HomeMy WebLinkAbout1818 ASTON AVE; ; CB101548; Permit09-22-2010 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Commercial/Industrial Permit Permit No: CB101548 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: Project Title: 1818ASTONAVCBAD Tl Sub Type: 2121200500 Lot#: $57,320.00 Construction Type: Reference #: COBRA PUMA - INSTALL INTERIOR RACKING INDUST 0 NEW Applicant: AMY EDWARDS 161 ATLANTIC ST POMONA CA 91768 909 869 0989 Status: Applied: Entered By: Plan Approved: Issued: Inspect Area: Plan Check#: ISSUED 08/20/2010 LSM 09/22/2010 09/22/2010 Owner: BLACKMORE PARKVIEW ASSOCIATES P 0 BOX 424 RANCHO SANTA FE CA 92067 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park Fee LFM Fee Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'l Pot. Water Con. Fee Reel. Water Con. Fee Green Bldg Stands (SB1473) Fee Fire Expedited Plan Review $454.83 Meter Size $0.00 Add'l Reel. Water Con. Fee $295.64 Meter Fee $0.00 SDCWA Fee $0.00 CFD Payoff Fee $12.04 PFF (3105540) $0.00 PFF (4305540) $0.00 License Tax (3104193) $0.00 License Tax (4304193) $0.00 Traffic Impact Fee (3105541) $0.00 Traffic Impact Fee (4305541) $0.00 PLUMBING TOTAL $0.00 ELECTRICAL TOTAL $0.00 MECHANICAL TOTAL $0.00 Master Drainage Fee Sewer Fee $0.00 Redev Parking Fee $0.00 Additional Fees $1.00 HMPFee $160.00 TOTAL PERMIT FEES $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $923.51 Total Fees:$923.51 Total Payments To Date:$923.51 Balance Due:$0.00 *iaa Inspector: FINAL APPROVAL Date:Clearance: NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired. ^(N£ Building Permit / V*^; 1635 Faraday Ave., Carts ^^ CITY OF 76O-602-2719/27' f""ADI CRAPl Fax 760-602-8 V-. /A l\ l_*3 D/* \-J www.carlsbadci 1818 Aston Avenue, Carlsbad CT/PROJECT* LOT* PHASE* # OF UNITS # BEDROOMS k-_-_ij— ,_ij_-_Application bad, CA 92008 Esl Si271' j.gov Da SUrrc*/SPACE*/UIWT* in Check No. && \ O \ ^4 & L Value .S'T, 5^< n Ck. Deposit ^~/-lO te $~J2JD/fO SW O • by- *PPP /1//V ARM # BATHROOMS TENANT BUSINESS NAME CO Cobra Puma MSTR.TYPE OCC. GROUP DESCRIPTION OF WORK: Include Square Feet of Affected Area(s) Installation of interior racks in an existing Puma building EXISTING USE PROPOSED USE GARAGE (SF) CONTACT NAME (If Different Fom Applicant) ~1 ADDRESS CITY STATE ZIP PHONE FAX EMAIL PROPERTY OWNER NAME . _ - ADDRESS /F"'/ /M ?cN^ A(/eT\ WL/T^/O"^ CITY / STATE-^<1 ZIP PHONE FAX "~?(0O-~*gQ*J ~ ^^(Kj ~?GO ~ ^&*J~-'1f6>O~? EMAIL ARCH/DESIGNER NAME & ADDRESS STATE LIC. # Sal Fateen-Seizmicinc 25969 PATIOS (SF) DECKS (SF) FIREF YES[ 'LACE AIR CONDmONIt 3* NOfl YEsOwof >IG FIRE SPRINKLERS 3 YES|~JNO|~] APPLICANT NAME . _ . . _. .Amy Edwards-Seizmicmc Inc. ADDRESS CITY Pomona PHONE 909-869-0989 161 Atlantic Street STATE ZIP S/*f //*)^Ca 91768 ' "" 909-869-0981 EMAIL aedwards@seizmicinc.com«•— jma-^j ADDRESS CITY /V-/J o (f/&^}~& PHONE EMAIL STATE LIC.# ^ef~2^ii f~2--~? ~6dAd?l oendina r /-/>Ay^r STATE ZIP CA <?&&£<£> FAX CLASS / CfTY BUS. LIC.f y ^ (Sec, 7031.5 Business and Professions Cods:apuiicara for such permit to file a si •—•-••-Business and Professions Code! orciv!! penalty of not more than five hundred dollars JS5QO}). W:O R K E B 5 ' C O JW PEN S ATI O N with Section 7000 of Division 3 of thea permit subjects the applicant to a Y I Workers' Compensation Declaration: ; hereby affirm under penalty of perjury one of the fallowing declarations: I I have and wifl maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. S-l-have and wil! maintain workers' compensation, as rewired by Section 3700 oijhe Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance number are: Insurance Co Pf2.0Fr~ f^^ d$ S*OC ** ^-F _ Policy No. VJC~ .5 f^^g f f~Expiration Date / / ^ r and policy Thjs section need not be completed if the permit is for one hundred dollars ($100) or less. LJ Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of California. WARNING; Failure to secure workers' compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (5100,000), in addition to the cost of compensation, damag^^|lrovl|fied^rjp Section SJ^Spfthe Labor code, interest and attorney's fees. £$ CONTRACTOR SIGNATURE / hereby affirm (fiat i am exempt from Contractor's License Law for the following reason: \ \ l, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's ! License Law does not apply to an owner of property who builds or improves thereon, and who does sucti work himself or through his own employees, provided that such improvements are not intended or offered for sale, if, however, the building or improvement is sold within one year of completion, the owner-builder wfif have the burden of proving that he did not buiid or improve for the purpose of safe). LJ I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to ah owner of property who builds or improves thereon, and contracts for such projects with contractorfs) licensed puisuant to the Contractor's License Law). [ 1 I am exempt under Section Business and Professions Code for this reason: 1. i personally plan to provide the major labor and materials for construction of the proposed property improvement, f JYes 2.1 (have / have not) signed an application for a building permit for the proposed work, 3.! have contracted with the following person (ftm) to provide the proposed construction (include name address / phone / contractors' license number): 4. i plan to provide portions of the wonX but i have hired the following person to coordinate, supervise and provide the major work (include name / address / phone / contractors' license number): 5,1 will provide some of the work, bu! I have contracted (hired) the following persons to provide the work indicated (include name / address / phone / type of work): ^PROPERTY OWNER SIGNATURE QAGENT DATE SW tap LETE TH IS SEC T.I O N F OR N O N-RE SIDE N Tl A L BUI L D IN G PERM I ISO N L Y Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505,25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? | |Yes 1 )NQ Is the applicant or future building occupant required to obtain a permit from the air pollution control district or airquality management district? I lYes f~~) No Isthefacilitytobeoinstnjctedwithinl.OOOt^toftheouterbMndaryofasctraolste? Hives FlNo EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. ;<|aO MS jit U C