HomeMy WebLinkAbout1819 ASTON AVE; ; CB982657; Permit0211 911 999
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
Project Title:
City of Carlsbad
Building Permit Permit No:CB982657
Building Inspection Request Line (760) 438-3101
1819 ASTON AV CBAD
COM Sub Type:
2121201100 Lot #:
$815,451 .OO Construction Type:
B/Fl Reference #:
29,336 SF SHELL BUILDING
Status: ISSUED
VN Applied: 0811 8/1998
Appr/lssued: 02/19/1999
Inspect Area:
Entered By: MDP
Owner:
FINAL APPROVAL
Inspector: Date: .& Clearance:
NOTICE: Please take NOTICE that approval of your project includes the “Imposition” of fees, dedications, reservations, or other exactions hereafter collectively referred to as ‘feesiexactbns.” You have 90 days from the date this permit was issued to protest imposition of these feeslexactions. If you protest them, you must
follow the protest pmdures set fo!ih in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance wivl Carlsbad Municipal Code Section 3.32.030. Failure to timely foilow that procedure will bar any subsequent iqai action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your llght to protest the specified feeslexactbns DOES NOT APPLY to water and sewer mnnection fees and WpaCtiY
changes, nci planning, zoning, grading or other similar applicatbn pmssing or service fees in mnnection with this pmject NOR DOES IT APPLY to any
feeslexaclhons of which you have previously been qiven a NOTICE similar to this, or as to which the statute of limitations has previouslv othewise expired.
CITY OF CARLSBAD
2075 Las Palmas Dr., Carlsbad, CA 92009 (760) 438-1161
PERMIT APPLICATION
CITY OF CARLSBAD BUILDING DEPARTMENT
2075 Las Palmas Dr., Carlsbad CA 92009
(760) 438-1161
FOR OFFICE USE ONLY
PLAN CHECK NO.
Businssr Name (at this address] 14-r Cos 5-#3 AuE. Address (include BldgiSuite XI
Le231 De'rctiption Lot No. Subdivision NamelNumber Unit No. Phase No. Total X of units
Assessor's Parcel X Existing Use
-
Q--i-T&CT ?)s-'2+ -6 e&gcsjrstc
Proposed 'Use
t
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a Permit to Construct. alter. improve. demolish or repair any Structure, prior to its
issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law
[Chaptar 9, commending with Section 7000 of Division 3 Of the Business and Professions Cod4 or that he is exempt therefrom, end the basis for the alleged
exem tion. Any violation of Section 7031.5 by any applicant for a Permit subjects the applicant to a civil penalty of not more than five hundred dollars i$50011.
Name Address City StatelZip Telephone X
keerL,3 Ltusr.
State License X License Class city BU*l"MI8 LiC..P. I
Designer Name Address City StateiZip Telephone
,, ,
0 of the work for which this permit io iswed.
issued. My worker's compensation insurance carrier and policy number are:
Insurance Company Policy No. Expiration Om
(THIS SECTION MEED NOT BE COMPLETED IF THE PERMIT IS FOR ONE HUNDRED DOLLARS Id1001 OR LESS)
CERTIFICATE OF EXEMPTION I Certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as
to become subject to the Workers' Compsnsation Laws of California.
WARNING: Failure to secure workers' compsnaatlon coverage la UnIawid. and ahdl subject an emplover to c"mina1 penalties and clvll finas up to ma hundred
thowmd dollars ~$100.0001. In sddltlon to the cost of compensation, damages LIS provided for in Section 3706 of the Labor code. Interest and attorney's fees.
I have and will maintain a certificate of Consent to self-insure for workers' ComPenSatian as provided by Section 3700 of the Labor Code. for the PeiformanCe
I have and will maintain workers' compensation. as required by Section 3700 of the Labor Code. for the performance Of the work for which this permit is
SIGNATURE DATE
I hersbv affirm that I am exemm from the Contractor's License Law for the followinu reason:
~Ib 1% rnk
I, 85 owner Of the property or my employees with wager as their sole compensation. will do the work and the stwCtUre is not intended or offered for sale ism. 7044, Business and Professions Code: The CmtraCtOr'S License Law does not apply to an owner Of property who builds or improves thereon, and who does
such work himself or through his own employees, provided that such improvements are not intended or offered far sale. If. however, the building or improvement is
sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose Of sslel. 3 I. as owner of the property, am exdusively ContraCting with licensed CDntraCtors to Construct the project (Sec. 7044. Business and Professions Code: The
ntmctor's License Law doer not apply to an owner Of pr~pertv who builds or improves thereon. and ContraCtS for such projects with contrmtorlsl licensed
pursuant to the Contractor's License Law).
0
1.
2.
I am exempt under Section
I persondly plan to provide the major labor and materials for Construction of the proposed property improvement. YES UNO
I fi& have not1 signed an application for a building permit for the proposed work.
Business and RofesDionD Code for this reason:
4.
number I contractors license number]:
5.
I plan to provide portions Of the work, but I have hired the follawing person to coordinate. supervise and provide the major work (include name i address i phone
I will provide some of the work. but I have contracted lhirsdl the fOllawing persons to provide the work indicated (include name I address I phone number I type
Is the applicant or future building occupant required to submit a business plan. acutely hazardous materials registration form or risk management and prewntion
program under Sections 25505. 25533 or 25534 of the Preolsy-Tanner Hazardous Substance Account Act? 0 YES 0 NO
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district?
Is the facility to be Constructed within 1.000 feet of the outer boundary of a School site? 0 YES 0 NO
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE
REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AM0 THE AIR POLLUTION CONTROL DISTRICT.
0 YES 0 NO
,, ,, .
I hereby affirm that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 3097lil Civil Codel.
LENDERS NAME LENDERS ADDRESS .. ..
~~~~~
I certify that I have read the application and state that the above information is Correct and that the information on the plans io accurate. I agree to comply with all
City ordinances and State laws relating to building COnStrUCtion. I hereby authorize representatives of the CitV of Carlsbad to enter upon the above mentioned
property for inspection purpooeo. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AN0 EXPENSES WHICH MAY IN AMY WAY ACCRUE AGAINST SAID CITY IN CONSEOUENCE OF THE GRANTING OF THIS PERMIT.
OSHA An OSHA permit is required for excavations over 5'0" dssp and demolition or Construction Of 5trUCtuies over 3 stories in height.
EXPIRATION Every permit issued by the Building Official under the provisions Of this Code shall expire by limitation and become null and void if thB building or
work authorized by Such permit is not commenced within 365 days from the date Of such permit or if the building or work authorized by such permit is suspended
or abandoned at any time after the w of t 80 days (Section 100.4.4 Uniform Building Codel.
i' 4 APPLICANT'S SIGNATURE - DATE +, - 3 W WHITE: File YELLOW Applicant PINK: Finance
Dept: Building Engineering Planning CMWD St Llte I
plan Check#
mi # CB982657
PmjW Name: 29,336 SF SHELL BUILDING
Dale 8/26/99
PermitType: COM
Sub Type:
Address: 1819 ASTON AV M:
contact^ CRAIG phone: 8195598413
sewer Bat: CA Watertist: CA ..........................................................................................................................................................
Inspected
By: _. R z;ected: 6hy/fl Approved: Disapproved: -
Inspected Date
By: Inspected: Approved: - Disapproved: __
inspected Date
By: Inspected: Approved: - Disapproved: -
Comments:
...........................................................................................................................................................
cltrrt-
Flnal Bullding lnspectlon
Dept Building Engineering Planning CMWD OYiFFirrr
Ran Ch& #:
mn #: CB982657
PmJect Name: 29,336 SF SHELL BUILDING
Date: 8/26/69
PennltType: COM
Sub Type:
Address: 1819ASTON AV M:
COntadPmm CRAIG phone: 6195598413
sewer Qist CA WaterCist: CA ..........................................................................................................................................................
Date
Inspected:% -3 Approved:L Disapproved: -
Inspected Date
By: Inspected: Approved: - Disapproved: ~
Inspected Date
By: Inspected: Approved: - Disapproved: -
Comments:
...........................................................................................................................................................
CllJw-
Flnal Bnlldlng lnspectlon
Dept: Building -g Plannlng CMWD St Lite Fire
plan check #:
mn x: CB982657
Nm: 29,336 SF SHELL BUILDING
Awnas: 1819ASTONAV Lol:
ContactperSon: CRAIG Ftme: 6195598413
sewer Did: CA WaterDist: CA
Date: 8/26/99
PennitType: COM
Sub Typa:
Date / b J Disapproved:-
Inspected
By: . Inspected: 826 9 Approved:-
Inspected Date
By: Inspected: Approved: ~ Disapproved: -
Inspected Date
By: Inspected: Approved: - Disapproved: -
Comments:
City of Carlsbad Inspection Request
For: 8/26/99
Permit# CB982657 Inspector Assignment: PY
Title: 29,336 SF SHELL BUILDING
DeSCriDtiOn:
Type: COM Sub Type:
Job Address: 1819 ASTON AV
Suite: Lot
Location:
APPLICANT HOLASEK JOSEPH
Owner: ROYAL VILLAGE LLC
Remarks: PM PLEASE - 3 PM PLEASE
Phone: 6195598413
Inspector:
Total Time: Requested By: CRAIG
CD Description
Entered By: CHRISTINE
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Inspection History Date Description ~ct lnsp COmmenk
6/1O/S9 39 Final Electrical PA PY OK TO RELEASE HOUSE METER
5/12/99 17 Interior LathDrywall AP DH PROVIDE LETTER FRM ENG/ARCH 24" O.C. NAIL OK
6/9/99 39 Final Electrical NR PY
5/11/99 17 Interior Lath/Drywall co DH FRAMING a NAILING CALLS FOR 16" O.C.
5/7/99 14 FramBISleel/Boltinglding AP PY FRAME AT ELEC ROOM 8 SOFFITS
5/4/99 14 FrarnelSteellBoltinglding AP PY SEE LIST ATTACHED
5/4/99 15 Rwf/Reroof AP PY
4/23/99 11 Ftg/Foundation/Piers AP RB ON DRY PACK @ COLUMNS
4/19/99 11 Ftg/Foundatim/Plers CO RB ATPOURSTRIP
3/30/99 11 Ftg/FoundaUon/Piers AP PY 18PANELS
3/16/99 12 SteeVBond Beam AP NF SLABPOUR
3/11/99 11 Ftg/Foundation/Piers AP PY PERiMETER FTG GRADE BEAM (4) INT PAD FTGS
3/10/99 11 Ftg/Foundation/Piers wc PY
3/10/99 21 UndergroundKJnder Flwr AP PY
3110199 22 Sewerwater Service wc PY
4/20/99 I I Ftg/Foundatlon/Piers AP PY POUR'STRIP
3/30/99 13 Shear PaneldHD's wc PY
City of Cr Inspection Request
Permit# CB982657 Inspector Assignment: PY
Title: 29,336 SF SHELL BUILDING ”
Description:
Type: COM Sub Type:
Job Address: 1819 ASTON AV
Suite: Lot
Location:
APPLICANT HOLASEK JOSEPH
Ownen LAGE LLC
Total Time:
Phone: 6195598413
inspector:
Reqr ste By: CRAIG
Entered By: CHRISTINE
CD Description Act Comments
39 Final Electrical
Inspection History
Date Description ~ct lnsp Comments
5/12/99 17 Interior LathlDrywall AP DH PROVIDE LETTER FRM ENGIARCH 24’ O.C. NAIL OK
5/11/99 17 Interior LathlDrywall CO DH FRAMING 8 NAILING CALLS FOR 16’ O.C.
5/7/99 14 Frame/Steel/BoltingMlding AP PY FRAME AT ELEC ROOM 8 SOFFITS
5/4/99 14 Frame/Steel/Boltinglding AP PY SEE LIST ATTACHED
5/4/99 15 Rwf/Remof AP PY
a 4/23/99 11 FtglFoundationlPiers AP RB ON DRY PACK @ COLUMNS
4/20/99 11 FtglFoundationlPiers AP PY POUR STRIP
4/19/99 11 FtglFoundationlPiers CO RB ATPOURSTRIP
3/30/99 11 Ftg/Foundation/Piers AP PY ISPANELS
3/30/99 13 Shear PaneWHDs wc PY
3/16/99 12Steel/Bond Beam AP NF SLABPOUR
3/11/99 11 FtglFoundationIPiers AP PY PERIMETER FTG GRADE BEAM (4) INT PAD FTGS
3/10/S3 11 FtglFoundatimIPiers wc PY
3/10/99 21 Undergroundlunder Floor AP PY
3/10/99 22 Sewerwater Service wc PY
c
City of Carlsbad Inspection Request
For: 5/12/99
Permit# CB982657 Inspector Assignment: PY
Title: 29,336 SF SHELL BUILDING
DescriDtion:
Type: COM Sub Type:
Job Address: 1819 ASTON AV
Suite: Lot
Location:
4PPLICANT : HOLASEK JOSEPH
Owner: ROYAL VILLAGE LLC
Remarks: PM PLEASE -AT BLDG 3
Total Time:
Phone: 6195598413
Inspector: LN
Requested By: CRAIG
Entered By: CHRISTINE
Inspection History
Date Description Act lnsp Comments
5/7/99
5/4/99
5/4/99
4/23/99
4/20/99
4/19/99
3/30/99
3/30/99
3/16/99
311 1/99
31 0/99
3/10/99
3/10/99
14 FamelSteal/Boltingldlng
14 Fame/Steel/Boltingldlng
15 Roof/Reroof
11 FtgffoundationlPien
11 Ftg/Foundatlon/Piers
11 Ftg/Foundation/Piers
11 FtglFoundationlPiers
13 Shear PaneldHD's
12 SteeVBond Beam
I1 Ftg/Foundal'on/Pien
11 Ftg/Foundation/Piers
21 Undergroundlunder Floor
22 SewerNater Sewice
AP PY
AP PY
AP PY
AP RB
AP PY
CO RB
AP PY wc PY
AP NF
AP PY wc PY
AP PY
wc PY
FRAME AT ELEC ROOM a SOFFITS
SEE LIST ATACHED
ON DRY PACK @ COLUMNS
POUR STRIP
AT POUR STRIP
18 PANELS
SLAB POUR
PERIMETER FTG GRADE BEAM (4) INT PAD FTGS
.- I' .
City of Carlsbad
For: 5/11/99
Permit# CB982657
Title: 29,336 SF SHELL BUILDING
DeSCrilItion:
Type: COM Sub Type:
Job Address: 1819 ASTON AV
Suite: Lot
Location:
4PPLICANT : HOLASEK JOSEPH
Owner: ROYAL VILLAGE LLC
Remarks:
Total Time:
Inspection Request
Inspector Assignment: PY
Phone: 7609186926
Inspector:
Requested By: CRAIG
Entered By: CHRISTINE
CD Description Act Comments
17 Interior LathlDrywall
Inspection History
Date DesuipUon Act lnsp Comments
37/99
5/4/99
5/4/99
4/23/99
4/20/99
4/19/99
3/30/99
330199
3/16/90
3/1 I /99
3/10/99
3/10/90
3/10/99
14 FramelSteaUBoltinglding
14 FramelSteaUBolUnglding
15 RwfRemof
11 FtglFoundaUonlPiers
11 FtglFoundaUonlPiers
11 Fig/FoundaUon/Plers
I I FtglFoundaUonPIers
13 Shear PaneldHD's
12 Steelmond Beam
11 FtgtFoundaUonlPiers
11 Ftg/FoundaUonlPiers
21 UndergmundNnder Flwr
22 SewerMlater Service
AP PY
AP PY
AP PY
AP RB
AP PY
CO RB
AP PY wc PY
AP NF
AP PY wc PY
AP PY wc PY
FRAME AT ELEC ROOM 8 SOFFITS
SEE LIST ATACHED
ON DRY PACK @ COLUMNS
POUR STRIP
AT POUR STRIP
18 PANELS
SLAB POUR
PERIMETER FTG GRADE BEAM (4) INT PAD FTGS
CITY OF CARLSBAD N om c E (760)438-3550
BUILDING DEPARTMENT, 2075 LAS PALMAS DRIVE
0 YES
@ BUbNG INSPECT# CODEENFORCEMENTOFFICER
City of Carlsbad Inspection Request
For: 4/20/99
Permit# CB982657
Tile: 29,336 SF SHELL BUILDING
Description:
Type: COM Sub Type:
Job Address: 1819 ASTON AV
Suite: Lot
Location:
'APPLICANT : HOLASEK JOSEPH
Owner: ROYAL VILLAGE LLC
Remarks: DRY PACK INSPE
Total Time:
Inspector Assignment: PY
Phone: 7609186926
Inspector:
Requested By: CRAIG
Entered By: CHRISTINE
CD Description - 11 FtglFoundatIonlPiers
- -
Inspection History
Date Description Act lnsp Garnments
3/30/93 11 FtglFoundatianlPiers AP PY 18PANELS
3/30/99 13 Shear PaneldHD's wc PY
3/16/93 12Steel/Bond ham AP NF SLABPOUR
3/11/99 11 FtglFoundationlPiers AP PY PERIMETER FTG GRADE BEAM (4) INT PAD FTGS
3/10/99 11 FtglFoundationlPIen wc PY
3/10/93 21 UndergroundNnder Floor AP PY
3/10/99 22 SewerMlater Service wc PY
.I .
CITY OF CARLSBAD
BUILDING DEPARTMENT 2075 US PALMAS DRIVE
FOR INSPECTION CALL (760) 438-3101. RE-INSPECTION FEE DUE? 0 YES
FOR FURTHER INFORMATION, CONTACT R /3 PHONE
Q BUILOI~ INSPEOR WE ENWRCEMENTOFFICER
Testing Engineers - San Diego, Inc. Established 1946
FINAL REPORT FOR
SPECIAL, INSPECTION AND MATERIAL TESTING
DATE: August27,1999 Job No. 99-076
TO Cityofcart6ed
2075 Las WLmaS
Carlhd, California 92009
WlildingDePattment
SUBJECT: SATEFAWRY COMPLETION OF WORK REQUIRING SPECUL INSPECTION AND MATERJAL TESTING
PERMITNO.: 982657
PROJECT ADDRESS: carlsbad Research Center Lot 65-Building #3
1819AstonAvenue
carlsbad, California
..
