HomeMy WebLinkAbout1808 Aston Ave; ; PC2019-0039; PermitPlan Check Permit
Print Date: 10/22/2019
Job Address: 1808 Aston Ave
Permit Type: BLDG-Plan Check Work Class: Commercial
Parcel No: 2121200700 Lot#:
Valuation: $ 0.00 Reference#:
Occupancy Group: Construction Type
# Dwelling Units: Bathrooms:
Bedrooms: Orig. Plan Check#:
Plan Check#:
Project Title:
Description: MCR ASTON: CREATE 3 SPEC SUITES (220,230 AND 235) TOTAL AREA a 8,554
FEE
MANUAL BUILDING PLAN CHECK FEE
Total Fees: $ 1,170.00
Building Division
Owner:
M C R ASTON LLC
1808 Aston Ave, 180
CARLSBAD,CA 92008
Total Payments To Date : $ 1,170.00
(city of
Carlsbad
Permit No: PC2019-0039
Status:
Applied:
Issued:
Permit
Fina led:
Inspector:
Final
Inspection:
Closed -Finaled
05/01/2019
06/18/2019
10/22/2019
AMOUNT
$1,170.00
Balance Due: $0.00
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov
«~; Building Permit Application Plan Check No. 'PC2<)1q -0'.l>:1
1635 Faraday Ave., Carlsbad, CA 92008 Est. Value ~ CITY 0 F 760-602-2717 / 2718 / 2719 Plan Ck. Deposit CARLSBAD Fax 760-602-8558
www.carlsbadca.gov Date 511 I 1q I
JOB ADDRESS SUITEI/SPACEI/UNITI ilAPN 1808 Aston Ave 220,230,2~ 212 -120 -07 -00
CT/PROJECT# ILOT# I PHA.SE # I# OF UNITS I# BEDROOMS # BATHROOMS I TENANT BUSINE..N NAME I CONSTR. TYPE I occ. GROUP
N/A -Speculative Suite V-A B
DESCRIPTION OF WORK: Include Square Feet of Affected Area(s)
Tenant improvement to include new interior partitions, electrical, mechanical and plumbing. 8,554 SF
ro-< ,;> ~u~+ts 11.6 1. ,o ! 2 ~5
EXISTING USE I PROPOSED USE I GARAGE (SF) PATIOS (SF) I DECKS (SF) AREPtACE rlR CONDITIONING I FIRE SPRINKLERS
Office Office n/a n/a n/a YESO No[Z] YES[Z]No □ YES[Z]No□
CONTACT NAME (If Different Fom App/leant) Same as Applicant APPLICANT NAME Chris Brandley
ADDRESS ADDRESS
5090 Shoreham Place, Suite 100
CITY STATE ZIP CITY STATE ZIP
San Dieao CA 92124
PHONE IFAX PHONE I FAX 619-297-1011 x103
EMAIL EMAIL
cbrandley@rbn-design.com
PROPERTY OWNER NAME MCR Aston LLC CONTRACTOR BUS, NAME Pacific Buildina Group
ADDRESS ADDRESS
1808 Aston Ave, Suite 180 9752 Aspen Creek Court, #150
CITY STATE ZIP CITY STATE ZIP
Carlsbad CA 92008 San Dieao CA 92126
PHONE I FAX PHONE IFAX 858-552-0600 858-552-0604
EMAIL EMAIL info@pacificbuildinggroup.com
ARCH/DESIGNER NAME & ADDRESS ISTATELIC.# STATE UC.# ICLASS B ICITYBUBLOS1207435 502376
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to_construct alter, improve, demolish or repair an:,-structure, l)rior to its issuance, also req1:ures the applicant for such permit to file a signed statement that he Is licensed pursuant to the provisions of the Contractor's License Law JChapter 9, commending with SecUon 7000 of Division 3 of the Business and Professions Code} or that he Is exemi;it therefrom, and the basis for the alleged exemption. Any violation of Section 031.5 by any applicant for a permit subJects the applicant to a civil penalty of not more than five hundred dollars {$500)).
WORKERS' COMPENSATION
Workers' Compensation Declaration: / hereby affirm under pena/t',T of perjury one of the following declarations: D I have and will maintain a certificate of consent to self.Insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued.