Tl O N L EN Dl NC A G E IM C Y I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 309? (i) Civil Code). Lender's Name Lender's Address A0> P L I C A IM T I certify thatltevereadteapplicafon ami state trtat the above irrfo^ I reer^ autJions rerjreserrtetfve of te City of Cartebad toerte ur^ AGAINST ALL UABimES, JUEK3MEMTS, COSTS AND EXPENSES WHICH MAYIN ANY WAY ACCRUE AGAJNSTSAJDaWINCONSECaJENC^OFTHEGRANmNGCFTHISr^RMIT. OSHA: An OSH A permit is required for excavations owr SO deep andcknoffioncfconstetaofstnidur^ 180 days from tr« date of such permit or if tJie buMr^ or vwrk authori^ by such ^APPLICANT'S SIGNATURE DATE Inspection List Permit*: CB101548 Type: Tl INDUS! COBRA PUMA - INSTALL INTERIOR RACKING Date Inspection Item Inspector Act Comments 10/07/2010 14 Frame/Steel/Bolting/Weldin TP PA TO LOAD ONLY, NEED FIRE FINAL FOR BLDG FINAL Tuesday, April 12, 2011 Page 1 of 1 SPECIAL INSPECTORS CERTIFICATE OF COMPLIANCE SPECIAL INSPECTOR REPORT Each inspector must complete this report and mail it to the Community, Economic & Development Services Department, Building and Safety Division. PLAN CHECK/PERMIT JOB ADDRESS: IB /& Daily &1 Weekly Q Final Q GENERAL CONTRACTOR: TYPE OF WORK INSPECTED Reinforced Concrete Prestressed Concrete Gypsum Concrete Other:y Masonry Grading/Fill Welding Hi-Tensile Bolting Spray-Applied Fireproofing Specify: Ujvjar, &AlrS)KML &> /-& / ** . •* A * .. . - . .' /)A. // # ., I// DESCRIPTION OF WORK INSPECTED: LOCATION IN STRUCTURE: REMARKS: All work on this job to date, to the best of my knowledge, has been satisfactorily completed and conforms to the approved plans and applicable building codes. DATE " ' SPECIAL INSPECT P:\PLANNING & BUILDiNG\BLDG\FORMS\SPEC INSPECTION REPORT.DOC CERTIFICATION/REGISTRATION NO. EsGil Corporation In Partnership with government for Quitting Safety DATE: 9/16/2010 JURISDICTION: City of Carlsbad a PLAN REVIEWER Q FILE PLAN CHECK NO.: 101548 SET: II PROJECT ADDRESS: 1818 Aston Avenue PROJECT NAME: Storage Racks for Cobra Puma I I The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. XI The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: IXI Esgil Corporation staff did not advise the applicant that the plan check has been completed. I I Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: » Telephone #: \1Date contacted: fffV (by: ) Fax #:mi 1 ^^s» *> * ' Mail Telephone/If Fax In Person XI REMARKS: 1 .^ire Department approval is required. 2*. City to field verify that the path of travel from the handicapped parking space to the rack area aVl the bathrooms serving the rack area comply with all the current disabled access requirementsV \ A -#—!/ * I! By: David Yao Enclosures: 4 I EsGil Corporation D GA D EJ D PC 9/10 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 4 (858)560-1468 + Fax (858) 560-1576 PLANNING/ENGINEERING APPROVALS PERMIT NUMBER CB101548 DATE 8/23/10 ADDRESS 1818 ASTON AVE RESIDENTIAL ADDITION- MINOR (<17,000.00) RETAINING WALL VILLAGE FAIRE POOL/SPA TENANT IMPROVEMENT COMPLETE OFFICE BUILDING OTHER RACKS PLANNER GINA mm ENGINEER L DATE 8/23/10 DATE H:\ADMIN\COllTO/PUNim/ENGINEEKING APPROVAL RECOMMENDED FOR APPROVAL Daryl K. James & Associates, Inc. Checked by: Daryl Kit James 205Colina Terrace Date: September?, 2010 tf /-y<-3.1 «„„„„„.. --»--"-** -J -* ' - -S*"* /*j-WVista, CA 92084 T. (760) 724-7001 Email: kitfire@sbcglobal.net APPLICANT: Amy Edwards JURISDICTION: Carlsbad Fire Department PROJECT NAME: Cobra Puma PROJECT ADDRESS: 1818 Aston Avenue PROJECT DESCRIPTION: CB101548 Racking Plan INSTRUCTIONS • This plan review has been conducted in order to verify conformance to minimum requirements of codes adopted by the Carlsbad Fire Department. • The items below require correction, clarification or additional information before this plan check can be approved for permit issuance. • To EXPEDITE the recheck process, please note on this list (or copy), following each correction, how and where each correction item has been addressed, i.e. sheet number, note number, detail number, legend number, etc Corrections or modifications to the plans must be clouded and provided with numbered deltas and revision dates. • PLEASE SEND OR DELIVER REVISED PLANS WITH BUILDING DEPT. COMMENTS DIRECTLY TO: DARYL K. JAMES 205 COLINA TERRACE VISTA, CA 92084 • Please direct any questions regarding this review directly to: Daryl K. James 760-724-7001 or kitfire@sbcglobal.net CORRECTION i Fire Protection Technical Opinion & Report By Barger Please provide a High-Piled Storage Fire Protection Technical Opinion & Report, prepared by an approved and qualified consultant listed with the Carlsbad Fire Dept. SEIZMIC MATERIAL HANDLING ENGINEERING EST. 1985 STORAGE RACKS DRIVE-IN RACKS CANTILEVER RACKS MEZZANINES CONVEYORS CAROUSELS PUSHBACK RACKS RACKBUILDINOS STEEL SHELVING MOVABLE SHELVING STORAGE RACKS MODULAR OFFICES GONDOLAS BOOKSTACKS FLOW RACKS FOOTINGS SEISMIC ANALYSIS STRUCTURAL DESIGN CITY APPROVALS STATE APPROVALS PRODUCT TESTING FIELD INSPECTION SPECIAL. FABRICATION. PERMITTING SERVICES ALASKA ARIZONA CALIFORNIA COLORADO CONNECTICUT FLORIDA GEORGIA IDAHO ILLINOIS INDIANA KANSAS KENTUCKY MARYLAND MASSACHUSETTS MICHIGAN MINNESOTA MISSOURI MONTANA NEBRASKA NEVADA NEW JERSEY NEW MEXICO NORTH CAROLINA OHIO OKLAHOMA OREGON PENNSYLVANIA TENNESSEE TEXAS UTAH VIRGINIA WASHINGTON WISCONSIN SEISMIC ANALYSIS OF STORAGE RACKS COBRA PUMA CARLSBAD 1818 ASTON AVE CARLSBAD, CA, Job No. 10-0842 APPROVED BY SAL E. FATEEN, P.E. 7/27/2010 161 ATLANTIC STREET * POMONA * CA91768 * TEL: (909) 869-0989 * FAX: (909) 869-09 MATERIAL HANDLING ENGINEERING TEL : (909)869 - 0989 FAX : (909)869 - 0981 161 ATLANTIC STREET, POMONA, CA 91768 PROJECT FOR SHEET NO. CALCULATED BY DATE COBRA PUMA CARLSBAD McCOMBS WALL 2 RF 7/27/2010 TABLE OF CONTENTS TABLE OF CONTENTS & SCOPE - — - 2 PARAMETERS ' 3 COMPONENTS & SPECIFICATIONS ~ : 4 LOADS & DISTRIBUTION ' ' ~ 5 LONGITUDINAL ANALYSIS - —— ~ — - ~ - 6 COLUMN ; : : 7 T"> T? A \ A -- ~ - OoriAM o BEAM TO COLUMN - '0 TpfcTl A /^^"rK-T/^1 ,...,, , 11BRACING " " " OVERTURNING ' ' 12 BASEPLATE :: ' 13 SLAB & SOIL- : : : 14 SCOPE: THIS ANALYSIS OF THE STORAGE SYSTEM IS TO DETERMINE ITS COMPLIANCE WITH THE APPROPRIATE BUILDING CODES WITH RESPECT TO STATIC AND SEISMIC FORCES. THE STORAGE