HomeMy WebLinkAbout1822 ASTON AVE; ; CB004856; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
0412 51200 1 Commercial/lndustrial Permit Permit No: (3004856
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type: TI Sub Type: INDUST
Parcel No: 2121202100 Lot #: 0 Status: ISSUED
Valuation: $853.496.00 Construction Type: NEW Applied: 12/22/2000
Occupancy Group: Reference #: Entered By: CB
Project Title: DllDT INCORPORATED/ Plan Approved: 04/19/2001
2,390 SF OFFICE.28,092 SF MFGNHSE Issued: 04/25/2001
1822 ASTON AV CBAD
Inspect Area:
Applicant: Owner:
CAROL COLE SMITH CONSULT'G ARCH
SUITE 200
12220 EL CAMINO REAL SAN DIEGO. CA 92130 RANCHO SANTA FE CA 92067 CGP 8011.91
858-793-4771
BLACKMORE FAMILY TRUST 1995
P 0 BOX 1810 7667 04/2!i/01 0002 01 02
Total Fees: $10,011.38 Total Payments To Date: $1,999.47 Balance Due: $8,011.91
Buildina Permit $3.076.00 Meter Size
Add'l Bhding Permit Fee
Plan Check
Add'l Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park Fee
LFM Fee
Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'l Pot. Water Con. Fee
Recl. Water Con. Fee
.. $0.00
$1,999.40
$0.00
$0.00
$179.23
$0.00
$0.00
$0.00
$0.00 $0.00
$0.00 $0.00
$0.00
$0.00
$0.00
$0.00
Add'l Re% Water Con. Fee
Meter Fee
SDCWA Fee
CFD Payoff Fee
PFF
PFF (CFD Fund)
License Tax
License Tax (CFD Fund)
Traffic Impact Fee
Traffic Impact (CFD Fund)
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Master Drainage Fee:
Sewer Fee:
Redev Parking Fee:
Additional Fees:
TOTAL PERMIT FEES
$0.00
$0.00
$0.00
$0.00
$1,218.00
$0.00
$0.00
$0.00
$288.00
$0.00
$209.00
$260.00
$185.00
$0.00
$2,596.75
$0.00
$0.00
$1 0,011.38
review, sat aside, voM, w annul fheirimposmbn.
1 FOR OFFICE USE ONLY
PERMIT APPLICATION
CITY OF CARLSBAD BUILDING DEPARTMENT
1635 Faraday Ave., Carlsbad, CA 92008
Description of Work #of Stories , X Of Bedrooms X of Bathrooms
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to Construct, alter, improve. demolish or repair any structure, prior to its
issuance, also requires the applicant for such p8imit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law
Chapter 9, commending with Section 7000 Of Division 3 of the Business and Professions Codel or that he is exempt therefrom. and the basis for the alleged . Any vioiation of Section 7031.5 by any applicant for a Permit subjects the applicant to a civil penalty of not more than five hundred dollars [$500i). eD.5Jk loo 5 'WDlW Li4 421053 wit 2wr
Address City StatelZip Telephone X 0~2z$
LA 42/30 fi State License ~6740 64 License Class City Business License I ZOO 6.75-
Designer Name Address City
CON'IpAcrrr3(i
5 rn1bi-l Ca.&&C - - StatelZip Telephone SINL bCd 1 lzwe& /Utl?aRQL 5%dOD/RJ S.LKk765 q 7 7 7
State License X .. ,, , , , ., , . . . ,., ,, ... ., , ,, ,. ..
y one of the following declsrat
0
of the Work tor which this permit is issued.
0 issued. My worker's compensation insurance carrier and policy number are:
I have and will maintain a certificate Of Consent to Self-insure for workers' compsnration 88 provided by Section 3700 Of the Labor Code. for the performance
I have and will maintain workers' compensation. as required by Section 3700 of the Labor Code. for the performance of the work for which this permit is
Insurmce Company om policy N~K O 89764% Expiration Date 0 ( AU6200/
(THIS SECTION NEED NOT BE COMPLETED IF THE PERMIT IS FOR ONE HUNDRED DOLLARS [$lo01 OR LESS1
0 CERTIFICATE OF
to become subject tot
WARNING: Failure
lhwsand dollan 161
ormanco of the work for which this permit is issued, I shall not employ any person in my manner so as
ge Is unlawful. and shall subject an employer 10 criminal penalties and civil fines up to one hundred
pensation. damages 01 provided for in Section 3706 of th La code, interest and anomy's fees. -4 ' B54/ ., DATE
0 es 8s their sole compensation. will do the work and the Strwturels not intended or offered for sale
(Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improveS thereon, and who does
such work himself or through his own employees. provided that such improvamentr are not intended or offered for sale. If, however, the building or improvement is
sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
0 I, as owner Of the property, am eXCIUdveIy contracting with licensed contractors to COnStrUCt the project ISec. 7044. Business and Professions Code: The
Contractor's License Law does not apply to an owner Of property who builds or improves thereon, and Contracts for such Projects with contractorlsl licensed
pursuant to the Contractor's License Law).
0
1.
2.
3.
I. as owner of the piope
I am exempt under Section
I personally plan to provide the major labor and materials for COnStrUCtion of the ProPosad ~ro~srtv improvement. 0 YES ON0
I (have I have not) signed an application for a building permit for the proposad work.
I haw contracted with the following person (firm1 to provide the proposed Construction (include name I address I phone number I Contractors license number):
Business and Professions Code for this reason:
4.
number I contractors license number):
5.
I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name I address I phons
I will provide same of the work, but I have contracted (hired) the following person5 to provide the work indicated (include name I address I phone number I type
PROPERTY OWNER SiGNATURE DATE ~'216~~~~R'~~~~~~#~sB~~~ ..,, , . ,
Io the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention
program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance ACCount Act7 0 YES 0 NO
16 the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district?
Is the facility to be constructed within 1,000 feet of the outer boundary of a school Site?
YES NO
0 YES 0 NO
IF ANY OF THE ANSWERS ARE YES. A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE
REOUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR PDLLUTIDN CONTROL DISTRICT.
affirm that there is a constrmti the work for which this permit is issued (Sec. 3097111 Civil Codel.
LENDER'S ADDRESS
, , ,,. . ,, ' ., , ,,
LENDER'S NAME
, , ,, ,, .
i certify that I haw read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all
City ordinances and State laws relating to building construmion. I hereby authorize representatives of the CitV of Carlsbad to enter upon the above mentioned
property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES,
JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CDNSEWENCE OF THE GRANTING OF THIS PERMIT.
OSHA An OSHA permit is required for excavations over 5'0" deep and demolition or Construction of structures over 3 stories in height.
EXPIRATION: Every permit issued by the building Oflicial under the provisions of this Code shall expire by limitation and become null and void if the building or work
authorized by such permit is not corn nced w'thin 180 days from the dale of such permit or if the building or work authorized by such permit is suspended or abandoned
at any time alter the work is cornmad forjdqdioddf 160 days (Section 106.4.4 Uniform Building Code). /I
APPLICANT'S SIGNATURE
WHITE: File YELLOW: Applicant PINK: Finance
Cbof Cadsbrd
Final Bullding Inspection
Dept: Building Engineering Planning CMWD St Lite
Plan Check#:
Permit #: CB004856
Project Name: DVDT INCORPORATED/
2,390 SF OFFICE,28,092 SF MFGNVHSE
Address: 1822 ASTON AV
Contact Person: DENNIS Phone: 7609298157
Sewer Dist: CA Water Dist: CA
Lot
Date:
Permit Type:
Sub Type:
0
07/18/2001
TI
INDUST
.......................................................................................................................................................... a 7h3/& Approved: ZDisapproved: - lnspecte
By: spected:
Inspected Date
Disapproved: - By: Inspected: Approved: __
Inspected Date
Disapproved: - By: Inspected: Approved: - ...........................................................................................................................................................
Comments:
City of Carlsbad Bldg Inspection Request
For: 12/05/2001
Permit# CB004856 Inspector Assignment: TP
Title: DllDT INCORPORATED/
Description: 2,390 SF OFFICE,28,092 SF MFGMlHSE
Type: TI Sub Type: INDUST Phone: 6198438777
Inspector:
Job Address: 1822 ASTON AV
Suite: Lot 0
Location:
APPLICANT CAROL COLE SMITH CONSULT'G ARCH
Owner: BLACKMORE COLLEGE CORNER PARTNERS
Remarks:
Total Time: Requested By: WADE
Entered By: CHRISTINE
CD Description Act Comments
I5 RooflReroof kc.
19 Final Structural I
69 z
Associated PCRs
PCR00143 ISSUED
PCROllOl ISSUED
PCR01129 ISSUED
PCR01156 iSSUED
InsDection History
Date Description Act lnsp Comments
07/20/2001
07/19/2001
07/18/2001
07/09/2001
07/09/2001
06/29/2001
06/28/2001
06/28/2001
06/20/2001
06/20/2001
06/20/2001
06/20/2001
06/18/2001
06/18/2001
0611 8/2001
0611 5/2001
06/15/2001
19 Final Structural
89 Final Combo
89 Final Combo
11 Ftg/Foundation/Piers
12 Steel/Bond Beam
29 Final Plumbing
15 Roof/Reroof
23 GasfresVRepairs
14 Frame/Steel/BoltingMlding
23 GasnesVRepairs
34 Rough Electric
44 Rough/DucWDampers
14 Frame/Steel/EoltingAlVelding
34 Rough Electric
44 Rough/Ducts/Dampers
14 Frame/Steel/Eoltingelding
24 Roughnopout
CO TP
CO TP
NR TP
AP TP
AP TP
CO TP
CO TP
AP TP
AP TP
AP TP
AP TP
AP TP
AP TP
AP TP
AP TP
CO TP
WC TP
TANK FND
T-EAR CElL @ LUNCH RM
GAS LN. TO BBQ
CElL LiTES @ LUNCH RM
DUCTS @ LUNCH RM
T-BAR CEiL N/INCL LUNCH RM
CElL LITES N/INCL LUNCH RM
DUCTS, PLMNS N/INCL LUNCH RM
CElL
r .
City of Carlsbad Bldg Inspection Request
For 12/05/2001
Permi
06/15/2001
06/15/2001
06/14/2001
06/14/2001
06/13/2001
06/1 3/2001
06/13/2001
06/13/2001
06/12/2001
06/12/2001
06/12/2001
06/12/2001
06/11/2001
05/30/2001
05/22/2001
05/21/2001
05/17/2001
05/16/2001
05/15/2001
05/1 5/2001
05/15/2001
05/09/2001
05/09/2001
05/09/2001
05/09/2001
05/08/2001
05/08/2001
05/08/2001
05/08/2001
05/07/2001
05/03/2001
05/03/2001
05/03/2001
05/01/2001
05/01/2001
05/01/2001
04/27/2001
04/27/2001
04/27/2001
04/27/2001
04/27/2001
04/27/2001
04/26/2001
04/26/2001
04/26/2001
04/26/2001
t# CEO04856
34 Rough Electric
44 Rough/DucWDampers
14 Frame/Steel/BoltingMelding
34 Rough Electric
14 Frame/Steel/BoltingNlding
24 Roughfropout
34 Rough Electric
44 Rough/DucWDampers
14 Frame/Steel/BoltingMeiding
24 Roughrropout
34 Rough Electric
44 RoughlDucWDampen
84 Rough Combo
23 GasrrestlRepairs
17 Interior Lath/Drywall
17 Interior Lath/Drywali
14 FramelSteellBoltingNelding
&i Rough Combo
17 Interior LaWDrywall
17 Interior LaWDrywall
84 Rough Combo
14 Frame/Steel/BoitingNlding
14 Frame/Steel/BoltingNldlng
17 Interior Lath/Drywall
34 Rough Electric
14 FramelSteellBoltingNVelding
14 Frame/Steel/BoltingMlding
34 Rough Electric
34 Rough Eleclric
17 Interior Lath/Drywall
14 Frame/Steel/BoltingNlding
16 Insulation
34 Rough Electric
14 Frame/Steel/BoltingWelding
17 interior LaWDrywall
34 Rough Electric
14 Frame/Steel/BoltingNlding
14 Frame/Steel/BoltingNlding
17 Interior Lath/Drywall
34 Rough Electric
34 Rough Electric
44 Rough/DucWDampers
14 Frame/Steel/BoltingMelding
17 Interior Lath/Drywall
21 Underground/Under Flwr
34 Rough Electric
WC TP
WC TP
PI TP
AP TP
NR TP
WC TP
WC TP
WC TP
PA TP
WC TP
PA TP
PA TP
CO TP
AP TP
AP TP
PA TP
AP TP
AP TP
PA NF
PA NF
PA NF
CD TP
AP TP
WC TP
AP TP
PA TP
AP TP
PA TP
AP TP
AP TP
AP TP
AP TP
AP TP
AP TP
AP TP
AP TP
AP TP
CO TP
WC TP
WC TP
AP TP
WC TP
PA TP
WC TP
AP TP
WC TP
Inspector Assignment: TP
T-CEIL
SUB PNLS. TRANS
T-BAR CElL RM 157 8-D LN
CElL LITES RM 157 B-D LN
DUCTS, PLMNS RM 157 8-D LN
T-CEIL
RESTRMS, RM 143
1 HR FULL HT WALL @ 153
RESTROOMS
SEE CARD
NEED BRACING DTL REV
WALLS RM 153-156 N/ INCL CORR F.H. WALL
WALL & CElL @ CORR 181
FULL HT DMZ WALL
RM 158-163
WALL @ RM 158163
FURRED WALLS
WALLS @ RM 158-163
WEST DMZ WALL
ONE SIDE WEST DMZ WALL
FURRED WALLS
SEE NOTICE
PNL WALL @ ELECT RM
Em Corporation
In Tawrsfiip witfi ~oucrnmnt for BuiGtiy Safe y
DATE: April 17,2001
JURI SDl CTl ON : Carlsbad
PLAN CHECK NO.: 00-4856
0 APPLICANT
Cl PLAN REVIEWER a FILE
SET: IV
PROJECT ADDRESS: 1822 Aston Ave.
PROJECT NAME: Blackmore di/dt TI
IXI The plans transmitted herewith have been corrected where necessary and substantially comply
0 The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
0 The plans transmitted herewith have significant deficiencies identified on the enclosed check list
0 The check list transmitted herewith is for your information. The plans are being held at Esgil
0 The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
0 The applicant's copy of the check list has been sent to:
with the jurisdiction's building codes.
and should be corrected and resubmitted for a complete recheck.
Corporation until corrected plans are submitted for recheck.
contact person.
IXI Esgil Corporation staff did not advise the applicant that the plan check has been completed.
Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone #:
Date contacted: Fax #:
REMARKS: The loose plu
Mail Telephone
sheets included herewith should be slip-sheeted into the set
"111" plans currently
By: Kurt Culver Enclosures:
Esgil Corporation
GA MB EJ 0 PC log tmsmtl.dot
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576
Em Corporation
ln Partnership with ~aucrnmnt for 9uiGfintSafety
DATE: April 5,2001
JURISDICTION: Carlsbad
PLAN CHECK NO.: 00-4856
0 FILE
SET 111
PROJECT ADDRESS: 1822 Aston Ave.
PROJECT NAME: Blackmore di/dt TI
0 The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
0 The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
0 The plans transmitted herewith have significant deficiencies identified on the enclosed check list
[XI The check list transmitted herewith is for your information. The plans are being held at Esgil
The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
[XI The applicant's copy of the check list has been sent to:
and should be corrected and resubmitted for a complete recheck.
Corporation until corrected plans are submitted for recheck.
contact person.
Smith Consulting
12220 El Camino Real, # 200 San Diego 92130
0 Esgil Corporation staff did not advise the applicant that the plan check has been completed.
[XI Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Rich Cornelius
Date contacted: 4-6-01 (by:&) Fax #: -4787
Telephone #: (858) 793-4777
Mail L/ Telephone Fax* In Person 0 REMARKS:
By: Kurt Culver Enclosures:
Esgil Corporation 0 GA 0 MB 0 EJ 0 PC 3/29/01 tmsrntl.dot
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576
- Carlsbad 00-4856
April 5, 2001
RECHECK PLAN CORRECTION LIST
JU Rl SDl CTl ON: Carlsbad PLAN CHECK NO.: 00-4856 11 PROJECT ADDRESS: 1822 Aston Ave. SET: 111
DATE PLAN RECEIVED BY
ESGIL CORPORATION: 3/29/01
DATE RECHECK COMPLETED:
April 5,2001
REVIEWED BY: Kurt Culver
FOREWORD (PLEASE READ):
This plan review is limited to the technical requirements contained in the Uniform Building Code,
Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws
regulating energy conservation, noise attenuation and disabled access. This plan review is
based on regulations enforced by the Building Department. You may have other corrections
based on laws and ordinances enforced by the Planning Department, Engineering Department
or other departments.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3,
1997 Uniform Building Code, the approval of the plans does not permit the violation of any
state, county or city law.
A. To facilitate rechecking, please identify, next to each item, the sheet of the plans upon
which each correction on this sheet has been made and return this sheet with the
revised plans.
B. The following items have not been resolved from the previous plan reviews. The original
correction number has been given for your reference. In case you did not keep a copy of
the prior correction list, we have enclosed those pages containing the outstanding
corrections. Please contact me if you have any questions regarding these items.
C. Please indicate here if any changes have been made to the plans that are not a result of
corrections from this list. If there are other changes, please briefly describe them and where
they are located on the plans. Have changes been made not resulting from this list?
OYes ONo
Carlsbad 00-4856
AprU 5,2001
1. Please make all corrections on the original tracings, as requested in the correction list.
Submit three sets of plans for cornmerciallindustrial projects (two sets of plans for
residential projects). For expeditious processing, corrected sets can be submitted in one of
two ways:
1. Deliver all corrected sets of plans and calculations/reports directly to the City of
Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700.
The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering
and Fire Departments.
2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320
Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all
remaining sets of plans and calculations/reports directly to the City of Carlsbad Building
Department for routing to their Planning, Engineering and Fire Departments.
NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by
the City Planning, Engineering and Fire Departments until review by EsGil Corporation is
complete.
PLUMBING, MECHANICAL AND ENERGY CORRECTIONS
PLAN REVIEWER: Eric Jensen
PLUMBING (1997 UNIFORM PLUMBING CODE)
1. Provide gas line sizing calculations: The isometric does not match the floorplan. Is this
a Spsi system with a 2”gas line? Compare the floorplan to the gas isometric: sheets
P2.1:No (future) stub out shown, only (1) radiant heater shown, sheet P2.2: Gas line
missing entirely, Sheet P4.1: % changes to 1 %” at the bottom of the sheet?, and the
isometric (show the pressure past the regulator.
MECHANICAL (1997 UNIFORM MECHANICAL CODE)
There appears to be three different sources for the mechanical design for this phase of the
tenant improvement: The mechanical plans (showing no equipment or labeling of room
uses), the electrical plans (showing installation of equipment and descriptions of
occupancies), and the Technical Report provided by Schirmer. Resolution of the
inconsistencies is necessary prior to plan check approval.
Provide the installation instructions for the Cyberclean 2000 Stencil Cleaner and the
MPM AP-25 screen printer detailing the “closed use” use of the Class II materials as well
as any special ventilation requirements. Note: Additional exhaust ventilation may be
required adjacent to the machines depending upon response. Provide the installation
instructions.
4.
Carlsbad 00-4856
AprU 5,2001
5. Specify the interlock between the fume hood and the make-up air system on the
mechanical plans. (Be specific as to what the fume hood controller is capable of). No
fume hood is shown. Co-ordinate the desian of the Fire Protection Safetv ReDort with
the mechanical desian. Fume hood mentioned in report. Where are stored materials
transferred?
6. Describe the use of the “burn-in” rooms. They are not mentioned in the hazardous
material report. Burn in rooms are 146, 147.
7. Include the vents and exhaust systems for the oven on the roof plan. Note EF2 appears
to be located too far away. Detail how or where over the oven that the EF2 duct will
terminate. Provide oven requirements for plan check.
8. The City of Carlsbad Fire Department will have to approve the use of a residential style
microwave/hood combination to be installed overhead of the range located in the
cafeteria. If a type I hood is required, please provide complete plan design. This item
may be forwarded to the City.
New. In Groups B, F, M, and S Occupancies, or portions thereof, where Class I, 11, or111-
A liquids are used (in any amount), mechanical exhaust shall be provided sufficient to
produce six air changes per hour. Such mechanical exhaust shall be taken from a point
at or near the floor. UBC, Section 1202.2.2. Schirmer requires ventilation within 12 of
floor. Please review the technical report, show the locations that require the ventilation,
provide the ventilation, or provide a modified report from Schirmer.
New. “Equipment, machinery or appliances which generate finely divided combustible waste or
which use finely divided combustible material shall be equipped with an approved method of
collection and removal.” UBC, Section 306.8 Room 159 is labeled a “router room”. Address
this location as well as any others requiring particular removal.
New. Detail exhaust ventilation system compliance with UMC Chapters 5 & 6.
(a) Clearly show the type of material to be exhausted by each exhaust system.
(b) Clearly show the duct materials are suitable for the intended use. UMC, Section 609.1
(c) Clearly show the exhaust duct material and gage used for each duct size. See UMC, Table
5-8 & 5-c.
(d) Separate and distinct systems shall be provided for incompatible materials. UMC, Sections
505.2
(e) Detail ducts conveying explosives or flammable vapors, fumes or dusts shall extend directly
to the exterior of the building without entering other spaces. UMC, Section 505.1.
(9 Detail minimum duct conveying velocities as per UMC, Section 505.4 and Table 5-A.
(9) Detail duct cleanouts as per UMC, Section 609.4.
(h) Detail required explosion venting of dust collection systems as per UMC, Section 609.5.
(i) Detail duct support as per UMC, Section 609.6.
Carlsbad 00-4856
AprU 5,2001
(j) Detail clearances from combustibles as per UMC, Sections 609.8 & 609.8.1.
New. Show compliance with UMC 505.1 (segregation of exhaust system) for the chemical
storage room. The chemical storage room is now not separated from the remainder of the
occupancy (dampers have been removed). The electrical plans specify this area to be
constructed per Class 1, Division I (Flammable vapors present) standards. Please describe this
rooms function as to why it is electrically classified hazardous but is not considered hazardous
via the Uniform Building or Mechanical Codes.
ENERGY CONSERVATION
11. On the plans clearly show the wall and roof insulation locations, thickness, and R-values,
as per the energy design. Notes 5 & 9 on sheetA3 are ambiguous. Please clarify, on the
floorplan, where the roof insulation and where the ceiling insulation will be installed
relative to the exterior (to the envelope) wall design will be. The building was previously
unconditioned space. If now conditioned, it is considered an addition, not an alternation,
requiring the resulting energy design. Please clarify.
Note: If you have any questions regarding this Plumbing, Mechanical, and Energy plan review
list please contact Eric Jensen at (858) 560-1468. To speed the review process, note on this list
(or a copy) where the corrected items have been addressed on the plans.
4
EX - Corporation
DATE: March 19,2001
JURI SDl CTl ON : Carlsbad
PLAN CHECK NO.: 00-4856
0 PLAN REVIEWER
0 FILE
SET 11
PROJECT ADDRESS: 1822 Aston Ave.
PROJECT NAME: Blackmore di/dt TI
The plans transmitted herewith have been corrected where necessary and substantially comply
0 The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
with the jurisdiction's building codes.
The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
The applicant's copy of the check list has been sent to:
Smith Consulting
12220 El Camino Real, # 200 San Diego 92130
0 Esgil Corporation staff did not advise the applicant that the plan check has been completed.
Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Rich Cornelius
Date contacted: 19 (by: 5) Fax #:-4787
Telephone #: (858) 793-4777
MaiilTelephone - Fa In Person 0 REMARKS:
By: Kurt Culver Enclosures:
Esgil Corporation 0 GA 0 MB 0 EJ 0 PC 3/8/01 trnsrnll.dot
9320 Chesapeake Drive, Suite 208 + San Diego;California 92123 + (858) 560-1468 Fax (858) 560-1576
Carlsbad 00-4856
March 19, 2001
RECHECK PLAN CORRECTION LIST
JURISDICTION: Carlsbad PLAN CHECK NO.: 00-4856
PROJECT ADDRESS: 1822 Aston Ave. SET: I1
DATE PLAN RECEIVED BY
ESGlL CORPORATION: 3/8/01
DATE RECHECK COMPLETED:
March 19, 2001
FOREWORD (PLEASE READ):
This plan review is limited to the technical requirements contained in the Uniform Building Code,
Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws
regulating energy conservation, noise attenuation and disabled access. This plan review is
based on regulations enforced by the Building Department. You may have other corrections
based on laws and ordinances enforced by the Planning Department, Engineering Department
or other departments.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3,
1997 Uniform Building Code, the approval of the plans does not permit the violation of any
state, county or city law.
A. To facilitate rechecking, please identify, next to each item, the sheet of the plans upon
which each correction on this sheet has been made and return this sheet with the
revised plans.
B. The following items have not been resolved from the previous plan reviews. The original
correction number has been given for your reference. In case you did not keep a copy of
the prior correction list, we have enclosed those pages containing the outstanding
corrections. Please contact me if you have any questions regarding these items.
C. Please indicate here if any changes have been made to the plans that are not a result of
corrections from this list. If there are other changes, please briefly describe them and where
they are located on the plans. Have changes been made not resulting from this list?
OYes QNo
Carlsbad 00-4856
March 19, 2001
1. Please make all corrections on the original tracings, as requested in the correction list.
Submit three sets of plans for commerciallindustrial projects (two sets of plans for
residential projects). For expeditious processing, corrected sets can be submitted in one of
two ways:
1. Deliver all corrected sets of plans and calculationslreports directly to the City of
Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700.
The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering
and Fire Departments.
2. Bring one corrected set of plans and calculationslreports to EsGil Corporation, 9320
Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all
remaining sets of plans and calculationslreports directly to the City of Carlsbad Building
Department for routing to their Planning, Engineering and Fire Departments.
NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by
the City Planning, Engineering and Fire Departments until review by EsGil Corporation is
complete.
Exit signs are required whenever two exits are required. Show all required exit sign
locations. Section 1003.2.8.2. CAFETERIA. NO RESPONSE RECEIVED. SHOW
EXIT SIGNS IN THE BREAKROOM.
Exit doors from Group A occupancies shall not be provided with a latch or lock unless it
is panic hardware. Section 1007. APPLY THIS TO THE BREAKROOM.
All doors and gates, within the exit path from Group A occupancies to a public way, shall
not be provided with latches or locks unless they are equipped with panic hardware.
Section 1003.3.2.2. NO RESPONSE RECEIVED.
When additional doors are provided for egress purposes, they shall conform to the width,
swing and hardware provisions in Chapter IO. Section 1003.3.1.1. NO
RESPONSE RECEIVED.
4.
5.
6.
7. DOOR 133C.
9. Some corridor walls are new, while others are existing. How do the plans indicate that
those existing walls will be of one-hour fire-resistive construction?
RECEIVED.
NO RESPONSE
SEE NEXT SHEET FOR OUTSTANDING PME ITEMS.
Carlsbad 00-4856
March 19, 2001
PLUMBING, MECHANICAL AND ENERGY CORRECTIONS
PLAN REVIEWER Eric Jensen
No response was included with the recheck submittal. Substantial differences exist between the
initial design of the PME systems and the latest submittal.
PLUMBING (1997 UNIFORM PLUMBING CODE)
1. Provide complete water line and gas line sizing calculation Tables on sheet PI. I. Pipe
sizing for these items will be plan checked after completion of the Tables. New. Provide
gas line sizing calculations: The isometric does not match the floorplan. Is this a 5psi
system with a 2gas line?
2. What is the source of fuel for the oven shown on P2.1?
3. Provide calculations to show compliance with UBC, Appendix 29, (Minimum Plumbing
Facilities) as per the City of Carlsbad.
MECHANICAL (1997 UNIFORM MECHANICAL CODE)
4. Provide the installation instructions for the Cyberclean 2000 Stencil Cleaner and the
MPM AP-25 screen printer detailing the “closed use” use of the Class II materials as well
as any special ventilation requirements. Note: Additional exhaust ventilation may be
required adjacent to the machines depending upon response.
Specify the interlock between the fume hood and the make-up air system on the
mechanical plans. (Be specific as to what the fume hood controller is capable of). No
fume hood is shown. Co-ordinate the desian of the Fire Protection Safetv ReDort with
the mechanical desian.
Describe the use of the “burn-in’’ rooms. They are not mentioned in the hazardous
material report. No response.
Include the vents and exhaust systems for the oven on the roof plan. Note EF2 appears
to be located too far away. Detail how or where over the oven that the EF2 duct will
terminate. Provide oven requirements for plan check.
The City of Carlsbad Fire Department will have to approve the use of a residential style
microwave/hood combination to be installed overhead of the range located in the
cafeteria. If a type I hood is required, please provide complete plan design.
- 5.
6.
7.
8.
Carlsbad 00-4856
March 19, 2001
9. Provide smoke detection in supply air duct of ’air-moving system’ for required shut-off for
smoke control as per UMC, Section 608 and also see Section 203. The note is not
adequate. Please specify how compliance with UMC 608 is made.
“Air-moving system is a system designed to provide heating, cooling, or ventilation in
which one or more air-handling units are used to supply air to a common space or to
draw air from a common plenum or space.” Please provide the required smoke detection
in supply air duct of ‘air-moving system’ for required shut-off for smoke control as per
UMC, Section 608 and also see Section 203.
New. Provide gas line sizing calculations: The isometric does not match the floorplan. Is this
a 5psi system with a 2”gas line?
New. In Groups B, F, M, and S Occupancies, or portions thereof, where Class I, 11, or Ill-A
liquids are used (in any amount), mechanical exhaust shall be provided sufficient to produce six
air changes per hour. Such mechanical exhaust shall be taken from a point at or near the floor.
UBC, Section 1202.2.2.
New. “Equipment, machinery or appliances which generate finely divided combustible waste or
which use finely divided combustible material shall be equipped with an approved method of
collection and removal.” UBC. Section 306.8
New. Detail exhaust ventilation system compliance with UMC Chapters 5 & 6.
a)
b)
c)
d)
e)
Clearly show the type of material to be exhausted by each exhaust system.
Clearly show the duct materials are suitable for the intended use. UMC, Section
609.1
Clearly show the exhaust duct material and gage used for each duct size. See
UMC, Table 5-B & 5-C.
Separate and distinct systems shall be provided for incompatible materials. UMC,
Sections 505.2
Detail ducts conveying explosives or flammable vapors, fumes or dusts shall
extend directly to the exterior of the building without entering other spaces. UMC,
Section 505.1.
9 Detail minimum duct conveying velocities as per UMC, Section 505.4 and Table 5-
A.
g) Detail duct cleanouts as per UMC, Section 609.4.
h) Detail required explosion venting of dust collection systems as per UMC, Section 609.5.
i) Detail duct support as per UMC, Section 609.6.
j) Detail’clearances from combustibles as per UMC, Sections 609.8 & 609.8.1.
New. Show compliance with UMC 505.1 (segregation of exhaust system) for the
chemical storage room.
IO.
Carlsbad 00-4856
March 19, 2001
ENERGY CONSERVATION
11. On the plans clearly show the wall and roof insulation locations, thickness, and R-values,
as per the energy design. Notes 5 & 9 on sheet A3 are ambiguous. Please clariv, on the
floorplan, where the roof insulation and where the ceiling insulation will be installed
relative to the exterior (to the envelope) wall design will be.
12. The completed and signed ENV-1, LTG-1, and MECH-1 forms must be imprinted on the
plans. Provide current forms. Include the ENV, Part 2 of 2 sheet.
Note: If you have any questions regarding this Plumbing, Mechanical, and Energy plan review
list please contact Eric Jensen at (858) 560-1468. To speed the review process, note on this list
(or a copy) where the corrected items have been addressed on the plans.
Em Corporation
In Tlutrursfiip with government for %dfingSafety
DATE: January 8,2001
JURI SDI CTl ON : Carlsbad
PLAN CHECK NO.: 00-4856
Q PLAN REVIEWER
Q FILE
SET: I
PROJECT ADDRESS: 1822 Aston Ave.
PROJECT NAME: Blackmore di/dt TI
0 The plans transmitted herewith have been corrected where necessary and substantially comply
The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff,
0 The plans transmitted herewith have significant deficiencies identified on the enclosed check list
IXI The check list transmitted herewith is for your information. The plans are being held at Esgil
The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
with the jurisdiction's building codes.
and should be corrected and resubmitted for a complete recheck.
Corporation until corrected plans are submitted for recheck.
contact person.
The applicant's copy of the check list has been sent to:
Smith Consulting
12220 El Camino Real, # 200 San Diego 921 30
Esgil Corporation staff did not advise the applicant that the plan check has been completed.
IXI Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: R;C)? &rne\;u5
Date contacted: 1- 9-01 (by: Sy Fax #:-4787
Telephone #: (858) 793-4777
Mail Telephone .I Fax J In Person
REMARKS:
By: Kurt Culver
Esgil Corporation IXI GA MB EJ PC
Enclosures:
12/26/00 tmsmll.dot
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576
L
Carlsbad 00-4856
January 8,2001
PLAN REVIEW CORRECTION LIST
TENANT IMPROVEMENTS
PLAN CHECK NO.: 00-4856 JURISDICTION: Carlsbad
OCCUPANCY: F 1 / B/A3
TYPE OF CONSTRUCTION: V-N, spr. ACTUAL AREA: TI = 30482
ALLOWABLE FLOOR AREA: n/c
USE: Lab/Office
STORIES: n/c
HEIGHT: n/c
SPRINKLERS?: Yes OCCUPANT LOAD: -180
REMARKS:
DATE PLANS RECEIVED BY
JURISDICTION: 12/21/00 ESGlL CORPORATION: 12/26/00
DATE INITIAL PLAN REVIEW
COMPLETED: January 8,2001
FOREWORD (PLEASE READ):
DATE PLANS RECEIVED BY
PLAN REVIEWER: Kurt Culver
This plan review is limited to the technical requirements contained in the Uniform Building Code,
Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws
regulating energy conservation, noise attenuation and access for the disabled. This plan review
is based on regulations enforced by the Building Department. You may have other corrections
based on laws and ordinances enforced by the Planning Department, Engineering Department,
Fire Department or other departments. Clearance from those departments may be .required
prior to the issuance of a building permit.
Code sections cited are based on the 1997 UBC.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3,
1997 Uniform Building Code, the approval of the plans does not permit the violation of any
state, county or city law.
To sDeed up the recheck Drocess. Dlease note on this list (or a CODV) where each
correction item has been addressed. Le., Dlan sheet number, sDecification section. etc.
Be sure to enclose the marked UD list when vou submit the revised Dlans.
TENANT IMPROVEMENTS WITHOUT SPECIFIC ENERGY DATA OR POLICY SUPPLEMENTS (1997UEC) tifonv.do1
Carlsbad 00-4856
January 8,2001
11. Please see below for PME corrections.
12. To speed up the review process, note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet, note or detail number,
calculation page, etc.
Please indicate here if any changes have been made to the plans that are not a
result of corrections from this list. If there are other changes, please briefly
describe them and where they are located in the plans.
Have changes been made to the plans not resulting from this correction list?
13.
Please indicate:
Yes 0 No 0
The jurisdiction has contracted with Esgil Corporation located at 9320
Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of
858/560-1468, to perform the plan review for your project. If you have any
questions regarding these plan review items, please contact Kurt Culver at
Esgil Corporation. Thank you.
PLUMBING, MECHANICAL AND ENERGY CORRECTIONS
PLAN REVIEWER Eric Jensen
PLUMBING (1997 UNIFORM PLUMBING CODE)
1. Provide complete water line and gas line sizing calculation Tables on sheet PI .I.
Pipe sizing for these items will be plan checked after completion of the Tables.
WH3 is shown installed below a fume hood. Please explain. 2.
3. What is the source of fuel for the oven shown on P2.1?
4. The electric water heater is shown installed in the qualification laboratory which
requires a fume hood to dissipate flammable vapors. Is the water heater
installed above grade or at grade level?
