HomeMy WebLinkAbout1820 BASSWOOD AVE; ; CB003342; Permit031.11 2/2601
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
# Dwelling Units:
Bedrooms:
Project Title:
Applicant:
ROBERT MOALES
PO BOX 31 16
VISTA CA 92035
760 940-8533
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Building Inspection Request Line (760) 602-2725
Residential Permit Permit No:CB003342
1820 BASSWOOD AV CBAD
RESDNTL SubType: RAD
2050804200 Lot #: 0
$1 1,845.00 Construction Type: NEW
14 Reference #:
0 Structure Type:
0 Bathrooms: 0
KREPPS RES
515 SF GARAGE
Status: ISSUED
Applied: 09/12/2000
Plan Approved: 10/05/2000
Issued: 03/12/2001
Entered By: CB
Inspect Area: Orig PC#:
Plan Check#:
Owner:
KREPPS GARY L
~ ~~ ~~ Total Fees: $264.46 Total Payments To Date: $85.20 Balance Due: $1 79.26
Building Permit
Add’l Building Permit Fee
Plan Check
Add’l Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add’l Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add’l Pot. Water Con. Fee
$131.08
$0.00
$85.20
$0.00
$0.00
$1 .I8
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Meter Size
Add’l Recl. Water Con. Fee
Meter Fee
SDCWA Fee
CFD Payoff Fee PFF
PFF (CFD Fund)
License Tax
License Tax (CFD Fund)
Traffic Impact Fee
Traffic Impact (CFD Fund)
LFMZ Transportation Fee
Sidewalk Fee
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
PLUMBING TOTAL $27.00
r.. Recl. Water Con. Fee $0.00 Sewer Fee: $0.00
T EES $264.46 SIGNAMQQ.~~ ,%
I FINAL APPROVAL
Inspector: Date: Clearance:
NOTICE: Please take NOTICE that approval of your project includes the ‘Imposition“ of fees, dedications, reservations, or other exactions hereafter collectively
referred to as ’feedexactions.” You have 90 days from the date this permit was issued to protest imposition of these feedexactiins. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
feedexactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired.
FOR OFFICE USE ONLY
PERMIT APPLICATION
CITY OF CARLSBAD BUILDING DEPARTMENT
1635 Faraday Ave., Carlsbad, CA 92008
Existing Use Proposed Use
Descriptibn of Work SQ. FT. #of Stories # of Bedrooms
ny.Y@ 5.E 1 79- .B- # of Bathrooms
Name Address
(Sac. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve. demolish or repair any structure, prior to its
issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law
[Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Codel or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars 1$50011.
*tetZip: _. . ; 7.: :$elq+-mpe #: : -; .:
-32. .... i .. i. _._: ;v ii_ ,i. ., - Name Address City
-n -. , .., , - . .- 2,; . 2J State License # License Class City Business License # ::. L ; 1. :.
Designer Name Address city State/Zip Telephone
State License #
Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following declarations:
0 of the work for which this permit is issued.
0
issued. My worker's compensation insurance carrier and policy number are:
Insurance Company Policy No. Expiration Date
(THIS SECTION NEED NOT BE COMPLETED IF THE PERMIT IS FOR ONE HUNDRED DOLLARS [$1001 OR LESS)
0 CERTIFICATE OF EXEMPTION: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as
to become subject to the Workers' Compensation Laws of California.
WARNING: Failure to secure workers' compensation coverage is unlawful, and shall subject an employer to criminal penaltiis and civil fines up to one hundred
thousand dollars f$100,000), in addition to the cost of compensation, damages as provided for m Section 3706 of the Labor code, interest and attorney's fees.
SIGNATURE DATE
I hereby affirm that I am exempt from the Contractor's License Law for the following reason:
0 I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does
such work himself or through his own employees. provided that such improvements are not intended or offered for sale. If, however, the building or improvement is
sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
0 1, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed
pursuant to the Contractor's License Law).
0
1.
2.
3.
4.
number / contractors license number):
5.
I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance
I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is
I am exempt under Section
I personally plan to provide the major labor and materials for construction of the proposed property improvement.