I ~underpenaltyofpejurythaftothebestofmy~l~,~e~requiringspecialinspedioRmatezialsantplingandtesting,
includtng the offate fabrication of building components for the structure/s comcted under the subpa permits is in conformam with the
appmved plans, the -on and observation program and other construction documents, and the applicable workmanship provisions ofthe unifom Building code.
Exext~l on this 27th day ofAugust, 1999.
The wotk which we provided consisted of Special Inspeaion: Rdnfaced Cmcrete, Smrtural Steel inchuling Field Welding, Non-DMrucIM an Ultrasonic Testing, High-Strength Bolting, DoweVBolt Anchorage and pull Test.
A. ~uleinspectionsaviceswereprovidedbyanaplnwedmaterialtestinglaboratotyorspecialinspection~:
TESTING LABORATORY OR SPECIAL INSPECTION AGENCY: TeSting Engineers - San Diego, Inc ADDRESS:
RESPONSIBLE MANAGING ENGINEER OF THE TESTING LABORATORY OR SPECIAL INSPECTION AGENCY:
7895 Convoy Court, Suite 18, San Diego, CA 92 11 1
NAME(P"T0RTYPE) RDOUglaSPmvins %, vim Q,
StateofCaliforniaRegiStrationNumber: C56018 Expiration Date: 12/31/00
B. Ifthe inspeaion smimwereprovidedby an independent cacifiedspecialinspector:
SPECIAL INSPECTORS NAME (P"T OR TYPE):
REGISTRATION NUMBER. EXPIRATION DATE:
SIGNATURE:
Testing Engineers - San Diego. Inc., 7895 Convoy Court, Suite18 San Diego, CA. 92111 [8581715-5800 Pax [858]715-5810
Testing Engineers - San Diego, Inc.
7895 Convoy Ct., Suite 18
San Diego, CA 92111
INSPECTION REPORT
MAT'L SAMPLING QTY
-Soil -
-Bare -
-Subgrade -
-Asphalt Concrete -
-Concrete Cylinders -
-Cone Flex Beams -
-Reml. Steel -
-Tendon (PT Strands) -
-Mo,tafar Samples -
-Grout Samples ~~
-Masonry Prisms -
-Masonry Block --
-Steel -- - H.S. Bolts -
Fireproofing __
PageLof -
MATERIAL DESCRIPTION
-Cone: Mix #!psi ~
-Cone: Mix #/psi
-Cone: Mix #/psi
-Rinf Rebai
-Rink W.W.F.
-Rinf Tendons
-Grout: Mix #!psi
-Mortar: Typeipsi
-Units: Black
Units: Block __ Steel
H.S. eoits
-Electrodes
-Fireprwiing
Metal Decking
Project Name
Address Ihf 43- -. i?,>.-&&- 3
n s Aid &esemtL Pi hr-
44 UJ. H
TESD Project # ?q - o 7 7L
General I Subcontractor
Building Permit # DSA #
Plan File # OSHPD #
Government Contract # Other
INSPECTION
-concrete
-Prestress Conc
-Masonry
-struct Steal
-Fireproofing
-Pile Dnving
~ NOn-DeSIwCtwe
-Batch Plant
-Soils Technician
-Mechanical
lectrical
_\LsOIt PUII-OU Ep y
-Rooling A., &OPS
~Waterprooflng - DSA
-0SHPD - speoa1Iy
INSPECTION CHECKLIST
-Sizes
-Slump
-Air Content
-Temperalure
-Unit Weight
-Consolidation
-Electrode Storage
-Torque Applied
-Load (Pounds)
-Thickness
I /
Field Representative #
CERTIFICATION OF COMPLIANCE: To the best of my knowledge, all of the reported work, unless othetwisehed is in conformance
with the approved plans and specifications and the workrnanship provisions of the applicable code.
INSPECTOR'S NAME AnrhM, K I dbnsd-zw CERT. NO.G' "y [fT AU.!h&sS
DATE,S-- M- 7 9 F 0 rm X 0 0 3 INSPECTOR'S SIGNATURE
Testing Engineers - San Diego, Inc. , : Established 1946
HIGH STRENGTH BOLT CONFORMANCE TEST
Date: May 10,1999
Job No: 99-076
Job Name:
Address: IsP~;smori Avenue
CARLSBAD RESEARCH CENTER-LOT 65, BLDG. 3
San Diego, California
Plan No: N/A
Permit: 982657
Report No: 141221
ENGINEER: R. DOUGLAS PROVINS, RCE 56018 EXPIRES 12/31/00
~ ~
SUBJECT: On 4/30/99, one 7/8x 2-3/4" A325 bolts with an A563 grade DH nut and F436
washer, was submitted to Testing Engineers for conformance to ASTM requirements.
RESULTS: All elements were submitted to Mh4A Laboratories for testing. Attached are
test results as reported by h4MA Laboratories (Mh4A Work Order No. GMS-05-06-34243).
All elements conform to applicable requirements of ASTM.
Testing Enfinecra -Sa" Diego, Inc.. 789.5 Convoy Court. Suite18 San Diego. CA. 921 I I ~6191715-S800 Fax 16191715-5810
~~~
--
----= -- _-.-- --%EAqALaboratories, I nc.
15062 BOLSA CHICA * HUNTINGTON BEACH, CA 92649 714/892-1961 - FAX 7141892-8159 DC- 4 n
USTOMER:
i
httertion: TED I<RIJF.IM
TESTING ENGINEERS - SAN DIEGO
7895 CONVOY COI.IRTI STE 18
SAN OTEGO, Cy, 921 11
MMAW.O.NO.: ,;~~.-05-fifi-3/,2~3
PAGE 'I OF 3
NDTAND MATERIALS TESTING FASTENER TESTING
15062 BOLSA CHICA * HUNTINGTON BEACH, CA 92649 * 714/8921961 * FAX,714/892-8159 1
:USTOMER:
TESTING ENGINEERS - SAN DIEGO
7895 CONVOY SOIJRT, STE 18
SAN DIEGO, SA 92111
Attention: TED KRUMM
~
CERTIFICATION OF TESTING
MA T E Fi I A I.. il ONF ORMS TO SFE C IF IC A T I ON
PAGE 2 OF ?
HE INFORMATION CONTAINED IN THIS CERTIFICATION REPRESENTS ONLY THE MATERIAL UBMllTED AND IS CERTIFIED ONLY FOR THE SAMPLES TESTED. REPRODUCTION EXCEPT IN FULL i RESERVED PENDING WRITTEN APPROVAL, ALL ANALYSES AND TESTS WERE PERFORMED IN CCORDANCE WITH MMA 0.A. MANUAL REVISION 9 DATED 9130196 AND ALL OTHER RELATED 'ROCEDURES. ALL TESTING WAS PERFORMED IN A MERCURY FREE ENVIRONMENT. CCREDITATIONS: A2LA 93-01, 93-02, 93-03 VALID TO 5/31/00. PRI 0019 VALID TO 1/31101, PRI 0092-
IO. 10055 VALID TO 3/1/00 AND FAA AIR AGENCY CERTIFICATE M35R933N VALID INDEFINITELY. VALID TO 7/31/99, PRI 0031-C VALID TO 1/31/00, PRI 0013 VALID TO 1/31/01. CITY OF LOS ANGELES MlNH MAI OU- ,* ,
CHEMICAL MECHANICAL
~ ~~
NOT AND MATERIALS TESTING FASTENER TESTING
Testing Engineers - San Diego, Inc. Established 1946
HIGH STRENGTH BOLT CONFORMANCE TEST I
Date:
Job No:
Job Name:
Address:
Report No:
ENGINEER
May 11,1999
99-076
18 19 Aston Avenue
San Diego, California
CARLSBAD RESEARCH CENTER-LOT 65, BLDG. 3
Plan No: N/A
Permit: 982657
f@ 141222
R. DOUGLAS PROWS, RCE 56018 EXPIRES 12/31/00
... .. ......... . ... .. ... ..... ......... .. . . ... ........ ..... ..... . .. . .. . -
SUBJECT: On 4/30/99, one W x 2-3/4" A325 bolt with an A563 grade DH nut and F436
washer was submitted to TESD for conformance to ASTM requirements.
RESULTS: All elements were submitted to MMA Laboratories for testing. Attached are
test results as reported by MMA Laboratories (MMA Work Order No. GMS-05-06-34242).
All elements conform to applicable requirements of ASTM.
TeslingEngineers-Snn Diego. Inc.. 7895 Convoy Court. Suite18 San Diego. CA. 92111 16191715-5809 Faxf6191715-5810
15052 BOrSA CHlCA * HUNTINGTON BEACH, CA 92649 * 714/892-1961 * FAX 7141892-8159 i
XJSTOMER:
TESTING ENGINEERS - SAN OIEGC!
7895 CONVOY COURT, STE .I8
SAN DIEGO. C:A 92111
Attention: TED l<Rl.!b!i?
CERTIFICATION OF TESTING
RESPECTFULLY.SUBMITTED,
CHEMICAL MECHANICAL
--
RECEIVE0 MAY 1 0 1999 -=--e - - ESAqflaboratories, - .- - Inc
15962 BDtSA CHICA * HUNTINGTON BEACH, CA 92649 7141892-1961 . FAX 714/892-8159 I
:USTOMER:
TESTING ENGINEERS - SAN DIEGO
7895 CONVOY COURT, STE IF:
SAN DIEGO. CA 92111
Attention: TED I<R?IMM
CERTIFICATION OF TESTING
HIPTION: 3/4" X 2 3/4" A325 EOLT W/Nt.IT R WASHER
LOT NO.: 822908
TESD LAB NO. : 52007
PRD..IE:CT : CARLSE,AD RESEARCH CENTER-LOT 65. BI_O?i. 3
PEEMIT NO. : 982657
H b4 RDN E S S
SPFCIFICATION: 1'k$:Ti4 A 563-!27 C;K, OH HFA'VV HEX INIIT
RE 0 I.! X R E M E N T : 24-38 HRi:
HARDNES!? RES!!LTS ACE. AN AVERhGE OF AT LEAST THREE REAOIN
ACCORDANCE WI1'I.I ASTM F CiOG-C15!.).
'Z AMP LE RESCII.. T
1 3 n t-I R c
H h 6: n N E
SPEC:IFT~:.ATION: ASTivi F 436-93
REO!! I R E M f: NT : 3F:.-45 HRC
HARDNESS RE'ZI!LTS ARE Ab! AVERhdGE Of^ AT LEAST THREE RII%DTNG': TE5TFD TP-1
ACC.OR~AN~:E WITH ASTM F cin6--.35!, .
5 AMP I.. E
'I b 0 t4 F'C
MAT E R I k L C: 0 N F 0 R M:': T 0 5 P E C 1 FICA T IO N
PAGE 2 OF 2
RESPECTFULLY SUBMITTED
MlNH MAI
QUALITY ADhlINISlHAlOR I
NDTANO MATERIALS TESTING FASTENER TESTING
Testing Engineers - San Diego, Inc.
7895 Convoy Ct., Suite 18
San Diego, CA 92111
INSPECTION REPORT
Page -_ 1 of
INSPECTION
-Concrete
___prestress conc
+ry
-Struct Steel
-Fireproofing
-Pile Driving - Non-Destructive
-Batch Plant
-Soils Technician
-Mechanical
-Electrical
-Ball PUII-Out
-Rooting
-Waterproofing II-2
-Specialty
MATL SAMPLING
-Soil
-Base - Subgrade
-Asphalt Concrete
-Concrete Cylinders
-Cow Flex Beams - Reint. Steel
-Tendon (PT Strands)
-Mona( Samples
-Grout Samples
-Masonry Prisms
-Masonry Block
-steel
-H.S. Bolts
-Fireproofing
__Roofing
-Other
QTY MATERIAL DESCRIPTION
-Cone: Mix #/psi -
-Cone: Mix Xipsi
-Cone: Mix #/psi
-Rinf Rebar
-Rinf: W.W.F.
-Rinf Tendons
-Grout: Mix #/psi
-Monar: Typelpsi
-Units: Block
-Slump
-Air Content
-Temperature
-Unit Weight
-Toque Applied
-Load (Pounds)
-Thickness
Field Representative #
with the approved plans and specifications and the workmanship provisions of the applicable code.
XfiiIAJ B hob& D w527 (P""l Cleady) CERT. NO. INSPECTOR'S NAME
INSPECTOR'S SIGNATURE +B hA% 49
of - Testing Engineers - San Diego, Inc. 7895 Convoy Court, Suite 18 a NOTICE TO COMPLY Page
San Diego, California 92 1 I 1
& REPORT
Plan File Number TO: KfgzJ CoJ~hJCZ>&
c..m J s7m cod S7flU&Z-VJ
Testing Engineers - San Diego, Inc.
7895 Convoy Ct., Suite 18
San Diego, CA 92111
INSPECTION REPORT
PageLof -
INSPECTION
-concrete
-Prestress conc
-Masonry
-SIr"ct steel
-Fireproofing
-Pile Driving
Non-Destructive
-Batch Piant
-Soils Technician
-Mechanical
-Electrical
-Bolt Pull-Out
Roofing - Walerproofing - DSA
-0SHPD
-Specialty
MAT'L SAMPLING QTY
-Soil -
-Base -
-Subgrade -
-Asphalt Concrete
-Concrete Cylinders -
-Cant Flex Beams -
-Reinf. Steel -
-Tendon (PT Strands) -
-Mortar Samples -
-Grout Samples -
Masonry Prisms -
-Masonry Block -
- + -H.S. Bolts
-Fireproofing -
Rooting -
-Other
MATERIAL DESCRIPTION
-Cant: Mix #/psi -
-Cane: Mix #/psi
-Cant: Mix #/psi
-Rinf: Rebar
-Rint: W.W.F.
-Rinf: Tendons
-Grout: Mix #/psi
-Mortar: Typeipsi
-Units: Block
-Units: Block
-Metal Decking
-Electrodes - Fireprwfing
-Other
INSP CTION CHECKLIST
-Slump
-Air Content
-Temperature
-Unit Weight - Consolidelfon
-Electrode Storage
-Torque Applied
-Laad (Pounds)
-Thickness
Field Representative #
CERTIFICATION OF COMPLIANCE: To the best of my knowledge, all of the reported work, unless otherwise stated, is in conformance
with the approved plans and specifications and the workmanship provisions of the applicable code.
INSPECTORS SIGNATURE Qc4-4-
Form8003
DATE 4- 2 e- w
Testing Engineers - San Diego, Inc.
7895 Convoy Court, Suite 18
San Diego, California 92 1 1 1
Project:
6D REPORT
0 NOTICE TO COMPLY Page of -
Address
Testing Engineers - San Diego, Inc.
7895 Convoy Ct., Suite 18
San Diego, CA 92111
INSPECTION REPORT
Page 1 of -_
44- 076 TESD Project #
INSPECTION
-Concrete
-prestress conc
Masonly
St,"d Steel
-Fireproofing
-Pile Onving - Non-DestwcIwe
-Batch Plant
___Sails Technician
-Mechanical
-Electrical
-Bolt Pull-Out
__Rooling
Wat*rproof,ng
DSA
-0SHPD
-Specialty
MAT'L SAMPLING
-sol1
-Base
-Subgrade - Asphalt Concrete
-Concrete Cylinders
-Cow Flex Beams
-Rein1 Steel
-Tendon [PT Strands)
-Mortar Samples
-Grout Samples
-Masonry Prisms
__Masonry Block
-Steel - H.S. Bolls
Fireproofing
___Rooling
-Other
MATERIAL DESCRIPTION
-Cone: Mix #/psi -
-Cane: Mix #/psi
-Cant: Mix #/psi
-Rinf: Rebar
-Rinf: W.W.F.
-Rint. Tendons
-Grout: Mix #/psi - Monar: Typelpsi
-Units' Block
-Units: Block
Steel
-H.S Bolls
-Metal Decking
-Electrodes
-Fireprwfing
-Other
INSPECTION CHECKLIST
- Plans
-Specifications
-Sizes
-Slump
-Air Content
-Temperature
-Unit Weight
consolidation
-Electrode Storage
-Torque Applied
-Load (Pounds)
-Thickness
~cMBmueaS(bnrequ1d - - Corredionr completed -
A
Field Representative #
CERTIFICATION OF COMPLIANCE: To the best of my knowledge, all of the reporte
with the approved plans and specifications and the workmanship provisions of the applicable code.
s. D w527 INSPECTOR'S NAME T&fd B (P,,", M&L&f Clearly) CERT. NO.
INSPECTOR'S SIGNATURE
FormXO
TESTING ENGINEERS-SAN
Established 1946
CUSTOMER Cwl rM &%ea, h (tqler Lot65 i31dc,.'3
\sbc\L;\ fq I- PURCHASE ORDER NUMBER
ADDRESS IfJ 19 &+on
JOB OR PROJECT LOCATION
SURFACE CONDITION HEAT NUMBER HEAT TREATMENT 0 Before 0 ARel
DIEGO,
DAT'q*JR -77
"0 7
REPORT NUMBER
TYPE OF MATERIAL TEMP OF MATERIAL
INC.
CERTIFIED REPORT OF
NONDESTRUCTIVE TESTING
Page of
Enclosure Added 0 Ye0 0 No
Testing Engineers - San Diego, Inc.
7895 Convoy Court, Suite 18
San Diego, California 921 11
x 6D REPORT ~CE TO COMPLY Page 1 of-
Job u ber 97- 076
Perm4 Plan File Number
Testing Engineers - San Diego, Inc.
7895 Convoy Court, Suite 18
San Diego, California 921 11
&LD REPORT a NOTICE TO COMPLY Page A- of- 2
Testing Engineers - San Diego, Inc.
7895 Convoy Court, Suite 18
San Diego, California 92 1 1 1
dELD REPORT a NOTICE TO COMPLY Page of -
I
I
Testing Engineers - San Diego, Inc.
7895 Convoy Ct., Suite 18
San Diego, CA 92111
INSPECTION REPORT
PageLof -
General I Subcontractor KE%%d COhjS~RLJL7io~ Go/C,M. 3. s???GgL US 7#Uc77d,J
Building Permit # "1-as67 DSA #
Plan File # OSHPD #
Government Contract # Other
INSPECTION
- comrete
- pre5tress conc -- - StNCt Steel
-Fireproofing
-Pile Driving - Non-Destructive
-Batch Plant
-Soils Technician
-Mechani~al
-Electrical
-Boll P"II.O"t
-Rooting - Waterpnxrfing
DSA
4PD
-Specially
MAT'L SAMPLING
-Soil
~0-e
-Subgrade
-Asphalt Concrete
-Concrete Cylinders
-Cone Flex Beams
-Reinl. Steel
-Tendon (PT Slrandr)
-Mottar Samples
-Grout Samples
-Masonry Prisms
- Masonv Block
-Steel
-H.S. Bolts
-Fireproofing
-Other
Rwfing
QTY MATERIAL DESCRIPTION
-Cone: Mix #/psi -
-Cone: Mix #/psi
-Cone: Mix #/psi
-Rinf: Rebar
-Rinf: W.W.F.