Provide calculations to show compliance with UBC, Appendix 29, (Minimum
Plumbing Facilities) as per the City of Carlsbad.
5.
Carlsbad 00-4856
January 8,2001
6.
7.
8.
9.
IO.
11.
12.
13.
14.
15.
-. MECHANICAL (1997 UNIFORM MECHANICAL CODE)
Provide the installation instructions for the Cyberclean 2000 Stencil Cleaner and
the MPM AP-25 screen printer detailing the “closed use” use of the Class II
materials as well as any special ventilation requirements. Note: Additional
exhaust ventilation may be required adjacent to the machines depending upon
response.
The chemical storage room uses a return air system in common with other
spaces. Explain compliance with UMC 403.2. (Note: Room warrants Class I
electrical equipment)
Specify the interlock between the fume hood and the make-up air system on the
mechanical plans. (Be specific as to what the fume hood controller is capable
of).
Describe the use of the “burn-in” rooms. They are not mentioned in the
hazardous material report.
The “hall” on the mechanical sheets is a rated “corridor” on the architectural
sheets. (Return air, opening protection, air transport) Please address.
Include the vents and exhaust systems for the oven on the roof plan. Note EF2
appears to be located too far away. Detail how or where over the oven that the
EF2 duct will terminate.
No mechanical is shown for the “south” electrical room ventilation. It appears to
be new to this permit. Please address.
Detail required roof access ladder to roof mounted HVAC equipment. UMC,
Section 307.5.
The City of Carlsbad Fire Department will have to approve the use of a
residential style microwavelhood combination to be installed overhead of the
range located in the cafeteria. If a type I hood is required, please provide
complete plan design.
Provide smoke detection in supply air duct of ’air-moving system’ for required
shut-off for smoke control as per UMC, Section 608 and also see Section 203.
The note is not adequate. Please specify how compliance with UMC 608 is
made.
*:e “Air-moving system is a system designed to provide heating, cooling, or ventilation
in which one or more air-handling units are used to supply air to a common space or
to draw air from a common plenum or space.” Please provide the required smoke
detection in supply air duct of ‘air-moving system’ for required shut-off for smoke
control as per UMC, Section 608 and also see Section 203.
Carlsbad 00-4856
January 8,2001
16. Detail the support pad for the boiler. (If installed onto a combustible roof
surface.)
17. Show the outside air intake for AH-I and it‘s relationship to the boiler flue (located directly to the west).
ENERGY CONSERVATION
18. Why the difference in square footage between the Title sheet and the Title 24
forms? The shipping area is directly conditioned (heated).
19. On the plans clearly show the wall and roof insulation locations, thickness, and
R-values, as per the energy design.
20. Show bi-level lighting controls as per Title 24, Part 6, Section 131(b).
(Shippinglreceiving area)
The completed and signed ENV-1, LTG-1, and MECH-1 forms must be imprinted
on the plans.
21.
Note: If you have any questions regarding this Plumbing, Mechanical, and Energy plan
review list please contact Eric Jensen at (858) 560-1468. To speed the review process,
note on this list (or a copy) where the corrected items have been addressed on the
plans.
+ ELECTRICAL PLAN REVIEW + 1996NEC
PLAN REVIEWER: MORTEZA BEHESHTI
1. Show or note on the plans the method used to limit fault currents to 10,000 amps on
branch circuits.
2. Include ”CU-1” in the existing “DB-1” load calculations. Include long continuous
loads (LCL) and the largest motor loads. NEC 220.
3. Specify the wiring method you intend to use for this project (i.e., EMT, Metal Flex,
NMC etc.). NEC 110-3(a) and (b)
4. Provide the required access and working space about electrical equipment. Detail 7
on E-6.1 transformer “T-I P2A blocks required code access to room #I 65. NEC
110-16.
Carlsbad 00-4856
January 8,2001
5. Note the following requirements on the prints for panelboards supplying fire alarm
equipment: Lockable cover, identified circuit breaker (red), and a breaker "lock-off
device to be installed.
6. Apply note #8 on sheet E-3.2 to all horneruns to the Class 1, Div.1 area. NEC 500
7. Provide a disconnect for each sign. NEC 600-6
Note: If you have any questions regarding this electrical plan review list please contact
Morteza Beheshti at (858) 560-1468. To speed the review process, note on this
list (or a copy) where the corrected items have been addressed on the plans.
..
The item you have submitted for review has been approved. The approval is based on plans, information and/or specifications provided in your submittal; therefore any changes to these items afler this date, including field modifications. must be reviewed by this office to insure continued conformance with applicable codes. Please review
carefully all comments attached, as failure to comply with instructions in this report can result in suspension of permit to build.
0 A Right-of-way permit is required prior to
construction of the following improvements:
~ City of Carlsbad
Please see attached report of deficiencies
marked wi 0. ake necessaly corrections to plans
or speci 0 ions for compliance with applicable
codes and standards. Submit corrected plans andlor
specifications to this office for review.
Date: -1 7-8 [
Date: 3-/Td
Date: y/ga/y/
I
ENGINEERING AUTHOREATION TO ISSUE BUILDING PERMIT
ATTACHMNTS
3 Dedication Application
Dedication Checklist
0
0
0
G
0
0
improvement Application
Improvement Checklist
Future Improvement Agreement
Grading Permit Application
Grading Submittal Checklist
Right-of-way Permit Application
Right-of-way Permit Submittal Checklist and Information Sheet
Sewer Fee Information Sheet
ENGINEERING DEPT. CONTACT PERSON
Name: TANIYA WADE
City of Carlsbad
Address: 1635 Faraday Avenue, Carisbad, CA 92008
Phone: (760) 602-2773
CFD INFORMATION
Parcel Map No:
Lots:
Recordation:
Carlsbad Tract:
A4
BUILDING PLANCHECK CHECKLIST
SITE PLAN
0 0 1. Provide a fully dimensioned site plan drawn to scale. Show:
A. North Arrow F. Right-of-way Width &Adjacent Streets
B. Existing & Proposed Structures G. Driveway widths
C. Existing Street Improvements H. Existing or proposed sewer lateral
D. Property Lines I. Existing or proposed water service
E. Easements J. Existing or proposed irrigation service
r 3RD
a/ 0 0 2. Show on site plan:
A. Drainage Patterns
1. Building pad surface drainage must maintain a minimum slope of one
percent towards an adjoining street or an approved drainage course.
2. ADD THE FOLLOWING NOTE: “Finish grade will provide a minimum positive
drainage of 2% to swale 5’ away from building.”
B. Existing & Proposed Slopes and Topography
C. Size, type, location, alignment of existing or proposed sewer and water service
(s) that serves the project. Each unit requires a separate service, however,
second dwelling units and apartment complexes are an exception.
D. Sewer and water laterals should not be located within proposed driveways, per
standards.
3. Include on title sheet:
A. Site address
B. Assessor‘s Parcel Number
C. Legal Description
For commercial/industriaI buildings and tenant improvement projects, include:
total building square footage with the square footage for each different use.
existing sewer permits showing square footage of different uses (manufacturing,
warehouse, office, etc.) previously approved.
EXISTING PERMIT NUMBER DESCRIPTION
2 RI wm
BUILDING PLANCHECK CHECKLIST ..
3‘ DISCRETIONARY APPROVAL COMPLIANCE
ST 3”D
)f 0 4a. Project does not comply with the following Engineering Conditions of approval for
Project No.
0 0 4b. All conditions are in compliance. Date:
DEDICATION REQUIREMENTS
5. Dedication for all street Rights-of-way adjacent to the building site and any storm
drain or utility easements on the building site is required for all new buildings and
for remodels with a value at or exceeding $15.ooo, pursuant to Carlsbad
Municipal Code Section 18.40.030.
Dedication required as follows:
Dedication required. Please have a registered Civil Engineer or Land Surveyor
prepare the appropriate legal description together with an 8 %” x 11” plat map and submit with a title report. All easement documents must be approved and
signed by owner(s) prior to issuance of Building Permit. Attached please find an application form and submittal checklist for the dedication process. Submit the
completed application form with the required checklist items and fees to the Engineering Department in person. Applications be accept by mail or fax.
Dedication completed by: Date:
IMPROVEMENT REQUIREMENTS
6a. All needed public improvements upon and adjacent to the building site must be constructed at time of building construction whenever the value of the construction exceeds $75.ooo, pursuant to Carlsbad Municipal Code Section 18.40.040.
Public improvements required as follows:
0 0
Attached please find an application form and submittal checklist for the public improvement requirements. A registered Civil Engineer must prepare the appropriate improvement plans and submit them together with the requirements on the attached checklist to the Engineering Department through a separate plan check process. The completed application form and the requirements on the
3
BUILDING PLANCHECK CHECKLIST
00
on
on
DO
OD
on
checklist must be submitted in person. Applications by mail or fax are not accepted. Improvement plans must be approved, appropriate securities posted and fees paid prior to issuance of building permit.
Improvement Plans signed by: Date:
6b. Construction of the public improvements may be deferred pursuant to Carlsbad
Municipal Code Section 18.40. Please submit a recent property title report or
current grant deed on the property and processing fee of $280 so we may
prepare the necessary Neighborhood Improvement Agreement. This agreement
must be signed, notarized and approved by the City prior to issuance of a
Building permit.
Neighborhood Improvement Agreement will include the following:
0 6c. Enclosed please find your Neighborhood Improvement Agreement. Please return
agreement signed and notarized to the Engineering Department.
Neighborhood Improvement Agreement completed by:
Date:
0 6d. No Public Improvements required. SPECIAL NOTE: Damaaed or defective
improvements found adiacent to buildina site must be repaired to the satisfaction
of the Citv Inspector prior to occupancy.
GRADING PERMIT REQUIREMENTS
The conditions that invoke the need for a grading permit are found in Section
11.06.030 of the Municipal Code.
7a. Inadequate information available on Site Plan to make a determination on grading
requirements. Include accurate grading quantities (cut, fill import, export).
7b. Grading Permit required. A separate grading plan prepared by a registered Civil
Engineer must be submitted together with the completed application form
attached. The Gradina Permit must be issued and rouah aradinq
approval obtained prior to issuance of a Buildina Permit.
0
0
NOTE:
Grading Inspector sign off by:
if a grading permit is not required.)
Date:
0 7c. Graded Pad Certification required. (Note: Pad certification may be required even
4 Rw. MMD
BUILDING PLANCHECK CHECKLIST & 0 0 0 7e. If grading is not required, write “No Grading” on plot plan.
7d .No Grading Permit required
MISCELLANEOUS PERMITS
0 0 8. A RIGHT-OF-WAY PERMIT is required to do work in City Right-of-way and/or
private work adjacent to the public Right-of-way. Types of work include, but are
not limited to: street improvements, tree trimming, driveway construction, tying
into public storm drain, sewer and water utilities.
Right-of-way permit required for:
9. INDUSTRIAL WASTE PERMIT If your facility is located in the City of Carlsbad
sewer service area, you need to contact the Carlsbad Municipal Water District,
at 5950 El Camino Real, Carlsbad, CA 92008. District personnel can
forms and assistance, and will check to see if your business enterprise is
on the EWA Exempt List. You may telephone (760) 438-2722, extension 7153,
for assistance.
Industrial Waste permit accepted by:
Date:
\Yl@
0 0 0 10.NPDESPERMlT
Complies with the City’s requirements of the National Pollutant Discharge
Elimination System (NPDES) permit. The applicant shall provide best
management practices to reduce surface pollutants to an acceptable level prior to
discharge to sensitive areas. Plans for such improvements shall be approved by
the City Engineer prior to issuance of grading or building permit, whichever
occurs first. 6 KO 11. sed fees are attached
0 No fees required ssme%? bc-4b.hm“ & ~1cLI.w WATER METER REVIEW
0 0 0 12a. Domestic (potable) Use
Ensure that the meter proposed by the owner/developer is not oversized.
Oversized meters are inaccurate during low-flow conditions. If it is oversized, for
the life of the meter, the City will not accurately bill the owner for the water used.
All single family dwelling units received “standard” 1” service with 5/23” service.
5 RI. 7lllllm
BUILDING PLANCHECK CHECKLIST
1ST 2ND 3RD
If owner/developer proposes a size other than the "standard", then
owner/developer must provide potable water demand calculations,
which include total fixture counts and maximum water demand in gallons
per minute (gpm). A typical fixture count and water demand worksheet is
attached. Once the gpm is provided, check against the "meter sizing
schedule" to verify the anticipated meter size for the unit.
Maximum service and meter size is a 2 service with a 2 meter.
If a developer' is proposing a meter greater than 2, suggest the
installation of multiple 2" services as needed to provide the anticipated
demand. (manifolds are considered on case by case basis to limit
multiple trenching into the street).
0 0 12b. Irrigation Use (where recycled water is not available)
All irrlgation meters must be sized via irrigation calculations (in gpm) prior
to approval. The developer must provide these calculations. Please follow
these guidelines:
1. If the project is a newer development (newer than 1998), check the recent
improvement plans and observe if the new irrigation service is reflected on
the improvement sheets. If so, at the water meter station, the demand in
gpm may be listed there. Irrigation services are listed with a circled "I",
and potable water is typically a circled "W. The irrigation service should
look like:
STA 1+00 Install 2 service and
1.5: meter (estimated 100 gpm)
2. If the improvement plans do not list the irrigation meter and the
serviceheter will be installed via another instrument such as the building
plans or grading plans (w/ a right of way permit of course), then the
applicant must provide irrigation calculations for estimated worst-case
irrigation demand (largest zone with the farthest reach). Typically, Larry
Black has already reviewed this if landscape plans have been prepared,
but the applicant must provide the calculations to you for your use. Once
you have received a good example of irrigation calculations, keep a set for
your reference. In general the calculations will include:
Hydraulic grade line
Elevation at point of connection (POC)
Pressure at POC in pounds per square inch (PSI)
Worse case zone (largest, farthest away from valve
Total Sprinkler heads listed (with gpm use per head)
include a 10% residual pressure at point of connection
3. In general, all major sloped areas of a subdivision/project are to be
irrigated via separate irrigation meters (unless the project is only SFD with
no HOA). As long as the project is located within the City recycled water
BUILDING PLANCHECK CHECKLIST 1ST 2ND 3RD
service boundary, the City intends on switching these irrigation
serviceslmeters to a new recycled water line in the future.
0 0 0 12c. Irrigation Use (where recycled water is available)
1. Recycled water meters are sized the same as the irrigation meter above.
2. If a project fronts a street with recycled water, then they should be
connecting to this line to irrigate slopes within the development. For
subdivisions, this should have been identified. and implemented on the
improvement plans. Installing recycled water meters is a benefit for the
applicant since they are exempt from paying the San Diego County Water
Capacity fees. However, if they front a street which the recycled water is
there, but is not live (sometimes they are charged with potable water until
recycled water is available), then the applicant must pay the San Diego
Water Capacity Charge. If within three years, the recycled water line is
charged with recycled water by CMWD, then the applicant can apply for a
refund to the San Diego County Water Authority (SDCWA) for a refund.
However, let the applicant know that we cannot guarantee the refund, and
they must deal with the SDCWA for this.
7 Rn. ,110
ENGINEERING DEPARTMENT
FEE CALCULATION WORKSHEET
0
WCalculation based on building plancheck plan submittal.
Estimate based on unconfirmed information from applicant.
Address: ]%% ,89dlc) R Auf Bldg. Permit No. 0 SLlgSb
Prepared by: e Date: ~!/S/I/ Checked by: Date:
EDU CALCULATIONS: List types and square footages for all uses.
Types of Use: &J o& Sq. FtJUnits: 40 a EDU's: e "d.5-
Types of Use: Sq. Ft./Units: EDU's:
ADT CALCULATIONS: List types and square footages for all uses.
Types of Use: S~II MQ, sq. Ft./Units: a3 CM 4 ADT's: 19
Types of Use: Sq. Ft./Units: ADT's:
FEES REQUIRED:
WITHIN CFD:*ES (no bridge & thoroughfare fee in District #1, reduced Traffic Impact Fee)
0 1. PARK-IN-LIEU FEE PARK AREA & #:
-
0 NO
FEEIUNIT: X NO. UNITS: =$
$3. TRAFFIC IMPACT FEE
ADT'siUNiTS: I (3- x FEEIADT: a4 =$ &&
0 3. BRIDGE AND THOROUGHFARE FEE IDIST. #1 __ DIST. #2 - DIST. #3 __ 1
ADT'sIUNITS: X FEEIADT: =$
0 4. FACILITIES MANAGEMENT FEE ZONE:
UNIT/SQ.FT.: X FEE/SQ.FT./UNIT =$ $& 5. SEWER FEE
EDU's: TT X FEEIEDU: 199 =$
BENEFIT AREA:
EDU's: %- X FEE/EDU: loqb =s @t 31.60
0 6. SEWER LATERAL ($2,500) =$
7. DRAINAGE FEES PLDA HIGH /LOW
ACRES: X FEE/AC: =$
0 8. POTABLE WATER FEES
UNITS CODE CONNECTION FEE METER FEE SDCWA FEE IRRIGATION
1of2
Rev. 7/14/00
ENGINEERING DEPARTMENT
FEE CALCULATION WORKSHEET
0 9. RECLAIMED WATER FEES
UNITS CODE CONNECTION FEE METER FEE
TOTAL OF ABOVE FEES+: $ a+vf.&T
+NOTE: This calculation sheet Is NOT a complete list of all fees which may be due.
Dedications and Improvements may also be required with Building Permits.
2of2
Rev. 7/14/00
CARLSBAD MWD !d002/002 .04/17/01 1l:OP 0760 431 1601 APR-17-2001 TUE 10:50 Ah CfiRLSBAD ENGINEERING FAX NO, 760 502 1052 P. 02
INOUSTRlAL WASTE DISCHARGE PERMIT
APPLICATION
PLANNING/ENCINEERING APPROVALS
PERMIT NUMBER CB DATE
-RESIDENTIAL f TENANT IMPROVEMENT
RESIDENTIAL ADDITION MINOR PLAZA CAMINO REAL
(< $10,000.00)
CARLSBAD COMPANY STORES
VILLAGE FAIRE
COMPLETE OFFICE BUILDING
OTHER ,
PLANNER DATE 1- o/
ENGINEER DATE
J rswaq? Carlsbad Fire Department 004856
1635 Faraday Ave. Fire Prevention
Carlsbad. CA 92008 (760) 602-4660
Plan Review Requirements Cafegory: Building Plan
Date of Report: 04/24/2001 Reviewed by: Q< 6dL
Name: SMITH CONSULT ARCH
Address: 12220 EL CAMINO REAL STE 200
City, State: SAN DIEGO CA 92130
Job#: 004856 Plan Checker:
Job Name: DIIDT-Phase I1 Bldg #: CB004856
Job Address: 1822 Aston Avenue Ste. or Bldg. No.
Approved The item you have submitted for review has been approved. The approval is
based on plans, information and I or specifications provided in your submittal;
therefore any changes to these items after this date, including field
modifications, must be reviewed by this office to insure continued conformance
with applicable codes and standards. Please review carefully all comments
attached as failure to comply with instructions in this report can result in
suspension of permit to construct or install improvements.
[XI
0 Approved
Subject to
The item you have submitted for review has been approved subject to the
attached conditions. The approval is based on plans, information and/or
specifications provided in your submittal. Please review carefully all comments
attached, as failure to comply with instructions in this report can result in
suspension of permit to construct or install improvements. Please resubmit to
this office the necessary plans and / or specifications required to indicate
compliance with applicable codes and standards.
0 Incomplete The item you have submitted for review is incomplete. At this time, this office
cannot adequately conduct a review to determine compliance with the
applicable codes and / or standards. Please review carefully all comments
attached. Please resubmit the necessary plans and I or specifications to this
office for review and approval.
Review 1st 2nd 3rd Other Agency ID
FD Job # 0048% FD File #
I Carlsbad Fire DeDartment 004856
1635 Faraday Ave. Fire Prevention Carlsbad, CA 92008
~~
(760) 602-4660
Plan Review Requirements Cafegov: Building Plan
Date of Report: 03/76/2001 Reviewed by: (2 I5cdcl-
Name: SMITH CONSULT ARCH
Address: 12220 EL CAMINO REAL STE 200
City, State: SAN DIEGO CA 92130
Plan Checker: Job#: 004856
Job Name: DVDT-Phase II Blda #: CB004856
Job Address: 1822 Aston Avenue Ste. or Bldg. No.
Approved The item you have submitted for review has been approved. The approval is
based on plans, information and I or specifications provided in your submittal;
therefore any changes to these items after this date, including field
modifications, must be reviewed by this office to insure continued conformance
with applicable codes and standards. Please review carefully all comments
attached as failure to comply with instructions in this report can result in
suspension of permit to construct or install improvements.
0
0 Approved
Subject to
The item you have submitted for revieL has been approved subject to the
attached conditions. The approval is based on plans, information andlor
specifications provided in your submittal. Please review carefully all comments
attached, as failure to comply with instructions in this report can result in
suspension of permit to construct or install improvements. Please resubmit to
this office the necessary plans and I or specifications required to indicate
compliance with applicable codes and standards.
Incomplete The item you have submitted for review is incomplete. At this time, this office
cannot adequately conduct a review to determine compliance with the
applicable codes and / or standards. Please review carefully all comments
attached. Please resubmit the necessary plans and I or specifications to this
office for review and approval.
Review 1 st 2nd 3rd Other Agency ID
FD Job # 004856 FD File #
-
-Requirements Category; Building Plan
Requirement: Pending 05.32 Additional Requirements or Comments
Technical report and the plans must reflect all requirements of Art. 75 and UFC standard 804.
Clarify storage of compressed gasses. Is it in cabinets or exhausted enclosure.
Regarding use of flammable and combustible liquids. Where are they planning to dispense the
liquids and where are the rags going to be placed.
Page 1 03/16/01
c :
Carlsbad Fire Department 004856
1635 Faraday Ave Fire Prevention
Carlsbad, CA 92008 (760) 602-4660
Plan Review Requirements Category: Building Plan
Date of Report: 01/15/2001 Reviewed by: c. ~~~
Name: SMITH CONSULT ARCH
Address: 12220 EL CAMINO REAL STE 200
City, State: SAN DIEGO CA 92130
Job#: 004856 Plan Checker:
Job Name: DVDT-Phase II Bldg #: CB004856
Job Address: 1822 Aston Avenue Ste. or Bldg. No.
Approved The item you have submitted for review has been approved. The approval is
based on plans, information and / or specifications provided in your submittal;
therefore any changes to these items after this date, including field
modifications, must be reviewed by this office to insure continued conformance
with applicable codes and standards. Please review carefully all comments
attached as failure to comply with instructions in this report can result in
suspension of permit to construct or install improvements.
0
0 Approved
Subject to
The item you have submitted for review has been approved subject to the
attached conditions. The approval is based on plans, information andlor
specifications provided in your submittal. Please review carefully all comments
attached, as failure to comply with instructions in this report can result in
suspension of permit to construct or install improvements. Please resubmit to
this office the necessaty plans and / or specifications required to indicate
compliance with applicable codes and standards.
Incomplete The item you have submitted for review is incomplete. At this time, this office
cannot adequately conduct a review to determine compliance with the
applicable codes and / or standards. Please review carefully all comments
attached. Please resubmit the necessaty plans and / or specifications to this
office for review and approval.
Review 1st 2nd 3rd Other Agency ID
FD File # FD Job # 004856
-
Requirements Categoy; Building Plan
Requirement: Pending 05.32 Additional Requirements or Comments
Technical report and the plans must reflect all requirements of Art. 75 and UFC standard 804.
Clarify storage of compressed gasses. Is it in cabinets or exhausted enclosure.
Regarding use of flammable and combustible liquids. Where are they planning to dispense the
liquids and where are the rags going to be placed.
I
Requirement Pending 05 34 Smoke Fire Damper requirements
Provide information on the plans as to how the smoke fire dampers are to be activated. If they are to
be activated by single station smoke detectors provide the locations of the detectors on the electrical
plans. Also provide the state fire marshals listing sheet and the manufacturers cut sheets on the
detector.
I
Page 1 01/15/01
SCHlRMER ENGINEERING CORPORATION
11 770 BERNARD0 PLAZA COURT. SUlTE 116 A SAN DIEGO, CA 92128 A PHONE 18581 673-5645 A FLY 18581 673-5849
FIRE PROTECTlONlLlFE SAFETY REPORT
FOR
dildt, INCORPORATED
PHASE 2
1822 ASTON AVENUE
CARLSBAD, CALIFORNIA
Prepared For:
Mr. Michael Diaz
dildt, incorporated
1822 Aston Avenue
Carlsbad, California 92008
SEC Project No. 2000174-001
December 21,2000
(Revised March 29,2001)
This report is the property of Schirmer Engineering Corporation. Copies retained by the client shall be utilized only
for this use and occupancy of the project, not for the purpose of construction of any other projects.
Fire Protection Engineering A Code Consulting A Loss Control A Security Consulting
fJ3 Yk6
di/dt. Inc . - 1822 Aston Avenue. Phase 2
Carlsbad. California
i December 21. 2000 (REV 3/29/01)
SEC Project No . 2000174-001
TABLE OF CONTENTS
INTRODUCTION ................................................................................................................. 1
APPLICABLE CODES ........................................................................................................ 1
BUILDING DESCRIPTION .................................................................................................. 1
OCCUPANCY ..................................................................................................................... 2
CONSTRUCTION AND FIRE-RESISTANCE RATINGS .................................................................. 2
ALLOWABLE AR En ............................................................................................................... 2
ALLOWABLE HEIGHT ............................................................................................................ 3
FIRE SUPPRESSION SYSTEM REQUIREMENTS ........................................................................ 3
HAZARDOUS MATERIAL STORAGE AND USE REQUIREMENTS .................................. 4
GENERAL REQUIREMENTS ................................................................................................... 5
COMPRESSED GASES .......................................................................................................... 6
FLAMMABLE & COMBUSTIBLE LIQUIDS .................................................................................. 7
MECHANICAL VENTILATION ............................................................................................ 7
CONCLUSION ..................................................................................................................... 8
INDEX OF TABLES
TABLE 1 . CONSTRUCTION REQUIREMENTS .............................................................................. 2
TABLE 2 . FIRE SUPPRESSION SYSTEM REQUIREMENTS ............................................................ 3
TABLE 3 . HAZARDOUS MATERIALS INVENTORY ........................................................................ 4
TABLE 4 . HAZARDOUS MATERIALS SUMMARY .......................................................................... 4
TABLE 5 . LIQUID NITROGEN TANK SEPARATION DISTANCE ........................................................ 6
APPENDICES
APPENDIX A . MATERIAL SAFETY DATA SHEETS
di/dt, Inc. - 1822 Aston Avenue, Phase 2
Carlsbad, California
1 December 21,2000 (REV 3/29/01)
SEC Project No. 2000174002
INTRODUCTION
di/dt, Incorporated is proposing to renovate an existing shell building at 1822 Aston Avenue for
executive offices, research and development, engineering offices, and laboratories for the
assembly and testing of circuit boards. The project is planned in three phases. Phase 1
consists of offices, prototyping and testing laboratories only. Phase 2 consists of electronics
assembly operations and additional offices. A research and development laboratory is planned
for the final phase.
Schirmer Engineering Corporation has been retained to provide an evaluation of the fire
protection and life safety requirements applicable to the proposed occupancy. The Phase 1
evaluation is contained in a separate report, reviewed and approved by the Carlsbad Fire
Department (Job No. 990364). Specifically, this report will address hazardous materials and
general building requirements due to assembly and testing of circuit boards (Phase 2).
APPLICABLE CODES
The following codes were used in preparing this report:
Uniform Building Code (UBC) - 1997 Edition
Uniform Fire Code (UFC) - 1997 Edition
Uniform Mechanical Code (UMC) - 1997 Edition
National Fire Protection Association (NFPA) 13, Standard for the lnstallation of Sprinkler
Systems, 1999 Edition
Uniform Fire Code (UFC), Standard 79-3, Identification of the Health, Flammability and
Reactivity of Hazardous Materials, 1997 Edition
National Fire Protection Association (NFPA) 45, Standard on Fire Protection for Laboratories
Using Chemicals, 1996 Edition.
BUILDING DESCRIPTION
For Phase 2, di/dt will occupy approximately 30,482 square feet of this approximately 63,139
square foot building with office (Group B) and manufacturing (Group F, Division 1) occupancies.
The remaining portion of the building will remain unoccupied until the final phase is completed.
. dildt. Inc. - 1822 Aston Avenue, Phase 2
Carlsbad, California
2
Construction
December 21, 2000 (REV 3/29/01)
SEC Project No. 2000174-001
Fire Resistance Rating Requirement I
An area utilization of the Phase 2 portion is as follows: . Offices (Group B) - 18,970 square feet
Electronics Assembly (Group F, Division 1) - 11,512 square feet
Exterior Bearing Wall
OCCUPANCY
The facility will be used for executive, administrative, research and development, engineering
offices, and assembly and electrical testing of electronic circuit boards. Circuit boards will be
manufactured utilizing Surface Mount Technology (SMT). Automatic equipment will be used to
apply adhesives and solder paste, place components, and oven cure circuit boards. Within the
electrical testing areas, miniature circuit boards will be populated and subjected to functional
tests. Light soldering and epoxy gluing will be performed on the circuit boards as necessary.
Final qualification of circuit boards will be performed using thermal shock equipment.
Four-hour less than 5 feet, two-hour
CONSTRUCTION AND FIRE-RESISTANCE RATINGS
The facility will comply with the UBC requirements for Type V Non-rated construction. The
required exterior wall and opening protection for Group B, Group F, Division 1 and Group S,
Division 1 occupancies is compliant as summarized in Table 1, Construction Requirements.
-
Exterior Non-bearing Wall
Opening Protection
elsewhere
Same as bearing
Openings not permitted less than 5 feet,
-
Exterior Non-bearing Wall
Opening Protection
elsewhere
Same as bearing
Openings not permitted less than 5 feet,
protected less than 20 feet
ALLOWABLE AREA
The building has a total area of 63,139 square feet. Section 505.2 of the UBC states that, “The
area of any one or two story building of Groups B; F, Division 1 or 2, M; S, Division 1, 2, 3, 4, or
5; and H, Division 5 occupancies shall not be limited if the building is provided with an approved
automatic sprinkler system throughout and entirely surrounded and adjoined by public ways or
yards not less than 60 feet.” The building complies with these requirements and therefore, will
have unlimited allowable area.
di/dt, Inc. - 1822 Aston Avenue, Phase 2
Carlsbad, California
3 December 21, 2000 (REV 3/29/01)
SEC Project No. 2000174001
Occupancy Type of Sprinkler Temperature/
System Orifice Size
(OFlinch)
Offices, Wet 1651 112
Reception, and
Restrooms
Manufacturing Wet 2861 17/32
ALLOWABLE HEIGHT
The allowable height for a building with Type V Non-rated construction with Group B and F-I
Occupancies is 40 feet (UBC Table 5-6). The maximum height of the building is approximately
32 feet; therefore, the requirements for allowable height are satisfied.
Required Sprinkler Design Reference
Criteria
Light Hazard - 0.10 gpm/sq.ft. NFPA 13,
over most remote 1,500 sq.ft. Figure 5-
2.3
Ordinary Hazard Group 2 - NFPA 13,
0.20 gpm/sq.ft. over most Fig'ure 5-
remote 1,500 sq.ft. 2.3
FIRE SUPPRESSION SYSTEM REQUIREMENTS
The fire suppression requirements, based on occupancy are summarized in Table 2, Fire
Suppression System Requirements.
The existing shell building is equipped EL0 K-I 1.2 sprinklers designed to provide a density of
0.60 gpm/sq.ft. for the most remote 2,000 square feet. The existing system is therefore
adequate. Below suspended ceiling spaces will be protected with sprinklers designed as
presented in Table 2, Fire Suppression System Requirements.
di/dt, Inc. - 1822 Aston Avenue, Phase 2
Carlsbad, California
4 December 21, 2000 (REV 3/29/01)
SEC Project No. 2000174-001
Type of Material
HAZARDOUS MATERIAL STORAGE AND USE REQUIREMENTS
A list of the hazardous materials to be used and stored within the Phase 2 portion of the facility
is shown in Table 3, Hazardous Materials Inventory. This list includes all hazardous materials
storage from Phase 1. The hazardous materials used in Phase 1 laboratories will now be
stored in Phase 2, specifically within the chemical safety storage room (Room No. 159).
Material Safety Data Sheets are included in Appendix A.
Quantities Exempt Amounts’
Storage Use I Storage I Use
Classification Key: CL II -Combustible Liquid Class 11, CL Ill-A - Combustible Liquid Class Ill-A, CL Ill-B - Combustible Liquid Class 111-8, FL I-B - Flammable Liquid Class I-B, IRR - Irritant, SEN -Sensitizer
1
The combined Phase 1 and Phase 2 areas occupied by di/dt will be treated as one control area
as defined in UBC, Section 204. The quantities of hazardous material used and stored within
the control area will be below the exempt amounts as defined in the UBC and UFC (see Table
4, Hazardous Material Summary).
Per UFC Tables 7902.5A, 7903.28, 8001.15A, 8001.15B, and 8802.3-A. The exempt amounts shown are applicable in a fully sprinklered building. When the material density is not available, a conversion of
10 pounds per gallon is used.
1
di/dt, Inc. - 1822 Aston Avenue, Phase 2
Carlsbad, California
5 December 21,2000 (REV 3/29/01)
SEC Project No. 2000174-001
In accordance with UFC Section 8001.15.1, storage, dispensing, use and handling of hazardous
materials in quantities not exceeding exempt amounts shall be in accordance with Section 8001.
GENERAL REQUIREMENTS
The general safeguards required for the use and storage of hazardous materials in non-
hazardous occupancies are as follows:
Design and construction of containers, cylinders and tanks: Containers shall be designed
and constructed in accordance with nationally recognized standards (UFC Section
8001.4.1).
Suitability of equipment, machinery and processes: Equipment, machinery and processes
used for dispensing, use or handling shall be approved, listed or designed and constructed
in accordance with approved standards for intended use. Such equipment, machinery and
processes shall be maintained in an operable condition (UFC Section 8001.4.4).
Material Safety Data Sheets (MSDS): MSDS shall be readily available on the premises for
all hazardous materials regulated by Article 80 (UFC Section 8001 6).
Identification Signs: Visible hazard identification signs as specified in UFC Standard 79-3
shall be placed at entrances to the locations where hazardous materials are stored,
dispensed, used or handled in quantities requiring a permit. Individual containers, cartons
or packages shall be conspicuously marked or labeled in accordance with nationally
recognized standards (UFC 8001.7).
Separation of Incompatible Materials: Incompatible materials in storage and storage of
materials incompatible with materials in use shall be separated when the stored materials
are in containers having a capacity of more than 5 pounds or % gallon. Separation shall be
accomplished by the following: (UFC Section 8001 .I 1.8).
di/dt, Inc. - 1822 Aston Avenue, Phase 2
Carlsbad, California
6 December 21, 2000 (REV 3/29/01)
SEC Project No. 2000174-001
Exposure
Buildings, regardless of construction type
Wall openings
Property lines
Combustible materials such as paper,
leaves, weeds, dry grass or debris
1. Segregating incompatible material storage by a distance of not less than 20 feet.
Minimum Distance (feet)
1
1
5
15
2. Isolating incompatible material storage by a noncombustible partition extending not less
than 18 inches above and to the sides of the stored material.
3. Storing liquid and solid material in hazardous materials storage cabinets.
4. Storing compressed gases in gas cabinets or exhausted enclosures.
COMPRESSED GASES
A 11,000 gallon liquid nitrogen tank (cryogenic fluid) will be located on the exterior of the
building. A vaporizer will be located next to the tank and used to provide nitrogen gas,
which will be supplied to the reflow oven in the SMT Laboratory (Room 157). The tank,
equipment and devices will be designed for compliance with recognized standards.
