HomeMy WebLinkAbout1811 ASTON AVE; ; CB050313; Permit07-14-2005
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Commercial/Industrial Permit Permit No
Building Inspection Request Line (760) 602-2725
Job Address
Permit Type
Parcel No
Valuation
Occupancy Group
Project Title
1811 ASTON AVCBAD
Tl Sub Type
2121201000 Lot#
$316,634 00 Construction Type
Reference #
LOBBY & CORE DESIGN FOR
10,214 SF 2 STORY SHELL
COMM
0
VN
Applicant
BLACKMORE FAMILY TRUST 1995
C/O ALLEN J BLACKMORE
P O BOX 424
RANCHO SANTA FE CA 92067
Status
Applied
Entered By
Plan Approved
Issued
Inspect Area
Plan Check*
Owner
BLACKMORE FAMILY TRUST 1995
C/O ALLEN J BLACKMORE
P O BOX 424
RANCHO SANTA FE CA 92067 ~
ISSUED
02/01/2005
KG
07/14/2005
07/14/2005
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee;
Plan Check Discount-1
Strong Motion Fee '
Park Fee
LFM Fee
Bridge Fee
BTD#2Fee
BTD #3 Fee '>
Renewal Fee
'Add'l Renewal Fee (
Other Building Fee
Pot Water Con Fee
Meter Size
Add'l Pot Water Con Fee
Reel Water Con Fee
$1,21492 Meter Size ' - '
$0 00 Add'l Reel Water Con Fee ;
$789 70 Meter Fee
$000 f/ SDCWAFee
$0 00 CFD Payoff Fee
$6649 PFF (3105540) ^
$000 ^ PFF (4305540) /
-.$000 ' License Tax (3104193}
$0 00 ,License Tax (4304193) ,,
$0 00 "Traffic Impact Fee (3105541),
/: $0 00 * " Traffic Impact Fee (4305541)
y ^$000 PLUMBING TOTAL*,'
'$000 . ELECTRICAL TOTAL / '
$000^ MECHANICAL TOTAL"
$000S Master Drainage Fee
, - Sewer Fee'
' $000 \Redev Parking Fee /
,( $0 0(KO) Additional Fees
TOTAL PERMIT FEES, /
$000
$000
$000
$000
$5,762 74
$000
$000
$000
$000
$000
$19500
$6000
$2800
$000
$000
$000
$000
$8,11685
Total Fees $8,11685 Total Payments To Date $1,579 40 Ba1ane$$ue:
" s * J
$6,537.45
BUILDING PLANS
>/ IN STORAGE
ATTACHED
01 02
COP 6537-45,
Inspector
FINAL APPROVAL
Date Clearance
NOTICE Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as lees/exactions" You have 90 days from the date this permit was issued to protest imposition of these fees/exactions If you protest them, you must
follow the protest procedures set forth in Government Code Section 6602Q(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
fees/exactions of which you have previouslv_been aiven a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired
PERMIT APPL CAT ON
CITY OF CARLSBAD BUILDING DEPARTMENT
1635 Faraday Ave , Carlsbad CA 92008
FOR OFFICE USE ONLY
PL^N CHECK N
EST VAL 3 }(,,<*
PlanCk Deposit
Validated By
Date Z-/
\3
/ LS
JigR JECTJNFORMATION ^
Addressiteclude Bldg/Suite #)Business Name {at this address)
Legal Description
CoT
Lot No Subdivision Name/Numberdo, &Unit No Phase No
do,
Total # of units
Assessor's Parcel #
rfif different from applicant)
V
(Sec 7031 5 Business and Professions Code Any City or County which requires a permit to construct, alter, improve demolish or repair any structure, prior to its issuance,
also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractors License Law [Chapter 9, commending with
Section 7000 of Division 3 of the Business and Professions Code] or that he is exempt therefrom and the basis for the alleged exemption Any violation of Section 7031 5 by
any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars [$500])
Name
State License # (0 7^&W f
Address
License Class P
City State/Zip
City Business License #
Telephone #
Designer Name
State License #
[6 ' WORKER'S~COM PENSATION*
Address City State/Zip Telephone #
Workers' Compensation Declaration I hereby affirm under penalty of perjury one of the following declarations
D 1 have and will maintain a certificate of consent to self-insure for workers compensation as provided by Section 3700 of the Labor Code for the performance of the work
for which this permit is issued
D I have and will maintain worker's compensation, as required by Section 3700 of the labor Code, for the performance of the work for which this permit is issued My
wotkers compensation insurance carrier and policy number are
Insurance Company X^/J^-fr-i^k^y/C^ Fl^.& Policy No f) A ^ *l ^ 2Q Expiration Da
(THIS SECTION NEED NOT BE COMPLETED IF THE PERMIT IS FOR ONE HUNDRED DOLLARS [$1001 OR LESS)
D CERTIFICATE OF EXEMPTION I certify that in the performance of the work for which this permit is issued, I shall not employ any person m any manner so as to
become subject to the Workers Corrmfinsation Laws of California
WARNING Fa 11 u reto sec u re wonders/ compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand
dollars($100,000}r^ddifyon^W thesist of compensation, damages are provided for in Section 3706 of the Labor Code, interest and attorney's feqs
DATE
..__.
I hereby affirm that I am exempt from the Contractor's License Law for the following reason
D I, as owner of the property or my employees with wages as their sole compensation, witl d the work and the structure is not intended or offered for sale (Sec 7044,
Business and Professions Code The Contractors License Law does not apply to an owner of property who builds or improves thereon and who does such work himself or
through his own employees, provided that such improvements are not intended or offered for sate If, however, the building or improvement is sold within one year of
completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale)
B' I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec 7044 Business and Professions Code The Contractor's
License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's
License Law)
P I am exempt under Section Business and Professions Code for this reason
1 I personally plan to provide the major labor and materials for construction of the proposed property improvement D YES D NO
2 I (have/have not) signed an application for a building permit for the proposed work
3 I have contracted with the following person (firm) to provide the proposed construction (include name / address / phone number/contractors license number)
4 I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name / address / phone number /
/ontractors license number)
5 I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name / address / phone number/type of work)
PROPERTY OWNER SIGNATURE A DATE
WHITE File YELLOW Applicant PINK Finance
PERMIT APPLICATION
CITY OF CARLSBAD BUILDING DEPARTMENT
1635 Faraday Ave , Carlsbad CA 92008
Page 2 of 2
[COMPLETE TMliTSECT^
Is the applicant or future building occupant required to submit a business plan, acutely hazardous matenals registration for or nsk management and prevention program under
Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? D YES Q NO
Is the applicant or future building occupant required to oblam a permit from the air pollution control district or air quality management district7 d YES D NO
Is the facility to be constructed within 1 ,000 feet of the outer boundary of a school site? D YES O NO
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE
REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT[8~CONSTRUCTION LEN DING'AGENCY ^ v ----- - ^-^ - — ...... -------- ,^,^^. ^.....^..^ ,..„....„....._.,-.„.,, „. .. ^ , . „ , ^
I hereby affirm that there is a construction lending agency for the performance of the work for which this permit is issued (Sec 3097(1) Civil Code)
LENDER'S NAME ________ _ _________ _ LENDER'S ADDRESS _
[9"T"'APPjLICANT CERTIFICATION "^^.Z^ Z ' Z!Z1Z ............. '-—- - -,U,, „ .... ._.„. ..."""""'""ZI""'." ..""-'-'- "•""- .......... -'-""" ..... ..... " ' '-' ' ..'. vU' ___ rn--J
I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate I agree to comply with all City
ordinances and State laws relating to building construction I hereby authorize representatives of the City of Carlsbad to enter upon the above mentioned property for inspection
purposes I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGEMENTS, COSTS AND
EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT
OSHA An OSHA permit is required for excavations of 5 0" deep and demolition or construction of structures over 3 stones in height
EXPIRATION Every permit issued by the building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work authorized
by such permit is not commenced within 180 days from the date of such permit or if the building or work authonzed by such permit is suspended or abandoned at any time after
the work is commenced for a period of 180 days (Section 106 4 4 Uniform Building Code)
APPLICANT'S SIGNATURE • V^- * \~S _ DATE 44
WHITE File YELLOW Applicant PINK Finance
City of Carlsbad
Final Building Inspection
Dept: Building Engineering
Plan Check#
Permits CB050313
Planning CMWD
Project Name LOBBY & CORE DESIGN FOR
10,214 SF 2 STORY
Address 1811 ASTON AV
Contact Person ROD
Sewer Dist CA
Inspected /"> //
Bv (5t KM t&/\
(
Inspected
Bv
Inspected
Bv
SHELL
Phone 6195203858
Water Dist CA
Date /
Inspected 3r/'%S/>
Date
Inspected
Date
Inspected
St Lite (EireJl
Date
Permit Type
Sub Type
Lot 0
/
^ Approved ^_
Approved
Approved
05/22/2006
Tl
COMM
- Disapproved
Disapproved
Disapproved
Comments
Inspection List
Permit* CB050313 Type Tl
Date Inspection Item
03/12/2007 89
05/25/2006 89
05/03/2006 29
04/19/2006 23
03/28/2006 34
03/28/2006 39
03/24/2006 34
02/10/2006 14
02/10/2006 34
02/08/2006 17
02/08/2006 18
01/30/2006 14
01/30/2006 14
01/30/2006 24
01/30/2006 24
01/30/2006 34
01/30/2006 34
01/30/2006 44
01/30/2006 44
01/27/2006 14
01/27/2006 14
01/27/2006 24
01/27/2006 34
01/27/2006 44
01/24/2006 14
01/24/2006 17
01/24/2006 23
01/19/2006 14
01/19/2006 17
01/19/2006 18
01/19/2006 24
01/19/2006 34
01/19/2006 44
01/12/2006 17
01/12/2006 84
01/11/2006 84
01/09/2006 11
01/09/2006 12
01/09/2006 14
01/09/2006 24
01/09/2006 34
01/09/2006 44
12/29/2005 14
12/29/2005 24
Final Combo
Final Combo
Final Plumbing
Gas/Test/Repairs
Rough Electric
Final Electrical
Rough Electric
Frame/Steel/Boltmg/Weldm
Rough Electric
Interior Lath/Drywall
Exterior Lath/Drywall
Frame/Steel/Boltmg/Weldin
Frame/Steel/Bolting/Weldm
Rough/Topout
Rough/Topout
Rough Electric
Rough Electric
Rough/Ducts/Dampers
Rough/Ducts/Dampers
Frame/Steel/Boltmg/Weldin
Frame/Steel/Bolting/Weldm
Rough/Topout
Rough Electric
Rough/Ducts/Dampers
Frame/Steel/Bolting/Weldm
Interior Lath/Drywall
Gas/Test/Repairs
Frame/Steel/Boltmg/Weldin
Interior Lath/Drywall
Exterior Lath/Drywall
Rough/Topout
Rough Electric
Rough/Ducts/Dampers
Interior Lath/Drywall
Rough Combo
Rough Combo
Ftg/Foundation/Piers
Steel/Bond Beam
Frame/Steet/Boltmg/Weldin
Rough/Topout
Rough Electric
Rough/Ducts/Dampers
Frame/Steel/Bottmg/Weldin '
Rough/Topout
COMM
Inspector Act
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP'
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
Fl
CO
NR
NR
AP
we
CO
AP
AP
AP
we
AP
AP
we
we
AP
AP
PA
AP
AP
AP
we
AP
we
NR
PA
AP
AP
AP
we
we
AP
we
AP
AP
NR
AP
AP
AP
we
we
we
AP
AP
LOBBY & CORE DESIGN FOR
10,214 SF 2 STORY SHELL
Comments
•
MSB, SUB PNLS, TRANS
WATER WALL & 2ND FLR HARD CEIL
WATER WALL & 2ND FLR HARD CEIL
1ST FLR LOBBY CEIL & SOFFITS
HAND CEIL, SOFFITS 2ND FLR
1ST FLR LOBBY HARD CEILS
HARD CEIL, SOFFITS 2ND FLR
1ST FLR LOBBY HARD CEILS
1ST FLR LOBBY HARD CEILS
HARD CEIL, SOFFITS 2ND FLR
FURRED WALL CLIPS AT ELEV
ELEV ENCL, EXT SOFFITS (WEST SIDE)
,
1 & 2 FLR SECTS
24HR TEST
2ND FLR WALLS
2ND FLR RESTROOMS, CORR
2ND FLR WALLS
1ST FLOOR RESTROOMS & CORR
2ND FLR RESTROOMS & CORR
INSIDE WATER FEATURE
INSIDE WATER FEATURE
STAIR ENCL WALLS
•
RESTRMS 1ST FLR, CORR
Monday, March 12,2007 Page 1 of 2
12/29/2005 34
12/29/2005 44
12/28/2005 21
12/22/2005 14
12/22/2005 24
12/22/2005 34
12/21/2005 84
12/13/2005 14
12/13/2005 17
12/13/2005 17
12/01/2005 12
11/30/2005 23
11/29/2005 21
11/29/2005 22
11/29/2005 23
11/29/2005 31
11/28/2005 21
11/28/2005 22
11/28/2005 31
11/22/2005 22
11/22/2005 31
11/18/2005 21
11/18/2005 31
11/07/2005 21
11/07/2005 22
10/14/2005 21
10/14/2005 22
10/14/2005 22
Rough Electric
Rough/Ducts/Dampers
Underground/Under Floor
Frame/Steel/Boltmg/Weldm
Rough/Topout
Rough Electric
Rough Combo
Frame/Steel/Boitmg/Weldin
Interior Lath/Drywall
Interior Lath/Drywall
Steel/Bond Beam
Gas/Test/Repairs
Underground/Under Floor
Sewer/Water Service
Gas/Test/Repairs
Underground/Conduit-Winn
Underground/Under Floor
Sewer/Water Service
Underground/Conduit-Winn
Sewer/Water Service
Underground/Conduit-Winn
Underground/Under Floor
Underground/Conduit-Wirm
Underground/Under Floor
Sewer/Water Service
Underground/Under Floor
Sewer/Water Service
Sewer/Water Service
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
BN
PY
PY
PY
PY
PY
RB
RB
RB
PY
PY
TP
TP
TP
TP
RB
RB
RB
AP
AP
AP
NR
AP
NR
NR
PA
PA
PA
AP
AP
AP
AP
AP
AP
NR
NR
NR
AP
AP
AP
AP
CO
CO
NR
AP
CO
RESTRMS1STFLR, CORR
RESTRMS 1ST FLR, CORR
WATER FEATURE INSIDE
1ST FLR RESTRMS
2ND FLR ELEV ENCL
ONE SIDE ELECT RM
2ND FLR ELEV ENCL
SLAB AREA PUMP+ COOL TOWER
AREAS
CONDENSATION LINE AND CONDUIT
CU BLDG TO EQUPT YARD FOR
FOUNTAIN
EQUPTYARD
PLANS SPEC CAST PIPE, 4IN W/C
2ND TIME
NO APPROVED PLANS & NEED MIN 5LB
TEST ON 4" LINE TO MECH BLDG
(CAME BACK 2ND TIME)
Monday, March 12,2007 Page 2 of 2
City of Carlsbad Bldg Inspection Request
PermiW CB030313
Title LOBBY & CORE DESIGN FOR
Description 10,214 SF 2 STORY SHELL
Inspector Assignment TP
Type Tl Sub Type COMM
Job Address 1811 ASTON AV
Suite Lot 0
Location
APPLICANT BLACKMORE FAMILY TRUST 1995
Owner
Remarks
Phone 6198415472
Inspector
Total Time 'Requested By BRANDON
Entered By JANEAN
CD Description
21 Uncferground/Uncter Floor
22 Sewer/Water Service
23 Gas/Test/Repairs
31 Underground/Conduit-Wiring
Act Comment
Comments/Notices/Hold
Associated PCRs/CVs
PCR05145 ISSUED I HE BLACKMORE COMPANY, S TRUCT REVISIONS
^PCR05146 ISSUED 1 HE BLACKMORE COMPANY, REV TO P E& M
PCR05176 ISSUED BLACKMORE CO-NEW GLAZING &, Al UM1NUM EOR S FOREt-RONl
PCR05178 ISSUED BLACKMORE BUILDING, SKYLIGHT SUBMITTAL
PCR05184 ISSUED BLACKMORE BUII DING, FLOOR AND ROOF IRUSS SUBMIT! AL
Inspection History
Date Description Ad
11/22/2005 22 Sewer/Water Service AP
11/22/2005 31 Underground/Conduit-Wiring AP
11/18/2005 21 Underground/Under Floor AP
11/18/2005 31 Underground/Conduit-Wmng AP
11/07/2005 21 Underground/Under Floor CO
11/07/2005 22 Sewer/Water Service CO
10/14/2005 21 Underground/Under Floor NR
10/14/2005 22 Sewer/Water Sen/ice CO
Insp Comments
PY CONDENSATION LINE AND CONDUIT
PY
CU BLDG TO EQUPT YARD FOR FOUNTAIN
EQUPT YARD
TP
TP
TP
TP
RB
RB
10/14/2005 22 Sewer/Water Service AP RB
PLANS SPEC CAST PIPE, 4IN W/C
NO APPROVED PLANS & NEED MtN 5LB T£ST ON 4" LINE TO MECH
BLDG (CAME BACK 2ND TIME)
2ND TIME
EsGil Corporation
In (Partnership wttK government for <BmCt£ing Safety
DATE JULY 7, 2005 . Q APPLICANT
JURISDICTION CARLSBAD , Q PLAN REVIEWER
Q FILE
PLAN CHECK NO : 05-0313 SET III
PROJECT ADDRESS. 1811 ASTON AVENUE
PROJECT NAME The Blackmore Company Lobby & Core T.I.
X] The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes
The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff
The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck
The check list transmitted herewith is for your information The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck .
The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person
The applicant's copy of the check list has been sent to
RICHARD CORNELIUS C/O RICHARD YEN & ASSOC 1024 ROSECRANS STREET, S D ,
CA92106
Esgil Corporation staff did not advise the applicant that the plan check has been completed
j,
Esgil Corporation staff did advise the applicant that the plan check has been completed
Person contacted RICHARD Telephone # 619-224-3605
Date contacted (by ) Fax # 619-224-1530
Mail Telephone Fax In Person
REMARKS
By. All Sadre Enclosures
Esgil Corporation
D GA D MB D EJ D PC 6/28 tmsmtldot
9320 Chesapeake Drive, Suite 208 * San Diego, California 92123 + (858)560-1468 4- Fax (858) 560-1576
EsGil Corporation
In Partnership witfi government f or (BuiCding Safety
\
DATE JUNE_aT2005 Q AEPLICANT
JURISDICTION CARLSBAD Q PLAN REVIEWER
Q FILE
PLAN CHECK NO . 05-0313 ' . SET II
PROJECT ADDRESS 1811 ASTON AVENUE
PROJECT NAME The Blackmore Company Lobby & Core T.I.
1 I The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes -
The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff
The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck
XI The check list transmitted herewith is for your information The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck PLEASE SEE BELOW
The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person
XI The applicant's copy of the check list has been sent to
RICHARD CORNELIUS C/O RICHARD YEN & ASSOC 1024 ROSECRANS STREET, S D ,
CA92106
Esgil Corporation staff did not advise the applicant that the plan check has been completed
Esgil Corporation staff did advise the applicant that the plan check has been completed
Person contacted RICHARD Telephone # 619-224-3605
Date contacted (oli/oS (bypy) Fax # 619-224-1530
Mail —Telephone Fax ^ In Person
XI REMARKS Please see attached for remaining items from previous list
By Ali Sadre Enclosures
Esgil Corporation
S GA D MB D EJ n PC 5/23 trnsmtldot
9320 Chesapeake Drive, Suite 208 4 San Diego, California 92123 4 (858)560-1468 4- Fax (858) 560-1576
CARLSBAD 05-O313
JUNE 2, 2005
• Please make all corrections on the originals and submit three revised, signed and
stamped plans to the Building Department
• To facilitate rechecking, please identify, next to each item, the sheet of the plans
upon which each correction on this sheet has been made and return this sheet
* with the revised plans
1 On the first sheet of the plans indicate.
• The actual areas versus allowable areas. [This is under T.I. permit is not an
acceptable response].