I (have /have not) signed an application for a building permit for the proposed work.
I have contracted with the following person (firm) to provide the proposed construction (include name I address / phone number / contractors license number):
I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name I address I phone
I will provide some of the work, but I have contracted (hired\,the following persons to provide the work indicated (include name I address I Dhone number I tvDe
Business and Professions Code for this reason:
YES UNO F
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention
program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? 0 YES 0 NO
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? 0 YES 0 NO
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? 0 YES NO
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE
REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
I hereby affirm that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 3097(i) Civil Code).
LENDERS NAME LENDER'S ADDRESS
CAN
I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all
City ordinances and State laws relating to building construction. I hereby authorize representatives of the Citt of Carlsbad to enter upon the above mentioned
property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES,
JUDGMENTS. COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT.
OSHA: An OSHA permit is required for excavations over 5'0" deep and demolition or construction of structures over 3 stories in height.
EXPIRATION: Every permit issued by the building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work
authorized by such permit is not commenced within 180 days from the date of such permit or if the building or work authorized bv such Dermit is susoended or abandoned
at any time after the work is comme 80 days (Section 106.4.4 Uniform Building Code).
APPLICANT'S SIGNATURE DATE s//z/ou
WHITE: File YELLOW: Applicant PINK: Finance
April 25, 2001 Permit Number: CB003342
Issue Date: 03/12/2001
ROBERT MOALES
P 0 BOX 3116
VISTA CA 92035
RE: BUILDING PERMIT EXPIRATION ADDRESS: 1820 BASSWOOD AV
PERMIT TYPE: RESDNTL PLEASE CALL FOR AN INSPECTION IF WORK IS
COMPLETE w*- \Q *Q$Q-TJ?NIOI
Our records indicate that your building permit will expire by limitation of time on 06)0472001 ?”
The provisions of UBC, Section 106.4.4 as amended by the Carlsbad Municipal Code state: “EXPIRATION.
Every permit issued by the Building Official under the provisions of this code shall expire by limitation and
become null and void if the building or work authorized by such permit is not commenced within 180 days
from the date of such permit (unless issued prior to 7/1/99 which is one year from date of permit), or if the
building or work authorized by such permit is stopped at any time after the work is commenced for a period of
180 days or if the building or work authorized by such permit exceeds three calendar years from the issuance
date of permit. Work shall be presumed to have commenced if the permittee has obtained a required inspection
approval of work authorized by the permit by the Building Official within 180 days of the date of permit
issuance. Work shall be presumed to be stopped if the permittee has not obtained a required inspection
approval of work by the Building Official within each 180 day period upon the initial commencement of work
authorized by such permit.
Before such work can be recommenced, a new permit shall be obtained to do so, and the fee, therefore, shall
be one-half the amount required for a new permit for such work, and provided that no changes have been made
or will be made in the original plans and specifications for such work, and provided further that such
suspension or abandonment has not exceeded one year. In order to renew action on a permit after expiration,
the permittee shall pay a new permit fee.
Any person holding an unexpired permit may apply for an extension of the time within which work may
commence under that permit when the permittee is unable to commence work within the time period required
by this section for good and satisfactory reasons. The Building Official may extend the time for action by the
permittee for a period not exceeding 180 days on written request by the permittee showing that circumstances
beyond the control of the permittee have prevented action from being taken. No permit shall be extended more
than once.
Please check below indicating your intentions and return this letter to us.
s44pr\a
Project abandoned. A new permit will be obtained prior to commencing work.
No fee extension requested for 180 days. (attach a letter of explanation)
Renewal permit requested.
If the project has been completed and only a final inspection is needed, please call the inspection request line at
If you have any questions, please contact the Building Inspection Department at (760) 602-2700.
(760) 602-2725.