-Rinf: Tendons
-Grout: Mix Ulpai
-Mottar: Typeipsi
-Units: Block
-H.S. Bolts
+tal Oeckin; 70,~
-ElectrOdes
-Fireproofing
-Other
-Slump
-Air Content
-Temperature
-Unit Weight
-Electrode Storage OWEu
-Torque Applied
-Load (Pounds)
-Thickness
- Canecweanbnreqired -
-Corrections completed -
with the approved plans and specifications and the workmanship provisions of the applicable code
INSPECTOR'S NAME
INSPECTORS SIGNATURE +BW FoimUOO3
DATE q-s- 99
Testing Engineers - San Diego, Inc.
7895 Convoy Ct., Suite 18
San Diego, CA 921 11
INSPECTION REPORT
PageLof 1 -
Address 1819 Anzw Awe. -
DRD CA.
General I Subcontractor K&TOf..l
Building Permit #
Plan File # OSHPD #
%- 3z77 ,SA#
Government Contract # Other /$q = 6/tca
/
-Pile Driving - Non.Oestruclive
-Bafch Plant
-Soils Technician
-Mechanical
__Electrical
-Boil P"II-Ou1
-Roofing
-Waterproofing - OSA
-0SHPD
-Specialty
MAT'L SAMPLING QTY
-Soil
-Base
-Subgrade
-Asphalt Concrete
-Concrete Cylinders
-Cone Flax Beam - Reinf. Steel
-Tendon (PT Strands) - Mortar Samples
-Grout Samples
-Masonry Prisms
- Masonly Blmk
-steel
-H.S. Bolts
-Fireproofing - Roofing
-Ofher
MATERIAL DESCRIPTION
-Cone: Mix Xlpsi -
-Cone: Mix #/psi
-flinl: W.W.F.
-flint: Tendons
-Grouf: Mix Xlpsi
-Mortar: Typelpsi
-Units: Block
nits: Block 2 Steel 43fL
-H.S. Bolts
Metal Decking
Elemodes I 'T; 8
Plans
-Slump
-Unit Weight
__Consolidation
-Electrode Storage
, -Torque Applied
-Load (Pounds)
J-ThEy ?> t?&L
7- L-
-caremvsaoon~red -
-Corrections mmpieted -
A
Field Representative #
CERTIFICATION OF COMPLIANCE: To the best of my knowledge, all of the reported work, unless otherwise stated, is in conformance
with the approved plans and specifications and the workmanship provisions of the applicable code.
so CI'y 334
INSPECTORS NAME CERT. NO.
FormXOO3 INSPECTOR'S SIGNATURE DATE 3-30-99
Testing Engineers - San Diego, Inc.
7895 Convoy Ct., Suite 18
San Diego, CA 92111
INSPECTION REPORT
PageLof -
Project Name A&f9&2
/@9 4s /dd AI/ c
&kzS/?nlb a?.
/ZebC arc4 c pl/r. L~AS 5 TESD Project # 97 - 076
Address
General / Subcontractor &&Jd
Building Permit # w-32 7 7 DSA #
Plan File # - OSHPD # -
/ Government Contract # Other 7
Prestress Conc
-Masonry - Stwct Steel
-Fireproofing
-Pile Driving - NM1-DBStrUctivB
-Batch Plant
-Soiln Technician
-Mechanical
-Electrical
-Bolt Pull-out
-Rooting - Waterpmfing
OSA
-0SHPD
- Specialty
MAT'L SAMPLING
-Sail
-Base
-Subgrade
-Asphalt Concrete
-Concrete Cylinders
-Cmc Flex Beams
-Reinl. Steel
-Tendon (PT Strands) - ~onar samples
-Grout samples
-Masonry Prisms
-Masonry Blwk
-Steel
-H.S. BO116
- Fireproofing
Roofing
-Other
MATERIAL DESCRIPTION
-Cone: Mix *psi -
-Cane: Mix Wpsi
onc: Mix #/psi
=in1 Rebar Hf;/d#f
-Rim W.W.F.
-Rint: Tendons
-Groul: Mix #/psi
-Martat: Typelpsi
-Units: Black
-Units: Black
-Steel
-H.S. Bolts
-Metal Deckmg
-Electrodes
-Fireproofing
-Other
INSPFTION CHECKLIST
-Sizes
-Slump
-Air Content
-Temperature
-Unit Weight
-Consolidation
-Electrode Storage
-Torque Applied
-Load (Pounds)
-Thickness
A
Field Representative #
CERTIFICATION OF COMPLIANCE: To the best of my knowledge, all of the reported work, unless othelwise stkiE8$ in conformance
with the approved plans and specifications and the workmanship provisions of the applicable code. .
.-. Ah2W-a- fnc//L/ 5d . CERT. NO. ." dz zd-PY8 (P""1 Clearly) INSPECTOR'S NAME .-
FormXW3 INSPECTOR'S SIGNATURE /? DATE 3 -30 -9 Y
Testing Engineers - San Diego, Inc.
7895 Convoy Ct., Suite 18
San Diego, CA92111
INSPECTION REPORT
. .
Testing Engineers - San Diego, Inc.
7895 Convoy Ct., Suite 18
San Diego, CA92111
INSPECTION REPORT
Page 1 of --
Building Permit # qf- 32 77 DSA# ---
OSHPD#
Other
- Plan File #
Government Contract # c -
-concrete INSFON
- PreslleO9 conc
-Masonry - struct steel
-Fireproofing
-Pile Driving - NOI1-DestrwIive
-Batch Plant
-Soils Technician
Mechanical - Eleclrical
-Bolt PUII-OUI
-Roofing
-Waterproofing
-DSA
-0SHPO - Specielty
MAT'L SAMPLING QTY
-Soil
-Base
-Subgrade
-Concrete Cylinders
-Cone Flex Beams
-Reinf. Steel
-Tendon (PT Strands)
-Mortar Samples - Gmut Samples
-Masonry Ptisms - Masonry Blmk
-steel - H.S. Bok
-Fireproo(ng - Roofing
-Other
-phan concrete
MATERIAL DESCRIPTION
J 35Y yNd -Cone: Mix #/psi /-.,
-Cone: Mix #/psi
onc: Mix #/psi
zinf: Rebar 6 O~/h/%L
-Rinf: W.W.F.
-Rinf: Tendons
-Grout: Mix #/psi
-Mortar: Type/psi
-Units: Block
-Units: Block
Steel
-H.S. Bolts
-Metal Decking
-Electrodes - Fireprwfing
-Other
- rconlent
-Temperature /
-Eiectrode Storage
-Torque Applied
-Load (Pounds)
-Thickness
ac2WlmqAlsd ~
Field Representative #
CERTIFICATION OF COMPLIANCE: To the best ,of my knowledge, all of the reported work, unless othenvise statedHconformance
with the approved plans and specifications and the workmanship provisions of the applicable code
,-
d z 20 -38 CERT. NO. /6 INSPECTOR'S NAME mlt asany]
INSPECTOR'S SIGNATURE w
Testing Engineers - San Diego, Inc.
7895 CONVOY CT., SUITE 18
SAN DIEGO, CA92111
INSPECTION REPORT
Page Lof __
Project Name pc f &A iZecrc\rcL Ch4.e c
Address /EIC AL r? AVL
TESD Project # SC; -07b
General I Subcontractor
Building Permit DSA #
Plan File # OSHPD #
Government Contract # Other
INSPECTION & Concrete - Prestress Conc - Masonry - SINCI Steel - Firepmollng - Pile Driving
- Batch Pian1
- Mechanical - Electrical - Bolt Pull-Out - Roofing - Waterproofing
DSA - OSHPD A Specialty> Au~"\p
- NOn-DESINCliVE
- Soils Technician
MAT'L SAMPLING QTY - soil - - Base - __ Subgrade - - Asphalt Concrete ~ - Concrete Cylinders - - Conc Flex Beams - - Reinl. Steel -
~ Tendon(PTStrands) - - Mortar Samples - - Qrout Samples - - Masonry Prisms -
Masonry Block - - Steel - - H.S. Bolts - - Firepmfing - - Roofing -
~ Ofher
MATERIAL DESCRIPTION - Conc.: Mix #/psi - Conc.: Mix #/psi - Conc.: MIX #/psi - Rinf.: Rebar - Rinf.: W.W.F. - Rinf.: Tendons - Gmut: Mix #/psi - Monar: Typdpsi - Units: Block - Unils: Block
- H.S. Bolts - Metal Dacking - Electrodes - Fireprooling
Slael
- Other
INSPECTION CHECKLIST - Plans
L Specifications __ Sizes - Slump - Air Conlent
- Unit Weight - Consolidation
~ Temperature
- Electrode Storage - - Toque Applied - Load (Pounds) - Thickness
- COnKbW&WlW- - Corrections ~~mpleled -
Field Representative
CERTIFICATION OF COMPLIANCE: To the best of my knowledge, all of the reported
with the approved plans and specifications and the workmanship provisions of the applicable code.
d, is in conformance
.-
I \Gra e IY17) CERT. NO. 7 I VI f: iP,I"t Clearhl) INSPECTORS NAME
L Jf%u-- \&If??. DATE
.----- INSPECTORS SIGNATURE -
Testing Engineers - San Diego, Inc.
7895 CONVOY CT., SUITE 18
SAN DIEGO, CA92111
INS P ECTl 0 N RE PORT
PageLof __
General /Subcontractor er A niAr
DSA # Building Permit # 98 * 2
Plan File # OSHPD #
Government Contract # Other
INSPECTION
- Prestress Conc - Masonry - SINCI Steel - Fireproofing - Pile Driving - Non-Destructive - satch Plant - Soils Technician - Mechanical - Eleclrical - son Pull-out - Roofing - Waterproofing - DSA - OSHPD - Specially
- s Concrete
MAT'L SAMPLING QTY - soil - sase -
- Asphalt Concrete -
~ Concrete Cylinders - Conc Flex seams - - Reinf. Steel - - Tendon (PTStrands) - - Mortar Samples - __ Grout Samples - - Masonry Prlsms - - Masonry Block - - Steel - H.S. Bolts - Flrepmoling
- Other
-
- Subgrade -
- - - - RWfing -
MATERIAL DESCRIPTION
WConc.: Mix #/psi
__ Conc.: MIX #/psi - Conc.: MIX Wpsi
- Rinl.: W.W.F. - Rinl.: Tendons - Grout: Mix #/psi - Mortar: Typelpsi - Units: Block - Units: Block - Steel - H.S. Boils - Metal Decking - EIeclmdes - Firepmofing - Other
- Rinf.: Rebar A6 f <-
INSPECTION CHECKLIST - Plans - Specifications __ sizes - Slump - Aircontent - Temperature - Unit Weight - ConsotidatioXKJF- - Eienmde Storage - - Toque Applied - Load (Pounds) __ Thlckness
.t */ ..
- Cm&e xbn wind - - Correctbns mwieled -
ed, is in conformance
with the approved plans and specifications and the workmanship provisions of the applicable code. -
INSPECTORS NAME n\/au\*, ?ace c ,no CERT. NO. 5 I+/ R (Print CIetrlyJ
r7<>m- lfaAl?A* DATE /*- INSPECTORS SIGNATURE
(61 9)-71 55800 AWTIC CITY'. MAV ' WUNW ' TESTING ENGINEERS SAN DIEGO 519)715~10 8WDIEGO.FT LAUDERDNE
REPORT OF COMPRESSION TEST
PROJECT CARLSBADRESEARCHCENTER PROJECT NO. 99-076
PROJECT ADDRESS
CONTRACTOR JETT &JONES, LLC
ARCHITECT/ ENGINEER
BLDG. PERMIT NO. 982657 PLAN FILE NO. N/A
181 7 ASTON AVE CARLSBAD
AZED STRUCTURAL ENGINEEWNOGLE ONUFER &ASSOCIATES
SAMPLE DATA
REPORT OF
CONCRETE 0 MORTAR 0 GROUT HS GROUT 0 PRISMSO OTHER
(DAYS)
7
2a
28
H
PLACEMENT DATE 3/31/99 DATE RECEIVED IN LAB 4/2/99
SUPPLIER SUPERIOR MIX DESIGN PSI 3000
MIX NUMBER 354P MIX DESCRIPTION 1" ROCK WI PO22
TYPE OF CEMENT II TICKET NO. 324437
ADMIXTURE NIA SLUMP (IN.) 5 I'
CONC. TEMP.(,~F).-. I. I .
LOCATION OF PLACEMENT
MIXING TIME (MIN) 60 ~. AIR CONTENT(%)^ NIA
70 .. ~~ 54 ~~ .. . , :> AlR75MP.p.- . . : . . .- . . . . . . . . ..:.. , , .. . !'
DESIGN STRENGTH (f 'c) PSI 3000 @ 28 DAYS SAMPLES MADE BY C. GRIFFIN
PANEL #14
STRENGTH (psi) LAB NO. DATE TESTED (inches) (sq. inches) (IW
19336 4/7/99 6x1 2 28.27 97,500 3450
19337 4/28/99 6x12 28.27 137,000 4850
19338 412a199 6x1 2 28.27 131,000 4630
19339 5/76/99 DISC
~
LABORATORY DATA
I AGE I I I DIMENSIONS I TEST AREA I MAXIMUM LOAD I COMPRESSIVE I
_. - - I I I I
1
ALL SAMPLING AND TESTING PERFORMED IN GENERAL ACCORDANCE WITH ASTM TEST METHODS. *ACTUAL MEASURED AREA.
.. ~. . . .. .. ..
~. . . ~~
.. REMARKS:, TW0,28 DAY 'TESTS COMPLY WITH PROJECT, SPECIFICATIONS. .. . . . . ... . . .. . . . .
~.~ ~ ~~ ~ ~. . . . , . , . . . . .. . .I .
CHECKED BY: REVIEWED BY: R. DOUGLAS PROVINS, RCE 56018
DATE: DATE:
(61 9)-7,55800 ATLANTCCITY*RWAY .ORULIW*
(619) 7j~10 JWDIEGO'Fl UUDERWE TESTING ENGINEERS SAN DIEGO
REPORT OF COMPRESSION TEST
PROJECT CARLSBADRESEARCHCENTER PROJECT NO. 99-076
PROJECT ADDRESS
CONTRACTOR JETT & JONES, LLC
ARCHITECT1 ENGINEER
BLDG. PERMIT NO. 982657 PLAN FILE NO. N/A
1817 ASTON AVE CARLSBAD
AZED STRUCTURAL ENGINEEWNOGLE ONUFER 8 ASSOCIATES
SAMPLE DATA
REPORT OF
CONCRETE 0 MORTAR 0 GROUT 0 HS GROUT 0 PRISMSO OTHER
PLACEMENT DATE 311 1/99 DATE RECEIVED IN LAB 3/16/99
SUPPLIER SUPERIOR MIX DESIGN PSI 3000
MIX NUMBER 354P MIX DESCRIPTION 5 112" SACK
TYPE OF CEMENT II TICKET NO. 323920
ADMIXTURE POZZ SLUMP (IN.) 3 112"
MIXING TIME (MIN) 46 AIR CONTENT(%) NIA
CONC. TEMP.( OF) N/A AIR TEMP.(OF) N/A
DESIGN STRENGTH (f 'J PSI 3000 @ 28 DAYS SAMPLES MADE BY G. TARANTINO
LOCATION OF PLACEMENT PR~N~ETERF~OTING GRADE BEAMS INTER PIERS AND GRADE BEAM SHEAR
LABORATORY DATA
LAB NO.
18605
18606
18607
I AGE DIMENSIONS TEST AREA MAXIMUM LOAD COMPRESSIVE
DATE TESTED (inches) (sq. inches) (IW STRENGTH (psi)
311 8/99 6x12 28.27 97,000 3430
4/8/99 6x12 28.27 141,500 5010
4/8/99 6x1 2 28.27 143,500 5080
(DAYS) E
AL
18608 I 5/6/99 I I I I DISC I
SAMPLING AND TESTING PERFORMED IN GENERAL ACCORDANCE WITH ASTM TEST METHODS, 'ACTUAL MEASURED AREA.
REMARKS: TWO 28 DAY TESTS COMPLY WITH PROJECT SPECIFICATIONS.
0 CHECKED BY: REVIEWED BY R. DOUGLAS PROVINS, RCE 56018
DATE: 415 b4 DATE:
(6, 9)-,, 55800 ATMIC CITI’RIWWAV .mUNW. TESTING ENGINEERS SAN DIEGO FAX (619) 7155810 S*NDIEW*FT UUDEROILE
REPORT OF COMPRESSION TEST
PROJECT CARLSBADRESEARCHCENTER PROJECT NO. 99-076
PROJECT ADDRESS
CONTRACTOR JETT & JONES, LLC
ARCHITECT/ ENGINEER
BLDG. PERMIT NO. 982657 PLANFILENO. . N/A
1817 ASTON AVE CARLSBAD
AZED STRUCTURAL ENGINEERINOGLE ONUFER & ASSOCIATES
SAMPLE DATA
REPORT OF
CONCRETE 0 MORTAR [I] GROUT 0 HS GROUT 0 PRISMSO OTHER
AGE
(DAYS)
7
PLACEMENT DATE 3/31/99 DATE RECEIVED IN LAB 4/2/99
SUPPLIER SUPERIOR MIX DESIGN PSI 3000
MIX NUMBER 354P MIX DESCRIPTION 5.4 SK W/ POZZ
TYPE OF CEMENT II TICKET NO. 324466
ADMIXTURE N/A SLUMP (IN.) 3 112’
MIXING TIME (MIN) 40 AIR CONTENT(%) N/A
CONC. TEMP.( OF) 68 AIR TEMP.(OF) 60
DESIGN STRENGTH (f ‘3 PSI 3000 @ 28 DAYS SAMPLES MADE BY G. TARANTINO
LOCATION OF PLACEMENT PANEL #5-
DIMENSIONS TEST AREA MAXIMUM LOAD COMPRESSIVE
LAB NO. DATE TESTED (inches) (sq. inches) (IW STRENGTH (psi)
19328 4/7/99 6x12 28.27 inR nnn 3820
LABORATORY DATA
I 28 I 19329 I 4/28/99 I 6x12 I 28.27 I 148,000 I 5240 I
I 28 1 19330 1 4/28/99 I 6x12 I 28.27 I 149,500 1 5290 I
I H I 19331 I 5/26/99 1 I I I DISC I
ALL SAMPLING AND TESTING PERFORMED IN GENERAL ACCORDANCE WITH ASTM TEST METHODS. ‘ACTUAL MEASURED AREA.
