HomeMy WebLinkAbout1835 ASTON AVE; ; CB982545; PermitCity of Carlsbad xQ
01/14/1999 Building Permit Permit No:CB982545
Building Inspection Request Line (760) 438-3101
Job Address:
Permit Type: COM Sub Type: Parcel No: 2121201200 Lot #: Status: ISSUED
Valuation: $333,600.00 Construction Type: VN Applied: 08/12/1998
Occupancy Group: B/Fl/Sl Reference #: Entered By: BT
Appr/lssued: 12/22/1998 Project Title: NEW 12OOOSF TILT UP SHELL Inspect Area:
1835 ASTON AV CBAD
Applicant: Owner:
BOB SUKUP
4322 SEA BRIGHT PL
CARLSBAD CA 92008 92008
720-0098
LEW JOHN C JR
ce Due: $41,466.71 Total Fees: $42,404.7
Fee
____.__.____-. Description
._____.__..______-. * ELECTRICAL TOTAL 410.00
91.00
936.05
* PLUMBING TOTAL
BLDG PLAN CHECK
1,440.08 BUILDING PMTS or manually enter Lic 4,800.00
PUBLIC FACILITIE 6,071.52
R 1 TIME SP TX 27.266.00
STRNG MOTION 70.06
1,320.00 TRAFFIC IMPACT
- FINAL APPROVAL I Date: Inspector: Clearance: I
NOTICE Please take NOTiCE mat approval of your project includes the 'Imposition' of fee5 dedications, reservations, or other exactions hereafter mllectively
referred to as 'feeslexactons.' You have 90 days from the date this prmt was issued to protest imposition of these feeslexaciiins. If you protest them, you must
follow the protest procedures set folth in Government Coda Section 66020(a), and file the protest and any other required information wah the City Manager for
processing in amrdance wnh Cadsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack. review, set aside, void, or annul their impmition.
You are hereby FURTHER NOTIFIED that your right to protest the specified feeslexactons DOES NOT APPLY to water and Sewer wnnection fees and capactiy
changes, nor planning, zoning, grading or other similar application processing or sewice fees in connection with this project NOR DOES IT APPLY to any
feedexactions of which you have previously been qiven a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired.
CITY OF CARLSBAD
2075 Las Palmas Dr., Carlsbad, CA 92009 (760) 438-1161
FOR OFFICE USE ONLY -tI PLAN CHECK NO. ' P~RMIT APPLIC-ATION
EST. VAL.
Plan Ck. Deposit
Validated By
CITY OF CARLSBAD BUILDING DEPARTMENT
2075 Las Palrnas Dr., Carlsbad CA 92009
(See. 7031.5 Business and Professions Code: Any Ci or County which requires a Permit to con~truct. site!, improve, demolish or repair any structure, prior to its
issuance. also requires the applicant for such Permit to file B signed Statement that he is licensed pursuant to the provisions of the Contractor's License Law
Chapter 9. commending With Section 7000 of Division 3 Of the Business and Professions Codel or that he is exempt therefrom. and the basis for the alleged
ex8mptim. Any violation Of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars [$5001L
Name Address City StatelZiP Telephone X
State License X LICBIISB Clarr City Businerr License X
Designer Name Address City StatelZiP Telephone
State Licente X
Workers' Compensation Declaration: I hereby affirm under penalty of perjury one Of the following declarations
0 of the work for which this Permit is issued.
0 issued. My worker's compensation insurmcn Carrier and poiicy number are:
i have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code. far the performance
I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the PsrformanCe of the work for which this permit is
In~u~mce Company Po #CY No E~piiatmn Date
(THIS SECTION NEED NOT BE COMPLETED IF THE PERMIT IS FOR ONE HUNDRED DOLLARS 1$100) OR LESS)
0 CERTIFICATE OF EXEMPTION: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so es
to become subject to the Workers' Compensation Laws of California.
WARNING: Fallura to secure worked cornpensadon coverage Is unlawhd, and shall subject an employer to crlmlnal penalties and clvll fines up to one hundred
thousand dollan 16100.0001, In addltlon to the cost of compensation. damages as provided for In Section 3706 of tha Labor code. Interest and attorney's fees.
SIGNATURE DATE
I hereby affirm that i am exempt from the Contractor's License Law for the following 1888011:
I, as owner of the property or my employees with wages as their role compensation, will do the work and the struct~is is not intended or offered for sals
ISec. 7044. Business and Professions Code: The Contractor's License Law doer not apply to an owner of propsnv who builds or improves thereon, and who does
such work himself or through his own employees, provided that such improvements are not intended or offered for sale If, however, the building or improvement is
sold within one year of completion. the owner-builder will have the burden of proving that he did not build or improve for the PU~PDOB Of sdel.
I, es owner of the property, am exclusi~ely contracting with licensed contractors to con~trucf the project ISec. 7044, Business and Professions Code: The
Contractor's License Law does not apply to an owner of property who builds or improves thereon. and contracts for such projects with contractor(sl licensed
purwant to the Contractor's License Lawl.
0
1.
2.
3.
VHiF
I am exempt under Section
I personally plan to provide the major labor and materials for construction of the proposed proparty improvement. 0 YES ON0
I lhave I have not) Signed an application for a building permit for the proposed work.
I have contracted with the following person lfirml to provide the Proposed Constwction linclude name I address I phone number I contractors license numbsri:
Business and Professions Code for this reason:
4.
number I contractors license number):
5.
Of work):
PROPERTY OWNER SIGNATURE DATE
I plan to provide ponions of the work, but I have hired the following perron to coordinate. wpewise and provide the major work (include name I address I phons
I will provide same of the work. but i have contracted (hired) the following persons 10 provide the work indicated linclude name I address I phone number I type
WWN
Is the applicant or future building occupant required to submit a businns plan, acutely hazardous materials registration farm or risk management and prevention
program under Sections 25505, 25533 or 25534 Of the Presley-Tanner Hazardous Substance Account Act? 0 YES 0 NO
1s the applicant or future building m~upint required to obtain a permit from tho air pollution control disttict or air quality management district?
1s the facility to be constructed within 1,000 feet of the outer boundary of II school site?
IF ANY OF THE ANSWERS ARE YES. A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE
0 YES NO
0 YES 0 NO
NTROL DISTRICT.
,, .. . I
~ ~:~ .~~ . ., ,, ., , , , . . . , ., , . .
I hereby affirm that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 3097lil Civil Code).
I certify that I have read the application and state that the above information is Correct and that the information on the plans is accurate. i agree to comply with all
City ordinances and State laws relating to building construction. I hereby authorize representatives of the City of Carlsbad to enter upon the above mentioned
property for inspection purposes. I ALSO AGREE TO SAVE. INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES,
JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SA10 CITY IN CONSEWENCE OF THE GRANTING OF THIS PERMIT.
OSHA An OSHA permit io required for excwstions over 5'0" deep and demolition or Construction Of structure^ over 3 Stories in height.
EXPIRATION Every permit issued by the Building Official under the Provisions of this Code shall expire by limitation and became null and void if the building or
work authorized by Such pBrmit is not commenced within 365 days from the date of such permit or if the building or work authorized by such permit is suspended
or abandoned at any time aft.r the work is commenced for B period Of 180 days ISeCtim 106.4.4 Uniform Building Code).
APPLICANT'S SIGNATURE DATE
WHITE File YELLOW Applicant PINK: Finance
ctw rf cadsbrd
! 30 Rnal BUIldinB Inspection ,.
Dept: Building E-g Planning CMWD St Lite Fire
Plan Check #:
Permit #: CB982545
Projed Name: NEW 12OOOSF TILT UP SHELL
Address: 1835 ASTON AV
Contact Perm: JOHN Phone: 7609437727
Sewer Dist: CA WaterDist: CA
Date: 7/30/99
Permit Type COM
Sub Type:
Lot:
..........................................................................................................................................................
Inspecteb ,A,$& Date
By: Inspected: 8-34 e Approved: - / Disapproved: -
Inspected Date
By: Inspected: Approved: - Disapproved: -
Inspected Date
By: Inspected: Approved: - Disapproved: -
Comments:
...........................................................................................................................................................
cb rl earisbra
Final Bullding lnspectlon
Dept: Building Engineering Planning CMWD St Lite
Plan Check #:
Permit #:
Project Name:
Address:
Contact Person:
Sewer Dist:
OB982545
NEW 12000SF TILT UP SHELL
1835 ASTON AV
JOHN Phone: 7609437727
CA Water Dist: CA
Lot:
I Fire
Date:
Permit Type:
Sub Type:
7/30/99
COM
7-23 -37Approved: - Date
Inspected d Disapproved: -
inspU Date
By: Inspected: Approved: - Disapproved: -
Inspected Date
By: Inspected: Approved: - Disapproved: -
CHY rf Cadsbrd
Final Buildin@ Insnectlon
Dept: Building Engineering Planning CMWD we Fire
Plan Check#: Date: 7/30/99
Penit #: CB982545 PermitType: COM
Project Name: NEW 12OOOSF TILT UP SHELL Sub Type:
Address: 1835 ASTON AV
Contact Person: JOHN Phone: 7609437727
Sewer Disl: CA Water Disl: CA
Lot:
lnspe c By: r;ected: 8 - 2 Approved:& Disapproved: -
Inspected Date
By: Inspected: Approved: __ Disapproved: __
Inspected Date
By: inspected: Approved: - Disapproved: __
..........a ............ ........ ............ . .... . ........ . ............. ...... .... .... ............ . ..... ..... .............. . ............. ......... I.... .... I
L. c
City of Carlsbad Inspection Request
For 8/9/99
Permit# CB982545 Inspector Assignment: TP
Title: NEW 12000SF TILT UP SHELL
Description:
Type: COM Sub Type:
Job Address: 1835 ASTON AV
Suite: Lot
Location:
APPLICANT BOB SUKUP
Owner: LEVY JOHN
Remarks:
Total Time:
Phone: 6199873000
Inspector: ?&
Requested By: JOHN
Entered By: BARBARA
CD Description Act Comments
19 Final Structural Ap
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Inspection History
Date Description Act lnsp Comments
7/30/99 89 Final Combo NR TP LACQUER SPRAYING IN BLDG
6/22/99 14 FramelSteellBoltingIding AP TP ROOF STRUCT. REV.
6/7/99 14 Frame/Steel/Boltinglding CO TP ENG FIX NOT COMP
6/7/99 32 Const. Service/Agricultural AP TP MAIN SWITCH/HOUSE PNL
6/7/99 39 Final Electrical WC TP
4/23/99 17 Interior Lath/Drywall AP TP ELECTRM
4/21/99 14 Frame/Steel/BoltingMlding CO TP ND REV. ROOF PLN (SOLID JOIST)
4/20/99 14 Frame/Steel/Bolting/Welding NR TP
4/20/99 14 Frame/Steel/BoltingIWelding NR TP
4/19/99 14 Frame/Steel/BoltingMlding AP TP ELECT RM
4/6/99 31 Underground/Conduit-Wiring AP TP U/G CONDUIT IN P.S.
4/1/99 11 FtglFoundationlPiers AP TP P.G. @ CLMN BASES
3/31/99 11 Ftg/Foundation/Piers NR TP
4/1/99 15 RooWReroof AP TP
3/31/99 15 Roof/Reroof NR TP
3/23/99 11 Ftg/Foundation/Piers AP SP HOOK BARS PNL 14 POUR STRP EXC.ENTRY
3/22/99 11 Ftg/Foundation/Piers CO TP P.S.
3/17/99 11 Ftg/Foundation/Piers WC TP
City of Carlsbad Inspection
For 8/9/99
Request
Permit# CB982545
311 7/99
311 5/99
3/10/99
3/9/99
3/8/99
3/8/99
3/4/99
3/4/99
3/4/99
3/3/99
3/3/99
3/3/99
3/2/99
3/2/99
2/23/99
2/23/99
2/18/99
2/18/99
2/17/99
2/17/99
2/17/99
2/11/99
2/10/99
1/28/99
1/28/99
1/27/99
1120/99
1/19/99
1/19/99
1/20/99
1/15/99
12 SteelIBond Beam
11 FlgIFoundationlPiers
23 GasflestlRepairs
23 GasflesVRepairs
22 Sewerwater Service
23 GawTesURepairs
11 FtgIFoundationIPiers
12 SteelIBond Beam
12 Ste%l/Bond Beam
11 Ftg/Foundation/Piers
12 Ste%i/Bond Beam
12 Ste%l/Bond Beam
12 SteeiIBond Beam
12 Ste%l/Bond Beam
61 Fooling
66 Grout
11 FlgIFoundationlPiers
31 UndergraundlConduit-Wiring
11 Ftg/Foundation/Piers
34 Rough Electric
66 Grout
61 Footing
12 SteelIBond Beam
11 FtgIFoundation/Piers
12 SteelIBond Beam
11 F$/Foundation/Piers
11 Ftg/Foundation/Piers
11 Flg/Foundation/Piers
12 SteelIBond Beam
31 UndergroundIConduit-Wiring
21 UndergroundNnder Floor
Inspector Assignment: TP
AP TP HOOK BARS @ PNL 5.6
NR TP RAIN
AP TP
CO TP NEED 18 "DEPTH IN AREAS
AP TP
WC TP
WC TP
AP TP PNL 15.17.18
WC TP
AP TP PNLS1-4.14
CO TP PNLS15. 17.18
AP TP ENTCLMNREINF
CO TP PNLS
WC TP
AP TP 2NDLlFT
AP DH PERiMETERFTGS
AP DH UFFER
NR TP CONTFTN
NR TP UFFER
AP TP ISTLiFTCMU
AP PD
AP TP PNLS5-14
WC TP
AP TP S.O.G.
NR TP
AP TP INT SPRD FTN & G.B.
CO TP
CO TP
AP TP MAlNSERViCE
AP TP WIINBLDG
AP TP HOOK BARS FTN BTM PNLS a14
CHRISTIAN WHEELER ENGINEERING
June 8,1999 Project #199.076
Report #1
Reflex I1
c/o Hasler Construction
2725 Galicia Way
La Costa, CA 92009
ATTENTION: John Hasler
REFERENCE: Reflex 11,1835 Aston Avenue, Carlsbad, CA
Building Permit #982545
Final Testing and Inspection Report SUBJECT:
Dear Mr. Hasler,
Christian Wheeler Engineering has provided testing and special inspections of field welding, reinforced
concrete and drilled anchors on the above referenced project as described in reports 1 through 11. The
work requiring testing and special inspection was, to the best of my knowledge, in conformance to the
approved plans and speaftcations and the applicable workmanship provisions of the Uniform Building
Code.
If you have any questions, please do not hesitate to call me at 619-496-9760.
Sincerelv,
Michael B. Wheeler, R.C.E. 45358
MBw:db
cc: (1) Reflex I1 c/o Hasler Construction
(1) City of Carlsbad
4925 Mercury Street + San Diego, CA 921 11 + 619-496-9760 + FAX 619-496-9758
L
2
CHRISTIAN WHEELER
ENGINEERING
Date
6-3-99
itephen W.
Campbell
#70917
6-4-99
itephen W.
Campbell
#70917
desi noted
inribution:
?ield Welding
3lectrodc: FCAW-232
iteel: A36
Velder: Mark Richard Stickler #6384-1,3G md 46
’erformed cootinuous special inspection during the tit up and welding of the added 3 x 3 x ‘A angle steel to the 7 columns per detail S1-4.
:ontacted the srruchlral engineer for detail clarification on location of angles and amount of weld. Angle acceptable welded to the column
ir beam bucket. Weld vertical leg one side and horizontal leg 1” top and bottom sides. To the best of my knowledge, welds inspected this
late are in substantial conformance with the detail and engineer’s cladfications.
’erformed continuous special inspection during the tit up and wleding of the “U” bent plate per detail S1-5. To the best of my knowledge,
velds inspected this date are in substantial conformance with the engineer’s detail.
?mire, he wok ebrewed is, to the best of my knowledge, in compliance with the approved plans and specificotiom.
!I Hasler Connwalon
]City of Corlrbod
4925 Mercury Street + San Diego, CA 92111 + 619-496-9760 + FAX 619-496-9758
.
CHRISTIAN WHEELER
ENGINEERING
DAILY REPORT
Superintendent's Signamre Dam
4925 Mercury Street + San Diego, CA 92111 + 619-496-9760
~~
i
I
, . ....
!
I
/'
I I \ ADD 116" 'V BENT PLATE
-, .-- . ..
3-63
CHRISTIAN WHEELER ENGINEERING
DAILY REPORT
I
Superinredent's SlgnoNm Date
4925 Mercury Street + San Dicgo, CA 92111 + 619-496-9760 4 FAX 619-496-9758
CHRIST1 AN WHEELER ENGINEERING
DAILY REPORT
I
y knowledge, in mrnplbnce wlth th. approved plans and Ipeclficotionr.
/ Reg. # Superintendent's Slp~Nre
1 U- 4925 Mercury Street + San Diego, CA 92111 + 619-496-9760 + FAX 619-496-9758
.. ..
CHRlSTlAN WHEELER
ENGINEERING
DAILY REPORT
CHRISTIAN WHEELER
EN C I N EER I N G
99.076
DAILY REPORT
P+e Name 1 Prola# , nm*, I1 DR # Page 9 lof1 ..-...n I.
Pmla Addnrr
contraaor
Subcontractor
1835 Aston Ave., Carlsbad
Hash Construction
I
Pennil # Pian FUe R
Archifed
Engineer
982545
A.T.S.
Simon G. Solario Jr.
3-29-99
Stephen Vi
Campbell
#0847684-
88
3-30-99
Stephen W
Campbell
#0847684-
88
Roof Nailing
3/4" Plywood, 10D x 2 3/8 Common
Arrived on site, as requested, to perform nailing inspection on the Type A roof diaphragm. ?he subcontractor was a no show. Work is
rescheduled for 3-30-99.
hrrived on site, as requested, to perform roof nailing inspection on the 3 14" plywood section per d&I 17 on S-2.
Inspected tbe nail spacing, edge distance and general conformance.
ro the best of my knowledge, the n&g inspected this date is in substantial conformance with the approved plans.
%wise, the wok observed is, 10 the best of my knowledge, in compliance with the approrod plans and specifications.
1) City of Corlrbod
%* 4925 Mcrcury Strcct + Snn Dicgo, CA 92111 + 619-496-9760 + FAX 619-496-9758
rola Nomo
rola Address
ontmnor
ubcontmnor
Reflex I1
1835 Aston Ave., Carlsbad
Hasler Construction
CTJ Enterprises
3-26-99
Thomas
Kdskn
#508
P.g. lofl Prole0 # )DR#
Penit # Plan File #
Architeo
Engineer
199.016
982545
A.T.S.
Simon G. Solado Jr.
Jnicri noted
Xtribution;
Field Welding
Steel: ASTM A36
Welder: Cuy Johnson ~ 546-19-7684
Provided condnuous visual inspection during the welding oflintel panel #I5 to wall embeds and columns as follows:
1.
2.
3.
4.
5.
Welds inspected are visually acceptable and are in accordance with the approved plans or engineer's direction.
Upper north plate connection used steel filler and welded over per engineer (reference RFl, item #6).
Lower north connection welded per detail 15/SD2.
2 columns to panel per engineer's RFI #I, item 5.
South connections welded and inspected at pdor date.
Outstanding items noted by prior inspections have been corrected or addressed by the engineer on RFI #l.
,hewire, the work observed is, to the best of my knowledge, in compliance with the approved pions end specifications.
12) Horler Construction
;I) City of Carlibod
4925 Mcrcury Street + Sa" Diegu, CA 92111 + 619-496-9160 + FhX 619-496-9758 h 2F
CHRISTIAN WHEELER
ENGINEERING
Reflex I1
1835 Aston Ave., Carlsbad
Hasler Construction
CTJ Enterptises/Sierca Cascade
'eject Nome
'ooject Address
mtmctor
ibmntractor
Projed # DR # Page 199.076 7 lofl
982545
A.T.S.
Simon G. Sollio Jr.
Penit # Pian File #
Architect
Engineer
Date
3-15-99
tephen W.
Campbell
#70917
3-16-99
#rephen W.
Campbell
#70917
lniers noted
)iwibution:
Field Welding
Electrode: FCAW 232
Steel: A36 and 706 and 53
Welder: Cary Johnson - 546-19-7684
Arrived on site, as requested, to continue special inspection during the fit up and welding of panel connections.
lonnections inspected this date were the hold down connection panel 18 at line 1.
Rain began to fall and project was cancelled und further notice.
The welds completed this date are in substantial conformance with the approved plans.
Arrived on site, as requested, to perform condnuous special inspection during the fit up and welding of panel connections.
Connections inspected this date are as follows:
1.
2.
3.
Bottom anchor connections at panels 7,8,17 and 18.
Ledger angle at panels 2 and 3 and 5 and 6.
Chord bar connections at panels 17 and 18 and repairs to connections 3 and 4 (item 1 on report dated March 12) and rep& to
connection 12 and 13 (item 2 on report dated March 12).
Mid connection panels 7 and 8. 4.
Items 3 and 4 are yet to be addressed by the engineer and connections at panel 15 require derail clariftcntion by the engineer.