PAT KELLEY
Principal Building Inspector
1635 Faraday Avenue Carlsbad, CA 92008-7314 - (760) 602-2700 FAX (760) 602-8560 @ Building Counter (760) 602-271 9 - FAX (760) 602-8558
EsGil Cornoration I
2n Tartnership with S;ouenrrnentfur Building Safety
DATE: 10/3/00
J U Rl SDl CTI ON : Carlsbad
PLAN CHECK NO.: 00-3342 SET: I1
0 APPLICANT
0 PLAN REVIEWER
CI FILE
Gi3m-3
PROJECT ADDRESS: 1820 Basswood
PROJECT NAME: Garage Addition for the Creps Residence
The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction’s building codes.
0 The plans transmitted herewith will substantially comply with the jurisdiction’s building codes
when minor deficiencies identified below are resolved and checked by building department staff.
0 The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
0 The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
0 The applicant’s copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
The applicant‘s copy of the check list has been sent to:
Esgil Corporation staff did not advise the applicant that the plan check has been completed.
0 Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone #:
Date contacted: (by: 1 Fax #:
Mail Telephone Fax In Person 0 REMARKS:
By: Mark Beauchamp Enclosures:
Esgil Corporation 0 GA 0 MB 0 EJ 0 PC 9/28/00 tmsmtl.dot
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576
t
EsGil Comoration
DATE: 9/22/00
JURISDICTION: Carlsbad
I
In Tartnership with Government for 9uiUing Safety
WEVIEWER
P FILE
PLAN CHECK NO.: 00-3342 SET: I
PROJECT ADDRESS: 1820 Basswood
PROJECT NAME: Garage Addition for the Creps Residence
0 The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction’s building codes.
0 The plans transmitted herewith will substantially comply with the jurisdiction’s building codes
when minor deficiencies identified below are resolved and checked by building department staff.
0 The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
0 The applicant’s copy of the check list is enclosed for the jurisdiction to fonvard to the applicant
contact person. w The applicant’s copy of the check list has been sent to:
Robert Morales
P.O. Box 31 16 Vista, CA 92085
0 Esgil Corporation staff did not advise the applicant that the plan check has been completed.
w Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Robert Morales (v*M$
Date Q%&%!%~*rS-@~ (by:- )
Telephone #: 760-940-8533
Fax #& 946-lk373
Mail ~Telephonac Fax, In Person 0 REMARKS:
By: Mark Beauchamp Enclosures:
Esgil Corporation 0 GA 0 MB 0 EJ [7 PC 9/14/00 tmsmtl.dot
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576
' . Carlsbad 00-3342
' 9/22/00
PLAN REVIEW CORRECTION LIST
SINGLE FAMILY DWELLINGS AND DUPLEXES
PLAN CHECK NO.: 00-3342 JURISDICTION: Carlsbad
PROJECT ADDRESS: 1820 Basswood
FLOOR AREA: 490 garage STORIES: 1
HEIGHT:
DATE PLANS RECEIVED BY
JURISDICTION : ESGIL CORPORATION: 9/14/00
DATE INITIAL PLAN REVIEW
DATE PLANS RECEIVED BY
PLAN REVIEWER: Mark Beauchamp
FOREWORD (PLEASE READ):
This plan review is limited to the technical requirements contained in the Uniform Building Code,
Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws
regulating energy conservation, noise attenuation and access for the disabled. This plan review
is based on regulations enforced by the Building Department. You may have other corrections
based on laws and ordinance by the Planning Department, Engineering Department, Fire
Department or other departments. Clearance from those departments may be required prior to
the issuance of a building permit.
Present California law mandates that residential construction comply with the 1998 edition of
the California Building Code (Title 24), which adopts the following model codes: 1997 UBC,
1997 UPC, 1997 UMC and 1996 NEC (all effective 7/1/99).
The above regulations apply to residential construction, regardless of the code editions adopted
by ordinance.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3,
1997 Uniform Building Code, the approval of the plans does not permit the violation of any
state, county or city law.
To speed up the recheck process. please note on this list (or a CODY) where each
correction item has been addressed, Le., plan sheet number, specification section, etc.
Be sure to enclose the marked UP list when you submit the revised plans.
’ Carlsbad 00-3342
9‘/22/’00
PLAN REVIEW CORRECTION LIST
1.
2.
3.
4.
5.
6.
