvlW-B
T 157.5 56.9 11881 22104 2LL1-3/4x.143 0.960 0.543~ 28803 5.2 9.1/ 5.5
V 1 1.6 30.6 -4963 -4965 1LL1-1/2XA109 0.315 0.2972 -5784 1.5 3.5/ 2.8
9.0/ 5.5
3.9/ 3.4
3.3/ 2.5
4.4/ 3.9
Page 24 V1.71 Vallev Joist West - Job #ON02915 - 07 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR RED
T115 1 - 32LH983/573 x 26' 8.500 Special Crimped angle
- End Lenqth Depth SloDe Holes TOD Chord Ext BCX Holdback Pitch EP/#lL
Parallel chord Longspan
Tag 6.000 5.000 50.000
Opp 6.000 5.000 50.000
Uniform Live load 573 #/ft full length
Uniform, SJI load 983 #/ft full length
Uniform Dead load 410 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point. An additional Dead load of lOOO# may occur at any top chord panel point.
H1,CLIP @ 3'3, 13'4" & 21'6" FTE OAL
End loads: - SJIWDeadbpki&
Left TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
32.000 in Deep 316.500 in Design length 3241 # Minimum Shear
30.597 in Effective Depth 867 in4 Ix 0 in4 Minimum Ix
27.000 in Clear Depth L/1276 Live Defl L/ 744 SJI Defl
1104847 in-#Moment 1.000 in Chord gap 0.290 in Camber
64.000 in Interior Panel 47.125 in Left End 47.125 in Right End
4 Web Vees 13963 # SJI reaction 13963 # SJI reaction
TOD Chord: 2
Bridg c 277"
Center:
-L L3x3x.227 A = 2.621 Y = 0.834 Fy = 50000 Q = 0.922
Ix= 2.285 Iy= 6.949 RX = 0.934 Ry = 1.628 RZ = 0.594
L = 32.000 P = -34633 Paz= -62840 M = 3753 No Fillers
Tag end panl: L = 47.125 P = -20545 Paz= -42981 M = 12694 NO Filler
First point: P = -20545 Pa = -70765 M = 20091
Chord shear: V = 20200 C = -11904 fv = 5782 fc = -4542 f = 6212
Bot Chord: 2-LL2x2x.187 Ix= 0.544
Center: L = 64.000
Chord shear: V = 20200
Web Ansl Lnsth Shear Force
T 157.5 56.9 11881 22104
V 1 1.6 30.6 -4963 -4965
C 1 56.5 55.5 -7875 -14273
T ./-6.3 44.3 4533 6559
V 2 0.0 30.6 -3794 -3794
C 2 46.3 44.3 -3241 -4689
A = 1.426 Y = 0.569 Fy = 50000 Q = 1.000
Iy= 2.173 RX = 0.617 Ry = 1.234 Rz = 0.394
T = 18639 fv = 15884 ft = 13071 f = 17176
2LL1-3/4X.143 0.960 0.543X 28803 5.2 9.1/ 5.5
2LL1-3/4X.125 0.8a4 0.546X -15032 3.8 9.0/ 5.5
lLL1-1/4x.109 0.261 0.2472 7819 2.0 3.9/-3.4
1LL1-3/4~.125 0.422 0.3472 -6356 1.3 4.4/ 3.9
P = 36110 Pa = 42782
Member Area- R -- Pa Weld T-AvlW-B
lLL1-1/2x.l09 0.315 0.2972 -5784 1.5 3.5/ 2.8
lLL1-1/4x.109 0.261 0.2472 -4203 1.2 3.3/ 2.5
Vallev Joist West Page 25 V1.71 - Job #ON02915 - 07 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR RED
T116 2 - 40LH868/483 x 45' 5.000 Special Crimped angle
Parallel chord Longspan
- End Lensth Deuth SloDe Holes Tor, Chord Ext BCX Holdback Pitch EP/#IL
Tag 6.000 5.000 90.000
Opp 6.000 5.000 Y 90.000
Uniform Live load 483 #/ft full length
Uniform SJI load 868 #/ft full length
Uniform Dead load 385 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
Hl-CLIP @ 15'3" FTE OAL TYPE 2 CLIP @ 30'6" FTE OAL
7" MAX SEAT WIDTH @ RE
S€ T BEARING 3-1/2" @ BE
End loads: __ SJI Dead Live Eauk Wind
Left TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kim
Right TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips 40.000 in Deep 541.000 in Design length 4892 # Minimum Shear
37.768 in Effective Depth 3447 in4 Ix 0 in4 Minimum Ix
32.000 in Clear Depth L/1205 Live Defl L/ 670 SJI Defl
2781574 in-#Moment 1.000 in Chord gap 0.847 in Camber
80.000 in Interior Panel 55.250 in Left End 55.250 in Right End 6 Web Vees 20566 # SJI reaction 20566 # SJI reaction
Tor, Chord: 2-L L4x4x.313 A = 4.812 Y = 1.116 Fy = 50000 Q = 0.936
Bridg c 347" Ix= 7.439 - Iy= 20.002 Rx = 1.243 Ry = 2.039 Rz = 0.791
Center: L = 40.000 P = -72038 Pai=-118408 M = 4841 No Fillers
Tag end panl: L = 55.250 P = -42884 Paz= -86684 M = 15452 No Filler
First point: P = -42884 Pa =-129926 M = 24297
Chord shear: V = 20200 C = -8559 fv = 5738 fc = -1779 f = 5806
Bot Chord: 2-L L4x4x.313 A = 4.812 Y = 1.116 Fy = 50000 Q = 0.936
Ix= 7.439 Iy= 20.002 Rx = 1.243 Ry = 2.039 Rz = 0.791
Center: L = 80.000 P = 73648 Pa = 144362
Chord shear: V = 20200 T = 42884 fv = 7350 ft = 8912 f = 8596
-
Page 26 vi.71 Vallev Joist West - Job #ON02915 - 07 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS CARLSBAD, CA
Comments: UBC 1997
TAG COLOR RED
T116 2 - 40LH868/483 x 45‘ 5.000 Special Crimped angle
Parallel chord Longspan
Web Arm1 Lnqth Shear Force Member Area- R -- Pa Weld T-AvlW-B
T 1 66.8 95.8 18405 46667 2L L2x2x.216 1.635 0.613~ 49041 7.3 15.9/15.9
V 140.9 50.0 -5158 -6828 1L L2X2X.125 0.484 0.3982 -7175 1.8 4.4/ 4.8
C 1 30.8 44.0-14367 -16724 2LL1-3/4X.125 0.844 0.546X -17197 4.5 9.1,’ 9.1
V 2 ‘0.0 37.8 -4189 -4189 lLL1-1/2X.109 0.315 0.2972 -4788 1.3 3.5/ 3.5
C 2 46.6 55.0 -7881 -11480 1L L2X2X.248 0.930 0.3912 -12482 1.6 4.7/ 5.2
T 3 46.6 55.0 4914 7158 lLLl-l/4x..109 0.261 0.2472 7819 2.2 3.9/ 4.4
V 3 0.0 37.8 -4254 -4254 lLL1-1/2X.109 0.315 0.2972 -4788 1.3 3.5/ 3.5
C 3 46.6 55.0 -4892 -7125 1L L2X2X.143 0.552 0.3962. -7438 1.7 4.7/ 5.2
T 2 46.6 55.0 10848 15802 1L L2x2x.143 0.552 0.3962 16547 3.7 4.7/ 5.2
P
Valley Joist West Page 27 V1.71
Job #ON02915 - 07 By ASM Entered 6/20/00 Revised 2/13/01 7
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR RED
T117 1 - 40LH942/517 x 45' 5.000 Special Crimped angle
Parallel chord Longspan
End Lensth Depth Slope Holes TOV Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 90.000
Opp 6.000 5.000 Y 90.000
Uniform Live load 517 #/ft full length
Uniform SJI load 942 #/ft full length
Uniform Dead load 425 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
H-TLIP @ 15'3" FTE OAL TYPE 2 CLIP @ 30'6" FTE OAL
7" MAX SEAT WIDTH @ RE
Sr.,dT BEARING 3-1/2" @ BE
End loads: SJImDeadamWind
Left TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
40.000 in Deep 541.000 in Design length 5309 # Minimum Shear
38.223 in Effective Depth 3082 in4 Ix 0 in4 Minimum Ix
34.000 in Clear Depth L/1006 Live Defl L/ 552 SJI Defl
3007182 in-#Moment 1.000 in Chord gap 0.847 in Camber
80.000 in Interior Panel 55.250 in Left End 55.250 in Right End
22234 # SJI reaction 6 Web Vees 22234 # SJI reaction
TOD Chord: 2-L L3X3X.416
Brids c 284" Ix= 3.831 - Center: L = 40.000
Tag end panl: L = 55.250
First point:
Chord shear: v = 20200
Bot Chord: 2-L L3X3X.340
Ix= 3.243
Center: L = 80.000
Chord shear: V = 20200
A = 4.646
Iy= 12.965 P = -76954
P = -45822
P = -45822
C = -9138
A = 3.849
Iy= 10.519 P = 78675 T = 45822
Y = 0.902
Rx = 0.908
Pax=-112228
Paz= -66832
Pa =-125439
fv = 6220
Y = 0.875
RX = 0.918
Pa = 115464
fv = 9756
Fy = 50000
Ry = 1.670 M = 5253
M = 16769 M = 26368
fC -1967
Fy = 50000
Ry = 1.653
ft = 11906
Q = 1.000
Rz 0.585
2 Fillers
No Filler
f = 6297
Q = 1.000
Rz = 0.588
f = 11429
Vallev Joist West Page 28 V1.71 - Job #ON02915 - 07 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR RED
T117 1 - 40LH942/517 x 45' 5.000 Special Crimped angle
Parallel chord Longspan
Web Anql T 1 66.5
V 1 40.6
C 1 30.5 T 2 46.3 v 2 0.0
C 2 46.3
T 3 46.3 v 3 0.0
C- 46.3
Lnqth
95.9
50.3
44.4-
55.3
38.2
55.3
55.3
38.2
55.3
Shear
19903
-5511
,15524
11712
-4456
-8498
5309
-4525
-5309
Force
49958
-7257
-18014
16952
-4456
-12300
7684
-4525
-7684
Member
2L L2X2X.248
1L L2X2X.143
2LL1-3/4x. 14.3
1L L2x2x.156
1L L2X2X.248
lLL1-1/2X.109
lLL1.-1/4X. 109
lLL1-1/2X.109
1L L2x2x.156
Area- R -__ Pa Weld 1.861 0.609~ 55830 6.8 l
0.552 0.3962 -8361 1.7
0.960 0.543X -20375 4.2
0.600 0.3962 17990 3.7
0.315 0.2972 -4721 1.4
0.930 0.3912 -12347 1.7
0.261 0.2472 7819 2.4
0.315 0.2972 -4721 1.4
0.600 0.3962 -8057 1.7
T - AVl W - B ,
L0.2/10.2
4.4/ 4.8
6.5/ 6.5
4.7/ 5.2
3.5/ 3.5
4.7/ 5.2
3.9/ 4.4
3.5/ 3.5
4.7/ 5.2
Valley Joist West Page 29 V1.71 - Job #ON02915 - 07 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR RED
T118 2 - 40LH868/483 x 45' 8.750 Special Crimped angle
- End Lenqth Depth Slope Holes TOT, Chord Ext BCX Holdback Pitch EP/#lL 90.000 Tag 6.000 5.000
Opp 6.000 5.000 Y 90.000
Parallel chord Longspan
Uniform Live load 483 #/ft full length
Uniform SJI load 868 #/ft full length
Uniform Dead load 385 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
H-LIP @ 15'3" FTE OAL TYPE 2 CLIP @ 30'6" FTE OAL
Si. &tT BEARING 3-1/2" @ LE End loads: - SJI NtUp Dead Live Ecruk Wind
Left TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kius
Right TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
40.000 in Deep 544.750 in Design length 4925 # Minimum Shear
37.768 in Effective Depth 3447 in4 Ix 0 in4 Minimum Ix
32.000 in Clear Depth L/1180 Live Defl L/ 657 SJI Defl
2819325 in-#Moment 1.000 in Chord gap 0.859 in Camber
80.000 in Interior Panel 56.188 in Left End 56.188 in Right End
6 Web Vees 20702 # SJI reaction 20702 # SJI reaction
Tor, Chord: 2-L L4x4x.313 A = 4.812 Y = 1.116 Fy = 50000 Q = 0.936
Bridg < 347" Ix= 7.439 Iy= 20.002 Rx = 1.243 Ry = 2.039 Rz = 0.791
Center: L = 40.000 P = -73038 Paz=-118408 M = 4842 No Fillers
Tag end panl: L = 56.188 P = -43124 Paz= -85835 M = 15967 No Filler
First point: P = -43124 Pa =-129926 M = 25156
Chord shear: V = 20200 C = -9293 fv = 5750 fc = -1931 f = 5831
Bot Chord: 2-L L4x4x.313 A = 4.812 Y = 1.116 Fy = 50000 Q = 0.936
Ix= 7.439 Iy= 20.002 RX = 1.243 Ry 2.039 Rz = 0.791
Center: L = 80,000 P = 74648 Pa = 144362
Chord shear: V = 20200 T = 43124 fv = 7391 ft = 8962 f = 8644
Vallev Joist West Page 30 V1.71
Job #ON02915 - 07 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR RED
T118 2 - 40LH868/483 x 45' 8.750 Special Crimped angle
Parallel chord Longspan
Web AnQ
T 1 66.8
V 1 40.1
C 1 32.8 T 2 46.6 v 2 0.0
C 2 46.6
T 3 46.6 v 3 0.0
C+ 46.6
95.8
49.4
45.0
55.0
37.8
55.0
55.0
37.8
55.0
Shear
18508
-5229
-14399
10847
-4194
-7880
-4259
-4925
4925
Force Member Am - R
46928 2L L2x2x.216 1.635 0.613~
-6837 1L L2X2X.125 0.484 0.3982
-17138 2LL1-3/4~.125 0.844 0.546X
-4194 lLL1-1/2x.109 0.315 0.2972
-11478 1L L2X2X.248 0.930 0.3912
7174 lLL1-1/4x.109 0.261 0.2472
15800 1L L2x2x.143 0.552 0.3962
-4259 lLL1-1/2~.109 0.315 0.2972
-7174 1L L2x2x.143 0.552 0.3962
-- Pa Weld
49041 7.3
-7264 1.8
-17022 4.6
16547 3.7
-4788 1.3
-12482 1.6
7819 2.2
-4788 1.3
-7438 1.7
T-AVlW-B
15.9/15.9
9.2/ 9.2
4.4/ 4.8
4.7/ 5.2
3.5/ 3.5
4.7/ 5.2
3.9/ 4.4
3.5/ 3.5
4.7/ 5.2
Valley Joist West Page 31 V1.71
Job #ON02915 - 07 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS CARLSBAD, CA
Comments: WC 1997 TAG COLOR RED
T119 12 - 40LH868/483 x 45' 9.250 Special Crimped angle
Parallel chord Longspan
~ End Lenqth Depth SloRe Holes TOR Chord Ext BCX Holdback Pitch EP/#lL Tag 6.000 5.000 90.000
Opp 6.000 5.000 90.000
Uniform Live load 483 #/ft full length
Uniform SJI load 868 #/ft full length
Uniform Dead load 385 #/ft full length
An additional SJI load of 1000# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
HIFLIP @ 15'3" FTE OAL TYPE 2 CLIP @ 30'6" FTE OAL
SL .T BEARING 3-1/2" @ LE
End loads: SJI Dead Live Eauk Wind
Left TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
40.000 in Deep 545.250 in Design length 4930 # Minimum Shear
37.768 in Effective Depth 3447 in4 Ix 0 in4 Minimum Ix
32.000 in Clear Depth L/1177 Live Defl L/ 655 SJI Defl
2824378 in-#Moment 1.000 in Chord gap 0.860 in Camber
'80.000 in Interior Panel 56.312 in Left End 56.312 in Right End
6 Web Vees 20720 # SJI reaction 20720 # SJI reaction
TOR Chord: 2-L L4x4x.313 A = 4.812 Y = 1.116 Fy = 50000 Q = 0.936
Bridg c 347" Ix= 7.439 Iy= 20.002 Rx = 1.243 Ry = 2.039 Rz = 0.791
Center: L = 40.000 P = -73172 Paz=-118408 M = 4843 No Fillers
Tag end panl: L = 56.312 P = -43156 Paz= -85722 M = 16036 No Filler
First point: P = -43156 Pa =-129926 M = 25272
Chord shear: V = 20200 C = -9391 fv = 5752 fc = -1952 f = 5834
Bot Chord: 2-L L4x4x.313 A = 4.812 Y = 1.116 Fy = 50000 Q = 0.936
Ix= 7.439 Iy= 20.002 RX = 1.243 Ry = 2.039 RZ = 0.791
Center: L = 80,000 P = 74781 Pa = 144362
Chord shear: V = 20200 T = 43156 fv = 7397 ft = 8968 f = 8650
Job #ON029
Customer: JD2.
- Valley Joist West
5 - 07 By ASM Er
INC #lo002
2049 KURT2 ST
Page 32 V1.71
red 6/20/00 Revised 2/13/01
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR RED
T119 12 - 40LH868/483 x 45' 9.250 Special Crimped angle
Parallel chord Longspan
Web
T1
v1
c1
T2
v2
c2
T3
v3
C-
Anql Lnqth Shear
66.8 95.8 18522
40.0 49.3 -5239
33.1 45.1-14403
46.6 55.0 10847
0.0 37.8 -4195
46.6 55.0 ,-7880
46.6 55.0 4930
0.0 37.8 -4259
46.6 55.0 -4930
Force Member Area- R -- Pa Weld T-AvlW-B
46962 2L L2x2x.216 1.635 0.613~ 49041 7.3 15.9/15.9
-6838 1L L2X2X.125 0.484 0.3982 -7275 1.8 4.4/ 4.8
-17194 2LL1-3/4X.143 0.960 0.543X -20209 4.0 9.2/ 9.2
-4195 lLL1-1/2X.109 0.315 0.2972 -4788 1.3 3.5/ 3.5
-11478 1L L2X2X.248 0.930 0.3912 -12482 1.6 4.7/ 5.2
-4259 lLL1-1/2~.109 0.315 0.2972 -4788 1.3 3.5/ 3.5
-7181 1L L2~2X.143 0.552 0.3962 -7438 1.7 4.7/ 5.2
15799 1L L2x2x.143 0.552 0.3962 16547 3.7 4.7/ 5.2
7181 lLL1-1/4x.109 0.261 0.2472 7819 2.2 3.9/ 4.4
Vallev Joist West Page 33 V1.71
Job #ON02915 - 07 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR RED
T120 4 - 40LH915/505 x 45' 9.250 Special Crimped angle
Parallel chord Longspan
End Lensth DeDth Slope Holes TOD Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 90.000
Opp 6.000 5.000 90.000
Uniform Live load 505 #/ft full length
Uniform SJI load 915 #/ft full length
Uniform Dead load 410 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
HFCLIP @ 15'3" FTE OAL TYPE.2 CLIP @ 30'6" FTE OAL
S, dT BEARING 3-1/2" @ LE
End loads: - SJI Dead Live a Wind
Left TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
40.000 in Deep 545.250 in Design length 5197 # Minimum Shear
38.123 in Effective Depth 3048 in4 Ix 0 in4 Minimum Ix
33.500 in Clear Depth L/ 995 Live Defl L/ 549 SJI Defl
2969930 in-#Moment 1.000 in Chord gap 0.860 in Camber
80.000 in Interior Panel 56.312 in Left End 56.312 in Riqht End
6 Web Vees 21788 # SJI reaction
TOD Chord: 2-LL3-1/2x.344 A = 4.579
Center: L = 40.000 P = -76226
Tag end panl: L = 56.312 P = -44964
Chord shear: V = 20200 C = -9780
Bridg < 314" Ix= 5.323 Iy= 15.651
First point: P = -44964
Bot Chord: 2-L L3X3X.340 A = 3.849
Ix= 3.243 IY= 10.519
Center: L = 80.000 P-=. 77903
Chord shear: V = 20200 T = 44964
Y = 1.002
RX = 1.078
Paz=-115945
Paz= -76856 Pa =-123642
fv = 6288
Y =- 0.875
Rx = 0.918
Pa = 115464
fv = 9549
21788 # SJI-reaction
Fy = 50000
Ry = 1.849 M = 5105
M = 16905
M = 26640
fc = -2136
Fy = 50000
Ry = 1.653
ft = 11683
Q = 1.000 Rz = 0.688
No Fillers
No Filler
f = 6378
Q = 1.000
RZ = 0.588
f = 11194
Vallev Joist West Page 34 V1.71
Job #ON02915 - 07 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Pro] ect : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR RED
T120 4 - 40LH915/505 x 45' 9!250 Special Crimped angle
Parallel chord Longspan
Web Anql Lnqth Shear
T 1 66.6 95.9 19479
V 1 39.7 49.6 -5467
C 132.9 45.4-15140 -
T 2 46.4 55.3 11395
V 2 0.0 38.1 -4364
C 2 46.4 55.3 -8272 - T 3 46.4 55.3 5197
V 3 0.0 38.1 -4431
Crl 46.4 55.3 -5197
Force Member 49002 2L L2x2x.216
-7109 1L L2~2X.125 ,18024 2LL1-3/4~.143
16516 1L L2x2x.143
-4364 ILLI-I/~X.~O~
7533 lLL1-1/4X.109
,11989 1L L2X2X.248
-4431 lLL1-1/2X.109
-7533 1L L2X2X.156
Area
1.635
0.484
0.960
0.552
0.315 0.930
0.261
0.315
0.600
R
0.613~
0.3982 0.543~
0.3962
0.2972 0.3912
0.2472
0.2972
0.3962
-- Pa Weld
49041 7.6
-7236 1.9
-20141 4.2
16547 3.9
-4736 1.3
-12377 1.6
7819 2.3
-4736 1.4
-8074 1.6
T -AV1W - B
13.1/10.6
7.9/ 6.8
4.4/ 4.8
4.7/ 5.2
3.5/ 3.5
4.7/ 5.2
3.9/ 4.4
3.5/ 3.5
4.7/ 5.2
Z--I?Y-O[
Page 1 V1.71 Vallev Joist West
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURTZ ST SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
G201 1 - 28G4N40.0/22.0 x 27' 3.000 Special Crimped angle
Parallel chord Girder
- End Lensth DeDth SloDe Holes Tou Chord Ext BCX Holdback Pitch EP/#~L
Tag 6.000 6.000 Y 2 0' 1.500 79.500
Opp 6.000 6.000 Y 2 0' 1.500 79.500
An additional 5JI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
TC conc loads: Load Suacinq Location Point
40000 6'7-1/2 617-1/2 U4 S JI - 18000 6'7-1/2 U4 Dead
22000 6'7-1/2 U4 Live
40000 7'0 13'7-1/2 U8 S JI
18000 13'7-1/2 U8 Dead
22000 13'7-1/2 U8 Live
40000 71: '20'7-1/2 U12 SJI
18000 "' 2017-1/2 U12 Dead 20'7-1/2 U12 Live 22000 6 17-1/2
NO TC HOLES
7" MAX SEAT WIDTH @ BE
KEEP CLEAR FOR KNIFE PLATE 7" @ LE
End loads: - SJImDeadU&~kWind
Left TC axial load: 0.0 0.0 0.0 0.0 23.5 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 23.5 0.0 Kips 28.000 in Deep 323.000 in Design length 15000 # Minimum Shear
24.450 in Effective Depth 5157 in4 Ix 0 in4 Minimum Ix
16.000 in Clear Depth L/1343 Live Defl L/ 738 SJI Defl
6410750 in-#Moment 1.000 in Chord gap 0.302 in Camber
42.000 in Interior Panel 17.875 in Left End 17.875 in Right End
8 Web Vees 61000 # SJI reaction 61000 # SJI reaction
Tou Chord: 2-LL6x6x.750
Ix= 56.310
Center: L = 21.000
Chord shear: V = 20200 -
~ Bo, Jhord: 2-LL6x6x.750
IX= 56.310
Center: L = 42.000
Chord shear: V = 20200
A = 16.875
Iy=143.648
P =-244965 c= 0
A = 16.875
Iy=143.648
P = 262198 T = 94002
Y=
Rx=
Paz=-
fv =
Y=
RX =
Pa =
fv =
1.775 Fy = 50000 Q = 1.000
1.827 Ry = 2.918 Rz = 1.173
6765 ~-fc = 0 f = 6765
1.775 Fy = 50000 Q = 1.000
1.827 Ry = 2.918 Rz = 1.173
6765 ft = 5570 f = 7316
481227 M = 0 No Fillers
506250
Page 2 V1.77 Vallev Joist West
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
G201 1 - 28G4N40.0/22.0 x 27' 3.000 Special Crimped angle
Parallel chord Girder
Web Ancrl
T 1 57.1 V 1 39.1 c 1 0.0 T 2 39.1 v 2 0.0
C 2 39.1 T 3 40.7 v 3 0.0
C- 40.7
T ~ 40.7 v 4 0.0
C 4 40.7
Shear Force
45.0 60883 111996
31.5 -1000
24.5-60883
31.5 60822
24.5 -1000
31.5-60760
32.2 20695
24.5 -1000
32.2-20630
32.2 20565
24.5 -1000
32.2-20500
~~
-1289
-60883
78382
-1000
-78302
27281
-1000
-27195
27109
-1000
-27023
Member . - R -- Pa Weld
2L L3X3X.340 3.849 0.918~ 11546411.1
lLL1-1/4X.109
2LL2-1/2~.250
2LL3X3x.250
1LLlXlX.lO9
2L L3X3X.313
1L L2X2X.248
1LLlXlX.lO9 2L L2x2x.156
1L L2X2X.248
1LLlxlx.lO9
2L L2x2x.156
0.261 0.2472
2.375'0.769~
2.875 0.930~ 0.206 0.1962
3 :560 6.922~
0.930 0.3912
0.206 0.1962
1.199 0.622~
0.930 0.3912
0.206 0.1962
1.199 0.622~
-2383 0.4
-63961 8.2
8625010.6
-1982 0.3
-94768 8.4
27915 3.7
-1982 0.3
-27279 5.9
27915 3.7
-1982 0.3 -27279 5.8
T - AVl W - B
17.3/17.3
3.6/ 3.9
12.9/12.9
13.6/13.6
3.0/ 3.0
13.6/13.6
3.0/ 3.0
13.7/13.7
3.0/ 3.0
13.7/13.7
4.3/ 4.7
4.3/ 4.7
Vallev Joist West Page 3 V1.71
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01 P
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
G202 1 - 2864N40.0/22.0 x 27' 3.000 Special Crimped angle
Parallel chord Girder
End Lenqth Depth Sloue Holes Tor, Chord Ext BCX Holdback Pitch EP/#~L
Tag 6.000 6.000 Y 2 0' 1.500 79.500
Opp 6.000 6.000 Y 2 0' 1.500 79.500
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
TC conc loads: Load Suacinq Location Point Tvue
6'7-1/2 6!7-1/2 U4 SJI
7 18000 6'7-1/2 U4 Dead
40000
22000 6'7-1/2 U4 Live
40000 7'0 13'7-1/2 U8 SJI
18000 13'7-1/2 U8 Dead
22000 13'7-1/2 U8 Live
40000 7'0 20'7-1/2 U12 SJI
18000 20'7-1/2 U12 Dead
22000 6 I7-1/2 20'7-1/2 U12 Live
0'0
NO TC HOLES
7" MAX SEAT WIDTH @ BE
KEEP CLEAR FOR KNIFE PLATE 7" @ LE
End loads: SJI-
Left TC axial load: 0.0 0.0
Right TC axial load: 0.0 0.0
28.000 in Deep 323.000
24.450 in Effective Depth 5157
16.000 in Clear Depth L/1343
Dead-&.&-
0.0 0.0 43.6 0.0 Kips
0.0 0.0 43.6 0.0 Kips
in Design length 15000 # Minimum Shear
in4 Ix 0 in4 Minimum Ix
Live Defl L/ 738 SJI Defl
0.302 in Camber
17.875 in Right End
on 61000 # SJI reaction
- 6410750 in-#Moment 1.000 in Chord gap
42.000 in Interior Panel 17.875 in Left End
8 Web Vees 61000 # SJI react
TOD Chord: 2-LL6x6x.750 A = 16.875 Y = 1 775 Fy = 50000 Q = 1.000
IX= 56.310 Iy=143.648 Rx = 1 827 Ry = 2.918 RZ = 1.173
Center: L = 21.000 p =-244965 Paz=-481227 M = 0 No Fillers
Chord shear: V = 20200 C = 0 fv = 6765 fc = 0 -f = 6765
- Bot dhord: 2-LL6x6x.750 A = 16.875 Y = 1.775 Fy = 50000 Q = 1.000
Ix= 56.310 Ip143.648 RX = 1.827 Ry = 2.918 RZ = 1.173
-
Center: L = 42.000 p = 262198 Pa = 506250
Chord shear: V = 20200 T = 94002 fv = 6765 ft = 5570 f = 7316
Page 4 V1.71 Vallev Joist West
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KmTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
G202 1 - 28G4N40.0/22.0 x 27' 3.000 Special Crimped angle
Parallel chord Girder
- Web a
T 1 57.1
V 1 39.1 c 1 0.0 T 2 39.1 v 2 0.0
C 2 39.1 T 3 40.7 v 3 0.0
C - 40.7
T 40.7 v 4 0.0
C 4 40.7
Lnsth Shear Force Member
45.0 60883 111996 2L L3X3X.340
31.5 -1000 -1289
24.5-60883 -60883
31.5 60822 78382
24.5 -1000 -1000
31.5-60760 -78302
32.2 20695 27281
24.5 -1000 -1000
32.2-20630 -27195
32.2 20565 27109
24.5 -1000 -1000
32.2-20500 -27023
lLL1-1/4X.109
2LL2-1/2~.250
2LL3X3X.250
1LLlXlX.lO9
2L L3x3x.313
1L L2X2X.248
1LLlXlX.lO9
2L L2x2x.156
1L L2X2X.248
1LLlXlX.lO9 2L L2x2x.156
Area
3.849
0.261
2.375
2.875
0.206
3.560
0.930
0.206
1.199
0.930
0.206
1.199
- R -- Pa Weld 0.918X 11546411.1
0.2472 -2383 0.4
0.769~
0.930~
0.922~
0.1962
0.3912
0.1962
0.3912
0.1962
0.622~
0.622~
-63961 8.2
8625010.6
-1982 0.3
-94768 8.4
-1982 0.3
-27279 5.9
27915 3.7
-1982 0.3
-27279 5.8
27915 3.7
T-AVlW-B
17.3/17.3
3.6/ 3.9
12.9/12.9
13.6/13.6
3.0/ 3.0
13.6/13.6
4.3/ 4.7
3.0/ 3.0
4.3/ 4.7
13.7/13.7
3.0/ 3.0
13.7/13.7
Valley Joist West Page 5 V1.71
Job #ON02915 - 02 By' ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KTJRTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
G203 1 - 28G4N31.4/17.27 x 27'11.750 Special Crimped
End Lenqth Depth Slope Holes Top Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 6.000 Y 2 0' 4.750 83.750
Opp 6.000 6.000 Y E 0' 3.000 2 0' 5.000 84.000
angle Parallel chord Girder
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
TC conc loads: Load Spacing Location Point Twe
31400 6'11-3/4 6 I11-3/4 u4 SJI
r- 14130 6'11-3/4 U4 Dead
17270 6'11-3/4 U4 Live
31400 7'0 13'11-3/4 U8 S JI
14130 13'11-3/4 U8 Dead
17270 13'11-3/4 U8 Live
31400 7'0 20'11-3/4 U12 SJI
14130 20'11-3/4 U12 Dead
20'11-3/4 U12 Live 17270 7'0
TC HOLES 7/8"X 5" GAUGE LE @ 1-3/4", RE i@ 1" & 5"
KEEP CLEAR FOR KNIFE PLATE 7" @ LE
End loads: SJI Live Eauk Wind
Left TC axial load: 0.0 0.0 0.0 0.0 27.6 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 27.6 0.0 Kips
28.000 in Deep 331.750 in Design length 11775 # Minimum Shear
25.633 in Effective Depth 2486 in4 Ix 0 in4 Minimum Ix
20.000 in Clear Depth L/ 771 Live Defl L/ 424 SJI Defl
1.000 in Chord qap . 0.318 in Camber - 5258046 in-#Moment
42.000 in Interior Panel
8 Web Vees
TOD Chord: 2-L L4x4x.500 Ix= 11.123
Center: L = 21.000
Chord shear: V = 20200
mhord: 2-L L4x4x.500
Center: L = 42.000
Chord shear: V = 20200
Ix= 11.123
18.937 in Left Enh 19.000 in Right End
48135 # SJI reaction 48065 # SJI reaction
A = 7.500 Y = 1.183 Fy = 50000 Q = 1.000
Iy= 32.375 RX = 1.218 Ry = 2.078 RZ = 0.782
C = -11005 fV = 12004 fC = -1467 f = 12026
A = 7.500 Y = 1.183 Fy = 50000 Q = 1.000 Iy= 32.375 RX = 1.218 Ry = 2.078 Rz = 0.782
T = 63711 fv = 12008 ft = 8495 f = 12737
P =-192241 Paz=-206506 M = 0 No Fillers
P = 205125 Pa = 225000
Valley Joist West Page 6 V1.71
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
G203 1 - 28G4N31.4/17.27 x 27'11.750 Special Crimped
angle Parallel chord Girder
Web hql
T 1 53.0
V 1 30.4 c 1 12.9
T 2 39.2 v 2 0.0
C 2 39.2 T 3 39.3 v 3 0.0 c-+ 39.3
T 39.3 v 4 0.0 c 4 39.3
Lnsth Shear Force
42.6 48033 79789
29.7 -1000 -1160
26.3-48025 -49260
33.1 47952 61915
25.6 -1000 -1000
33.1-47889 -61834
33.1 16426 21234
25.6 -1000 -1000
33.1-16362 -21152
33.1 16299 21071
25.6 -1000 -1000
33.1-16236 -20989
Member
2L L3x3x.313
1LLlXlX.lO9
2LL2-1/2~.230
1LLlxlx.lO9
2LL3X3x.250
1LL2X2X.187
1LLlXlX.lO9
lLL2x2x.187
1LLlXlX.lO9
2LL2-1/2X.212
lCL2-1/2X.212
lLL2-1/2X.212
Area
3.560
0.206
2.030
2.194
0.206
2.875
0.713
0.206
1.015
0.713
0.206
1.015
- R -- Pa Weld T-AvlW-B
0.922~ 106802 8.6 10.4/10.4
0.772~ 65826 9.1 9;2/ 9.2
0.3942 21391 3.8 4.3/ 4.7
0.1962 -1340 0.4 3.1/ 3.4
0.775X -52478 7.8 9.1/ 9.1
0.1962 -1803 0.3 3.0/ 3.0
0.930X -73278 8.3 9.31 9.3
0.1962 -1803 0.3 3.0/ 3.0
0.3942 21391 3.8 4.3/ 4.7
0.1962 -1803 0.3 3.0/ 3.0 0.4932 -21265 3.3 4.8/ 5.2
0.4932 -21265 3.4 4.a/ 5.2
Vallev Joist West Page 7 V1.71
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lOO02
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
G204 1 - 28G4N31.4/17.27 x 27'11.750 Special Crimped
angle Parallel chord Girder
- End Lenqth Deuth Sloue Holes TOU Chord Ext BCX Holdback Pitch EP/#lL
Taq 6.000 6.000 Y 2 0' 4.750 83.750
Opp 6.000 6.000 Y E 0' 3.000 2 0' 5.000 84.000
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
TC conc loads: Load Suacinq Location Point Tvue
31400 6'11-3/4 6 111-3/4 U4 S JI
+ 14130 6'11-3/4 U4 Dead
17270 6'11-3/4 U4 Live
31400 7'0 13'11-3/4 U8 S JI
14130 13'11-3/4 U8 Dead
17270 13'11-3/4 U8 Live
14130 20'11-3/4 U12 Dead
20'11-3/4 U12 Live
31400 7'0 20'11-3/4 U12 SJI
17270 7'0
TC HOLES 7/8"X 5" GAUGE LE @ 1-3/4", RE @ 1" & 5"
KEEP CLEAR FOR KNIFE PLATE 7" @ LE
End loads: __ SJI NtUI,DeaduEaukWind
Left TC axial load: 0.0 0.0 0.0 0.0 31.8 0.0 KiDS
Right TC axial load: 0.0 0.0 0.0 0.0 31.8 0.0 Kips
28.000 in Deep 331.750 in Design length 11775 # Minimum Shear
25.633 in Effective Depth 2486 in4 Ix 0 in4 Minimum Ix
20.000 in Clear Depth L/ 771 Live Defl L/ 424 SJI Defl
5258046 in-#Moment 1.000 in Chord gap 0.318 in Camber
42.000 in Interior Panel 18.937 in Left End 19.000 in Right End
8 Web Vees 48135 # SJI reaction 48065 # SJI reaction
Tou Chord: 2-L L4x4x.500 A = 7.500 Y = 1.183 Fy = 50000 Q = 1 000
Center: L = 21.000 P =-192241 Paz=-206506 M = 0 No Fil ers
Chord shear: V = 20200 C = -11005 fv = 12004 fc = -1467 f = 1-026
- Boyhord: 2-L L4x4x.500 A = 7.500 Y = 1.183 Fy = 50000 Q = 1.000
Ix= 11.123 Iy= 32.375 Rx = 1.218 Ry = 2.078 Rz = 0 782
Ix= 11.123 Iy= 32.375 Rx = 1.218 Ry = 2.078 Rz = 0.782
Center: L = 42.000 P = 205125 Pa = 225000
Chord shear: V = 20200 T = 63711 fv = 12008 ft = 8495 f = 12737
Page 8 ~1.71 Valley Joist West
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
6191295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
G204 1 - 28G4N31.4/17.27 x 27’11.750 Special Crimped
angle Parallel chord Girder
Web Ansl Lnqth Shear Force Member
T 153.0 42.6 48033 79789 2L L3x3x.313
V 130.4 29.7 -1000 -1160 1LLlXlX.109 c 112.9 T 2 39.2 v 2 0.0 c 2 39.2 T 3 39.3 v 3 0.0 c -- 39.3
T . 39.3 v 4 0.0 c 4 39.3
26.3-48015
33.1 47952
25.6 -1000
33.1-47889
33.1 16426
25.6 -1000
33.1-16362
33.1 16299
25.6 -1000
33.1-16236
-49260
61915
-1000
-61834
21234
-1000
-21152
21071
-1000
-20989
2LL2-1/2X.212
2LL2-1/2~.230
1LLlXlX.lO9
2LL3X3x.250
1LL2X2X.187
1LLlXlX.lO9
1LL2x2x.187
1LLlXlX.lO9
lLL2-1/2X.212
lLL2-1/2X.212
Area
3.560
0.206
2.030
2.194 0.206
2.875
0.713
0.206
1.015
0.713
0.206
1.015
- R -- Pa Weld
0.922~ 106802 8.6
0.1962
0.775~
0.772~
0.1962
0.930~
0.3942
0.1962
0.4932
0.3942
0.1962
0.4932
-1340 0.4
-52478 7.8
65826 9.1
-1803 0.3
-73278 8.3
21391 3.8
-1803 0.3
-21265 3.4
21391 3.8
-1803 0.3
-21265 3.3
T - AV~ w -B
9.1/ 9.1
9.3/ 9.3
4.3/ 4.7
3.0/ 3.0
4.8/ 5.2
4.3/ 4.7
4.8/ 5.2
10.4/10.4
3.1/ 3.4
9.2/ 9.2
3.0/ 3.0
3.0/ 3.0
Page 9 V1.71 Vallev Joist West
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T201 1 - 26LH935/550 x 23' 9.500 Special Crimped angle
Parallel chord Longspan
End Lenqth Dewth Slowe Holes TOP Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 46.000
Opp 6.000 5.000 46.000
Uniform Live load 550 #/ft full length
Uniform SJI load 935 #/ft full length
Uniform Dead load 385 #/€t full length An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
HY-"LIP @ 11'10 FTE OAL
St..,T BEARING 3-1/2" @ LE
End loads: - SJImDeadaE&&Wind .j
Left TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
26.000 in Deep 281.500 in Design length 2742 # Minimum Shear
24.863 in Effective Depth 429 in4 Ix 0 in4 Minimum Ix
22.000 in Clear Depth L/ 934 Live Defl L/ 549 SJI Defl
842161 in-#Moment 1.000 in Chord gap 0.229 in Camber
48.000 in Interior Panel 22.375 in Left End 22.375 in Right End
6 Web Vees 11967 # SJI reaction 11967 # SJI reaction
Tow Chord: 2-L L2x2x.216 A = 1.635 Y = 0.579 Fy = 50000 Q = 1.000
Bridg e 211" Ix= 0.615 Iy= 2.520 Rx = 0.613 Ry = 1.242 Rz = 0.392
Center: L = 24.000 P = -33747 Paz= -40837 M = 1882 No Fillers
Tag end panl: L = 22.375 P = -22023 Paz= -34162 M = 2848 No Filler
First point: P = -22023 Pa = -44137 M = 4057
Chord shear: V = 20200 C = -277 fv = 10640 fc = -170 f = 10640
Bot Chord: 2-L L2x2x.156 A = 1.199 Y = 0.558 Fy = 50000 Q = 0.935
Ix= 0.464 Iy= 1.805 RX = 0.622 Ry = 1.227 Rz = 0.396
Center: L = 48.000 P = 33872 Pa = 35980
Chord shear: V = 20200 T = 19358 fv = 17530 ft = 16141 f = 19299
Vallev Joist West Page 10 V1.71
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T201 1 - 26LH935/550 x 23' 9.500 Special Crimped angle
Parallel chord Longspan
Web Anql T 1 60.5
V 1 41.0 c 1 1.7
T 2 44.0 v 2 0.0 c 2 44.0
T 3 44.0 v 3 0.0 c ;* 44.0
Lncrth
50.5
33.0
24.9
34.6
24.9
34.6
34.6
24.9 34.6
Shear
10939
-9193
7301
-2826
-3005
-5346
3390
-2742 -3039
Force Member Area
22235 2LL1-3/4~.143 0.960
-3746 2LLlxlx.109 0.412
-9197 1L L2~2X.143 0.552
10147 lLL1-1/2X.125 0.359
-3005 1LLlXlX.109 0.206 -7430 1LL1-3/4~.125 0.422
4712 lLL1-1/4X.109 0.261
-3039 lLLlXlX.109 0.206
-3811 lLL1-1/2~.109 0.315
- R -- Pa Weld 0.543~ 28803 5.2
0.307X -7504 1.2
0.3962 -10244 2.2
0.196Z -3263 0.9
0.3472 -7872 2.0
0.2472 7819 1.5
0.1962 -3263 0.9
0.2972 -5251 1.2
0.2962 10781 2.7
T -AVIW - B
4.7/ 4.7
3.3/ 3.3
3.3/ 3.8
2.8/ 3.3
5.6/ 5.6
3.0/ 3.5
2.3/ 2.3
2.31 2.3
3.01 3.5
Page 11 V1.71 Valley Joist West
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T202 1 - 26LH952/559 x 23' 9.500 Special Crimped angle
- End Lenqth DeDth SloDe Holes Top Chord Ext BCX Holdback Pitch EP/#1L
Parallel chord Longspan
Tag 6.000 5.000 46.000
Opp 6.000 5.000 46.000
Uniform Live load 559 #/ft full length
Uniform SJI load 952 #/ft full length
Uniform Dead load 393 #/ft full length
An additional SJI load of 2000# mav occur at any toD chord Dane1 Doint.
An additional Dead load of 2000# may occur at aiy tbp chordApanelApoint.
HI.-?LIP @ 11'10 FTE OAL
Sl .T BEARING 3-1/2" @ LE
End loads: SJI
Left TC axial load: 0.0
Right TC axial load: 0.0
26.000 in Deep
24.844 in Effective Depth
22.000 in Clear Depth
926569 in-#Moment
48.000 in Interior Panel
6 Web Vees
--Live--
0.0 0.0 0.0 9.8 0.0 Kim
0.0 0.0 0.0 9.8 0.0 Kips
L/1036 Live Defl L/ 608 SJI Defl
1.000 in Chord gap 0.229 in Camber
22.375 in Left End 22.375 in Right End
281.500 in Design length 2792 # Minimum Shear
483 in4 Ix 0 in4 Minimum Ix
13166 # SJI reaction 13166 # SJI reaction
Tow Chord: 2-L L2X2X.248 A = 1.861 Y = 0.591 Fy = 50000 Q = 1.000
Bridg c 212" Ix= 0.691 Iy= 2.905 Rx = 0.609 Ry = 1.250 Rz = 0.391
Tag end panl: L = 22.375 P = -23812 Paz= -38841 M = 2899 No Filler
Center: L = 24.000 P = -36995 Pa= -46450 M = 1916 No Fillers .
.First point: P = -23812 Pa = -50247 M = 4130
Chord shear: V = 20200 C = -307 fv = 10268 fc = -165 f = 10268
Bot Chord: 2-LL2x2x.176 A = 1.346 Y = 0.565 Fy = 50000 Q = 0.981
IX= 0.516 Iy= 2.042 RX = 0.619 Ry = 1.232 Rz = 0.394
Chord shear: V = 20200 T'= 21192 fv = 16997 ft = 15744 f = 18732
Center: L = 48.000 P = 37295 Pa = 40381
Page 12 V1.71 Vallev Joist West - Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T202 1 - 26LH952/559 x 23' 9.500 Special Crimped angle
Parallel chord Longspan
Web And
T 1 60.5
V 141.0 c 1 1.7
T 2 44.0 v 2 0.0 c 2 44.0 T 3 44.0 v 3 0.0
C> 44.0
Lncrth Shear
50.5 11966
32.9 -3865
24.9-10186
34.5 8176
24.8 -4051
34.5 -6101
34.5 4027
24.8 -4089
34.5 -2792
Force Member Am - R
24337 2LL1-3/4X.155 1.037 0.541X
-5124 2LLlxlx.109 0.412 0.307~
-10190 1L L2~2x.143 0.552 0.3962
11367 1LL1-3/4~.125 0.422 0.3472
-4051 lLL1-1/4X.109 0.261 0.2472
-8483 1LL1-3/4~.143 0.480 0.3462
-4089 lLL1-1/4~.109 0.261 0.2472
-3881 lLL1-1/2~.109 0.315 0.2972
5598 lLL1-1/4x.109 0.261.0.2472
-- Pa Weld
31109 5.3
-7507 1.6
-10249 2.4
12656 3.1
-5107 1.3
-9309 2.0
7819 1.7
-5107 1.3
-5253 1.2
T-AVlW-B
5.5/ 5.5
4.6) 4.6
3.3/ 3.3
3.3/ 3.7
2.5/ 2.5
3.3/ 3.7
2.8/ 3.2
2.5) 2.5
3.0/ 3.5
Vallev Joist West Page 13 V1.71
.- Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T203 1 - 32LH982/582 x 17' 7.125 Special Crimped angle
Parallel chord Longspan
- End Lenqth Depth Slone Holes TOP Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 40.000
Opp 6.000 5.000 E 0' 7.500 40.000
Uniform Live load 582 #/ft full length Uniform SJI load 982 #/ft full length
Uniform Dead load 400 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
HWLIP 19 4'5" & 13'4" FTE OAL
FL 1 SKEW RE NS 8-3/4"
TOE W2 DOWN RE
End loads: SJINtUpDeadLiveEaukWind
Left TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
32.000 in Deep 207.125 in Design length 2119 # Minimum Shear
30.587 in Effective Depth 989 in4 Ix 0 in4 Minimum Ix
27.000 in Clear Depth L/5111 Live Defl L/3029 SJI Defl
538180 in-#Moment 1.000 in Chord gap 0.124 in Camber
48.000 in Interior Panel 27.781 in Left End 27.781 in Right End
4 Web Vees 9475 # SJI reaction 9475 # SJI reaction
Tor, Chord: 2-LL2-1/2x.212 A = 2.030 Y = 0.703 Fy = 50000 Q = 0.967
Bridg e 243" Ix= 1.219 Iy= 4.158 Rx = 0.775 Ry = 1.431 Rz = 0.493
Center: L = 24.000 P = -17595 Paz= -51834 M = 1987 No Fillers
Tag end panl: L = 27.781 P = -13208 Paz= -41517 M = 4478 No Filler
First point: P = -13208 Pa = -54813 M = 6834
Chord shear: V = 20200 C = -3328. fv = 5468 fc = -1639 f = 5529
Bot Chord: 2-LL2-1/2x.230 A = 2.194 Y = 0.710 Fy = 50000 Q = 0.996
Ix= 1,309 Iy= 4.520 RX = 0.772 Ry = 1.435 RZ = 0.492
Center: L = 48.000 P = 16040 Pa = 65826
Chord shear: V = 20200 T = 10131 fv = 7091 ft = 4617 f = 7457 - Web AnqlLLncrth Shear Force Member Area- R -- Pa Weld T-Av1W-B T L51.2 48.8 8155 13005 2LL1-1/4X.109 0.521 0.387X 15637 4.0 6.7/ 6.7
V, -8.5 32.2 -3336 -3517 lLL1-1/4x.109 0.261 0.2472 -3922 1.1 3.0/ 3.1
C 129.9 35.3 -5796 -6684 1L L2~2X.143 0.552 0.3962 -7146 1.6 3.8/ 4.1
T 2 38.1 38.9 3562 4527 lLL1-1/4X.109 0.261 0.247.2 7819 1.4 3.3/ 3.6
V 2 0.0 30.6 -3052 -3052 lLL1-1/4X.109 0.261 0.2472 -4205 0.9 3.0/ 3.0
C 2 38.1 38.9 -2119 -2693 lLL1-1/4X.109 0.261 0.2472 -2782 0.8 3.3/ 3.6
Page 14 V1.71 Valley Joist West - Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T204 1 - 32LH982/582 x 17' 7.125 Special Crimped angle
End Lenqth Dewth Slope Holes TOD Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 40.000
Opp 6.000 5.000 E 0' 7.500 40.000
Parallel chord Longspan
Uniform Live load 582 #/ft full length
Uniform SJI load 982 #/ft full length
Uniform Dead load 400 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
HWLIP (3 4'5" & 13'4" FTE OAL
TOE W2 DOWN RE
FL 1 SKEW RE FS 8-3/4"
End loads: SJIZJIDeaddEaukWind
Left TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Ki-os L~ ~ Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
32.000 in Deep 207.125 in Design length 2119 # Minimum Shear
30.587 in Effective Depth . 27.000 in Clear Depth
538180 in-#Moment
48.000 in Interior Panel
4 Web Vees
TOR Chord: 2-LL2-1/2x.212
Bridg c 243" Ix= 1.219
Center: L = 24.000
Tag end panl: L = 27.781
First point:
Chord shear: V = 20200
Bot Chord: 2-LL2-1/2x.230 Ix= 1.309
Center: L = 48.000
Chord shear: V = 20200
Web Anql Lnqth Shear Force T L-51.2 48.8 8155 13005
V -8.5 32.2 -3336 -3517
C 129.9 35.3 -5796 -6684
T 2 38.1 38.9 3562 4527
V 2 0.0 30.6 -3052 -3052
C 2 38.1 38.9 -2119 -2693
989 in4 Ix 0 in4 Minimum Ix
L/5111 Live Defl L/3029 SJI Defl
1.000 in Chord gap 0.124 in Camber
27.781 in Left End 27.781 in Right End
9475 # SJI reaction 9475 # SJI reaction
A = 2.030 Y = 0.703 Fy = 50000 Q = 0.967
Iy= 4.158 RX = 0.775 Ry = 1.431 RZ = 0.493
P = -17595 Paz= -51834 M = 1851 No Fillers
P = -13208 Paz= -41517 M = 4478 No Filler
P = -13208 Pa = -54813 M = 6834
C = -3328 fv = 5468 fC = -1639 f = 5529
A = 2.194 Y = 0.710 Fy = 50000 Q = 0.996
Iy= 4.520 RX = 0.772 Ry = 1.435 RZ = 0.492
T = 10131 fV = 7091 ft = 4617 f = 7457 P = 16040 Pa = 65826
Member Area- R -__ Pa Weld T-Av1W-B
2LL1-1/4x.109 0.521 0.387~ 15637 4.0 6.7/ 6.7
lLL1-1/4~.109 0.261 0.2472 -3922 1.1 3.0/ 3.1
1L L2~2X.143 0.552 0.3962 -7146 1.6 3.8/ 4.1
lLL1-1/4~.109 0.261 0.2472 -4205 0.9 3.0/ 3.0
lLL1-1/4~.109 0.261 0.2472 -2782 0.8 3.3/ 3.6
lLL1-1/4x.109 0.261 0.2472 7819 1.4 3.3/ 3.6
Page 15 V1.71 Valley Joist West
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lOOOZ
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T205 1 - 32LH928/543 x 25'10.250 Special Crimped angle
Parallel chord Longspan
End Lenqth Depth SloDe Holes Top Chord Ext BCX Holdback Pitch EP/#lL
Taq 6.000 5.000 50.000
Opp 6.000 5.000 50.000
Uniform Live load 543 #/ft full length
Uniform SJI load 928 #/ft full length
Uniform Dead load 385 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
HXLIP @ 12'11" FTE OAL
SI CT BEARING 3-1/2" @ RE End loads: SJINtUpmLiveEqukWind
Left TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
32.000 in Deep 306.250 in Design length 2960 # Minimum Shear
30.587 in Effective Depth 989 in4 Ix 0 in4 Minimum Ix
27.000 in Clear Depth L/1695 Live Defl L/ 992 SJI Defl '
983190 in-#Moment 1.000 in Chord gap 0.271 in Camber
48.000 in Interior Panel 28.563 in Left End 28.563 in Right End
6 Web Vees 12842 # SJI reaction 12842 # SJI reaction
TOD Chord: 2-LL2-1/2x.212 A = 2.030 Y = 0.703 Fy = 50000 Q = 0.967
Bridg < 243" Ix= 1.219 Iy= 4.158 Rx = 0.775 Ry = 1.431 Rz = 0.493
Center: L = 24.000 P = -31553 Paz= -51834 M = 1858 No Fillers
Tag end panl: L = 28.563 P = -20136 Paz= -41063 M = 4461 No Filler
First point: P = -20136 Pa = -54813 M = 6850
Chord shear: V = 20200 C = -2787 fv = 8813 fc = -1373 f = 8840
Bot Chord: 2-LL2-1/2x.230 A = 2.194 Y = 0.710 Fy = 50000 Q = 0.996
IX= 1.309 Iy= 4.520 RX = 0.772 Ry = 1.435 RZ = 0.492
Center: L = 48.000 P = 32144 Pa = 65826
Chord shear: V = 20200 T = 18173 fv = 10070 ft = 8282 f = 10888
Vallev Joist West Page 16 V1.71
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T205 1 - 32LH928/543 x 25'10.250 Special Crimped angle
Parallel chord Longspan
Web Anql Lnsth T 1 57.5 56.9
V 132.4 36.2
C 1 16.6 31.9 T 2 38.1 38.9 V 2 0.0 30.6
C 2 38.1 38.9 T 3 38.1 38.9
V 3 0.0 30.6
CA 38.1 38.9
Shear
11581
-3294
-9342
-2986
-5297
-3014
-2960
7231 .
3362
Force Member
21549 2LL1-1/2X.125
-3903 lLL1-1/2X.109
-9749
9191
-2986
-6733
4274
-3014
-3763
Area
0.719
0.315
0.673
0.315 0.261
0.422
0.261
0.261
0.315
R - 0.465~
0.2972
0.3942
0.2972 0.2472
0.3472
0-.247z
0.2472
0.2972
-- Pa Weld T-AvlW-B
21563 5.8 7.4/ 7.4
-5012
-10283
9454
-4205
-7225
7819
-4205
-4622
1.2
1.9
2.8
0.9
1.8
1.3
0.9
1.2
3.4) 3.7
3.7/ 3.8
3.5/ 3.9
3.8/ 4.1
3.5/ 3.9
3.0/ 3.0
3.3/ 3.6
3.0/ 3.0
Vallev Joist West Page 17 V1.71
r Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T206 2 - 32LH928/543 x 25' 9.250 Special Crimped angle
- End Lensth DeDth Holes TO*, Chord Ext ' BCX Holdback Pitch EP/#iL
Tag 6.000 5.000 50.000
Opp 6.000 5.000 50.000
Parallel chord Longspan
Uniform Live load 543 #/ft full length
Uniform SJI load 928 #/ft full length
Uniform Dead load 385 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
HFLIP @ 12'11" FTE OAL
S€- .<T BEARING 3-1/2" @ RE
End loads: SJINtUr,-Livewu
Left TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
32.000 in Deep 305.250 in Design length 2951 # Minimum Shear
30.692 in Effective Depth 985 in4 Ix 0 in4 Minimum Ix
27.500 in Clear Depth L/1705 Live Defl L/ 997 SJI Defl
977029 in-#Moment
48.000 in Interior Panel
6 Web Vees
Tow Chord: 2-LL2-1/2x.250
Bridg c 245" Ix= 1.406
Center: L = 24.000
Tag end panl: L = 28.312
First point:
Chord shear: V = 20200
Bot Chord: 2-L L2X2X.248
Ix= 0.691
Center: L = 48.000
Chord shear: V = 20200
1.000 in Chord gap 0.270 in Camber
28.312 in Left End 28.312 in Riuht End
12803 # SJI reaction
A = 2.375
Iy= 4.924 P = -31287
P = -20043
P = -20043
C = -2623
A= 1.861
Iy= 2.905 P = 31833 T = 18065
Y = 0.717
Rx = 0.769
Paz= -62454
Paz= -49422
Pa = -64125
fv = 7467
Y = 0.591
Rx = 0.609
fv = 11644
Pa = 55830
12803 # SJI-reaction
Fy = 50000
Ry = 1.440 M = 1858
M = 4387 M = 6723
fc = -1104
Fy = 50000
Ry = 1.250
ft = 9707
Q = 1.000
RZ = 0.491
No Fillers
No Filler
f = 7487
Q = 1.000
RZ = 0.391
f = 12615
Vallev Joist West Page 18 V1.71
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01 ,--
Customer: JD2, INC #lo002 2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS CARLSBAD, CA
Comments: UBC 1997 TAG COLOR BLUE
T206 2 - 32LH928/543 x 25’ 9.250 Special Crimped angle
Parallel chord Longspan
- Web
T 1 57.4
V 1 32.7
C 1 15.7 T 2 38.0 v 2 0.0
C 2 38.0
T 3 38.0 v 3 0.0 C +..38 .O
Lnqth
57.0
36.5
31.9
39.0
30.7
39.0
39.0
30.7
39.0
Shear.