To the best of my knowledge, all welds inspected this date are in substantial conformance.
ierwiie, the work obrenod is, to the best of my knowledgo, in compliance with the approved pions and rpecificolionr.
21 Hmler Construction
i 1 Cily of Carisbod
_. Revi&&y Michad 8. Wheeler, R.C.E. #A5358 -
4925 Mcrcury Street + San Dicgo, CA 92111 + 619-496-9760 + FAX 619-496-9758 IT+-
‘-
oleo Name
O~M Address
mtmoor
!bcontmoor
Reflex I1
1835 Aston Ave., Carlsbad
Hasler Construction
CTJ Enterprises
Pro/ect # DR # Page
Permit # Plan Fila #
Architeo
Engineer
199.076 6 lofl
982545
A.T.S.
Simon G. Solaria Jr.
Dqte
3-12-99
tephen W.
Campbell
#70917
10847684-
88
lnieii noted
lirtribvtion;
iield Welding/DriUed Anchors
Tlectrode: FCAW 232
steel: A36 and 706 and 53
%‘elder: Cary Johnson - 546-19-7684
Epoxy: CIA-GEL 7000
Rebar: A615, Grade #4
4rrived on site as requested to perform continuous special inspection during the welding of panel connections for the project
3onnections inspected this date were as follows:
I.
2.
Mid connection panels: 1 and 2,2 and 3,3 and 4,4 and 5,5 and 6,9 and 10,lO and 11,11 and 12,12 and 13 and 13 and 14.
Chord bar connection panels: 1 and 2.2 and 3,3 and 41,4 and 5,5 and 6,7 and 8.9 and 10,lO and 11,11 and 12,12 and 132 and 13
and 14.
Upper plate connection panels: 6 and 73.8 and 9,16 and 17,16 and 17 and 18 and 14. 3.
VOTES All require engineer‘s approval or corrections prior to iid
I)
2)
3)
4)
Chord connection panels 3 and 4 - panel 3 chord bars are short, only 3 %“ of weld.
Chard connection panels 12 and 13. panel 13 bottom chord bar, top weld requires additional weld plus repair of porosity.
Upper plate connection panels 6 and 7 - inserts misaligned, weld at panel 7 = only 6”.
Upper plate connection panels 18 and 1 - detail shows 6” wide angle with 8” weld each side, contractor welded ‘A” flat plate, 1 ’/4 wide
against panel 18 w %” fillet 8” long and ‘A” fllet 7” long at panel 1.
While on site performing welding inspection, sub-contractor requested that I inspect the installation of drilled and epoxied reinforcing bar
dowels. NOTE: The welder was on lunch break at this time.
Inspected the installation of 60 dowels at the footing and panels outside of panels 5 and 6,6 dowels at the inside footing at panels 7 and 8
and 6 dowels at the outside footing and panel at panel 14.
Contractor has letter from engineer with denil clarification and has approved mbrtihlte epoxy. To the best of my knowledge, dowels
installed this date are in substandal conformance with the engineers letter and detail.
wmire, lhe woA obrewed is, to the best of my knowledge, in compliance with the approved plans and IpeCificatiOnl.
2) Hder Conitrunion
i) City of Carlsbad
4925 Mcicury Street + Sa“ Diego, CA 92111 + 619-496-9760 + FAX 619-496-9758 %%
Sent By: Chrlstlan Wheeler Englneerlng; 619 4969758; Mar-17-99 8:22; rage ziz
CHK~llAkWHEtl.lX EN C I N C C R I N C.
. .. I ,. . . . . . . ., ., , .
i.+.:. r :. ,. . ,. . : ~ ,~ , , ,. l.i .... % .,..._,... >.,.b;. .
CHRISTIAN WHEELER
ENGINEERING
DAILY REPORT
Plan File # _.
I .
San'Dicgo. CA 92111 9-49619760' + FAX 619-496-9758
CHRISTIAN WHEELER
ENGINEERING
Sample # Date Tested Age (days)
COMPRESSIVE STRENGTH TEST RESULTS
Area (sq. inches) Maximum Load Comp. Strength Failure Type
(W (Psi)
Job Name: Reflex I1
Job Address:
Contractor: Hash Construction
Subcontractor:
1835 Arton Avc., Carlsbad
0396
0397
0398
Job #: 199.076
Penit #: 982545 Plan File #:
Architect: A.T.S.
Engineer: Simon G. Solano
4-1-99 28 28.27 89,490 3,170
4-1-99 28 28.27 96,250 3,400
Discarded
Test Location: Panel #17
Req. Strength: 3000 psi
Dale Sampled: 3-4-99
Date Received: 3-5-99
Sampled by: AC
Tested by: CWE
Sample Type: Concrete, 6" x 12"
Supplier: Escandido Superior
Mix #: 355P
Admixture(s):
Truck #: 384 Ticket #: 391804
MixTemp: 700 Air Temp:
Slump: 4" %Air:
Min in Mixer: 40 Unit Wt:
I 0395 1 3-11-99 1 6 I 28.27 1 66,150 1 2.340 I I
~
The sampling, handling, wring and compressive strength leoBng were performed by Christian Wheeler Engineering in accordance with the applicable ASTM standards. No other warran6es express or implied.
Distribution:
(2) Hash Construction
(1) City of Carlsbad
Reviewed by:
Michael 6. Wheeler, RCE #I45358
4925 Mercury Strcct + San Diego, CA 92111 + 619-496-9760 + FAX 619-496-9758
)AILY REPORT
'ojcxt Name DR #
.olea Address Permit # Plon File #
Reflex I1 199.076 5 1 Of2
1835 Aston Ave., Carlsbad 982545
Hash Construction A.T.S. Architea
rbmntroaor Engineer Simon G. Salario Jr.
3-2-99
Aaron
Cooley
3.3-99
Aaron
Cooley
3-4-99
Aaron
Cooley
nles noted
irlribmion:
Reinforced Concrete
Rebar: A615, Grade 60, A706, Grade 60
Concrete: Superior Mix 355P, 3000 psi
4rrived on site, as requested, to provide special inspection on panels 1 through 4,15 through 18.
Foreman not ready for inspection. Further inspection 4 be required.
Arrived on site, as requested, to provide the special inspection on panels number 15 through 18,l through 4 and ndius panels (2).
For panel #15, plan details 15/SD2 and 16/SD2 show two #7 x 8' A-706 rebar with 20° radius, both ends. The bar placed was only 7' long.
Informed contractor of problem. The contractor contacted engineer for approval. The engineer approved and sent a copy of approval wkh
i detail.
For panels 17 and 18, plan detail 13B/SDI calls for hold down bars. Pockets caused the need to cut bottom 2-3 ties for pilasters. The
:ontractor contacted the engineer. The engineer is sending approval. Will sign off on concrete report when I receive the letter.
Far panel #15, details 15/SD3 and 16/SD3 - Contractor called engineer for approval to thicken panel by 5/8" to obtain required clearance
for welded bars on metal plates. Will sign off panel upon receipt of copy of engineer's approval.
Panels 1 through 4.16 and radius panels (2) are ready for concrete pour.
Arrived on site, as requested, to perform special inspection of the placement and consolidation of 104.5 cubic yards of concrete in the
following locations:
1.
2. Radius panels (2)
3.
4.
Prior to placement of the concrete, checked the reinforcing steel for columns and panel hooks. Checked for proper grade, size, locations and
mwise, the wok obwerved is, to the best of my knowledge, in compliance with the approved plans ond spcxificolionr.
Panels 1 through 4 and 15 through 18
Concrete columns at F (6)
Panel hooks post &up detail for plans 8/SD1 Line 5 at A through G
1) Horrler Conrtrvaion
I] City of Carlrbad
Reviewed by Michael 8. Wheeler, R.C.E."#45358 - /
k?- 4925 Mcrcury Strcct + San Diego, CA 92111 + 619-496-9760 + PAX 619-496-9158
CHRISTIAN WHEELER
ENGlNEERiNG
rojm Nome
roject Address
owraaor
rbcomraaor
Reflex I1
1835 Aston hve., Carlsbad
Hasler Consmction
Pro/ecI # DR # Page 199.076 5 2of2
982545
A.T.S.
Simon G. Solaio Jr.
Permit # Pian File #
Architea
Engineer
3-4-99
Aaron
Cooley
nieri noted
~irtribution:
:learances. Also received RFIs from the engineer for areas mentioned in report from 3-3-99. All panels, columns and panel hooks at line 5
t A through G ready for concrete.
:onCrete was placed by pump and consolidated by mechanical vibration.
'abricated one set of 4 concrete test cylinders taken from panel #17. Slump = 4", Temp. 70'. Truck #384, Ticket #391804.
enire, the wo* observed is, to the best of my knowlodge, in compliance with tho approved plonr and specifications.
2) Harrier Cmtruaion
I) City of Carlrbrrd
Revlewd by Michael 8. Wheeler, R.C.E. #45358
4925 Mercury Strect + San Diego, CA 92111 + 619-496-9760 + FAX 619-496-9758
CHRISTIAN WHEELER
ENGINEERING
Sample #
0312
COMPRESSIVE STRENGTH TEST RESULTS
Failure Type Date Tested Age (days) Area (sq. inches) Maximum Load Comp. Strength
(Ibs) (Psi)
2-25-99 7 28.27 95,760 3,390
Job Name: Reflex I1
Job Address:
Contractor: Hasler Construction
Subcontractor:
1835 Aston Ave., Cadsbad
0315
Job #: 199.076
Permit #: 982545 Plan File #:
Architect: A.T.S.
Engineer: Simon G. sakio
Discaided
Test Location: Perimeter footings
Req. Strength: 3000 psi
Date Sampled: 2-18-99
Date Received: 2-20-99
Sampled by: AC
Tested by: PCI
Sample Type: Concme, 6” x 12”
Supplier: Superior
Mix #: 354P
Admixture(s): POZZ
Truck #: 539 Ticket #: 323266
MixTemp: 720 Air Temp:
Slump: 3” %Air:
Min in Mixer: 50 Unit Wt:
I 0313 I 3-18-99 I 28 I 28.27 I 132,110 I 4,670 I
I 0314 I 3-18-99 I 28 I 28.27 I 131,540 I 4,650 I
Reviewed by:
. .-
Michael 8. Wheeler. RCE #45358
4925 Mercury Street + Sno Dicgo, CA 92111 + 619-496-9760 + FAX 619-496-9758
CHRISTIAN WHEELER
ENGINEERING
.* .
. .
CHRISTIAN WHEELER
ENGINEERING
rnW Nom
rnled Addnrr
omroctor
rbcomraoor
Reacx XI
1835 Astoo Ave., Carlsbad
Haslet Construction
Sierra Cascade
Dote
2-16-99
Aaron
Coolcy
2-17-99
Aaron
Cooley
2-18-99
Aaron
Cwley
den noted
ifitributim
1 1 of2 Proled # DR ?4
Permit # Plan File #
Architee
Ewinnr
199.076 4
982545
A.T.S.
Simon G. Solario Jr.
kinforced Concrete
lebar: Ml5, Grade M), ,4706. Grade 60
:onuete: Superior Mix 354P, 3OOO psi
&ed on site, as requested, to perform special inspection of reinforcing steel for all perimeter fwti.p.
:ontractor was not ready for inspections. Future inspections requixed.
urived on site, as requested, to provide the special inspection on the perimeter footing for building. Checked for proper steel grade, sizes
nd clearances. AU work was done in accordance with the approved plans and specifications for job.
kved on site, as requested, to provide special inspection of the placement and consolidation of 76 cubic yards of concrete placed in the
,erLDeter footings for buildings.
:oncrcte was placed by means of tailgate and consolidated by mechanical vibration.
gbricated one set of 4 concrete cylinders for compression testing. Slump = )",Temp. = 72',Tmck #539,Ticket #323266.
'o the best of my knowledge, all work was done in substantial accordance with the approved plans and specifications.
Irwim, the wolc observed is, to the ben of my kmwkdge, in compliance with the eppmrad piam and specifications.
1) Harder Connmeion
I) City of Carlrbad
4925 Mercury Street + San Diego, CA 92111 + 619-496-9760 + FAX 619-496-9758
)AILY REPORT
mieo Nome Pmim # DR # Page Reflex I1 199.076 3 1 of2
I ^. r.. Y
~ ontmcto, Amhiieo Hassler Conswction 1 .. L.T.S.
Date
2-9-99
Aaron
Cwley
2-10-99
Aaron
Cooley
Inlers mated
Nnributioni
Reinforced Conucte
Rebnc A615, Grade 60, AIW, Grade 60
Concrctc: Superior Mix 355P, 3ooo psi
Anivcd on site, as requested, to perform special inseon of reinforcing steel for panels 5-14.
The following is a list of typical problems:
All PA135 straps not in place- Per 4SD3.
Purlin anchors not in place.
Vertical reinforcing (typical) not centered in wall.
Panel to panel embeds (detail 18SD2) are of the wrong steel (need A-706, A615 installed).
Individual panel problems are as follows:
Panel #lo, #14, #5, #12, #7 - Pilasters need to be chaired up for correct clearance.
Panel #8 and #7 -Hold downs have wrong steel, need #7s has #6s in now.
Panel #7 (9SD3) -Wrong welded steel - need A706 steel, has A615 now.
Panel #? and #6 -Nelson studs 14SD2 need to be 4". has 3 1/2" now.
Panel #5 - add #5 corner steel under steel frame door vertical steel.
These items require re-inspection prior to conaete inspection.
Arrived on site, as requested, for the reinspecdon of reinforcing steel in panels 5-14.
Checked for clearances, location, rebar type. All work is done in accordance wih the approved plans and specifications
Received a note of clarification approving vertical steel (typical) in center of panels from hc engineer. All steel that needed to be replaced
(including embeds) with correct steel has been done.
herwise, the work obrened is, 10 he best of my knowkdge, In mmplionco wim he appmd phnr and sp+cifli~cotionr.
2) Ha5Sl.r ComtnvtiM
1) City of Carlrbod .
4925 Mercury Street i Ssn Diego, CA 92111 i 619-496-9760 i FAX 619-496-9758 1%
CHRISTIAN WHEELER
ENCiNEERlNG
mlea Name Reflex I1 Prolea # DR # Page 199.076 2 1 of1 mlea Name Reflex I1 Prolea # DR # Page 199.076 2 1 of1
Reinforced Conuctc
Concrete: 4000 psi, #355PAE, Superior
Arrived on site to provide quality control observation of approximately 190 cubic yards of concrete. Sampled fmt truck on the job,
fabricated one set of three test cylinders, slump and air test. Slump = 3”, Air 1.5%. Informed contractor ofair test result. Mix design calls
for 5% f 1%. Sampled 3 subsequent trucks, air content was 1.25%. 3.5%, 3.25%. Contractor elected to use loads. AU other loads were
observed and appeared to be between 3” - 4” slump. Otherwise, concrete practices sppearexo be acceptable.
c -
mlea Address
Ontmar
ubmntmoor
1835 Aston Ave.
Hassler Consuuction
Jnlerr noted othewiw, the work observed is, m the best of my knowkdge, in coomplhnce with the oppmved pions ad spsclfimtbnr.
XdributiM;
2) Hmrler Condnutlon
P*,rmil# Plan File #
Architea
Engineer
982545
A.T.S.
Simon G. Solvio Jr.
1) City of brlrbad
~~~~~~~~~ ~ ~
Ontmar
ubmntmoor
Hassler Consuuction
4925 Mercury Street + San Dicgo, CA 92111 + 619-496-9760 + FAX 619-496-9758
Architea
Engineer
A.T.S.
simnn r. sni.in ir
P*,rmil# 982545 Plan File #
COMPRESSIVE STRENGTH TEST RESULTS
Plan File #:
Job Name: Reflex I1 Job #: 199.076
Job Address: 1835 Aston Ave. Pemn #: 982545
Contractor: Hasler Construcdon AEhhct:
Subcontractor: Engineer:
Test Location: Footing Supplier: Superior
Req. Strength: 3000 psi Mix #: 354P
Date Sampled: 1-20-99 Admixture(s):
Date Received: 1-21-99
Sampled by: AC MixTemp: 700 Air Temp:
Tested by: PCI Slump: 4” %Air:
Sample Type: Concrete, 6“ x 12” Min in Mixer: 50 Unit Wt:
Truck #: 424 Ticket #: I 17462
The sampling. handling. wring and wmpreasive strength testing were performed by Christian Wheeler Engineering in accordance with the applicable ASTM standards. NO other wananties express or implied.
Distribution:
(2) Haslcr Consmction
(I) City of Cvlsbad
Reviewed by:
Michael B. Wheeler, RCE #45358
4925 Mercury Street + San Diego, CA 92111 + 619-496-9760 + FAX 619-496-9758
CHRISTIAN WHEELER
ENGINEERING
Pmlm Nonu Reflex I1
1835 Aston Ave.
Hassler Construction
Proled Address
Contmaor
Svbmntmaor
Pmlm # DR # Page 199.076 I loft
982545
A.T.S.
Simon G. Solado Ir.
Permit # Plan File #
Architect
Engineer
teinforced Concrete
Lbnr: ASTM A615 Grade 60
bncrete: Moo psi, #354P, Superior
hived on site, as requested, to perform special inspection on the placement and consolidation of 76 cubic yards of concrete in the
bllowing locations: Footings at Line 4 at A-G, Line 2 at A-D, Line B at 1.5-5, Line C at 1.6-5, Line D at 2-5, Line E at 2.2-5, Line F at 2.4.:
'dor to placement of concrete, checked the areas for proper reinforcing steel. Checked for rebar size, locations and clearances.
IonCrete was placed by tailgate and chute and consolidated by mechanical vibration.
7abdcated one set of 4 concrete test cylinders for compression testing. Slump 4". Temp 70°, Tmck #424, Ticket #117462.
erwi~, the wok obrsned is, to the bee of my knowledge, in mmplince with the approved pions and qmdfimtions.
Reviewed ULW by Michoal 8. Whaler, R.C.E. #45358
4925 Mercury Street + San Dicgo, CA 92111 + 619-496-9760 + FAX 619-496-9758
.",' . .-:.
:. :.
.. . '. . _* ..
..
....
INTERNATIONAL CONFERENCE OF BUILDING OFFICIALS Q.643 . . .;
\',
AARON COOLEY .. ,
13610 AVENIDA DELL CHARRO
EL CAJON, CA 92021
SSN: 559-55-4218
AS1 ID: 32-US-32013649 BDATE: 07/11/77
EXAMINATION: REINFORCED CONCR./ICBO EXAM DATE: 12/12/98
.,.,
' .. . j
. .... . ..
,., , ,
EXAMINATION RESULT: PASS
,.:.. . . Congyatu$ations! You have
will be mailed to you by ICBO within six to eight weeks.
assed the joint.AC1 /BOCA ICBO/SgCCI : : ., ': :.,:;:I
,. <. . . . .....?
examlnation listed above. tour SCBO Certif icate of 6 ompletion
~
. . ,.~., It is extremely important that you notify ASI+of.any errprs in yo name or address as listed above. If an incorrect please notify AS1 at 6800) x75-8301 within the,next f business days. There may be an a ditlonal fee from ICBO, if.yOUr Certificate of Completion must be reissued due to an error in th. information.
You are eligible for either special ins ector or special ins ect
documents, which are l&sted in the Candidate Bulletin. It is you resppnsibility to.submlt these documents to ICBO. Upon ICBO's recel t and ver+flcatlon of these documents certification wlll be automatlcally issued 40 you.
of this information l&
associate certification upon. your submi. k? tal of the additlonay
the appropriate .:
If you need additional information on certification ... ,.... . . . .... please contact: .., . . . .. .,J
_,.. . . ,' ." . ..
ICBO - Certification services 5360 Workman Mill Road Whittier, CA 90601-2298
-19-
- I--- - ------- CENTERLINE OF PANEL & FOOTING Typ. U.NO.
\ AT 14' 0.C !
FOOTING SIZE AND *I /-- Rum PER FND. I/ PIAN AND SCCIEDULE *Y
RFFl EX CORPORATION BUILDING
I TAN 1'5
584-7407 FAX
I
810 W. Los Vallecltos. Ste A .Sari Marcos CA.92069 (760) 752-7010.Fax (760) 752-7092
FOOTlNGlCAlSSON OBSERVATION SUMMARY
Date: Febuary 16,1999
Project Name:
Location:
Permit No:
Reflex II - Carlsbad Reseach Center
1825 Aston Avenue, Carlsbad, CA 92008
Referenced Geotechnical Report(s):
"GEOTECHNICAL INVESTIGATION AND FOUNDATION RECOMMENDATIONS FOR THE PROPOSED
CENTER- REFLEX II, TO BE LOCATED ON LOT 64,1825 ASTON AVENUE, CARLSBAD, CALIFORNIA,
Project No: 981771-1, dated June 30,1998, prepared by Engineering Design Group.
Code: 1994 U.B.C.
Observation of Summary:
-:Initials A representative of E.D.G. observed on-site soil conditions. Soil
conditions at the site are substantially in conformance with those assumed in
the geotechnical report.