[Z] I have and will maintain workers' compensation, as required bv Section 3700 of the Labor Code, for the performance of the work fof' which this permit is issued, My workers' compensation insurance carrier and policy
number are: Insurance Co Old ~p11bllc: Gener.al ln111rance Corporation Policy No. A-1CW-l88418-15 Expiration Date ou1-2t:ie
~section need not be completed if the permit is for one h11ndred dollars ($100) or less. LJ Certificate of Exemption: I certify that in the pertormance of the work for which this permit is issued, t shall not employ any person in any manner so as to become subject to the Wort(ers' Compensation Laws of
California. WARNING: Failure to secure workers' compensation coverage is unlawful, and shall subject an employer to crlmlnal penaltles and clvll fines up to one hundred thousand dollars (&100,000), In
addition to the cost of compensation, · ad for In 06 of the Labor code, Interest and attomey's fees.
Jt5 CONTRACTOR SIGNATURE
I hereby affirm that I am exempt from Contractor's License Law for the fol/owing reason: D I, as owner of the property or my employees wtth wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's
License Law does not apply to an owner of property who builds or Improves thereon, and who does such work himself or through his own employees, provided that such improvements are r.ot intended or offered for
sale. If, however, the bulldlng or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale}.
□
□
l, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of
property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law).
I am exempt under Section ----~,usiness and Professions Code for this reason:
1. I personally plan to provide the major labor and materials for construction of the proposed property improvement 0Yes 0No
2. I (have I have not) signed an application for a building permit for the proposed work.
3. I have contracted with the follov,;ng person (firm) to provide the proposed construction (include name address/ phone I contractors' license number):
4. I plan to provide portions of the work, but I have hired the folk>wing person to coordinate, supervise and provide the major work (include name/ address I phone I contractors' license numbe~:
5. I wil provide some of the work, but I have contracted (hired) the foUowlng persons to provide the work indicated (include name I address I phone I type of work):
,I$ PROPERTY OWNER SIGNATURE □AGENT DATE
!
COMPLETE THIS SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY
Is lhe applicant or Mure building occupant required lo submit a business.R!WJ, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the
Presley-Tanner Hazardous Substance Account Act:/ D Yes WNo
Is lhe applicant or Mure building occupant required lo obtain a permit from the air polh.Jlion control district or a~alily management district? [Jves [Z] No
Is the facility lo be constructed within 1,000 feet of the outer boundary of a school site? 0Yes LLJNo
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF
EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
CONSTRUCTION LENDING AGENCY
I hereby affinn that there 1s a construction lending agency for the performance of the work this permit 1s issued (Sec. 3097 (1) C1vd Code)
Lender's Name Lender's Address
APPLICANT CERTIFICATION
I C8111fythat I have read the application and state that the above Information Is conectand that the lnfonnatlon on the pians lsacwate. I agmeto comply'Mth all Cl1y ordinances and State laws retatlngto bulking construcUon.
l hereby authorize representatiw of lhe aty of Cartsbad to enter upon the above mentioned property for flspection purposes. I ALSO AGREE TO SA VE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD
AGAINST ALL LIABILITIES, JUDGMENTS, COSTS ANO EXPENSES WHICH MAY IN ANYWAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT.
OSHA: An OSHA pennlt is required for excavations over 5'0' deep clld demolition or construction of structures over 3 stories in height
EXPIRA TICf,I: Ewry permit issued by the Buiking Official uooer the ~visions of this Code shal expire by imitation aid beoome nuH and void if the building or v.ork authorized by such permit is oot oommeoced within
180 days from the date of such pennlt or if the OOikf 'M'.llk au by such permit is suspended or abandoned at any time after the work is commeoced for a · of 180 days (Secoon 106.4.4 Uniform Bukling Code) .
...@S° APPLICANT'S SIGNATURE DATE
✓• EsG1I
A SAFEbuilt Compt1ny
DATE: May 9, 2019
JURISDICTION: Carlsbad
D APPLICANT
D JURIS.
PLAN CHECK#.: CBPC2019-0039
PROJECT ADDRESS: 1808 Aston Ave.