11551
-3274
-9333
7232
-2985
-5297
3363
-3012
-2951
Force Member Area
21442 2LL1-3/4X.143 0.960
-3890 lLL1-1/2x.109 0.315
-9695 lLL2x2x.176 0.673
9180 lLL1-1/2x.109 0.315
-2985 lLL1-1/4x.109 0.261
-6725 lLL1-3/4X.125 0.422
4269 lLL1-1/4X.109 0.261
-3012 lLL1-1/4~.109 0.261
-3746 lLL1-1/2X.109 .0.315
R
0.543~
0.2972
0.2972
0.2472
0.3472
0.2472
0.2472
0.2972
0.3942 -
1 Pa Weld
28803 5.0
-4979 1.2 10300 1.9
9454 2.8
-4188 0.9 -7212 1.8
7819 1.3
-4188 0.9
-4610 1.2
T - AVl W - B
7.11 5.3
3.4/ 3.1
3.7/ 3.3
3.5) 3.3
3.0/ 2.5
3.8/ 3.5
3.3/ 3.0
3.5/ 3.3 3.0/ 2.5
Valley Joist West Page 19 V1.71
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T207 1 - 32LH928/543 x 26' 0.750 Special Crimped angle
End Lenqth Depth Sloue Holes TOV Chord Ext BCX Holdback' Pitch EP/#lL
Parallel chord Longspan
Tag 6.000 5.000 50.000
Opp 6.000 5.000 50.000
Uniform Live load 543 #/ft full length
Uniform SJI load 928 #/ft full length
Uniform Dead load 385 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
HPCLIP @ 12'11" FTE OAL
SI .T BEARING 3-1/2" @ RE
End loads: __ SJI NtUD Dead Live a Wind
Left TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
32.000 in Deep 308.750 in Design length 2985 # Minimum Shear
30.587 in Effective Depth 989 in4 Ix 0 in4 Minimum Ix
27.000 in Clear Depth L/1654 Live Defl L/ 968 SJI Defl
998678 in-#Moment 1.000 in Chord gap 0.276 in Camber
48.000 in Interior Panel 29.188 in Left End 29.186 in Right End
6 Web Vees 12938 # SJI reaction 12938 # SJI reaction
TOD Chord: 2-LL2-1/2x.212 A = 2.030 Y = 0.703 Fy = 50000 Q = 0.967
Bridg c 243" Ix= 1.219 Iy= 4.158 Rx = 0.775 Ry = 1.431 Rz = 0.493
Center: L = 24.000 P = -31989 Paz= -51834 M = 1859 No Fillers
Tag end panl: L = 29.188 P = -20236 Paz= -40695 M = 4650 No Filler
First point: P = -20236 Pa = -54813 M = 7170
Chord shear: V = 20200 C = -3176 fv = 8834 fc = -1564 f = 8868
Bot Chord: 2-LL2-1/2x.230 A = 2.194 Y = 0.710 Fy = 50000 Q = 0.996
Ix= 1.309 Iy= 4.520 RX = 0.772 Ry = 1.435 RZ = 0.492
Center: L = 48.000 P = 32651 Pa = 65826
Chord shear: V = 20200 T = 18289 fv = 10134 ft.= 8335 f = 10958
Vallev Joist West Page 20 V1.71
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T207 1 - 32LH928/543 x 26' 0.750 Special Crimped angle Parallel chord Longspan
Web Anal T 1 57.5
V 1 31.6
C 1 18.7 T 2 38.1 v 2 0.0 c 2 38.1 T 3 38.1 v 3 0.0 C.'~ 38.1
Lnqth
56.9
35.9
32.3
38.9
30.6
38.9
38.9
30.6
38.9
Shear
11654
-3343
-9364
7229
-2989
-5295
3362
-3016
-2985
Force
21687
-3925
-9888
9189
-2989
-6731
4273
-3016
-3794
Member
2LL1-1/2~.125 ILLI-I)~~. 109
lLL1-1/2X.109
lLL1-1/4X.109
lLL1-1/4X.109
lLL1-1/4X.109
lLL1-1/2X. 10.9
1LLZx2x.176
1LL1-3/4X.125
Area- R
0.719 0.465~
0.315 0.2972
0.673 0.3942
0.315 0.2972
0.261 0.2472
0.422 0.3472
0.261 0.2472
0.261 0.2472
0.315 0.2972
-- Pa Weld
21563 5.8
-5059 1.2
-10112 1.9
9454 2.8
-4205 0.9
-7225 1.8
7819 1.3
-4205 0.9
-4622 1.2
T- AV1 W - B
7.4/ 7.4
3.4/ 3.7 3.7/ 3.9
3.5/ 3.9
3.8/ 4.1
3.5/ 3.9
3.0/ 3.0
3.3/ 3.6
3.0/ 3.0
L
Vallev Joist West Page 21 V1.71
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T208 2 - 32LH928/543 x 26' 6.000 Special Crimped angle
End Lensth Depth Slope Holes TOP Chord Ext BCX Holdback Pitch EP/#.lL
Parallel chord Longspan
Tag 6.000 5.000 50.000 50.000 Opp 6.000 5.000 E 0' 0.500
Uniform Live load 543 #/ft full length
Uniform SJI load 928 #/ft full length
Uniform Dead load 385 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
H-CLIP @ 12'11" FTE OAL
End loads: SJImDeadLiveEcrukWind
Left TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips 32.000 in Deep 314.000 in Design length 3035 # Minimum Shear
30.587 in Effective Depth 989 in4 Ix 0 in4 Minimum Ix
27.000 in Clear Depth L/1572 Live Defl L/ 920 SJI Defl
1031595 in-#Moment 1.000 in Chord gap 0.285 in Camber
48.000 in Interior Panel 30.500 in Left End 30.500 in Right End
6 Web Vees 13141 # SJI reaction 13141 # SJI reaction
TOR Chord: 2-LL2-1/2x.212 A = 2.030 Y = 0.703 Fy = 50000 Q = 0.967
Bridg c 243" Ix= 1.219 Iy= 4.158 RX = 0.775 Ry = 1.431 RZ = 0.493
Center: L = 24.000 P = -32939 Paz= -51834 M = 1860 No Fillers
Tag end panl: L = 30.500 P = -20444 Paz= -39909 M = 5060 No Filler
First point: P = -20444 Pa = -54813 M = 7864 Chord shear: V = 20200 C = -3999 fv = 8876 fc = -1970 f = 8931
Bot Chord: 2-LL2-1/2x.230 Ix= 1.309
Center: L = 48.000
Chord shear: V = 20200
Web Ana
T 1 57.5
V 129.8
C J-23.0
T 38.1 v 2 0.0
C 2 38.1
T 3 38.1 v 3 0.0
Lnsth Shear
56.9 11809
35.2 -3447
33.2 -9409
38.9 7225
30.6 -2993
38.9 -5293
38.9 3360
30.6 -3021
Force
21975
-3972
-10224
9184
-2993
-6728
4271
-3021
A = 2.194 Y = 0.710 Fy = 50000
Iy= 4.520 Rx = 0.772 Ry = 1.435
T = 18532 fv = 10269 ft = 8446
2LL1-3/4X.125 0.844 0.546~ 25313 5.9
lLL1-1/2X.109 0.315 0.2972 -5155~~1.2
1LL2X2X.187 0.713 0.3942 -10275 1.8
lLL1-1/2~.109 0.315 0.2972 9454 2.8
lLL1-1/4X.109 0.261 0.2472 -4205 0.9
1LL1-3/4X.125 0.422 0.3472 -7225 1.8
lLL1-1/4X.109 0.261 0.2472 7819 1.3
lLL1-1/4x.109 0.261 0.2472 -4205 0.9
P = 33727 Pa = 65826
Member Area- R -- Pa Weld
Q = 0.996
RZ = 0.492
f = 11103
T-AVlW-B
7.3/ 7.3
3.4/ 3.6
3.8/ 3.9
3.5/ 3.9
3.8/ 4.1
3.0,' 3.0
3.3/ 3.6 3.0/ 3.0
C 3 38.1 38.9 -3035 -3858 lLL1-1/2X.109 0.315 0.2972 -4622 1.2 3.5/ 3.9
-
Page 22 V1.71 Valley Joist West
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364 .
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T209 7 - 32LH928/543 x 26' 8.500 Special Crimped angle
Parallel chord Longspan
End Lensth Depth SloDe Holes TOD Chord Ext BCX Holdback Pitch EP/#iL
Tag 6.000 5.000 50.000
Opp 6.000 5.000 50.000
Uniform Live load 543 #/ft full length
Uniform SJI load 928 #/ft full length
Uniform Dead load 385 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
HT1LIP 12 13'4" FTE OAL
End loads: __ SJ1-Deadd.a-
Left TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips 32.000 in Deep 316.500 in Design length 3059 # Minimum Shear
30.587 in Effective Depth 989 in4 Ix 0 in4 Minimum Ix
27.000 in Clear Depth L/1535 Live Defl L/ 898 SJI Defl
1047457 in-#Moment 1.000 in Chord gap 0.290 in Camber
48.000 in Interior Panel 31.125 in Left End 31.125 in Right End
6 Web Vees 13238 # SJI reaction . 13238 # SJI reaction
TOD Chord: 2-LL2-1/2x.212 A = 2.030 Y = 0.703 Fy = 50000 Q = 0.967
Bridg c 243" Ix= 1.219 Iy= 4.158 Rx = 0.775 Ry = 1.431 Rz = 0.493
Center: L = 24.000 P = -33458 Paz= -51834 M = 1861 No Fillers
Tag end panl: L = 31.125 P = -20543 Paz= -39529 M = 5262 No Filler
First point: P = -20543 Pa = -54813 M = 8204
Chord shear: V = 20200 C = -4394 fv = 8897 fc = -2164 f = 8963
Bot Chord: 2-LL2-1/2x.230 A = 2.194 Y = 0.710 Fy = 50000 Q = 0.996
Ix= 1,309 Iy= 4.520 Rx = 0.772 Ry = 1.435 RZ = 0.492
Center: L = 48.000 P = 34245 Pa = 65826
Chord shear: V = 20200 T = 18648 fv = 10333 ft = 8499 f = 11173
Web Anql T 1 57.5 v 1 28.9 C "25.0 T . 38.1 v 2 0.0
C 2 38.1
T 3 38.1 v 3 0.0
Lnq t h
56.9
34.9 33.7
38.9
30.6
38.9
38.9
30.6
Shear
11883
-3497
-9431
7223
-2996
-5292
3360
-3023
Force Member Area- R
22112 2LL1-3/4~.125 0.844 0.546~
-3994 lLLl-l/2x.109 0.315 0.2972
-10404 1L L2X2X.216 0.817 0.3922
9182 lLL1-1/2~.109 0.315 0.2972
-2996 lLL1-1/4X.109 0.261 0.2472
-6726 lLL1-3/4x.125 0.422 0.3472
-3023 lLL1-1/4~.109 0.261 0.2472
4271 lLL1-1/4x.109 0.261 0.2472
-- Pa Weld
25313 6.0
-5198 1.2
-11411 1.6
9454 2.8
-4205 0.9
-7225 1.8
7819 1.3
-4205 0.9
T - Avl W - B
7.3/ 7.3
3.3/ 3-.~6
3.8/ 4.0
3.5/ 3.9
3.8/ 4.1
3.0/ 3.0
3.3/ 3.6
3.0/ 3.0
C 3 38.1 38.9 -3059 -3889 lLL1-1/2X.109 0.315 0.2972 -4622 1.2 3.5/ 3.9
-
Valley Joist West Page 23 V1.71
Entered 6/20/00 Revised 2/13/01 - Job #ON02915 - 02 By ASM
Customer: JD2, INC #lo002
2049 KURTZ ST SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T210 1 - 32LH945/552 x 26' 1.750 Special Crimped angle
Parallel chord Longspan
End Lenqth Depth Slope Holes Tow Chord Ext BCX Holdback Pitch EP/#~L
Taq 6.000 5.000 Y 50.000
Opp 6.000 5.000 E 0' 7.500 50.000
Uniform Live load 552 #/ft full length
Uniform SJI load 945 #/ft full length
Uniform.Dead load 393 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
H-7LIP @ 13 ' 0" FTE OAL
FL-L SKEW RE NS 8-5/8"
TOE W2 DOWN RE MAX SEAT WIDTH 7" MAX LE SHORT BEARING 3-1/2" @ LE
End loads: - SJImDeadUEaukWind
Left TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
32.000 in Deep 309.750 in Design length 3049 # Minimum Shear
30.692 in Effective Depth 985 in4 Ix 0 in4 Minimum Ix
27.500 in Clear Depth L/1605 Live Defl L/ 937 SJI Defl
1021897 in-#Moment 1.000 in Chord gap 0.278 in Camber
48.000 in Interior Panel 29.437 in Left End 29.437 in Right End
6 Web Vees 13196 # SJI reaction 13196 # SJI reaction
TOR Chord: 2-L L2X2X.248 A = 1.861 Y = 0.591 Fy = 50000 Q = 1.000
Bridg c 212" Ix= 0.691 Iy= 2.905 Rx = 0.609 Ry = 1.250 Rz = 0.391
Center: L = 24.000 P = -32538 Paz= -46450 M = 1874 No Fillers
Tag end panl: L = 29.437 P = -20490 Paz= -33406 M = 4813 No Filler
First point: P = -20490 Pa = -50247 M = 7434
Chord shear: V = 20200 C = -3376 fv = 9606 fc = -1814 f = 9649
Bot Chord: 2-LL2-1/2x.250 A = 2.375 Y = 0.717 Fy = 50000 Q = 1.000
Ix= 1.406 Iy= 4.924 RX = 0.769 Ry = 1.440 Rz = 0.491
Center: L = 48.000 P = 33295 Pa = 71250
Chord shear: V = 20200 T = 18583 fv = 9506 ft = 7824 f = 10279 -
Page 24 V1.71 Vallev Joist West - Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T210 1 - 32LH945/552 x 26' 1.750 Special Crimped angle
Parallel chord Longspan
Web Ansl Lnsth
T 1 57.4 57.0
V 131.2 35.9
C 1 19.5 T 2 38.0 v 2 0.0
C 2 38.0 T 3 38.0 v 3 0.0
C' 38.0
32.6
39.0
30.7
39.0
39.0 30.7
39.0
Shear
11882
-3406
-9529
7347
-3025
-5380
3412
-3053
-3049
Force Member
-3980 1~~1-1/2~.109
22057 2LL1-3/4~.143
-10110 1LL2~2x.187
9327 lLL1-1/2x.109 -3025 lLL1-1/4X.109
-6830 lLL1-3/4x.125
4332 lLL1-1/4~.109
-3053 lLL1-1/4X.109
-3871 lLL1-1/2x.109
a- R
0.960 0.543~
0.315 0.2972
0.713 0.3942
0.315 0.2972
0.261 0.2472
0.422 0.3472
0.261 0.2472
0.261 0.2472
0.315 0.2972
-- Pa Weld
28803 5.2 -5065 1.2
-10614 1.8
9454 2.9
-4188 0.9
-7212 1.8
7819 1.3
-4188 0.9
-4610 1.2
T - AVl W - B
5.3/ 7.1
2.8/ 3.7
2.5/ 3.0
3.2/ 3.9
2.9/ 3.9
3.1/ 4.1
2.7/ 3.6
2.5/ 3.0
2.9/ 3.9
_-
Vallev Joist West Page 25 V1.71
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T211 1 - 32LH945/552 x 26' 1.750 Special Crimped angle
End Lenqth Devth Slope Holes TOT) Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 Y 50.000
Opp 6.000 5.000 E 0' 7.500 50.000
Parallel chord Longspan
Uniform Live load 552 #/ft full length
Uniform SJI load 945 #/ft full length
Uniform Dead load 393 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
H'TLIP @ 13'0" FTE OAL
TOE W2 DOWN RE
FL-d SKEW RE FS 8-5/8"
MAX SEAT WIDTH 7" MAX LE SHORT BEARING 3-1/2" @ LE
End loads: - SJI NtUpDeadumWind
Left TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
32.000 in Deep 309.750 in Design length 3049 # Minimum Shear
30.692 in Effective Depth 985 in4 Ix 0 in4 Minimum Ix
27.500 in Clear Depth L/1605 Live Defl L/ 937 SJI Defl
1021897 in-#Moment 1.000 in Chord gap 0.278 in Camber
48.000 in Interior Panel 29.437 in Left End 29.437 in Right End
6 Web Vees 13196 # SJI reaction 13196 # SJI reaction
Top Chord: 2-L L2X2X.248 A = 1.861 Y = 0.591 Fy = 50000 Q = 1.000
Bridg c 212" Ix= 0.691 Iy= 2.905 Rx = 0.609 Ry = 1.250 Rz = 0.391
Center: L = 24.000 P = -32538 Paz= -46450 M = 1874 No Fillers
Tag end panl: L = 29.437 P = -20490 Paz= -33406 M = 4813 No Filler
First point: P = -20490 Pa = -50247 M s 7434
Chord shear: V = 20200 C = -3376 fv = 9606 fc = -1814 f = 9649
Bot Chord: 2-LL2-1/2x.250 A = 2.375 Y = 0.717 Fy = 50000 Q = 1.000
Ix= 1.406 Iy= 4.924 Rx = 0.769 Ry = 1.440 RZ = 0.491
Center: L = 48.000 P = 33295 Pa = 71250
Chord shear: V = 20200 T = 18583 fv = 9506 ft = 7824 f = 10279 -
Valley Joist West Page 26 V1.71
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01 ,-
Customer:
Project :
Comments :
T211
JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
ASTON VIEWS
CARLSBAD, CA
UBC 1997
TAG COLOR BLUE
1 - 32LH945/552 x 26' 1.750 Special Crimped angle
Parallel chord Longspan .
Web Anql Lnqth Shear Force Member Area- R
T 157.4 57.0 11882 22057 2LL1-3/4X.143 0.960 0.543X V 131.2 35.9 -3406 -3980 lLL1-1/2~.109 0.315 0.2972
C 1 19.5 32.6 -9529 -10110 lLL2~2x.187 0.713 0.3942
T 2 38.0 39.0 7347 9327 lLL1-1/2X.109 0.315 0.2972
V 2 0.0 30.7 -3025 -3025 lLL1-1/4~.109 0.261 0.2472
C 2 38.0 39.0 -5380 -6830 lLL1-3/4X.125 0.422 0.3472
T 3 38.0 39.0 3412 4332 lLL1-1/4~.109 0.261 0.2472
V 3 0.0 30.7 -3053 -3053 lLL1-1/4X.109 0.261 0.2472
C/- 38.0 39.0 -3049 -3871 lLL1-1/2~.109 0.315 0.2972
-- Pa Weld T-AvlW-B
28803 5.2 5.3/ 7.1
2.8/ 3.7 -5065 1.2
-10614 1.8
9454 2.9
-4188 0.9
-7212 1.8
,7819 1.3
-4188 0.9
-4610 1.2
3,2/ 3.9
2.9/ 3.9
3.1/ 4.1
2.7/ 3.6
2.5/ 3.0
2.9/ 3.9
2.5/ 3.0
.-
Vallev Joist West . Page 27 V1.71
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01 7
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T212 1 - 32LH928/543 x 26' 9.750 Special Crimped angle
Parallel chord Longspan
End Lenqth Depth Slowe Holes TOR Chord Ext BCX Holdback
Taq 6.000 5.000 E 0' 3.500
Opp 6.000 5.000
Pitch EP/#1L
50.000
50.000
Uniform Live load 543 #/ft full length
Uniform SJI load 928 #/ft full length
Uniform Dead load 385 #/ft full length An additional SJI load of lOOO# may occur at any top chord panel point. An additional Dead load of lOOO# may occur at any top chord panel point.
"'--!LIP @ 13'8" FTE OAL
End loads: - SJ1rnDeadLive-U
Left TC axial load: 0.0 0.0 0.0 0.0 79.4 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 79.4 0.0 Kips 32.000 in Deep 317.750 in Design length 3072 # Minimum Shear
30.567 in Effective Depth 1016 in4 Ix 0 in4 Minimum Ix
27.000 in Clear Depth L/1558 Live Defl L/ 912 SJI Defl
2202422 in-#Moment 1.000 in Chord gap 0.292 in Camber
48.000 in Interior Panel 31.437 in Left End 31.437 in Right End
6 Web Vees 13286 # SJI reaction 13286 # SJI reaction
TOR Chord: 2-L L3x3x.281 A = 3.214 Y = 0.854 Fy = 50000 Q = 1.000
Bridg < 279" Ix= 2.756 Iy= 8.645 Rx = 0.926 Ry = 1.640 Rz = 0.591
Center: L = 24.000 P = -72053 Paz= -87083 M = 1830 No Fillers
Tag end panl: L = 31.437 P = -64920 Pax= -77093 M = 5365 Filler Reqd
First point: P = -64920 Pa = -86780 M = 8377
Chord shear: V = 20200 C = -4595 fv = 5600 fc = -1430 f = 5645
Bot Chord: 2-L L2x2x.216 A = 1.635 Y = 0.579 Fy = 50000 Q = 1.000
IX= 0.615 Iy= 2.520 RX = 0.613 Ry = 1.242 Rz = 0.392
Center: L = 48.000 P = 34529 Pa = 49041
Chord shear: V = 20200 T = 18718 fv = 13796 ft = 11450 f = 14937 Web Ansl Lnqth Shear Force Member Area....- R -__ Pa Weld T-Av1W-B
T 157.5 56.9 11920 22191 2LL1-3/4x.143 0.960 0.543X 28803 5.2 8.9/ 5.4
V 128.5 34.8 -3717 -4227 1LLl-l)2X.109 0.315 0.2972 -5221 1.3 3.6/ 3.0
T . 38.1 38.9 7223 9183 lLL1-1/2~.109 0.315 0.2972 9454 2.8 3.8/ 3.3 C i-25.9 34.0 -9442 -10500 1L L2X2X.216 0.817 0.3922 -11262 1.6 4.1/ 3.4
V 2 0.0 30.6 -3201 -3201 lLL1-1/4X.109 0.261 0.2472 -4208 1.0 3.3/ 2.5
C 2 38.1 38.9 -5291 -6727 1LL1-3/4X.125 0.422 0.3472 -7227 1.8 4.1/ 3.5
T 3 38.1 38.9 3360 4271 lLL1-1/4x.109 0.261 0.2472 7819 1.3 3.6/ 3.0
V 3 0.0 30.6 -3216 -3216 lLL1-1/4X.109 0.261 0.2472 -4208 1.0 3.3/ 2.5
C 3 38.1 38.9 -3072 -3905 lLL1-1/2~.109 0.315 0.2972 -4625 1.2 3.8,’ 3.3
-
Valley Joist West Page 28 V1.71
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T213 1 - 32LH928/543 x 26' 9.750 Special Crimped angle
Parallel chord Longspan
- End Lencrth Depth, Slope Holes Tor, Chord Ext BCX Holdback Pitch EP/#iL
50.000 Tag 6.000 5.000 E 0' 3.500
Opp 6.000 5.000 50.000
Uniform Live load 543 #/ft full length
Uniform SJI load 928 #/ft full length
Uniform Dead load 385 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point. An additional Dead load of lOOO# may occur at any top chord panel point.
H-LIP @ 13 ' 8" FTE OAL
End loads: SJIUJlDeadLivegkWind
Left TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips 32.000 in Deep 317.750 in Design length 3072 # Minimum Shear
30.587 in Effective Depth 989 in4 Ix 0 in4 Minimum Ix
27.000 in Clear Depth L/1517 Live Defl L/ 888 SJI Defl
1055433 in-#Moment 1.000 in Chord gap 0.292 in Camber
48.000 in Interior Panel 31.437 in Left End 31.437 in Right End
6 Web Vees 13286 # SJI reaction 13286 # SJI reaction
Top Chord: 2-LL2-1/2~.230 A = 2.194 Y = 0.710 Fy = 50000 Q = 0.996
Bridg < 244" Ix= 1.309 Iy= 4.520 Rx = 0.772 Ry = 1.435 Rz = 0.492
Center: L = 24.000 P = -33719 Paz= -57535 M = 1861 No Fillers
Tag end panl: L = 31.437 P = -20592 Paz= -43432 M = 5365 No Filler
First point: P = -20592 Pa = -59243 M = 8377 Chord shear: V = 20200 C = -4592 fv = 8210 fc = -2093 f = 8277
Bot Chord: 2-LL2-1/2x.212 A = 2.030 Y = 0.703
Center: L = 48.000 P = 34506 Pa = 60903
Chord shear: V = 20200 T = 18706 fv = 11245
Ix= 1.219 Iy= 4.158 Rx = 0.775
Web Anql Lnsth Shear Force Member Area- R T 157.5 56.9 11920 22181 2LL1-3/4X.125 0.844 0.546~
V 128.4 34.8 -3522 -4005 lLL1-1/2X.109 0.315 0.2972
C -25.9 34.0 -9442 -10499 1L L2X2X.216 0.817 0.3922 T . 38.1 38.9 7223 9181 lLL1-1/2x.109 0.315 0.2972
V 2 0.0 30.6 -2997 -2997 lLL1-1/4X.109 0.261 0.2472
C 2 38.1 38.9 -5291 -6725 lLL1-3/4X.125 0.422 0.3472
T 3 38.1 38.9 3360 4270 lLL1-1/4X.109 0.261 0.2472
V 3 0.0 30.6 -3025 -3025 lLL1-1/4X.109 0.261 0.2472
Fy = 50000
Ry = 1.431
ft = 9214 -- Pa Weld
25313 6.0
-5219 1.2
-11252 1.6
9454 2.8
-4205 0.9
-7225 1.8
7819 1.3
-4205 0.9
Q = 0.967
RZ = 0.493
f = 12152 T - AVl W - B
7.2/ 7.2
3.3) 3.6
3.8/ 4.0
3.5/ 3.9
3.8/ 4.1
3.0/ 3.0
3.0/ 3.0
3.3/ 3.6
C 3 38.1 38.9 -3072 -3904 lLL1-1/2X.109 0.315 0.2972 -4622 1.2 3.5/ 3.9
r
Vallev Joist West Page 29 V1.71
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T214 1 - 32LH928/543 x- 27' 0.500 Special Crimped angle
Parallel chord Longspan
- End Lenqth Depth Slope Holes TOD Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 E 0' 3.500 42.250
Opp 6.000 5.000 E 0' 1.000 42.250
Uniform Live load 543 #/ft full length
Uniform SJI load 928 #/ft full length
Uniform Dead load 385 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
HYLIP @ 13'8" FTE OAL
End loads: SJINtUpJLive&Wind
Left TC axial load: 0.0 0.0 0.0 0.0 76.4 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 76.4 0.0 Kips
32.000 in Deep 320.500 in Design length 3098 # Minimum Shear
30.567 in Effective Depth 1016 in4 Ix 0 in4 Minimum Ix
27.000 in Clear Depth L/1519 Live Defl L/ 889 SJI Defl
2168091 in-#Moment 1.000 in Chord gap 0.297 in Camber
48.000 in Interior Panel 32.125 in Left End . 32.125 in Right End
6 Web Vees 13393 # SJI reaction 13393 # SJI reaction
Top Chord: 2-L L3x3x.281 A = 3.214 Y = 0.854 Fy = 50000 Q = 1.000
Bridg < 279" Ix= 2.756 Iy= 8.645 Rx = 0.926 Ry = 1.640 Rz = 0.591
Center: L = 24.000 P = -70929 Paz= -87083 M = 1826 No Fillers
Tag end panl: L = 32.125 P = -61487 Paz= -68419 M = 5595 No Filler
First point: P = -61487 Pa = -86780 M = 8762
Chord shear: V = 20200 C = -7432 fv = 5614 fc = -2312 f = 5732
Bot Chord: 2-L L2x2x.216 A = 1.635 Y = 0.579 Fy = 50000 Ix= 0.615 Iy= 2.520 RX = 0.613 Ry = 1.242
Center: L = 48.000 P = 35106 Pa = 49041
Chord shear: V = 20200 T = 15834 fv = ,13918 ft = 9686
Web Anql Lnqth Shear Force Member Area- R -- Pa Weld
T 152.8 50.5 12025 19883 2LL1-3/4x.143 0.960 0.543~ 28803 4.7
V 114.9 31.6 -3781 -3913 lLLl-l/4x.109 0.261 0.2472 -4029 1.2
T - 38.1 38.9 7221 9180 lLL1-1/2x.109 0.315 0.2972 9454 2.8 C '-38.1 38.9 -9466 -12035 1LL2-1/2X.212 1.015 0.4932 -16000 1.9
V 2 0.0 30.6 -3191 -3191 lLL1-1/4~.109 0.261 0.2472 -4208 1.0
C 2 38.1 38.9 -5290 -6725 lLL1-3/4X.125 0.422 0.3472 -7227 1.8
V 3 0.0 30.6 -3211 -3211 lLL1-1/4~.109 0.261 0.2472 -4208 1.0
T 3 38.1 38.9 3359 4271 lLL1-1/4x.109 0.261 0.2472 7819 1.3
Q = 1.000
Rz = 0.392
f = 14736
T - AVl W - B
8.2/ 5.1
4.8/ 4.2
3.8/ 3.3
3,3/ 2.5
4.1/ 3.5
3.3/ 2.5
3.2/ 2.6
3.6/ 3.0
C 3 38.1 38.9 -3098 -3939 lLL1-1/2X.109 0.315 0.2972 -4625 1.2 3.8/ 3.3
,--
,e
Vallev Joist West Page 30 V1.71
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Pro] ect : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997 TAG COLOR BLUE
T215 1 - 32LH928/543 x 27' 0.500 Special Crimped angle
Parallel chord Longspan
- End Lenqth Dewth Slowe Holes Tow Chord,Ext BCX Holdback Pitch EP/#lL
Taq 6.000 5.000 E 0' 3.500 50.000
Opp 6.000 5.000 E 0' 1.000 50.000
Uniform Live lbad 543 #/ft full length
Uniform SJI load 928 #/ft full length
Uniform Dead load 385 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
H"1LIP @ 13'8" FTE OAL
End loads: - SJI mDeadmukWind
Left TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
32.000 in Deep 320.500 in Design length 3098 # Minimum Shear
30.587 in Effective Depth 989 in4 Ix 0 in4 Minimum Ix
27.000 in Clear Depth L/1479 Live Defl L/ 865 SJI Defl
1073087 in-#Moment 1.000 in Chord gap 0.297 in Camber
48.000 in Interior Panel 32.125 in Left End 32.125 in Right End
6 Web Vees 13393 # SJI reaction 13393 # SJI reaction
TOP Chord: 2-LL2-1/2x.230 A = 2.194 Y = 0.710 Fy = 50000 Q = 0.996
Bridg c 244" Ix= 1.309 Iy= 4.520 Rx = 0.772 Ry = 1.435 Rz = 0.492
Center: L = 24.000 P = -34296 Paz= -57535 M = 1862 No Fillers
Tag end panl: L = 32.125 P= -20701 Paz= -42946 M = 5595 No Filler
First point: P = -20701 Pa = -59243 M = 8762
Chord shear: V = 20200 C = -5029 fv = 8231 fc = -2292 f = 8310 .
Bot Chord: 2-LL2-1/2~.212 A = 2.030 Y = 0.703 Fy = 50000 Ix= 1.219 Iy= 4.158 Rx = 0.775 Ry = 1.431
Center: L = 48.000 P = 35083 Pa = 60903
Chord shear: V = 20200 T = 18833 fv = 11321 ft = 9277 -- Pa Weld
T 1 57.5 56.9 12001 22331 2LL1-3/4x.125 0.844 0.546~ 25313 6.0
V 127.4 34.5 -3576 -4029 ILL1-1/2~.109 0.315 0.2972 -5264 1.2
T. 38.1 38.9 7221 9178 lLL1-1/2~.109 0.315 0.2972 9454 2.8
Web Anql Lnqth Shear Force Member Area- R
C -28.0 34.6 -9466 -10719 1L L2X2X.216 0.817 0.3922 -10877 1.7
V 2 0.0 30.6 -2999 -2999 lLL1-1/4x.109 0.261 0.2472 -4205 0.9
C 2 38.1 38.9 -5290 -6724 1LL1-3/4X.125 0.422 0.3472 -7225 1.8
V 3 0.0 30.6 -3027 -3027 lLL1-1/4~.109 0.261 0.2472 -4205 0.9
T 3 38.1 38.9 3359 4269 lLL1-1/4x.109 0.261 0.2472 7819 1.3
Q = 0.967
RZ = 0.493
f = 12235
T-AVlW-B
7.2/ 7.2
3.3/ 3.6
3.8/ 4.0
3.5/ 3.9
3.0/ 3.0
3.8/ 4.1
3.0/ 3.0
3.3/ 3.6
C 3 38.1 38.9 -3098 -3938 lLL1-1/2X.109 0.315 0.2972 -4622 1.2 3.5/ 3.9
-
Vallev Joist West Page 31 V1.71
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01 r
Customer: JD2. INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T216 1 - 32LH928/543 x 26'11.000 Special Crimped angle
Parallel chord Longspan
End Lenqth Depth Slope Holes TOR Chord Ext BCX Holdback Pitch EP/#lL
Tau 6.000 5.000 E 0' 3.500 50.000
Opp 6.000 5.000 E 0' 3.500 50.000
Uniform Live load 543 #/ft full length
Uniform SJI load 928 #/ft full length
Uniform Dead load 385 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point. An additional Dead load of lOOO# may occur at any top chord panel point.
H'V7LIP @ 13'8" FTE OAL
End loads: SJI NtUp Dead Live a Wind Left TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
32.000 in Deep 319.000 in Design length 3084 # Minimum Shear
30.587 in Effective Depth 989 in4 Ix 0 in4 Minimum Ix
27.000 in Clear Depth L/1500 Live Defl L/ 877 SJI Defl
1063440 in-#Moment 1.000 in Chord gap 0.294 in Camber
48.000 in Interior Panel 31.750 in Left End 31.750 in Right End
6 Web Vees 13335 # SJI reaction 13335 # SJI reaction
Tor, Chord: 2-LL2-1/2x.230 A = 2.194 Y = 0.710 Fy = 50000 Q = 0.996
Bridg c 244" Ix= 1.309 Iy= 4.520 Rx = 0.772 Ry = 1.435 Rz = 0.492
Center: L = 24.000 P = -33981 Paz= -57535 M = 1829 No Fillers
Tag end panl: L = 31.750 P = -20642 Paz= -43211 M = 5469 No Filler
First point: P = -20642 Pa = -59243 M = 8551
Chord shear: V = 20200 C = -4790 fv = 8220 fc = -2183 f = 8292
Bot Chord: 2-LL2-1/2x.212 A = 2.030 Y = 0.703 Fy = 50000 Q = 0.967
Ix= 1.219 Iy= 4.158 RX = 0.775 Ry = 1.431 RZ 0.493
Center: L = 48.000 P = 34768 Pa = 60903
Chord shear: V = 20200 T = 18763 fv = 11280 ft = 9243 f = 12190 Pa Weld T-AvlW-B
T 157.5 56.9 11957 22249 2LL1-3/4x.125 0.844 0.546~ 25313 6.0 7.2/ 7.2
-- Web Anql Lnsth Shear Force Member Area- R
V 128.0 34.6 -3546 -4016 1LL1-1/2~.109 0.315 0.2972 -5240 1.2 3.3/ 3.6
C "26.9 34.3 -9453 -10597 1L L2X2X.216 0.817 0.3922 -11085 1.7 3.8/ 4.0
T . 38.1 38.9 7222 9179 lLL1-1/2X.109 0.315 0.2972 9454 2.8 3.5/, 3.9
V 2 0.0 30.6 -2998 -2998 lLL1-1/4X.109 0.261 0.2472 -4205 0.9 3.0/ 3.0
C 2 38.1 38.9 -5290 -6725 1LL1-3/4X.125 0.422 0.3472 -7225 1.8 3.8/ 4.1
T 3 38.1 38.9 3359 4270 lLL1-1/4X.109 0.261 0.2472 7819 1.3 3.3/ 3.6
V 3 0.0 30.6 -3026 -3026 lLL1-1/4X.109 0.261 0.2472 -4205 0.9 3.0/ 3.0
C 3 38.1 38.9 -3084 -3920 lLL1-1/2~.109 0.315 0.2972 -4622 1.2 3.5/ 3.9
-
Page 32 V1.71 Valley Joist West
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURT2 ST SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T217 1 - 32LH767/451 x 30' 2.625 Special Crimped angle
Parallel chord Longspan
End Lenqth Depth Slope Holes Tow.Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 50.000
Opp 6.000 5.000 50.000
Uniform Live load 451 #/ft full length
Uniform SJI load 767 #/ft full length
Uniform Dead load 316 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead.load of lOOO# may occur at any top chord panel point.
HIYLIP @ 10'1" & 20'2" FTE OAL
End loads: SJImDead-EaukWind
Left TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
32.000 in Deep 358.625 in Design length 2865 # Minimum Shear
30.426 in Effective Depth 1286 in4 Ix 0 in4 Minimum Ix
26.500 in Clear Depth L/1652 Live Defl L/ 971 SJI Defl
1127175 in-#Moment 1.000 in Chord gap 0.372 in Camber
48.000 in Interior Panel 29.656 in Left End 29.656 in Right End 7 Web Vees 12461 # SJI reaction 12461 # SJI reaction
Tor, Chord: 2-LL2-1/2x.313 A = 2.934 Y = 0.740 Fy = 50000 Q = 1.000
Bridg < 247" Ix= 1.699 Iy= 6.209 Rx = 0.761 Ry = 1.455 Rz = 0.489
Center: L = 24.000 P = -37046 Paz= -77079 M = 1533 No Fillers
Tag end panl: L = 29.656 P = -20806 Paz= -59691 M = 3963 No Filler
First point: P = -20806 Pa = -79220 M = 6128
Chord shear: V = 20200 C = -3514 fv = 6040 fc = -1198 f = 6069
Bot Chord: 2-L L3x3x.227 A = 2.621 Y = 0.834 Fy = 50000 Q = 0.922
Ix= 2.285 Iy= 6.949 RX = 0.934 Ry = 1.628 RZ = 0.594
Center: L = 48.000 P = 36061 Pa = 78628
Chord shear: V = 20200 T = 17952 fv = 8355 ft = 6849 f = 9030
Valley Joist West Page 33 V1.73
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T217 1 - 32LH767/451 x 30' 2.625 Special Crimped angle
Parallel chord Longspan
Web Ansl
T 1 57.6
V 1 31.1
C 1 20.4 T 2 38.3 v 2 0.0 c 2 38.3 T 3 38.3 v 3 0.0 c p. 38.3
T 38.3 v 4 0.0
Lnsth Shear
56.8 11379
35.5 -2985
32.5 -9452
38.8 7671
30.4 -2674
38.8 -6070
38.8 4469
30.4 -2708
38.8 -2868
38.8 2865 30.4 -2719
Force
21255
-3485
-10085
9770
-2674
-7731
-2708
-3653
3649
-2719
5692
Member
2LL1-1/2X.125
lLL1-1/2X.109
lLL1-1/4X.109
lLL1-1/4X.109
lLL1-1/4X.109
lLLl-l/2X;109
lLL1-1/4X.109
lLL1-1/4X.109
1LL2x2x.176
lLL1-1/2~.125
1LL1-3/4X.143
Area
0.719
0.315
0.673
0.359
0.261
0.480
0.261
0.261
0.315
0.261
0.261
R
0.465~
0.2972
0.2962
0.2472
0.3462
0.2472
0.2472
0.2972
0.2472
0.2472
-
0.3942 -
-- Pa Weld
21563 5.7
-5114 1.1
,10039 1.9
10781 2.6
-4232 0.8
-8508 1.8
7819 1.8
-4232 0.8
-4641 1.1
7819 1.1
-4232 0.8
T - AVl W - B
7.1/ 9.3
3.4/ 3.9
3.7/ 4.1
3.5/ 4.2
3.8/ 4.4
3.3/ 3.9
3.5/ 4.2
3.3/ 3.9
3.0/ 3.3
3.0,' 3.3
3.0/ 3.3
Vallev Joist West Page 34 V1.71 - Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002 2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS CARLSBAD, CA
Comments: UBC 1997 TAG COLOR BLUE
T218 2 - 32LH767/451 x 30' 6.125 Special Crimped angle
Parallel chord Longspan
End Lenqth Depth Slope Holes Tor, Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 E 0' 0.500 50.000
Opp 6.000 5.000 E 0' 0.500 50.000
Uniform Live load 451 #/ft full length
Uniform SJI load 767 #/ft full length Uniform Dead load 316 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point. An additional Dead load of lOOO# may occur at any top chord panel point.
HULIP @ 10'3" & 20'2" FTE OAL
End loads: - SJI mDeadk&Wind
Left TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips 32.000 in Deep 362.125 in Design length 2893 # Minimum Shear
30.426 in Effective Depth 1286 in4 Ix 0 in4 Minimum Ix
26.500 in Clear Depth L/1604 Live Defl L/ 943 SJI Defl
1145242 in-#Moment 1.000 in Chord gap 0.379 in Camber
48.000 in Interior Panel 30.531 in Left End 30.531 in Right End 7 Web Vees 12573 # SJI reaction 12573 # SJI reaction
Top Chord: 2-LL2-1/2x.313 A = 2.934 Y = 0.740 Fy = 50000 Q = 1.000
Bridg < 247" Ix= 1.699 Iy= 6.209 Rx = 0.761 Ry = 1.455 Rz = 0.489
Center: L = 24.000 P = -37640 Paz= -77079 M = 1533 No Fillers
Tag end panl: L = 30.531 P = -20921 Paz= -58874 M = 4191 No Filler
.Chord shear: V = 20200 C = -4069 fv = 6056 fc = -1387 f = 6095
Bot Chord: 2-L L3x3x.227 A = 2.621 Y = 0.834 Fy = 50000 Q = 0.922
First point: P = -20921 Pa = -79220 M = 6514
Ix= 2.285 Iy= 6.949 RX = 0.934 Ry = 1.628 RZ = 0.594
Center: L = 48.000 P = 36753 Pa = 78628
Chord shear: V = 20200 T = 18086 fv = 8417 ft = 6901 f = 9097
Page 35 ~1.71 Vallev Joist West
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #10002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T218 2 - 32LH767/451 x 30' 6.125 Special Crimped angle
Parallel chord Longspan
Web Ana
T 1 57.6
V 1 29.9
C 1 23.2
T 2 38.3 v 2 0.0 c 2 38.3
T 3 38.3 v 3 0.0 c A 38.3
T 38.3 v 4 0.0
Lnqth
56.8
35.1 33.1
38.8
30.4
38.8
38.8
30.4
38.8
38.8
30.4
Shear
11465
-3042 -9477
7668 -2677
-6068
-2711
-2893
-2722
4468
2893
Force , Member Area- R
21414 2LL1-1/2X.125 0.719 0.465~
-3508
-10314
9767
-2677
-7728
5690
-2711
-3685
3685
-2722
2LLlXlX.109
lLL1-1/4X.109
lLL1-1/4X.109
lLL1-1/4X.109
lLL1-1/2X.109
lLL1-1/4X.109
lLL1-1/4X.109
1LL2x2x.187
lLL1-1/2X.125
1LL1-3/4~.143
0.412 0.307~
0.713 0.3942
0.359 0.2962
0.261 0.2472
0.480 0.3462
0.261 0.2472
0.261 0.2472
0.315 0.2972
0.261 0.2472
0.261 0.2472
-- Pa Weld
21563 5.8
-7034 1.1
-10338 1.9
10781 2.6
-4232 0.8
-8508 1.8
7819 1.8
-4232 0.8
-4641 1.1
7819 1.1
-4232 0.8
T - AVl W - B
7.0/ 9.2
5.3/ 6.6
3.8/ 4.2
3.5/ 4.2
3.8/ 4.4
3.3/ 3.9
3.5/ 4.2
3.3/ 3.9
3.0/ 3.3
3.0/ 3.3
3.0/ 3.3
Vallev Joist West Page 36 V1.71
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lOOOZ
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997 TAG COLOR BLUE
T219 1 - 32LH982/582 x 8' 7.875 Special Crimped angle
Parallel chord Longspan
- End Lenqth Dewth Slope Holes Tow Chord Ext BCX Holdback Pitch EP/#lL
Taq 6.000 5.000 27.938
Opp 6.000 5.000 E 0' 4.500 27.938
Uniform Live load 582 #/ft full length
Uniform SJI load 982 #/ft full length
Uniform Dead load 400 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point. An additional Dead load of lOOO# may occur at any top chord panel point.
HXLIP @ 4'5" FTE OAL
TC W2 DOWN RE
FULL SKEW RE NS 8-5/8" End loads: SJImDeadLiveEQukWind
0.0 Kim Left TC axial load: 0.0 0.0 0.0 0.0 8.2
Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
32.000 in Deep 99.875 in Design length 1022 # Minimum Shear
30.692 in Effective Depth 985 in4 Ix 0 in4 Minimum Ix
27.500 in Clear Depth L/45402 Live Defl L/26908 SJI Defl
247790 in-#Moment 1.000 in Chord gap 0.029 in Camber
24.000 in Interior Panel 18.969 in Left End 18.969 in Right End
3 Web Vees 5087 # SJI reaction 5087 # SJI reaction
TOP Chord: 2-L L2X2X.248 A = 1.861 Y = 0.591 Fy = 50000 Q = 1.000
Bridg c 212" Ix= 0.691 Iy= 2.905 Rx = 0.609 Ry = 1.250 Rz = 0.391
Center: L = 12.000 P = -8073 Paz= -52060 M = 309 No Fillers
Tag end panl: L = 18.969 P = -7587 Paz= -41176 M = 2054 No Filler
First point: P = -7587 Pa = -50247 M = 3253
Chord shear: V = 20200 C = -930 fv = 2397 fc = -500 f = 2410
Bot Chord: 2-LL2-1/2x.250 A = 2.375 Y = 0.717 Fy = 50000 Q = 1.000
Ix= 1.406 Iy= 4.924 RX = 0.769 Ry = 1.440 RZ = 0.491
Center: L = 24.000 P = 3899 Pa = 71250
Chord shear: V = 20200 T = 3423 fv = 3241 ft = 1441 f = 3320 Pa Weld T-AvlW-B
T 1-40.2 40.2 4051 5303 2LLlxlx.109 0.412 0.307~ 12367 1.6 4.5/ 5.8
-- Web Ansl~Lnqth Shear Force Member Area- R - V -2.8 31.5 -2589 -2655 lLL1-1/4~.109 0.261 0.2472 -4055 0.8 2.5/ 3.1
C 121.4 33.0 -2378 -2554 lLL1-1/2~.109 0.315 0.2972 -2657 0.8 2.7/ 3.4
T 2 21.4 33.0 1022 1097 lLL1-1/4x.109 0.261 0.2472 7819 0.3 2.5/ 3.2
V 2 0.0 30.7 -2022 -2022 1LLlXlX.109 0.206 0.1962 -2236 0.6 2.3/ 2.8
Valley Joist West Page 37 V1.71
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014 619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T220 1 - 32LH982/582 x 8' 7.875 Special Crimped angle . Parallel chord Longspan
End Lenqth Depth Slope Holes Top Chord Ext BCX Holdback Pitch EP/#lL
Tau 6.000 5.000 27.938
Opp 6.000 5.000 E 0' 4.500 27.938
Uniform Live load 582 #/ft full length
Uniform SJI load 982 #/ft full length
Uniform Dead load 400 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
HFLIP (9 4'5" FTE OAL
TL W2 DOWN RE
FULL SKEW RE FS 8-5/8" End loads: - SJI Dead Live Equk Wind
Left TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
32.000 in Deep 99.875 in Design length 1022 # Minimum Shear
30.692 in Effective Depth 985 in4 Ix 0 in4 Minimum Ix
27.500 in Clear Depth L/45402 Live Defl L/26908 SJI Defl
247790 in-#Moment 1.000 in Chord gap 0.029 in Camber
24.000 in Interior Panel 18.969 in Left End 18.969 in Right End
3 Web Vees 5087 # SJI reaction 5087 # SJI reaction
Top Chord: 2-L L2X2X.248 A = -1.861 Y = 0.591 Fy = 50000 Q = 1.000
Bridg < 212" Ix= 0.691 Iy= 2.905 Rx = 0.609 Ry = 1.250 Rz = 0.391
Center: L = 12.000 P = -8073 Paz= -52060 M = 309 No Fillers Tag end panl: L = 18.969 P = -7587 Paz= -41176 M = 2054 NO Filler
First point: P = -7587 Pa = -50247 M = 3253
Chord shear: V = 20200 C = -930 fv = 2397 fc = -500 f = 2410
Bot Chord: 2-LL2-1/2x.250 A = 2.375 Y = 0.717 Fy = 50000 Q = 1.000 Ix= 1.406 Iy= 4.924 Rx = 0.769 Ry = 1.440 R2 = 0.491
Center: L = 24.000 P = 3899 Pa = 71250
Chord shear: V = 20200 T = 3423 fv = 3241 ft = 1441 f = 3320 Pa Weld T-AvlW-B
T L40.2 40.2 4051 5303 2LLlxlx.109 0.412 0.307~ 12367 1.6 4.5/ 5.8
_- Web And Lnqth Shear Force Member Area- R
V ' k2.8 31.5 -2589 -2655 lLL1-1/4x.109 0.261 0.2472 -4055 0.8 2.5/ 3.1
C 121.4 33.0 -2378 -2554 lLL1-1/2X.109 0.315 0.2972 -2657 0.8 2.7/ 3.4
T 2 21.4 33.0 1022 1097 lLL1-1/4X.109 0.261 0.2472 7819 0.3 2.5/ 3.2
V 2 0.0 30.7 -2022 -2022 lLLlxlx.109 0.206 0.1962 -2236 0.6 2.3/ 2.8
Vallev Joist West Page 38 V1.71
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01 -.
Customer: JD2, INC #lo002
2049 KURTZ ST SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T221 1 - 32LH928/543 x 26' 6.000 Special Crimped angle
End Lensth Depth Slope Holes TOD Chord Ext BCX Holdback Pitch EP/#lL
Parallel chord Longspan
Tag 6.000 5.000 50.000
Opp 6.000 5.000 E 0' 0.500 50.000
Uniform Live load 543 #/ft full length
Uniform SJI load 928 #/ft full length
Uniform Dead load 385 #/ft full length
An additional SJI load of 1000# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
HflLIP @ 12'11" FTE OAL
End loads: - SJImDeadaEqukWind
Left TC axial load: 0.0 0.0 0.0 0.0 38.1 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 38.1 0.0 Kips
32.000 in Deep 314.000 in Design length 3035 # Minimum Shear
30.692 in Effective Depth 985 in4 Ix 0 in4 Minimum Ix
27.500 in Clear Depth L/1566 Live Defl L/ 916 SJI Defl
1502781 in-#Moment 1.000 in Chord gap 0.285 in Camber
48.000 in Interior Panel 30.500 in Left End 30.500 in Right End
6 Web Vees 13141 # SJI reaction 13141 # SJI reaction
TOP Chord: 2-LL2-1/2x.250 A = 2.375 Y = 0.717 Fy = 50000 Q = 1.000
Bridg < 245" Ix= 1.406 Iy= 4.924 Rx = 0.769 Ry = 1.440 R2 = 0.491
Center: L = 24.000 P = -48963 Paz= -62454 M = 1860 No Fillers
Tag end panl: L = 30.500 P = -36535 Paz= -47800 M = 5060 No Filler First point: P = -36535 Pa = -64125 M = 7864
Chord shear: V = 20200 C = -3985 fv = 7527 fc = -1678 f = 7574
Bot Chord: 2-L L2X2X.248 A = 1.861 Y = 0.591
Ix= 0.691 Iv= 2.905 Rx = 0.609
Center: L = 48.000 PA= 33611 Pa = 55830
Chord shear: V = 20200 T = 18469 fv = 11904
Web Ansl Lnsth Shear Force Member Area- R
T 157.4 57.0 11809 21921 2LL1-3/4x.143 0.960 0.543~
V-1 29.7 35.3 -3517 -4049 lLL1-1/2X.109 0.315 0.2972
C L23.0 33.3 -9409 -10218 1LL2~2X.187 0.713 0.3942
T 38.0 39.0 7225 9172 lLL1-1/2~.109 0.315 0.2972
C 2 38.0 39.0 -5293 -6719 lLL1-3/4X.125 0.422 0.3472
T 3 38.0 39.0 3360 4266 lLL1-1/4X.109 0.261 0.2472
V 3 0.0 30.7 -3101 -3101 lLL1-1/4~.109 0.261 0.2472
V 2 0.0 30.7 -3074 -3074 lLL1-1/4x.109 0.261 0.2472
Fy = 50000
Ry = 1.250
ft = 9924 -- Pa Weld
28803 5.2
-5142 1.3
-10226 1.8
9454 2.8
-4188 0.9
-7212 1.8
7819 1.3
-4188 1.0
Q = 1.000
Rz = 0.391
f = 12897
T - AvlW - B
7.1/ 5.3
3.4/ 3.1
3.8/ 3.4
3.5/ 3.3
3.8/ 3.5
3.3/ 3.0
3.0/ 2.5
3.0/ 2.5
C 3 38.0 39.0 -3035 -3853 lLL1-1/2X.109 0.315 0.2972 -4610 1.2 3.5/ 3.3
Page 39 V1.71 Valley Joist West
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01 I
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T222 2 - 32LH928/543 x 26' 6.000 Special Crimped angle
Parallel chord Longspan
End Lensth Dewth Slowe Holes Tow Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 Y 50.000
Opp 6.000 5.000 E 0' 0.500 50.000
Uniform Live load 543 #/ft full length
Uniform SJI load 928 #/ft full length
Uniform Dead load 385 #/ft full length An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
HMLIP @ 12'11" FTE OAL
End loads: - SJI NtUI>)-EQukm
Left TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
32.000 in Deep 314.000 in Design length 3035 # Minimum Shear
30.587 in Effective Depth 989 in4 Ix 0 in4 Minimum Ix
27.000 in Clear Depth L/1572 Live Defl L/ 920 SJI Defl
1031595 in-#Moment 1.000 in Chord gap 0.285 in Camber
48.000 in Interior Panel 30.500 in Left End 30.500 in Right End
6 Web Vees 13141 # SJI reaction 13141 # SJI reaction
Tow Chord: 2-LL2-1/2x.212 A = 2.030 Y = 0.703 Fy = 50000 Q = 0.967
Bridg c 243" Ix= 1.219 Iy= 4.158 Rx = 0.775 Ry = 1.431 Rz = 0.493
Center: L = 24.000 P = -32939 Paz= -51834 M = 1860 No Fillers
Tag end panl: L = 30.500 P = -20444 Paz= -39909 M = 5060 No Filler
First point: P = -20444 Pa = -54813 M = 7864
Chord shear: V = 20200 C = -3999 fv = 8876 fc = -1970 f = 8931
Bot Chord: 2-LL2-1/2x.230 A = 2.194 Y = 0.710 Fy = 50000
Ix= 1.309 Iy= 4.520 RX = 0.772 Ry = 1.435
Chord shear: V = 20200 T = 18532 fv = 10269 ft = 8446
Web Ansl Lnsth Shear Force Member Area- R -- Pa Weld
Center: L = 48.000 P = 33727 Pa = 65826
T 1 57.5 56.9 11809 21975 2LL1-3/4X.125 0.844 0.546~ 25313 5.9
V 1 29.8 35.2 -3447 -3972 lLL1-1/2x.109 0.315 0.2972 -5155 1.2
C 1-23.0 33.2 -9409 -10224 1LL2X2X.187 0.713 0.3942 -10275 1.8
T 18.1 38.9 7225 9184 lLL1-1/2x.109 0.315 0.2972 9454 2.8
V 2 0.0 30.6 -2993 -2993 lLL1-1/4X.109 0.261 0.2472 -4205 0.9
C 2 38.1 38.9 -5293 -6728 lLL1-3/4X.125 0.422 0.3472 -7225 1.8
T 3 38.1 38.9 3360 4271 lLL1-1/4X.109 0.261 0.2472 7819 1.3
V 3 0.0 30.6 -3021 -3021 lLL1-1/4x.109 0.261 0.2472 -4205 0.9
Q = 0.996 RZ = 0.492
f = 11103 T - AVlW - B
7.3/ 7.3
3.8/ 3.9
3.5/ 3.9
3.4/ 3.6
3.0/ 3.0
3.8/ 4.1
3.3/ 3.6
3.0,' 3.0
C 3 38.1 38.9 -3035 -385’8 lLL1-1/2~.109 0.315 0.2972 -4622 1.2 3.5/ 3.9
-
Page 40 V1.71 Valley Joist West - Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T223 2 - 32LH928/543 x 26' 4.250 Special Crimped angle
Parallel chord Longspan
End,Lenqth Deuth Slope Holes TOU Chord Ext BCX Holdback Pitch EP/#~L
Taq 6.000 5.000 Y 50.000
Opp 6.000 5.000 Y 50.000
Uniform Live load 543 #/ft full length
Uniform SJI load 928 #/ft full length
Uniform Dead load 385 #/ft full length
An additional SJI.load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point
HWLIP @ 13'0" FTE OAL
7' AX SEAT WIDTH LE
SHORT BEARING 3-1/2" LE End loads: - SJI NtUr,Dead&-Wind
Left TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kiws
Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
32.000 in Deep 312.250 in Design length 3018 # Minimum Shear
30.692 in Effective Depth 985 in4 Ix 0 in4 Minimum Ix
27.500 in Clear Depth L/1592 Live Defl L/ 932 SJI Defl
1020563 in-#Moment 1.000 in Chord gap 0.282 in Camber
48.000 in Interior Panel 30.062 in Left End 30.062 in Right End
6 Web Vees 13074 # SJI reaction 13074 # SJI reaction
TOP Chord: 2-LL2-1/2x.250 A = 2.375 Y = 0.717 Fy = 50000 Q = 1.000
Bridg c 245" Ix= 1.406 Iy= 4.924 Rx = 0.769 Ry = 1.440 Rz = 0.491
Center: L = 24.000 P = -32508 Paz= -62454 M = 1838 No Fillers
Tag end panl: L = 30.062 P = -20320 Paz= -48130 M = 4921 No Filler
First point: P = -20320 Pa = -64125 M = 7629
Chord shear: V = 20200 C = -3711 fv = 7515 fc = -1563 f = 7556
Bot Chord: 2-L L2X2X.248 A = 1.861 Y = 0.591 Fy = 50000 Q = 1.000
Ix= 0.691 Iy= 2.905 Rx = 0.609 Ry = 1.250 Rz = 0.391
Center: L = 48.000 P = 33252 Pa = 55830
Chord shear: V = 20200 T = 18388 fv = 11852 ft = 9881 f = 12841
Page 41 V1.71 Vallev Joist West
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T223 2 - 32LH928/543 x 26' 4.250 Special Crimped angle
Parallel chord Longspan
7 Web Anql Lnsth T 157.4 57.0
V 1 30.3 35.5
C 121.6 33.0 T 2 38.'0 39.0
V 2 0.0 30.7
c-2 38.0 39.0 T 3 38.0 39.0
V 3 0.0 30.7
C 5. 38.0 39.0
Shear
11758
-3413
-9394
7227
-2991
-5294
3361
-3019 -3018
Force
21826
-3953
-10100
9174
-2991
-6720
-3019
-3832
4266
Member
2LL1-3/4X.143
1LL2X2X.187
lLL1-1/2X.109
lLL1-1/2X.109
lLL1-1/4X.109
lLL1-1/4X.109
lLL1-1/4X.109
lLL1-1/2X.109
lLL1-3/4~.125
Area
0.960
0.315
0.713
0.315
0.261
0.422
0.261
0.261 0.315
0.543~
0.2972
0.3942
0.2972
0.2472
0.3472
0.2472
0.2472
0.2972
-- Pa Weld
28803 5.1
-5111 1.2
-10394 1.8
9454 2.8
-4188 0.9
-7212 1.8
7819 1.3
-4188 0.9
-4610 1.2
T-AVlW-B
7.1/ 5.3
3.4/ 3.1
3.8/ 3.4
3.5/ 3.3
3.8/ 3.5
3.3/ 3.0
3.0/ 2.5
3.5/ 3.3
3.0/ 2.5
.-
Page 42 V1.71 Vallev Joist West
,- Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T224 1 - 38LH945/560 x 15' 7.625 Special Crimped angle
Parallel chord Longspan
End Lenqth Deuth Sloue Holes TOP Chord Ext BCX Holdback Pitch
Tag 6.000 5.000 45.81
Opp 6.000 5.000 E 0' 6.000 45.81
Uniform Live load 560 #/ft full length Uniform SJI load 945 #/ft full length
Uniform Dead load 385 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
FPL SKEW RE NS 10'1/8" TOE W2 DOWN RE
T W2 DOWN RE H1 CLIP @ 7'10" FTE OAL
SHORT BEARING 3-1/2" LE
End loads: SJImDead-EcJL&Wind
Left TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
38.000 in Deep 183.625 in Design length 1808 # Minimum Shear
36.260 in Effective Depth 2438 in4 Ix 0 in4 Minimum Ix
32.000 in Clear Depth L/18791 Live Defl L/11136 SJI Defl
498079 in-#Moment 1.000 in Chord gap 0.098 in Camber
48.000 in Interior Panel 21.906 in Left End 21.906 in Right End
4 Web Vees 8230 # SJI reaction 8230 # SJI reaction
TOR Chord: 2-L L3x3x.313
Bridg c 280" Ix= 3.024
Center: L = 24.000
Tag end panl: L = 21.906
First point: Chord shear: V = 20200
Bot Chord: 2-L L3X3X.340
Ix= 3.243
Center: L = 48.000
Chord shear: V = 20200
A = 3.560
Iy= 9.659 P = -13736 P = -12766
P = -12766 c= 0
A = 3.849
Iy= 10.519 P = 10420 T = 8614
Y = 0.865
RX = 0.922
Paz= -96421
Paz= -84013
Pa = -96122 fv = 2878
Y = 0.675
RX = 0.918
Pa = 115464
fv = 3495
Fy = 50000
Ry = 1.647 M = 1853
M = 2769
M = 3909
fc = 0
Fy = 50000
Ry = 1.653
ft = 2238
Q = 1.000 RZ = 0.589
No Fillers
No Filler
f = 2878
Q = 1.000
RZ = 0.588
f = 3669
Valley Joist West Page 43 V1.71 - Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002 2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997 TAG COLOR BLUE
T224 1 - 38LH945/560 x 15' 7.625 Special Crimped angle
Parallel chord Longspan
Web Anql Lncrth Shear Force Member Area .R -- Pa Weld T-Av1W-B
T 150.4 56.9 7129 11182 2LLlxlx.109 0.412 0.307~ 12367 3.5 8.0/ 8.0
V 131.1 42.4 -2780 -3248 lLL1-1/2x.109 0.315 0.2972 -4080 1.0 3.7) 3.9
T 2 33.5 43.5 3466 4156 lLL1-1/4x.109 0.261 0.2472 7819 1.3 3.5/ 3.8 C 1 0.0 36.3 -5404 -5404 1L L2~2X.125 0.484 0.3982 -5945 1.5 4.0/ 4.0
V 2 0.0 36.3 -2959 -2959 lLL1-1/4X.109 0.261 0.2472 -3199 0.9 3.3/ 3.3
C 2 33.5 43.5 -1808 -2168 lLL1-1/4X.109 0.261 0.2472 -2224 0.7 3.5/ 3.8
Page 44 V1.71 Vallev Joist West
/L Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002 2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T225 1 - 38LH945/560 x 15' 7.625 Special Crimped angle
Parallel chord Longspan
~ End Lenqth Depth Slope Holes TOP Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 45.813
Opp 6.000 5.000 E 0' 6.000 45.812
Uniform Live load 560 #/ft full length
Uniform SJI load 945 #/ft full length
Uniform Dead load 385 #/ft full length An additional SJI load of 2000# may occur at any top chord panel point.
An additional Dead load of 2000# may occur at any top chord panel point.