Please make all corrections on the original tracings, as requested in the correction list. Submit
three sets of plans for commerciaI/industrial projects (two sets of plans for residential projects).
For expeditious processing, corrected sets can be submitted in one of two ways:
1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad
Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will
route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire
Departments.
2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320
Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining
sets of plans and caIculations/reports directly to the City of Carlsbad Building Department for
routing to their Planning, Engineering and Fire Departments.
NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the
City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete.
Revise the statement on the Title Sheet of the plans to state that this project shall comply with
the 1998 edition of the California Building Code (Title 24), which adopts the 1997 UBC, UMC
and UPC and the 1996 NEC.
The following anchor bolt requirements shall apply in Seismic Zones 3 and 4, per Section
1806.6.1 :
a) Plate washers (minimum size of 2” x 2” x 3/16”) shall be used on each anchor bolt.
Show nailing will be in compliance with Table 23-ll-B-1.
Per UBC Section 2321.4, provide the following note on the plans if trusses are used: “Each
truss shall be legibly branded, marked or otherwise have permanently affixed thereto the
following information located within 2 feet of the center of the span on the face of the bottom
chord:
a) b) The design load.
c)
Identity of the company manufacturing the truss.
The spacing of the trusses.”
Provide a roof framing plan for the angled portion of the garage. Section 106.3.3.
Show on the plans the location, length and type of braced wall panel as per UBC Section
2320.1 1.3 and Table 23-IV-C-1.
Braced wall panels shall start at not more than 8’ from each end of a braced wall
line.
In all Seismic Zones, braced wall panels in one story structures (or the top story
of a two or three story building) shall be installed at each end and not more than
25’ on center along the length of the braced wall line.
i)
ii)
' Carlsbad 00-3342
9122joo
7. The alternate braced panel beside the garage door is required to have a minimum length of 2
feet 8 inches. Section 2320.1 1.4.
8. Show on the plan that ground-fault circuit-interrupter protection complies with NEC Art. 210-8,
all 125-volt, single-phase, 15- and 20- ampere receptacles installed in garages shall be GFlC
protected.
0 To speed up the review process, note on this list (or a copy) where each correction item has been
addressed, Le., plan sheet, note or detail number, calculation page, etc.
0 Please indicate here if any changes have been made to the plans that are not a result of
corrections from this list. If there are other changes, please briefly describe them and where they
are located in the plans.
Have changes been made to the plans not resulting from this correction list? Please indicate:
Yes 0 No 0
0 The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite
208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review
for your project. If you have any questions regarding these plan review items, please contact
Mark Beauchamp at Esgil Corporation. Thank you.
' -, Carlsbad 00-3342
9/22/00
JURI SDI CTI 0 N: Carlsbad
PREPARED BY: Mark Beauchamp
VALUATION AND PLAN CHECK FEE
PLAN CHECK NO.: 00-3342
DATE: 9/22/00
BUILDING ADDRESS: 1820 Basswood
BUILDING OCCUPANCY: U TYPE OF CONSTRUCTION: V-N
Type of Review: Complete Review 0 structura~ Only
0 Other
0 Hourly I I
Esgil Plan Review Fee
I 79.51
I 63.61 I
Comments:
Sheet 1 of 1
rnacvalue.doc
- City of Carlsbad
BUILDING PLANCHECK CHECKLIST
DATE: lo. r. -7 PLANCHECK NO.: CB 334>
h I BUILDING ADDRESS: $Lo _Ipnsrl,
PROJECT DESCRIPTION: 490 SF
ASSESSOR'S PARCEL NUMBER: s)ar - 000
ENGINEERING DEPARTMENT
APPROVAL DENIAL
The item you have submitted for review has been approved. The approval is based on plans, information and/or specifications provided in your submittal; therefore any changes to these items after this date, including field modifications, must be reviewed by this office to insure continued conformance with applicable codes. Please review
carefully all comments attached, as failure to comply
with instructions in this report can result in
suspension of permit to build.
Please see the attached report of deficiencies
marked with 0. Make necessary corrections to plans
or specifications for compliance with applicable codes and standards. Submit corrected plans and/or
specifications to this office for review.