REMARKS: TWO 28 DAY TESTS COMPLY WITH PROJECT SPECIFICATIONS.
w CHECKED BY: REVIEWED BY: R. DOUGLAS PROVINS. RCE 56018
DATE: DATE: 4/--/w
(61 9)-,155800 ATUNTIC CIlY*R*HW*I *ORUNW* TESTING ENGINEERS SAN DIEGO FAX 1619) 7155810 SINDIEU)*F%UUDERDNE
REPORT OF COMPRESSION TEST
(DAYS)
7
28
28
H
PROJECT CARLSBADRESEARCHCENTER PROJECT NO. 99-076
PROJECT ADDRESS
CONTRACTOR JElT & JONES, LLC
ARCHITECT/ ENGINEER
BLDG. PERMIT NO. 982657 PLAN FILE NO. N/A
181 7 ASTON AVE CARLSBAD
AZED STRUCTURAL ENGINEEWNOGLE ONUFER & ASSOCIATES
SAMPLE DATA
REPORT OF
CONCRETE 0 MORTAR 0 GROUT 0 HS GROUT PRISMSO OTHER
STRENGTH (psi) LAB NO. DATE TESTED (inches) (sq. inches) (IW
18605 3/18/99 6x1 2 28.27 97,000 3430
18606 4/8/99 6x1 2 28.27 141,500 5010
18607 4/8/99 6x1 2 28.27 143,500 5080
18608 5/6/99 DISC
PLACEMENT DATE 311 1/99 DATE RECEIVED IN LAB 311 6/99
SUPPLIER SUPERIOR MIX DESIGN PSI 3000
MIX NUMBER 354P MIX DESCRIPTION 5 112" SACK
TYPE OF CEMENT II TICKET NO. 323920
ADMIXTURE POZZ SLUMP (IN.) 3 112
MIXING TIME (MIN) 46 AIR CONTENT(%) N/A
CONC. TEMP.( OF) N/A AIR TEMPfF) N/A
DESIGN STRENGTH (f 'J PSI 3000 @ 28 DAYS SAMPLES MADE BY G. TARANTINO
LOCATION OF PLACEMENT PRIMETEFOOTING GRADE BEAMS INTER PIERS AND GRADE BEAM SHEAR
LABORATORY DATA
I DIMENSIONS I TEST AREA I MAXIMUM LOAD I COMPRESSIVE I
ALL SAMPLING AND TESTING PERFORMED IN GENERAL ACCORDANCE WITH ASTM TEST METHODS 'ACTUAL MEASURED AREA
REMARKS: TWO 28 DAY TESTS COMPLY WITH PROJECT SPECIFICATIONS.
eD9 CHECKED BY, REVIEWED BY: R. DOUGLAS PROVINS, RCE 56018
DATE: DATE: 4% h.,
AS 5 o c I AT c 5
A KC H IT r Cf 'i
May 18,1999
Mr. Craig Connelly
Keet00 coMtrw(ion
334hchaorDrive%110
$an Marcos. CA 92069
Rr. Lot65
Mh. Framing Cbrilkatom
Craig,
This Imn is io confirin the adequacy of miscellaneous fnming items, as install&
on dx jobsite:
1. Rooms
The telephone mom waUs haw ken framed with 5/8" Type "X" Cyp.
Bd on each side of 3 518" 20 GAGl studs at 24" OC. The &phone
room ceilinpr have been him& with 518" Typc "X Gyp.Bd. on one
side of 6" 20 GAG1 ads PI 24" OC.
This framing is acreptablc.
2. -how Wind-
The vncical framing for the window so& is 6" 20GAGI studs at 16"
OC. Thc horirmral fiaming for thc window sofits is 6"
20 GAGl studs at 24" OC witb 518" Typ. "X" Gyp. Bd. on one side only.
This fnming is sc~eptabl~.
ShouM you have any comments or quosrioas pkue mnwt me at (619) 297-8066,
Thank you, NOM, [nc.
Joseph ffolapfik
International Structural Products Corp.
April 5, 1999
Craig Connelly
Keeton Construction
334 Rancheros Dr. Suite 110
San Marcos, CA. 92069
Ref. 99-01 44 Carlsbad Research Lot 65
Carlsbad. CA
Dear Craig:
I have read t..e letters that you faxe- .o me regar_--ig the number of TT braces require
for the above-mentioned project. We agree that only one TT brace is required when the
system has no uplift forces. A review of the bill of materials show that no uplift is
present, therefore we recommend that only one TT brace is used.
I like to remind you that back on 03/19/99, 1 responded to some comments the engineer
had on both our drawings and calculations. If you take a look at item 1 on the drawing
comments, you will see that he requested 2 TT braces. We have done this change. Please
confirm that he will be satisfied with just one.
Please call if you have any questions regarding this job.
Sincerely
w Salvador
Engineering Engineering Consultant
F-14 Basrett Ctr. 1328 - 6001 Gateway West - El Paro, Texas 79925
Phone (915) 532-4414 - Fax (915) 532-4728
P. 05 JAN-21-99 THU 08:03 CITY OF CARLSBAD COMM DE FAX NO. 4380894
City of Carlsbad
GERTWATF 0 F COMPLIANCE
PAYMENT QF S CHOO L FEES OR OT HER WIGAILON Thls form must be completed by the CiIy and lhe appropriate school districts and returned to the Clty prior lo
issuing a building permit. The City will not issue any bullding permlt without a completed school fee form,
Project Name.
Building Permit
Plan Check Number: 30- 2657
Project Address: 1817 &&tu, &e
A.P.N. : %It. \to- \\- 00
, Project Applicant
(Owner'@') Name(s)
Project Description: 2 7, 33 €an she\\
Residential: Number of New Dwel lina Units
Square Feet of Living Area in New Dwelling
Square Feet of Living Area in SDlJ _- -~ Second Dwelling unit: -
Res. Additions: Net Square Feet New Area -
--- Cornerc./ Ind.: Square Feet Floor Area 7-q , 37 6 nil
City Certification: Date: ..
~ICTS WITHIN -OF CAW
Carlsbad Unified School Dlstria
801 Pine Ave.
CarlsbadCA 92009 (434-0661)
Encinitas Unlon School District
Encinitas. CA 92024 (9444300)
Certification of Applicant /Owners. The per60n executing this declaration COwnef) certifies under penally of perjury that (1)
the information pmvided Is correct and true to the best of the Owner's knowledge and that Ihe Owner will file an amended cenfflcatlon of payment and pay the additional fee if Owner requests an lnmase in the number of dwelling units or square
footage after the building permit is issued or If the initlai determination of unlts or square footage is found to be incorrect.
and that (2) the Owner is the owner1 deVelOpSr of We above described prajecqs). or that the person executing this
declaration Is auhQrized to sign on behalf of the Owner.
San Marcos Unified school Dlstrid
215 Mata Way
San Marcos, CA 02069 (7352200)
Ssn Diqub Union High School District
Endnitas, CA 92024 (7538491) 101 South Ranch Santa Fe Rd 710 EneinHas Blvd.
-- @ r075 Lao Palmas Dr. - Carlsbad. CA 32009-1576 (760) 438-1181 * FAX (760) 438-0894
JAN-21-99 THU 08:03 CITY OF CARLSBAD COMM DE FAX NO. 4380894
Gov. Code Gov. Code Government
53080/65995 65970 Code 5331 1
(AB 181) (SB 201) (Mello - Roos)
P, 06
Prior Exlsting Exempt from
Mitigation Agreement fee
Note: requirements
dl /e&(
Amount Collected (b s./owQ. 10
.. . :. Total amount or (new) floor area within the building
Fee Amount per Square Foot
39, ,330
~
-Or If subject to Prior Existing Mitigation Agreement
.. For Detached Residential Dwelling Units or Attached Dwelling Units > 1600 Square Feet
Total Number of Dwelling Units
Amount per Dwelling Unit ..
Amouril Collected - -and/or-
For Atlached and Detached Dwelling Units c 160U square feet/ per dwelling (If applicable)
Total Number of Dwelling Units
Amount per Dwelling Unit
Amount Collected
., . ,.
SCHOOL DISTRICT
This is lo certlfy that the applicant listed on page 1 has paid all amounts or completed other appllcable school
mitigation determined by the information presented sbove and due to the School District. The City may issue
bulldlng permits for this project. ..
SIGNATURE OF SCHOOL DISTRICT OFFICIAL
DATE
TITLE
PHONE NUMBER
The Carlsbad Unified School District has elected lo Imposed the fees andlor anmunb hereln upon a finding that those
facilities descrlbed in the School lmpacf Mifigation Fee JuMation Siudy for Catisbad Unified School Dlsfricl, prepared by
David Taussig &Associates for the DisMct Section 88020 afthe Government Code enacted as Assembly Bill 3081, mt
forh as Chapter 549, Statutes of the State of Callfomla. requires that all sehool districts, Including the Catisbad Unified and
the Encinitas Union School Distficts. provide a written notice to the project applican! at the time of payment of the school
fees, miligation paymenls. Or Other exaction. This notice Is to advise We project applicant that the protest period regard to
such amounts or the velidity thereof in accordance wilh Section 66020 of lho Government Code and other amlicable law.
~
!
..
commences with such payment or performance of any other requirement as desuibed in Section 66020 of !he Government
Cads Addhonally. this nolice advises lhar the protest thereof must occur within 80 calendar days thereafter.
- Fa Corporation
In partners& with Gowernmcnt for Buifding Safety
DATE: NOV. 19, 1998
JURISDICTION: CARLSBAD 0 PLANREVIEWER
PLAN CHECK NO.: 98-2657 SET I11
PROJECT ADDRESS: 1819 ASTON AVE.
0 FILE
PROJECT NAME: CARLSBAD BUSINESS PARK
The plans transmitted herewith have been corrected where necessary and substantially comply
0 The plans transmitted herewith will substantially comply with the jurisdiction’s building codes
when minor deficiencies identified below are resolved and checked by building department staff.
The plans transmitted herewith have significant deficiencies identified on the enclosed check list
0 The check list transmitted herewith is for your information. The plans are being held at Esgil
The applicant‘s copy of the check list is enclosed for the jurisdiction to forward to the applicant
0 The applicant’s copy of the check list has been sent to:
with the jurisdiction’s building codes.
and should be corrected and resubmitted for a complete recheck.
Corporation until corrected plans are submitted for recheck.
contact person.
Esgil Corporation staff did not advise the applicant that the plan check has been completed.
0 Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone #:
Date contacted: (by: 1 Fax #:
Mail Telephone Fax In Person
REMARKS:
By: AliSadre Enclosures:
0 GA 0 CM 0 EJ 0 PC LOG
Esgil Corporation
trnsrnU.dot
9320 Chesapeake Drive, Suite 208 + SanDiego, California 92123 + (619) 560-1468 Fax (619) 560-1576
*/ c I
EsGil Corporation
Zn !Partnerskip with ~overnmrnt for BuiMing Safety
DATE: NOV. 9,1998
JURISDICTION: CARLSBAD
PLAN CHECK NO.: 98-2657
0 APPLICANT
0 PIAN REVIEWER
0 FILE
E!!!!W
SET I1
PROJECT ADDRESS: 1819 ASTON AVE.
PROJECT NAME: CARLSBAD BUSINESS PARK
0 The plans transmitted herewith have been corrected where necessary and substantially comply
0 The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
0 The plans transmitted herewith have significant deficiencies identied on the enclosed check list
The check list transmitted herewith is for your information. The plans are being held at Esgil
0 The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
The applicant's copy of the check list has been sent to:
with the jurisdiction's building codes.
and should be corrected and resubmitted for a complete recheck.
Corporation until corrected plans are submitted for recheck.
contact person.
Joseph Holasek c/o Nogle Onufer AIA 2398 San Diego Ave., San Diego, CA 921 10
Esgil Corporation staff did not advise the applicant that the plan check has been completed.
0 Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone #:
Date contacted: (by: 1 Fax #:
Mail Telephone Fax InPerson
REMARKS: Please see attached for remaining items from previous list.
By: AliSadre Enclosures:
Esgil Corporation 0 GA 0 CM 0 EJ 0 PC 11/12 tmsmU.dot
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (619) 560-1468 + Fax (619) 560-IS76
CARJSBAD 98-2657
NOV. 9,1998
1.
6.
8.
9.
IO.
12.
15.
19.
20.
0
0
Please make all corrections on the original tracings and submit three revisedl
signed sets of prints, to: The jurisdiction's building department.
Please provide a letter from the soils engineer confirming that the foundation
plan and specifications have been reviewed and that it has been determined that
the recommendations in the soil report are properly incorporated into the plans.
Specify diameter and embedment of power driven pins for non-bearing partitions
on 26lA8.
Please submit the name and information for the inspection agency to the building
official for approval prior to issuance of the building permit. Section 106.3.5.
Please provide structural details & references for the trash enclosure per 5/A-2.
Please delete details such as 13/S5; 4, 10, 13, 14 & 15/S6 on plans; there is no
step in this building.
Please submit diaphragm deflection calculation for longitudinal direction showing
allowable drift limits are not exceeded. Section 1628.8.2.
Please specify where details I 1 & 19/S6 are referenced on plans.
Section 1921.6.12 requires 6" O.C. max tie spacing as opposed to 16" O.C.
Please revise details 17 & 18/S6 accordingly. Please do not resubmit plans
without this correction.
To speed up the review process, note on this list (or a copy) where each correction item
has been addressed, Le., plan sheet, note or detail number, calculation page, etc.
The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake
Drive, Suite 208. San Diego, California 92123; telephone number of 619/560-1468, to
perform the plan review for your project. If you have any questions regarding these plan
review items, please contact Ali Sadre at Esgil Corporation. Thank you.
EsGil Corporation
DATE: AUG 31,1998
JURISDICTION: CARLSBAD
PLAN CHECK NO.: 98-2657
PROJECT ADDRESS: 1819 ASTON AVE.
SET I
0 FILE
PROJECT NAME: CAFUSBAD BUSINESS PARK
0 The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
0 The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
0 The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
0 The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
The applicant's copy of the check list has been sent to: Joseph Holasek c/o Nogle Onufer AIA 2398 San Diego Ave., San Diego, CA 921 10
Esgil Corporation staff did not advise the applicant that the plan check has been completed.
0 Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone #:
Date contacted: (by: 1 Fax #:
Mail Telephone Fax In Person
0 REMARKS:
By: AliSadre Enclosures:
Esgil Corporation
0 GA 0 CM 0 EJ 0 PC at20 msmtt.dot
9320 Chesapeake Drive, Suite 208 + SanDiego, California 92123 + (619) 560-1468 + Fax (619) 560-1576
CARLSBAD 98-2657
AUG 31,1998
PLAN REVIEW CORRECTION LIST
COMMERCIAL
OCCUPANCY: B/F-1 USE: OFFICE/ MANUF.
TYPE OF CONSTRUCTION: VN/SPRK. ACTUAL AREA: 29,336
ALLOWABLE FLOOR AREA: 8%~3(spr.)x2(yrd.) STORIES: ONE
HEIGHT: 25
SPRINKLERS?: Y OCCUPANT LOAD: SHELL I REMARKS:
DATE PLANS RECEIVED BY DATE PLANS RECEIVED BY
JURISDICTION: 8/18 ESGIL CORPORATION: 8/20
DATE INITIAL PLAN REVIEW PLAN REVIEWER: Ali Sadre
FOREWORD (PLEASE READ):
This plan review is limited to the technical requirements contained in the Uniform Building Code,
Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws
regulating energy conservation, noise attenuation and access for the disabled. This plan review
is based on regulations enforced by the Building Department. You may have other corrections
based on laws and ordinances enforced by the Planning Department, Engineering Department,
Fire Department or other departments. Clearance from those departments may be required prior
to the issuance of a building permit.
Code sections cited are based on the 1994 UBC.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3,
1994 Uniform Building Code, the approval of the plans does not permit the violation of any state,
county or city law.
To speed UD the recheck process. please note on this list (or a cow) where each
correction item has been addressed, Le., plan sheet number, specification section. etc.
Be sure to enclose the marked up list when you submit the revised plans.
CARJSBAD 98-2657
AUG 31,1998
1.
2.
3.
4.
5.
6.
7.
8.
9.
IO.
11.
12.
13.
14.
Please make all corrections on the original tracings and submit three new sets of
prints, to: The jurisdiction’s building department.
Provide a statement on the Title Sheet of the plans that this project shall comply
with Title 24 and 1994 UBC. UMC and UPC and 1993 NEC.
Please note on the cover sheet of plans that buildings I & II are not included .in
this permit and building 111 is.
Please justify the allowable areas on cover sheet of plans, Le., 8,000 x 3 (Sprk.)
x 1.5 (60’-Yards on two sides).
Specify on the structural specifications sheet the soil classification and the soils
expansion index. Section 1804.3.
Please provide a letter from the soils engineer confirming that the foundation
plan and specifications have been reviewed and that it has been determined that
the recommendations in the soil report are properly incorporated into the plans.
Show typical interior partition details with stud size, spacing, metal gage,
approval number, span as well as ceiling joists information and connection
details for the electrical room.
Specify embedment, size, ICBO number and manufacturer of power driven pins
for non-bearing partitions. Show end distance and spacing. Section 1701.7.
When special inspection is required, the architect or engineer of record shall
submit the name and information for the inspection agency to the building official
for approval prior to issuance of the building permit. Section 106.3.5.
Please provide structural details & references for the trash enclosure per 5/A-2.
The sheet numbers as noted on Sections referenced on floor plans per sheet A-
3.3 are incorrect.
There is no step between the building segments on grid line 3 per floor plans or
per Section plans as depicted on several foundation and roof framing details.
Please delete such details on plans.
Please reference window K per sheet A-7.3 on plans.
Please dimension the maximum span of end bays on sheet S-3.2, adjacent to
line 1, Le., not to exceed 10’ which is the limit of joist spans.