2 - The taped on detail, as per E/A3 2, should be reflected on the revised plans to be
submitted for review
3 Delete the concrete wall legend, on Sht S2 (not used on this project)
4 Where is detail G, as referenced on floor plan, as per Sheet S2?
5 • Where is detail 14/SD2 as referenced on floor plan, as per Sheet S2?
6 Provide a schedule for C-5A, C-5B, etc as referenced on the foundation plans, Sheet
' S2
7 Where is detail 18/S4 1 as referenced on the foundation plan, Sheet S2?
8 On the floor plan, Sheet S2, specify exactly which beams/ columns, etc , are new &
which are existing
9 Please see attached for P/M/E corrections
10 Please note where the HC items, as per attached list, are addressed on plans
• The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake
Drive, Suite 208, San Diego, California 92123, telephone number of 858/560-1468, to
perform the plan review for your project. If you have any questions regarding these plan
review items, please contact All Sadre at Esgil Corporation Thank you
CARLSBAD 05-0313
JUNE 2, 2005
• , PLUMBING AND MECHANICAL CORRECTIONS ,
PLAN REVIEWER: Glen Adamek
20 The final set of corrected drawings to be reviewed for signing and sealing just
before the permits are to be issued. The WF-sheets are not signed and sealed?
Each sheet of the plans must be signed by the person responsible for their preparation,
even though there are no structural changes, before the permits are issued Business
and Professions Code
21 No response provided and not shown on the drawings? Clearly show the location of
the water feature equipment (pumps, filters and 750 gallon surge tank) (Note the water
feature equipment including piping for the water feature may not be located in the elevator
equipment room #110)
22 No response provided and not shown on the drawings? Provide design calculations
and details for the support of the proposed 750 gallon surge tank for the water features
23 No response provided and not shown on the drawings? Please provide complete
plans, details and calculations for the construction of the proposed water features
'25 No response provided and not shown on the drawings? Provide data on proposed
hazardous material to be stored and used UBC, Section 307 and UFC
A) Clearly show types of hazardous material is being stored or used Provide a list of the proposed
hazardous materials as per the types in UBC, Tables 3-D, and 3-E Provide the material safety
data sheets (MSDS)
B) Clearl^show the amounts of each type of hazardous material to be stored and in use
C) Clearly show where in the buildings each type of hazardous material is being stored or used
• PLUMBING (2000 UNIFORM PLUMBING CODE)
26 Please show the upstream sewer manhole rim elevation compared to the new
plumbing fixture flood rim elevations. Clearly show what new fixtures flow
through required backwater valves and which fixtures do not flow through
backwater valves. As per UPC, Section 710 1, provide backwater valves on all building
drains which serve plumbing fixtures with flood rim elevations below the upstream
manhole nm elevations Only fixtures with flood rim levels below the upstream manhole
rim elevation may flow through a backwater valve
27. On the drawings show the location of the existing 2 inch water meter as per the
response and check the developed water line length as per the water line sizing
calculations. Show the water meter size and location and the water line size from the
water meter to the building
28 Correct the water line sizing calculations on sheet P6 1
A) Correct the pressure loss at the water meter as per UPC, Chart A-1 (For 74 GPM through a 2 inch
water meter the pressure loss is 5 psi)
CARLSBAD 05-0313
JUNE 2, 2005
B) As per UPC, Chart A-4 all the GPM values in the Pipe Sizing table on sheet P6 1 are too large
Please correct, then correct the fixture units values for both tank type and flush valves as per the
UPC, Charts A-3 and A-2
30 Please provide plumbing plans for fountain fill lines and drainage systems for equipment
rooms and drainage systems for fountains
a) The WF-sheets are incomplete and do not show the locations of pumps, filters, surge tanks, fill
lines and drainage systems
b) The plumbing plans do not show the fill lines and drainage systems for the proposed fountains and
fountain equipment
31 The plumbing plans do not show the water fountains' fill lines from the RPBP to each
fountain and the control valves for each fountain and the size and routes of fill lines from
the backflow devise to each fountain Please correct
32 Detail the connection of the 11/2 pressure dram lines from the sump pumps at the
Equipment Yard to the gravity sewer line, as per UPC, Section 7104
A) Show the PD (pressure dram line) sloping to dram back to the sump pumps
B) Detail the required wye branch fitting where the pressure drain line drops into the top of the gravity
sewer line
• MECHANICAL (2000 UNIFORM MECHANICAL CODE)
38 Please show the location of the proposed water feature pumps, filters and surge
tank. The response seem to note the equipment is outside the building, But the site
plans and the building floor plans do not show the proposed locations of the
proposed equipment. Please correct. Clearly show the required exhaust ventilation of
the proposed water feature equipment room
Note: If you have any questions regarding this Plumbing and Mechanical plan review list please
contact Glen Adamek at (858) 560-1468 To speed the review process, note on this list (or a
copy) where the corrected items have been addressed on the plans
CARLSBAD 05-0313
JUNE 2, 2005
DISABLED ACCESS REVIEW LIST
DEPARTMENT OF STATE ARCHITECT - TITLE 24
The following disabled access items are taken from the 2001 edition of California Building Code, Title 24 Per Section
101 1711, all publicly and privately funded public accommodations and commercial facilities shall be accessible to
persons with disabilities
NOTE All Figures and Tables referenced in this checklist are printed in the California Building Code, Title 24
Please see below for the HC items to be reflected on plans Alternatively, these items may be rephrased and imprinted
on plans provided the necessary changes are made on plans
• SITE PLAN REQUIREMENTS
1 Show that an accessible route of travel is to be provided to all portions of the building, to accessible building
entrances and between the building and the public way, per Section 11 14B 1 2
• ACCESSIBLE PARKING
2 The words "NO PARKING" shall be painted on the ground within each loading and unloading access aisle (in
white letters no less than 12" high and located so that it is visible to traffic enforcement officials) Section
1129B42
3 Ramps shall not encroach into any accessible parking space or the adjacent access aisle Section
1129B43
• SIGNAGE
4 Per Section 1003 2861, tactile exit signs shall be required at the following locations
a) Wherever basic UBC provisions require exit signs from a room or area to a corridor or hallway The
tactile exit sign shall have the words, "EXIT ROUTE "
b) Each grade-level exit door The tactile exit sign shall have the word, "EXIT "
c) Each exit door that leads directly to a grade-level exterior exit by means of a stairway The tactile exit
sign shall have the following words as appropriate
i) "EXIT STAIR DOWN ", "EXIT STAIR UP "
5 Tactile stair level identification signs (complying with Section 1117B 5 1) shall be located at each floor level
landing in all enclosed stairways in buildings two or more stories in height to identify the floor level At the exit
discharge level, the sign shall include a raised five-pointed star located to the left of the identifying floor level
Section 10033 3131
6 Where permanent identification is provided for rooms and spaces, raised letters shall also be provided and
. shall be accompanied by Braille Section 11 1 7B 5
7 Provide a note on the plans stating that the signage requirements of Section 1 1 1 7B 5 will be satisfied
EsGil Corporation
In <Partners&ip -untfi government for (BuiCding Safety
DATE FEB. 14, 2005
JURISDICTION CARLSBAD
PLAN CHECK NO. 05-0313 ' SET I
PROJECT ADDRESS 1811 ASTON AVENUE
PROJECT NAME The Blacfcmore Company Lobby & Core T.I.
Ji^EPLICANT
Q PLAN REVIEWER
a FILE
The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes
The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff
The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck
XI The check list transmitted herewith is for your information The plans are being held at Esgil
Corporation until corrected p!ans are submitted for recheck
The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person
XI The applicant's copy of the check list has been sent to
RICHARD CORNELIUS C/O RICHARD YEN & ASSOC 1024 ROSECRANS STREET, S D.,
CA92106
Esgil Corporation staff did not advise the applicant that the plan check has been completed
Esgil Corporation staff did advise the applicant that the plan check has been completed
Person contacted RICHARD (t/^i) Telephone # 619-224-3605
Date cSS^ylp' J/^ (by $&) Fax # 619-224-1530
MaiP^Telephone — Fax In Person
REMARKS
By All Sadre Enclosures
Esgil Corporation
Kl GA ^ MB D EJ D PC 2/03 trnsmtl dot
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858)560-1468 •* Fax (858) 560-1576
CARLSBAD 05-0313
FEB. 14, 2005
GENERAL PLAN CORRECTION LIST
JURISDICTION CARLSBAD PLAN CHECK NO O5-0313
PROJECT ADDRESS 1811 ASTON AVENUE
T I AREA = 10,214, TOTAL EXISTING FLOOR AREA = 60,000 S F , ALLOWABLE
= UNLIMITED V-N/SPR WITH 4-60'YARDS
TYPE OF OCCUPANCY = B, TYPE OF CONSTRUCTION = V-N/SPR ,
DATE PLAN RECEIVED BY DATE REVIEW COMPLETED
ESGIL CORPORATION 2/03 FEB. 14, 2005
REVIEWED BY All Sadre
FOREWORD (PLEASE READ):
This plan review is limited to the technical requirements contained in the Uniform
Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical
Code and state laws regulating energy conservation, noise attenuation and disabled
access This plan review is based on regulations enforced by the Building Department
You may have other corrections based on laws and ordinances enforced by the
Planning Department, Engineering Department or other departments
The following items listed need clarification, modification or change All items must be
satisfied before the plans will be in conformance with the cited codes and regulations
Per Sec 10643, 1997 Uniform Building Code, the approval of the plans does not
permit the violation of any state, county or city law
• Please make all corrections on the originals and submit three revised, signed
and stamped plans to the Building Department
• To facilitate rechecking, please identify, next to each item, the sheet of the
plans upon which each correction on this sheet has been made and return
this sheet with the revised plans
• Please indicate here if any changes have been made to the plans that are not a
result of corrections from this list If there are other changes, please briefly
describe them and where they are located on the plans Have changes been
made not resulting from this list? Q Yes Q No
1 On the first sheet of the plans indicate
• The actual areas versus allowable areas Also note the T I floor area under this permit.
• The occupant load of the remodel area(s)
CARLSBAD 05-0313
FEB. 14, 2005
2 Provide a section view of all new interior partitions Show
a) Type, size and spacing of studs including the allowable span of the studs on plans
Indicate gauge for metal studs Specify manufacturer and approval number or indicate "to
be ICBO approved"
b) Method of attaching the bottom plates to structure I e , note the shot pins size, spacing,
embedment, ICBO approval #, etc on plans
3 In buildings having floors of wood frame construction, draft stop the area
between the ceiling and floor above so that no concealed space exceeds 3,000
s f and no horizontal dimension exceeds 100 L F Section 708.
4 Please provide a full height section through the elevator shaft This is to be used
for coordination with the structural details so far as the new concrete walls and
their lateral support as proposed
5. In buildings having roofs of wood frame construction, draft stop the area between
the ceiling and roof above so that no concealed space exceeds 9,000 s f and no
horizontal dimension exceeds 100 L F Section 708
6 When two exits are required, dead end corridors are limited to 20 feet Section
1004 2 6 Show doors on corridors 118 & 119 on A1 1, near grid points 4-C 5 &
4-H 5 accordingly
7 Corridors shall have interior door openings protected by tight-fitting smoke and
draft control assemblies rated 20 minutes Doors shall be maintained self-closing
or be automatic closing by action of a smoke detector per Section 713 2 Doors
shall be gasketed to provide a smoke and draft sea! where the door meets the
stop on sides and top Section 1004,3 4321
8 Provide a complete architectural section of the corridor, showing all fire-resistive
materials and details of construction for all floor, walls, roof and all penetrations
Section 100434
9 Duct penetrations of fire-rated corridor construction shall have smoke and fire
dampers per Sections 713 10 and 713 11
10 If a room with an exhaust fan has a door opening into a rated corridor, show how
makeup air will be provided to the room The door cannot be undercut, nor can a
louver in the door be provided Section 1004 34321
11 Provide a note on plans stating "Penetrations of fire-resistive walls, floor-ceilings
and roof-ceilings shall be protected as required in UBC Sections 709 and 710 "
12 Please note on the cover sheet of plans that all the existing facilities including
site items, entrances, walks, ramps, parking, etc are HC complying, subject to
field verification
CARLSBAD 05-0313
FEB. 14, 2005
13. Provisions in Chapter 7 require special treatment of penetrations at fire-resistive
assemblies Provide typical details on the plans showing how the fire-resistive
integrity will be maintained at the following conditions (Include the manufacturers'
names and ICBO numbers (or equal) for any sealant)
THROUGH-PENETRATIONS (through the entire assembly)
Fire-resistive walls shall have penetrations protected with through-penetration fire stops
having an F-ratmg, T-ratmg or complying with UBC Standard 7-1, depending on their
locations, sizes and combustibility
Fire resistive floor/ceiling assemblies shall have penetrations protected with through-
penetration fire stops having and F-ratmg, T-ratmg or complying with UBC Standard 7-1,
depending on their sizes, combustibility and whether the penetrations are in walls above
MEMBRANE-PENETRATIONS (through only one side of an assembly)
Fire-resistive walls shall have penetrations protected with membrane-penetration fire
stops having an F-rating or complying with UBC Standard 7-1, depending on their size
and combustibility Limited steel electrical outlet boxes (not exceeding 16 sq in , nor
more than 100 sq tn foranylOOsq ft of wall) require no protection
Fire-resistive floors or ceilings having penetrations shall comply with Section 710
NOTE The plans should indicate the various fire-stop ratings required for all
penetrations
14 Please complete all blank bubbles, references and keynotes to xx/xx, '??/?'?, etc,
on plans
15 Please submit a copy of the soils report as noted on SP1 to EsGil for review
16 Please specify where details 9/SD1 & 10/SD2 are referenced on plans
17 On Sheet S2, specify the concrete wall thickness under the wall legend (for each
type)
18 Please complete, sign, stamp & return the attached Special Inspection form to
EsGil for review & approval prior to the permit being issued
19 Please see attached for P/M/E & HC items
• The jurisdiction has contracted with Esgil Corporation located at 9320
Chesapeake Drive, Suite 208, San Diego, California 92123, telephone number
of 858/560-1468, to perform the plan review for your project. If you have any
questions regarding these plan review items, please contact All Sadre at Esgil
Corporation Thank you
CARLSBAD 05-0313
FEB. 14, 2005
PLUMBING AND MECHANICAL CORRECTIONS
PLAN REVIEWER: Glen Adamek
20 Each sheet of the plans must be signed by the person responsible for their
preparation, even though there are no structural changes, before the permits are
issued Business and Professions Code
21 Clearly show the location of the water feature equipment (pumps, filters and 750
gallon surge tank) (Note the water feature equipment including piping for the
water feature may not be located in the elevator equipment room #110)
22 Provide design calculations and details for the support of the proposed 750
gallon surge tank for the water features
23 Please provide complete plans, details and calculations for the construction of
the proposed water features
24 Show the required ceiling rated fire dampers at duct openings in the fire rated
ceiling membranes UBC, Section 713 11 #4 Please provide a section through
the fire rated corridors to show the locations of the required fire rated ceiling
systems
25 Provide data on proposed hazardous material to be stored and used UBC,
Section ,307 and UFC
a) Clearly show types of hazardous material is being stored or used Provide
a list of the proposed hazardous materials as per the types in UBC,
Tables 3-D, and 3-E Provide the material safety data sheets (MSDS).
b) Clearly show the amounts of each type of hazardous material to be stored
and in use
c) Cieariy show where in the buildings each type of hazardous material is
being stored or used
PLUMBING (2000 UNIFORM PLUMBING CODE)
26 Please show the upstream sewer manhole rim elevation. As per UPC,
Section 7101, provide backwater valves on all building drains which serve
plumbing fixtures with flood nm elevations below the upstream manhole rim
elevations Only fixtures with flood rim levels below the upstream manhole rim
elevation may flow through a backwater valve
27 Show the water meter size and location and the water line size from the water
meter to the building
CARLSBAD 05-0313
FEB. 14, 2O05
28 Provide complete water line sizing calculations, including the water pressure,
pressure losses, water demands, and developed pipe lengths UPC Section
6100 and Appendix'A'
29 UPC, Section 601.2 Identification of a Potable and Nonpotable Water
System. In all buildings where potable water and not potable water systems are
installed, each system shall be clearly identified Each system shall be color
coded as follows
601.2.1 Potable Water - Green background with white lettering
601.2.2 Nonpotable Water (Water Feature water systems) - Yellow
background with black lettering, with the words "CAUTION NONPOTABLE
WATER, DO NOT DRINK".
Table 6-1 Minimum Length of Color Field and Size of Letters. See Table
30 Correct the floor drains at the Fountain Pool shown on sheet P4 1
a) The riser detail on sheet P6 1, detail 1 does not match the plumbing floor
plan on sheet P4 1 Please show how fountain water is kept from draining
into the sewer system during normal operations (Note the fountains are
not like bathtub drains )
b) Please provide data for the proposed Shut-off valve down stream of the
- required trap and vent Why is the Fountain Pool drains directly
connected to the building sewer system? (Most Pools and Fountains are
drained by pump system through an indirect dram, standpipe system )
31 Clearly show the required backflow protection of water feature fill lines As per
UPC, Section 603 4 5 Water supply inlets to tanks, vets, sumps, swimming
pools and other receptors shall be protected by one of following means
1 An approved airgap,
2 A listed vacuum breaker installed on the discharge side of the last valve
with the critical level not less than six (6) inches or in accordance with its
listing,
3 A backflow preventer suitable for the contamination or pollution, installed
in accordance with the requirements for that type of devise or assembly
as set forth in this chapter
32 Water closet bowls for public use shall be of the elongated type as per UPC
Section 409 1
33 All water closet seats, except those within dwelling units, shall be of the open
front type as per UPC, Section 409 2 2
34 Detail how combustion air for fuel burning water heaters will be provided in
accordance with the Uniform Plumbing Code, Section 507 0
CARLSBAD O5-0313
FEB. 14, 2O05
35 Show P & T valve on water heater and detail dram line route from P & T valve to
the exterior or approved receptor. UPC Section 608 5
36 Detail the connection of the two pressure dram lines from the sump pumps at the
Equipment Yard to the gravity sewer line As per UPC, Section 710.4 show
connection from the top of the gravity sewer line through a wye branch fitting
MECHANICAL (2000 UNIFORM MECHANICAL CODE)
37 Correct the ventilation of the Elevator Equipment Room #110 to provide the
required independent ventilation system for the elevator equipment room to
prevent the overheating of the electrical equipment as per UBC Section 3005 1
38 Clearly show the required exhaust ventilation of the proposed water feature
equipment room
Note: If you have any questions regarding this Plumbing and Mechanical plan review
list please contact Glen Adamek at (858) 560-1468 To speed the review process, note
on this list (or a copy) where the corrected items have been addressed on the plans
CARLSBAD 05-0313
FEB. 14, 2O05
ELECTRICAL AND ENERGY CORRECTIONS
PLAN REVIEWER: Morteza Beheshti
• ELECTRICAL (1999 NATIONAL ELECTRICAL CODE)
1. Show or note on the plans the method used to limit fault currents to 10,000 amps
on branch circuits. NEC 230-208
2 Duplicate panel schedules have been submitted on sheet E5 1 Please clarify
and eliminate one set
3 Please clarify existing and new equipment on sheet E2 2.
4. Please provide a minimum of 1 foot-candle of emergency illumination at the floor
level NEC 700-16.
5 Please complete sheet notes such as on sheet E1 0
6 Provide GFI protected receptacle(s) within 25 feet of HVAC equipment NEC
210-8(b)2& 210-63
• ENERGY CONSERVATION
7. The energy forms are ok
Note: If you have any questions regarding this Electrical or Energy plan review
list please contact Morteza Beheshti at (858) 560-1468 To speed the review
process, note on this list (or a copy) where the corrected items have been
addressed on the plans
ESGIL CORP FBX 1^535601576 Feb 15 2005 y 04 P 10r
CARLSBAD O5-O313
FEB. 14, 3005
City of Carlsbad
Building Department
BUILDING DEPARTMENT
NOTICE OF REQUIREMENT FOR SPECIAL DEFECTION
Do Not Remove From Plans
Plan Check No. O5-0313
Job Address or Legal Description 1811 ASTON AVENUE
Owner TtekA6M>te O). Address
.You arc hereby notified that in addition to the inspection of construction provides by the Building
Department, an approved Registered Special Inspector is required to provide continuous inspection during
the performance of the phases of construction indicated on the reverse side of this sheet.