RACKS ARE PREFABRICATED AND ARE TO BE FIELD ASSEMBLED ONLY, WITHOUT ANY FIELD WELDING. MATERIAL HANDLING ENGINEERING TEL : (909)869 - 0989 FAX : (909)869 - 0981 161 ATLANTIC STREET, POMONA, CA 91768 PROJECT FOR SHEET NO. CALCULATED BY DATE COBRA PUMA CARLSBAD McCOMBS WALL 3 RF 7/27/2010 THE STORAGE RACKS CONSIST OF SEVERAL BAYS, INTERCONNECTED IN ONE OR BOTH DIRECTIONS, WITH THE COLUMNS OF THE VERTICAL FRAMES BEING COMMON BETWEEN AND ADJACENT BAYS. THE ANALYSIS WILL FOCUS ON A TRIBUTARY BAY TO BE ANALYSED IN BOTH THE LONGITUDINAL AND TRANSVERSE DIRECTION. STABILITY IN THE LONGITUDINAL DIRECTION IS MAINTAINED BY THE BEAM TO COLUMN MOMENT RESISTING CONNECTIONS, WHILE BRACING ACTS IN THE TRANSVERSE DIRECTION. CONCEPTUAL DRAWING Some components may not be used or may vary. TRIBUTARY AREA LEGEND 1. COLUMN 2. BEAM 3. BEAM TO COLUMN 4. BASE PLATE 5. HORIZONTAL BRACING 6. DIAGONAL BRACING 7. BACK TO BACK CONNECTOR TRANSVERSE LONGITUDINAL NOTE: ACTUAL CONFIGURATION SHOWN ON COMPONENTS & SPECIFICATIONS SHEET PROJECT FOR MATERIAL HANDLING ENGINEERING TEL : (909)869 - 0989 FAX : (909)869 - 0981 161 ATLANTIC STREET, POMONA, CA 91768 COBRA PUMA CARLSBAD McCOMBS WALL SHEET NO. 4 CALCULATED BY RF PATE 7/27/2010 COMPONENTS & SPECIFICATIONS LEVELS = 6 PANELS = 5 LIVE LOAD = Load Varies FRAME HEIGHT = 192 in. FRAME DEPTH = 42 in. BEAM LENGTH= 96 in. SEISMIC CATEGORY = D (Fa = 1.03, Ss = 1.18) TYPE = SINGLE ROW SITE CLASS = D HI =6 in. H2=22in. H3=22in, H4=22in. H5=22in. H6 = 66in. -if—r H64_h H5 J_T^ H4 H 4' H3 4-r H2 J H1 WE W5 W4 W3 W2 W1 Wl =150 Ibs. W2=1501bs. W3=150Ibs. W4=150Ibs. W5= 1600 Ibs. W6= 1600 Ibs. Y5 Y4 H Y3 Y2 Y1 Yl = 42 in Y2 = 42 in Y3 = 42 in Y4 = 42in Y5= 12 in COLUMN BEAM® Level 1 CONNECTOR @ Level 1 OK OK IC1513(3X1 5/8 X 13GA) Steel = 55000 psi Stress =22% 50140 Steel = 55000 psi Max Static Capacity = 7554 Ib. Stress = 2% OK THREE PIN CONNECTOR Stress = 9% COLUMN BACKER BEAM @ Level 2+CONNECTOR @ Level 2+ OK None Stress = 50140 Max Static Capacity =? 7554 Ib. Stress = 21% OK THREE PIN CONNECTOR Stress = 24% BRACING SLAB & SOIL HORIZONTAL OK 1-1/2 X 1-1/2 X 16ga Stress = 5% DIAGONAL OK 1-1/2 X 1-1/2 X 16ga Stress = 12% Slab = 5" X 2500 psi Soil Bearing Pressure = 1000 psf Slab Puncture Stress = 25% Slab Bending Stress = 19% OK BASE PLATE ANCHORS OK 8 in X 5 in X 0.375 in Steel = 36000 psi MBase = 0 in. Ib. Stress =19% Hilti Kwikbolt TZ 0.5 Dia. X 2.5 Min. Embd. Pullout Capacity =1110 Ibs. Shear Capacity = 1200 Ibs. No. Of Anchors = 2 per Base Plate Anchor Stress = 13% OK NOTES: Analyzed per the 2007 CBC PROJECT FOR MATERIAL HANDLING ENGINEERING TEL : (909)869 - 0989 FAX : (909)869 - 0981 161 ATLANTIC STREET. POMONA. CA 91768 COBRA PUMA CARLSBAD McCOMBS WALL SHEET NO. 5 CALCULATED BY RF PATE 7/27/2010 LOADS AND DISTRIBUTION; Number Of Levels: 6 wLL (Sum of live loads): 3800 Ibs wDL (Sum of dead loads): 420 Ibs TOTAL FRAME LOAD: 4220 Ibs Fa: 1.03 Ss: 1.18 le: 1.00 Rw (Longitudinal): 4.00 Rw (Transverse): 4.00 LONGTUDINAL DIRECTION V =r (2/3) X 1.03 X 1.1 8 X 1 X (((2/3)3800) + 420) / (4 X 1.4) VLong • 427 Ibs TRANSVERSE DIRECTION V ='Trans ~ (2/3) X 1.03 X 1.18 X 1 X (((2/3)3800) + 420) / (4 X 1.4) Tram • 421 F, = V\ •"" 1 2 3 4 5 6 6 28 50 72 94 160 LONGITUDINAL ",- 220 220 220 220 1,670 1,670 *A 1,320 6,160 11,000 15,840 156,980 267,200 458,500 •• // 1 6 10 15 146 249 427 Ibs TRANSVERSE ^220 220 220 220 1,670 1,670 "A 1,320 6,160 11,000 15,840 156,980 267,200 458,500 /, 1 6 10 15 146 249 427 Ibs MATERIAL HANDLING ENGINEERING TEL : (909)869 - 0989 FAX : (909)869 - 0981 161 ATLANTIC STREET, POMONA, CA 91768 PROJECT FOR SHEET NO. CALCULATED BY DATE COBRA PUMA CARLSBAD McCOMBS WALL 6 RF 7/27/2010 LONGITUDINAL ANALYSIS: THE ANALYSIS IS BASED ON THE PORTAL METHOD, WITH THE POINT OF CONTRA FLEXURE OF THE COLUMNS ASSUMED AT MID-HEIGHT BETWEEN BEAMS, EXCEPT FOR THE LOWEST PORTION, WHERE THE BASE PLATE PROVIDES ONLY PARTIAL FIXITY, THE CONTRA FLEXURE IS ASSUMED TO OCCUR CLOSER TO THE BASE. (OR AT THE BASE FOR PINNED CONDITION, WHERE THE BASE PLATE CANNOT CARRY MOMENT). *"• Upper ^ ±v' Mc<mn>K ~ MC,mn • 2 = M Upper + MLower Vising = 214 Ibs Mn-n M5-5 M4-4 . M3-3 jt M2-2 Ml-1 M base nf 7 *>jFn */F4 *fF3 0 in/Ib ~ 214 in/lb FRONT ELEVATION LEVELS 1 2 3 4 5 6 h 4 22 22 22 22 66 / 0 3 5 8 73 124 AXIAL LOAD 2,110 2,000 1,890 1,780 1,670 835 MOMENT 856 2,354 2,321 2,266 2,178 4,125 Mconn 1,819 2,552 2,508 2,436 4,816 3,726 SAMPLE CALC. = (214 Ibs X 4 in) - 0 in/lb = 856 in/Ib MATERIAL HANDLING ENGINEERING TEL : (909)869 - 0989 FAX : (909)869 - 0981 161 ATLANTIC STREET. POMONA. CA 91768 PROJECT COBRA PUMA CARLSBAD FOR McCOMBS WALL SHEET NO. 7 CALCULATED BY RF DATE 7/27/2010 COLUMN ANALYSIS : Axial P= 2000 Ibs M = 2354 in/lb * x = 1.2X20in/1.24104in R* = 19.3 Zy-Ly = 1X42in/06154in Ry = 68.2 " P 62.5 KSI —Max = 68-2 Wi/ rV /rMax) - 28KSI Since :Fe>Fy/2.. ( p \ = 55KSIX[1 -55KSI/(4X62.50827KSI)] = F i ^_ A 4'-^J = 42.9 KSI = Aeff-Fn = o.5154inA2X42.9KSI = 22111 Ibs = 22111 Ibs/1.92 = 11516 IbsP-A.0~ttc 0.17 P M.. '. h- Myield = M =S -F = 0.52925 InA3 X 55000 PSI= 29109 in/lb _My Q/= 29109/1.67 in/lb = (3. 14159)A2X 29500 KSI X 0.79387 /(24i= 401280 Ibs 1/1- Per = (1/(1-(1.92X2000 lb/4012801b)))A-l = 0.99 A- B JL SECTION PROPERTIES A : Sin B : 1.625 in Aeff Sx lySy : Ry Kx Lx Ky Ly Fy E 0.0897 in : 0.5154 in : 0.79387 inA 0.52925 in : 1.241041 0.1952inA 0.2364 inA 0.6154 in : 1.2 :20in :42in : 55 KSI :29500 KSI Qc: 1-92 Q/: 1-67 Cmx : 0.85 Cb : 1 (2000 Ib / 1 1516 Ib) + (0.85 X 2354 in/lb / 17431 in/lb X 0.99) = 0.29 < 1.33 (22%) MATERIAL HANDLING ENGINEERING TEL: (909) 869-0989 • FAX: (909) 869-0981 161 ATLANTIC AVENUE • POMONA, CA 91768 PROJECT FOR SHEET NO. CALCULATED BY DATE COBRA PUMA CARLSBAD McCOMBS WALL 7.1 RF 9/2/2010 COLUMN ANALYSIS SECTION. Pstatic= 2,000 LB Pseismic= 2354IN-LB/42 IN = 56 LB Ptotal= 2,056 LB My= V*h = 214 LB* 8 IN = 1,712-IN-LIB KxLx/rx = 1.2*20 IN/1.241 IN = 19.3 KyLy/ry=. 