SET: I
PROJECT NAME: Speculative Suites 220/230/235
□
□
□
□
□
[;8J
□
□
The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes. ·
The plans transmitted herewith will substantially comply with the jurisdiction's codes
when minor deficiencies identified below are resolved and checked by building department staff.
The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
The check list transmitted herewith is for your information. The plans are being held at EsGil
until corrected plans are submitted for recheck.
The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
The applicant's copy of the check list has been sent to:
EsGil staff did not advise the applicant that the plan check has been completed.
EsGil staff did advisezh applican. t that the plan check has been completed.
Person contacted: Cs\. Telephone#:
Date contacted: (by:\l) Email:
Mail Telephone Fax In Person
REMARKS:
By: Kurt Culver
EsGil
Enclosures:
5/2/19
9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576
Carlsbad CBPC2019-0039
May 9, 2019
[DO NOT PAY -THIS IS NOT AN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad
PREPARED BY: Kurt Culver
BUILDING ADDRESS: 1808 Aston Ave.
BUILDING OCCUPANCY:
BUILDING
PORTION
Tl
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code cb
---------
1997 UBC Building Permit Fee
AREA
( Sq. Ft.)
8554
---...
1997 UBC Plan Check Fee -.,
Valuation
Multiplier
46.51
By Ordinance
Type of Review: 0 Complete Review
0 Other
PLAN CHECK#.: CBPC2019-0039
DATE: May 9, 2019
Reg.
Mod.
VALUE ($)
D Structural Only
397 847
397,847
I
D Repetitive Fee
.,,.. Repeats
-~ 0 Hourly
EsGil Fee
1-------11 Hr. @ *
$1,027.221
Comments:
Sheet 1 of 1
• -
. .
SAN DIEGO REGIONAL
HAZARDOUS MATERIALS ·
OFFICE USE ONLY
RECORD ID t __________________
1 PLAN CHECK # _________________
1
Q 1-~~~A~l~R~E~,---c--__!::==;:'.=-==--=~~=:==~B~P~OA~~~~==~~
#
APN#
-120 -<r1-0 o
Telephone# c.~m Lill\ 2'
The following questions represent the facl · s activities, NOT. specific project description.
PART I: FIRE DEPARTMENT -HAZARDOUS MATERIALS DIVISION: OCCUPANCY CLASSIFIC~N: (not reqyired for proiects within the City of San ™9.1: Indicate by drding the item, whether your business will use. process, or store any of the folng hazardous materials. If any of the Items are circled.
applicant must contact the Fire Protection Agency with jurisdiction prior to plan submittal.
Occupancy Rating: Facility's Squaro Footage (including proposed project):
1. Explosive or Blasting Agents
2 Compressed Gases
5. Organic Peroxides 9. Water Reactives 13. Corrosives
6. Oxidizers 10. Cryogenics ~ards
3. Flammable/Combustible l.Jquids 7. Pyrophoncs 11. Highly Toxic or Toxic Materials 15. None of Toes
4. Flammable Solids 8. Unstable Reactives 12. Radioactives
1.
2
3
4.
5.
6.
7.
8.
□ □ □ □ □
Expected Date of Occupancy
(for new construction or remodeling projects)
Is your business ~sted on the reverse side of this form? (checi< all that apply).
WiU your business dispose of Hazardous Substances or Medical Waste in any amount?
Wil your business store or handle Hazardous Substances In quan@es greate< than or equal to 55 gallons. 500
pounds and/or 200 cubic feet? ~ Wil your busmess store or handle carcinogens/reproductive toxins in any quantity?
~ Win your business use an existing or install an underground storage tank? JSJ Wil your business store or handle Regulated Substances (CalARP)? ~ Wil your business use or install a Hazardous Waste Tank System (Trtle 22, Article 10)?
IJo.L Win your business store petroleum in tanks or containers at your facility with a total facility storage capacrty equal to
or reater than 1,320 alons? California's Abo round Petroleum Stora e Ad .