CARLSBAD 98-2657
AUG 31,1998
15.
16.
17.
18.
19.
20.
21.
b
.
Please cross reference different type panel connections on panel elevation
plans.
Please dimension the thickened pier heights on panel elevation plans in all
cases.
Please note where detail 13/S5 is referenced on plans.
Please note the cap plate thickness on detail 11/S5.
Please specify where details 4, 10, 11 & 19/S6 are referenced on plans.
Section 1921.6.12 requires 6 O.C. rnax tie spacing as opposed to 16 O.C.
Please revise details 17 & 181S6 and all other similar details.
Please revise the tie spacing on detail 16/S6 per Sections 1921.3.3.2 &
1921.3.3.4. Le., 2 from each end, d/4 where shear ties are required and d/2
where they are not.
To speed up the review process, note on this list (or a copy) where each correction item
has been addressed, Le., plan sheet, note or detail number, calculation page, etc.
The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake
Drive, Suite 208, San Diego, California 92123; telephone number of 619/560-1468. to
perform the plan review for your project. If you have any questions regarding these plan
review items, please contact Alf Sadre at Esgil Corporation. Thank you.
CARLSBAD 98-2657
AUG 31,1998
VALUATION AND PLAN CHECK FEE
TOTAL VALUE
J URl SDl CTl ON : CARLSBAD PLAN CHECK NO.: 98-2657
815,541
PREPARED BY: Ali Sadre DATE: AUG 31,1998
BUILDING ADDRESS: 1819 ASTON AVE.
BUILDING OCCUPANCY: B/F1 TYPE OF CONSTRUCTION: VN
Sheet I of 1
macvalue.dw 5196
z .
The item you have submitted for review has been approved. The approval is based on plans, information and/or specifications provided in your submittal: therefore any changes to these items after this date, including field modifications, must be reviewed by this office to insure continued conformance with applicable codes. Please review carefully all comments attached, as failure to comply with instructions in this report can result in suspension of permit to build.
A Right-of-way permit is required prior to
construction of the following improvements:
Please s attached report of deficiencies
marked tth 0. M e necessaty corrections to plans
or spec 0 or compliance with applicable
codes and standards. Submit corrected plans and/or specifications to this office for review.
QbDate: (z$/!? $J
By: Date:
By: Date:
Right-of-way Permit Application
Right-of-way Permit Submittal Checklist and Information Sheet
Recordation: hy 101, I987
C'i-$y-zZcl, 4 'I5 4 Carlsbad Tract:
A4 Sewer Fee Information Sheet
LWSP- " no" -7 -009-?576 - (619) 438-1161 - FAX (619) 438-0894 1
@
r
BUILDING PLANCHECK CHECKLIST
SITE PLAN
Provide a fully dimensioned site plan drawn to scale. Show:
North Arrow D. Property Lines
Existing & Proposed Structures E. Easements
Existing Street Improvements F. Right-of-Way'Width &
-JLC be '*-pw st+. R+~.*A SPt ir ?., ~ik &le
Showonsite plan: pcr*:t\ GH redl tr0 4e r Md.
.rik ,,,b &its\ G. Drivewaywidths
Adjacent Streets
6r 1'4~9 0
A. Drainage Patterns
1. Building pad surface drainage must maintain a minimum slope of one
2. ADD THE FOLLOWING NOTE: "Finish grade will provide a minimum positive
B. Existing & Proposed Slopes and Topography
percent towards an adjoining street or an approved drainage course.
drainage of 2% to swale 5' away from building."
0 0 3. Include on title sheet: J 0
A. Site address
B. Assessor's Parcel Number
C. Legal Description
For commerciallindustrial buildings and tenant improvement projects, include:
total building square footage with the square footage for each different use,
existing sewer permits showing square footage of different uses (manufacturing,
warehouse, office, etc.) previously approved.
EXISTING PERMIT NUMBER DESCRIPTION
DISCRETIONARY APPROVAL COMPLIANCE
4a. Project does not comply with the following Engineering Conditions of approval for No 0
0 0 0 4b. All conditions are in compliance. Date:
2 \VlbP~awBrURNQmDwoc~---t Frncmmr R." -7
BUILDING PLANCHECK CHECKLIST
DEDICATION REQUIREMENTS ISTJ ~NDJ 3.~0~
0 0 0 5. Dedication for all street Rights-of-way adjacent to the building site and any storm
drain or utility easements on the building site is required for all new buildings and
for remodels with a value at or exceeding $ , pursuant to Carlsbad
Municipal Code Section 18.40.030.
Dedication required as follows:
Dedication required. Please have a registered Civil Engineer or Land Surveyor prepare the appropriate legal description together with an 8 %” x 11” plat map and submit with a title report. All easement documents must be approved and signed by owner(s) prior to issuance of Building Permit. Attached please find an application form and submittal checklist for the dedication process. Submit the completed application form with the required checklist items and fees to the Engineering Department in person. Applications be accept by mail or fax.
Dedication completed by: Date:
IMPROVEMENT REQUIREMENTS
6a. All needed public improvements upon and adjacent to the building site must be constructed at time of building construction whenever the value of the construction exceeds $ , pursuant to Carlsbad Municipal Code Section 18.40.040.
Public improvements required as follows:
0 0 0
Attached please find an application form and submittal checklist for the public improvement requirements. A registered Civil Engineer must prepare the appropriate improvement plans and submit them together with the requirements on the attached checklist to the Engineering Department through a separate plan check process. The completed application form and the requirements on the checklist must be submitted in person. Applications by mail or fax are not accepted. Improvement plans must be approved, appropriate securities posted and fees paid prior to issuance of building permit.
Improvement Plans signed by: Date:
0 0 0 6b. Construction of the public improvements may be deferred pursuant to Carlsbad
Municipal Code Section 18.40. Please submit a recent property title report or
we may prepare the necessary Future Improvement Agreement. This agreement
must be signed, notarized and approved by the City prior to issuance of a
Building permit.
Future public improvements required as follows:
current grant deed on the property and processing fee of $ so
1
7 - \.
1"
0
0
0
0
a
0
0
0
2w
0
0
0
0
0
0
0
P
3" 0
0
0
0
0
0
0
0
BUILDING PLANCHECK CHECKLIST
6c. Enclosed please find your Future Improvement Agreement.
agreement signed and notarized to the Engineering Department.
Future Improvement Agreement completed by:
Date:
Please return
6d. No Public Improvements required. SPECIAL NOTE: Damaaed or defective
irnorovements found adiacent to buildina site must be reoaired to the satisfaction
of the Citv lnsoector orior to occuoancy.
GRADING PERMIT REQUIREMFNTS
The conditions that invoke the need for a grading permit are found in Section
11.06.030 of the Municipal Code.
7a. Inadequate information available on Site Plan to make a determination on grading
requirements. lndude accurate grading quantifies (cut, fill import, export).
7b. Grading Permit required. A separate grading plan prepared by a registered Civil
Engineer must be submitted together with the completed application form
attached. The Gradina Permit must be issued and rouah aradinq
aoDroval obtained Drior to issuance of a Buildina Permit.
NOTE:
Grading Inspector sign off by:
if a grading permit is not required.)
Date:
7c. Graded Pad Certification required. (Note: Pad certification may be required even
7d.NO Grading Permit required.
7e.lf grading is not required, write 'No Grading" on plot plan.
MISCELLANEOUS PERMITS
8. A RIGHT-OF-WAY PERMIT is required to do work in City Right-of-way and/or
private work adjacent to the public Right-of-way. Types of work include, but are
not limited to: street improvements, tree trimming, driveway construction, tieing
into public storm drain, sewer and water utilities.
Right-of-way permit required for:
4
BUILDING PLANCHECK CHECKLIST
1 SI/ 2"d" 3w
0 0 0 9. A SEWER PERMIT is required concurrent with the building permit issuance. The
fee is noted in the fees section on the following page.
CI R 0 IO. INDUSTRIAL WASTE PERMIT If your facility is located in the City of Carlsbad
sewer service area, you need to contact the Carlsbad Municipal Water District,
located at 5950 El Camino Real, Carlsbad, CA 92008. District personnel can
provide forms and assistance, and will check to see if your business enterprise is
on the EWA Exempt List. You may telephone (760) 438-2722, extension 153, for
assistance.
Industrial Waste permit accepted by:
Date:
0 0 0 11. NPDES PERMIT
Complies with the City's requirements of the National Pollutant Discharge
Elimination System (NPDES) permit. The applicant shall provide best
management practices to reduce surface pollutants to an acceptable level prior to
discharge to sensitive areas. Plans for such improvements shall be approved by
the City Engineer prior to issuance of grading or building permit, whichever
occurs Irst.
12. !/ Required fees are attached
0 No fees required
c/o 0
0 0 0 13. Additional Comments:
ENGINEERING DEPARTMENT
FEE CALCULATION WORKSHEET
0
0
Address: 819 As +Oh Ad. Bldg. Permit No. CB 98 - 2657
Prepared by: 9. R;C Date: )2/9ks Checked by: Date:
EDU CALCULATIONS: List types and square footages for all uses.
Types of Use: i,,m!bk-e (Sk[$q. Ft./Units: ?q, 336
Types of Use: Sq. Ft./Units: EDU's:
ADT CALCULATIONS: List types and square footages for all uses.
Estimate based on unconfirmed information from applicant.
Calculation based on building plancheck plan submittal.
EDU's: 5. 37
Types of Use: Wueiwe (yk( I) Sq. Ft./Units: ,291 336 ADT'S: I Y 6211
Types of Use: Sq. Ft./Units: ADT's:
FEES REWIR
WITHIN CFD:
@ PARK-IN-LIEU FEE
Y ES (no bridge & thoroughfare fee in District #1, reduced Traffic Impact Feel 0 NO
PARK AREA & #:
FEEIUNIT: X NO. UNITS =$ A
2. TRAFFIC IMPACT FEE
ADT'dUNITS: I qd X FEE/ADT: 22 =$ 36 c/
d
dBRiDGE AND THOROUGHFARE FEE (DiST. #i j DiST. #2 - DIST. #3 - 1
ADT'slUNITS: X FEE/ADT: =$ .@
d'FACiLiTiES MANAGEMENT FEE ZONE: 5
UNIT/SQ.FT.: 29; 33b X FEE/SQ.FT./UNIT: 4oa =$ ! 117 3 4
5. SEWER FEE
PERMIT No. S698-2bl
EDU's: 5.27 x FEEIEDU: I!S54 - -8 10,883
EDU's: 5.37 X FEEIEDU: lp7O =$ 6.28 j
BENEFIT AREA: f DRAINAGE BASIN:
66. SEWER LATERAL ($2,5001 =$ /la 8/7. DRAINAGE FEES PLDA HIGH /LOW
ACRES X FEE/AC:
TOTAL OF ABOVE FEES*: $
*NOTE: This calculation sheet is NOT a complete list of all fees which may be due.
Dedications and Improvements may also be required with Building Permits.
31
P-VEE CUCUUTK)N WORKSHEET REV 7/13/08
PLANNING DEPARTMENT
BUILDING PLAN CHECK REVIEW CHECKLIST
Plan Chevo Address I814 A &Dn f+?.
Planner Phone (61 9) 438-1 161, extension 4%g I APN: 212 -\a0 - I1 mu, -
e roject8ensity: DUIAC
Remaining net dev acres:
Type of Project & Use: ma/ H"~~~gCtu
Zoning: &f General Plan: p 1 Facilities Management Zone: 5
CFD finlout) #-Date of participation: Circle One
(For non-residential development: Type of land used created by
this permit: )
Leaend: Item Complete 0 Item Incomplete - Needs your action
0 0 Environmental Review Required: YES - NO & TYPE
DATE OF COMPLETION:
Compliance with conditions of approval? If not, state conditions which require action.
Conditions of Approval: fl 0 0 Discretionary Action Required: YES NO TYPE
APPROVALIRESO. NO. DATE
PROJECT NO.
OTHER RELATED CASES:
Compliance with conditions or approval? If not, state conditions which require action.
Conditions of Approval:
-
Coastal Zone AssessmentlCompliance
Project site located in Coastal Zone? YES- NOX
CA Coastal Commission Authority? YES - - NO
If California Coastal Commission Authority: Contact them at - 31 11 Camino Del Rio North, Suite
200, San Diego CA 92108-1725; (619) 521-8036
Determine status (Coastal Permit Required or Exempt):
If NO, complete Coastal Permit Determination Form now.
Coastal Permit Determination Log #:
Follow-Up Actions:
1) Stamp Building Plans as "Exempt" or "Coastal Permit Required" (at minimum
Floor Plans).
2) Complete Coastal Permit Determination Log as needed.
Coastal Permit Determination Form already completed? YES - NO-
4300
>( - NO lnclusionary Housing Fee required: YES -
Data Entry Completed? YES ~
(Effective date of lnclusionary Housing Ordinance ~ May 21, 1993.)
- NO
[Enter CB I: UACT; NEXT12 Construct housing Y/N; Enter Fee Amount [See fee schedule for amount): Return1
Site Plan:
1. Provide a fully dimensional site plan drawn to scale. Show: North arrow,
property lines, easements, existing and proposed structures, streets, existing
street improvements, right-of-way width, dimensional setbacks and existing
topographical lines. See -4
2. Provide legal description of property and assessor’s parcel number.
Zoning:
1. Setbacks:
Front: cAk?y? Required 36 Shown
Interior Side: Required -6- Shown
Street Side: && Required 2/0 Shown
Rear: Required , Shown
Shown Front: Required
Interior Side: Required Shown
Street Side: Required Shown
Rear: Required Shown
Structure separation: Required Shown
2. Accessory structure setbacks: rvb
3. Lot Coverage:
4. Height: Required 35 ‘w Shown 2s ‘
OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER dL, DATE 2- [b-y?
98299 . Bureau of Prevention rlsbad City o f Ca
Fire Department
Plan Review: Requirements Category: Building Plan Check
Date of Report: Tuesday, August 25, 1998
Contact Name Nogle Onuffer ASSOC.
Reviewed by:
Address 2398 San Diego Avenue
City, State San Diego CA92110
'EIp"6g. flept. No. tBS%=B657
Job Name Lot65- 1819
Planning No.
Job Address 1819 Aston Ste. or Bldg. No.
Approved - The item you have submitted for review has been approved. The approval is
based on plans; information and/or specifications provided in your submittal;
therefore any changes to these items after this date, including field modifica-
tions, must be reviewed by this office to insure continued conformance with
applicable codes. Please review carefully all comments attached, as failure
to comply with instructions in this report can resuit in suspension of permit to
construct or install improvements.
0 Disapproved - Please see the attached report of deficiencies. Please make corrections to
plans or specifications necessary to indicate compliance with applicable
codes and standards. Submit corrected plans and/or specifications to this
office for review.
For Fire Department Use Only
Review 1 st 2nd 3rd
CFDJoW 98299 File#
Other Agency ID
2560 Orion Way - Carlsbad, California 92008 (619) 931-2121
mLa!c Lo~#65 CMtI&%
OP
DATE s,2&,-=
% . i% - ZED Structurah-Engineers i
7920 Miramar Ftd 1127 sgn 110 cov M
(619) 549-6996 8-
San Deigo Ca 92126
~ CONTENTS : _________- _____-_--- j DESIGN LOADS ..................................... D1 --> D2
COLUMN DESIGN C1 --> C1 .. WALL DESIGN ....................................... W1 --> W6
F6OTINGS ......................................... F1 --> F2
LAT'ERAL ANALYSIS ................................. L1 -->
i ROOF FRAMING ..................................... R1 --> WC'f i i ....................................
: .*
SPECIAL STRUCTURAL DESIGN ........................ SS1 --> SS i)
GOVERNING CODES : _________________ ______-_-___-____
UNIFORM BUILDING CODE ............................. 1994
AMERICAN INSTITUTE OF STEEL CONSTRUCTORS MANUAL ... 9TH EDITION
AMERICAN CONCRETE INSTITUTE (318-83) .............. 1983
DESIGN CRITEREA : - ________---__---_ _____-----
1- SEISMIC ZONE :4 . "BIV 2- WIND EXPOSURE
3- MAXIMUM ALLOWABLE SOIL PRESSURE : 2,000 PSF CONT FTG
2,500 PSF PAD FTG
4- MATERIALS & DESIGN STRESSES (U.0.N) :
- FRAMING LUMBER : DOUGLAS-FIR LARCH (NORTH) - BOLTED CONNECTIONS : STEEL FRAMING : A325-N
- STRUCTURAL STEEL : A36 (FY 36 KSI) - REINFORCING STEEL : #4 & SMALLER ASTM 615 (FY 40 KSI)
- CONCRETE : SLAB ON GRADE : (F'C = 2,500 PSI)
WOOD FRAMING : A307
#5 & LARGER ASTM 615 (FY = 60 KSI)
ALL OTHERS : (F'C = 3,000 PSI)
5- BASIC LIVE LOADS :
ROOF
FLOORS : BALCONIES
CORRIDORS
LIVING
SPECIAL
.
.-
LOT # /S
A-ZED structunt wi consultrnts BHEET NO 01 OF-
CALCULATCDBV AR Q DATE 5 -%-. 70 7275 Rock Canyon Dr.
San Dlego, CA 92126 CHECKED BY DATE - - (619) 549-8996
lCALE
.,
:,, ,... , ., .! .I .!...
i
b7 #cg
A-ZED struccunl EW~G consultlnrs SHEET NO Dz OF
7275 Rock Canyon Dr. CALCULATED Bv && 0 DATE 5-26-90
San Diego, CA 92126 CHCCKED BV DATE (619) (549-6996
&3T /t65
WEE7 NO d. OF
A? o DATE 5-26-98 -. A-ZED Shuch~nl Em C&hb
cALCULATCDBV 7275 Rock Canyon Dr. - DATE San Dlego, CA 92126 1619) 649-8896 CHECKED BY
JDO-SgQC' &7 w 65
A-ZED stmaonl ~mhri& cofisultl~s OHEET NO d of
7275 Rock CSnyOn Dr. CALCULATEDOV RAO OATE 5 - Zb-98
San Dlego, CA 92126 CHECKED OV - DATE (619) 649-8988
. ....... . ....... ... .. .,...... ......