1*42 IN/0.6154 IN = 68.2 <=== (Kl/r)max Fe= TrA2E/(KL/r)maxA2 = 62.5 KSI Fy/2= 27.5 KSI SINCE, Fe > Fy/2 THEN, Fn= Fy(1-Fy/4Fe) = 55 KSI*[1-55 KSI/(4*62.5 KSI)] = 42.9 KSI Pn= AefTFn ='22,111 LB Qc= 1.92 WEAK AXIS COLUMN ANALYSIS Pool V= Mseismic= h= DEPTH= (EQ. C4-3) (EQ C4-2) Pa= Pn/Qc = 22111 LB/1.92 (EQC4-1) = 11,516 LB P/Pa= 0.18 > 0.15 FLEXURE CHECK: P/Pa + (Cmx*Mx)/(Max*|jx) < 1.33 P/Pao + Mx/Max s 1.33 (EQ C5-1) Pno= Ae*Fy (EQ C5-2) = 0.5151NA2*55000PSI = 28,347 LB Pao= Pno/Oc = 28347 LB/1.92 = 14,764 LB Myield=My= Sy*Fy = 0.236 INA3 * 55000 PSI = 29,109 IN-LB [jx= Max= My/Df = 29109IN-LB/1.67 = 17,430 IN-LB Pcr= TTA2EI/(KL)maxA2 = TTA2*29500000 PSi/(1*42 IN)A2 = 32,218 LB THUS, (2056 LB/11516 LB) + (0.85*1712 IN-LB)/(17430 IN-LB*0.88) = (2056 LB/14764 LB) + (1712 IN-LB/17430 IN-LB) = SIDE ELEVATION 214 LB 2,354 IN-LB 8.0 IN 42 IN SECTION PROPERTIES A= 3.0 IN B= 1.625 IN C= 0.75 IN t= 0.090 IN Aeff= 0.515INA2 Ix = 0.794 INA4 Sx = 0.529 INA3 rx= 1.241 IN ly= 0.195INA4 Sy = 0.236 INA3 ry= 0.615 IN Kx= 1.2 Lx = 20.0 IN Ky= 1.00 Ly=42.0IN Fy= 55 KSI E= 29,500 KSI Qf= 1.67 Cmx= 0.85 Cb= 1.0 {1/[1-(Qc*P/Pcr)]}A-1 (1/[1-(1.92*2056 LB/32218 LB)]}A-1 0.88 0.27 < 1.0 OK (EQC5-1) 0.24 < 1.0, OK (EQC5-2) MATERIAL HANDLING ENGINEERING TEL : (909)869 - 0989 FAX : (909)869 - 0981 161 ATLANTIC STREET, POMONA, CA 91768 PROJECT COBRA PUMA CARLSBAD FOR McCOMBS WALL SHEET NO. 8 CALCULATED BY RF DATE 7/27/2010 BEAM ANALYSIS: . . BEAM TO COLUMN CONNECTIONS PROVIDE ADEQUATE MOMENT CAPACITY TO STABLIZE THE SYSTEM, ALTHOUGH IT DOES NOT PROVIDE FULL FIXITY. THUS, THE BEAMS WILL BE ANALYSED ASSUMING PARTIAL END FIXITY. FOR THE COMPUTATION OF BEAM TO COLUMN MOMENT CAPACITY, THE PARTIAL END FIXITY MOMENT OF THE BEAM WILL BE ADDED TO THE LONGITUDINAL FRAME MOMENT FOR THE ANALYSIS OF THE CONNECTION. EFFECTIVE MOMENT FOR PARTIALLY FIXED BEAM For a simply supported beam, the max moment at the center is given by WL ~ /& '. An assumption of partial fixity will decrease this maximum moment by the following method. Percentage of End Fixity = 25% ^ = 0.25 MCenter = MCenter(Simple ends) - 6*MCenter(Fixed ends) = 0.104-JF/2 Reduction Coefficient P = 0.104/0.125 = 0.833 Mc^-P-Wl*!* =0.833. M2/8 MKnds=(/)-MMai:(FixedEnds) = W12/U- 0.25 = 0.0208 • Wl2 EFFECTIVE DEFLECTION FOR PARTIALLY FIXED BEAM For a simply supported beam, the max deflection at the center is given \yyswi */3S4 EI . An assumption of partial fixity will decrease this maximum deflection by the following method. Mcenter(simple) Mends Mcenter (feed) TYPICALBEAM FRONT VIEW 384 •£•/,. LiveLoad IM - ISOlbs £>eaJZoflJ//v/=41b/ftX2X(96/12) .= 64 Ibs M - 0.104*0/72 =1070in/IbCenter "r t M1!ncls = 0.0208* Wl2 =214 in/lb Fh = 0.6 • F = 33000 PSI FBFff: = 33000 PSF MATERIAL HANDLING ENGINEERING TEL : (909)869 - 0989 FAX : (909)869 - 0981 161 ATLANTIC STREET, POMONA, CA 91768 PROJECT COBRA PUMA CARLSBAD FOR McCOMBS WALL SHEET NO. 9 CALCULATED BY RF DATE 7/27/2010 BEAM ANALYSIS : MAXIMUM STATIC LOAD --. ' <• PER LEVEL DEPENDS ON: 1. MAXIMUM MOMENT CAPACITY ~'~ Fh=M/Sx F°iw „ FE MaxWeight llvl- — = ((33000 X 16 X 1.30811) 2. MAXIMUM ALLOWABl A i, , — L \ 80 = Q5 384-£-/r 38'A/fsrv l/ffpicrlit /7W — V/l^ N!^T: D fl-L +- 1 (0.833 X 96)) X 0.875 = 7554 Ibs/lvl / = 3.41851 inA4 £ _ 1.30811inA3 £ DEFLECTION -p zzSSOOO PSI a(impactCoefficient} = 0.89 33 In ^-0.833 9= 0-25 L(Length) = 96 in 4 = 96 in Step— 1.625 in BeamThickness = 0.07 BeamDepth = 5 in \-E-Ix-kAlloy, r3 TopWidth= 1.75 in BottomWidth= 2.75 i ~~ | 5 47 i 1n = ((384 X 29000000 X 3.41851 X 0.533) / (5 - (4 X 0.25))) X 96A3 = 11474 Ibs/lvl MAXIMUM ALLOWABLE LIVE LOAD PER LEVEL = 7SS41bs/lvl BeamStress = 2% ALLOWABLE AND ACTUAL M~ -*!'/* u^ Level Mstatic I 1070 2 1070 3 1070 4 1070 5 8320 6 8320 BENDING MOMENT AT EACH LEVEL Allow, Static x h = 3/^*1.125 M&,,m/,=M( ^impact ^Allow.Static ^-Seismic 1204 43168 1819 1204 43168 2552 1204 43168 2508 1204 43168 2436 9360 43168 4816 9360 43168 3726 \f O jjj E1 jij 1 O Allow , Seismic x b 'onn M,,, 0 . . ResultAllow.Sersmic 57557 GOOD 57557 GOOD 57557 GOOD 57557 GOOD 57557 GOOD 57557 GOOD 3 MATERIAL HANDLING ENGINEERING TEL : (909)869 - 0989 FAX : (909)869 - 0981 161 ATLANTIC STREET, POMONA, CA91768 PROJECT COBRA PUMA CARLSBAD FOR McCOMBSWALL SHEET NO. 10 CALCULATED BY RF DATE 7/27/2010 BEAM TO COLUMN ANALYSIS : CONNECTION CAPACITY DEPENDS ON THE FOLLOWING PARAMETERS: 1 . SHEAR CAPACITY OF PIN PinDiameter = 0.438/w. Fy = 55000 PSI 2 nAshaar = Diameter • — = 0.1507 in A2 o P2 tk QA-Fy-Ash«ar = 0.4 X 55000 X 0. 1 507 in* = 3315 Ibs 2. BEARING CAPACITY OF PIN ColumnThickness = 0.0897 Fu = 65000PS7 Q = 2.22 a = 2.22 PaearinK = a -Fu • Dia. • Col Thickness /Q. = 2.22 X 65000 X 0.438 X 0.0897 / 2.22 = 2554 Ibs 3. MOMENT CAPACITY OF BRACKET EdgeDist . = 1.0 In. PinSpacing = 2 In -1/2" 1/2" Fy = 55000 PSI C= P+P+P Taip= 0.179 In. S(:llp=Q.min3 = PI X 1.667 M Capacity = SClip ' lending = 0. 1 27 In A3 X .66 X Fy = 461 0 in-lb C'd = MCapaetty= 1.667 P^d d- EdgeDist /2 = 0.5 PcJiP ^1.667'^) = 4610 / (1.667 X 0.5) = 5531 Ibs MINIMUM VALUE OF-Pl GOVERNS / = 2554 Ibs - 1-5/8" - 4.5]+ ft *(2.5/4.5)* 2.5J+ [/? * (.5/4.5)* .5]* 1 .33 = 20192in-lb > 1819in-!b OK MATERIAL HANDLING ENGINEERING TEL : (909)869 - 0989 FAX : (909)869 - 0981 161 ATLANTIC STREET, POMONA, CA 91768 PROJECT FOR SHEET NO. CALCULATED BY DATE COBRA PUMA CARLSBAD McCOMBS WALL 11 RF 7/27/2010 TRANSVERSE ANALYSIS; BRACING; IT IS ASSUMED THAT THE LOWER PANEL RESISTS THE FRAME SHEAR IN TENSION AND COMPRESSION. IF HORIZONTAL AND DIAGONAL MEMBERS ARE THE SAME, ANALYSIS WILL BE DONE ON THE DIAGONAL MEMBER AS IT WILL GOVERN. DIAGONAL BRACING : COMPRESSION MEMBER Ldiag = *J(L-6)2 + (D - (2 • BCol))2 = 54tg« Vtrans • LDiagVdiag = • k-l rMin (1 X 54.8008)7 (0.527) rM F,, F =F1 n * e Pn=Area-Fn = 604 Ibs = 104 In 26469.4 PSI 27500 26469.4 PSI = 7306 Ibs SIDE ELEVATION Panel Height (L) = 42 In Panel Depth (D) = 42 In Column Depth (B) = 1.625 In Clear Depth (d) = (D - 2*B) = 38.7 = 3805 Ibs Brace Stress = VDiag = 0.16 <1.33 (12%) MATERIAL HANDLING ENGINEERING TEL : (909)869 - 0989 FAX : (909)869 - 0981 161 ATLANTIC STREET, POMONA, CA 91768 PROJECT COBRA PUMA CARLSBAD FOR McCOMBS WALL SHEET NO. 12 CALCULATED BY RF DATE 7/27/2010 OVERTURNING ANALYSIS : FULLY LOADED Total Shear = 427 Ibs Mml = 427 X 129 X 1.15 = 63345 in/lb = (3800+(.85 X 420)) X 42/2 = 87297 in/lb l(M -M,} = (63345-87297) /42 — ,_._>,.._,.9VL $LL — s"if\ iun n,i«i;-A- ^--~ tUpUfl d TOP SHELF LOADED -570 Ibs. Puplift <= 0 No Up Lift Shear juf"* = 215 Ibs =215X160X1.15 = 39580 in/lb = (1600 + (.85X420)) X 42/2 = 41097 in/lb = (39580-41097) / 42 = -36 Ibs. Pup!ift<=0 No up Lift ANCHORS No. of