The tank foundations and supports will be designed to withstand the low-temperature effects
of liquid nitrogen spillage. The tank will be equipped with a pressure-relief valve designed in
accordance with nationally recognized standards (UFC 7501 5).
The liquid nitrogen tank will be separated from buildings and other exposures in accordance
with UFC Table 7501.9.2-A, as shown in Table 5, Liquid Nitrogen Tank Separation Distance.
di/dt, Inc. - 1822 Aston Avenue, Phase 2
Carlsbad, California
7 December 21, 2000 (REV 3/29/01)
SEC Project No. 2000174-001
The tank will be protected from physical damage by the installation of pipe bollards. Bollard
design will be based on the following:
1. Constructed of steel not less than 4 inches in diameter and concrete filled.
2. Spaced not more than 4 feet between posts on center.
3. Set not less than 3 feet deep in a concrete footing of not less than a 15-inch diameter.
4. Set with the top of the posts not less than 3 feet above ground.
5. Located not less than 5 feet from the tank.
FLAMMABLE & COMBUSTIBLE LIQUIDS
Small quantities of isopropyl alcohol (Class I-B liquid) will be used in the SMT-2 Laboratory
(Room 155) to clean circuit board parts. Solder flux (Class I-B liquid) will be used for light
assembly of circuit boards. Stencil cleaners will be used within equipment in the SMT
Laboratory (Room 157). The Cyberclean 2000 Stencil Cleaner uses 10 gallons of Bioact stencil
cleaner (Class II liquid). The MPM AP-25 screen printer uses 5 gallons of lonox stencil cleaner
(Class Ill-A liquid). The use of stencil cleaner within the equipment is considered a closed use.
Epoxy adhesives and solder paste will be used in assembly operations in the SMT laboratories.
Electrical wiring and equipment shall be installed and maintained in accordance with the
Electrical Code in areas where flammable and combustible liquids are used. Locations where
flammable vapor/air mixtures could exist under normal operations shall be classified as Class I,
Division 1 when the area is within five feet of any edge of the equipment and Class I, Division 2
when the area is between five feet and eight feet of any edge of the equipment, extending in all
directions (UFC Table 7901.4-A). Laboratory use of isopropyl alcohol and solder flux in 50 cc
(less than 2 fl. oz.) and 20 cc (less than 1 fl. oz.) spill-proof pump dispenser bottles is not
considered applicable to these requirements.
MECHANICAL VENTILATION
UBC Section 1202.2.2 requires that in areas where Class I, II, or Ill-A liquids are used,
mechanical exhaust shall be provided in sufficient quantities to produce six air changes per
hour. The mechanical exhaust shall be taken at or near floor level. The intent of this
requirement is to provide dilution ventilation such that the amount of vapors liberated from the
flammable or combustible liquids would not be sufficient to cause an explosion or fire. Since
most flammable or combustible liquids are heavier than air, the requirement to locate exhaust
di/dt, Inc. - 1822 Aston Avenue, Phase 2
Carlsbad, California
8 December 21,2000 (REV 3/29/01)
SEC Project No. 2000174-001
inlets at or near floor level is intended to direct exhaust ventilation to the most likely area of
vapor accumulation.
Dispensing of isopropyl alcohol and solder flux into use containers will be conducted within
Chemical Storage (Room 162). The isopropyl alcohol and solder flux will be dispensed from
one-gallon containers into 50 cc (less than 2 fl. 02.) and 20 cc (less than 1 fl. 02.) spill-proof
pump dispenser bottles. The exhaust ventilation for the Chemical Storage room will be
balanced to provide 800 cfm, or 12.7 air-changes per hour, well above the required 6 air-
changes per hour. The exhaust will be taken 12 inches from the floor.
Several spill-proof pump dispenser bottles of isopropyl alcohol and solder flux will be used in the
laboratories. Approximately 34 ounces of isopropyl alcohol and less than one ounce of solder
flux will be used per week. The potential for a liquid spill is minimized by the low usage, and
even if a container is spilled, the spill-proof lid will not allow chemical leakage. Any wipes used
to clean circuit board parts will be disposed of properly in designated flammable waste
containers. For these reasons, only environmental air movement, which is less than six air
changes per hour, will be provided in the laboratories.
CONCLUSION
In conclusion, this facility will meet or exceed the requirements of the UBC, and UFC due to
exceptional sprinkler system and limited amounts of hazardous materials.
Prepared by: Reviewed by:
SCHIRMER ENGINEERING CORPORATION SCHIRMER ENGINEERING CORPORATION
c A$P&L
Michael S. Marlowe
Fire Protection Consultant Engineering Manager
MSM:MES/mg:lc
Garner A. Palenske, P.E.
APPENDIX A
MATERIAL SAFETY DATA SHEETS
lsopropyl Alcohol MSUS c.. .,
I. CHEMICAL PRODUCT AND COMPANY IDENTIFICATION
2,COMPOSITION/INFORMATlON ON INGREDIENTS
3. HAZARDS IDENTIFICATIO_N
4. FIRST-AID MEASURES
5. FIRE FIGHTING MEASURES __ 6. ACCIDENTAL RELEASE MEASURS
7. HANDLING AND STORAAE
8. EXPOS&Rx-CONTROLSlPERSONAL PRO-TECTION
9. PHYSICAL AND CHEMICAL PROPERTIES
10. STABILITY AND REACTlVln
-_ 11. TOXICOLOGICAL INFORMAIIllN
____-__ 12. ECOLOGICAL INFORMATIC3
13. DISPOSAL CONSIDERATIONS
14. TRANSPORT INFORMATION
15. REGULATORY INFORMATION
16. OTHER INFORMATION
PRODUCT NAME: Isopropyl Alcohol
OTHEWGENERIC NAMES: 2-Propano1, Isopropanol, IPA
PRODUCT USE: Solvent
MANUFACTURER: Burdick & Jackson, Inc.
A Subsidiary of AlliedSignal Inc.
1935 S. Harvey Street
Muskegon, MI 49442
FOR MORE INFORMATION CALL:
(Monday-Friday, 9:00am4:30pm)
Product Safety Department
800.368.0050 1 800 424-9300 (Cherntrec)
231.726.3171
IN CASE OF EMERGENCY CALL:
(24 HourslDay, 7 DaysNVeek) 973455-2000 (AlliedSignal, Morristown, NJ)
INGREDIENT NAME CAS NUMBER WEIGHT %
isopropyl Alcohol 67-63-0 100%
http://www. bandj.com/MainWindowPagesJMSDS/IsoprAkMSDS.htm 8/22/2000
,.
Trace impurities and additional material names not listed above may also appear in Section
15 towards the end of the MSDS. These materials may be listed for local "Right-To-Know''
compliance and for other reasons.
EMERGENCY OVERVIEW.
Flammable. A clear, colorless, liquid with a slight alcoholic odor. Can cause skin, eye and
respiratory tract irritation.
POTENTIAL HEALTH HAZARDS
SKIN: Repeated exposures to the skin may result in burning, itching, redness and
dermatitis.
EYES: Liquid and vapor contact produces intense stinging and burning sensations. It has
been reported that prolonged contact to the liquid may cause temporary damage to the
eyes, but healing has been prompt.
INHALATION: Exposure can cause respiratory tract and throat irritation, headaches,
shortness of breath and symptoms similar to intoxication. Overexposure can produce severe central nervous system depression, coma and possibly fatal respiratory failure.
INGESTION: The probable lethal dose in an adult is 240 ml but as little as 20 ml may
produce symptoms. Symptoms may include, severe nausea, abdominal pain, bleeding and
central nervous system depression.
DELAYED EFFECTS: None known.
Ingredients found on one of the OSHA designated carcinogen lists are listed below.
INGREDIENT NAME NTP STATUS IARC STATUS OSHA LIST
Isopropyl Alcohol Group 3,
Unclassifiable
SKIN: Flush with water for at least 15 minutes. Remove contaminated clothing. Wash
clothing before reuse.
EYES: Flush with water for at least 15 minutes. If irritation persists, get medical assistance.
INHALATION: Remove from exposure area to fresh air. If victim is not breathing administer
artificial respiration according to your level of training and obtain professional medical
assistance immediately.
INGESTION: If patient is conscious, rinse mouth with water. Do not induce vomiting unless
http://www. bandj. com/MainWindowPage&lSDS/IsoprAkMSDS .htm 8/22/2000
Isopropyl Alcohol MSDS
instructed to do so by a physician. Get immediate medical attention.
ADVICE TO PHYSICIAN: No specific instructions. Treat symptomatically.
FLAMMABLE PROPERTIES
FLASH POINT: 53°F (12°C)
FLASH POINT METHOD: Closed Cup
AUTOIGNITION TEMPERATURE: 750°F (399°C)
UPPER FLAME LIMIT (volume % in air):
LOWER FLAME LIMIT (volume % in air):
FLAME PROPAGATION RATE (solids):
2.0 (LFL)
12.0 (UFL)
Not applicable
OSHA FLAMMABILITY CLASS: 18
EXTINGUISHING MEDIA:
Dry chemical. carbon dioxide or alcohol resistant foam. Water may be ineffective. Water
spray may be used to reduce vapors and to cool containers exposed to fire.
UNUSUAL FIRE AND EXPLOSION HAZARDS:
Fire hazard when exposed to heat, flame or oxidizers. Vapors are heavier than air and may
travel a considerable distance to an ignition source and flash back. Vapor mixtures are
explosive.
SPECIAL FIRE FIGHTING PRECAUTIONSllNSTRUCTlONS:
Wear self-contained breathing apparatus. Do not release runoff from fire control methods to
sewers or waterways. Keep fire exposed containers cool and reduce vapors with water
spray.
IN CASE OF SPILL OR OTHER RELEASE:
(Always wear recommended personal protective equipment.)
Eliminate sources of ignition. Isolate the spill area. Stop leak in a safe and practical manner.
(If leak cannot be stopped easily and safely, advise trained emergency response personnel
of the situation.) Using inert material (such as ground corncobs) dike the spilled solvent to
prevent it from running into drains or waterways.
Spills and releases may have to be reported to Federal and/or local authorities. See Section
15 regarding reporting requirements.
NORMAL HANDLING:
(Always wear recommended personal protective equipment.)
Keep away from heat, open flame or other high temperature sources. Avoid cotact with skin,
eyes and clothing; avoid breathing vapor or mist. Use good personal hygiene and
http://www.bandj.comiMainWindowPagesJMSDS/IsoprAlcMSDS.htm 8/22/2000
isopropyl .wconoi MW~ 0- . -- --
. housekeeping practices.
STORAGE RECOMMENDATIONS:
Store in an area designed for storage of flammable liquids. (OSHA 29 CFR 1910,106)
Protect containers from physical damage. Store in a cool, dry, well-ventilated area away
from ignition sources and other fire hazards. Flammable liquid and vapor. Once liquid
solvent has been completely dispensed, containers which appear "empty" should be
handled in the same manner as when they were "full" of liquid solvent.
ENGINEERING CONTROLS: .- Provide general or local exhaust ventilation systems to maintain airborne concentrations
below permissible TLV levels. Local exhaust ventilation is preferred because it prevents
contaminant dispersion into the work area by controlling it at its source.
PERSONAL PROTECTIVE EQUIPMENT
SKIN PROTECTION:
Where liquid contact is possible impervious coveralls are recommended. To minimize the
possibility in other handling and storage operations, wear appropriate PPE to include
chemical resistant gloves, boots and apron.
EYE PROTECTION:
Safety glasses are considered minimum protection. Goggles or face shield may be
necessary depending on quantity of material and conditions of use.
RESPIRATORY PROTECTION:
Seek professional advice prior to respirator selection and use. Follow OSHA respirator
regulations (29 CFR 191 0.134) and, if necessary, wear a MSHNNIOSH-approved
respirator. For emergency or non-routine operations (cleaning spills, reactor vessels, or
storage tanks), wear a SCBA. Warning! Air-purifying respirators do not protect workers in
oxygendeficient atmospheres.
ADDITIONAL RECOMMENDATIONS:
This material should be used in close proximity to eyewash station and safety shower. Use
appropriate personal hygiene after handling this material. Do not smoke in the vicinity of
flammable materials.
EXPOSURE GUIDELINES
INGREDIENT NAME ACGIH TLV OSHA PEL OTHER LIMIT
Isopropyl Alcohol 400 ppm TWA 400 ppm TWA None
500 ppm STEL
= Limit established by AlliedSignal.
* = Workplace Environmental Exposure Level (AIHA).
http://www.bandj.com/UainWindowPages/MSDSAsoprAcMSDS. htm 8/22/2000
Isopropyl Alcohol MSUb --D- - -- -
. - = Biological Exposure Index (ACGIH).
OTHER EXPOSURE LIMITS FOR POTENTIAL DECOMPOSITION PRODUCTS:
None
____~ ~____ ~
APPEARANCE: Clear, colorless liquid
PHYSICAL STATE: Liquid
MOLECULAR WEIGHT: 60.1 1
CHEMICAL FORMULA: (CH,),CHOH
ODOR: Slight alcohol odor SPECIFIC GRAVITY (water = 1.0): 0.785 @ 25°C
SOLUBILITY IN WATER (weight Complete
%): Not Applicable.
pH: 82.3"C
BOILING POINT: -88°C
MELTING POINT:
VAPOR PRESSURE: 2.1
VAPOR DENSITY (air = 1.0): EVAPORATION RATE: 100
% VOLATILES: 12°C
@ 20°C 33 mmHg - 3 COMPARED TO: Butyl Acetate = 1
(Flash point method and additional flammability data
are found in Section 5.) FLASH POINT:
NORMALLY STABLE? (CONDITIONS TO AVOID):
Stable at room temperatures. Avoid contact with ignition sources. Vapors are flammable.
Containers may rupture violently in fire and travel a considerable distance.
INCOMPATIBILITIES:
Strong oxidizers, strong acids, reactive metals, including aluminum. Forms ketones in
presence of oxygen.
CONDITIONS TO AVOID:
Heat, sparks and flame. Direct sunlight.
HAZARDOUS DECOMPOSITION PRODUCTS:
Incomplete combustion can generate carbon monoxide and other hazardous gases.
HAZARDOUS POLYMERIZATION: Will not occur.
IMMEDIATE (ACUTE) EFFECTS:
http:/lwww.bandj.com/MainWndowPages/MSDSflsoprAlcMSDS. htm 8/22/2000
Isopropyl klcohol MSDS
Oral LD,, (rat): 5045 mglkg
Skin Irritation (rabbit): 500 mg - mild
Eye Irritation (rabbit): 10 mg - moderate; 100 mg - moderate
DELAYED (SUBCHRONIC AND CHRONIC) EFFECTS:
8000 ppm/8 hr.lday for 20 weeks (intermittent) caused sensory change involving peripheral
nerves.
OTHER DATA:
None
Relatively biogradeable. LC,, Pimephales promelas (fathead minnows) 11,160 mg/l/24 hr (static bioassay in Lake
Superior water at 18-22 deg. C. LC,, Pimephales promelas (fathead minnows) 10.4 9/1/96
hr.
RCRA
Is the unused product a RCRA hazardous waste if discarded? Yes
If yes, the RCRA ID number is: DO01 Ignitable
OTHER DISPOSAL CONSIDERATIONS:
The information offered here is for the product as shipped. Use andlor alterations to the
product such as mixing with other materials may significantly change the characteristics of
the material and alter the RCRA classification and the proper disposal method.
US DOT PROPER SHIPPING NAME:
US DOT HAZARD CLASS: US DOT ID NUMBER UN1219
US DOT PACKING GROUP: II
NA EMERGENCY RESPONSE GUIDE: 129
Isopropyl Alcohol
3, Flammable Liquid
For additional information on shipping regulations affecting this material, contact the
information number found in Section 1.
TOXIC SUBSTANCES CONTROL ACT (TSCA)
http://www . bandj.com/MainWindowPageslMSDSlIsoprAlcMSDS. htm 8/22/2000
Isopropyl Alcohol MSDS
TSCA INVENTORY STATUS: Listed on the inventory.
OTHER TSCA ISSUES: Subject to export notification
SARA TITLE IlllCERCLA
"Reportable Quantities" (RQs) andlor "Threshold Planning Quantities" (TPQs) exist for the
following ingredients.
INGREDIENT NAME SARNCERCLA RQ (Ib) SARA EHS TPQ (Ib)
No ingredients listed in this section
Spills or releases resulting in the loss of any ingredient at or above its RQ requires
immediate notification to the National Response Center [(800) 424-8802] and to your Local
Emergency Planning Committee.
SECTION 31 1 HAZARD CLASS: Immediate Fire
SARA 313 TOXIC CHEMICALS:
The following ingredients are SARA 31 3 'Toxic Chemicals". CAS numbers and weight
percents are found in Section 2.
INGREDIENT NAME COMMENT
Isopropyl Alcohol Only persons who manufacture by the strong acid process are
subject to reporting requirements.
STATE RIGHT-TO-KNOW
In addition to the ingredients found in Section 2, the following are listed for state right-to-
know purposes.
INGREDIENT NAME WEIGHT % COMMENT
No ingredients listed in this section.
ADDITIONAL REGULATORY INFORMATION: None
WHMIS CLASSIFICATION (CANADA): Not determined
FOREIGN INVENTORY STATUS: Listed on the Canadian DSL and EINECS
CURRENT ISSUE DATE: May, 1998
PREVIOUS ISSUE DATE: June, 1995 December, 1997
NFPA Classification Health: 1
http://w.bandj. com/MainWindowPage&lSDSAsoprAlcMSDS. htm 8/2u2000
Isopropyl Alcohol MSUS r%r " "I "
. Flammability: 3
Reactivity: 0
CHANGES TO MSDS FROM PREVIOUS ISSUE DATE ARE DUE TO THE FOLLOWING:
1. New format
2. (May, 1998) Added Conditions to Avoid statement in Section 10.
http://www. bandj . com/MainWindowPagesA4/MSDS/IsoprAlcMSDS. htm 8/22/2000
Material Safety Data Sheet a
Alpha Metals, Inc.
Product: Lonco SLS 65 Flux
MSDS Number: PO86
Cateaorv: Flux Effective Date: 02/09/98
PROD~C~NAME Lonco SLS 65 Flux (NUMBER)
CHEMICAL FAMILY Mixture.
D.O. THAZARD CLASS Flammable liquid.
INGREDIENTS CAS WEIGHT OSHA PEL ACGIH TLV
NUMBER PERCENT
Isopropyl Alcohol(2-Propanol) 67-63-0 90-92 400 ppm 400 ppm
Stel 500 ppm Stel 500 ppm
Aliphatic Dibasic Ester 11 19-40-0 4.0 NE NE
Dicarboxylic Acids 6a937-72-4 ~2.5 NE NE
(PUBLISHED or ESTIMATED VALUES)
BOILING WlNT Oeg. F. 180 SPEClFlC GRAVITY 0.801
(760 mm Hg) (H20=1) (a? 77 deg F) VAPOR PRESSURE 30 % VOLATILE by WEIGHT 90-92
(mm Hg AT 20 Ckg. C.)
VAPOR DENSIN (AIR-1) >2 EVAPORATION 2.3
RATE(BUAC=I)
SOLUBlLlN IN WATER Appreciable pH (5% aqueous soh.) 3.4
APPEARANCEAND ODOR Clear, colorless liquid, alcohol odor.
ESTIMATED FLAMMABLE LIMITS (% By Volume in Air) LEL2.0 UEL12.7
FLASH POINTDeg. F. 53 closed cup.
DCTINGUISHING MEDIA Alcohol type or all-purpose-type foam for large fires.
Carbon dioxide or dry chemical media for small fires.
SPEClAL FlREFlGHTlNG Use NIOSH approved Self-contained breathing apparatus
PROCEDURES and protective clothing. Cool fire exposed containers
with water.
UNUSUAL FIREAND Vapors are heavier than air and may travel along
EXPLOSION HRZARD ground. Never use welding torch on or near containers
(even empty). May produce a floating fire hazard.
(SymptomslEffects of Overexposure)
INHALATION: Can cause irritation of the respiratory tract with Coughing and
chest discomfort. High concentrations of vapor may cause
headache and drowsiness.
INGESTION: Slightly toxic. May cause abdominal discomfort, nausea,
vomiting and diarrhea. Drowsiness and/or loss of consciousness
may occur.
SKIN: May cause minor irritation with itching and possible slight local
redness. Prolonged or repeated contact may cau3e defatting and
drying. Absorption; exposure to small quantities are not antici-
pated to cause adverse health effects. Widespread and prolonged
exposure may result in the absorption of harmful amounts of mat-
erial, leading to signs and symptoms as described for ingestion.
EYES: Causes irritation, may cause corneal injury.
LISTED CARCINOGENS: None of the materials in this product are listed in
NTP
INHALATION
INGESTION
SKIN CONTACT
EYE CONTACT
STABILITY
[ARC, or OSHA as carcinogens.
(Emergency 81 First Aid Procedures)
Remove to fresh air. If not breathing give artificial respim
tion. If breathing is difficult administer oxygen. Obtain medical attention.
If fully conscious give two glasses of water, INDUCE vomiting. Never give anything by mouth to an unconscious person.
Remove contaminated clothing. Wash with soap and water. If
irritation persists or if contact has been prolonged obtain
medical attention.
Immediately flush with water for several minutes. Obtain
medical attention.
CONDlTION Heat, sparks and open flames.
STABLE: X UNSTABLE S TO AVOID
INCOMPA TIBlUTY Strong oxidbing agents.
(Materials to Avoid)
HAZARDOUS
DECOMPOSITlON dioxide.
PRODUCTS HAZARDOUS POLYMERlZATlON CONDITIONS
!MLL OCCUR: WILL NOT 0CCUR:X TO A VOID None
Burning can produce carbon monoxide and/or carbon
STEPS TO BE TAKEN IN CASE MATERIAL IS RELEASED OR SPILLED
Ventilate if in enclosed area. Eliminate all ignition sources.
SMALL SPILL,: Absorb liquid on paper, vermiculite, floor absorbent, or
other absorbent material and transfer to hood.
LARGE SPILL: See Section X.
WASTE DISPOSAL Destroy by approved incineration or deposit in approved landfill.
Must be in accordance with Federal, State, and Local Laws and Regulation
RESPIR4TORY No special requirements with adequate ventilation present, approved respiratoly protective equipment used when vapor or
mist concentrations exceed applicable standards.
EYEWEAR Chemical type protective goggles.
Provide eye bath near work site.
CLOTHING'GLOVES Wear eistant gloves such as rubber, neoprene or plastic.
VENTIU TION Provide sufficient mechanical (general and/or local exhaust)
ventilation to maintain exposure below TLVs.
PRECAUTIONS TO BE TAKEN IN HANDLING AND STORING
Observe precautions for a flammable liquid. Keep container closed when not in use. Store away from ignition sources in cool dry area.
Use adequate ventilation. Read all wntainer labeling.
Avoid the use of metal drum spigots. Use Polyethylene, Polypropylene
or Teflon.
OTHER PRECAUTIONS:
CONTAINERS: Since empty containers may retain product residues (vapor, liquid, or solid) all
labeled hazard precautions must be observed. FOR INDUSTRIAL USE ONLY. KEEP OUT OF
REACH OF CHILDREN. DO NOT TAKE INTERNALLY.
STEPS TO BE TAKEN IN CASE MATERIAL IS RELEASED OR SPILLED: (continued)
LARGE SPILL: Persons nd wearing pmtectiie equipment should be exduded from area.
Dike area of spill to prevent spreading. Pump liquid to salvage tank. Take up remaining liquid with absorbent material. Shovel into containers.
NOTES TO PHYSICIAN:
There is no specific antidote. Treatment of overekpasure should be directed at the control of symptoms and the clinical condaion
of the patient.
REGULATORY INFORMATION
Toxic Substance Control Ad (TSCA) Status:
All ingredients of this product are listed on the TSCA inventory
SARA TITLE 111 (Section 313):
Components present in this product at a level which could require
reporting under the statute are:
None
V.O.C. Content - 737 grams/liier (92% by weight).
EMERGENCY TELEPHONE NUMBER
CHEMTREC 1-800-424-9300 DAY or NIGHT
The information contained herein is based on data considered accurate and is offered at no charge. No
warranty is expressed or implied regarding the accuracy of this data. Liability is eqressiy disclaimed for
loss or injury arising out of use of this information of the use of any materials designated.
Material Safety Data Sheet a
Alpha Metals, Inc.
Product: BIOACT SC-1 OE
MSDS Number: 1491 Category: Cleaner Effective Date: 01/05/99
PRODUCT NAME [NUMBER) BIOACT SC-IOE
CHEMlCAL FAMlLY Mixture
D. 0. T HAZARD CLASS 3
INGREDIENTS CAS WElGHT OSHA PEL ACGIH TLV
NUMBER PERCENT
lsoparafhic hydrocarbon (C9-CI 2 90622-57-4 10-30 NE NL
isoalkanes)
Propanol, (2-methoxy- 34590-94-8 20-40 lOOppm 100ppm
methylethoxy)
I-methyl4 (1methylethenyl)- 5989-27-5 40-60 NE NE
cyclohexene
(PUBLISHED or ES77MATED VALUES)
BOlLlNG POlNTDeg. F. >340 SPEClFlC GRAWN 0.84
(760 mm Hsl (Hfl’1)
VAPOR PRESSURE >I X VOLATILE by WElGHT 100 (mm Hg AT 20 Deg. C.) VAPOR DENSlN (AlR=l) >l NAPORATlON RATE <I
SOLUBlLlN IN WATER Negligible PH
APPE4RANCEAND ODOR Clear colorless liquid with a mild odor
ESTIMATED FLAMMABLE LlMlTS (% By Volume in Air) LELNE UELNE
. FLASH POINT Deg. F. 126 (52 C) (ASTM D93-85. Pensky-Maltens Closed Cup)
Water fog, dry chemical, foam;carbon dioxide
SPECIAL FIRE FlGHTING Self-contained positive pressure breathing apparatus and protective
PROCEDURES cbthing should be WM in fighting fires involving chemicals.
DCTlNGUISHlNG MEDIA
UNUSUAL FIRE AND
EXPLOSION HAZARD
Exercise care when disposing of rags contaminated with this product.
Use normal precautions appropriate for oiv rags.
._ (SymptomslEffects of Overexposure)
INHALATION: Acute or chronic inhalation in unventilated aEeaS may cause irritation to the eyes
and the respiratory tract.
INGESTION: LOW order of toxicity. Hay cause mild nausea and abdominal discomfort.
SKIN: Excessive skin contact will remove natural skin oils which could lead to reversible
dermatitis.
EYES: Contact with eyes may cause mild irritation.
LISTED CARCINOGENS: None.
INHALATlON
INGESTlON
SKIN CONTACT
EYE CONTACT
(Emergency & First Aid Procedures)
Remove to fresh air. If not breathing, give artificial respiration. If breathing
is difficult, give oxygen. Contact a physician.
DO NOT induce vomiting; seek medical attention. Never give anything by
mouth to an unconscious person.
Remove contaminated clothing. Thoroughly wash affected area with soap
and water: use skin cream if irritation is severe.
Immediately flush eyes with water for 15 minutes. Call a physician if initation persists.
. STABILITY
STABLE: X UNSTABLE:
INCOMPA TIBlLIN
(MateHais to Avoid)
HAZARDOUS
DECOMPOSlTlON
PRODUCTS
CONDlTlON Heat, sparks and flames.
S TO AVOlD
Strong mineral acids and strong oxidbing agents.
None, other than normal products of combustion.
HAZARDOUS POLYMERIZATION CONDlTlONS
WLL OCCUR: WlLL NOT 0CCUR:X TO A VOID NA
SEPS TO BE TAKEN IN CASE MATERIAL IS RELEASED OR SPILLED
Absorb spill with inert material, then place in chemical waste container. Dilute
spills on ground or porous surfaces with water. For large spills, dike for later
disposal.
WASTE DISPOSAL Waste treat or incinerate used material in compliance with all applicable
regulations.
RESPIRATORY
EYEWEAR
Must be in amtdance with Federal, State, and Local Laws and Regulation
Use NIOSHIMSHA approved respirator if ventilation is not sufficient.
Safety glasses/goggles are recommended. Provide eye bath near work site.
CLOTHINWGLOVES Chemically resistant gloves should be used with all industrial
chemicals.
VENTILA TION Mechanical (general) ventilation should have an air flow of 55 CFM.
PRECAUTIONS TO BE TAKEN IN HANDLING AND STORING
Store in original container, preferably in a cool, ventilated fire-resistant building. Since empty containers
may retain product residues (vapor. liquid or solid) all labeled precautions must be observed.
OTHER PRECAUTIONS:
CONTAINERS: Since empty containen may retain product residues (vapor, liquid. or solid) all labeled hazard precautions must be observed. FOR INDUSTRIAL USE ONLY. KEEP OUT OF
REACH OF CHILDREN. DO NOT TAKE INTERNALLY.
.. .
REGULATORY INFORMATION SARATITLE 111 (Section 313):
Components present in this product ai a level which could require reporting under the statute are: NONE
California State Proposition 65:
This product does not contain chemicals which the State of California has found to cause cancer. birth
defects or other reproductive harm.
Toxic Substance Control Act (TSCA) Status:
All ingredients of this product are listed on the TSCA inventory.
EMERGENCY TELEPHONE NUMBER
CHEMTREC 1-800-424-9300 DAY or NIGHT
The information contained herein is based on data considered accurate and is offered at no charge. No
wananty is expressed or implied regarding the accuracy of this data. Liability is expressly disclaimed for
loss or injury arising out of use of this information of the use of any materials designated.
MSDS for Ionox BC Circuit Cleaner from Micro Care
Material Safety Data Sheet for:
Ionox@ BC Circuit Cleaner
Prepared: Tue Aug 22 2000
U.S. Format
- I. Chemical Identification
Trade Name: Ionox@ BC Circuit Cleaner
Part Numbers: MCC-KBC (aerosol can), MCC-KBCG (1 gallon cubitainer), MCC-KBCT (3 gallon
cubitainer), MCC-KBCP (5 gallon cubitainer), MCC-KBCD (55 gallon drum), MCC-KBCW (5" x 8"
presaturated wipe), MCC-KBCWT (12" x 12" presaturated wipe).
Chemical Family: A blend of alcohol and glycol ether acetate with a very high flaspoint, used as a
precision cleaner for electronics. In the aerosol form, tetrafluoroethane is used as a propellant.
Manufacturer: Micro Care Corporation, 34 Ronzo Road, Bnstol, CT 06010 USA
Phone: (860) 585-7912
Email: info@microcare.com
CAGE CodeiFSCM: OATV9
Fax: (860) 585-7378
Emergency Telephone: In North America, dial C"REC (800) 424-9300
11. Hazardous Ingredients
Hazardous Mixtures of Liquids, Solids or Gases, With Ingredients by Weight, Toxicity Ratings
and CAS Codes:
Ionox BC:
2-Carbin01, tetrahydrofuryl --- 7045% --- See Section V --- CAS # 97-99-4
Dipropylene Glycol Methyl Ether Acetate -- 15-30% --- See Section V --- CAS ## 88917-22-0
Tetrafluoroethane (aerosol only) --- lOY0-0?6 --- 1000 ppm --- CAS #811-97-2
All components of this product are listed in the TSCA inventory
111. Physical Data
Boiling Point: 203-221' F
Vapor Pressure: 0.4 mmHg @ STP
Vapor Density (Air = 1): 3.5 (calculated)
http://microcare. com/MSDS/MSDS-KBC.US.phtml 8/22/2000
Solubility in H20 Complete
Appearance and Odor: Clear pale yellow liquid, mild alcohol odor.
Specific Gravity (H,O = 1 ): 1.030
Evaporation Rate (Ether = 1): < I
IV. Fire and Explosion Data
Flash Point: 183" F. (TCC)
Flammable Limits: LL = 1.5% v/v; UL = 9.7% v/v.
Auto Ignition Temperature: 282" C.
Extinguishing Media: Water, Foam, Dry Chemical, Carbon Dioxide.
Special Fire Fighting Procedures: Keep containers cool with water spray. Wear eye protection and
NIOSH-approved self-contained breathing apparatus.
Unusual Fire and Explosion Hazards: Containers generate pressure when heated causing violent
bursting and dangerous propelling of container. This is especially true for aerosol containers which are
packaged under pressure. Forms toxic decomposition products. Vapors are heavier than air and may
travel to a source of ignition and flash back. Waste rags and towels soaked with Ionox BC are subject
to possible spontaneous combustion if improperly disposed, Use only approved containers for disposal.
NFPA Rating:
Health I
Flammability: 2
Reactivity: 0
V. Health Hazard Data
Threshold Limit Value: None established.
Effects of Over Exposure:
Inhalation: In confined or poorly ventilated areas, vapors which readily accumulate can cause
unconsciousness or death.
Oral: Low to moderate oral toxicity.
Skin: Prolonged or repeated skin contact can cause irritation, defatting of skin, and dermatitis.
http://microcare.com/MSDS/MSDS-KE3C.US.phtml 8/22/2000
Eyes: Persons wearing contact lenses should wear chemical protective safety glasses when using this
product. Liquid can cause slight temporary irritation with slight temporary cornea injury. Vapors can
irritate eyes.
Emergency and First Aid Procedures:
Inhalation: Remove to fiesh air. Do not give Epinephrine. Give artiiicial respiration ifnecessary. Call
physician.
Eyes and Skin: Persons wearing contact lenses should wear chemical protective safety glasses when
using this product. Flush with water for 15 minutes; call physician immediately.
Ingestion: Give water and induce vomiting. Contact physician immediately.
Systemic and Other Effects:
Based on available data, repeated exposures are not anticipated to cause any signiscant adverse effects.
Routes of Entry: Inhalation: yes Skin: yes Ingestion: yes
Health Hazards (acute and chronic)
2-Carbinol, tetmhydrofuryk Oral: Rat (LD50): 1600-5250 mgikg; mouse (LD50): 2300 mg/kg;
Guinea Pig (LD50): 800-3000 mgkg. Intravenous: Rabbit (LD50): 725 @g. Skin: Guinea Pig
(LD50): 5000 mgkg. Intraperitoneal: Guinea Pig (LD50): 400 mgikg; Rat (LD50): 400-1000 mgkg
Inhalation: Rat (LDSO): 4700 ppd4 hours; Rat (LD0/3): 655 ppd6 hours; Rat (LD2/3): 12,650
ppd6 hours. Eye Irritation: Rabbit: 20 md24 hours moderate irritation.
Dipropylene Glycol Methyl Ether Acetate: Oral: Rat (LD50): >5000 mgkg. Skin: Rabbits (LDSO):
>5000 mgkg. No other data available.
Carcinogenicity: None of the ingredients of Ionox BC are listed as carcinogens by NTP, IARC, 01
OSHA.
VI. Reactivity Data
Stability: Material is stable.
Conditions to Avoid: Keep away fiom open flame and sources of heat.
Incompatibility: Avoid acids, strong alkaloids, oxidizers, aluminum, and other reactive metals.
Hazardous Decomposition Products: Carbon dioxide, carbon monoxide, and other oxides of carbon and possibly hydrogen chloride, phosgene (trace amounts).
Polymerization: Will not occur.
http://microcare.corn/MSDSMSDS-KBC.US.phtd 8/22/2000
VII. Spill or Leak Procedures
Spill, Leak or Release: In the event of such an occurence, evacuate area, absorb spilled liquid with
commercial, nonflammable absorbent, Le., sand, vermiculite. Remove unprotected personnel. Protected
personnel should remove ignition sources and shut off fire sources. Provide ventilation. Shovel (spark
proof) absorbent material into drums and close. Do not flush to sewer. Although the chances of a
significant spill or leak is unlikely in an aerosol container, the control procedures for a spill are the
same for aerosol and non-aerosol containers.
Waste Disposal: Comply with Federal, State, and Local regulations. Consult appropriate regulatory
agency prior to disposal or discharge of waste materia!. -
VIII. Special Protection Information
Respiratory Protection: Do not use in closed spaces. Use only in well ventilated areas.
Ventilation: Adequate.