Jon 9gc-v Lor 6s-
A-ZED struehlnl ~t~~i-&j conrultm(l *HCCT NO 4 OF
7275 Rock Canyon Dr.
(619) 549-8996
CALCULATCD Bv.- DATC s - 26- 4A
San Diego. CA 92126 CHCCKED BY ___ DATE
I Tilt-Up Wall Panel Design L -
I General Information h ~ . . . . . -. . . .. . . . . -. . I
Description TYPICAL PANEL AT FRONT (I BACK OF BLDG. SUPPORTING
PURLIN LOADS
Clear Height 23.000 R fc 3.000.0 pgf Seismic Zone 4 Parapet Height 0.000 It FY 80,000.0 psi Min Vert Steel % 0.0020 Thickness 8.750 in Phi 0.900 Min Horir Steel % 0.0012 Bar Size 5 Width 12.000 in Ease Fixity 0% Bar Spacing 14.000 in Parapet Does Not Reduce Moma Wall Seismic Factor 0.3000 Bar Depth 3.000 in Parapet Seismic Factor 0.3000
Max Den. Ratio 150.0 LL 6 ST Not Combined Concrete Weight . 145.00 pcf Using: UBC Sac. 1914.0 method ... Exact, Non-iterated 1 Loads c
Lateral Loads Vertical Loads Wind Load PSf Uniform DL 390.00 Wff Uniform LL 800.00 WR
Point Load ibs ... eccentricity 5.500 in ... height ll ... load type Seismic Concentric DL WR Concentric LL #/R
Lateral Load Wll ... distance to top R
... distance to bot ff Seismic "I" Magnifler 1.000 ... load type Seismic Wind "I" Magnifler 1.000
. ...
I Wall Analysis I
For Factored Load Strassq For Service Load Deflections Seismic w S&nk Basic Den wlo P-Delta 0.239 0.000 in 0.171 0.000 in Basic M wlo P-Delta 28,700.4 0.0 in# 20,500.3 0.0 in#
Moment Excess of Mcr 17,713.1 0.0 in# 0.0 17.713.1 ind Max. P-Delta Deflection 7.522 0.000 in 0.171 0.000 in Max P-Delta Moment 42,688.7 0.0 in# 22,939.8 42,888.7 in#
Maximum Allow Vertical Bar Spacing 18.000 in Parapet Ear Spacing Raq'd : SEISMIC 18.000 in Maximum Allow Horizontal Bar Spacing 18.000 in Parapet Bar Spacing Req'd : WIND 18.0M) in
., Wall Design OK
23.00R clear height, O.OOR parapet, 8.75111 thick with W bars at 14.00in on center, d= 3.00in. fc 3,000.0ps
Using: UBC Sec. 1914.0 meth od... Exact, Non-Iterated
Factored Load Bending : Seismic Load Governs Service Load Deflaction : Seismic Load Governs
Maximum iterated Moment : Mu 42,888.75 in4 Maximum Iterated Deflection 0.171 in
Moment Capacity 42.777.50 in# Deflection Limit 1.840 in
Mn Phi : Moment Capacity 42,777.50 In# 41.919.82 In# Selmmlo Wind
Applied: Mu @ Mid-Span 42,668.75 In-# 0.00 In# Applied: Mu @ Top of Wail 7,823.00 In4 0.00 in# I Max iterated Service Load Deflection 0.17 in
1,814 : 1 ~ctua~ Deflection Ratio 0.00 in
0 :1
Actual Reinforcing Percentage 0.0074 _- 0.0074 I Allowable Max. Reinf. Percent = 0.5 Rho Bai 0.0128 0.0128 I Actual Axial Stress : (Pw + Po )I Ag
Allowable Mal Stress = 0.4 fm
18.39 psi
120.00 OS1
18.39 psi
120.00 DSi
(e) 198397 ENERCALC c:bnerakWOJ9#la.w KW-Cu5UB310, vS.O.2, lJm19B7
Tma:CulSbadL~Blda 3 J0bxgBM)s o.(lnr: ZWDoudar Me:
MSCIiptton Lwplcal Conc Panel al the Fmnt 6 Back of 8Wg
Bcop.:
_- lilt-Up Wall Panel Design -2
I Analysis Data 1
E 3,122,018.6 psi n = Es'l Ec 9.29
Fr = 273.86 psi
Ht I Thk Ratio 40.89
Values for Mn Calculatl on... As:efk [Pu:tot + AsFyFy
a : (AsFy + Pu)1(.85 Ic b)
c = a 1.85
igross 307.547 In4 lcracked 16.06 In4
I-eff (ACI methods only) 0.00 In4
Phi: Capacity Reductlon 0.900 Mn = As:eff FY (d - ai21 47.530.56 in#
0.684 In
Seismlc
0.297 in
0.582 In
Sgross 91.125 in3 Mcr = S Fr 24.955.6 in# Rho: Bar Reint Pct 0.0214
wind 0.289 in
0.587 In
0.667 in 307.55 in4
15.80 in4 0.00 In4 0.900
48,577.36 in-# .. 1 Additional Value8 J
Wind Lords used for InIlySl8 Factored Lords Wall Weight 81.582 psf Seismic
Wall Wt Wail Seismic Factor 24.469 psf Applied Axial Load 548.00 409.50 Wft
Service Applied Axial Load 390.00 Wfl Total Lateral Loads 1.859.16 1,394.37WR
Service Wt bp Max Mom
Wail Wt Parapet Seismic Factor 24.469 psf Lateral Wall Weight 1,313.18 984.87 Wft
937.97 Wft
Total SelviceAxial Loads 1,327.97 #/I?
LAC1 Factors (per ACI, applied Internally to entered loads) J ACI 9-1 a 9-2 DL 1.400 ACI 9-2 Group Factor 0.750 UBC 1921.2.7 "1.4" Factor 1.400
ACI 9-1 a 9-2 LL 1.700 ACI 9-3 Dead Load Factor 0.900 UBC 1921 2.7 "0.V Factor 0.900
ACI 0-1 a 9-2 ST 1 700 ACI 9-3 Short Term Factor 1.300 .... seismic = ST * : 1.100
i
(c) 1983-97 ENERCALC c:bnemakWX9#la.ecw KW-0802610. V5.0.2, 1Jun-1997
LGenerai information I
Description CONC. PANEL AT HIGH POINT NEAR RIDGE W/ NO
GIRDER LOADING
Clear Height Parapet Height Thickness Bar Size
Bar Spacing Bar Depth Max Den. Ratio
Concrete Weight
24.000 fl rc 3,000.0 psi Seismic Zone 4
80,000.0 61 Min Veri Steal % 0.0020
0.900 Min Horiz Steel % 0.0012
14.000 in Parapet Weight Counteracts Midd Wall Seismic Factor 0.3000 3.000 in Parapet Seismic Factor 0.3000
150.0 LL 6. ST Not Combined 145.00 pcf
1.000 fl FY 8.750 in Phi 5 Width 12.000 in Base Fixity 0%
Using: UBC Sec. 1914.0 method ... Exact, Non-Iterated
~~~~~~~~~ ~~~~~~ ~
Lateral Loads Vertkd LOd8 Wind Load PSf Uniform DL Wfl
Uniform LL fiwt Point Load ibs ... eccentricity in .,
... height fl ... load type Seismic Concentric DL Wfl
Lateral Load #M ... distance to top fl ... distance to bot fl Seismic "I" Magnifier 1.000 ... load type Seismic Wind "I" Magnifler 1.000
WR . .. Concentric LL
I Wail Analysis 1
For Factored Load Stress es For Sarvlce Load Deflect ions !Y!i& 0 000 in m 0 189 Seismic w Basic Defl w/o P-Delta 0.285 O.OO0 in ~~~~~~ ~ ~ Basic M w/o P-Delta 29,494.8 0.0 inf 21,087.8 0.0 inf Moment Excess of Mcr 18.659.2 0.0 in4 0.0 18,659.2 in#
Max. P-Delta Deflection 8.185 0.000 in 0.189 O.OO0 in Max P-Delta Moment 41.814.8 0.0 I& 23,103.4 41,814.8 Inf
Maximum Allow Vertical Bar Spacing 98.000 in Parapet Bar Spacing Raq'd : SEISMIC 18.000 in
Maximum Allow Horizontal Bar Spacing 18.OOO in Parapet Bar Spacing Req'd : WIND 18.000 in
Wail Design OK
24.00fl ~. clear height, I .OOfl parapet, 8.75111 thick with #5 bars at 14.00ln on center, d= 3.00ln, fc = 3,000.0ps
Uslng: UBC Sec. 1914.0 meth od... Exact, Non-Iterated
Factored L6ad Bending : Seismic Load Governs Service Load Deflection : Seismic Load Governs
Maximum iterated Moment : Mu 41.814.80 in4 Maxlmum iterated Deflection 0.18s in
Moment Capacity 42,08837 inf Deflection Limit 1.020 in
Mn Phi : Moment Capacity
Applied: Mu @ Mid-Span
Applied: Mu @ Top of Wail
Max Iterated Service Load Deflection Actual Deflection Ratlo
Selrmlc 42,08837 In#
41,614.80 In#
205.54 In#
0.19 in
1,521 : 1 I Actual Reinforcing Percentage 0.0074 Allowable Max. Reinf. Perwnt = 0.5 Rho Bal 0.0128 - -
Wind 41,397.81 In-#
0.00 in#
0.00 In#
0.00 in
0 :1
0.0074
0.0128
Actual Axial Stress : (Pw + Po ) I Ag
Allowable Axial Stress = 0.4 fm
13.09 psi 13.06 psi
120.00 psi 120.00 psi
c:bnereak\BB00911b KW~2U10, v5.0.2. 1 Jun-I997 (c) 198397 ENERCALC
, ..
I Tilt-Up Wall Panel Design
LAnalysis Data L
E 3,122,018.6 psi Sgross 91.125 In3 n=EslEc 9.29 Mcr = S Fr 24,955.6 in4
Fr = 273.86 psi Rho: Bar Reinf Pct 0.0214 lit I Thk Ratio 42.87
Values for Mn Calculatlon ... Selsmic Wlnd As:eff= [Pu:tot + AsFyyFy 0.290 In 0.284 in
a : (AsFy + Pu)/(.85Cc b) 0.570 In 0.557 in c = a I .85 0.870 in 0.858 in 1gross 307.547 In4 307.55 in4
lcracked 15.85 In4 15.84 in4 I-eff (ACi methods only) 0.00 in4 0.00 In4
Mn = As:eff Fy (d - Sn) 46.702.03 In4 45.997.57 in4
Phi: Capacity Reduction 0.900 0.900
[Additional Values 1
Well Weight 81.582 psi Well Wt Wall Seismic Factor 24.489 psf Applled Axial Load 0.00 0.00 Wft
-- n Loads used for anrlysla Factored Loads
Wall Wt Parapet Selsmlc Factor 24.469 psf Lateral Wall Weight 1.484.44 1,113.33 Wft Servlce Applled Axlal Load 0.00 Ufl Totel Lateral Loads 1.484.44 1.113.33Wft Servlce Wt @ Max Mom
Total Servlce Axlal Loads
1.060.31 Wfl
1,060.31 XM
LAC1 Factors (per ACI, applled Internally to entered loads) L
ACi 9-1 8 9-2 DL 1.400 ACI 9-2 Qroup Factor 0.750 UBC 1921.2.7"1.4" Factor 1.400
ACI 9-1 8 9-2 LL 1.700 ACi 9-3 Dead Load Factor 0.900 UBC 1921.2.7 "0.9 Factor 0.900
ACI 9-1 a 9-2 ST 1.700 ACi g-3 Short Term Factor 1.300
.... selsmic- ST' : 1.100
i
scop.: ..
Tilt-UD Wall Panel Deslan P- tb
1 General Information
Description CONC. PANEL AT HIGH POINT NEAR RIDGE WITH
GIRDER LOADING
I
Clear Height
Parapet Height Thickness
Bar Size Bar Spacing
Bar Depth
Max Defl. Ratio
Concrete Weight
24.000 ff rc 3,000.0 psi Seismic Zone 4
1.000 ff FY 60,000.0 psi Min Vert Steel % 0.0020 6.750 in Phi 0.900 Min Horir Steel % 0.0012
8.000 in Parapet Weight Counteracts Midd Wall Saismic Factor 0.3000 4.000 In Parapet Seismic Factor 0.3000
150.0 LL & ST Not Combined 145.00 DCf
5 Width 12.000 in Base Fixity 0%
Using: UBC Sec. 1914.0 m&xd ... Exact, Non-Iterated - - I Loads 1
Lateral Loads Verticri Load8
Wind Load PSf Uniform DL 5,800.00 WR Uniform LL 5.800.00 Wff
Point Load ibs ... eccentricity 2.000 in ..:height R ... load type Seismic Concentric DL WR
Concentric LL WR Lateral Load WR ... distance to top R ... distance to bot ff Seismic "I" Magnifler 1.000 ... load type Seismic Wind "I" Magnifier 1.000
For Factored Load Strasrea For Service Load DaflectipOl
Basic Defl wlo P-Delta Basic M w/o P-Delta
&&& !!Y!!la 0.353 0.000 in 0.252 0.000 in 38.150.5 0.0 in# 27.250.4 0.0 in#
Ym
.~ ~ Moment Excess of Mcr 77: 186.6 0.0 in# 15,322.3 77.18i.6 in# Max. P-Delta Deflection 6.701 0.000 in 1.253 0.OOO in
Max P-Delta Moment 102,142.2 0.0 in3. 40,277.9 102,142.2 In4
Maximum Allow Velticel Bar Spacing 18.OOO in Parapet Bar Spacfng Req'd : SEISMIC 18.OOO in
Maxlmum Allow Horizontal Bar Spacing 18.000 in Parapet Bar Spacing Req'd : WIND 18.000 In
Wall Design OM
24.0M1 clear height. I .OOfl parapet, 6.75in thick wHh #5 bars at 8.00in on center, d= 4.001n. fc = 3,000.Ops1,
Using: UBC Sec. 1914.0 method ... Exact. Non-Iterated
Factored Load Bending : Seismic Load Govern¶ Service Load Deflection : Seismic Load Governs
Maximum iterated Moment : Mu 102,142.18 in4 Maximum iteratad Deflaction 1.253 in
Moment Capacity 108.928.43 in# Deflection Limn 1.920 in
Mn Phi : Moment Capacity
Applied: Mu @ MidSpen
Applied: Mu @ Top of Wall
Selamlc Wind 106.928.43 In-# 104,198.87 In#
102,142.18 In-# 0.00 In-# 32,885.52 in# 0.00 in#
Max iterated Servlce Load Deflection
Actual Reinforcing Percentage 0.0097 Allowable Max. Reinf. Percent = 0.5 Rho Bai 0.0128
1.25 in
Actual Deflection Ratio 230 :I
Actual Axial Stress : (Pw + Po )I Ag
Allowable Axlei Stress = 0.4 fm I 84.70 psi
120.00 mi
0.00 in
0 :1
0.0097 0.0128
84.70 psl 120.00 DSl
(c) 1-97 ENERCALC c:brmmkW8fY3W IC KW-0802810. V5.0.2.1J1#?-1007
.-
Ab
”_ TM:C.~~~~LLB~ 3 JOb*WLWB Dsgnr: WDoudar Ma:
scope :
a-bn : Conc Panel d Hbh Pdnt nuar RMo
L -2
I
Tilt-Up Wall Panel Design
I Analysis Data -
E 3.122.018 8 PSI Sgross 91 125 in3 n = Es I Ec 9 29 Mcr = S Fr 24,955 8 In-# Fr = 273 88 psi Rho Bar Ralnf Pct 0 0214 Ht I Thk Ratlo 42 87
.” Vafcrcm for Mn Calculation ... As:eff= [Pu:tot + AsFyyFy Seismic
0.825 in Wind 0.585 In
a : [AsFy + Pu)/(.85 fc bj 1.147 in
c = a I .85 1.442 In 1.350 in
lgross 307.547 In4 307.55 in4
hacked 49.99 In4 48.01 in4
I-aff (ACI methods only) 0.00 In4 0.00 in4
Mn = As:eff Fy (d - nL?) 121,031.59 in4 115,775.53 In-#
1.228 In
Phl: Capacity Reduction 0.900 0.900
1 Addltlonal Values I
Factored Lords Loads used for malyrls
Wall Weight 81 562 psf Seismic Wind
Wall Wt Wall Selsrnlc Factor 24 489 DSf Aoolled Axial Load 8 120 00 8 090 00 XIR ~. ~~ ~~ ~~~~ Wall Wt Parapet Selsmlc Factor 24.489 psf Lbiaral Wall Weight 1,484.44 1,113.33 XM Service Applied Mal Load 5.800.00 Ufl Total Lateral Loads 9,804.43 7,203.33 Ufl Service Wt @ Max Morn Total Service Axlal Loads 1.080.31 #fl
8.880.31 Wfl
ACI 9-1 a 9.2 DL 1.400 ACI 9-2 Qroup Factor 0.750 UBC 1921.2.7 “1.4” Factor 1.400
ACI 9-1 8 9-2 LL 1.700 ACI 9-3 Dead Load Factor 0.900 UBC 1921.2.7 “0.9‘ Factor 0.900
ACI 9-1 8 9-2 ST 1.700 ACI 9-3 Short Term Factor 1.300 .... selsrnlc=ST*: 1.100
(e) 193397 ENERCALC c:-\gBM)(M10 KWM#~BIO. v5.o.z. t~un-im7
Lo7 i46S
A-ZED srmctunl E& cauulwm WECT NO. PI OF
7275 Rock Canyon Dr. CALCULATEDBV Ah /3 DATE 5 - tb-90
CHECKED BY - DATE San Dlego. CA 92128
(819) 549-6998
1,
...I... ....,...... .,,..... ! ,... .,. . . ,. , . , ..,.. . ,.. .
JoB3c k7 #d5
A-ZED stn~unl wG c-tt~mm WCCT NO A or
CALCULATED BY #no DATE 4-26-78 7275 Rock Canyon Dr. .- - DATE Sen Diego. CA 92126 CHECKED BY (819) 549-8998
.t .... *. ..... ... ..
....... I ......... ! I1 ........ I .......... j ....
r
......... !i I ...... .'....... s ....
i
I
.. .- lor cl c
01 - A-ZED Sauctunl LIW~GC-
7275 Rock Canyon Dr. San Dlego, CA 92128
CALCULATED BY- DATE B - 27 %
CHECICD BY DATC
ICALE
(819) 549-8998
--
JOI Lir 65
A-ZED strachlnl EW~W~GCOWUME ancet NO. Of
7275 Rock Canyon Dr.
I619\ 549-6996
CALCULATED rr- DATE 4- 27 - 78
Sen Dlego, CA 92126 CHECUED IV DATE
.. ... , ... .....,. ... , ........ ,
.- -, ICALE
..... .... ..i 8 ....* .....