A representative of E.D.G. observed and measured footing excavation
depthhidth. Footing excavations extend to proper depth and bearing strata,
and are in general conformance with recommendations of the referenced
geotechnical report.
A representative of E.D.G. measured footing setback from slope face.
The setback was in general accordance with the recommendations of the
geotechnical report.
r/
L
:Initials 4E
-:Initials
Notes to SuperintendenffForeman
I.
2.
Footinglcaisson excavations should be cleaned of loose debris and thoroughly moistened just
prior to placing concrete.
In the event of a site change subsequent to our footinglcaisson observation and prior to
concrete placement (i.e., heavy rain, etc.), we should be contacted to perform additional site
observations.
Notes to Buildina Inspector
1.
/
Soil compaction test results, including depth of fill, relative compaction, bearing values, and
soil expansion index test results are contained in the As-Graded Geotechnical Report
provided at the corn letion of grading (IF APPLICABLE).
NOH inspect$s of interior footings only. 2.
2- I&49
Date
Job NO. 981771-1
LUForrnsW FRM\SIItTIt-t Reflex I1 .FOOTING SUMMARY. 2-1599.wpd.wpd
3-22-1999 10:OOAM FROM EDG 7607527010 P. 2
-
810 w. LW vakdm. sts A. %n Mumr CA.92069 (760) 752-7010.F~~ (760) 752-7082
Date:
To:
Re:
Subject:
Dear Bob,
MaEh 22.1999
Bob Sukup
Sea Bright Company
4322 Sea Bright Place Carlsbad, CA 92008
Carlsbad Research Center - Reflex II - 1825 Aston Avenue, Carisbad. CA.
Recommendations for Backfill Material
We have pruvided this letter as a follow up to our site visit and conversation with the
contractor at the above referenced project on March 4,1999 regarding recommendatins
for fill material to be placed between the interior of the deepened panel wall and the cut
slope along the north building elevation. Due to construction restraints, such as in place
steel rebar. it is was our recommendation that this area be backfilled with crushed
aggregate. Prior to the placement of aggregate material. all loose soils that had
accumulated at the backfill location were removed, and a filter fabric barrier was set in
place at the face of the cut slope. Subsequent to the placement of backfill, the filter fabric
end was lapped 12 inches over the top of the in place aggregate to prevent the migration
of soil material beneath the existing slab into the backMed aggregate. These conditions were observed by an engineer from our firm on March 18.1999.
If you have any questions regarding the enclosed information. please do not hesitate to
contact our office.
Sincerely,
NO. 47672 Gp. 12-99
California RCE #47672
Pam No. 1
FOOTlNGlCAlSSON OBSERVATION SUMMARY
Date: February 11,1999
Project Name:
Location:
Reflex II - Carlsbad Reseach Center
1825 Aston Avenue, Carlsbad, CA 92008
Permit No: 98 - 2 Sit 5
Referenced Geotechnical Report(s): "GEOTECHNICAL INVESTIGATION AND FOUNDATION
LOT64,1825ASTONAVENUE,CARLSBAD,CALIFORNIA", Project No: 981771-1,dated June30,1998,
prepared by Engineering Design Group.
Code: 1994 U.B.C.
Observation of Summarv:
RECOMMENDATIONS FOR THE PROPOSED RESIDENCE CENTER- REFLEX Ii, TO BE LOCATED ON
:Initials A representative of E.D.G. observed on-site soil conditions. Soil
conditions at the site are substantially in conformance with those assumed in
the geotechnical report.
A representative of E.D.G. observed and measured retaining wall footing
excavation depthhidth. Footing excavations extend to proper depth and
bearing strata, and are in general conformance with recommendations of the
referenced geotechnical report.
A representative of E.D.G. measured footing setback from slope face.
The setback was in general accordance with the recommendations of the
geotechnical report.
z-
7/ :Initials
-:Initials
Notes to Superintendent/Foreman
1.
2.
Footinglcaisson excavations should becleaned of loose debrisand thoroughly moistened just
prior to placing concrete.
In the event of a site change subsequent to our footinglcaisson observation and prior to
concrete placement (Le., heavy rain, etc.), we should be contacted to perform additional site
observations.
Notes to Buildina Insoector
I. Soil compaction test results, including depth of fill, relative compaction, bearing values, and
soil expansion index test results are contained in the As-Graded Geotechnical Report
provided at the completion of grading (IF APPLICABLE).
terior footings only.
2-,I-??
ESIGN GROUP Date
Job NO. 981771-1
DIFormsU FRMB81771.1 Reflex It .RETAINING WALL FOOTING SLJMMARY.Z-~~~.wpd.wpd
FOOTINGICAISSON OBSERVATION SUMMARY
Date: January 19,1999
Project Name:
Location:
Reflex II - Carlsbad Reseach Center
-Aston Avenue, Carlsbad, CA 92008 1833-
Permit NO: 98 -2sqs
Referenced Geotechnical Report(s): “GEOTECHNICAL INVESTIGATION AND FOUNDATION
LOT64,1825ASTONAVENUE, CARLSBAD, CALIFORNIA, Project No: 981771-1,dated June30,1998,
prepared by Engineering Design Group.
Code: 1994 U.B.C.
abservation of Summaw:
*:Initials
RECOMMENDATIONS FOR THE PROPOSED RESIDENCE CENTER- REFLEX II, TO BE LOCATED ON
’
A representative of E.D.G. observed on-site soil conditions. Soil
conditions at the site are substantially in conformance with those assumed in
the geotechnical report.
A representative of E.D.G. observed and measured footing excavation depthlwidth. Footing excavations extend to proper depth and bearing strata,
and are in general conformance with recommendations of the referenced
geotechnical report.
A representative of E.D.G. measured footing setback from slope face.
The setback was in general accordance with the recommendations of the
geotechnical report.
A
-:Initials
*Initials
,+ED4 &pr.,c& pY-t et cb\ tcir\brud*f in pet &t- 4 t brt ‘s
<kr 5D-I o+ phUL w
c_ Notes to SuDerintendenUForeman
1.
2.
Footingkaisson excavations should becleaned of loosedebrisand thoroughly moistened just
prior to placing concrete. In the event of a site change subsequent to our footingkaisson ObSeNatiOn and prior to
concrete placement (i.e., heavy rain, etc.), we should be contacted to perform additional site
observations.
Notes to Buildina lnsmctor
1. Soil compaction test results, including depth of fill, relative compaction, bearing values, and
soil expansion index test results are contained in the As-Graded Geotechnical Report
provided at the completion of grading (IF APPLICABLE). Note this inspection is of interior footings Only. 2.
Representative of ENGINEERINqDESlbN GROUP
t-14- 1s
Date
Job No. 961314-3
\\Sandylflle!fomaM FRMl9LH771-1 Reflex 11 .FOOTING SUMMARY.1-’18-8O.wpd.wpd
R J POTRRTZ ELECTRICRL CONTRRCTING
P.O.BOK 288
BORREGO SPRINGS, CA. 92884 CR. LIC# 612671 d
FROM : THE SEA ~i- Fcb. 03 1999 10:079M Pi PWE NO. : 619 726 8898 -- * Ihe Sea Bright rrcI)Lyc 0 ~TI P z n y
- EsGil - Corporation
DATE: December 11, 1998
JURISDICTION: Carlsbad
PLAN CHECK NO.: 98-2545
WNT
0 PLAN REVIEWER
0 FILE
SET 111
PROJECT ADDRESS: 1825 Aston Avenue
PROJECT NAME: REFLEX CORPORATION (tilt-up OMce Building)
0 The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified in the attached list are resolved and checked by building
department staff.
0 The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
0 The check list transmitted herewith is for your information. The plans are being held at Esgil
The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
0 The applicant's copy of the check list has been sent to:
Corporation until corrected plans are submitted for recheck.
contact person.
Esgil Corporation staff did not advise the applicant that the plan check has been completed.
0 Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone #:
Date contacted: (by: ) Fax #:
Mail Telephone Fax In Person 0 REMARKS:
By: Sergio Azuela Enclosures:
Esgil Corporation
GA MB EJ PC 1212 tmsmtl.dot
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (619) 560-1468 + Fax (619) 560-1576
Provide a letter from the soils foundation plan, grading
plan and specifications have
recommendations in the
documents.
been determined that the
into the construction
Carlsbad 98-2545 111
December 11, 1998
Applicant shall provide a “Special Inspection Program” to the Building Official. The
Building Department will resolve this correction.
7 EsGil Cornoration -~ ~~
In Tarhurship with Goucrnment for 3uiLfingSafcty
DATE: October 12, 1998
JURI SD I CTl ON : Carlsbad
PLAN CHECK NO.: 98-2545
0 PLAN REVIEWER
0 FILE
SET 11
PROJECT ADDRESS: 1825 Aston Avenue
PROJECT NAME: REFLEX CORPORATION (tilt-up Office Building)
0 The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
0 The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
0 The plans transmitted herewith have significant deficiencies identified on the enclosed check list
The check list transmitted herewith is for your information. The plans are being held at Esgil
0 The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
The applicant's copy of the check list has been sent to:
and should be corrected and resubmitted for a complete recheck.
Corporation until corrected plans are submitted for recheck.
contact person.
Bob Sukup
4322 Seabright Place, Carlsbad. CA 92008
Esgil Corporation staff did not advise the applicant that the plan check has been completed.
0 Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone #:
Date contacted: (by: 1 Fax #:
Mail Telephone Fax In Person 0 REMARKS:
By: Sergio Azuela Enclosures:
Esgil Corporation 0 GA 0 MB 0 EJ 0 PC 9129 trnsmtl.dot
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (619) 560-1468 + Fax (619) 560-1576
Carlsbad 98-2545 I1
October 12, 1998
RECHECK PLAN CORRECTION LIST
JURISDICTION: Carlsbad PLAN CHECK NO.: 98-2545
PROJECT ADDRESS: 1825 Aston Avenue SET: I1
DATE PLAN RECEIVED BY
ESGlL CORPORATION: 9/29
REVIEWED BY: Sergio Azuela
FOREWORD (PLEASE READ):
DATE RECHECK COMPLETED:
October 12, 1998
This plan review is limited to the technical requirements contained in the Uniform Building Code,
Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws
regulating energy conservation, noise attenuation and disabled access. This plan review is
based on regulations enforced by the Building Department. You may have other corrections
based on laws and ordinances enforced by the Planning Department, Engineering Department
or other departments.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3,
1994 Uniform Building Code, the approval of the plans does not permit the violation of any
state, county or city law.
A. Please make all corrections on the original tracings and submit two new sets of prints to:
Esgil Corp. or to the bldg. dept. of the juris.
B. To facilitate rechecking, please identify, next to each item, the sheet of the plans upon
which each correction on this sheet has been made and return this sheet with the
revised plans.
C. The following items have not been resolved from the previous plan reviews. The original
correction number has been given for your reference. In case you did not keep a copy of
the prior correction list, we have enclosed those pages containing the outstanding
corrections. Please contact me if you have any questions regarding these items.
D. Please indicate here if any changes have been made to the plans that are not a result of
corrections from this list. If there are other changes, please briefly describe them and where
they are located on the plans. Have changes been made not resulting from this list?
OYes ONo
Carlsbad 98-2545 I1
October 12, 1998
1. Please make all corrections on the original tracings, as requested in the correction
list.
Submit three sets of plans for commerciallindustrial projects (two sets of plans for
residential projects). For expeditious processing, corrected sets can be submitted
in one of two ways:
1. Deliver all corrected sets of plans and calculationslreports directly to the
City of Carlsbad Building Department, 2075 Las Palmas Drive, Carlsbad, CA
92009, (760) 438-1 161. The City will route the plans to EsGil Corporation and the
Carlsbad Planning, Engineering and Fire Departments.
2. Bring one corrected set of plans and calculationslreports to EsGil
Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (619)
560-1468. Deliver all remaining sets of plans and calculationslreports directly to
the City of Carlsbad Building Department for routing to their Planning, Engineering
and Fire Departments.
NOTE: Plans that are submitted directly to EsGil Corporation only will not
be reviewed by the City Planning. Engineering and Fire Departments until review
by EsGil Corporation is complete.
All sheets of the plans and the first sheet of the calculations are required to be
signed by the California licensed architect or engineer responsible for the plan
preparation. Please include the California license number, seal, date of license
expiration and the date the plans are signed. Business and Professions Code.
From the soils report provided: e - Clearly show the minimum required depth of 18 at all foundation details on
sheet SDI.
- B - The soils engineer recommended that helshe review the foundation
excavations. Note on the foundation plan that "Prior to the contractor requesting
a Building Department foundation inspection, the soils engineer shall advise the
building official in writing that:
a) The building pad was prepared in accordance with the soils report,
b) The utility trenches have been properly backfilled and compacted, and
c) The foundation excavations, the soils expansive characteristics and bearing capacity conform to the soils report." - C - Provide a letter from the soils engineer confirming that the foundation plan,
grading plan and specifications have been reviewed and that it has been
determined that the recommendations in the soils report are properly
incorporated into the construction documents (required by the soil report page
3.
13.
13).
14. Specify on the foundation plan or structural specifications sheet the soil
classification, the soils expansion index and the design bearing capacity of the
foundation. Section 1804.3.
Carlsbad 98-2545 I1
October 12, 1998
18. Applicant shall provide a “Special Inspection Program” to the Building Official.
This correction will be resolved by the Building Department.
If you have any questions in regards to these corrections please call Sergio Azuela at
ESGlL Corporation (619) 560-1468.
EsGil Corporation
2n partnership with ~ouernment for 9uiGfingSafety
DATE: August 31,1998
JURISDICTION: Carlsbad
PLAN CHECK NO.: 98-2545
0 APPLICANT >
0 PLAN REVIEWER
0 FILE
SET I
PROJECT ADDRESS: 1825 Aston Avenue
PROJECT NAME: REFLEX CORPORATION (tilt-up Office Building)
0 The plans transmitted herewith have been corrected where necessary and substantially comply
0 The plans transmitted herewith will substantially comply with the jurisdiction’s building codes
with the jurisdiction’s building codes.
when minor deficiencies identified below are resolved and checked by building department
staff.
0 The plans transmitted herewith have significant deficiencies identified on the enclosed check list
The check list transmitted herewith is for your information. The plans are being held at Esgil
0 The applicant‘s copy of the check list is enclosed for the jurisdiction to forward to the applicant
The applicant’s copy of the check list has been sent to:
and should be corrected and resubmitted for a complete recheck.
Corporation until corrected plans are submitted for recheck.
contact person.
Bob Sukup
4322 Seabright Place, Carlsbad, CA 92008
[XI Esgil Corporation staff did not advise the applicant that the plan check has been completed.
0 Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone #:
Date contacted: (by: 1 Fax #:
Mail Telephone Fax InPerson 0 REMARKS:
By: Sergio Azuela Enclosures:
Esgil Corporation
GA 0 CM [XI EJ PC 811 7 tmomtl.dd
9320 Chesapeake Drive, Suite 208 + San Diego, Caliiomia 92123 + (619) 560-1468 + Fax (619) 560-1576
Carlsbad 98-2545
August 31,1998
PLAN REVIEW CORRECTION LIST
COMMERCIAL
OCCUPANCY: B, F-1 Ba S-1 USE: Office/Manufacturing
and Warehouse (shell)
TYPE OF CONSTRUCTION: VN ACTUAL AREA: 12,000 SF
ALLOWABLE FLOOR AREA: 24,000 SF STORIES: 1
8,000 X 3 (sprinklers) HEIGHT: 18FT
SPRINKLERS?: YES OCCUPANT LOAD: 56
DATE PLANS RECEIVED BY DATE PLANS RECEIVED BY
JURISDICTION: 8/12/98 ESGlL CORPORATION: 8/17
DATE INITIAL PLAN REVIEW PLAN REVIEWER: Sergio Azuela
FOREWORD (PLEASE READ):
This plan review is limited to the technical requirements contained in the Uniform Building
Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state
laws regulating energy conservation, noise attenuation and access for the disabled. This plan
review is based on regulations enforced by the Building Department. You may have other
corrections based on laws and ordinances enforced by the Planning Department, Engineering
Department, Fire Department or other departments. Clearance from those departments may be
required prior to the issuance of a building permit.
Code sections cited are based on the 1994 UBC
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3,
1994 Uniform Building Code, the approval of the plans does not permit the violation of any
state, county or city law.
To speed up the recheck process. please note on this list (or a copv) where each
correction item has been addressed, Le., plan sheet number, specification section, etc.
Be sure to enclose the marked up list when you submit the revised plans.
LIST NO. 22. GENERAL COMMERCIAL WITHOUT ENERGY OR POLICY SUPPLEMENTS (1994 UBC) comfowdot
Carlsbad 98-2545
August 31, 1998
GENERAL
1.
2.
3.
4.
5.
Please make all corrections on the original tracings, as requested in the
correction list.
Submit three sets of plans for commercial/industriaI projects (two sets of plans
for residential projects). For expeditious processing, corrected sets can be
submitted in one of two ways:
1. Deliver all corrected sets of plans and calculationslreports directly to
the City of Carlsbad Building Department, 2075 Las Palmas Drive, Carlsbad, CA
92009, (760) 438-1 161. The City will route the plans to EsGil Corporation and
the Carlsbad Planning, Engineering and Fire Departments.
2. Bring one corrected set of plans and calculationslreports to EsGil
Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (619)
560-1468. Deliver all remaining sets of plans and calculationslreports directly to
the City of Carlsbad Building Department for routing to their Planning,
Engineering and Fire Departments.
NOTE: Plans that are submitted directly to EsGil Corporation only will not
be reviewed by the City Planning, Engineering and Fire Departments until review
by EsGil Corporation is complete.
0 PLANS
Provide the names, addresses and telephone numbers of the owner and the
responsible design professionals on the Title Sheet.
All sheets of the plans and the first sheet of the calculations are required to be
signed by the California licensed architect or engineer responsible for the plan
preparation. Please include the California license number, seal, date of license
expiration and the date the plans are signed. Business and Professions Code.
Provide a Building Code Data Legend on the Title Sheet. Include the following
code information for each building proposed:
t Occupancy Group Please include also the F-I occupancy since
manufacturing use is stated under the parking required.
t Description of Use
SITEPLAN
Provide a statement on the site plan stating: "All property lines, easements and
buildings, both existing and proposed, are shown on this site plan."
Carlsbad 98-2545
August 31, 1998
EXITS
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
When additional doors are provided for egress purposes, they shall conform to
the width, swing and hardware provisions in Chapter 10. Sections 1004.3 and
1004.6. See Section 1004.1 2.
Regardless of occupant load, a floor or landing not more than 1 inch (1/2-inch if
disabled access is required) below the threshold is required on each side of an
exit door. Section 1004.9. Please clearly show it on plans.
Door landings shall have a length measured in the direction of travel of not less
than 44 inches. Section 1004.10. Please clearly show on plans the landings
at all exterior doors.
EXITSIGNS
Exit signs are required whenever two exits are required. Show all required exit
sign locations. Section 101 3.1.
Show two sources of power for the lamps at exit signs. Section 1013.4,
Show that exits are lighted with at least one foot candle at floor level. Section
1012.1.
FIRE EXTINGUISHING
Note on the plans: "When serving more than 100 sprinkler heads, automatic
sprinkler systems shall be supervised by an approved central, proprietary or
remote, station service, or shall be provided with a local alarm which will give an
audible signal at a constantly attended location." Section 904.3.
FOUNDATION
Provide a copy of the project soil report prepared by a California licensed
architect or civil engineer. The report shall include foundation design
recommendations based on the engineer's findings and shall comply with UBC
Section 1804.
Specify on the foundation plan or structural specifications sheet the soil
classification, the soils expansion index and the design bearing capacity of the
foundation. Section 1804.3,
Investigate the potential for seismically induced soil liquefaction and soil
instability in seismic zones 3 and 4. Section 1804.5
Carlsbad 98-2545
August 31. 1998
16. Provide notes on the foundation plan listing the soils report recommendations for
foundation slab and building pad preparation.
CONCRETE
17.
18.
19.
20.
21.
22.
23.
24.
25.
Where flexible diaphragms provide lateral support for walls, the value of C, for
anchorage from UBC Table 16-0 shall be increased 50% for the center one-half
of the diaphragm span. See footnote 3 in Table 16-0. Please clearly show
where in the structural calculations is this taken in consideration.
FRAMING
When special inspection is required, the architect or engineer of record shall
prepare an inspection program which shall be submitted to the building official
for approval prior to issuance of the building permit. Please review Section
106.3.5. Please complete the attached form.
In buildings having floors and roofs of wood frame construction, other than
dwelling or hotel occupancies, draft stop the area between the ceilins and roof above so that no concealed space exceeds 3,000 s.f. and no horizontal
dimension exceeds 60 L.F. (if space has sprinklers, then 9,000 s.f. and 100
L.F.). Section 708.
Provide truss details and truss calculations for this project. Specify on the plans
the truss identification numbers.
Specify nail size and spacing for roof diaphragm. Roof diaphragm nailing
schedule was not provided.
TITLE 24 DISABLED ACCESS
Provide notes and details on the plans to show compliance with the enclosed
Disabled Access Review List. Disabled access requirements may be more
restrictive than the UBC.