Local Exhaust: For small work areas
Mechanical: Adequate for storage.
Protective Gloves: For long repeated contact, Neoprene.
Eye Protection: Persons wearing contact lenses should wear chemical safety glasses
Other Protective Equipment: Protective clothing for repeated contact. PVA or Neoprene preferred.
JX. Special Precautions
Precautions for Handling and Storage: Avoid breathing vapors. Avoid lighted cigarettes, flame,
welding or hot spots which may generate toxic decomposition products. Vapors are heavy and may
concentrate in low poorly ventilated areas.
Section 313 Supplier Information
This product contains the following toxic chemicals subject to the reporting requirements of Section
3 13 of the Emergency Planning and Community Right to Know Act of 1986 and of 40 CFR 372:
CAS # CHEMICAL NAME % BY WEIGHT
None
This information musi be included in all MSDS sheets that are copied and distributed for this
material.
me term "Ionox" is a registeredtrademark of Kyzen Cop
http://microcare.com/MSDS/MSDS-KBC.US. phtml 8/22/2000
EPIBOND 7275-1 Ciba Specialty Chemicals Corporation
Effective Date: 12/5/98 Performance Pohers
Emergency Overview: WARNING!!! Causes severe eye irritation. Causes skin irritation and possible allergic skin rextion.
Harmful if inhaled. Harmful ifswallowed.
NE = Not Established NR = Not Reviewed * = OSHA Hazardous Ingredient
3. HAZARDS IDENTIFICATION
5. FIRE FIGHTING MEASURES
Flash Point:
Flash Point Methad Used:
> 126T (> 259 “F)
Closed Cup
Fire Fighting Extinguishing Media: Carbon dioxide, foam, dry chemical, water spray.
Fire Fighting Equipment: Use self-contained breathing apparatus and full protective clothing.
Fire and Explosion Hazards: Keep fire-exposed containers cool with water.
Printed: 23/99 Page 2 of 6
EPlBOND 7275-1 Ciba Specialty Chemicals Corporation Effective Date: 12/5/98 Prrfnnnancr Pnhrmen
Hazardous Combustion Products: Decomposition and combustion products may be toxic.
6. ACCIDENTAL RELEASE MEASURES
Accidental Release Measures: Evacuate spill area. Ventilate area. Avoid breathing vapor. Use protective equipments. Clean up
all traces of spill. Shovel as much of material as possible into dry, clean containers. On hard surface use absorbent material to pick
up remainder; on loose surfaces shovel up contaminated layer. Keep spills and cleaning runoffs out of municipal sewers and open
bodies of water.
7. HANDLING AND STORAGE
Signal Word: Warning !
Precautions: Avoid contact with eyes, skin, or clothing. Wear eye protection and impervious gloves when handling. Wash
thoroughly after handling. Avoid breathing vapor or mist. Keep containers closed when not in use. Use only with adequate
ventilation. Do not take internally.
Other Handling Information: In accordance with good industrial practice, handle with care and avoid unnecessary personal
contact Avoid contact with eyes and prolonged or repeated skin contact. Do not inhale mists. Use with adequate ventilation. For
industrial use only.
Storage Information: Storage temperature: Maximum 25 deg C. Store in doors in a cool, dry area with adequate ventilation.
Store at or below 5 deg C for beaer shelf life of the product.
Additional Information: PLEASE READ TECHNICAL DATA SHEET BEFORE HANDLING THE PRODUCT. KEEP OUT
OF THE REACH OF CHILDREN. FOR INDUSTRIAL USE ONLY.
8. EXPOSURE CONTROLS I PERSONAL PROTECTION
Personal Protective Equipment: Eye bath and safety shower should be available. Wear protective clothing.
Skin Protection: Wear impervious gloves.
Respiratory Protection: Wear respirator (MSHAMIOSH or approved equivalent) suitable for concentrations and type of air
contaminants encountered.
Eye Protection: Wear splash-proof chemical goggles.
Engineering Controls: Good general mechanical ventilation and local exhaust.
Emergency Respouse Protection: Wear breathing apparatus (MSHAMIOSH-approved, pressure demand, self-contained or
equivalent) and full protective gear.
Printed 23199 Page 3 of 6
EPIBOND 7275-1 Ciba Specialty Chemicals Corporation
Effective Date: 12/5/98 Performance PolyIllen
9. PHYSICAL AND CHEMICAL PROPERTIES
Appearance:
Color:
Odor:
Solubility in Water:
Vapor Pressure:
SQ&C Gravity:
Evaooration Rate:
Vii0Sity:
Vapor Density: voc:
Soft Paste
Red
Slight
Slightly Miscible
Soft Paste
< 1 mm Hg at 20°C (68 OF) - 1.28 (water = 1)
< 1
>I
70 gL
(Butyl Acetate = I)
(This is an estimated value.)
10. STABILITY AND REACTIVITY
Conditions to Avoid: Elevated temperatures, acids and amines.
Stability: Stable under normal conditions.
Incompatibility: Water, strong oxidizing agents, acids, and amines.
Hazardous Decompasition Productr: Carbon monoxide, carbon dioxide, aldehydes, and oxides of nitrogen
Hazardour Polymerization: Will not occur
11. TOXICOLOGICAL INFORMATION
Acute Oral Effects (LD50): For Bisphenol A Diglycidyl Ether Resin: >5,000 mgKg (rats)
For 1,4-Butanedioldiglycidyl ether: 1410 mg/Kg (rats)
Acute Dermal Toxicity (LD50): For Bispbenol A Diglycidyl Ether Resin: >6,000 mg/Kg (rabbits)
For 1,4-Butanedioldiglycidyi ether: 1100 mflg (rabbits)
Inhalation Toxicity (LC50): > I 1.3 mg/L (E%&) (I,4-butanedioldiglycidyl ether)
Sensitization: Skin sensitizer.
Skin Irritation: Severe skin irritant.
Eye Irritation: Moderate - severe.
12. ECOLOGICAL INFORMATION
Biodegradability: No information available.
Ecotoxicity: No information available.
Printed 2/3/99 Page 4 of 6
Effective Date: 12/5/98
EPIBOND 7275-1 Ciba Specialty Chemicals Corpoxation
Performanre Polymers
13. DISPOSAL CONSIDERATIONS
Waste Disposal Method: Incinerate; landfill or incinerate contaminated diking material in accordance with local, state, and
federal regulations.
14. TRANSPORT INFORMATION
DOT Non-Bulk
IATA Non-Bulk
Proper Shipping Name:
Proper Shipping Name:
Resin compounds, N.O.I.
Resin compounds, N.0.1.
15. REGULATORY INFORMATION
Occupational Safety and Health Act (OSHA): This Material Safety Data Sheet (MSDS) has been prepared in compliance with
the federal OSHA Hazard Communication Standard 29 CFR 1910.1200. This product is considered to be a hazardous chemical
under that standard.
Resource Conservation and Recovery Act (RCRA): Not a hazardous waste under RCRA (40 CFR 261).
SARA Title III: Seetion 304 - CERCLA: This product contains no chemicals regulated under Section 304 as extremely
hazardous chemicals for emergency release notification ("CERCLA" List).
SARA Title IIk Section 311i312 - Hazard Communcation Standard (HCS): Immediate (acute) health hazard
SARA Title ILI: Section 313 Toxic Chemical List CTCL): This product does not contain a toxic chemical for routine annual
'Toxic Chemical Release Reporting' under Sec. 3 13 (40 CFR 372).
TSCA Section 8(h) - Inventory Status: Chemical components listed on TSCA Inventory
TSCA Section 12(b) - Export Notification: This product contains the following chemicals which are subject to Section 12(b)
export notification:
Chemical Name : 1,2-Ethanediamine. N-(2-aminoethyl)-
CASRN : 11140-0
Canadian Inventory Status: All components included on the Domestic Substances List (DSL).
California Proposition 65: Warning! This chemical is known to the state of California to cause cancer and birth defects or other
reproductive harm.
chemical name: Epiclorohydrin
CAS RN# 106-89-6
%by WT: 0.0062
Pennsylvania Right-to-Know: The following is required composition information:
Generic Name : Bisphenol A diglycidyl ether resin
Printed 23/99 Page S of 6
Elktive Date: 12/5/98 EPIBOND 7275-1 Ciba speeialiy chemicals Corporation
Performance Polnners
CASRN : 25068-38-6
Comment : Not on Pennsylvania Hazardous Substance List.
Chemical Name : Dibenzo[i,t][l,4,7,12,15,18]hexaazacyclodocosine-5,13,18,26(6H,19H)-tetrone,
7,8,9,10,11,12,20,21,22,23,24~5dodecahydro-
CASRN : 68003-28-1
Comment : Not on Pennsylvania Hazardous Substance List.
Chemical Name : Carbonic acid calcium salt (1:l)
CASRN : 471-34-1
Common Name : Calcium Carbonate
Comment : Not on Pennsylvania Hazardous Substance List.
Chemical Name : Oxirane, 2,2’-[ 1,4-butanediylbis(oxymethylene)]bis-
CASRN : 2425-79-8
Common Name : Butanediol Diglycidyl Ether
Comment : Not on Pennsylvania Hazardous Substance List.
Chemical Name : 1,3-Propanediol, 2-ethyl-2-(hydroxymethyl)-, polymer with (ch1oromethyl)oxirane
CASRN : 30499-70-8
Comment : Not on Pennsylvania Hazardous Substance List.
Chemical Name : Siloxanes and silicones, dime, reaction products with silica
CASRN : 67762-90-7
Comment : Not on Pennsylvania Hazardous Substance List.
Chemical Name : 12-Ethanediamine, N-(2-aminoethyl>
CASRN : 111-40-0
Common Name : Diethylenetriamine
Comment : Hazardous Substance.
16. OTHER INFORMATION
MSDS No:
Reason Issued:
Approved By:
Title:
Supersedes Date:
10085
Add Epiclorohydrin warning
Rajesh S. Patel
EH&S Chemist
02/06/98
other hformation: L/M Code: JFU - JS0597(J10020033)
Material Code: FPC3 195
Revision Summary: The following sections have been modified since the last effective date: I, 2,3,4,9, 10, 11, 14, 15
Dixiaimer: The following supercedes Buyer’s documents. SELLER MAKES NO REPRESENTATION OR WARRANTY,
EXPRESS OR IMPLIED, INCLUDING OF MERCHANTABlLIn OR FITNESS FOR A PARTICULAR PURPOSE. No
statements herein are to be construed as inducements to infringe any relevant patent. Under no circumstances shall Seller be liable
for incidental, consequential or indirect damages for alleged negligence, breach of warranty, strict liability, tort or contract arising
in connection with the produd(s). Buyer’s sole remedy and Seller’s sole liability for any claims shall be Buyer’s purchase price.
Data and results are based on controlled or lab work and must be confirmed by Buyer by testing for its intended conditions of use.
The product@) has not been tested for, and is therefore not recommended for, uses for which prolonged contact with mucous
membranes, abraded skin, or blood is intended; or for uses for which implantation within the human body is intended.
Printed: 2/3/99 Page 6 of 6
.
Material Safety Data Sheet
WOKX IIXNIIFIIR (111 piatti CWWMI NWTC)
1'-505 Part A
Fur 24 lluur Eutrr~nrny Asltlulrr, Call 1-8UU-424-93UU (CIIWUT~C)
hlnuulidwcr's Name 'l'elqlxrie Nwihw
hlnntmaam'r Address ax Nuirihn .......................... Zymet ! Inc. (973) 428 - 5245 ............................................................................. ...................................................................................................................................
J 07936 .......................................................... .........................................
8/94 ........... Karl I. Loh .......................................................................... ...................................
~~~- I SECTION I -IDENTITY f
.. T-505 Pari A NIA
............................................................. ...................................................... ................................................ Noli regulated
I SECTION 2 - IJAZARDOUS INGREDLENTS 1
llirdtold Litnil Value (uiiils) .I,! ~~!~~l~?!.~!~?~~d~!~~~u.~.~~.-~~?~~d~ !.?.????!?) 'i .......................................... %I ul!l!a= .................................................................. Carbon Black 1333-86-4 C1 3.5 ing/m3 (ACGIH) 3.5
................................................................................. ...... mm3..EHA) ..................
......
...................................... I SECTION 3 - PIiYSlCAL & CHEMICAL CHARACTERISTICS (FIRE & EXPLOSION DATA) I
I)olling I'oinl specilic Chvily = I) Vapor Prsaurc (mw 119)
...................................
..............................................................
.............................
......................... .............................................................................................................
Wear self-contained breathing apparatus and full bunker gear in confined spaces. Cool fire exposed containers with
waler. ............................................................... ..............................................................
None ............................ .......................
-- ..... Uhusud Fire aid Eqloriai Ilazards
Slnhilily Cmditiav lo avoid , Acids, Bases, Amine ............................................. .................................... ................... zardws Dcmngosiliui Pwdu
........................................................ Carbon Monoxide, AI Y~~oca!~o!s ........................
May Occur 0 Mav Not Occur quantities over .5 kg .......................................................................................... ................................................. *
Material Safety Data Sheet
[SECTION 5 - IIEALT€I 11AzIuu)S I
Signs attd sypioau
1. A~te Wneynnme
..................................... .................................................... ..... ................................. .......................................................... Acute-Moderately irrilaling lo skin and eyes.
ay cause skin sensitization. ...................................................................................................................................................................... ............................................................................
............ der.;: ......................................................................................................................................................... L11.11
Nalimd 'I'oximlugy hop" I.A.R.C. hlwJgrJFhs ()SI I,\
Yes 0 No ............................. ......................................... ......................................................................................................................... -
Remove to fre
Immediately 11
iralion if not breathing.
iriules. Gel medical attenliori.
................................................ ....................................................................................................................................................................... 2. Eyn
............................................................................................................................................................. .................................................... 3 Skin
................................................................................................................................................................................................................................................................ Remove contarninaled clothing. Wipe skin and wash with soap and water. Get medical atlention.
I. lage1imnr
.................... ................ ......................
I SECTION G - SPECIAL PROTECTION INFORMA'TION I
Rqirahry Protediut (SpSiTy T>ve)
................................................................................................................................... .........................................
l.oc71 Edmud hlntiaiiie~l (Ciaind) Special (hll€l
............................................ ................................................. ...............................................................
.s.!ml.............. les ................................................................................
1 SECTION 7 - SPECIAL PRECAUTIONS AND SPILWLEAKPROCEUURES I
Prccnulim- lo be'ibku, ini tlJndling;ind Storage
Store in cool dry place. Keep away from open flame and high temperatures. Avoid contact with eyes and prolonged or
peated skin contact. ............................................................................................................................... ............................................... OUia Praauliatr
........ .......................................... ..................................... .................................................................................. Slepr lo he 'Inlot in Cnrc hbl
...................................................... Soak UP residue with an ab3 .....................................................................................................................
Wadc I)imcr;al htdltd
........................................................................................................... Place in an appropriate disposal facility hi compliance with local regulaUons. .................................................................
I SECTION 8 -REGULATORY AND ADDITIONAL INFORMATION 1
....................... LD 50 RAT Oral 11.4..q!kg9, _._. ora!..M.o.use._l..5.B.~!ks. erma!..R.abbi!.20..m!!kq~ ...........................................................
Material Safety Data Sheet ZMEZ QUICK IUENTIIER (In Plant Cammln Name)
T-505 Part B For 24 Hoar Emrriency AuLturcc. Cd 1-800-431-9300 (CIIEMTREO
hlanufaaurer's Name Tdephmc Numba
...................................................
Conman Name: (used an ISM) (Trade Name & Syxmym~)
Chmiul Name Formula
LX)T Hsmd Clntrifiatim (49 CFR)
Cas Numbs
..................... ........ ......................... ....................................................................... ..................... NIA T-505 ! Part5 ^
Heterocyclic Amine NIA ................................................................................................................................................................. EPozY.Yardene! ...... Roper ShWingNimc UN or NA Number
01 regulated NIA ..............................................................................................................................................................................
[SECTION 2 - fLUARDOUS MGREDLENTS I
pr .... !.!a....C. ..... ?.....! .. ................................................................................................... Ca- Number ....................................................................... 'Ihhmhold Ld Value ((nits) .............. Hptpmrvrlir Amino NIA >on NIA ..... ........ ~.:.~~.~:..=.~~..~:.'.=.:..::.::~::.~ .......................................................................................................... :.::.:.: ........................... :...:.: ...................... ........... ................ 0 ster 40
1 SECTION 3 - PEiYSlCAL & CEEMICAL CHARACTERISTICS (FIRE & EXPLOSION DATA) - I
Boiling Pod Specific Gravity (m - 1) Vnpcu Prnrurc (nun tip)
............................................................. 1 at 20 OC ................ 200 OC 1 .o
Pmt Volatile hy Vaiumc I?$) Vnporv.n9ils(Air= I) €vqmtim Ralc ( =I) .. .. NIA NIA NIA ........................................................................................ " . ........... Flash Point Saluhiliiy in Wdn Radivdy in Wits
315 OF TCO 10 per cent Not determined
....................................... Dark brown liquid with musty .. caramel . like odor ............... Flammable Lids in Air ?'. by Volume
..................................................................................
....................................
SLabiMy Cmdiiar~to avoid ..a,! ..... .s lable ... ............................................... iMy (Mdsislsto Avoid)
Strong Oxidizers .................... ................................................ .......................................................... Rswrdour Polymerization Candaimr to Avoid
......................................................... MayOccur 0 MayNo
. Material Safety Data Sheet
SECTION 5 - HEALTE BAZARDS
Signs md Symplom of Eqorure
I
I. A"I(C Ovacqaure ........................ Causes eye and skin irritation, ma ........................
................... ...................................................................................................... ...........................................................................
..................... .......................................................................................................................................................................................................
Nationel Toximlogy Program 1.AR.C. Mmographs VSfIA
Yes 0 No [XI Yes 0 No [XI ........... ...... ............................................................................................................................................................................................... No
€ma Aid P I. Inhalation -
2. Eya .............................................................................. Remove to fresh air. Se en!.!!?!!: ............................................................................................................................................................... :.
.... nh!r..wi!h..soae..a"d..wa!er~ ................................................................
....... ....................... 1 SECTION 6 - SPECIAL PROTECTION INFORMATION I
Not required ............ ............
Ventilation
Special (Xhn
...........................................................................................
Chemial gogg!es or face shield ..........................................................................................................................................................
............................................................................................................................................................................. ...................
I SECTION 7 - SPECIAL PRECAUTIONS AND SPlLIAEAK PROCEDURES I
Prccaulions Io be Taken it timdlng and Storage hen not in use. Store away from heat or open flame. Avoid ski ntact. ............................ .................................................................................................................................................
........ ............ .... Slqs to be Takm h Care Material is Rclenvd or Spilled Absorb spill ................................................................................. with sand. claypr vemiculite and .. Waste Dimmn.1 Mdhod. r~ ~~~~~~~~
...........................................................................................................................................
Material Safety Data Sheet
Alpha Metals, lnc.
Product:
MSDS Number: 0001 OOOA Category: Solder Cream Effedive Date: 04128/97
PRODUCT NAME (NUMBER)
CHEMICAL FAMILY Mixture
D.0.T HAZARD CLASS Not regulated.
Solder Paste 63SnI37Pb Ultraprint 78 (86-90% Alloy)
folder Paste 63Sd37Pb Ultrapflnt 78 (86-90% Alloy)
ING REDlEN TS CAS WEIGHT OSHA PEL ACGlH JUV
Tin 7440-31-5 54-57 2.0 mglcum 2.0 mglcum
Lead 7439-92-1 31-33 0.05 ms/cum 0.05 mglcum
NUMBER PERCENT
Rosins (modified). proprietary 4-7 .I
Sensitizer, reduce exposure as low as psitle.
(PUBLISHED or ESTIMATED VALUES)
BOILING POINT Deg. F. NA SPECIFIC GRAVITY (HzO=ll NA
(7W rnrn Hg)
VAPOR PRESSURE NA % VOLATILE by WE/GHT NIL
(mm Hg AT 20 Deg. C.)
VAPOR DENSITY (AIR=lJ NA EVAPORATION RATE NIL
SOLUBILITY IN WATER Insoluble PH NA
APPEARANCE AND ODOR Grey, viscous paste, mild odor.
ESTIMATED FLAMMABLE LlMlTS (% By Volume in Air) 1EL:NA UEL:NA
FLASH POINT Deg. F. NA
EXTINGUISHING MEDIA NA
SPECIAL NRE FIGHTING
PROCEDURES
UNUSUAL FIREAND NA
EXPLOSION HAZARD
Use NIOSH approved self-contained breathing
apparatus if product is involved in a fire.
.. ,
rage L UI J “LrrrUn LI*UII*LJ-,UI*U -- UlVlLjUMUlYY IUL
c OSHA PEL: 0.1 MG/CUM
’ ACGIH TLV: 0.1 MG/CUM
-____----.._.-_____._________________
Proprietary: NO
Ingredient: MODIFYING AGENT
Ingredient Sequence Number: 03
Percent: cl
NIOSH (RTECS) Number: 1003627MA
Proprietary: NO
Ingredient: PIGMENTS
Ingredient Sequence Number: 04
Percent: c1
NIOSH (RTECS) Number: 1000046PI
__.__---..______._.._________________
............................................................................
Physical/Chemical Characteristics ...........................................................................
Appearance And Odor: BLACK PASTE Vapor Pressure (MM Hg/70 F) : NEGLIGIBLE
Specific Gravity: 1.1-1.2 Solubility In Water: INSOLUBLE
...........................................................................
Fire and Explosion Hazard Data ...........................................................................
Flash Point: >2OOF Extinguishing Media: CO2, DRY CHEMICAL, FOAM, WATER FOG
Special Fire Fighting Proc: WEAR POSITIVE PRESSURE SCBA & FULL PROTECTIVE
EQUIPMENT. COOL EXPOSED CONTAINERS W/WATER. LARGE: EVACUATE AREA FROM A
SAFE DISTANCE.
Unusual Fire And Expl Hazrds: CLOSED CONTAINERS MAY VIOLENTY RUPTURE UNDER FIRE CONDITIONS.
...........................................................................
Reactivity Data -------------___________________________~===_--- -___=----_--_===________========= -----------______---____________________
Stability: YES Cond To Avoid (Stability): UNDER NORMAL HANDLING & STORAGE CONDITIONS.
Materials To Avoid: STRONG OXIDIZERS, ACIDS, BASES. UNCONTROLLED MIXING W/
Hazardous Decomp Products: CO, C02, ALDEHMES, ACIDS & OTHER ORGANIC
SUBSTANCES.
Hazardous Poly Occur: NO
AMINES/A”YDRIDES/MERCAPTANS/IMIDAZOLES.
...........................................................................
Health Hazard Data
.............................................................................
Route Of Entry - Inhalation: YES
Route Of Entry - Skin: NO
Route Of Entry - Ingestion: NO Health Haz Acute And Chronic: EYES: IRRITATION. SKIN: MODERATE IRRITATION,
PROLONGED/REPEATED EXPOSURE MAY CAUSE DERMATITIS, SENSITIZATION, ALLERGIC RESPIRATORY IRRITATION. INGESTION: HARMmTL IF SWALLOWED.
Carcinogenicity - NTP: NO
Carcinogenicity - IARC: NO Carcinogenicity - OSHA: NO
Explanation Carcinogenicity: NONE
Signs/Symptorns Of OvereXp: IRRITATION, BLURRED VISION, BURNING SENSATION, TEARING, DEFATTING, DRYING ACTION, RASH, ITCHING, HIVES, SWELLING OF THE
EXTREMITIES, NAUSEA, HEADACHES. Med Cond Aggravated By Exp: PRE-EXISTING SKIN &/EYE DISORDERS. Emergency/First Aid Proc: EYES: FLUSH THOROUGHLY W/WATER FOR 15 MINS.
SKIN: WASH THOROUGHLY W/PLENTY OF WATER, FOLLOWED BY WASHING W/SOAP &
WATER. INHALATION: REMOVE TO FRESH AIR. GIVE CPR/OXYGEN IF NEEDED. INGESTION: DILUTE BY GIVING PLENTY OF WATER TO DRINK, IF CONSCIOUS & ALERT.
NEVER GIVE ANYTHING BY MOUTH TO A DROWSY, UNCONSCIOUS/CONVULSING PERSON. OBTAIN MEDICAL ATTENTION IN ALL CASES.
08/30/2000
Ocher PT3ceCLive Equiprnenc: SPLASH PROOF CHEMICAL GCGGLiS/FACE S3IEL3/
CXIEYICXL RCSISTA'IT APXON/I.V.?ZRVIOUS CLClTEIXG/EYE WASH ?ACILZTIES/SAFEY SHOWER
Work Syglenic ?ractices: REMOVZ/LAUNDER CONTAMINATED CLOTHING 9ZFOXE
XEUSE. WASH HANDS THOROL'GELY AFER "DLING/SE?ORE EATIXG/SMOKING/DRINKING
Special Xazard Precautions: EYES: IRRITATION. SKIN: XODERATE IRRITATIZJN, PRCLONGED/REPEATE> EXPOSmZ MAY CAUSE DZRMATITIS. SENSITIZATION. ALLERGIC
RESPIRATORY IRRITATION. INGESTION: HARMFUL IF SWALLOWED. IRRITATION,
BLURRZD VISION, 3URNING SENSATION, TEARING, DEFATTING, DRYING ACTION, USH.
ITCHING. YIIVES, SELLING CF THE EXTREXITIPS, NAUSEA. HEA3ACHZS.
Label Name: OMEGA ENGINEERING INC
Label Street: ONE OMEGA DRIVE Label P.O. Box: 4047
Label City: STAMFORD Label State: CT
Label Zip Code: 06907-0047
Label Country: US Label Emergency Number: 203-359-1660
08/30/2000
~
HOROIVITZ TAYLOR ENGINEERING .
STRUCTURAL t CIVIL CONSULTIHG
STRUCTURAL CALCULATIONS
PROJECT: 'DI /Pf PnnsE n:
DESIGN ASSUMPTIONS:
CONCRETE STRENGTH AT TWENTY EIGHT DAYS:
MASONRY: GWDE "N' CONCRETE BLOCK F M =
MORTAR. TYPES 18OOPSI
GROUT: 2000 PSI
REINFORCING STEEL: A615 GRADE 40: #5 AND LESS (U.O.N.)
GRADE 60: #E AND LARGER
STRUCTURAL STEEL: A26
LUMBER: DOUGLAS FIR-LARCH
JOISTS #2
BEAMS AND POSTS #2
STUDS STUD OR BETTER
SEISMIC FORCE: z -A,+ REPORT BY: Cj&+UIL9
WIND FORCE. 70 flp *) k3P.B
DESIGN LOADS:
REPORT NO.: 4-6- @-%OIL PRESSURE: &@o
FLOOR DEAD LOAD WALL DEAD LOAD
=G - FLAT - INT. - EXT.
ROOFING FLOORING INTERIOR 10 PSF
EXTERIOR 16 PSF PLYWOOD
JOISTS
INSUL. & CLG.
MISC.
$
5
PLYWOOD
JOISTS
INSUL. & CLG.
MISC.
TOTAL = - /- TOTAL = --
FLOOR LIVE LOAD W' ROOF LIVE LOAD
SLOPING
FLAT
INTERIOR 40 PSF
BALCONY 60 PSF (U.O.N.)
EXIT WALKWAY 100 PSF
These calculations are limited oniy to the items included herein, selected by the client and do not impv approial of any other portion of W, structure by this office. These calculations are not valid V altered in any way, or not accompanied by a'wet stamp
3914 Murphy Canyon Rdl 6 Suite AI00 - San Diego, California 92123 (858) 560.4383 .. FAX (Sia)@@q#?$&, . .. ... ..
, '7
.... .. ~ .~~ . .
L
.
Section 16050
PART 1 GENERAL REQUIREMENTS
1.1
1.1.1
1.1.2
1.2
1.2.1
1.2.2
1.2.3
1.2.4
1.2.5
1.3
1.3.1
1.3.2
BASIC ELECTRICAL REQUIREMENTS
RELATED DOCUMENTS
The general conditions and Division 1 are part of this section and the contract for this
work and apply to this section as fully as if repeated herein. This section, 16050,
applies to all Division 16 categories.
Reference to other sections: The applicable requirements from other Division 16
sections shall form a part of the electrical work and each section shall be referenced to
the other sections.
EXPLANATION OF DRAWINGS
These construction documents are intended to be diagrammatic and reflect the scope,
quality, and character of the work to be performed: all miscellaneous materials and
work, though not specifically mentioned, shall be furnished and installed by the
Contractor.
The Contractor shall confirm sizes, dimensions, weights and locations of all equipment
prior to installation. Dimensioned architectural drawings shall take precedence over
diagrammatic layouts shown on these contract documents.
The specifications and the drawings are an integral document and shall be considered
complementary to each other. In the case of a conflict between the specifications and
the drawings, the more constricting condition shall be enforced.
The Contractor shall be responsible for reporting any discrepancies, errors, or omissions
noted prior to bid.
It is the intent of the drawings to indicate schematic routing and placement of devices,
fixtures, equipment and conduit. Exact locations shall be dimensioned on these
documents or in other trade documents (architectural, mechanical, etc.). Offsets,
elbows, or extensions shall be furnished and installed by the Contractor as necessary to
avoid structure, piping, clearances and to provide a complete and workmanlike
installation.
QUALITY ASSURANCE
All work, material or equipment shall comply with the codes, ordinances and regulations
of the local government having jurisdiction, including the regulations of serving utilities
and any participating government agencies having jurisdiction.
All electrical work shall comply with the latest edition under enforcement of the
following codes and standards or other regulations which may apply:
.1 American Disabilities Act (ADA)
.2
.3
.4
American National Standards Institute (ANSI)
American Society for Testing and Materials (ASTMl
Institute of Cable Engineers Association KEA)
DIDT PHASE II
MWE Project No. 00-1 59
Basic Electrical Requirements
December 19, 2000
1.3.3
1.3.4
1.3.5
1.4
1.4.1
1.4.2
1.4.3
1.4.4
1.4.5
.5
.6
.7
.8
.9
.10
.I 1
.12
.I3
Institute of Electrical and Electronic Engineers (IEEE)
Local Code Enforcement Agency Requirements
National Electrical Code (NEC)
National Electrical Contractor's Association (NECA)
National Electrical Manufacturer's Association (NEMA)
National Electrical Testing Association (NETA)
National Fire Protection Association (NFPA)
Underwriters' Laboratories, Inc. (UL)
Uniform Building Code (UBC)
No requirement of these drawings and specifications shall be construed to void any of
the provisions of the above standards. Any conflicts or changes required to the contract
documents in order to obtain compliance with applicable codes shall be brought to the
immediate attention of the Owner's Representative by the Contractor.
All items shall be listed by Underwriter's Laboratories and shall bear the U.L. label,
Equipment shown to scale is approximate only and based upon a general class of
equipment specified. The Contractor shall verify all dimensions and clearances prior to
commencement of work.
The Contractor shall verify all points of connection with the manufacturer's
requirements, instructions, or recommendations prior to installation. The actual
dimensions, weights, clearance requirements and installation requirements shall be
verified and coordinated by the Contractor.
SUBMITTALS
Shop drawings for materials, equipment, devices, fixtures, and systems shall be
submitted by the Contractor for review within 30 days after award of the contract. In
addition to the requirements for submittals stated herein, the Contractor shall be
responsible for compliance with the requirements of Division 1.
The Contractor shall bear the responsibility for any materials installed which were not
submitted for review or not installed in compliance with the review comments and the
contract documents.
Verbal authorization of submittal documents or changes to the requirements of the
contract documents shall not be acceptable. All submittal material must be documented
in a written format.
All submittal packages must be submitted at one time and in accordance with the
specification section appropriate for the material. All packages must be identical and
clearly labeled indicating the specification section, project name, submittal date,
Contractor's name, Engineer's name, preparer's name and submission version (first
submission, resubmittal #1, etc.).
Product catalog cutsheets and descriptive literature shall be cross-referenced to the
specification Sectioh by paragraph.
DIDT PHASE II
MWE Project No. 00-1 59
Basic Electrical Requirements
December 19, 2000
16050-2
1.4.6
1.4.7
1.4.8
1.4.9
1.4.10
1.4.11
1.4.12
1.4.13
1.4.14
1.4.15
All submittal packages shall be permanently bound in brochure or booklet format. A
minimum quantity of six submittal booklets shall be provided by the Contractor;
additional copies may be required if so noted.
Materials which bear a certification or approval of a testing agency, performance criteria,
society, agency, of other organization shall be submitted with all labels identified.
The submittal shall be complete and with catalog data and information properly marked
to show, among other things, materials, capacity and performance data to meet the
specified requirements.
Incomplete submittals will be rejected at the discretion of the reviewing Engineer.
Review of the submittal is only for general conformance with the contract documents.
The Contractor is responsible for confirmation and coordinatlon of dimensions,
quantities, sizes, fabrication, installation methods, and for coordination of work of other
trades with electrical work.
Detailed working drawings shall be prepared and submitted showing items which are to
be fabricated including transformer mounting racks, unistrut mounting frames,
equipment room layouts, pull boxes, splice boxes, gutters, etc.
Minimum scale for submitted drawings shall be 118". Details shall be drawn to 1/4"
scale. All drawings shall be 8.5"xll" or larger.
Submittal brochures shall be complete and descriptive of the type, make, manufacturer,
application, quantity, performance, capacity, ratings, options, dimensions, clearances,
weights, nameplate data, special installation requirements, mounting method, NEMA
type, NEMA class, environmental restrictions, layout requirements or other information
as may be necessary for review of the material.
Submittal brochures for switchgear shall include, as a minimum, the following:
singleline diagrams; fault current ratings of buses and devices: device identification,
ratings, layout and characteristics: dimensions; circuit identification; identification label
type and method of affixing; mounting; conduit entry point and quantities: NEMA
enclosure type; and additional data as required for a complete review.
Submittal brochures for lighting systems shall include, as a minimum, the following:
manufacturer; detailed drawing or photograph; dimensions; lamp data; ballast data:
certified photometric data from a third-party testing agency; U.L. label listing; fixture
number or identification from the drawings; finish color and material; mounting
equipment; socket type and rating; environmental ratings (damp location, watertight,
explosionproof, etc.); voltage; input wattage; and additional information as necessary for
a complete review.
1.4.16 The Contractor shall be responsible for all aspects of substitutions of material including
any additional cost or delay incurred as a result of the substitution. The Contractor shall
coordinate all substitutions with other trades, verify code compliance, verify clearances,
photometric performance, appearance, suitability, constructability, and availability of the
material prior to submitting the substitution for review. The Contractor shall bear the
responsibility of any increased costs to other trades which are directly related to the
substitution.
Basic Electrical Requirements
December 19, 2000
16050-3
DI/DT PHASE II
MWE Project No. 00-159
1.5
1.5.1
1.5.2
1.5.3
1.6
1.6.1
1.6.2
1.6.3
1.6.4
1.7
1.7.1
1.7.2
1.7.3
1.7.4
MATERIAL HANDLING
The Contractor shall deliver all equipment and material to the site in the manufacturer's
original packaging without seals broken.
The Contractor shall handle, store, and protect all equipment and materials in
accordance with the manufacturer's recommendations.
The Contractor shall immediately replace damaged or defective equipment or materials
with identical new equipment or material at no cost, inconvenience, or delay to the
Owner.
EXISTING CONDITIONS
The Contractor shall verify all existing conditions prior to bid and include all costs in bid
The Contractor shall match the finish and appearance of all existing conditions where
constructing new work adjacent to existing surfaces or equipment.
Coordinate with the Owner's Representative for all ongoing projects or the work of other
trades which may affect the Contractor's work. Verify Owner schedule requirements for
special or standard events which may impact the Contractor's work.
Coordinate work to be performed in occupied areas and comply with the Owner's
requirements such that the Owner's work is not disrupted by the Contractor. Verify the
need for work to be performed during premium hours, evenings, weekends, or holidays
prior to bid and include all costs in bid. Bring to the Owner's attention the need for all
disruptive work prior to commencement of work.