0 CalARP Exempt
I
Date ln,~als
0 CalARP Required
Date Initials
0 CalARP Complete
Date lnmals
CO NTY AIR POUUTI N DI TRICT APCD : Any YES• answer requires a stamp from APCO 10124 Old Grove Road, San
Otego, A 921 1 . ( ) 2 50). [•No stamp required if 01 Yes fills! 03 Yes !!)g 04-06 No). The following questions are intended
to identify the majority o air pollution issues at the planning stage. Projects may require add~1onal measures not Identified by these questions. For comprehensive
requirements contact APCD. Residences are typically exempt, except -those with more than one bu1khng• on the property; single buildings with more than four
dwelling units; townhomes; condos, mixed-commercial use; deliberate bums; residences forming part of a larger project rExcludes garages & small outbuildings.)
,.
2
3.
4.
5
6.
BY
YES NO ~ i ~ □
Will the project disturb 160 square feet or more of existing bulld,ng materials?
Will any load supporting structural members be removed? Notification may be required 1 O working days prior to commencing demol~ion.
(ANSWER ONLY IF QUESTION 1 or 2 IS YES) Has an asbestos survey been performed by a Certified Asbestos Consultant or Site Surveillance
Technician?
□
□
□
~ (ANSWER ONLY IF QUESTION 3 IS YES) Based on the survey results, will the project disturb any asbestos containing material? Notification
may be required 10 workrng days prior to commencing asbestos removal.
~ Will the proJect or associated construction equipment emit air contaminants? See the reverse side of this form or APCD factsheet
(www.sdapcd.org/lnfp/[ads/permks P<IO for typical equipment requiring an APCD permit 0 (ANSWER ONLY IF QUESTION 5 IS YES) Will the project or associated construction equipment be located within 1,000 feet of a school
bounda
Date
DATE· I I
EXEIIPT OR NO FURTHER IHFORMATION RfOUIIIED RELEASED FOR IIUILDtNG PERMIT IIUT NOT 1'011 OCCUPANCY RELEARD FOR OCCUl'ANCY
COUNTY-HMO• A~O COUNTY-HMO APCD COUNTY-HMO APCD
~~v-
q_O
___ ,,(;
"o,,
~ u&~1rq0 i g Date/ nltJa~ " v ~O,
"1-Of sa"
. . . A stamp 1n thJS box .2.!fil'. exempts busrnesses from completing or updating a Hazardous Materials Bus111ess Plan. Other permitting requirements may shll apply .
HM-9171 (08115) County of San Diego -DEH -Hazardous Materials Div1s1on
CARLSBAD FIRE DEPARTMENT
EXPEDITED PLAN CHECK REQUEST
CB ____ _
I am requesting Expedited Fire Plan Check and understand I will
be assessed an additional fee at the rate of $90.00 dollars per
hour plus $25.00 dollars administration fee. Plans will not be
released until all fees are paid. Applicant is responsible for all
expedited fees should the project not be completed.
Turnaround time for the expedited fire plan review will be 14
calendar days with a turnaround time for re-checks of seven
calendar days. Plans check by the Fire Department will be
checked on a first come, first serve basis and could take up to
60 days or more to be completed.
YES NO
PLEASE CIRCLE YOUR SELECTION
Applicant Signatur~ Date
Copy to Building file and Fire Prevention
«1~> ~ CITY OF
CARLSBAD
STORM WATER
COMPLIANCE
ASSESSMENT
B-24
Development Services
Building Department
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
I am applying to the City of Carlsbad for the following type( s) of construction permit:
~ Building Permit □ Right-of-Way Permit
Patio/Deck
Re-Roofing
Sign
Spa-Factory
Sprinkler
□ My project is categorically EXEMPT from
the requirement to prepare a storm water
pollution prevention plan (SWPPP) because it
only requires issuance of one or more of the
following permit types:
Electrical
Fire Additional
Fire Alann
Fixed Systems
Mechanical
Mobile Home
Plumbing
Water Discharge
Project Storm Water Threat Assessment Criteria*
No Threat Assessment Criteria
Jd My project qualifies as NO THREAT and is exempt from the requirement to prepare a storm water pollution prevention plan (SWPPP) because
it meets the "no threat' assessment criteria on the City's Project Threat Assessment Worksheet for Detennination of Construction SWPPP Tier
Level. My project does not meet any of the High, Moderate or Low Threat criteria described below.