ADDITIONAL
Please clarify where in the structural calculations are the considerations for the
architectural reveal.
Please provide on the plans construction details for the tilt-up curved panels.
Please clearly show on plans for panels: 7, 8, 17 and 18 which are the holdowns
to be used (are they A, B, C or D).
Carlsbad 98-2545
August 31, 1998
26. Please clarify why? in the structural calculations (pages 6 and 7) are included
calculations for the 8” concrete wall shear capacity. Shouldn’t be included for a
6.5 concrete wall?
27. Additional corrections may follow.
28. See attached list for electrical corrections
To speed up the review process, note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet, note or detail number,
calculation page, etc.
Please indicate here if any changes have been made to the plans that are not a
result of corrections from this list. If there are other changes, please briefly
describe them and where they are located in the plans.
Have changes been made to the plans not resulting from this correction list?
Please indicate:
0 Yes 0 No
The jurisdiction has contracted with Esgil Corporation located at 9320
Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number
of 61 9/560-1468, to perform the plan review for your project. If you have any
questions regarding these plan review items, please contact Sergio Azuela at
Esgil Corporation. Thank you.
+ ELECTRICAL PLAN REVIEW + 1993 NEC
+ PLAN REVIEWER: Morteza Beheshti
29. On single line diagram provide overcurrent protection for panel feeders. NEC
230-208. Also no meter shown.
30. Show the available fault current ( Isc ) from the serving utility co. and at the
house panel “LP”.
Carlsbad 98-2545
August 31. 1998 - 31.
32.
33.
34.
35.
36.
37.
38.
39.
Show or note on the plans the method used to limit fault currents to 10,000 amps
on branch circuits. Show the fuse letters if used to limit fault current (i.e. , JJN,
A3T, LPN). Also note on the plans that circuit breakers used in the subpanels
will be listed for series combination with the current limiting main fuses or circuit
breakers.
Specify the wire type (AL or CU) and insulation (Le. THWN). NEC 310.
Show the grounding system required for service. NEC 250-24, 80(a), 81 (c).
Show the grounding electrode conductor size and wire type (ALICU). NEC 250-
94.
Specify the wiring method you intend to use for this project (Le., EMT, Metal
Flex, NMC etc.).
Complete the panel schedule on sheet E-I.
Note: If you have any questions regarding this electrical plan review list please
contact the plan reviewer listed above at (619) 560-1468. To speed the review
process, note on this list ( or a copy) where the corrected items have been
addressed on the plans.
PLUMBING, MECHANICAL AND ENERGY CORRECTIONS
PLAN REVIEWER: Erie Jensen
Each sheet of the plans must be signed by the person responsible for their
preparation, even though there are no structural changes. Business and
Professions Code.
PLUMBING (1994 UNIFORM PLUMBING CODE)
The Civil drawings do not match the plumbing drawings for water supply piping
routing. The Civil appears to be routed throughout he existing building, the
plumbing site shows a new water meter with the pipe routed through the parking
lot. Please make consistent.
The architectural sheet A-4 shows both a 6l and 4" diameter roof drain with 4 X
6 opening through the parapet wall, If a scupper is installed it must be 3 times
the area of the required roof drain. UBC 1506.3
Carlsbad 98-2545
August 31, 1998
Note: If you have any questions regarding this Plumbing, Mechanical, and
Energy plan review list please contact Eric Jensen at (619) 560-1468. To speed
the review process, note on this list (or a copy) where the corrected items have
been addressed on the plans.
DEPARTMENT OF STATE ARCHITECT NON RESIDENTIAL
TITLE 24 DISABLED ACCESS REQUIREMENTS
The following disabled access items are taken from the 1995 edition of California
Building Code, Title 24. Per Section 101.17.1 1, all publicly and privately funded public
accommodations and commercial facilities shall be accessible to persons with
disabilities as follows:
(1) Any building, structure, facility, complex, or improved area, or portions
thereof, which are used by the general public.
(2) Any sanitary facilities which are made available for the public, clients, or
employees in such accommodations or facilities.
(3) Any curb or sidewalk intended for public use that is constructed with
private funds.
(4) All existing accommodations when alterations, structural repairs or
additions are made to such accommodations.
NOTE: All Figures and Tables referenced in this checklist are printed in the California
Building Code, Title 24.
a SITE PLAN REQUIREMENTS
Please clearly show on plans the accessible routes of travel by lines of arrows
includinq the sloDe of the routes ( +-++ X% ++-+ 1
1. Clearly show that the site development and grading are designed to provide
access to all entrances and exterior ground floor exits, as well as access to
normal paths of travel, per Section 11276.1, Where necessary to provide
access, shall incorporate pedestrian ramps, curb ramps, stairways and
handrails, etc.
Plans show that more than one building is located on the proposed Site.
Accessible routes of travel shall be shown to be provided between buildings and
accessible site facilities, per Section 11276.1.
2.
Carlsbad 98-2545
August 31,1998
3. Show, or note that at every primary public entrance, and at every major function
area along, or leading to, an accessible route of travel, there is to be a sign
displaying the international symbol of accessibility. Signs are required to indicate
the direction to accessible building entrances and facilities, per Sections
11 178.5.7 and 11276.3.
a DISABLED ACCESS PARKING SPACES
a Please cross reference the correct detail for the disabled access parking
spaces on dans (Site Plan shows detail 2/A-2. and it should be 13/A-21,
0 CURB RAMPS
Please clearlv show full compliance on plans for all curb ramps included in
please revise the Title on detail 6/A-2 (plans show SUSPENDED CLG. it should
have CURB RAMPI.
the accessible routes of travel. Full comdiance will be rechecked. Also
4. Revise plans to show that curb ramps shall be constructed at each corner of a
street intersection or where a pedestrian way crosses a curb, per Section
11278.5.1.
0 WALKS AND SIDEWALKS
Please clearlv show full compliance on plans for all walks and sidewalks
included in the accessible routes of travel. Full compliance will be rechecked
5. If any proposed walks slope 4:20 (5%) they must comply with ramp
requirements of Section 1007, per Section 1023.3, Revise plans to show or note
requirements.
a PEDESTRIAN RAMPS
Please clearlv show full compliance on plans for all pedestrian ramw included
in the accessible routes of travel. Full compliance will be rechecked
e ENTRANCES AND CIRCULATION
6. Revise plans to show that all entrances, and exterior ground level exits, are
accessible, per Section 1001.9.1.
Carlsbad 98-2545
August 31,1998 . 7.
8.
9.
10.
11.
Show that an accessible route of travel is to be provided to all portions of the
building, to accessible building entrances and between the buildina and the
public way, per Section 11 146.1.2.
0 DOORS
Show, or note, that there is a level floor or landing on each side of all doors. The
floor or landing is to be <’A” lower than the doorway threshold, per Section
1004.9.1 a.
Show or note that all hand-activated door opening hardware meets the following
requirements, per Section 1004.3.1 :
a)
b)
Is to be centered 230” but S44“ above floor.
Latching, or locking, doors in a path of travel are operated with a single
effort by:
i) Lever type hardware.
ii) Panic bars
iii) Push-pull activating bars.
iv) Or other hardware designed to provide passage without the
requirement to grasp the hardware.
Show or note that the lower 10” of all doors comply with Section 1004.8.1, as
follows:
a)
b)
To be smooth and uninterrupted, to allow the door to be opened by a
wheelchair footrest, without creating a trap or hazardous condition.
Narrow frame doors may use a IO’ high smooth panel on the push side of
the door.
NOTE: Exception for automatic or sliding doors.
Provide a note on the plans that the maximum effort to operate doors, applied at
right angles to hinged doors or at center plane at sliding doors, per Section
1004.5.1, will be:
a) <8W# at exterior doors.
b) 15# for interior doors.
c) SI% where fire doors are required.
Carlsbad 98-2545
August 31, 1998
GENERAL ACCESSIBILITY REQUIREMENTS
SIGNAGE
12. Where permanent identification is provided for rooms and spaces, raised letters
shall also be provided and shall be accompanied by Braille. Section 11 178.5.
Provide a note on the plans stating that the signage requirements of Section
11 178.5 will be satisfied.
13.
END OF DOCUMENT
PLAN CHECK NUMBER: u& OWNER'S NAME: * *v-
I, as the owner, or agent of the Owner (contractors may
CedfY that I, Or the erchltectlenglnaer of iecord, will be responstblo lac employing the spscial Inspector(0) a$ mqulmd by UnHom Bulldlng Code (u5C) Sectlon 1701.1 for the construction project locsted et the &!e listed abve. UBC Sectlon 108.3.5.
employ me speclal Inspector),
.. .
f mrd, certifv that I have prepared the following special d by UBC Sedan 106,9.6 for the tbnsVuoUan pmjeot located at
#u-.& 4-w
the site llsted above,
I ..
Carlsbad 98-2545
August 31, 1998
VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad PLAN CHECK NO.: 98-2545
PREPARED BY: Sergio hela
BUILDING ADDRESS: 1825 Aston Avenue REFLEX INC. Office/Ind. Tilt-up
BUILDING OCCUPANCY: By F-1 & S-1
DATE: August 31, 1998
TYPE OF CONSTRUCTION: VN
TOTAL VALUE
I I I
333,600.00
Sheet 1 of 1
rnacvalue.doc 51%
,
The item you have submitted for review has been approved. The approval is based on plans,
information and/or specifications provided in your submittal; therefore any changes to these items after
this date, including field modifications, must be
reviewed by this office to insure continued conformance with applicable codes. Please review carefully all comments attached, as failure to comply with instructions in this report can result in
suspension of permit to build.
w Right-of-way permit is required prior to
construction of the following improvements:
-~ ~
Please se t e attached report of deficiencies
marked with . Make necessary corrections to plans or specificati s for compliance with applicable
codes and standards. Submit corrected plans and/or
specifications to this office for review.
.zg: * Date: * By: Date:
By: Date:
Recordation: E Right-of-way Permit Application
0 Right-of-way Permit Submittal Checklist Carlsbad Tract: and Information Sheet
0 Sewer Fee Information Sheet A4
@ HIWORDI~~St?~~P~.FmOarlsbad. CA 92009-3576. (760) 438-1 161 . FAX (760) -1-69
/ SITE PLAN
BUILDING PLANCHECK CHECKLIST
0 0 1. Provide a fully dimensioned site plan drawn to scale. Show:
roperty Lines
asements
ight-of-Way Width & Adjacent Streets
+ 3RD'
& Proposed Structures
Street Improvements
Driveway widths
2. Show on site plan:
\ erainage Patterns
1. Building pad surface drainage must maintain a minimum slope of one
perceni towards an adjoining street or an approved drainage course.
drainage of 2% to swale 5' away from building."
@ADD THE FOLLOWING NOTE: "Finish grade will provide a minimum positive
/' &xisting & Proposed Slopes and Topography
0 0 3. Include on title sheet: d
ite address R$ ssessor's Parcel Number
Legal Description
For commerciaVindustria1 buildings and tenant improvement projects, include:
total building square footage with the square footage for each different use,
existing sewer permits showing square footage of different uses (manufacturing,
warehouse, office, etc.) previously approved.
EXISTING PERMIT NUMBER DESCRIPTION
DISCRETIONARY APPROVAL COMPLIANCE
4a. Project does not comply with the following Engineering Conditions of approval for 0 0 Project No.
0 0 4b. All conditions are in compliance. Date:
2
BUILDING PLANCHECK CHECKLIST
DEDICATION REQUIREMENTS
5. Dedication for all street Rights-of-way adjacent to the building site and any storm
drain or utility easements on the building site is required for all new buildings and
for remodels with a value at or exceeding $ , pursuant to Carlsbad
Municipal Code Section 18.40.030.
Dedication required as follows:
&, ;NO/ 3RD/
0
Dedication required. Please have a registered Civil Engineer or Land Surveyor prepare the appropriate legal description together with an 8 %" x 11" plat map and submit with a title report. All easement documents must be approved and signed by owner(s) prior to issuance of Building Permit. Attached please find an application form and submittal checklist for the dedication process. Submit the completed application form with the required checklist items and fees to the Engineering Department in person. Applications be accept by mail or fax.
Dedication completed by: Date:
IMPROVEMENT REQUIREMENTS
6a. All needed public improvements upon and adjacent to the building site must be constructed at time of building construction whenever the value of the construction exceeds $ , pursuant to Carlsbad Municipal Code Section 18.40.040.
Public improvements required as follows:
0
Attached please find an application form and submittal checklist for the public improvement requirements. A registered Civil Engineer must prepare the appropriate improvement plans and submit them together with the requirements on the attached checklist to the Engineering Department through a separate plan check process. The completed application form and the requirements on the
checklist must be submitted in person. Applications by mail or fax are not accepted. Improvement plans must be approved, appropriate securities posted and fees paid prior to issuance of building permit.
Improvement Plans signed by: Date:
0 0 0 6b. Construction of the public improvements may be deferred pursuant to Carlsbad Municipal Code Section 18.40. Please submit a recent property title report or
we may prepare the necessary Future Improvement Agreement. This agreement
must be signed, notarized and approved by the City prior to issuance of a
Building permit.
Future public improvements required as follows:
current grant deed on the property and processing fee of $ so
3 (I.". l-
BUILDING PLANCHECK CHECKLIST
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
6c. Enclosed please find your Future Improvement Agreement. Please return
agreement signed and notarized to the Engineering Department.
Future Improvement Agreement completed by:
Date:
6d. No Public Improvements required. SPECIAL NOTE: Damaaed or defective
imDrovements found adiacent to buildina site must be reDaired to the satisfaction
of the Citv InsDector Drior to occuDancy.
GRADING PERMIT REQUIREMENTS
The conditions that invoke the need for a grading permit are found in Section
11.06.030 of the Municipal Code.
7a. Inadequate information available on Site Plan to make a determination on grading
requirements. Include accurate grading quantities (cut, fill import, export).
7b. Grading Permit required. A separate grading plan prepared by a registered Civil
Engineer must be submitted together with the completed application form
attached. NOTE: The Gradina Permit must be issued and rouah aradinq
. ~ aDDroval obtained Drior to issuance of a Buildina Permit.
Grading Inspector sign off by:
if a grading permit is not required.) Sakk +f.l.sh bd-9
Date:
@ Graded Pad Certification required. (Note: Pad certification may be required even
7d.No Grading Permit required.
7e.lf grading is not required, write "No Grading" on plot plan.
MISCELLANEOUS PERMITS
8. A RIGHT-OF-WAY PERMIT is required to do work in City Right-of-way and/or
private work adjacent to the public Right-of-way. Types of work include, but are
not limited to: street improvements, tree trimming, driveway construction, tieing
into public storm drain, sewer and water utilities.
Right-of-way permit required for:
BUILDING PLANCHECK CHECKLIST
4 H IwROIWCSICHKISm",u,~ PllnsMdc wn BPMOI Form JJ mr
A SEWER PERMIT is required concurrent with the building permit issuance. The
fee is noted in the fees section on the following page.
10. INDUSTRIAL WASTE PERMIT If your facility is located in the City of Carlsbad
sewer service area, you need to contact the Carlsbad Municipal Water District,
located at 5950 El Camino Real, Carlsbad. CA 92008. District personnel can
provide forms and assistance, and will check to see if your business enterprise is
on the EWA Exempt List. You may telephone (760) 438-2722, extension 153, for
assistance.
Industrial Waste permit accepted by:
Date:
0 w3
/
E/-0 0 11. NPDES PERMIT
Complies with the City's requirements of the National Pollutant Discharge
Elimination System (NPDES) permit. The applicant shall provide best
management practices to reduce surface pollutants to an acceptable level prior to
discharge to sensitive areas. Plans for such improvements shall be approved by
the City Engineer prior to issuance of grading or building permit, whichever
occurs first.
0 12. o/. Required fees are attached - . 0 No fees required
J0
5
.
ENGINEERING DEPARTMENT
FEE CALCULATION WORKSHEET
stimate based on unconfirmed information from applicant.
Calculation based on building plancheck plan submittal.
Address: 1 &?5' Jhh Bldg. Permit No. Cg 9&7.55'.'7
Prepared by: cp Date: 911 L/98 Checked by: Date:
EDU CALCULATIONS: List types and square footages for all uses. '2Ao-4gm EDU's: 2.m Types of Use: L~~WUSQ Sq. Ft.lUnits:
e- SGOU -l-J+U)o
Types of Use: Sq. FtJUnits: EDU's:
ADT CALCULATIONS. * List types and square footages for all uses.
Types of Use: -~+J&z Sq. Ft.lUnits: A- (
Types of Use: Sq. Ft.Nnits: ADT's:
WITHIN FEESRE=UIRE2 CFD: ES (no . bndge . & thoroughfare fee in District #I, reduced Traffic Impact Fee) 0 NO
/a+ PDT's: 60 5 A.bu d-nu d4C-L.p
f$, 1. PARK-IN-LIEU FEE PARK AREA & I:
X NO. UNITS
ADT'sNNITS: 60 X FEE/ADT: gc? =$ 1x0 $h 3. BRIDGE AND THOROUGHFARE FEE (DIST. #l - DIST. #2 - DIST. #3 - 1
ADT'sNNITS X FEEIADT:
0/4/;AciLiTiES MANAGEMENT FEE ZONE: 5
&EWER FEE
UNITISQ.FT.:& rrpro x FEEISQ.FT.NNIT: . Yn =$ q80n
PERMIT No. s f?%O/B 3
X FEE/EDU:/&)SL/ =s YY 50
X FEEIEDU: /070 =$ 2568
DRAINAGE BASIN:
/& 6. SEWER LATERAL [$2,500) @ 7. DRAINAGE FEES PLDA HIGH /Low
ACRES X FEEIAC:
TOTAL OF ABOVE FEES*: SI-2 Lm
*NOTE This calculation sheet ism a complete lii of afl fees which may be due.
Dedications and Improvements may also be required with Building Permits.
REV 7/19/98
PLANNING DEPARTMENT
BUILDING PLAN CHECK REVIEW CHECKLIST .
Planner Grea Fisher Phone (61 9) 438-1 161, extension 4328
APN: 212 -/2v*/,&
Type of Project and Use: 5?dd j. ( f ,“A
Zone: c-M Facilities Management Zone: 5’
CFD (inlout) #
Circle One Iff propeny In. complete SPECIAL TAX CALCULATION WORKSHEET provided by Building
Department.)
Leaend
Item Complete
Item Incomplete - Needs your action
TYPE _. $‘ !$ Environmental Review Required: YES - NO
DATE OF COMPLETION:
Compliance with conditions of approval? If not, state conditions which require action.
Conditions of Approval
TYPE - Discretionary Action Required: YES - NO
APPROVALIRESO. NO. DATE
PROJECT NO.
OTHER RELATED CASES:
Compliance with conditions or approval? If not, state conditions which require action.
Conditions of Approval
Coastal Zone AssessmentlCompliance
Project site located in Coastal Zone?
CA Coastal Commission Authority? Y.ES- NO
if California Coastal Commission Authority: . Contact them at - 31 11 Camino Dei Rio North, Suite
200, San Diego CA 92108-1725: (619) 521-8036
Determine status (Coastal Permit Required or Exempt):
Coastal Permit Determination Form already completed?
If NO, complete Coastal Permit Determination Form now.
Coastal Permit Determination Log #:
Follow$’p Actions:
1 ) ,$tamp Building Plans as ”Exempt” or “Coastal Permit Required” (at minimum
Floor Plans).
) Complete Coastal Permit Determination Log as needed.
- YES - NO
-
- YES- NO
’.
/
- lnclusionary Housing Fee required: YES __ NO
(Effective date of lnclusionary Housing Ordinance - May 21, 1993.)
Date Entry Completed? YES __ NO
I -
Site Plan:
[7 1. Provide a fully dimensional site plan drawn to scale. Show: North arrow,
property lines, easements, existing and proposed structures, streets, existing
street improvements, right-of-way width, dimensional setbacks and existing
topographical lines.
0 2. Provide legal description of property and assessor's parcel number. P? 1 Zoning:
1. Setbacks:
Front:
Int. Side:
Street Side:
Rear:
Required Shown
Required Shown
Required Shown
Required Shown
0 2. Accessory Structure Setbacks:
Front: , Required Shown
Required Shdwn
Required Shown
/ Rear: Required jShown
sz:;de :
3. Lot Coverage: Required fw#Shown 33&
4. Height: Required / '5- Shown L?5-
5s- 0 0 5. Parking: Spaces Required 57 Shown
Guest Spaces Required Shown -
D mED ML??OUQ9 cmsw e
(./?-if5 Kl&W
OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER -HZZ--mTE
d& 98290
e Bureau of Prevention rlsba City o f Ca
Fire Department
Review 1 st 2nd 3rd
CFDJoM 98290 File#
Other Agency ID
Plan Review: Requirements Category: Building Plan Check
-
Date of Report: Monday, December 21, 1998
Contact Name ATS Archltecture
Address 1094 Cudahy PI #I16
City, State San Diego CA92110
Reviewed by:
ddg. Dept. No. CB982545 Planning No.