By: Date:
Right-of-way permit is required prior to
Date: construction of the following improvements:
/i
HORlZATlON TO ISSUE BUILDING
By: Date: I
f
ATTACHMENTS
0 Dedication Application
0 Dedication Checklist
0 Improvement Application
0 Improvement Checklist
0 Future Improvement Agreement
0 Grading Permit Application
0 Grading Submittal Checklist
ENGINEERING DEPT. CONTACT PERSON
Name: KATHLEEN M. FARMER
City of Carlsbad
Address: 1635 Faraday Avenue, Carlsbad, CA 92008
Phone: (760) 602-2741
CFD INFORMATION
Parcel Map No:
Lots:
Recordation: 0 Right-of-way Permit Application
Right-of-way Permit Submittal Checklist
and Information Sheet Carlsbad Tract:
Sewer Fee Information Sheet
H\WoRw-W)Barlsbad, CA 92004-731 4 * (760) 602-2720 FAX (760) %p85@@ @
BUILDING PLANCHECK CHECKLIST
SITE PLAN
1. Provide a fully dimensioned site plan drawn to scale. Show:
orth Arrow Width & Adjacent Streets
Existing & Proposed Structures
xisting or proposed sewer lateral
or proposed water service
Existing or proposed irrigation service
isting Street Improvements -7 Property Lines
Easements. *
0 0 2. Show on site plan: p/
/ A. Drainage Patterns
1. Building pad surface drainage must maintain a minimum slope of one
percent towards an adjoining street or an approved drainage course.
2. ADD THE FOLLOWING NOTE: “Finish grade will provide a minimum positive
drainage of 2% to swale 5’ away from building.’’
6. Existing & Proposed Slopes and Topography
C. Size, type, location, alignment of existing or proposed sewer and water service
(s) that serves the project. Each unit requires a separate service, however,
second dwelling units and apartment complexes are an exception.
D. Sewer and water laterals should not be located within proposed driveways, per
standards.
3. Include on title sheet:
A. Site address
B. Assessor‘s Parcel Number
C. Legal Description
For commerciaVindustriaI buildings and tenant improvement projects, include:
total building square footage with the square footage for each different use,
existing sewer permits showing square footage of different uses (manufacturing,
warehouse, office, etc.) previously approved.
EXISTING PERMIT NUMBER DESCRIPTION
2 W. 7l1m
BUILDING PLANCHECK CHECKLIST
1ST 2ND
ocl
no
3d
0
DISCRETIONARY APPROVAL COMPLIANCE
4a. Project does not comply with the following Engineering Conditions of approval for
Project No.
4b. All conditions are in compliance. Date:
DEDICATION REQUIREMENTS
5. Dedication for all street Rights-of-way adjacent to the building site and any storm
drain or utility easements on the building site is required for all new buildings and
for remodels with a value at or exceeding $15,000, pursuant to Carlsbad
Municipal Code Section 18.40.030.
Dedication required as follows:
Dedication required. Please have a registered Civil Engineer or Land Surveyor prepare the appropriate legal description together with an 8 %" x 11" plat map and submit with a title report. All easement documents must be approved and signed by owner(s) prior to issuance of Building Permit. Attached please find an application form and submittal checklist for the dedication process. Submit the completed application form with the required checklist items and fees to the Engineering Department in person. Applications will not be accept by mail or fax,
Dedication completed by: Date:
IMPROVEMENT REQUIREMENTS
6a. All needed public improvements upon and adjacent to the building site must be
constructed at time of building construction whenever the value of the construction exceeds $75,000, pursuant to Carlsbad Municipal Code Section
18.40.040.
Public improvements required as follows:
Attached please find an application form and submittal checklist for the public improvement requirements. A registered Civil Engineer must prepare the appropriate improvement plans and submit them together with the requirements on the attached checklist to the Engineering Department through a separate plan check process. The completed application form and the requirements on the
BUILDING PLANCHECK CHECKLIST
IST 2ND 3rd
checklist must be submitted in person. Applications by mail or fax are not
accepted. Improvement plans must be approved, appropriate securities posted and fees paid prior to issuance of building permit.