................... ..... ......... ........ ....
. ., .............. ,..... .. .. ........ A,.; ..... ..... . rfi.+yc; ......... we,.. .>..#...!. ............ ..i ................. ....,... .... ....... ........ ...... ....... t .....,.... ,- ._ :
....... ..
-.
i i
~~
...
JOB 98d9oR 62' 6F
CALCULATEDIV 440 DATE 3 -r-38 A-ZED strurmnl EW- condm 8HECT NO L2A.F
7275 Rock Canyon Dr. - DATE San Dlego. CA 92126 (619) 549-6996 CHECKED BV
..
*.
JOB 9800 9 L.7 6s
CALCULATED81 A A 0 DATE r- f-- 325
A-ZED S-A E- catnrlmn WEIT NO. "' OF
7275 Rock Canyon Dr.
San Dlago, CA 92128 CHECKED DV - DATE (819) 549-8996
i
..
,.
.. .
i
” LoT 6C
OHLET NO OF
CALCULATED *V- DATE 5
CUECKED IV
-27-48 A-ZED stnrchlnl ~~~consuitmm
7275 Rock Canyon Dr. San Dlego, CA 92126
(619) 549-6996 DATE
,-
i ! i I.
!.
~
,
I
,
i: , .-.
I. I
LOT &C
OF - A-ZED shuecunl -&cdmm
7275 Rock Canyon Dr. CALCULATEDDV- DATE 4. 77
CHECKEDDV - - DATE San Diego. CA 92128 (819) 549-8998
..
A-ZED struaunl E~~COIWI~~~ anm NO. LS or
CALCULATED SV- DATE 5- 22 - 98 7275 Rock Canyon Dr.
San Dlego, CA 92126 CHECIED #V DAll (619) 549-6906 SCALE
..
LnT 65
A-ZED struaunl En&ie&Cdb 8nm NO. L6, OF
CALCULATEDEV 2F.D OATE 5- z2-98 7275 Rock Canyon Dr. __ OATE San Dlago. CA 92126
(619) 549-6996 CHECKED BY
. .. .~ . .
. .. . .. .. .
,
.’
i
.~ .
JD,2<1 mfx
A-ZED sauctunl ~c~~~~~mnta 8H€€T NO. L7 OF
7275 Rock Canyon Dr.
(619) 549-6996
CALCULATED BY- DATE
- DATE
- 22 - 98
San Dlego, CA 92126 CHECUEDIY ___
JOB YPoo? b7 cs
A&~’s~Ic~I ~n~imeri~g cc!mhata WECT NO. L 7A OF -- c 3e 7275 Rock Canyon Dr. CALCULATED DV A-,A.n DAlE
San Dlego, CA 92126 CHECKED IV DATE (619) 540-6996 WALE
t.: !E
’.,
JOLA%T5 bT 6- A-ZED struaunl Enghcc& CdtUIb OHECT NO we OF
CALCULATCO ny 5 - 27 - 70 7275 Rock Canyon M. ZFP
San Dlego, CA 92128 CHECKED DV - DATE (619) 649-6996 - -
..... I... .... ~ ..I..
.. .j ........ i... . .;. ..
I i' ;
!!i ..I ...... 1 .... 1
.,.,.I ........ ! ..... ,...
111
I,
.......... ......
....... ....... ....
........ .......... ..........
...
........ .......
Lo7 6A fl
Ot - 27- 9A A-ZED stmcttuu~ ~qiwwiiG~consu~~
7275 Rock Canyon Dr.
San Olego, CA 92128
1610) 549-6988
CALCULATED BV- DITC 5
CHECKED BY - DATE
,
i
,, r . ... . .
..
romLL%2zz - A-ZED sbua~nl ~wineeriXccdmota WEE1 NO. IO Of
CALCULATEDDV- DATE S -c 27 ‘?8 7275 Rock Canyon Dr. __ DATE San Dlego. CA 02126 (610) 540-6096 CHECKED DV
UT /;C
212D DAlE Lf- SO-98 7275 Rock Canyon Dr. ..I
lWCCf NO. OT
CALCULATEDBY
A-ZED struaunl E-~CC~BUIIUIIE
San Dlego, CA 92126 CHECKED BV __ DATE
SCALE (619) 549-6998
1
, ..,.......... j.. .
1,
I .... I.. . . :, i. . .
,
i
.~ .
..
i
..
Jon.avq LOT &
A-ZED srmaunl ~~ine~ cmmt(.atl 8HCCT NO. L-r z OF -
CALCULATED IV 'FD DATC
San Dlego, CA 92128 CHECKED IV __ DAT€
7275 Rock Canyon Dr.
OCALC (619) 549-8996
,..
. . I.. . . . , ... , : I .... i.. I .. ., ..,. .,...,.. ... ,. z... ..i
JDI 48c9---&&- A-ZED srmctlvrl --cdanb WCCT NO. 3 OF
7275 Rock Canyon Dr. CALCULATED BY -. - 7.43 DATE 5- 22 -9cs
CWECKED BY - DATE
ICALE
San Diego, CA 92126 (619) M9-6996
Lo7
CALCULATED av-- DATE G- 27 - TB A-ZED smccc~nl ~igcma~~cwl Joa-Li inccr NO. Of ___
7275 Rock Canyon Dr.
(618) 549-6886 San Dlego. CA 82126 CHECKED IIV __ DATE
WALE
.... ,1..i ....
.. . ;.. .
i
.. .
,.
i
7275 Rock Canyon Dr. San Dlego, CA 92126 (619) 549-6996
LoT 65-
OV
*D DATE 6 -27- 9;3
A-ZED -iigc,-~m
7275 Rock Canyon Dr. CALCULATED~Y
San Dlego, CA 92126 CHECIED 8Y '.- - DATE (619) 549-6996
8CALE
,, 8,
4. mB*y &7 GS
A-ZED shuc~nl mg&cmuimta ancci NO. L I7 OF
CALCULATCDIIY DAlC 5 27-Lt4 7275 Rock Canyon Dr.
San Dlego, CA 92126 16181 549-6996 CHECKCD BY __ DATE
-
<. LOT 6s
A-ZED smnl miw&gcdtauta OF ~ WCCT NO
CALCULATCDIY ZPD DATS 5-27 w 7s 7275 Rock Canyon Dr.
San Dlago, CA 92126 CHECKED BV - DATE (619) 549-6996 8CALC
.............
..
.... ;... . ..; .......... ; .............. ...., . .~. ... I.. . ..
TRANSMITTING
Ip(slXUrnRAL CALCULATIONS COPKS.
0 STRUCTURAL BLUE PRINTS SETS.
RETURMJUG
0 REDMARKEDDRAWINGS.!WZ'TS
0 REDMARKED SPECIFICATIONS, SECXIONS
0 SHOP DRAWINGS
STAMPED
UOI'HEiR
~
'I"SMl"G ORIGINALS
0 STRUCTURAL DRAWINGS. SWEETS
SENTBY:
FRDM : FI-ZED ENtINEERS . a.
PKEE M. : 1 619 S49 6996 NGV. 18 1958 06:m P04
CONCRETE PIER 5ECTION
pMx.E M. : 1 619 549 69% Nov. 18 1938 86:3wn pB5
CONCRETE PIER SECTION
./00/.08 YON 12:41 FAX 6107560837 iG LANIKAI
LAMKAl MANA~coRpoRATKlN
$. z <-
Fgool
TELECOPIER COVER PACE
To: &kjwf
FAX NUMBER:
FROM
b I-
!
I :,
Tills FAX CONSISTS OF &PACESES, INCLUDING THIS COVER SHEET
COMMENmr
s
, * -dM-
/-
. #
r / n
I Y
THIS FAX NUMBER IS (619) 756-9837
IF THERE IS A PROBLEM IN RECEIVING ANY OF TliESE PAGE!& PLEASE CALL (619) 7569820.
OPERATOR
. .~ . .. .. .
.. ;: .
YON 12:41 FAX 6197569837 1C LANIMI
CALENGINEERING 562 799 9459 02/09 $98 09:zo luo.as, 07
NorCal Engineering
Soils and C,cotcchnicsd Consultants
1064 I Humbolt Syea LUS Almitos, Ch 90720
(562)799-W69 FAX (ShZ)799-94)459
P.Q. Box 9672
Rancho Santa, California 92087
February 6, 1998 Project Number 7101-97
’10 lY12/@ p&f& I- “f:/fL ,- (lo.. - L’ =O.
Pmmc s PkC4l-q
Ann: Mr. T. Lawrence Jett
RE: Addendum No. 2 -Preliminary Geotechnicsl Inwstigatmn Report dated December 5, 1997 - Proposed Multi-Unit Structures - Located at the
Southeast Corner of College Boulevard and Abton Avenue. in the City of
tartabad. California
Dear Mr. Jett:
As requested, rigid pavement section design is being provided for the above referenced
project. The sectins given are based upon an estimated R-value of 30 for pavement
areas.
Type of Traffic Icalnc lI!skx
Light Vehicle Parking 4 Light Vehiele Circulation Areas .s
Medium Truck 8
Heavy Truck 7
5.5
6.0
6.5
7.0
Concrete may be placed directly upon subgrade roils compacted to a minimum of 90%
relative compaction in the upper 12 inches. Subgrade soils should be moisture
condiiionod to 130% of optimum moisture levels immediately prior to placement
concrete.
We appreciate this opportunity lo be of service to you. If you have any
queellons, please d act the underrigned.
. .I<: 2
Scott 0. Spensiero
Project Manager
further
Preliminary Geotechnical Investigation
Proposed Multi-Unit Structures
College Boulevard & Aston Avenue
Carlsbad, California
Project Nurn ber 71 01 -97
December 5,1997
NorCal Engineering
NorCal Engineering
December 5. 1997
Soils and Geotechnical Consultants
10641 Humbolt Street Los Alamitos, CA 90720
(562) 799-9469 Fax (562) 799-9459
ILIrK J - Project Number 7101-97
Lanikai Management Corporation
P.O. Box 9672
Rancho Santa Fe, California 92067
Attn: T. Lawrence Jett
RE: Preliminary Geotechnical Investigation - Proposed Multi-Unit Structures
- Located at the Southeast comer of College Boulevard and Aston
Avenue, in the City of Carlsbad. California
Dear Mr. Jett:
Pursuant to your request, this firm has performed a Geotechnical Investigation for the
above referenced project in accordance with your authorization of proposal dated
October 29, 1997. The purpose of this investigation is to evaluate the geotechnical
conditions of the subject site and to provide recommendations for the proposed project.
This geotechnical engineering report presents the finding of our study along with
conclusions and recommendations for development. We appreciate this opportunity to
be of service to you. If you have any further questions, please do not hesitate to contact
the undersigned.
Respectfully submitted,
NORCAL ENGINEERING
b. 12/3 1 /m Keith D. Tucker
Project Engineer
R.G.E. 841
Scott D. Spensiero
Project Manager
.dl
*< December 5, 1997
Page 2
Project Number 7101-97
Project DescnDtlon
The purpose of the investigation was to explore the subsurface conditions and to
provide preliminary geotechnical engineering design parameters for evaluation of the
site with respect to the proposed project. It is anticipated that the proposed
development will consist of officeharehouse buildings on the 27 acre property as shown
on the Preliminary Grading Plan by Robert Stocton dated November 20, 1985. Other
improvements will consist of asphaltic paved parking and driveway areas, concrete
loading areas and landscaping.
..
Site Descrlotlon
The subject site consists of two bi-level mass graded located within Carlsbad Research
Center. The site is situated at the southeast corner of Aston and College, in the City of
Carlsbad. The generally rectangular shaped site is elongated in an north to south
direction with topography descending from west to east. An approximately 4 feet high
graded slope separates the two lots. The parcel is currently undeveloped and covered
with a sparse to moderate growth of vegetation consisting of natural grasses and
weeds. The site is bordered by ascending slopes along the east property line and
descending slopes along the south, north and west property perimeter ranging in height
from 55 to 520 feet.
..
The Carlsbad Research Center development consists of several individual lots located
within the tract which had been recently mass graded for future development. The
earthwork operations were performed and were geotechnically observed and tested by
San Diego Consultants, Inc., as described by their report tilted, As-Graded Geotechnical
Report, Phases, dated April, 1988, Job No. 05-2863-006-00-10
The subject parcel consists of a graded transition lot with a maximum fill depth of 22 feet
located at the southwest corner. The cut slope are generally on the east side of the lot.
NorCal Engineering
December 5,1997
Page 3
Project Number 7101-97
Eisld Invesm
The investigation consisted of the placement of ten subsurface trenches by a backhoe
to a maximum depth of 20 feet placed strategically in proposed areas of development.
The explorations were visually classified and logged by a field engineer with locations of
the subsurface explorations shown on the attached Site Plan. The exploratory
excavations revealed the existing earth materials to consist of an engineered fill and
bedrock. A detailed description of the subsurface conditions are listed on the
excavation logs in Appendix A. These soils are described as follows:
..
Fill: An engineered fill was encountered consisting predominately of a
brown to tan brown, CLAY, silty sandy clay and clayey SANDS.
These soils were noted to be densektiff and damp and moist.
Native Soils: A reddish brown CLAY, sandy with gravel and rock were
encountered in a portion of the excavations. These native soils
were very stiff and dry to damp.
Bedrock: A grey siltstone with fine grained interbeds was encountered in test
excavations 4, 6, and 8. The bedrock was noted to be moderately
hard to hard and moist:
The upper 1.5 to 3.0 of the surface soils were noted to be disturbed and loose from the
existing surface vegetation and past discing operations. These upper soils were very
moist due to recent rains. No groundwater was encountered to the depth of our
excavations and no caving occurred. '
NorCal Engineering
! 1 4.
December 5.1997
Page 4
Project Number 7101-97 -
Relatively undisturbed samples of the subsurface soils were obtained to perform
laboratory testing and analysis for direct shear, consolidation tests, and to determine in-
place moistureldensities. These undisturbed samples consisted of one inch rings with
inside diameter of 2.5 inches. Bulk bag samples were obtained in the upper soils for
expansion index tests, maximum density tests, atterberg limits and sulfate tests. All test
results are included in Appendix B, unless noted otherwise.
A. The field moisture content (ASTM:D 2216) and the dry density of the ring
samples were determined in the laboratory. This data is listed on the log of
excavations.
B. Maximum density tests (ASTM: D-1557-78) were performed on typical
samples of the upper soils. Results of these tests are shown on Table 1.
C. Expansion index tests in accordance with the Uniform Building Code
Standard No. 29-2 were performed on remolded samples of the upper
soils to determine the expansive characteristics. Results of these tests
are provided on Table II.
D. Soluble sulfate tests in accordance with EPA Method 9038 were
performed on representative soils samples to estimate the potential for
corrosion of concrete in contact with the on-site soils. Results are
provided in Table IV.
E. Direct shear tests (ASTM: D-3080) were performed on undisturbed and
disturbed samples of the subsurface soils. These tests were performed to
determine parameters for the calculation of the safe bearing capacity. The
test is performed under saturated conditions at loads of 500 Ibs./sq.ft.,
1,000 Ibs./sq.ft., and 2,000 Ibs.lsq.ft. with results shown on Plate A.
NorCal Engineering
t. .I December 5, 1997
Page 5
Project Number 7101-97
F. Consolidation tests (ASTM: D-2435) were performed on undisturbed
samples to determine the differential and total settlement which may be
anticipated based upon the proposed loads. Water was added to the
samples at a surcharge of one KSF and the settlement curves are plotted
on Plate B.
Conclusions and Recommendations
Based upon our evaluations, the proposed. development is acceptable from a
geotechnical engineering standpoint. By following the recommendations and guidelines
set forth in our report, the structures will be safe from excessive settlements under the
anticipated design loadings and conditions. The proposed development shall meet all
requirements of the City Building Ordinance and will not impose any adverse effect on
existing adjacent structures. In addition, this firm has reviewed the previous
geotechnical reports by San Diego Geotechnical Consultants, Inc., and concurs overall
that the geotechnical conditions of the subject site are currently representative of the
conditions encountered during the described rough grading report. It is our opinion that
the planned grading is geotechnically feasible provided that all of the recommendations
presented in our geotechnical report is implemented and the information in the San
Diego Consultants, Inc. is accurate.
The following sections present a discussion of geotechnical related requirements for
specific design recommendations of different aspects of the project. It is recommended
that site inspections be performed by a representative of this firm during all grading and
construction of the development to verify the findings and recommendations
documented in this report. Any unusual conditions which may be encountered in the
course of the project development may require the need for additional study and revised
recommendations.
NorCal Engineering
December 5, 1997
Page 6
Project Number 7101-97
Val-
All slopes impacting the subject site are considered to be grossly and surficial stable.
The slopes constructed during mass grading operations were built at a slope ratio no
greater than 2 to 1 (horizontal to vertical) and appear to be in accordance with previous
project plans and specifications. These slopes would appear to possess safety factors
of 1.50 or greater for gross stability. In addition, an observation of these slopes appear
to perform adequately with respect to surficial stability. However, to minimize future
erosion, the slope maintenance recommendations should be implemented. The
landscaping shall consist of a suitable proportion of deep rooted slope plantings
classified as being drought resistant. The possibility of construction delays, weather
conditions and plant growth may require additional erosion control measures such as
matting, netting and plastic sheeting.
Site Gradina Recommendations
Any vegetation shall be removed and hauled from proposed grading areas prior to the
start of grading operations. Any removed soils may be reutilized as compacted fill once
any deleterious material or oversized materials (in excess of eight inches) is removed.
All grading operations shall be performed in accordance with the attached
“Specifications for Compacted Fill Operations”. All upper disturbed soils (upper one
foot) shall be removed, the exposed surface shall be scarified to a depth of 12 inches,
brought to the proper moisture content and compacted to a minimum of 90% of the
laboratory standard (ASTM: D-1557-78) prior to placement of any additional compacted
fill soils.