Job Name Spec Warehouse
Job Address lBd Aston Ste. or Bldg. No. ‘j 3)’
Approved - The item you have submitted for review has been approved. The approval is
based on plans; information and/or specifications provided in your submittal;
therefore any changes to these items after this date, including field modifica-
tions, must be reviewed by this office to insure continued conformance with
applicable codes. Please review carefully all comments attached, as failure
to comply with instructions in this report can result in suspension of permit to
construct or install improvements.
0 Disapproved - Please see the attached report of deficiencies. Please make corrections to
plans or specifications necessary to indicate compliance with applicable
codes and standards. Submit corrected plans and/or specifications to this
office for review.
2560 Orion Way Cerlsbad, California 92008 (619) 931-2121
-. .
.... ....... ..... c .<.:. '. .,I\..' , ,-,::,,, "* . ._ ., mo - ,, . ,,.. - . . /, .;,: .. .. , I.., ......
98290 . Bureau of Prevention rlsbad City o f Ca Fire Department
Plan Review: Requirements Category: Building Pian Check
Date of Report: Thursday, November 12,1998 Reviewed by: 0. bGeL
Contact Name ATS Archliecture
Address
City, State
1094 Cudahy PI #I 16
Sari Diego CA 921 10
Planning No.
Job Name Spec Warehouse
Job Address 1825 Aston Ste. or Bldg. No.
Approved - The item you have submitted for review has been approved. The approval is
based on plans; information and/or specifications provided in your submittal;
therefore any changes to these items after this date, including field modifica-
tions, must be reviewed by this office to insure continued conformance with
applicable codes. Please review carefully all comments attached, as failure
to comply with instructions in this report can result in suspension of permit to
construct or install improvements.
0 Disapproved - Please see the attached report of deficiencies. Please make corrections to
plans or specifications necessary to indicate compliance with applicable
codes and standards. Submit corrected plans and/or specifications to this
office for review.
For Fire Department Use On&
Review 1 st 2nd 3rd
CFDJoM 98290 File#
Other Agency ID
2560 Orion Way Carlsbad, California 92008 (619) 931-2121
98290
Bureau of Prevention
rlsbad City o f Ca Fire Department
Plan Review: Requirements Category: Building Pian Check
Date of Report: Monday. October 5,1998 Reviewed by: 6. 3d-L
Contact Name ATS Architecture
Address
City, State
41 80 Ruff in Rd Ste 230
San Diego CA 92123
Bldg. Dept. No. CB982545
Job Name Reflex
Job Address 1825 Aston Ste. or Bldg. No.
Planning No.
0 Approved - The item you have submitted for review has been approved. The approval is
based on plans; information and/or specifications provided in your submittal;
therefore any changes to these items after this date, including field modifica-
tions, must be reviewed by this office to insure continued conformance with
applicable codes. Please review carefully all comments attached, as failure
to comply with instructions in this report can result in suspension of permit to
construct or install improvements.
Disapproved - Please see the attached report of deficiencies. Please make corrections to
plans or specifications necessary to indicate compliance with applicable
codes and standards. Submit corrected plans and/or specifications to this
office for review.
For Fire Department Use Only
Review 1st 2nd 3rd
CFDJoM 98290 File#
Other Agency ID
2560 Orion Way Carisbad, California 92008 (619) 931-2121
98290 . Bureau of Prevention rlsbad City o f Ca Fire Department
Plan Review: Requirements Category: Building Plan Check
Date of Report: Friday, August 21, 1998
Contact Name Bob Sukup
Reviewed by:
Address 4322 Sea Bright PI
City, State Carlsbad CA 92008
Bldg. Dept. No.
Job Name Reflex
Job Address 1825 Aston Ste. or Bldg. No.
C.4 '?fQ(Y$lanning No.
0 Approved - The item you have submitted for review has been approved. The approval is
based on plans; information and/or specifications provided in your submittal;
therefore any changes to these items after this date, including field modifica-
tions, must be reviewed by this office to insure continued conformance with
applicable codes. Please review carefully all comments attached, as failure
to comply with instructions in this report can result in suspension of permit to
construct or install improvements.
Disapproved - Please see the attached report of deficiencies. Please make corrections to
plans or specifications necessary to indicate compliance with applicable
codes and standards. Submit corrected plans and/or specifications to this
office for review.
For Fire DeDartment Use Onlv
Review 1 st 2nd 3rd-
CFDJoW 98290 File#
Other Agency ID
I I
2560 Orion Way Carlsbad, California 92008 (619) 931-2121
SOLORIO AND ASSOCIATES STRUCTURAL -CONSULTANTS
ANSWERS TO STRUCTURAL PLAN CHECK COMMENTS
DATE: September 17, 1998
PLAN FILE No.: Carlsbad 98-2545
PLAN CHECKER: Sergio Azuela
ITEM
16.
17.
18.
20.
21.
23.
24.
25.
26.
L
The slab information is shown on sheet 5-2 of the drawings, i.e. slab thickness, reinforcing
and underlayment. The building pad thickness is noted on sheet S-I of the drawings under
"Foundation and Slab Notes", for more building pad information we refer the contractor to
the soils report.
Please see attached calculation page RI.
Architect to provide form.
Please see attached truss calculations, page R24 and R25. Please see plans for truss
identification.
Please see revised sheet S4 for nail size and spacing for roof diaphragm.
The architectural reveals occur near the top of the tiltup panels, the tiltup design is at the
mid-height of the panel and does not affect the thickness of the panel at this point.
Calculations as shown are correct.
The curved wails are not tiltup panels, the walls are C.I.P. concrete. The reinforcing of the
walls is shown on S3. The details refer to this wall as C.I.P. not tiltup.
Please see revised panel elevations, panels 7, 8, 17 and 18.
Please see attached calculations for 6 112" thick panels, pages R2 thru R23.
108 WEST le- ST TLL: 10561 63 1. I500
MISSION. TEXAS 78572 F.X: 10561 584-7407
.Oi0*!C@.sT. YT cow E.4 'i ,.
SOLORIO AND ASSOCIATES STRUCTURAL - CONSULTANTS
Job#: 98206 Tic Reflex Designer: ss Date: Sept98 Description:
Scope New Building F4
WALL ANCHORAGE
cp wall
Cp parapet
Height of wall
Height of parapet
Thickness of wall
Weight of Concrete
Center one half increase
Typ. Line A,G
1.5
Force per foot 306 Ibs
Anchor Force at 8 feet O.C. 2447 Ibs
Anchor Force at 4 feet O.C. 1223 Ibs
Ibs
At center one half of dia
Force per foot 459 Ibs
Anchor Force at 8 feet O.C.
Anchor Force at 4 feet O.C. 1835 Ibs
Use
Use IpA128I
3670
Use -1
Use (PA1351
CROSS-TIES Fg: Depth of diap.
Width of diap.
Diap. Ratio 2.0 o.k
Max Diap. Ratio 4.0
Total Shear 4894 Ibs
Shear per foot 306 #Iff
Allowable Shear per foot -1 #In
Chord Force 2447
Use note on purlin sched.
At center one half of dia
Depth of diap.
Width of diap.
Diap. Ratio 1.3 o.k
Max. Diap. Ratio 4.0
Total Shear 7341 Ibs
Shear per foot 306 #/ft
Allowable Shear per foot #/ft
Chord Force 2447
Use note on purlin sched.
Typ. Line 1, 5 pift
1.5
306 Ibs
2447 Ibs
1223 Ibs JPAIJSI
Ibs
459 Ibs
3670
1835 Ibs
El
IPA135]
Ift
In
1.0 0.k
4.0
1223 ibs
153 Wft 3201 #in
306
0.k.
1.0 0.k
4.0
1835 Ibs
229 #/n
459
3201 #/n
0.k.
n \my?, ALL RIGHTS RESERVED COPIRiGm 1m 0
SOLORIO AND ASSOCIATES STRUCTURAL - \ CONSULTANTS
Title Reflex Jab# SS206 Designer: JS Date: Sep1'98 Description:
Scope New Building PZ
DESIGN VALUES, cont
CAPACITY OF 6 112" CONCRETE WALL
Section 1911.1.1 V, c +v,
V" =vc+vs
V" = 4vc+ +vs
Section 191 1.10.3 Nominal Shear Strenght, V,
vn = 10 (f'c)05 hd
= (10)(3000)05 (6.5") (12") (0.8) = 34178 #Iff
Nominal Shear Strenght, V,
vn = 8 (f'c)05 A, = (8)(3000)05 (3.625") (12") = 19061 #Iff
Section 1921.4.6
Section 1921.6.4.2 V, =A,[2(f~)~~+p~f,,]
V" vn = 11290 Ibs
For design for horizontal shear forces in plane of wall, d shall be taken equal to
0.81,
Unless a more detailed calculation is made in accordance with Section 1911.10.6,
shear strenght V, shall not be taken greater than: vc = 2 (f'c)05 hd
= (2)(3000)05 (6.5") (12) = 0544 IbsKt
= (3.625~12) [ 2 (3000)05 + 0.0025 x 60000 ]
Section 1911.10.4
Section 1911.10.5
Section 1911.10.8 Should Vu > + V, 12 shearwall reinforcing per section 1911.10.9 of the code
Should Vu > + V, the value of V, should be determined by the following expression:
V,= &fyd I s2
Section 1921.2.7 Load factors
U = 1.4 (D+L+E)
U = 0.9D + 1.4E
Section 1921.6.5.1
Section 1921.3 4 = 0.85
Strenght-reduction factor +* per Section 1909.3
SOLORIO 7 AND ASSOCIATES
STRUCTURAL \ - CONSULTANTS
Tie Renu Job#: 88205 Designer: ss Date: Sept '98 Description :
n3 Scope New Building
DESIGN VALUES, cont
CAPACITY OF 6 1/2" CONCRETE WALL, cont.
Section 1921.6 Shear Walls
Section 1921.6.2 Reinforcement
Section 1921.6.2.1 Minimum reinforcing ratio = 0.0025, longitudinal and transverse direction
= (0.0025) (6.5) (12) = 0.195 in2 #4 at 14" O.C. each way minimum or
(2) #4 at 14" O.C. each way minimum
Section 1921.6.2.2 Provide two curtains of reinforcement if the in-plane factored shear force exceeds
~ACV(~C)~~
For one layer of reinforcing;
V" = (2)(3000)05 (3.625) (12) (0.8)
= 3812#/ft
Provide standard hook engaging the edge reinforcement terminating at the edges
of shear walls if V, in the plane of the wall exceeds Acv(fc)05
V" = (3000)0S (5) (12")(0.8)
= 2629#/ft
Section 1921 3.2.3 Special Transverse reinforcement for sheanvalls.
Not required if maximum extreme fiber stress c 0.2 fc
Fu = (1.4) (4889 #/ft) ( ) /(8/12)
0.2fc = (0.2) (3000)
= 130 psi
= 600 psi > 130 psi ; O.K. No boundary member required
SOLORIO . 7 AND ASSOCIATES STRUCTURAI \ . .. ., - - C 0 N S ULTANTS
liik Reflex Job# 98205 Designer: ss Date: Sept'98 Description:
Scope New Building
Pcj
SHEARWALLS
Ib Ib . Ib Ib Ib Ib Ib Ib pcf = - psf = - plf = - psi=- pcf = - si z in.in psf = - plf =- PSIS-
f? fl in2 f13 R2 R in2 fl3
t = 6.5.in d = 12.in f = 3000.psi f = 60000.psi
0 = 0.85 V = 2.,61.d.t V = 8544- Ib
ft fl
Line A,
V = 47397.lb Vf = 0.lb
Lp = 36.5.fl
Vf V ,,f 1.4.- Vr v ur '= 1.4. L p.o.80 L p.o.8
v = 2272.plf v ,,f = 0-plf
Seismic Load
Total length shearwalls
v ss = O.v V ss = 7263 -plf
SOLORIO - . AND ASSOCIATES
STRUCTURAL C 0 N S U LTANTS
Tic Reflex Job# 88206 Designer: ss Dde: Sepi'98 Description:
Scope New Building
Line A
Individual Panel Shear
L~~ = 28.n
Hp = l9,R
H ps = i7.n
Section 1911.10.9 Design of Horizontal Reinforcing
Individual Panel Length
Height of panel
Height of lateral force at floorhoof H psf = 0.n
Rebar Area's
A, = 0.31.s.i
A, =1 Number of layers
Area of steel
@fy.AV.A ,
s2 = s = -38.017 -in Vu-@V,
- size Area in in-2 3 0.1 1
5 0.31
6 0.44
7 0.60
8 0.79
9 1 .oo
s h '= 14.in horizontal spacing of Rebar
ro h = 0.0034 >0.0025 min. permitted per code, O.K.
Use #5 horizontal at 14" O.C.
Design of Vertical Reinforcing
H' ro n '= 0.0025 7 0.5. 2.5 - (r0 h - 0.0025) i \ LPS:
L ps = 28.R
ro = 0.0033 0.0025 min. permitted per code, O.K.
ro = 0.0025
A = 0.31.si Rebar Area's
size Area in in-2
An =1 Number of layers 3 0.1 I
sl'=- A v.A n
4 0.20
5 0.31
6 0.44
a 0.79
9 1 .oo
s 1 = 19.08-in 7 0.60 t.ro
Use #5 vertical at 14" O.C.
ALL RIGHTS RESERVED COPYRIGHT 1898 0 n \M*,kaM0"0\88X)5 w
SOLORIO AND ASSOCIATES STRUCTURAL - CONSULTANTS
Ti Reflex Job#: 88206 Designer: ss Date: Sept'98 Description:
Scope New Building
Line A
Check Panel Overturning
Lp = 28.R
H = 19.R
H ps = 17.R H psf = 0 fl
L rp = 8.R
Lpo = 15.R
Lps = Lp- L
w = 15.psf Wf = O.psf
Lfp = 0.R
Lpof = 0.R
H 7.5.~ H pof = 0.R
L ps = 13-R PO
Wp = 82.psf
0.80.v 0.80,~
.L ps.H ps - 1.4 1.4
uf.L .H PS PSf OT =
Total Panel Length
Height of panel
Height of lateral force at floorlroof
Length of purlins supported by wall
Height of openings
Length of openings
Panel Length available for shearwall
Weight of panel
Weight of roof, floor
OT = 286979.1.lb-R
P L -Wr.Lrp.0.5.L .L *WfLfP.0.5.LP.L RM= W P\ .iH P .L P -Hpo~Lpo-Hpo~Lpo~)~ PP
2
RM = 505106-1b.R
OT - 0.85.RM UPL =
LP
UPL = 5084.lb
Uplift O.K.
SOLORIO 7 AND ASSOCIATES STRUCTURAL - c o N s u L T-A N T S
TiUe Refkx Job* 98206 Designer: ss Date: Sept '98 Description:
scope New Building
Line A
Section 1921.6.5 Design of Shearwalls for Flexural and Axial Loads
Item 1
Ag = t.- PS
2
P = 0.10.A g.(f c)
OT RM ' 0.8.Lp
A = 507d
P ua = 152100.lb
P = 35361 .Ib
Pu c Pua ; O.K.
Item 2
Or
Item 3
Vu C 3'lWh'fc~0.5
t 12 0.5 Vu, =3.--.--.3000 .Ib in
Ib V ua = 12817.- n
Ib V = 2272.- ft .. Vu c Vua: O.K.
NO Shear wall boundary zone detail requirements as defined in Section 1921.6.5.6
not required.
ALL RIGHTS RESERVED COPYRIGHl1898 0 uw~,l~wmwam mnar\8sms wd
SOLORIO I-
AND ASSOCIATES STRUCTURAL - \ CONSULTANTS
Title Reflex Job# 98205 Designer: ss Date: Sepi'98 Description:
Scope New Building
l2Y
SHEARWALLS
Ib Ib . Ib Ib Ib Ib Ib Ib pcf = - pSf = - plf = - psis- pcf = - si = in.in psf = - plf - PSI=- f? n in2 n3 f? n in2 n3
t = 65in d = 12.in f = 3000. psi f = 60000.psi
Ib V = 8544.- 0 = 0.85 vc = 2.$5.d.- t R n c
Line p,
V = 43623.1b V f = 0.lb
L~ = 38.n
Vf Vuf = 1.4.- Vr v ur : 1.4. L p.0.80 L p.0.8
v = 2009*plf v uf = 0-plf
Seismic Load
Total length shearwalls
v s5 '= O.v V ss = 7263 plf
SOLORIO AND ASSOCIATES STRUCTURAL - CONSULTANTS
Title Reflex Job# 98206 Designer: 85 Date: Sept'98 Description:
Scope New Building
Line A
Individual Panel Shear
L ps = 13.R
H = 19.R Height of panel
H ps = 17.R
Section 1911.10.9 Design of Horizontal Reinforcing
Individual Panel Length
H psf 7 0.R Height of lateral force at floorlroof
Rebar Area's
A = 0.31.si Area of steel
A, =I Number of layers
O.f y.A ,.A 52 '= v " - O.v s = -36.1 11 -in
* Area in in-2
3 0.1 1
4 0.20
5 0.31
6 0.44
7 0.60
8 0.79
9 1 .oo
s = 14.in horizontal spacing of Rebar
Design of Vertical Reinforcing
ro = 0.0034 >0.0025 min. permitted per code, O.K.
Use #5 horizontal at 14" O.C.
ro = 0.0025 + 0.5. iH j2.5 - $1. (ro ,, - 0.0025)
PS
Lps = 13-R
ro , = 0.003 0.0025 min. permitted per code, O.K.
ro '= 0.003
A = 0.31.si
A, =l Number of layers
s 1 = 15.9 -in
Rebar Areah
3 0.1 1
4 0.20
5 0.31
6 0.44
7 0.60 a 0.79
9 1 .oo
si?& Area in in2
Use #5 vertical at 14" O.C.
SOLORIO , AND ASSOCIATES STRUCTURAL \ - CONSULTANTS
TMe Reflex Job# 98205 Designer: ss Date: Sept'98 Description:
Scope New Building
G Line R
Check Panel Overturning
Lp = 13.R
H 7 19.R
H ps = 17.R
Lrp = 8.R
Lpo = 0.R
Lps Lp- L
H = 0.R
PO
W = 82,psf
w = 15.psf
Total Panel Length
Height of panel
Height of lateral force at floorlroof
Length of purlins supported by wall
Height of openings
Length of openings
Panel Length available for shearwall
Weight of panel
Weight of roof, floor
H psf = 0.R
Lfp = 0.R
H pof = 0.R
Lpof = 0.R
L ps = 13-ft
Wf -0.psf
0.8O.v 0.8O.v OT = 1.4 OT = 253702.18-lb*R
P \.L + w ,.L rp.0.5.L p.L + w f.L fP.0.5. L p.L w p' (H p.L p - H p0.L PO - H p0f.L pof, p
2 RM '=
RM = 136721-1b-ft
OT - 0.85-RM UPL =
LP
UPL = 10576-lb
USE l3AlSDl min.
SOLORIO AND ASSOCIATES STRUCTURAL CONSULTANTS
Job# 88205 Title Reflex Designer: ss Date: Sept'98 Description:
Scope New Building
PI I
G.
Line A
Section 1921.6.5 Design of Shearwalls for Flexural and Axial Loads
Item 1
Ag = t.- PS
2 A = 507-in2 9
P = 0.10.A g( . fc> P = 152100.lb
OT - RM P, = 0.8.L P , = 37541 -1b
Pu c Pua ; O.K.
Item 2
Or
Item 3
Vu 3'lw*hTcA0.5
t 12 0.5 vu, = 3.--.--.3000 .Ib in ft
Ib V = 12817.- ft
Vu = 2009.- Ib
R .. Vu c Vua; O.K.
NO Shear wall boundary zone detail requirements as defined in Section 1921.6.5.6
not required.
ALL RIGHTS RESERVED. COPYRIGHT leoB 0 n \m*r~\.Mono\os2m - xpd
SOLORIO AND ASSOCIATES STRUCTURAL
CONSULTANTS
TiUe Reflex Job# 98205 Designer: 6s Date: Sept'98 Description:
Scope New Building
SHEARWALLS
Ib Ib . Ib Ib Ib Ib . Ib Ib pcf = - psf = - plf = - psi=- pcf = - si = in.in psf =- plf =- PIS-
f? R in2 fl3 r12 R in2 R3
t = 65in d = 12.in f = 3000.psi f = 60000.psi
V := 2.fii.d.- vc= 8544.- Ib 0 := 0.85 R n
I Line A,
V .= 37873.lb V := O.Ib
Lp = 156.R
Seismic Load
Total length shearwalls
Vf Vuf 1.4.- Vr v uI = 1.4. L p.o.80 L p:o.8
v = 425 'plf vuf=O.plf
Vr'Vf
L p.o.8 Vu = 1.4. V = 425 'plf c Vss ; O.K.
v s5 '= O.v V ss = 7263 - plf
AU RIGHTS RESERVED COPYRIGHT ,808 0 H wrFFllarWTmLEs2fE mnmw82s w
SOLORIO c-
AND ASSOCIATES STRUCTURAL
CON 5 U LTA NTS
We Reflex Job#: 98205 Designer: ss Date: Sept'98 Description:
Scope New Building
m3
I Line b
Individual Panel Shear
L~~ = 32.n
H = 19.R Height of panel
H ps = i7.n
Section 1911.10.9 Design of Horizontal Reinforcing
A, = 0.31.si Area of steel
Individual Panel Length
H psf 0.n Height of lateral force at floorlroof
Rebar Area's
3 0.1 1
&e Area in in-2
A, =1 Number of layers 4 0.20
5 0.31
6 0.44
7 0.60
8 0.79
9 1 .oo
s h '= 14.in horizontal spacing of Rebar
Design of Vertical Reinforcing
ro h = 0.0034 >0.0025 min. permitted per code, O.K.