Improvement Plans signed by: Date:
c] 6b. Construction of the public improvements may be deferred pursuant to Carlsbad
Municipal Code Section 18.40. Please submit a recent property title report or
current grant deed on the property and processing fee of $280 so we may
prepare the necessary Neighborhood Improvement Agreement. This agreement
must be signed, notarized and approved by the City prior to issuance of a
Building permit.
Neighborhood Improvement Agreement will include the following:
0 0 6c. Enclosed please find your Neighborhood Improvement Agreement. Please return
agreement signed and notarized to the Engineering Department.
Neighborhood Improvement Agreement completed by:
Date:
0 0 6d. No Public Improvements required. SPECIAL NOTE: Damaaed or defective
improvements found adiacent to buildinq site must be repaired to the satisfaction
of the City Inspector prior to occupancy.
GRADING PERMIT REQUIREMENTS
The conditions that invoke the need for a grading permit are found in Section
1 1.06.030 of the Municipal Code.
0 0 0
c]
7a. Inadequate information available on Site Plan to make a determination on grading
requirements. Include accurate grading quantities (cut, fill import, export).
7b. Grading Permit required. A separate grading plan prepared by a registered Civil
Engineer must be submitted together with the completed application form
attached. The Gradinn Permit must be issued and rouclh qradinq
approval obtained prior to issuance of a Buildinq Permit.
NOTE:
Grading Inspector sign.off by: Date:
0 0 7c. Graded Pad Certification required. (Note: Pad certification may be required even
if a grading permit is not required.)
Rev. 8128100
BUILDING PLANCHECK CHECKLIST
1ST 2ND 3RD 0 0 0 7d .No Grading Permit required.
0 0 c] 7e. If grading is not required, write “No Grading” on plot plan.
MISCELLANEOUS PERMITS
0 0 0 8. A RIGHT-OF-WAY PERMIT is required to do work in City Right-of-way and/or
private work adjacent to the public Right-of-way. Types of work include, but are
not limited to: street improvements, tree trimming, driveway construction, tying
into public storm drain, sewer and water utilities.
Right-of-way permit required for:
0 0 0 9. INDUSTRIAL WASTE PERMIT If your facility is located in the City of Carlsbad
sewer service area, you need to contact the Carlsbad Municipal Water District,
located at 5950 El Camino Real, Carlsbad, CA 92008. District personnel can
provide forms and assistance, and will check to see if your business enterprise is
on the EWA Exempt List. You may telephone (760) 438-2722, extension 7153,
for assistance.
Industrial Waste permit accepted by:
Date:
0 0 0 10.NPDESPERMlT
Complies with the City’s requirements of the National Pollutant Discharge
Elimination System (NPDES) permit. The applicant shall provide best
management practices to reduce surface pollutants to an acceptable level prior to
discharge to sensitive areas. Plans for such improvements shall be approved by
the City Engineer prior to issuance of grading or building permit, whichever
,‘ occurs first.
WATER METER REVIEW
0 0 0 12a. Domestic (potable) Use
Ensure that the meter proposed by the owner/developer is not oversized.
Oversized meters are inaccurate during low-flow conditions. If it is oversized, for
the life of the meter, the City will not accurately bill the owner for the water used.
0 All single family dwelling units received “standard” 1” service with 5/8” service.
5 RH. 711uOo
BUILDING PLANCHECK CHECKLIST
1ST 2ND 3RD
0 If owner/developer proposes a size other than the “standard”, then
owner/developer must provide potable water demand calculations,
which include total fixture counts and maximum water demand in gallons
per minute (gpm). A typical fixture count and water demand worksheet is
attached. Once the gpm is provided, check against the “meter sizing
schedule” to verify the anticipated meter size for the unit.
0 Maximum service and meter size is a 2 service with a 2” meter.
0 If a developer is proposing a meter greater than 2”, suggest the
installation of multiple 2” services as needed to provide the anticipated
demand. (manifolds are considered on case by case basis to limit
multiple trenching into the street).