The Registered Special Inspector shall be approved by the City of Carlsbad Building
Department prior to the issuance of the building permit Special Inspectors having a
current certification from the City of San Diego, Los Angeles, or ICBO are approved as
Special Inspectors for the type of construction for which they are certified.
The inspections by a Special Inspector do not change the requirements for inspections by
personnel of the City of Carlsbad building department. The inspections by a Special
Inspector are m addition to the inspections normally required by the County Building
Code.
The Special Inspector is not authorized to inspect and approve any work other than that for which he/she
15 specifically assigned to inspect. The Special Inspector is not authorized to accept alternate materials,
structural changes, or any requests for plan changes. The Special Inspector is required to submit written
reports to the City of Carlsbad building department of all work that he/she inspected and approved The
final inspection approval will not be given until all Special Inspection reports have been received and
approved by the City of Carlsbad building department.
Please submit the names of the inspectors who will perform the special inspections on each of the items
indicated on the reverse side of this sheet
(over)
ESGIL COFP Fa/'19535601576 Feb 15 2005 05 P 11
CARLSBAD 05-0313
FEB. 14, 2O05
SPECIAL INSPECTION PROGRAM
ADDRESS OR LEGAL DESCRIPTION:
PLAN CHECK NUMBER: CgO5-3l5 OWNER'S NAME: Tlte
i, as the owner, of agent of the owner {contractors ma/ DSS employ the special inspector), certify that I,
or the architect/engineer of record, will be responsible for employing the special inspectors) as rsquirsd
by Uniform Building Code (UBC) Section 1701.1 for the construction project located at the site listed
above UBC Section 106 3 5
Signed
I, as the engineer/architect of record, certify that I have prepared the following special inspection program as
b> USC 3cb>uuii 1 06 3 5 fur the project located at the site listed above.
Signed C-
1. List of work requiring special Inspection:
E3 Soils Compliance Prior to Foundation Inspection
CE3 Structural Concrete Over 2500 PSI
Q Prestressed Concrete
O Structural Masonry
LJ Designer Specified
2. Name(s) of indlvldual(s) or firm{s} respo
A. ___
g Fiald Welding
D High Strength Bolting
^ Expansion/Epoxy Anchor
f"! Sprayed-Cn
D Other
aetu
C.
3. Duties of the special inspectors for the work listed above;
A.
B,
C.
Spedai inspectors shall cneck ir with the City and present their credentials for approval prior to beginning work on the Job site
CARLSBAD 05-0313
FEB. 14, 2O05
DISABLED ACCESS REVIEW LIST
DEPARTMENT OF STATE ARCHITECT - TITLE 24
The following disabled access items are taken from the 2001 edition of California Building Code, Title 24 Per Section
101 17 11, all publicly and privately funded public accommodations and commercial facilities shall be accessible to
persons with disabilities
NOTE All Figures and Tables referenced in this checklist are printed in the California Building Code, Title 24
Please see below for the HC items to be reflected on plans Alternatively, these items may be rephrased and imprinted
on plans provided the necessary changes are made on plans
• SITE PLAN REQUIREMENTS
1 Show that an accessible route of travel is to be provided to all portions of the building, to accessible building
entrances and between the building and the public way, per Section 1114B 1 2
• ACCESSIBLE PARKING
2 The words "NO PARKING" shall be painted on the ground within each loading and unloading access aisle (in
white letters no less than 12" high and located so that it is visible to traffic enforcement officials) Section
1129B42
3 Ramps shall not encroach into any accessible parking space or the adjacent access aisle Section
1129B43
• SIGNAGE
4 Per Section 1003 2861, tactile exit signs shall be required at the following locations
a) Wherever basic UBC provisions require exit signs from a room or area to a corridor or hallway The
tactile exit sign shall have the words, "EXIT ROUTE"
b) Each grade-level exit door The tactile exit sign shall have the word, "EXIT"
c) Each exit door that leads directly to a grade-level exterior exit by means of a stairway The tactile exit
sign shall have the following words as appropriate
i) "EXIT STAIR DOWN ", "EXIT STAIR UP"
5 Tactile stair level identification signs (complying with Section 1117B 5 1) shall be located at each floor level
landing in all enclosed stairways in buildings two or more stones in height to identify the floor level At the exit
discharge level, the sign shall include a raised five-pointed star located to the left of the identifying floor level
Section 10033 3131
6 Where permanent identification is provided for rooms and spaces, raised letters shall also be provided and
shall be accompanied by Braille Section 1117B 5
7 Provide a note on the plans stating that the signage requirements of Section 1117B 5 will be satisfied
CARLSBAD 05-0313
FEB. 14, 2005
VALUATION AND PLAN CHECK FEE
JURISDICTION: CARLSBAD PLAN CHECK NO/ 05-0313
PREPARED BY All Sadre DATE FEB. 14, 2005
BUILDING ADDRESS 1811 ASTON AVENUE
BUILDING OCCUPANCY. B TYPE OF CONSTRUCTION V-N/SPR
BUILDING
PORTION
REMODEL
-
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code
AREA
(Sq Ft)
10214
-
CB
Valuation
Multiplier
*
By Ordinance
Reg
Mod
VALUE ($)
316,634
$1,214,92
1994 UBC Plan Check Fee
Type of Review Complete Review Structural Only
$789.70
I I Repetitive Fee
Repeats
Other
Hourly
Esgil Plan Review Fee
Hour
$680 36
Comments
Sheet 1 of 1
macvalue doc
DATE
BUILDING ADDRESS
PROJECT DESCRIPTION
City of Carlsbad1^—_l^^_^__^^^___^^^_^^__^_«_gH«____«_«______p._____
Public Works — Engineering
BUILDING PLANCHECK CHECKLIST
/f//
PLANCHECK NO CB
ASSESSOR'S PARCEL NUMBER EST VALUE ^/j
ENGINEERING DEPARTMENT
APPROVAL
The item you have submitted for review has been
approved The approval is based on plans,
information and/or specifications provided in your
submittal, therefore any changes to these items after
this date, including field modifications, must be
reviewed by this office to insure continued
conformance with applicable codes Please review
carefully ail comments attached, as failure to comply
with instructions in this report can result in
suspension of permit to build
Q A Right-of-Way permit is required prior to
construction of the following improvements
DENIAL
Please see^fnT^tattached report of deficienciesJT j r
marked with D Wake necessary corrections to plans
or sperailicaiierfs for compliance with applicable
codesfand standards Submit corrected plans and/or
specifications to this offpe^orreview
By
By
Date
Date
ENGINEERING AUTHORIZATION TO ISSUE BUILDING PERMIT
Date
FOR OFICIAL USE ONLY
'
ATTACHMENTS
i J Dedication Application
' - Dedication Checklist
U Improvement Application
LJ Improvement Checklist
D Neighborhood Improvement Agreement
G Grading Permit Application
D Grading Submittal Checklist
Li Right-of-Way Permit Application
fj Right-of-Way Permit Submittal Checklist
and Information Sheet
ENGINEERING DEPT CONTACT PERSON
Name KATHLEEN M. FARMER
City of Carlsbad
Address 1635 Faraday Avenue, Carlsbad, CA 92008
Phone (760) 602-2741
CFD INFORMATION
Parcel Map No
Lots
Recordation
Carlsbad Tract
CA 92OO^-7314 (76O) 602-272O - FAX (760)
BUILDING PLANCHECK CHECKLIST
SITE PLAN
1SV 2ND ^ •S D LJ 1 Provide a fully dimensioned site plan drawn to scale Show
A North Arrow F Right-of-Way Width & Adjacent Streets
B Existing & Proposed Structures G Driveway widths
C Existing Street Improvements H Existing or proposed sewer lateral
D Property Lines (show all dimensions) I Existing or proposed water service
E Easements J Existing or proposed irrigation service
] D 2 Show on site plan
A Drainage Patterns
1 Building pad surface drainage must maintain a minimum slope of one
percent towards an adjoining street or an approved drainage course
2 ADD THE FOLLOWING NOTE "Finish grade will provide a minimum positive
drainage of 2% to swale 5' away from building "
B Existing & Proposed Slopes and Topography
C Size, type, location, alignment of existing or proposed sewer and water service (s)
that serves the project. Each unit requires a separate service, however, second
dwelling units and apartment complexes are an exception
D. Sewer and water laterals should not be located within proposed driveways, per
standards
] [3 3 Include on title sheet-
A Site address
B Assessor's Parcel Number
C Legal Description
For commercial/industrial buildings and tenant improvement projects, include
total building square footage with the square footage for each different use,
existing sewer permits showing square footage of different uses (manufacturing,
warehouse, office, etc ) previously approved
EXISTING PERMIT NUMBER DESCRIPTION
Show all existing use of SF and new proposed use of SF.
Example:
Tenant Improvement for 3500 SF of warehouse to 3500 SF of office.
F \FarmertKalhy\MASTERS\Building Plancneck Cklsl Form (Generic) doc
BUILDING PLANCHECK CHECKLIST
1ST 2ND 3RD DISCRETIONARY APPROVAL COMPLIANCE
D D D 4a Project does not comply w;th the following Engineering Conditions of approval for
Project No
4b All conditions are in compliance Date
DEDICATION REQUIREMENTS
D D CD 5 Dedication for all street Rights-of-Way adjacent to the building site and any storm
dram or utility easements on the building site is required for all new buildings and
for remodels with a value at or exceeding $ 15.000 . pursuant to Carlsbad
Municipal Code Section 18 40 030
Dedication required as follows
Dedication required Please have a registered Civil Engineer or Land Surveyor
prepare the appropriate legal description together with an 8 Yz" x 11" plat map and
submit with a title report All easement documents must be approved and signed
by owner(s) prior to issuance of Building Permit Attached please find an
application form and submittal checklist for the dedication process Submit the
completed application form with the required checklist items and fees to the
Engineering Department in person Applications will not be accept by mail or fax
Dedication completed by Date
IMPROVEMENT REQUIREMENTS
6a All needed public improvements upon and adjacent to the building site must be
constructed at time of building construction whenever the value of the
construction exceeds $ 75.000 . pursuant to Carlsbad Municipal Code Section
1840040
Public improvements required as follows
Attached please find an application form and submittal checklist for the public
improvement requirements A registered Civil Engineer must prepare the
appropriate improvement plans and submit them together with the requirements
on the attached checklist to the Engineering Department through a separate plan
check process The completed application form and the requirements on the
F \Farmer\Kalhy\M AST ERSiBui Id ing Plancheck Cklst Form (Generic) doc
V
BUILDING PLANCHECK CHECKLIST
..ST
CH D checklist must be submitted in person. Applications by mail or fax are not
accepted improvement plans must be approved, appropriate securities posted
and fees paid prior to issuance of building permit
Improvement Plans signed by Date
LD n D 6b Construction of the public improvements may be deferred pursuant to Carlsbad
Municipal Code Section 1840 Please submit a recent property title report or
current grant deed on the property and processing fee of $ 360 00 so we may
prepare the necessary Neighborhood Improvement Agreement This agreement
must be signed, notarized and approved by the City prior to issuance of a
Building permit
Future public improvements required as follows
6c Enclosed please find your Neighborhood Improvement Agreement Please return
agreement signed and notarized to the Engineering Department
Neighborhood Improvement Agreement completed by
Date
CD D Q 6d No Public Improvements required SPECIAL NOTE Damaged or defective
improvements found adiacent to building site must be repaired to the satisfaction
of the City Inspector prior to occupancy
GRADING PERMIT REQUIREMENTS
The conditions that invoke the need for a grading permit are found in Section
11 06 030 of the Municipal Code
D D D 7a Inadequate information available on Site Plan to make a determination on grading
requirements Include accurate grading quantities in cubic yards (cut, fill import,
export and remedial) This information must be included on the plans.
D D 7b Grading Permit required A separate grading plan prepared by a registered Civil
Engineer must be submitted together with the completed application form
attached NOTE The Grading Permit must be issued and rough grading
approval obtained prior to issuance of a Building Permit
Grading Inspector sign off by Date
D D 7c Graded Pad Certification required (Note: Pad certification may be required even
if a grading permit is not required )
F \FaimerM<athy\MASTERS\BijildinB Plancheck Ckist Form (Generic) doc
9
BUILDING PLANCHECK CHECKLIST
..ST pND QRD
D D D 7d No Grading Permit required
D D D 7e If grading is not required, write "No Grading" on plot plan
MISCELLANEOUS PERMITS
D D D 8 A RIGHT-OF-WAY PERMIT is required to do work in City Right-of-Way and/or
private work adjacent to the public Right-of-Way Types of work include, but are
not limited to street improvements, tree trimming, driveway construction, tying
into public storm dram, sewer and water utilities
Right-of-Way permit required for
D D 9 INDUSTRIAL WASTE PERMIT If your facility is located in the City of Carlsbad
sewer service area, you need to contact the Carlsbad Municipal Water District,
located at 5950 El Cammo Real, Carlsbad, CA 92008 District personnel can
provide forms and assistance, and will check to see if your business enterprise is
on the EWA Exempt List You may telephone (760) 438-2722, extension 7153,
for assistance
Industrial Waste permit accepted by .
Date
D IH D 10 NPDES PERMIT
Complies with the City's requirements of the National Pollutant Discharge
Elimination System (NPDES) permit The applicant shall provide best
management practices to reduce surface pollutants to an acceptable level prior to
discharge to sensitive areas Plans for such improvements shall be approved by
the City Engineer prior to issuance of grading or building permit, whichever
occurs first
-Q~~ D D 11 Q Required fees are attached -
^SfNofees required ^o^^i ^ ^-^^
WATER METER REVIEW
D D D 12a Domestic (potable) Use
Ensure that the meter proposed by the owner/developer is not oversized
Oversized meters are inaccurate during low-flow conditions If it is oversized, for
the life of the meter, the City will not accurately bill the owner for the water used
• All single family dwelling units received "standard" 1" service with 5/8" service
ertKathy\MASTEHS\Building Planchsck Cklsl Form (Generic) doc
ST >RD
D D D 12b
BUILDING PLANCHECK CHECKLIST
• If owner/developer proposes a size other than the "standard", then
owner/developer must provide potable water demand calculations,
which include total fixture counts and maximum water demand in gallons
per minute (gpm) A typical fixture count and water demand worksheet is
attached Once the gpm is provided, check against the "meter sizing
schedule" to verify the anticipated meter size for the unit
• Maximum service and meter size is a 2" service with a 2" meter
• If a developer is proposing a meter greater than 2", suggest the
installation of multiple 2" services as needed to provide the anticipated
demand (manifolds are considered on case by case basis to limit
multiple trenching into the street)
Irrigation Use (where recycled water is not available)
• All irrigation meters must be sized via irrigation calculations (in gpm) prior
to approval The developer must provide these calculations Please follow
these guidelines
1 If the project is a newer development (newer than 1998), check the recent
improvement plans and observe if the new irrigation service is reflected on
the improvement sheets If so, at the water meter station, the demand in
gpm may be listed there Irrigation services are listed with a circled "I",
and potable water is typically a circled "W" The irrigation service should
look like
STA 1+00 Install 2" service and
1 5 meter (estimated 100 gpm)
If the improvement plans do not list the irrigation meter and the
service/meter will be installed via another instrument such as the building
plans or grading plans (w/ a right of way permit of course), then the
applicant must provide irrigation calculations for estimated worst-case
irrigation demand (largest zone with the farthest reach) Typically, Larry
Black has already reviewed this if landscape plans have been prepared,
but the applicant must provide the calculations to you for your use Once
you have received a good example of irrigation calculations, keep a set for
your reference In general the calculations will include
• Hydraulic grade line
• Elevation at point of connection (POC)
• Pressure at POC in pounds per square inch (PSI)
• Worse case zone (largest, farthest away from valve.
• Total Sprinkler heads listed (with gpm use per head)
• Include a 10% residual pressure at point of connection
In general, ail major sloped areas of a subdivision/project are to be
irrigated via separate irrigation meters (unless the project is only SFD with
no HOA) As long as the project is located within the City recycled water
F \Farmer\KathyWASTERS\Buildmg Planchack Cklal Form (Generic) due
1ST 2r
BUILDING PLANCHECK CHECKLIST
3RD
service boundary, the City intends on switching these irrigation
services/meters to a new recycled water line in the future
CD 12c Irrigation Use (where recycled water is available)
1 Recycled water meters are sized the same as the irrigation meter above
2 If a project fronts a street with recycled water, then they should be
connecting to this line to irrigate slopes within the development For
subdivisions, this should have been identified, and implemented on the
improvement plans Installing recycled water meters is a benefit for the
applicant since they are exempt from paying the San Diego County Water
Capacity fees However, if they front a street which the recycled water is
there, but is not live (sometimes they are charged with potable water until
recycled water is available), then the applicant must pay the San Diego
Water Capacity Charge If within three years, the recycled water line is
charged with recycled water by CMWD, then the applicant can apply for a
refund to the San Diego County Water Authority (SDCWA) for a refund
However, let the applicant know that we cannot guarantee the refund, and
they must deal with the SDCWA for this
13,. Additional Comments
F \Farmer\Kalliy\M AST ERS\Buildi tig Plancheck Cklsl Form (Generic) do 7
(t:
n
n
ENGINEERING DEPARTMENT
FEE CALCULATION WORKSHEET
Estimate based on unconfirmed information from applicant
Calculation based on building plancheck plan submittal
Address Bldg Permit No
Prepared by Date Checked by Date
EDU CALCULATIONS List types and square footages for all uses
Types of Use Sq Ft /Units
Types of Use Sq Ft /Units
APT CALCULATIONS List types and square footages for all uses
Types of Use Sq Ft /Units
Types of Use Sq Ft /Units
EDU's
EDU's
ADT's
ADT's
FEES REQUIRED
WITHIN CFD D YES (no bridge & thoroughfare fee in District #1, reduced Traffic Impact Fee) D NO
D 1 PARK-IN-LIEU FEE
FEE/UNIT
PARK AREA & #
X NO UNITS = $
D 2 TRAFFIC IMPACT FEE
ADT's/UNITS X FEE/ADT — $
n
D
n
3 BRIDGE AND THOROUGHFARE FEE
ADT's/UNITS
4 FACILITIES MANAGEMENT FEE
UNIT/SO FT
5 SEWER FEE
EDU's
BENEFIT AREA
EDU's
(DIST #1 DIST #2
X FEE/ADT
ZONE
X FEE/SQ FT /UNIT
X FEE/EDU
X FEE/EDU
DIST #3 )
= $
= $
= $
D 6 SEWER LATERAL ($2,500)
D 7 DRAINAGE FEES PLDA HIGH
ACRES X FEE/AC _
D 8 POTABLE WATER FEES
UNITS CODE CONNECTION FEE METER FEE
= $
/LOW
= $
SDCWA FEE IRRIGATION
r9|r,,|ai|nn Worksheet
1 of 2
Rev 7/14/00
S %
o o
J
n, t*a*\ -,*•s- -fin0 g
o
DD
PLANNING DEPARTMENT
BUILDING PLAN CHECK REVIEW CHECKLIST
Plan Check No CB /*? } '_
r~* t +^i
APN:
f£>((Address
Phone (760) 602-
Type of Project & Use..
Zoning: CM General Plan: P'l
CFD (in/out) #__Date of participation:.
Net Project Density. f^/A_ -DU/AC
Facilities Management Zone:
Remaining net dev acres.
Circle One (For non-residentiaf development' Type of land used created by this
permir___ )
Legend: IS Item Complete -
Environmental Review Required:% ' •
DATE OF COMPLETION* '
Item Incomplete - Needs your action
YES _ 1 NO _ TYPE _— ~"
Compliance with conditions of approval? If not, state conditions which require action.
Conditions of Approval: _____
Discretionary Action Required:
APPROVAURESO. NO
PROJECT NO
YES NO TYPE
DATE
OTHER RELATED CASES.
Compliance with conditions or approval? If not, state conditions which require action.
Conditions of Approval: ,
Coastal Zone Assessment/Compliance
Project s/te located in Coastal Zone*? YES___ NO_
CA Coastal Commission Authority? YES NO.
If California Coastal Commission Authority. Contact them at - 7575 Metropolitan Drive, Suite 103,
San Diego CA 92108-4402; (619) 767-2370
Determine status (Coastal Permit Required or Exempt)
Coastal Permit Determination Form already completed? YES NO
If NO, complete Coastal Permit Determination Form now
Coastal Permit Determination Log #: >
Follow-Up Actions: ... s \ ,r \ \ *
1) Stamp Building Plans as "Exempt" or "Coastal Permit Required" (at minimum Floor Plans).