TC W2 DOWN RE
H1 CLIP 6' 7'10 FTE OAL
SHORT BEARING 3-1/2" LE
FULL SKEW RE FS 10'1/8"
End loads: __ SJI-DeadWgkW
Left TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
38.000 in Deep 183.625 in Design length 1808 # Minimum Shear
36.260 in Effective Depth 2438 in4 Ix 0 in4 Minimum Ix
32.000 in Clear Depth L/18791 Live Defl L/11136 SJI Defl
540849 in-#Moment 1.000 in Chord gap 0.098 in Camber
48.000 in Interior Panel 21.906 in Left End 21.906 in Right End
4 Web Vees 9230 # SJI reaction 9230 # SJI reaction
TOD Chord: 2-L L3x3x.313 A = 3.560 Y = 0.865 Fy = 50000 Q = 1.000
Bridg c 280" Ix= 3.024 Iy= 9.659 Rx = 0.922 Ry = 1.647 Rz = 0.589
Center: L = 24.000 P = -14916 Paz= -96421 M = 1853 No Fillers
Tag end panl: L = 21.906 P = -13686 Paz= -84013 M = 2769 No Filler
First point: P = -13686 Pa = -96122 M = 3909
Chord shear: V = 20200 C = 0 fv = 3283 fc = 0 f = 3283
Bot Chord: 2-L L3X3X.340 A = 3.849 Y = 0.875 Fy = 50000 Q = 1.000
Ix= 3.243 Iy= 10.519 RX = 0.918 Ry = 1.653 Rz = 0.588
Center: L = 48.000 P = 11686 Pa = 115464
Chord shear: V = 20200 T-= 9534 fv = 3868 ft = 2477 f = 4061
,---
Valley Joist West Page 45 V1.71
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T225 1 - 38LH945/560 x 15‘ 7.625 Special Crimped angle
Parallel chord Longspan
Web Ansl Lnsth Shear Force Member Area- R -__ Pa Weld T-AvlW-B T 1 50.4 56.9 7890 12376 2LLlxlx.109 0.412 0.307~ 12367 3.8 8.0,’ 8.0
V 1 31.1 42.4 -3784 -4421 lLL1-1/2~.125 0.359 0.2962 -4658 1.2 3.7/ 3.9
C 1 0.0 36.3 -6165 -6165 1L L2X2X.143 0.552 0.3962 -6815 1.5 4.0/ 4.0 T 2 33.5 43.5 4096 4912 lLL1-1/4~.109 0.261 0.2472 7819 1.5 3.5/ 3.8
V 2 0.0 36.3 -3965 -3965 lLL1-1/2~.109 0.315 0.2972 -5009 1.2 3.5/ 3.5
C 2 33.5 43.5 -1945 -2332 lLL1-1/2~.109 0.315 0.2972 -3898 0.7 3.7/ 4.0
.r-
Valley Joist West Page 46 V1.71 - Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS CARLSBAD, CA
Comments: UBC 1997 TAG COLOR BLUE
T226 1 - 38LH945/560 x 24' 2.750 Special Crimped angle
Parallel chord Longspan
End Lenqth DeDth Sloue Holes TOU Chord Ext BCX Holdback Pitch EP/#~L
Taq 6.000 5,000 56 .OOO
Opp 6.000 5,000 E 0' 6.000 56.000
Uniform Live load 560 #/ft full length
Uniform SJI load 945 #/ft full length
Uniform Dead load 385 #/ft full length An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
H: .LIP @ 7'10 & 11'0 FTE OAL
FEPL SKEW RE NS 10-1/8" TOE W2 DOWN RE
SHORT BEARING 3-1/2" @ LE
End loads: - SJINtup-da.&
Left TC axial load: 0.0 .o.o 0.0 0.0 9.8 0.0 KiDs
Right TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
38.000 in Deep 286.750 in Design length 2823 # Minimum Shear
36.260 in Effective Depth 2438 in4 Ix 0 in4 Minimum Ix
32.000 in Clear Depth L/4934 Live Defl L/2924 SJI Defl
893824 in-#Moment 1.000 in Chord gap 0.238 in Camber
80.000 in Interior Panel 31.688 in Left End 31.688 in Right End
4 Web Vees 12291 # SJI reaction 12291 # SJI reaction
TOD Chord: 2-L L3x3x.313 A = 3.560 Y = 0.865 Fy = 50000 Q = 1.000
Bridg < 280" Ix= 3.024 Iy= 9.659 Rx = 0.922 Ry = 1.647 Rz = 0.589
Center: L = 40.000 P = -24651 Paz= -86176 M = 6025 No Fillers
Tag end panl: L = 31.688 P = -19242 Paz= -76096 M = 5983 No Filler
First point: P = -19242 Pa = -96122 M = 7801
Chord shear: V = 20200 C = -2153 fv = 4434 fc = -605 f = 4444
Bot Chord: 2-L L3X3X.340 A = 3.849 Y = 0.875 Fy = 50000 Q = 1.000 Ix= 3.243 Iy= 10.519 Rx = 0.918 Ry = 1.653 Rz = 0.588
Center: L = 80.000 P = 24299 Pa = 115464
Chord shear: V = 20200 T = 16165 fv = 5321 ft = 4200 f = 5720
Web Anql Lnsth Shear Force Member Area- R -- Pa Weld T-AvlW-B
T 1 56.1 65.0 10855 19472 2LL1-1/2X.125 0.719 0.465~ 21563 5.2 8.71 8.7 r- V 11.6 42.6 -3577 -4200 1LL1-lj2X.125 0.359 0.2962 -4615 1.1 3.7/ 4.0
C 1 14.5 37.5 -8327 -8600 1L L2X2X.216 0.817 0.3922 -9306 1.3 4.0/ 4.1
T 2 47.8 54.0 5364 7987 lLL1-1/2x.109 0.315 0.2972 9454 2.5 4.3/ 4.8
V 2 0.0 36.3 -4273 -4273 lLL1-1/2X.109 0.315 0.2972 -5009 1.3 3.5/ 3.5
C 2 47.8 54.0 -2823 -4203 lLL1-3/4X.125 0.422 0.3472 -4622 1.1 4.5/ 5.0
Valley Joist West Page 47 V1.71 - Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002 2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T227 1 - 38LH945/560 x 24' 2.750 Special Crimped angle
End Lenqth Deuth Slope Holes TOP Chord Ext BCX Holdback Pitch EP/#iL
Parallel chord Longspan
Tag 6.000 5.0.00 56.000
Opp 6.000 5.000 E 0' 6.000 56.000
Uniform Live load 560 #/ft full length
Uniform SJI load 945 #/ft full length Uniform Dead load 385 #/ft full length
An additional SJI load of 2000# may occur at any top chord panel point.
An additional Dead load of 2000# may occur at any top chord panel point.
FU,A SKEW RE FS 10-1/8" TOE W2 DOWN RE
SHORT BEARING 3-1/2" @ LE
HI LIP @ 7'10 & 11'0 FTE OAL
End loads: - SJI NtU13. Dead Live Eauk Wind
Left TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kius
Right TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
38.000 in Deep 286.750 in Design length 2823 # Minimum Shear
36.260 in Effective Depth 2438 in4 Ix 0 in4 Minimum Ix
32.000 in Clear Depth L/4934 Live Defl L/2924 SJI Defl
959931 in-#Moment 1.000 in Chord gap 0.238 in Camber
80.000 in Interior Panel 31.688 in Left End 31.688 in Right End
4 Web Vees 13291 # SJI reaction 13291 # SJI reaction
TOD Chord: 2-L L3x3x.313 A = 3.560 Y = 0.865 Fy = 50000 Q = 1.000
Bridg c 280" Ix= 3.024 Iy= 9.659 Rx = 0.922 Ry = 1.647 Rz = 0.589
Center: L = 40.000 P = -26474 Paz= -86176 M = 6025 No Fillers
Tag end panl: L = 31.688 P = -20450 Paz= -76096 M = 5983 No Filler
First point: P = -20450 Pa = -96122 -M = 7801
Chord shear: V = 20200 C = -2354 fv = 4849 fc = -661 f = 4860
Bot Chord: 2-L L3X3X.340 IX= 3.243
Center: L = 80.000
Chord shear: V = 20200
Web Anql Lnqth shear^ Force T 156.1 65.0 11666~ 20928
V .-\,1.6 42.6 -4582 -5381
C 1 14.5 37.5 -9106 -9405
T 2 47.8 54.0 6004 8940
V 2 0.0 36.3 -5282 -5282
C 2 47.8 54.0 -2823 -4203
A = 3.849 Y = 0.875 Fy = 50000
Iy= 10.519 RX = 0.918 Ry = 1.653
T = 17374 fv = 5719 ft = 4514
P = 26277 Pa = 115464
Member Area- R -- Pa Weld
2LL1-1/2X.125 0.719 0.465~ 21563 5.6 1LL1-3j4x.125 0.422 0.3472 -6637 1.4
lLL1-1/2x.109 0.315 0.2972 9454 2.8
1L L2X2X.248 0.930 0.3912 -10528 1.3
lLL1-1/2X.125 0.359 0.2962 -5848 1.4
1LL1-3/4X.125 0.422 0.3472 -4622 1.1
Q = 1.000 Rz = 0.588
f = 6148
T - AVl W - B
8.7/ 8.7
3.9/ 4.2
4.0/ 4.1 4.3/ 4.8
3.5/ 3.5
4.5/ 5.0
Valley Joist West Page 48 V1.71
- Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T228 1 - 38LH940/539 x 32' 5.375 Special Crimped angle
Parallel chord Longspan
End Lensth DeRth Slope Holes TOR Chord Ext BCX Holdback Pitch EP/#~L
Tag 6.000 5.000 90.000
Opp 6.000 5.000 90.000
Uniform Live load 539 #/ft full length
Uniform SJI load 940 #/ft full length
Uniform Dead load 401 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
sr .T BEARING 3-1/21* LE Hl-CLIP @ 11'0" & 22'0" FTE OAL
MAX SEAT WIDTH 6" @ RE
End loads: __ SJI Dead Live Eauk Wind
Left TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips 38.000 in Deep 385.375 in Design length 3773 # Minimum Shear
36.145 in Effective Depth 2475 in4 Ix 0 in4 Minimum Ix
31.500 in Clear Depth L/2145 Live Defl L/1230 SJI Defl
1550542 in-#Moment 1.000 in Chord gap 0.430 in Camber
80.000 in Interior Panel 56.344 in Left End 56.344 in Right End
4 Web Vees 16094 # SJI reaction 16094 # SJI reaction
Tor, Chord: 2-LL3-1/2x.344 A = 4.579 Y = 1.002 Fy = 50000 Q = 1.000
Bridg c 314" Ix= 5.323 Iy= 15.651 Rx = 1.078 Ry = 1.849 Rz = 0.688
Center: L = 40.000 P = -41050 Paz=-115945 M = 5531 No Fillers
Tag end panl: L = 56.344 P = -34049 Paz= -76818 M = 17387 No Filler
First point: P = -34049 Pa =-123642 M = 27395
Chord shear: V = 20200 C = -6271 fv = 3813 fc = -1369 f = 3874
Bot Chord: 2-L L3x3x.281
IX= 2.756
Center: L = 80.000
Chord shear: V = 20200 - Web Anql Lnqth Shear Force T 1 67.7 95.1 13659 35950
V 11.2 48.0 -5542 -7367 c 1 34.3 43.8 -9181 -11118
T 2 47.9 53.9 5304 7911
V 2 0.0 36.1 -4339 -4339
C 2 47.9 53.9 -3773 -5628
A = 3.214 Y = 0.854 Fy = 50000
Iy= 8.645 RX = 0.926 Ry = 1.640
T = 33254 fv = 8101 ft = 10346
Member Area- R -- Pa Weld
2L L2x2x.156 1.199 0.622~ 35980 7.8
lLL2-1/2~.212 1.015 0.4932 -13354 1.8
lLL1-1/2~.109 0.315 0.2972 -5025 1.3
P = 42898 Pa = 96422
1L L2X2X.125 0.484 0.3982 -7455 2.0
lLL1-1/2x.109 0.315 0.2972 9454 2.4
1L L2X2X.125 0.484 0.3982 -6590 1.5
Q = 1.000
RZ = 0.591
f = 9612
T - AVl W - B
13.6/11.3
4.5/ 4.9
4.7/ 5.0
4.3/ 4.8
3.5/ 3.5
4.8/ 5.3
Vallev Joist West Page 49 vi.71 - Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T229 1 - 38LH940/539 x 32' 5.375 Special Crimped angle
- End Lenqth Depth Slolse, Holes Top Chord Ext BCX Holdback Pitch EP/#lL
Parallel chord Longspan
Tag 6.000 5.000 90.000
Opp 6.000 5.000 90.000
Uniform Live load 539 #/ft full length
Uniform SJI load 940 #/ft full length
Uniform Dead load 401 #/ft full length
An additional SJI load of 2000# may occur at any top chord panel point.
An additional Dead load of 2000# may occur at any top chord panel point.
Hl-CLIP @ 11'0" & 22'0" FTE OAL,
SI' T BEARING 3-1/2" LE MAX SEAT WIDTH 6" @ RE
End loads: __ S JI
Left TC axial load: 0.0
Right TC axial load: 0.0 38.000 in Deep
36.145 in Effective Depth
31.500 in Clear Depth
80.000 in Interior Panel
1646886 in-#Moment
4 Web Vees
NtUpDeadLiveEcruku
0.0 0.0 0.0 9.8 0.0 KiDS
0.0 0.0 0.0 9.8 0.0 KibS
385.375 in Design length 3773 # Minimum Shear
2475 in4 Ix 0 in4 Minimum Ix
L/2145 Live Defl L/1230 SJI Defl
1.000 in Chord gap 0.430 in Camber
56.344 in Left End 56.344 in Right End
17094 # SJI reaction 17094 # SJI reaction
Top Chord: 2-LL3-1/2x.344 A = 4.579 Y = 1.002 Fy = 50000 Q = 1.000
Bridg c 314" Ix= 5.323 Iy= 15.651 Rx = 1.078 Ry = 1.849 Rz = 0.688
Center: L = 40.000 P = -43600 PazA-115945 M = 5531 No Fillers
Tag end panl: L = 56.344 P = -35927 Paz= -76818 M = 17387 No Filler
First point: P = -35927 Pa =-123642 M = 27395
Chord shear: V = 20200 C = -6754 fv = 4107 fc = -1475 f = 4172
Bot Chord: 2-L L3x3x.281 A = 3.214 Y = 0.854 Fy = 50000 Q = 1.000
Ix= 2.756 Iy= 8.645 RX = 0.926 Ry = 1.640 RZ = 0.591
Center: L = 80.000 P = 45564 Pa = 96422
Chord shear: V = 20200 T = 35133 fv = 8559 ft = 10931 f = 10155
Web Anql Lnqth Shear Force Member Area- R -- Pa Weld T-AvlW-B
T 1 67.7 95.1 14430 37981 2LL2x2x.176 1.346 0.619~ 40381 7.3 13.6/11.3
V T- 1.2 48.0 -6549 -8705 1L LZx2x.143 0.552 0.3962 -8793 2.0 4.5/ 4.9
C 134.3 43.8 -9889 -11975 lLL2-1/2x.212 1.015 0.4932 -13354 1.9 4.7/ 5.0
T 2 47.9 53.9 5908 8811 lLL1-1/2~.109 0.315 0.2972 9454 2.7 4.3/ 4.8
V 2 0.0 36.1 -5351 -5351 1LL1-1/2X.125 0.359 0.2962 -5870 1.4 3.5/ 3.5
C 2 47.9 53.9 -3773 -5628 1L LZX2X.125 0.484 0.3982 -6590 1.5 4.8/ 5.3
Page 50 V1.71 Vallev Joist West
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T230 3 - 38LH972/555 x 33' 0.625 Special Crimped angle
- End Lensth Depth SloDe Holes Tor, Chord Ext BCX Holdback Pitch EP/#iL
Tag 6.000 5.000 90.000
Opp 6.000 5.000 E 0' 0.500 90.000
Parallel chord Longspan
Uniform Live load 555 #/ft full length
Uniform SJI load 972 #/ft full length
Uniform Dead load 417 #/ft full length
An additional SJI load of 2000# may occur at any top chord panel point.
An additional Dead load of 2000# may occur at any top chord panel point.
Hl_CLIP @ 11'0 & 22'0" FTE OAL
S€ T BEARING 3-1/2" LE
End loads: SJI Dead Live Wind
Left TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
38.000 in Deep 392.625 in Design length 3975 # Minimum Shear
36.154 in Effective Depth 2426 in4 Ix 0 in4 Minimum Ix 31.500 in Clear Depth L/1930 Live Defl L/1102 SJI Defl
1757126 in-#Moment 1.000 in Chord gap 0.446 in Camber
80.000 in Interior Panel 58.156 in Left End 58.156 in Right End
4 Web Vees 17901 # SJI reaction 17,901 # SJI reaction
Tor, Chord: 2-LL3-1/2x.287 A = 3.853 Y = 0.981 Fy = 50000 Q = 0.955
Bridg c 312" Ix= 4.545 Iy= 12.998 Rx = 1.086 Ry = 1.837 Rz = 0.691
Center: L = 40.000 P = -46584 Paz= -93761 M = 3529 No Fillers
Tag end panl: L = 58.156 P = -37334 Paz= -61480 M = 19127 No Filler
First point: P = -37334 Pa =-lo4038 M = 30235
Chord shear: V = 20200 C = -8021 fv = 5098 fc = -2082 f = 5204
Bot Chord: 2-L L3x3x.313 A = 3.560 Y = 0.865
IX= 3.024 Iy= 9.659 Rx = 0.922
Center: L = 80.000 P = 48602 Pa = 106802
Chord shear: V = 20200 T = 36749 fv = 8039
T 1 67.7 95.1 15098 39729 2LL2x2x.176 1.346 0.619~
V 1 39.5 46.9 -6855 -8888 1L L2x2x.143 0.552 0.3962
Web Ansl Lncrth Shear Force Member Area- R
C ?'-- 8.1 45.9-10243 -13010 lLL2-1/2X.230 1.097 0.4922 T 2 -47.9 53.9 6064 9043 lLL1-1/2X.109 0.315 0.2972
V 2 0.0 36.2 -5473 -5473 1LL1-1/2X.125 0.359 0.2962
C 2 47.9 53.9 -3975 -5929 1L L2~2x.125 0.484 0.3982
Fy = 50000
Ry = 1.647
ft = 10322 -- Pa Weld
40381 7.6
-9008 2.1
-13085 1.9
9454 2.8
-5868 1.5
-6589 1.6
Q = 1.000 RZ = 0.589
f = 9553 T - AVl W - B
13.9/11.1
4.4/ 4.8
4.8/ 5.1
4.3/ 4.8
3.5/ 3.5
4.8/ 5.3
Page 51 V1.71 Valley Joist West - Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 Po# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T231 2 - 40LH868/483 x 45' 5.000 Special Crimped angle
Parallel chord Longspan
End Lenuth Slope Holes Tou Chord Ext BCX Holdback Pitch EP/#lL
Tau 6.000 5.000 90.000
Opp 6.000 5.000 Y 90.000
Uniform Live load 483 #/ft full length
Uniform SJI load 868 #/ft full length
Uniform Dead load 385 #/ft full length
An additional SJI load of 1000# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
HlXLIP @ 15'3" FTE OAL TYPE 2 CLIP @ 30'6" FTE OAL
7" im SEAT WIDTH @ RE
st r BEARING 3-1/2" ra BE
End loads: SJI-mLiveaWind
Left TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
40.000 in Deep 541.000 in Design length 4892 # Minimum Shear
37.871 in Effective Depth 3480 in4 Ix 0 in4 Minimum Ix
32.500 in Clear Depth L/1216 Live Defl L/ 677 SJI Defl 2781574 in-#Moment 1.000 in Chord gap 0.847 in Camber
80.000 in Interior Panel 55.250 in Left End 55.250 in Right End
6 Web Vees 20566 # SJI reaction 20566 # SJI reaction
TOD Chord: 2-L L4x4x.375 A = 5.719 Y = 1.138 Fy = 50000 Q = 1.000
Bridg c 349" Ix= 8.717 Iy= 24.067 Rx = 1.235 Ry = 2.051 Rz = 0.788
Center: L = 40.000 P = -71842 Paz=-149242 M = 4841 No Fillers
Tag end panl: L = 55.250 P = -42768 Paz=-107619 M = 15452 No Filler
First point: P = -42768 Pa =-154406 M = 24297
Chord shear: V = 20200 C = -8536 fv = 4789 fc = -1493 f = 4847
Bot Chord: 2-LL3-1/2x.313 A = 4.186 Y = 0.991 Fy = 50000 Q = 0.987
Ix= 4.904 Iy= 14.205 Rx = 1.082 Ry = 1.842 RZ = 0.690
Center: L = 80.000 P = 73448 Pa = 125582
Chord shear: V = 20200 T = 42768 fv = 8400 ft = 10217 f = 9832
L
Page 52 V1.71 Valley Joist West
r Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T231 2 - 40LH868/483 x 45' 5.000 Special Crimped angle
Parallel chord Longspan
Web Anql Lnqth Shear
T 1 66.7 95.8 18405 V 1 40.9 50.1 -5158
C 130.7 44.1-14367
T 2 46.6 55.1 10848 v 2 0.0 37.9 -4188
C 2 46.6 55.1 -7881 T 3 46.6 55.1 4914
V 3 0.0 37.9 -4253
C 3 46.6 55.1 -4892 -
Force Member Area
46560 2L L2x2x.216 1.635
-6819 1L L2~2X.125 0.484
-16712 2LL1-3/4X.125 0.844
15779 1L L2x2x.143 0.552
-4188 lLL1-1/2~.109 0.315
-11463 1L L2X2X.248 0.930
7147 lLL1-1/4x.109 0.261
-7115 1L L2X2X.143 0.552
-4253 lLL1-1/2~.109 0.315
R
0.3982
0.3962
0.2972
0.3912
0.2472
0.2972
0.3962
- 0.613~
0.546~
-- Pa Weld
49041 7.3
-7164 1.8
-17182 4.5
16547 3.7
-4773 1.3
-12451 1.6
7819 2.2
-4773 1.3
-7424 1.7
T - AVl W - B
15.6/13.3
4.41 4.8
8.9/ 7.9
4.7/ 5.2
3.5/ 3.5
4.7/ 5.2
3.9/ 4.4
3.5/ 3.5
4.7/ 5.2
Vallev Joist West Page 53 V1.71
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T232 1 - 40LH882/489 x 45' 5.000 Special Crimped angle
- End Le,nsth Depth Slowe Holes Top Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 90.000
Opp 6.000 5.000 Y 90.000
Parallel chord Longspan
Uniform Live load 489 #/ft full length
Uniform SJI load 882 #/ft full length
Uniform Dead load 393 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of 1000# may occur at any top chord panel point.
HL-LIP @ 15'3" FTE OAL TYPE 2 CLIP @ 30'6" FTE OAL
SF. .r BEARING 3-1/2" @ BE
7" MAX SEAT WIDTH @ RE
End loads: __ SJI Dead Live Eguk Wind
Left TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
40.000 in Deep 541.000 in Design length 4970 # Minimum Shear
37.701 in Effective Depth 4381 in4 Ix 0 in4 Minimum Ix
32.000 in Clear Depth L/1512 Live Defl L/ 838 SJI Defl
2824257 in-#Moment 1.000 in Chord gap 0.847 in Camber
80.000 in Interior Panel 55.250 in Left End 55.250 in Right End
6 Web Vees 20882 # SJI reaction 20882 # SJI reaction
Tor, Chord: 2-L L4x4x.375 A = 5.719 Y = 1.138 Fy = 50000 Q = 1.000
Bridg c 349" Ix= 8.717 Iy= 24.067 Rx = 1.235 Ry = 2.051 Rz = 0.788
Center: L = 40,000 P = -73275 Paz=-149242 M = 4919 No Fillers
Tag end panl: L = 55.250 P = -43623 Paz=-107619 M = 15701 No Filler
First point: P = -43623 Pa =-154406 M = 24689
Chord shear: V = 20200 C = -8705 fv = 4862 fc = -1522 f = 4921
Bot Chord: 2-L L4x4x.438 A = 6.624 Y = 1.161 Fy = 50000 Q = 1.000 Ix= 9.957 Iy= 28.235 RX = 1.226 Ry 2.065 RZ = 0.785
Center: L = 80.000 P = 74913 Pa = 198729
Chord shear: V = 20200 T = 43623 fv = 5334 ft = 6585 f = 6268
Valley Joist West Page 54 V1.71
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002 2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T232 1 - 40LH882/489 x 45' 5.000 Special Crimped angle
Parallel chord Longspan
Web Ansl T 1 66.8
V 141.0
C 1 30.8 T 2 46.7 v 2 0.0
C 2 46.7 T 3 46.7 v 3 0.0
C 46.7
Lnsth Shear
95.7 18689
49.9 -5226
43.9-14586
55.0 11012
37.7 -4241
55.0 -7998
55.0 4984
37.7 -4306
55.0 -4970
Force Member Area- R -- Pa Weld T-AvlW-B
47457 2L L2x2x.216 1.635 0.613~ 49041 7.4 15.6/15.6
-6922 1L L2X2X.125 0.484 0.3982 -7183 1.9 4.4/ 4.8
-16986 2LL1-3/4X.125 0.844 0.546~ -17208 4.6 8.9/ 8.9
16055 1L L2x2x.143 0.552 0.3962 16547 3.8 4.71 5.2
-4241 lLL1-1/2x.109 0.315 0.2972 -4798 1.3 3.5/ 3.5
-11661 1L L2X2X.248 0.930 0.3912 -12502 1.6 4.7/ 5.2
7266 lLL1-1/4X.109 0.261 0.2472 7819 2.2 3.9/ 4.4
-4306 lLL1-1/2X.109 0.315 0.2972 -4798 1.3 3.51 3.5
-7247 1L L2X2X.143 0.552 0.3962 -7447 1.7 4.71 5.2
Vallev Joist West Page 55 V1.71
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01 ,--
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T233 7 - 40LH868/483 x 45' 9.250 Special Crimped angle
Parallel chord Longspan
- End Lenath DeWch SloDe Holes Top Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 90.000
Opp 6.000 5.000 90.000
Uniform Live load 483 #/ft full length
Uniform SJI load 868 #/ft full length
Uniform Dead load 385 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
H.VLIP 13' 15'3" FTE OAL TYPE 2 CLIP @ 30'6" FTE OAL
S.F. .,T BEARING 3-1/2" @ LE
End loads: SJImDeaduEaukWind
Left TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
40.000 in Deep 545.250 in Design length 4930 # Minimum Shear
38.196 in Effective Depth 3397 in4 Ix 0 in4 Minimum Ix
34.000 in Clear Depth L/1159 Live Defl L/ 645 SJI Defl
2824378 in-#Moment 1.000 in Chord gap 0.860 in Camber
80.000 in Interior Panel 56.312 in Left End 56.312 in Right End
6 Web Vees 20720 # SJI reaction 20720 # SJI reaction
TOD Chord: 2-L L3X3X.416 A = 4.646 Y = 0.902 Fy = 50000 Q = 1.000
Bridg c 284" Ix= 3.831 Iy= 12.965 Rx = 0.908 Ry = 1.670 Rz = 0.585
Center: L = 40.000 P = -72353 Pax=-112228 M = 4720 2 Fillers
Tag end panl: L = 56.312 P = -42673 Paz= -65136 M = 16036 No Filler
First point: P = -42673 Pa =-125439 M = 25272
Chord shear: V = 20200 C = -9286 fv = 5771 fc = -1999 f = 5856
Bot Chord: 2-L L3X3X.416 A = 4.646 Y = 0.902 Fy = 50000 Q = 1.000
Ix= 3.831 Iy= 12.965 RX = 0.908 Ry = 1.670 RZ = 0.585
Center: L = 80.000 P = 73945 Pa = 139377
Chord shear: V = 20200 T = 42673 fv = 7421 ft = 9185 f = 8727
Valley Joist West Page 56 ~1.71
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T233 7 - 40LH868/483 x 45’ 9.250 Special Crimped angle
Parallel chord Longspan
Web
T1 v1 c1
T2
v2
c2
T3
v3 c-
Ansl 66.5
39.7
32.8
46.3
0.0
46.3
46.3
0.0
46.3
Lnqth Shear
95.9 18522
49.6 -5237 45.4-14403
55.3 10847
38.2 -4191
55.3 -7880
55.3 .4930
38.2 -4255
55.3 -4930
Force Member Area- R
46519 2L L2x2x.216 1.635 0.613~
-6805 1L L2x2x.125 0.484 0.3982
-17137 2LL1-3/4X.143 0.960 0.543X
15706 1LL1-3/4X.155 0.518 0.3452
-11410 1L L2X2X.248 0.930 0.3912
7139 lLL1-1/4x.109 0.261 0.2472
-4255 lLL1-1/2X.109 0.315 0.2972
-4191 lLL1-1/2~.109 0.315 0.2972
-7139 1L L2x2x.143 0.552 0.3962
-- Pa Weld
49041 7.3
-7228 1.8
-20127 4.0
15554 3.4
-4725 1.3 -12355 1.5
7819 2.2
-4725 1.3 -7378 1.7
T - AVl W - B
10.2/10.2
4.4/ 4.8
4.4/ 4.9
3.5/ 3.5
4.7/ 5.2
3.9/ 4.4
3.5/ 3.5
4.7/ 5.2
6.6/ 6.6
i-
Vallev Joist West Page 57 V1.71
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014 '
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS CARLSBAD, CA
Comments: UBC 1997 TAG COLOR BLUE
T234 2 - 40LH896/496 x 45' 9.250 Special Crimped angle
Parallel chord Longspan
End Lenqth Dewth Slowe Holes TOD Chord Ext BCX Holdback Pitch EP/#lL
Tau 6.000 5.000 90.000
Opp 6.000 5.000 90.000
Uniform Live load 496 #/ft full length
Uniform SJI load 896 #/ft full length
Uniform Dead load 400 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
Hl-LIP @I 15'3" FTE OAL TYPE 2 CLIP @I 30'6" FTE OAL
Sh .f BEARING 3-1/2" @ LE End loads: SJINtUpDeadLiveu&Wind
Left TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
40.000 in Deep 545.250 in Design length 5089 # Minimum Shear
37.701 in Effective Depth 4381 in4 Ix 0 in4 Minimum Ix
32.000 in Clear Depth L/1456 Live Defl L/ 806 SJI Defl
2911090 in-#Moment 1.000 in Chord gap 0.860 in Camber
80.000 in Interior Panel 56.312 in Left End 56.312 in Right End
6 Web Vees 21356 # SJI reaction 21356 # SJI reaction
Top Chord: 2-L L4x4x.375 A = 5.719 Y = 1.138 Fy = 50000 Q = 1.000
Bridg c 349" Ix= 8.717 Iy= 24.067 Rx = 1.235 Ry = 2.051 Rz = 0.788
Center: L = 40.000 P = -75554 Paz=-149242 M = 4872 No Fillers
Tag end panl: L = 56.312 P = -44565 Paz=-106324 M = 16553 No Filler
First point: P = -44565 Pa =-154406 M = 26087
Chord shear: V = 20200 C = -9695 fv = 4947 fc = -1695 f = 5020
Bot Chord: 2-L L4x4x.438 A = 6.624 Y = 1.161 Fy = 50000 Q = 1.000
Ix= 9.957 Iy= 28.235 Rx = 1.226 Ry = 2.065 RZ = 0.785
Center: L = 80.000 P = 77216 Pa = 198729
Chord shear: V = 20200 T = 44565 fv = 5449 ft = 6727 f = 6403
Vallev Joist West Page 58 V1.71
,- Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002 2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T234 2 - 40LH896/496 x 45' 9.250 Special Crimped angle
Parallel chord Longspan
Web Ansl Lnsth T 166.8 95.7 49.2 V 140.0 c 1 33.2
T 2 46.7 v 2 0.0
C 2 46.7 T 3 46.7 v 3 0.0
C*- 46.7
45.0-
55.0
37.7
55.0
55.0
37.7
55.0
Shear
19092
-5375
14842
11173
-4298
-8113
5089
-4364
-5089
Force
48482
-7022
-17728
16291
-4298
-11829
7420
-4364
-7420
Member
2L L2x2x.216
1L L2X2X.125 2LL1-3/4X.143
1L L2X2X.143
1~~1-1/2~.109 1L L2X2X.248
lLL1-1/4X.109
1~~1-1/2~.109
1L L2X2X.143
Area
1.635
0.484
0.960
0.552
0.315
0.930
0.261
0.315
0.552
0.613~
0.3982
0.543~
0.3962
0.2972
0.3912
0.2472
0.2972
0.3962
-- Pa Weld T-AvlW-B
49041 7.6 15.6/15.6
-7283 1.9 4.4/ 4.8
-20222 4.2 9.0/ 9.0
-4798 1.3 3.5/ 3.5
-4798 1.3 3.5/ 3.5
-7447 1.7 4.7/ 5.2
16547 3.8 4.7/ 5.2
-12502 1.6 4.7/ 5.2
7819 2.3 3.9/ 4.4
Page 59 V1.71 Vallev Joist West
.- Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS CARLSBAD, CA
Comments: UBC 1997 TAG COLOR BLUE
T235 1 - 40LH896/496 x 45' 9.250 Special Crimped angle
- End Lencrth Dewth SLope Holes Tow Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 90.000
Opp 6.000 5.000 90.000
Parallel chord Longspan
Uniform Live load 496 #/ft full length
Uniform SJI load 896 #/ft full length
Uniform Dead load 400 #/ft full length
An additional SJI load of 2000# may occur at any top chord panel point.
An additional Dead load of 2000# may occur at any top chord panel point.
Hlr--LIP @ 15'3" FTE OAL TYPE 2 CLIP @ 30'6" FTE OAL
SEA .T BEARING 3-1/2" @ LE End loads: - SJI WDead-EaukWind
Left TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
40.000 in Deep 545.250 in Design length 5089 # Minimum Shear
37.701 in Effective Depth 4381 in4 Ix 0 in4 Minimum Ix
32.000 in Clear Depth L/1456 Live Defl L/ 806 SJI Defl
30474 02 in-#Moment 1.000 in Chord gap 0.860 in Camber
80.000 in Interior Panel 56.312 in Left End 56.312 in Right End
6 Web Vees 22356 # SJI reaction 22356 # SJI reaction
Tow Chord: 2-L L4x4x.375 A = 5.719 Y = 1.138 Fy = 50000 Q = 1.000
Bridg c 349" Ix= 8.717 Iy= 24.067 Rx = 1.235 Ry = 2.051 Rz = 0.788
Center: L = 40.000 P = -79092 Paz=-149242 M = 4872 No Fillers
Tag end panl: L = 56.312 P = -46522 Paz=-106324 M = 16553 No Filler
First point: P = -46522 Pa =-154406 M = 26087
Chord shear: V = 20200 C = -10213 fv = 5212 fc = -1786 f = 5288
Bot Chord: 2-L ~4x4x.438 A = 6.624 Y = 1.161 Fy = 50000 Q = 1.000
Ix= 9.957 Iy= 28.235 RX = 1.226 Ry t 2.065 Rz = 0.785
Center: L = 80.000 P = 80832 Pa = 198729
Chord shear: V = 20200 T = 46522 fv = 5688 ft = 7023 f = 6685
Vallev Joist West Page 60 V1.77
,-- Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002 2049 KURT2 ST SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T235 1 - 40LH896/496 x 45' 9.250 Special Crimped angle
Parallel chord Longspan
Web Ansl Lnsth Shear
T 166.8 95.7 19931
V 140.0 49.2 -6383
C 133.2 45.0-15636 T 2 46.7 55.0 11893
V 2 0.0 37.7 -5313
C 2 46.7 55.0 -8760 T 3 46.7 55.0 5627 V 3 0.0 37.7 -5382
C+ 46.7 55.0 -5089
Force Member Area- R
50612 2L L2X2X.248 1.861 0.609~
-8338 1L L2x2x.143 0.552 0.3962
17340 1L L2x2x.156 0.600 0.3962
-18676 2LL1-3/4X.143 0.960 0.543X
-5313 lLL1-1/2X.125 0.359 0.2962
-12772 1LL2-1/2X.212 1.015 0.4932
8204 lLL1-1/2X.109 0.315 0.2972
-5382 lLL1-1/2~.125 0.359 0.2962
-7420 1L L2x2x.143 0.552 0.3962
-- Pa Weld
55830 6.9
-8568 2.0
-20222 4.4
17990 3.7
-5579 1.4
-18238 2.0
9454 2.5
-5579 1.4
-7447 1.7
T - AVl W - B
15.6/15.6
4.4j 4.8
9.0/ 9.0
4.7/ 5.2
3.5/ 3.5
3.5/ 3.5
4.7/ 5.2
5.2/ 5.7
4.2/ 4.7
Valley Joist West Page 61 V1.71
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01 F-
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T236 1 - 40LH896/496 x 45' 9.250 Special Crimped angle
- End Lenqth Depth Slolse Holes TOP Chord Ext BCX Holdback Pitch EP/#lL
Parallel chord Longspan
Tag 6.000 5.000 90.000
Opp 6.000 5.000 90.000
Uniform Live load 496 #/ft full length
Uniform SJI load 896 #/ft full length
Uniform Dead load 400 #/ft full length
An additional SJI load of 2000# may occur at any top chord panel point.
An additional Dead load of 2000# may occur at any top chord panel point.
Hl-LIP @ 11'10" & 15'3" FTE OAL TYPE 2 CLIP @ 30'6" FTE OAL
S€. T BEARING 3-1/2" @ LE
End loads: SJImDeadLiveEaukWind
Left TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips 40.000 in Deep 545.250 in Design length 5089 # Minimum Shear
37.701 in Effective Depth 4381 in4 Ix 0 in4 Minimum Ix
32.000 in Clear Depth L/1456 Live Defl L/ 806 SJI Defl
3047402 in-#Moment 1.000 in Chord gap 0.860 in Camber
80.000 in Interior Panel 56.312 in Left End 56.312 in Right End
6 Web Vees 22356 # SJI reaction 22356 # SJI reaction
TOR Chord: 2-L L4x4x.375 A = 5.719 Y = 1.138 Fy = 50000 Q = 1.000
Bridg c 349" Ix= 8.717 Iy= 24.067 Rx = 1.235 Ry = 2.051 . Rz = 0.788
Center: L = 40.000 P = -79092 Paz=-149242 M = 4872 No Fillers
Tag end panl: L = 56.312 P = -46522 Paz=-106324 M = 16553 No Filler
First point: P = -46522 Pa =-154406 M = 26087
Chord shear: V = 20200 C = -10213 fv = 5212 fc = -1786 f = 5288
Bot Chord: 2-L L4x4x.438 A = 6.624 Y = 1.161 Fy = 50000 Q = 1.000
Ix= 9.957 Iy= 28.235 RX = 1.226 Ry = 2.065 RZ = 0.785
Center: L = 80.000 P = 80832 Pa = 198729
Chord shear: V = 20200 T = 46522 fv = 5688 ft = 7023 f = 6685
Page 62 V1.71 Vallev Joist West
Job #ON02915 - 02 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR BLUE
T236 1 - 40LH896/496 x 45' 9.250 Special Crimped angle
Parallel chord Longspan
Web Anql T 1 66.8
V 140.0
C.1 33.2
T 2 46.7 v 2 0.0
C 2 46.7
T 3 46.7 v 3 0.0
C 46.7
Lnqth
95.7
49.2
45.0-
55.0
37.7
55.0
55.0
37.7
55.0
Shear
19931
-6383
15636
11893
-5313
-8760
5627
-5382
-5089
Force Member Area- R
50612 2L L2X2X.248 1.861 0.609~
-8338 1L L2X2X.143 0.552 0.3962
-18676 2LL1-3/4X.143 0.960 0.543~
17340 1L L2x2x.156 0.600 0.3962
-5313 lLL1-1/2X.125 0.359 0.2962
-12772 lLL2-1/2X.212 1.015 0.4932
8204 lLL1-1/2x.109 0.315 0.2972
-5382 1LL1-1/2X.125 0.359 0.2962
-7420 1L L2X2X.143 0.552 0.3962
-__ Pa Weld
55830 6.9
-8568 2.0
-20222 4.4
17990 3.7
-5579 1.4
-18238 2.0
9454 2.5
-5579 1.4
-7447 1.7
T -AV1W- B
15.6/15.6
9.0/ 9.0
4.4/ 4.8
4.7/ 5.2
5.2,' 5.7
3.5/ 3.5
4.2/ 4.7
3.5/ 3.5
4.7/ 5.2
Vallev Joist West Page 1 V1.71
Job #ON02915 - 03 By ASM Entered 6/20/00 Revised 2/13/01 7
Customer: JD2. INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR GREEN
G301 1 - 20G2N53/29.15 x 13' 4.750 Special Crimped angle
End Lensth DeDth SloDe Holes TOD Chord Ext BCX Holdback Pitch EP/#lL
Parallel chord Girder
Tag 6.000 6.000 Y E 0' 0.500 2 0' 4.750 81.875
Opp 6.000 6.00.0 2 0' 1.500 78.875
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
TC conc loads: Load SDacinq Location Point
53000 6'9-7/8 689-7/8 U4 S JI
23850 6'9-7/8 U4 Dead
6'9-7/8 U4 Live r
29150 6 I6-7/8
KEEP CLEAR FOR KNIFE PLATE 7" @ LE
TC HOLES 7/8" X 5" GAUGE LE @ 1-3/4"
End loads: SJII&adadUkW
Left TC axial load: 0.0 0.0 0.0 0.0 23.5 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 23.5 0.0 Kips
20.000 in Deep 156.750 in Design length 6625 # Minimum Shear
17.708 in Effective Depth 902 in4 Ix 0 in4 Minimum Ix
12.000 in Clear Depth L/1754 Live Defl L/ 965 SJI Defl
2115350 in-#Moment 1.000 in Chord gap 0.071 in Camber
40.188 in Interior Panel 18.469 in Left End 17.719 in Right End
4 Web Vees 26993 # SJI reaction 28007 # SJI reaction
Tor, Chord: 2-L L4x4x.500 A = 7.500 Y = 1.183 Fy = 50000 Q = 1.000
Center: L = 20.469 P = -89982 Paz=-207104 M = 0 No Fillers
Ix= 11.123 Iy= 32.375 Rx = 1.218 Ry = 2.078 Rz = 0.782
Bot Chord: 2-L L4X4X.293 A = 4.516 Y = 1.108 Fy = 50000
IX= 7.014 Iy= 18.699 Rx = 1.246 Ry = 2.035
Center: L = 40.188 P = 119456 Pa = 135489
Chord shear: V = 20200 T = 45405 fv = 11434 ft = 10054
Web Ansl Lnclth Shear Force Member Area- R _- Pa Weld
T 159.4 34.8 26801 52725 2L L2x2x.248 1.861 0.609~ 55830 7.2
V& 33.1 21.1 -1000 -1193 lLLlxlx.109 0.206 0.1962 -2653 0.4
C 26.8 19.8-26744 -29958 2L L2~2x.156 1.199 0.622~ -30323 6.5
V 2 0.0 17.7 -1000 -1000 1LLlxlx.109 0.206 0.1962 -3479 0.3
C 2 49.1 27.1-26483 -40478 2L L2x2x.216 1.635 0.613X -41260 6.3
TZ 49.1 27.1 26614 40677 2LL2x2x.176 1.346 0.619~ 40381 7.8
Q = 0.908 Rz = 0.792
f = 12490
T - AVl W - B
12.2/12.2
3.2/ 3.5
8.6/ 8.6
10.1/10.1
3.0/ 3.0
10.1/10.1
Vallev Joist West Page 2 V1.71
Job #ON02915 - 03 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURT2 ST SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR GREEN
G302 1 - 28G4N24.6/13.53 x 27'11.500 Special Crimped
angle Parallel chord Girder
End Lensth Devth Slope Holes TOV Chord Ext BCX Holdback Pitch EP/#lL
83.750 Tag 6.000 6.000 Y 2 0' 4.750
Opp 6.000 6.000 Y 2 0' 4.750 83.750
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
TC conc loads: Load Spacinq Location Point a
24600 6'11-3/4 6111-3/4 U4 S JI - 11070 6'11-3/4 U4 Dead
13530 6'11-3/4 U4 Live
24600 7'0 13'11-3/4 U8 S JI
11070 13'11-3/4 U8 Dead
13530 13'11-3/4 U8 Live
24600 7'0 20'11-3/4 U12 SJI
11070 2Ot11-3/4 U12 Dead
20'11-3/4 U12 Live 6'11-3/4
TC HOLES 7/8" X 5" GAUGE BE @ 1-3/4" KEEP CLEAR FOR KNIFE PLATE 7" @ BE
End loads: __ SJI NtUpmUmWind
Left TC axial load: 0.0 0.0 0.0 0.0 27.6 0.0 Kips Right TC axial load: 0.0 0.0 0.0 0.0 27.6 0.0 Kips
28.000 in Deep 331.500 in Design length 9225 # Minimum Shear 25.701 in Effective Depth 2046 in4 Ix 0 in4 Minimum Ix
20.000 in Clear Depth L/ 812 Live Defl L/ 446 SJI Defl
4132650 in-#Moment 1.000 in Chord gap 0.318 in Camber
42.000 in Interior Panel 18.937 in Left End 18.937 in Right End
8 Web Vees 37900 # SJI reaction 37900 # SJI reaction
Tov Chord: 2-L L4x4x.438 A = 6.624 Y = 1.161 Fy = 50000 Q = 1.000
Center: L = 21.000 P =-150698 Paz=-182457 M = 0 No Fillers
Chord shear: V = 20200 C = -5696 fv = 10782 fc = -860 f = 10790
Ix= 9.957 Iy= 28.235 Rx = 1.226 Ry = 2.065 Rz = 0.785
Bot Chord: 2-L L4x4x.375 A = 5.719 Y = 1.138 Fy = 50000 Q = 1.000
Ix= 8.717 Iy= 24.067 RX = 1.235 Ry = 2.051 RZ = 0.788
Center: L = 42.000 P~ = 160800 Pa = 171563
Chord shear: V = 20200 T = 52936 fv = 12597 ft'= 9257 f = 13420
Vallev Joist West Page 3 V1.71
Job #ON02915 - 03 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS CARLSBAD, CA
Comments: UBC 1997 TAG COLOR GREEN
G302 1 - 28G4N24.6/13.53 x 27'11.500 Special Crimped
angle Parallel chord Girder
web
T1
VI.
c1
T2
v2
c2
T3
v3 e-
l. v4 c4
Anql Lnqth Shear
54.5 44.2 37791
33.6 30.8 -1000
8.6 26.0-37780
39.2 33.1 37717
0.0 25.7 -1000
39.2 33.1-37653
39.3 33.2 12990
0.0 25.7 -1000
39.3 33.2-12927
39.3 33.2 12863
0.0 25.7 -1000
39.3 33.2-12800
Force Member Area- R
65042 2LL2-1/2X.230 2.194 0.772~
-1200 lLLlxlx.109 0.206 0.1962
-38207 2L L2X2X.216
48648 2L L2x2x.216
-1000 1LLlXlX.lO9
-48567 2LL2-1/2X.212 16775 1L L2x2x.156
-1000 1LLlXlX.lO9
-16693 1L L2X2X.248
16611 1L L2x2x.143
-1000 1LLlXlX.lO9
-16530 1L L2X2X.248
1.635 0.613~
1.635 0.613~
0.206 0.1962
2.030 0.775~
0.600 0.3962
0.206 0.1962
0.930 0.3912
0.552 0.3962
0.206 0.1962
0.930 0.3912
Pa Weld T-Av1W-B -- 65826 9.5 11.1/11.1
-1245 0.4 3.2/ 3.5
-41676 6.0 8.9/ 8.9
49041 7.6 9.3/ 9.3
-1793 0.3 3.0/ 3.0
-.50146 7.7 9.4/ 9.4
17990 3.6 4.3/ 4.7
-1793 0.3 3.0/ 3.0
-16775 2.3 4.3/ 4.7
16547 3.9 4.3/ 4.7
-1793 0.3 3.0/ 3.0
-16775 2.2 4.3/ 4.7
,-
Vallev Joist West Page 4 V1.71
Job #ON02915 - 03 By ASM Entered 6/20/00 Revised 2/13/01 F
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR GREEN
G303 2 - 28G4N31.4/17.27 x 27'11.500 Special Crimped
End Lenqth Depth Slope Holes TOR Chord Ext BCX Holdback Pitch EP/#lL
angle Parallel chord Girder
Tag 6.000 6.000 Y 2 0' 4.750 83.750
Opp 6.000 6.000 Y 2 0' 4.750 83.750
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
TC conc loads: Load Spacinq Location Point
31400 6'11-3/4 6'11-3/4 U4 S JI
7 14130 6'11-3/4 U4 Dead
17270 6'11-3/4 U4 Live
31400 7'0 13'11-3/4 U8 S JI
14130 13'11-3/4 U8 Dead
17270 13'11-3/4 U8 Live
31400 110 20'11-3/4 U12 SJI
14130 '" 20111-3/4 U12 Dead
20'11-3/4 U12 Live 17270 6'11-3/4
TC HOLES 7/8" X 5" GAUGE BE @ 1-3/4" KEEP CLEAR FOR KNIFE PLATE 7" @ BE
End loads: SJImDeadLive-Wind
Left TC axial load: 0.0 0.0 0.0 0.0 27.6 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 27.6 0.0 Kips
28.000 in Deep 331.500 in Design length 11775 # Minimum Shear
25.'633 in Effective Depth 2486 in4 Ix 0 in4 Minimum Ix
20.000 in Clear Depth L/ 773 Live Defl L/ 425 SJI Defl
5252100 in-#Moment 1.000 in Chord gap 0.318 in Camber
42.000 in Interior Panel 18.937 in Left End 18.937 in Right End
8 Web Vees 48100 # SJI reaction 48100 # SJI reaction
TOD Chord: 2-L L4x4x.500 A = 7.500 Y = 1.183 Fy = 50000 Q = 1.000
Center: L = 21.000 P =-191979 Paz=-206506 M = 0 No Fillers
Chord shear: V = 20200 C = -7253 fv = 11995 fc = -967 f = 12005
IX= 11.123 Iy= 32.375 Rx = 1.218 Ry = 2.078 RZ = 0.782
Bot Chord: 2-L L4~4x.500 A = 7.500 Y = 1.183 Fy = 50000 Q = 1.000 IX= 11.123 Iy= 32.375 RX = 1.218 Ry = 2.078 Rz = 0.782
Center: L = 42.000 P = 204893 Pa = 225000
Chord shear: V = 20200 T = 67400 fv = 11998 ft = 8987 f = 12812
Valley Joist West Page 5 V1.71 - Job #ON02915 - 03 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS CARLSBAD, CA
Comments: UBC 1997
TAG COLOR GREEN
G303 2 - 28G4N31.4/17.27 x 27'11.500 Special Crimped
angle Parallel chord Girder
Web Anql Lnqth Shear Force Member Area- R -- Pa Weld T 1 54.5 44.2 47991 82740 2L L3x3x.313 3.560 0.922~ 106802 8.9
v1
c1
T2
v2
c2
T3
v3
C- Ti
v4
c4
33.6
8.6
39.2
0.0
39.2
39.3
0.0
39.3
39.3
0.0
39.3
30.8 -1000
25.9-47980
33.1 47917
25.6 -1000
33.1-47853
33.1 16390
25.6 -1000
33.1-16327
33.1 16263
25.6 -1000
33.1-16200
-1201 1LLlXlX.109 0.206 0.1962 -1249 0.4
-48525 2LL2-1/2~.212 2.030 0.775X -52599 7.7
61869 2LL2-1/2~.230 2.194 0.772~ 65826 9.1
-1000 1LLlXlX.109 0.206 0.1962 -1803 0.3 -61788 2LL3X3X.250 2.875 0.930~ -73278 8.3
-1000 1LLlXlX.109 0.206 0.1962 -1803 0.3
-21106 1LL2-1/2X.212 1.015 0.4932 -21265 3.4
-1000 1LLlXlX.109 0.206 0.1962 -1803 0.3
-20942 lLL2-1/2X.212 1.015 0.4932 -21265 3.3
21188 1LL2x2x.187 0.713 0.3942 21391 3.8
21024 lLL2x2x.187 0.713 0.3942 21391 3.8
T - AVl W - B
10.6/10.6
3.2/ 3.5
9.2/ 9.2
3.0/ 3.0
9.3/ 9.3
9.3/ 9.3
4.3/ 4.7
4.8/ 5.2
4.3/ 4.7
4.8/ 5.2
3.0/ 3.0
3.0/ 3.0
Vallev Joist West Page 6 V1.71
Entered 6/20/00 Revised 2/13/01 - Job #ON02915 - 03 By ASM
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR GREEN
G304 1 - 2864N31.2/17.16 x 27' 6.750 Special Crimped
angle Parallel chord Girder
End Lenqth Deuth Slope Holes TOU Chord Ext BCX Holdback Pitch EP/#lL - Taq 6.000 6.000 Y 2 0' 1.500 79.500
Opp 6.000 6.000 Y E 0' 0.500 2 0' 4.750 83.250
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
TC conc loads: Load Suacinq Location Point Tvue
14040 6'7-1/2 U4 Dead
6'7-1/2 U4 Live
SJI 31200 6t7-1/2 U4 6'7-1/2
,-- 17160 ~ -.. 31200 "" 13'7-1/2 U8 S JI
14040 13'7-1/2 U8 Dead
17160 2:: 13'7-1/2 U8 Live
20'7-1/2 U12 SJI I'V 31200
17160 6'11-1/4
14040 20'7-1/2 U12 Dead
20'7-1/2 U12 Live
TC HOLES.7/8" X 5" GAUGE RE @ 1-3/4" KEEP CLEAR FOR KNIFE PLATE 7" @ BE
7" MAX SEAT WIDTH @ LE End loads: - SJI NtUpw-aWind
Left TC axial load: 0.0 0.0 0.0 0.0 23.5 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 23.5 0.0 Kips
28.000 in Deep 326.750 in Design length 11700 # Minimum Shear
24.450 in Effective Depth 5157 in4 Ix 0 in4 Minimum Ix
16.000 in Clear Depth L/1673 Live Defl L/ 920 SJI Defl
5105820 in-#Moment 1.000 in Chord gap 0.309 in Camber
42.000 in Interior Panel 17.875 in Left End 18.813 in Right End
8 Web Vees 48337 # SJI reaction 47263 # SJI reaction
TOD Chord: 2-LL6x6x.750 A = 16.875 Y = 1.775 Fy = 50000 Q = 1.000
Ix= 56.310 Iy=143.648 Rx = 1.827 Ry = 2.918 Rz = 1.173
Center: L = 21.000 P =-195844 Paz=-481227 M = 0 No Fillers
Chord shear: V = 20200 C = -3451 fv = 5358 fc = -205 f = 5359
d- Chord: 2-LL6x6x.750 A = 16.875 Y = 1.775 Fy = 50000 Q = 1.000 Ix= 56.310 Iy=143.648 RX = 1.827 Ry = 2.918 RZ = 1.173
Center: L = 42.000 P = 208827 Pa = 506250
Chord shear: V = 20200 T = 71009 fv = 5359 ft = 4208 f = 5757
Valley Joist West Page 7 V1.71
Job #ON02915 - 03 By ASM Entered 6/20/00 Revised 2/13/01 ,--
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR GREEN
G3 04 1 - 28G4N31.2/17.16 x 27' 6.750 Special Crimped angle Parallel chord Girder
Web Anql Lnqth Shear Force Member Area- R -- Pa Weld T-AvlW-B
T 155.8 43.5 48227 85838 2LL3X3x.250 2.875 0.930~ 8625011.6 16.8/16.8
v1
c1
T2
v2
c2
T3
v3 c-7
v4
c4
Li
36.5
4.1
39.1
0.0
39.1
40.7
0.0
40.7
40.7
0.0
40.7
30.4 -1000
24.5-48222
31.5 48161
24.5 -1000
31.5-48100
32.2 16836
24.5 -1000
32.2-16771
32.2 16707
24.5 -1000
32.2-16643
-1245 lLLlxlx.109 0.206 0.1962 -1279 0.4 3.2/ 3.6
-48345 2L L2~2x.248 1.861 0.609~ -48011 6.6 12.4/12.4
62065 2LL2-1/2X.230 2.194 0.772~ 65826 9.1 13.5/13.5
-1000 1LLlXlX.109 0.206 0.1962 -1982 0.3 3.0,' 3.0
-61987 2LL3X3X.250 2.875 0.930~ -73881 8.3 13.6/13.6
-1000 lLLlXlX.109 0.206 0.1962 -1982 0.3 3.0/ 3.0
-22108 lLL2-1/2x.230 1.097 0.4922 -23817 3.2 4.8/ 5.2
-1000 1LLlXlX.109 0.206 0.1962 -1982 0.3 3.0/ 3.0
-21939 lLL2-1/2x.230 1.097 0.4922 -23817 3.2 4.8/ 5.2
22193 1L L2x2x.216 0.817 0.3922 24520 3.5 4.3/ 4.7
22024 1L L2x2x.216 0.817 0.3922 24520 3.4 4.3/ 4.7
Vallev Joist West: Page 8 V1.71
Entered 6/20/00 Revised 2/13/01 - Job #ON02915 - 03 By ASM
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR GREEN
G305 2 - 2864N40/22.0 x 27' 6.750 Special Crimped angle
Parallel chord Girder
End Lenqth Delsth SloDe Holes TOD Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 6.000 Y E 0' 0.500 2 0' 4.750 83.250
Opp 6.000 6.000 Y 2 0' 1.500 79.500
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
TC conc loads: Load Slsacinq Location Point Tme
40000 6'11-1/4 6 I11-1/4 U4 S JI
rc 18000 6'11-1/4 U4 Dead
22000 6'11-1/4 U4 Live
40000 7'0 13'11-1/4 U8 S JI
18000 13'11-1/4 U8 Dead
22000 13'11-1/4 U8 Live
40000 7'0 20'11-1/4 U12 SJI
18000 20'11-1/4 U12 Dead
22000 6 l7-1/2 2OV11-1/4 U12 Live
TC HOLES 7/8" x 5" GAUGE LE @ 1-3/4"
KEEP CLEAR FOR KNIFE PLATE 7" @ BE
7" MAX SEAT WIDTH @ RE
End loads: SJI
Left TC axial load: 0.0
Right TC axial load: 0.0
28.000 in Deep
24.450 in Effective Depth
16.000 in Clear Depth
42.000 in Interior Panel
6522886 in-#Moment
8 Web Vees
mDeadLive&&Wind
0.0 0.0 0.0 23.5 0.0 Kips
0.0 0.0 0.0 23.5 0.0 Kips
5157 in4 Ix 0 in4 Minimum Ix
L/1305 Live Defl L/ 718 SJI Defl
1.000 in Chord gap 0.309 in Camber
18.813 in Left End 17.875 in Right End
326.750 in Deslgn length 15000 # Minimum Shear
60311 # SJI reaction 61689 # SJI reaction
TOR Chord: 2-LL6x6x.750 A = 16.875 Y 1.775 Fy = 50000 Q = 1.000
Ix= 56.310 Ip143.648 Rx = 1.827 Ry = 2.918 Rz = 1.173
Center: L = 21.000 P =-250153 Paz=-481227 M = 0 No Fillers
Chord shear: V = 20200 C = -1539 fv = 6688 fc = -91 f = 6688
- Fr Chord: 2-LL6x6x.750 A = 16.875 Y 1.775 Fy = 50000 Q = 1.000
Ix= 56.310 Iy=143.648 Rx = 1.827 Ry = 2.918 Rz = 1.173
Center: L = 42.000 P = 266785 Pa = 506250
Chord shear: V = 20200 T = 96012 fv = 6688 ft = 5690 f = 7268
Vallev Joist West Page 9 V1.71
By ASM Entered 6/20/00 Revised 2/13/01 - Job #ON02915 - 03
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR GREEN
G305 2 - 28G4N40/22.0 x 27' 6.750 Special Crimped angle
Parallel chord Girder
Web hql
T 1 57.9 v 1 39.5 c 1 1.5 T 2 40.4 v 2 0.0
C 2 40.4
T 3 40.7 v 3 0.0
C" 40.7
'I 40.7 v 4 0.0
C 4 40.7
Lnqth Shear Force
46.0 60192 113320
31.7 -1000 -1297
24.5-60190 -60210
32.1 60126 78960
24.5 -1000 -1000
32.1-60063 -78877
32.2 19998 26362
24.5 -1000 -1000
32.2-19934 -26278
32.2 19870 26193
24.5 -1000 -1000
32.2-19806 -26108
2LL3X3x.250
1LLlXlX.lO9
2L L3X3X.313
1L L2x2x.248
1LLlXlX.lO9
2L L2x2x.156
1L L2X2X.248
1LLlXlX.lO9
2L L2x2x.156
Area
3.849
0.261
2.375
2.875
0.206
3.560
0.930
0.206
1.199
0.930 0.206
1.199
A -- Pa Weld
0.918~ 11546411.2
0.2472
0.769~
0.930~
0.1962
0.922~
0.3912
0.1962
0.3912 0.1962
0.622~
0.622~
-2353 0.4
-63957 8.1
8625010.6
-1982 0.3
-94464 8.5
27915 3.6
-1982 0.3
-27279 5.7
27915 3.6
-1982 0.3
-27279 5.6
T - AVl W - B
17.6/17.6
3.6/ 3.9
12.9/12.9
13.8/13.8
3.0/ 3.0
13.8/13.8
3.0/ 3.0
13.7/13.7
3.0/ 3.0
13.7/13.7
4.3/ 4.7
4.3/ 4.7
,-
Valley Joist West Page 10 V1.71
Job #ON02915 - 03 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS CARLSBAD, CA
Comments: UBC 1997
TAG COLOR GREEN
G306 1 - 30G4N31.9/17.55 x 28' 5.250 Special Crimped
angle Parallel chord Girder
End Lenqth Depth Slope Holes TOP Chord Ext BCX Holdback Pitch EP/#lL
Tau 6.000 6.000 Y 2 0' 4.750 82.250
Opp 6.000 6.000 2 0' 1.500 83.375
An additional SJI load of lOOO# may occur at any top chord panel point. An additional Dead load of lOOO# may occur at any top chord panel point. TC conc loads: Load Swacinq Location Point Twe
31900 6'10-?!! 6'10-1/4 U4 SJI
14350 "'" 6'10-1/4 U4 Dead
17550 6'10-1/4 U4 Live
31900 6'10-5!: 13'8-7/8 U8 S JI
13'8-7/8 U8 Dead 14350 17550 13'8-7/8 U8 Live
31900 7'9 21'5-7/8 U12 SJI
14350 2115-7/8 U12 Dead 21'5-7/8 U12 Live 17550 6'11-3/8
U'U
TC HOLES 7/8" X 5" GAUGE LE @ 1-3/4"
KEEP CLEAR KNIFE PLATE 7" @ LE
End loads: SJI-mLiveEQukWind
Left TC axial load: 0.0 0.0 0.0 0.0 27.6 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 27.6 0.0 Kips
30.000 in Deep 337.250 in Design length 11963 # Minimum Shear
27.656 in Effective Depth 2711 in4 Ix 0 in4 Minimum Ix
22.000 in Clear Depth L/ 813 Live Defl L/ 447 SJI Defl
5347963 in-#Moment 1.000 in Chord gap 0.329 in Camber
43.906 in Interior Panel 18.563 in Left End 18.844 in Right End
8 Web Vees 49500 # SJI reaction 48200 # SJI reaction
TOW Chord: 2-L L4x4x.500 A = 7.500 Y = 1.183 Fy = 50000 Q = 1.000
Center: L = 20.656 P =-180907 Paz=-206894 M = 0 No Fillers
Chord shear: V = 20200 C = -36718 fv = 12346 fc = -4896 f = 12586
B$ Chord: 2-L L4x4x.438 A = 6.624 Y = 1.161 Fy = 50000 Q = 1.000
Chord shear: V = 20200 T = 33188 fv = 14111 ft = 5010 f = 14332
Ix= 11.123 Iy= 32.375 Rx = 1.218 Ry = 2.078 Rz = 0.782
Ix= 9.957 Iy= 28.235 RX = 1.226 Ry = 2.065 RZ = 0.785
Center: L = 43.906 P = 193377 Pa = 198729
Vallev Joist West Page 11 V1.71
,-- Job #ON02915 - 03 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC.1997
TAG COLOR GREEN
G306 1 - 30G4N31.9/17.55 x 28' 5.250 Special Crimped
angle Parallel chord Girder
Web Anql Lnath Shear Force Member Area- R -__ Pa Weld
T 1 33.9 33.3 49445 59550 2LL2-1/2X.230 2.194 0.772~ 65826 8.7
V 1 0.0 27.7 -1000
C 1 36.6 34.5-49384 T 2 36.6 34.5 49323
V 2 0.0 27.7 -1000
C 2 36.6 34.5-49262 T 3 36.8 34.5 17301
V 3 0.0 27.7 -1000 r' 36.8 34.5-17240
1 t 36.8 34.5 17179
V 4 0.0 27.7 -1000
C 4 36.8 34.5-17117
-1000
-61539
61463
-1000
-61387
21594
-1000
-21518
21441
-1000
-21365
~LLIX~X. 109
2LL3X3X.250
ZLL2-1/2~.230
1LLlXlX.109
2LL3X3X.250
lLL2X2X.187
1LLlXlX.109
lLL2-1/2~.230
1LL2x2x.187
1LLlXlX.lO9
lLL2-1/2~.230
0.206 0.1962
2.875 0.930~
2.194 0.772~
0.206 0.1962
2.875 0.930~
0.713 0.3942
0.206 0.1962
1.097 0.4922
0.713 0.3942
0.206 0.1962
1.097 0.4922
-1549
-72750
65826
-1549
-72750
21391
-1549
-22895
21391
-1549
-22895
0.3
8.3
9.0
0.3
8.3
3.9
0.3
3.2
3.9 0.3
3.1
T-AVlW-B
8.9/ 8.9
3.0j 3.0
9.3/ 9.3
9.1/ 9.1
3.0/ 3.0
9.3/ 9.3
3.0/ 3.0
4.7/ 5.1
3.0/ 3.0
4.7/ 5.1
4.3/ 4.6
4.3/ 4.6
Vallev Joist West Page 12 V1.71
Job #ON02915 - 03 By ASM Entered 6/20/00 Revised 2/13/01 r
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR GREEN
T301 2 - 18LH945/560 x 10' 6.750 Special Crimped angle
Parallel chord Longspan
End Lenqth Depth Sloue Holes TOP Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 40.000
Opp 6.000 5.000 40.000
Uniform Live load 560 #/ft full length
Uniform SJI load 945 #/ft full length
Uniform Dead load 385 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
hT^ CLIP @ 5'5" FTE OAL
End loads: __ SJImm-aWind
Left TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
18.000 in Deep 122.750 in Design length 1208 # Minimum Shear
16.999 in Effective Depth 145 in4 Ix 0 in4 Minimum Ix
14.500 in Clear Depth L/3743 Live Defl L/2218 SJI Defl
218851 in-#Moment 1.000 in Chord gap 0.044 in Camber
46.750 in Interior Panel 30.687 in Left End 30.687 in Right End
2 Web Vees 5833 # SJI reaction 5833 # SJI reaction
Tor, Chord: 2-L L2x2x.216 A = 1.635 Y = 0.579 Fy = 50000 Q = 1.000
Bridg c 211" Ix= 0.615 Iy= 2.520 Rx = 0.613 Ry = 1.242 Rz = 0.392
Center: L = 30.687 P = -12874 Paz= -28498 M = 5297 No Fillers
Tag end panl: L = 30.687 P = -12874 Paz= -28498 M = 5297 No Filler
First point: P = -12874 Pa = -44137 M = 7946
Chord shear: V = 20200 C = -2349 fv = 1977 fc = -1437 f = 2104
Bot Chord: 2-LL1-1/2x.125 A = 0.719 Y = 0.421 Fy = 50000 Q = 0.961
Ix= 0.156 Iy= 0.765 RX = 0.465 Ry = 1.032 RZ = 0.296
Center: L = 46.750 P = 10530 Pa = 21563
Chord shear: V = 20200 T = 9647 fv = 11508 ft = 13421 f = 13321
Web Ansl Lnqth Shear Force Member Area- R __- Pa Weld T-AvlW-B
T 1 65.9 41.6 4315 10568 2LLlxlx.109 0.412 0.307~ 12367 3.3 7.2/ 5.2
Cd 54.0 28.9 -1708 -2905 lLL1-1/2x.109 0.315 0.2972 -3454 0.9 3.5/ 3.3 V 1 23.3 18.5 -3476 -3784 lLLlxlx.109 0.206 0.1962 -4287 1.2 2.2/ 1.9 ~
Valley Joist West Page 13 V1.71
Job #ON02915 - 03 By ASM Entered 6/20/00 Revised 2/13/01 7
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR GREEN
T302 1 - 18LH945/560 x 6' 9.750 Crimped angle Parallel chord Longspan
End Lenqth Depth Slope Holes Top Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 28.875
Opp 6.000 5.000 Y 28.875
Uniform Live load 560 #/ft full length
Uniform SJI load 945 #/ft full length
Uniform Dead load 385 #/ft'full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
H1 CLIP @ 3'3" FTE OAL
r End loads: - SJI NtUpm-UkWind
TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0 .,o 9.8 0.0 Kihs
18.000 in Deep 77.750 in Design length 765 # Minimum Shear
17.088 in Effective Depth 120 in4 Ix 0 in4 Minimum Ix
14.750 in Clear Depth L/12233 Live Defl L/7249 SJI Defl
161626 in-#Moment 1.000 in Chord gap 0.017 in Camber
24.000 in Interior Panel 19.438 in Left End 19.438 in Right End
2 Web Vees 4061 # SJI reaction 4061 # SJI reaction
Top Chord: 2-LL1-3/4x.143 A = 0.960 Y = 0.490 Fy = 50000 Q = 0.953
Bridg < 192" Ix= 0.283 Iy= 1.225 Rx = 0.543 Ry = 1.130 Rz = 0.346
Center: L = 19.438 P = -9458 Paz= -19413 M = 2125 No Fillers
Tag end panl: L = 19.438 P = -9458 Paz= -19413 M = 2125 No Filler
First point: P = -9458 Pa = -25923 M = 3188
Chord shear: V = 20200 C = -889 fv = 2528 fc = -925 f = 2570
Bot Chord: 2-LL1-1/2x.125 A = 0.719 Y = 0.421 Fy = 50000 Q = 0.961
Ix= 0.156 Iy= 0.765 RX = 0.465 Ry = 1.032 Rz = 0.296
Center: L = 24.000 P = 4620 Pa = 21563
Chord shear: V = 20200 T = 4640 fv = 7868 ft = 6456 f = 8504 Pa Weld T-AvlW-B
T 1 57.5 31.8 2950 5499 2LLlxlx.109 0.412 0.307~ 12367 1.7 5.2/ 4.3
-- Web Anql Lnqth Shear Force Member Area- R
V 123.5 18.6 -2574 -2807 lLLlxlx.109 0.206 0.1962 -4268 0.9 2.0/ 1.9
C 135.1 20.9 -1265 -1546 lLL1-1/4X.109 0.261 0.2472 -3718 0.5 2.3/ 2.3-
,-
Valley Joist West Page 14 V1.71
Job #ON02915 - 03 By ASM Entered 6/20/00 Revised 2/13/01 ,--
Customer: JD2, INC #lo002
2049 KURTZ ST SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR GREEN
T303 2 - 18LH945/560 x 6' 9.750 Crimped angle Parallel chord Longspan
End Lenqth Deuth Sloue Holes Tou Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 28.875
Opp 6.000 5.000 28.875
Uniform Live load 560 #/ft full length
Uniform SJI load 945 #/ft full length
Uniform Dead load 385 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
H1 CLIP @ 3'3" FTE OAL
End loads: - SJI mDeaduukWind c
deft TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips Right TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
18.000 in Deep 77.750 in Design length 765 # Minimum Shear
17.088 in Effective Depth 120 in4 Ix 0 in4 Minimum Ix
14.750 in Clear Depth L/12233 Live Defl L/7249 SJI Defl
161626 in-#Moment 1.000 in Chord gap 0.017 in Camber
24.000 in Interior Panel 19.438 in Left End 19.438 in Right End
2 Web Vees 4061 # SJI reaction 4061 # SJI reaction
Tou Chord: 2-LL1-3/4x.143 A = 0.960 Y = 0.490 Fy = 50000 Q = 0.953
Bridg c 192" Ix= 0.283 Iy= 1.225 Rx = 0.543 Ry = 1.130 Rz = 0.346
Center: L = 19.438 P = -9458 Paz= -19413 M = 2125 No Fillers
Tag end panl: L = 19.438 P = -9458 Paz= -19413 M = 2125 No Filler
First point: P = -9458 Pa = -25923 M = 3188
Chord shear: V = 20200 C = -889 fv = 2528 fc = -925 f = 2570
Bot Chord: 2-LL1-1/2~.125 A = 0.719 Y = 0.421 Fy = 50000 Q = 0.961
Ix= 0.156 Iy= 0.765 RX = 0.465 Ry = 1.032 RZ 0.296
Center: L = 24.000 P = 4620 Pa = 21563 Chord shear: V = 20200 T = 4640 fv = 7868 ft = 6456 f = 8504
Web Ana Lnqth Shear Force Member Area- R -- Pa Weld T-AvlW-B
T 1 57.5 31.8 2950 5499 2LLlxlx.109 0.412 0.307~ 12367 1.7 5.2/ 4.3
V 123.5 18.6 -2574 -2807 1LLlXlX.109 0.206 0.1962 -4268 0.9 2.0/ 1.9
C 1 35.1 20.9 -1265 -1546 lLL1-1/4x.109 0.261 0.2472 -3718 0.5 2.3/ 2.3
,-
Vallev Joist West Page 15 V1.71
Job #ON02915 - 03 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997 TAG COLOR GREEN
T304 1 - 18LH945/560 x 10' 6.750 Crimped angle Parallel chord Longspan
End Lensth Dewth Slowe Holes TOD Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 Y 40.000
Opp 6.000 5.000 40.000
Uniform Live load 560 #/ft full length
Uniform SJI load 945 #/ft full length Uniform Dead load 385 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
H1 CLIP k3 5'5" FTE OAL
7 End loads: - SJI Dead Live Eauk Wind
.eft TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 KiDS
Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
18.000 in Deep 122.750 in Design length 1208 # Minimum Shear
16.999 in Effective Depth 145 in4 Ix 0 in4 Minimum Ix
14.500 in Clear Depth L/3743 Live Defl L/2218 SJI Defl
218851 in-#Moment 1.000 in Chord gap 0.044 in Camber
46.750 in Interior Panel 30.687 in Left End 30.687 in Right End
2 Web Vees 5833 # SJI reaction 5833 # SJI reaction
Top Chord: 2-L L2x2x.216 A = 1.635 Y = 0.579 Fy = 50000 Q = 1.000
Bridg c 211" Ix= 0.615 Iy= 2.520 Rx = 0.613 Ry = 1.242 Rz = 0.392
Center: L = 30.687 P = -12874 Paz= -28498 M = 5297 No Fillers
Tag end panl: L = 30.687 P = -12874 Paz= -28498 M = 5297 No Filler
First point: P = -12874 Pa = -44137 M = 7946
Chord shear: V = 20200 C = -2349 fv = 1977 fc = -1437 f = 2104
Bot Chord: 2-LL1-1/2x.125 A = 0.719 Y = 0.421 Fy = 50000 Q = 0.961
rx= 0.156 IY= 0.765 RX = 0.465 RY = 1.032 RZ = 0.296
Center: L = 46.750 P = 10530 Pa = 21563 Chord shear: V = 20200 T = 9647 fv = 11508 ft = 13421 f = 13321
Web Anql Lnsth Shear Force Member Area- R -- Pa Weld T-AvlW-B
T 1 65.9 41.6 4315 10568 2LLlxlx.109 0.412 0.307~ 12367 3.3 7.2/ 5.2
V 123.3 18.5 -3476 -3784 lLLlxlX.109 0.206 0.1962 -4287 1.2 2.2/ 1.9
C 154.0 28.9 -1708 -2905 lLL1-1/2x.109 0.315 0.2972 -3454 0.9 3.5/ 3.3
,-
Page 16 V1.71 Valley Joist West
Job #ON02915 - 03 By ASM Entered 6/20/00 Revised 2/13/01 I-
Customer: JD2, INC #lo002 2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR GREEN
T305 1 - 32LH1018/598 x 22' 6.250 Special Crimped angle
End Lenqth DeDth Slope Holes TOD Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 72.000
Opp 6.000 5.000 72.000
Parallel chord Longspan
Uniform Live load 598 #/ft full length
Uniform SJI load 1018 #/ft full length
Uniform Dead load 420 #/ft full length An additional SJI load of lOOO# may occur at any top chord panel point. An additional Dead load of lOOO# may occur at any top chord panel point.