0 0 12b. Irrigation Use (where recycled water is not available)
All irrigation meters must be sized via irrigation calculations (in gpm) prior
to approval. The developer must provide these calculations. Please follow
these guidelines:
I. If the project is a newer development (newer than 1998), check the recent
improvement plans and observe if the new irrigation service is reflected on
the improvement sheets. If so, at the water meter station, the demand in
gpm may be listed there. Irrigation services are listed with a circled “I”,
and potable water is typically a circled “W”. The irrigation service should
look like:
STA 1+00 Install 2 service and
1.5: meter (estimated 100 gpm)
2. If the improvement plans do not list the irrigation meter and the
service/meter will be installed via another instrument such as the building
plans or grading plans (w/ a right of way permit of course), then the
applicant must provide irrigation calculations for estimated worst-case
irrigation demand (largest zone with the farthest reach). Typically, Larry
Black has already reviewed this if landscape plans have been prepared,
but the applicant must provide the calculations to you for your use. Once
you have received a good example of irrigation calculations, keep a set for
your reference. In general the calculations will include:
0 Hydraulic grade line
0 Elevation at point of connection (POC)
0 Pressure at POC in pounds per square inch (PSI)
0 Worse case zone (largest, farthest away from valve
0 Total Sprinkler heads listed (with gpm use per head)
0 Include a 10% residual pressure at point of connection
3. In general, all major sloped areas of a subdivision/project are to be
irrigated via separate irrigation meters (unless the project is only SFD with
no HOA). As long as the project is located within the City recycled water
BUILDING PLANCHECK CHECKLIST
IST 2ND 3RD
service boundary, the City intends on switching these irrigation
services/meters to a new recycled water line in the future.
0 0 12c. Irrigation Use (where recycled water is available)
I. Recycled water meters are sized the same as the irrigation meter above.
2. If a project fronts a street with recycled water, then they should be
connecting to this line to irrigate slopes within the development. For
subdivisions, this should have been identified, and implemented on the
improvement plans. Installing recycled water meters is a benefit for the
applicant since they are exempt from paying the San Diego County Water
Capacity fees. However, if they front a street which the recycled water is
there, but is not live (sometimes they are charged with potable water until
recycled water is available), then the applicant must pay the San Diego
Water Capacity Charge. If within three years, the recycled water line is
charged with recycled water by CMWD, then the applicant can apply for a
refund to the San Diego County Water Authority (SDCWA) for a refund.
However, let the applicant know that we cannot guarantee the refund, and
they must deal with the SDCWA for this.
0 0 0 13. Additional Comments:
7 Rw. 7114AlCJ
., ENGINEERING DEPARTMENT
FEE CALCULATION WORKSHEET
0
Estimate based on unconfirmed information from applicant.
Calculation based on building plancheck plan submittal.
Address: Bldg. Permit No.
Prepared by: Date: Checked by: Date:
EDU CALCULATIONS: List types and square footages for all uses.
Types of Use: Sq. Ft./Units: EDU's:
Types of Use: Sq. Ft./Units: EDU's: -
ADT CALCULATIONS: List types and square footages for all uses.
Types of Use: Sq. Ft./Units: ADT's:
Types of Use: Sq. Ft./Units: ADT's: -
FEES REQUIRED:
WITHIN CFD: 0 YES (no bridge & thoroughfare fee in District #1, reduced Traffic Impact Fee) 0 NO
0 1. PARK-IN-LIEU FEE PARK AREA & #:
FEE/UNIT: X NO. UNITS: =$
0 2. TRAFFIC IMPACT FEE
ADT'dUNITS: X FEE/ADT: =$
0 3. BRIDGE AND THOROUGHFARE FEE (DIST. #I - DIST. #2 - DIST. #3 - 1
ADT's/UNITS: X FEE/ADT: =$
0 4. FACILITIES MANAGEMENT FEE ZONE:
U NIT/SQ. FT . : X FEE/SQ.FT./UNIT: =$
0 5. SEWERFEE
EDU's: X FEE/EDU: =$
BENEFIT AREA:
EDU's: X FEE/EDU: =$
0 6. SEWER LATERAL ($2,500) =$
0 7. DRAINAGE FEES PLDA HIGH /LOW
ACRES: X FEEIAC: =$
8. POTABLE WATER FEES
UNITS CODE CONNECTION FEE METER FEE SDCWA FEE I RRlG ATlON
WormDoca\Mlsfms\Fee Calculation Worksheet
1 of2
Rev. 7/14/00
ENGINEERING DEPARTMENT
FEE CALCULATION WORKSHEET
0 9. RECLAIMED WATER FEES
UNITS CODE CONNECTION FEE
TOTAL OF ABOVE FEES+: $
SNOTE:
Dedications and Improvements may also be required with Building Permits.