Anchors : 1 Pull Out Capacity : lllOLbs. Shear Capacity : 1200 Lbs. COMBINED STRESS Fullv Loaded = (0 /1110 X 2))+ ((427 /2)/(1200 X 2)) = 0.09 Top Shelf Loaded = (0 / (1110 X 2))+ ((215 /2)/(1200 X 2)) = 0.04 USE 2 Hilti Kwikbolt TZ 0.5 Dia. X 2.5 Min. Embd. Anchors per BasePlate. (or approved equal) Puplift CROSS AISLE ELEVATION MATERIAL HANDLING ENGINEERING TEL : (909)869 - 0989 FAX : (909)869 - 0981 161 ATLANTIC STREET, POMONA, CA 91768 PROJECT FOR SHEET NO. CALCULATED BY DATE COBRA PUMA CARLSBAD McCOMBS WALL 13 RF 7/27/2010 BASE PLATE ANALYSIS ; THE BASE PLATE WILL BE ANALYZED WITH THE RECTANGULAR STRESS RESULTING FROM THE VERTICAL LOAD P, COMBINED WITH THE TRIANGULAR STRESSES RESULTING FROM THE MOMENT Mb (IF ANY). THERE ARE 3 CRITERIA IN DETERMINING Mb. THEY ARE 1. MOMENT CAPACITY OF THE BASE PLATE, 2. MOMENT CAPACITY OF THE ANCHOR BOLTS, AND 3. Vcol*h/2 (FULL FIXITY). Mb IS THAT SMALLEST VALUE OBTAINED FROM THE 3 CRITERIA ABOVE. 2 Col MBase P Pr _ rCo! 21101bs 0 in/Ib A D-B f =J b D-B2 6 f -2A.,A2- B J Jh\ = Jb ~ Jb: Ste=- fh "Base ' ?'Base Base Plate Width (B) = 8 in Base Plate Depth CD) = 5 in Base Plate Thickness (t) = 0.375 in b = 3 in bl ' = 2.5 in Fv (base) = 36000 PS I 52.8 PSI = 0 PSI OPSI = OPSI = 164.84 in/Ib 0.02 in/cb = 36000 PSI = 0.19 <= 1 OK ANCHOR TENSION No. of Anchors Resisting Tension (n) = . 1 T-d,=MBase-(PCol-(b/2)} ffli 1 /<! — ft2 — *1 Pool'- Dp- Mtf " y jfh jft NEGATIVE, THEREFORE NO TENSION fT f— Danchor—rr MATERIAL HANDLING ENGINEERING TEL : (909)869 - 0989 FAX : (909)869 - 0981 161 ATLANTIC STREET, POMONA, CA 91768 PROJECT COBRA PUMA CARLSBAD FOR McCOMBS WALL SHEET NO. 14 CALCULATED BY RF DATE 7/27/2010 SLAB AND SOIL : THE SLAB WILL BE CHECKED FOR PUNCTURE STRESS. IF NO PUNCTURE OCCURS, IT WILL BE ASSUMED TO DISTRIBUTE THE LOAD OVER A LARGER AREA OF SOIL AND WILL ACT AS A FOOTING. PUNCTURE 2110Ibs Mot = 63345.45 in-lb [.2-Pslalic+l.Q-'(Mol/dy) * = 4444 Ibs •> n^ = 100 PSI A —•^ f PJ v „ * max F ~ A -Fv pwncl puncl SLAB TENSION t •2-t = 180 sq. in. = 0.25 A = X°il +t h_L-B 2 Mmnt. = — MCanc 144-2 E1 O C1 rb "Cone ' rConc = 481 sq. in. = 21.94 in = 11.32 in = 5.31 in = 130 in-lb = 4.17 cb. in. = 162.5 PSI = 0.19 *(EQ 16-19) SEC. 1605.' P B L T t FOOTING B = 8 in W = 5 in Frame Depth J = 42 in CONCRETE f'c = 2500 PSI / = 5 in ^ = 0.65 SOIL fsoil = 1000PSF OK SEIZMIC MATERIAL HANDLING ENGINEERING EST. 1985 TEL : (909) 869-0989 FAX : (909) 869-0981 STRUCTURAL CORRECTION FOR • . - COBRA PUMA CARLSBAD 1818 ASTON AVENUE CARLSBAD,CA PLAN CHECK #101548 SEIZMIC, INC. PROJECT # 10-0842 DATE: 9/2/10 1. Provide a note on the plans indicating if any hazardous material will be stored and/or used within the building which exceed the quantities listed in IBC Tables 307.7(1) and 307.7(2). Response: Hazardous material information to be provided by owner. 2. Obtain Fire Department approval. Response: Fire Department approval to be addressed by the owner 3. Provide calculations for the column weak axis bending plus axis for transverse seismic loading. The axial load is the maximum compression load at the base from vertical plus seismic overturning. The column moment will probably be maxi um for the lateral load from the base plate to the first diagonal brace (not only to the first horizontal member). Response: Provided, please see page 7.1 of revised calculations. 4. The tena!nt space and new and/or existing facilities serving the remodeled area must be accessible to and functional for the physically disabled. Show a path of travel from the handicapped parking space to the rack area and the bathrooms serving the rack area comply with all the current disabled access requirements. Title 2 ,Part 2. Response: Disabled access to be provided by owner 5. Indicate the clearance from the new racks to the ex/sting building walls and building columns. Response: Rack clearance from building columns and walls indicated on sheet 10-0842-A, note # 1.1. 6. Note on the plans that the rack design loads will be posted per section 1.4.2 of RM1. Response: Posting of rack design loads is noted on sheet 10-0842-A, note #10. If there are any questions regarding this project please call me. Thank you for your time and consideration. Sincerely, Roy J. Farrow, Seizmic Inc. SEIZMIC MATERIAL HANDLING ENGINEERING EST. 1985 STORAGE RACKS DRIVE-IN RACKS CANTILEVER RACKS MEZZANINES CONVEYORS CAROUSELS PUSHBACK RACKS RACKBUILDINOS STEEL SHELVING MOVABLE SHELVING STORAGE RACKS MODULAR OFFICES GONDOLAS BOOKSTACKS FLOW RACKS FOOTINGS SEISMIC ANALYSIS STRUCTURAL DESIGN CITY APPROVALS STATE APPROVALS PRODUCT TESTING FIELD INSPECTION SPECIAL. FABRICATION. PERMITTING SERVICES ALASKA ARIZONA CALIFORNIA COLORADO CONNECTICUT FLORIDA GEORGIA IDAHO ILLINOIS INDIANA KANSAS KENTUCKY MARYLAND MASSACHUSETTS MICHIGAN MINNESOTA MISSOURI MONTANA NEBRASKA NEVADA NEW JERSEY NEW MEXICO NORTH CAROLINA OHIO OKLAHOMA OREGON PENNSYLVANIA TENNESSEE TEXAS UTAH VIRGINIA WASHINGTON WISCONSIN SEISMIC ANALYSIS OF STORAGE RACKS COBRA PUMA CARLSBAD 1818 ASTON AVE CARLSBAD, CA, Job No. 10-0842 APPROVED BY SAL E. FATEEN, P.E. 7/27/2010 161 ATLANTIC STREET * POMONA * CA91768 * TEL: (909) 869-0989 * FAX: (909) 869-0981 MATERIAL HANDLING ENGINEERING TEL : (909)869 - 0989 FAX : (909)869 - 0981 161 ATLANTIC STREET, POMONA, CA91768 PROJECT FOR SHEET NO. CALCULATED BY DATE COBRA PUMA CARLSBAD McCOMBS WALL 2 RF 7/27/2010 TABLE OF CONTENTS TABLE OF CONTENTS & SCOPE - - 2 PARAMETERS ; 3 COMPONENTS & SPECIFICATIONS 4 LOADS & DISTRIBUTION 5 LONGITUDINAL ANALYSIS - ~ — - 6 COLUMN 7 T~» T7 A A yf QBbAM 8 BEAM TO COLUMN : '0 BRACING - - n OVERTURNING ' ' 12 BASEPLATE 13 SLAB & SOIL- • : 14 SCOPE: THIS ANALYSIS OF THE STORAGE SYSTEM IS TO DETERMINE ITS COMPLIANCE WITH THE APPROPRIATE BUILDING CODES WITH RESPECT TO STATIC AND SEISMIC FORCES. THE STORAGE RACKS ARE PREFABRICATED AND ARE TO BE FIELD ASSEMBLED ONLY, WITHOUT ANY FIELD WELDING. MATERIAL HANDLING ENGINEERING TEL : (909)869 - 0989 FAX : (909)869 - 0981 161 ATLANTIC STREET, POMONA, CA 91768 PROJECT FOR SHEET NO. CALCULATED BY DATE COBRA PUMA CARLSBAD McCOMBS WALL 3 RF 7/27/2010 THE STORAGE RACKS CONSIST OF SEVERAL BAYS, INTERCONNECTED IN ONE OR BOTH DIRECTIONS, WITH THE COLUMNS OF THE VERTICAL FRAMES BEING COMMON BETWEEN AND ADJACENT BAYS. THE ANALYSIS WILL