W-CLIP @ 9'2" FTE OAL
L ZRT BEARING 3-1/2" @ LE
End loads: - SJI mDeadu&pkWind
Left TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
32.000 in Deep 266.250 in Design length 2823 # Minimum Shear
30.567 in Effective Depth 1016 in4 Ix 0 in4 Minimum Ix 27.000 in Clear Depth L/2405 Live Defl L/1413 SJI Defl
843237 in-#Moment 1.000 in Chord gap 0.205 in Camber
63.125 in Interior Panel 50.563 in Left End 50.563 in Right End
3 Web Vees 12293 # SJI reaction 12293 # SJI reaction
TOD Chord: 2-L L3x3x.281 A = 3.214 Y = 0.854 Fy = 50000 Q = 1.000
Bridg c 279" Ix= 2.756 Iy= 8.645 Rx = 0.926 Ry = 1.640 Rz = 0.591
Center: L = 32.000 P = -27587 Paz= -82741 M = 2282 No Fillers
Tag end panl: L = 50.563 P = -23990 Paz= -51691 M = 15129 No Filler
First point: P = -23990 Pa = -86780 M = 23963
Chord shear: V = 20200 C = -5580 fv = 3250 fc = -1736 f = 3364
Bot Chord: 2-L L2x2x.216 A = 1.635 Y = 0.579
Center: L = 63.125 P = 25223 Pa = 49041
Chord shear: V = 20200 T = 22639 fv = 11442
Ix= 0.615 Iy= 2.520 RX = 0.613
Web Ansl Lnqth Shear Force Member Area- R
T 1 66.4 76.4 9886 24703 2LL1-3/4X.143 0.960 0.543X
VJ 32.5 36.2 -5391 -6388 lLL1-3/4X.125 0.422 0.3472
T L 46.3 44.3 2823 4088 lLL1-1/4X.109 0.261 0.2472
V 2 0.0 30.6 -3853 -3853 lLL1-1/4X.109 0.261 0.2472
C' 45.5 43.6 -5480 -7820 1L L2x2x.248 0.930 0.3912
Fy = 50000 Q = 1.000
Ry = 1.242 RZ = 0.392
ft = 13849 f = 13374 -- Pa Weld T-AvlW-B
28803 5.8Ll1.2/ 6.4
-7627 1.7 ~3.9/ 3.4
-7760 1.1 4.6/ 4.1
7819 1.3 3.9/ 3.4
-4208 1.2 3.3/ 2.5
Vallev Joist West Page 17 V1.71
Job #ON02915 - 03 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002 2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS CARLSBAD, CA
Comments: UBC 1997 TAG COLOR GREEN
T306 1 - 32LH978/576 x 22' 6.250 Special Crimped angle
- End Lenqth Depth Sloue Holes TOD Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000
Opp 6.000 5.000
Parallel chord Longspan
72.000
72.000
Uniform Live load 576 #/ft full length
Uniform SJI load 978 #/ft full length
Uniform Dead load 402 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point. An additional Dead load of lOOO# may occur at any top chord panel point. HL CLIP @ 9'2" FTE OAL
t 3RT BEARING 3-1/2" @ LE End loads: - SJI NtUpmUaWind 0.0 92.3 0.0 Kios Left TC axial load: 0.0 0.0 0.0 -L
Right TC axial load: 0.0 0.0 0.0 0.0 92.3 0.0 Kips 32.000 in Deep 266.250 in Design length 2712 # Minimum Shear
30.058 in Effective Depth 1508 in4 Ix 0 in4 Minimum Ix
25.000 in Clear Depth L/3706 Live Defl L/2183 SJI Defl
2333169 in-#Moment 1.000 in Chord gap 0.205 in Camber
63.125 in Interior Panel 50.563 in Left End 50.563 in Right End 3 Web Vees 11850 # SJI reaction 11850 # SJI reaction
TOD Chord: 2-L L4X4X.293 A = 4.516 Y = 1.108 Fy = 50000 Q = 0.908
Bridg < 346" Ix= 7.014 Iy= 18.699 Rx = 1.246 Ry = 2.035 Rz = 0.792
Center: L = 32.000 P = -77624 Paz=-111976 M = 2192 No Fillers
Tag end panl: L = 50,563 P = -75663 Pax= -96074 M = 14534 Filler Reqd
First point: P = -75663 Pa =-121940 M = 23021
Chord shear: V = 20200 C = -5476 fv = 2256 fc = -1213 f = 2336
Bot Chord: 2-L L3x3x.227 A = 2.621 Y = 0.834 Fy = 50000 Q = 0.922
Ix= 2.285 Iy= 6.949 RX = 0.934 Ry = 1.628 RZ = 0.594
Center: L = 63.125 P = 24725 Pa = 78628
Chord shear: V = 20200 T = 22186 fv = 6994 ft = 8465 f = 8175 Pa Weld T-Av1W-B
T 1 66.8 76.2 9526 24144 2LL1-3/4x.125 0.844 0.546~ 25313 6.5 16.3/11.5
-- Web Anql Lnsth Shear Force Member Area- R
V 1 32.9 35.8 -5439 -6477 1LL1-3/4~.125 0.422 0.3472 -7691 1.7 3.9/ 4.2
C- 46.0 43.3 -5289 -7613 1L L2X2X.248 0.930 0.3912 -7888 1.0 4.6/ 5.1
T 46.8 43.9 2712 3962 lLL1-1/4x.109 0.261 0.2472 7819 1.2 3.9/ 4.4
V 2 0.0 30.1 -3996 -3996 lLL1-1/4x.109 0.261 0.2472 -4293 1.2 3.3/ 3.3
Vallev Joist West Page 18 V1.71
Job #ON02915 - 03 By ASM Entered 6/20/00 Revised 2/13/01 r
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR GREEN
T307 3 - 32LH928/543 x 25' 8.750 Special Crimped angle
Parallel chord Longspan
End Lenqth Depth Slope Holes TOP Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 Y 72.000
Opp 6.000 5.000 72.000
Uniform Live load 543 #/ft full length
Uniform SJI load 928 #/ft full length
Uniform Dead load 385 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
WCLIP @ 12"ll" FTE OAL
5. ,RT BEARING 3-1/2" @ RE
End loads: __ SJI Dead Live Ecruk Wind
Left TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 KiQS
Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
32.000 in Deep 304.750 in Design length 2946 # Minimum Shear
30.681 in Effective Depth 991 in4 IX 0 in4 Minimum Ix
27.500 in Clear Depth L/1723 Live Defl L/1008 SJI Defl
973956 in-#Moment 1.000 in Chord gap 0.269 in Camber
64.000 in Interior Panel 44.187 in Left End 44.187 in Right End
4 Web Vees 12784 # SJI reaction 12784 # SJI reaction
Top Chord: 2-LL2-1/2x.313 A = 2.934 Y = 0.740 Fy = 50000 Q = 1.000
Bridg c 247" Ix= 1.699 Iy= 6.209 Rx = 0.761 Ry = 1.455 Rz = 0.489
Center: L = 32.000 P = -30681 Pax= -71861 M = 2425 2 Fillers
Tag end panl: L = 44.187 P = -25810 Paz= -44510 M = 10568 No Filler
First point: P = -25810 Pa = -79220 M = 16612
Chord shear: V = 20200 C = -4413 fv = 4708 fc = -1504 f = 4768
Bot Chord: 2-L L2x2x.216 A = 1.635 Y = 0.579 Fy = 50000 Q = 1.000
Ix= 0.615 Iy= 2.520 RX = 0.613 Ry = 1.242 Rz = 0.392
Center: L = 64.000 P = 31745 Pa = 49041
Chord shear: V = 20200 T = 24744 fv = 12553 ft = 15137 f = 14658 Pa Weld T-AvlW-B
T 1 66.3 76.4 10845 27017 2LL1-3/4x.143 0.960 0.543~ 28803 6.4 8.4/ 6.4
40.1 40.1 -4516 -5902 lLL1-3/4x.125 0.422 0.3472 -7035 1.6 3.8/ 3.6
30.9 35.8 -7368 -8588 lLL2x2x.187 0.713 0.3942 -8966 1.5 3.8/ 3.5
-- Web Anql Lnqth Shear Force Member Area- R
T L 46.2 44.3 4317 6238 lLL1-1/4X.109 0.261 0.2472 7819 1.9 3.6/ 3.4
V 2 0.0 30.7 -3628 -3628 lLL1-1/4x.109 0.261 0.2472 -4189 1.1 3.0/ 2.5
C 2 46.2 44.3 -2946 -4257 lLL1-1/2~.125 0.359 0.2962 -4259 1.1 3.8/ 3.6
Vallev Joist West Page 19 V1.71
Job #ON02915 - 03 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lOOOZ
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997 TAG COLOR GREEN
T308 1 - 32LH1004/584 x 25' 9.250 Special Crimped angle
Parallel chord Longspan
End Lenqth DeDth SloDe Holes Tor, Chord Ext BCX Holdback Pitch EP/#lL
Taq 6.000 5.000 72.000
Opp 6.000 5.000 72.000
Uniform Live load 584 #/ft full length
Uniform SJI load 1004 #/ft full length
Uniform Dead load 420 #/ft full length
An additional SJI load of 2000# may occur at any top chord panel point.
An additional Dead load of 2000# may occur at any top chord panel point.
HJ-CLIP 63 12'11" FTE OAL
C RT BEARING 3-1/2" 63 RE
End loads: __ SJImDeadUWWind
Left TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
32.000 in Deep 305.250 in Design length 3192 # Minimum Shear
30.578 in Effective Depth 978 in4 Ix 0 in4 Minimum Ix
27.000 in Clear Depth L/1573 Live Defl L/ 915 SJI Defl
1127107 in-#Moment 1.000 in Chord gap 0.270 in Camber
64.000 in Interior Panel 44.313 in Left End 44.313 in Right End
4 Web Vees 14770 # SJI reaction 14770 # SJI reaction
TOKI Chord: 2-LL3X3x.250 A = 2.875 Y = 0.842 Fy = 50000 Q = 0.961
Bridg e 278" Ix= 2.488 Iy= 7.669 Rx = 0.930 Ry = 1.633 Rz = 0.592
Center: L = 32,000 P = -35240 Paz= -71461 M = 2609 No Fillers
Tag end panl: L = 44.313 P = -29311 Paz= -50499 M = 11497 No Filler
First point: P = -29311 Pa = -77625 M = 18078
Chord shear: V = 20200 c = -5255 fv = 5752 fc = -1828 f = 5824
Bot Chord: 2-L LZx2x.216 A = 1.635 Y = 0.579 Ix= 0.615 Iv= 2.520 Rx = 0.613
Center: L = 64.000 P = 36860 Pa = 49041
Chord shear: V = 20200 T = 28517 fv = 14418
Web Anql Lnqth Shear Force Member Area- R
T 166.4 76.4 12457 31119 2LL2x2x.176 1.346 0.619~
V 140.0 39.9 -5820 -7601 1LL1-3/4X.143 0.480 0.3462
C4- 31.3 35.8 -8628 -10102 1L L2X2X.216 0.817 0.3922
T 46.3 44.3 5226 7564 lLL1-1/4X.109 0.261 0.2472
V 2 0.0 30.6 -4854 -4854 lLL1-1/2X.109 0.315 0.2972
C 2 46.3 44.3 -3192 -4621 lLL1-3/4X.125 0.422 0.3472
Fy = 50000
Ry = 1.242
ft = 17445 -- Pa Weld
40381 6.0
-8273~ 1.8
-10183 1.6
7819 2.3
-5788 1.5
-6358 1.2
Q = 1.000 Rz = 0.392
f = 16851
T - AVl W - B
11.0/ 6.3
4.2/ 3.6
4.1/ 3.5
3.9/ 3.4
3.5/ 2.8 4.4/ 3.9
Page 20 V1.71 Vallev Joist West
Job #ON02915 - 03 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997 TAG COLOR GREEN
T309 3 - 32LH928/543 x 25' 9.250 Special Crimped angle Parallel chord Longspan
End Lenqth Depth Slope Holes TOR Chord Ext BCX Holdback Pitch , EP/#lL
Taq 6.000 5.000 72.000 72.000 Opp 6.000 5.000
Uniform Live load 543 #/ft full length
Uniform SJI load 928 #/ft full length Uniform Dead load 385 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
HLCLIP @ 12'11" FTE OAL
C RT BEARING 3-1/2" @ RE
End loads: SJImDeaduEqukWind
Left TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips Right TC axial load: 0.0 0.0 0.0 , 0.0 8.2 0.0 Kips
32.000 in Deep 305.250 in Design length 2951 # Minimum Shear
30.575 in Effective Depth 1020 in4 Ix 0 in4 Minimum Ix
27.000 in Clear Depth L/1766 Live Defl L/1033 SJI Defl
977029 in-#Moment 1.000 in Chord gap 0.270 in Camber
64.000 in Interior Panel 44.313 in Left End 44.313 in Right End
4 Web Vees 12803 # SJI reaction 12803 # SJI reaction
Top Chord: 2-L L3x3x.227 A = 2.621 Y = 0.834 Fy = 50000 Q = 0.922
Bridg c 277" Ix= 2.285 Iy= 6.949 Rx = 0.934 Ry = 1.628 Rz = 0.594
Center: L = 32.000 P = -30858 Paz= -62840 M = 3477 No Fillers
Tag end panl: L = 44.313 P = -25913 Paz= -44871 M = 10627 No Filler
First point: P = --25913 Pa = -70765 M = 16710
Chord shear: V = 20200 C = -4491 fv = 5413 fc = -1713 f = 5480
Bot Chord: 2-L LZx2x.248 A = 1.861 Y = 0.591 Fy = 50000 Q = 1.000
Ix= 0.691 Iy= 2.905 RX = 0.609 Ry = 1.250 RZ = 0.391
Center: L = 64.000 P = 31955 Pa = 55830
Chord shear: V = 20200 T = 24864 fv = 10948 ft = 13361 f = 12825
Web Anql Lnqth Shear Force Member Area- R -- Pa Weld T-AvlW-B
T 1 66.4 76.4 10860 27132 2LL1-3/4x.155 1.037 0.541~ 31109 5.9 11.4/ 6.2
V 1 40.0 39.9 -4526 -5911 1LL1-3j4x.125 0.422 0.3472 -?7061 1.6 4.2/ 3.6
31.3 35.8 -7372 -8633 lLL2X2X.187 0.713 0.3942 -8947 1.6 4.1/ 3.5 C_I-
T I 46.3 44.3 4317 6249 lLL1-1/4X.109 0.261 0.2472 7819 1.9 3.9/ 3.4
V 2 0.0 30.6 -3629 -3629 lLL1-1/4X.109 0.261 0.2472 -4207 1.1 3.3/ 2.5
C 2 46.3 44.3 -2951 -4271 1LL1-1/2X.125 0.359 0.2962 -4273 1.2 4.2/ 3.6
Vallev Joist West Page 21 V1.71
Job #ON02915 - 03 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR GREEN
T310 1 - 32LH965/563 x 25' 9.250 Special Crimped angle
End Lenqth Depth Slope Holes Too Chord Ext BCX Holdback Pitch EP/#lL
Parallel chord Longspan
Tag 6.000 5.000 72.000
Opp 6.000 5.000 72.000
Uniform Live load 563 #/ft full length
Uniform SJI load 965 #/ft full length
Uniform Dead load 402 #/ft full length
An additional SJI load of 2000# may occur at any top chord panel point.
An additional Dead load of 2000# may occur at any top chord panel point.
I$L CLIP @ 12'11" FTE OAL
L ,RT BEARING 3-1/2" @ RE
End loads: __ SJImMUEaukM
Left TC axial load: 0.0 0.0 0.0 0.0 49'.6 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 49.6 0.0 Kips
32.000 in Deep 305.250 in Design length 3068 # Minimum Shear
30.555 in Effective Depth 1050 in4 Ix 0 in4 Minimum Ix
27.000 in Clear Depth L/1752 Live Defl L/1022 SJI Defl
1729158 in-#Moment 1.000 in Chord gap 0.270 in Camber
64.000 in Interior Panel 44..313 in Left End 44.313 in Right End
4 Web Vees 14274 # SJI reaction 14274 # SJI reaction
Top Chord: 2-L L3x3x.313 A = 3.560 Y = 0.865 Fy = 50000 Q = 1.000
Bridg < 280" Ix=. 3.024 Iy= 9.659 Rx = 0.922 Ry = 1.647 RZ = 0.589
Center: L = 32.000 P = -56591 Paz= -91594 M = 2507 No Fillers
Tag end panl: L = 44.313 P = -50845 Paz= -63927 M = 11050 No Filler First point: P = -50845 Pa = -96122 M = 17376
Chord shear: V = 20200 C = -5088 fv = 4445 fc = -1429 f = 4502
2-L L2x2x.216 A = 1.635 Y = 0.579
Ix= 0.615 Iy= 2.520 Rx = 0.613
Center: L = 64.000 P = 35649 Pa = 49041
Chord shear: V = 20200 T = 27567 fv = 13927
Web Ansl Lnqth Shear Force Member Area- R
T 1 66.4 76.4 12033 30079 2L L2x2x.163 1.251 0.621~
c" 31.4 35.8 -8348 -9776 1L L2x2x.216 0.817 0.3922
V 140.1 39.9 -5758 -7522 lLL1-3/4X.143 0.480 0.3462-
T L 46.3 44.2 5070 7341 lLL1-1/4x.109 0.261 0.2472
V 2 0.0 30.6 -4856 -4856 lLL1-1/2X.109 0.315 0.2972
C 2 46.3 44.2 -3068 -4443 1LL1-3/4X.125 0.422 0.3472
Fy = 50000
Ry = 1.242
ft = 16864
Pa Weld
- -8277 1.8
-10194 1.5
7819 2.3
-5791 1.5 -6360 1.2
_- 37526 6.2 I .~
Q = 1.000 RZ = 0.392
f = 16281
T-AVlW-B
L0.7/ 6.3
4.2/ 3.6
4.1/ 3.5
3.9/ 3.4 3.5/ 2.8
4.4/ 3.9
Vallev Joist West Page 22 V1.71 - Job #ON02915 - 03 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS CARLSBAD, CA
Comments: UBC 1997 TAG COLOR GREEN
T311 1 - 32LH928/543 x 26' 0.250 Special Crimped angle
Parallel chord Longspan
End Lenqth Depth Slope Holes Top Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 Y 72.000
Opp 6.000 5.000 72.000
Uniform Live load 543 #/ft full length
Unsform SJI load 928 #/ft full length
Uniform Dead load 385 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point. HA CLIP @ 12'11" FTE OAL
C RT BEARING 3-1/2" @ RE End loads: - SJI-Dead&W&&
Left TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
32.000 in Deep 308.250 in Design length 2980 # Minimum Shear
30.575 in Effective Depth 1020 in4 Ix 0 in4 Minimum Ix
27.000 in Clear Depth L/1715 Live Defl L/1003 SJI Defl
995570 in-#Moment 1.000 in Chord gap 0.275 in Camber
64.000 in Interior Panel 45.062 in Left End 45.062 in Right End
4 Web Vees 12919 # SJI reaction 12919 # SJI reaction
Top Chord: 2-L L3x3x.227 A = 2.621 Y = 0.834 Fy = 50000 Q = 0.922
Bridg c 277" Ix= 2.285 Iy= 6.949 Rx = 0.934 Ry = 1.628 Rz = 0.594
Center: L = 32.000 P = -31381 Paz= -62840 M = 3494 No Fillers
Tag end panl: L = 45.062 P = -26088 Paz= -44374 M = 10980 No Filler First point: P = -26088 Pa = -70765 M = 17299
Chord shear: V = 20200 C = -4870 fv = 5433 fc = -1858 f = 5512
Bot Chord: 2-L L2x2x.248
Center: L = 64.000
Chord shear: V = 20200
Ix= 0.691
Web Anal Lnsth Shear Force
T 1 66.4 76.4 10949 27355
V 139.2 39.5 -4586 -5918
C'- 33.4 36.6 -7399 -8858
T I 46.3 44.3 4316 6247
V 2 0.0 30.6 -3632 -3632
C 2 46.3 44.3 -2980 -4313
A = 1.861 Y = 0.591 Fy = 50000
Iy= 2.905 RX = 0.609 Ry = 1.250
T = 25068 fv = 11038 ft = 13470 P = 32562 Pa = 55830
Member Area- R -- Pa Weld
2LL1-3/4~.155 1.037 0.541X 31109 5.9
1LL1-3j4x.125 0.422 0.3472 -7135 1.6
1L L2X2X.216 0.817 0.3922 -9743 1.4
lLL1-1/4X.109 0.261 0.2472 7819 1.9
lLL1-1/4X.109 0.261 0.2472 -4207 1.1
lLL1-1/2~.125 0.359 0.2962 -4273 1.2
Q = 1.000 Rz = 0.391
f = 12930 T - Avl W - B
11.4/ 6.2
4.1/ 3.6
4.2/ 3.6
3.9/ 3.4
3.3/ 2.5
4.2/ 3.6
Valley Joist West Page 23 V1.71 - Job #ON02915 - 03 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002 2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR GREEN
T312 7 - 32LH928/543 x 26' 0.750 Crimped angle Parallel chord Longspan
End Lencrth Deuth Sloue Holes Tou Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 72.000
Opp 6.000 5.000 72.000
Uniform Live load 543 #/ft full length
Uniform SJI load 928 #/ft full length
Uniform Dead load 385 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
H1 CLIP @ 12'11" FTE OAL
SWRT BEARING 3-1/2" @ RE
End loads: __ SJI
Left TC axial load: 0.0
32.000 in Deep
30.575 in Effective Depth
27.000 in Clear Depth
998678 in-#Moment
64.000 in Interior Panel
Right TC axial load: 0.0
4 Web Vees
m&ad-wwind
0.0 0.0 0.0 8.2 0.0 KiDs
0.0 0.0 0.0 8.2 0.0 Kips
1020 in4 IX 0 in4 Minimum Ix
308.750 in Design length 2985 # Minimum Shear
L/1706 Live Defl L/ 998 SJI Defl
1.000 in Chord gap 0.276 in Camber
45.188 in Left End 45.188 in Right End
12938 # SJI reaction 12938 # SJI reaction
Top Chord: 2-L L3x3x.227 A = 2.621 Y = 0.834 Fy = 50000 Q = 0.922
Bridg c 277" Ix= 2.285 Iy= 6.949 Rx = 0.934 Ry = 1.628 Rz = 0.594
Center: L = 32.000 P = -31468 Paz= -62840 M = 3497 No Fillers
Tag end panl: L = 45.188 P = -26117 Paz= -44290 M = 11039 No Filler
First point: P = -26117 Pa = -70765 M = 17398
Chord shear: V = 20200 C = -4934 fv = 5436 fc = -1882 f = 5517
Bot Chord: 2-L L2x2x.248 A = 1.861 Y = 0.591 Fy = 50000 Q = 1.000
Ix= 0.691 Iy= 2.905 Rx = 0.609 Ry 1.250 Rz = 0.391
Center: L = 64.000 P = 32663 Pa = 55830
Chord shear: V = 20200 T = 25102 fv = 11053 ft = 1348'9 f = 12948
Web Anql Lnqth Shear Force Member Area- R -- Pa Weld T-AvlW-B
T 1 66.4 76.4 10964 27392 2LL1-3/4x.155 1.037 0.541~ 31109 6.0 11.4/ 6.2
V 1 39.1 39.4 -4596 -5919 1LL1-3/4~.125 0.422 0.3472 -7148 1.6 4.1/ 3.6
C 1 33.7 36.7 -7404 -8897 1L L2~2x.216 0.817~0i392Z -9670 1.4 4.2/ 3.6
T' 46.3 44.3 4316 6247 lLL1-1/4x.109 0.261 0.247~ 7819 1.9 3.9/ 3.4~
V- 0.0 30.6 -3632 -3632 lLL1-1/4x.109 0.261 0.2472 -4207 1.1 3.3/ 2.5
C 2 46.3 44.3 -2985 -4320 1LL1-3/4X.125 0.422 0.3472 -6358 1.2 4.4/ 3.9
Valley Joist West Page 24 V1.71 - Job #ON02915 - 03 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS CARLSBAD, CA
Comments: UBC 1997
TAG COLOR GREEN
T313 1 - 32LH928/543 x 26' 3.750 Special Crimped angle
Parallel chord Longspan
End Lenath DeDth SloDe Holes TOD Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 Y 72.000
Opp 6.000 5.000 Y 72.000
Uniform Live load 543 #/ft full length
Uniform SJI load 928 #/ft full length
Uniform Dead load 385 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point. An additional Dead load of lOOO# may occur at any top chord panel point HA CLIP @ 13'0"
7 MAX SEAT WIDTH 63 LE
SHORT BEARING 3-1/2" @ LE
FTE OAL
End loads: - S JI
Left TC axial load: 0.0
Right TC axial load: 0.0
32.000 in Deep
30.575 in Effective Depth
27.000 in Clear Depth
64.000 in Interior Panel
4 Web Vees
1017422 in-#Moment
NtUplLiveukWind
0.0 0.0 0.0 8.2 0.0 Kius
0.0 0.0 0.0 8.2 0.0 Kihs
1020 in4 Ix 0 in4 Minimum Ix
L/1658 Live Defl L/ 970 SJI Defl
1.000 in Chord gap 0.281 in Camber
45.938 in Left End 45.938 in Right End
311.750 in Design length 3014 # Minimum Shear
13054 # SJI reaction 13054 # SJI reaction
Too Chord: 2-L L3x3x.227 A = 2.621 Y = 0.834 Fy = 50000 Q = 0.922
Bridg < 277" Ix= 2.285 Iy= 6.949 Rx = 0.934 Ry = 1.628 Rz = 0.594
Center: L = 32.000 P = -31996 Paz= -62840 M = 3514 No Fillers
Tag end panl: .L = 45.938 P = -26292 Paz= -43787 M = 11400 No Filler
First point: P = -26292 Pa = -70765 M = 17998
Chord shear: V = 20200 C = -5316 fv = 5456 fc = -2028 f = 5549
Bot Chord: 2-L L2x2x.248
Ix= 0.691
Center:
Chord shear:
Web Anql Lnqth
T 1 66.4 76.4 v.,- 38.2 38.9
C - 35.6 37.6
T 2 46.3 44.3
V 2 0.0 30.6
C 2 46.3 44.3
L = 64.000 v = 20200
Shear Force
11054 21615
-4656 -5925
-7431 -9137
4315 6246
-3635 -3635
-3014 -4362
A = 1.861 Y = 0.591 Fy = 50000
Iy= 2.905 Rx = 0.609 Ry = 1.250
T = 25307 fv = 11143 ft = 13598 P = 33276 Pa = 55830
Member Area- R -- Pa Weld
2LL1-3/4x.155 1.037 0.541~ 31109 6.0
1LL1-3/4~.125 0.422 0.3472 -7220 1.6
1L L2X2X.216 0.817 0.3922 -9236 1.4
lLL1-1/4~.109 0.261 0.2472 -4207 1.1
1LL1-3/4X.125 0.422 0.3472 -6358 1.2
lLL1-1/4x.109 0.261 0.2472 7819 1.9
Q = 1.000
Rz = 0.391
f = 13053
T - AVl W - B
11.4/ 6.2
4. li~ 3.5
4.2/ 3.7 3.9/ 3.4
3.3/ 2.5
4.4/ 3.9
Valley Joist West Page 25 V1.71 - Job #ON02915 - 03 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR GREEN
T314 1 - 32LH928/543 x 26' 3.750 Special Crimped angle
Parallel chord Longspan
End Lenqth DeDth SloDe Holes Tor, Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 Y 72.000
Opp 6.000 5.000 Y 72.000
Uniform Live load 543 #/ft full length
Uniform SJI load 928 #/ft full length
Uniform Dead load 385 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
HLCLIP I3 2'10", 13'0", & 21'3" FTE OAL
7 LXAX SEAT WIDTH @ LE
SHORT BEARING 3-1/2" 13 LE
End loads: __ SJImDeaddaWind
Left TC axial load: 0.0 0.0 0 . 0. 0.0 8.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
32.000 in Deep 311.750 in Design length 3014 # Minimum Shear
30.575 in Effective Depth 1020 in4 IX 0 in4 Minimum Ix
27.000 in Clear Depth L/1658 Live Defl L/ 970 SJI Defl
1017422 in-#Moment 1.000 in Chord gap 0.281 in Camber
64.000 in Interior Panel 45.938 in Left End 45.938 in Right End
4 Web Vees 13054 # SJI reaction 13054 # SJI reaction
TOP Chord: 2-L L3x3x.227 A = 2.621 Y = 0.834 Fy = 50000 Q = 0.922
Bridg c 277" Ix= 2.285 Iy= 6.949 Rx = 0.934 Ry = 1.628 Rz = 0.594
Center: L = 32.000 P = -31996 Paz= -62840 M = 3514 No Fillers
Tag end panl: L = 45.938 P = -26292 Paz= -43787 M = 11400 No Filler
First point: P = -26292 Pa = -70765 M = 17998
Chord shear: V = 20200 C = -5316 fv = 5456 fc = -2028 f = 5549
Bot Chord: 2-L L2x2x.248 Ix= 0.691
Center: L = 64.000
Chord shear: V = 20200
Web Anql Lnqth Shear Force
T 1 66.4 76.4 11054 27615
V' 38.2 38.9 -4656 -5925
C - 35.6 37.6 -7431 -9137
V 2 0.0 30.6 -3635 -3635
C 2 46.3 44.3 -3014 -4362
T 2 46.3 44.3 4315 6246
A = 1.861 Y = 0.591 Fy = 50000
Iy= 2.905 Rx = 0.609 Ry = 1.250
T = 25307 fv = 11143 ft = 13598
P = 33276 Pa = 55830
Member Area- R -- Pa Weld
2LL1-3/4x. 155 ~1.037 0.541~ 31109 6.0
1L L2x2x.216 0.817 0.3922 -9236 1.4
lLL1-3/4x.125 0.422 0.3472 -7220 1.6
lLL1-1/4X.109 0.261 0.2472 7819 1.9
lLL1-1/4X.109 0.261 0.2472 -4207 1.1
lLL1-3/4X.125 0.422 0.3472 -6358 1.2
Q = 1.000 RZ = 0.391
f = 13053 T -AV1W - B
11.4,' 6.2
4.1/ 3.5
4.2/ 3.7
3.9/ 3.4
3.3/ 2.5
4.4/ 3.9
Vallev Joist West Page 26 V1.71
Job #ON02915 - 03 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS CARLSBAD, CA
Comments: UBC 1997
TAG COLOR GREEN
T315 1 - 32LH928/543 x 26' 7.500 Special Crimped angle
End Lensth Depth Slove Holes TOP Chord Ext Pitch EP/#lL
Tag 6.000 5.000 Y 72.000
Opp 6.000 5.000 Y 72.000
Parallel chord Longspan
Uniform Live load 543 #/ft full length
Uniform SJI load 928 #/ft full length
Uniform Dead load 385 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
yl-CLIP 6' 13'4" FTE OAL
End loads: __ SJIW_Dead-Q&m
Left TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
32.000 in Deep 315.500 in Design length 3050 # Minimum Shear
30.578 in Effective Depth 978 in4 Ix 0 in4 Minimum Ix
27.000 in Clear Depth L/1532 Live Defl L/ 896 SJI Defl 1041097 in-#Moment 1.000 in Chord gap 0.288 in Camber
64.000 in Interior Panel 46.875 in Left End 46.875 in Right End
4 Web Vees 13199 # SJI reaction 13199 # SJI reaction
Top Chord: 2-LL3X3x.250 A = 2.875 Y = 0.842 Fy = 50000 Q = 0.961
Bridg e 278" Ix= 2.488 Iy= 7.669 Rx = 0.930 Ry = 1.633 Rz = 0.592
Center: L = 32.000 P = -32660 Paz= -71461 M = 3537 No Fillers
Tag end panl: L = 46.875 P = -26509 Paz= -48463 M = 11860 No Filler
First point: P = -26509 Pa = -77625 M = 18761
Chord shear: V = 20200 C = -5798 fv = 4976 fc = -2017 f = 5078
Bot Chord: 2-L L2x2x.216 A = 1.635 Y = 0.579
Ix= 0.615 Iv= 2.520 Rx = 0.613
Center: L = 64.000 P = 34047 Pa = 49041
Chord shear: V = 20200 T = 25559 fv = 12922
Web Anql Lnqth Shear Force Member Area- R T 1 66.4 76.4 11165 27891 2LL1-3/4X.155 1.037 0.541X
V 1 37.1 38.3 -4731 -5931 1LL1-3/4X.125 0.422 0.3472
C 1 37.8 38.7 -7465 -9452 1L L2X2X.248~ 0.930 0.3912
T'- 46.3 44.3 4313 6244 lLL1-1/4x.109 0.261 0.2472
L' L 0.0 30.6 -3638 -3638 lLL1-1/4X.109 0.261 0.2472
C 2 46.3 44.3 -3050 -4415 1LL1-3/4X.125 0.422 0.3472
Fy = 50000 Ry = 1.242
ft = 15635
Pa Weld
31109 6.1
-7308 1.6
-9851 1.3
7819 1.9
-4207 1.1
-6358 1.2
_-
Q = 1.000 Rz = 0.392
f = 15103 T - Avl W - B
11.3/ 6.4
4.1/ 3.5
4.3/ 3.7
3.9/ 3.4
3.3/ 2.5
4.4/ 3.9
Vallev Joist West Page 27 V1.71
Job #ON02915 - 03 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR GREEN
T316 1 - 32LH928/543 x 26' 7.500 Special Crimped angle
Parallel chord Longspan
End Lenqth Depth Slope Holes TOR Chord Ext BCX Holdback Pitch EP/#lL 72.000
Opp 6.000 5.000 Y 72.000
Tag 6.000 5.000 Y
Uniform Live load 543 #/ft full length
Uniform SJI load 928 #/ft full length
Uniform Dead load 385 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
€&CLIP 3'3", 13'4" & 21'6" FTE OAL
End loads: - SJIDDead-EaukWind
Left TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
32.000 in Deep 315.500 in Design length 3050 # Minimum Shear
30.578 in Effective Depth 978 in4 Ix 0 in4 Minimum Ix
27.000 in Clear Depth L/1532 Live Defl L/ 896 SJI Defl
1041097 in-#Moment 1.000 in Chord gap 0.288 in Camber
64.000 in Interior Panel 46.875 in Left End 46.875 in Right End
4 Web Vees 13199 # SJI reaction 13199 # SJI reaction
Tor, Chord: 2-~~3x3x.250 A = 2.875 Y = 0.842 Fy = 50000 Q = 0.961
Bridg c 278" IX= 2.488 Iy= 7.669 RX = 0.930 Ry = 1.633 Rz = 0.592
Center: L = 32.000 P = -32660 Paz= -71461 M = 3537 No Fillers
Tag end panl: L = 46.875 P = -26509 Paz= -48463 M = 11860 No Filler
First point: P = -26509 Pa = -77625 M = 18761
Chord shear: V = 20200 C - -5798 fv = 4976 fc = -2017 f = 5078
Bot Chord: 2-L L2x2x.216 A = 1.635 Y = 0.579
Ix= 0.615 Iy- 2.520 RX = 0.613
Center: L = 64.000 P = 34047 Pa = 49041
Chord shear: V = 20200 T = 25559 fv = 12922
Web Anql Lnsth Shear Force Member Area- R T 1 66.4 76.4 11165 27891 2LL1-3/4x.155 1.037 0.541~
V 1 37.1 38.3 -4731 -5931 lLL1-3/4~.125 0.422 0.3472
C 137.8 38.7 -7465 -9452 1L L2X2X1248 0.930 0.3912
V i. 0.0 30.6 -3638 -3638 lLL1-1/4x.109 0.261 0.2472
C 2 46.3 44.3 -3'050 -4415 lLL1-3/4x.125 0.422 0.3472
T- 46.3 44.3 4313 6244 lLL1-1/4x.109 0.261 0.2472
Fy = 50000
Ry = 1.242
ft = 15635
Pa Weld
31109 6.1
-7308 1.6
--9851 1.3
7819 1.9
-4207 1.1
-6358 1.2
--
Q = 1.000 Rz = 0.392
f = 15103
T - Avl W - B
11.3/ 6.4
4.1/ 3.5
4.3/ 3.7 3.9/ 3.4
3.3/ 2.5
4.4/ 3.9
Vallev Joist West Page 28 V1.71 - Job #ON02915 - 03 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2. INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR GREEN
T3 17 7 - 32LH928/543 x 26' 8.500 Crimped angle Parallel chord Longspan
End Lensth Depth Slope Holes TOR Chord Ext BCX Holdback Pitch EP/#lL
Taa 6.000 5.000 72.000
Opp 6.000 5.000 72.000
Uniform Live load 543 #/ft full length
Uniform SJI load 928 #/ft full length
Uniform Dead load 385 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
H1 CLIP @ 13'4" FTE OAL
-. End loads: __ SJI m_DeaduEQukWind
eft TC axial load: 0.0
Right TC axial load: 0.0
32.000 in Deep
30.578 in Effective Depth
27.000 in Clear Depth
64.000 in Interior Panel
1047457 in-#Moment
4 Web Vees
- ~~ 0.0 0.0 0.0 8.2 0.0 Kips
0.0 0.0 0.0 8.2 0.0 Kips
316.500 in Design length 3059 # Minimum Shear
978 in4 IX 0 in4 Minimum Ix
L/1518 Live Defl L/ 888 SJI Defl
1.000 in Chord gap 0.290 in Camber
47.125 in Left End 47.125 in Right End
13238 # SJI reaction 13238 # SJI reaction
TOR Chord: 2-LL3X3x.250 A = 2.875 Y = 0.842 Fy = 50000 Q = 0.961
Bridg < 278" Ix= 2.488 Iy= 7.669 Rx = 0.930 Ry = 1.633 Rz = 0.592
Center: L = 32.000 P = -32854 Paz= -71461 M = 3543 No Fillers
Tag end panl: L = 47.125 P = -26567 Paz= -48261 M = 11984 No Filler
First point: P = -26567 Pa = -77625 M = 18967
Chord shear: V = 20200 C = -5927 fv = 4982 fc = -2062 f = 5088
Bot Chord: 2-L L2x2x.216 A = 1.635 Y = 0.579 Fy = 50000 Q = 1.000
Ix= 0.615 Iy= 2.520 RX = 0.613 Ry = 1.242 RZ = 0.392
Center: L = 64.000 p = 34255 Pa = 49041
Chord shear: V = 20200 T = 25627 fv = 12957 ft = 15677 f = 15143 Web Ansl Lnqth Shear Force Member Area- R _- Pa Weld T-AvlW-B
T 1 66.4 76.4 11195 27965 2LL1-3/4X.155 1.037 0.541X 31109 6.1 11.3/ 6.4
V 136.8 38.2 -4751 -5933 1LL1-3j4x.125 0.422 0.3472 -7331 1.6 4.lj 3.5
C 1 38.4 39.0 -7474 -9539 1L L2~2x.248 0.930 0.3912 -9696 1.3 4.3/ 3.8
T 2 46.3 44.3 4313 6243 lLL1-1/4x.109 0.261 0.2472 7819 1.9 3.9/ 3.4
V,' 0.0 30.6 -3639 -3639 lLL1-1/4X.109 0.261 0.2472 -4207~ 1.1 3.3/ 2.5
C - 46.3 44.3 -3059 -4429 lLL1-3/4~.125 0.422 0.3472 -6358 1.2 4.4,' 3.9
Valley Joist West Page 29 V1.71
Job #ON02915 - 03 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002 2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS CARLSBAD, CA
Comments: UBC 1997
TAG COLOR GREEN
T318 2 - 40LH868/483 x 45' 5.000 Special Crimped angle
End Lenqth Depth Slope Holes TOR Chord Ext BCX Holdback Pitch EP/#lL
Parallel chord Longspan
Tag 6.000 5.000 90.000
Opp 6.000 5.000 Y 90.000
Uniform Live load 483 #/ft full length
Uniform SJI load 868 #/ft full length
Uniform Dead load 385 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point
HACLIP E' 15'3" FTE OAL TYPE 2 CLIP @ 30'6" FTE OAL
C RT BEARING 3-1/2" @ BE ,- - -~ ~~. ~ . - MAX SEAT WIDTH 7" E' RE End loads: __ SJImWd-Wind
Left TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kips
40.000 in Deep 541.000 in Design length 4892 # Minimum Shear
37.746 in Effective Depth 3739 in4 Ix 0 in4 Minimum Ix
32.000 in Clear Depth L/1307 Live Defl L/ 727 SJI Defl
2781574 in-#Moment 1.000 in Chord gap 0.847 in Camber
80.000 in Interior Panel 55.250 in Left End 55.250 in Ri'ght End
6 Web Vees 20566 # SJI reaction 20566 # SJI reaction
TOR Chord: 2-L L4x4x.375 A = 5.719 Y = 1.138 Fy = 50000 Q = 1.000
Bridg c 349" Ix= 8.717 Iy= 24.067 Rx = 1.235 Ry = 2.051 Rz = 0.788
Center: L = 40.000 P = -72081 Paz=-149242 M = 4730 No Fillers
Tag end panl: L = 55.250 P = -42910 Paz=-107619 M = 15452 No Filler
First point: P = -42910 Pa =-154406 M = 24297
Chord shear: V = 20200 C = -8564 fv = 4789 fc = -1498 f = 4847
Bot Chord: 2-L L4x4x.313 A = 4.812 Y = 1.116 Fy = 50000 Q = 0.936
Ix= 7.439 Iy= 20.002 Rx = 1.243 Ry = 2.039 RZ = 0.791
Chord shear: V = 20200 T = 42910 fv = 7350 ft = 8917 f = 8597 Center: L = 80.000 P = 73692 Pa = 144362
-
Vallev Joist West Page 30 V1.71 - Job #ON02915 - 03 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR GREEN
T318 2 - 40LH868/483 x 45' 5.000 Special Crimped angle
Parallel chord Longspan
Web Awl
T 1 66.8
V 1 40.9
C 1 30.8
T 2 46.7 v 2 0.0
C 2 46.7
T 3 46.7 v 3 0.0
C-3 46.7
Lnath Shear
95.8 18405
50.0 -5158
43.9-14367
55.0 10848
37.7 -4189
55.0 -7881
55.0 4914
37.7 -4254
55.0 -4892
Force Member - Area - R 46690 2L L2x2x.216 1.635 0.613~
-6829 1L L2~2x.125 0.484 0.3982
-16726 2LL1-3/4~.125 0.844 0.546X
-4189 lLL1-1/2x.109 0.315 0.2972
-11483 1L LZX2x.248 0.930 0.3912
7160 lLL1-1/4x.109 0.261 0.2472
-7127 1L L2~2x.143 0.552 0.3962
15807 1L L2x2x.143 0.552 0.3962
-4254 lLL1-1/2~.109 0.315 0.2972
-- Pa Weld
49041 7.3
-7178 1.8
-17201 4.5
16547 3.7
-4792 1.3
-12488 1.6
7819 2.2
-4792 1.3
-7441 1.7
T - AVl W - B
15.6/15.6
4.4/ 4.8
8.9/ 8.9
4.7/ 5.2
3.5j 3.5
4.7/ 5.2
3.9/ 4.4
3.5/ 3.5
4.7/ 5.2
Vallev Joist West Page 31 V1.71
Job #ON02915 - 03 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer:. JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR GREEN
T319 2 - 40LH868/483 x 45' 8.750 Special Crimped angle
Parallel chord Longspan
End Lenqth DeDth Slowe Holes TOD Chord Ext BCX Holdback Pitch EP/#lL
Tas 6.000 5.000 90.000
Opp 6.000 5.000 Y 90.000
Uniform Live load 483 #/ft full length
Uniform SJI load 868 #/ft full length
Uniform Dead load 385 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
€&CLIP @ 15'3" FTE OAL TYPE 2 CLIP @ 30'6" FTE OAL
L RT BEARING 3-1/2" LE End loads: __ SJI mDeadmEQukWind
Left TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kiws
Right TC axial load: 0.0 0.0 0.0 0.0 9.8 0.0 Kihs
40.000 in Deep 544.750 in Design length 4925 # Minimum Shear
37.982 in Effective Depth 3421 in4 Ix 0 in4 Minimum Ix
33.000 in Clear Depth L/1171 Live Defl L/ 652 SJI Defl
2819325 in-#Moment 1.000 in Chord gap 0.859 in Camber
80.000 in Interior Panel 56.188 in Left End 56.188 in Right End 6 Web Vees 20702 # SJI reaction 20702 # SJI reaction
TOP Chord: 2-L L3X3X.416 A = 4.646 Y = 0.902 Fy = 50000 Q = 1.000
Bridg c 284" Ix= 3.831 Iy= 12.965 Rx = 0.908 Ry = 1.670 Rz = 0.585
Center: L = 40.000 P = -72627 Pax=-112228 M = 4721 2 Fillers
Tag end panl: L = 56.188 P = -42881 Paz= -65337 M = 15967 No Filler
First point: P = -42881 Pa =-125439 M = 25156
Chord shear: V = 20200 C = -9241 fv = 5769 fc = -1989 f = 5854
2-L L4~4x.313 A = 4.812 Y = 1.116 Fy = 50000 Q = 0.936
Ix= 7.439 Iy= 20,002 RX = 1.243 Ry = 2.039 RZ = 0.791
Center: L = 80.000 P = 74228 Pa = 144362
Chord shear: V = 20200 T = 42881 fv = 7391 ft = 8911 f = 8630
Vallev Joist West Page 32 V1.71 - Job #ON02915 - 03 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR GREEN
T319 2 - 40LH868/483 x 45' 8.750 Special Crimped angle
Parallel chord Longspan
Web Anql Lnqth Shear Force Member Am _. R -- Pa Weld T-AvlW-B
T 1 66.7 95.8 18508 46705 2L L2x2x.216 1.635 0.613~ 49041 7.3 10.2/15.9
V 1 39.9 49.5 -5229
C 1 32.7 45.1-14399
T 2 46.5 55.2 10847
V 2 0.0 38.0 -4192
C 2 46.5 55.2 -7880 T 3 46.5 55.2 4925
V 3 0.0 38.0 -4256
C-3 46.5 55.2 -4925
-6820
-17109
15753
-4192
-11444
7153
-4256
-7153
1L L2x2x.125
2LL1-3/4~.125
1L L2X2X.143
i~~i-i/2~.109 1L L2x2x.248
lLL1-1/4X.109
lLL1-1/2X.109
1L L2X2X.143
0.484 0.3982
0.844 0.546~
0.552 0.3962
0.315 0.2972
0.930 0.3912
0.261 0.2472
0.315 0.2972
0.552 0.3962
-7240
-16990
16547 -4757
-12419
7819 -4757
-7408
1.8 4.4/ 4.8
4.6 6.6/ 9.2
3.7 4.7/ 5.2 1.3 3.5/ 3.5
2.2 3.9/ 4.4
1.3 3.5/ 3.5
1.7 4.7/ 5.2
1.6 4.7/ 5.2
Valley Joist West Page 33 V1.71
Job #ON02915 - 03 By ASM Entered 6/20/00 Revised 2/13/01 ,-
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR GREEN
T320 10 - 40LH868/483 x 45' 9.250 Special Crimped angle
Parallel chord Longspan
End Lenqth Depth Slope Holes TOP Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 90.000
Opp 6.000 5.000 90.000
Uniform Live load 483 #/ft full length
Uniform SJI load 868 #/ft full length
Uniform Dead load 385 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
WCLIP @ 15'3" FTE OAL TYPE 2 CLIP @ 30'6" FTE OAL
5 RT BEARING 3-1/2" LE
End loads: - SJINtWDead-EaukWind Left TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 8.2 0.0 Kips
40.000 in Deep 545.250 in Design length 4930 # Minimum Shear
37.982 in Effective Depth 3421 in4 Ix 0 in4 Minimum Ix
33.000 in Clear Depth L/1168 Live Defl L/ 650 SJI Defl
2824378 in-#Moment 1.000 in Chord gap 0.860 in Camber
56.312 in Left End 56.312 in Riqht End 80.000 in Interior panel
6 Web Vees
TOP Chord: 2-L L3X3X.416
Bridg < 284" Ix= 3.831
Center: L = 40.000
Tag end panl: L = 56.312
First point: Chord shear: V = 20200
Bot Chord: 2-L L4x4x.313
Ix= 7.439 Center: L = 80.000
Chord shear: V = 20200
20720 #
A = 4.646
Iy= 12.965 P = -72760 P 2 -42913
P -42913 c = -9338
A 3 4.812
Iy= 20.002 P = 74361
T = 42913
SJI reaction
Y = 0.902 RX = 0.908
Pax=-112228
Paz= -65136
Pa =-125439 fv = 5771
Y = 1.116
RX = 1.243
Pa = 144362
fv = 7397
20720 # SJI-reaction
Fy = 50000 Q = 1.000
Ry = 1.670 Rz = 0.585
M = 4843 2 Fillers
M = 16036 No Filler
M = 25272
fc = -2010 f = 5857
Fy = 50000 Q = 0.936
Ry = 2.039 Rz = 0.791
ft = 8918 f = 8637
Valley Joist West Page 34 V1.71
Job #ON02915 - 03 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR GREEN
T320 10 - 40LH868/483 x 45' 9.250 Special Crimped angle
Parallel chord Longspan
Web Ansl Lnqth Shear T 1 66.7 95.8 18522
V 1 39.8 49.5 -5238
C 1 33.0 45.3-14403 -
T 2 46.5 55.2 10847
V 2 0.0 38.0 -4193
C 2 46.5 55.2 -7880 -
T 3 46.5 55.2 4930
V 3 0.0 38.0 -4257
C-3 46.5 55.2 -4930
Force
46739
-6822
17166 15752
11444
7160
-4257
-7160
-4193
Member
2L L2x2x.216
1L L2X2X.125
2LL1-3/4X.143
1L L2X2X.143
lLL1-1/2X.109
1L L2x2x.248
lLL1-1/4X.109
i~~i-i/2~.109
1L L2X2X.143
Area- R
1.635 0.613~
0.484 0.3982
0.960 0.543~
0.552 0.3962
0.315 0.2972
0.261 0.2472
0.315 0.2972
0.552 0.3962
0.930 0.3912
-- Pa Weld
49041 7.3
-7252 1.8
-20168 4.0
16547 3.7
-4757 1.3
-12419 1.6
7819 2.2
-4757 1.3
-7408 1.7
T-AVlW-B
10.2/15.9
4.4/ 4.8
6.6/ 9.2
4.7/ 5.2
3.5) 3.5
4.7/ 5.2
3.9/ 4.4
3.5/ 3.5
4.7/ 5.2
z 4-a/
Vallev Joist West Page 1 V1.71
- Job #ON02915 - 05 By ASM Entered 6/20/00 Revised 2/13/01
Customer :
Project:
Comments :
G401
JD2, INC #lo002
2049 KURT2 ST SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
ASTON VIEWS
CARLSBAD, CA
UBC 1997
TAG COLOR YELLOW
1 - 38G5N15.5/6.36 x 36' 4.250 Special Crimped angle
Parallel chord Girder
End Lensth Depth. Slope Holes Top Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 6.000 2 0' 0.875 80.000
Opp 6.000 6.000 Y E 0' 1.000 2 0' 5.375 88.125
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
TC conc loads: Load SDacinq Location Point TYr)e
6'8 U2 Dead
,-- 6360 6'8 U2 Live
9140 14'1-3/8 U4 Dead
6360 14'1-3/8 U4 Live
9140 21'6-3/4 U6 Dead
6360 21'6-3/4 U6 Live
9140 29'0-1/8 U8 Dead 29'0-1/8 U8 Live
6'8 U2 S JI 6'8
0'0
0'0
15500
9140
15500 7'5-3/8 14'1-3/8 U4 S JI
15500 7'5-3/8 21'6-3/4 U6 S JI
15500 7'5-3/8 29'0-1/8 U8 SJI
7'4-1/8 6360
KEEP CLEAR FOR KNIFE PLATE 8" @ RE
TC HOLES 7/8" X 4" GAUGE RE @ 1-3/4" End loads: SJI&-Live&&Wind 0.0 0.0 0.0 40.1 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 40.1 0.0 Kips Left TC axial load: 0.0
38.000 in Deep 432.250 in Design length 7750 # Minimum Shear
35.987 in Effective Depth
31.000 in Clear Depth L/1182 Live Defl
89.375 in Interior Panel 38.000 in Left End 42.063 in Right End
2991 in4 Ix 0 in4 Minimum Ix
L/ 485 SJI Defl
4411342 in-#Moment 1.000 in Chord gap 0.541 in Camber
5 Web Vees 32583 # SJI reaction 31417 # SJI reaction
VJ Page 2 V1.71 - Job #ON02915 - 05 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST ~
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR YELLOW
G401 1 - 38G5N15.5/6.36 x 36' 4.250 Special Crimped angle
Parallel chord Girder
Tow Chord: 2-L L4x4x.375 A = 5.719 Y = 1.138 Fy = 50000 Q = 1.000
Center: L = 44.688 P =-122582 Paz=-133053 M = 0 No Fillers
Chord shear: V = 20200 C = -23410 fv = 10801 fc = -4094 f = 10993
IX= 8.717 Iy= 24.067 Rx = 1.235 Ry = 2.051 RZ = 0.788
Bot Chord: 2-L L3X3X.340 A = 3.849 Y = 0.875 Fy = 50000
IX= 3.243 Iy= 10.519 Rx = 0.918 Ry = 1.653
Chord shear: V = 20200 T = 46907 fv = 15913 ft = 12188
Center: L = 89.375 P = 112741 Pa = 115464
Web Ansl Lnsth Shear Force Member Area- R -- Pa Weld 7 55.3 63.2 32462 57045 2LL2-1/2x.250 2.375 0.769~ 71250 7.7
V 121.3 38.6 -1000 -1073 lLL1-1/4X.109 0.261 0.2472 -1587 0.3
C 135.8 44.4-32402 -39974 2LL2-1/2X.212 2.030 0.775X -45812 6.3 T 2 51.2 57.4 16799 26784 lLL2-1/2X.212 1.015 0.4932 30452 4.3
V 2 0.0 36.0 -1000 -1000 lLL1-1/4X.109 0.261 0.2472 -1827 0.3
C 2 51.2 57.4-16695 -26619 2L L2X2X.216 1.635 0.613~ -26429 4.1
T 3 51.2 57.4 7750 12356 1L L2X2X.125 0.484 0.3982 14.531 3.3
V 3 0.0~ 36.0 -1000 -1000 lLL1-1/4X.109 0.261 0.2472 -1827 0.3
Q = 1.000 Rz = 0.588
f = 17040
T - AVl W - B
11.4/ 8.0
3.3/ 3.5
9.4/ 7.1
3.3/ 3.3
3.3/ 3.3
5.51' 6.1
10.8/ 7.8
5.0/ 5.6
Valley Joist West Page 3 V1.71 - Job #ON02915 - 05 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR YELLOW
G402 2 - 5467N16.6/6,81 x 55' 9.500 Special Crimped angle
Parallel chord Girder
End Lenqth Depth Slope Holes Top Chord Ext BCX Holdback Pitch EP/#lL
Tau 6.000 6.000 Y E 0' 1.000 2 0' 4.750 94.750
Opp 6.000 6.000 Y E 0' 1.000 2 0' 4.750 94.750
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
TC conc loads: Load Suacinq Location Point
16600 7'10-3/4 7110-3/4 u2 S JI
9790 7'10-3/4 U2 Dead - 6810 7'10-3/4 U2 Live
9790 15'10-3/4 U4 Dead
6810 15'10-3/4 U4 Live
9790 23'10-3/4 U6 Dead
6810 23'10-3/4 U6 Live
9790 31'10-3/4 U8 Dead
6810 31'10-3/4 U8 Live
9790 39'10-3/4 U10 Dead
6810 O'O 39'10-3/4 UIO Live
9790 47'10-3/4 U12 Dead O'O 47'10-3/4 ~12 Live
16600 15'10-3/4 U4 S JI
16600 23'10-3/4 U6 S JI
16600 31'10-3/4 U8 S JI
16600 39'10-3/4 U10 SJI
16600 47'10-3/4 U12 SJI
6810 7'10-3/4
KEEP CLEAR FOR KNIFE PLATE 8" @ BE
TC HOLES 7/8" x 4" GAUGE BE @ 1-3/4" End loads: - SJI NtUpDeaduEaukWind
0.0 0.0 0.0 40.1 0.0 Kips
0.0 0.0 0.0 40.1 0.0 Kips
~ 46.000 in Clear Depth L/1016 Live Defl L/ 417 SJI Defl
9720634 in-#Moment 1.000 in Chord gap 1.282 in Camber
-6.000 in Interior Panel 45.375 in Left End 45.375 in Right End
Left TC axial load: 0.0
54.000 in Deep 665.500 in Design length 12450 # Minimum Shear 51.656 in Effective Depth 9407 in4 Ix 0 in4 Minimum Ix
Right TC axial load: 0.0
7 Web Vees 50800 # SJI reaction 50800 # SJI reaction
Vallev Joist West Page 4 V1.71 - Job #ON02915 - 05 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR YELLOW
G402 2 - 54G7N16.6/6.81 x 55' 9.500 Special Crimped angle
Parallel chord Girder
TOP Chord: 2-L L4x4x.500 A = 7.500 Y = 1.183 Fy = 50000 Q = 1.000
Center: L = 48.000 P =-188182 Pax=-194354 M = 0 6 Fillers
Fourth: L = 48.000 P =-131736 Paz=-l68630 No Fillers Chord shear: V = 20200 C = -28196 fv = 12665 fc = -3759 f = 12804
Bot Chord: 2-L L4x4x.438 A = 6.624 Y = 1.161 Fy = 50000 Q = 1.000
Ix= 11.123 Iy= 32.375 RX = 1.218 Ry = 2.078 RZ = 0.782
Ix= 9.957 Iy= 28.235 RX = 1.226 Ry = 2.065 RZ = 0.785
Center: L = 96.000 P = 185123 Pa = 198729
Chord shear: V = 20200 T = 62821 fv = 14470 ft = 9483 f = 15227 - 1 ! Anql Lnqth Shear
?' 151.1 82.2 50704 v 1 19.8
C 1 29.1
T 2 42.9 v 2 0.0
C 2 42.9
T 3 42.9 v 3 0.0 C 3 42.9 T 4 42.9 v 4 0.0
54.9 -1000
59.1-50661
70.5 33989
51.7 -1000
70.5-33916
70.5 17244
51.7 -1000
70.5-17172
70.5 12450
51.7 -1000
Force Member Area- R -- Pa Weld T-AvlW-B
80730 2L L3x3x.313 3.560 0.922~ 106802 8.7 10.2/10.2
-1063 lLL1-1/2X.109 0.315 0.2972
-57979 2LL3X3X.250 2.875 0.930~
-1000 lLL1-1/2X.109 0.315 0.2972
-46299 2LL3X3X.250 2.875 0.930~
23540 1LL2-1/2X.212 1.015 0.4932
-1000 lLL1-1/2X.109 0.315 0.2972
-23442 2LL2-1/2X.212 2.030 0.775X
46397 2L L2x2x.216 1.635 0.613~
16995 1L L2x2x.248 0.930 0.3912
-1000 i~~i-i/2~.io9 0.315 0.2972
-1378 0.3 3.51 3.7
-1557 0.3 3.51 3.5
-61660 7.8 9.2/ 9.2
49041 7.2 9.5/ 9.5
-55599 6.2 9.61 9.6
30452 3.7 5.0/ 5.5
-1557 0.3 3.5/ 3.5
-33467 3.7 9.5/ 9.5
27915 2.3 4.51 5.0
-1557 0.3 3.5/ 3.5
Vallev Joist West Page 5 V1.71 - Job #ON02915 - 05 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002 2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997 TAG COLOR YELLOW
T401 2 - 32LH224/119 x 52'10.125 Crimped angle Parallel chord Longspan
End Lensth Deuth Slope Holes Tow Chord Ext BCX Holdback Pitch EP/#lL
Tas 6.000 5.000 -0.438 53.063
Opp 6.000 5.000 ' 0.438 53.063
Uniform Live load 119 #/ft full length
Uniform SJI load 224 #/ft full length
Uniform Dead load 105 #/ft full length
An additional SJI load of 1000# mav occur at anv tou chord Dane1 Doint.