2) Complete Coastal Permit Determination Log as needed.
* - "^ .
InclusionaryHbusing Fee required: YES l NO '" l - ' \ ' >
(Effective date of Inclusionary Housing Ordinance - May 21,1993.) ; , '
Data Entry Completed? YES NO '
(A/P/Ds^ Activity Maintenance, enter CB#, toolbar, Screens, Housing Fees, Construct Housing Y/N,
Enter Fee, UPDATE!)
Site Plan:
H VADMIN\COUI^ER\BldgPinchkRevChklst Rev 9/01
an
a a
an
CD Q 1- Provide a fully dimensional site plan drawn to scale. Show: North arrow, property lines,
easements, existing and proposed structures, streets, existing street improvements, right-of-way
width, dimensional setbacks and existing topographical lines (including all side and rear yard
, slopes). '„ x' '
d Q 2. Provide legal description of property and assessor's parcel number. — _ _.;
» " "* **"" */ '
\ • * ^ *
Policy 44 - Neighborhood Architectural Design Guidelines
D 1. Applicability: YES NO X
D D D 2. Project complies YES NO
Zoning:
fe D D 1- Setbacks:
Front: Required
Interior Side: Required
Street Side: Required ^^^ mmwn s s< s
Rear: Required Shown ^^\Y&^\—
Top of slope: Required Shown
<£iszL^tcna PertnitJ/ r '
Shown _
Shown _
Shown
Shown
{ O
D [U D 2- Accessory structure setbacks:
Front: Required
Interior Side: Required
Street Side: Required
Rear: Required
Structure separation: Required.
3. Lot Coverage: Required.
4. Height' Required.
Shown
Shown
Shown
Shown
Shown
5. Parking:Spaces Required
Shown
Shown
Shown
(breakdown by uses for commercial and industrial projects required)
Residential Guest Spaces Required Shown
j
Additional Comments Cl\£'
maw
OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER
H'\ADMIN\COUNTER\BldgPInchkRevChklst
DATE
Rev 9/01
Carlsbad Fire Department 050313
' 1635 Faraday Ave
v Carlsbad, CA 92008
Plan Review Requirements Category:
Date of Report 03/25/2005
Fire Prevention
(760) 602-4660
Building Plan
Reviewed by
Name
Address
YEN & ASSOC
1024ROSECRANSST
City, State SAN DIEGO CA 92106
Plan Checker
Job Name Blackmore-Lot 66
Job# 050313
Job Address 1811 Aston Ave
h J
Bldg# CB050313
Ste orBldg No
Approved The item you have submitted for review has been approved The approval is
based on plans, information and / or specifications provided in your submittal,
therefore any changes to these items after this date, including field
modifications, must be reviewed by this office to insure continued conformance
with applicable codes and standards Please review carefully all comments
attached as failure to comply with instructions in this report can result in
suspension of permit to construct or install improvements
Approved
Subject to
The item you have submitted for review has been approved subject to the
attached conditions The approval is based on plans, information and/or
specifications provided in your submittal Please review carefully all comments
attached, as failure to comply with instructions in this report can result in
suspension of permit to construct or install improvements Please resubmit to
this office the necessary plans and / or specifications required to indicate
compliance with applicable codes and standards
Incomplete The item you have submitted for review is incomplete At this time, this office
cannot adequately conduct a review to determine compliance with the
applicable codes and / or standards Please review carefully all comments
attached Please resubmit the necessary plans and / or specifications to this
office for review and approval
Review
FD Job #
1st 9nH 3rd
050313 FDFile#
Other Agency ID
^Requirements Category: Building Plan
Requirement Pending 05 01 Project Data
Provide complete address and suite designation Provide building construction information indicating
occupancy classification, type of construction, number of stories, aggregate square footage,
occupant load, and description of intended uses
UNDER FIRE NOTES THERE ARE SEVERAL REFERENCES TO "FHPS POLICY" FOLLOWED BY
AN ALPHANUMERIC DESIGNATOR PLEASE REMOVE ANY AND ALL OF THESE
REFERENCES
PLEASE INCLUDE THE FOLLOWING NOTE " THE FIRE SPRINKLER SYSTEM FOR THIS
BUILDING MUST BE DESIGNED TO 33GPM/3000 S F PROVIDE NOTE ON THE PLANS THAT
FIRE SPRINKLER PLANS SHALL BE SUBMITTED TO THE FIRE DEPARTMENT FOR APPROVAL
PRIOR TO INSTALLATION
Requirement Pending 05 05 Water Improvement Plans
Submit water improvement plans for review and approval
AS PREVIOUSLY DISCUSSED WITH THE SHELL BUILDING ARCHITECT, THE FIRE
DEPARTMENT WOULD PREFER THAT THE FIRE SPRINKLER RISER BE LOCATED IN A ROOM
OR AREA ACCESSIBLE FROM THE EXTERIOR ADDITIONALLY THIS ROOM MAY ALSO BE
USED FOR OTHER UTILITIES SO LONG AS PROPER SEPERATIONS CAN BE MAINTAINED
Requirement Pending 0521 Exit Doors
Exit doors shall be of the pivoted type or side hinged swinging type Exit doors shall swing in the
direction of exit travel when serving an occupant load of 50 or more
Special Doors - Revolving, sliding and overhead doors shall not be used as required exits
Power-operated doors complying with UBC Standard 7-8 may be used for exit purposes
Additional Doors - When additional doors are provided for egress purposes, they shall conform to all
the provisions of UBC Chapter 10
See item 32 for specific requirements for your exit doors
THE DOORS LEADING INTO AND FROM THE RATED EXIT STAIRWELLS SHALL BE RATED 60
MINUTE DOORS PLEASE REVISE DOOR SCHEDULE AND SHEET A 1 1 AND A 1 2
SHEET A 6 1 - DOOR AND WINDOW SCHEDULE REVISE NOTES FOR DOOR 210 TO
REFLECT FIRE LABEL 60 MIN AND CHANGES NOTED ABOVE
DOORS 103 AND 115 SHALL BE RATED DOORS
IN REMARKS FOR ALL RATED DOORS PLEASE INCLUDE SMOKE SEALS
Page 1 03/25/05
Carlsbad Fire Department 050313
1635 Faraday Ave
Carlsbad, CA 92008
Plan Review Requirements Category:
Date of Report Q2/Q8/20Q5
Fire Prevention
(760) 602-4660
Building Plan
Reviewed by
Name
Address
YEN & ASSOC
1024ROSECRANSST
City, State SAN DIEGO CA 92106
Plan Checker
Job Name Lot 66, 1811 Aston
Job# 050313
Job Address 1811 Aston Ave
D
Bldg# CB050313
Ste orBldg No
Approved The item you have submitted for review has been approved The approval is
based on plans, information and / or specifications provided in your submittal,
therefore any changes to these items after this date, including field
modifications, must be reviewed by this office to insure continued conformance
with applicable codes and standards Please review carefully all comments
attached as failure to comply with instructions in this report can result in
suspension of permit to construct or install improvements
Approved The item you have submitted for review has been approved subject to the
Subject to " attached conditions The approval is based on plans, information and/or
specifications provided in your submittal Please review carefully all comments
attached, as failure to comply with instructions in this report can result in
suspension of permit to construct or install improvements Please resubmit to
this office the necessary plans and / or specifications required to indicate
compliance with applicable codes and standards
Incomplete The item you have submitted for review is incomplete At this time, this office
cannot adequately conduct a review to determine compliance with the
applicable codes and / or standards Please review carefully all comments
attached Please resubmit the necessary plans and / or specifications to this
office for review and approval
RRUIRW 1 st
FDJob# 050313
2nc) 3rH Other Agency ID
FDFile#
Requirements Category:Building Plan
Requirement Pending 0521 Exit Doors
Exit doors shall be of the pivoted type or side hinged swinging type Exit doors shall swing in the
direction of exit travel when serving an occupant load of 50 or more /
Special Doors - Revolving, sliding and overhead doors shall not be used as required exits
Power-operated doors complying with UBC Standard 7-8 may be used for exit purposes
Additional Doors - When additional doors are provided for egress purposes, they shall conform to all
the provisions of UBC Chapter 10
See item 32 for specific requirements for your exit doors
THE DOORS LEADING INTO AND FROM THE RATED EXIT STAIRWELLS SHALL BE RATED 60
MINUTE DOORS PLEASE REVISE DOOR SCHEDULE AND SHEET A 1 1 AND A 1 2
SHEET A 6 1 - DOOR AND WINDOW SCHEDULE REVISE NOTES FOR DOOR 210 TO
REFLECT FIRE LABEL 60 MIN AND CHANGES NOTED ABOVE
IN REMARKS FOR ALL RATED DOORS PLEASE IN CLUDE SMOKE SEALS
Page 1 02/08/05
STRUCTURAL CALCULATIONS
PROJECT LOT
HOROWITZTAYLORKUSHKAKI
STRUCTURAL ENGINEERS
DESIGN ASSUMPTIONS
CONCRETE STRENGTH AT TWENTY EIGHT DAYS
MASONRY GRADE "N" CONCRETE BLOCK F ' M =
MORTAR TYPE S 1,800 PS!
GROUT _ 2000 PSl
REINFORCING STEEL A-615 GRADE 40.
GRADE 60
STRUCTURAL STEEL A-36
LUMBER DOUGLAS FIR-LARCH
JOISTS
BEAMS AND POSTS
STUDS
SEISMIC FORCE
PSl
PS!
#4 AND LESS (U O N
#5 AND LARGER
#2
#2
STUD OR BETTER
REPORT BY
WIND FORCE
DESIGN LOADS
RO'OF DEAD LOAD
SLOPING
ROOFING
PLYWOOD
JOISTS
INSUL & CLG
MISC
TOTAL =
ROOF LIVE LOAD
SLOPING
FLAT
REPORT NO SOIL PRESSURE 2-OOO
FLAT
FLOOR DEAD LOAD
JNT
FLOORING
PLYWOOD
JOISTS
INSUL &CLG
MISC
TOTAL =
FLOOR LIVE LOAD
INTERIOR
BALCONY
EXIT WALKWAY
EXT
WALL DEAD LOAD
INTERIOR
EXTERIOR
10PSF
16PSF
40 PSF
60 PSF(UON)
100 PSF
These calculations are Jimjted only to the items included herein, selected by the client and do not imply approval of any other portion
of the structure by this office These calculations are not valid if altered in any way, or not accompanied by a wet stamp and
signature of the Engineer of Record
Job No
£>4^n
Designed By
&£>-_• i_j
Date
if [30/04
14288 Damelson St • Suite 200 * Poway CA 92064-8819 •679-8989 • Fax (858) 679-8959
I*-*
106-
£
V } = , 17
<2-r"
~ Vz," ft
U? V,
'<_ = loS v*
* "00
, 5: i-
7
TV •*• ,
UJ frlffl^JftU.
TOf
Vi J
?t
p^
3.=,
i ^ «,T ' 1 0
<3 -
^ V -
= IgZ l-tt
•o ~
®
•'
V '
//I
^
-f
-
Geotechnical - Geologic • Environmental
5741 Palmer Way - Carlsbad, California 92008 • (760)438-3155 - FAX (760) 931-0915
March 21, 2005
W O 4466-A-SC
The Blackmore Company
1530 Faraday Avenue, Suite170
Carlsbad, California 92008
Attention Ms Colleen Blackmore
Subject Geotechnical Review of Lobby and Core Improvements Plans, Carlsbad
Research Center, Lot 66, Carlsbad, San Diego County, California
Dear Ms Biackmore
In accordance with your request, GeoSoils, Inc (GSI) has reviewed the existing soils
reports (GSI, 2004a, 2004b, 1998, and 1996) and the lobby and core improvements plans
(HTK, Structural Engineers [HTK], 2004) for the proposed development, and has prepared
this geotechnical plan review letter The purpose of our study was to review HTK (2004)
for general conformance with the recommendations outlined in GSI (2004a, 2004b, 1998,
and 1996) Our scope of services has included a review of the existing soils reports (GSI,
2004a, 2004b, 1998, and 1996), and the lobby and core improvements plans (HTK, 2004),
analysis of data, and the preparation of this geotechnical review letter Unless specifically
superceded in the text of this report, the recommendations presented in GSI (2004a,
2004b, 1998, and 1996) are considered valid and applicable, and should be appropriately
implemented during planning, design, and construction GSI recommends that the
structural consultant for the mam building review and comment on these plans with regard
to geometric layout of footings within the main foundation plan The wall column loads
should also be reviewed for structural compatibility
o
PROPOSED DEVELOPMENT
*r
It is our understanding that the proposed development is to consist of preparing the site
for the construction of a two-story, "tilt-up" commercial building that would be supported
by continuous and pad footings with a concrete slab-on~grade floor
GEOTECHNICAL REVIEW OF LOBBY AND CORE IMPROVEMENTS PLANS
The reviewed structural plans, notes, and details appear to be in general conformance with
the recommendations provided by this office and presented in GSI (2004a, 2004b, 1998,
and 1996), from a geotechnical viewpoint Based on our review, the following comments
are provided
1 The reference to the soils report on sheet SP1 is incorrect with respect to GSI's
project number and date of publication. It is the opinion of GSI that GSI (2004a and
2004b) and this letter should be referenced on HTK (2004)
2 Foundation Note No 3 on sheet SP1 should indicate that all footings should be a
minimum of 24 inches deep below the lowest adjacent grade This should be
indicated on all structural details regarding the proposed foundation In the field,
GSI will evaluate footing excavations from a geotechnical standpoint
3 Foundation Drawing Note No 1 on sheet S2 is not consistent with GSI
recommendations for slab thickness. According to GSI (2004b), the concrete slab
should be 5 inches thick, minimally It is the opinion of GSI that Foundation
Drawing Note No 1 should indicate the actual thickness of the moisture barrier
According to GSI (2004b), the moisture barrier should consist of a minimum 10-mil,
polyvmyl-chloride membrane with all laps sealed, per the Uniform Building Code
([UBC], International Conference of Building Officials [ICBO], 1997)
4 With regard to Foundation Note No 11, GSI recommends that walls not be
overloaded by backfill equipment or stockpiled building materials Only equipment
necessary to achieve the required compactive effort should be utilized
5 With regard to structural concrete (Sheet SP1, Notes 5 and 6), GSI is inquiring
about the party responsible for reviewing the mix design Additionally, please
provide the required water to cement ratio for structural concrete that will be
evaluated by performance testing (by others) during construction
6 Please clarify the materials located below the slab indicated on Structural Details 2,
3, 6, and 7 on Sheet SD1 and Structural Detail 11 on Sheet SD2 If compacted fill
is used on these details, please delineate as such
7 With regard to Structural Detail 7 on Sheet SD1, GSI is inquiring if a pressure relief
valve is necessary to mitigate the potential for hydrostatic uplift to the lower footing
8 With regard to Structural Detail 5 on Sheet SD1, it is the opinion that a description
of construction sequencing should be considered as a part of this detail GSI
recommends that the wall be constructed and backfilled prior to the construction
of the "slab by others "
The Blackmore Company WO 4466-A-SC
Carlsbad Research Center, Lot 66 March 21, 2005
File e \wpg\4400\4466a grol Page 2
GeoSoils, Inc.
9 GSI is inquiring if the depression between the floor slab and wall, as indicated on
Structural Details 1, 2, 4, 6, and 8 on Sheet SD1, is a well Please clarify
10 GSI is inquiring about the type of methodology to remove water from the bottom of
the elevator pit An emergency sump pump, blind side water proofing and/or
adjusted concrete mix design is recommended from a geotechnical standpoint
LIMITATIONS
The materials encountered on the project site and utilized for our analysis are believed
representative of the area, however, soil and bedrock materials vary in character between
excavations and natural outcrops or conditions exposed during mass grading Site
conditions may vary due to seasonal changes or other factors
Inasmuch as our study is based upon our review and engineering analyses and laboratory
data, the conclusions and recommendations are professional opinions These opinions
have been derived in accordance with current standards of practice, and no warranty,
either express or implied, is given Standards of practice are subject to change with time
GSI assumes no responsibility or liability for work or testing performed by others, or their
inaction, or work performed when GSI is not requested to be onsite, to evaluate if our
recommendations have been properly implemented Use of this report constitutes an
agreement and consent by the user to all the limitations outlined above, notwithstanding
any other agreements that may be in place In addition, this report may be subject to
review by the controlling authorities Thus, this report brings to completion our scope of
services for this portion of the project All samples will be disposed of after 30 days, unless
specifically requested by the client, in writing
The Blackmore Company W O 4466-A-SC
Carlsbad Research Center, Lot 66 March 21, 2005
File e \wp9\4400\4466a grol Page 3
GeoSoils, Inc.
The opportunity to be of service is sincerely appreciated If you should have any
questions, please do not hesitate to contact our office
Respectfully submitted,
GeoSoils, Inc.
r-
John P Franklin / Andrew TGuat
pngineenng Geologist, CEG 1340 Geotechnical Eri
RB/JPF/ATG/jk/jh
Attachment. Appendix - References
Distribution' (2) Addressee
(2) Smith Consulting Architects, Attention Mr Scott Cairns
The Blackmore Company W O 4466-A-SC
Carlsbad Research Center, Lot 66 March 21, 2005
File e \wp9\4400\4466a gro! Page 4
GeoSoils, Inc.
APPENDIX
REFERENCES
GeoSoils, Inc , 2004a, Addendum to GeoSoils, Inc report dated August 16, 2004 and
geotechnical plan review, Carlsbad Research Center, Lot 66, Carlsbad, San Diego
County, California, W O 4466-A-SC, dated December 10
, 2004b, Update geotechnical evaluation, Carlsbad Research Center, Lot 66,
Carlsbad, San Diego County, California, W O 4466-A-SC, dated August 16
, 1998, Geotechnical response to review by City of Carlsbad, Lot 66, Carlsbad
Research Center, Carlsbad, San Diego County, California, W O 2146-A-SC, dated
September 15
, 1996, Preliminary geotechnical evaluation, Carlsbad Research Center, Lot 66, City
of Carlsbad, San Diego County, California, W O 2146-A-SC, dated November 11
HTK, Structural Engineers, 2004, Lobby and core improvements plans for Lot 66, 1811
Aston Avenue, Carlsbad, California 92008, sheets SP1, S2, SD1 and SD2, job no
04-217 00, dated November 16
International Conference of Building Officials, 2001, California building code, California
code of regulations title 24, part 2, volume 1 and 2
, 1997, Uniform building code- Whittier, California, vol 1, 2, and 3
GeoSoils, Inc.