UTILITY COMPANY REQUIREMENTS
The contractor shall contact the serving utility company for all utility system
requirements prior to commencement of work. Utility work shall include electric power,
telephone, data, fiber optic cable, cable television or other utilities as may require
connections as a part of this contract. Coordinate and comply with all serving utility
company requirements.
The utility information depicted on the contract documents is for bidding purposes only
and shall not be used for construction purposes. All construction shall be performed
according to engineered documents from the serving utility company. The Contractor
shall obtain and coordinate with utility company requirements as a part of this contract
and furnish and install all work as a part of this contract.
Verify all connection points, routing, and requirements with the serving utility company
prior to commencement of work end coordinate final requirements with other trades.
The Contractor shall be responsible for all costs associated with his failure to contact or
coordinate with utility company requirements.
DllDT PHASE I1
MWE Project No. 00-1 59
Basic Electrical Requirements
December 19, 2000
16050-4
1.8
1.8.1
1.8.2
1.9
1.9.1
1.9.2
1.9.3
1.9.4
1.9.5
1.9.6
1.10
1.10.1
1.10.2
CONSTRUCTION UTILITY REQUIREMENTS
Power, telephone or other temporary construction utility services required by the
Contractor shall be the responsibility of the Contractor.
Arrangements for construction utility services shall be made by the Contractor in
coordination with the Owner's Representative and the serving utility company.
CONTINUITY OF SERVICE
The Contractor shall coordinate all shutdowns with the Owner's Representative.
Electrical shutdowns shall be kept to the minimum number necessary to complete the
work.
The Contractor shall coordinate all work done on overtime or premium time with
Owner's Representative prior to commencement of work.
All work performed in or through occupied spaces, or other work disruptive to existing
occupants shall be considered as performed during premium time or as overtime for the
purposes of the bid; include all costs in bid.
The Contractor shall notify Owner's Representative of all shutdowns or disruptive work
minimum of 72 hours prior to commencement of work. The Contractor shall obtain
approval from the Owner's Representative prior to commencement of work.
The Contractor shall provide all necessary temporary power, including temporary power
generation, to accommodate shutdowns and minimize disruption of work.
The Owner reserves the right to provide emergency repairs or temporary power to
maintain service continuity at the Contractor's cost in the event Contractor fails to
provide adequate service continuity.
RECORD DOCUMENTS
The Contractor shall prepare as-built documents depicting all revisions to branch circuits,
conduit routing, equipment, or materials. Drawings shall be legible, reproducible, and
properly identified such they may be used as a reference for maintenance or
construction.
The Contractor shall provide a minimum of three copies of the operation and
maintenance manuals to the Owner's Representative at the completion of the project.
Each copy shall be bound in a three-ring binder and labeled indicating: the project name;
system name; Contractor's name, telephone number, and contact person; and Owner's
name. The Contractor shall provide the following information within each manual:
.1 List of the Subcontractors performing work on the system including contact
names and telephone numbers.
.2 Routine and emergency service contacts and telephone numbers for each
system.
.3 Description of system operation.
.4 Single line diagrams and control wiring diagrams.
.5 Detailed product literature with technical information.
DllDT PHASE II
MWE Project No. 00-1 59
Basic Electrical Requirements
December 19, 2000
16050-5
1.11
1.11.1
PART 2
2.1
2.1.1
2.1.2
2.1.3
PART 3
3.1
3.1.1
3.1.2
3.1.3
3.1.4
3.1.5
.6
.7
.8
.9
GUARANTEE
All electrical work, materials and equipment provided under this contract shall be
guaranteed for a period of one year from the date of acceptance of the work by the
Owner. Any failures, problems, or deficiencies experienced during this period due to
defective materials or faulty workmanship shall be immediately corrected by the
Contractor without cost to the Owner. The Contractor shall be responsible for all
damages to the Owner's facility due to deficiencies in the electrical system. Equipment
guarantees in excess of one year shall not be superseded by this guarantee.
PRODUCTS
MATERIALS
All materials shall be new, of prime quality, listed as suitable for the application, and
bear factory-applied U.L. labels.
Materials shall be currently in production and shall be supported by spare parts, repair
service, maintenance, and factory technical support.
Materials of one assembly (switchboards, substations, motor control centers, etc.) shall
be of one manufacturer unless specifically stated otherwise in the contract documents.
Sequence of starting, shutdown and operation.
Installation instructions and safety requirements.
Maintenance schedule, testing instructions and performance parameters
Parts list including recommended spare parts.
EXECUTION
INSTALLATION REQUIREMENTS
All work shall conform to National Electrical Contractors Association 'standards of
installation and the requirements of the manufacturer, Division 1, Division 16, and the
Owner's Representative.
The Contractor shall field-verify all dimensions and coordinate dimensions with
equipment sizes and locations.
The Contractor shall coordinate and install all penetrations, openings, slots, chases, or
sleeves as necessary for the routing and installation of raceways. conductors. or
equipment. The Contractor shall provide approved fire sealant to maintain fire ratings at
all penetrations.
The Contractor shall coordinate the placement and sequence of installation of all
mounting bolts, conduits, sleeves, etc. which are to be set in poured-in-place concrete
slabs per the structural drawings.
The Contractor shall install access panels in walls or ceilings in coordination with the
Architect for all junction boxes or electrical equipment which requires access.
DI/DT PHASE II
MWE Project No. 00-1 59
Basic Electrical Requirements
December 19, 2000
16050-6
3.1.6
3.1.7
3.1.8
3.1.9
3.1.10
3.2
3.3
3.3.1
3.3.2
3.3.3
3.3.4
3.3.5
3.3.6
3.3.7
3.3.8
All equipment shall be installed plumb, parallel, or orthogonal to structure and in a neat
orderly fashion. All material shall be accessible for maintenance, inspection, servicing or
replacement.
Verify final locations for devices during the rough-in phase with dimensioned
architectural drawings, fabrication drawings, or other space planning requirements
included in the contract documents.
The Contractor shall coordinate and arrange for the proper sequence of construction
including scheduling of long-lead items, shutdowns, work of other trades, and Owner-
scheduled events.
The Contractor shall provide adequate and qualified supervision for the work performed:
no work shall be performed without the supervision of a representative of the
Contractor.
The Contractor shall coordinate and cooperate with all other trades for a successful
completion of the project.
SEISMIC BRACING
The Contractor shall seismically brace all equipment in accordance with Title 24
requirements for Seismic Zone 4 and provide certification of seismic compliance upon
request.
CUTTING AND PATCHING
The Contractor shall provide cutting and patching as required to install the electrical
system in this contract.
Coordinate the schedule of all cutting such that the work may be performed in an
expeditious manner with minimum inconvenience to the Owner.
Remove or cut structures or materials as necessary for demolition prior to the installation
of new electrical work.
The Contractor shall protect all surfaces, structure, furnishings, and finishes not directly
affected by cutting or patching.
Provide dust and moisture barriers as required during cutting and prior to patching
openings.
All penetrations through roofs shall be performed per architectural requirements.
Patching shall be performed with materials which exactly match the adjacent surfaces in
color, texture, character, and appearance.
All patches must maintain the fire ratings of the original surface and shall be sealed with
a U.L. listed and Fire Marshal approved sealant.
DllDT PHASE II
MWE Project No. 00-1 59
Basic Electrical Requirements
December 19, 2000
16050-7
grease or markings. All cleaning shall be performed by the Contractor in accordance
with the appropriate manufacturer's recommendations.
END OF SECTION
DllDT PHASE It
MWE Project No. 00-1 59
Basic Electrical Requirements
December 19, 2000
16050-9
Section 161 10 RACEWAYS
PART 1
1.1
1.1.1
1.2
1.2.1
1.2.2
GENERAL PROVISIONS
RELATED DOCUMENTS
The general conditions, Division 1, and Basic Electrical Requirements (Section 16050)
are part of this section and the contract for this work and apply to this section as fully
as if repeated herein.
QUALITY ASSURANCE AND STANDARDS
All work, material or equipment shall comply with the codes, ordinances and regulations
of the local government having jurisdiction, including the regulations of serving utilities
and any participating government agencies having jurisdiction.
All electrical work shall comply with the latest edition under enforcement of the
following codes and standards or other regulations which may apply:
.1
.2
.3
.4
.5
.6
.7
.E
.9
.10
.ll
.12
.13
American Disabilities Act (ADA)
American National Standards Institute (ANSI)
American Society for Testing and Materials (ASTM)
Institute of Cable Engineers Association KEA)
Institute of Electrical and Electronic Engineers (IEEE)
Local Code Enforcement Agency Requirements
National Electrical Code (NEC)
National Electrical Contractor's Association (NECA)
National Electrical Manufacturer's Association (NEMA)
National Electrical Testing Association (NETA)
National Fire Protection Association (NFPA)
Underwriter's Laboratories, Inc. (UL)
Uniform Building Code (UBC)
No requirement of these drawings and specifications shall be construed to void any of
the provisions of the above standards. Any conflicts or changes required to the contract
documents in order to obtain compliance with applicable codes shall be brought to the
immediate attention of the Owner's Representative by the contractor.
All items shall be listed by Underwriter's Laboratories and shall bear the U.L. label,
Equipment shown to scale is approximate only and based upon a general class of
equipment specified. The Contractor shall verify all dimensions and clearances prior to
commencement of work.
1.2.3
1.2.4
1.2.5 The Contractor shall verify all points of connection with the manufacturer's
requirements, instructions, or recommendations prior to installation. The actual
dimensions, weights, clearance requirements and installation requirements shall be
verified and coordinated by the contractor.
1.3 SUBMITTALS
1.3.1 Submit shop drawings per Section 16050 for review including the following:
DllDT PHASE II
MWE Project No. 00-159
Raceways
December 19, 2000
16110-1
PART 2
2.1
2.1.1
2.1.2
2.1.3
2.1.4
2.1.5
2.1.6
2.1.7
2.2
2.2.1
2.2.2
2.2.3
2.2.4
2.3
2.3.1
2.3.2
2.3.3
2.3.4
2.4
2.4.1
.1 Raceway materials
.2 Fitting materials
.3 Installation materials and methods
PRODUCTS
RIGID GALVANIZED STEEL (RGS) CONDUIT
Continuous hot-dipped galvanized manufactured per UL and ANSI requirement.
Rigid aluminum conduit is not acceptable.
Fittings for use with steel conduit, rigid or flexible, shall be manufactured per UL
requirements and shall be cast metal with gasketed closures.
Fittings for RGS conduit shall be malleable iron or forged steel with cadmium or zinc
coating.
Union couplings for joining rigid conduit at intermediate runs shall be of the same
material as the conduit. Couplings shall be threaded concrete-tight to permit completing
conduit runs when neither conduit can be turned and to permit breaking the conduit run
at the union.
Set screw connectors or threadless type are not acceptable.
Minimum raceway size shall not be less than 3h".
ELECTRICAL METALLIC TUBING (EMT)
Conduit shall be cold rolled zinc coated steel and manufactured per UL and ANSI
requirements.
Fittings for EMT shall be watertight steel or malleable gripping ring compression type.
Pressure cast material for nuts of compression ring type fittings and set screw
connections are not acceptable.
Minimum raceway size shall be %".
FLEXIBLE METALLIC CONDUIT
Flexible conduit shall bear the UL label and be zinc coated steel.
Fittings for flexible metallic conduit shall be steel or malleable iron. Fittings shall clamp
to conduit securely.
Screw in type, sheet metal or set screw type fittings are not acceptable.
Minimum raceway size shall not be less than Y4".
LIQUID TIGHT FLEXIBLE CONDUIT
Conduit shall be manufactured in accordance with UL and ANSI requirements. Conduit
DllDT PHASE II
MWE Project No. 00-1 59
Raceways
December 19, 2000
16110-2
2.4.2
2.4.3
2.5
2.5.1
2.5.2
PART 3
3.1
3.1.1
3.1.2
3.2
3.2.1
3.2.2
3.3
3.3.1
3.3.2
3.3.3
3.4
3.4.1
3.4.2
3.4.3
shall be approved for grounding and compatible with approved fittings. Flexible steel
conduit shall be hot dipped galvanized with extruded PVC covering manufactured per UL
requirements.
Fittings shall be liquid tight type with body and gland nut of steel or malleable iron with
provisions for grounding flexible conduit to fittings.
Minimum raceway size shall be W'.
POLYVINYL CHLORIDE (PVC) CONDUIT
PVC shall be constructed of a virgin homopolymer PVC compound and be manufactured
according to NEMA and UL specifications. PVC conduit shall be Schedule 40 or 80.
Minimum raceway size shall be 3/4".
EXECUTION
\ RIGID GALVANIZED STEEL (RGS) CONDUIT
RGS shall be used where exposed to weather or where subject to physical damage in
exposed areas below 8'0" above finished floor.
RGS shall be used in NEC classified hazardous locations with seal connections per NEC
requirements.
ELECTRICAL METALLIC TUBING (EMT)
EMT shall be run indoors concealed in drywall type construction, above suspended
ceilings, and exposed indoors not less than 8'0" above finished floor in unfinished areas.
EMT shall not be installed underground or embedded in concrete.
FLEXIBLE METALLIC CONDUIT
Flexible conduit shall be used for indoor lighting connections in suspended ceiling areas
and shall not exceed 6'0" in length.
Flexible conduit shall be used for final connection to control equipment and not to
exceed 2'0" in length.
The conduit grounding system shall be continuous as recommended by the manufacturer
and UL approved.
LIQUID TIGHT FLEXIBLE CONDUIT
Flexible conduit shall be used for final connection to machines, motors, transformers and
equipment that requires vibration isolation.
Flexible conduit shall be used for final connection to equipment in wet or damp locations
or where exposed to grease, water, dust, or dirt.
The conduit grounding system shall be continuous as recommended by the manufacturer
DllDT PHASE II
MWE Project No. 00-1 59
Raceways
December 19, 2000
161 10-3
3.5
3.5.1
3.5.2
3.5.3
3.6
3.6.1
3.6.2
3.6.3
and UL requirements.
POLYVINYL CHLORIDE (PVC) CONDUIT
All sweeps, bends, and risers shall be concrete encased Schedule 80.
All underground high voltage conduit, telephone conduit, service entrance conduit and
feeders 100A and over shall have 3" of red mixed concrete cover.
All PVC conduit feeders shall contain a copper green grounding conductor sized per NEC
requirements and continuity shall be maintained throughout conduit runs and pullboxes.
CONDUIT INSTALLATION
All conduit installation methods shall comply with the latest enforced edition of the
National Electrical Code and the authority having jurisdiction.
All conduit installations shall comply with the manufacturer's installation requirements.
All spare conduit shall be provided with a pullwire.
DI/DT PHASE II
MWE Project No. 00-159
END OF SECTION
Raceways
December 19, 2000
16110.4
Section 161 20 WIRE AND CABLE
PART 1
1.1
1.1.1
1.2
1.2.1
1.2.2
GENERAL PROVISIONS
RELATED DOCUMENTS
The general conditions, Division 1, and Electrical General Requirements (Section 16050)
are part of this section and the contract for this work and apply to this section as fully
as if repeated herein.
QUALITY ASSURANCE AND STANDARDS
All work, material or equipment shall comply with the codes, ordinances and regulations
of the local government having jurisdiction, including the regulations of serving utilities
and any participating government agencies having jurisdiction.
All electrical work shall comply with the latest edition under enforcement of the
following codes and standards or other regulations which may apply:
.1
.2
.3
.4
.5
.6
.7
.9
.10
.11
.12
.13
.a
American Disabilities Act (ADA)
American National Standards Institute (ANSI)
American Society for Testing and Materials (ASTM)
Institute of Cable Engineers Association (ICEA)
Institute of Electrical and Electronic Engineers (IEEE)
Local Code Enforcement Agency Requirements
National Electrical Code (NEC)
National Electrical Contractor’s Association (NECA)
National Electrical Manufacturer’s Association (NEMA)
National Electrical Testing Association (NETA)
National Fire Protection Association (NFPA)
Underwriter’s Laboratories, Inc.(UL)
Uniform Building Code (UBC)
No requirement of these drawings and specifications shall be construed to void any of
the provisions of the above standards. Any conflicts or changes required to the contract
documents in order to obtain compliance with applicable codes shall be brought to the
immediate attention of the Owner’s Representative by the contractor.
All items shall be listed by Underwriter’s Laboratories and shall bear the UL label.
Equipment shown to scale is approximate only and based upon a general class of
equipment specified. The Contractor shall verify all dimensions and clearances prior to
commencement of work.
1.2.3
1.2.4
1.2.5 The Contractor shall verify all points of connection with the manufacturer’s
requirements, instructions, or recommendations prior to installation. The actual
dimensions, weights, clearance requirements and installation requirements shall be
verified and coordinated by the contractor.
1.3 SUBMITTALS
DllDT PHASE II
MWE Project No. 00-1 59
Wire and Cable
December 19, 2000
161 20-1
1.3.1
PART 2
2.1
2.2
2.3
2.4
2.5
2.6
2.7
PART 3
3.1
3.2
3.3
3.4
3.5
3.6
Submit shop drawings per Section 16050 for review including the following:
.1 Conductor materials
.2 Connector and fitting materials
.3 Installation materials and methods
PRODUCTS
Conductors shall be copper; conductors size #10AWG and smaller shall be solid,
conductors size #8AWG and larger shall be stranded. Conductors shall be minimum size
#12AWG for power and lighting circuits; control circuits shall use a minimum conductor
size of #14AWG.
Insulation shall be type THW or THHNlTHWN for all branch circuits up to and including
size #2AWG. Insulation for conductors over size #2AWG shall be XHHN.
Jackets shall be nylon or PVC material.
All cables shall be UL listed for the application.
All conductors shall be installed in conduit in the field, unless specifically noted
otherwise in these documents. Type AC and type NM cable is not acceptable; type MC
cable may be used where specifically noted for purposes of flexibility, maintenance, or
ease of installation but shall not be used without permission.
Multi-conductor flexible cords shall be types SO, SJO, STO, or SJTO.
Connectors shall be UL listed and suitable for the conductor material being connected
and rated appropriately. Connectors shall be solderless metal pressure type for
conductors #1 OAWG and smaller. Connectors shall be compression type for conductors
#8AWG and larger.
EXECUTION
All wiring methods shall comply with the latest enforced edition of the National Electrical
Code and the authority having jurisdiction.
Conductors shall be installed in clean raceways using nylon cord, polypropylene cord,
hemp rope, or other material which will not damage the conductors or conduit. Do not
use metal fish tape. Use lubricant when necessary for pulling.
Conductors shall be pulled into conduit simultaneously so as to not damage conductors
during pulling.
Conductors installed at outlets and switches shall have a minimum of 6" pigtail left in
the box for future connections. All conductors not connected to devices shall be
terminated with splice caps or tape.
Conductors shall be terminated such that no copper material is exposed. Conductors
shall be trained and labeled at terminations in a neat and workmanlike manner.
All terminations shall comply with the manufacturer's installation and torquing
requirements.
DllDT PHASE II
MWE Project No. 00-1 59
Wire and Cable
December 19, 2000
161 20-2
3.7
3.8
3.9
3.10
3.1 1
3.12
3.13
Splices on conductors #lOAWG and smaller shall be made with splice caps twisted onto
the conductors. Tape all splices.
Splices on conductors #8AWG and larger shall be made with pressure connectors and
terminal lugs. Where exposed to water, damp air, or moisture splices shall be
watertight.
Splices shall be not be made in feeders; splices to branch circuits shall not be made
within panelboards or similar enclosures.
When combining homeruns, the Contractor shall derate all conductors per code
requirements including reducing the ampacity. using high temperature insulation where
necessary. Conduit sizes shall be adjusted by the Contractor as suitable for the
conductor revisions.
The Contractor shall provide a code-sized insulated ground conductor, in addition to the
feeder conductors indicated on the drawings, where nonmetallic conduit is used.
Conductors shall be color-coded as follows:
208YllZOV
Black
Red
Blue
White
Green
Phase
A
B
C
Neutral
Ground
480Yl277V
Brown
Orange
Yellow
Gray
Green
Where tape or labels are used for color-coding, apply material at each end of the
conductor, splices, boxes, and all terminations.
END OF SECTION
DllDT PHASE II
MWE Project No. 00-159
Wire and Cable
December 19, 2000
16120-3
Section 161 30 BOXES
PART 1
1.1
1.1.1
1.2
1.2.1
1.2.2
GENERAL PROVISIONS
RELATED DOCUMENTS
The general conditions, Division 1, and Electrical General Requirements (Section 16050)
are part of this section and the contract for this work and apply to this section as fully
as if repeated herein.
OUALITYASSURANCEANDSTANDARDS
All work, material or equipment shall comply with the codes, ordinances and regulations
of the local government having jurisdiction, including the regulations of serving utilities
and any participating government agencies having jurisdiction.
All electrical work shall comply with the latest edition under enforcement of the
following codes and standards or other regulations which may apply:
.I
.2
.3
.4
.5
.6
.7
.8
.9
.10
.ll
.12
.13
American Disabilities Act (ADA)
American National Standards Institute (ANSI)
American Society for Testing and Materials (ASTM)
Institute of Cable Engineers Association (ICEA)
Institute of Electrical and Electronic Engineers (IEEE)
Local Code Enforcement Agency Requirements
National Electrical Code (NEC)
National Electrical Contractor's Association (NECA)
National Electrical Manufacturer's Association (NEMA)
National Electrical Testing Association (NETA)
National Fire Protection Association (NFPA)
Underwriters' Laboratories, Inc. (UL)
Uniform Building Code (UBC)
No requirement of these drawings and specifications shall be construed to void any of
the provisions of the above standards. Any conflicts or changes required to the contract
documents in order to obtain compliance with applicable codes shall be brought to the
immediate attention of the Owner's Representative by the contractor.
All items shall be listed by Underwriter's Laboratories and shall bear the U.L. label.
Equipment shown to scale is approximate only and based upon a general class of
equipment specified. The Contractor shall verify all dimensions and clearances prior to
commencement of work.
1.2.3
1.2.4
1.2.5 The Contractor shall verify all points of connection with the manufacturer's
requirements, instructions, or recommendations prior to installation. The actual
dimensions, weights, clearance requirements and installation requirements shall be
verified and coordinated by the contractor.
1.3 SUBMITTALS
1.3.1 Submit shop drawings per Section 16050 for review including the following:
DI/DT PHASE II
MWE Project No. 00-1 59
Boxes
December 19, 2000
161 30-1
PART 2
2.1
2.2
2.3
2.4
2.5
2.6
2.7
PART 3
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
.1 Box materials
.2 Accessory materials
PRODUCTS
Boxes shall be flat rolled steel sized as required by code and as suitable for the
application. knock-outs in sides and back.
Grounding shall be accommodated by means of threaded holes.
Provide accessories, extension rings, gaskets, supports, trim rings, hangers, straps, and
other material as necessary for a complete code complying installation.
Boxes installed outdoors shall be weathertight, dusttight, and corrosion resistant.
Provide gaskets and conduit hubs.
Provide Type FS boxes for surface mounted applications.
Provide additional support for boxes as necessary when mounting fixtures or devices
from boxes.
Provide ganged boxes for multiple switches and devices; provide barriers for boxes
served by separate voltages.
Acceptable manufacturers shall be Appleton, Crouse Hinds, Steel City, or Raco.
EXECUTION
All box installation methods shall comply with the latest enforced edition of the National
Electrical Code and the authority having jurisdiction.
Install all boxes plumb, square, and securely fastened to structure.
Boxes shall be placed such that they are readily accessible.
Cover or plug all unused openings in boxes where knockout blanks have been removed.
Install boxes such that they are flush with the finished surface of the wall or surface
within which they are mounted.
Install all boxes at mounting heights per architectural, electrical code, and ADA
requirements.
Boxes shall not be mounted back to back in walls.
Boxes in sealed environments shall be sealed with an approved sealant suitable for the
application.
Boxes penetrating fire rated walls or surfaces shall be sealed with a Fire Marshal
approved fire sealant to maintain the fire rating of the wall or surface.
Boxes located above inaccessible ceilings shall be made accessible by means of access
doors or hatches in the ceiling.
Boxes shall have mounting holes and
DI/DT PHASE II
MWE Project No. 00-1 59
Boxes
December 19, 2000
161 30-2
3.1 1
3.12
Install all boxes per manufacturer's recommendations and requirements.
Provide for ground continuity at all boxes.
DllDT PHASE II
MWE Project No. 00-1 59
END OF SECTION
Boxes
December 19, 2000
161 30-3
Section 16140 WIRING DEVICES AND CONNECTORS
PART 1
1.1
1.1.1
1.2
1.2.1
1.2.2
GENERAL PROVISIONS
RELATED DOCUMENTS
The general conditions, Division 1, and Electrical General Requirements (Section 16050)
are part of this section and the contract for this work and apply to this section as fully
as if repeated herein.
QUALITY ASSURANCE AND STANDARDS
All work, material or equipment shall comply with the codes, ordinances and regulations
of the local government having jurisdiction, including the regulations of serving utilities
and any participating government agencies having jurisdiction.
All electrical work shall comply with the latest edition under enforcement of the
following codes and standards or other regulations which may apply:
.1
.2
.3
.4
.5
.6
.7
.E
.9
.10
.11
.12
.13
American Disabilities Act (ADA)
American National Standards Institute (ANSI)
American Society for Testing and Materials (ASTM)
Institute of Cable Engineers Association (KEA)
Institute of Electrical and Electronic Engineers (IEEE)
Local Code Enforcement Agency Requirements
National Electrical Code (NEC)
National Electrical Contractor's Association (NECA)
National Electrical Manufacturer's Association (NEMA)
National Electrical Testing Association (NETA)
National Fire Protection Association (NFPA)
Underwriter's Laboratories, Inc. (UL)
Uniform Building Code (UBC)
No requirement of these drawings and specifications shall be construed to void any of
the provisions of the above standards. Any conflicts or changes required to the contract
documents in order to obtain compliance with applicable codes shall be brought to the
immediate attention of the Owner's Representative by the contractor.
All items shall be listed by Underwriter's Laboratories and shall bear the UL label,
Equipment shown to scale is approximate only and based upon a general class of
equipment specified. The Contractor shall verify all dimensions and clearances prior to
commencement of work.
1.2.3
1.2.4
1.2.5 The Contractor shall verify all points of connection with the manufacturer's
requirements, instructions, or recommendations prior to installation. The actual
dimensions, weights, clearance requirements and installation requirements shall be
verified and coordinated by the contractor.
1.3 SUBMITTALS
1.3.1 Submit shop drawings per Section 16050 for review including the following:
DliDT PHASE II
MWE Project No. 00-1 59
Wiring Devices and Connectors
December 19, 2000
16140-1
PART 2
2.1
2.1.1
2.1.2
2.1.3
2.1.4
2.1.5
2.2
2.2.1
2.2.2
2.3
2.3.1
2.3.2
2.3.3
2.3.4
2.4
2.4.1
PART 3
3.1
.1 Receptacles
.2 Switches
.3 Wiring devices
.4 Accessories
PRODUCTS
RECEPTACLES
Wiring devices shall be UL listed and suitable for the application.
Devices shall be color coded per the system to which they are connected: normal power
shall be white; emergency power shall be red; dedicated outlets shall be grey; unless
otherwise noted on the construction documents.
Receptacles shall be heavy duty, screw type, side wired, 1 ZOV, 20A, duplex type,
unless noted otherwise on the construction documents. Verify NEMA configuration with
construction documents.
Weathertight receptacles shall be gasketed in cast metal boxes with cast metal
coverplates with spring-loaded hinged covers over each opening.
Ground fault interrupting receptacles shall be duplex type and capable of detecting a
leaking current of 5mA.
TOGGLE SWITCHES
Toggle wall switches shall be quiet AC type, rated 120/277V, 20A and UL listed for the
application.
Switches shall be single pole, double throw with white finish unless noted otherwise.
COVERPLATES
Single, combination coverplates shall be used at all ganged device locations.
Provide white plastic coverplates with white screws in all office areas. Provide stainless
steel coverplates with matching screws in laboratory, process, manufacturing, and clean
room areas or as noted on the construction documents.
Provide labeled plates as noted on the construction documents.
Provide labeled plates at all receptacles with circuit and panel designation. Labeling
method shall utilize clear adhesive printed labels with black bold letters.
ACCEPTABLE MANUFACTURERS
Acceptable manufacturers shall be Arrow Hart, Hubbell, Leviton, or Pass and Seymour.
EXECUTION
Installation method of wiring devices shall comply with the latest enforced edition of the
DI/DT PHASE 11
MWE Project No. 00-159
Wiring Devices and Connectors
December 19, 2000
161 40-2
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
National Electrical Code and the authority having jurisdiction.
Install all devices in accordance with the manufacturer’s recommendations and
requirements.
Coordinate device mounting height, location and type with architectural and interior
drawings. Coordinate with other trades to identify conflicts with device locations and
notify the Engineer of any conflicts.
Install devices only in clean boxes.
Install all trim rings and coverplates in coordination with other trades and their
installation schedules.
Tighten and inspect all connections prior to covering devices and reconnect or repaii
wiring as necessary.
Test all devices for voltage level, continuity, ground fault, and short circuits.
Install all devices plumb and square to structure and adjacent surfaces.
Connect and inspect all ground bonds prior to covering device.
Demonstrate the proper operation of all ground fault interrupting devices.
DllDT PHASE II
MWE Project No. 00-159
END OF SECTION
Wiring Devices and Connectors
December 19, 2000
161 40-3
Section 161 50 GROUNDING & BONDING
PART 1
1.1
1.1.1
1.2
1.2.1
1.2.2
1.3
1.3.1
1.3.2
1.4
1.4.1
1.4.2
1.5
GENERAL PROVISIONS
RELATED DOCUMENTS
The general conditions, Division 1, and Electrical General Requirements (Section 16050)
are part of this section and the contract for this work and apply to this section as fully
as if repeated herein.
SCOPE
Permanently and effectively ground conduit systems, supports, cabinets, switchboards,
equipment cases, motor frames, lighting standards, landscape lighting, etc., and system
neutral conductors per National Electrical Code.
Grounding details, symbols and singlelines shown on plans are schematic only. If
additional equipment, such as ground rods, clamps, conductors, etc., is required per
National Electrical Code furnish and install without additional cost to Owner.
QUALITY ASSURANCE AND STANDARDS
The latest revision of standards listed below form an integral part of this specification
.1
.2 National Electrical Code (NEC)
.3
.4
.5 Underwriters Lab. (UL)
.6 Tecto Weld
Furnish products listed by Underwriters Laboratories, Inc. as suitable for purposes
specified and shown.
SUBMITTALS
Submit shop drawings per Section 16050 for review.
Manufacturer's data on grounding and bonding products and associated accessories.
ACCEPTABLE MANUFACTURERS
.1 Burndy Corporation
.2 Cadweld Division
.3 Crouse-Hinds
.4 Thomas and Betts Corporation
.5 Okonite Company
American Society for Testing and Materials (ASTM)
National Fire Protection Association (NFPA)
Institute of Electrical and Electronics Engineers (IEEE)
PART 2 PRODUCTS
2.1 GROUNDING MATERIAL
DllDT PHASE I1
MWE Project No. 00-1 59
Grounding and Bonding
December 19, 2000
161 50-1
2.1.1
2.1.2
2.1.3
2.1.4
2.1.5
2.1.6
2.1.7
2.1.8
2.1.9
Rod Electrode: Material to be copper clad steel rod, 3/4 inch diameter with minimum 10
feet of length.
Mechanical Connectors:
installed.
Exothermic Connectors: Material shall be of low emission, electric-start type and of
sound continuity when installed.
Bare Ground Conductors
.1
.2
.3
Material shall be copper and of sound continuity when
Conductor shall be 7 strand annealed copper.
Individual members of stranded conductor shall meet the requirements of ASTM
8-3.
Stranded conductors shall be assembled in accordance with the requirements of
ASTM 8-8.
Insulated Conductor (Equipment grounding conductor)
.1 Size in accordance with NEC Article 250-95 unless otherwise shown as
oversize.
Grounding Well Components
.1
.2
Well Pipe: Material shall be 8 inch diameter by 24 inch long concrete pipe with
belled end.
Well Cover: Material shall be cast iron with the text "GROUND" embossed on
cover.
Ground Bus Bar
.1 ASTM B1 87, 98% conductivity copper bus bar, size two (2) inches wide by
114inch thick.
Terminal Lugs
.1
.2 For 250MCM and larger: Aluminum mechanical lugs.
Bonding Plates, Connectors, Terminals and Clamps
.1
For 410 AWG and smaller conductors: Copper compression lugs.
Bonding Plates, Connectors, Terminals and Clamps: Provide electrical bonding
plates, connectors, terminals, lugs and clamps as recommended by bonding
plate, connector, terminal and clamp manufacturers for indicated applications.
2.1.10 Jumpers
.1 Copper braided or leaf-type flexible jumper, size as necessary.
2.1.11 Bus Bar Insulators
.1 Fiber glass reinforced polyester insulator with 'A inch diameter threaded holes at
both ends for bus bar installation.
DI/DT PHASE II
MWE Project No. 00-1 59
Grounding and Bonding
December 19, 2000
161 50-2
2.1.12
2.1.13
Electrical Grounding Connection Accessories
.1 Electrical Grounding Connection Accessories: Provide electrical insulating tape,
heat-shrinkable insulating tubing, welding materials, bonding straps, as
recommended by accessories manufacturers for type service indicated.
Field Welding
.1 Field Welding: Comply with AWS Code for procedures, appearance, and quality
of welds; and for methods used in correction welding work. Provide welded
connections where grounding conductors connect to underground grounding and
plate electrodes.
PART 3 EXECUTION
3.1 GENERAL
3.1.1 Install electrical grounding and bonding systems as indicated, in accordance with
manufacturer's instructions and applicable portions of NEC, NECA's "Standard of
Installation", and in accordance with recognized industry practices to ensure that
products comply with requirements.
3.1.2
3.1.3
3.1.4
3.1.5
3.2
3.2.1
Coordinate with other electrical work as necessary to interface installation of electrical
grounding and bonding system work with other work.
Ground each separately-derived system neutral to nearest cold water piping, service
entrance equipment grounding electrodes, and building steel.
Connect together system neutral, service equipment enclosures, building steel, exposed
noncurrent carrying metal parts of electrical equipment, metal raceway systems,
grounding conductor in raceways and cables, receptacle ground connectors, and
plumbing systems.
Apply corrosion-resistant finish to field-connections, buried metallic grounding and
bonding products, and places where factory applied protective coatings have been
destroyed, which are subjected to corrosive action.
GROUND INSTALLATION
Equipment Grounding Conductor
.1
.2
Provide separate, insulated conductor within each feeder and branch circuit
raceway including lighting circuits.
Terminate each end on suitable lug, bus, bushing, or device.
3.2.2 Motors or equipment rated at 480V shall have bonded ground jumpers from feeder
conduit to motor frame.
Grounding bushing shall be used wherever conduits are grounded.
Ground the electrical service system neutral at service entrance equipment to the
grounding electrode system.
3.2.3
3.2.4
DI/DT PHASE II
MWE Project No. 00-1 59
Grounding and Bonding
December 19, 2000
161 50-3
3.2.5
3.2.6
3.2.7
3.2.8
3.2.9
3.2.10
3.2.1 1
3.3
3.3.1
3.3.2
3.4
3.4.1
3.4.2
3.4.3
Ground each separately-derived system neutral to nearest effectively grounded metallic
water pipe, and to rod electrode as shown on drawings.
Install rod electrodes at locations indicated.
Provide grounding well pipe with cover at rod locations where indicated. Install well
pipe top flush with finished grade.
Install products in accordance with manufacturers instructions.
Use mechanical connections in above ground and accessible locations and use
exothermic connectors in underground and inaccessible locations.
Provide bonding to meet Regulatory Requirements. Include bonding of metallic gas and
sprinkler piping systems.
Install ground clamps specifically designed for grounding purposes. Where grounded
conductor is in conduit, use ground clamp which grounds both conductor and conduit.