An additional Dead load of lOOO# may occur at aAy t'op chordLpanelApoint.
H1 CLIP @ 10'6", 31'8", & 42'3" FTE OAL
TYPE 2 CLIP @ 21'1" FTE OAL
.CRT BEARING 3-1/2" @ RE
End loads: - SJI NtUpadU&,&M
Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
32.000 in Deep 630.125 in Design length 1470 # Minimum Shear
30.877 in Effective Depth 606 in4 Ix 0 in4 Minimum Ix
28.000 in Clear Depth L/ 544 Live Defl L/ 289 SJI Defl
1083999 in-#Moment 1.000 in Chord gap 1.149 in Camber
48.000 in Interior Panel 37.531 in Left End 37.531 in Right End
12 Web Vees 6881 # SJI reaction 6881 # SJI reaction
Tow Chord: 2-LL2x2x.176 A = 1.346 Y = 0.565 Fy = 50000 Q = 0.981
Bridg c 209" Ix= 0.516 Iy= 2.042 Rx = 0.619 Ry = 1.232 Rz = 0.394
Center: L = 24.000 P = -34903 Pax= -35826 M = 448 10 Fillers
Tag end panl: L = 37.531 P = -13339 Paz= -19024 M = 1830 No Filler
First point: P = -13339 Pa = -36343 M = 2912
Chord shear: V = 20200 C = -4439 fv = 8112 fc = -3298 f = 8278
Bot Chord: 2-L L2x2x.156 A = 1.199 Y = 0.558 Fy = 50000 Q = 0.935
Ix= 0.464 Iy= 1.805 RX = 0.622 Ry = 1.227 Rz = 0.396
Center: L = 48.000 P = 35107 Pa = 35980
Chord shear: V = 20200 T = 10666 fv = 10336 ft- = 8894 f = 11252
Valley Joist West Page 6 V1.71 - Job #ON02915 - 05 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR YELLOW
T401 2 - 32LH224/119 x 52'10.125 Crimped angle Parallel chord Longspan
Web Anql Lnqth Shear
T 158.8 59.7 6450
V 123.7 c 1 37.9 T 2 37.9 v 2 0.0 c 2 37.9
T 3 37.9 v 3 0.0 c 3 37.9
T 4 37.9
y- 0.0 c 4 37.9 T 5 37.9 v 5 0.0 c 5 37.9 T 6 37.9
V 6 0.0
C 6 37.9
33.7 -'1762
39.1 5099
39.1 -5711
30.9 -1550 39.1 -4613
39.1 4127
30.9 -1579
39.1 -3641
39.1 3154
30.9 -1600
39.1 -2668
39.1 2182
30.9 -1615
39.1 -1696
39.1 1470
30.9 -1623
39.1 -1470
Force Member Area- R
12465 2LLlxlx.109 0.412 0.307~
-1923 lLL1-1/4X.109 0.261 0.2472
-7233 1LL2X2X.187 0.713 0.3942
6458 lLL1-1/4X.109 0.261 0.2472
-1550 1LLlXlX.109 0.206 0.1962
-5842 lLL1-3/4X.125 0.422 0.3472
5227 lLL1-1/4X.109 0.261 0.2472
-1579 1LLlXlX.109 0.206 0.1962
-4611 lLL1-1/2X.109 0.315 0.2972
3995 lLL1-1/4X.109 0.261 0.2472
-1600 1LLlXlX.109 0.206 0.1962
-3380 lLL1-1/2X.109 0.315 0.2972
2764 lLL1-1/4X.109 0.261 0.2472
-1615 1LLlXlX.109 0.206 0.1962
-2148 lLL1-1/4x.109 0.261 0.2472
1862 lLLl-1/4X.109 0.261 0.2472
-1623 lLLlXlX.109 0.206 0.1962
-1862 lLL1-1/4X.109 0.261 0.2472
Pa Weld _- 12367 3.9
-3664 0.6
-7498 1.3
7819 2.0
-2209 0.5 -7190 1.6
7819 1.6
-2209 0.5
-4588 1.4
7819 1.2
-2209 0.5
-4588 1.0
7819 0.9
-2209 0.5
-2750 0.7
7819 0.6
-2209 0.5
-2750 0.6
T - AVl W - B
6.1/ 6.1
2.5/ 2.7
3.4/ 3.8
2.7/ 3.0
2.3/ 2.3 3.2/ 3.5
2.3/ 2.3
2.9/ 3.3
2.7,' 3.0
2.3/ 2.3
2.7/ 3.0
2.3/ 2.3
2.7/ 3.0
2.7/ 3.0
2.3/ 2.3
2.7/ 3.0
2.7/ 3.0'
2.9/ 3.3
Vallev Joist West Page 7 V1.71 - Job #ON02915 - 05 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Pro] ect : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR YELLOW
T402 7 - 32LH240/128 x 52'10.125 Crimped angle Parallel chord Longspan
End Lenqth Depth Slope Holes Top Chord Ext BCX Holdback Pitch EP/#lL
Taq 6.000 5.000 -0.438 53.063
Opp 6.000 5.000 0.438 53.063
Uniform Live load 128 #/ft full length
Uniform SJI load 240 #/ft full length
Uniform Dead load 112 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
H1 CLIP @ 10'6", 31'8", ti 42'3" FTE OAI,
TYPE 2 CLIP @ 21'1" FTE OAL
.FRT BEARING 3-1/2" @ RE
End loads: SJI Dead Live Wind
Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kius
Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
32.000 in Deep 630.125 in Design length 1575 # Minimum Shear
30.871 in Effective Depth 636 in4 Ix 0 in4 Minimum Ix
28.000 in Clear Depth L/ 531 Live Defl L/ 283 SJI Defl
1150175.in-#Moment 1.000 in Chord gap 1.149 in Camber
48.000 in Interior Panel 37.531 in Left End 37.531 in Right End
12 Web Vees 7301 # SJI reaction 7301 # SJI reaction
TOD Chord: 2-LLZxZx.187 A = 1.426 Y = 0.569 Fy = 50000 Q = 1.000
Bridg c 210" Ix= 0.544 Iy= 2.173 Rx = 0.617 Ry = 1.234 Rz = 0.394
Center: L = 24.000 P = -37042 Pax= -38638 M = 480 6 Fillers
Tag end'panl: L = 37.531 P = -13903 Paz= -20246 M = 1961 No Filler
First point: P = -13903 Pa = -38504 M = 3120
Chord shear: V = 20200 C = -4708 fv = 8097 fc = -3302 f = 8263
Bot Chord: 2-L L2x2x.163 A = 1.251 Y = 0.560 Fy = 50000 Q = 0.952 Ix= 0.482 Iy= 1.888 Rx = 0.621 Ry 1.229 RZ = 0.395
Center: L = 48.000 P = 37258 Pa = 37526
Chord shear: V = 20200 T = 11322 fv = 10498 ft = 9051 f = 11432
Vallev Joist West Page 8 V1.71 - Job #ON02915 - 05 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR YELLOW
T402 7 - 32LH240/128 x 52'10.125 Crimped angle Parallel chord Longspan
Web Annsl Lncrth Shear
v 123.7 33.7 -i8i4
T 158.8 59.7 6845
C 137.9 39.1 -6056 T 2 37.9 39.1 5403
V 2 0.0 30.9 -1587 c 2 37.9 39.1 -4885
T 3 37.9 39.1 4367
V 3 0.0 30.9 -1617 C 3 37.9 39.1 -3849 T 4 37.9 39.1 3330
1 *- 0.0 30.9 -1640
C 4 37.9 39.1 -2812 T 5 37.9 39.1 2294 V 5 0.0 30.9 -1657
C 5 37.9 39.1 -1776 T 6 37.9 39.1 1575 V 6 0.0 30.9 -1665 C 6 37.9. 39.1 -1575
Force Member
13230 2LL1-1/4~.109
-1981 1LL1-lj4x.109
-7671 1L L2~2x.216
6843 lLL1-1/4~.109
-1587 1LLlxlx.lO9
-6187 1LL1-3/4X.125
5531 lLL1-1/4~.109
-1617 lLLlXlX.109
-4875 lLL1-1/2~.125
4219 lLL1-1/4~.109
-1640 1LLlXlX.109
-3562 lLL1-1/2X.109
2906 lLL1-1/4~.109
-1657 1LLlXlX.109
-2250 lLL1-1/4~.109
1995 lLL1-1/4X.109 -1665 lLLlXlx.109
-1995 lLL1-1/4X.109
Area- R
0.521 0.387~
0.261 0.2472
0.817 0.3922
0.261 0.2472
0.206 0.1962
0.422 0.3472
0.261 0.2472
0.206 0.1962
0.359 0.2962
0.261 0.2472
0.206 0.1962
0.315 0.2972
0.261 0.2472
0.206 0.1962
0.261 0.2472
0.261 0.2472 0.206 0.1962 0.261 0.2472
-__ Pa Weld
15637 4.1
-3665 0.6
-8537 1.2
7819 2.1
-2210 0.5
-7190 1.7
7819 1.7
-2210 0.5
-5311 1.3
7819 1.3
-2210 0.5
-4588 1.1
7819 0.9
-2210 0.5
-2751 0.7
7819 0.6
-2210 0.5
-2751 0.6
T - AVl W - B
5.9/ 5.9
2.5/ 2.7
3.4/ 3.8
2.7/ 3.0
2.3/ 2.3
3.2/ 3.5
2.7/ 3.0
2.3/ 2.3
2.9/ 3.3
2.7/ 3.0
2.3/ 2.3
2.7/ 3.0
2.7/ 3.0
2.7/ 3.0
2.9/ 3.3
2.3/ 2.3
2.3j 2.3
2.7/ 3.0
Vallev Joist West Page 9 V1.71
Job #ON02915 - 05 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR YELLOW
T403 2 - 32LH240/128 x 52'10.125 Special Crimped angle
Parallel chord Longspan
End Lensth DeDth Sloue Holes TOD Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 -0.438 53.063
Opp 6.000 5.000 0.438 53.063
Uniform Live load 128 #/ft full length
Uniform SJI load 240 #/ft full length
Uniform Dead load 112 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOoO# may occur at any top chord panel point. - TC conc loads: Load Spacing Location Point
300 7'11-3/4 7 11-3/4 u3 SJI, Dead
300 42'4-1/4 2'6-1/8 . 10'5-7/8 U4 SJI, Dead
H1 CLIP @ 10'6", 31'8", & 42'3" FTE OAL
TYPE 2 CLIP @ 21'1" FTE OAL
SHORT BEARING 3-1/2" @ RE
End loads: - SJIm&xJ&-W
Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
32.000 in Deep 630.125 in Design length 1650 # Minimum Shear
30.866 in Effective Depth 661 in4 Ix 0 in4 Minimum Ix
28.000 in Clear Depth L/ 551 Live Defl L/ 283 SJI Defl
1182819 in-#Moment 1.000 in Chord gap . 1.149 in Camber
37.531 in Left End 37.531 in Right Gnd
7798 # SJI reaction 7405 # SJI reaction
48.000 in Interior Panel
12 Web Vees
TOP Chord: 2-LL2x2x.187
Bridg c 210" Ix= 0.544
Center: L = 24.000
Tag end panl: L = 37.531
First point:
Chord shear: V = 20200
Bot Chord: 2-LL2x2x.176
IX= 0.516
Center: L = 48.00~0 . .ord shear: V = 20200
-
A = 1.426
Iy= 2.173 P = -38185
P = -14726
P = -14726
C = -5095
A = 1.346
Iy= 2.042 P = 38321 T = 12145
Y = 0.569
Rx = 0.617 Pax= -38638
Paz= -20246
Pa = -38504
fv = 8760
Y = 0.565
RX = 0.619
fv = 10428
Pa = 40381
Fy = 50000
Ry = 1.234 M = 480
M = 1937
M = 3168
fc = -3573
Fy = 50000
Ry = 1.232
ft = 9023
Q = 1.000
Rz = 0.394
10 Fillers No Filler
f = 8940
Q = 0.981
RZ = 0.394
f = 11362
Vallev Joist West Page 10 V1.71 - Job #ON02915 - 05 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS CARLSBAD, CA
Comments: UBC 1997
TAG COLOR YELLOW
T403 2 - 32LH240/128 x 52'10.125 Special Crimped angle
Parallel chord Longspan
Web Anql Lnqth Shear Force Member Area- R -- Pa Weld
T 158.8 59.7 7341 14191 2LL1-1/4x.109 0.521 0.387x 15637 4.4 V 123.7 33.7 c 137.9 39.1 T 2 37.9 39.1
V 2 9.8 31.3
C 2 38.8 39.6 T 3 36.9 38.6
V 3 0.0 30.9 c 3 37.9 39.1
?- 37.9 39.1
b 4 0.0 30.9 c 4 37.9 39.1 T 5 37.9 39.1
V 5 0.0 30.9 c 5 37.9 39.1
T 6 37.9 39.1
V 6 0.0 30.9
C 6 37.9 39.1
-1818
-6553
5952
-1901
-5125
4255
-1617
-3745
3227
-1648
-2709
2191
-1663
-1673
1650
-1671 -1650
-1985 1LL1-lj4x.109 0.261 0.2472
-8300 1L L2X2X.216 0.817 0.3922
7540 lLL1-1/4X.109 0.261 0.2472
-1929 1LLlXlX.109 0.206 0.1962
-6575 1LL1-3/4X.125 0.422 0.3472
5322 lLL1-1/4X.109 0.261 0.2472
-1617 lLLlXlX.109 0.206 0.1962
-4744 lLL1-1/2X.125 0.359 0.2962
4088 lLL1-1/4x.109 0.261 0.2472
-1648 1LLlXlX.109 0.206 0.1962
-3431 lLL1-1/2X.109 0.315 0.2972
2775 lLL1-1/4X.109 0.261 0.2472
-1663 1LLlXlX.109 0.206 0.1962
-2119 lLL1-1/4x.109 0.261 0.2472
2090 lLL1-1/4X.109 0.261 0.2472
-1671 lLLlXlX.109 0.206 0.1962
-2090 lLL1-1/4x.109 0.261 0.2472
-3666
-8539
7819
-2147
-7112
7819
-2210
-5311
7819
-2210
-4589
7819
-2210 -2751
7819
-2210 -2751
0.6
1.3
2.3
0.6
1.8
1.6
0.5
1.3
1.3
0.5
1.1
0.9
0.5
0.7
0.6
0.5
0.6
T - AVl W - B
5.9/ 5.9
2.5/ 2.7
3.4/ 3.8
2.7/ 3.0
3.2/ 3.5
2.6/ 3.0
2.3/ 2.3
2.2/ 2.3
2.9) 3.3
2.7/ 3.0
2.3/ 2.3
2.7/ 3.0
2.9/ 3.3
2.3) 2.3
2.7/ 3.0
2;7/ 3.0
2.3/ 2.3
2.7/ 3.0
Vallev Joist West Page 11 V1.71 - Job #ON02915 - 05 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002 2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997 TAG COLOR YELLOW
T404 1 - 32LH240/128 x 52' 7.125 Crimped angle Parallel chord Longspan
- End Lensth Depth Slope Holes Tow Chord Ext BCX Holdback Pitch EP/#lL Tag 6.000 5.000 -0.438 Y 51.563
Opp 6.000 5.000 0.438 51.563
Uniform Live load 128 #/ft full length
Uniform SJI load 240 #/ft full length
Uniform Dead load 112 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of loOO# may occur at any top chord panel point.
H1 CLIP @ 10'6", 31'8", & 42'3" FTE OAL
TYPE 2 CLIP 6' 21'1" FTE OAL ..' RT BEARING 3-1/2" @, RE
End loads: SJINtUpw-Equk-
Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
32.000 in Deep 627.125 in Design length 1568 # Minimum Shear
30.871 in Effective Depth 636 in4 Ix 0 in4 Minimum Ix
28.000 in Clear Depth L/ 538 Live Defl L/ 287 SJI Defl
1139996 in-#Moment 1.000 in Chord gap 1.138 in Camber
48.000 in Interior Panel 36.781 in Left End 36.781 in Right End
12 Web Vees 7271 # SJI reaction 7271 # SJI reaction
Tow Chord: 2-LL2x2x.187 A = 1.426 Y = 0.569 Fy = 50000 Q = 1.000
Bridg e 210" Ix= 0.544 Iy= 2.173 Rx = 0.617 Ry = 1.234 Rz = 0.394
Center: L = 24.000 P = -36712 Pax= -38638 M = 480 6 Fillers
Tag end panl: L = 36.781 P = -13581 Paz= -20789 M = 1885 No Filler
First point: P = -13581 Pa = -38504 M = 2994
Chord shear: V = 20200 C = -4704 fv = 8089 fc = -3299 f = 8255
Bot Chord: 2-L L2x2x.163 A = 1.251 Y = 0.560 Fy = 50000 Q = 0.952
Ix= 0,482 Iy= 1.888 Rx = 0.621 Ry = 1.229 Rz = 0.395
Center: L = 48.000 P = 36928 Pa = 37526
Chord shear: V = 20200 T = 10956 fv = 10467 ft = 8759 f = 11346
c
Valley Joist West Page 12 V1.71 - Job #ON02915 - 05 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR YELLOW
T4 04 1 - 32LH240/128 x 52’ 7.125 Crimped angle Parallel chord Longspan
Web Anql
T 1 58.1
V 1 22.5 c 137.9 T 2 37.9 v 2 0.0 c 2 37.9
T 3 37.9 v 3 0.0 c 3 37.9
T 4 37.9
0.0 T ’-
c 4 37.9
T 5 37.9 v 5 0.0 c 5 37.9
T 6 37.9
V 6 0.0
C 6 37.9
Lnqth
58.4
33.4
39.1
39.1
30.9
39.1
39.1
30.9
39.1
39.1
30.9
39.1
39.1
30.9
39.1
39.1
30.9
39.1
Shear
6824
-1798 -6051
5404
-1585 -4886
4368
-1616
-3850
3331
-1639
-2813
2295
-1655
-1777
1568
-1664
-1568
Force Member
12908 2LL1-1/4X.109
-1946 lLL1-1/4x.109
-7664 1L L2XZx.216
6846 lLL1-1/4~.109
-1585 1LLlXlX.lO9
-6189 1LL1-3/4X.125
-1616 1LLlXlX.109
5533 lLL1-1/4X.109
-4876 lLL1-1/2~.125
4220 lLL1-1/4~.109
lLLl - 1 /2x. 10 9
2907 lLL1-1/4~.109
-1655 1LLlXlX.109
-2250 lLL1-1/4~.109
1986 lLL1-1/4~.109
-1986 lLL1-1/4~.109
-1639 1LLlXlX.109
. - 3 563
-1664 lLLlxlx.109
Area- R
0.521 0.387~
0.261 0.2472
0.817 0.3922
0.261 0.2472
0.206 0.1962
0.422 0.3472
0.261 0.2472
0.206 0.1962
0.359 0.2962
0.261 0.2472
0.206 0.1962
0.315 0.2972
0.261 0.2472
0.206 0.1962
0.261 0.2472
0.261 0.2472
0.206 0.1962
0.261 0.2472
-- Pa Weld
15637 4.0
-3718 0.6
-8537 1.2
7819 2.1
-2210 0.5
-7190 1.7
7819 1.7
-2210 0.5
-5311 1.3
7819 1.3
-2210 0.5
-4588 1.1
7819 0.9
.-2210 0.5
-2751 0.7
7819 0.6
-2210 0.5
-2751 0.6
T - AVl W - B
5.9/ 5.9
2.5j 2.7
3.4/ 3.8
3.2/ 3.5
2.3/ 2.3
2.9/ 3.3
2.3/ 2.3
2.9/ 3.3
2.7/ 3.0
2.3/ 2.3
2.7/ 3.0
2.7/ 3.0
2.7/ 3.0
2.3/ 2.3
2.7/ 3.0
2.7/ 3.0
2.3/ 2.3
2.7/ 3.0
Valley Joist West Page 13 V1.71 - Job #ON02915 - 05 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #10002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR YELLOW
T405 2 - 32LH224/119 x 52' 7.625 Crimped angle Parallel chord Longspan
End Lensth Delsth Sloue Holes TOR Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 -0.438 51.813
Opp 6.000 5.000 0.438 51.813
Uniform Live load 119 #/ft full length
Uniform SJI load 224 #/ft full length
Uniform Dead load 105 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
H1 CLIP @ 10'6", 31'8", & 42'3" FTE OAL
TYPE 2 CLIP @ 21'1" FTE OAL .?- RT BEARING 3-1/2" @ RE
End loads: __ SJI DDeaduukWind
Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
32.000 in Deep 627.625 in Design length 1464 # Minimum Shear
30.877 in Effective Depth 606 in4 Ix 0 in4 Minimum Ix
28.000 in Clear Depth L/ 550 Live Defl L/ 292 SJI Defl
1076037 in-#Moment 1.000 in Chord gap 1.140 in Camber
48.000 in Interior Panel 36.906 in Left End 36.906 in Riqht End
12 Web Vees
TOP Chord: 2-LL2x2x.176
Bridg c 209" Ix= 0.516
Center: L = 24.000
Tag end panl: L = 36.906
First point:
Chord shear: V = 20200
Bot Chord: 2-L L2x2x.156
Center: L = 48.000
Chord shear: V = 20200
IX= 0.464
6858 # SJI reaction
A = 1.346
Iy= 2.042 P -34645
P = -13086 P = -13086
C = -4436
A = 1.199
Iy= 1.805 P = 34849
T = 10380
Y = 0.565
RX = 0.619
Pax= -35826
Paz= -19435
Pa = -36343
fv = 8106
Y = 0.558
RX = 0.622
Pa = 35980
fv = 10311
6858 # SJI-reaction
Fy = 50000
Ry = 1.232 M = 448
M = 1771
M = 2814
fc = -3295
Fy = 50000
Ry = 1.227
ft = 8655
Q = 0.981
Rz = 0.394
10 Fillers
No Filler
f = 8272
Q = 0.935
Rz = 0.396
f = 11182
Page 14 V1.71 Valley Joist West
Job #ON02915 - 05 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997 TAG COLOR YELLOW
T405 2 - 32LH224/119 x 52' 7.625 Crimped angle Parallel chord Longspan
T1
v1
c1
T2
v2
c2
T3
v3
c3
T4 F-
c4
T5
v5
c5
T6
V6
C6
Anql 58.2
22.7
37.9
37.9
0.0
37.9
37.9
0.0
37.9
37.9
0.0
37.9
37.9
0.0
37.9
37.9
0.0
37.9
Lnsth
58,6
.33.5
39.1
39.1
30.9 39.1
39.1
30.9
39.1
39.1
30.9
39.1
39.1
30.9
39.1 39.1
30.9
39.1
Shear
6434
-1749
-5707
5100
-1549
-4614
4128
-1578
-3641
3155
-1599 -2669
2183
-1614
-1696
1464
-1621
-1464
Force Member m- R
12212 2LLlxlx.109 0.412 0.307~
-1896 lLLlXlX.109 0.206 0.1962
-7228 1LL2X2X.187 0.713 0.3942
6460 lLL1-1/4X.109 0.261 0.2472
-1549 lLLlXlX.109 0.206 0.1962
-5844 1LL1-3/4X.125 0.422 0.3472
5228 lLL1-1/4x.109 0.261 0.2472
-1578 lLLlXlX.109 0.206 0.1962
-4612 lLL1-1/2X.109 0.315 0.2972
3996 lLL1-1/4x.109 0.261 0.2472
-1599 lLLlXlX.109 0.206 0.1962
-3380 lLL1-1/2X.109 0.315 0.2972
2765 lLL1-1/4x.109 0.261 0.2472
-1614 1LLlXlX.109 0.206 0.1962
-2149 lLL1-1/4X.109 0.261 0.2472
1855 lLL1-1/4x.109 0.261 0.2472
-1621 lLLlXlX.109 0.206 0.1962
-1855 lLL1-1/4x.109 0.261 0.2472
Pa Weld
12367 3.8 --
-1880 0.6
-7498 1.3
7819 2.0
-2209 0.5
-7190 1.6
7819 1.6
-2209 0.5
-4588 1.4
7819 1.2
-2209 0.5
-4588 1.0
7819 0.9
-2209 0.5
-2750 0.7
7819 0.6
-2209 0.5
-2750 0.6
' T - AVl W - B
6.0/ 6.0
3.4,' 3.8
2.2/ 2.4
2.7/ 3.0
2.3/ 2.3
3.2/ 3.5
2.7/ 3.0
2.3/ 2.3
2.9/ 3.3
2.3/ 2.3
2.9/ 3.3
2.7/ 3.0
2.3/. 2.3
2.7/ 3.0
2.7/ 3.0
2.7/ 3.0
2.7/ 3.0
2.3/ 2.3
Vallev Joist West Page 15 V1.71
Job #ON02915 - 05 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Pro] ect : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR YELLOW
T406 3 - 32LH240/128 x 52' 7.625 Crimped angle Parallel chord Longspan
End Lenqth Deuth SloDe Holes TOO Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 -0.438 51.813
Opp 6.000 5.'000 0.438 51.813
Uniform Live load 128 #/ft full length
Uniform SJI load 240 #/ft full length
Uniform Dead load 112 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
HI. CLIP @ 10'6", 31'8", & 42'3" FTE OAL
TYPE 2 CLIP @ 21'1" FTE OAL
CRT BEARING 3-1/2" @ RE
End loads: SJI Dead Live Wind
Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
32.000 in Deep 627.625 in Design length 1569 # Minimum Shear
30.871 in Effective DeDth 636 in4 Ix 0 in4 Minimum Ix
28.000 in Clear Depth
48.000 in Interior Panel
1141689 in-#Moment
12 Web Vees
Tor, Chord: 2-LL2x2x.187
Bridg c 210" Ix= 0.544
Center: L = 24.000
Tag end panl: L = 36.906
First point:
Chord shear: V = 20200
Bot Chord: 2-L L2x2x.163
Ix= 0.482
Center: L = 48.000 Chord shear: V = 20200
L/ 537 Live Defl L/ 287 SJI Defl
1.000 in Chord gap 1.140 in Camber
36.906 in Left End 36.906 in Right End
7276 # SJI reaction
A = 1.426
Iy= 2.173 P = -36767
P = -13634
P = -13634
C = -4705
A = 1.251
P = 36983
T = 11017
1y= 1.888
Y = 0.569
Rx = 0.617
Pax= -38638
Paz= -20699
Pa = -38504
fv = 8090
Y = 0.560
Rx = 0.621
fv = 10472
Pa = 37526
7276 # SJI-reaction
Fy = 50000
Ry = 1.234 M = 480
M = 1897 M = 3015
fC = -3299
Fy = 50000
Ry = 1.229
ft = 8808
Q = 1.000
Rz = 0.394
No Filler
f = 8257
Q = 0.952
RZ = 0.395
f = 11360
6 Fillers
Vallev Joist West Page 16 V1.71 - Job #ON02915 - 05 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR YELLOW
T406 3 - 32LH240/128 x 52' 7.625 Crimped angle Parallel chord Longspan
Web Anql Lnsth Shear
T 1 58.2 58.6 6828 v 1 22.7 c 1 37.9
T 2 37.9 v 2 0.0 c 2 37.9
T 3 37.9 v 3 0.0 c 3 37.9
T 4 37.9
7- 0.0 c 4 37.9 T 5 37.9 v 5 0.0 c 5 37.9
T 6 37.9 V 6 0.0
C 6 37.9.
33.5 -1801
39.1 -6051
39.1 5404
30.9 -1586
39.1 -4886
39.1 4368
30.9 -1616
39.1 -3849
39.1 3331
30.9 -1639
39.1 -2813
39.1 2295
30.9 -1655
39.1 -1776
39.1 1569
30.9 -1664
39.1 -1569
Force
12961
-1952
-7665
6845
-1586
-6189
5532
-1616
-4876
4219
-1639
-3563
2907
-1655
-2250
1987
-1664
-1987
Member
2LL1-1/4X.109
lLLl-lj4X. 109
lLL1-1/4X.109
lLL1-1/4X.109
lLL1-1/4X.109
lLL1-1/2X.109
lLL1-1/4X.109
lLL1-1/4X.109
lLL1-1/4X.109
lLL1-1/4X.109
1L L2x2x.216
1LLlXlX.lO9
lLL1-3/4X.125
1LLlXlX.lO9
lLL1-1/2~.125
1LLlXlX.lO9
1LLlXlX.lO9
1LLlxlx.lO9
Area. - R 0.521 0.387~
0.261 0.2472
0.817 0.3922
0.261 0.2472
0.206 0.1962
0.422 0.3472
0.261 0.2472
0.206 0.1962
0.359 0.2962
0.261 0.2472
0.206 0.1962
0.315 0.2972
0.261 0.2472
0.206 0.1962
0.261 0.2472.
0.261 0.2472
0.206 0.1962
0.261 0.2472
-- Pa Weld
15637 4.0
-3709 0.6
-8537 1.2
7819 2.1
-2210 0.5
-7190 1.7
7819 1.7
-2210 0.5
-5311 1.3
7819 1.3
-2210 0.5
-4588 1.1
7819 0.9
-2210 0.5
-2751 0.7
7819 0.6
-2210 0.5
-2751 0.6
T -AVlW - B
5.9/ 5.9
2.5/ 2.7
3.4/ 3.8
2.7/ 3.0
2.3/ 2.3
3.2/ 3.5
2.7/ 3.0
2.9/ 3.3
2.3/ 2.3 2.9/ 3.3
2.7/ 3.0
2.3/ 2.3
2.7/ 3.0
2.7/ 3.0
2.3/ 2.3
2.7/ 3.0
2.3/ 2.3
2.7/ 3.0
.
Valley Joist West Page 17 V1.71 - Job #ON02915 - 05 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR YELLOW
T407 1 - 32LH232/124 x 52' 9.625 Crimped angle Parallel chord Longspan
End Lenqth Depth Slope Holes Top Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 -0.438 Y 52.813
Opp 6.000 5.000 0.'438 52.813
Uniform Live load 124 #/ft full length
Uniform SJI load 232 #/ft full length
Uniform Dead load 108 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
H1 CLIP @ 10'6", 31'8", & 42'3" FTE OAL
TYPE 2 CLIP @ 21'1" FTE OAL
9?RT BEARING 3-1/2" @ RE
End loads: - SJI NtUDDeadwEaukWind
Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
32.000 in Deep 629.625 in Design length 1522 # Minimum Shear
30.873 in Effective Depth 622 in4 Ix 0 in4 Minimum Ix
28.000 in Clear Depth L/ 537 Live Defl L/ 287 SJI Defl
1115440 in-#Moment 1.000 in Chord gap 1.147 in Camber
48.000 in Interior Panel 37.406 in Left End 37.406 in Right End
12 Web Vees 7086 # SJI reaction 7086 # SJI reaction
Top Chord: 2-LL2x2x.187 A = 1.426 Y = 0.569 Fy = 50000 Q = 1.000
Bridg < 210" Ix= 0.544 Iy= 2.173 Rx = 0.617 Ry = 1.234 Rz = 0.394
Center: L = 24.000 P = -35920 Pax= -38638 M = 464 6 Fillers
Tag end panl: L = 37.406 P = -13564 Paz= -20337 M = 1883 No Filler
First point: P = -13564 Pa = -38504 M = 2996
Chord shear: V = 20200 C = -4573 fv = 7865 fc = -3207 f = 8026
Bot Chord: 2-L L2x2x.156 A = 1.199 Y = 0.558 Fy = 50000 Q = 0.935
Ix= 0.464 Iy= 1.805 Rx = 0.622 Ry = 1.227 RZ = 0.396
Center: L = 48.000 P = 36130 Pa = 35980
Chord shear: V = 20200 T = 10935 fv = 10648 ft = 9118 f = 11582
Vallev Joist West Page 18 V1.71 - Job #ON02915 - 05 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR YELLOW
T407 1 - 32LH232/124 x 52' 9.625 Crimped angle Parallel chord Longspan
web
T1
v1 c1
T2
v2
c2 T3
v3
c3
T4
\- c-l
T5
v5
c5
T6
V6
C6
Anql
58.7
23.5
37.9
37.9
0.0
37.9
37.9
0.0
37.9
37.9
0.0
37.9
37.9
0.0
37.9 37.9
0.0
37.9
Lnqth Shear
59.5 6644 33.7 -1785
39.1 -5883
39.1 5251
30.9 -1568
39.1 -4749
39.1 4247
30.9 -1598
39.1 -3745
39.1 3243
30.9 -1620
'39.1 -2740
39.1 2238
30.9 -1635
39.1 -1736 39.1 1522
30.9 -1644
39.1 -1522
Force Member Area- R
-i%6 i~~i-i/4~.iog 0.261 0.2472
12795 2LL1-1/4X.109 0.521 0.387%
-7451 1LLZX2X.187 0.713 0.3942
6651 lLL1-1/4x.109 0.261 0.2472
-1568 lLLlxlx.109 0.206 0.1962
-6015 1LL1-3/4X.125 0.422 0.3472
5379 lLL1-1/4~.109 0.261 0.2472
-4743 lLL1-1/2x.125 0.359 0.2962
-1598 lLLlxlx.109 0.206 0.1962
4107 lLL1-1/4x.109 0.261 0.2472
-1620 lLLlxlx.109 0.206 0.1962
2835 lLL1-1/4x.109 0.261 0.2472
-1635 lLLlxlx.109 0.206 0.1962
-2199 lLL1-1/4x.109 0.261 0.2472
1927 lLL1-1/4x.109 0.261 0.2472
-1644 lLLlxlx.109 0.206 0.1962
-1927 lLL1-1/4x.109 0.261 0.2472
-3471 lLLl-1/2~.109 0.315 0.2972
-- Pa Weld
15637 4.0
-3674 0.6
-7499 1.3
7819 2.1
-2209 0.5
-7190 1.6
7819 1.7
-2209 0.5
-5310 1.3 7819 1.3
-2209 0.5 -4588 1.1
7819 0.9
-2209 0.5
-2750 0.7
7819 0.6
-2209 0.5
-2750 0.6
T - AVlW - B
5.9/ 5.9
3.4/ 3.8
2.5/ 2.7
2.7/ 3.0
2.3/ 2.3
3.2/ 3.5
2.7/ 3.0
2.3/ 2.3
2.9/ 3.3
2.7/ 3.0 2.31 2.3
2.9) 3.3
2.7/ 3.0
2.3/ 2.3
2.7/ 3.0
2.7/ 3.0
2.3/ 2.3
2.7/ 3.0
Vallev Joist West Page 19 V1.71 - Job #ON02915 - 05 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002 2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997 TAG COLOR YELLOW
T408 1 - 32LH240/128 x 52' 9.625 Crimped angle Parallel chord Longspan
- End Lencrth DeDth SloDe Holes Top Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 -0.438 Y 52.813
Opp 6.000 5.000 ' 0.438 52.813
Uniform Live load 128 #/ft full length
Uniform SJI load 240 #/ft full length
Uniform Dead load 112 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
H1 CLIP @ 10'6", 31'8", & 42'3" FTE OAL
TYPE 2 CLIP @ 21'1" FTE OAL
.MRT BEARING 3-1/2" @ RE
End loads: - SJI NtUpm-mwind
Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
32.000 in Deep 629.625 in Design length 1574 # Minimum Shear
30.871 in Effective Depth 636 in4 Ix 0 in4 Minimum Ix
28.000 in Clear Depth L/ 532 Live Defl L/ 284 SJI Defl
1148475 in-#Moment 1.000 in Chord gap 1.147 in Camber
48.000 in Interior Panel 37.406 in Left End 37.406 in Right End
12 Web Vees 7296 # SJI reaction 7296 # SJI reaction
TOD Chord: 2-LL2x2x.187 A = 1.426 Y = 0.569 Fy = 50000 Q = 1.000
Bridg c 210" Ix= 0.544 Iy= 2.173 Rx = 0.617 Ry = 1.234 Rz = 0.394
Center: L = 24.000 P = -36986 Pax= -38638 M = 480 6 Fillers
Tag end panl: L = 37.406 P = -13849 Paz= -20337 M = 1948 No Filler
First point: P = -13849 Pa = -38504 M = 3099
Chord shear: V = 20200 C = -4708 fv = 8095 fc = -3301 f = 8262
Bot Chord: 2-L LZx2x.163 A = 1.251 Y = 0.560 Fy = 50000 Q = 0.952
Ix= 0,482 Iy= 1.888 RX = 0.621 Ry = 1.229 RZ = 0.395
Center: L = 48.000 P = 37203 Pa = 37526
Chord shear: V = 20200 T = 11261 fv = 10493 ft = 9003 f = 11418
Valley Joist West Page 20 V1.71 - Job #ON02915 - 05 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAJJ, CA
Comments: UBC 1997
TAG COLOR YELLOW
T408 1 - 32LH240/128 x 52' 9.625 Crimped angle Parallel chord Longspan
Web Ansl
T 1 58.7
V 1 23.5 c 1 37.9
T 2 37.9 v 2 0.0 c 2 37.9
T 3 37.9 v 3 0.0 c 3 37.9
T 4 37.9 v- 0.0 c f 37.9 T 5 37.9 v 5 0.0 c 5 37.9 T 6 37.9
V 6 0.0
C 6 37.9
Lnsth
59.5
33.7
39.1
39.1
30.9
39.1
39.1
30.9
39.1
39.1
30.9
39.1
39.1
30.9
39.1
39.1
30.9
39.1
Shear
6841 - 18 1'2
-6055
5403
-1587
-4885
4367
-1617
-3849
3331 -1640
-2812
2294
-1656
-1776
1574
-1665
-1574
Force
13176 -1975
-7670
6844
-1587
-6188
5531
-1617
-4875
4219 -1640
-3562
-1656
-2250
1994 -1665
-1994
2906
Member
2LL1-1/4X.109
lLLl-lj4X. 109
1L L2x2x.216
1LLlXlX.lO9
lLL1-3/4~.125
1LLlXlX.lO9
lLL1-1/2~.125
1LLlXlX.lO9
lLL1-1/4X.109
lLL1-1/4X.109
lLL1-1/4X.109
lLL1-1/2X.109
lLL1-1/4X.109
lLL1-1/4X.109
lLL1-1/4X.109
lLL1-1/4X.109
1LLlXlX.lO9
1LLlXlX.lO9
Area
0.521
0.261
0.817
0.261
0.206
0.422
0.261
0.206
0.359
0.261
0.206
0.315
0.261
0.206
0.261
0.261
0.206
0.261
0.387~
0.2472
0.3922
0.2472
0.1962
0.3472 0.2472
0.1962
0.2962
0.2472
0.1962
0.2972
0.2472
0.1962
0.2472
0.2472
0.1962
0.2472
-- Pa Weld T-AvlW-B
15637 4.1 5.9/ 5.9
-3674 0.6
-8537 1.2
7819 2.1
-2210 0.5
-7190 1.7
7819 1.7
-2210 0.5
-5311 1.3
7819 1.3
-2210 0.5
-4588 1.1
7819 0.9
-2210 0.5
-2751 0.7
7819 0.6
-2210 0.5
-2751 0.6
2.5; 2.7
2.7/ 3.0
2.3/ 2.3
3.2/ 3.5
2.7/ 3.0
2.3/ 2.3
2.9/ 3.3
3.4/ 3.8
2.7; 3.0
2.3/ 2.3
2.9/ 3.3
2.3/ 2.3
2.3/ 2.3
2.7/ 3.0
2.7/ 3.0
2.7/ 3.0
2.7/ 3.0
Valley Joist West Page 21 V1.71 - Job #ON02915 - 05 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #10002 2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS CARLSBAD, CA
Comments: UBC 1997 TAG COLOR YELLOW
J401 1 - 30K232/124 x 45'10.125 Crimped angle Parallel chord Shortspan
End Lensth Depth Slope Holes TOD Chord Ext BCX Holdback Pitch EP/#lL
Taa 4.000 4.875 -0.438 Y E 0' 1.500 54.000 op; 4.000 5.000 0.438 54.000
Uniform Live load 124 #/ft full length
Uniform SJI load 232 #/ft full length Uniform Dead load 108 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point. An additional Dead load of lOOO# may occur at any top chord panel point.