, SECOND, UPDATE GEOTECNICAL EVALUATION
:*'V"' ( CARLSBAD RESEARCH CENTER; LOT 66 ,yt-, ^ ^
"' CITY, OF CARLSBAD, SAN DIEGO COUNTY, CALIFORNIA^ '
<> THE BLACKMORE COMPANY,,.,
1530 FARADAY AVENUE*, SUITE 170
>, CALIFO~RNIA~92008V
Geotechnical • Geologic - Environmental
5741 Palmer Way * Carlsbad, California 92008 - (760)438-3155 • FAX (760) 931-0915
February 16, 2005
W.O 4466-A-SC
The Blackmore Company
1530 Faraday Avenue, Suite170
Carlsbad, California 92008
Attention Ms Colleen Blackmore
Subject Second Update Geotechnical Evaluation, Carlsbad Research Center, Lot 66,
City of Carlsbad, San Diego County, California
Dear Ms. Blackmore
In accordance with your request, GeoSoils, Inc (GSI) has logged additional exploratory
subsurface excavations atthe subject site, performed additional laboratory testing, and has
prepared this second update geotechnical evaluation The purpose of our study was to
obtain additional information as to the nature of earth materials underlying the site, and to
provide update recommendations for site preparation and earthwork construction based
on our findings. Our scope of services has included a review of the existing soils reports
(see Appendix A), additional subsurface investigation, pertinent laboratory testing, and the
preparation of this update report Unless superceded in the text of this report, the
recommendations presented in GSI (2005, 2004a, 2004b, and 1996) are considered valid
and applicable, and should be appropriately implemented during planning, design, and
construction
SITE EXPLORATION
Surface observations and subsurface explorations were performed on February 4, 2005,
by a representative geologist of this office A survey of line and grade for the subject site
was not conducted by this firm at the time of our site reconnaissance Near-surface soil
and geologic conditions were explored with 10 exploratory test pit excavations within the
site The purpose of the test pits was to determine the geotechnical properties of the
underlying materials The approximate locations of each exploratory test pit are shown on
the attached Geotechnical Map (see Figure 1) Test Pit Logs are presented in Appendix B
N
oB-1 af
Approximate location of
proposed building
LEGEND
af Artificial fill - documented
Jsp Jurassic Santiago PeakVolcanics
.1—O-*Geologic contact, queriedwhere uncertain
0 TP-10 Approximate location ofexploratory test pit
(this study)
(""") B-4 Approximate location of
exploratory boring (GSI, 1996)
Lot 67
GEOTECHNICAL MAP
DATE 2/05 WO. NQ 4466-A-SC
Geotechnical • Geologic - Environmental
Scale: None FIGURE 1
FORM 89/2 2
SITE GEOLOGIC UNITS
The site geologic units encountered or observed during the additional subsurface
investigation included artificial fill (documented) and the Jurassic Santiago Peak Volcanics
The earth materials are generally described below, from the youngest to the oldest The
distribution of these materials is shown on Figure 1 •
Artificial Fill (Documented)
It is our understanding that documented artificial fill, placed during mass grading of the
Carlsbad Research Center, mantles a majority of the site at the surface. However,
documentation of these fill soils was not provided to this office. Where encountered during
this investigation, these materials generally consisted of brown to dark brown sandy clays
and sandy silts and light gray to yellow brown to gray to dark brown to brown to orange
clayey sands and silty sands. These documented fill soils are generally suitable for the
support of settlement-sensitive improvements and/or engineered fill in their existing state
However, the upper ±1/2-foot to ±21/2 feet of the fill has been degraded from periodic
wetting and drying and therefore, is generally considered unsuitable to support
settlement-sensitive improvements and/or engineered fill in its existing state. Mitigation in
form of removal and recompaction will be necessary. The upper ±1/2-footto ±21/2feet of
the fill varies from low to medium expansive and also possesses a plasticity index (PI)
greater than 15 which will necessitate a more onerous foundation design unless removed
from the influence of the proposed building and replaced with non-plastic materials, or
blended with the underlying sandy fill soils
Jurassic Santiago Peak Volcanics (Map Symbol - Jsp)
The Jurassic Santiago Peak Volcanics were observed to underlie the existing fill in some
of our test pits Where encountered, these bedrock materials generally consisted of
fractured, meta-volcanic rock that broke to clayey sand and silty sand with angular
gravel- to cobble-size rock fragments upon excavation Generally, the size of the rock
fragments was on the order of 4 to 8 inches in one dimension Excavation, into the
bedrock with a Caterpillar 320 track excavator to a depth of 9 feet below grade, ranged
from slightly to moderately difficult These bedrock materials are generally considered
suitable for the support of settlement-sensitive improvements and/or engineered fill in their
existing state
LABORATORY TESTING
General
Representative composite samples of site soil were collected for appropriate laboratory
testing The purpose of the laboratory testing was to determine if blending the low to
The Blackmore Company WO 4466-A-SC
Carlsbad Research Center, Carlsbad February 16, 2005
File e \wp9\4400\4466a sug Page 3
CeoSoilSj Inc.
medium expansive sandy and clayey onsite soils, at different ratios, could produce a PI of
less than 15, which would allow for a variance in foundation design from Section 1815 of
the Uniform Building Code ([UBC], International Conference of Building Officials [ICBO],
1997).
Expansion Potential
Expansion testing was performed on representative blended samples of site soils in
accordance with UBC Standard 18-2 The results of the supplemental expansion testing
on blended site soils are presented in the following table
BLEND RATIO
(SAND.CLAY)1
21
41
EXPANSION
< INDEX
52
38
EXPANSION
POTENTIAL,
Medium
Low
Atterberq Limits
Supplemental testing was performed on representative blended soil samples to evaluate
the liquid limit, plastic limit and plasticity index in general accordance with ASTM D4318-64
The test results are presented in the following table and in Appendix C
BLEND.RATIO
(SAND:CLAY)X
21
41
LIQUID «;
* ', LIMPt
37
31
PLASTIC.
' LIMIT
18
20
PLASTICITY
INDEX:
19
11
CONCLUSIONS AND RECOMMENDATIONS
As stated earlier, unless superceded in the text of this report, the recommendations
presented in GSI (2005,2004a, 2004b, and 1996) are considered valid and applicable, and
should be appropriately implemented during planning, design, and construction. Based
upon our field observations, laboratory testing, and engineering analysis, the primary
geotechnical concerns with respect to the proposed development are
• Depth to competent bearing soils/suitability of existing artificial fill and remedial
removals
The Blackmore Company
Carlsbad Research Center, Carlsbad
File e \wp9\4400\4466a sug
GeoSotls, Inc.
WO 4466-A-SC
February 16, 2005
Page 4
The PI of the onsite soils
• Rock hardness/nppabflity (trenchabihty) of the bedrock
• Particle sizes of the excavated bedrock.
The recommendations presented herein consider these as well as other aspects of the site
The engineering analyses performed concerning site preparation and the
recommendations presented herein have been completed using the information provided
and obtained during our field work
In the event that any significant changes are made to proposed site development, the
conclusions and recommendations contained in this report shall not be considered valid
unless the changes are reviewed and the recommendations of this report verified or
modified in writing by this office
1 Soil engineering, observation, and testing services should be provided during
grading to aid the contractor in removing unsuitable soils and in his effort to
compact the fill
2. Geologic observations should be performed during grading to verify and/or further
evaluate geologic conditions Although unlikely, if adverse geologic structures are
encountered, supplemental recommendations and earthwork may be warranted
3 The existing documented fill soils and the Jurassic Santiago Peak Volcanics are
generally considered to be suitable for the support of settlement-sensitive
improvements and/or engineered fill in their existing state However, the upper
±1/2 foot to ±21/2 feet of the documented, clayey artificial fill has been degraded due
to periodic wetting and drying and is therefore, considered unsuitable for the
support of settlement-sensitive improvements and/or engineered fill in its existing
state Removal and recompaction will be necessary Additionally, the recently
backfilled test pits were not compacted to industry standards Thus, removal and
recompaction in the areas of the subsurface explorations will also require removal
and recompaction
4 Laboratory testing indicates that a 4 1 (sand clay) blend ratio would be necessary
to attain a PI less than 15 and a variance from Section 1815 of the UBC (ICBO,
1997) Alternative earthwork recommendations, to those provided in GSI (2005) for
essentially creating a fill cap where the PI is less than 15, are as follows-
Alternative A
• The upper ±V^ foot to ±2Vz feet of the clayey fill soils should be removed to
expose the underlying sandy fill soils to a lateral distance of 10 feet outside
The Blackmore Company W O 4466-A-SC
Carlsbad Research Center, Carlsbad February 16, 2005
File e \wp9\4400\4466a sug Page 5
GeoSoils, Inc.
the building footprint The removal bottom should be designed to slope
away from the building. The removed soils should be exported from the site
or placed within the driveway/parking areas It should be noted that placing
these clayey soils within the driveway/parking areas could result in more
onerous pavement sections and hardscape designs Once removals are
completed, the bottom of the removal excavation should be scarified,
moisture conditioned to at least optimum moisture content, and
recompacted to 90 percent relative compaction The removed clayey soils
should be replaced with onsite or import fill soils possessing a PI less than
15. The replacement fill should be moisture conditioned to the soils
optimum moisture content (or slightly above) and be compacted to
90 percent relative compaction It should be noted that GSI will need to
perform additional laboratory testing of any proposed import soils to verify
compatibility, expansion potential and plasticity index
-or-
Aiternative B
The upper 8 feet of the existing fill soils should be removed, thoroughly
blended, moisture conditioned to, or slightly above the soil's optimum
moisture content, and compacted to 90 percent relative compaction. The
lateral extent of the removal and blending should be at least 10 feet outside
the building footprint Prior to fill placement, the removal bottom should be
scarified, moisture conditioned to at least the soil's optimum moisture
content, and recompacted to 90 percent relative compaction It should be
noted that thrs alternative scenario will require selective grading and that
soils possessing a PI greater than 15 may still be encountered at finish
grade
Field observations and a conversation with the equipment operator indicate that
excavating into the bedrock, with a Caterpillar 320 track excavator to a depth of
9 feet below the existing grade, ranged from slightly to moderately difficult
However, the possibility of focalized "hard spots" requiring heavy ripping, blasting,
or difficulty trenching cannot entirely be precluded in the southeast portion of the
site
Excavation into the bedrock generally produced clayey sands and silty sands with
angular gravel- to cobble-size clasts. A majority of the rock fragments were
measured to be between 4 and 8 inches in one dimension. However occasional
rock fragments up to 12 inches in one dimension were observed
The Blackmore Company W O 44G6-A-SC
Carlsbad Research Center, Carlsbad February 16, 200S
File e \wp9\4400\4466a sug Page G
GeoSoils, Inc.
LIMITATIONS
The materials encountered on the project site and utilized for our analysis are believed
representative of the area; however, soil and bedrock materials vary in character between
excavations and natural outcrops or conditions exposed during mass grading Site
conditions may vary due to seasonal changes or other factors
Inasmuch as our study is based upon our review and engineering analyses and laboratory
data, the conclusions and recommendations are professional opinions. These opinions
have been derived in accordance with current standards of practice, and no warranty,
either express or implied, is given Standards of practice are subject to change with time
GSI assumes no responsibility or liability for work or testing performed by others, or their
inaction, or work performed when GSI is not requested to be onsite, to evaluate if our
recommendations have been properly implemented Use of this report constitutes an
agreement and consent by the user to alt the limitations outlined above, notwithstanding
any other agreements that may be in place. In addition, this report may be subject to
review by the controlling authorities Thus, this report brings to completion our scope of
services for this portion of the project. All samples will be disposed of after 30 days, unless
specifically requested by the client, in writing
The Blackmore Company W O 4466-A-SC
Carlsbad Research Center, Carlsbad February 16, 2005
File e \wp9\4400\4466asug Page 7
GeoSoils, Inc.
The opportunity to be of service is greatly appreciated If you have any questions, please
do not hesitate to call our office.
Respectfully submitted,
GeoStffc, Inc.
Paul L McClay
Engineering Geologis
RB/ATG/PLM/jk/jh
Attachments
Distribution
Andrew T Guatelh
Principal Engineer, GE 2320
Appendix A - References
Appendix B - Test Pit Logs
Appendix C - Laboratory Data
(4) Addressee
(1) Smith Consulting Architects, Attention Mr. Scott Cairns
(1) Reno Contracting, Inc , Attention Mr Wade Richardson
The Blackmore Company
Carlsbad Research Center, Carlsbad
File e \wp9\4400\4466a sug
WO 4466-A-SC
February 16,2005
Pages
GeoSoils, Inc.
* s h. - • ' ' -)" ' ^ ' I.1 *^'*1.
APPENDIX A
REFERENCES
GeoSoils, Inc , 2005, Alternative earthwork recommendations, Lot 66, Carlsbad Research
Center, Carlsbad, San Diego County, California, W 0.4466-A-SC, dated January 13
, 2004a, Addendum to GeoSoils, Inc report dated August 16,2004 and geotechnical
plan review, Carlsbad Research Center, Lot 66, Carlsbad, San Diego County,
California, W O 4466-A-SC, dated December 10
, 2004b, Update geotechnical evaluation, Carlsbad Research Center, Lot 66,
Carlsbad, San Diego County, California, W O. 4466-A-SC, dated August 16.
, 1998, Geotechnical response to review by City of Carlsbad, Lot 66, Carlsbad
Research Center, Carlsbad, San Diego County, California, W O 2146-A-SC, dated
September 15
, 1996, Preliminary geotechnical evaluation, Carlsbad Research Center, Lot 66, City
of Carlsbad, San Diego County, California, W.O 2146-A-SC, dated November 11.
GSSI, Structural Engineers, 2005, Structural plans for. Lot 66, Carlsbad Research Center,
Carlsbad, California, sheets S1 1, S2 1, S4 1 and S4 2, job no 97101 S02, revision
dated January 25
International Conference of Building Officials, 2001, California building code, California
code of regulations title 24, part 2, volume 1 and 2
, 1997, Uniform building code Whittier, California, vol 1, 2, and 3.
GeoSoils, Inc.
TEST PIT LOGS
UNIFIED SOIL CLASSIFICATION SYSTEM
Major Divisions
Coarse-Grained SoilsMore than 50% retained on No 200 sieves200 sieveFine-Grained Soi50% or more passes No03 tn
£ ffl S
-5 c » - 1
5° |°
o o £ QJ _10 °l sf
»- <D c m
o _ > m 12„ >- m aj cz
|S 5 0#
w ^ fa "*
QJ to |J>
tn
5 1.2
"]i "2 o
W
w ^to -g m
~c "^ ~
en
f Highly Organic Soils
Group
Symbols
GW
GP
GM
GC
SW
SP
SM
sc
ML
CL
OL
MH
CH
OH
PT
Typical Names
Well-graded gravels and gravel-
sand mixtures, little or no fines
Poorly graded gravels and
gravel-sand mixtures, little or no
fines
S Ity gravels gravel-sand-silt
mixtures
Clayey gravels, gravel-sand-clay
mixtures
Well-graded sands and gravelly
sands, little or no fines
Poorly graded sands and
gravelly sands, little or no fines
Silty sands, sand-silt mixtures
Clayey sands, sand-clay
mixtures
Inorganic silts, very fine sands,
rock flour, silty or clayey fine
sands
Inorganic clays of low to
medium plasticity gravelly clays,
sandy clays, si)ty clays, lean
clays
Organic silts and organic silty
clays of low plasticity
Inorganic silts, micaceous or
diatomaceous fine sands or silts,
elastic silts
Inorganic clays of high plasticity,
fat clays
Organic clays of medium to high
plasticity
Peat, mucic, and other highly
organic soils
CONSISTENCY OR RELATIVE DENSITY
CRITERIA
Standard Penetration Test
Penetration
Resistance N
(blows/ft)
0-4
4-10
10-30
30-50
>50
Relative
Density
Very loose
Loose
Medium
Dense
Very dense
Standard Penetration Test
Penetration
Resistance N
(bfows/ft) Consistency
<2 Very Soft
2-4 Soft
4-8 Medium
8-15 Stiff
15-30 Very Stiff
>30 Hard
Unconfined
Compressive
Strength
(tons/ft2)
<025
025- 050
0 50 - 1 00
1 00 - 2 00
2 00 - 4 00
>400
3" 3/4" #4 #10 #40 #200 US Standard Sieve
Unified Soil rnhhlpe:Classification c°bbles
Gravel Sand
coarse fine coarse medium fine
MOISTURE CONDITIONS
Silt or Clay
MATERIAL QUANTITY OTHER SYMBOLS
Bry Absence of moisture dusty, dry to the touch trace 0 - 5 % C Core Sample
Slightly Moist Below optimum moisture content for compaction few 5-10% S SPT Sample
Moist Near optimum moisture content little 10-25% B Bulk Sample
Very Moist Above optimum moisture content some 25 - 45 % T Groundwater
Wet Visible free water, below water table Qp Pocket Penetrometer
BASIC LOG FORMAT
Group name, Group symbol, (grain size), color, moisture, consistency or relative density Additional comments odor, presence of roots, mica, gypsum,
coarse grained particles, etc
EXAMPLE f
Sand (SP), fine to medium grained, brown, moist, loose, trace silt, little fine gravel, few cobbles up to 4" in size, some hair roots and rootlets
File Mgr c,\SoilClassif wpd PLATE B-1
O o> "o
2 8-S< E co
CO
CO
o
o nsJS O
m w
CO
>*
cdn
Q "8-1 LL.
Q.
07
LUH
CC
O
IT
O
Q.
XLU
LL
O
O
O
J >
- ,!
'' '>*
' 1
' >
k 3' i
^ . '
•" ^ *
* > ,* > ' '
-i.
, r
, ¥"-,
' l' z !
; o
a. '
"-" DC ,; ° ',* - v in ,
j ^ ••
v, *„ s
v LU LU "~ '
f!
UJ
i OC\ t
V ^! o ; >5
_j ^GROUP/SYMBOL'*. t X
•5 JT" *" **
PT $^
\°^
HO;w z
.1|S?E^
ow
too
E
>^
2D)
_o
o
^ARTIFICIAL FILL- SANDY CLAY.o
CM
o
_
co55cdooo
«
to
E
•5o>
£
CL
EcdT3
|
^SANDY SILT/SANDY CLAY, darkorgan icsQ
v^f•rCM
CM
CD
,-i
CD
^J
E
•a
0
E
4-TCO
O
E
cf
o
JZ
CO5
"CD
o
cd
O)
D)
Q"
CO
O
o
C/)
en
^NCM
T3CD
ai
Total Depth = 9'No Groundwater/Cavjng EncountBackfilled 2-4-2005d.h-
4-1
O
CO
-CO
o
E
c"
o
o4-1
>
o1—
1
T3CD
E
ARTIFICIAL FILL: SANDY CLAY.o
i —
o
o•4-*
CD
O3
ro
o
_o
c
o
-"^
£2
_o
"CD
o
cd
D)
_C
Ol m
SILTY SAND to CLAYEY SAND, lidark brown, moist, medium densio
Q)^L.
CD
o5
Total Depth = 9'No Groundwater/Caving EncountBackfilled 2-4-2005C\j
a.h-
CO
LU
O
O
n * 2" ^1 OE jo CM
"o ca •*"ra O >,
CD jo CO
CD 2
O.
LU
I-
>-DC
O
CCo_JQ.XLU
LL.
O
oo
* ,*(
*
* s
1
'l 1 '( '
< s
,
;, 5
."-."<,
"~ '' f, ^
C
" ; ' '» J
c" ' ; \ / , \* DESCRIPTIONg£f'uj.g^
• '' cc3 --v
.'' 1^
V
UJ ' '
„ < Q f~"
> ^ 07? DQr ffi syri >-
CO
, X '
^~ **^^Q-v *;^ LU t-
vg;
H t
to=
CO
E?o
"ffi
oenCOooo
£-"
o
to
ARTIFICIAL FILL- SANDY CLAY, brown, moi1o
•^cy
•^O
_^
rB
"O -i2
B$
2 03
CT ti
0 T*- 0r~ ^r
5 oO ^r
L- H
•^ ^_
"« —
S D3O c
Tn S
i SILTY SAND to CLAYEY SAND, light gray to yibrown, moist, medium dense, occasional sutoCO
SCO
^~
CM
c
5o
^^(O
_o
CD
o
03
S
J30Q.
"5
>• D)
^-^f
Oocc
o
•z.SANTIAGO PEAKVOLCANICS: METAVOLCCCO
5
O
^cCO
LU
§
O
o
to-^ ,„CO S03 CO
02 •"""t/3 *^~
o E
•a *r- 55,
CO 0)
D3 5J
ll
Q 8
O3
in
CO
a.: Total Depth = 9'No Groundwater/Caving EncounteredBackfilled 2-4-2005wQ
coO)
o
"cOL:o
to
COooo
4=TOto
'to
ARTIFICIAL FILL. SANDY CLAY, brown, moiio
^j*-,
o
C5o
^c~to
_g
"03
Q
Z
CO
It
CO
n>. -ff.?JL
Oocc
g
z
SANTIAGO PEAKVOLCANICS- METAVOLCCO
CO03 *2
X3- CO
- O
CD 2"
Z3 ,—
O TCO CM
CD
CD" yto w
^ o
05 °
> 0
£r_i
. -Q>, 0)co a.
01 ^
CO ^
1
**Total Depth = 4'No Groundwater/Caving EncounteredBackfilled 2-4-2005CL
h-
CO
CQ
LU
3
Q-
O o>CO o
O
TJ tf)cd O_ JD OE CO CM
-^ ~ ^_-O CO *tJ5 o >,m co «
CD 2
Q CD
—' U_
CO
ta.
CO
UJi-
GC
Oscco
a.XUJ
LJ_O
ao
< • '- '„
' '
'•
'
, V I
,
>J~ ' . ','
*
'
„< .