Strap metal is not acceptable for grounding and bonding.
ISOLATED GROUND INSTALLATION
Provide isolated grounding conductor for circuits supplying isolated ground receptacles.
Ground conductor will be sized per NEC unless otherwise noted to be of larger size.
Isolated ground will be routed through panel and to transformer ground for 208V or
120V. Isolated ground will be routed to distributed rod electrode for 480V or 277V.
GROUND RESISTANCE TESTING
Grounding electrode resistance testing shall be accomplished with a ground resistance
direct reading single test meter utilizing the fall-of-potential method and two reference
electrodes. Perform test prior to interconnection to other grounding systems. Orient the
concrete-encased ground electrode to be tested and the two reference electrodes in a
straight line spaced fifty (50) feet apart. Drive the two reference electrodes five (5) feet
apart.
Maximum grounding system resistance to be 5 ohms for secondary systems. Install
additional ground rods as needed to achieve a resistance of .5 ohms.
Test results shall be in writing and shall show temperature, humidity and condition of
the soil at the time of the tests.
END OF SECTION
DllDT PHASE (I
MWE Project No. 00-1 59
Grounding and Bonding
December 19, 2000
161 50-4
Section 161 70 CIRCUIT AND MOTOR DISCONNECTS
PART 1
1.1
1.1.1
1.2
1.2.1
1.2.2
GENERAL PROVISIONS
RELATED DOCUMENTS
The general conditions, Division 1, and Electrical General Requirements (Section 16050)
are part of this section and the contract for this work and apply to this section as fully
as if repeated herein.
QUALITY ASSURANCE AND STANDARDS
All work, material or equipment shall comply with the codes, ordinances and regulations
of the local government having jurisdiction, including the regulations of serving utilities
and any participating government agencies having jurisdiction.
All electrical work shall comply with the latest edition under enforcement of the
following codes and standards or other regulations which may apply:
.1
.2
.3
.4
.5
.6
.7
.E
.9
.10
.11
.12
.13
American Disabilities Act (ADA)
American National Standards Institute (ANSI)
American Society for Testing and Materials (ASTM)
Institute of Cable Engineers Association KEA)
Institute of Electrical and Electronic Engineers (IEEE)
Local Code Enforcement Agency Requirements
National Electrical Code (NEC)
National Electrical Contractor's Association (NECA)
National Electrical Manufacturer's Association (NEMA)
National Electrical Testing Association (NETA)
National Fire Protection Association (NFPA)
Underwriter's Laboratories, Inc. (UL)
Uniform Building Code (UBC)
No requirement of these drawings and specifications shall be construed to void any of
the provisions of the above standards. Any conflicts or changes required to the contract
documents in order to obtain compliance with applicable codes shall be brought to the
immediate attention of the Owner's Representative by the contractor.
All items shall be listed by Underwriter's Laboratories and shall bear the UL label.
Equipment shown to scale is approximate only and based upon a general class of
equipment specified. The Contractor shall verify all dimensions and clearances prior to
commencement of work.
1.2.3
1.2.4
1.2.5 The Contractor shall verify all points of connection with the manufacturer's
requirements, instructions, or recommendations prior to installation. The actual
dimensions, weights, clearance requirements and installation requirements shall be
verified and coordinated by the contractor.
1.3 SUBMITTALS
1.3.1
DliDT PHASE II
Submit shop drawings per Section 16050 for review including the following:
Circuit and Motor Disconnects
MWE Project No. 00-1 59 December 19, 2000
16170-1
PART 2
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.1 1
2.12
2.13
2.14
PART 3
3.1
.I Voltage and current ratings
.2 NEMA enclosure type
.3
.4 Dimensions
.5 Fuse type and class
Horsepower and fault current rating
PRODUCTS
Disconnects shall NEMA 1, indoor type, or rated for the locations in which they are
installed as noted on the construction documents.
Disconnects shall be UL listed and suitable for the application.
Exterior disconnects shall be raintight, dusttight, have raintight hubs, and be rated
NEMA 3R.
Disconnects shall be heavy duty type, rated 600V with current capacity as noted on the
construction documents. Verify NEMA configuration with construction documents.
Disconnects shall have hinged, lockable, dead-front doors with permanently marked
ONIOFF indicators. Enclosures shall be baked enamel factory painted steel with conduit
knockouts.
Disconnects shall be operated by a handle accessible from the exterior of the enclosure.
Handles shall have provision to be padlocked in the OFF position.
All current carrying parts shall be high conductivity copper designed to carry rated load
without damage from heat and plated to resist corrosion.
Switch mechanism shall be a quick-make, quick-break type such that the operation of
the contact is restrained by the handle during the closing or opening operation.
Switches shall have a minimum fault current rating of 200,000A RMS.
All switches shall be fused unless specifically noted otherwise.
The disconnect door cover shall have an interlocking mechanism to prevent opening the
cover when the switch is in the ON position.
Fuses serving motor loads shall be Class L and Class RK1, 250V and 600V. time delay,
dual element unless noted otherwise on the construction documents.
Fuses serving non-motor loads shall be Class L and Class RKI, 250V and 600V. fast
acting, dual element unless noted otherwise on the construction documents.
Provide built-in fuse pullers.
Acceptable manufacturers shall be General Electric, Cutler-Hammer, Siemens, Square D,
and Westinghouse. Fuses shall be Gould-Shawmut or Bussman.
EXECUTION
Installation method of disconnects shall comply with the latest enforced edition of the
DlDT PHASE II
MWE Project No. 00-1 59
Circuit and Motor Disconnects
December 19, 2000
161 70-2
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
National Electrical Code and the authority having jurisdiction.
Install all disconnects in accordance with the manufacturer's recommendations and
requirements.
Coordinate disconnect mounting height, location and type with architectural and interior
drawings. Coordinate with other trades to identify conflicts with device locations and
notify the Engineer of any conflicts. Mount switches 42" above finished floor unless
noted otherwise.
Provide suitable galvanized metal strut framework where no wall or structure is available
for the mounting of disconnects.
Provide flexible conduit connections for disconnects mounted to strut framework,
motors, or vibrating equipment.
Tighten and inspect all connections and reconnect or repair wiring as necessary.
Test all disconnects for voltage level, continuity, ground fault, and short circuits. Check
switch mechanism operation under no load conditions prior to operating under load.
Install all disconnects plumb and square to structure and adjacent surfaces.
Provide and install all fuses sized per the equipment manufacturer's recommendation.
END OF SECTION
DI/DT PHASE II
MWE Project No. 00-1 59
Circuit and Motor Disconnects
December 19, 2000
161 70-3
Section 16420 SWITCHBOARDS
PART 1
1.1
1.1.1
1.2
1.2.1
1.2.2
GENERAL PROVISIONS
RELATED DOCUMENTS
The general conditions, Division 1, and Electrical General Requirements (Section 16050)
are part of this section and the contract for this work and apply to this section as fully
as if repeated herein.
QUALITY ASSURANCE AND STANDARDS
All work, material or equipment shall comply with the codes, ordinances and regulations
of the local government having jurisdiction, including the regulations of serving utilities
and any participating government agencies having jurisdiction.
All electrical work shall comply with the latest edition under enforcement of the
following codes and standards or other regulations which may apply:
.1
.2
.3
.4
.5
.6
.7 .a
.9
.10
.ll
.12
.13
American Disabilities Act (ADA)
American National Standards Institute (ANSI)
American Society for Testing and Materials (ASTM)
Institute of Cable Engineers Association (ICEA)
Institute of Electrical and Electronic Engineers (IEEE)
Local Code Enforcement Agency Requirements
National Electrical Code (NEC)
National Electrical Contractor's Association (NECA)
National Electrical Manufacturer's Association (NEMA)
National Electrical Testing Association (NETA)
National Fire Protection Association (NFPA)
Underwriter's Laboratories, Inc.(UL)
Uniform Building Code (UBC)
No requirement of these drawings and specifications shall be construed to void any of
the provisions of the above standards. Any conflicts or changes required to the contract
documents in order to obtain compliance with applicable codes shall be brought to the
immediate attention of the Owner's Representative by the Contractor.
All items shall be listed by Underwriter's Laboratories and shall bear the U.L. label.
Equipment shown to scale is approximate only and based upon a general class of
equipment specified. The Contractor shall verify all dimensions and clearances prior to
commencement of work.
1.2.3
1.2.4
1.2.5 The Contractor shall verify all points of connection with the manufacturer's
requirements, instructions, or recommendations prior to installation. The actual
dimensions, weights, clearance requirements and installation requirements shall be
verified and coordinated by the contractor.
1.3 SUBMITTALS
1.3.1 Submit shop drawings per Section 16050 for review including the following:
DIDT PHASE II
MWE Project No. 00-1 59
Switchboards
December 19, 2000
16420-1
PART 2
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
.I Switchboards
.2 Overcurrent protection
.3 Instrumentation
.4
.5
PRODUCTS
Switchboards shall be factory assembled, dead-front, metal enclosed, self-supporting
floor standing sections as noted in the construction documents.
Vertical sections shall contain overcurrent protective devices including circuit breakers
and fuses and shall be nominally 90" in height.
Switchboard finish shall be baked enamel factory paint of manufacturer's standard color.
Dimensions, weights, ratings, and layouts
Device settings and trip ratings
Provide front accessibility for wireways on each side of overcurrent protective devices
for entire height of section. Provide welded steel framework with screw covers
removable from the front; covers may be hinged.
All bussing shall be silver-coated copper with ratings as indicated in the construction
documents.
Switchboard, bussing, and devices shall be rated for the minimum available fault current
as indicated on the construction documents.
Switchboards shall be equipped with lifting eyes.
Switchboards shall be suitable for the environment in which they are located and shall
be NEMA 1, indoor, unless noted otherwise on the construction documents.
Main circuit breakers shall be provided and shall be solid state trip type with ratings as
noted. Distribution circuit breakers shall be molded case type. All circuit breakers shall
be bolt-on type.
2.10
2.11
Cross bussing shall be fully rated for the length of the switchboard.
Instrumentation shall be provided where noted.
provided in accordance with the serving utility company requirements.
The switchgear manufacturer shall submit a coordination and short circuit study for the
entire system provided including long time, short time, instantaneous, and ground fault.
Provide permanently adhered "bakelite" labels indicating the identification of each device
on the switchboard adjacent to the device and visible on the enclosure exterior.
Provide a ground bus in each switchboard section with connecting ground bonds
between sections.
Acceptable manufacturers shall be General Electric, Siemens, Square D, Cutler Hammer.
Utility company metering shall be
2.12
2.13
2.14
2.15
DllDT PHASE II
MWE Project No. 00-159
Switchboards
December 19, 2000
16420-2
PART 3
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.1 1
3.12
EX E C U T IO N
Installation method of switchboards shall comply with the latest enforced edition of the
National Electrical Code and the authority having jurisdiction.
Install all switchboards in accordance with the manufacturer's recommendations and
requirements.
Coordinate switchboard location and size with architectural and interior drawings.
Coordinate with other trades to identify conflicts with switchboard locations and notify
the Engineer of any conflicts.
Coordinate switchboard size with concrete housekeeping pads.
Check all connections, phase rotation, ground resistance and insulation
levels.
Ground fault protective devices shall be tested by an approved third party testing agency
and a written report submitted with the operation manual for review.
Test all switchboards and overcurrent protection devices for voltage level, continuity,
ground fault, and short circuits.
Install all switchboards plumb and square to structure and adjacent surfaces.
Connect and inspect all ground bonds prior to energizing switchboard.
Demonstrate the proper operation of all ground fault protective devices.
Clean all switchboard interiors and exteriors prior to handing over to Owner. Touch up
scratched paint and finishes as necessary.
Adjust and set all devices for proper operation. Set ground fault protective device as per
the written report recommendations.
resistance
END OF SECTION
DVDT PHASE II
MWE Project No. 00-1 59
Switchboards
December 19, 2000
16420-3
Section 16460 TRANSFORMERS
PART 1
1.1
1.1.1
1.2
1.2.1
1.2.2
GENERAL PROVISIONS
RELATED DOCUMENTS
The general conditions, Division 1, and Electrical General Requirements (Section 16050)
are part of this section and the contract for this work and apply to this section as fully
as if repeated herein.
QUALITYASSURANCEANDSTANDARDS
All work, material or equipment shall comply with the codes, ordinances and regulations
of the local government having jurisdiction, including the regulations of serving utilities
and any participating government agencies having jurisdiction.
All electrical work shall comply with the latest edition under enforcement of the
following codes and standards or other regulations which may apply:
.1
.2
.3
.4
.5
.6
.7
.8
.9
.10
.11
.12
.13
American Disabilities Act (ADA)
American National Standards Institute (ANSI)
American Society for Testing and Materials (ASTM)
Institute of Cable Engineers Association KEA)
Institute of Electrical and Electronic Engineers (IEEE)
Local Code Enforcement Agency Requirements
National Electrical Code (NEC)
National Electrical Contractor's Association (NECA)
National Electrical Manufacturer's Association (NEMA)
National Electrical Testing Association (NETA)
National Fire Protection Association INFPA)
Underwriter's Laboratories, Inc.(UL)
Uniform Building Code (UBC)
No requirement of these drawings and specifications shall be construed to void any of
the provisions of the above standards. Any conflicts or changes required to the contract
documents in order to obtain compliance with applicable codes shall be brought to the
immediate attention of the Owner's Representative by the Contractor.
All items shall be listed by Underwriter's Laboratories and shall bear the UL label.
Equipment shown to scale is approximate only and based upon a general class of
equipment specified. The Contractor shall verify all dimensions and clearances prior to
commencement of work.
1.2.3
1.2.4
1.2.5 The Contractor shall verify all points of connection with the manufacturer's
requirements, instructions, or recommendations prior to installation. The actual
dimensions, weights, clearance requirements and installation requirements shall be
verified and coordinated by the contractor.
1.3 SUBMITTALS
1.3.1 Submit shop drawings per Section 16050 for review including the following:
DllDT PHASE II
MWE Project No. 00-1 59
Transformers
December 19, 2000
16460-1
PART 2
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.1 1
2.12
PART 3
3.1
3.2
.1
.2 Temperature rating above ambient
.3 Regulation and sound levels
.4
.5 Nameplate data
PRODUCTS
Transformers shall be general purpose, ventilated dry type, factory assembled, dead-
front, metal enclosed, self-supporting floor standing as noted in the construction
documents.
Transformers shall be 480V-208YllZOV 34 4W(primary-secondary) voltage rated,
unless noted otherwise.
Transformers shall be rated for 80°C rise above an ambient temperature of 40°C.
Coils shall be continuously wound non-hygroscopic type with thermosetting varnish.
Windings shall be aluminum or copper.
Taps shall be provided at primary windings with (6)2%% taps, three above and three
below rated voltage.
Integral vibration isolators shall be provided between the core and coil assembly and the
transformer enclosure in addition to the vibration isolation located between the enclosure
and the floor.
Grounding shall be provided by means of a flexible grounding strap
Transformers shall be suitable for the environment in which they are located and shall be
NEMA 1, indoor, unless noted otherwise on the construction documents.
Transformers shall have lifting lugs and be enclosed in a heavy gauge, sheet steel
housing with baked enamel finish. The enclosure shall be ventilated.
Transformers located in exterior areas shall be NEMA 3R. with drip shield and corrosion
resistant finish.
Transformers shall comply with the latest ANSI and NEMA ST-20 sound performance
requirements and as a minimum exceed the requirements by 3-5dB.
Acceptable manufacturers shall be General Electric, Cutler-Hammer, Siemens, Square D,
Cutler-Hammer.
EXECUTION
Installation method of transformers shall comply with the latest enforced edition of the
National Electrical Code and the authority having jurisdiction.
Install all transformers in accordance with the manufacturer's recommendations and
reauirements.
Voltage, kVA, impedance, frequency, taps, and efficiency
Mounting details and vibration isolation
DI/DT PHASE II
MWE Project No. 00-1 59
Transformers
December 19, 2000
16460-2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11
3.12
Coordinate transformer location and size with architectural and interior drawings.
Coordinate with other trades to identify conflicts with transformer locations and notify
the Engineer of any conflicts.
Coordinate transformer size with concrete housekeeping pads, structural frames, and
mounting hardware.
Brace transformers per California Code of Regulations, Title 24, Seismic Zone 4
requirements.
Provide rubber vibration isolation between transformer and floor, structure, or any fixed
surface (including wireways).
Test all transformers for voltage level at primary and secondary windings.
Install all transformers plumb and square to structure and adjacent surfaces.
Connect and inspect all ground bonds prior to energizing transformer
Install all conduit connections to transformer with liquid tight flexible conduit.
Clean all transformer interiors and exteriors prior to handing over to Owner. Touch up
scratched paint and finishes as necessary.
Tighten and test all connections prior to energizing the transformer.
OllDT PHASE II
MWE Project No. 00-1 59
END OF SECTION
Transformers
December 19, 2000
16460-3
Section 16470 PANELBOARDS
PART 1
1.1
1.1.1
1.2
1.2.1
1.2.2
GENERAL PROVISIONS
RELATED DOCUMENTS
The general conditions, Division 1, and Electrical General Requirements (Section 16050)
are part of this section and the contract for this work and apply to this section as fully
as if repeated herein.
QUALITY ASSURANCE AND STANDARDS
All work, material or equipment shall comply with the codes, ordinances and regulations
of the local government having jurisdiction, including the regulations of serving utilities
and any participating government agencies having jurisdiction.
All electrical work shall comply with the latest edition under enforcement of the
following codes and standards or other regulations which may apply:
.1
.2
.3
.4
.5
.6
.7
.8
.9
.10
.11
.12
.13
American Disabilities Act (ADA)
American National Standards Institute (ANSI)
American Society for Testing and Materials (ASTM)
Institute of Cable Engineers Association (KEA)
Institute of Electrical and Electronic Engineers (IEEE)
Local Code Enforcement Agency Requirements
National Electrical Code (NEC)
National Electrical Contractor's Association (NECA)
National Electrical Manufacturer's Association (NEMA)
National Electrical Testing Association (NETA)
National Fire Protection Association (NFPA)
Underwriter's Laboratories, Inc.(UL)
Uniform Building Code (UBC)
No requirement of these drawings and specifications shall be construed to void any of
the provisions of the above standards. Any conflicts or changes required to the contract
documents in order to obtain compliance with applicable codes shall be brought to the
immediate attention of the Owner's Representative by the Contractor.
All items shall be listed by Underwriter's Laboratories and shall bear the UL label.
Equipment shown to scale is approximate only and based upon a general class of
equipment specified. The Contractor shall verify all dimensions and clearances prior to
commencement of work.
1.2.3
1.2.4
1.2.5 The Contractor shall verify all points of connection with the manufacturer's
requirements, instructions, or recommendations prior to installation. The actual
dimensions, weights, clearance requirements and installation requirements shall be
verified and coordinated by the contractor.
1.3 SUBMITTALS
1.3.1 Submit shop drawings per Section 16050 for review including the following:
DliDT PHASE II
MWE Project No. 00-1 59
Panelboards
December 19. 2000
16470-1
PART 2
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.11
2.12
2.13
2.14
2.15
PART 3
3.1
3.2
.1 Panelboards
.2
.3 Mounting, enclosure, dimensions
.4 Voltage, ratings, and phases
.5
PRODUCTS
Panelboards shall be factory assembled, dead-front, metal enclosed, wall mounted type
as noted in the construction documents.
Panelboards shall be rated 6OOVAC and shall not exceed 1200A current capacity.
Panelboard finish shall be baked enamel factory paint of manufacturer's standard color.
Provide front accessibility for wireways on each side of overcurrent protective devices
for entire height of panelboard.
All bussing shall be silver-plated copper with ratings as indicated in the construction
documents.
Panelboard, bussing, and devices shall be rated for the minimum available fault current
as indicated on the construction documents.
Enclosures shall be galvanized sheet steel cabinet type with hinged and lockable doors,
dead front, and permanently adhered identification labels on the front.
Panelboards shall be suitable for the environment in which they are located and shall be
NEMA 3R, outdoor, unless noted otherwise on the construction documents.
Circuit breakers shall be molded case type; all circuit breakers shall be bolt-on type.
Main lugs shall be anti-turn solderless pressure type for use with copper conductors.
Instrumentation shall be provided where noted.
Enclosures, panel interiors, and devices shall be of one manufacture.
Provide a typewritten panel schedule located in a sleeve on the interior of the panelboard
door indicating loads and areas connected to each circuit.
Provide a ground bus in each panelboard.
Acceptable manufacturers shall be General Electric, Siemens, Square D, Cutler-Hammer.
Overcurrent protection, bus capacity, main ratings, AIC rating
Device settings, trip ratings, and layout
EXECUTION
Installation method of panelboards shall comply with the latest enforced edition of the
National Electrical Code and the authority having jurisdiction.
Install all panelboards in accordance with the manufacturer's recommendations and
requirements.
DI/DT PHASE I1
MWE Project No. 00-1 59
Panelboards
December 19, 2000
16470-2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11
3.12
Coordinate panelboard location and size with archifectural and interior drawings.
Coordinate with other trades to identify conflicts with panelboard locations and notify
the Engineer of any conflicts.
Fasten panelboards securely to structural wall or surface to Seismic Zone 4
requirements. Panelboards shall be mounted no higher than 6'0" to the highest device
from finished floor and no lower than 24" above finished floor. Provide panel skirts
where noted.
Check all connections, phase rotation, ground resistance and insulation resistance levels.
Complete the panel schedule card and place in the sleeve on the interior of the
panelboard door.
Test all panelboards and overcurrent protection devices for voltage level, continuity,
ground fault, and short circuits.
Install all panelboards plumb and square to structure and adjacent surfaces.
Connect and inspect all ground bonds prior to energizing panelboard.
Demonstrate the proper operation of all ground fault protective devices.
Clean all panelboard interiors and exteriors prior to handing over to Owner. Touch up
scratched paint and finishes as necessary.
Adjust and set all devices for proper operation.
OI/DT PHASE II
MWE Project No. 00-1 59
END OF SECTION
Panelboards
December 19, 2000
16470-3
Section 16510 LIGHTING CONTROLS
PART 1
1.1
1.1.1
1.2
1.2.1
1.2.2
1.2.3
1.3
1.3.1
1.3.2
1.3.3
1.3.4
1.3.5
1.3.6
1.4
GENERAL REQUIREMENTS
RELATED DOCUMENTS
The general conditions, Division 1, and Electrical General Requirements (Section 16050)
are part of this section and the contract for this work and apply to this section as fully
as if repeated herein.
DESCRIPTION OF WORK
Extent of lighting control system work is indicated by drawings, and by the requirements
of this section. It is defined to include intelligent lighting control panels, switch inputs,
wiring, and ancillary programming equipment.
Type of lighting control equipment and wiring specified in this section include the
following:
.1 Programmable Lighting Control Panels
Requirements are indicated elsewhere in these specifications for work including, but not
limited to, raceways and electrical boxes and fittings required for installation of control
equipment and wiring:
.1
QUALITY ASSURANCE AND STANDARDS
ETL & ETLc approvals - The control panels shall be tested and listed under the UL 91 6
Energy Management Equipment standards and CSA C22.2 #205 by a nationally
recognized testing laboratory.
NEC Compliance -The control system shall comply with all applicable National Electrical
Codes regarding electrical wiring standards.
NEMA Compliance - The control system shall comply with all applicable portions of the
NEMA standards regarding the types of electrical equipment enclosures.
Component Pre-testing - All control equipment shall undergo strict inspection standards.
The equipment shall be previously tested and burned-in at the factory prior to
installation.
System Checkout - A factory trained technician or factory authorized personnel shall
functionally test the control system and verify performance after installation.
Manufacturer - Manufacturer shall have a minimum of 10 years experience in control
systems. Manufacturer shall provide off the shelf control products from its inventory.
Control systems that require custom panel sizing shall not be acceptable.
Not work of this section
SUBMITTALS
DIDT PHASE II
MWE Project No. 00-1 59
Lighting Controls
December 19, 2000
16510-1
1.4.1
1.4.2
1.4.3
PART 2
2.1
2.1.1
2.1.2
2.1.3
2.1.4
2.1.5
2.1.6
2.1.7
Product Data - Submit manufacturer's data on lighting control system and components.
Shop Drawings - Submit drawings of lighting control system and accessories including,
but not necessarily limited to the central programming system. intelligent relay panels,
network wiring, switch inputs, analog inputs and modem location.
.1 Riser DiagramlSystem Diagram
.2
Spare Parts - Submittals shall also include recommended spare parts lists.
Control System Network Wiring Diagram
PRODUCTS
MATERIALS AND COMPONENTS (System Description)
The lighting control system shall consist of intelligent relay control panels with 16 or 32
programmable switch inputs and shall offer a maximum of either 16 or 32 relays.
The lighting control system shall provide networking control panels. Panels shall permit
data sharing for global control. All inputs (no limitation) are transferable over the
network to create any switching pattern required.
Masking of control inputs permits customization of switch inputs, analog inputs, and
telephone override control. Masking permits the user to determine how the control
inputs shall function. Inputs may be customized to "restrict Off's or On's, no timer,
ignored, and setback". A mask determines when the control input is available or
unavailable for defined times, specific days and holidays.
Control panels rnay be optionally controlled through VisionTouch PC software.
VisionTouch permits the lighting control system to be controlled from multiple PC
locations. VisionTouch control presents lighting scenes or groups as control buttons on
the screen of the PC. The user rnay modify the buttons or the control aspect of the
buttons to adjust to the changes required by the building event schedule.
The programmable intelligence of each panel shall provide stand alone control for each
panel. Each individual panel shall have programmable inputs, Time Of Day control, and
analog control (i.e. temperature, kW. photocell, & etc.). Programmable intelligence shall
include:
.1
.2
.3
.4
40 Time Of Day schedules per day for 16 relay panel
80 Time Of Day schedules per day for 32 relay panel
Momentary or Maintained switch inputs, switch input timers (1 -240 minutes)
Analog inputs temperature control, photocell control presetting foot-candle level,
and electrical power monitoring
Each panel shall provide a Warn Off (flash the lights) to inform the occupants of an
impending Off command. The Warn Off command will allow 10 extra minutes for the
occupants to override their lights or exit the premises.
Control panels shall permit lighting to be overridden "On" for after hours use or cleaning.
These overrides shall be hard wired inputs or voice guided touch tone telephone control.
Any control pattern shall be available from any switch or phone location to override the
system.
DllDT PHASE I/
MWE Project No. 00-1 59
Lighting Controls
December 19, 2000
1651 0-2
2.1.8
2.1.9
2.1.10
2.2
2.2.1
2.2.2
2.2.3
The control system shall log all change of state information. Time and date stamping
(event logging) shall be logged for overrides, analog values, relay operations and power
fail & recovery.
Programming the control system shall be through a local terminal or off-line through a
PC running the Supervisor software on MS-DOS. Central programming software shall
permit multiple users to access the lighting control system simultaneously.
Each intelligent relay control panel shall have the following hardware features.
MATERIALS AND COMPONENTS (Hardware Features)
Relay Type - The system shall utilize control relays which are rated to 20 amps at
277VAC. The relays shall be magnetically held. Relay configuration and are provided in
groups of eight. The relays shall be rated for 10 million mechanical operations. A
limited 10 year warranty shall be provided on the individual relays.
Contact Inputs -The control system shall allow dry contracts (Digital Inputs) for override
purposes. Momentary or maintained contacts shall be supported as a 3 wire
(Momentary) or 2 wire (SPST) inputs respectively. Inputs shall be dry contacts (24 VDC
@I 12 ma. Internally supplies to the inputs). An input shall be linkable to any number of
relays for override control. The control system shall accept up to 16 or 32 dry contact
switch inputs.
Analog Inputs - Each control panel shall be capable of monitoring and controlling outputs
from analog sensor(s). All control panels shall permit temperature, photocell, and kWh
monitoring. Analog information shall be shared on the network for any controller to
utilize.
.1
.2
.3
.4
DlDT PHASE II
MWE Project No. 00-1 59
Photocells -The control system shall accept indoor, skylight, and outdoor photo
sensing heads. Photo sensing control shall permit the user to specify the actual
foot-candle level where desired switching shall occur. An internal dead band
timer shall exist to prevent the lights under photo sensor control to toggle
inadvertently, as the sensor passes through (twilight hours) the control
threshold.
kWh Monitoring Hardware - The control system shall be capable of monitoring
electrical power demand and consumption. Electrical power monitoring shall
accept both current transformers and transducer or through pulse metering.
Pulse metering is provided only through the WatchKeeper (analog). Kilowatt
power monitoring through current transformers and a watt transducer shall
provide true power monitoring. Proper sizing of electrical metering equipment
shall be specified through the Design Engineer.
Temperature Monitoring Hardware - The control system shall accept temperature
monitoring hardware for monitoring or building control. Temperature inputs shall
consist of both monolithic integrated circuit temperature sensors and 4-20 ma.
Temperature sensors. The control panel shall provide default temperature
sensing ranges that are menu choices. The Supervisor shall provide custom
sensor ranges for special types of applications.
Programmable 4-20 ma. Sensor Loop - The control system shall support 4-20
ma. Sensor loops. These sensors shall provide additional flexibility for building
control. The system shall accept both sourcing (remote powered) and sinking
(loop powered) 4-20 ma. sensors. Control systems that do not provide analog
Lighting Controls
December-19, 2000
16510-3
2.2.4
2.2.5
2.2.6
sensor interface shall not be acceptable.
selections for 4-20 ma. sinking or sourcing.
Analog inputs shall provide user
Modular Design - All connections for the network, dry contact inputs, and analog inputs
shall incorporate modular connectors. The relay board shall be modular and designed for
rapid field replacement or upgrading. The intelligent CPU board shall be mounted on
quick release spring pins that shall permit an entire change out of the processor and
input board in less than 1 minute. Systems that do not employ modular connectors shall
not be acceptable.
Hardware Options
.1
.2
.3
.4
Lighted Switch Card (LSC) - The controller shall provide an option for pilot light
wall switch enunciation. A modular card shall connect into the controller board
and shall provide power to illuminate pilot light switches. This option shall
confirm relay operation. When a relay is in the “ON” position the pilot light
switch shall be illuminated.
Automatic Relay Card (ARC) - The system shall utilize hybrid control relays that
are rated to 20 amps at 277VAC. The hybrid relay shall combine a high speed
electronic switch with a mechanically held relay to create a unique switching
device. The hybrid design shall look at each AC phase and shall close the
electronic switch precisely at the absolute zero crossing. The mechanical relay
in parallel shall follow and close after the in-rush current condition. The relay
shall provide an integral switch for both manual hand operation and visual
indication of relay status. The relays shall be rated for 10 million mechanical
operations. A limited 2 year warranty shall be provided on the individual relays.
Two Pole Relay Card (TPRC) -The controller shall provide an option for two pole
relay control. The Two Pole Relay Card TPRC shall offer the feature of
controlling two pole voltages such as 208. 240, and 480 VAC lighting loads.
The relays shall be modular in design and offer manual hand override control.
This optional relay card shall also provide a visual indication of relay status. The
208, 240VAC version shall provide 8 relays per card whereas the 480 VAC
version shall provide 4 relays per card. Combinations of relays shall be
permitted since relays shall snap into location.
Latching Relay Card (LRC) - The controller shall provide an option for remote
placement of the control relays. A modular card shall connect into the relay
compartment. Twisted (3) conductor cable shall power and control the remote
mounted relays. The relays may be mounted remotely, but shall not exceed a
maximum distance of 500 feet with 18 AWG and 750 feet 16 AWG wire
conductor.
Diagnostic Aids - Each control panel shall incorporate diagnostic aids for confirmation of
proper operation, or in case of failure, these aids shall guide the individual in rapid
troubleshooting of the system. The control panels shall employ Light Emitting Diodes
(LED’s) that visibly indicate:
.1 Power
.2 Network Communications
.3 System OK
.4 RS-232 Transmit & Receive
.5 Power-up OK
.6 Memory Confirmation
.7 Broadcast Reception
DllDT PHASE II
MWE Project No. 00-1 59
Lighting Controls
December 19, 2000
16510-4
.8
The panel shall also utilize annunciation at each panel that indicates: Power-up OK i3
Memory cleared. Control systems that do not provide self help diagnostics shall not be
acceptable.
Memory Back-up - The system shall utilize a memory back-up device that is system
integrated and shall be maintenance-free. Both the system clock and data in RAM shall
be protected against power interruptions lasting as long as one week. Power restoration
for as little as thirty minutes shall restore the interrupt protection circuit to its full seven
day protection capability. Systems that require any periodic battery maintenance shall
not be acceptable.
Multi-tapped Transformer - The control panel shall incorporate the use of a multi-tapped
transformer. The panel shall not require specification of voltage for each control
location. The voltages of 120 & 277VAC shall be available with each standard control
panel.
Status Indication of Relays - The system shall provide visible status indication of all
relays through the door of each panel. The visual indication shall disclose ONlOFF
status and relay number.
Service Overrides - The control panel shall provide a three position service override for
each individual relay and a master control switch for the entire panel. These service
overrides shall not be accessible from the exterior.
.1
OnlOff Status of Each Relay
Individual - The individual service override shall provide a three position switch
with the option of "ON", "AUTO", and "OFF", respectively. The system shall
remember the last command to the individual relay. Upon returning the relay
service override switch to the "AUTO" position the relay shall return to the most
recent command state given to that relay even if the last command occurred
during the service override condition.
Master - The master service override provides a single three position switch with
the option of "ALL ON", "AUTO", and "ALL OFF", respectively. This master
switch shall operate all of the relays in the controller. This switch shall override
and supersede all commallds from the logic board when the switch is in the
"ALL ON (green LED) or ALL OFF (red LED)" position. The master switch shall
function to override all the relays should the logic board be removed.
External Override - The system shall provide external priority override for the entire
panel. Through an externally maintained contact the override card shall place the panel
in a priority state. This external contact will supersede any other programmed state and
will command all the relays ON or OFF depending on operational choice. This priority
state will continue until the external contact is removed. Once the external override is
removed the control panel will return the relays to the appropriate programmed state.
.2
2.2.7
2.2.8
2.2.9
2.2.10
2.2.1 1
2.2.12 Lockable Enclosure - Each control panel shall be enclosed in a lockable NEMA class 1
enclosure. The enclosure shall be manufactured out of 1/16" steel and shall provide pre-
punched knockouts for efficient installation.
Panels - The control system shall consist of panels that may be configured in either a
network or stand alone manner. A control panel may be configured to have 8, 16, 24,
or 32 relays. A fully configured network shall have up to 255 control panels that are
2.2.13
DI/DT PHASE II
MWE Project No. 00-1 59
Lighting Controls
December 19, 2000
16510-5
.
2.2.14
2.2.1 5
2.2.16
connected together via twisted shielded pair (network).
Modem - The control system shall be capable of modem communications. Each control
panel shall provide a serial communications port for external communications. The
system shall be a multi-tasking system and permit more than one modem in operation at
a time communicating on the network. Communication speed shall be a minimum of
14400 baud. The modem shall utilize the Hayes compatibility standard and enable
modem access as defined by the Bell 212A and CCITT V.22 protocol standards.
Telephone Overrides (TIM) -The control system shall provide intelligent software for the
Telephone Interface Module (TIM) option. The optional TIM unit shall allow modem
communications and touch tone overrides from any touch tone phone. The control
system shall be multi-tasking and permit up to one modem (TIM) for each control panel
within a network environment.
.1 Override Operation - Touch-tone interface shall permit the control panel to place
override information onto the network and the preassigned control points shall
be commanded accordingly "ON/OFF". All user interface shall be through the
twelve Touch-tone keys on the telephone. All entries into the override system
shall be prompted by a digitized voice. Systems not employing voice guided
override instruction are not acceptable.
The TIM shall provide individual control passwords. Each password shall allow a
preset group designation (number of relays) and the duration of the telephone
override. TIM shall also provide a password to prevent entry into the override
control system.