Use #5 horizontal at 14" O.C.
ro := 0.0025 + 0.5. 2.5 - - . (ro h - 0.0025) i: 2 L ps = 32.R
ro = 0.0034 0.0025 min. permitted per code, O.K.
ro .= 0.0034
A, = 0.31.si
An:= 1 Number of layers
s 1 = 14.03-in
Rebar Area's
3 0.1 1
4 0.20
5 0.31
6 0.44
7 0.60
0 0.79
9 1 .oo
- Sue Area in in-2
Use #5 vertical at 14" O.C.
SOLORIO -
AND ASSOCIATES STRUCTURAL
C 0 N S U LTANTS - \ Job* 98206 Tie Reflex Designer: 6s Date: Sept'98 Description:
Scope New Building
e4.l
I
Line R
Check Panel Overturning
Lp = 32.R
H = 19.R
H ps = 17.R H psf = 0.R
LrP = 8.R Lfp =O.R
Lpo = 12.R Lpof = 0.R
Lps -Lp-Lpo L ps = 20.R
w = 15.psf Wf = O.psf
H = 12.R H pof = 0.R
-
Wp = 82.psf
0.80.~ 0.80.~
.L ps.H ps + 1,4 OT = 1.4
Total Panel Length
Height of panel
Height of lateral force at floorhoof
Length of purlins supported by wall
Height of openings
Length of openings
Panel Length available for shearwall
Weight of panel
Weight of roof, floor
OT = 82543.72-lb-ft
P w p. (H p.~ - H po.~ - H pof' L pof).L + w ,.L ,p.o.s. L .L + w r~ fp.o.5. L p.~ RM = PP
2
RM = 639488-lb-ft
OT - 0.85.RM UPL =
LP
UPL = -14407.lb
Upli O.K.
ALL RlGhTS RESERVED COPlRlGHT 1888 0 H w~,l~wnossms nRByuuDs w
SOLORIO AND ASSOCIATES STRUCTURAL CONSULTANTS
rile Reflex Job# 88205 Designer: ss Date: Sept'98 Description:
Scope New Building
as-
I
Line rl
Section 1921.6.5 Design of Sheatwalls for Flexural and Axial Loads
kern I
A = 780.in2
P ua = O.lO.Ag.(fc) P = 234000.lb
OT + RM
- 0.8.Lp
Item 2
Or
Itern 3
Vu e 3'lw'h"fcA0.5
V ua .= 3.--.--.3000 t 12 0.5 .Ib in ft
P = 28204-Ib
Pu e Pua ; O.K.
Ib V ua = 12017.- n
Ib Vu = 425.- R Vu e Vua; O.K.
No Shear wall boundary zone detail requirements as defined in Section 1921.6.5.6
not required.
SOLORIO AND ASSOCIATES STRUCTURAL
7 CON 5 U LTANTS
Tile Reflex Job#: 88206 Designer: SI Date: Sept'98 Description:
Scope New Building
el b
SHEARWALLS
psf =- Ib plf =- Ib PIE- . Ib pcf = - Ib psf = - Ib plf = - Ib psis- Ib pcf = - Ib si = iwin
f? n in2 n3 f? R in2 n3
t = 6.5.in d 12.in f = 3000. psi f = 60000.psi
Q, '= 0.85 V 2.v6.d.1 V = 8544.- Ib
n n
Line 5,
V 37873,lb Vf = 0.lb
Lp = 124.R
Seismic Load
Total length shearwalls
v = 534 'plf v uf = 0-plf
Vr-Vf
L p.o.8 V '= 1.4. v = 534 'plf c Vss ; O.K.
v ss = Q,.v V ss = 7263 'plf
ALL RIGHTS RESERVED, COWRlGtn 1981) 0 H WyFlkkokmWx6 - wd
SOLORIO AND ASSOCIATES STRUCTURAL
C 0 N S U LTANTS
TiUe Reflex Job# 98205 Designer: ss Date: Sept'98 Description:
Scope New Building
Line 5
Individual Panel Shear
L~~ = 32.n
H = i9.n
H ps = i7.n H psf = 0.n
Section 1911.10.9 Design of Horizontal Reinforcing
A = 0.31.si Area of steel
A, =I Number of layers
0.f y.A ,.A , 52 = v " - @V
Sh = 14.in
Design of Vertical Reinforcing
s 2 = -28.197 .in
Indh al Pant Length
Height of panel
Height of lateral force at floorlroof
Rebar Area's
3 0.1 1
4 0.20
5 0.31
6 0.44
7 0.60
8 0.79
9 1 .oo
- Size Area in in-2
horizontal spacing of Rebar
ro h = 0.0034 >0.0025 rnin. permitted per code, O.K.
Use #5 horizontal at 14" O.C.
ro = 0.0025 - 0.5. 2.5 - - . @ - 0.0025) il LHJ
L~ = 32.n
ro , = 0.0034
ro , = 0.0034
A = 0.31.si Rebar Area's
0.0025 rnin. permitted per code, O.K.
A, =1 Number of layers
s 1 = 14.03-in
- Size Area in in-2
3 0.1 1
4 0.20
5 0.31
6 0.44
7 0.60
8 0.79
9 1 .oo
Use #5 vertical at 14" O.C.
SOLORIO AND ASSOCIATES S T R U C.T U R A L
CON 5 U LTA NTS
Job* 88205 Title Reflex Designer: ss Date: Sep1'98 Description:
scope NCW Building
8
Line 5
Check Panel Overturning
L~ 5 28.n
H = i9.n
H ps = i7.n H psf = 0.R
= 32.n Lfp =o.n
H = 7.17 H pof = 0.R
L~~ = 15.11
Lps = Lp- L
w, = 15.psf
Lpof = O.ft
L ps = 13-R PO
Wp = 82.psf
Wf = 0.psf
0.8O.v 0.8O.v
.L ps.H ps - 1.4 1.4 OT :=
Total Panel Length
Height of panel
Height of lateral force at floorlroof
Length of purlins supported by wall
Height of openings
Length of openings
Panel Length available for shearwall
Weight of panel
Weight of roof, floor
OT = 67499.46-1b-R
W p' (H p.L - H po.L - H pof' L pof). L RM = r rp PP W .L .0.5.L .L + W fL fp.05L p.L
2
OT - 0.85.RM UPL =
LP
RM = 584276-lb-R
UPL = -15326.Ib
Uplii O.K.
SOLORIO -
AND ASSOCIATES STRUCTURAL
C 0 N S U LTANTS \ -
Title Rem Job* 98205 Designer: ss hts: Sept '98 Description:
Scope New Building
Line 5
Section 1921.6.5 Design of Sheatwalls for Flexural and Axial Loads
Item 1
PS
2 A 9 '= t.-
P = O.lO.Ag.(f c)
OT + RM P, = 0.8.L
Item 2
Or
Item 3
Vu c 3"lw"h'fcA0.5
t 12 0.5 V '= 3.--.--.3000 .Ib in R
Ib
R vu = 534.-
A = 507d
P = 152100-lb
P , = 29097-lb
Pu c Pua ; O.K.
Ib V = 12817.- ft
Vu c Vua; O.K.
No Shear wall boundaly zone detail requirements as defined in Section 1921.6.5.6
not required.
ALL RIGWTS RESERVED COWRIGHT 1888 0 H lMfi,!d&u&mE - wd
SOLORIO AND ASSOCIATES STRUCTURAL - CON 5 U LTA NTS
TRle Reflex Job#: 98205 Designer: ss Date: Sept'98 Description:
Scope New Building
SEISMIC FORCES
Seismic Zone: 4
V = Z I C W,/ R, z= 0.40
I= 1.00
C= 2.75 R= 6
V= 0.183 W,
E-W Direction
[(I3 ps9 (175 ft) + (17/2+ 2)(82 psf)(Z) ] (0.183) = 731 Ibs/ft (3997 Ibs/ft)
N-S Direction
[(I3 psf) (96 ft) + (17/2+ 2)(82 psQ(2) ] (0.183) = 543 Ibs/ft (2970 Ibslft)
[(I3 PSf) (40 ft) + (17/2+ 2)(82 psf)(2) ] (0.183) = 411 Ibs/ft (2242 Ibs/ft)
ALL RIGHTS RESERVED. COPYRIGHT 1- 0 H-Wp,~~owx€ - rpa
FlROUZl
CONSULTING
ENGINEERS, INC.
Tile : Reflex
Dsgnr: 85
Description :
Job # 98205
Date:
Scope : New Building E2 I
I Horizontal Plywood Diaphragm c
Description diap
1 General Information I
North-South Length 96.00 n Diaphrgm Weight 0.00 psf
EaseWest Length 186.00 n Seismic Factor 1 .oooo
Nort-South Chord 64.00 n Diaphragm is Blocked
East-West Chord 175.00 n Blocking Direction North-South
Boundary Loads Acting North & South 1 I #1 587.00 wn from o.ooon to 0.000 n
#2 #in from o.ooon to 0.000 n
#3 #In from o.ooon to 0.000 n
#4 wn from o.ooon to 0.000 n
~ ~~___~ [ Boundary Loads Acting East & West I #1 789 00 #In from oooon to 0 000 n
#2
#3
wn from o.ooon to 0.000 n wn from o.ooon to 0.000 n
#4 wn from o.ooon to 0.000 n
Shear Zone i I Framing Thickness Grade Nail Sue Svacino Value Distance 1 -
At North Wall 3x
2nd zone 3x
3rd zone 2x
3rd zone 2x
2nd zone 3x
At South Wall 3x
Centerzone
in
112"
1R"
1 I2
112
1 I2
1R"
112"
" I in #/R n I Structural I 1 Od 2.3.12 820.0 0.00 I
Structural I 1 Od 2.5.3,12 720.0 0.00 ~
Structural I 1 Od 4,6,12 425.0 0.00 ~
Structural I 1 Od 4,6,12 425.0 0.00 ~
0.00 I i Structural I 1 Od 2,3,12 820.0 0.00
Structural I 1 Od 6,6,12 320.0
Structural I 1 Od 2.5,3,12 720.0
Shear Zone I Framing
At West Wall
2nd zone
3rd zone
3rd zone
Center zone
2nd zone 3x
At East Wall 3x
Shear 8 Chord Forces
Thickness
in
112
1R"
1R"
1R"
112"
In"
1R"
Grade
Structural I
Structural I
Structural I
Structural I
Structural I
Structural I
Structural I
Nail Size
1 Od
1 Od
1 Od
1 Od
1 Od
1 Od
1 Od
Spacing
in
2,3,12
2.5.3,12
4,6,12
6,6,12
4.6,12
2.5,3.12
2.3,12
Value
#Iff
820.0
720.0
425.0
320.0
425.0
720.0
820.0
Distance
0.00
23.81
40.92
40.92
23.81
0.00
n
-
Diaphragm Shears.. . South West - East
Total Shear 37.872.01bs 37,872.Olbs 54.591.01bs 54,591.0 Ibs
Shear per Foot 203.6iwn 203.61 wn 568.6~iwn 568.68 wn
Chord Forces. ..
@I 114 *Length 29.588.51bs 3.874.51bs
@I 1R * Length 39,663.81bs 5.193.91bs @ 314 Length 29,905.9 Ibs 3,916.1 Ibs
Length I Width Ratio 1.938
(C) 1983-97 ENERCALC d:knercaIcrhU8205.ecw kwo6022&1. V5.0.3. 27-Aug-1997. Win32
..
SOLORIO -
AND ASSOCIATES STRUCTURAL - \ CONSULTANTS
Tile Reflex Job#: 98205 Designer: ss Date: Sept'98 Description:
Scope New Building
e22
LATERAL LOAD
UL RIGHTS RESERVED. COWRIGHT ?SOB 0 H Vk~~lesOronO\smos rSn&SGS€ wd
Tile : Rek Drgnr: ss
Description :
Date:
Job # 98205
Scope : New Building
r (22 3
Sinale Span Beam Analysis - - I
Description : REACTIONS FOR HOR.ZONTAL D AP
] General Information I
I
Center Span 185 00 ft Moment of Inertia 1 000 in4
Len Cantilever n Elastic Modulus 1 ksi
Right Cantilever n Beam End Fixity Fix-Fix
1 Trapezoidal Loads
Magnitude @? Len 0 543 Wft wn wn wft
Magnltude @ Right 0441 wn wn wn wn
Dist To Len Side ft n n n
Dist To Right Side 185 ooo ft n n n
1 Quem Values I
~ ~~~ ~~~
Center Location 92.000 n Left Cant 0.000 n
Moment 701.82 k-n 0.00 k-n
Shear 4.11 k 0.00 k
Deflection *.###At# in 0.00000 in
Summary
Moments.. . Shears... i Max+ @ Center 701.82k-ft at 91.76ft @Left 47.40 k
~ Max - rg? Center -1,432.33 k-ft at 0.00 n @ Right 43.62 k
! @? Right Cant -1,374.14 k-R @ Center W.M in
i
@ Len Cant -1,432.33 k-ft Deflections ...
~
Right Cant 0.000 R
0.00 k-n
0.00 k
0 00000 in
I
@ Len 47.40 k I @? Right 43.62 k i
I Reactions ...
I at 91.76ft
~ Maximum = 1,432.33 k-ft I
@? Left Cant. 0.000 in at 0.00R
@ Right Cant 0.000 in at 0.00R
(C) 198597 ENERCALC d~\enercalcrhW8205.ew KWOM12284. V5.0.3, 27-Aug-1997, Win32
16" TJSW OPEN WEB TRUSS @ 96.0" olc
...,zW" *x. an. Y"rn.V wz
LLIZIIN SISCI PA tt===< .p,i, M*-ml
THIS PRODUCT MEETS OR EXCEEDS THE SET DESIGN CONTROtS FOR THE APPLICATION AND LOADS LISTED
Member Slope: 0 Roof Slope: .2W2
I --
-.
All dimensions are horirontu. Product Diagram is Conceptual.
LOAbS: -
Analysis for JOIST MEMBER Suppofiing ROOF AppEcation. LOads(psf). 20 Live at 125% duration. 15 Dead
REkCTIONS(lba.) SUPPORTS:
WlDTH JUSilFlCATlON LIW DEPglTOTAL DETAIL OTHER
1 2fd plate 350 LeRFace 1600 I 1200 I2BOO 2w4 Blochng
2 2x4 plat0 3 50" Right Face 1600 I1200 / 2800 2x4 Bloeiang
- Le8 support: TopM. Approx. clip height: 2.5'. Approx. cZp width 5". Mowed choice(s): TOP I. JI - Right su~port: ToP-PIII. Apprcx. clip heigh? 3.5". Approx. clip width: 5". Allowed choice(s) TO? (STAN
DESIGN CONTROLS:
IARD)
IARDI
MAXIMUM DESIGN CONIXOL CONTROL LOCATION
Shear(Wj 2754 2754 275s Passed(100961 LT. end Span 1 uneer Roof loadrng
Mommt(R-lb) 13802 13552 lT2L Passed(7W) MID Span 1 under Roof loading
Live Dcfi.iin) 0.551 0.983 FassediU523) MID Span 1 under Roof loading
Teal Defl.(ini 0.789 1.311 Passed(il2bS) MID Span 1 under Roofloading - Defiechon Cnteria: STANDARD(LL:m40, TL:Ut&Q). - Bacing(?ui: All compressim edges (top and bottm! must be braced at T 1" oIc unies detailed OtheWIse. Proper attachmant and
positioning of lateral bracing is required to acnieve member stability
4DDITlONAL NOTES:
- IMPORTANT! The analysts Dresmted is OUtDut from sotware developed by Trus Joist MacmBan(TJMX Nowable product values Shown
are in accordance wth current TJM mammts and code accepted d-kgn values. Thp specific product appllcatia, input design
mnformaffie vith the design drawings ofthe buihing. and hzve not been renewEd by TJM Engineering. 500 e-?.
- THIS ANALYSIS FOR TRUS JOIST MacMILLAF! PRODUCTS ONLY! PRODUCT SUBSTITUTION VOIDS THIS ANALYSIS. - Allowable Stress Design methodoiogy was u6ed for Code NER analyzinp the TJM Cornrnerclal product listed above. - Tne open web tmss analysis presenred Is apprommate. An open web trusses nre custom designed to cany the specific dbslgn
- Pricing Load&#) = 280
j! have not been checked for loads and stated dimensiom have been previae? by others ( spbppl a -0 AS
leads for each projed. Adual truss capacity when bbricated i6 limited to that required lo resist the specified loads.
556 29" TJSm OPEN WEB TRUSS @ 96.0" olc EZS a .5,mp.. dZ sn*hunw -
c;l,llh ~lml szz rlcenm
19'. +: YUO :& Ji'
THIS PRODUCT MEETS OR EXCEEDS THE SET DESIGN CONTROLS FOR THE APPLICATION AND LOADS LISTED
AU dimensions are horizontal.
--
Prbduct Diagram is Cohceptual.
-&Q&
Analysis fcf JOISTMEMBER Supporting ROOF Application. Loads(prfl: 16 Live at 125% duration. 15 Dead
9UPPORTS: REACTIONS(bs.)
WIDTH JUSTlFlCATlON LlVU DEADITOTAL DETAJL OTHER
1 24plate 3.50" Len Face 211211B80140Q2 2x4 Biocldng 2 2x4 plate 3.50" Right Face 211211B80140B2 2x4 Blocldng - Leff suppon: Top-All, Approx. clip height: 39 Approx. cilp wdth: 5'. Allowed choice(5): TOP (STANDARDj - Rigk SUDDO~~: Top-All, Approx. clip height: 3.Y Approx. chp widh 5". Allowed choicc(s): TOP (STANDARD)
3ESIGN CONTROLS:
MAXIMUM DESIGN CONTROL CONTROL LOCATION
Shear(lb) 4C51 1051 40% Passed(lOU%) LT. endspan 1 under Roof loading
Mment(t-lb~ 33472 32310 34543 Passed(%%) MID Span 7 under Rwf loafing
Live Defl.imi 0.745 1.63? Passed(U526) MI0 Span 1 under Roof loading
Total DeR.(in) 1.444 2.178 Passed(m71) MID Span 1 under Roofloading
- Defiedion Crltetia: STANDARD(LLU240. TL:U18O). - Dncmg(Lu:i: An compression edges (top and bottomj must be braced at 2 P' OIC unkss deniiod otherwise. Proper attachment and
positioning of lateral bracing IS required to achieve member stability.
4DDmONAL NOTES! - IMPORTANT! he analysis presented is ourpul from sonware deve(0pCd by Trus Joist hkcF(lillan(TJM). product vakres snow
are in accordance mth cumnt TJbl materiais and cod5 accepred Mgn values. The speFifis produd appiIcation. input design
0 RSS OU h-3 j. have not been checked for loads and stated dimensions have been provided by others i SoboTuo hu
cmformance with the design dnwngs ofthe buMng. and have not been rewewed by TJM Enginecnng. - TdlS ANALYSIS FOR TRUS JOIST MacMlLlAN PRODUCTS ONLY! PRODUCT SU8STlTUllON VOIDS THIS ANALYSIS. - Allowable stress Design methodology was used for Code NER analyang the TJM Commercial produd listed above. . me open web tme analysis presented is approximate. All open web trusses are cuBtom designed 10 carry the specin: design
. Pricing Loaqplf) = 248
loads for each project. Actual truss capacity when fabncated is limitsd tc that required to rm6isl the speci5ed loads.
SOLORIO AND ASSOCIATES STRUCTURAL -CONSULTANTS
ANSWERS TO STRUCTURAL PLAN CHECK COMMENTS
DATE: September 17, 1998
PIAN FILE No.: Carlsbad 98-2545
PLAN CHECKER: Sergio Azuela
ITEM
16.
17.
18.
20.
21.
23.
24.
25.
26.
The slab information is shown on sheet S-2 of the drawings, i.e. slab thickness, reinforcing
and underlayment. The building pad thickness is noted on sheet S-I of the drawings under
"Foundation and Slab Notes", for more building pad information we refer the contractor to
the soils report.
Please see attached calculation page RI.
Architect to provide form.
Please see attached truss calculations, page R24 and R25. Please see plans for truss
identification.
Please see revised sheet S4 for nail size and spacing for roof diaphragm.
The architectural reveals occur near the top of the tiltup panels, the tiltup design is at the
mid-height of the panel and does not affect the thickness of the panel at this point.
Calculations as shown are correct.
The curved walls are not tiltup panels, the walls are C.I.P. concrete. The reinforcing of the
walls is shown on S3. The details refer to this wall as C.I.P. not tiltup.