1/J
^ z 'DESCRIPT10< •>- fr
"• i
1 ^
' ' >iV 1
IN
" ' 'UJ ' •
1 '•' tt ^" H 3?'
6
SAMPLE' DEPTH"'(ft.), '"'|l
i ^ (0
;ii
Q
^ !
^ O *
1 1' ' ' *
•^ Q.
Ot/3
5
b
c"
o
FICIAL FILL- SANDY Cl-cr
_jo
OJ
o
0COd
0
medium cU)
O
cf
o
-Q
_O
CO
D)
J— •
D)
Q"
CO
UJ
5
O
oCO
CM ounteredDepth = 9'roundwater/Cavmg Enctilled 2-4-2005CO ^ o
O O cOI- Z CD
LO
Q_H-
O
JD
^C
CO-o
o
^5o
to
_o
"0
o
CO
D)FICIAL FILL- SANDY Ct, soft to medium denseen o< E
o
CD
O
CDUJ
0
T3
E
^3
T3
0E
i r
V)
Ot
c5o
^to
_o
"0
o
c
o
o
CO
D)
Q
CO
^o
o
CO
CD
^COT3
O1
O
£1
-
^L,
( )
Off
LCANICU
^UJ
^
COo
TIAGO PEAK VOLCAN7
$
o
0
JD
^H
Q.
i—
3D)C
CO
Q
< cCO 0fill^s
J Xo °
a|CO 3
"cO «0 to
If
Q3 E
£r S
o ^
CL 0
E ^ro <p
T3 0
>, -Q
D) O
cn
CO
CD
D_
1-ounteredDepth = 9'roundwater/Cavmg Encfilled 2-4-2005CO ^ n"o o co
*±
CD
UJ
§Q.
O CD T3 LD
°? I E q<, E jo CM
$|5£
^m CD «
O CD H^ J=:
(0UJ
DC
O
cco_IQ.Xatu_O
(3O
•
/ i
•i ,
1
^'
>
,
;
"" Z 'O
1- v! D_
* f cc
, O0) ,' • UJ
" ]Q
< *~ '
v" <
s
•• 1
*
i^^ XMOISTURE '(%) ' ,SAMPLEDEPTH'*(ft.)GROUPSYMBOL,X a I
t-,6 ;
s t
o
•I-1
ob
c
o
-°
<j
o
Q
TIFICIAL FILL. SArCC<
o
C\l
o
CD
C
T3
O
E
D)
D)
Q
CO
CO
CO
O
TJCD
CD
c:3OO
LJJ
D)al Depth = 10'Groundwater/Cavirskfilled 2-4-2005O O rd
£ Z CO
^Q.
O
OCO
•1— •COo1-
c
5o
.0
CO
o
co
COCOo
= CD0 N
>• CO
O
c:
o
•".
^O
o
TIFICIAL FILL SAor<
CD
.a
JDoo
co
O)c
CO
COco
dium dense, occasCDE
o
CO
o
CO
D_
1-
c
T3
E
o>
E
to
o
E
cf
o
"i
o
CD
O
CO
D)
CT
Q
~2L
CO
CO
CO
o
CO
T3
CD
CD
C
•3
Oo
LLJ
D)al Depth = 101/2'Groundwater/Cavirskfilled 2-4-2005O O (0i- z m
inmLU
SD_
OCO
< E ^
T3 mCO O
-Q P.
CO
O
u >,
CD %to 2
Q.
WUJ
CC
O
CC
O
LL
O
(3
O
1 •*' ' ;*
'(^ {
1 V
•
**
_
,
,
1 -
<
,
,
' Z
' O
• .'!-'D-,
CC
O(0 ,*UJ
Q
v
v Y, ' '-*
1 ;' ';V
- -,
1 ^- !
* w ' '
DC .
1- ^tf) S^.
- O\ E >
^UJ _.
' "• n" "^S ^ ^£,GROUPSYMBOL "i -^ .-
o X ' ;
t "~"
/ ?f
V 2tn zUJ •
, Q.
(Ooc03
D)
O—CD
g
C/3cdooo
tfoCO
o
E
c5o
^
o
Q
<CO
_i_i
LL
_J
<
O
ARTIFIo
CN
6
cp
1-
"53o
E
cf5o
-
^^^L
O
Q
~Z.<;
CO
o
0COc0T3
E
13
T3
0E
to
o
E
>^CO
Dl
Qz:<CO>-UJ^O w
oo
CO
CD
C\l
T!0
04-J
C13OOcLLI
cn
epth - 9'undwater/Cavied 2-4-2005Q £ =
^^^££&
tioCO
"co6
E
cf
o
o
Q
<CO
li_l
LL
_l
<
O
ARTIFI•
o
1-6
o
Q.iI
jo
3
D>
(0
"(0c:o
toooo
CD"tncCD
T3
E
•6
0E
to
o
E
cf
o
.a
_o
D) W
Q" 03z: o
•< CDC/) N
UJ _CD
o 8
o
CO
CD
-aCD
jg
"crjooc=
LLI
D)epth = 9'undwater/Cavned 2-4-2005Q o =
S0?o o toi- z: CQ
(O
m
UJ
''APPENDIX c
LABORATORY DATA
60
50
tu 40Q
to
DL
20
10
CL
ML
CH
MH
20 40 60
LIQUID LIMIT
80 100
Sample Depth/El LL PL PI Fines Classification
80/20Mix 00 31 20 11
Composite 00 37 18 19
GeoSollSi .Ink;.r S^J y. gtj ^ a 7j| i i«.
GeoSoils, Inc
5741 Palmer Way
Carlsbad, CA 92008
Telephone (760)438-3155
Fax (760)931-0915
ATTERBERG LIMITS1
Project BLACKMORE
Number 4466-A-SC
Date February 2005
RESULTS
Figure C - 1
*>>. '
UPDATE GEOTECHNICAL EVALUATION
CARLSBAD RESEARCH CENTER, LOT 66
. CARLSBAD, SAN DIEGO COUNTY, CALIFORNIA
I FOR
Hoi
THE BLACKMORE COMPANY
1530 FARADAY AVENUE, SUITE 170
CARLSBAD, CALIFORNIA 92008
W.0. 4466-A-SC AUGUST 16, 2004
GeoSo
Geotechnical * Geologic • Environmental
5741 Palmer Way • Carlsbad, California 92008 • (760)438-3155 • FAX (760) 931-0915
August 16, 2004
W.O. 4466-A-SC
The Blackmore Company
1530 Faraday Avenue, Suite170
Carlsbad, California 92008
Attention: Ms. Colleen Blackmore
Subject: Update Geotechnical Evaluation, Carlsbad Research Center, Lot 66,
Carlsbad, San Diego County, California
Dear Ms. Blackmore:
In accordance with your request, GeoSoils, inc. (GSl) has reviewed the existing soils
reports (GSl, 1996 and 1998) for the subject site and has prepared this update
geotechnica! evaluation. The purpose of our study was to evaluate the nature of earth
materials underlying the site and to provide update recommendations for site preparation,
earthwork construction, and foundation design/construction, based on our findings. Our
scope of services have included a review of the existing soils reports (GSl, 1998 and 1996),
a site reconnaissance visit, and the preparation of this update report. Unless superceded
in the text of this report, the recommendations presented in GSi (1998 and 1996) are
considered valid and applicable, and should be appropriately implemented during
planning, design, and construction.
SITE RECONNAISSANCE
A site reconnaissance visit was conducted on August 10,2004, by a representative of this
office. Upon observation, the site appeared to be generally in the same condition as it was
during the preparation of GSl (1996).
SEISMIC DESIGN PARAMETERS
ISeismic Zone (per Figure 16-2*)
Seismic Zone Factor (per Table 1 6-I*)
Soil Profile Type (per Table 16-J*)
4 I
0.40 I
SD I
Seismic Coefficient Cffl {per Table 1 6-Q*)
Seismic Coefficient Cv (per Table 16-R*)
Near Source Factor Na (per Table 16-S*)
Near Source Factor Nv (per Table 16-T*)
Seismic Source Type (per Table 16-U*)
Distance to Seismic Source
Upper Bound Earthquake (Rose Canyon)
044Na
0.64 Nv
1.0
1 19
B
3.7 mi (6.0 km)
MW69
* Figure and table references from Chapter 16 of the UBC (ICBO, 1997)
UPDATE EARTHWORK RECOMMENDATIONS
Transitions/Overexcavation
Based on a review of the grading plans (see the Appendix), it appears that a cut/fill
transition crosses the southeast corner of the proposed structure. In order to provide
uniform foundation support and better facilitate trenching for foundations/onsite utility
trenches (under the slab), portions of the budding pad, located in cut and areas with plan
fills less than ± 10 feet thick, should be overexcavated a minimum of ±10 feet below finish
grade. The maximum to minimum fill thickness across the building pad should not exceed
a ratio of 3:1 (maximum:minimum). Overexcavation should be completed to a minimum
lateral distance of 5 feet outside the building footprint. Overexcavation is only required for
the building envelope and is not required for driveways and parking areas.
Fill Placement
1. Laboratory testing indicates that low to medium expansive soils underlie the site.
However, the potential for highly expansive soils to exist ons'rte cannot be
precluded. If highly expansive soils are encountered, they should not be placed
within 7 feet of finish grade. Otherwise, more onerous foundation design, such as
the use of a post-tension slab, will be required.
2. It should be noted that excavations into the volcanic bedrock may generate oversize
rock material. Any oversized rock materials, greater than 8 inches in diameter,
should be stockpiled and placed under the observation of the soils engineer. As
per Uniform Building Code ([UBC], International Conference of Building Officials
[ICBO], 1997) requirements, no rock materials greater than 12 inches in diameter
should be placed within 10 feet of finish grade, unless prior approval has been
granted by the City and geotechnical engineer. Procedures for rock placement are
outlined in the Rock Disposal section of this report.
The Blackmore Company
Carlsbad Research Center, Lot 66
File:e \\Mp9VWOOVH66a uge
W.O. 4466-A-SC
August 16, 2004
Page 2
GeoSoils, Inc.
Rock Disposal
During the course of grading, materials generated from the proposed cuts and remedial
removals are anticipated to be of varying diameters. Any oversized rock materials, greater
than 8 inches in diameter, should be stockpiled and placed under the observation of the
soils engineer. As per UBC (ICBO, 1997) requirements, no rock materials greater than
12 inches in diameter should be placed within 10 feet of finish grade, unless prior approval
has been granted by the County and geotechnical engineer. Generally, for the purpose
of this report, the materials may be described as either 8 inches or iess, greater than 8 and
less than 36 inches, and greater than 36 inches. These three categories set the basic
dimensions for where and how the materials are to be placed.
Materials 8 Inches In Diameter or Less
Inasmuch as rock fragments along with the overburden materials are anticipated to be a
part of the materials used in the grading of the site, a criteria is needed to facilitate the
placement of these materials within guidelines which would be workable during the rough
grading, post-grading improvements, and serve as acceptable compacted fill.
1. Fines and rock fragments 8 inches or less in diameter may be placed as compacted
fill cap materials within the slopes and street areas as described below. The rock
fragments and fines should be brought to at least optimum moisture content and
compacted to a minimum relative compaction of 90 percent of the laboratory
standard.
2. The purpose for the 8-inch diameter cut off is to allow reasonable sized rock
fragments into the fill under selected conditions surrounded with compacted fines.
The 8-inch diameter size also allows a greater volume of the rock fragments to be
handled during grading, while staying in reasonable limits for later onsite excavation
equipment (backhoes and trenchers) to excavate onsrte utility lines.
Materials Greater Than 8 and Less Than 36 Inches In Diameter
1. During the process of excavation, a moderate amount of rock fragments or
constituents larger than 8 inches in diameter may be generated. These oversized
materials greater than 8 and less than 36 inches in diameter may be incorporated
into the fills utilizing a series of rock blankets.
2. Each rock blanket should consist of rock fragments of approximately 8 to 36 inches
in diameter along with fines generated from the proposed cuts and overburden
materials from removal areas. The blankets should be limited to 24 to 36 inches in
thickness and should be placed with fines which have been brought to at least
optimum moisture content prior to compaction.
The Blackmore Company W.O 4466-A-SC
Carlsbad Research Center, Lot 66 August 16, 2004
File e \wp9\4400\4466a uge Page 3
GeoSoils, Inc.
3. Rock blankets should be restricted to areas which are at least 1 foot below the
lowest utility invert and/or 10 feet below finish grade within the street right-of-way,
and a minimum of 15 horizontal feet from any fill slope surface.
4 Compaction may be achieved by utilizing wheel rolling methods with scrapers and
water trucks, track-walking by bulldozers, and sheepsfoot tampers.
5. Each rock blanket should be completed with its surface compacted prior to
placement of any subsequent rock blanket or rock windrow
I Materials Greater Than 36 Inches in Diameter
»
( 1. Oversize rock greater than 36 inches in diameter should be placed in single rock
J windrows. The windrows should be at least 15 feet or an equipment width apart,
f whichever is greatest.
2. The void spaces between rocks in windows should be filled with the more granular
* soils by flooding them into place.
3. A minimum vertical distance of 3 feet between soil fill and rock lift should be
maintained on a preliminary basis. Actual vertical distance should be further
evaluated in the field based on existing conditions. Also, the windrows should be
staggered from lift to lift. Rock windrows should not be placed closer than 15 feet
to the face of fill slopes.
4. Larger rocks too difficult to be placed into windrows may be individually placed into
a dozer trench. Each trench should be excavated into the compacted fill or dense
natural ground a minimum of one foot deeper than the size of the rock to be buried
After the rocks are placed in the trench (not immediately adjacent to each other),
granular fill material should be flooded into the trench to fill the voids.
The oversize rock trenches should be no closer together than 15 feet at a particular
elevation and at least 15 feet from any slope face. Trenches at higher elevations
should be staggered and there should be 4 feet of compacted fill between the top
of one trench and the bottom of the next higher trench, on a preliminary basis.
Actual vertical distances should be further evaluated in the field based on existing
conditions. Placement of rock into these trenches should be under the full-time
inspection of the soils engineer.
5. Consideration should be given, if applicable, to using oversize materials in open
space "green belt" areas which would be designated as non-structural fills.
TheBlackmoreCompany WO 4466-A-SC
Carlsbad Research Center, Lot 66 August 16, 2004
File e \wp9\4400\4466a uge Page 4
GeoSoils, Inc.
PRELIMINARY RECOMMENDATIONS - FOUNDATIONS
Preliminary Foundation Design
In the event that the information concerning the proposed development plan is not correct,
or any changes in the design, location, or loading conditions of the proposed structure are
made, the conclusions and recommendations contained in this report are for the subject
site only, and shall not be considered valid unless the changes are reviewed and
conclusions of this report are modified or approved in writing by this office.
The information and recommendations presented in this section are considered minimums
and are not meant to supercede design(s) by the project structural engineer or civil
engineer specializing in structural design. Upon request, GSI could provide additional
consultation regarding soil parameters, as related to foundation design. They are
considered preliminary recommendations for proposed construction, in consideration of
our field investigation, laboratory testing, and engineering analysis.
Our review, previous field work, and previous laboratory testing indicates that onsite soils
generally have a medium expansion potential (Expansion Index [E.L] = 51 to 90).
Preliminary recommendations for foundation design and construction are presented below.
Final foundation recommendations should be provided at the conclusion of grading, based
on laboratory testing of soils exposed at finish grade.
Bearing Value
1 The foundation systems should be designed and constructed in accordance with
guidelines presented in the latest edition of the UBC. Foundations should not
simultaneously bear on formational sediments and compacted fill.
2. An allowable bearing value of 1,500 pounds per square foot (psf) may be used for
design of continuous footings 12 inches wide and 12 inches deep, and for design
of isolated pad footings 24 inches square and 24 inches deep, founded entirely into
properly compacted fill and connected by grade beam or tie beam in at least one
direction. This value may be increased by 20 percent for each additional 12 inches
in depth to a maximum value of 2,500 psf. The above values may be increased by
one-third when considering short duration seismic or wind loads. No increase in
bearing for footing width is recommended.
Lateral Pressure
1 For lateral sliding resistance, a 0,35 coefficient of friction may be utilized for a
concrete to soil contact when multiplied by the dead load.
The Blackmore Company W O 4466-A-SC
Carlsbad Research Center, Lot 66 August 16,2004
Rle-e \wp9\4400\4466a.uge Page 5
GeoSails, Inc.
2 Passive earth pressure may be computed as an equivalent fluid having a density of
250 pcf with a maximum earth pressure of 2,500 psf.
3. When combining passive pressure and frictional resistance, the passive pressure
component should be reduced by one-third.
Footing Setbacks
All footings should maintain a minimum 7-foot horizontal setback from the base of the
footing to any descending slope This distance is measured from the footing face at the
bearing elevation. Footings should maintain a minimum horizontal setback of
H/3 (H = slope height) from the base of the tooting to the descending slope face and no
less than 7 feet, nor need be greater than 40 feet. Footings adjacent to unlined drainage
swales should be deepened to a minimum of 6 inches below the invert of the adjacent
unlined swale. Footings for structures adjacent to retaining walls should be deepened so
as to extend below a 1:1 projection from the heel of the wall. Alternatively, walls may be
designed to accommodate structural loads from buildings or appurtenances as described
in the "Wall Design Parameters Considering Expansive Soils" section of this report.
Construction
The following foundation construction recommendations are presented as minimum criteria
from a soils engineering standpoint. The onsite soil expansion potential is generally
medium (E.I. 51 to 90). Conventional foundations may be utilized for medium expansive
soils. Foundation recommendations for medium expansive soil conditions are presented
herein.
Recommendations by the project's design-structural engineer or architect, which may
exceed the soils engineer's recommendations, should take precedence over the following
minimum requirements. Final foundation design will be provided based on the expansion
potential of the near surface soils encountered during grading.
Medium Expansion Potential (E.I. 51 to 90)
1. For site soils with high plastic range (plasticity index >15), the design for
conventional slab-on-grade foundations should follow the requirements of Section
1815 of the UBC (ICBO, 1997).
2. Conventional continuous footings should be founded at a minimum depth of
24 inches below the lowest adjacent ground surface for one- or two-story floor ioads
into properly compacted fill. Isolated interior and/or exterior piers and columns are
not recommended. All footings should be reinforced with four No. 4 reinforcing
bars, two placed near the top, and two placed near the bottom of the footing.
Footing widths should be as indicated in UBC (ICBO, 1997).
The Blackmore Company W.O 4466-A-SC
Carlsbad Research Center, Lot 66 August 16, 2004
Rle e \wp9\440CM466a uge Page 6
GeoSoils, Inc.
3 A grade beam, reinforced as above, and at least 24 inches square, should be
provided across garage entrances. The base of the reinforced grade beam should
be at the same elevation as the adjoining footings.
4. Concrete slabs should be underlain by a vapor barrier consisting of a minimum of
10-mil, polyvinyl-chloride membrane with all laps sealed, per the UBC. The vapor
barrier should be placed mid-depth within 4 inches of washed sand to aid in uniform
curing of the concrete and to prevent puncture of the vapor barrier.
5. Concrete slabs, including garage areas, should be a minimum of 5 inches thick, and
reinforced with No. 4 reinforcement bars placed on 18-inch centers, in two
horizontally perpendicular directions (i.e., long axis and short axis) All slab
reinforcement should be supported to ensure proper mid-slab height positioning
during placement of the concrete. "Hooking" of reinforcement is not an acceptable
method of positioning.
6. Garage slabs, if any, should be poured separately from the main footings and be
quartered with expansion joints or saw cuts, A positive separation from the footings
should be maintained with expansion joint material to permit relative movement.
7. Presaturation of slab areas is recommended forthese soil conditions. The moisture
content of each slab area should be at least 125 percent of the soil's optimum
moisture content and be verified by the soil engineer to a depth of 24 inches below
the adjacent ground grade in the slab areas, within 72 hours of the vapor barrier
placement.
8. Soils generated from footing excavations to be used onsite should be compacted
to a minimum relative compaction 90 percent of the laboratory standard, whether
it is to be placed inside the foundation perimeter or in the yard/right-of-way areas.
This material must not alter positive drainage patterns that direct drainage away
from the structural areas and toward the street.
9. Foundations near the top of slope should be deepened to conform to the latest
edition of the UBC (ICBO, 1997) and provide a minimum of 7 feet horizontal
distance from the slope face. Rigid block wall designs located along the top of
slope should be reviewed by a soils engineer.