.2
PC Based Interface (Supervisor) - PC based software shall enable any IBM Compatible
PC to program any lighting control panel that is connected to the network. The central
programming software shall permit the user to modify the control panel programming in
either an "ON or OFF-LINE" mode. This software package shall store all programmed
data and archive for future use. Systems using third party software are not acceptable.
The following features shall be standard in the PC based software:
Standard Software Features:
.1
.2
.3 kWh Monitoring
.4
.5
.6 Telecommunications
.7 Password Access (multi-level)
.8
.9 Network Status Indication
,lO Global Software Modifications
Optional Software Enhancements
.1
.2 Touch Screen Programming
.3 Tenant Billing
Trend Logging with Analog Data Setpoints (with 16 size only)
Real Time Analog Monitoring (with 16 size only)
Graphing of Logged ~~~~~~ Data
Exportation of Logged Data for Data Manipulation
Automatic Upload of Data From Panels
Supervisor Graphics Interface with Mouse
File Maintenance
.1
.2 Data Base Comparison Checking
.3 DOS Shell Capability
Archive programs, & All Log Information
DllDT PHASE II
MWE Project No. 00-1 59
Lighting Controls
December 19, 2000
16510.6
.4
The Supervisor software package shall be capable of operating on any IBM Compatible
with Windows 95 or MS-DOS operating system. Minimum computer requirements shall
be an RS-232 asynchronous serial port COMl or COM2. Software package shall permit
the PC to be utilized for other functions (i.e. word processing, data-base, & etc..)
besides lighting control. Systems that require an "on-line" dedicated computer for
control system operation shall not be acceptable.
Local (terminal) - The system shall provide a RS-232 serial communications port for
external communications. "On board" firmware shall allow for local terminal
communications at 9600 baud. The system shall have full operational system software
resident within the control panel. The system as standard shall allow "on-line"
programming from a local terminal communication connection.
Network -The control system shall be capable of panel to panel communications over a
high speed hard wired data network. The network shall consist of twisted shielded pair
of wire utilizing the RS-485 communication standard. The network shall communicate
at 19.2K baud and employ the circuit protecting feature of auto-thermal shutdown. The
network shall support a maximum of 255 control panels. This communication standard
and baud rate shall allow a maximum distance of 2000 feet for panel to panel
communications. The recommended wire size is 18 gauge twisted shielded pair of wire
(1 8/2 wire-uniform 1 turn per 3 inches minimum and 50 pf/ft maximum). Belden #9841
or equivalent.
VisionTouch (Touch ScreenlSupervisor Graphics Interface)
.1
Uploading and Downloading of Programs
VisionTouch (Mouse Button or Touch Screen) - The lighting control system shall
employ software that presents lighting events simply as an array of buttons to
be invoked from a mouse. The control buttons refer to lighting control
configurations or events. The buttons shall indicate the actual status of the
event under control. The screen shall also denote communication anomalies on
the network and report them on the screen to the system operator.
The control system shall provide the same software functions as indicated
above, but instead provide lighting event selection through touch screen control,
stand alone touch screens for event control or status reporting. The control
system shall permit multiple touch screen locations. The user shall have full
control and may lock~out unauthorized users from access.
Supervisor Graphics Interface (SGI) - The Supervisor Graphical Interface program
provides graphical representation of building operation through lighting control
floor plan status. The software shall intuitively present icons for event control.
The SGI software shall permit drawing files to be overlaid with control icons for
straightforward control. The operator may choose any graphical overlay that
best fits the mode of building operation. The user may point and click the
mouse to specific control zones or event control through a menu of pre-
programmed lighting control events.
~~~~ ~~~~ ~~ ~ ~~ ~~ ~~~
.2
2.2.17
2.2.18
2.2.19
2.2.20 Tenant Billing Software - An optional billing package shall be provided in conjunction to
the PC based software (Supervisor). Billing information shall be stored in the
WatchKeepers for retrieval by the Supervisor. Tenant hours of use are uploaded from
the site and compiled into the billing program for calculation. Logged information shall
be printed into monthly billing statements. Time and date denotation shall be available
for each billing occurrence. One PC site shall be capable of monitoring multiple building
DI/DT PHASE II Lighting Controls
MWE Project No. 00-1 59 December 19, 2000
16510-7
sites.
Run-time Totalizer - The lighting control system shall be cgpable with optional software
to log and indicate burn and strike times for each circuit of fixtures. The Runtime
Totalizer provides reports for maintenance personnel to manage their lighting systems
more efficiently.
Switch Network Node - The lighting control system shall support the Switch Network
Node (SNN) for gathering multiple switch inputs and placing them onto the network.
The SNN shall gather a maximum of 128 switch inputs in groups of sixteen and impose
them onto the network for global lighting control commands. The control system shall
permit a total 255 SNN's or WatchKeepers or any combination thereof on one network.
Any switch input may command any relay combination in any panel or panels on the
WatchKeeper network.
2.2.21
2.2.22
PART 3 EXECUTION
3.1 EQUIPMENT INSTALLATION AND DOCUMENTATION
3.1.1 Installation -The control system shall be installed and fully wired as shown on the plans
by the installing contracting. The contractor shall complete all electrical connections to
all control circuits, network terminations, RS-232 connections, sensors and override
wiring.
3.1.2
3.1.3
3.1.4
3.2
3.2.1
Telephone Lines - The owner shall arrange for all telephone lines that are needed for
telecommunications and touch tone telephone override wiring as denoted on the plans.
All phone connections shall be terminated into RJ-11 modular telephone jacks. If
multiple lines are required they shall be installed on a rotating line so when one line is
busy, the call will automatically switch to the next line.
Documentation - The contractor shall provide accurate "as-built" drawings to the owner
for correct programming and proper maintenance of the control system. The "as-builts"
shall indicate the load controlled by each relay and the relay panel number.
Operation and Service Manuals - The factory shall supply all operation and service
manuals as related to the design of the control system.
PRODUCT SUPPORT AND SERVICE
System Start-up - Before requesting for factory start-up services the installing contractor
shall verify that:
.1
.2
.3
.4
The control system has been fully installed in accordance with manufacturer's
installation instructions.
Phone lines checked for dial tone.
All low voltage wiring for overrides and sensors be completed.
All "as-builts" that describe relay load locations be delivered to the owner.
3.2.2 Factory Support - Factory telephone support shall be available at no cost to the owner.
Factory assistance shall consist Of solving programming or application questions
concerning the control equipment. The factory shall maintain toll free numbers for
technical support for their customers.
DllDT PHASE II
MWE Project No. 00-1 59
Lighting Controls
December 19, 2000
16510-8
3.3
3.3.1
3.4
3.4.1
SYSTEM DELIVERY AND ACCEPTANCE
Delivery - Delivery of the control system shall be within 6 to 8 weeks of "notice to
proceed". The contractor is responsible for complete installation of the entire system
according to strict factory standards and requirements. The following items shall
constitute factory standards and requirements:
.1 All system equipment shall operate in accordance with specification and
industrial standard procedures.
.2 An operational user program shall exist in the control system. The program shall
execute and perform all functions required to effectively operate the site
according to the requirements herein.
Demonstration of program integrity during normal operation and pursuant to a
power outage.
Contractor shall provide a minimum of two days training on the operation and
use of the control system. Additional support services shall be negotiated
between the contractor and the building owner or manager.
.3
.4
WARRANTY
Manufacturer shall supply a 2 year warranty on all hardware and software. A limited 10
year warranty shall be provided on the individual relays.
END OF SECTION
DI/DT PHASE II
MWE Project No. 00-1 59
Lighting Controls
December 19, 2000
16510-9
Section 16520 LIGHTING - INTERIOR
PART 1
1.1
1.1.1
1.1.2
1.2
1.2.1
1.2.2
1.2.3
1.2.4
1.3
1.3.1
GENERAL PROVISIONS
RELATED DOCUMENTS
The general conditions, Division 1 and the Electrical General Requirements (Section
16050) are part of this section and the contract for this work and apply to this section
as fully as if repeated herein.
The following sections apply to this section, including but not limited to:
Section: 161 10 Raceways
161 21 Manufactured Wiring Systems
161 30 Outlet Boxes
16140 Wiring Devices
161 50 Grounding 81 Bonding
16470 Panelboards
SCOPE
Provide labor, materials, tools, and equipment necessary for and incidental performing of
all operations in connection with furnishing, delivery and installation of the equipment of
this section, as shown on the drawings and specified herein.
Furnish and install complete lighting systems, wired, assembled and operable, except
where specifically noted otherwise, which includes but not limited to the following:
.1 Luminaires
.2 Lamps and ballasts
.3 Mounting hardware
.4 Accessories as noted
The materials and equipment herein specified shall be of new and furnished in
accordance with the applicable standards.
Specifications and drawings are intended to convey the general features, function and
character of the fixtures only, and do not illustrate or set forth every item or detail
necessary of the work.
QUALITY ASSURANCE AND STANDARDS
The latest revision of the standards listed below form an integral part of this
specification:
.1
.2 Underwriters Laboratories (UL)
.3
.4
.5
.6
.7 National Electrical Code (NEC)
National Electrical Manufacturer's Association (NEMA)
National Fire Protection Association (NFPA)
American Society of Testing Materials (ASTM)
Institute of Electrical and Electronic Engineers (IEEE)
American National Standards Institute (ANSI)
DllDT PHASE II
MWE Project No. 00-1 59
Lighting - Interior
December 19, 2000
16520-1
1.3.2
1.4
1.4.1
1.4.2
7.4.3
.8
.9 Certified Ballast Manufacturers (CBM)
.10
.l 1
Materials and equipment as well as workmanship provided under this section shall
conform to the highest commercial standards, and as specified and as indicated on the
drawings. Fixture parts and components not specifically identified or indicated shall be
made of materials most appropriate to their use or function and as such resistant to
corrosion, thermal and mechanical stresses encountered in the normal application and
function of the fixtures.
Illuminating Engineering Society of North America (IESNA)
National Appliance Energy Conservation Amendments of 1988 (Public Law 100-
357).
Commission Internationale de I'Eclairage (CIE)
SUBMITTALS
Shop drawings for all fixtures shall be submitted and reviewed prior to fabrication. Any
material produced prior to the review of shop drawings or samples, and not in
conformance with the Contract Documents, shall be rejected with the Contractor
bearing full responsibility and cost. Submit shop drawings per Section 16050 for review,
include the following:
.1 Luminaires
.2 Lamps
.3 Ballasts
.4 Photometric reports
.5
.6 Accessories
Submit shop drawings indexed, and in accordance with luminaire identification per
drawings. Each item shall be tabbed clearly4dentifying the catalog ordering numbers
including all optional equipment specified.
Luminaire shop drawings shall include the following:
Point by Point calculations specific to the project.
.I Manufacturers product information sheets. Photocopy of partial data sheet or
drawings is not acceptable. Product information shall include the following:
Ballast type, manufacturer and performance characteristics a.
b. Lamp type. manufacturer and performance characteristics
C. Finish, frame, trim and housing type
d. Reflector system and characteristics
e. Diffuser type and characteristics
f. Weight and dimensions
9. Standard manufacturer options
h.
I. Luminaire efficiency i. Coefficient of utilization
k. Candlepower data table
I. Zonal lumens table
m. ClEllES luminaire classification
n.
~~~ ~~~~~ ~~
Luminaire series and model number
Maintenance and operating instructions including tools required,
types of cleaners to be used and suggested replacement parts
list.
0. . Average footlambert table.
DIDT PHASE II
MWE Project No. 00-1 59
Lighting - Interior
December 19, 2000
16520-2
1.4.4
1.4.5
1.4.6
.2 Photometric data assembled in a standard IES photometric test report
Lamp shop drawings shall include type, dimensions, manufacturer and operating
characteristics, including but not limited to:
.1
.2
.3
.4
.5
.6
.?
.8
.9
.10
.11
Operating voltage range
Color Rendering Index (CRI) value per IES standards
Color temperature (in Kelvin)
Mounting position
Starting temperature, indoor and outdoor
Startinglrestrike time
Lamp life
Lamp efficiency
Warranty
Lamp base
Lumen rating
Ballast shop drawings shall include type, dimensions, manufacturer and operating
characteristic including but not limited to:
.1
.2
.3
.4
.5
.6
.?
.8
.9
Ballast operating temperature and voltage
Total harmonic distortion
Ballast startinglrestrike time
Ballast efficiency factor (BEF)
Ballast transformation type (ie: autotransformer, preheat, instant-start, rapid
start, constant wattage, reactor, trigger-start)
UL classification (ie: Class "P")
Power factor
Sound rating (fluorescent only)
NEMA rating
If requested by the Engineer, samples shall be submitted for final selection. Samples
shall comply with the following:
Paint chips:
.1
.2
.3
Samples shall be provided and approved prior to any release to manufacture.
Samples-shali be minimum of 3"x3" and be of exact finishes.
Samples shall be exact representatives of the luminaires:
a. Priming process
b. Painting process
C. Baking process
d. Finish process
e.
Samples shall be submitted for the following luminaires:
a. Exterior luminaires
b.
Samples shall be labeled with manufacturers color call-out, as well as the paint
manufacturers call-out.
Luminaire material U.e. sheet metal, aluminum, wood, etc)
.4
Interior luminaries that are surface, pendant, wall, and floor mounted.
.5
Fixtures:
.I Submit for approval samples called for to the Engineer when and where
DI/DT PHASE II
MWE Project No. 00-1 59
Lighting - Interior
December 19, 2000
16520-3
1.5
1.5.1
1.5.2
1.6
1.6.1
1.6.2
1.7
1.7.1
1.7.2
directed, the components marked with the name of the project, and fixture
type, and part number. Fixture shall be provided with a 6' cord and plug, and
specified lamp. Allow two weeks from the date of receipt tor thorough
examination and review by the Engineer.
Fixtures under the contract shall be identical with the approved sample fixture.
No fixture used as a sample will be allowed to be installed on the project.
In the event the submissions are disapproved, the fixtures will be returned to the
contractor to immediately make a new submission of fixture or fixtures meeting
the contract requirements.
All charges for these shipments are to be prepaid by the Contractor.
Samples shall be provided and approved prior to any release to manufacture.
.2
.3
.4
.5
SUBSTITUTIONS
The fixture schedule and specifications represent the judgement of trained, experienced
design professionals. The fixture selections were made base upon the Owners
requirements. Those fixtures chosen as appropriate lor the project, were further
reviewed with regards to the manufacturers and representatives reliability and their
ability to perform over the course of the project.
The Owners or Owners Representative are aware of the cost of each fixture.
FACTORY TESTING
Luminaire testing shall be conducted by an approved independent testing laboratory.
Luminaire tests shall be reported in accordance with Illuminating Engineering Society
(IES) Standard Photometric Test Report.
WARRANTY
Contractor shall warranty equipment and installation free from defects in material and
workmanship for a period of no less than (11 year from the date of project completion.
This includes the fixture, its finishes and components (see ballasts below).
Fluorescent ballasts shall be warrenteed against defects in material and workmanship for
a period of no less than (3) ~ years ~~~ for electromagnetic ~~~ ballasts, ~~ and (5) years for
electronic ballasts,~ from the date of project completion regardless of the date of
manufacture.
~ ~~~~ ~~ ~ ~~ ~~
1.7.3 HID ballasts shall be warrenteed against defects in material and workmanship for a
period of no less than (2) year from the date of project completion regardless of the date
of manufacture.
PART 2 PRODUCTS
2.1 GENERAL
2.1.1 Luminaries shall bear the appropriate UL label for location, mounting position and
operating conditions in which it is installed.
Luminaries, ballasts and lamps shall each be of the same manufacturer and of identical
finish, appearance, and performance. Luminaries which are pre-lamped before shipment
2.1.2
DI/DT PHASE II
MWE Project No. 00-1 59
Lighting - Interior
December 19, 2000
16520-4
2.1.3
2.1.4
2.1.5
2.1.6
2.1.7
2.1.8
2.1.9
2.2
2.2.1
2.2.2
2.2.3
shall have identical lamp manufacturer. Mix and match of different lamp manufacturer
shall not be acceptable.
Recessed ceiling mounted luminaires shall be provided with appropriate frame and trim
type compatible with ceiling construction. Reference architectural plans for ceiling
construction type and specifications.
Luminaires and devices shall be free of burrs, scratches, marks, and dents which may
occur during transportation, storage or installation. Construction shall be finished to
eliminate sharp edges exposed to installer and end-user.
Sheet metal construction of luminaires shall be of sufficient rigidity to prevent
deformation during installation and typical use.
Casted parts and sections of a luminaire shall be smooth, free of blemishes, rust and
scale and be irradiated, sandblasted and anodized.
All burned out lamps and ballasts shall be replaced by the end of contract prior to
Architect, Owner Representative and Engineer final punchlist.
Trim color for indoor luminaire installation shall be as indicated on plans.
Enamel paint shall be baked on at a minimum 3OO0F and have 86% reflectivity for a
surface, which is to be reflective.
LAMPS
Incandescent lamps
.1
.2
.3
.4
Fluorescent lamps
.1 Unless specified on plans or in Lighting Fixture Schedule, the lamp color
temperature shall be 3500 Kelvin (K).
.2 Unless otherwise noted, lamps shall have a CRI (color rendering index) of 82 or
greater.
Incandescent lamps above 300W shall be mogul base type unless otherwise
noted.
Incandescent lamps below 300W shall be medium base type unless otherwise
noted.
Incandescent lamps shall be frosted inside or as manufacturer recommended and
130V rated unless otherwise noted.
Low Voltage lamps MR16 shall be >NFL= unless otherwise noted.
HID lamps
.1 Metal halide lamps shall be phosphor coated and universal burning position type
unless otherwise noted. Metal halide lamps shall incorporate a quartz shroud
around arc tube to prevent outer jacket rupture in the event of a non-passive arc
tube failure.
Metal halide lamps shall be of the type with a lifetime color stability within +/-
200K. If not available for the type and wattage specified, metal halide lamps
with the best color uniformity as per current industry standards shall be used.
.2
DI/DT PHASE II
MWE Project No. 00-1 59
Lighting - Interior
December 19, 2000
16520-5
2.2.4
2.2.4
2.2.5
2.3
2.3.1
2.3.2
.3 High Pressure Sodium lamps shall be diffuse coated and universal burning
position type unless otherwise noted.
Compact Fluorescent
.1
.2
.3
Acceptable manufacturers
.1
.2
.3
.4
.5
.6
All lamps shall be burned once installed in the fixtures for 100 hours, prior to switching
or dimming.
BALLASTS
General
.1
.2
.3
.4
.5
.6
Unless specified on plans or in Lighting Fixture Schedule, the lamp color
temperature shall be 3500 Kelvin (K).
Unless otherwise noted, lamps shall have a CRI (color rendering index) of 82 or
greater.
Lamp base and fixture socket shall match pin configuration.
Incandescent Lamps: OsramlSylvania, GE or Philips
Fluorescent Lamps: OsramlSylvania, 800 XP series
Low Pressure Sodium Lamps: OsramlSylvania or Philips
Metal Halide Lamps: OsramlSylvania, GE or Philips
High Pressure Sodium Lamps: OsramlSylvania, GE or Philips
Mercury Vapor Lamps: OsramlSylvania, GE or Philips
Ballasts shall be UL listed when installed in luminaire.
Ballasts shall be grounded appropriately as governed by NEC Article 41 0-E.
Ballasts shall be located within the luminaire for which it is operating unless
specifically indicated on plans as remote ballast type.
Ballasts shall contain no PCBs in any indoor or outdoor installation unless
otherwise noted.
Ballasts shall be rated weatherproof type where there is moisture present.
A permanent waterproof seal shall be factory provided where the wiring enters
the ballast compartment of an outdoor luminaire installation.
Fluorescent ballasts
.1 Electromagnetic Ballasts
1. Electromagnetic "standard" ballast shall comply with the "National
Appliance Conservation Amendment of 1988" (Public Law 100-357)
Ballast Efficiency Factor (BEF) as enforced by the Certified Manufactures
(CBM) for "high efficiency" ballast design standards.
b. Electromagnetic ballasts shall be sound "A" rated per NEMA standards
C. Electromagnetic ballasts shall comply with NEC standards for thermal
protection and shall be UL listed and marked "Class P".
d. Electromagnetic ballasts shall be listed by California Energy
Commission's Energy Efficiency Standards of approved ballast
manufacturers.
Electromagnetic ballasts indicated to be high power factor (HPF) shall be
rated 90% (P.F.) minimum unless otherwise noted.
e.
.2 Solid State Ballasts (Electronic)
Lighting - Interior
December 19, 2000
16520-6
DllDT PHASE II
MWE Project No. 00-1 59
2.3.3
2.3.4
2.3.5
a.
b.
C.
d.
e.
f.
9.
h.
Electronic ballasts shall meet or exceed ANSI, IEEE, and FCC standards
for lamp starting and operation, electro-magnetic interference, radio
frequency interference suppression and line transient protection.
Electronic ballasts shall not interfere with other electrical equipment
normal operation.
Electronic ballasts shall operate at a frequency of 20 to 35kHz with no
detectable flicker and be high power factor (97% or higher).
Electronic ballasts that operate more than one lamp shall be able to
maintain full output of the companion lamp(s1 after failure of any
combination of lamp(s).
Electronic ballasts shall not be affected by lamp failure nor hinder the
normal life of operating lamp.
Electronic ballast normal case operating temperature shall not exceed
70°C.
Rapid-start electronic ballasts shall provide softktable start of rapid-start
lamps and maintain full cathode heat during operation.
Electronic ballasts shall be marked with manufacturer's name, part
number, supply voltage, power factor, open circuit voltage, current draw
for each lamp type and bear all applicable UL listings on housing.
Low-Pressure Sodium Ballasts
.1
.2
HID Ballasts
.1
Low-pressure sodium ballasts shall bear all applicable UL listings on housing.
Low-pressure sodium ballasts shall be auto-leakage transformer type.
Mercury vapor ballasts shall be Constant Wattage Autotransformer (CWA),
Autoregulator type with current crest factor of 1.6 to 1.8 and voltage regulation
of 10% allowable.
Metal halide ballasts shall be Lead-Peak Autotransformer type with current crest
factor of 1.6 to 1.8 and voltage regulation of 10% allowable.
High pressure sodium ballasts shall be Regulating type with voltage regulation of
10% allowable and shall meet ANSI trapezoid limitations for voltage
characteristics over the life of the lamp.
HID ballasts shall be fused with manufacturer recommended size and type.
HID ballasts shall bear all applicable UL listings on housing.
.2
.3
.4
.5
Acceptable Manufacturers
.1 Electromagnetic ballasts: Magnetek, Advance Transformer Co., Motorola or
approved equal.
.2 Solid state ballasts (electronic): Osram Sylvania or, Quicktronic, or approved
equal.
.3 Low-pressure sodium ballasts: Magnetek, Advance Transformer Co. or approved
equal.
.4 Mercury vapor ballasts: Magnetek, Advance Transformer Co. or approved equal.
.5 Metal halide ballasts: Magnetek, Advance Transformer Co. or approved equal.
.6 High pressure sodium ballasts: Magnetek, Advance Transformer Co. or approved
equal.
2.4 LUMINAIRES
DllDT PHASE II
MWE Project No. 00-159
Lighting - Interior
December 19, 2000
16520-7
2.4.1 General
.I
.2
.3
.4
.5
.6
.7
.8
.9
.IO
2.4.2
2.4.3
Escutcheon plates, coverplates, and finish trim hardware shall meet flush with
ceiling, floor, wall or other surfaces to which they may be mounted.
Luminaire construction shall allow initial installation of recessed luminaires
without the presence of finish trim, diffusers or lens.
Lamp sockets and reflector assemblies shall be securely fastened to luminaire
housing to prevent rotation, adjustment or rocking of hardware during lamping or
future relamping.
Luminaire lenses shall be securely retained in a fashion so that relamping or
accessing to luminaire will not dislodge lens.
Luminaire lenses and diffusers shall be free from chromatic or spherical
imperfections and have thermal characteristics capable of withstanding installed
lamp temperatures.
Pendant type luminaries shall be mounted to provide balanced construction with
the use of swivel hanger. Swivel hanger shall be provided standard or ordered
as accessory unless specified otherwise.
Bracket type luminaires shall be specifically designed for type installation which
is indicated.
Luminaries shall be factory tested, prewired and preassembled unless otherwise
specified or intended.
Luminaires located in direct exposure to the weather to include rain, sleet and
snow shall be marked "Suitable For Wet Locations" with UL label. Luminaires
located outdoors but not in direct exposure to rain shall be marked "Suitable for
Damp Locations" minimum rated.
Where ceiling space is not accessible, luminaire housing shall provide access to
luminaire junction box to comply with NEC section 370-29.
Incandescent Luminaires
.I Recessed incandescent luminaires shall be provided with mounting frame and
attached prewired junction box rated for through-wiring with 60EC conductors.
Fluorescent Luminaires
.1 Recessed fluorescent luminaires shall be constructed to limit ballast housing
surface temperature in luminaire to 90°C with the following factors:
a. Voltage: 277V +5%
b. Room Ambient Temp: 25OC + 5%
C. Plenum Ambient Temp: 55OC +5%
d. Ceiling Material R Factor: 20
Medium BiPin type lamp socket shall be fastened securely to housing via
brackets or straps to eliminate excessive flexing or pressure during normal lamp
installation. Socket should be replaceable without removing entire housing.
Medium BiPin type lamp sockets without a housing shall be secured with (2)
appropriate screws or bolts to prevent misalignment.
Fluorescent pin type sockets shall utilize corrosion-resistant "edge-wipe'' type
contacts.
Steel metal fluorescent luminaire housing shall be constructed of die formed,
heavy duty, cold rolled steel. Housing shall be welded using lab seam
construction and corners mitered and free of burrs, cracks, gouges, scratches.
Aluminum fluorescent luminaire housing shall be extruded or die formed in
sections, which will positively interconnect to provide a rigid unit when
.2
.3
.4
.5
.6
DliDT PHASE II
MWE Project No. 00-1 59
Lighting - Interior
December 19, 2000
16520-8
2.4.4
2.4.5
2.4.6
.7
.8
.9
.10
.11
assembled.
Steel metal construction of fluorescent luminaires housing shall be ribbed,
section or paneled to provide internal structure.
Parabolic baffle optic control for fluorescent luminaires shall be semi-specular
anodized, of low iridescent and constructed of sheet aluminum. Baffle shall be
constructed to ensure rigidity and parabolic contours through interlocking cell
assembly.
Prismatic'lenses shall be of virgin acrylic plastic pattern 12 (0.1 25 inches thick
prestressed to span 48-inches) unless specified otherwise on plans.
Fluorescent luminaires mounted in accessible ceiling areas shall utilize a plug
'together modular wiring system. The system shall be installed with all required
fittings, plugs, and cord drops for a complete and operating system.
Compact fluorescent luminaire shall incorporate an End of Life (EOL) protection
device.
Low Pressure Sodium Luminaires
.1 Low pressure sodium luminaires shall comply with HID luminaire requirements
where applicable.
HID Luminaires
.1
.2
HID luminaires shall be provided with porcelain, screw type mogul sockets UL
listed for 1500W or higher at 600 volts where applicable.
High pressure sodium luminaires shall operate ballasts and lamps with lamp in
open and short circuit conditions for 6 months without significant ballast life
loss.
.3 High pressure sodium luminaires shall operate within 2% of their labeled
wattage with a 10% variance of input rated voltage. Power factor shall
maintain minimum of 85% through life.
Self-Illuminance Luminaires
.1
.2
.3
.4
Self-iiluminating luminaires shall have passed ANSI 540 tests of structural
integrity by an approved testing agency.
Manufacturer of supplied luminaires shall keep record of installation and number
of luminaires and type installed.
In the event of specified end of code life, the manufacture shall contact and
inform the owner of the expiration date.
In the event of demolition, improvements, or permanent removal of luminaire,
the manufacture shall be accessible for proper disposal as indicated by OSHA,
NFPA and other governing authorities at no cost to the owner or future owners.
2.4.7 EMERGENCY LIGHTING UNITS
.1 90 minute battery packs
.2 UBClLife safety approved
Acceptable manufactures shall be as specified on plans per Lighting Fixtures Schedule
unless otherwise specified herein or on plans.
2.4.8
PART 3 EXECUTION
DllDT PHASE II
MWE Project No. 00-1 59
Lighting - Interior
December 19, 2000
16520-9
3.1
3.1.1
3.2
3.2.1
3.2.2
3.2.3
3.2.4
3.2.5
3.2.6
3.2.7
FIELD QUALITY CONTROL
Any discrepancies with specified luminaire and its proposed use or environment shall be
brought to the Engineer's attention as soon as possible.
.1 At project close-out, a list of damaged fixtures received by the contractor shall
be provided to the Electrical Engineer for evaluation of fixture manufacturers
shipping and packaging methods.
INSTALLATION
Luminaires shall be installed complete with all accessories, glassware, canopies, sockets,
reflectors, optics, wiring devices and supplied with new lamps of the type and wattage
indicated on plans or in this specification unless specifically noted otherwise.
All luminaires shall be supported in accordance with ASTM E-580 recommended
guidelines for seismic restraint, as well as the latest version of the Uniform Building
Code related to lateral and vertical bracing, including but not limited to:
.1
.2
Recessed luminaires shall have a minimum of two (2) #12 gauge wires attached
to structure above, independent of ceiling support system.
All lighting fixtures shall be positively attached to the suspended ceiling system.
The attachment device shall have a capacity of 100 percent of the lighting
fixture weight acting in any direction.
Pendant-hung lighting fixtures shall be supported directly from the structure
above with No. 9 gauge (3.8mm) wire or approved alternate support without
using the ceiling suspension system for direct support.
.3
Mount luminaires in mechanical yards, areas and rooms to clear any mechanical
equipment, conduit and clearances. Coordinate mounting with mechanical plans.
Junction box and ballast compartment shall be accessible from below when housing is
installed in final position. Wiring shall be secured from damage when accessed for
relamping.
Fire rated gypsum board enclosures shall be constructed around all recessed luminaires
that penetrate fire rated areas.
All surface mounted luminaires installed on a suspended ceiling grid shall have four (4)
supporting clips positively attaching corners of housing to the ceiling. Installation shall
include 11%" spacers between the housing and ceiling tile where applicable.
Actual locations of luminaires and dimensions shall be referenced to architectural
drawings. Electrical plans shall not be used to scale for construction purposes. Any
discrepancies shall be brought to the engineer's attention prior to installation.
3.2.8 Utilize modular wiring systems in the installation of luminaires where accessible and
applicable. The system shall be complete with all required fittings, plugs, and cord
drops for a complete operating system per specifications.
Provide additional junction boxes as required where conductor exceeds factory provided
junction box limitations.
3.2.9
DllDT PHASE II
MWE Project No. 00-1 59
Lighting - Interior
December 19, 2000
16520-10
3.2.10
3.2.1 1
3.2.12
3.2.13
3.2.14
3.2.15
3.3
3.4
3.4.1
3.4.2
3.4.3
3.4.4
3.4.5
3.5
3.5.1
Installation shall be appropriately coordinated with all disciplines to insure proper
ventilation and heat dissipation as required per manufacturer.
Where luminaires are served from two sources, a barrier shall be provided to separate
emergency source from normal source with notation indicating separate sources.
Luminaires not utilizing modular wiring systems, shall be connected with minimum six
(6) foot length of flexible metal conduit from a structurally mounted junction box.
Wall mounted luminaires and junction boxes shall be rigidly supported to structure to
provide adequate support during normal operation.
Pendant luminaires shall be mounted in a uniform mounting height and in straight
continuous rows. Final coordination with mechanical equipment and plumbing fixtures
shall be made in the field to ensure consistent spacing and locations.
All wall mounted fixtures shall be mounted to a supporting wall bracing material in
addition to the junction box. The sutface is secured to structural elements in the wall.
The bracing shall be capable of supporting the weight of the fixture and comply with the
manufacturer's requirements and recommendations.
LABORATORY INSTALLATION
.1 Luminaries mounted in a controlled environment such as a Clean Room shall be
gasketed and sealed where the housing meets the plaster ceiling with a
continuous silicone-based resilient sealant bead.
Luminaries installed in a wet environment such as a wipe-down or hose-down
laboratory shall bear the "Wet Location" UL listing and sealed waterproof with
appropriate silicone based resilient sealant.
Ceiling openings installed in a sealed environment to insure accessibility to outlet
boxes shall be gasketed to prevent any flow of air. The cover shall be
constructed to ensure structural integrity for continuous removal from ceiling
and be mounted with large head screws as required.
.2
.3
FIELD TESTING
Upon completion of installation, an operation test shall be conducted to show that all
equipment operates in accordance with the requirement of this specification.
All applicable tests shall be conducted in the presence of an Owner Representative and
copies of any reports shall be provided.
Reports shall indicate when and where the test was conducted and who was present.
Upon completion of installations, luminaires requiring positioning shall be adjusted and
aimed at final position.
Exit signs shall be individually reviewed after installation completion to ensure directional
arrows are properly provided and positioned.
CLEANING AND REPAIR
After complete lighting installation and before project completion, all damaged or faulty
DlDT PHASE II
MWE Project No. 00-1 59
Lighting - Interior
December 19, 2000
16520-1 1
3.5.2
3.5.3
3.5.4
lenses or louvers in luminaires shall be replaced by the Electrical Contractor, at no
additional cost to the Owner.
All anodized or highly visual or optically sensitive reflectors shall be cleaned of all
fingerprints and smudges for a clean installation per manufacturers recommendations.
All luminaries with paint scratches, dents or deformations due to installation or shipping
shall be repaired, touched up or replaced as required or deemed necessary by the
Electrical Engineer at no additional cost to the Owner.
Upon final installation of individual luminaires, dirt and debris shall be removed from
luminaire enclosures.
END OF SECTION
Section 16520
Master Specs
Lighting - Interior
16520-1 2
Section 16950 OCCUPANCY SENSORS
PART 1 GENERAL
1.1 WORK INCLUDED
1.1.1 Contractor's work to include all labor, materials, tools, appliances, control hardware,
sensor, wire, junction boxes and equipment necessary for and incidental to the delivery,
installation and furnishing of a completely operational occupancy sensor lighting control
system, as described herein.
1.1.2
1.1.3
1.2
1.2.1
1.2.2
1.2.3
1.2.4
1.3
1.3.1
1.3.2
1.3.3
ContractorlSupplier shall examine all general specification provisions and drawings for
related electrical work required as work under Division 16.
Contractor shall coordinate all work described in this section with all other applicable
plans and specifications, including but not limited to wiring, conduit, fixtures, HVAC
systems and building management systems.
EQUIPMENT QUALIFICATION
Products supplied shall be from a single manufacturer that has been continuously
involved in the manufacturing of occupancy sensors for a minimum of five (5) years.
Mixing of manufacturers shall not be allowed.
All components shall be U.L. listed, offer a five (5) year warranty and meet all state and
local applicable code requirements.
Products shall be manufactured by an IS0 9002 certified manufacturing facility and shall
have a defect rate of less than 1/3 of 1%.
Wall switch products must be capable of withstanding the effects of inrush current.
Submittals shall clearly indicate the method used.
SYSTEM DESCRIPTION
The objective of this section is to ensure the proper installation of the occupancy sensor
based lighting control system so that lighting is turned off automatically after reasonable
time delay when a room or area is vacated by the last person to occupy said room or
area.
The occupancy sensor based lighting control shall accommodate all conditions of space
utilization and all irregular work hours and habits.
Contractor shall warrant all equipment furnished in accordance to this specification to be
undamaged, free of defects in materials and workmanship, and in conformance with the
specifications. The suppliers obligation shall include repair or replacement, and testing
without charge to the owner, all or any parts of equipment which are found to be
damaged, defective or non-conforming and returned to the supplier. The warranty shall
commence upon the owner's acceptance of the project. Warranty on labor shall be for a
minimum period of one (1) year.