H1 CLIP @ 9'2", 18'5", 36'10" FTE OAL
7-'E 1 CLIP @ 27'7" FTE OAL
L3RT BEARING 3-1/2" @ RE
*****BDL 4-7/8"***** ******BDR 5"******
End loads: - SJI mm-u-kWind
Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
30.000 in Deep 546.125 in Design length 1320 # Minimum Shear
28.945 in Effective Depth 476 in4 Ix 0 in4 Minimum Ix
26.250 in Clear Depth L/ 630 Live Defl L/ 337 SJI Defl
873536 in-#Moment 1.000 in Chord gap 0.863 in Camber
48.000 in Interior Panel 28.531 in Left End 28.531 in Right End
11 Web Vees 6279 # SJI reaction 6279 # SJI reaction
Top Chord: 2-L L2x2x.163 A = 1.251 Y = 0.560 Fy = 50000 Q = 0.952
Bridg < 178" Ix= 0.482 Iy= 1.888 Rx = 0.621 Ry = 1.229 Rz = 0.395 Center: L = 24.000 P = -30179 Pax= -31142 6 Fillers
Eighth: L = 24.000 P = -26930 Paz= -27205 No Fillers
Tag end panl: L = 28.531 P = -13301 Paz= -22353 M = 1113 No Filler
First point: P = -13301 Pa = -33773 M = 1708
Chord shear: V = 20200 C = -935 fv = 8201 fC = -748 f = 8210
Bot Chord: 2-LL1-3/4x.155 A = 1.037 Y = 0.495 Fy = 50000 Q = 0.983
Ix= 0.304 Iy= 1.330 Rx = 0.541 Ry = 1.133 Rz = 0.345
Center: L = 48.000 P = 29390 Pa = 31109
Chord shear: V = 20200 T = 10614 fv = 10891 ft = 10236 f = 12033
Valley Joist West Page 22 V1.71 - , Job #ON02915 - 05 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #10002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS CARLSBAD, CA
Comments: UBC 1997 TAG COLOR YELLOW
5401 1 - 30K232/124 x 45'10.125 Crimped angle Parallel chord Shortspan
Web Anql Lnqth Shear Force Member Area- R -- Pa Weld T-AvlW-B T 1 60.9 54.0 5908 12148 AU - 29/32 0.645 0.226 17406 1.3 ~~
V 1 39.0 33.8 -1603' -2064 lLL1-1/4X.109 0.261 0.2472 -2072 0.6 2.7/ 2.7
C 1 9.9 26.6 -5347 -5428 lLL1-3/4~.125 0.422 0.3472 -6627 1.5 3.0/ 2.8 T 2 39.7 34.1 4796 6230 lLL1-1/4x.109 0.261 0.2472 7819 1.9 2.7/ 2.7
V 2 0.0 26.3 c 2 39.7 34.1
T 3 39.7 34.1
V 3 0.0 26.3 c 3 39.7 34.1
T 4 39.7 34.1
v-' 0.0 26.3 c -4 39.7 34.1
T 5 39.7 34.1
V 5 0.0 26.3 c 5 39.7 34.1
T 6 39.7 34.1
V 6 0.0 26.3
-1550
-4288
3780 -1578
-3272
2764 -1599
-2256
1748
-1611
-1320
1320
-1615
-1550
-5570
4910
-1578
-4250
3590
-1599
-2930
2271
-1611
-1714
1714
-1615
1LLlXlX.lO9
1LL1-3/4~.125
1LLlXlX.lO9
1LL1-3/4X.125
lLL1-.1/4X. 109 1LLlXlX.lO9
lLL1-1/2X.109
1LLlXlX.lO9
1LL1-1/4X.109
lLL1-1/4X.109
1LLlXlX.lO9
1LL1-1/4x. 109
lLL1-1/4X. 109
0.206 0.1962
0.422 0.3472
0.261 0.2472
0.206 0.1962
0.422 0.3472
0.261 0.2472
0.206 0.1962
0.315 0.2972
0.261 0.2472
0.206 0.196~
0.261 0.2472
0.261 0.2472
0.206 0.1962
-1719
-6154
7819 -1719
-6154~
7819 -1719
-3573
7819
-1719
-2035
7819
-1719
0.5
1.5
1.5
0.5
1.1
1.1
0.5
0.9
0.7
0.5
0.5
0.5
0.5
2,3/
3.2/
2.7/
2.3/
3.2/
2.71 2.31
2.91
2.7/
2.3/
2.71
2.7/
2.3/
2.0
3.2
2.7
2.0
3.2
2.7
2.0
3.0
2.7
2.0
2.7
2.7
2.0
Page 23 V1.71 Vallev Joist West - Job #ON02915 - 05 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST ~ ~~
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR YELLOW
5402 2 - 30K240/128 x 45'10.125 Special Crimped angle
Parallel chord Shortspan
End Lenqth Depth Slor)e Holes Tor) Chord Ext BCX Holdback Pitch EP/#lL
Taq 4.000 4.875 -0.438 ' Y E 0' 1.500 54.000 .~ ...
opp 4.000 5.000 0.438 54.000
Uniform Live load 128 #/ft full length
Uniform SJI load 240 #/ft full length
Uniform Dead load 112 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
bFCLIP @ 9'2", 18'5", 36'10" FTE OAL
'ILr'E 1 CLIP @ 27'7" FTE OAL
SHORT BEARING 3-1/2" @ RE
*****BDL 4-7/8"***** ******BDR 571******
End loads: SJImDead-mWind
Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
30.000 in Deep 546.125 in Design length 1365 # Minimum Shear
28.945 in Effective Depth 476 in4 Ix 0 in4 Minimum Ix
26.250 in Clear Depth L/ 610 Live Defl L/ 325 SJI Defl
895283 in-#Moment 1.000 in Chord gap 0.863 in Camber
48.000 in Interior Panel 28.531 in Left End 28.531 in Right End
11 Web Vees 6461 # SJI reaction 6461 # SJI reaction
TOR Chord: 2-L L2x2x.163 A = 1.251 Y = 0.560 Fy = 50000 Q = 0.952
Bridg c 178" Ix= 0.482 Iy= 1.888 Rx = 0.621 Ry = 1.229 Rz = 0.395
Center: L = 24.000 P = -30930 Pax= -31142 10 Fillers
Sixth: L = 24.000 P = -23410 Paz= -27205 No Fillers
Tag end panl: L = 28.531 P = -13572 Paz= -22353 M = 1151 No Filler
First point: P = -13572 Pa = -33773 M = 1767
Chord shear: V = 20200 C = -962 fv = 8437 fc = -769 f = 8446
Bot Chord: 2-LL1-3/4x.155 A = 1.037 Y = 0.495 Fy = 50000 Q = 0.983
Ix= 0,304 Iy= 1.330 RX = 0.541 Ry = 1.133 Rz = 0.345
Center: L = 48.000 P = 30242 Pa = 31109
Chord shear: V = 20200 T = 10924 fv = 11209 ft = 10535 f = 12385 -
Vallev Joist West Page 24 V1.71
- Job #ON02915 - 05 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #loo02
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR YELLOW
5402 2 - 30K240/128 x 45'10.125 Special Crimped angle
Parallel chord Shortspan
-- Pa Weld Web Anql Lnath Shear Force Member Area- R
T 1 60.9 54.0 6081 12502 AU - 29/32 0.645 0.226 17406 1.4
v1
c1
T2
v2
c2
T3
v3 c3
T- v-&
c4
T5
v5
c5
T6
V6
39.0
9.9
39.7
0.0
39.7
39.7
0.0
39.7
39.7
0.0
39.7
39.7
0.0
39.7
39.7
0.0
33.8 -1623
26.6 -5501
34.1 4932
26.3 -1568
3,4.1 -4408
34.1 3884
26.3 -1597
34.1 -3360
34.1 2836
26.3 -1618
34.1 -2312
34.1 1788
26.3 -1630
34.1 -1365
34.1 1365
26.3 -1635
-2090 lLL1-1/4X.109 0.261 0.2472
-5584 lLL1-3/4x.125 0.422 0.3472
6406 lLL1-1/4x.109 0.261 0.2472
-1568 lLLlxlx.109 0.206 0.1962
-5726 1LL1-3/4x.125 0.422 0.3472
5045 lLL1-1/4x.109 0.261 0.2472
-1597 lLLlxlx.109 0.206 0.1962
-4364 lLL1-3/4x.125 0.422 0.3472
3684 lLL1-1/4x.109 0.261 0.2472
-3003 lLL1-1/2x.109 0.315 0.2972
2323 lLL1-1/4x.109 0.261 0.2472
-1774 lLL1-1/4x.109 0.261 0.2472
1774 lLL1-1/4x.109 0.261 0.2472
-1635 lLLlxlx.109 0.206 0.1962
-1618 lLLlXlX.109 0.206 0.1962
-1630 1LLlXlX.109 0.206 0.1962
-2072 0.6
-6627 1.5
-1719 0.5
-6154 1.5
7819 1.6
-1719 0.5
-6154 1.2
7819 1.1
-1719 0.5
-3573 0.9
7819 0.7
-1719 0.5
-2035 0.5
7819 0.5
7819 2.0
-1719 0.5
T-AVlW-B
2.71 2.7
3.0/ 2.8
2.31 2.0
3.2/ 3.2 2.7/ 2.7
2.3/ 2.0 3.2/ 3.2
2.7/ 2.7
2.3/,2.0
2.9/ 3.0
2.71 2.7
2.3/ 2.0
2.7/ 2.7
2.7/ 2.7
2.7/ 2.7
2.31 2.0
Valley Joist West Page 25 V1.71
- Job #ON02915 - 05 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR YELLOW
5403 4 - 30K224/119 x 45' 7.625 Special Crimped angle
Parallel chord Shortspan
- End Lenqth Depth Slope Holes Top Chord Ext BCX Holdback Pitch EP/#lL
Taq 4.000 4.875 -0.438 E 0' 2.000 54.000
Opp 4.000 5.000 0.438 54.000
Uniform Live load 119 #/ft full length
Uniform SJI load 224 #/ft full length
Uniform Dead load 105 #/ft full length
An additional SJI load of loOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
€9-CLIP @ 9'2", 18'5", 36'10" FTE OAL
lA2E 1 CLIP @ 27'7" FTE OAL
* * * *BDL 4 - 7 /8 I! * * * * * * * * * * *BDR 5 n * * * * * *
SHORT BEARING 3-1/2" @ RE
End loads: __ S JI
Left TC axial load: 0.0
30.000 in Deep
28.952 in Effective Depth
26.250 in Clear Depth
846454 in-#Moment
48.000 in Interior Panel
Right TC axial load: 0.0
11 Web Vees
mDeadLiveEaukWind
7.2 .O.O Kim 0.0 0.0 0.0
0.0 0.0 0.0 7.2 0.0 Kips
543.625 in Design length 1268 # Minimum Shear
448 in4 Ix 0 in4 Minimum Ix
L/ 626 Live Defl L/ 332 SJI Defl
1.000 in Chord gap 0.855 in Camber
27.906 in Left End 27.906 in Right End
6074 # SJI reaction 6074 # SJI reaction
TOD Chord: 2-L L2x2x.156
Bridg c 178" Ix= 0.464
Center: L = 24.000
Sixth: L = 24.000
Tag end panl: L = 27.906
First point:
Chord shear: V = 20200
Bot Chord: 2-LL1-3/4x.143
IX= 0.283
Center: L = 48.000
Chord shear: ~-V. = 20200
F
A = 1.199
Iy= 1.805 P = -29237
P = -22122
P = -13009
P = -13009
C = -683
A = 0.960
Iy= 1.225 P = 28290
T = 10269
Y = 0.558
RX = 0.622
Pax= -29375 Paz= -25723
Paz= -21458
Pa = -32382 fv = 8317
Y = 0.490
Rx = 0.543
fv = 11424 Pa = 28803
Fy = 50000
Ry = 1.227
M = 1030 M = 1574
fc = -570
Fy = 50000
Ry = 1.130
ft = 10696
Q = 0.935
Rz = 0.396
10 Fillers
No Fillers
No Filler
f = 8322
Q = 0,953
Rz = 0.346
f = 12614
Vallev Joist West Page 26 V1.71 - Job #ON02915 - 05 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
Comments: UBC 1997
CARLSBAD, CA
TAG COLOR YELLOW
J4 03 4 - 301(224/119 x 45' 7.625 Special Crimped angle
Parallel chord Shortspan
Web Anql Lnqth Shear T 1 60.9 54.0 5718
V 1 39.8 34.2 -1571
C 1 7.5 26.5 -5190 T 2 39.7 34.1 4661 V 2 0.0 26.3 -1531
C 2 39.7 34.1 -4169 T 3 39.7 34.1 3677
V 3 0.0 26.3 -1559
C 3 39.7 34.1 -3185
?- 39.7 34.1 2693
V 4 0.0 26.3 -1578 c 4 39.7 34.1 -2200
T 5 39.7 34.1 1708
V 5 0.0 26.3 -1590
C 5 39.7 34.1 -1268 T 6 39.7 34.1 1268
V 6 0.0 26.3 -1594
Force Member
11754 'AU - 29/32
-2044 lLL1-1/4X.109
-5235 lLL1-3/4X.125
6054 lLL1-1/4X.109
-1531 1LLlXlX.109
-5415 1LL1-3/4X.125
4776 lLL1-1/4X.109
-1559 1LLlXlX.lO9
-4137 lLL1-3/4X.125
3497 lLL1-1/4~.109
-1578 lLLlXlX.109
-2858 lLL1-1/2x.109
2219 lLL1-1/4X.109
-1590 lLLlXlX.109
-1648 lLL1-1/4X.109
1648 lLL1-1/4X.109
-1594 1LLlXlX.lO9
Area
0.645
0.261
0.422
0.261
0.206
0.422
0.261
0.206
0.422
0.261
0.206
0.315
0.261
0.206
0.261
0.261
0.206
R
0.226
0.2472
0.3472
0.2472
0.1962
0.3472
0.2472
0.1962
0.3472
0.2472
0.1962
0.2972
0.2472
0.1962
0.2472 0.2472
0.1962
- -- Pa Weld
17406 1.3
-2028 0.6
-6672 1.4
7819 1.9
-1719 0.5
7819 1.5
-1719 0.5
7819 1.1
-1719 0.5
-3574 0.9
7819 0.7
-1719 0.5
7819 0.5
-6155 1.5
-6155 1.1
-2035 0.5
-1719 0.5
T - AVl W - B
2.7/ 2.8
3.0/ 2.8
2.7/ 2.7
2.3/ 2.0
3.2/ 3.2
2.7/ 2.7
2.3/ 2.0
2.7/ 2.7
2.9/ 3.0
2.7/ 2.7
2.3/ 2.0
2.7/ 2.7
2.7/ 2.7
2.3/ 2.0
3.2/ 3.2
2.3/ 2.0
Valley Joist West Page 27 V1.71 - Job #ON02915 - 05 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
Comments: UBC 1997
CARLSBAD, CA
TAG COLOR YELLOW
J404 12 - 30K240/128 x 45'10.125 Crimped angle Parallel chord Shortspan
End Lensth Depth SloDe Holes TOR Chord Ext BCX Holdback Pitch EP/#lL
Tag 4.000 4.875 -0.438 E 0' 2.000 54.000
opp 4.000 5.000 0.438 54.000
Uniform Live load 128 #/ft full length
Uniform SJI load 240 #/ft full length
Uniform Dead load 112 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOo# may occur at any top chord panel point. * * * **BDL 4 -7/8 *** * * * * * * **BDR 5 I! **** * *
H1 CLIP @ 9'2", 18'5", 36'10" FTE OAL
?r'E 1 CLIP @ 27'7" FTE OAL
~L~~RT BEARING 3-1/2-" @ RE
End loads: - SJI NtUD~mEaukWind
Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
30.000 in Deep 546.125 in Design length 1365 # Minimum Shear
28.945 in Effective Depth 476 in4 Ix 0 in4 Minimum Ix
26.250 in Clear Depth L/ 610 Live Defl L/ 325 SJI Defl
895283 in-#Moment 1.000 in Chord gap 0,863 in Camber
48.000 in Interior Panel 28.531 in Left End 28.531 in Right End
11 Web Vees 6461 # SJI reaction 6461 # SJI reaction
TOKJ Chord: 2-L L2x2x.163 A = 1.251 Y = 0.560 Fy = 50000 Q = 0.952
Bridg e 178" Ix= 0.482 Iy= 1.888 Rx = 0.621 Ry = 1.229 Rz = 0.395
Center: L = 24.000 P = -30930. Pax= -31142 10 Fillers
Sixth: L = 24.000 P = -23410 Paz= -27205 No Fillers
Tag end panl: L = 28.531 P = -13572 Paz= -22353 M = 1151 No Filler
First point: P = -13572 Pa = -33773 M = 1767
Chord shear: V = 20200 C = -962 fv = 8437 fc = -769 f = 8446
Bot Chord: 2-LL1-3/4x.155 A = 1.037 Y = 0.495 Fy = 50000 Q = 0.983 Ix= 0.304 Iy= 1.330 RX = 0.541 Ry = 1.133 RZ = 0.345
Center: L = 48.000 P = 30242 Pa = 31109
Chord shear: V = 20200 T = 10924 fv = 11209 ft = 10535 f = 12385
~~
Valley Joist West Page 28 V1.71
_- Job #ON02915 - 05 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR YELLOW
5404 12 - 30K240/128 x 45'10.125 Crimped angle Parallel chord Shortspan
Web Awl Lnqth T 1 60.9 54.0
V 139.0 33.8
C 1 9.9 26.6
T 2 39.7 34.1
V 2 0.0 26.3 c 2 39.7 34.1
T 3 39.7 34.1
V 3 0.0 26.3 c 3 39.7 34.1
T 4 39.7 34.1
1'- 0.0 26.3 c 4 39.7 34.1
T 5 39.7 34.1
V 5 0.0 26.3 c 5 39.7 34.1
T 6 39.7 34.1
V 6 0.0 26.3
Shear
6081
-1623
-5501
4932
-1568
-4408
3884
-1597
-3360
-1618
-2312
1788
2836
-1630
-1365
-1635 1365
Force
12502
-2090
-5584
6406
-1568
-5726
5045
-1597
-4364
-1618
-3003
3684
2323
-1630
-1774
1774
-1635
Member
AU - 29/32
1LL1-1/4X. 109
1LL1-3 /4X. 125
1LLlXlX.lO9 lLL1-1/4X.109
lLLl-3 /4x. 125
lLL1-1/4X.109
lLL1-1/4X.109
lLL1-1/2X.109
lLL1-1/4X.109
lLL1-1/4X.109
lLL1-1/4X.109
1LLlXlX.lO9
lLL1-3/4X.125
1LLlXlX.lO9
1LLlXlX.lO9
1LLlXlX.lO9
Area
0.645
0.261
0.422
0.261 0.206
0.422
0.261
0.206
0.422
0.261
0.206
0.315
0.261
.O .206
0.261
0.261 0.206
0.226
0.2472
0.3472
0.2472 0.1962
0.3472
0.2472
0.1962
0.3472
0.2472
0.1962
0.2972
0.2472
0.1962
0.2472
0.2472 0.1962
-- Pa Weld
17406 1.4
-2072 0.6
-6627 1.5
7819 2.0
-1719 0.5 -6154 1.5
7819 1.6
-1719 0.5
-6154 1.2
7819 1.1
-1719 0.5
-3573 0.9
7819 0.7
-1719 0.5
-2035 0.5
7819 0.5
-1719 0.5
T - AVl W - B
2.7/ 2.7
3.0/ 2.8
2.7/ 2.7
2.3/ 2.0 3.2/ 3.2
2.7/ 2.7
2.3/ 2.0
3.2/ 3.2
2.7/ 2.7
2.3/ 2.0
2.9/ 3.0
2.3/ 2.0
2.7/ 2.7
2.7/ 2.7
2.7/ 2.7
2.3/ 2.0
Z-lWl Valley Joist West Page 1 V1.71
,.- Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
G501 1 - 28G3N16.6/6.8 x 27' 9.750 Special Crimped angle
Parallel chord Girder
End Lensth DeDth Slowe Holes Tow Chord Ext, BCX Holdback Pitch EP/#iL
Tag 6.000 6.000 Y E 0' 1.000 2 0' 4.750 94.750
Opp 6.000 6.000 Y E 0' 5.000 2 0' 5.000 47.000
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point
TC conc loads: Load SDacinq Location Point Tvoe
9800 010 7'10-3/4 U4 Dead
16600 7'10-314 7010-3/4 u4 S JI
6800
16600
~ ~ ~~
7!10-3/4 U4 Live ::: 15'10-3/4 U8 S JI
15'10-3/4 U8 Dead 9800
6800 15'10-3/4 U8 Live
9800 23'10-3/4 U11 Dead
23'10-3/4 U11 Live 6800
vu
16600 23'10-374 U11 SJI
3'11
TC. HOLES 1 3/4" LE. 7/8" DIA. 4" GAGE
KNIFE PLATE 8" LE. End loads: - SJI-D~~~~L&W
Left TC axial load: 0.0 0.0 0.0 0.0 40.1 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 40.1 0.0 Kips
28.000 in Deep 329.750 in Design length 6225 # Minimum Shear
26.145 in Effective Depth 1299 in4 Ix 0 in4 Minimum Ix
21.500 in Clear Depth L/1151 Live Defl L/ 472 SJI Defl
2724733 in-#Moment 1.000 in Chord gap 0.315 in Camber
59.750 in Interior Panel 21.688 in Left End 45.000 in Right End
6 Web Vees 22294 # SJI reaction 29506 # SJI reaction
Tow Chord: 2-LL3-1/2x.344 A = 4.579 Y = 1.002 Fy = 50000 Q = 1.000
Center: L = 24.000 P =-lo4218 Paz=-121493 M = 0 No Fillers
Ix= 5.323 Iy= 15.651 Rx = 1.078 Ry = 1.849 RZ = 0.688
Chord shear: V = 20200 C = 0 fv = 9201 fc = 0 f = 9201
Bot Chord: 2-L L3x3x.281 A = -3.214 Y = 0.854 Fy = 50000 Q = 1.000 - Ix= 2.756 Iy= 8.645 RX = 0.926 Ry = 1.640 RZ = 0.591
Center: L = 59.750 P = 95867 Pa = 96422
Chord shear: V = 20200 T = 38454 fv = 13142 ft = 11964 f = 14439
Valley Joist West Page 2 V1.71 - Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
G501 1 - 28G3N16.6/6.8 x 27' 9.75Q Special Crimped angle
Parallel chord Girder
Web Ansl Lnqth Shear Force Member Area -, R T 160.0 52.4 22157 44380 2L L2x2x.216 1.635 0.613~ V 142.2 35.3 -1000 -1349 lLL1-1/4X.109 0.261 0.2472
C 1 0.0 26.1-22157 -22157 lLL2-1/2X.230 1.097 0.4922
T 2 42.2 35.3 22085 29801 1LL2-1/2X.212 1.015 0.4932 V 2 0.0 26.1 -1000 -1000 lLLlXlX.109 0.206 0.1962
C 2 42.2 35.3-22013 -29704 2LL2X2X.176 1.346 0.619~ T 3 42.6 35.5 6225 8450 lLL1-1/2X.109 0.315 0.2972
V 3 0.0 26.1 -1000 -1000 lLLlXlX.109 0.206 0.1962
C,3 42.6 35.5 -6225 -8450 1L L2X2X.143 0.552 0.3962
-- Pa Weld
49041 6.9
-1901 0.4
-24154 3.2
30452 4.7
-1733 0.3
-30780 5.7
9454 2.6
-1733 0.3
-8927 2.0
T - AVl W - B
11.0/ 9.3
3.7/ 4.2
4.5/ 4.5
5.0/ 5.4
3.0/ 3.0
8.5/ 7.3
4.0/ 4.4
3.0/ 3.0
4.5/ 4.9
Valley Joist West Page 3 V1.71 - Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
G502 1 - 28G3N16.6/6.8 x 27' 9.750 Special Crimped angle
Parallel chord Girder
-End - Lensth Deoth Slope Holes TOP Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 6.000 Y E 0' 1.000 2 0' 4.750 94.750
Opp 6.000 6.000 Y E 0' 5.000 2 0' 5.000 47.000
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
TC conc loads: Load SDacinq Location Point TYDe
9800 7'10-3/4 U4 Dead
6800 7'10-3/4 U4 Live
9800 15'10-3/4 U8 Dead
6800 15'10-3/4 U8 Live
9800 23'10-3/4 U11 Dead
23'10-3/4 U11 Live 6800
16600 7'10-3/4 7010-3/4 u4 S JI
P
16600 15'10-3/4 U8 S JI
16600 23'10-3/4 U11 SJI
3'11
TC. HOLES 1 3k4" LE. 7/8" DIA. 4" GAGE
KNIFE PLATE 8" LE. End loads: SJI-DeadLiveEcrukWind
Left TC axial load: 0.0 0.0 0.0 0.0 41.0 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 41.0 0.0 Kips
28.000 in Deep 329.750 in Design length 6225 # Minimum Shear
26.145 in Effective Depth 1299 in4 Ix 0 in4 Minimum Ix
21.500 in Clear Depth L/1151 Live Defl L/ 472 SJI Defl
2737439 in-#Moment 1.000 in Chord gap 0.315 in Camber
59.750 in Interior Panel 21.688 in Left End 45.000 in Right End
6 Web Vees 22294 # SJI reaction 29506 # SJI reaction
Too Chord: 2-LL3-1/2x.344 A = 4.579 Y = 1.002 Fy = 50000 Q = 1.000
Center: L = 24.000 P =-lo4704 Paz=-121493 M = 0 No Fillers Ix= 5.323 Iy= 15.651 Rx = 1.078 Ry = 1.849 Rz = 0.688
0 fv = 9201 fc = 0 f = 9201 Chord shear: V = 20200 C =
~ .~
&Chord: 2-L L3x3x.281 A = 3.214 Y = 0.854 Fy = 50000 Q = 1.000 Ix= 2.756 Iy= 8.645 RX = 0.926 Ry = 1.640 RZ = 0.591
Chord shear: V = 20200 T = 38454 fv = 13142 ft = 11964 f = 14439
Center: L = 59.750 P = 95867 Pa = 96422
Vallev Joist West Page 4 V1.71 - Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
G502 1 - 28G3N16.6/6.8 x 27' 9.750 Special Crimped angle
Parallel chord Girder
Web Ansl
T 1 60.0 V 142.2 c 1 0.0 T 2 42.2 v 2 0.0
C 2 42.2
T 3 42.6 v 3 0.0
CF' 42.6
Lnqth Shear
52.4 22157
35.3 -1000
26.1-22157
35.3 22085
26.1 -1000
35.3-22013
35.5 6225
26.1 -1000
35.5 -6225
Force Member Area- R
44380 2L L2x2x.216 1.635 0.613~
-1349 lLL1-1/4X.109 0.261 0.2472
-22157 lLL2-1/2X.230 1.097 0.4922
29801 lLL2-1/2X.212 1.015 0.4932
-1000 1LLlXlX.109 0.206 0.1962
-29704 2LL2~2x.176 1.346 0.619X
8450 lLL1-1/2X.109 0.315 0.2972
-1000 lLLlXlX.109 0.206 0.1962
. -8450 1L L2X2X.143 0.552 0.3962
-- Pa Weld
49041 6.9 I
-1901 0.4
-24154 3.2
30452 4.7
-1733 0.3
-30780 5.7
9454 2.6
-1733 0.3
-8927 2.0
3 - AvlW - B
L1.0/ 9.3
3.7/ 4.2
4.5/ 4.5
3.0/ 3.0
5.0/ 5.4
8.5/ 7.3
4.0/ 4.4
3.0/ 3.0
4.5/ 4.9
Valley Joist West Page 5 V1.71 - Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
T501 4 - 32LH240/128 x 52' 6.625 Special Crimped angle
Parallel chord Longspan
End Lensth Depth SloDe Holes TOD Chord Ext BCX Holdback pi
Tag 6.000 5.000 -0.438
Opp 6.000 5.000 0.438
- ch EP/#1L
51.312
51.312
Uniform Live load 128 #/ft full length
Uniform SJI load 240 #/ft full length
Uniform Dead load 112 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point. TPE 1 CLIP @ 21'1" FTE. OAL. H. :LIP @ 10'6",31'8" & 42'3" FTE. OAL.
SHORT BEARING 3-1/2" @ RE
End loads: SJI
Left TC axial load: 0.0
Right TC axial load: 0.0
32.000 in Deep
30.871 in Effective Depth
28.000 in Clear Depth
48.000 in Interior Panel
1138303 in-#Moment
12 Web Vees
m-LiveEaukWind
0.0 KiDs 0.0 0.0 0.0 7.2 -c ~ 0.0 0.0 0.0 7.2 0.0 Kips
626.625 in Design length 1567 # Minimum Shear
636 in4 Ix 0 in4 Minimum Ix
L/ 540 Live Defl L/ 288 SJI Defl
1.000 in Chord gap 1.136 in Camber
36.656 in Left End 36.656 in Right End
7266 # SJI reaction 7266 # SJI reaction
TOD Chord: 2-LLZx2x.187
Bridg c 210" Ix= 0.544
Center: L = 24.000
Tag end panl: L = 36.656
First point: Chord shear: V = 20200
Bot Chord: 2-L L2x2x.163
IX= 0.482
Center: L = 48.000
Chord shear: V = 20200
A = 1.426
Iy= 2.173 P = -36657
P = -13527
P = -13527
C = -4703
A = 1.251
Iy= 1.888 P = 36873 T = 10896
Y = 0.569
RX = 0.617
Pax= -38638
Paz= -20879
Pa = -38504 fv = 8088
Y = 0.560
RX = 0.621
fv = 10462
Pa = 37526
Fy = 50000
Ry = 1.234 M = 480 M = 1872 M = 2'974
fC = -3298
Fy = 50000
Ry = 1.229
ft = 8711
~~
Q = 1.000 RZ = 0.394
6 Fillers
No Filler
f = 8254
Q = 0.952
RZ = 0.395
f = 11332
Valley Joist West Page 6 V1.71 - Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CAFLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
T501 4 - 32LH240/128 x 52' 6.625 Special Crimped angle
Parallel chord Longspan
Web Ansl Lnsth Shear
T 158.0 58.2 6821 v 1 22.3 c 1 37.9
T 2 37.9 v 2 0.0 c 2 37.9 T 3 37.9 v 3 0.0 c,2- 37.9 T 37.9 v 4 0.0 c 4 37.9
T 5 37.9 v 5 0.0 c 5 37.9 T 6 37.9
V 6 0.0
C 6 37.9
~~~~
33.4 -1796
39.1 -6050
39.1 5405
30.9 -1585
39.1 -4886
39.1 4368
30.9 -1616
39.1 -3850
39.1 3332
30.9 -1639
39.1 -2813
30.9 -1655
39.1 -1777
39.1 1567
30.9 -1663
39.1 -1567
39.1 2295
Force Member
12855 R9 - 1-IN.
-1941
-7663
6846
-1585
-6189
5533
-1616
-4876
4220
-1639
-3563 2907
-1655
-2250
1984
-1663
-1984
lLL1-1/4X.109
1L L2x2x.216
1LLlXlX.lO9
lLL1-3/4X.125
1LLlxlx.lO9
lLL1-1/2X.125
1LLlXlX.lO9
lLL1-1/4X.109
1LL1-1/4x. 109
lLL1-1/4X.109
lLL1-1/2X.109
lLL1-1/4X.109
lLL1-1/4X.109
lLL1-1/4X.109
1LLlXlX.lO9
lLL1-1/4X.109
1LLlXlX.lO9
Area
0.785
0.261
0.817
0.261
0.206
0.422
0.261
0.206
0.359
0.261
0.206
0.315
0.261
0,206
0.261
0.261
0.206
0.261
0.250
0.2472
0.3922 0.2472
0.1962
0.3472
0.2472
0.1962
0.2962
0.2472
0.1962
0.2972 0.2472
0.1962
0.2472
0.2472
0.1962
0.2472
-- Pa Weld
23562 1.3
-3726 0.6
-8537 1.2
7819 2.1
-2210 0.5
-7190 1.7
7819 1.7
-2210 0.5
-5311 1.3
7819 1.3
-2210 0.5
-4588 1.1
7819 0.9
-2210 0.5
-2751 0.7
7819 0.6
-2210 0.5
-2751 0.6
T - AVl W - B
2.5/ 2.7
2.7/ 3.0
3.4/ 3.8
2.3/ 2.3
3.2/ 3.5
2.7/ 3.0
2.3/ 2.3
2.9/ 3.3
2.7/ 3.0
2.3/ 2.3
2.9/ 3.3
2.7/ 3.0
2.3/ 2.3
2.7/ 3.0
2.7/ 3.0
2.3/ 2.3
2.7/ 3.0
Vallev Joist West Page 7 V1.71
Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Pro] ect : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
T502 1 - 32LH240/128 x 53' 3.875 Special Crimped angle
Parallel chord Longspan
End Lenqth Dewth Slope Holes TOP Chord Ext .BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 -0.438 55.938
Opp 6.000 4.875 0.438 55.938
Uniform Live load 128 #/ft full length
Uniform SJI load 240 #/ft full length
Uniform Dead load 112 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
TFT 1 CLIP @ 21'1" FTE. OAL.
H_ :LIP @ 10'6",31'8" & 42'3" FTE. OAL.
End loads: - SJIWDeadUEaukWind
Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
32.000 in Deep 635.875 in Design length 1590 # Minimum Shear
30.871 in Effective Depth .636 in4 Ix 0 in4 Minimum Ix
28.000 in Clear Depth L/ 517 Live Defl L/ 275 SJI Defl - 1169811 in-#Moment
48.000 in Interior Panel
12 Web Vees
Tow Chord: 2-LL2x2x.187
Bridg < 210" Ix= 0.544
Center: L = 24.000
Tag end panl: L = 38.969
First point:
Chord shear: V = 20200
Bot Chord: 2-L L2x2x.163
IX= 0.482
Center: L = 48.000
Chord shear: V = 20200
1.000 in Chord gap 1.170 in Camber
38.969 in Left End 38.969 in Right End
7359 # SJI reaction 7359 # SJI reaction
A = 1.426 Y = 0.569 Fy = 50000 Q = 1.000
Iy= 2.173 Rx = 0.617 Ry = 1.234 Rz = 0.394 P = -37678 Pax= -38638 M = 480 10 Fillers
P = -14526 Paz= -19184 M = 2112 No Filler
P = -14526 Pa = -38504 M = 3369
C = -4717 fv = 8111 fc = -3308 f = 8278
A = 1.251 Y = 0.560 Fy = 50000 Q = 0.952
Iy= 1.888 Rx = 0.621 Ry = 1.229 RZ = 0.395
T = 12028 fv = 10559 ft = 9616 f = 11602 P = 37894 Pa = 37526
Vallev Joist West Page 8 V1.71 - Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
T502 1 - 32LH240/128 x 53' 3.875 Special Crimped angle
Parallel chord Longspan
Web Anql Lnqth Shear
T 1 60.2 62.1 6884
V 125.9 34.3 -1845
C 137.9 39.1 -6067
T 2 37.9 39.1 5400
V 2 0.0 30.9 -1590
C 2 37.9 39.1 -4882
T 3 37.9 39.1 4364
V 3 0.0 30.9 -1620
C) 37.9 39.1 -3846
T 37.9 39.1 3329
V 4 0.0 30.9 -1643 c 4 37.9 39.1 -2811 T 5 37.9 39.1 2293
V 5 0.0 30.9 -1660
C 5 37.9 39.1 -1775
T 6 37.9 39.1 1590 V 6 0.0 30.9 -1668
C 6 37.9 39.1 -1590
Force
13859
-2050
-7685
6840
-1590
-6184
5528
-1620
-4872 4216
-1643
-3561
-1660
-2249
2905
2014
-1668
-2014
Member RA - 1 1/8
lLL1-1/4X.109
lLL1-1/4X.109
lLL1-1/4X.109
lLL1-1/4X.109
lLL1-1/2X.109
lLL1-1/4X.109
lLL1-1/4X.109
lLL1-1/4X.109
lLL1-1/4X.109
1L L2x2x.216
1LLlXlX.lO9
lLL1-3/4X.125
1LLlXlX.lO9
lLL1-1/2~.125
1LLlXlX.lO9
1LLlXlX.lO9
1LLlXlX.lO9
Area
0.994
0.261 0.817
0.261
0.206
0.422
0.261
0.206
0.359
0.261
0.206
0.315
0.261
0.206
0.261
0.261
0.206
0.261
0.281
0.2472
0.3922
0.2472
0.1962
0.3472
0.2472
0.1962
0.2962
0.2472
0.1962
0.2972 0.2472
0.1962
0.2472
0.2472
0.1962
0.2472
-~ Pa Weld
29821 1.3
-3556 0.6
-8537 1.2
7819 2.1
-2210 0.5
-7190 1.7
7819 1.7
-2210 0.5
-5311 1.3
7819 1.3
-2210 0.5
-4588 1.1
7819 0.9
-2210 0.5
-2751 0.7
7819 0.6
-2210 0.5
-2751 0.6
T - AVlW - B
2.5/ 2.7
3.4/ 3.8
2.7/ 3.0
2.7/ 3.0
2.9/ 3.3
2.7/ 3.0
2.9/ 3.3 .
2.7/ 3.0
2.7/ 3.0
2.7/ 3.0
2.3/ 2.3
3.2/ 3.5
2.3/ 2.3
2.3/ 2.3
2.3/ 2.3
2.7/ 3.0
2.3/ 2.3
Vallev Joist West Page 9 V1.71
,- Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002 2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS CARLSBAD, CA
Comments: UBC 1997 TAG COLOR WHITE
T503 1 - 32LH240/128 x 53' 3.875 Special Crimped angle
Parallel chord Longspan
End Lenqth Depth Slolse Holes TOP Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 -0.438 55.938
Opp 6.000 4.875 0.438 55.938
Uniform Live load 128 #/ft full length
Uniform SJI load 240 #/ft full length
Uniform Dead load 112 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point. -.TC conc loads: Load Spacinq Location Point Type
6'8 U2 SJI, Dead
loo 2'0-718 8'8-7/8 u3 SJI, Dead 100
6'8
44'7
TYPE 1 CLIP @ 21'1" FTE. OAL.
H1 CLIP @ 10'6",31'8" & 42'3" FTE. OAL. End ioads: - S JI
Left TC axial load: 0.0
Right TC axial load: 0.0
32.000 in Deep
30.866 in Effective Depth
28.000 in Clear Depth
48.000 in Interior Panel 1178852 in-#Moment
12 Web Vees
-mLiveQ&Wind
0.0 0.0 0.0 7.2 0.0 Kips
0.0 0.0 0.0 7.2 0.0 Kips
635.875 in Design length 1615 # Minimum Shear
661 in4 Ix 0 in4 Minimum Ix '
L/ 537 Live Defl L/ 283 SJI Defl
1.000 in Chord gap 1.170 in Camber
38.969 in Left End 38.969 in Right End
7530 # SJI reaction 7387 # SJI reaction
TOR Chord: 2-LL2x2x.187 A = 1.426 Y = 0.569 Fy = 50000 Q = 1.000
Bridg < 210" Ix= 0.544 Iy= 2.173 Rx = 0.617 Ry = 1.234 Rz = 0.394
Center: L = 24.000 P = -37999 Pax= -38638 M = 480 10 Fillers
Tag end panl: L = 38.969 P = -14827 Paz= -19184 M = 2117 No Filler
First point: P = -14827 Pa = -38504 M = 3359
Chord shear: V = 20200 C = -4851 fv = 8340 fc = -3402 f = 8512
Bot Chord: 2-LL2x2x.176 A = 1.346 Y = 0.565 Fy = 50000 Q = 0.981 Ix= 0.516 Iy= 2.042 Rx = 0.619 Ry = 1.232 Rz = 0.394
Center: L = 48.000 P = 38193 Pa = 40381
F>rd shear: V = 20200 T = 12330 fv = 10022 ft = 9160 f = 11019
Vallev Joist West Page 10 V1.71 - Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
T503 1 - 32LH240/128 x 53' 3.875 Special Crimped angle
Parallel chord Longspan
Web Ansl T 1 60.2
V 1 25.9 c 1 37.9
T 2 37.9 v 2 1.7 c 2 37.9 T 3 37.9 v 3 0.0
C$ 37.9 T 37.9 v 4 0.0 c 4 37.9 T 5 37.9 v 5 0.0 c 5 37.9
T 6 37.9
V 6 0.0
C 6 37.9
Lnsth Shear
62.1 7056
34.3 -1846
39.1 -6239
39.1 5462
30.9 -1692
39.1 -4844
39.1 4336
30.9 -1623
39.1 -3818
39.1 3300
30.9 -1645
39.1 -2783
39.1 2265
30.9 -1662
39.1 -1747
39.1 1615
30.9 -1670
39.1 -1615
Force Member Area- R
14206 RA - 1 1/8 0.994 0.281
-2052 lLL1-1/4X.109 0.261 0.2472
-7903 1L L2~2x.216 0.817 0.3922
6919 lLL1-1/4X.109 0.261 0.2472
-1693 1LLlXlX.109 0.206 0.1962
-6136 1LL1-3/4X.125 0.422 0.3472
5492 lLL1-1/4X.109 0.261 0.2472
-1623 lLLlXlX.109 0.206 0.1962
-4836 lLL1-1/2~.125 0.359 0.2962
4181 lLL1-1/4X.109 0.261 0.2472
-1645 1LLlXlX.109 0.206 0.1962
-3525 lLL1-1/2~.109 0.315 0.2972
2869 lLL1-1/4X.109 0.261 0.2472
-1662 lLLlXlX.109 0.206 0.1962
-2213 lLL1-1/4X.109 0.261 0.2472
2045 lLL1-1/4x.109 0.261 0.2472
-1670 lLLlXlX.109 0.206 0.1962
-2045 lLL1-1/4X.109 0.261 0.2472
-- Pa Weld
29821 1.4
-3557 0.6
-8539 1.2
7819 2.1 -2208 0.5
-7191 1.7
7819 1.7
-2210 0.5
-5311 1.3
7819 1.3
-2210 0.5
-4589 1.1
7819 0.9
-2210 0.5
-2751 0.7
7819 0.6
-2210 0.5
-2751 0.6
T - AVl W - B
2.5/ 2.7
3.4j 3.8
2.7/ 3.0
2.3/ 2.3
3.1/ 3.5
2.7/ 3.0
2.3/ 2.3
2.7/ 3.0
2.9/ 3.3
2.3/ 2.3
2.7/ 3.0
2.3/ 2.3
2.7/ 3.0
2.7/ 3.0
2.3/ 2.3
2.7/ 3.0
2.9/ 3.3
Valley Joist West Page 11 V1.71 - Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
T504 1 - 32LH240/128 x 53' 6.125 Special Crimped angle
Parallel chord Longspan
- End Lenqth. Depth ' Slope Holes TOD Chord Ext BCX Holdback Pitch EP/#lL
Tag- 6.000.' 5.125 -0.438 E 0' 1.000 57.063
Opp 6.000 4.875 0.438 57.063
Uniform Live load 128 #/ft full length
Uniform SJI load 240 #/ft full length Uniform Dead load 112 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point. TYXE 1 CLIP @ 21'3" FTE. OAL.
H :LIP @ 10'9",31'11" & 42'6" FTE. OAL. End loads: - SJI mDead*Eauk&&
Left TC axial load: 0.0 0.0 0.0 0.0 61.4 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 61.4 0.0 Kips
32.000 in Deep 638.125 in Design length 1595 # Minimum Shear
30.601 in Effective Depth 836 in4 Ix 0 in4 Minimum Ix
27.000 in Clear Depth L/ 671 Live Defl L/ 358 SJI Defl
2050518 in-#Moment 1.000 in Chord gap 1.178 in Camber.
48.000 in Interior Panel 39.531 in Left End 39.531 in Right End
12 Web Vees 7381 # SJI reaction 7381 # SJI reaction
TOD Chord: 2-L L3x3x.227 A = 2.621 Y = 0.834 Fy = 50000 Q = 0.922 Bridg c 277" Ix= 2.285 Iy= 6.949 RX = 0.934 Ry = 1.628 RZ = 0.594
Center: L = 24.000 P = -67008 Pax= -68557 M = 480 4 Fillers
10th: L = 24.000 P = -65467 Paz= -65898 No Fillers
Tag end panl: L 39.531 P = -50265 Pax= -55995 M = 2173 Filler Reqd
First point: P = -50265 Pa = -70765 M = 3468
Chord shear: V = 20200 C = -4762 fV = 4458 fC = -1817 f = 4549
Bot Chord: 2-LL2x2x.176 A = 1.346 Y = 0.565 Fy = 50000 Q = 0.981
Ix= 0.516 Iy= 2.042 RX = 0.619 Ry = 1.232 Rz = 0.394
Chord shear: V = 20200 T = 12415 fV = 9801 ft = 9223 f = 10831 Center: L = 48.000 P = 38480 Pa = 40381
Vallev Joist West Page 12 V1.71 - Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002 2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
T504 1 - 32LH240/128 x 53’ 6.125 Special Crimped angle
Parallel chord Longspan
Web Ansl Lnqth Shear Force Member Area- R -- Pa Weld
T 1 60.9 63.0 6900 14203 RA - 1 1/8 0.994 0.281 29821 1.4
V 1 26.9
C 1 38.1
T 2 38.1 v 2 0.0
C 2 38.1 T 3 38.1 v 3 0.0
Cj 38.1
T’ 38.1 v 4 0.0
C 4 38.1
T 5 38.1 v 5 0.0
C 5 38.1 T 6 38.1
V 6 0.0
C 6 38.1
34.3 -2015
38.9 -6071
38.9 5398
30.6 -1754
38.9 -4881
38.9 4363
30.6 -1773
38.9 -3846
38.9 3328
30.6 -1792
38.9 -2810
38.9 2293
30.6 -1807
38.9 -1775
30.6 -1815
38.9 -1595
38.9 1595
-2259 lLL1-1/4x.109 0.261 0.2472
6861 lLL1-1/4x.109 0.261 0.2472
-7716 1L L2x2x.216 0.817 0.3922
-1754 lLLlxlx.109 0.206 0.1962
-6203 lLL1-3/4x.125 0.422 0.3472
5545 lLL1-1/4~.109 0.261 0.2472
-1773 lLLlXlX.109 0.206 0.1962
4230 lLL1-1/4X.109 0.261 0.2472
-1792 1LLlXlX.109 0.206 0.1962
2914 lLL1-1/4x.109 0.261 0.2472
-2256 lLL1-1/4X.109 0.261 0.2472
2027 lLL1-1/4X.109 0.261 0.2472
-2027 lLL1-1/4X.109 0.261 0.2472
-4887 lLL1-1/2x.125 0.359 0.2962
-3572 lLL1-1/2x.109 0.315 0.2972
-1807 lLLlxlx.109 0.206 0.1962
-1815 1LLlxlx.109 0.206 0.1962
-3555 0.7
-8631 1.2
7819 2.1
-2249 0.5
-7223 1.7 c 7819 1.7
-2249 0.5
-5352 1.3
7819 1.3
-2249 0.6
-4621 1.1
7819 0.9
-2249 0.6
-2781 0.7
7819 0.6
-2249 0.6
-2781 0.6
T - AVl W - B
3.3/ 2.7
4.3/ 3.8
3.6/ 3.0
3.0/ 2.3
4.1/ 3.5
3.6/ 3.0
3.0/ 2.3
3.6,’ 3.0
3.8/ 3.3
3.0/ 2.3
3.8/ 3.3
3.6/ 3.0
3.0/ 2.3
3.6/ 3.0
3.6/ 3.0
3.0/ 2.3
3.6/ 3.0
Valley Joist West Page 13 V1.71
Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002 2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
T505 1 - 32LH240/128 x 53' 6.125 Special Crimped angle
Parallel chord Longspan
End Lenqth Devth Slope Holes Tov Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.125 -0.438 E 0' 1.000 57.063
Opp 6.000 4.875 0.438 57.063
-
Uniform Live load 128 #/ft full length
Uniform SJI load 240 #/ft full length
Uniform Dead load 112 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
,TC conc loads: Load SPacinq Location Point
100 6'9-1/8 6!9-1/8 u2 SJI, Dead
100 44 2'2 ' 7 8'11-1/8 u3 SJI, Dead
TYPE 1 CLIP @ 21'3" FTE OAL
H1 CLIP @ 10'9", 31'11", & 42'6" FTE OAL
End loads: __ SJImDead-g~kU
Left TC axial load: 0.0 0.0 0.0 0.0 61.4 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 61.4 0.0 Kips
32.000 in Deep 638.125 in Design length 1620 # Minimum Shear
30.601 in Effective Depth 836 in4 Ix 0 in4 Minimum Ix
27.000 in Clear Depth L/ 671 Live Defl L/ 354 SJI Defl - 2060420 in-#Moment
48.000 in Interior Panel
12 Web Vees
TOP Chord: 2-L L3x3x.227 Bridg < 277" Ix= 2.285
Center: L = 24.000
10th: L = 24.000
Tag end panl: L = 39.531
First point:
Chord shear: V = 20200
Bot Chord: 2-LL2x2x.176
IX= 0.516 ,-- Center: L = 48.000 &lord shear: V = 20200
1.000 in Chord gap 1.178 in Camber
39.531 in Left End 39.531 in Right End
7552 # SJI reaction 7410 # SJI reaction
A = 2.621 Y = 0.834 Fy =. 50000 Q = 0.922
Iy= 6.949 RX = 0.934 Ry = 1.628 RZ = 0.594
P = -67332 Pax= -68557 M = 480 4 Fillers
P = -65836 Paz= -65898 No Fillers
P = -50572 Pax= -55995 M = 2183 Filler Reqd
P = -50572 Pa = -70765 M = 3447
C = -4896 fv = 4583 fc = -1868 f = 4678
A = 1.346 Y = 0.565 Fy = 50000 Q = 0.981
Iy= 2.042 RX = 0.619 Ry = 1.232 Rz = 0.394
T = 12723 fv = 10044 ft = 9452 f = 11100
P = 38781 Pa = 40381
Valley Joist West Page 14 V1.71
Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
619/295-3153 FAX# 609/295-3628 PO# 00-364
SAN DIEGO, CA 92110-2014
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
T505 1 - 32LH240/128 x 53' 6.125 Special Crimped angle
Parallel chord Longspan
Web Ansl Lnqth Shear T 160.9 63.0 7071
v1
c1
T2
v2
c2
T3
v3
T
v4
c4
T5
v5
c5
T6
V6
C6
CPi
26.9
38.1
38.1
3.9
38.1
38.1
0.0
38.1
38.1
0.0
38.1
38.1
0.0
38.1
38.1
0.0
38.1
34.3 -2016
38.9 -6243
38.9 5449
30.7 -1856
38.9 -4831
38.9 4334
30.6 -1775
38.9 -3817
38.9 3299
30.6 -1794
38.9 -2782
30.6 -1809
38.9 -1746
38.9 1620
30.6 -1817
38.9 -1620
38.9 2264
Force Member Area.&
14556 RA - 11/8 0.994 0.281
-2261 lLL1-1/4X.109 0.261 0.2472
-7934 1L L2X2X.216 0.817 0.3922
6925 lLL1-1/4X.109 0.261 0.2472
-1860 lLLlXlX.109 0.206 0.1962
-6140 lLL1-3/4X.125 0.422 0.3472
5508 lLL1-1/4x.109 0.261 0.2472
-1775 1LLlXlX.109 0.206 0.1962
-4851 lLL1-1/2X.125 0.359 0.2962
4193 lLL1-1/4x.109 0.261 0.2472
-1794 1LLlXlX.109 0.206 0.1962
-3535 lLL1-1/2X.109 0.315 0.2972
2877 lLL1-1/4x.109 0.261 0.2472
-1809 1LLlXlX.109 0.206 0.1962
-2219 lLL1-1/4x.109 0.261 0.2472
2059 lLL1-1/4x.109 0.261 0.2472
-2059 lLL1-1/4X.109 0.261 0.2472
-1817 lLLlxlx.109 0.206 0.1962
-- Pa Weld
29821 1.4
-3555 0.7
-8631 1.2
7819 2.1
-2239 0.6
-7223 1.7
-2249 0.5
-5352 1.3
7819 1.3
-2249 0.6
-4621 1.1
7819 1.7
7819 0.9
-2249 0.6
-2781 0.7
7819 0.6
-2249 0.6
-2781 0.6
T -AVlW - B
3.3/ 2.7
4.3/ 3.8
3.0/ 2.3
3.6/ 3.0
4.1/ 3.5
3.6/ 3.0
3.0/ 2.3
3.8) 3.3
3.6/ 3.0
3.0/ 2.3
3.8/ 3.3
3.6,' 3.0
3.0/ 2.3
3.6/ 3.0
3.6/ 3.0
3.6/ 3.0
3.0/ 2.3
,-
Valley Joist West Page 15 V1.71 - Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997 TAG COLOR WHITE
T506 2 - 32LH240/128 x 53' 6.125 Special Crimped angle
Parallel chord Longspan
End Lenqth Depth Slope Holes Tow Chord Ext BCX Haldback Pitch EP/#lL
Tag 6.000 5.125 -0.438 E 0' 1.000 57.063
Opp 6.000 4.875 0.438 57.063
Uniform Live load 128 #/ft full length
Uniform SJI load 240 #/ft full length
Uniform Dead load 112 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point. TYPE 1 CLIP. @ 21'3" FTE OAL
H' :LIP @ 10'9", 31'11", & 42'6" FTE OAL
End loads: - SJI NtUpm-EaukWind
Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
32.000 in Deep 638.125 in Design length 1595 # Minimum Shear
30.866 in Effective Depth 661 in4 Ix 0 in4 Minimum Ix
28.000 in Clear Depth L/ 531 Live Defl L/ 283 SJI Defl
1177540 in-#Moment 1.000. in Chord gap 1.178 in Camber
48.000 in Interior Panel 39.531 in Left End 39.531 in Right End
12 Web Vees 7381 # SJI reaction 7381 # SJI reaction
TOD Chord: 2-LL2x2x.187 A = 1.426 Y = 0.569 Fy = 50000 Q = 1.000
Bridg < 210" Ix= 0.544 Iy= 2.173 Rx = 0.617 Ry = 1.234 Rz = 0.394
Center: L = 24.000 P = -37934 Pax= -38638 M = 480 10 Fillers
Tag end panl: L = 39.531 P = -14773 Paz= -18761 M = 2173 No Filler
First point: P = -14773 Pa = -38504 M = 3468
Chord shear: V = 20200 C = -4721 fv = 8117 fc = -3310 f = 8284
Bot Chord: 2-LL2x2x.176 A = 1.346 Y =. 0.565 Fy = 50000 Q = 0.981 Ix= 0.516 Iy= 2.042 RX = 0.619 Ry = 1.232 RZ = 0.394
Center: L = 48.000 P = 38150 Pa = 40381
Chord shear: V = 20200 T = 12308 fv = 9801 ft = 9144 f = 10815
Vallev Joist West Page 16 V1.71
,-- Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
T506 2 - 32LH240/128 x 53' 6.125 Special Crimped angle
Parallel chord Longspan
Web Ansl Lncrth Shear
T 1 60.7 63.1 6900
V 1 26.7 c 1 37.9
T 2 37.9 v 2 0.0 c 2 37.9
T 3 37.9 v 3 0.0
T 37.9 v 4 0.0 c 4 37.9
T 5 37.9 v 5 0.0 c 5 37.9 T 6 37.9
V 6 0.0
C 6 37.9
c r37.9
34.6 -1857
39.1 -6071
39.1 5398
30.9 -1591
39.1 -4881
39.1 4363
30.9 -1621
39.1 -3846
39.1 3328
30.9 -1644
39.1 -2810
39.1 2293
30.9 -1661
39.1 -1775
39.1 1595
30.9 -1670
39.1 -1595
Force
14110
-2078
-7691
6838
-1591
-6183
5527
-1621
-4871
4216
-1644
-3560
2904
-1661
-2249
2021
-1670
-2021
Member
RA - 1 1/8
ILL1-1/4x.109
lLL1-1/4X.109
lLL1-1/4X.109
lLL1-1/4X.109
lLL1-1/2X.109
lLL1-1/4X.109
lLL1-1/4X.109
lLL1-1/4X.109
lLL1-1/4X.109
1L L2xZx.216
1LLlxlx.lO9
lLL1-3/4~.125
1LLlXlX.lO9
lLL1-1/2X.125
1LLlXlX.lO9
1LLlXlX.lO9
1LLlXlX.lO9
Area
0.994
0.261
0.817
0.261
0.206
0.422
0.261
0.206
0.359
0.261
0.206
0.315
0.261-
0.206
0.261
0.261
0.206
0.261
0.281
0.2472
0.3922
0.2472
0.1962
0.3472
0.2472
0.1962
0.2962
0.2472
0.1962
0.2972
0.2472
0.1962
0.2472
0.2472
0.1962
0.2472
-- Pa Weld
29821 1.4
-3512 0.6
-8539 1.2
7819 2.1
-2210 0.5
-7191 1.7
7819 1.7
-2210 0.5
-'5311 1.3
7819 1.3
-2210 0.5
-4589 1.1
7819 0.9
-2210 0.5
-2751 0.7
7819 0.6
-2.210 0.5
-2751 0.6
T - AVl W - B
2.5/ 2.7
3.4/ 3.8
2.7/ 3.0
2.3,' 2.3
3.2/ 3.5
2.7/ 3.0
2.3/ 2.3
2.9/ 3.3
2.7/ 3.0
2.3/ 2.3
2.9/ 3.3
2.7/ 3.0
2.3/ 2.3
2.7/ 3.0
2.7/ 3.0
2.3/ 2.3
2.7/ 3.0
Vallev Joist West Page 17 ~1.71 - Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
J501 1 - 20K238/140 x 15' 6.250 Special Crimped angle
Parallel chord Shortspan
End Lenuth Depth SloDe ,Holes TOP Chord Ext BCX Holdback Pitch EP/#lL
Tau 4.000 5.000 0.750 42.000 ~~~ ~ ~ ~
Opp 4.000 4.875 -0.750 E 0' 2.500 42.000
Uniform Live load 140 #/ft full length
Uniform SJI load 238 #/ft full length
Uniform Dead load 98 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
HlSLIP @ 8'2" FTE OAL
SI .T BEARING 3-1/2" TE FULL SKEW RE FS @ 4-1/2" End loads: - SJI mm*EQuk-
Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
182.250 in Design length 452 # Minimum Shear 20.000 in Deep
19.226 in Effective Depth
17.250 in Clear Depth
182517 in-#Moment 48.000 in Interior Panel
4 Web Vees
TOD Chord: 2-LL1-1/2x.125
Bridg e 150" Ix= 0.156
Center: L = 24.000
Tag end panl: L = 21.563
First point:
Chord shear: V = 20200
Bot Chord: 2-LL1-1/4x.109
IX= 0.078
Center: L = 48.000
Chord shear: V = 20200 - Web Anql Lnuth Shear Force T 1 64.3 39.8 2374 5480
V 43.8 23.9 -1458 -2020
C i 9.2 17.5 -1929 -1955 T 2 51.3 27.6 1346 2152 V 2 0.0 17.3 -1523 -1523
C 2 51.3 27.6 -738 -1180
-
- - 112 in4 Ix 0 in4 Minimum Ix
L/3529 Live Defl L/2076 SJI Defl
1.000 in Chord gap 0.096 in Camber
21.563 in Left End 21.563 in Right End
2807 # SJI reaction 2807 # SJI reaction
A = 0.719 Y 0.421 Fy 5 50000 Q = 0.961
Iy= 0.765 Rx = 0.465 Ry 5 1.032 RZ = 0.296 P = -9493 Paz= -13208 No Fillers
P = -8340 Paz= -12855 M 5 678 No Filler
P = -8340 Pa = -19406 M 950
C = -314 fv = 5145 fC = -436 f = 5149
A = 0.521 Y = 0.353 Fy = 50000 Q = 0.978
Iy= 0.457 RX = 0.387 Ry E 0.936 Rz = 0.247
T = 4939 fv = 8712 ft = 9476 f = 9917
P = 6653 Pa = 15637
Member Area- R pa Weld T-AvlW-B
AU - 29/32 0.645 0.226 17406 0.6 --, ~~ ...
lLLlxlx.109 0.206 0.196~ -2074 0.6 1.9/ 2.0
lLL1-1/4x.109 0.261 0.2472 -4632 0.6 2.0/ 1.8
lLL1-1/4x.109 0.261 0.2472 7819 0.7 2.3/ 2.5
lLLlxlx.109 0.206 0.196~ -3582 0.5 1.8,' 1.5
lLL1-1/4~.109 0.261 0.2472 -3108 0.4 2.3/ 2.5
Valley Joist West Page 18 V1.71 - Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS CARLSBAD, CA
Comments: UBC 1997 TAG COLOR WHITE
5502 1 - 20K238/140 x 15' 6.250 Special Crimped angle
- End Lenqth Depth Slope Holes TOD Chord Ext BCX Holdback Pitch EP/#lL
Parallel chord Shortspan
Tag 4.000 5.000 0.750 42.000
Opp 4.000 4.875 -0.750 E 0' 2.500 42.000
Uniform Live load 140 #/ft full length
Uniform SJI load 238 #/ft full length Uniform Dead load 98 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
HGCLIP @ 8'2" FTE OAL
S LT BEARING 3-1/2" TE . FULL SKEW RE NS @ 4-1/2"
End loads: SJI-DeadLivemWind
Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
20.000 in Deep 182.250 in Design length 452 # Minimum Shear
19.226 in Effective Depth 112 in4 Ix 0 in4 Minimum Ix
17.250 in Clear Depth L/3529 Live Defl L/2076 SJI Defl
182517 in-#Moment 1.000 in Chord gap 0.096 in Camber
48.000 in Interior Panel 21.563 in Left End 21.563 in Right End
4 Web Vees 2807 # SJI reaction 2807 # SJI reaction
TOP Chord: 2-LL1-1/2x.125 A = 0.719 Y = 0.421 Fy = 50000 Q = 0.961
Bridg c 150'' Ix= 0.156 Iy= 0.765 Rx = 0.465 Ry = 1.032 Rz = 0.296
Center: L = 24.000 P = -9493 Paz= -13208 No Fillers
Tag end panl: L = 21.563 P = -8340 Paz= -12855 M = 678 No Filler
First point: p = -8340 Pa = -19406 M = 950
Chord shear: v = 20200 C = -314 fv = 5145 fc = -436 f = 5149
Bot Chord: 2-LL1-1/4x.109
Ix= 0.078 ~~ ~
Center: L = 48.000
Chord shear: V = 20200
Web Ansl Lnqth Shear Force
T 1 64.3 39.8 2374 5480
V'- 43.8 23.9 -1458 -2020
C I 9.2 17.5 -1929 -1955 T 2 51.3 27.6 1346 2152
V 2 0.0 17.3 -1523 -1523
C 2 51.3 27.6 -738 -1180
A = 0.521 Y = 0.353 Fy = 50000
Iy= 0.457 RX = 0.387 Ry = 0.936
T = 4939 fv = 8712 ft = 9476 P = 6653 Pa = 15637
Member Area- R -- Pa Weld AU - 29/32 0.645 0.226 17406 0.6
1LLlXlX.109 0.206 0.1962 -2074 0.6
lLL1-1/4x.109 0.261 0.2472 -4632 0.6
lLLlXlX.109 0.206 0.1962 -3582 0.5
1LL1-1/4X.109 0.261 0.2472 -3108 0.4
lLL1-1/4x.109 0.261 0.2472 7819 0.7
Q = 0.978 RZ = 0.247
f = 9917
T-AVlW-B
1.9/ 2.0
2.0/ 1.8
1.8/ 1.5
2.3/ 2.5
2.3/ 2.5
Valley Joist West Page 19 V1.71 - Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
J503 1 - 20K248/146 x 17' 7.000 Special Crimped angle
Parallel chord Shortspan
End Lenath Devth Slove Holes Tov Chord Ext BCX Holdback Pitch EP/#lL
Taq 4.000 5.000 -0.438 42.000
Opp 4.000 5.125 0.436 E 0' 2.500 42.000
Uniform Live load 146 #/ft full length
Uniform SJI load 248 #/ft full length
Uniform Dead load 102 #/ft full length
An additional SJI load of 1000# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
FPL SKEW RE FS @ 4-1/2"
R :LIP @ 4'5" & 10'6" FTE OAL
SHORT BEARING 2-1/4" FTE OAL
End loads: SJI
Left TC axial load: 0.0
Right TC axial load: 0.0
20.000 in Deep
19.226 in Effective Depth
17.250 in Clear Depth
213044 in-#Moment
48.000 in Interior Panel
4 Web Vees
-3mECJ&Wind
0.0 0.0 0.0 7.2 0.0 Ki?x L- 0.0 0.0 0.0 7.2 0.0 Kips
L/2310 Live Defl L/1360 SJI Defl
1.000 in Chord gap 0.124 in Camber
27.750 in Left End 27.750 in Right End
207.000 in Design length 535 # Minimum Shear
112 in4 Ix 0 in4 Minimum Ix
3139 # SJI reaction 3139 # SJI reaction
Too Chord: 2-LL1-1/2x.125 A = 0.719 Y = 0.421 Fy = 50000 Q = 0.961
Bridg < 150" Ix= 0.156 Iy= 0.765 Rx = 0.465 Ry = 1.032 Rz = 0.296
Center: L = 24.000 P = -11081 Pax= -13208 2 Fillers
Tag end panl: L = 27.750 P = -8853 Pax= -14279 M = 1128 Filler Reqd First point: P = -8853 Pa = -19406 M = 1722
Chord shear: V = 20200 C = -1621 fv = 5362 fc = -2255 f = 5479
Bot Chord: 2-LL1-1/4x.109 A = 0.521 Y = 0.353 Fy = 50000 Q = 0.978 Ix= 0.078 Iy= 0.457 RX = 0.387 Ry = 0.936 RZ = 0.247'
Center: L = 48.000 P = 8449 Pa = 15637
Chord shear: V = 20200 T = 5532 fv = 9758 ft = 10613 f = 11108
Vallev Joist West Page 20 V1.71 - Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
J503 1 - 20K248/146 x 17' 7.000 Special Crimped angle
Parallel chord Shortspan
Web Ansl Lnclth Shear Force Member Area, - R -- Pa Weld T-Av1W-B
V 1 32.5 20.5 -1611 -1910 lLLlxlx.109 0.206 0.1962 -2825 0.6 1.7/ 1.7
T 1 64.3 39.8 2659 6138 AU - 29/32 0.645 0.226 17406 0.7
C 138.9 22.2 -2011 -2583 lLL1-1/4X.109 0.261 0.2472 -3346 0.8 2.0/ 2.1
T 2 51.3 27.6 1360 2175 lLL1-1/4x.109 0.261 0.2472 7819 0.7 2.3/ 2.5
V 2 0.0 17.3 -1551 -1551 lLLlXlX.109 0.206 0.1962 -3582 0.5 1.8/ 1.5
C 2 51.3 27.6 -748 -1196 lLL1-1/4X.109 0.261 0.2472 -3108 0.4 2.3/ 2.5
Vallev Joist West Page 21 ~1.71
F Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBc 1997
TAG COLOR WHITE
5504 1 - 20K248/146 x 17' 6.875 Crimped angle Parallel chord Shortspan
End Lensth Devth Slove Holes TOR Chord Ext BCX Holdback Pitch EP/#lL
Tag 4.000 5.000 -0.438 42.000
opp 4.000 5.000 0.438 E 0' 2.500 42.000
Uniform Live load 146 #/ft full length
Uniform SJI load 248 #/ft full length
Uniform Dead load 102 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
FULL SKEW RE NS @ 4-1/2"
HI-CLIP 6' 4'5" & 10'6" FTE OAL
St !T BEARING 2-1/4" FTE OAL
End loads: __ SJI mDeaduEQukWind
Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
Right TC axial load.: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
20.000 in Deep 206.875 in Design length 534 # Minimum Shear
19.226 in Effective Depth 112 in4 Ix 0 in4 Minimum Ix
17.250 in Clear Depth L/2314 Live Defl L/1362 SJI Defl
212897 in-#Moment 1.000 in Chord gap 0.124 in Camber
48.000 in Interior Panel 27.719 in Left End 27.719 in Right End
4 Web Vees 3138 # SJI reaction 3138 # SJI reaction
TOR Chord: 2-LL1-1/2x.125 A = 0.719 Y = 0.421 Fy = 50000 Q = 0.961
Bridg < 150" Ix= 0.156 Iy= 0.765 Rx = 0.465 Ry = 1.032 Rz = 0.296
Center: L = 24.000 P = -11073 Pax= -13208 2 Fillers
Tag end panl: L = 27.719 P = -8851 Pax= -14286 M = 1126 Filler Reqd First point: P = -8851 Pa = -19406 M = 1718
Chord shear: V = 20200 C = -1614 fv = 5361 fc = -2246 f = 5478
Bot Chord: 2-LL1-1/4x.109 A = 0.521 Y = 0.353 Fy = 50000 Ix= 0.078 Iy= 0.457 RX = 0.387 Ry = 0.936
Center: L = 48.000 P = 8441 Pa = 15637
Chord shear: V = 20200 T = 5530 fv = 9754 ft = 10609
Web Ansl Lnsth Shear Force Member Area- R -- Pa Weld T 164.3 39.8 2658 6135 AU - 29/32 0.645 0.226 17406 0.7
V 1 32.6 20.5 -1610 -1911 1LLlXlX.109 0.206 0.1962 -2821 0.6
C- 38.8 22.1 -2010 -2578 lLL1-1/4x.109 0.261 0.2472 -3357 0.8 T 51.3 27.6 1360 2175 lLL1-1/4x.109 0.261 0.2472 7819 0.7
V 2 0.0 .17.3 -1551 -1551 lLLlxlx.109 0.206 0.1962 -3582 0.5
C 2 51.3 27.6 -748 -1196 lLL1-1/4x.109 0.261 0.2472 -3108 0.4
Q = 0.978 RZ = 0.247
f = 11103
T-AVlW-B
1.7/ 1.7
2.3/ 2.5
2.3/ 2.5
2.0/ 2.1
1.8/ 1.5
Vallev Joist West Page 22 V1.71 - Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002 2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
5505 1 - 20K238/140 x 24' 1.625 Special Crimped angle
Parallel chord Shortspan
End Lenqth Depth Slope Holes Top Chord Ext BCX Holdback Pitch EP/#lL
Tau 4.000 5.000 0.750 42.000
Opp 4.000 4.875 -0.750 E 0' 2.500 42.000
Uniform Live load 140 #/ft full length
Uniform SJI load 238 #/ft full length
Uniform Dead load 98 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point. FUJ SKEW RE FS @ 4-1/2"
H. !LIP @ 8'2" & 16'5" FTE OAL
SHORT BEARING 3-1/2" @ LE End loads: - SJIm~WEaukWind Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
20.000 in Deep 285.625 in Design length 708 # Minimum Shear
19.226 in Effective Depth 112 in4 Ix 0 in4 Minimum Ix
17.250 in Clear Depth L/ 917 Live Defl L/ 539 SJI Defl
311780 in-#Moment 1.000 in Chord gap 0.236 in Camber
48.000 in Interior Panel 23.406 in Left End 23.406 in Right End
6 Web Vees 3832 # SJI reaction 3832 # SJI reaction
TOR Chord: 2-LL1-1/2x.125 A = 0.719 Y = 0.421 Fy = 50000 Q = 0.961
Bridg < 150" Ix= 0.156 Iy= 0.765 Rx = 0.465 Ry = 1.032 Rz = 0.296
Center: L = 24.000 P = -16217 Pax= -16753 8 Fillers
Second: L = 23.406 P = -9950 Paz= -13476 No Fillers
Tag end panl: L 23.406 P = -10292 Paz= -12128 M = 787 NO Filler
First point: P = -10292 Pa = -19406 M = 1142 Chord shear: V = 20200 C = -1053 fv = 7926 fC = -1465 f = 7960
Bot Chord: 2-LL1-1/4x.109 A = 0.521 Y = 0.353 Fy = 50000 Q = 0.978 Ix= 0.078 Iy= 0.457 Rx = 0.387 Ry = 0.936 Rz = 0.247
Center: L = 48.000 P = 14234 Pa = 15637
Chord shear: V = 20200 T = 7199 fu-=~ 12698 ft = 13812 f = 14455
r
Valley Joist West Page 23 V1.71 - Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002 2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
5505 1 - 20K238/140 x 24' 1.625 Special Crimped angle
Parallel chord Shortspan
Web Anql Lnsth Shear
T 1 64.3 39.8 3460
V 140.8 22.8 -1503
C 1 19.5 18.3 -2972
T 2 51.3 27.6 2418 V 2 0.0 17.3 -1543
C 2 51.3 27.6 -1858
T 3 51.3 27.6 1298 V 3 0.0 17.3 -1557
C,L 51.3 27.6 -738
Force
7988
-1986
-3153
3868
-1543
-2972
2076
-1557
-1180
Member Area- R
AU - 29/32 0.645 0.226
lLLlxlx.109 0.206 0.1962
lLL1-1/4x.109 0.261 0.2472
lLL1-1/4x.109 0.261 0.2472
lLLlxlx.109 0.206 0.1962
lLL1-1/4x.109 0.261 0.2472
lLLlxlx.109 0.206 0.1962
lLL1-1/4~.109 0.261 0.2472
lLL1-1/4~.109 0.261 0.2472
-- Pa Weld
17406 '0.9
-2281 0.6
-4420 1.0
7819 1.2
-3582 0.5
-3108 0.9
7819 0.6
-3582 0.5
-3108 0.4
, T-AvlW-B
1.8/ 1.9
2.0/ 1.8
2.3/ 2.5
1.8/ 1.5
1.8/ 1.5
2.3/ 2.5
2.3/ 2.5
2.3/ 2.5
Vallev Joist West Page 24 V1.71
,- Job #ON02915 - 04 By AS'M Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002 2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
J506 1 - 20K238/140 x 24' 1.625 Special Crimped angle
Parallel chord Shortspan
End Lenqth Depth Slope Holes TOU Chord Ext BCX Holdback Pitch EP/#~L 42.000 Tau 4.000 5.000 0.750
Opp 4.000 4.875 -0.750 E 0' 2.500 42.000
Uniform Live load 140 #/ft full length
Uniform SJI load 238 #/ft full length
Uniform Dead load 98 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
FULL SKEW RE NS @ 4-1/2"
H' :LIP @ 8'2" & 16'5" FTE OAL
SHURT BEARING 3-1/2" @ LE
End loads: SJI
Left TC axial load: 0.0
Right TC axial load: 0.0
20.000 in Deep
19.226 in Effective Depth
17.250 in Clear Depth
311780 in-#Moment
48.000 in Interior Panel
6 Web Vees
NtUDDead-EaukWind
0.0 0.0 0.0 7.2 0.0 Kius
0.0 0.0 0.0 7.2 0.0 Kips
L/ 917 Live Defl L/ 539 SJI Defl
1.000 in Chord gap 0.236 in Camber
23.406 in Left End 23.406 in Right End
285.625 in Design length 708 # Minimum Shear
112 in4 Ix 0 in4 Minimum Ix
3832 # SJI reaction 3832 # SJI reaction
TOD Chord: 2-LL1-1/2x.125 A = 0.719 Y = 0.421 Fy = 50000 Q = 0.961
Bridg < 150" Ix= 0.156 Iy= 0.765 Rx = 0.465 Ry = 1.032 Rz = 0.296 Center: L = 24.000 P = -16217 Pax= -16753 8 Fillers
Second: L = 23.406 P = -9950 Paz= -13476 No Fillers
Tag end panl: L = 23.406 P = -10292 Paz= -12128 M = 787 No Filler
First point: P = -10292 Pa = -19406 M = 1142
Chord shear: V = 20200 C = -1053 fv = 7926 fc = -1465 f = 7960
Bot Chord: 2-LL1-1/4x.109 A = 0.521 Y = 0.353 Fy = 50000 Q = 0.978
Ix= 0.078 Iy= 0.457 RX = 0.387 Ry = 0.936 RZ = 0.247
Center: L = 48.000 P = 14234 Pa = 15637
Chord shear: V = 20200 T = 7199 fv = 12698 ft = 13812 f = 14455
r-
Valley Joist West Page 25 V1.71 - Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #10002 2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
5506 1 - 20K238/140 x 24' 1.625 Special Crimped angle Parallel chord Shortspan
Web Anql Lnqth Shear Force Member Area- R -- Pa Weld T 1 64.3 39.8 3460 7988 AU - 29/32 0.645 0.226 17406 0.9
V 140.8 22.8
C 1 19.5 18.3 T 2 51.3 27.6
V 2 0.0 17.3
C 2 51.3 27.6 T 3 51.3 27.6
V 3 0.0 17.3
Cy 51.3 27.6
-1503
-2972
2418
-1543
-1858
1298
-1557
-738
-1986 iLLixix.io9 0.206 0.196~
-3153 lLL1-1/4x.109 0.261 0.2472
3868 lLL1-1/4X.109 0.261 0.2472
-1543 lLLlXlX.109 0.206 0.1962
-2972 lLL1-1/4X.109 0.261 0.2472
2076 lLL1-1/4X.109. 0.261 0.2472
-1557 lLLlXlX.109 0.206 0.1962
-1180 lLL1-1/4X.109 0.261 0.2472
-2281 0.6
-4420 1.0
7819 1.2
-3582 0.5
-3108 0.9
7819 0.6
-3582 0.5
-3108 0.4
T - AVl W - B
l.8/ 1.9
2.0/ 1.8
1.8/ 1.5
1.81 1.5
2.3/ 2.5
2.3/ 2.5
2.3/ 2.5
2.3/ 2.5
Valley Joist West Page 26 V1.71 - Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
5507 1 - 20K229/122 x 26' 5.875 Special Crimped angle
Parallel chord Shortspan
End Lenqth Depth Slowe Holes Top Chord Ext BCX Holdback Pitch EP/#iL
Taq 4.000 5.000 Y 42.000 42.000 opp 4.000 5.000 E 0' 2.500
Uniform Live load 122 #/ft full length
Uniform SJI load 229 #/ft full length
Uniform Dead load 107 #/ft full length
An additional SJI load of 1000# may occur at any tow chord wanel ooint.