UPDATE WALL DESIGN PARAMETERS CONSIDERING EXPANSIVE SOILS
Conventional Retaining Walls
The design parameters "provided below assume that either very low expansive soils
(Class 2 permeable filter material or Class 3 aggregate base) or native materials are used
The Blackmore Company W.O 4466-A-SC
Carlsbad Research Center, Lot 66 August 16, 2004
Rle-e.\wp9\4400\4466a uge Page 7
GeoSoils, Inc.
to backfill any retaining walls. The type of backfill (i.e., select or native), should be1
specified by the wall designer, and clearly shown on the plans. Building walls, below
grade, should be water-proofed or damp-proofed, depending on the degree of moisture
protection desired. The foundation system for the proposed retaining walls should be
designed in accordance witfr the recommendations presented in this and preceding
sections of this report, as appropriate. Footings should be embedded a minimum of
18 inches below adjacent grade (excluding landscape layer, 6 inches) and should be
24 inches in width. There should be no increase in bearing for footing width.
Recommendations for specialty walls (i.e., crib, earthstone, geogrid, etc.) can be provided
upon request, and would be based on site specific conditions.
Restrained Walls
Any retaining walls that will be restrained prior to placing and compacting backfill material
or that have re-entrant or male corners, should be designed for an at-rest equivalent fluid
pressure (EFP) of 65 pounds per cubic foot (pcf), plus any applicable surcharge loading
For areas of male or re-entrant comers, the restrained wall design should extend a
minimum distance of twice the height of the wall (2H) laterally from the corner.
CantHevered Walls
The recommendations presented below are for cantilevered retaining walls up to 10 feet
high. Design parameters for walls less than 3 feet in height may be superceded by City
and/or County standard design. Active earth pressure may be used for retaining wall
design, provided the top of the wall is not restrained from minor deflections. An equivalent
fluid pressure approach may be used to compute the horizontal pressure against the wall.
Appropriate fluid unit weights are given below for specific slope gradients of the retained
material. These do not include other superimposed loading conditions due to traffic,
structures, seismic events or adverse geologic conditions. When wall configurations are
finalized, the appropriate loading conditions for superimposed loads can be provided upon
request.
SURFACE SLOPE OF
RETAINED MATERIAL
{HORIZONTAUVERTICAL)
Level*
2to1
EQUIVALENTFLUID WEIGHT P.C.F.(SELECT BACKFILL)
38
55
EQUIVALENT
FLUID WEU5HTP;C.F,
(NATIVE BACKFILL)
50
65
* Level backfill behind a retaining wait is defined as compacted earth materials,
properly drained; without a slope for a distance of 2H behind the wall
The Blackmore Company
Carlsbad Research Center, Lot 66
File e \wp9\4400\4466a uge
W 0. 4466-A-SC
August 16, 2004
PageB
j Inc.
Retaining Wail Backfill and Drainage
Positive drainage must be provided behind all retaining walls in the form of gravel wrapped
in geofabnc and outlets A backdrain system is considered necessary for retaining walls
that are 2 feet or greater in height. Details 1,2, and 3, present the backdramage options
discussed below. Backdrains should consist of a 4-inch diameter perforated PVC or ABS
pipe encased in either Class 2 permeable filter material or Va-inch to 3A-inch gravel wrapped
in approved filter fabric (Mirafi 140 or equivalent). For low expansive backfill, the filter
material should extend a minimum of 1 horizontal foot behind the base of the walls and
upward at least 1 foot. For native backfill that has up to medium expansion potential,
continuous Class 2 permeable drain materials should be used behind the wall. This
material should be continuous (i.e., full height) behind the wall, and it should be
constructed in accordance with the enclosed Detail 1 (Typical Retaining Wall Backfill and
Drainage Detail). For limited access and confined areas, (panel) drainage behind the wall
may be constructed in accordance with Detail 2 (Retaining Waff Backfill and Subdrain
Detail Geotextile Drain). Materials with an expansion index (E.I.) potential of greater than
90 should not be used as backfill for retaining walls. For more onerous expansive
situations, backfill and drainage behind the retaining wall should conform with Detail 3
(Retaining Wall And Subdrain Detail Clean Sand Backfill).
Outlets should consist of a 4-inch diameter solid PVC or ABS pipe spaced no greater than
± 100 feet apart, with a minimum of two outlets, one on each end. The use of weep holes
in walls higher than 2 feet should not be considered. The surface of the backfill should be
sealed by pavement or the top 18 inches compacted with native soil (E.I, < 90). Proper
surface drainage should also be provided For additional mitigation, consideration should
be given to applying a water-proof membrane to the back of all retaining structures. The
use of a waterstop should be considered for all concrete and masonry joints.
Wall/Retaining Wall Footing Transitions
Site walls are anticipated to be founded on footings designed in accordance with the
recommendations in this report. Should wall footings transition from cut to fill, the civil
designer may specify either:
a) A minimum of a 2-foot overexcavation and recompaction of cut materials for a
distance of 2H, from the point of transition.
b) Increase of the amount of reinforcing steel and wall detailing (i.e., expansion joints
or crack control joints) such that a angular distortion of 1/360 for a distance of 2H
on either side of the transition may be accommodated. Expansion joints should be
placed no greater than 20 feet on-center, in accordance with the structural
engineer's/wall designer's recommendations, regardless of whether or not transition
conditions exist. Expansion joints should be sealed with a flexible, non-shrink grout
The Blackmore Company W.O. 4466-A-SC
Carlsbad Research Center, Lot 66 August 16, 2004
File e \wp9\4400\4466a uge Page 9
GeoSotts, Inc.
DETAILS
NTS.
Provide Surface Drainage
+12'
(PWaterproofing
Membrane (optional)
Weep Hole
Finished Surface
WATERPROOFING MEMBRANE (optional):
Liquid boot or approved equivalent.
ROCK:
3/4 to 1-1/2" (inches) rock.
FILTER FABRIC:
Mlrafi 14QN or approved equivalent; place fabric flap behind core.
PIPE:
4" (Inches) diameter perforated PVC. schedule 40 or approved alternative with minimum of
1% gradient to proper outlet point.
WEEP HOLE:
Minimum 2" (inches) diameter placed at 20' (feet) on centers along the wall, and 3" (Inches)
above finished surface. (No weep holes for basement walls.)
TYPICAL RETAINING WALL BACKFILL
AND DRAINAGE DETAIL
DETAIL 1
Geotechnical • Geologic • Environmental
c) Embed the footings entirely into native formational material (i e., deepened
footings).
II transitions from cut to fill transect the wall footing alignment at an angle of less than
45 degrees (plan view), then the designer should follow recommendation "a" (above) and
until such transition is between 45 and 90 degrees to the wall alignment.
TOP-OF-SLOPE WALLS/FENCES/IMPROVEMENTS AND EXPANSIVE SOILS
Expansive Soils and Slope Creep
Soils at the site are likely to be expansive and therefore, become desiccated when allowed
to dry. Such soils are susceptible to surficial slope creep, especially with seasonal
changes in moisture content. Typically in southern California, dunng the hot and dry
summer period, these soils become desiccated and shrink, thereby developing surface
cracks. The extent and depth of these shrinkage cracks depend on many factors such as
the nature and expansivity of the soils, temperature and humidity, and extraction of
moisture from surface soils by plants and roots. When seasonal rains occur, water
percolates into the cracks and fissures, causing slope surfaces to expand, with a
corresponding loss in soil density and shear strength near the slope surface. With the
passage of time and several moisture cycles, the outer 3 to 5 feet of slope materials
experience a very slow, but progressive, outward and downward movement, known as
slope creep. For slope heights greater than 10 feet, this creep related soil movement will
typically impact all rear yard flatwork and other secondary improvements that are located
within about 15 feet from the top of slopes, such as swimming pools, concrete flatwork,
etc., and in particular top of slope fences/walls. This influence is normally in the form of
detrimental settlement, and tilting of the proposed improvements. The dessication/swelling
and creep discussed above continues over the life of the improvements, and generally
becomes progressively worse. Accordingly, the developer should provide this information
to any owners and owners association, as well as tenants.
Top of Slope Walls/Fences
Due to the potential for slope creep for slopes higher than about 10 feet, some settlement
and tilting of the walls/fence with the corresponding distresses, should be expected. To
mitigate the tilting of top of slope walls/fences, we recommend that the walls/fences be
constructed on a combination of grade beam and caisson foundations. The grade beam
should be at a minimum of 12 inches by 12 inches in cross section, supported by drilled
caissons, 12 inches minimum in diameter, placed at a maximum spacing of 6 feet on
center, and with a minimum embedment length of 7 feet below the bottom of the grade
beam. The strength of the concrete and grout should be evaluated by the structural
engineer of record. The proper ASTM tests for the concrete and mortar should be
provided along with the slump quantities. The concrete used should be appropriate to
The Blackmore Company W.O. 4466-A-SC
Carlsbad Research Center, Lot 66 August 16, 2004
File e \wp9\4400\4466a uge Page 13
GeoSoils, Inc.
mitigate sulfate corrosion, as warranted. The design of the grade beam and caissons
should be in accordance with the recommendations of the project structural engineer, and
include the utilization of the following geotechnical parameters:
Creep Zone: 5-fpotverticat zone belowthe slope face and projected upward
parallel to the slope face.
Creep Load: The creep load projected on the area of the grade beam
should be taken as an equivalent fluid approach, having a
density of 60 pcf. For the caisson, it should be taken as a
uniform 900 pounds per linear foot of caisson's depth, located
above the creep zone.
Point of Fixity: Located a distance of 1.5 times the caisson's diameter, below
the creep zone.
Passive Resistance: Passive earth pressure of 300 psf per foot of depth per foot of
caisson diameter, to a maximum value of 4,500 psf may be
used to determine caisson depth and spacing, provided that
they meet or exceed the minimum requirements stated above.
To determine the total lateral resistance, the contribution of the
creep prone zone above the point of fixity, to passive
resistance, should be disregarded.
Allowable Axial Capacity:
Shaft capacity ; 350 psf applied below the point of fixity over the surface area
of the shaft.
Tip capacity: 4,500 psf.
EXPANSIVE SOILS. DRIVEWAY. FLATWORK. AND OTHER IMPROVEMENTS
The soil materials on site are likely to be expansive. The effects of expansive soils are
cumulative, and typically occur over the lifetime of any improvements. On relatively level
areas, when the soils are allowed to dry, the dessication and swelling process tends to
cause heaving and distress to flatwork and other improvements. The resulting potential
for distress to improvements may be reduced, but not totally eliminated. To that end, it is
recommended that the developer should notify any owners or owners association, or
tenants, of this long-term potential for distress. To reduce the likelihood of distress, the
following recommendations are presented for all exterior flatwork:
The Blackmore Company W O 4466-A-SC
Carlsbad Research Center, Lot 66 August 16, 2004
File e \wp9\4400\4466a uge Page 14
GeoSoils, Inc.
1. The subgrade area for concrete slabs should be compacted to achieve a minimum'
90 percent relative compaction, and then be presoaked to 2 to 3 percentage points
above (or 125 percent of) the soils' optimum moisture content, to a depth of
18 inches below subgrade elevation. The moisture content of the subgrade should
be verified within 72 hours prior to pouring concrete.
2. Concrete slabs should be cast over a relatively non-yielding surface, consisting of
a4-inch layer of crushed rock, gravel, or clean sand, that should be compacted and
level prior to pouring concrete. The layer should wet-down completely prior to
pouring concrete, to minimize loss of concrete moisture to the surrounding earth
materials.
3. Exterior slabs should be a minimum of 4 inches thick. Driveway slabs and
approaches should additionally have a thickened edge (12 inches) adjacent to all
landscape areas, to help impede infiltration of landscape water under the slab.
4. The use of transverse and longitudinal control joints are recommended to help
control slab cracking due to concrete shrinkage or expansion. Two ways to
mitigate such cracking are: a) add a sufficient amount of reinforcing steel,
increasing tensile strength of the slab; and, b) provide an adequate amount of
control and/or expansion joints to accommodate anticipated concrete shrinkage
and expansion.
In order to reduce the potential for unsightly cracks, slabs should be reinforced at
mid-height with a minimum of No, 3 bars placed at 18 inches on center, in each
direction. The exterior slabs should be scored or saw cut, Vz to 3/s inches deep,
often enough so that no section is greater than 10 feet by 10 feet. For sidewalks or
narrow slabs, control joints should be provided at intervals of every 6 feet. The
slabs should be separated from the foundations and sidewalks with expansion joint
filler material.
5. No traffic should be allowed upon the newly poured concrete slabs until they have
been properly cured to within 75 percent of design strength. Concrete compression
strength should be a minimum of 2,500 psi.
6. Driveways, sidewalks, and patio slabs adjacent to the house should be separated
from the house with thick expansion joint filler material. In areas directly adjacent
to a continuous source of moisture (i.e., irrigation, planters, etc.), all joints should
be additionally sealed with flexible mastic.
7. Planters and walls should not be tied to the house.
8. Overhang structures should be supported on the slabs, or structurally designed
with continuous footings tied in at least two directions.
TheBlackmore Company WO 4466-A-SC
Carlsbad Research Center, Lot 66 August 16, 2004
Be e \\Np9\4400\446Sa uge Page 15
GeoSof Is, Inc.
9. Any masonry landscape walls that are to be constructed throughout the property
should be grouted and articulated in segments no more than 20 feet long These
segments should be keyed or doweled together
10. Utilities should be enclosed within a closed utilidor (vault) or designed with flexible
connections to accommodate differential settlement and expansive soil conditions.
11 Positive site drainage should be maintained at all times. Finish grade on the lots
should provide a minimum of 1 to 2 percent fall to the street, as indicated herein.
It should be kept in mind that drainage reversals could occur, including
post-construction settlement, if relatively flat yard drainage gradients are not
periodically maintained by the owner or owners association, or tenant.
12. Due to expansive soils, air conditioning (A/C) units should be supported by slabs
that are incorporated into the building foundation or constructed on a rigid slab with
flexible couplings for plumbing and electrical lines. A/C waste water lines should
be drained to a suitable non-erosive outlet.
13. Shrinkage cracks could become excessive if proper finishing and curing practices
are not followed. Finishing and curing practices should be performed per the
Portland Cement Association Guidelines. Mix design should incorporate rate of
curing for climate and time of year, sulfate content of soils, corrosion potential of
soils, and fertilizers used on site.
UPDATE DEVELOPMENT CRITERIA
Slope Deformation
Compacted fill slopes designed using customary factors of safety for gross or surficial
stability and constructed in general accordance with the design specifications should be
expected to undergo some differential vertical heave or settlement in combination with
differential lateral movement in the out-of-slope direction, after grading. This
post-construction movement occurs in two forms: slope creep, and lateral fill extension
(LFE). Slope creep is caused by alternate wetting and drying of the fill soils which results
in slow downslope movement. This type of movement is expected to occur throughout the
life of the slope, and is anticipated to potentially affect improvements or structures (i.e.,
separations and/or cracking), placed near the top-of-slope, up to a maximum distance of
approximately 15 feet from the top-of-slope, depending on the slope height This
movement generally results in rotation and differential settlement of improvements located
within the creep zone. LFE occurs due to deep wetting from irrigation and rainfall on
slopes comprised of expansive materials. Although some movement should be expected,
long-term movement from this source may be minimized, but not eliminated, by placing
the fill throughout the slope region, wet of the fill's optimum moisture content.
The Blackmore Company W.O 4466-A-SC
Carlsbad Research Center, Lot 66 August 16, 2004
Be e \wp9\44QQ\4466a.uge Page 16
GeoSoils, Inc.
;4 V'~ It is generally not practical to attempt to eliminate the effects of either slope creep or LFE.
t £•?' suitable mitigative measures to reduce the potential of lateral deformation typically include:
!f, I'** setback of improvements from the slope faces (per the 1997 UBC and/or California
^ f^ Building Code), positive structural separations (i.e., joints) between improvements, and
f ^ stiffening and deepening of foundations. Expansion joints in walls should be placed no
^/ greater than 20 feet on-center, in accordance with the structural engineer's
J^t; recommendations. All of these measures are recommended for design of structures and
3 X improvements. The ramifications of the above conditions, and recommendations for
mitigation, should be provided to each owner and/or any owners association or tenants.
Slope Maintenance and Planting
Water has been shown to weaken the inherent strength of all earth materials. Slope
stability is significantly reduced by overly wet conditions. Positive surface drainage away
from slopes should be maintained and only the amount of irrigation necessary to sustain
plant life should be provided for planted slopes. Over-watering should be avoided as it can
adversely affect site improvements, and cause perched groundwater conditions. Graded
slopes constructed utilizing onsite materials would be erosive. Eroded debris may be
minimized and surficial slope stability enhanced by establishing and maintaining a suitable
vegetation cover soon after construction. Compaction to the face of fill slopes would tend
to minimize short-term erosion until vegetation is established. Plants selected for
landscaping should be light weight, deep rooted types that require little water and are
capable of surviving the prevailing climate. Jute-type matting or other fibrous covers may
afd in allowing the establishment of a sparse plant cover. Utilizing plants other than those
recommended above will increase the potential for perched water, staining, mold, etc., to
develop. A rodent control program to prevent burrowing should be implemented.
Irrigation of natural (ungraded) slope areas is generally not recommended. These
recommendations regarding plant type, irrigation practices, and rodent control should be
provided to each owner and/or tenant. Over-steepening of slopes should be avoided
during building construction activities and landscaping.
Drainage
Adequate lot surface drainage is a very important factor in reducing the likelihood of
adverse performance of foundations, hardscape, and slopes. Surface drainage should be
sufficient to prevent ponding of water anywhere on a lot, and especially near structures and
tops of slopes. Lot surface drainage should be carefully taken into consideration during
fine grading, landscaping, and building construction. Therefore, care should be taken that
future landscaping or construction activities do not create adverse drainage conditions.
Positive site drainage within lots and common areas should be provided and maintained
at all times. Drainage should not flow uncontrolled down any descending slope Water
should be directed away from foundations and not allowed to pond and/or seep into the
ground. In general, the area within 5 feet around a structure should slope away from the
structure. We recommend that unpaved lawn and landscape areas have a minimum
The Blackmore Company W.0.4466-A-SC
Carlsbad Research Center, Lot 66 August 16,2004
File e \wp9\4400\4466a uge Page 17
GeoSoils, Inc.
gradient of 1 percent sloping away from structures, and whenever possible, should be
above adjacent paved areas. Consideration should be given to avoiding construction of
planters adjacent to structures (buildings, pools, spas, etc.). Pad drainage should be
directed toward the street or other approved area(s) Although not a geotechnical
requirement, roof gutters, down spouts, or other appropriate means may be utilized to
control roof drainage. Down spouts, or drainage devices should outlet a minimum of Sfeet
from structures or into a subsurface drainage system. Areas of seepage may develop due
to irrigation or heavy rainfall, and should be anticipated. Minimizing irrigation will lessen
this potential, if areas of seepage develop, recommendations for minimizing this effect
could be provided upon request.
Toe of Slope Drains/Toe Drains
Where significant slopes intersect pad areas, surface drainage down the slope allows for
some seepage into the subsurface materials, sometimes creating conditions causing or
contributing to perched and/or ponded water Toe of slopeAoe drains may be beneficial
in the mitigation of this condition due to surface drainage. The general criteria to be
utilized by the design engineer for evaluating the need for this type of drain is as follows:
• Is there a source of irrigation above or on the slope that could contribute to
saturation of soil at the base of the slope?
• Are the slopes hard rock and/or impermeable, or relatively permeable, or; do the
slopes already have or are they proposed to have sufadrains (i.e., stabilization fills,
etc.)?
• Was the lot at the base of the slope overexcavated or is it proposed to be
overexcavated? Overexcavated lots located at the base of a slope could
accumulate subsurface water along the base of the fill cap.
Are the slopes north facing? North facing slopes tend to receive less sunlight (less
evaporation) relative to south facing slopes and are more exposed to the currently
prevailing seasonal storm tracks.
• What is the siope height? It has been our experience that slopes with heights in
excess of approximately 10 feet tend to have more problems due to storm runoff
and irrigation than slopes of a lesser height.
• Do the slopes "toe out" into a lot where perched or ponded water may adversely
impact its proposed use?