Please see revised panel elevations, panels 7, 8, 17 and 18.
Please see attached calculations for 6 1/2 thick panels, pages R2 thru R23.
R 108 WLDT 18- ST TLL: IS501 63 1-1 500
MISSION. TEXIS 78572 FAX: IS561 584-7407
E:%,A:,. *"iou:o&ns vi cow
SOLORIO AND ASSOCIATES STRUCTURAL
CONSULTANTS
TIle Reflex Job# 98206 Designer: SI Date: Sept'98 Description:
Scope New Building M
WALL ANCHORAGE
Cp wall
Cp parapet
Height of wall
Height of parapet
Thickness of wall
Weight of Concrete
Typ. Line A,G Fl;
Center one half increase 1.5
Force per foot 306 Ibs
Anchor Force at 8 feet O.C. 2447 Ibs
Anchor Force at 4 feet O.C. 1223 Ibs
Ibs
At center one half of dia
Force per foot 459 Ibs
Anchor Force at 8 feet O.C.
Anchor Force at 4 feet O.C. 1835 Ibs
Use
Use p%q
3670
Use
Use piiq
CROSS-TIES
Depth of diap.
Width of diap.
Diap. Ratio 2.0 0.k.
Max. Diap. Ratio 4.0
Total Shear 4894 Ibs
Allowable Shear per foot IJ wft
Chord Force 2447
Shear per foot 306 wn
Use note on purlin sched
At center one half of dia
Depth of diap.
Width of diap. El ::
Diap. Ratio 1.3 0.k.
Max. Diep. Ratio 4.0
Total Shear 7341 Ibs
Allowable Shear per foot #n
Chord Force 2447
Shear per foot 306 #/ft
Use note on purlin sched.
Typ. Line 1, 5
1.5
306 Ibs
2447 Ibs I not use I
1223 Ibs
LPA135 1
Ibs
459 Ibs
3670
1835 Ibs
pzq
FI
I+] ::
1.0 0.k.
4.0
1223 Ibs
153 wn
wn
306
0.k.
1.0 0.k.
4.0
1835 lbs
459
0.k.
ALL RlGHTS RESERVED. COWRIGHT 1988 0
SOLORIO AND ASSOCIATES STRUCTURAL - C 0 N S U LTANTS
Tnle Reflex Job# Sa206 Designer: ss Date: Sept'QE Description:
Scope New Building e=
DESIGN VALUES, cont
CAPACITY OF 6 112" CONCRETE WALL
Section 1911.1.1 V, c +vn
V" = v, + v,
vu = tv,+ +v,
Section 191 1.10.3 Nominal Shear Strenghf, V,
v, = 10 (f'c)O5 hd = (10)(3000)05 (6.5) (12) (0.8)
= 34178 #lft
Nominal Shear Strenghf, V,
vn = 8 (f'c)" A,
= (8)(3000)05 (3.625") (12) = 19061 #/ft
= A, [ 2 (f'c)' + p, fy ] = (3.625~12) [ 2 (3000)0s + 0.0025 x 60000 ]
Section 1921.4.6
Section 1921.6.4.2 V,
V"
vn = 11290 Ibs
For design for horizontal shear forces in plane of wall, d shall be taken equal to
0.81,
Unless a more detailed calculation is made in accordance with Section 1911.10.6,
shear strenght V, shall not be taken greater than:
vc = 2 (f'c)05 hd
= (2)(3000)05 (6.5") (12")
= 8544 Ibslft
Section 191 1.10.4
Section 1911.10.5
Section 1911.10.8 Should Vu > 4Vc I2 shearwall reinforcing per section 191 1.10.9 of the code
Should Vu > 4 V, the value of V, should be determined by the following expression:
W,= A&d I s,
Section 1921.2.7 Load Factors
U = 1.4 (D+L+E)
U = 0.9D + 1.4E
Strenghf-reduction factor 4, per Section 1909.3 Section 1921.6.5.1
Section 1921.3 4 = 0.85
ALL RIGKISRESERVED, COWRIGHTlgSSO H W~ll~~lono\g8x)s nllaS8205 M
SOLORIO AND ASSOCIATES STRUCTURAL
C 0 N S U LTA NTS
Job# 98206 Title Reflex Designer: ss Date: Sept'98 Description:
scope New Building G3
DESIGN VALUES, cont
CAPACITY OF 6 112" CONCRETE WALL, cont.
Section 1921.6 Shear Walls
Section 1921.6.2 Reinforcement
Section 1921.6.2.1 Minimum reinforcing ratio = 0.0025, longitudinal and transverse direction
= (0.0025) (6.5) (12) = 0.195 in2 #4 at 14" O.C. each way minimum or
(2) #4 at 14" O.C. each way minimum
Section 1921.6.2.2 Provide two curtains of reinforcement if the in-plane factored shear force exceeds
2Acv(fc)O
For one layer of reinforcing;
V" = (2)(3000)05 (3.625) (12") (0.8)
= 3812#/ft
Provide standard hook engaging the edge reinforcement terminating at the edges
of shear walls if Vu in the plane of the wall exceeds Acv(fc)05
V" = (3000)05 (5) (12")(0.8)
= 2629 #/fi
Section 1921.6.2.3 Special Transverse reinforcement for shearwalls.
Not required if maximum extreme fiber stress < 0.2 fc Fu = (1.4) ( 4889 #/ft) ( ) / (8/12)
0.2fc = (0.2) (3000)
= 130 psi
= 600 psi > 130 psi :. O.K. No boundary member required
ALL RIGHTS RESERVED. COPYRIGHT 1888 0
SOLORIO AND ASSOCIATES
STRUCTURAL - CONSULTANTS
Title Refiex Job#: S8206 Designer: 86 Date: Sept'98 Description:
Scope New Building
SHEARWALLS
t := 65in d := 12.in f := 3000. psi f := 60000. psi
Line A,
V := 47397.1b V f := O.Ib
L := 36.5.R
Seismic Load
Total length shearwalls
v = 2272.plf vuf=O.plf
V = 2272.plf Vss ; O.K. Vr+Vf
L p.o.8 Vu := 1.4.
v ss := 0.v V ss = 7263 -plf
\
ti W~~k~l~~W235 MexW82C6 '@ ALL RIGHTS RESERVED. COPYRIGHT 18880
SOLORIO -
AND ASSOCIATES
STRUCTURAL C 0 N S U LTANTS
Title Reflex Job# S8206 Designer: 58 Date: Septa% Description:
Scope New Building
Line A
Individual Panel Shear
L p6 := 28.R
H := 19.R
Individual Panel Length
Height of panel
H ps = 17.R
Section 1911.10.9 Design of Horizontal Reinforcing
A, = 0.31.d Area of steel
A, -1 Number of layers
H psf = 0.R Height of lateral force at floorhoof
Rebar Area's
3 0.1 1
4 0.20
5 0.31
6 0.44 7 0.60
8 0.79
9 1 .oo
- Sue Area in in2
s h := 14.in horizontal spacing of Rebar
ro h = 0.0034 >0.0025 min. permitted per code, O.K.
Use #5 horizontal at 14" O.C.
A ,.A v ro := __ t.s h
Design of Vertical Reinforcing
r0 := 0.0025 + 0.5. 2.5 - - ' (r0 h - 0.0025) ( 3 L ps = 284
ro , = 0.0033 0.0025 min. permitted per code, O.K.
ro = 0.0025
A = 0.31.4
A, =I Number of layers
A v.A n s1 :=- t.ro , s 1 = 19.08-in
Rebar Area's
3 0.11
4 0.20
5 0.31
6 0.44
7 0.60
8 0.79
9 1 .oo
&& Area io in-2
Use #5 vertical at 14" O.C.
~~~~
ALL RIGHTS RESERVED. COPYRIGHT lW 0
..
SOLORIO AND ASSOCIATES
STRUCTURAL CONSULTANTS
Job# 98206 Title Reflex Date: Sept'9E Designer: ss Description:
Scope New Building
Line A
Check Panel Overturning
Lp = 28.R
H = 19.R
H ps = 17.R
Lrp z8.e
H = 7.5.~
Lpo = 15.R
PO Lps =Lp-L
w, = 15.psf
Wp = 82.psf
Total Panel Length
Height of panel
Height of lateral force at floorlroof
Length of purlins supported by wall
Height of openings
Length of openings
Panel Length available for shearwall
Weight of panel
Weight of roof, floor
H psf = 0.R
Lfp = 0.R
H pof = 0.R
Lpof = 0.R
L ps = 13-R
Wf = O.psf
0.80.~ 0.80.V .L ps.H ps + 1.4 1.4 uf.L .H PS PSf OT = OT = 286979.1*lb.R
RM = 505106-lb-R
OT - 0.85.RM UPL '=
LP
UPL = 5084-lb
Uplift O.K.
ALL RIGHTS RESERVED, COWRlGKl lSS8 0 H:UlyFila\.al~a\88205!SWX mhW8205.Wd
SOLORIO -
AND ASSOCIATES STRUCTURAL
CON 5 U LTANTS
Title Reflex Job# 98206 Designer: ss Date: Sept'98 Description:
Scope New Building
Line A
Section 1921.6.5 Design of Shearwalls for Flexural and Axial Loads
Item 1
Ag - - t.- LPS
2
P ua := 0.10.A g.(f c)
OT + RM
0.8.Lp
A = 507 .in2
P ua = 152100-lb
P = 35361 -Ib
Pu Pua ; O.K.
Item 2
Or
Item 3
Vu < 3"lw*h'fcA0.5
t 12 0.5 V ua := 3.--.--.3000 .Ib in ft
Ib V ua = 12017.- R
Ib V ,, = 2272,- fi Vu < Vua: O.K.
No Shear wall boundary zone detail requirements as defined in Section 1921.6.5.6
not required.
ALL RIGHTS RESERVED. COWRIGHT 1998 0 H\Mpileswonolss2m RRa\88a)5.wpd
SOLORIO AND ASSOCIATES STRUCTURAL
CONSULTANTS
Title Reflex Job# SBZOb Designer: ss Date: Sept'W Description:
Scope New Building
SHEARWALLS
Ib Ib . Ib Ib Ib Ib Ib Ib Pcf := - psf := - pIf := - psi=- p~f := - si := in.in psf := - plf := - PSI=- f? R in2 R3 f? ft in2 R3
t := 6.5.in d := 12.in f := 3000.psi f := 60000.psi
Ib v = 8544.- R 0 := 0.85
t
Line p,
V := 43623.1b V f := O.Ib
L := 38.R
Seismic Load
Total length shearwalls
Vf V uf = 1.4.- Vr v = 1.4. L p.o.80 L p.o.8
v ur = 2009-plf v uf = 0-plf
V = 2009-plf c Vss ; O.K. Vu := 1.4. Vr+Vf
L p.o.8
v ss := O.v V ss = 7263 -plf
SOLORIO AND ASSOCIATES STRUCTURAL
CONSULTANTS
Job#: 98206 Title Reflex Designer: ss Date: Sep1'98 Description:
Scope New Building
Linea 6
Individual Panel Shear
Lps = 13.R
H = 19.R Height of panel
H ps = 17.R
Section 1911.10.9 Design of Horizontal Reinforcing
A = 0.31.si Area of steel
Individual Panel Length
H ,,sf = 0.R Height of lateral force at floorhoof
Rebar Area's
3 0.1 1
&c Area in inA2
A, =I Number of layers 4 0.20
5 0.31
6 0.44
7 0.60
0 0.79
9 1 .oo
sh = 14.in horizontal spacing of Rebar
Design of Vertical Reinforcing
fo h = 0.0034 >0.0025 min. permitted per code, O.K.
Use #5 horizontal at 14" O.C.
ro = 0.0025 f 0.5. 2.5 - - ' (r0 h - 0.0025) a Lps = 13.R
ro = 0.003 0.0025 min. permitted per code, O.K.
ro := 0.003
A .= 0.314
An:=l Number of layers
Rebar Area's
3 0.1 1
4 0.20
5 0.31
6 0.44
7 0.60
0 0.79
9 1 .oo
Area in in-2
Use #5 vertical at 14" O.C.
ALL RIGHTS RESERVED. COPYRIGHT18980 H WyFllsr\rOlom\98205 nflcolsSX)S W
SOLORIO AND ASSOCIATES STRUCTURAL - CONSULTANTS
Job#: 98206 Title Renex Oesignu: ss Date: Sept'98 Description :
Scope New Building
R-13
G Line 4
Check Panel Overturning
L = 13.R
H = 19.R
Hps = 17.R
P
Lrp = 8.R
Lpo = 0.R
Lps -Lp-Lpo
w, = 15.psf
H = 0.R
-
Wp = 82.psf
Total Panel Length
Height of panel
Height of lateral force at floorhoof
Length of purlins supported by wall
Height of openings
Length of openings
Panel Length available for shearwall
Weight of panel
Weight of roof, floor
Hpsf z0.R
L fp = 0.R
H pof = 0.R
Lpof = 0.R
L ps = 13-R
Wf = O.psf
0.8O.v 0.80.~ .H uf.L .H PS PS + 1.4 PS PSf OT = 1.4 OT = 253702.18-lbsR
RM = 136721-1b.R
OT - 0.85.RM UPL :=
LP
UPL = 10576-Ib
USE 13AISDl rnin.
ALL RIGHTS RESERVED, COPYRIGHT18380 H:WMyFilarL~.9lorioW205 MIna88205.nlxl
SOLORIO AND ASSOCIATES STRUCTURAI - \ CONS U LTANTs
Title Reflex Job# 88206 Designer: 6s Date: Sept'98 Description:
Scope New Building
G.
Line A
Section 1921.6.5 Design of Shearwalls for Flexural and Axial Loads
Item 1
Ag = t.- PS
2 A = 507-in2
P := 0.10.A g.(f ,-) P ua = 152100-lb
OT + RM
0.8.Lp P = 37541,lb
Pu c Pua ; O.K.
Item 2
Or
Item 3
Vu c 3*Wh'fcA0.5
Vu, = 3.--.--.3000 t 12 0.5 .Ib
in ft
Ib V ua = 12817'- n
Ib V ,, = 2009.- n Vu c Vua; O.K.
No Shear wall boundary zone detail requirements as defined in Section 1921.6.5.6
not required.
ALL RIGHTS RESERVED, COPYMGHTlgs80 HUAyFiIeskddOW8XX rd&98205.*pd
..
SOLORIO AND ASSOCIATES STRUCTURAL - CONSULTANTS
Title Reflex Jab* 88206 Designer: 56 Date: Sept'98 Description:
Scope New Building
PI z
SHEARWALLS
t := 65in d := 12.in f := 3000,psi f := 6OOOO.psi
Ib
R Vc=8544.- 0 .= 0.85
Line A,'
V '= 37873. Ib V f '= 0.lb
L := 156.R
Seismic Load
Total length shearwalls
Vf V uf := 1.4.- vr v := 1.4. L p.o.80 L ,.0.8
v = 425 'plf v uf = 0-plf
V = 425 'plf c Vss ; O.K. Vr+Vf
L p.o.8 Vu := 1.4.
v ss := 0.v V ss = 7263 'plf
ALL RiGHTS RESERVED, COPYFIGHTlss80 H~ym~~OriOW~ RfwzDl.xpd
..
SOLORIO AND ASSOCIATES STRUCTURAL - C 0 N S U LTA NTS
Title Reflex Job# 88206 Designer: 65 Date: Sepl'98 Descripfion:
Scope New Building
u3
I
Line L
Individual Panel Shear
Lps = 32.R
H = 19.R Height of panel
H ps = 17.R
Section 1911.10.9 Design of Horizontal Reinforcing
A = 0.31.si Area of steel
Individual Panel Length
H psf = 0.R Height of lateral force at floor/roof
Rebar Area's
3 0.1 1
- Size Area in in2
A, =I Number of layers
'Pfy.A ,.A , s2 = s = -27.745 -in v u - @V
4 0.20
5 0.31
6 0.44
7 0.60 a 0.79
9 1 .oo
horizontal spacing of Rebar
ro h = 0.0034 >0.0025 min. permitted per code, O.K.
Use #5 horizontal at 14" O.C.
Design of Vertical Reinforcing
ro , = 0.0025 + 0.5. . (r~ - o.0025) L ps = 32-R
ro = 0.0034 0.0025 min. permitted per code, O.K.
ro , := 0.0034
A = 0.31.si
A, -1 Number of layers
A v.A n S. :=- -I t.ro s 1 = 14.03-in
Rebar Area's.
sk Ama in in2
3 0.1 1
4 0.20
5 0.31
6 0.44
7 0.60 a 0.79
9 1 .oo
Use #5 vertical at 14" O.C.
ALL RIGHTS RESERVED, COPYRiGHT lsSa 0 HUlyFiieshlmI98XY raO&SGC5Wpd
SOLORIO AND ASSOCIATES STRUCTURAL - CONSULTANTS
Tnle Reflex Job# 88206 Designer: ss Me: Sept'98 Description:
Scope New Building
I
Line K
Check Panel Overturning
L .= 32.n
H := i9.n
H ps = 17.n H psf .= 0.n
L rp .= 8.R Lfp := 0.R
H := 12.n H pof := 0.n
L := 12.n L pof := 0.n
Lps := Lp- Lpo L ps = 20-n
w := 82.psf
W, = 15psf
P'
w f .= 0.ps.f
0.80.~ 0.80.~ uf.L .H PS PSf OT = 1.4
Total Panel Length
Height of panel
Height of lateral force a lloorlroa
Length of purlins supported by wall
Height of openings
Length of openings
Panel Length available for shearwall
Weight of panel
Weight of roof, floor
OT = 82543.724b.R
2
RM = 639488.lb-R
OT - 0.85.RM UPL :=
LP
UPL = -14407.lb
Uplift O.K.
H:~~il~!sol~io~ mn~.v& ALL RIGHTSRESERVED, COPYRIGHT 19980
SOLORIO AND ASSOCIATES STRUCTURAL - CONSULTANTS
Tnle Reflex Job#: SSZOS Designer: ss Date: Sept'W Description:
Scope NewBuilding
ecs-
I
Line rl
Section 1921.6.5 Design of Shearwalk for Flexural and Axial Loads
Item 1
A := t.- Lps
2
OT + RM P, = 0.8.L
A = 780*in2
P ua = 234000-lb
P = 28204.lb
9
Pu < Pua ; O.K. Item 2
Or
Item 3
Vu < 3'Wh*fcA0.5
t 12 0.5
in fl V := 3.--.--.3000 .Ib
Ib Vu = 425.- R
Ib V ua = 12817.- R
Vu < Vua; O.K.
No Shear wall boundary zone detail requirements as defined in Section 1921.6.5.6
not required.
ALL RIGHTS RESERVED, COPYRIGHT 1898 0 H:!MyfibblofloL98Z€ Rllra\88x)5.W
SOLORIO -
AND ASSOCIATES STRUCTURAL
CONSULTANTS
Job#: 98206 Tile Reflex Designer: ss Date: Sept.98 Description:
Scope New Building
El b
SHEARWALLS
t := 65in d := 12.in f := 3000. psi f := 60000. psi
Ib 0, := 0.85 V := 2. f Wd.- V, = 8544.- ft
Line 5,
V := 37873.lb V f := 0.lb
L := 124.R
v := 1.4. "f V ,,f 1.4.- Vr
L p.0.80 L p.0.8
v = 534 .plf vuf=O.plf
Seismic Load
Total length shearwalls
v ss .= @V V ss = 7263 'plf
ALL RIGHTS RESERVED, COPYRIGHT 1998 0 H:\Myfila\rolotio!9mn n(lsxy)8m,wpd
SOLORIO AND ASSOCIATES STRUCTURAL - CONSULTANTs
Tile Reflex Job# 98206 Designer: 85 Date: Sept'98 Description:
Scope New Building
PI 1
Line 5
Individual Panel Shear
Lps = 32.R
H = 19.R Height of panel
H = 17.17 H psf = 0-A Height of lateral force at floorhoof
Section 1911.10.9 Design of Horizontal Reinforcing
A, = 0.31.si Area of steel
Individual Panel Length
Rebar Area's
3 0.1 1
- Si Area in in2
A;= 1 Number of layers
0.f y.A ,.A s2 := s 2 = -28.197 .in V,-O.V,
4 0.20
5 0.31
6 0.44
7 0.60
8 0.79
9 1 .oo
sh := 14,in horizontal spacing of Rebar
ro h = 0.0034 >0.0025 min. permitted per code, O.K.
Use #5 horizontal at 14" O.C.
An'Av ro := __
t's h
Design of Vertical Reinforcing
ro '= 0.0025 + 0.5. L ps = 32.A . (W - 0.0025)
ro = 0.0034 0.0025 min. permitted per code, O.K.
ro := 0.0034
Av:= 0.31.si Rebar Area's
An:= 1 Number of layers
s 1 = 14.03 *in
Area in in2 3 0.1 I
4 0.20
5 0.31
6 0.44
7 0.60
8 0.79
9 1 .oo
Use #5 vertical at 14" O.C.