Tier 1 -Low Threat Assessment Criteria
□ My project does not meet any of the Significant or Moderate Threat criteria, is not an exempt permit type (See list above) and the project
meets one or more of the following criteria:
• Results in some soil disturbance; and/or
• Includes outdoor construction activities (such as roofing, saw cutting, equipment washing, material stockpiling, vehicle fueling, waste
stockpiling).
Tier 2 -Moderate Threat Assessment Criteria
□ My project does not meet any of the Significant Threat assessment Criteria described below and meets one or more of the following criteria:
• Project requires a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Carlsbad Mun~ipal Code); or,
• Project will result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement
removal, equipment storage, refueling and maintenance areas and project meets one or more of the additional following criteria:
• Located within 200 feet of an environmentally sensitive area or the Pacific Ocean, and/or
• Disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical, and/or
• Disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse, and/or
• Construction will be initiated during the rainy season or will extend into the rainy season (Oct 1 through April 30).
Tier 3 -Significant Threat Assessment Criteria
□ My project includes clearing, grading or other disturbances to the ground resulting in soil disturbance totaling one or more acres including any
associated construction staging, equipment storage, stockpiling, pavement removal, refueling and maintenance areas: and/or
□ My project is part of a phased development plan that will cumulatively result in soil disturbance totaling one or more acres including any
associated construction staging, equipment storage, refueling and maintenance areas: or,
D My project is located inside or within 200 feet of an environmentally sensitive area (see City ESA Proximity map) and has a significant
potential for contributing pollutants to nearby receiving waters by way of storm water runoff or non-storm water discharge(s).
I cerofy to the best of my knowledge that the above
checked •tatements are true and correct I understand
and acknowledge that even though thl• project doe•
not require preparaUon of a con•trucUon SWPP, I must
still adhere to, and at all Ume• during con•truction
activiUes for the permit type(•/ check above compty
with the •torm water best management pracUce•
pursuant to TiUe 15 of the Carlsbad Municipal Code
and to City Standards.
Assessor Parcel No.
'The City Engineer may authorize minor variances from the Stonn
Water Threat Assessment Criteria in special circumstances wtiere it
can be shown that a lesser or higher Construction SWPPP Tier Level is
warranted.
B-24
City Concurrence:
□YES CJNO
Page 1 of 1
By: Date: Project ID:
Rev.03/09
C_cityof
Carlsbad
PURPOSE
CLIMATE ACTION PLAN
CONSISTENCY CHECKLIST
B-50
Development Services
Building Division
1635 Faraday Avenue
(760) 602-2719
www.carlsbadca.gov
This checklist is intended to assist building permit applicants identify which Climate Action Plan (CAP) ordinance
requirements apply to their projects. Unless none of the requirements apply, the completed checklist must be
included in the building permit application. It may be necessary to supplement the completed checklist with
supporting materials, calculations or certifications, to demonstrate full compliance with CAP ordinance
requirements. For example, projects that propose or require a performance approach to comply with energy-
related measures will need to attach to this checklist separate calculations and documentation as specified by
the ordinances.
-" If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum requi red
by ordinance, an explanation must be provided to the satisfaction of the Building Offici al.
-" Details on CAP ordinance requirements are available on the city's website.
Project Name/Building
Permit No.: 0\7 ~.i...:a=U=U\.:..:..'f\.c....:....:.\l-=-~--'We.-=-_\~ _ ____,,'2,:...::...U>_~_~.....:...'>J_O .... .....:..t_'l:,_"5" ___ BP No.: fG '2,.0\ t\ -00 ~q
Property Address/APN: \ &0 ti ~:1\ll~ tw~ c 0 \A \~ \'t)b
Applicant Name/Co.: Q,QJt--1 ..... ~~\~I--!
Applicant Address:
Contact Phone: U ,q _ 1,1] _ \ \)\ \ Contact Email:
Contact information of person completing this checklist (if different than above):
Name:
Company
name/address:
B-50
Contact Phone:
Contact Email:
Applicant Signature: L~
Page 1 of 3
A\J µ: 1,\1, -\1..0 · 01 · Ob
Date: 0'5/f)t / l~
Revised 04/19
City of Carlsbad Climate Action Plan Consistency Checklist
Use the table below to determine which sections of the Ordinance Compliance checklist are applicable to your project.