Based on these general criteria, the construction of toe drains may be considered by the
design engineer along the toe of slopes, or at retaining walls in slopes, descending to the
rear of such lots. Following are Detail 4 (Schematic Toe Drain Detail) and Detail 5
The Blackmore Company W.0.4466-A-SC
Carlsbad Research Center, Lot 66 August 16, 2004
Be^wp9\4400\4466auge Page 18
GeoSoils, Inc.
(Subdram Along Retaining Wall Detail). Other drains may be warranted due to unforeseen
conditions, owner or tenant irrigation, or other circumstances. Where drains are
constructed during grading, including subdrains, the locations/elevations ot such drains
should be surveyed, and recorded on the final as-built grading plans by the design
engineer. It is recommended that the above be disclosed to all interested parties,
including owners and any owners association, as well as tenants
Erosion Control
Cut and fill slopes will be subject to surficial erosion during and after grading. Onsrte earth
materials have a moderate to high erosion potential. Consideration should be given to
providing hay bales and silt fences for the temporary control of surface water, from a
geotechnical viewpoint.
Landscape Maintenance
Only the amount of irrigation necessary to sustain plant life should be provided.
Over-watering the landscape areas will adversely affect proposed site improvements. We
would recommend that any proposed open-bottom planters adjacent to proposed
structures be eliminated for a minimum distance of 10 feet. As an alternative,
closed-bottom type planters could be utilized. An outlet placed in the bottom of the
planter, could be installed to direct drainage away from structures or any exterior concrete
flatwork. If planters are constructed adjacent to structures, the sides and bottom of the
planter should be provided with a moisture barrier to prevent penetration of irrigation water
into the subgrade. Provisions should be made to drain the excess irrigation water from the
planters without saturating the subgrade below or adjacent to the planters. Graded slope
areas should be planted with drought resistant vegetation. Consideration should be given
to the type of vegetation chosen and their potential effect upon surface improvements (i.e.,
some trees will have an effect on concrete flatwork with their extensive root systems).
From a geotechnical standpoint leaching is not recommended for establishing
landscaping. If the surface soils are processed for the purpose of adding amendments,
they should be recompacted to 90 percent minimum relative compaction.
Gutters and Downspouts
As previously discussed in the drainage section, the installation of gutters and downspouts
should be considered to collect roof water that may otherwise infiltrate the soils adjacent
to the structures If utilized, the downspouts should be drained into PVC collector pipes
or non-erosive devices that will carry the water away from the house. Downspouts and
gutters are not a requirement; however, from a geotechnical viewpoint, provided that
positive drainage is incorporated into project design (as discussed previously).
The Blackmore Company W 0.4466-A-SC
Carlsbad Research Center, Lot 66 August 16, 2004
File-e-\wp9\4400\4466a uge Page 21
GeoSoils, Inc.
Subsurface and Surface Water
Subsurface and surface water are not anticipated to affect site development, provided that
the recommendations contained in this report are incorporated into final design and
construction and that prudent surface and subsurface drainage practices are incorporated
into the construction plans Perched groundwater conditions along zones of contrasting
permeabilities may not be precluded from occurring in the future due to site irrigation, poor
drainage conditions, or damaged utilities, and should be anticipated. Should perched
groundwater conditions develop, this office could assess the affected area(s) and provide
the appropriate recommendations to mitigate the observed groundwater conditions.
Groundwater conditions may change with the introduction of irrigation, rainfall, or other
factors.
Site Improvements
Recommendations for exterior concrete fiatwork design and construction can be provided
upon request. If in the future, any additional improvements (e.g., pools, spas, etc.) are
planned for the site, recommendations concerning the geological or geotechnical aspects
of design and construction of said improvements could be provided upon request. This
office should be notified in advance of any fill placement, grading of the site, or trench
backfilling after rough grading has been completed. This includes any grading, utility
trench, and retaining wall backfills.
Tile Flooring
Tile flooring can crack, reflecting cracks in the concrete slab below the tile, although small
cracks in a conventional slab may not be significant. Therefore, the designer should
consider additional steel reinforcement for concrete slabs-on-grade where tile will be
placed. The tile installer should consider installation methods that reduce possible
cracking of the tile such as slipsheets. Slipsheets or a vinyl crack isolation membrane
(approved by the Tile Council of America/Ceramic Tile Institute) are recommended
between tile and concrete slabs on grade.
Additional Grading
This office should be notified in advance of any fill placement, supplemental regrading of
the site, or trench backfilling after rough grading has been completed. This includes
completion of grading in the street and parking areas and utility trench and retaining wall
backfills.
The Blackmore Company W O. 4466-A-SC
Carlsbad Research Center, Lot 66 August 16, 2004
File-e.\wp9\4400\4466auge Page 22
GeoSoils, Inc.
Footing Trench Excavation
All footing excavations should be observed by a representative of this firm subsequent to
trenching and prior to concrete form and reinforcement placement. The purpose of the
observations is to verify that the excavations are made into the recommended bearing
material and to the minimum widths and depths recommended for construction. If loose
or compressible materials are exposed within the footing excavation, a deeper footing or
removal and recompaction of the subgrade materials would be recommended at that time
Footing trench spoil and any excess soils generated from utility trench excavations should
be compacted to a minimum relative compaction of 90 percent, if not removed from the
site.
Trenching
Considering the nature of the onsite soils, it should be anticipated that caving or sloughing
could be a factor in subsurface excavations and trenching. Shoring or excavating the
trench walls at the angle of repose (typically 25 to 45 degrees) may be necessary and
should be anticipated. All excavations should be observed by one of our representatives
and minimally conform to CAL-OSHA and local safety codes.
Utility Trench Backfill
1. All interior utility trench backfill should be brought to at least 2 percent above
optimum moisture content and then compacted to obtain a minimum relative
compaction of 90 percent of the laboratory standard. As an alternative for shallow
(12-inch to 18-inch) under-slab trenches, sand having a sand equivalent value of
30 or greater may be utilized and jetted orfiooded into place. Observation, probing
and testing should be provided to verify the desired results.
2. Exterior trenches adjacent to, and within areas extending below a 1:1 plane
projected from the outside bottom edge of the footing, and all trenches beneath
hardscape features and in slopes, should be compacted to at least 90 percent of
the laboratory standard. Sand backfill, unless excavated from the trench, should
not be used in these backfill areas. Compaction testing and observations, along
with probing, should be accomplished to verify the desired results.
3. All trench excavations should conform to CAL-OSHA and local safety codes.
4. Utilities crossing grade beams, perimeter beams, or footings should either pass
below the footing or grade beam utilizing a hardened collar or foam spacer, or pass
through the footing or grade beam in accordance with the recommendations of the
structural engineer.
The Blackmore Company W 0. 4466-A-SC
Carlsbad Research Center, Lot 66 August 16, 2004
Rle-e \wp9\4400\4466a uge Page 23
GeoSoils, Inc.
SUMMARY OF RECOMMENDATIONS REGARDING
GEOTECHN1CAL OBSERVATION AND TESTING
We recommend that observation and/or testing be performed by GS1 at each of the
following construction stages:-
• During grading/recertification
During significant excavation (i.e., higher than 4 feet).
• During placement of subdrains, toe drains, or other subdrainage devices, prior to
placing fill and/or backfill.
After excavation of building footings, retaining wall footings, and free standing walls
footings, prior to the placement of reinforcing steel or concrete.
Prior to pouring any slabs or flatwork, after presoaking/presaturation of building
pads and other flatwork subgrade, before the placement of concrete, reinforcing
steel, capillary break (i.e., sand, pea-gravel, etc.), or vapor barriers (i.e., visqueen,
etc.).
During retaining wall subdrain installation, prior to backfill placement.
During placement of backfill for area drain, interior plumbing, utility line trenches,
and retaining wall backfill.
• During slope construction/repair.
• When any unusual soil conditions are encountered during any construction
operations, subsequent to the issuance of this report.
• When any developer, owner, ortenant improvements, such as flatwork, spas, pools,
walls, etc., are constructed.
• A report of geotechnical observation and testing should be provided at the
conclusion of each of the above stages, in order to provide concise and clear
documentation of site work, and/or to comply with code requirements.
• GSI should review project sales documents to owners/owners associations for
geotechnical aspects, including irrigation practices, the conditions outlined above,
etc., prior to any sales. At that stage, GSI will provide owners maintenance
guidelines which should be incorporated into such documents.
The Blackmore Company W O 4466-A-SC
Carlsbad Research Center, Lot 66 August 16, 2004
File e \wp9\4400\4466a uge Page 24
GeoSoils, Inc.v
OTHER DESIGN PROFESSIONALS/CONSULTANTS
The design civil engineer, structural engineer, post-tension designer, architect, landscape
architect, wall designer, etc., should review the recommendations provided herein
incorporate those recommendations into all their respective plans, and by explicit
reference, make this report part of their project plans. This report presents minimum
design criteria for the design of slabs, foundations and other elements possibly applicable
to the project. These criteria should not be considered as substitutes for actual designs
by the structural engineer/designer. The structural engineer/designer should analyze
actual soil-structure interaction and consider, as needed, bearing, expansive soil influence,
and strength, stiffness and deflections in the various slab, foundation, and other elements
in order to develop appropriate, design-specific details. As conditions dictate, it is possible
that other influences will also have to be considered. The structural engineer/designer
should consider all applicable codes and authoritative sources where needed If analyses
by the structural engineer/designer result in less critical details than are provided herein
as minimums, the minirnums presented herein should be adopted. It is considered likely
that some, more restrictive details will be required. If the structural engineer/designer has
any questions or requires further assistance, they should not hesitate to call or otherwise
transmit their requests to GSI. In order to mitigate potential distress, the foundation and/or
improvement's designer should confirm to GSI and the governing agency, in writing, that
the proposed foundations and/or improvements can tolerate the amount of differential
settlement and/or expansion characteristics and design criteria specified herein.
PLAN REVIEW
Final project plans should be reviewed by this office prior to construction, so that
construction is in accordance with the conclusions and recommendations of this report.
Based on our review, supplemental recommendations and/orfurther geotechnical studies
may be warranted.
LIMITATIONS
The materials encountered on the project site and utilized for our analysis are believed
representative of the area; however, soil and bedrock matenals vary in character between
excavations and natural outcrops or conditions exposed during mass grading. Site
conditions may vary due to seasonal changes or other factors.
The Blackmore Company W.O 4466-A-SC
Carlsbad Research Center, Lot 66 August 16, 2004
File-e \wp9\4400\4466a uge Page 25
GeoSoils, Inc.
SF•r
Inasmuch as our study is based upon our review and engineering analyses and laboratory
data, the conclusions and recommendations are professional opinions. These opinions
have been derived in accordance with current standards of practice, and no warranty is
expressed or implied. Standards of practice are subject to change with time. GS1 assumes
no responsibility or liability for work or testing performed by others, or their inaction; or
work performed when GSI is not requested to be onsite, to evaluate if our
recommendations have been properly implemented Use of this report constitutes an
agreement and consent by the user to all the limitations outlined above, notwithstanding
any other agreements that may be in place. In addition, this report may be subject to
review by the controlling authorities. Thus, this report brings to completion our scope of
services for this portion of the project.
The opportunity to be of service is greatly appreciated. If you have any questions, please
do not hesitate to call our office.
Respectfully submitted,
GeoSoils, Inc.
an Boehmer
Staff Geologist
P. Franklin
gineering Geologis
RB/DWS/JPF/jk
Attachment; Appendix - References
Distribution: (4) Addressee
David W. Skelly
Civil Engineer, CEG
The Blackmore Company
Carlsbad Research Center, Lot 66
File e \wp9\4400\4466a uge
W.O 4466-A-SC
August 16, 2004
Page 26
GeoSoils, Inc.
APPENDIX
REFERENCES
GeoSoils, Inc, 1996, Preliminary geotechnical evaluation, Carlsbad Research Center,
Lot 66, City of Carlsbad, San Diego County, California, W.O..2146-A-SC, dated
November 11.
, 1998, geotechnical response to Review by City of Carlsbad, Lot 66, Carlsbad
Research Center, Carlsbad, San Diego County, California, W.0.2146-A-SC, dated
September 15.
International Conference of Building Officials, 1997, Uniform building code: Whittier,
California, vol. 1,2, and 3.
San Dieguito Engineering, Inc., 1998, Preliminary grading plan for: Carlsbad Research
Center, Lot 66, sheet 2 of 3, 30-scale, no project number, no drawing number,
dated July 31,
GeoSoils, Inc.
08-10-2005
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Plan Check Revision Permit No PCR05146
Building Inspection Request Line (760) 602-2725
Job Address
Permit Type
Parcel No
Valuation
Reference #
Project Title
1811 ASTON AVCBAD
PCR
2121201QQQ Lot# 0
Construction Type NEW
1050313
"" "IE BLACKMORE (COMPANY
'REV TOP, E&M
Applicant
RENO CONSTRUCTIO
8104 COMMERCIAL STREET
LA MESA, CA 91942
619462-7025
Status ISSUED
Applied 07/21/2005
Entered By SB
Plan Approved 08/10/2005
Issued 08/10/2005
Inspect Area
Owner
BLACKMORE FAMILY TRUST 1995
C/O ALLEN J BLACKMORE
P-OBOX424,
RANCHO SANTA FE CA 92067
Plan Check Revision Fee
Additional Fees
Total Fees ($240 00 Total Payments To Date SO 00 Balance Due $240 00
436008/10/05 0002 01 02/
CGP 240-00
Inspector
FINAL APPROVAL
Date Clearance
NOTICE Please take NOTICE that approval of your project includes the Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions" You have 90 days from the date this permit was issued to protest imposition of these fees/exactions If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
fees/exactions of which vou have oreviouslv been aiven a NOTICE similar to this, or as to which the statute of limitations has oreviouslv otherwise expired
PERMIT APPLICATION
CITY OF CARLSBAD BUILDING DEPARTMENT
1635 Faraday Ave , Carlsbad, CA 92008
FOR OFFICE USE
PLAN CHECK NO.
EST. VAL
Plan Ck Deposit
Validated By
Date f~*l\lA
Busmass Name (at this address)
Legal Description Lot No Subdivision Name/Number Unit No Phase No
OFF 1 LE
Total # of units
Assessor's Parcel #
' JL
Existing Use
(jQ rjOO
SQ FT
-L
Proposed Use
41Description of Work #of Stories # of Bedrooms if of Bathrooms
Of?«H«MenUrom vpnVowU-
Name Address City
Qwnar< * D Agent for Owner
Slate/Zip Telephone #Fax »
Name Address City State/Zip Telephone #
Name Address City State/Zip Telephone 9
(Sec 7031 5 Business and Professions Code Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its
issuance, also requires the applicant for such permit to fifa a signed statement that ha is licensed pursuant to the provisions of the Contractor's License Law
(Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code! or that he is exempt therefrom, and the basis for the alleged
exemption Any violation of ^Section 7031 5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred-dollars [$500D
Name ' Address
State License # tfl H 0(o*| Ucense Class
Designer Name Address
State License ft
City ^tate/Zip Telephonfe # ,. - — ' gj
D Citv Business License # f
• City State/Zip Telephone
Workers' Compensation Declaration I hereby affirm under penalty of perjury one of the following declarations
Q I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance
of the work for whicri this permit is issued
J3^ I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is
issued My worker's compensation insurance earner and policy number are
Insurance Company _ST*. "V?f\^y_ "V*S!fc£i<x ^^*£Ik*k TNS^t^U^-f/oUcy No iyCQ L" t 0 C) ^ Q ^ Expitation Oate_
(THIS SECTION NEED NOT BE COMPLETED IF THE PERMIT IS FOR ONE HUNDRED DOLLARS [$100] OR LESS)
D CERTIFICATE OF EXEMPTION I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as
to become subject to the Workers' Compensation Laws of California
WARNING Failure to secure workers' compensation coverage is unlawful, and (hall subject an employer to criminal penalties and civil fines up to one hundred
thousand dollars ($100,000), in addition to the cost of compensation, damages as provided for In Section 3706 of the Labor code, interest and attorney's fees
SIGNATURE DATE
^W^t^'fwV****' *,!'\'"tKktf^?$£~''£-1*-*''?' >'„ '*•*' '"^ ,f •><*• - •>; s« f '>- - i1 , * ' "• * •* ,- :,' *
I hereby affirm that I am exempt from the Contractor's License Law for the following reason
Q I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale
(Sec 7044, Business and Professions Code The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does
such work himself or through his own employees, provided that such improvements are not intended or offered for sale If, however, the building or improvement is
sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale)
Q I, as owner of the property, am exclusjveJy contracting with licensed contractors to construct the project (Sec 7044, Business and Professions Code The
Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed
pursuant to the Contractor's License Law)
D I am exempt under Section Business and Professions Code for this reason
1 I personally plan to provide the major labor and materials for construction of the proposed property improvement Q YES QNO
2 1 (have / have not) signed an application for a building permit for the proposed work
3. \ have conttacl&d with the following poison (firm) to provide the proposed construction (include name / address / phone number / contractors license number)
4 I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name / address / phone
number / contractors licens* number)
5 I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name / address / phone number / type
of work)
PROPERTY OWNER SIGNATURE _ _ DATE
&jV4'*;sVtrAm^i!^Vl4 vLV^fe-i
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention
program under Sections 25505, 25533 or 25534 of the Pteslev-Tarmer Hazardous Substance Account Act? Q YES (3 NO
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? LD YES Q NO
Is tna facility to be constructed within 1 ,000 faet of the outer boundary of a school site? [_] YES Q NO
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE
REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT
hereby affirm that there is a construction lending agency for the performance of the work for which this permit is issued (Sec 3097(0 Civil Code)
LENDER'S NAME LENDER'S ADDRESS
1 certify that I have read the application and state that the above information is correct and that the information on the plans is accurate I agree to comply with all
City ordinances and State laws relating to building construction I hereby authorize representatives of the City of Carlsbad to enter upon the above mentioned
property for inspection purposes ( ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES,
JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAV ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT.
OSHA An OSHA permit is required for excavations over 5'0" deep and demolition or construction of structures over 3 stories in height
EXPIRATION Every permit issued by the buildingjDfficial under the provisions of this Coda shall expire by limitation and become null and void if the building or work
authorized by such permit is not commenced withrr£t80 days from the date of such permit or if the building or work authorized by such permit is suspended or abandoned
at any time after the work is comfnehced ip^pSnod of 130 days (Section 106 4 4 Uniform Building Code) / /
APPLICANT'S SIGNATURE " «4-—-——•"-"""' DATE
WHITE File YELLOW Applicant PINK Finance 7
EsGil Corporation
In Partnership -untfi government for (Bui&ing Safety
DATE August 1, 2005
JURISDICTION Carlsbad
PLAN CHECK NO 05-0313.rev SET I
PROJECT ADDRESS 1811 Aston Ave.
PROJECT NAME Lobby & Core TI plumb, mech, and elect revisions
Q PLAN REVIEWER
Q FILE
X] The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff
The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
The check list transmitted herewith is for your information The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck
The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person
The applicant's copy of the check list has been sent to.
X] Esgil Corporation staff did not advise the applicant that the plan check has been completed
Esgil Corporation staff did advise the applicant that the plan check has been completed
Person contacted Telephone #.
Date contacted: (by ) Fax #
Mail Telephone Fax In Person
REMARKS'
By. Glen Adamek
Esgil Corporation
D GA D MB D EJ
-Enclosures.
D PC 7/25/05 tmsnntl dot
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858)560-1468 4 Fax (858) 560-1576
Carlsbad 05-O313.rev
August 1, 2005
VALUATION AND PLAN CHECK FEE
JURISDICTION Carlsbad
PREPARED BY Glen Adamek
BUILDING ADDRESS- 1811 Aston Ave.
BUILDING OCCUPANCY
PLAN CHECK NO 05-0313.rev
DATE August 1, 2005
TYPE OF CONSTRUCTION
BUILDING
PORTION
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code
AREA
(Sq Ft)
cb
1994 UBC Building Permit Fee vV
Valuation
Multiplier
By Ordinance
Reg
Mod
VALUE {$)
/
1994 UBC Plan Check Fee
Type of Review
$240 00
D Complete Review
D Other
m Hourly
Structural Only
Hours *
Esgll Plan Review Fee
* „ Based on hourly rate
Comments Revised plumbing, mechanical, and electrical
$192.00
Sheet 1 of 1
macvalue doc