This calculation sheet is NOT a complete list of all fees which may be due.
2 of2
Word\Docs\Misfoma\Fw CakubUon Worksheet Rev. 7/14/00
PLANNING DEPARTMENT
BUILDING PLAN CHECK REVIEW CHECKLIST
Plan Check No. CB003?s4&l Address \%a0 hswmd +V
Planner Paul Godwin
APN: &OS-O%O --%L
Type of Project & Use: Net Project Density: DU/AC
Zoning: e-\ General Plan: ELW Facilities Management Zone: 1
CFD finlniitl # Date of participation: Remaining net dev acres:
Phone 1760) 602-4625
I
7 Circle One -
(For non-residential development: Type of land used created by
this permit: 1
Lecaend: Item Complete Item Incomplete - Needs your action '
- *(- , @ 0 'Ewironmental Review Required: YES - ' NO - x TYPE
I .. ' DATE OF COMPLETION: '. , z *
!.
Compliance with conditions of approval? If not, state conditions which require action.
Conditions of Approval:
TYPE NO - Discretionary Action Required: YES -
6- APPROVAL/RESO. NO. DATE
PROJECT NO.
OTHER RELATED CASES:
Compliance with conditions or approval? If not, state conditions which require action.
Conditions of Approval: , .
c] Coastal Zone Assessment/Cokpliance P Project site located in Coastal Zone? YES- NO )(
If California Coastal Commissi6n Authority: Contact them at - 31 11 Camino Del Rio North, SGe
200, San Diego CA 92108-1725; (619) 521-8036
Determine status (Coastal Permit Required or Exempt) :
Coastal Permit Determination Form already completed? YES . NO
If NO, complete Coastal Permit Determination Form ;ow. *
Coastal Permit Determination Lag #:
Follow-up Actions:
1) Stamp Building Plans as "Exempt" or "Coastal Permit Required" (at minimum
Floor Plans).
2) Complete Coastal Permit Determination Log as needed.
CA Coastal Commission Authority? YES NO-
- I-..-
4
* :{#- t -1 ,' I t
4
H:\ADMIN\COUNTER\BldgPlnchkRevChklst
lnclusionary Housing Fee required: YES
I (Effective date of lnclusionary Housing Ordinance - May 21, 1993.)
NO -\ Data Entry Completed? YES - IAIPIDs, Activity Maintenance, enter CW, toolbar, Screens, Housin Fees, Construct Housing Y/N, Enter Fee, UPDATEI)
J
Site Plan: ’- P
1. Provide a fully dimensional site plan drawn to scale. Show: North arrow,
property lines, easements, existing and proposed structures, streets, existing
street improvements, right-of-way width, dimensional setbacks and existing
topographical lines.
2. Provide legal description of property and assessor’s parcel number. . *.
Zoning: p!ioo1. Setbacks :
Front: Required 37‘ Shown Ty’
Interior Side:
Street Side: Required \3 Shown \4 Required 5, Shown ,.
1
Rear: Required Shown
Accessory structure setbacks :
Front: Required Shown
Interior Side: Required Shown
Street Side: Required Shown
Rear: Required Shown
Structure separation: Required Shown
Lot Coverage: Required 6 70% Shown o\c
Height: OK f
Reauired I: 2 3 Shown
a Additional Comments
1.
Parking: a Spaces Required 0 K
Guest Spaces Required Shown
i OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTE
H:\ADMIN\COUNTEA\EldgPlnchkRevChklst
%- e .. ,
. .. ..
P