An additional Dead load of lOOO# may occur at any tbp chordApanelApoint.
FPL SKEW RE NS @ 4-1/2" H. 'LIP @ 10'6" FTE OAL
SHORT BEARING 3-1/4" @ LE End loads: SJI-DeadLiveEaukWind
Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
20.000 in Deep 313.875 in Design length 749 # Minimum Shear
19.101 in Effective Depth 132 in4 Ix 0 in4 Minimum Ix
16.750 in Clear Depth L/ 935 Live Defl L/ 498 SJI Defl
349839 in-#Moment 1.000 in Chord gap 0.285 in Camber
48.000 in Interior Panel 30.469 in Left End 30.469 in Right End
6 Web Vees 3995 # SJI. reaction 3995 # SJI reaction
Tow Chord: 2-LL1-3/4x.125 A = 0.844 Y = 0.484 Fy = 50000 Q = 0.897
Bridg < 163" Ix= 0.251 Iy= 1.068 Rx = 0.546 Ry = 1.125 Rz = 0.347 Center: L = 24.000 P = -18315 Pax= -19383 4 Fillers
Fourth: L = 24.000 P = -15551 Paz= -16467 No Fillers
Tag end panl: L = 30.469 P = -10624 Paz= -12512 M = 1246 No Filler
First point: P = -10624 Pa = -22781 M = 1936
Chord shear: V = 20200 C = -3210 fv = 6694 fc = -3805 f = 6959
Bot Chord: 2-LL1-1/2x.109 A = 0.630 Y = 0.415 Fy = 50000 Q = 0.905
Ix= 0.138 Iy= 0.666 Rx 0.467 Ry = 1.028 RZ 0.297
Center: L = 48.000 P = 16412 Pa = 18907
Chord shear: V = 20200 T = 7490 fv = 10938 ft = 11885 f. = 12448
7
Vallev Joist West Page 27 V1.71 - Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014 619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
J507 1 - 20K229/122 x 26' 5.875 Special Crimped angle
Parallel chord Shortspan
Web Anql Lnqth
T 164.5 38.9
V 126.5 18.7
C 147.6 24.9
T 2 51.5 26.9
V 2 0.0 16.8
C 2 51.5 26.9 T 3 51.5 26.9
V 3 0.0 16.8 Cy 51.5 26.9
Shear
3577
-1629
-2929
2332
-1536
-1798
1263
-1550
-749
Force
8300
-1821
-4345
3745
-1536
-2887
2029
-1550
-1202
Member
AU - 29/32
1LLlXlX.lO9
lLL1-1/2X.109
lLL1-1/4X.109
lLLl - 1/4x. 10 9
lLL1-1/4X.109
1LLlXlX.lO9
lLL1-1/4X.109
1LLlxlx.lO9
Area- R
0.645 0.226
0.206 0.1962
0.315 0.2972
0.261 0.2472
0.206 0.1962
0.261 0.2472 0.261 0.2472
0.206 0.1962
0.261 0.2472
-- Pa Weld
17406 1.0
-3246 0.6
-4487 1.3
7819 1.2
-3693 0.5
-3270 0.9
7819 0.6
-3693 0.5
-3270 0.4
T - AVl W - B
2.0/ 1.9
2.8/ 2.9
2.0/ 1.8
2.0/ 1.8
2.7/ 2.9
2.71 2.9
2.7/ 2.9
2.7/ 2.9
Vallev Joist West Page 28 V1.71
Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
J508 1 - 20K229/122 x
Parallel chord Shortspan
End Lenqth Depth SloDe
Taa 4.000 5.000 -0.438
Opi; 4.000 5.125 0.438
Uniform Live load 122 #/ft
Uniform SJI load 229 #/ft
Uniform Dead load 107 #/ft
26' 6.125 Special Crimped angle
Holes TOP Chord Ext BCX Holdback Pitch EP/#lL Y
E 0' 2.500
full length full length
full lenath
42,000
42.000
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
FLF-L SKEW RE FS @ 4-1/2"
H :LIP @ 10'6" FTE OAL
SHORT BEARING 3" @ LE
End loads: SJI-&adadL&Wind
Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
20.000 in Deep 314.125 in Design length 749 # Minimum Shear
19.101 in Effective Depth 132 in4 Ix 0 in4 Minimum Ix
16.750 in Clear Depth L/ 933 Live Defl L/ 497 SJI Defl
350228 in-#Moment 1.000 in Chord gap 0.286 in Camber 48.000 in Interior Panel 30.531 in Left End 30.531 in Riqht End
6 Web Vees 3997 # SJI reaction
TOP Chord: 2-LL1-3/4x.125
Bridg c 163" Ix= 0.251
Center: L = 24.000
Fourth: L = 24.000
Tag end panl: L = 30.531
First point:
Chord shear: V = 20200
Bot Chord: 2-LL1-1/2x.109
IX= 0.138
Center: L = 48.000
Chord shear: V = 20200
A = 0.844
Iy= 1.068 P = -18336
P = -15572
P = -10627
P = -10627
C = -3230
A = 0.630
Iy= 0.666 P = 16434
T = 7494
Y = 0.484
RX = 0.546
Pax= -19383
Paz= -16467 Paz= -12489
Pa = -22781
fv = 6695
Y = 0.415
RX = 0.467
fv = 10944
Pa = 18907
3997 # SJI-reaction
Fy = 50000
Ry = 1.125
M = 1251
M = 1945
fC = -3828
Fy = 50000
Ry = 1.028
ft = 11891
Q = 0.897 Rz = 0.347
4 Fillers
No Fillers No Filler
f = 6963
Q = 0.905
Rz = 0.297
f = 12455
Vallev Joist West Page 29 V1.71 - Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
5508 1 - 20K229/122 x 26' 6.125 Special Crimped angle
Parallel chord Shortspan
Web Anql Lnqth Shear Force Member Area- R -- Pa Weld
T 1 64.5 38.9 3579 8305 AU - 29/32 0.645 0.226 17406 1.0
V 126.4 18.7 -1630 -1820 1LLlXlX.109 0.206 0.1962 -3252 0.6
C 147.8 24.9 -2929 -4360 lLL1-1/2x.109 0.315 0.2972 -4468 1.3
T 2 51.5 26.9 2332 3745 lLL1-1/4~.109 0.261 0.2472 7819 1.2
V 2 0.0 16.8 -1536 -1536 1LLlXlX.109 0.206 0.1962 -3693 0.5
C 2 51.5 26.9 -1798 -2887 lLL1-1/4x.109 0.261 0.2472 -3270 0.9
V 3 0.0 16.8 -1550 -1550 1LLlXlX.109 0.206 0.1962 -3'693 0.5
C+ 51.5 26.9 -749 -1203 lLL1-1/4x.109 0.261 0.2472 -3270 0.4
T 3 51.5 26.9 1263 2029 lLL1-1/4x.109 0.261 0.2472 7819 0.6
T -AVlW - B
2.0/ 1.9
2.8/ 2.9
2.0/ 1.8
2.0/ 1.8
2.7/ 2.9
2.7k 2.9
2.7/ 2.9
2.7/ 2.9
Page 30 V1.71 Vallev Joist West - Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002 2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
5509 1 - 20K248/146 x 8' 7.875 Special Crimped angle
- End Lenqth DeDth Slope Holes Top Chord Ext BCX Holdback Pitch EP/#lL
Tag 4.000 5.000 36.000
opp 4.000 5.000 E 0' 2.500 36.000
Parallel chord Shortspan
Uniform Live load 146 #/ft full length
Uniform SJI load 248 #/ft full length
Uniform Dead load 102 #/ft full length An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
FU L SKEW RE NS @ 4-1/2"
S k T BEARING 2-1/4" @ LE
H1 CLIP @ 4'5" FTE OAL
End loads: - SJINtUI>Dead-EaukU
Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
20.000 in Deep 99.875 in Design length 258 # Minimum Shear
19.226 in Effective Depth 112 in4 Ix 0 in4 Minimum Ix
17.250 in Clear Depth L/20564 Live Defl L/12106 SJI Defl
131533 in-#Moment 1.000 in Chord gap 0.029 in Camber 31.875 in Interior Panel 24.969 in Left End 24.969 in Right End
2 Web Vees 2032 # SJI reaction 2032 # SJI reaction
Tor, Chord: 2-
Bridg < 150"
Center:
-LL1-1/2~.125 A = 0.719 Y = 0.421 Fy = 50000 Q = 0.961
Ix= 0.156 Iy= 0.765 RX = 0.465 Ry = 1.032 RZ = 0.296
L = 24.969 P = -6841 Paz= -11486 M = 920 No Fillers
Tag end panl: L = 24.969 P = -6841 Paz= -11486 M = 920 No Filler
First point: P = -6841 Pa = -19406 M = 1380
Chord shear: V = 20200 C = -628 fv = 2021 fc = -874 f = 2068
Bot Chord: 2-LL1-1/4x.109 A = 0.521 Y = 0.353 Fy = 50000 Q = 0.978
IX= 0.078 Iy= 0.457 Rx = 0.387 Ry = 0.936 Rz = 0.247
Chord shear: V = 20200 T = 2535 fv = 5261 ft = 4864 f = 5796
Center: L = 31.875 P = 2639 Pa = 15637
Web Anql Lnqth Shear Force Member Area- R -- Pa Weld T-AvlW-B
T 1 60.5 35.0 1434 2912 AU - 29/32 0.645 0.226 17406 0.3
V r?5.2 19.1 -1547 -1709 1LLlxlx.109 0.206 0.1962 -3166 0.5 1.7/ 1.6
C i 39.7 22.4 -758 -985 lLL1-1/4~.109 0.261 0.2472 -3272 0.3 2.0/ 2.1
Vallev Joist West Page 31 ~1.71 - Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002 2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
5510 1 - 20K248/146 x 8' 7.875 Special Crimped angle
End Lenqth Depth Slope Holes TOD Chord Ext BCX Holdback Pitch EP/#lL
Tag 4.000 5.000 -0.438 36.000
Opp 4.000 5.125 0.438 E 0' 2.500 36.000
Parallel chord Shortspan
Uniform Live load 146 #/ft full length
Uniform SJI load 248 #/ft full length
Uniform Dead load 102 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point. An additional Dead load of lOOO# may occur at any top chord panel point.
S"YT BEARING 2-1/4" @ LE
H1 CLIP @ 4'5" FTE OAL
SKEW RE FS @ 4-1/2"
End loads: SJIIDeadLiveEcrukWind
Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
20.000 in Deep 99.875 in Design length 258 # Minimum Shear
19.226 in Effective Depth 112 in4 Ix 0 in4 Minimum Ix
17.250 in Clear Depth L/20564 Live Defl L/12106 SJI Defl
131533 in-#Moment 1.000 in Chord gap 0.029 in Camber
31.875 in Interior Panel 24.969 in Left End 24.969 in Right End
2 Web Vees 2032 # SJI reaction 2032 # SJI reaction
TOD Chord: 2-LL1-1/2x.125 A = 0.719 Y = 0.421 Fy = 50000 Q = 0.961
Bridg < 150" Ix= 0.156 Iy= 0.765 Rx = 0.465 Ry = 1.032 Rz = 0.296
Center: L = 24.969 P = -6841 Paz= -11486 M = 920 No Fillers
Tag end panl: L = 24.969 P = -6841 Paz= -11486 M = 920 No Filler
First point: P = -6841 Pa = -19406 M = 1380
Chord shear: V = 20200 C = -628 fv = 2021 fC = -874 f = 2068
Bot Chord: 2-LL1-1/4x.109 4 = 0.521 Y = 0.353 Fy = 50000 Q = 0.978
Ix= 0.078 Iy= 0.457 Rx = 0.387 Ry = 0.936 RZ = 0.247
Center: L = 31.875 P = 2639 Pa = 15637
Chord shear: V = 20200 T = 2535 fv = 5261 ft = 4864 f = 5796 Pa Weld T-AvlW-B
V/-25.2 19.1 -1547 -1709 lLLlxlx.109 0.206 0.1962 -3166 0.5 1.7/ 1.6
-- Web Anql Lnqth Shear Force Member Area- R
T 1 60.5 35.0 1434 2912 AU - 29/32 0.645 0.226 17406 0.3
C I 39.7 22.4 -758 -985 lLL1-1/4~.109 0.261 0.2472 -3272 0.3 2.0/ 2.1
Valley Joist West Page 32 V1.71 - Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
5511 3 - 24K227/121 x 33' 1.500 Special Crimped angle
Parallel chord Shortspan
End Lenqth Deuth Holes Tor) Chord Ext BCX Holdback Pitch EP/#lL
Tag 4.000 5.000 1.000 48.000
Opp 4.000 5.125 -1.000 E 0'. 1.000 48.000
Uniform Live load 121 #/ft full length
Uniform SJI load 227 #/ft full length
Uniform Dead load 106 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
HkCLIP @ 8'2", 16'5", & 24'11" FTE OAL
S: !T BEARING 3-1/2" @ LE End loads: __ SJI mDeadaE_crukWind
Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
24.000 in Deep 393.500 in Design length 930 # Minimum Shear
23.088 in Effective Depth 220 in4 Ix 0 in4 Minimum Ix
20.750 in Clear Depth L/ 796 Live Defl L/ 424 SJI Defl
499303 in-#Moment 1.000 in Chord yap 0.448 in Camber
48.000 in Interior Panel 26.375 in Left End 26.375 in Right End
8 Web Vees 4722 # SJI reaction 4722 # SJI reaction
TOD Chord: 2-LL1-3/4x.143 A = 0.960 Y = 0.490 Fy = 50000 Q = 0.953
Center: L = 24.000 P = -21626 Pax= -23230 4 Fillers
Sixth: L = 24.000 P = -19482 Paz= -19535 No Fillers
Bridg c 164" Ix= 0.283 Iy= 1.225 Rx = 0.543 Ry = 1.130 RZ = 0.346
Tag end panl: L = 26.375 P = -11644 Paz= -16549 M = 938 No Filler
First point: P = -11644 Pa = -25923 M = 1414
Chord shear: V = 20200 C = -1122 fv = 7671 fc = -1169 f = 7693
Bot Chord: 2-LL1-1/2x.125 A = 0.719 Y = 0.421 Fy = 50000 Q = 0.961
Ix= 0.156 Iy= 0.765 RX = 0.465 Ry = 1.032 RZ = 0.296
Center: L = 48.000 P = 20119 Pa = 21563
Chord shear: V = 20200 T = 8678 fv = 11615 ft = 12073 f = 13090
Vallev Joist West Page 33 V1.71 - Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
J511 3 - 24K227/121 x 33' 1.500 Special Crimped angle
Parallel chord Shortspan
Web Anql, Lnqth Shear
T 1 63.3 46.3 4355
V 140.4 27.2 -1543
C 1 16.3
T 2 46.1 v 2 0.0
C 2 46.1
T 3 46.1 v 3 0.0
C,J 46.1 T 46.1 v 4 0.0
C 4 46.1
21.6 -3839
29.9 3302
20.8 -1530
29.9 -2787
29.9 2272
20.8 -1551
29.9 -1757
29.9 1242
20.8 -1562
29.9 -930
Force Member
9709 AU - 29/32 ~ ~~ ~
-2025 lLL1-1/4X.109
-4000 lLL1-1/2X.109
-4020 lLL1-1/2X.109
-2534 lLL1-1/4X.109
4763 lLL1-1/4X.109
-1530 1LLlXlX.lO9
3277 lLL1-1/4X.109
-1551 1LLlxlx.109
1791 lLL1-1/4X.109
-1342 lLL1-1/4X.109
-1562 lLLlxlx.109
Area- R
0.645 0.226
0.261 0.2472
0.315 0.2972
0.261 0.2472 0.206 0.1962
0.315 0.2972
0.261 0.2472
0.206 0.1962
0.261 0.2472
0.261 0.2472
0.206 0.1962
0.261 0.2472
-__ Pa Weld
17406 1.1
-3190 0.6
-5246 1.2
-2750 0.5
-4466 1.2
7819 1.0
-2750 0.5
-2641 0.8
7819 0.6
-2750 0.5
-2641 0.4
7819 1.5
T - Avl W - B
2.4/ 2.5
2.5; 2.3
2.5/ 2.6
2.0/ 1.8
2.7/ 2.9
2.5/ 2.6
2.0/ 1.8
2.5/ 2.6
2.5/ 2.6
2.0/ 1.8
2.5/ 2.6
c
Vallev Joist West Page 34 V1.71
Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002 2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
5512 2 - 24K219/117 x 33' 0.000 Special Crimped angle
Parallel chord Shortspan
- End Lenqth Depth Slope Holes Tor, Chord Ext BCX Holdback Pitch EP/#lL
Tag 4.000 5.000 1.000 48.000
' opp 4.000 5.000 -1.000 E 0' 4.500 48.000
Uniform Live load 117 #/ft full length
Uniform SJI load 219 #/ft full length
Uniform Dead load 102 #/ft full length An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
H1 CLIP @ 8'2", 16'5", & 24'11"
SrIT BEARING 3-1/2" (3 LE End loads: SJIrnDeaddLlkWind
Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
24.000 in Deep 392.000 in Design length 894 # Minimum Shear
23.088 in Effective Depth 220 in4 Ix 0 in4 Minimum Ix
20.750 in Clear Depth L/ 833 Live Defl L/ 445 SJI Defl
485471 in-#Moment 1.000 in Chord gap 0.445 in Camber
48.000 in Interior Panel 26.000 in Left End 26.000 in Right End
8 Web Vees 4577 # SJI reaction 4577 # SJI reaction
TOD Chord: 2-LL1-3/4x.143 A = 0.960 Y = 0.490 Fy = 50000 Q = 0.953
Bridg < 164" Ix= 0.283 Iy= 1.225 Rx = 0.543 Ry = 1.130 Rz = 0.346
Center: L = 24.000 P = -21027 Pax= -23230 4 Fillers
Sixth: L = 24.000 P = -18940 Paz= -19535 No Fillers
Tag end panl: L = 26.000 P = -11412 Paz= -16716 M = 881 No Filler
First point: P = -11412 Pa = -25923 M = 1322
Chord shear: V = 20200 C = -970 fv = 7458 fc = -1010 f = 7475
Bot Chord: 2-LL1-1/2x.125 A = 0.719 Y = 0.421 Fy = 50000 Q = 0.961
Ix= 0.156 Iy= 0.765 Rx = 0.465 Ry = 1.032 Rz = 0.296
Chord shear: V = 20200 T = 8412 fv = 11260 ft = 11704 f = 12690
Center: L = 48.000 P = 19427 Pa = 21563
Vallev Joist West Page 35 V1.71
,_ Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002 2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
J512 2 - 24K219/117 x 33' 0.000 Special Crimped angle
Parallel chord Shortspan
Web ?ma Lnqth Shear ,Force Member Area- R -- Pa Weld T-AvlW-B T 1 63.3 46-.3 4222 9413 AU - 29/32 0.645 0.226 17406 1.0
V 140.9 27.5
C 114.6 21.4
T 2 46.1 29.9 V 2 0.0 20.8
C 2 46.1 29.9 T 3 46.1 29.9
V 3 0.0 20.8
C> 46.1 29.9
T, 46.1 29.9 v 4 0.0 20.8
C 4 46.1 29.9
-1518
-3733
3215
-1512
-2716
2217
-1533
-1717
1218
-1543 -894
-2008
-3857
4637
-1512
-3917
3197
-2477
1757
-1533
-1543 -1290
lLL1-1/4X.109
lLL1-1/2X.109
lLL1-1/4X.109
lLL1-1/2X.109
lLL1-1/4X.109
lLL1-1/4X.109
lLL1-1/4X.109
lLL1-1/4X.109
1LLlXlX.lO9
1LLlXlX.lO9
lLLlXlX.109
0.261 0.2472
0.315 0.2972
0.261 0.2472
0.206 0.1962
0.315 0.2972 .
0.261 0.2472
0.206 0.1962
0.261 0.2472
0.261 0.2472
0.206 0.1962
0.261 0.2472
-3139
-5286
7819
-2750
-4466
7819
-2750
-2641
7819
-2750 -2641
0.6
1.2
1.4
0.5
1.2
1.0
0.5
0.8
0.5
0.5
0.4
2.4/ 2.5
2.5/ 2.3
2.5/ 2.6
2.7/ 2.9
2.5/ 2.6
2.5/ 2.6
2.51 2.6
2.5/ 2.6
2.0/ 1.8
2.0/ 1.8
2.0/ 1.8
Page 36 V1.71 Vallev Joist West - Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
5513 4 - 30K219/116 x .45' 9.625 Special Crimped angle
Parallel chord Shortspan
End Lensth Depth Slope Holes TOR Chord Ext BCX Holdback Pitch EP/#lL
Tag 4.000 5.000 -0.438 54 .OOO
opp 4.000 5.000 0.438 54.000
Uniform Live load 116 #/ft full length
Uniform SJI load 219 #/ft full length
Uniform Dead load 103 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
HI. CLIP @ 9'2", 18'5", & 36'10" FTE OAL
TT' 1 CLIP @ 27'7"
SHuKT BEARING 2-1/4" @ LE
SHORT BEARING 3-1/2" @ RE
End loads: SJI-DeadLiveEaukWind
Left TC axial load:' 0.0 0.0 0.0 0.0 7.2 0.0 Kips Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
30.000 in Deep 545.625 in Design length 1245 # Minimum Shear
28.952 in Effective Depth 448 in4 Ix 0 in4 Minimum Ix
26.250 in Clear Depth L/ 635 Live Defl L/ 336 SJI Defl 838182 in-#Moment 1.000 in Chord gap 0.861 in Camber
48.000 in Interior Panel 28.406 in Left End 28.406 in Right End
11 Web Vees 5979 # SJI reaction 5979 # SJI reaction
TOD Chord: 2-L L2x2x.156 A = 1.199 Y = 0.558 Fy = 50000 Q = 0.935
Bridg < 178" Ix= 0.464 Iy= 1.805 Rx = 0.622 Ry = 1.227 Rz = 0.396
Center: L = 24.000 P = -28951 Pax= -29375 6 Fillers
Eighth: L = 24.000 P = -25847 Paz= -25723 No Fillers
Tag end panl: L = 28.406 P = -12867 Paz= -21232 M = 1042 No Filler
First point: P = -12867 Pa = -32382 M = 1598
Chord shear: V = 20200 C = -847 fv = 8168 fc = -706 f = 8176
Bot Chord: 2-LL1-3/4x.143 A = 0.960 Y = 0.490 Fy = 50000 Q = 0.953
Ix= 0.283 Iy= 1.225 Rx = 0.543 Ry 1.130 Rz = 0.346
Center: L = 48.000 P = 27951 Pa = 28803
Chord shear: V = 20200 T = 10102 fv = 11237 ft = 10522 f = 12408 rc
Valley Joist West Page 37 V1.71 - Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
5513 4 - 30K219/116 x 45’ 9.625 Special Crimped angle
Parallel chord Shortspan
Web Anql Lnqth Shear Force Member Area- R -- Pa Weld T-AV1W-B T 1 60.9 54.0 5624 11562 AU - 29/32 0.645 0.226 17406 1.3
V 1 39.2 c 1 9.4
T 2 39.7 v 2 0.0 c 2 39.7
T 3 39.7 v 3 0.0 c 3 39.7
T 39.7 v Y 0.0 c 4 39.7
T 5 39.7 v 5 0.0 c 5 39.7 T 6 39.7
V 6 0.0
33.9 -1568
26.6 -5097
26.3 -1521
34.1 -4093
34.1 3611
26.3 -1548
34.1 -3129
34.1 2647
26.3 -1567
34.1 -2165
34.1 1683
26.3 -1579
34.1 -1245
34.1 1245
34.1 4575
26.3 -1583
-2023 lLL1-1/4X.109 0.261 0.2472
5942 lLL1-1/4x.109 0.261 0.2472
-5167 1LL1-3/4~.125 0.422 0.3472
-1521 lLLlXlX.109 0.206 0.1962
-5316 1LL1-3/4~.125 0.422 0.3472
-1548 1LLlXlX.109 0.206 0.1962
-4064 lLL1-1/2X.125 0.359 0.2962
3438 lLL1-1/4x.109 0.261 0.2472
-1567 1LLlXlX.109 0.206 0.1962
4690 lLL1-1/4x.109 0.261 0.2472
-2812 lLL1-1/2x.109 0.315 0.2972
2186 lLL1-1/4x.109 0.261 0.2472
-1617 lLL1-1/4x.109 0.261 0.2472
1617 lLL1-1/4x.109 0.261 0.2472
-1583 lLLlxlx.109 0.206 0.1962
-1579 lLLlXlX.109 0.206 0.1962
-2063 0.6 2.7/ 2.8
-6637 1.4 3.0/ 2.8
-1719 0.5 2.3/ 2.0
-6155 1.4 3.2/ 3.2
-1719 0.5 2.3,’ 2.0
7819 1.8 2.7/ 2.7
7819 1.4 2.7/ 2.7
-4050 1.1 2.9/ 3.0
7819 1.1 2.7/ 2.7
-1719 0.5 2.3/ 2.0 -3574 0.9 2.9/ 3.0
7819 0.7 2.7/ 2.7
-1719 0.5 2.3/ 2.0
-2035 0.5 2.7/ 2.7
7819 0.5 2.7/ 2.7
-1719 0.5 2.3/ 2.0
Vallev Joist West Page 38 V1.71
rc Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS CARLSBAD, CA
Comments: UBC 1997 TAG COLOR WHITE
J514 1 - 30K229/122 x 45' 9.625 Special Crimped angle
End Lenqth Depth Slope Holes TOP Chord Ext BCX Holdback Pitch EP/#lL
Tag 4.000 5.000 -0.438 Y 54.000
opp 4.000 5.000 0.438 54.000
Parallel chord Shortspan
Uniform Live load 122 #/ft full length
Uniform SJI load 229 #/ft full length
Uniform Dead load 109 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
HGCLIP @ 9'2", 18'5", & 36'10" FTE OAL T 1 CLIP @ 27'7"
SHORT BEARING 3" @ LE
SHORT BEARING 3-1/2" @ RE End loads: - SJI mDeadup&Wind
Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kihs
30.000 in Deep 545.625 in Design length 1302 # Minimum Shear
28.893 in Effective Depth 457 in4 Ix 0 in4 Minimum Ix
26.000 in Clear Depth L/ 616 Live Defl L/ 328 SJI Defl
870516 in-#Moment 1.000 in Chord gap 0.861 in Camber
48.000 in Interior Panel 28.406 in Left End 28.406 in Right End
11 Web Vees 6206 # SJI reaction 6206 # SJI reaction
Tow Chord: 2-L L2x2x.163 A = 1.251 Y = 0.560 Fy = 50000 Q = 0.952
Bridg < 178" Ix= 0.482 Iy= 1.888 Rx = 0.621 Ry = 1.229 Rz = 0.395 Center: L = 24.000 P = -30129 Pax= -31142 6 Fillers
Eighth: L = 24.000 P = -26879 Paz= -27205 No Fillers
Tag end panl: L = 28.406 P = -13293 Paz= -22414 M = 1099 No Filler
First point: P = -13293 Pa = -33773 M = 1685
Chord shear: V = 20200 C = -887 fv = 8171 fc = -709 f = 8178
Bot Chord: 2-L L2x2x.125 A = 0.969 Y = 0.546 Fy = 50000 Q = 0.834
Ix= 0.380 Iy= 1.441 RX = 0.626 Ry = 1.219 RZ = 0.398
Center: L = 48.000 P = 29286 Pa = 29063
.Ch_ord shear: V = 20200 T = 10588 fv = 11766 ft = 10929 f = 12973
Vallev Joist West Page 39 V1.71 - Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
J5 14 1 - 30K229/122 x 45‘ 9.625 Special Crimped angle
Parallel chord Shortspan
Web Ansl Lnsth Shear Force Member Area,- R I -- Pa Weld T-AvlW-B T 1 60.9 53.5 5883 12112 AU - 29/32 0.645 0.226 17406 1.3
v1
c1
T2
v2
c2
T3
v3
T
Vr
c4
T5
v5
c5
T6
V6
c.2
39.2
9.5
39.7
0.0
39.7
39.7
0.0
39.7
39.7
0.0
39.7
39.7
0.0
39.7
39.7
0.0
33.6 -1594
26.4 -5327
33.8 4779
26.0 -1544
33.8 -4273
33.8 3767
26.0 -1572
33.8 -3261
33.8 2755
26.0 -1592
33.8 -2249
26.0 -1605
33.8 -1302
33.8 1743
33.8 1302
26.0 -1609
-2057 lLL1-1/4X.109 0.261 0.2472
-5401 lLL1-3/4X.125 0.422 0.3472
6212 lLL1-1/4X.109 0.261 0.2472
-1544 lLLlXlX.109 0.206 0.1962
4897 lLL1-1/4x.109 0.261 0.2472
-1572 1LLlXlX.109 0.206 0.1962
-4239 1LL1-3/4X.125 0.422 0.3472
3581 lLL1-1/4X.109 0.261 0.2472
-1592 1LLlXlX.109 0.206 0.1962
2266 lLL1-1/4~.109 0.261 0.2472
-1605 1LLlXlX.109 0.206 0.1962
-1692 lLL1-1/4x.109 0.261 0.2472
1692 lLL1-1/4~.109 0.261 0.2472
-1609 lLLlXlX.109 0.206 0.1962
-5555 lLL1-3/4x.125 0.422 0.3472
-2924 lLL1-1/2~.109 0.315 0.2972
-2100 0.6 2.7/ 3.1
-6703 1.5 3.0/ 3.0
7819 1.9 2.7/ 3.1
-1752 0.5 2.3,’ 2.3
-6222 1.5 3.2/ 3.6
7819 1.5 2.7/ 3.1
-1752 0.5 2.3,’ 2.3 -6222 1.1 3.2/ 3.6
7819 1.1 2.7/ 3.1 -1752 0.5 2.3/ 2.3
-3637 0.9 2.9/ 3.3
7819 0.7 2.7/ 3.1
-1752 0.5 2.3/ 2.3 -2071 0.5 2.7/ 3.1
7819 0.5 2.7/ 3.1
-1752 0.5 2.3/ 2.3
Vallev Joist West Page 40 V1.71 - Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
5515 1 - 30K229/122 x 45' 9.625 Special Crimped angle
Parallel chord Shortspan
- End Lenqth Depth Sloue Holes TOP Chord Ext BCX Holdback Pitch EP/#lL
Tag 4.000 5.000 -0.438 Y 54.000
opp 4.000 5.000 0.438 54.000
Uniform Live load 122 #/ft full length
Uniform SJI load 229 #/ft full length
Uniform Dead load 107 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
H1 CLIP @ 9'2", 18'5", & 36'10" FTE OAL Tcl 1 CLIP @ 27'7"
SHUKT BEARING 3-1/4" @ LE
SHORT BEARING 3-1/2" @ RE
End loads: __ SJImW-EaukW
Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
30.000 in Deep 545.625 in Design length 1302 # Minimum Shear
28.949 in Effective Depth 456 in4 Ix 0 in4 Minimum Ix
26.250 in Clear Depth L/ 615 Live Defl L/ 328 SJI Defl
864532 in-#Moment 1.000 in Chord gap 0.861 in Camber
48.000 in Interior Panel 28.406 in Left End 28.406 in Right End
11 Web Vees 6206 # SJI reaction 6206 # SJI reaction
TOD Chord: 2-L L2x2x.163 A = 1.251 Y = 0.560 Fy = 50000 Q = 0.952
Bridg c 178" Ix= 0.482 Iy= 1.888 Rx = 0.621 Ry = 1.229 Rz = 0.395
Center: L = 24.000 P = -29864 Pax= -31142 6 Fillers
Eighth: L = 24.000 P = -26647 Paz= -27205 No Fillers
Tag end panl: L = 28.406 P = -13197 Paz= -22414 M = 1089 No Filler
First point: P = -13197 Pa = -33773 M = 1671
Chord shear: V = 20200 C = -879 fv = 8112 fc = -703 f = 8119 .
Bot Chord: 2-LL1-3/4x.143 A = 0.960 Y = 0.490 Fy = 50000 Q = 0.953 Ix= 0.283 Iy= 1.225 RX = 0.543 Ry = 1.130 RZ = 0.346
Center: L = 48.000 P = 29016 Pa = 28803
Chord shear: V = 20200 T = 10490 fv = 11668 ft = 10926 f = 12883
/c
Page 41 V1.71 Vallev Joist West - Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
5515 1 - 30K229/122 x 45' 9.625 Special Crimped angle
Parallel chord Shortspan
Web Anql Lnqth Shear
T 160.9 54.0 5840
V 139.2 33.9 -1593
C 1 9.4 26.6 -5289 T 2 39.7 34.1 4745
V 2 0.0 26.3 -1543
C 2 39.7 34.1 -4243
T 3 39.7 34.1 3741
V 3 0.0 26.3 -1571
Cy 39.7 34.1 -3239 T' 39.7 34.1 2737
V 4 0.0 26.3 -1591
C 4 39.7 34.1 -2235
V 5 0.0 26.3 -1603
C 5 39.7 34.1 -1302
V 6 0.0 26.3 -1607
T 5 39.7 34.1 1733
T 6 39.7 34.1 1302
Force Member Area- R
12006 AU - 29/32 0.645 0.226
-2055 lLL1-1/4X.109 0.261 0.2472
-5362 1LL1-3/4X.125 0.422 0.3472
6163 lLL1-1/4x.109 0.261 0.2472
-1543 lLLlXlX.109 0.206 0.1962
-5511 1LL1-3/4X.125 0.422 0.3472
4859 lLL1-1/4x.109 0.261 0.2472 -1571 1LLlXlX.109 0.206 0.1962
-4207 1LL1-3/4X.125 0.422 0.3472
3555 lLL1-1/4x.109 0.261 0.2472 -1591 1LLlXlX.109 0.206 0.1962
-2903 lLL1-1/2X.109 0.315 0.2972
2251 lLL1-1/4x.109 0.261 0.2472
-1603 lLLlXlX.109 0.206 0.1962
-1691 lLL1-1/4X.109 0.261 0.2472
1691 lLL1-1/4x.109 0.261 0.2472
-1607 lLLlXlX.109 0.206 0.1962
-- Pa, Weld
17406 1.3
-2063 0.6
-6637 1.4
-1719 0.5
-6154 1.5
-1719 0.5
-6154 1.1
7819 1.1
-1719 0.5
-3574 0.9
7819 0.7
-1719 0.5
-2035 0.5
-1719 0.5
7819 1.9
7819 1.5
7819 0.5
T -AVlW - B
2.7/ 2.8
3.0/ 2.8
2.7/ 2.7 2.3/ 2.0
3.2/ 3.2
2.71 2.7
2.3/ 2.0
3.2/ 3.2
2.7/ 2.7
2.31 2.0
2.9/ 3.0
2.7/ 2.7
2.3/ 2.0
2.7/ 2.7
2.7/ 2.7
2.3/ 2.0
Vallev Joist West Page 42 V1.71
7 Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
5516 6 - 30K240/128 x 45'10.125 Special Crimped angle
Parallel chord Shortspan
End Lenqth Dewth slope Holes TOR Chord Ext BCX Holdback Pitch EP/#~L
Tag 4.000 4.875 -0.436 E 0' 2.000 54.000
opp 4.000 5.000 0.438 54 .OOO
Uniform Live load 128 #/ft full length
Uniform SJI load 240 #/ft full length
Uniform Dead load 112 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
H1 CLIP @ 9'2", 18'5", & 36'10" FTE OAL
TS- 1 CLIP @ 27'7" FTE OAL
SHUAT BEARING 3-1/2" @ RE End loads: SJImDead-mWind
Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
30.000 in Deep 546.125 in Design length 1365 # Minimum Shear
28.945 in Effective Depth 476 in4 Ix 0 in4 Minimum Ix
26.250 in Clear Depth L/ 610 Live Defl L/ 325 SJI Defl
895283 in-#Moment 1.000 in Chord gap 0.863 in Camber
48.000 in Interior Panel 28.531 in Left End 28.531 in Riqht End
11 Web Vees 6461 # SJI reaction
Tow Chord: 2-L L2x2x.163
Bridg < 178" Ix= 0.482
Center: L = 24.000
Sixth: L = 24.000
Tag end panl: L = 28.531
First point:
Chord shear: V = 20200
Bot Chord: 2-LL1-3/4x.155
IX= 0.304
Center: L = 48.000
Chord shear: V = 20200
A = 1.251
P = -30930
P = -23410
P = -13572
P = -13572
C = -962
A = 1.037
Iy= 1.330 P = 30242
T = 10924
Iy= 1.888
Y = 0.560
RX = 0.621
Pax= -31142
Paz= -27205
Paz= -22353
Pa = -33773
fv = 8437
Y = 0.495
RX = 0.541
Pa = 31109
fv = 1120~9
6461 # SJI-reaction
Fy = 50000
Ry = 1.229
M = 1151 M = 1767
fc = -769
Fy = 50000
Ry = 1.133
ft = 10535
Q = 0.952
RZ = 0.395
10 Fillers No Fillers
No Filler
f = 8446
Q = 0.983
Rz = 0.345
f = 12385
Valley Joist West Page 43 V1.71 - Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: VBC 1997
TAG COLOR WHITE
5516 6 - 30K240/128 x 45'10.125 Special Crimped angle
Parallel chord Shortspan
Web Anql Lnqth Shear T 1 60.9 54.0 6081
V 139.0 33.8 -1623
C 1 9.9 26.6 -5501
T 2 39.7 34.1 4932
V 2 0.0 26.3 -1568 c 2 39.7 34.1 -4408 T 3 39.7 34.1 3884
V 3 0.0 26.3 -1597
C L39.7 34.1 -3360
T' 39.7 34.1 2836
V + 0.0 26.3 -1618
C 4 39.7 34.1 -2312
T 5 39.7 34.1 1788
V 5 0.0 26.3 -1630
C 5 39.7 34.1 -1365
T 6 39.7 34.1 1365 V 6 0.0 26.3 -1635
Force Member
12502 AU - 29/32
-2090 lLL1-1/4X.109
-5584 1LL1-3/4~.125
6406 lLL1-1/4~.109
-1568 1LLlXlX.109
-5726 1LL1-3/4X.125
5045 lLL1-1/4X.109
-1597 1LLlXlX.lO9
-4364 lLL1-3/4~.125
3684 lLL1-1/4X.109
-1618 lLLlXlX.109
-3003 lLL1-1/2X.109
2323 lLL1-1/4X.109
-1630 1LLlXlX.109
-1774 lLL1-1/4X.109
1774 lLL1-1/4X.109
-1635 1LLlXlX.109
Area
0.645
0.261 0.422
0.261
0.206
0.422
0.261
0.206
0.422
0.261
0.206
0.315
0.261
0.206
0.261
0.261
0.206
- R -- Pa Weld 0.226 17406 1.4
0.2472 -2072 0.6
0.3472
0.2472
0.1962 0.3472
0.2472
0.1962
0.3472
0.2472
0.1962
0.2972
0.2472
0.1962
0.2472
0.2472
0.1962
-6627 1.5
-1719 0.5
-6154 1.5
-1719 0.5
-6154 1.2
7819 1.1
-1719 0.5
-3573 0.9 7819 0.7
-1719 0.5
-2035 0.5
7819 0.5
7819 2.0
7819 1.6
-1719 0.5 ..
T - AVl W - B
2.71 2.7
3.0/ 2.8
2.7/ 2.7
2.3) 2.0
3.2/ 3.2
2.7/ 2.7
2.3/ 2.0
3.2/ 3.2
2.7/ 2.7
2.3/ 2.0
2.9/ 3.0
2.3/ 2.0
2.7/ 2.7
2.7/ 2.7
2.3/ 2.0
2.7/ 2.7
Vallev Joist West Page 44 ~1.71
7 Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
5517 2 - 30K240/128 x 46' 0.375 Special Crimped angle
Parallel chord Shortspan
End Lensth Delsth Slolse Holes TOR Chord Ext BCX Holdback Pitch EP/#~L
Tau 4.000 5.000 -0.438 E 0' 3.000 54. onn
opp 4.000 5.000 0.438 54.000
Uniform Live load 128 #/ft full length
Uniform SJI load 240 #/ft full length
Uniform Dead load 112 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
H1 CLIP 63 9'5", 18'8", & 37'1" FTE OAL
T"', 1 CLIP @ 27'10" FTE OAL
ShdT BEARING 3-1/2" 63 RE
End loads: SJIuJlDeadLiveL&Wind
Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
30.000 in Deep 548.375 in Design length 1371 # Minimum Shear
28.945 in Effective Depth 476 in4 Ix 0 in4 Minimum Ix
26.250 in Clear Depth L/ 602 Live Defl L/ 321 SJI Defl
901181 in-#Moment 1.000 in Chord gap 0.870 in Camber
48.000 in Interior Panel 29.094 in Left End 29.094 in Right End
11 Web Vees 6484 # SJI reaction 6484 # SJI reaction
Top Chord: 2-L L2x2x.163 A = 1.251 Y = 0.560 Fy = 50000 Q = 0.952
Bridg < 178" Ix= 0.482 Iy= 1.888 Rx = 0.621 Ry = 1.229 Rz = 0.395
Center: L = 24.000 P = -31134 Pax= -31142 10 Fillers
Sixth: L = 24.000 P = -23619 Paz= -27205 No Fillers
Tag end panl: L = 29.094 P = -13599 Paz= -22074 M = 1195 No Filler
First point: P = -13599 Pa = -33773 M = 1842
Chord shear: V = 20200 C = -1177 fv = 8443 fc = -941 f = 8456
Bot Chord: 2-LL1-3/4x.155 A = 1.037 Y = 0.495 Fy = 50000 Q = 0.983
Ix= 0.304 Iy= 1.330 RX = 0.541 Ry = 1.133 RZ = 0.345
Center: L = 48.000 P = 30474 Pa = 31109
Chord shear: V = 20200 T = 10955 fv = 11241 ft = 10565 f = 12420
Valley Joist West Page 45 V1.71 - Job #ON02915 - 04 By ASM Entered 6/20/00 Revised 2/13/01
Cwtomer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR WHITE
J517 2 - 30K240/128 x 46' 0.375 Special Crimped angle
Parallel chord Shortspan
Web Ansl
T 1 60.9 V 1 38.4 c 1 12.1
T 2 39.7 v 2 0.0 c 2 39.7
T 3 39.7 v 3 0.0 c 3 39.7
Tr 39.7 v f 0.0 c 4 39.7
T 5 39.7 v 5 0.0 c 5 39.7
T 6 39.7
V 6 0.0
Lnsth
54.0
33.5
26.8
34.1
26.3
34.1
34.1
26.3
34.1
34.1
26.3
34.1
34.1
26.3
34.1
34.1
26.3
Shear
6098
-1635
-5505
-1569
-4406
3883
-1598
-3359
2835
-1619
-2311
1788
-1631
-1371
1371
-1636
4930
Force Member Area- R
12538 AU - 29/32 0.645 0.226
-2085 lLL1-1/4~.109 0.261 0.2472
-5629 1LL1-3/4X.125 0.422 0.3472
-1569 lLLlXlX.109 0.206 0.1962
-5724 lLL1-3/4~.125 0.422 0.3472
5044 lLL1-1/4~.109 0.261 0.2472
-1598 1LLlXlX.109 0.206 0.1962
-4363 1LL1-3/4~.125 0.422 0.3472
-1619 lLLlXlX.109 0.206 0.1962
6404 lLL1-1/4x.109 0.261 0.2472
3683 lLL1-1/4x.109 0.261 0.2472
-3002 lLL1-1/2x.109 0.315 0.2972
2322 lLL1-1/4x.109 0.261 0.2472
-1631 lLLlxlx.109 0.206 0.1962
1781 lLL1-1/4x.109 0.261 0.2472
-1636 lLLlxlx.109 0.206 0.1962
-1781 lLL1-1/4X.109 0.261 0.2472
-- Pa Weld
17406 1.4
-2111 0.6
-6576 1.5
7819 2.0
-1719 0.5
-6154 1.5
-1719 0.5
-6154 1.2
7819 1.1
-1719 0.5
-3573 0.9
7819 0.7
-1719 0.5
-2035 0.6
7819 0.6
-1719 0.5
7819 1.6
T-AVlW-B
2.7/ 2.7
3.0/ 2.8
2.7,' 2.7
2.3/ 2.0
2.7/ 2.7
2.3/ 2.0
3.2/ 3.2
2.7/ 2.7
2.3/ 2.0
2.9/ 3.0
2.7/ 2.7
2.3/ 2.0
2.7/ 2.7
'2.7/ 2.7
2.3/ 2-0
3.2/ 3:2
.--. ,P.@
Z.fJ3/
Valley Joist West Page 1 V1.71 - Job #ON02915 - 08 By ASM Entered 6/20/00 Revised 2/13/01
Customer:
Project:
Comments :
G601
JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
ASTON VIEWS
CARLSBAD, CA
UBC 1997
TAG COLOR ORANGE
1 - 42G5N17.4/7.1 x 41' 4.625 Special Crimped angle
~ - Parallel chord Girder
End Lenqth Depth Slope Holes Top Chord Ext BCX Holdback Pitch EP/#lL Taq 6.000 6.000 -0.438 Y E 0' 1.000 2 0' 6.250 99.000
Opp 6.000 6.000 0,438 2 0' 0.001 105.87
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
TC conc loads: Load Spacing Location Point Twe
8'3 u2 SJI
8'3 u2 Dead
17400
F 7100 8'3 u2 Live
10300
17400 8'1-1/4 16'4-1/4 U4 SJI
10300 16'4-1/4 U4 Dead
7100 16'4-1/4 U4 Live
17400 "'-'I4 24'5-1/2 U6 SJI
10300 24'5-1/2 U6 Dead
7100 24'5-1/2 U6 Live
17400 8'1-1/4 32'6-3/4 U8 SJI
10300 32'6-3/4 U8 Dead
32'6-3/4 U8 Live
8'3
0'0
0'0
7100 8'9-7/8
TC HOLES @ 1-3/4 7/8" DIA HOLES 4 GAGE
KEEP CLEAR FOR KNIFE PLATE 8 " TE
End loads: __ SJ1m~Live-U
Left TC axial load: 0.0 0.0 0.0 0.0 41.0 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 41.0 0.0 Kips
42.000 in Deep 492.625 in Design length 8700 # Minimum Shear
39.753 in Effective Depth 4004 in4 Ix 0 in4 Minimum Ix
34.000 in Clear Depth L/1062 Live Defl L/ 433 SJI Defl
5659972 in-#Moment 1.000 in Chord gap 0.702 in Camber
97.250 in Interior Panel 47.500 in Left End 50.938 in Right End
5 Web Vees 36286 # SJI reaction 35314 # SJI reaction
Page 2 V1.71 Vallev Joist West
t Job #ON02915 - 08 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR ORANGE
G601 1 - 42G5N17.4/7.1 x 41' 4.625 Special Crimped angle
Parallel chord Girder
TOR Chord: 2-L L4x4x.375 A = 5.719 Y = 1.138 Fy = 50000 Q = 1.000
Center: L = 48.625 P =-142378 Pax=-148220 M = 0 2 Fillers
Fourth: L = 48.625 P =-121682 Paz=-128204 No Fillers Chord shear: V = 20200 C = -35405 fv = 12030 fc = -6191 f = 12421
Bot Chord: 2-L L4X4X.293 A = 4.516 Y = 1.108 Fy = 50000 Q = 0.908
Ix= 8.717 Iy= 24.067 RX = 1.235 Ry = 2.051 RZ = 0.788
Ix= 7.014 Iy= 18.699 Rx = 1.246 Ry = 2.035 RZ = 0.792
Center: L = 97.250 P = 134035 Pa = 135489
Chord shear: V = 20200 T = 52769 fv = 15430 ft = 11684 f = 16499
k- Ansl Lncrth Shear Force Member Area- R -- Pa Weld T-AvlW-B T I 55.6 70.3 36168 63974 2LL2-1/2x.230 2.194 0.772~ 65826 9.4 11.5/11.5 v 1 14.8 41.1 -1000 -1034 1~~1-1j4x.109 0.261 0.2472 -1399 0.3 3.2j 3.4
C 144.5 55.7-36089 -50556 2LL3X3x.250 2.875 0.930~ -63370 6.8 10.0/10.0 T 2 50.7 62.8 18590 29371 lLL2-1/2X.212 1.015 0.4932 30452 4.7 5.5/ 6.1 V 2 0.0 39.8 -1000 -1000 lLL1-1/4x.109 0.261 0.2472 -1497 0.3 3.3/ 3.3
C 2 50.7 62.8-18491 -29215 2LL2-1/2X.212 2.030 0.775X -37441 4.6 10.7/10.7
V 3 0.0 39.8 -1000 -1000 lLL1-1/4x.109 0.261 0.2472. -1497 0.3 3.3/ 3.3
T 3 50.7. 62.8 8700 13745 1L L2x2x.156 0.600 0.3962 17990 3.0 5.0/ 5.5
Valley Joist West Page 3 V1.71 - Job #ON02915 - 08 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST.