FOCUS ON A TRIBUTARY BAY TO BE ANALYSED IN BOTH THE LONGITUDINAL AND TRANSVERSE DIRECTION. STABILITY IN THE LONGITUDINAL DIRECTION IS MAINTAINED BY THE BEAM TO COLUMN MOMENT RESISTING CONNECTIONS, WHILE BRACING ACTS IN THE TRANSVERSE DIRECTION. <y CONCEPTUAL DRAWING Some components may not be used or may vary. TRIBUTARY AREA LEGEND 1. COLUMN 2. BEAM 3. BEAM TO COLUMN 4. BASE PLATE 5. HORIZONTAL BRACING 6. DIAGONAL BRACING 7. BACK TO BACK CONNECTOR TRANSVERSE LONGITUDINAL NOTE: ACTUAL CONFIGURATION SHOWN ON COMPONENTS & SPECIFICATIONS SHEET PROJECT FOR MATERIAL HANDLING ENGINEERING TEL : (909)869 - 0989 FAX : (909)869 - 0981 161 ATLANTIC STREET. POMONA. CA 91768 COBRA PUMA CARLSBAD McCOMBS WALL SHEET NO. 4 CALCULATED BY RF »ATE 7/27/2010 COMPONENTS & SPECIFICATIONS SITE CLA< •^ n w PANELS = 5 LIVE LOAD = Load Varies FRAME HEIGHT = 192 in. FRAME DEPTH = 42 in. BEAM LENGTH= 96 in. SFISMIC CATEGORY - D (Fa — 1.03, Ss — 1.1 a) TYPE = SINGLE ROW COLUMN H2=22in. H6 H3=22in. , w H4-22in. p H5=22in. H5 H6 = 66 in. J W h H4 H J Wr H3 J wr H2 I Wr H1 <• 4 I' I'( L BEAM,( 5S = D 6 Wl ISO Ibs ^ - Yl-42m W2=1501bs. 1 Y2-42m 5 W3=1501bs. ^5 Y3 = 42in 2 I'M .'mi 1 Y4 = 42inW4 — 150IUS. si , W5=16001bs. 1 \ Y5=12m 4 W6=16001bs. Y4 \ \ 3 H Y3 / i /r \ Y2 \ J \1 r / Y1 / 4 / - 'I )(— D — 4" % Level 1 CONNECTOR @ Level 1 OK OK OK 1C1513(3X1 5/8 X 13GA) 50140 THREE PIN CONNECTOR Steel = 55000 psi Steel = 55000 psi Stress = 9% Stress =22% Max Static Capacity = 7554- lb. Stress = 2% COLUMN BACKER None Stress = BEAM @ Level 2+ CONNECTOR @ Level 2+ OK OK 50140 THREE PIN CONNECTOR Max Static Capacity = 7554 lb. Stress = 24% Stress = 21% BRACING HORIZONTAL OK 1-1/2 X 1-1/2 X 16ga Stress = 5% DIAGONAL OK 1-1/2 X 1-1/2 X 16ga Stress =12% BASE PLATE OK 8 in X 5 in X 0.375 in Steel = 36000 psi MBase = 0 in. lb. Stress =19% SLAB & SOIL Slab = 5" X 2500 psi OK Soil Bearing Pressure = 1 000 psf Slab Puncture Stress = 25% Slab Bending Stress = 19% ANCHORS Hilti Kwikbolt TZ 0.5 Dia. X 2.5 Min. Embd. OK Pullout Capacity =1110 Ibs. Shear Capacity = 1200 Ibs. No. Of Anchors = 2 per Base Plate Anchor Stress = 13% NOTES: Analyzed per the 2007 CBC MATERIAL HANDLING ENGINEERING TEL : (909)869 - 0989 FAX : (909)869 - 0981 161 ATLANTIC STREET. POMONA. CA 91768 PROJECT COBRA PUMA CARLSBAD FOR McCOMBS WALL SHEET NO. 5 CALCULATED BY RF PATE 7/27/2010 LOADS AND DISTRIBUTION: Number Of Levels: 6 wLL (Sum of live loads): 3800 Ibs wDL (Sum of dead loads): 420 Ibs TOTAL FRAME LOAD: 4220 Ibs Fa: 1.03 Ss: 1.18 le: 1.00 Rw (Longitudinal): 4.00 Rw (Transverse): 4.00 TT Long ~~ LONGTUDINAL DIRECTION 2/3.F..y,.V(((2/3).yJ+lQ /L-1.4 TRANSVERSE DIRECTION """ (2/3) X 1.03 X 1.18 X 1 X (((2/3)3800) + 420) / (4 X 1.4) VLO»S • 427 Ibs (2/3) X 1.03 X 1.18 X IX (((2/3)3800) + 420) / (4 X 1.4) Trans • 427 ] F, = V\ Levels 1 2. 3 4 5 6 * 6 28 50 72 94 160 LONGITUDINAL ", 220 220 220 220 1,670 1,670 wA 1,320 6,160 11,000 15,840 156,980 267,200 458,500 // 1 6 10 15 146 249 427 Ibs TRANSVERSE ", 220 220 220 220 1,670 1,670 *A 1,320 6,160 11,000 15,840 156,980 267,200 458,500 /, 1 6 10 15 146 249 427 Ibs MATERIAL HANDLING ENGINEERING TEL : (909)869 - 0989 FAX : (909)869 - 0981 161 ATLANTIC STREET, POMONA, CA 91768 PROJECT FOR SHEET NO. CALCULATED BY DATE COBRA PUMA CARLSBAD McCOMBS WALL 6 RF 7/27/2010 LONGITUDINAL ANALYSIS: THE ANALYSIS IS BASED ON THE PORTAL METHOD, WITH THE POINT OF CONTRA FLEXURE OF THE COLUMNS ASSUMED AT MID-HEIGHT BETWEEN BEAMS, EXCEPT FOR THE LOWEST PORTION, WHERE THE BASE PLATE PROVIDES ONLY PARTIAL FIXITY, THE CONTRA FLEXURE IS ASSUMED TO OCCUR CLOSER TO THE BASE. (OR AT THE BASE FOR PINNED CONDITION, WHERE THE BASE PLATE CANNOT CARRY MOMENT). *^FnUpper Lower = M Conn'R' + MC,>nn'i: Mcom MCom V' Col • 2 = M Upper + MLowr \ -^ Upper + ^ Lower \ ( 2 J vI-»»R , _ I14,h(: 2 0 in/Ib - 214 in/Ib FRONT ELEVATION LEVELS 1 2 3 4 5 6 h, 4 22 22 22 22 66 f, 0 3 5 8 73 124 AXIAL LOAD 2,110 2,000 1,890 1,780 1,670 835 MOMENT 856 2,354 2,321 2,266 2,178 4,125 Mconn 1,819 2,552 2,508 2,436 4,816 3,726 SAMPLE CALC. = (214 Ibs X 4 in) - 0 in/lb = 856 in/Ib MATERIAL HANDLING ENGINEERING TEL : (909)869 - 0989 FAX : (909)869 - 0981 161 ATLANTIC STREET. POMONA. CA 91768 PROJECT COBRA PUMA CARLSBAD FOR McCOMBS WALL SHEET NO. 7 CALCULATED BY RF DATE 7/27/2010 COLUMN ANALYSIS : P = 2000 Ibs M = 2354 in/lb = 1.2X20in/1.24104in „* R* = 19.3 —Max = 68.2 K-Ly R—-—- = 1 X 42in / 0.6154in Axial = 68.2 Trr2 /7 1 Since :Ft>Fy/2. 1.5 KSI 28KSI F=F\ 1 — 55KSIX[1-55KSI/(4X62.50827KSI)] 4-Fe) = 42.9 KSI Pn-Aeff-Fn = o.5154inA2X42.9KSI = 22111 Ibs __^_ °~Q^= 221 11 Ibs/ 1.92 11516 Ibs = 0.17 F/exwe P M -4-——i-<1 '. I _i i .b:^>0.15 Myield = M =S -F = 0.52925 InA3 X 55000 PS1= 29109 in/lb y x r = 29109/1.6 in/lb = (3. 14159)A2X 29500 KSI X 0.79387 /(24i= 401280 Ibs ~TB SECTION PROPERTIES A : Sin B : 1.625 in t : Aeff Sx Rx ly : Sy : Ry : Kx Lx Ky Ly Fy E 0.0897 in : 0.5154 in : 0.79387 inA 0.52925 in : 1.24104 i 0.1952inA 0.2364 inA 0.6154 in : 1.2 :20in :42in : 55 KSI : 29500 KSI 1/1- Qc JT\ = (1/0 -(1.92X2000 Ib/401280 lb)))A-l = 0.99 tic: 1-92 Q/: 1.67 Cmx : 0.85 Cb : 1 (2000 Ib / 1 1516 Ib) + (0.85 X 2354 in/lb / 17431 in/lb X 0.99) = 0.29 < 1.33 (22%) MATERIAL HANDLING ENGINEERING TEL: (909) 869-0989 • FAX: (909) 869-0981 161 ATLANTIC AVENUE • POMONA, CA 91768 PROJECT FOR SHEET NO. CALCULATED BY DATE COBRA PUMA CARLSBAD McCOMBS WALL 7.1 RF 9/2/2010 COLUMN ANALYSIS SECTION. Pstatic= 2,000 LB Pseismic= 2354IN-LB/42 IN = 56 LB Ptotai= 2,056 LB My= V*h = 214 LB* 8 IN = 1,712 IN-LB WEAK AXIS COLUMN ANALYSIS INKxLx/rx= 1.2*20 IN/1.241 = 19.3 KyLy/ry=. 