For residential alterations and additions to existing buildings, contact the building counter for the building permit valuation.
Building Permit Valuation (BPV) $ ___________ _
Cont1ructlon Type Complete Sec:tlon(I) Notes:
D Residential
□ New construction 1A
□ Alterations: □ exempt
□ BPV <!: $60,000
□ Electrical service panel upgrade
1A
1A
1-2 family dwellings and townhouses with attached garages
only
□ BPV <!: $200,000
,
1A
Multi-family dwellings only where interior finishes are removed
and significant site work and upgrades to structural and
mechanical, electrical, and/or plumbing systems are proposed
l:gj Nonresidential
□ New construction 18 and 2
Alterations 2
1. Electric Vehicle Charging
A D Residential New construction and major alterations (or electric panel upgrade)*
Please refer to Carlsbad Ordinance CS-349 when completing this section.
□ One and two-family residential dwelling or townhouse with attached garage:
□ One EVSE ready parking space required □ Exception :
□ Multi-family residential· □ Exception ·
Total Parking Spaces EVSE Spaces
Proposed Caoable I Ready
I
Calculations: Total EVSE spaces= .10 x Total parking (rounded up to nearest whole number)
EVSE Installed = Total EVSE Spaces x .50 (rounded up to nearest whole number)
EVSE other= Total EVSE spaces -EVSE Installed
(EVSE other may be "Capable," "Ready" or "Installed.")
Installed I Total
I
I
*Major alterations are: (1) for one and two-family dwellings and townhouses with attached garages, alterations have a building permit valuation~ $60,000 or
include an electrical service panel upgrade; (2) for multifamily dwellings (three units or more without attached garages), alterations have a building permit valuation
~ $200,000, interior finishes are removed and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed.
B D Nonresidential new construction (includes hotels/motels) □ Exception ·
Total Parking Spaces EVSE Spaces
Proposed Capable I Ready I Installed I Total
I l I
Calculation· Refer to the table below·
Total Number of Parking Spaces provided Number of required EV Spaces Number of reauired EVSE Installed Soares
□ 0-9 1 1
□ 10-25 2 1
□ 26-50 4 2
□ 51-75 6 3
□ 76-100 9 5
□ 101-150 12 6
□ 151-200 17 9
□ 201 and over 10 percent of total 50 percent of Required EV Soares
Updated 4/12/2019 2
••
,._ City of Carlsbad Climate Action Plan Consistency Checklist
2. Transportation Demand Management (TOM)
A. List each proposed nonresidential use and gross floor area (GFA) allocated to each use.
B. Employee ADT/1 ,000 square feet is selected from the table below.
Use GFA Employee ADT for first Employee ADT for each
1,000S.F. subsequent 1,000 S.F.
Total
If total employee ADT is greater than or equa1'110 employee AD , a TOM plan is required.
TOM plan required: Ye~ No D
Employee ADT Estimation for Various Commercial Uses
ADT for first
1,000 s.f.
EmpADTI
1000 s.f.1
Office (all)2 20
Restaurant 11
Retaib 8
Industrial 4
Manufacturing 4
Warehousin 4
1 Unless otherwise noted, rates estimated from /TE Trip
Generation Manual, 1CfhEdition
20
11
4.5
3.5
3
1
2 For all office uses, use SAN DAG rate of 20 ADT/1 ,000 sf to
calculate employee ADT
3 Retail uses include shopping center, variety store, supermarket,
gyms, pharmacy, etc.
Other commercial uses may be subject to special
consideration
Sample calculations:
Office: 20,450 sf
1. 20,450 sf/ 1000 x 20 = 409 Employee ADT
Retail: 9,334 sf
1. First 1,000 sf= 8 ADT
2. 9,334 sf -1,000 sf= 8,334 sf
3. 8,334 sf/ 1,000 x 4.5 + 8 = 46 Em lo ee ADT
Total Employee ADT
I 7 I
/' ---........
1 1, I"\
'--J
2-0-~l.
Updated 4/ 12/20 I 9
APT
3