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR ORANGE
G602 1 - 54G7N16.6/6.81 x 55' 9.500 Special Crimped angle
Parallel chord Girder
End Lenqth Deuth Slope Holes TOD Chord Ext BCX Holdback Pitch EP/#lL
Taq 6.000 6.000 Y E 0' 1.000 2 0' 4.750 94.750
Opp 6.000 6.000 Y E 0' 1.000 2 0' 4.750 94.750
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
TC conc loads: Load Suacinq Location Point
16600 7'10-314 7 110-3/4 u2 S JI
9790 7'10-3/4 U2 Dead - 6810 7'10-3/4 U2 Live
9790 15'10-3/4 U4 Dead
6810 15'10-3/4 U4 Live
9790 23'10-3/4 U6 Dead
6810 23'10-3/4 U6 Live
9790 31'10-3/4 U8 Dead
6810 31'10-3/4 U8 Live
9790 39'10-3/4 U10 Dead
6810 39'10-3/4 U10 Live
9790 47'10-3/4 U12 Dead
47'10-3/4 U12 Live
16600 15'10-3/4 U4 S JI
16600 23'10-3/4 U6 S JI
16600 31'10-3/4 U8 S JI
16600 39'10-3/4 U10 SJI
16600 47'10-3/4 U12 SJI
6810 7'10-3/4
TC HOLES @ 1-3/4 BE 7/8 DIA HOLES 4 GAGE
KEEP CLEAR FOR KNIFE PLATE 8" BE
End loads: SJINtUp-LiveEqukWind
Left TC axial load: 0.0 0.0 0.0 0.0 41.0 0.0 Kius
Right TC axial load: 0.0 0.0 0.0 0.0 41.0 0.0 Kips
54.000 in Deep 665.500 in Design length 12450 # Minimum Shear
51.656 in Effective Depth 9407 in4 Ix 0 in4 Minimum Ix
46.000 in Clear Depth L/1016 Live Defl L/ 417 SJI Defl
9745739 in-#Moment 1.000 in Chord gap 1.282 in Camber
-6.000 in Interior Panel 45.375 in Left End 45.375 in Right End
7 Web Vees 50800 # SJI reaction 50800 # SJI reaction
Vallev Joist West Page 4 V1.71 - Job #ON02915 - 08 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR ORANGE
G602 1 - 5467N16.6/6.81 x 55' 9.500 Special Crimped angle
Parallel chord Girder
TOP Chord: 2-L L4x4x.500 A = 7.500 Y = 1.183 Fy = 50000 Q = 1.000
Center: L = 48.000 P =-188668 Pax=-194354 M = 0 6 Fillers
Fourth: L = 48.000 P =-132222 Paz=-168630 No Fillers
Chord shear: V = 20200 C = -22312 fv = 12665 fc = -2975 f = 12752
Ix= 11.123 Iy= 32.375 RX = 1.218 Ry = 2.078 RZ = 0.782
Bot Chord: 2-L L4x4x.438 A = 6.624 Y = 1.161 Fy = 50000
Ix= 9.957 Iy= 28.235 RX = 1.226 Ry = 2.065
Chord shear: V = 20200 T = 68698 fv = 14468 ft = 10371 y-: Ansl Lnsth Shear Force Member Area- R -- Pa Weld
T 153.6 87.0 50695 85378 2L L3x3x.313 3.560 0.922~ 106802 9.2
Center: L = 96.000 P = 185123 Pa = 198729
V 125.5 57.2 -1000 -1108 lLL1-1/2~.109 0.315 0.2972 -1269 0.3
C 123.8 56.4-50661 -55356 2LL3X3x.250 2.875 0.930~ -62998 7.5
V 2 0.0 51.7 -1000 -1000 lLL1-1/2~.109 0.315 0.2972 -1557 0.3
C 2 42.9 70.5-33916 -46299 2LL3X3x.250 2.875 0.930~ -55599 6.2
V 3 0.0 51.7 -1000 -1000 lLL1-1/2~.109 0.315 0.2972 -1557 0.3
C 3 42.9 70.5-17172 -23442 2LL2-1/2~.212 2.030 0.775X -33467 3.7
V 4 0.0 51.7 -1000 -1000 lLL1-1/2~.109 0.315 0.2972 -1557 0.3
T 2 42.9 70.5 33989 46397 2L L2x2x.216 1.635 0.613~ 49041 7.2
T 3 42.9 70.5 17244 23540 lLL2-1/2x.212 1.015 0.4932 30452 3.7
T 4 42.9 70.5 12450 16995 1L L2x2x.248 0.930 0.3912 27915 2.3
Q = 1.000
Rz = 0.785
f = 15369 T - AVlW - B
10.5/10.5
3.6) 3.8
9.2/ 9.2
9.5/ 9.5 3.5/ 3.5
3.5/ 3.5
9.5/ 9.5 4.5/ 5.0
3.5/ 3.5
9.6/ 9.6 5.0/ 5.5
Valley Joist West Page 5 V1.71 - Job #ON02915 - 08 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002 2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR ORANGE
T601 1 - 32LH229/122 x 48' 5.375 Crimped angle Parallel chord Longspan
End Lensth Depth SloDe Holes Tor, Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 -0.438 50.687
Opp 6.000 5.000 0.438 50.687
Uniform Live load 122 #/ft full length
Uniform SJI load 229 #/ft full length
Uniform Dead load 107 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
TYPE 2 CLIP E! 16'11" FTE OAL
H1 CLIP E! 6'4'' & 27'6." & 38'1" FTE OAL P ,RT BEARING 3 - 1/2 '' BE
End loads: - S JI
Left TC axial load: 0.0
32.000 in Deep
30.945 in Effective Depth
28.250 in Clear Depth
953953 in-#Moment
48.000 in Interior Panel
Right TC axial load: 0.0
11 Web Vees
mDeadLivel&Wind
0.0 0.0 0.0 7.2 0.0 Kips
0.0 0.0 0.0 7.2 0.0 Kips
577.375 in Design length 1377 # Minimum Shear 544 in4 Ix 0 in4 Minimum Ix
L/ 619 Live Defl L/ 330 SJI Defl
1.000 in Chord gap 0.965 in Camber
36.344 in Left End 36.344 in Right End
6509 # SJI reaction 6509 # SJI reaction
Top Chord: 2-L L2x2x.163 A = 1.251 Y = 0.560 Fy = 50000 Q = 0.952
Bridg c 209" Ix= 0.482 Iy= 1.888 Rx = 0.621 Ry = 1.229 Rz = 0.395
Center: L = 24.000 P = -30827 Pax= -32394 M = 458 8 Fillers
Tag end panl: L = 36.344 P = -12369 Paz= -18213 M = 1757 No Filler
First point: P = -12369 Pa = -33773 M = 2788
Chord shear: V = 20200 C = -4144 fv = 8195 fc = -3313 f = 8360
Bot Chord: 2-LL1-3/4x.155 A = 1.037 Y = 0.495 Fy = 50000 Q = 0.983
Ix= 0.304 Iy= 1.330 RX = 0.541 Ry = 1.133 Rz = 0.345
Center: L = 48.000 P = 30152 Pa = 31109
Chord shear: V = 20200 T = 9563 fv = 11204 ft = 9222 f = 12115
Valley Joist West Page 6 V1.71 - Job #ON02915 - 08 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST ~~ SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR ORANGE
T601 1 - 32LH229/122 x 48' 5.375 Crimped angle Parallel
Web Anql Lnqth Shear
T 157.6 57.7 6078
V 1 21.7 33.3 -1751 c 1 37.8 39.2 -5343
T 2 37.8 39.2 4726
V 2 0.0 30.9 -1553
C 2 37.8 39.2 -4226
T 3 37.8 39.2 3726
V 3 0.0 30.9 -1579
C 3 37.8 39.2 -3227
T 4 37.8 39.2 2727
Ir 0.0 30.9 -1597
C 4 37.8 39.2 -2228 T 5 37.8 39.2 1728
V 5 0.0 30.9 -1608
C 5 37.8 39.2 -1377 T 6 37.8 39.2 1377
V 6 0.0 30.9 -1612
Force
11331
-1885
-6761
5980
-1553 -5348
4716
-1579
-4084
-1597
-2819
2187
3451
-1608
-1743
1743
-1612
Member
2LLlXlX.109
1LLlXlX.lO9 1LL2x2x. 176
1LLlXlX.lO9
lLL1-1/2~.125
1LLlXlX.lOS
lLL1-1/4X.109
lLL1-1/4X.109
lLL1-1/2X.109
lLL1-1/4X.109
lLL1-1/2X.109
lLL1-1/4X.109
lLL1-1/4X.109
lLL1-1/4X.109
1LLlXlX.lO9
1LLlXlX.lO9
1LLlXlX.109
Area
0.412
0.206
0.673
0.261
0.206
0.359
0.261
0.206
0.315
0.261
0.206
0.315
0.261
0.206 0.261
0.261
0.206
R - 0.307~
0.1962
0.3942
0.2472
0.1962
0.2962
0.2472 0.1962
0.2972
0.2472
0.1962
0.2972
0.1962 0.2472
0.2472
0.1962
0.2472
-- Pa Weld
12367 3.5
-1897 0.6
-7079 1.3
7819 1.8
-2199 0.5
-5299 1.4
7819 1.5
-2199 0.5
-4580 1.3
7819 1.1
-2199 0.5
-4580 0.9
7819 0.7
-2199 0.5 -2742 0.5
7819 0.5
-2199 0.5
chord Longspan
T -AVlW - B
6.0/ 5.1
2.2/ 2.2
3.4/ 3.5
2.7/ 2.7
2.31 2.0
2.9/ 3.0
2.7) 2.7
2.3/ 2.0
2.9/ 3.0
2.7/ 2.7
2.3/ 2.0
2.9/ 3.0
2.7/ 2.7
2.3/ 2.0 2.7/ 2.7
2.7/ 2.7
2,3/ 2.0
Valley Joist West Page 7 V1.71 - Job #ON02915 - 08 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS CARLSBAD, CA
Comments: UBC 1997 TAG COLOR ORANGE
T602 1 - 32LH242/129 x 48' 5.375 Crimped angle Parallel chord Longspan
End Lensth Deuth Slope Holes Tor, Chord Ext BCX Holdback Pitch EP/#iL Tag 6.000 5.000 -0.438 50.687
Opp 6.000 5.000 0.438 50.687
Uniform Live load 129 #/ft full length
Uniform SJI load 242 #/ft full length
Uniform Dead load 113 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
TYPE 2 CLIP @ 16'11" FTE OAL
HI. CLIP @ 6'4" & 27'6" & 38'1" FTE OAL .c RT BEARING 3-1/2" BE
End loads: SJImDeadLiveEaukWind
Left TC axial load: 0.0 0.0 0.0 0.0 77.0 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 77.0 0.0 Kips
32.000 in Deep 577.375 in Design length 1455 # Minimum Shear
30.605 in Effective Depth 750 in4 Ix 0 in4 Minimum Ix
27.000 in Clear Depth L/ 807 Live Defl L/ 430 SJI Defl
2209894 in-#Moment 1.000 in Chord gap 0.965 in Camber
48.000 in Interior Panel 36.344 in Left End 36.344 in Right End
11 Web Vees 6822 # SJI reaction 6822 # SJI reaction
TOD Chord: 2-LL3X3x.250 A = 2.875 Y 0.842 Fy = 50000 Q = 0.961
Bridg c 278" Ix= 2.488 Iy= 7.669 Rx = 0.930 Ry = 1.633 Rz = 0.592
Center: L = 24.000 P = -72208 Paz= -75071 M = 484 No Fillers
Tag end panl: L = 36.344 P = -60179 Pax= -64805 M = 1856 Filler Reqd
First point: p = -60179 Pa = -77625 M = 2946
Chord shear: V = 20200 C = -4389 fv = 3731 fc = -1527 f = 3808
Bot Chord: 2-L L2x2x.143 A = 1.103 Y = 0.553 Fy = 50000 Q = 0.898
Ix= 0.429 Iy= 1.652 Rx = 0.624 Ry = 1.224 RZ = 0.396
Center: L = 48.000 P = 31952 Pa = 33093
Chord shear: V = 20200 T = 10135 fv = 11138 ft = 9188 f = 12048
Vallev Joist West Page 8 V1.71 - Job #ON02915 - 08 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR ORANGE
T602 1 - 32LH242/129 x 48’ 5.375 Crimped angle Parallel
- Web Anql Lnqth Shear Force Member Area- R -- Pa Weld T 1 57.8 57.5 6371 11972 2LLlxlx.109 0.412 0.307~ 12367 3.7 v 1 22.0 c 138.1
T 2 38.1 v 2 0.0
C 2 38.1 T 3 38.1 v 3 0.0
C 3 38.1 T 4 38.1
1- 0.0
C 4 38.1
T 5 38.1 v 5 0.0
C 5 38.1 T 6 38.1 V 6 0.0
33.0
38.9
38.9
30.6
38.9
38.9
30.6
38.9
38.9
30.6
38.9
38.9
30.6
38.9
38.9
30.6
-2012
-5597
4947
-1806
-4421
3895
-1823
-3370
2844
-1835
-2319
1793
-1843
-1455
1455
-1845
-2169 lLL1-1/4X.109 0.261 0.2472
-7112 lLL2X2X.176 0.673 0.3942
6286 lLL1-1/4x.109 0.261 0.2472
-1806 lLLlXlX.109 0.206 0.1962
-5618 lLL1-3/4X.125 0.422 0.3472
4950 lLL1-1/4x.109 0.261 0.2472
-1823 lLLlXlX.109 0.206 0.1962
-4282 lLL1-1/2X.109 0.315 0.2972
3615 lLL1-1/4x.109 0.261 0.2472
-1835 lLLlXlX.109 0.206 0.1962
-2947 lLL1-1/2x.109 0.315 0.2972
2279 lLL1-1/4X.109 0.261 0.2472
-1843 1LLlXlX.109 0.206 0.1962
-1850 lLL1-1/4~.109 0.261 0.2472
1850 lLL1-1/4X.109 0.261 0.2472
-1845 lLLlxlx.109 0.206 0.1962
-3791 0.7
-7177 1.4
7819 1.9
-2248 0.6
-7223 1.5
7819 1.5
-2248 0.6
-4620 1.3
7819 1.1
-2248 0.6
-4620 0.9
7819 0.7
-2248 0.6
-2780 0.6
7819 0.6
-2248 0.6
chord Longspan
T - AVl W - B
9.4,’ 6.1
3.3; 2.7
3.6,’ 3.0
3.0/ 2.3
4.1/ 3.5
3.6/ 3.0
4.3/ 3.8
3.0/ 2.3
3.8/ 3.3
3.8/ 3.3
3.6/ 3.0
3.0/ 2.3
3.6/ 3.0
3.0/ 2.3
3.6/ 3.0
3.6/ 3.0
3.0/ 2.3
Page 9 V1.71 Valley Joist West
- Job #ON02915 - 08 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002 2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997 TAG COLOR ORANGE
T603 5 - 32LH240/128 x 52'10.125 Crimped angle Parallel chord Longspan
End Lensth Demh SloDe Holes Too Chord Ext BCX Holdback Pitch EP/#lL
Taq 6.000 5.000 -0.438 53. nm - __
Opp 6.000 5.000 0.438 53.063
Uniform Live load 128 #/ft full length
Uniform SJI load 240 #/ft full length
Uniform Dead load 112 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
TYPE 2 CLIP @ 21'1" FTE OAL H1 CLIP @ 10'6" & 31'8" & 42'3" FTE OAL
.f-,RT BEARING 3-1/2" @ RE
End loads: - SJI NtUpDeadhEgukWind
Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
32.000 in Deep 630.125 in Design length 1575 # Minimum Shear
30.871 in Effective Depth 636 in4 Ix 0 in4 Minimum Ix 28.000 in Clear Depth L/ 531 Live Defl L/ 283 SJI Defl
1150175 in-#Moment 1.000 in Chord gap 1.149 in Camber
48.000 in Interior Panel 37.531 in Left End 37.531 in Right End
12 Web Vees 7301 # SJI reaction 7301 # SJI reaction
TOD Chord: 2-LL2x2x.187 A = 1.426 Y = 0.569 Fy = 50000 Q = 1.000
Bridg < 210" Ix= 0.544 Iy= 2.173 Rx = 0.617 Ry = 1.234 Rz = 0.394
Center: L = 24.000 P = -37042 Pax= -38638 M = 480 6 Fillers
Tag end panl: L = 37.531 P = -13903 Paz= -20246 M = 1961 No Filler
First point: P = -13903 Pa = -38504 M = 3120
Chord shear: V = 20200 C = -4708 fv = 8097 fc = -3302 f = 8263
Bot Chord: 2-L L2x2x.163 A = 1.251 Y = 0.560 Fy = 50000 Q = 0.952
Ix= 0.482 Iy= 1.888 RX = 0.621 Ry = 1.229 Rz = 0.395
Center: L = 48.000 P = 37258 Pa = 37526
Chord shear: V = 20200 T = 11322 fv = 10498 ft = 9051 f = 11432
Vallev Joist West Page 10 V1.71 - Job #ON02915 - 08 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR ORANGE
T603 5 - 32LH240/128 x 52'10.125 Crimped angle Parallel chord Longspan
Web Anql
T 158.8
V 123.7 c 1 37.9
T 2 37.9 v 2 0.0 c 2 37.9 T 3 37.9 v 3 0.0 c 3 37.9 T 4 37.9
v- 0.0 c 4 37.9
T 5 37.9 v 5 0.0 c 5 37.9 T 6 37.9
V 6 0.0
C 6 37.9
59.1
33.1
39.1
39.1
30.9
39.1.
39.1
30.9
39.1
39.1
30.9
39.1
39.1
30.9
39.1
39.1
30.9
39.1
Shear
6845
-1814
-6056
5403
-1587
-4885
4367
-1617
-3849
3330
-1640
-2812
2294
-1657
-1776
1575
-1665 -1575
Force Member Area- R
13230 2LL1-1/4x.109 0.521 0.387X
-1981 lLL1-1/4x.109 0.261 0.2472
-7671 1L L2X2X.216 0.817 0.3922
6843 lLL1-1/4x.109 0.261 0.2472
-1587 lLLlXlX.109 0.206 0.1962
-6187 1LL1-3/4X.125 0.422 0.3472
5531 lLL1-1/4x.109 0.261 0.2472
-1617 1LLlXlX.109 0.206 0.1962
-4875 lLL1-1/2X.125 0.359 0.2962
4219 lLL1-1/4x.109 0.261 0.2472
-1640 lLLlXlX.109 0.206 0.1962
-3562 lLL1-1/2X.109 0.315 0.2972
2906 lLL1-1/4x.109 0.261 0.2472
-1657 1LLlXlX.109 0.206 0.1962
-2250 lLL1-1/4X.109 0.261 0.2472
1995 lLL1-1/4X.109 0.261 0.2472
-1995 lLL1-1/4X.109 0.261 0.2472
-1665 lLLlxlx.109 0.206 0.1962
-- Pa Weld
15637 4.1
-3665 0.6
-8537 1.2
7819 2.1
-2210 0.5
-7190 1.7
7819 1.7
-2210 0.5
-5311 1.3
7819 1.3
-2210 0.5
-4588 1.1
7819 0.9
-2210 0.5
-2751 0.7
7819 0.6
-2210 0.5
-2751 0.6
T-AV1W-B
5.9/ 5.9
2.5,' 2.7
3 ..4/ 3.8
2.7/ 3.0
2.3/ 2.3
3.21 3.5
2.7/ 3.0
2.3/ 2.3
2.9/ 3.3
2.7/ 3.0
2.3/ 2.3
2.9/ 3.3
2.7/ 3.0
2.3/ 2.3
2.7/ 3.0
2.7/ 3.0
2.3/ 2.3
2.7/ 3.0
Vallev Joist West Page 11 V1.71 - Job #ON02915 - 08 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR ORANGE
T604 2 - 32LH253/135 x 52'10.125 Crimped angle Parallel chord Longspan
End Lenqth Depth Slope Holes TOP Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 -0.438 53.063
Opp 6.000 5.000 0.438 53.063
Uniform Live load 135 #/ft full length
Uniform SJI load 253 #/ft full length
Uniform Dead load 118 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
TYPE 2 CLIP @ 21'1" FTE OAL
H1 CLIP @ 10'6", 31'8" & 42'3" FTE OAL
SRT BEARING 3-1/2" @ RE End loads: SJIm-LiveEQukm
Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
32.000 in Deep 630.125 in Design length 1661 # Minimum Shear
30.856 in Effective Depth 704 in4 Ix 0 in4 Minimum Ix
28.000 in Clear Depth L/ 557 Live Defl L/ 297 SJI Defl
1203943 in-#Moment 1.000 in Chord gap 1.149 in Camber
48.000 in Interior Panel 37.531 in Left End 37.531 in Right End
12 Web Vees 7643 # SJI reaction 7643 # SJI reaction
Top Chord: 2-L L2x2x.216 A = 1.635 Y = 0.579 Fy = 50000 Q = 1.000
Bridg < 211" Ix= 0.615 Iy= 2.520 Rx = 0.613 Ry = 1.242 Rz = 0.392
Center: L = 24.000 P = -38792 Pax= -40837 M = 506 2 Fillers
Tag.end panl: L = 37.531 P = -14368 Paz= -23098 M = 2067 No Filler
First point: P = -14368 Pa = -44137 M = 3289
Chord shear: V = 20200 C = -4929 fv = 7334 fc = -3015 f = 7487
Bot Chord: 2-LL2x2x.176 A = 1.346 Y = 0.565 Fy = 50000 Q = 0.981 Ix= 0.516 Iy= 2,042 Rx = 0.619 Ry 1.232 Rz = 0.394
Center: L = 48.000 P = 39019 Pa = 40381
Chord shear: V = 20200 T = 11859 fv = 10179 ft = 8810 f = 11091
Vallev Joist West Page 12 V1.71 - Job #ON02915 - 08 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2. INC #lo002 ~~
2049 KURTZ ST SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
Comments: UBC 1997
CARLSBAD, CA
TAG COLOR ORANGE
T6 04 2 - 32LH253/135 x 52'10.125 Crimped angle Parallel
- Web
T1
v1
c1
T2
v2
c2
T3
v3
c3
T4
1- c4
T5
v5
c5 T6
V6
C6
Ansl Lnsth Shear
58.9 59.7 7166
23.7 33.1 -1857
37.9
37.9
0.0
37.9
37.9
0.0
37.9
37.9
0.0
37.9
37.9
0.0
37.9
37.9
0.0
37.9
39.1 -6337
39.1 5650
30.9 -1617
39.1 -5106
39.1 4562
30.9 -1649
39.1 -4018
39.1 3473
30.9 -1673
39.1 -2929
39.1 2385
30.9 -1691
39.1 -1841
39.1 1661
30.9 -1700
39.1 -1661
Force Member Area- R
13856 2LL1-1/4x.109 0.521 0.387~
-2028 1LL1-1/4X.109 0.261 0.2472
-8028 1L L2X2X.216 0.817 0.3922
7158 lLL1-1/4x.109 0.261 0.2472
-1617 lLLlXlX.109 0.206 0.1962
-6468 lLL1-3/4X.125 0.422 0.3472
5779 lLL1-1/4X.109 0.261 0.2472
-1649 1LLlXlX.109 0.206 0.1962
-5090 lLL1-1/2x.125 0.359 0.2962
4400 lLL1-1/4X.109 0.261 0.2472
-1673 lLLlXlX.109 0.206 0.1962
-3711 lLL1-1/2X.109 0.315 0.2972
3022 lLL1-1/4x.109 0.261 0.2472
-2333 lLL1-1/4X.109 0.261 0.2472
2104 lLL1-1/4X.109 0.261 0.2472
-2104 lLL1-1/4X.109 0.261 0.2472
-1691 lLLlxlx.109 0.206 0.1962
-1700 lLLlxlx.109 0.206 0.1962
chord Longspan
-- Pa Weld T-AvlW-B 15637 4.3 5.8/ 5.8
-3668 0.6 2.5/ 2.7
-8543 1.3
7819 2.2
-2212 0.5
-7192 1.7
7819 1.8 -2212 0.5
-5313 1.4
7819 1.4 -2212 0.5
-4590 1.1
7819 0.9
-2212 0.5
-2752 0.7
7819 0.6
-2212 0.5
-2752 0.6
3.4/ 3.8
2.7/ 3.0
2.3/ 2.3
3.2/ 3.5
2.7/ 3.0
2.3/ 2.3
2.9/ 3.3 2.7/ 3.0
2.3/ 2.3
2.9/ 3.3
2.7/ 3.0
2.3/ 2.3
2.7/ 3.0
2.7/ 3.0
2.3/ 2.3
2.7/ 3.0
Vallev Joist West Page 13 V1.71 - Job #ON02915 - 08 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR ORANGE
T605 1 - 32LH253/135 x 52'10.125 Special Crimped angle
Parallel chord Longspan
End Lenqth DeDth SloDe Holes TOD Chord Ext BCX Holdback Pitch EP/#lL
Taq 6.000 5.000 -0.438 53.063
Opp 6.000 5.000 0.438 53.063
Uniform Live load 135 #/ft full length
Uniform SJI load 253 #/ft full length
Uniform Dead load 118 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point. - TC conc loads: Load Spacinq Location Point TYT)e
300 12'5-118 12 15-1/8 u5 SJI, Dead
4'0 16'5-1/8 U7 SJI, Dead 36'5 300
TYPE 2 CLIP @ 21'1" FTE OAL
H1 CLIP @ 10'6", 31'8" & 42'3" FTE OAL
SHORT BEARING 3-1/2" @ RE
End loads: SJI-mLiveEaukWind
Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kim
Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
32.000 in Deep 630.125 in Design length 1736 # Minimum Shear
30.856 in Effective Depth 704 in4 Ix 0 in4 Minimum Ix
28.000 in Clear Depth L/ 557 Live Defl L/ 282 SJI Defl
1255261 in-#Moment 1.000 in Chord gap 1.149 in Camber
48.000 in Interior Panel 37.531 in Left End 37.531 in Right End
12 Web Vees 8080 # SJI reaction 7805 # SJI reaction
Top Chord: 2-L L2x2x.216 A = 1.635 Y = 0.579 Fy = 50000 Q = 1.000
Bridg c 211" Ix= 0.615 Iy= 2.520 Rx = 0.613 Ry = 1.242 Rz = 0.392
Center: L = 24.000 P = -40582 Pax= -44269 M = 506 4 Fillers
Tag end panl: L = 37.531 P = -15091 Paz= -23098 M = 2067 No Filler
First point: P = -15091 Pa = -44137 M = 3289
Chord shear: V = 20200 C = -5269 fv = 7840 fc = -3223 f = 8004
Bot Chord: 2-LL2x2x.176 A = 1.346 Y 0.565 Fy = 50000 Q = 0.981
Ix= 0.516 Iy= 2.042 RX = 0.619 Ry = 1.232 Rz 0.394
Center: L = 48.000 P = 40682 Pa = 40381
~.,ord shear: V = 20200 T = 12582 fv = 10800 ft = 9347 f = 11768
I Vallev Joist West Page 14 V1.71 - Job #ON02915 - 08 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR ORANGE
T605 1 - 32LH253/135 x 52'10.125 Special Crimped angle
Parallel chord Longspan
Web Ancrl
T 1 58.9
V 1 23.7 c 1 37.9
T 2 37.9 v 2 0.0 c 2 37.9 T 3 37.9 v 3 0.0
c-3 37.9
7 37.9 v 4 0.0 c 4 37.9
T 5 37.9 v 5 0.0 c 5 37.9
T 6 37.9
V 6 0.0
C 6 37.9
Lnqth Shear
59.7 7603
33.7 -1860
39.1 -6774
39.1 6087
30.9 -1624
39.1 -5543
39.1 4999
30.9 -1959
39.1 -4155
39.1 3611 30.9 -1984
39.1 -2766
39.1 2222
30.9 -1701
39.1 -1736
39.1 1736
30.9 -1709
39.1 -1736
Force Member Area- R
14701 2LL1-1/4x.109 0.521 0.387X
-2031 lLL1-1/4x.109 0.261 0.2472
-8581 1L L2x2x.216 0.817 0.3922
-1624 lLLlxlx.109 0.206 0.1962 7711 lLL1-1/4~.109 0.261 0.2472
-7022 lLL1-3/4X.125 0.422 0.3472
6333 lLL1-1/4X.109 0.261 0.2472
-1959 lLLlxlx.109 0.206 0.1962
-5263 lLL1-1/2x.125 0.359 0.2962
4574 lLL1-1/4x.109 0.261 0.2472
-1984 lLLlxlx.109 0.206 0.1962
-3505 lLL1-1/2x.109 0.315 0.2972
2816 lLL1-1/4x.109 0.261 0.2472
-1701 lLLlxlx.109 0.206 0.1962
2199 lLL1-1/4x.109 0.261 0.2472
-1709 lLLlxlx.109 0.206 0.1962
-2199 lLL1-1/4x.109 0.261 0.2472
-2199 lLL1-1/4~.109 0.261 0.2472
-- Pa Weld
15637 4.5
-3668 0.6
-8543 1.3 7819 2.4
-2212 0.5
-7192 1.9
7819 2.0
-2212 0.6
-5313 1.4
7819 1.4
-2212 0.6
-4590 1.1 7819 0.9
-2212 0.5
-2752 0.7 7819 0.7
-2212 0.5
-2752 0.7
T - AVlW - B
5.8/ 5.8
2.5/ 2.7
3.4/ 3.8
2.7/ 3.0
3.2/ 3.5
2.3/ 2.3
2.3/ 2.3
2.7/ 3.0
2.9/ 3.3
2.7/ 3.0
2.3/ 2.3
2.7/ 3.0
2.7/ 3.0
2.7/ 3.0
2.3/ 2.3
2.7/ 3.0
2.9/ 3.3
2.3/ 2.3
Vallev Joist West Page 15 V1.71
,_ Job #ON02915 - 08 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002 2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS CARLSBAD, CA
Comments: UBC 1997 TAG COLOR ORANGE
T606 1 - 32LH246/131 x 52' 6.125 Special Crimped angle Parallel chord Longspan
End Lenuth Dewth Slope Holes TOV Chord Ext BCX Holdback Pitch EP/#lL
Tau 6.000 5.000 -0.438 Y 51.062
Opp 6.000 5.000 0.438 51.062
Uniform Live load 131 #/ft full length
Uniform SJI load 246 #/ft full length
Uniform Dead load 115 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point. An additional Dead load of lOOO# may occur at any top chord panel point.
TC conc loads: Load Swacinq Location Point i-
300 12'3-118 1213-1/8 u5 SJI, Dead
4'0 16'3-1/8 U7 SJI, Dead 300 36'3
H1 CLIP @ 10'6", 31'8" ti 42'3" FTE OAL
TYPE 2 CLIPS @ 21'1" FTE OAL
SHORT BEARING 3-1/2" @ RE
End loads: - SJI mmidaWind Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
32.000 in Deep 626.125 in Design length 1679 # Minimum Shear
30.856 in Effective Depth 704 in4 Ix 0 in4 Minimum Ix
28.000 in Clear Depth L/ 585 Live Defl L/ 296 SJI Defl
1211833 in-#Moment 1.000 in Chord gap 1.134 in Camber
48.000 in Interior Panel 36.531 in Left End 36.531 in Right End
12 Web Vees 7856 # SJI reaction 7580 # SJI reaction
TOD Chord: 2-L L2x2x.216 A = 1.635 Y = 0.579 Fy = 50000 Q = 1.000
Bridg c 211" Ix= 0.615 Iy= 2.520 Rx = 0.613 Ry = 1.242 Rz = 0.392
Center: L = 24.000 P = -39179 Pax= -40837 M = 492 2 Fillers
Tag end panl: L = 36.531 P = -14380 Paz= -23931 M = 1906 No Filler
First point: P = -14380 Pa = -44137 M = 3027
Chord shear: V = 20200 C = -5146 fv = 7657 fc = -3148 f = 7817
Bot Chord: 2-LL2x2x.176 A = 1.346 Y = 0.565 Fy = 50000 Q = 0.981
Ix= 0.516 Iy= 2.042 RX = 0.619 Ry = 1.232 RZ = 0.394 - Center: L = 48.000 P = 39274 Pa = 40381
~.,ord shear: V = 20200 T = 11771 fv = 10516 ft = 8745 f = 11388
Vallev Joist West Page 16 V1.71 - Job #ON02915 - 08 By ASM Entered 6/20/00 .Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR ORANGE
T606 1 - 32LH246/131 x 52' 6.125 Special Crimped angle
Parallel chord Longspan
Web Ansl Lncrth Shear Force Member Area- R -__ Pa Weld T-Av1W-B T 157.8 58.0 7403 13906 2LL1-1/4~.109 0.521 0.387X 15637 4.3 5.7/ 5.7
V 122.1 33.3 -1816 -1960 lLL1-1/4x.109 0.261 0.2472 -3737 0.6 2.5/ 2.7
C 1 37.9 39.1 -6616 -8381 1L L2X2X.216 0.817 0.3922 -8543 1.3
T 2 37.9 39.1
V 2 0.0 30.9 c 2 37.9 39.1
T 3 37.9 39.1
V 3 0.0 30.9 c 3 37.9 39.1
T- 37.9 39.1
b * 0.0 30.9 c 4 37.9 39.1
T 5 37.9 39.1
V 5 0.0 .30.9 c 5 37.9 39.1
T 6 37.9 39.1
V 6 0.0 30.9 C 6 37.9 39.1
5957
-1606
-5427
4896
-1940
-4066 3536
-1965
-2705
2175
-1680
-1679
1679
-1688
-1679
7547
-1606
-6875
6203
-1940
-5151 4479
-1965
-3427
2755
-1680
-2128
2128
-1688
-2128
lLL1-1/4X.109
lLL1-1/4X.109
lLL1-1/4X.109
lLL1-1/2X.109
lLL1-1/4X.109
1LL1-1/4x.109
lLL1-1/4X,. 109
lLL1-1/4X.109
1LLlXlX.lO9
1LL1-3/4X.125
1LLlXlX.lO9
lLL1-1/2~.125
1LLlXlX.lO9
1LLlXlX.lO9
1LLlXlX.lO9
0.261 0..2472
0.206 0.1962
0.422 0.3472
0.261 0.2472
0.206 0.1962
0.359 0.2962
0.261 0.2472
0.206 0.1962
0.315 0.2972
0.261 0.2472
0.206 0.1962
0.261 0.2472
0.261 0.2472
0.206 0.1962
0.261 0.2472
7819
-2212
-7192
7819
-2212
-5313
7819
-2212
-4590
7819
-2212
-2752 7819
-2212
-2752
2.3
0.5
1.9 1.9
0.6
1.4
1.4
0.6
1.1
0.9
0.5
0.7 0.7
0.5
0.7
3.4/ 3.8
2.7/ 3.0
2.3/ 2.3
3.2/ 3.5 2.7/ 3.0
2.3) 2.3
2.9/ 3.3 2.7/ 3.0
2.3/ 2.3
2.9/ 3.3 2.7/ 3.0
2.3/ 2.3
2.7/ 3.0 2.7/ 3.0
2.3/ 2.3
2.7/ 3.0
Valley Joist West Page 17 V1.71
Job #ON02915 - 08 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
Comments: UBC 19'97
CARLSBAD, CA
TAG COLOR ORANGE
T607 2 - 32LH240/128 x 52' 6.625 Crimped angle Parallel chord Longspan
End Lenqth DeDth Slooe Holes TOD Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 -0.438 51.312
Opp 6.000 5.000 0.438 51.312
Uniform Live load 128 #/ft full length
Uniform SJI load 240 #/ft full length
Uniform Dead load 112 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
H1 CLIP @ 10'6", 31'8" & 42'3" FTE OAL
TYPE 2 CLIPS @ 21'1" FTE OAL ,-RT BEARING 3-1/2" @ RE
End loads: SJINtUp-LiveEcntkWind
Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips 32.000 in Deep 626.625 in Design length 1567 # Minimum Shear
30.871 in Effective Depth 636 in4 Ix 0 in4 Minimum Ix
28.000 in Clear Depth L/ 540 Live Defl L/ 288 SJI Defl
113 83 03 ,in- #Moment 1.000 in Chord gap 1.136 in Camber
48.000 in Interior Panel 36.656 in Left End 36.656 in Right End
12 Web Vees 7266 # SJI reaction 7266 # SJI reaction
TOD Chord: 2-LL2x2x.187 A = 1.426 Y = 0.569 Fy = 50000 Q = 1.000
Bridg c 210" Ix= 0.544 Iy= 2.173 RX = 0.617 Ry = 1.234 RZ = 0.394
Center: L = 24.000 P = -36657 Pax= -38638 M = 480 6 Fillers
Tag end panl: L = 36.656 P = -13527 Paz= -20879 M = 1872 No Filler
First point: P = -13527 Pa = -38504 M = 2974
Chord shear: V = 20200 C = -4703 fv = 8088 fc = -3298 f = 8254
Bot Chord: 2-L L2x2x.163 A = 1.251 Y = 0.560 Fy = 50000 Q = 0.952
Ix= 0.482 Iy= 1.888 RX = 0.621 Ry = 1.229 RZ = 0.395
Center: L = 48.000 P = 36873 Pa = 37526
Chord shear: V = 20200 T = 10896 fv = 10462 ft = 8711 f = 11332
Vallev Joist West Page 18 V1.71
P Job #ON02915 - 08 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Pro] ect : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR ORANGE
T607 2 - 32LH240/128 x 52' 6.625 Crimped angle Parallel
-- Pa Weld T 158.0 58.2 6821 12855 2LL1-1/4x.109 0.521 0.387~ 15637 4.0
Web Anql Lnqth Shear Force Member Area- R
V 1 22.3 33.4 -1796 -1941 lLL1-1/4~.109 0.261 0.2472 -3726 0.6
C 137.9 39.1 -6050 -7663 1L L2~2x.216 0.817 0.3922 -8537 1.2 T 2 37.9 39.1 5405 V 2 0.0 30.9 -1585
C 2 37.9 39.1 -4886 T 3 37.9 39.1 4368 V 3 0.0 30.9 -1616 C 3 37.9 39.1 -3850
T 4 37.9 39.1 3332
v-' 0.0 30.9 -1639
L i 37.9 39.1 -2813
T 5 37.9 39.1 2295
V 5 0.0 30.9 -1655
C 5 37.9 39.1 -1777
T 6 37.9 39.1 1567
V 6 0.0 30.9 -1663
C 6 37.9, 39.1 -1567
6846
-1585
-6189
5533
-1616 -4876
4220
-1639
-3563
2907
-1655 -2250
1984
-1663 -1984
1LL1- 1/4x. 109
lLL1-1/4X.109
lLL1-1/4X.109
lLL1-1/2X.109
lLL1-1/4X.109
lLL1-1/4X.109
lLL1-1/4X.109
lLL1-1/4X.109
1LLlXlX.lO9
lLL1-3/4X.125
1LLlXlX.lO9 1LL1-1/2X.125
1LLlXlX.lO9
1LLlXlX.lO9
1LLlXlX.lO9
0.261 0.2472
0.206 0.1962 0.422 0.3472
0.261 0.2472
0.206 0.1962
0.359 0.2962
0.261 0.2472
0.206 0,1962
0.315 0.2972
0.261 0.2472
0.206 0.1962
0.261 0.2472
0.261 0.2472
0.206 0.1962
0.261 0.2472
7819
-2210 -7190
7819
-2210
-5311
7819
-2210
-4588
7819
-2210
-2751
7819
-2210
-2751
2.1
0.5
1.7
1.7
0.5
1.3
1.3
0.5
1.1
0.9
0.5
0.7
0.6
0.5
0.6
chord Longspan
T - AVl W - B
5.8/ 5.8
2.5; 2.7
2.7/ 3.0
3.2/ 3.5
3.4/ 3.8
2.3/ 2.3
2.7; 3.0
2.3/ 2.3
2.9/ 3.3
2.7/ 3.0
2.3/ 2.3
2.9/ 3.3
2.7/ 3.0
2.3; 2.3
2.7/ 3.0
2.7/ 3.0
2.7/ 3.0
2.3/ 2.3
Vallev Joist West Page 19 V1.71 - Job #ON02915 - 08 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002 2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR ORANGE
T608 1 - 32LH253/135 x 52' 6.625 Crimped angle Parallel chord Longspan
End Lenqth Depth SlaDe Holes TOR Chord Ext BCX Holdback Pitch EP/#lL
Tag 6.000 5.000 -0.438 51.312
Opp 6.000 5.000 0.438 51.312
Uniform Live load 135 #/ft full length
Uniform SJI load 253 #/ft full length
Uniform Dead load 118 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
H1 CLIP @ 10'6", 31'8" ti 42'3" FTE OAL
TYPE 2 CLIPS @ 21'1" FTE OAL
.nRT BEARING 3-1/2" @ RE
End loads: - SJI mDeadmEaukWind
Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
32.000 in Deep 626.625 in Design length 1651 # Minimum Shear
30.856 in Effective Depth 704 in4 Ix 0 in4 Minimum Ix
28.000 in Clear Depth L/ 566 Live Defl L/ 302 SJI Defl
1191476 in-#Moment 1.000 in Chord gap 1.136 in Camber
48.000 in Interior Panel 36.656 in Left End 36.656 in Right End
12 Web Vees 7606 # SJI reaction 7606 # SJI reaction
TOD Chord: 2-L L2x2x.216 A = 1.635 Y = 0.579 Fy = 50000 Q = 1.000
Bridg c 211" Ix= 0.615 Iy= 2.520 Rx = 0.613 Ry = 1.242 Rz = 0.392 2 Fillers
Tag end panl: L = 36.656 P = -13974 Paz= -23828 M = 1974 No Filler
Center: L = 24.000 P = -38388 Pax= -40837 M = 506
First point: P = -13974 Pa = -44137 M = 3135
Chord shear: V = 20200 C s -4923 fV = 7326 fC = -3012 f = 7479
Bot Chord: 2-LL2x2x.176 A = 1.346 Y = 0.565 Fy = 50000 Q = 0.981
Ix= 0.516 Iy= 2.042 Rx = 0.619 Ry = 1.232 RZ = 0.394
Chord shear: V = 20200 T = 11412 fV = 10143 ft = 8478 f = 10993 Center: L = 48.000 P = 38615 Pa = 40381
Vallev Joist West Page 20 V1.71
P Job #ON02915 - 08 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR ORANGE
T608 1 - 32LH253/135 x 52’ 6.625 Crimped angle Parallel chord Longspan
Web Anql
T 1 58.0 v 1 22.3 c 1 37.9 T 2 37.9 v 2 0.0 c 2 37.9
T 3 37.9 v 3 0.0 c 3 37.9
T 4 37.9
TF. 0.0 c t 37.9
T 5 37.9 v 5 0.0 c 5 37.9
T 6 37.9
V 6 0.0
C 6 37.9
Lnsth
58.2
33.4
39.1
39.1
30.9
39.1
39.1
30.9
39.1 39.1
30.9
39.1
39.1
30.9
39.1
39.1
30.9
39.1
Shear
7141
-1837
-6329
5652
-1615
-5107
4563
-1647
-4019
3475
-1671
-2930
2386
-1689
-1842
1651
-1698
-1651
Force ,Member Area- R
13462 2LL1-1/4x.109 0.521 0.387~
-1986 lLL1-1/4X.109 0.261 0.2472
-8019 1L L2~2X.216 0.817 0.3922
7160 lLL1-1/4X.109 0.261 0.2472
-1615 lLLlXlX.109 0.206 0.1962
-6470 lLL1-3/4X.125 0.422 0.3472
5781 lLL1-1/4x.109 0.261 0.2472
-1647 lLLlXlX.109 0.206 0.1962
-5091 lLL1-1/2X.125 0.359 0.2962
4402 lLL1-1/4~.109 0.261 0.2472
-1671 lLLlXlX.109 0.206 0.1962
-3712 lLL1-1/2~.109 0.315 0.2972
3023 lLL1-1/4X.109 0.261 0.2472
-1689 lLLlXlX.109 0.206 0.1962
-2333 lLL1-1/4X.109 0.261 0.2472
-1698 1LLlXlX.109 0.206 0.1962
-2092 lLL1-1/4x.109 0.261 0.2472
2092 lLL1-1/4x.109 0.261 0.2472
-- Pa Weld
15637 4.2
-3729 0.6
-8543 1.3
7819 2.2
-2212 0.5
-7192 1.7
7819 1.8
-2212 0.5
-5313 1.4
7819 1.4
-2212 0.5
-4590 1.1
7819 0.9
-2212 0.5
-2752 0.7 7819 0.6
-2212 0.5
-2752 0.6
T-AVlW-B
5.7/ 5.7
3.4/ 3.8
2.5/ 2.7
2.7/ 3.0
2.3/ 2.3
3.2/ 3.5
2.7/ 3.0
2.3/ 2.3
2.7/ 3.0
2.9/ 3.3
2.3/ 2.3
2.9/ 3.3
2.7/ 3.0
2.3/ 2.3
2.7/ 3.0
2.7/ 3.0
2.3/ 2.3
2.7/ 3.0
Vallev Joist West Page 21 V1.71
Job #ON02915 - 08 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR ORANGE
5601 1 - 30K246/131 x 45'10.125 Special Crimped angle
Parallel chord Shortspan
End Lenqth Depth Slope Holes TOD Chord Ext BCX Holdback Pitch EP/#lL
Taq 4.000 4.875 -0.438 Y E 0' 1.500 54.000
opp 4.000 5.000 0.438 54.000
Uniform Live load 131 #/ft full length
Uniform SJI load 246 #/ft full length
Uniform Dead load 115 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
H1 CLIP @ 9'2", 18'5", & 36'10" FTE OAL
FE 1 CLIP @ 27'7" FTE OAL
S. 3RT BEARING 3-1/2" @ RE
End loads: - SJI NtUlsDead-EaukWind Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
30.000 in Deep 546.125 in Design length 1399 # Minimum Shear
28.940 in Effective Depth 491 in4 Ix 0 in4 Minimum Ix
26.250 in Clear Depth L/ 615 Live Defl L/ 328 SJI Defl
911576 in-#Moment 1.000 in Chord gap 0.863 in Camber
48.000 in Interior Panel 28.531 in Left End 28.531 in Right End
11 Web Vees 6598 # SJI reaction 6598 # SJI reaction
Tow Chord: 2-LL2xZx.176 A = 1.346 Y = 0.565 Fy = 50000 Q = 0.981
Bridg < 179" Ix= 0.516 Iy= 2.042 Rx = 0.619 Ry = 1.232 Rz = 0.394 Center: L = 24.000 P = -31498 Pax= -34397 6 Fillers
Eighth: L = 24.000 P = -28086 Paz= -29932 No Fillers
Tag end panl: L = 28.531 P = -13777 Paz= -24514 M = 1180 No Filler
First point: P = -13777 Pa = -36343 M = 1812
Chord shear: V = 20200 C = -982 fv = 7977 fc = -730 f = 7986
Bot Chord: 2-LL1-3/4x.155 A = 1.037 Y = 0.495 Fy = 50000 Q = 0.983
Ix= 0.304 Iy= 1.330 Rx = 0.541 Ry = 1.133 RZ = 0.345
Center: L = 48.000 P = 30886 Pa = 31109
Chord shear: V = 20200 T = 11158 fv = 11447 ft = 10761 f = 12649
c
Valley Joist West Page 22 V1.71 - Job #ON02915 - 08 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997 TAG COLOR ORANGE
5601 1 - 30K246/131 x 45'10.125 Special Crimped angle
Parallel chord Shortspan
Web Awl Lnqth Shear Force Member Area- R -__ Pa Weld
' T 160.9 54.0 6210 12770 AU - 29/32 0.645 0.226 17406 1.4
V 1 39.0 c 1 9.9
T 2 39.7 v 2 0.0 c 2 39.7 T 3 39.7 v 3 0.0 c 3 39.7 Tr 39.7
'i/ r 0.0 c 4 39.7
T 5 39.7 v 5 0.0 c 5 39.7
T 6 39.7
V 6 0.0
33.8
26.6
34.1
26.3
34.1
34.1
26.3
34.1
34.1
26.3
34.1
34.1
26.3
34.1 34.1
26.3
-1638
-5616
5034
-1581
-4498
3962
-1611
-3426
2890
-1632
-2354
1818
-1645
-1399
1399
-1649
-2109 lLL1-1/2X.109 0.315 0.2972
-5701 I,LL1-3/4x.125 0.422 0.3472
6539 lLL1-1/4x.109 0.261 0.2472
-1581 1LLlXlX.109 0.206 0.1962
-5843 1LL1-3/4X.125 0.422 0.3472
-1611 lLLlXlX.109 0.206 0.1962
3754 lLL1-1/4X.109 0.261 0.2472
-1632 1LLlXlX.109 0.206 0.1962
-3058 lLL1-1/2X.109 0.315 0.2972
2362 lLL1-1/4~.109 0.261 0.2472
-1645 lLLlXlX.109 0.206 0.1962
1818 lLL1-1/4X.109 0.261 0.2472
5147 lLL1-1/4x.109 0.261 0.2472
-4450 lLL1-3/4x.125 0.422 0.3472
-1818 lLL1-1/4x.109 0.261 0.2472
-1649 lLLlxlx.109 0.206 0.1962
-3638 0.7
-6627 1.5
7819 2.0
-1719 0.5
-6153 1.6
7819 1.6
-1719 0.5
-6153 1.2
7819 1.2
-1719 0.5
-3573 0.9
7819 0.7
-1719 0.5
-2034 0.6
-1719 0.5
7819 0.6
T - AVlW - B
2.9/ 3.0
3.0; 2.8
2.7/ 2.7
2.3/ 2.0
3.2/ 3.2
2.7/ 2.7
2.3/ 2.0
3.2) 3.2
2.7/ 2.7
2.3/ 2.0
2.9/ 3.0
2.7,' 2.7
2.3; 2.0
2.7/ 2.7
2.7/ 2.7
2.3/ 2.0
Vallev Joist West Page 23 V1.71 - Job #ON02915 - 08 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR ORANGE
J602 1 - 30K253/135 x 45' 7.625 Special Crimped angle
End Lenqth Depth Sloue Holes TOR Chord Ext BCX Holdback Pitch EP/#lL
Parallel chord Shortspan
Tag 4.000 4.875 -0.438 E 0' 2.000 54.000
Opp 4.000 5.000 0.438 54.000
Uniform Live load 135 #/ft full length
Uniform SJI load 253 #/ft full length
Uniform Dead load 118 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
H1 CLIP @ 9'2", 18'5", & 36'10" FTE OAL
P?E 1 CLIP @ 27'7" FTE OAL
LJRT BEARING 3-1/2" @ RE
End loads: __ SJI. Dead Live Wind
Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
30.000 in Deep 543.625 in Design length 1433 # Minimum Shear
28.940 in Effective Deuth 491 in4 Ix 0 in4 Minimum Ix - 26.250 in Clear Depth
923369 in-#Moment
48.000 in Interior Panel
11 Web Vees
TOR Chord: 2-LL2x2x.176
Bridg e 179" Ix= 0.516
Center: L = 24.000
Eighth: L = 24.000
Tag end panl: L = 27.906
First point:
Chord shear: V = 20200
Bot Chord: 2-LL1-3/4x.155
Ix= 0.304
Center: L = 48.000
Chord shear: V = 20200
L/ 606 Live Defl L/ 323 SJI Defl
1.000 in Chord gap 0.855 in Camber
27.906 in Left End 27.906 in Right End
6731 # SJI reaction
A = 1.346
Iy= 2.042 P = -31906
P = -28411
P = -13978 P = -13978 c = -757
A = 1.037
Iy= 1.330 P = 31362
T = 11393
Y = 0.565
Rx = 0.619
Pax= -34397
Paz= -29932
Paz= -24862
Pa = -36343
fv = 8161
Y = 0.495
Rx = 0.541
Pa = 31109
fv = 11688
6731 # SJI reaction
Fy = 50000
Ry = 1.232
M = 1163
M = 1778
fc = -562
Fy = 50000
Ry = 1.133
ft = 10987
Q = 0. 8.
Rz = 0.394
6 Fillers
No Fillers
No Filler
f = 8166
Q = 0.983
Rz = 0.345
f = 12915
Vallev Joist West Page 24 V1.71
r Job #ON02915 - 08 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR ORANGE
J602 1 - 30K253/135 x 45' 7.625 Special Crimped angle
Parallel chord Shortspan
Web Anql Lnqth Shear
T 1 60.9 54.0 6341
V 139.8 34.2 -1642
C 1 7.5 26.5 -5746
T 2 39.7 34.1 5154
V 2 0.0 26.3 -1596
C 2 39.7 34.1 -4604 T 3 39.7 34.1 4054
V 3 0.0 26.3 -1626 C 3 39.7 34.1 -3504
T'- 39.7 34.1 2954
V + 0.0 26.3 -1648
C 4 39.7 34.1 -2403 T 5 39.7 34.1 1853
V 5 0.0 26.3 -1661
C 5 39.7 34.1 -1433 T 6 39.7 34.1 1433
V 6 0.0 26.3 -1666
Force Member
13039 AU - 29/32
-2137 lLL1-1/2X.109
-5795 lLL1-3/4X.125
6696 lLL1-1/4X.109
-1596 lLLlXlX.109
-5981 1LL1-3/4X.125
5267 lLL1-1/4x.109
-1626 lLLlXlX.109
-4552 lLL1-3/4X.125
-1648 1LLlXlX.109
3837 lLL1-1/4X.109
-3122 1~~1-1/2~.109
2408 lLL1-1/4X.109
-1661 1LLlXlX.109
-1861 lLL1-1/4X.109
1861 lLL1-1/4X.109
-1666 lLLlXlX.109
Area
0.645
0.315 0.422
0.261
0.206
0.422
0.261
0.206
0.422
0.261
0.206
0.315
0.261
0.206
'0.261
0.261
0.206
0.226
0.2972
0.3472
0.1962
0.3472
0.1962
0.3472
0.2472
0.1962
0.2972
0.2472
0.1962
0.2472
0.2472
0.1962
0.2472
0.2472
Pa Weld -- 17406 1.4
-3562 0.7
-6672 1.6
7819 2.1
-1719 0.5
-6153 1.6
7819 1.6
-1719 0.5
-6153 1.2
7819 1.2
-1719 0.5
-3573 1.0
7819 0.7
-1719 0.5
-2034 0.6
7819 0.6
-1719 0.5
T -AvlW - B
2.9/ 3.0
3.0/ 2.8
2.7/ 2.7
2.3/ 2.0
3.2/ 3.2
2.7/ 2.7
2.3/ 2.0
3.2/ 3.2
2.7/ 2.7
2.3/ 2.0
2.9) 3.0
2.7/ 2.7
2.3/ 2.0
2.7/ 2.7
2.7/ 2.7
2.3/ 2.0
Vallev Joist West Page 25 V1.71 - Job #ON02915 - 08 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS CARLSBAD, CA
Comments: LJBC 1997
TAG COLOR ORANGE
5603 7 - 30K240/128 x 45'10.125 Special Crimped angle
Parallel chord Shortspan
End Lenqth Depth Slope Holes TOR Chord Ext BCX Holdback Pitch EP/#lL
Taq 4.000 4.875 -0.438 E 0' 2.000 54.000
Opp 4.000 5.000 0.438 54.000
Uniform Live load 128 #/ft full length
Uniform SJI load 240 #/ft full length
Uniform Dead load 112 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point.
H1 CLIP @ 9'2", 18'5", & 36'10" FTE OAL
.c'E 1 CLIP @ 27'7" FTE OAL
5i~dRT BEARING 3-1/2" @ RE
End loads: __ SJI -DeadaEcrukWind
Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
30.000 in Deep 546.12.5 in Design length 1365 # Minimum Shear
28.945 in Effective Depth 476 in4 Ix 0 in4 Minimum Ix
26.250 in Clear Depth L/ 610 Live Defl L/ 325 SJI Defl
895283 in-#Moment 1.000 in Chord gap 0.863 in Camber
48.000 in Interior Panel . 28.531 in Left End 28.531 in Right End
13 Web Vees 6461 # SJI reaction 6461 # SJI reaction
TOR Chord: 2-L L2x2x.163 A = 1.251 Y = 0.560 Fy = 50000 Q = 0.952 Bridg e 178" Ix= 0,482 Iy= 1.888 RX = 0.621 Ry = 1.229 RZ = 0.395
Center: L = 24.000 P = -30930 Pax= -31142 10 Fillers
Sixth: L = 24.000 P = -23410 Paz= -27205 No Fillers
Tag end panl: L = 28.531 P = -13572 Paz= -22353 M = 1151 NO Filler
First point: P'= -13572 Pa = -33773 M = 1767
Chord shear: V = 20200 C = -962 fv = 8437 fc = -769 f = 8446
2-LL1-3/4~.155 A = 1.037 Y = 0.495 Fy = 50000 Q = 0.983
Ix= 0.304 Iy= 1.330 RX = 0.541 Ry = 1.133 RZ = 0.345
Center: L = 48.000 P = 30242 Pa = 31109
Chord shear: V = 20200 T = 10924 fv = 11209 ft = 10535 f = 12385
r-
Vallev Joist West Page 26 V1.71 - Job #ON02915 - 08 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURT2 ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR ORANGE
5603 7 - 30K240/128 x 45'10.125 Special Crimped angle
Parallel chord Shortspan
web
T1
v1
c1
T2
v2 c2
T3
v3
c3
7- \+
c4
T5
v5
c5
T6
V6
Ansl Lnqth Shear
60.9 54.0 6081
39.0 33.8 -1623
9.9 26.6 -5501
39.7 34.1 4932
0.0 26.3 -1568
39.7 34.1 -4408
39.7 34.1 3884
0.0 26.3 -1597
39.7 34.1 -3360
0.0 26.3 -1618
39.7 34.1 -2312 39.7 34.1 1788
0.0 26.3 -1630
39.7 34.1 -1365
39.7 34.1 1365
0.0, 26.3 -1635
39.7 34.1 2836
Force Member Area- R
12502 AU - 29/32 0.645 0.226
-2090 lLL1-1/4X.109 0.261 0.2472
-5584 1LL1-3/4X.125 0.422 0.3472
6406 lLL1-1/4X.109 0.261 0.2472
-1568 lLLlXlX.109 0.206 0.1962
-5726 lLL1-3/4X.125 0.422 0.3472
5045 lLL1-1/4x.109 0.261 0.2472
-1597 1LLlXlX.109 0.206 0.1962
-4364 1LL1-3/4X.125 0.422 0.3472
3684 lLL1-1/4x.109 0.261 0.2472
-1618 lLLlXlX.109 0.206 0.1962
-3003 lLL1-1/2X.109 0.315 0.2972
2323 lLL1-1/4X.109 0.261 0.2472
-1630 1LLlXlX.109 0.206 0.1962
-1774 lLL1-1/4X.109 0.261 0.2472
1774 lLL1-1/4X.109 0.261 0.2472
-1635 lLLlXlX.109 0.206 0.1962
-- Pa Weld
17406 1.4
-2072 0.6
-6627 1.5
7819 2.0
-1719 0.5
-6154 1.5
7819 1.6
-1719 0.5
-6154 1.2
7819 1.1
-1719 0.5
-3573 0.9
7819 0.7
-1719 0.5
-2035 0.5
7819 0.5
-1719 0.5
T - AVlW - B
2.7/ 2.7
3.0/ 2.8
2.71 2.7
3.2/ 3.2
2.71 2.7
2.3/ 2.0
2.7/ 2.7
2.3/ 2.0
2.91 3.0
2.7/ 2.7
2.7,' 2.7
2.71 2.7
2.31 2.0
2.3/ 2.0
3.21 3.2
2.3/ 2.0
c
Valley Joist West Page 27 V1.71 - Job #ON02915 - 08 By ASM Entered 6/20/00 Revised 2/13/01
Customer: JD2, INC #lo002
2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project : ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR ORANGE
J604 3 - 30K253/135 x 45'10.125 Special Crimped angle
Parallel chord Shortspan
End Lenqth Depth Slope Holes Tor, Chord Ext BCX Holdback Pitch EP/#lL
Tag 4.000 4.875 -0.438 E 0' 2.000 54.000
opp 4.000 5.000 0.438 54.000
Uniform Live load 135 #/ft full length
Uniform SJI load 253 #/ft full length
Uniform Dead load 118 #/ft full length
An additional SJI load of lOOO# may occur at any top chord panel point.
An additional Dead load of lOOO# may occur at any top chord panel point. H1 CLIP @ 9'2", 18'5", & 36'10" FTE OAL
T/?E 1 CLIP @ 27'7" FTE OAL
LdRT BEARING 3-1/2" @ RE End loads: - SJI NtUpmbEQuk-
Left TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
Right TC axial load: 0.0 0.0 0.0 0.0 7.2 0.0 Kips
30.000 in Deep 546.125 in Design length 1439 # Minimum Shear
28.882 in Effective Depth 507 in4 Ix 0 in4 Minimum Ix
26.000 in Clear Depth L/ 616 Live Defl L/ 329 SJI Defl
929990 in-#Moment 1.000 in Chord gap 0.863 in Camber
48.000 in Interior Panel 28.531 in Left End 28.531 in Right End
6757 # SJI reaction 11 Web Vees 6757 # SJI reaction
Tor, Chord: 2-LL2x2x.176
Bridg c 179" Ix= 0.516
Center: L = 24.000
Eighth: L = 24.000
Tag end panl: L = 28.531
First point:
Chord shear: V = 20200
Bot Chord: 2-L L2x2x.143
Center: L = 48.000
Chord shear: V = 20200
Ix= 0.429
A = 1.346
Iy= 2.042 P = -32200 P = -28700
P = -14030
P = -14030 c = -1008
A = 1.103
Iy= 1.652 P = 31695 T = 11453
Y = 0.565
Rx = 0.619
Pax= -34397
Paz= -29932
Paz= -24514
Pa = -36343
fv = 8168
Y = 0.553
Rx = 0.624
Pa = 33093
fv = 11121
Fy = 50000
Ry = 1.232
M = 1214
M = 1863
fc = -749
Fy = 50000
Ry = 1.224
ft = 10382
Q = 0.981
Rz = 0.394
6 Fillers
No Fillers No Filler
f = 8177
Q = 0.898
Rz = 0.396
f = 12273
Vallev Joist West Page 28 V1.71
Job #ON02915 - 08 By ASM Entered 6/20/00 Revised 2/13/01 -
Customer: JD2, INC #lo002 2049 KURTZ ST
SAN DIEGO, CA 92110-2014
619/295-3153 FAX# 609/295-3628 PO# 00-364
Project: ASTON VIEWS
CARLSBAD, CA
Comments: UBC 1997
TAG COLOR ORANGE
J604 3 - 30K253/135 x 45'10.125 Special Crimped angle
Parallel chord Shortspan
Web Anql Lnqth Shear
T 1 61.0 53.5 6361
V 139.1 33.5 -1656
C 1 9.9 26.4 -5750
T 2 39.7 33.8 5153
V 2 0.0 26.0 -1597
C 2 39.7 33.8 -4603
T 3 39.7 33.8 4053
V 3 0.0 26.0 -1628
C 3 39.7 33.8 -3503
TF 39.7 33.8 2953
V , 0.0 26.0 -1650
C 4 39.7 33.8 -2403 T 5 39.7 33.8 1853
V 5 0.0 26.0 -1663
C 5 39.7 33.8 -1439 T 6 39.7 33.8 1439 V 6 0.0 26.0 -1667
Force Member Area- R
13101 AU - 29/32 0.645 0.226
-2134 lLL1-1/2X.109 0.315 0.2972
-5838 lLL1-3/4~.125 0.422 0.3472
6699 lLL1-1/4x.109 0.261 0.2472
-1597 lLLlxlx.109 0.206 0.1962
-5984 lLL1-3/4x.125 0.422 0.3472
-1628 lLLlxlx.109 0.206 0.1962
3839 lLL1-1/4x.109 0.261 0.2472
-3124 lLL1-1/2x.109 0.315 0.2972
2409 lLL1-1/4x.109 0.261 0.2472
-1663 1LLlxlx.109 0.206 0.1962
1871 lLL1-1/4x.109 0.261 0.2472
-1667 1LLlxlx.109 0.206 0.1962
5269 lLL1-1/4x.109 0.261 0.2472
-4554 1LL1-3/4X.125 0.422 0.3472
-1650 1LLlXlX.109 0.206 0.1962
-1871 lLL1-1/4X.109 0.261 0.2472
-- Pa Weld
17406 1.4
-3702 0.7
-6693 1.6 7819 2.1
-1752 0.5
-6221 1.6
7819 1.6
-1752 0.5
-6221 1.2
7819 1.2
-1752 0.5
-3636 1.0
7819 0.7
-1752 0.5
-2070 0.6
7819 0.6
-1752 0.5
T - Avl W - B
2.9/ 3.3
3.0/ 3.0
2.3/ 2.3
2.71 3.1
3.2/ 3.6
2.7/ 3.1
2.3/ 2.3
3.2/ 3.6
2.71 3.1
2.3/ 2.3
2.9i 3.3
2.7/ 3.1
2.3/ 2.3
2.7/ 3.1
2.7/ 3.1
2.3/ 2.3
,-