1*42 IN/0.6154 IN = 68.2 <=== (Kl/r)max DEPTH Pcol My AXIAL SINCE, THEN, Fe= irA2E/(KL/r)maxA2 = 62.5 KSI Fy/2= 27.5 KSI Fe > Fy/2 Fn= Fy(1-Fy/4Fe) = 55 KSI*[1-55 KSI/(4*62.5 KSI)] = 42.9 KSI Pn= Aeff'Fn ='22,111 LB Qc= 1.92 V= Mseismic= h= DEPTH= (EQ. C4-3) (EQ C4-2) Pa= Pn/Qc = 22111 LB/1.92 (EQC4-1) = 11.516LB P/Pa= 0.18 > 0.15 FLEXURE CHECK: P/Pa + (Cmx*Mx)/(Max*(jx) £ 1.33 P/Pao + Mx/Max <• 1,33 (EQ C5-1) Pno= Ae*Fy (EQ C5-2) = 0.515 INA2'55000 PSI = 28,347 LB Pao= Pno/Dc = 28347 LB/1.92 = 14,764 LB Myield=My= Sy*Fy = 0.236 INA3 * 55000 PSI = 29,109 IN-LB px= Max= My/Qf = 29109IN-LB/1.67 = 17,430 IN-LB Pcr= tTA2EI/(KL)maxA2 = irA2*29500000 PSl/(1*42 IN)A2 =.32,218 LB " THUS, (2056 LB/11516 LB) + (0.85*1712 IN-LB)/(17430 IN-LB*0.88) = (2056 LB/14764 LB) + (1712 IN-LB/17430 IN-LB) = SIDE ELEVATION 214 LB 2,354 IN-LB .8.0 IN 42 IN SECTION PROPERTIES A= 3.0 IN B= 1.625 IN C= 0.75 IN t = 0.090 IN Aeff= 0.515INA2 Ix = 0.794 INA4 Sx = 0.529 INA3 rx= 1.241 IN ly= 0.195INM Sy = 0.236 INA3 ry= 0.615 IN Kx= 1.2 Lx= 20.0 IN Ky=1.00 Ly = 42.0 IN Fy= 55 KSI E= 29,500 KSI Qf= 1.67 Cmx= 0.85 Cb= 1.0 {1/[1-(nc*P/Pcr)]}A-1 {1/[1-(1.92*2056 LB/32218 LB)]}A-1 0.88 0.27 < 1.0 OK (EQC5-1) 0.24 < 1.0, OK (EQC5-2) MATERIAL HANDLING ENGINEERING TEL : (909)869 - 0989 FAX : (909)869 - 0981 161 ATLANTIC STREET, POMONA, CA 91768 PROJECT COBRA PUMA CARLSBAD FOR McCOMBS WALL SHEET NO. 8 CALCULATED BY RF DATE 7/27/2010 BEAM ANALYSIS : BEAM TO COLUMN CONNECTIONS PROVIDE ADEQUATE MOMENT CAPACITY TO STABLIZE THE SYSTEM, ALTHOUGH IT DOES NOT PROVIDE FULL FIXITY. THUS, THE BEAMS WILL BE ANALYSED ASSUMING PARTIAL END FIXITY. FOR THE COMPUTATION OF BEAM TO COLUMN MOMENT CAPACITY, THE PARTIAL END FIXITY MOMENT OF THE BEAM WILL BE ADDED TO THE LONGITUDINAL FRAME MOMENT FOR THE ANALYSIS OF THE CONNECTION. EFFECTIVE MOMENT FOR PARTIALLY FIXED BEAM For a simply supported beam, the max moment at the center is given by wi 2 /8 . An assumption of partial fixity will decrease this maximum moment by the following method. Percentage of End Fixity = 25% 0 = 0.25 MCenter = MCenter(Simple ends) - 0*MCenter(Fixed ends) = 0.104-r/2 Reduction Coefficient P = 0.104/0.125 = 0.833 =0.833- Wl2f% = W12/12- 0.25 = 0.0208 -Wl2 EFFECTIVE DEFLECTION FOR PARTIALLY FIXED BEAM For a simply supported beam, the max deflection at the center is given bysw V384 E1 • An assumption of partial fixity will decrease this maximum deflection by the following method. „ 5JF?4 Mcenterfsimple) Mcenter TYPICALBEAM FRONT VIEW 384- E- L LiveLoad I hi = 1501bs DeadLoad/M=*WftX2X(96l\2) = 64 Ibs MCenler= 0.104* p^2 =1070in/lb M,!nds = 0.0208* Wl2 = 214in/Ib Fh=0.6-F = 33000 PSI FBFff = 33000 PSI MATERIAL HANDLING ENGINEERING TEL : (909)869 - 0989 FAX : (909)869 - 0981 161 ATLANTIC STREET, POMONA, CA 91768 PROJECT COBRA PUMA CARLSBAD FOR McCOMBS WALL SHEET NO. 9 CALCULATED BY RF DATE 7/27/2010 BEAM ANALYSIS ; MAXIMUM STATIC LOAD PER LEVEL DEPENDS ON: 1 . MAXIMUM MOMENT CAPACITY ~ '~~ Fh = M/SX FR " \ / /rXw £ FB,ff -16 -SxMaxWeight / M - LS' x -a fr!r| : ; D P'L = ((33000 X 16 X 1.3081 1) / (0.833 X 96)) X 0.875 = 7554 Ibs/lvl / = 3.41851 inA4 2. MAXIMUM ALLOWABLE DEFLECTION p =55000 PSI A a/fo«. =£/180 = 0.533 In ,5=0833 W14 L(Length) = 96 A . /? " 384-E-Ix = ((384X29000000X3.4 MAXIMUM ALLOW ABL M6p — 1 .625 in \-E-Ix>kMlmf r3 TopWidth= 1.7 v = 1.30811 inA3 X a(impactCoefficient) - 0.875 Q= 0.25 in L = 96 in ReamThickness = 0.0747 i BeamDepth = 5 in 5 in BottomWidth= 2.75 in | -46/ ~ " " "" 1851 X 0.533) / (5 - (4 X 0.25))) X 96A3 = 11474 Ibs/lvl E LIVE LOAD PER LEVEL = 75541bs/lvl BeamStress = 2% ALLOWABLE AND ACTUAL BENDING MOMENT AT EACH LEVEL M Impact Level Mstatic 1 1070 2 1070 3 1070 4 1070 5 8320 6 8320 = MM,*1.125 AH"*a° '* * Ms<1,m,=M( ^Impact ^AHow,Slatic ^Seismic 1204 43168 1819 1204 43168 2552 1204 43168 2508 1204 43168 2436 9360 43168 4816 9360 43168 3726 Tt,f C jfeFsfcl /5'71V1 Allow geismic ~ °x rb i'JJ MA1, Q. . ResultAllow.Seismic 57557 GOOD 57557 GOOD 57557 GOOD 57557 GOOD 57557 GOOD 57557 GOOD MATERIAL HANDLING ENGINEERING TEL : (909)869 - 0989 FAX : (909)869 - 0981 161 ATLANTIC STREET, POMONA, CA 91768 PROJECT COBRA PUMA CARLSBAD FOR McCOMBS WALL SHEET NO. 10 CALCULATED BY RF DATE 7/27/2010 BEAM TO COLUMN ANALYSIS : CONNECTION CAPACITY DEPENDS ON THE FOLLOWING PARAMETERS: 1. SHEAR CAPACITY OF PIN PinDiameter = 0.438/n. Fy = 55000 PSI •> nL = Diameter"— = 0.1507 inA2 4 X 5500° X °'J 507 inA = 3315 lbs 2. BEARING CAPACITY OF PIN ColumnThickness = 0.0897 FH = 65000PS7 £2 = 2.22 a = 2.22 G- PI P2 nearmg =a'F>,'Dtci-' Col.Thickness/Q. = 2.22 X 65000 X 0.438 X 0.0897 / 2.22 = 2554 lbs 3. MOMENT CAPACITY OF BRACKET EdgeDist . = 1.0In. PinSpacing - 2 In Fy = 55000 PSI C= ^+JP2+P3 r,,,=0.179/n. = PI X 1.667 "1/2" 1/2" Mcapacity = SciiP ' ^/toa*»K = 0.127 InA3 X .66 X Fy = 4610 in-lb C'd=MCapacily= 1.667 /^-J d = EdgeDist/2 = 0.5 ^7/1/7 = MCarac!ty/( 1.667 -d) = 4610/0.667 X 0.5)= 5531 lbs MINIMUM VALUE OF-Pl GOVERNS ^ = 2554 lbs MCom-Mlm = [Pi *4.5j+[/> *(2,5/4.5)*2.5]+[^.*(.5/4.5)*.5]*1.33 = 20192in-lb > 1819in-Ib OK 3" l?=7ga - 1-6/8" MATERIAL HANDLING ENGINEERING TEL : (909)869 - 0989 FAX : (909)869 - 0981 161 ATLANTIC STREET, POMONA, CA 91768 PROJECT FOR SHEET NO. COBRA PUMA CARLSBAD McCOMBS WALL 1 1 CALCULATED BY RF DATE 7/27/2010 TRANSVERSE ANALYSIS; BRACING; IT IS ASSUMED THAT THE LOWER PANEL RESISTS THE FRAME SHEAR IN TENSION AND COMPRESSION. IF HORIZONTAL AND DIAGONAL MEMBERS ARE THE SAME, ANALYSIS WILL BE DONE ON THE DIAGONAL MEMBER AS IT WILL GOVERN. DIAGONAL BRACING : COMPRESSION MEMBER Ldiag = A/(I-6)2+(JD-(2.J8Co/))2 = 548,, Vdiag - k-l rMin Vtrans • LDiag (IX 54.8008)7 (0.527) U2e '"HrMin F., F =F1 n e P=Area-F = 604 Ibs 104 In = 26469.4 PSI = 27500 26469.4 PSI = 7306 Ibs SIDE ELEVATION Panel Height (L) = 42 In Panel Depth (D) = 42 In Column Depth (B) = 1.625 In Clear Depth (d) = (D - 2*B) = 38.7 Oc = 1.92 = 3805 Ibs Brace Stress = VDiag P = 0.16 <1.33 (12%) MATERIAL HANDLING ENGINEERING TEL : (909)869 - 0989 FAX : (909)869 - 0981 161 ATLANTIC STREET, POMONA, CA 91768 PROJECT COBRA PUMA CARLSBAD FOR McCOMBSWALL SHEET NO. 12 CALCULATED BY RF DATE 7/27/2010 OVERTURNING ANALYSIS : FULLY LOADED Total Shear = 427 Ibs Mml = 427 X 129 X 1.15 = 63345 in/Ib = (3800+(.85 X 420)) X 42/2 l(Mml-Ms,} : (63345-87297)/42 87297 in/lb 1 iipij.fi = -570 ibs. Puplift<=ONoUpLift TOP SHELF LOADED Shear = 21 5 ibs =215X160X1.15 = 39580 in/lb = (1600+ (.85X420)) X 42/2 = 41097 in/lb : IM™~ •«/ = (39580-41097) / 42 d . = -36 Ibs. Puplift<=0 No up Lift ANCHORS No. of Anchors : 2 Pull Out Capacity : 1110 Lbs. Shear Capacity : 1200 Lbs. COMBINED STRESS Fullv Loaded • = (0 /1110 X 2))+ ((427 /2)/(1200 X 2)) = 0.09 Tbz? Shelf Loaded = (0 / (H10 X 2))+ ((215 /2)/(l200 X 2)) = 0,04 USE 2 Hilti Kwikbolt TZ 0.5 Dia. X 2.5 Min. Embd. Anchors per BasePlate. (or approved equal) P uplift CROSS AISLE ELEVATION MATERIAL HANDLING ENGINEERING TEL : (909)869 - 0989 FAX : (909)869 - 0981 161 ATLANTIC STREET, POMONA, CA 91768 