In building areas of transition between bedrock, native soils and engineered fill,
additional overexcavation of bedrocklnative soils consisting of a depth of three feet
below proposed foundations including floor slab areas is required to mitigate the
potential of differential settlement. Otherwise all foundation for each individual building
shall be embedded into engineered fill or all into bedrock. This fill shall extend a
minimum of five horizontal feet or to the depth of vertical overexcavation, whichever is
greater, beyond the outside edge of the perimeter foundation. All parking subgrade
NorCal Engineering
December 5, 1997
Page 7
Project Number 7101-97
areas will require the removal of all disturbed soils (upper one foot) prior to placement of
any additional fill or pavement.
and Subsidence
Results of our in-place density tests reveal that the soil shrinkage will be on the order of
8 to 12% within the engineered fill soils, based upon the assumption that the fill is
compacted to 92% of maximum dry density per ASTM standards. Subsidence should
be 0.25 feet due to earthwork operations. The volume change does not include any
allowance for vegetation or organic stripping, removal of subsurface improvements or
topographic approximations. Although these - values are only approximate, they
represent our best estimate of lost yardage which will likely occur during grading. If
more accurate shrinkage and subsidence factors are needed, it is recommended that
field testing using the actual equipment and grading techniques should be conducted.
Temporary unsurcharged excavations in the existing site materials less than 5 feet high
may be made at a vertical gradient unless cohesionless soils are encountered.
Temporary unsurcharged excavations from 5 to 10 feet high may be trimmed at a 1 to
l(horizonta1 to vertical) gradient. In areas where soils with little or no binder are
encountered, where adverse geological conditions are exposed, or where excavations
are adjacent to existing structures, shoring, slot-cutting, or flatter excavations may be
required.
The temporary cut slope gradients given above do not preclude local raveling and
sloughing. All excavations shall be made in accordance with the requirements of CAL-
OSHA and other public agencies having jurisdiction. Care should be taken to provide or
maintain adequate lateral support for all adjacent improvements and structures at all
times during the grading operations and construction phase.
All foundations may be designed utilizing the following safe bearing capacities for a
embedded depth of 24 inches into approved compacted fill soils or bedrock with the
corresponding widths:
NorCal Engineering
*I \.
December 5,1997
Page 8
!b!mlm
1.5
2.0
4.0
5.0
Project Number 7101-97
Continuous Isolated
2000 2500
2075 2575
2275 2775
2375 2875
A one third increase may be used when considering short term loading and seismic
forces. AI1 continuous foundations shall be reinforced a minimum of one b.4 bar, top
and bottom. Isolated foundations may be reinforced at the discretion of the project
structural engineer.
All foundations located near adjacent slopes shall meet all setback criteria per the 1994
Uniform Building Code (UBC). The bottom of foundations located adjacent to
descending slopes shall maintain a safe horizontal setback consisting of 113 the height
of the slope from bottom of the footing to the face of the slope.
The following values may tie utilized in resisting lateral loads imposed on the structure.
Requirements of the current Uniform Building Code should be adhered to when the
coefficient of friction and passive pressures are combined:
Coefficient of Friction - 0.35
Equivalent Passive Fluid Pressure = 200 Ib./cu.ft.
Maximum Passive Pressure = 2,000 Ibs./sq.ft.
The passive pressure recommendations are valid only for compacted fill soils and/or
competent bedrock materials.
NorCal Engineering
._ December 5, 1997
Page 9
Project Number 7101-97
Resultant pressure curves for the consolidation tests are shown on Plate B.
Computations utilizing these curves and the recommended safe bearing capacities
reveal that the foundations will experience settlements on the order of 3/4 inch and
differential settlements of less than 1/4 inch. Settlements will occur due to foundation
loads and area fill surcharge pressures.
Existing fill soils will incur additional settlement over time with the area subsidence on
the order of a 1/2 inch across the length of the structures. The associated angular
rotation of wall footings should be less than 1/2 inch over 40'linear feet at the site.
Thus, shallow building foundations should be designed for these differential settlements
during the design life of the structure.
all Des ian Pa raw
Active earth pressures against retaining walls will be equal to the pressures developed
by the following fluid densities. These values are for granular free draining backfill
material placed adjacent to the walls at various ground slopes above the walls.
Surface Slope of Retained Materials Equivalent Fluid
(Horizontal to YaiidJ
Level
5 to 1
4 to 1
3 to 1
2to1
30
35
38
40
45
Any applicable short-term construction surcharges and seismic forces should be added
to the above lateral pressure values. A backfill zone of non-expansive material shall
consist of a wedge beginning a minimum of one horizontal foot from the base of the wall
extending upward at an inclination no less than 3/4 to 1 (horizontal to vertical). All walls
shall be waterproofed as needed and protected from hydrostatic pressure by a reliable
permanent subdrain system.
NorCal Engineering
!' .,
December 5, 1997
Page 10
Project Number 7101-97
Slab Recommendations
All concrete floor slabs shall be a minimum of five inches in thickness reinforced a
minimum of No. 3 bars, eighteen inches in each direction positioned in the center of the
slab and placed on approved subgrade soils. Prior to placement of slabs, the subgrade
soils shall be moisture conditioned above optimum moisture content to a depth of
eighteen inches. A vapor barrier overlain by four inches of approved sand shall be
utilized beneath all floor slabs sensitive to the infiltration of moisture. All concrete slab
areas to receive floor coverings should be moisture tested to meet all manufacturer
requirements prior to placement.
Corrosion DesianCritaria
Representative samples of the surficial soils, typical of the subgrade soils expected to
be encountered within foundation excavations, revealed low levels of sulfate
concentrations. Therefore, no special cement foundations are deemed necessary and a
Type II cement shall be utilized'for building foundations at this time. Additional sulfate
tests shall be performed at the completion of rough grading to assure that these soils
are consistent with the recommendations stated in this design. Sulfate test results may
be found on the attached Table 111.
Pave- i
The table below provides a preliminary pavement design based upon an estimated R-
Value of 30 for the proposed pavement areas. Final pavement design may need to be
based on R-value testing of the subgrade soils near the conclusion of rough grading to
assure that these soils are consistent with those assumed in this preliminary design.
Tvoe of Traffic
Light Vehicle Parking
Traffic Asphaltic Base hkx Concrete f in) -1
4.0 3.0 3.5
Light Vehicle Circulation Areas 5.0 3.0 4.5
Med. Truck Parking & Circulation Areas 6.0 3.5 6.5
(GVW 42,000 Ibs.; 3 axle)
(GVW c 90,000 Ibs.; 5 axle)
Heavy Truck Areas 7.0 3.5
NorCal Engineering
.j December 5, 1997
Page 11
Project Number 7101-97
Pavement section thickness should be increased for areas where heavier vehicular use
or larger wheel loads are anticipated. All concrete slabs to be utilized for pavement or
utilized for forklift use shall be a minimum of six inches in thickness and placed on
approved compacted subgrade soils.
Any approved base material shall consist of a Class II aggregate or equivalent and
should be compacted to a minimum of 95% relative compaction. All pavement materials
shall conform to the requirements set forth by the City of Carlsbad. The base material
and asphaltic concrete should be tested prior to delivery to the site and during
placement to determine conformance with the project specifidtions. A pavement
engineer shall designate the specific asphalt mix design to meet the required project
specifications.
The recommendations and conclusions contained in this report are based upon the soil
conditions uncovered in our test excavations. No warranty of the soil condition between
our excavations is implied. NorCal Engineering should be notified for possible further
recommendations if unexpected to unfavorable conditions are encountered during
construction phase. It is the responsibility of the owner to ensure that all information
within this report is submitted to the Architect and appropriate Engineers for the project.
This firm should have the opportunity to review the final plans to verify that all our
recommendations are incorporated. This report and all conclusions are subject to the
review of the controlling authorities for the project.
A preconstruction conference should be held between the developer, general contractor,
grading contractor, city inspector, architect, and geotechnical engineer to clarify any
questions relating to the grading operations and subsequent construction. Our
representative should be present during the grading operations and construction phase
to certify that such recommendations are complied within the field.
NorCal Engineering
', . i, ,
December 5,1997
Page 12
Project Number 7101-97
The geotechnical investigation has been conducted in a manner consistent with the level
of care and skill exercised by members of our profession currently practicing under
similar conditions in the Southern California area. No other warranty, expressed or
implied is made.
NorCal Engineering
.I ..I '$ . ..
December 5, 1997
Page 13
Project Number 7101-97
Preparation
Any existing low density soils and/or saturated soils shall be removed to competent
natural soil under the inspection of the Soils Engineering Firm. After the exposed
surface has been cleansed of debris and/or vegetation, it shall be scarified until it is
uniform in consistency, brought to the proper moisture content and compacted to a
minimum of 90% relative compaction (in accordance with ASTM: D-1557-78).
Material For Fill
The on-site soils or approved import soils may be utilized for the compacted fill provided
they are free of any deleterious materials and shall not contain any rocks, brick,
asphaltic concrete, concrete or other hard materials greater than eight inches in
maximum dimensions. Any import soil must be approved by the Soils Engineering firm
a minimum of 24 hours prior to importation of site.
Placement of Compacted Fill Soils
The approved fill soils shall be placed in layers not in excess of six inches in thickness.
Each lift shall be uniform in thickness and thoroughly blended. The fill soils shall be
brought to within 15% of the optimum moisture content, unless otherwise specified by
the Soils Engineering firm. Each lift shall be compacted to a minimum of 90% relative
compaction (in accordance with ASTM: D-1557-78) and approved prior to the placement
of the next layer of soil. Compaction tests shall be obtained at the discretion of the Soils
Engineering firm but at a minimum of one test for every 500 cubic yards placed andlor
for every two vertical feet of compacted fill placed.
NorCal Engineering
., .,I 'I .. December 5. 1997
Page 14
Project Number 7101-97
' The minimum relative compaction shall be obtained in accordance with accepted
methods in the construction industry. The final grade of the structural areas shall be in a
dense and smooth condition prior to placement of slabs-on-grade or pavement. No fill
soils shall be placed, spread or compacted during unfavorable weather conditions.
When the grading is interrupted by heavy rains, compaction operations shall not be
resumed until approved by the Soils Engineering firm.
Grading Observations
The controlling governmental agencies should be notified prior to commencement of any
grading operations. This firm recommends that the grading operations be conducted
under the observation of a Soils Engineering firm as deemed necessary. A 24 hour
notice must be provided to this firm prior to the time of our initial inspection.
Observation shall include the clearing and grubbing operations to assure that all
unsuitable materials have been properly removed; approval of the exposed subgrade in
areas to receive fill and in areas where excavation has resulted in the desired finished
grade and designate areas of overexcavation; and performance of field compaction
tests to determine relative compaction achieved during fill placement. In addition, all
foundation excavations shall be observed by the Soils Engineering firm to confirm that
appropriate bearing materials are present at the design grades and recommend any
modifications to construct footings.
NorCal Engineering
Project Number 7101-97
(In order of appearance)
x A - LogptZeSf+rcavabow
Test Excavations 1-10
OntON Tests
Table I - Maximum Density Tests
Table II - Expansion Index Tests
Table 111 - Sulfate Tests
Plate A - Direct Shear Tests
Plate B - Consolidation Tests
NorCal Engineering
IMATE .
D EXF -
Project Number 7101-97
APPENDIX A
NorCal Engineering
NorCaI Engineering om AND GEOTEECHMCAL CONSULTAhTS
PllDn I mllt
WIFIED SOIL CLASSIFIUTI~ SYsm
2. i$ a'- -
14.
12.
8. s
10.
109.
105.
106.#
107.!
F
E
__ Canpacted Fill Soils
CLAYS, sandy silty clays, lmse and wet in upper 1.5'
stiff below
Native Soils
Clay sandy with rock and shale fragnents
silty,grey to dark brm, medim stiff
to stiff, diatamceous
DATE DRILLD): 11-14-97
Bulk *le WUIRUtr USED: Extension Backhoe
-MER LML:None Encountered a Jar -18
NorCal Engineering
> ID'S OF TEST EC" #I 3ILS AMI GEOTECHMCAL CONSULTANTS
, .. , .I I, *. \
1 1
Carpacted Fill Soils
CLAYS and sandy. silty
clays loose and wet in up& 1.5' stiff belcnv
Native Soils
Clay sandy with rock and shale frayements
silty, grey to dark brawn, medim stiff
to stiff, diatmceous
i
AT 1
canpacted Fill soils
CIAYS and sandy, silty clays, loose and wet in upper 2.0
stiff below
Native Soils
Clay sandy with rock and shale fra-ts silty, grey to dikk brm, medium stiff
to stiff, diatamaceous
ME DRIUED: 11-14-97 a Bulk ala EqUIRWr UaD: Extended Backhoe
Spoon a Jar -14 grrmmUTuI LML: None Encountered
NorCal Engineering
ICG OF TEST BC&=CkJ #3 OILS AND GEOTECHMCAL CONSULTANTS
QlvI I MTE
, I"
/I ..
Surficial Fill Soils Sandy, silty clays, loose and wet
Native Soils
Clay sandy with rodc and shale frawts
silty; grey to dark bmwn, medium stiff to stiff, diatmdeous
SILTSTONE Grey, stiff damp to mist
ME DRXUm: 11-14-97
EpuImEmT uap: Extended Backhoe ~uIt -1.
Jar -la WLUITER LML: None Encountered
NorCal Engineering
LCG OF TEST EIOCRVATICEI # 4 OCU AND CEolEcHKIcAL CONSULTANTS
I MlE 1
I-
IO
15
Surficial Fill Soils
Sandy, silty
clays, loose and wet
Native Soils Clay sandy with rock and shale fragnents silty, grey to dark brown, stiff and mist
ME DRILLED: 11-14-97
NorCal Engineering
ILX; OF TEST EG%WWION # 5 OaS AND GEOTEQHMCAL CONSULTANTS
-
1 a' -
13.7
11.5
.
3 g, -
105.5
104.t
I I
Native Soils Clay sandy with rock and shale fragments silty, grey to dark brawn, dun stiff
to stiff belaw upper 1.0, diataMceous
. SILTSTONE
Grey stiff and dap
ME 0U-z 1 1-1 4-97
EpUIRUrr USED:Extended Backhoe
MCT [ Mlli I
..
i\ 1 1
Ccnpcted Fill Soils
CL?iYS, sandy silty clays, loose and wet in upper 1.5
stiff belaw
Native Soils Clay sandy with rock and shale fragments silty, qrey to dark brawn, mediian stiff
to stiff, diatanaceous
DATE DRILLED: 11-14-97
Standard Split Spoon El Ring -10
a Jar -10 6RouIQIyI;TER W: None Encountered
E. 2: .a
NorCal Engineering I
I
115.
-
canpacted Fill Soils CLAYS, sandy silty
clays, loose and wet in upper 1.5
stiff helm
Native Soils Clay-sandy with rock and shale fragments
silty, grey to dark brawn, dm stiff
to stiff, diatumcems
C IbckCorr Bulk -la €QUI- USED: mended Backhoe
S Standard split Spoon ma: None Encountered a Jar -la i Rfng -1.
NorCal Engineering
UX; OF TEST m"Im 18 ;OILS AND GEolECHMCAL CONSULTANTS
MCT I ME
-
3 a' -
12.8
13.4
9.7
.
is z= -
107. f
109:
105.1
carpacted Fill Soils
CIAYS, sandy silty clays, loose and wet in upper 1.5
stiff belaw
NorCal Engineering I
-
3 a' -
9.7
I
108.6 Canpacted Fill Soils
CLAYS, sandy silty
clays, loose and wet in upper 1.5
stiff below
MTE ORXLLDD: 11-14-97
BU~L -le EQUIRucr Umr: Extended Backhoe
%lit Spoon a Jar -le LEVEL: None Encountered
NorCal Engineering
ICG OF TEST -VATIm # 10 ;OILS AND GE(YIEC"ICAL CONSULTANTS
Project Number 7101-97
NorCal Engineering
.*,I. 5 .. December 5.1997
Page 15
saQQ!!2
T6 @ 3-5' Siltstone
TI @ 0-2' CLAY. silty
T9 @ 0-2' CLAY. sandy silt
Optimum
rdQL5hU
16.0
15.5
13.0
sQult=
T6 @ 3-5'
T1 @O-2'
T9 @ 0-2'
EiimIQk
T6 @ 3-5'
T1 @ 0-2'
T9 @ 0-2'
Project Number 7101-97
Classification
Siltstone
CLAY, silty
CLAY, sandy silt
Maximum Dry
111.0
109.5
115.0
Expansion
llJ!kx
87
66
54
p
540
268
374
NorCal Engineering
..
DRY msnm LIQUID DEPTH DWSITY CoI(N(T LIMIT sm mR (En) (PCF) (2) ( 2)
X 1 5.0 105.1 17.7
A 6 10.0 104.6 11.5
0 9 12.5 105.4 9.7
0 3 2.5 107.4 a. a
-2
USTICITY INDEX
( 2)
0
2
6
8
10
COIISOLIDATIOII TEST RESULTS NorCal Engineering
;OILS AND GEOTECHNICAL CONSULTANTS
..I ,. - * -. I ,. .t ::: ............ .C'.'!... ............ ; ......... .... ................... .. .:.:iT,.,.: . 2500 ........ ... ......................... ....... ....... ,.
..I ............................. .: .! ;. ..... ! , .... ........ ...................... .... ... __ .- ... - ........ .. ... .. .. ...... - ...... ........ .. .. ... .. .... ...... ...
1500
IO00
500
0
. _- .---
_-.-
I I I I I I -I 0 500 loo0 1500 2wo
.. -- - NOfWi. STES.5 (PSF)
DRY loISNRE smOL BORING DEPTH 0 DENSITY ca"i-r c MUBER (FEET) (DEGREES) (PSF) (pcF)
X 1 2.5 23 450 109.6 14.6
0 6 3.0 19 375 105.9 13.7
A 9 3.5 26 325 107.6 12.8 I Dl 1 I I I I I
NOTE: TESTS PERFOFNO ON SATURATED SAMPLES UNLESS SHOWN BELOW.
(FM) FIELD HOISTURE
TESTS PERFORMED ON UNDISTURBED SAMPLES UNLESS SHOWN BELOW.
(R) SAWPLES REmKDEO AT 90% OF WXIMUM DRY DENSITY
NorCal Engineering I
SOILS AND GEOTECHNICL CONSULTAmS, DIRECT SHEAR TEST RESULTS
PROJECT I DATE 1
P. 04 JAN-21-99 THU 08:03 CITY OF CARLSBAD COMM DE FAX NO. 4380894
NON-RESIDENTIAL CERTIFICATE
I ! '.!
i !
!
:::
i I .. i
.#
! .. ,.
,i !
! i .. .
4 -6