DIDT PHASE II
MWE Project No. 00-1 59
Occupancy Sensors
December 19, 2000
16950-1
1.4
1.4.1
1.4.2
1.4.3
1.4.4
1.4.5
1.5
1.5.1
1.5.2
PART 2
2.1
2.1.1
2.1.2
2.2
2.2.1
SUBMITTALS
Manufacturer shall substantiate conformance to this specification by supplying the
necessary documents, performance data and wiring diagrams. Any deviations to this
specification must be clearly stated by letter and submitted.
Submit a lighting plan clearly marked by manufacturer showing proper product, location
and orientation of each sensor.
Submit any interconnection diagrams per major subsystem showing proper wiring.
Submit standard catalog literature, which includes performance specifications indicating
compliance to the specification.
Catalog sheets must clearly state any load restrictions when used with electronic
ballasts.
SYSTEM OPERATION
It shall be the contractork responsibility to make all proper adjustments to assure
owner's satisfaction with the occupancy system, or;
Factory Startup (Optional): It shall be the manufacturer's responsibility to verify all
proper adjustments and train owner's personnel to ensure owner's satisfaction with the
occupancy system. This service is provided at an additional cost.
SPECIFIC REQUIREMENTS
ACCEPTABLE MANUFACTURERS
The Watt Stopper, or Pre-approved Equal: For pre-approval, provide all the information
listed under section 1.04A and 1.04D a minimum of ten (10) working days prior to initial
bid date.
The listing of any manufacturer as "acceptable" does not imply automatic approval. It is
the sole responsibility of the electrical contractor to ensure that any price quotations
received and submittals made are for sensors, which meet or exceed the specifications
included herein.
PRODUCTS
All products shall be Watt Stopper product numbers:
.1 Ceiling sensors: WT-605, WT-600, WT-1105, WR-2205, WT-2200, WT-2250,
WT-2255, W-500A, W-l 000A. W-l050A. W-2000A. W-2050A, W-2000H. W-
2050H. WPIR, DT-200, DT-205, CX-100. CX-105, CI-200. CI-205
.2 Wall sensors: WI-200. WS-1201277. WA-100. WD-170, WD-180, WD-270,
WD-280
.3 Power and slave packs: B1 20E-P, B277E-P, A1 2OC-P, A277C-P, C120E-P,
C277E-P, S1201277-P, AT-1 20. AT-277
.4 Low temperature: CB-100
DIDT PHASE I1
MWE Project No. 00-1 59
Occupancy Sensors
December 19, 2000
16950-2
3.1.2
3.1.3
3.2
3.2.1
3.2.2
diagrammatic and indicate only the rooms which are to be provided with sensors. The
contractor shall provide additional sensors if required to properly and completely cover
the respective room.
It is the contractors responsibility to arrange a pre-installation meeting with the
manufacturer's factory authorized representative, at the owner's facility, to verify
placement of sensors and installation criteria.
Proper judgment must be exercised in executing the installation so as to ensure the best
possible installation in the available space and to overcome local difficulties due to space
limitations or interference of structural components. The contractor shall also provide,
at the owner's facility, the training necessary to familiarize the owner's personnel with
the operation, use, adjustment, and problem solving diagnosis of the occupancy sensing
devices and systems.
FACTORY COMMISSIONING (OPTIONAL)
Upon completion of the installation, the system shall be completely commissioned by the
manufacturer's factory authorized technician who will verify all adjustments and sensor
placement to ensure a trouble-free occupancy-based lighting control system. This
service is provided at an additional cost.
The electrical contractor shall provide both the manufacturer and the electrical engineer
with ten working days written notice of the scheduled commissioning date. Upon
completion of the system fine tuning the factory authorized technician shall provide the
proper training to the owner's personnel in the adjustment and maintenance of the
sensors.
END OF SECTION
DI/DT PHASE II
MWE Project No. 00-1 59
Occupancy Sensors
December 19, 2000
16950-5
8
t
Cnnnie5ue E. Diekbm
Mu complied with the requircmenli or Scction 6.1 oithe AWS Standard far
with , withoul- cyr ooncction. - colw blind
on and Cdi6cation ai Wclding Inrpccton. QC1-96
95070121
July 2001 CeNThI. Numb.?
KEccnify hy
. ..
. ..
BUllDlNG TYPE NONRESIDENTIAL 0 HIGH RISE RESldENTlAL 0 HOTEUMOTEL GUESTROOM
DATE
~~
PHASE OF CONSTRUCTION c] NEW CONSTRUCTION 0 ADDITION HALTERATION 0 UNCONDITIONED (file amdavit)
METHOD OF ENVELOPE HCOMPONENT 0 OVERALL ENVELOPE 0 PERFORMANCE
Indicate location on plans of Note Block for Mandatory Measures MI. I I INSTRUCTIONS TO APPLICANT I For Detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, please refer to the
Nonresidential Manual published by the California Energy Commission.
ENV-j: Required on plans for all submittals. Part 2 may be incorporated in schedules on plans.
ENV-2: Used for a// submitfals; choose appropriate version depending on method of envelope compliance.
ENV-3: Optional. Use if default U-valuesare not used. Choose appropriate version for assembly U-value to be calculated.
Nonresidential Cwnpliaanm Form November 1998
_,'
, . 'i p. ..
. ..
05/29/2001
Job Address:
Permit Type:
Parcel No:
Valuation:
Reference #:
Project Title:
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Plan Check Revision
Building Inspection Request Line (760) 602-2725
Permit No:PCROI 101
1822 ASTON AV CBAD PCR Status: ISSUED
2121202100 Lot #: 0 Applied: 04/30/2001
$0.00 Construction Type: NEW Entered By: RMA
Plan Approved: 05/09/2001
Issued: 05/29/2001
DIIDT-REVISE DRAFT STOP SUPPOR
STEEL
Inspect Area:
Applicant:
SMITH CONSULTING ARCHITECTS
Owner:
BLACKMORE FAMILY TRUST 1995
P 0 BOX 1810
RANCHO SANTA FE CA 92067
Total Fees: $109.00 Total Payments To Date: $0.00 Balance Due: $109.00
Plan Check Revision Fee
Additional Fees
$109.00
$0.00
0577 05/29/01 0002 01 02 CGP 109-00
I FINAL APPROVAL
Inspector: Date: Clearance: I
NOTICE: Please take NOTICE that approval of your project includes the ‘Imposilon’ of fees, dedications, resenations, or other exactions hereafter WllectiVelY
referred to as 7e~dexactbns.’ You have 90 days from the dale mis permil was issued lo protest imposition of theSa feeslexactans. If you protest Rem, you muSt
follow me protest procedures set folth in Government Code Section 66020(a), and fila the protest and any other required information wah the CiV Manager for
processing in accordance w#h Cadsbad Municipal Code Section 3.32.030. Failure to timely follow that pmcedure will bar any sutsequent legal actin to attack,
review, set aside, void, M annul their imposition.
You arehereby FURTHERNOTlFiEDVlatywrrighttopmtestthespec~edfees/exac(ions WESNOTAPPLY tomferandsRvermnnectimfeesand~Y
changes, nor planning, zoning, grading or other similar applimn pmcessing or servim fees in mnnection wim this pro@% NOR DOES IT APPLY to any
feedexactions of which you have previously been given a NOTICE Similar io this, 01 as to which the statute of limitaflons has previouslv otherwise expired.
FOR OFFICE USE ONLY
PLAN CHECK NO.
EST. VAL.
Plan Ck. Deposit
PERMIT APPLICATION
CITY OF CARLSBAD BUILDING DEPARTMENT
1635 Faraday Ave., Carlsbad, CA 92008
<Add, PS (include B d Sulta XI Business Name tat this ad e991 &zz A"sou AV~ r/Aeu;tw~,~A I Lif
Legal Description Lot No. Subdivision NamelNumbar I Unit No. Phase No. Total X of units
Assess~r's Parcel X Existing Use ROpOsed Use
#of Stories X of Bedrooms X of Bathrooms
Name Address City StStdZip Telephone X
ijsuance, also requires the applicant tor such permit to file a signed statement that he is licensed pursumt to the provisions of the Contractor's License Law
[Chapter 9. commending with Section 7000 of Division 3 of the Business and Professions Codel or that he is exempt therefrom, and the basis far the alleged
exemption, Any violation of Ssotion 7031.5 by any applicant far a permit subjects the applicant to a civil penalty of not more than five hundred dollars 1650011.
Name Address City Statelzip Telephone #
State License X License Class City Business License X
Designer Name Address City StatelZip Telephone
sta
WO
0 of the work for which this permit is issued.
0 issued. My worker's Compemation imsurmce carrier and policy number are:
Insurance Company Policy No. Expiration Date
(THIS SECTION NEW NOT BE COMPLETED IF THE PERMIT IS FOR ONE HUNDRED DOLLARS IdlOOl OR LESS1
0 CERTIFICATE OF EXEMPTION I fertify that in the performance of the Work for which this permit is issued, I shall not employ any person in any manner so 86
to b6c-e subject to the Worksrs' Compensation Laws of California.
WARNING: Fallwe to sew workers' cornpenmtlon coveraga Io unlawful. uld shall st.Wai.ct an empbyr to crlmlnal psnalliu and civil Rnsl up to one hundred
thousand dollars ~$100.000~. In addllion to the cost Of Wmpensatlon. damages u provided lor in Section 5706 of the Wr coda. interest and anomsy's fees.
.. ,. &t@
I have and will maintain a certificate of Eonsent to self-insure for workers' Compensation as provided by Section 3700 of the Labor Code. for the performance
I have and will maintain workers' compensation. as required by Section 3700 of the Labor Code. for the performance of the work for which this permit is
SIGNATbRE DATE
I heiebv affirm that t am exempt from the Contractor's Llcsnrs Law 101 the fDllowing mason: 7. ' .OiVN~~U~tkCmRA?nllON
0 I, as owner of the property or my employees with wages as their so10 Compensation. will do the Work and the Structure is not intended or offered for sale
(Sec. 7044, Business and Professions Code: The Contractor% Ucsnra Law doer not apply to an owner of propew who builds or improves thereon. and who does such work himself or through his own empIoyees, provided that such improvements 818 not intended or offered far sale. If, however. the building or improYement is
sold within one year of completion. the owner-builder will have the burden of proving that he did not build or improve for the p~rpose Of salel.
0 I, as owner of the property. am exciusivsly contracting with licensed contractors to Construct the Project ISec. 7044. Business and Profassions Code: The
Contractor's License Law does not apply to an owner of property who builds or improves thereon. and contracts 101 such projects with contractorld licensed
pursuant to the Contractor's License Law).
0
1.
2.
3.
4.
number I Contractors iicsnrs number):
5.
of work):
PROPERTY OWNER SIGNATURE DATE
I am exempt undar Section
i personally plan to provide the major iabar and materials for construction of the ProPOsed property improvsmsnt. 0 YES ON0
I thaw I have not1 signed an application for a building permit for the proposed work.
I have contracted with the following person tfirml to provide the proposed Construction [include name I address I phone number I COntfaCtOrS license numberl:
I pian to provide portions of the work, but I have hired the foliowing Per8on to coordinate, supervise and provide the major work linclude name I address I phone
I will provide some of th8 work, but I have contracted (hired) the foilowing parsons to provide the work indicated (include name I address I phone number I type
Business and Professions Code for this reason:
14eaif
1s the appiioant or future building occupant required to submit a business plan, acutely hazardous matwiab registration form or risk management and prevention
program under Sections 25505. 25533 or 25634 of the PrerlsvTanner Hazardous Substance ACCOUnt Act? 0 YES 0 NO
1s the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district?
1s the facility to be constructed within 1,000 feet of the outer boundary of a achooi site?
0 YES 0 NO
0 YES NO
IF ANY OF THE ANSWERS ARE YES. A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE
REOUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AJR POUUTION CONTROL DISTRICT.
City ordinances and State iaws relating to building construction. I hereby authorize representatives Of the CitV of Carlrbad to enter upon the @bow msntioned
property tor inspection purpose6. I ALSO AGREE TO SAVE. INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAO AGAINST ALL LIABILITIES.
JUDGMENTS, COSTS AN0 EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT.
OSHA An OSHA permit is required for excavations over 5'0. deep and demolition or construction Of structures ovm 3 Stories in height.
EXPIRATION Every prmit
authorized by such permit is not commenc6d within 180 days fr
a1 any lime aner the woh is corn
itation and become null and void if the building or work
ate of Such permit or if the building or work authorized by such permit is Suspended or abandoned
lion 108.4.4 Uniform Building Code).
APPLICANT'S SiGNATURE DATE 'v- 30,@/
: File YELLOW Applicant PINK: Finance
Em Corporation ____
Zn Tamrcrsfiip witfi ~oucmmcnt for SuiUing Safcy
DATE: May 8,2001
JURI SDl CTl ON: Carlsbad
PLAN CHECK NO.: 00-4856 REV (PCR011101) SET: I
PROJECT ADDRESS: 1822 Aston Ave.
PROJECT NAME: Draft Stop Support
0 FILE
[XI The plans transmitted herewith have been corrected where necessary and substantially comply
0 The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
0 The plans transmitted herewith have significant deficiencies identified on the enclosed check list
0 The check list transmitted herewith is for your information. The plans are being held at Esgil
0 The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
0 The applicant's copy of the check list has been sent to:
.
with the jurisdiction's building codes.
and should be corrected and resubmitted for a complete recheck.
Corporation until corrected plans are submitted for recheck.
contact person.
[XI Esgil Corporation staff d@ not advise the applicant that the plan check has been completed.
0 Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone #:
Date contacted: (by: 1 Fax #:
Mail Telephone Fax In Person 0 REMARKS:
By: Kurt Culver Enclosures: City-approved plans
Esgil Corporation 0 GA 0 MB 0 EJ c] PC 5/1/01 trnsrnU.dot
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 Fax (858) 560-1576
i Carlsbad 00-4856 REV (PCR011101)
Map 8,2001
VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad PLAN CHECK NO.: 00-4856 REV (PCRO11101)
PREPARED BY: Kurt Culver
BUILDING ADDRESS: 1822 Aston Ave.
DATE: May 8,2001
BUILDING OCCUPANCY: TYPE OF CONSTRUCTION:
TOTAL VALUE . Jurisdiction Code cb By Ordinance
Bldg. Pernit Fee by Ordinance v
I Plan Check Fee by Ordinance
Type of Review: 0 Complete Review 0 Structural Only
0 Repetitive Fee . Repeats
Id
0 Other
$108.94
Hourly I 11 Hour' la -
Esgll Plan Review Fee
' Based on hourly rate
Comments: Review of draft stop support: Esgil fee = 1 hr. @ $87.1 5/hr.
I $87.1 51
Sheet 1 of 1 macvalue.doc
HOROWITZ TAYLOR ENGINEERING
STRUCTURAL L CIVIL CONSULTlflC
STRUCTURAL CALCU LATl OH S
PROJECT: dL' /dg
Fl 6 5;JPPOFT
DESIGN ASSUMPTIONS.
CONCRETE STRENGTH AT TWENTY EIGHT DAYS:
MASONRY:
MORTAR. TYPES 1800PSI
GROUT: 2000 PSI
REINFORCING STEEL: A415 GRADE 40. #5 AND LESS (U.O.N.)
- - GRADE "N CONCRETE BLOCK F ' M =
' GRADE 60: #6 AND LARGER
STRUCTURAL STEEL: A-36
LUMBER: DOUGLAS FIR-LARCH
JOISTS #2 BEAMS AND POSTS #2 STUDS STUD OR BEITER
SEISMIC FORCE: dc4 REPORT BY:
WIND FORCE: -
DESIGN LOADS:
REPORT NO : SOIL PRESSURE
->
ROOF DEAD LOAD
SLOPING - FIAT
ROOFING PLYWOOD JOISTS
INSUL. & CLG.
MISC.
TOTAL =
ROOF LNE LOAD
SLOPING
FIAT .
A FLOOR DEAD LOAD WALL DEAD LOAD %-
PI
FLOORING INTERIOR . IOPSF . . v PLYWOOD EXTERIOR 16 PSF. JOISTS .js' ~..
INSUL& CLG. MISC. ..; . I 4: .~. . ..
.
FLOOR LIVE LOAD
INTERIOR 40 PSF
BALCONY 60 PSF (U.O.N.)
EXIT WALKWAY 100 PSF
..
These calculations are limited only to the items induded herein. seleded by tha client and'do not imply approkl of any other. or not accompanied by a'wet stamp ,
.. . ..
3914 b\urphy Canyon Rd. * Suite ,4100 San Diego, California 92123 * .(858) 560.
..
~ ~ .~ .. ~~~ . .,i.
I
,"
il CL 3 a
?
-3
2
-
0 c
..
\
,0711 312001
FINAL APPROVAL
Inspector: Date: Clearance:
NOTICE: Please take NOTICE mat approval of your project includes the 'Impailon" of fees, dedeatbns, reservations. or other exadons herealter dleclively
referred t0 as 'feedemtiins." You have 90 days hom the date this permit was issued to protest imposwon of these feedexatiwns. If yw protest them, you must
follow the protest pmcedures set forth in Government Code Section GBMO(a), and file the protest and any olher required information wah lhe Cio, Manager for
processing in aomdanm with Carlsbad Municipal Code Saction 3.52.030. Failure to timelyfolbwthat procedure will bar any subsequent legal acliwn to attack. review, set aside, void, or annul their impositbn.
You are hereby FURTHER NOTIFIED that ywr iiht to protest the ylecliid feedexactbns DOES NOT APPLY to water and sewor connection fees and Capam
changes, ~CN planning, zoning, grading or other simlar applimlbn processing or seriim lees in mnnection wilh this project NOR DOES IT APPLY to any
~
City of Carlsbad
1635 Faraday Av Carlrbad, CA 92008
Plan Check Revision Permit No:PCROll56
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type: PCR Status: ISSUED Parcel No: 2121202100 Lot #: 0 Applied: 07/11/2001
Valuation: $0.00 Construction Type: NEW Entered By: MDP Reference #: CB004856 Plan Approved: 07/1 a2001
Issued: 07/13/2001 Project Title: DT /DI Inspect Area:
1822 ASTON AV CBAD
ELECTRICAL REVISIONS
Owner:
BLACKMORE FAMILY TRUST 1995
12220 EL CAMINO REAL SAN DIEGO CA 92121
(858) 793-4777
P 0 BOX 1810 RANCHO SANTA FE CA 92#* 07'13/01 Ooo2 O1 218.00 O2 CGP
Total Fees: $218.00 Total Payments To Date: 50.00 Balance Due: $218.00
Plan Check Revision Fee
Additional Fees $21 8.00 $0.00
PLAN CHECK NO.
EST. VAL.
Plan Ck. Deposit
Validated By
PERMIT APPLICATION
CIT? OF CARLSBAD BUILDING DEPARTMENT
1635 Faraday Ave., Carlsbad, CA 92008
Business Name lat this addrssd
Subdivision NamelNvmber Unit NO. Phase No. Total X of units Legal Description Lot No.
Assessor's Parcel X Existing Use Proposed Use
X of Bedrooms X of Bathrooms
Name Address City SsatelZip Telephone X
G~M~XWN~&
81s and Professions
issum~e. also requires the applicant for such permit to file a Signed statement that he is licensed pursuant to the provisions of the Contractor's License Law
[Chapter 9. commending with Section 7000 Of Division 3 Of the Business and Professions Code1 or that ha is exempt therefrom, and the basis for the alleged
exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than live hundred dollars i950011.
Name Address City StlttelZip Telephone X
State License X License Class City Business License X
Designer Name Address City StateIZip Telephone
of the work for which thii permit is issued.
0 issued. My worker's compensation insurance Carrier and policy number are:
insurance Company Policy NO. Expiration Date
ITHIS SECTION NEED NOT BE COMPLETED IF THE PERMIT IS FOR ONE HUNDRED DOLLARS Id1001 OR LESS1
0 CERTIFICATE OF EXEMPTION: I Certify that in the performance of the work for which this permit io issued, I shall not employ any person in any manner so as
to became subject to the Workers' Compensation Laws of California.
WARNING Fallure to secure worked compwaatlon coverage la UnIaWfuI. and shall subject an employer 10 uiminal panaltles and civil Rnss up to one hundred
thousand dollars 15100.000~. In addltlon to the coat of cornpansation. damages as provided for in Section 3706 of the Labar coda, interest and attorney's fell..
I have and will maintain a certificate of ConsBnt to self-insure for workers' compensation 85 provided by Section 3700 of the Labor Cads. for the performmce
I have and will maintain workers' compensation. as required by Section 3700 of the Labor Code. for the performance Of the work for which this Permit is
DATE
I hereby affirm that I am oxempt from the Contractor's License Law lor the following reason:
0 I, as owner of the property or my employees with wages as their sole compensation. will do the work and the Structure is not intended or offered for sale
(Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property Who builds or improves thereon, and who dnes
such work himself or through his own employees. provided that such improvements are not intended or offered for sale. If, however. the building or improvement is
sold within one year of completion. the ownsr-builder will have the burden of proving that he did not build or improve for the p~rpose of sale).
I, as owner of the property, am exclusively contracting With licensed contractors to construct the project 1Sec. 7044. Business and Prof86siOns Code: The
Contractor's License Law does not apply to an owner of property who builds or improver thereon, and contiacts for such projects with COntraCtOrld licensed
pursuant to the Contrsctar's License Law).
0
1.
2.
3.
I am exempt under Section
I personally plan to provide the major labor and materials for construction of the proposed property improvement. YES ON0
I (have I have not) signed an application lor 8 building permit for the proposed work.
I have contracted with the following person Ifirm) to provide tha proposed Construction lincluds name I address I phone number I contractors license number):
Burinasr and Professions Code for this reason:
4.
number I contractors license number):
5.
I plan to provide portions of the work, but I have hired the following person to coordinate. supervise and provide the major work (include name I eddress I phone
I will Drovids some of the work. but I have contracted lhiredl the foliowino ~eroon9 to orovide the work indicated linclude name I address I Dhone number I tvPe
15 tha applicant or future building omupant required to submit a burinass plan. acutely hazaidOuO materials registration form or risk management and prevention
program under Sections 25505, 25533 or 25534 of the PrerlerTanner Hazardous Substance Account Act7
Is the applicant or future building occupant rsquirad to obtain a permit from the air pollution control district 0, air quality management district7
io the facility to be Constructed within 1,000 feet Of the outer boundan, of a school site? 0 YES NO
IF ANY OF THE ANSWERS ARE YES. A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE
REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
0 YES 0 NO
0 YES 0 NO
i hereby affirm that there is a construction lending agency for ths performance of the work for which this permit is issued ISsc. 3097lil Civil Code).
.ENDER'S NAME LENDER'S ADDRESS
9. APPLICANT CERTIFICATION
I certify that I haw read the application and state that the above information is correct and that the information on the plans is accurate. i agree to comply with aIi
City ordinances and State laws relating to building COnStlUCtion. I hereby authorize representatives of the CitV of Carlrbad to enter upon the above mentioned
property for inspection purposes. I ALSO P HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES.
JUDGMENTS. COSTS AND EXPENSES WHICH D CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT.
OSHA An OSHA permit is required for ex
EXPIRATION: Every permit issued
authorized by such permit is not c
at any time afler the work is com
APPLICANT'S SIGNATURE DATE
n or construction of structures over 3 stories in height.
oris of this Code Shall expire by limitation and become null and void if the building or woh
h permit or if the building or work authoriz
.4 Uniform Building Code).
W Applicant PINK: Finance
07/05/2001
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Plan Check Revision
Building Inspection Request Line (760) 602-2725
Permit No:PCROI 129
Job Address:
Permit Type: PCR Status: ISSUED
Parcel No: 2121202100 Lot #: 0 Applied: 06/12/2001
Valuation: $0.00 Construction Type: NEW Entered By: RMA
Reference #: Plan Approved: 06/25/2001
Issued: 07/05/2001
Project Title: DIIDT-REV-ADD NITROGEN TANK Inspect Area:
1822 ASTON AV CBAD
FOUNDATION
Applicant:
RENO CONSTRUCTION
8104 COMMERCIAL STREET
LA MESA, CA 91942
61 9 462-7025
owner: BLACKMORE FAMILY TRUST 1995
P 0 BOX 1810
SANTA FE CA 929&2 07/05/01 W2 01 02 CGP 109 * 00
Total Fees: $109.00 Total Payments To Date: $0.00 Balance Due: $109.00
Plan Check Revision Fee
Additional Fees
$109.00
$0.00
FINAL APPROVAL
Inspector: -- Date:* Clearance:
NOTICE Piease take NOTICE hat approval of your project includes the 'impition' of fees. dedications, resewatwns, or Mer exactions hereafter mllectively refemc to as "feeslexactions.' You have 90 days from the date this perm# was issued to protest Imposition of these feeslexactons. if you pmtest hem, you must
foilow the protest pmcedures setfofi in Government Code Section 66020(a). and file the protest and any oher required information with the City Manager for px?sing in accordance wiih Cadstad Municipal Code Sscti~ 3.32030. Failure to timely follow lhat pmcedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their lmpitbn.
You areherebyFURTHERNOTlFlEDthatywr~httoProtestVlespecified~exatiwnsDOES NOT APPLY towaterand sewermnnactionfeesandcapactiy
changes. nci planning, zoning, grading or other similar applicatbon pmsing or setvim fefs in mnnection with this project NOR DOES IT APPLY to any
feeslexac4ons of which you have wwiwsiv been given a NOTICE similar to this, M as to which the statute of limitations has prevlousiv othelwise expired.
-....... -. . -.--..-.-
CITY OF CARLSBAD
1635 Faraday Ave., Carlsbad, CA 92008
FOR OFFICE USE
PLAN CHECK NO.
EST. VAL.
Plan Ck. Deposit
Validated
Date
Legal Description Lot No. Subdivision NamelNumber Unit No. Phase No. Total X of units
Assessor's Parcel 1) Existing Use Proposed Use
/vnRdhac/ 7Auu ?=OVJWr).r/Orl Description of Work SQ. FT. Xof Stories X of Bedrooms 1) of Bathrooms
. ..,,
77
Nsma Address City StateIZip Telephone X
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to COnstrUCt, alter. improve, demolish or repair any Structure, prior to its
~SSU~IICB. also requires the applicant for such Permit to file a signed statement that he is licensed pursuant to the provisions Of the Contractor's License Law
Ichmtsr 9. commendinn with Section 7000 Of Division 3 of the Business and Professions Code1 or that he is BXemL therefrom, and the basis for the allwed
&emption.' Any violati& of Section 7031.5 by AUO G&AmUomf6
Name
state License a Gq7yO 4 9 License 4 City Business License x la 6 V;
Address City StatelZip Tslephona Designer Name
of not more than five hundred dollar5 [650011 bk 93/05 6 /$- &*dst.L)
Address City StateIZip Telephone X
4s ,: o/lwuwil d 496'668 i/d -&F- 4 90 J A.Z. MfbblZf 0 R 5566 6B.j F=fBMuk"T
, .. . , . .. .. State License I Z0r)l
18
Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following declarations:
0 of the work for which this permit is issusd.
issued. My worker's compensation insurance carrier and policy number are:
I have and will maintain a cartifieate of consent to reif-insure for workers' compensation as provided by Section 3700 Of the Labor Code, for the performance
I have and will maintain workers' CompenSation, as raquired by Section 3700 of the Labor Code, for the performance Of the work for which this permit lo
insurance Company UP- Policy NO. SFU~W@& Expiration Oats e;./* 41
[THIS SECTION NEED NOT BE COMPLETED IF THE PERMIT IS FOR ONE HUNDRED DOLLARS 161001 OR LESS1
to become Subject to the workers' Compensation Laws of California.
CERTIFICATE OF EXEMPTION I Certify that in the performance of the work for which this permit is issued. I shall not employ any p~rson in any manner so 8s
s up to one hundred
0 I. as owner Of the pmperty or my employees with wager as their so18 Compensation. will do the work and the Structure is not intended or offered for sale
(Sec. 7044. Business and Professions Code: The Contractor's License Law doe6 not apply to an owner of propeny who builds or improves thereon, and who doer such work himself or through his own employees. provided that such improvements are not intended or offered for sale. If, however, the building or improvement is
soid within one year of completion. the owner-builder will have the burden of proving that ha did not build or improve for the p~rpose of sale).
0 I, as owner of the ~roperty, am exClUsivsiv contracting With licensed Contractors to construct the project Issc. 7044. Business and Professions Code: The
Contractor's License Law does not apply to an Owner of propsny who builds or improves thereon, and Contracts for such projects With ContcaCtOrlsl licensed
pursuant to the Contractor's License Law).
0
1.
2.
3.
I am exempt under Section
I personally plan to provide the major labor and materials for construction of the proposed property improvement. 0 YES UNO
I lnave I have noti signed an application for a building Permit for the proposed work.
I have contracted With the following person Ifirml to provide the proposed construction (include name I address I phons number I contractors license numberl:
Business and Professions Code for this reason:
4.
numbsr I contractors llcens~ number):
5.
of work):
I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work fincluds name I address I phone
I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated linclude name I address I phone number I type
Is the applicant or future building occupant required to submit a business pian. acutely hazardous materialr registration form or risk management and prevention
program under Sections 25505, 25533 or 25534 of the Preslev-Tanner Hazardous Substance Account Act? 0 YES NO
is the applicant or future building occupant required to obtain a permit from the air pollution Control district or air quality management district?
1s the facility to be constructed within 1.000 feet of the Outer boundary Of I school site? 0 YES 0 NO
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE
REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
0 YES 0 NO
, .,, CONSTRUCTION'LEN~ING~AGEN~Y' . , ', ',. ,, ,
I hereby affirm that there is B COnStrUCtlon lending agency for the performance Of the work for which this permit is issued ISec. 309711) Civil Codel.
LENDER'S NAME
I cenify that I haw read the application and State that the above information is correct and that the information on the plans is accurate. I agree to comply with all
City ordinances and State laws relating to building construction. I hereby authorize representatives of the Citv of Carlsbad to enter upon the above mentioned
property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES,
JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEOUENCE OF THE GRANTING OF THIS PERMIT.
OSHA An OSHA permit is rsqui
EXPIRATION: Evely permit issu
authorized by such permit is no
at any time after the work is co
avatians over 50" emolition or construction ot structures over 3 Stories in height.
sions of this Code shall expire by limitation and become null and void if the building or work of such permit or if the building or work authorized by such permit is suspended or abandoned
106.4.4 Uniform Building CMe).
APPLICANT'S SIGNATURE DATE 6. /Z.*U/
EET 7 Corporation
Zn partnership with gavcmnuntfor BuiGfintSafcty
DATE: June 20,2001
JURISDICTION: Carlsbad 0 PLAN REVIEWER
0 FILE
PLAN CHECK NO.: 00-4856 REV 2 (PCRO1129)
PROJECT ADDRESS: 1822 Aston Ave.
PROJECT NAME: di/dt Phase I1 Tank Foundation
[XI The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
0 The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
0 The plans transmitted herewith have significant deficiencies identified on the enclosed check list
0 The check list transmitted herewith is for your information. The plans are being held at Esgil
0 The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
0 The applicant's copy of the check list has been sent to:
SET: I
and should be corrected and resubmitted for a complete recheck.
Corporation until corrected plans are submitted for recheck.
contact person.
Esgil Corporation staff did not advise the applicant that the plan check has been completed.
0 Esgil Corporation staff did advise the applicant that the pian check has been completed.
Person contacted: Telephone #:
Date contacted: (by: 1 Fax #:
Mail Telephone Fax In Person 0 REMARKS:
By: Kurt Culver Enclosures: City-approved plans
Esgil Corporation 0 GA 0 MB EJ 13 PC 6/14/01 tmsmtl.dot
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576
.
Carlsbad 00-4856 REV 2 (PCRO1129)
June 20,2001
VALUATION AND PLAN CHECK FEE
J URl SDl CTl ON : Carlsbad PLAN CHECK NO.: 00-4856 REV 2 (PCRO1129)
PREPARED BY: Kurt Culver
BUILDING ADDRESS: 1822 Aston Ave.
BUILDING OCCUPANCY: TYPE OF CONSTRUCTION:
DATE: June 20,2001
I I I I I
I I I I I
I I I I I
Air Conditioning
TOTAL VALUE . Jursdictlon Code cb By Ordinance
I Bldg. Permt Fee by Ordinance A -
I Plan Check Fee by Ordinance 2
Type of Re~ew: 0 Complete Review 0 Structural Only
TFee Repeats , 0 Other
Hourly I 11 Hour* 0
Esgil Plan Review Fee t $87.151
* Based on hourly rate
Comments: Review tank foundation: Esgil fee = 1 hr. @ $87.15/hr.
Sheet1 of 1
macvalue.doc
PLANNING/ENGINEERINC APPROVALS
PERMIT NUMBER& pc R 0 /G?9
ADDRESS
RESIDENTIAL TENANT IMPROVEMENT
RESIDENTIAL ADDITION MINOR PLAZA CAMINO REAL
( < $10,000.00)
CARLSBAD COMPANY STORES
VILLAGE FAIRE
COMPLETE OFFICE BUILDING
DOcsIMisfOrmYPlanning Engineering Auurovais
Carlsbad Fire Department 01129
1635 Faraday Ave. Fire Prevention
Carlsbad, CA 92008 (760) 602-4660
Plan Review Requirements Category: Building Plan
Date of Report: 06/44/2001 Reviewed by: 0. =
Name: Reno Contracting
Address: 1450 Frazee Road Suite 100
City, State: San Diego CA 92108
Plan Checker: Job#: 01129
Job Name: DVDT Bldg #: PCR01129
Job Address: 1822 Aston Avenue - ,) Ste. or Bldg. No. , y'
Approved The item you have submitted for review has been approved. The approval is
based on plans, information and l or specifications provided in your submittal;
therefore any changes to these items after this date, including field
modifications, must be reviewed by this office to insure continued conformance
with applicable codes and standards. Please review carefully all comments
attached as failure to comply with instructions in this report can result in
suspension of permit to construct or install improvements.
!a
0 Approved
Subject to
The item you have submitted for review has been approved subject to the
attached conditions. The approval is based on plans, information andlor
specifications provided in your submittal. Please review carefully all comments
attached, as failure to comply with instructions in this report can result in
suspension of permit to construct or install improvements. Please resubmit to
this office the necessary plans and l or specifications required to indicate
compliance with applicable codes and standards.
0 Incomplete The item you have submitted for review is incomplete. At this time, this office
cannot adequately conduct a review to determine compliance with the
applicable codes and l or standards. Please review carefully all comments
attached. Please resubmit the necessary plans and l or specifications to this
office for review and approval.
Review 1st 2nd 3rd Other Agency ID
FDJob# 01129 FD File #
*~c"~~ic~~,~~~~AGE I .................. .................... ,. .
.......
............. ............. ...........
1 j
*.,
x
! ........
I SHIPPING-RECEIVING/
I-
, __, ,.
I
i
I I
I
4 I I
I
I
I I I
I
I
0 c
11 I1 I1 I1 L I 1u
P
I I i i
I
I
A. J. MILLER & ASSOCIATES COMPUTATIONS
STRUCTURAL ENGINEERING CORPORATION NO OF SHEETS
D, CALIFORNIA94808 * (510) 855-0401 FAX855- 425
DATE 5588q5- o\ CLIENT OAK '"bL KBNO nl\ -'ic MONTSTAEET *
BYW CHK- PROJECT D! lm
I I
*.
A.J. MILLER & ASSOCIATES COMPUTATIONS
STRUCTURAL ENGINEERING CORPORATION NO LOF SHEETS
D, CALIFORNIA84608 * (510) 855.8401 * FAX655-8425
DATE 5s- 1. CLIENT O A "GC m8NO 0 1. I.?$.
5588 FR MONT STREET
BY np CHI( PRMCT In !m I
*. A.J. MILLER & ASSOCIATES COMPUTATIONS
STRUCTURAL ENGINEERING CORPORATION NO ??+ OF SHEETS
DATE-- CUENT JOBNd
5588 FREMONTSTREET * OAKL , CALIFORNIA94BO8 (510)855-8401. FAXE55.8425
By n2 CHK PROJECT QI Im i