PROJECT COBRA PUMA CARLSBAD FOR McCOMBS WALL SHEET NO. 13 CALCULATED BY RF DATE 7/27/2010 BASE PLATE ANALYSIS : THE BASE PLATE WILL BE ANALYZED WITH THE RECTANGULAR STRESS RESULTING FROM THE VERTICAL LOAD P, COMBINED WITH THE TRIANGULAR STRESSES RESULTING FROM THE MOMENT Mb (IF ANY). THERE ARE 3 CRITERIA IN DETERMINING Mb. THEY ARE 1. MOMENT CAPACITY OF THE BASE PLATE, 2. MOMENT CAPACITY OF THE ANCHOR BOLTS, AND 3. Vcol*h/2 (FULL FIXITY). Mb IS THAT SMALLEST VALUE OBTAINED FROM THE 3 CRITERIA ABOVE. MBasis 2110 Ibs 0 in/lb A D-B M,, /* =D-B2/6 f -Jhl "~B Jhl = Jb ~ Jb: Mh S -^0 Daw f F = 75F -1 33r Base •' y ~JJ i/ /) V Base Plate Width (B) = 8 in b = 3 in Base Plate Depth (D) = Sin bl = 2.5 in Base Plate Thickness ft) = 0.375 in FV (base) = 36000 PS! 52.8 PSI = 0 PSI = 0 PSI = OPSI = 164.84 in/lb 0.02 in/cb = 36000 PSI = 0.19 <=1 OK rh * Base * Bos* ANCHOR TENSION No. of Anchors Resisting Tension (n) = 1 T-d2=MHase-(PCol-(b/2)} „ MK1 Base - 0 NEGATIVE, THEREFORE NO TENSION b1 bt " Pcot'- Dp- Mtf '' | iffi. Danchor—?r MATERIAL HANDLING ENGINEERING TEL : (909)869 - 0989 FAX : (909)869 - 0981 161 ATLANTIC STREET, POMONA, CA 91768 PROJECT COBRA PUMA CARLSBAD FOR McCOMBS WALL SHEET NO. 14 CALCULATED BY RF DATE 7/27/2010 SLAB AND SOIL ; THE SLAB WILL BE CHECKED FOR PUNCTURE STRESS. IF NO PUNCTURE OCCURS, IT WILL BE ASSUMED TO DISTRIBUTE THE LOAD OVER A LARGER AREA OF SOIL AND WILL ACT AS A FOOTING. PUNCTURE italic = 21101bs Mol = 63345.45 in-Ib Pmax=(l.2-Pxtatic+l.O-(Mol/d)) * = 4444-Ibs ^ _-> r^ = 100 PSI ^ -•"pwicf "~ J_v_ _ _ max F ~ A -Fv pvncl punct SLAB TENSION P -144A _ •* max ••""' ~ 1 T.1. . fi-:'-) Jxoil ;Vf<r4 •2-t 180 sq. in. = 0.25 +t 6 =L-B 2 1-f2 144-2 ft, _ MC.onc = 481 sq. in. = 21.94 in = 11.32 in = 5.31 in = 130 in-lb = 4.17 cb. in. = 162.5 PSI = 0.19 Cone Cone *(EQ16-19)SEC. 1605.4 P B L FOOTING B = 8 in W = 5 in Frame Depth d = 42 in CONCRETE /<? = 2500 PSI / = 5 in 0 = 0.65 SOIL = 1000PSF OK w Business Nairn Project Address Mailing Address ProjecLContscf I — SAN DIEGO REGIONAL HAZARDOUS MATERIALS QUESTIONNAIRE Business Contact Telephone # twrt ffofr ( ) City State Zip Code City State Zip Code OFFICE USE ONLY UPFPS HV# BP DATE / / APN# Plan File* Telephone # &*^/0 (160 )"7/Q -3-B-7Z ' The following questions represent the facility's activities, NOT the specific project desci PART 1: F|RE DEPARTMENT - HAZARDOUS MATERIALS DIVISION: OCCUPANCY CLASS»FICATION; Indicate by eirc will use, process.or store any of the following hazardous materials. If any of the items are circled, applicant must cont Iption. ling the item, whether your business act the Fire Protection Agency with jurisdiction prior to plan submittal. 1 Explosive or Blasting Agents 2. Compressed Gases 3. Flammable/Combustible Liquids 4. Flammable Solids 5. Organic Peroxides 6. Qxidizers 7. Pyroplwtes 8. Unstable Reactives 9, Water Reactives 10. Cryogenics 11. Highly Toxic or Toxic Materials 12. Radioaclives 13. Corrosives 14. OSbpr Heaffii Hazards15. <Non I DIEGO COU.M.TY DEPARTMENT OP ENVIRONMENTAL HEALTH - HAZARDOUS IptATERIAi-S DIVISIONS iHMO>: If (he answer to any of the questions is yes, applicant must contact the County of San Diego Hazardous Materials Division, 1255 Imperial Avenue, 3'" floor, San Die PART »:..SAN Expected Date of Occupancy: _D iCall (619) 338-2222 prior to the issuance of a building permit FEES ARE REQUIRED. YES NC Is your business listed on the reverse side of this form? (check all that apply). Wili your business dispose ot Hazardous Substances or Medical Waste in any amount? Will your business store or handle Hazardous Substances in quantities equal to or greater than 55 gallons, 500 pounds, 200 cubic feet, or carcinogens/reproductive toxins in any quantity? Wiil your business use an existing or install an underground storage tank? Will your business store or handle Regulated Substances (CalARP)? Will your business use or install a Hazardous Waste Tank System (Title 22, Article 10)? San Diego, CA 92101. 10 D CalARP Exempt Date Initials D CalARP Required Date Initials D CalARP Complete Date Initials PART III: SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT: If the answer to any of the questions below is yes, applicant must contact the Air Pollution Comrol District (APCO), 10124 Old Grove Road, San Diego, CA 92131-1649. telephone (858) 585-2600 prior to the issuance of a building or demolition permit. Note: if the answer to questions 3 or 4 is yes, applicant must also submit an asbestos notification form to the APCO at least 10 working days prior lo commencing demolition or renovation, except ;,aS/;:'''.-•',-'-'. C>'!•'"••'..;.::': of residential structures of four units or less. Contact the APCD for more information. YES NO, 1 • D El WtlS the subject facility or construction activities inciuoe operations or equipment that emit or are capable of emitting an air contaminant? (Sec the APCD factsheat at h!1p:.'iVAW/,!'>d3pCfHitg/j;ifo/fads/periniis p.rlf, and the list of typical equipment requiring an APCO permit on the reverse side of this from. Contact APCD if you have any questions), 2, D D (ANSWER ONLY IF QUESTION 1 IS YES) Will the subject facility be located within 1 ,OOC feet of She outer boundary of a schooi <tc through 12;?(Public and private schools may be found after search of the California School Directory at http: ,';VAWV. ccte_.ca ,go.yi'f a Adi: or cortlsct trie ^-"•appropriate school diSH'rcl)2 f~I pf isfiii there be renovation that involves tsanaling of any frlsbie asbestos materials, or disturbing any material thai contains non-friable asbestos? 4 O 5r Wljl there be demolition involving i<-:e rspiovat of a load supporting structural member? Briefly .activities:Briefly describe proposed project: deciaro undor penalty of perjury that to the best of my Knowledge and betof the responses made herein are true and correct. "ifw t>i oilier or Autftoriiea Agent FpRBf¥fc!?njsEl3NLY: ~" Signatuse of Owner or Autriorizea Agent Date 1 , . - . - - I 'AV : -^ •". C' • EKF^P? CJJ? NO FURTHER {NFOKfaAHOflfTKUUI^EO _^Jwi-j-N; Vr1"*u;/s?CD PTPLM^riD ?QF, BUILOIKG PERMIT BUT W F *OH OCXUPANCy1 j RF1.EASFD rOR OCCUPANCY JC'i*^"'' **'' •"'.*<'!-' i /--.'."'irD r _fKi:j HM-9J71 (04/07)of San Dicpn - HE! i — l-iaxardous Materials Division sa £o O