ALL RIGHTS RESERVED, COWRlGHTlSSBO H:wpil~!domwm relwmzmwpd
SOLORIO AND ASSOCIATES STRUCTURAL - i CONSULTANTS
Job* 98206 Title Reflex Designer: 85 Date: Sept'98 Description:
Scope New Building
el P
Line 5
Check Panel Overturning
L = 28.R P
H = 19.R
H ps = 17.R H psf = 0.R
L rp = 32.R
Lpo = 15.R
Lps = Lp- L
w, = 15.psf
LfP = 0.R
Lpof = 0.R
H = 7.R H pof = 0.R
L ps = 13.ft PO
W = 82,psf
Wf = O.psf
0.80.v 0.80.~ .L p.H ps + 1.4 1.4
uf.L .H PS PSf OT :=
Total Panel Length
Height of panel
Height of lateral force at floorhoof
Length of purlins supported by wall
Height of openings
Length of openings
Panel Length available for shearwall
Weight of panel
Weight of roof, floor
OT = 67499.46.lb-ft
RM = P , (H p.L p - H p0.L PO - H p0f L pof). L p + w ,.L ,p.0.5.L p.L + w fL fp.0.5.L p.L
2
RM = 584276-Ib-R
OT - 0.85.W UPL :=
LD
UPL = -15326.1b
Upli O.K.
ALL RIGHE RESERVED, COPYRIGHT 1898 0
SOLORIO AND ASSOCIATES
STRUCTURAL C 0 N S U LTANTS
Tie Reflex Job#: S8206 Designer: ss Date: Sept'98 Description:
Scope New Building
Line 5
Section 1921.6.5 Design of Shearwalls for Flexural and Axial Loads
Item I
Ag - - t.- LPS
2 A = 507-in2
P ua = 0.10.A g.(f c) P ua = 15210Plb
OT + RM P := 0.8.L P = 290974b
Pu c Pua ; O.K. Hem 2
Or
Item 3
VU 3"Wh*fcA0.5
V ua := 3.--.--.3000 t 12 0.5 .Ib in R
Ib
R vu = 534.-
Ib V = 12817.- R
Vu Vua; O.K.
No Shear wall boundary zone detail requirements as defined in Section 1921.6.5.6
not required.
ALL RIGHTS RESERVED, COPYRIGI4rl9&SO H:\M~~~wo~oK~~~ -.w
SOLORIO AND ASSOCIATES a CONSULTANTS STRUCTURAL
rile Reflex Job#: 88206 Designer: JS Date: Sepl’98 Description :
Scope New Building
pz”
SEISMIC FORCES
Seismic Zone: 4
v = z I c w,/ R,
Z= 0.40
I= 1 .oo
C= 2.75
R, = 6
V= 0.183 W,
E-W Direction
[(I3 psf) (175 ft) + (17/2+ 2)(82 psf)(Z) ] (0.183) = 731 Ibs/ft (3997 Ibs/ft)
N-S Direction
[(I3 psf) (96 ft) + (17/2+ 2)(82 psf)(2) ] (0.183) = 543 Ibs/ft (2970 Ibs/ft)
[(I3 psf) (40 ft) + (17/2+ 2)(82 psf)(Z) ] (0.183) = 411 Ibs/ft (2242 Ibs/ft)
ALL RIGHTS RESERVED. COPYRIGHrls880 H:UlyFil&soWo\B8205Wx6 Ma?8s205.W
.,
FlROUZl
CONSULTING
ENGINEERS, INC.
We : Reflex
Drgnr: ss Description :
Job # 98205 Date:
Scope : New Building
p-2 1
Horizontal Plvwood DiaDhraam c
Description diap.
1 General Information I North-South Length 96.00 ft Diaphrgm Weight 0.00 psf
EaseWest Length 186.00 n Seismic Factor 1 .oooo
Nort-South Chord 64.00 ft Diaphragm is Blocked
East-West Chord 175.00 R Blocking Direction North-South L Boundary Loads Acting North 8 South I #I 587.00 Wft from 0.000ft to 0.000 ft
#2
#3
#4
Wft from 0.ooon to 0.000 ft
Wft from 0.000ft to 0.000 ft
#/R from 0.000R to 0.000 It L Boundary Loads Acting East 8 West 1 #1 789.00 #m from 0.000ft to 0.000 ft
#2
#3
#In from 0.oooft to 0.000 ft
#ft from O.OOOft to 0.000 fl
#4 #lR from 0.000R to 0.000 ft
Design Data B Nailing Requirement
Framing Thickness Grade Nail Size Spacing
in in
At North Wall 3x 112" Structural I 1Od 2,3,12
2nd zone 3x 112" Structural I 10d 2.5,3,12
3rd zone 2x 1 I2 Structural I 1 Od 4,6.12
Centerzone 2x 112" Structural I 1 Od 6,6,12
3rd zone 2x 112 Structural I 1 Od 4.6,12
2nd zone 3x 1 I2 Structural I 1 Od 2.5,3,12
At South Wall 3x 112" Structural I 1 Od 2~3.12
Shear
Value
#/ft
820.0
720.0
425.0
320.0
425.0
720.0
820.0
Zone
Distance
ft
0.00
0.00
0.00
0.00
0.00
0.00
Design Data 8 Nailing Requirement
Shear Zone
3rd zone
At East Wall
2nd zone 3x
1 Shear 8 Chord Forces
Thickness Grade
in
1R" Structural I
112" Structural I
112" Structural I
112" Structural I
112" Structural I
1P Structural I
112" Structural I
Nail Size
1 Od
1 Od
1 Od
1 Od
1 Od
1 Od
1 Od
Spacing
in
2.3,12
2.5,3,12
4,6,12
6,6,12
4,6,12
2.5,3,12
2,3,12
.~
Value
#/ft
820.0
720.0
425.0
320.0
425.0
720.0
820.0
~~~~~
Distance
R
0.00
23.81
40.92
40.92
23.81
0.00
~~~~ ~ 1 Diaphragm Shears.. . - North - South - East
Total Shear 37,872.01bs 37,872.01bs 54,591 .Olbs 54,591.0 Ibs
Shear per Foot 203.61#m 203.61Wft 568.66Mt 568.66 #In
@J 114 * Length 29,588.51bs 3,874.51bs 112 * Length 39,663.8lbs 5.193.91bs
@J 314 " Length 29,905.9 Ibs 3,916.1 Ibs
Chord Forces ...
Length I Width Ratio 1.938
IC) 1W97 ENERCALC d:L?nermlcrhU8205.ecw KW-0602284, V5.0.3,27-Aug-1937, Win32
SOLORIO AND ASSOCIATES STRUCTURAL
CONSULTANTS
1 q 2’ i
Job# 88206 Tie Reflex Designer: 6s Date: Sept’98 Description:
Scope New Building
9 3‘
e12
LATERAL LOAD
...........
...........
I I LL- -
I I
ALL RIGHTSRESERVED. COWRIGHT lM0 H:lMyFilsr\ralono\g8X)5 rSn~.w
Tile : Renex
Dsgnr: ss Description :
Swm : New Buildina
Job # 98205
Date:
L Single Span Beam Analysis
Description : REACTIONS FOR HORIZONTAL DlAP
I General Information I
Center Span 185.00 n Moment of Inertia 1.000 in4
Len Cantilever n Elastic Modulus 1 ksi
Right Cantilever ft Beam End Fixity Fix-Fix
1 TraDezoidal Loads h L. I Magnitude @ Left 0.543 wn wn wft wn
Magnitude @ Right 0441 wn km wn Wft
Dist To Left Side ft n n n
Dist To Right Side 1135 ooo n n ft n 1 Query Values
Center Location 92 ooo n Left Cant 0 000 ft Right Cant 0 000 n
Moment 701 82 k-ft 0 00 k-n 0 00 k-n
Shear -011 k 0 00 k 000 k
Deflection ###.#f###c in
~ .. ..
0.00000 in 0.00000 in
Moments ... Shears... Reactions ... Max + @ Center 701.82 k-ft at 91.76 R @ Len 47.40 k @ Len 47.40 k
Max - @ Center -1,432.33 k-ft at 0.00 n @ Right 43.62 k @ Right 43.62 k
@ Len Cant -1,432.33 k-ft
@Right Cant -1,374.14 k-n
Maximum = 1,432.33 k-ft
Deflections ...
@ Center ####.#A#r in at 91.76 n
@ Left Cant. 0.000 in at 0.00ft
@ Right Cant 0.000 in at 0.00ft
(C) 198597 ENERCALC d:knerc4crhW205.ecw KWd602284. V5.0.3, 27-Aug-1997. Win32
16" TJS" OPEN WE6 TRUSS @ 96.0" olc
..&#ztwv 6 li i.n.1 NunPo ma
'A!,.,." SlC5l Qnm 11WSW
aFoiit aoewmi
THIS PRODUCT MEETS OR EXCEEDS THE SET DESIGN CONTROLS FOR THE APPLICATION AND LOADS LISTED
Member Slope: 0 Roof Slope: 25/12 r- 7 I
AM dimensions are horizonlaL Product Diagram is Conespturl.
LoAbS;
Analysis for JOIST MEMBER Supporting ROOF Appfieation. Loads(psf): 20 LlVe at 125% duration, 15 Dead
SUPPORTS; REACTIONSObs.)
WIDTH JUSTlFlCATlON LIW DEADITOTAL DETAIL oTHER
1 2u4plate 3.50 LeRFace , 1600/1200/2800 2w4 Blocldng
2 2x4 plate 3.50" Right Face 1600 I 1200 / 2800 2x4 Blockina . Left support: Top-AII. Approx. clip height: 3.5: Approx. clip width 5. AUowed choice@): TOP (STANDARD) - Right support: TnpAJ, Approx. clip height: 3.5, Appror Clip width: 5". Allowed choice(s): TOP (STANDARD)
DESIGN CONTROLS
MAXIMUM DESIGN CONTROL CONTROL LOCATION
Shear(lb) 2x4 2754 2754 Passed(1OWL) LT. end Span 1 under Roof loading
Mommt(ft-lb) f 3802 13532 17724 Passed(76%) MID Span I under Roof loading
Live Defl.(in) 0.451 0.983 Passed(U523) MID Span 1 under Roaf loading
Tatal Defl.(in\ 0.789 1.371 Passed(U2bQ) MID Span 1 under Roof loading - Deflectran Criteria: STPINDARD(LL:LIZ40, TL:Utm). - BracingLu): All compreisicn edges (top and boltam) must be braced at 3 1" a/c unless detailed otherwise. Proper attachment and
positioning of lateral bracing is required to achieve member stability.
ADDITIONAL NOTE%
- IMPORTAM! The analysis Pr-ented is output from soRware deveMptd by Tnrs Joist MacMiUan(TJM1. Allowable product wues shown
are in accordance wth current TJM materials and code accepted design values. me speciflc pmdUct application, inpvt design
loads and stated dimensions have been prwidbd by other6 I sub~pl 0 , 0 ASS OOA~ . ), have not been checked for conformance with the design drawings ofthe building. and have not been reviewed by TJM Engineenng.
-THIS WYSIS FOR TRUS JOIST MacMlLLAh' PRODUCTS ONLY!
~ Allowable Stress Design methodology was usad for Code NER analyano the TJM Commercial product listed above,
.The open wen truss analysis presented Is approdmate. An open web trusses ora custom designed to ceriy the specific deslgn
PRODUCT SUBSTITUTION VOIDS THIS MLYSIS.
leads for each pro;ed. Actual tm6 capacity Man fabricated is limited to that required to resid the specified loads. - baing bad($) = 280
PROJECT INFORMATLON OPERATOR INFORMATION:
Qllmw Bldg. TJM
Jay Law
300 Calisbad Ulhoe Dr. 11218
@a02 inLia JUI~I UL,~ILLL\ - -- - _.- I"".="~"","
(I
e4 23 TJS" OPEN WEB TRUSS @ 96.0" olc &+&+%&&" %as
.8,l"p'. 6;o S."dNWbX SQOIUC Z~D,,~ nmt wd 1108om
ogo1 dl UVidiDh 07;
THIS PRODUCT MEETS OR EXCEEDSTWE SET DESIGN CONTROLS FOR THE APPLICATION AND LOADS LISTED
Member SloDe: 0 Roof SlODQ: 2912
L 53' -. +
Product Digram is Conceptual. AU dimensions are horizontal.
-oADS;
Analysisfor JOISTMEMBER Supporting ROOF Applicalinn. Lnads(psf): 16 Live at 125% duration. 15 Dead
REACTIONS(lbs.) SUPPORTS:
WIDTH JUSTIFICATION LlVEl DEADITOTAL DETAIL OTHER
1 2X4plate 3.50" Len Faee 21 12 I1880 / 4092 2x4 Blocking 2 34 plate 3.50" Right Face 21 12 I 1880 I4092 2x4 Blocldng - Lee support: Top-All. &prox. clip height: 3.5" Approx. clip Hld?h: 5'. Allowed choice(s): TOP (STANDARD) - Rigld tupunft: TopAll, Amrox. clip height: 3.5". Appro%. cap width 5". Allowed choice($): TOP (STANDARD)
3ESIGN CONTROLS
MAXIMUM DESIGN CONTROL CONTROL LOCATION
Sheartb) 4051 4051 4050 Passed(iOO%) LT. end Span 1 under Roof loading
Moment(ft-lbJ 33472 32810 34543 Passed(*%) MID Span 1 under Roof loading
Live Defl.(inj 0.745 1.533 Passed(U526) MID Span 1 under Roof loading
Total DeR.(inj 1.444 2.178 Passed(W271) MI0 Span 1 under Roofloading
- Deflection Criteria: STANDARD(LL:L1240. TL:U180). - Encing(1u): Iw compression edges (top and bottom) must be braced at 2' W olc unk55 detailed otherwise. Proper attachment and
positionins of lateral bracing is required to achieve member stabisty.
4DDmONAL NOTES! - IMPORTAMT! The analysis presenled Is output from somre dev&& by Trus Joist MacMiRan(TJM). Allwablt produd values shown
are in accordance with current TJM materials and coda accepted design values. The spefic product application. input design
loads and stated dimensions have been provided by others C So~oeCo - 0 ASS ou A-rS.3
conformance mth the design drawngs ofthe bugding, and have not been rmewed by TJM Eninesring.
I, have not been checked for
-THIS ANALYSIS FOR TRUS JOIST MacMlLLAN PRODUCTS ONLY! - Allowable Stress Design methodology was used for Code NER analyzing the TJM Commercial product lisled above. . The npen web trute analysis presenled is approximate. All own web trusses ate cueinm designed to cntry the specinc design
. Pricing Load(pif) = 248
PRODUCT SUBSTITUTION VOIDS THIS ANALYSIS.
loads for each proiect. Actual truss capacity when fabricated is limitsd to that required to nsid the specified loads.
SOLORIO AND ASSOCIATES STRUCTURAL - CONSULTANTS
STRUCTURAL CALCULATIONS FOR:
REFLEX CORPORATION
Carlsbad Research Center
SA Project No. 98205
Carlsbad, California
PREPARED FOR:
ATS Architecture
1094 Cudahy Place, Suite 116
San Diego, CA 92110
DATE: July 24, 1998
Solorio and Associates expressly reserves its common law copyright and other property rights in thio document. This
document shall not be reproduced, copied, changed or disclosed in any form or manner without first obtaining the express
wrilten consent of Solorio and Associates. 1998
108 WEST 18% STREET TLL: (8581 83 I - I500
M15510N. TCXAS 78872 FIX ; (858) 584-7407
EMAIL: 60L0.10@608."T.COH
SOLORIO AND ASSOCIATES STRUCTURAL - CONSULTANTS
STRUCTURAL CALCULATIONS FOR:
REFLEX CORPORATION
Carlsbad Research Center
SA Project No. 98205
Carlsbad, California
PREPARED FOR:
ATS Architecture
1094 Cudahy Place, Suite 116 San Diego, CA 921 10
DATE: July 24, 1998
Solorio and Associates expressly reserves ita common law copyright an
document shall not be mprodumd, copied, changed or disclosed in any
written consent of Solorio and Associates. 0 19980,
I 8"
LXAS
ither property rights in this document. This 'rn or manner without first obtaining the express
STRLET TLL: 10501 €33 1. I 500
78878 FAX: 105€3) 584-7407
E"AIL: SOLO.!O@BOS."T.COM
SOLORIO AND ASSOCIATES STRUCTURAL
ENGINEERING
Framing 3.5
I Misc. 2.0
Title Reflex Job# 98206 Wner: 8s Data. July '98 oescription:
Roofing
Scope New Building
6.0
I
DESIGN LOADS
ROOF
Purlins
Total
Material
13.0
1 Weight
(PSD I
Roofing
Plywood
6.0
1.5
Plvwood I 1.5 I
Framing
Misc.
I .5
2.0
Total
LIVE LOAD
Sub-purlins
11.0
Slope 4:12 = 20.0 psf Reducible
Material
Walls
8 Tiltup Wall = 97.0 psf
H:~y$ll~~lori.a~m mnd8M5 w ALL RIGHTS RESERVED, COPYRlGHl ?Doll0
SOLORIO AND ASSOCIATES STRUCTURAL
.~. . ..
Fb
Grades Width Thickness Ff
2 and 3" 4"
Select Structural, 2,3 and 4 1.5 1.5 1.5
No. 1 and better 5 1.4 1.4 1.4
ND. I, ND. 2, ND. 3 6 1.3 1.3 1.3
8 1.2 1.3 1.2
10 1.1 I .2 1.1
12 1.0 1.1 l.Q
14 and wider 0.9 1 .o 0.9
Stud 2,3 and 4 1.1 1.1 1.1
5 and 6 1.0 1.0 1 .o
Tltle Reflex Job# 88206 Desigrnr: 88 Date: July '98 D8smiption:
..
Fc
1.15
1.1
1.1
1.05
1 .o 1 .o
0.9
1.05
1.0
Scope New Building
B&S .
No. 1 ' Fb = 1350 psi Ft = 750 psi Fv = 85 psi
Fc = 1100 psi
C, = (I2/d)lm if d42'
E = 1700000 in
GLULAM MEMBERS
24F-V4 Fb = 2400 psi Fv =I65 psi E = I800000 in
Axially Loaded
E = 1600000 in
Fb = 2400 psi Fv =I65 psi
Axially Loaded
E = 1600000 in
Fc = 1650 psi Ft = 1150 psi
E = 1800000 in
Ft = 1150 psi
24F-V8
Fc = 1650 psi
ALL RIGHTS RESERVED, COPYRIGHT 1988 0 H\~y~i1~~1~n~\ga205 ron~h98~5.~pd
SOLORIO AND ASSOCIATES STRUCTURAL a ENGINEERING
Job# 88206 Date: July '98 Tltle Refm Designer: ss Description:
Scope New Building
3
DESIGN VALUES, cont
SOIL
Soils report by:
Allowable bearing pressure at 30' embedment = 1800 psf
Lateral soil pressure
Engineering Design Group
Cantilever wall = 35 pcf
Restrained wall = and additional 7xH
Allowable lateral forces = 300 pounds per square foot per foot of depth.
Allowable lateral sliding resistance = 0.35 x dead load.
STEEL
Pipe columns ASTM A53 Grade B, Fy=35 Ksi
Tube Columns ASTM A501, Fy=46 Ksi
CONCRETE
Foundation, Slab 8. Tiltup Walls fc = 3000 psi
CODE 8 PUBLICATIONS
UBC 1994'Edition
AISC, Ninth Edition
PCI Design Handbook, Fourth Edition
Nelson Stud Welding Handbook for Non-residential Construction
Simpson Strong-Tie Connectors
ALL RlGHlS RESERVED, COWRIGHT 16980
Tltk Rotlax Job# 88206 Deslgnsr: as Date: July '98
Scope New Building
SOLORIO Description: AND ASSOCIATES STRUCTURAL 5 ENGINEERING
rl
DESIGN VALUES, cont
HORIZONTAL DIAPHRAGM
112" Thick Struct. I rated plywood
All edges Supported Nailed with 8d at:
a)
b)
2" O.C. EN AND BN, FN AT 12" O.C. (3x Members required)
2 112" O.C. EN AND BN. FN AT 12" O.C. (3x Members required)
v = 820#1ft
v = 720 #lft
v = 425 #in
v = 320 #lft cj 4" O.C. EN AND BN, FN AT 12" 0.c:
d) 6" O.C. EN AND BN, FN AT 12" O.C.
CHORD CAPACIV
Capacity = Area x fs x 1.33
Assumed weld size 1/4"
Capacity of 114" fillet weld = 3710 Ibs
(1) #6 Cap.= (0.44) (24000) ( Weld length required 3)
(2) #5 Cap.= (2) (0.30) (24000) (1.33)
Weld length required
(2) #6 Cap.= (2) (0.44) (24000) (1.33)
Weld length required
(2) #7 Cap.= (2) (0.60) (24000) (1.33)
Weld length required
(2) #8 Cap.= (2) (0.78) (24000) (1.33) Weld length required
14044 Ibs
(.44) (60000) (1.25) l(2) (3710)
4.5 in
19152 Ibs
(.30) (60000) (1.25) l(2) (3710)
3 in
28090 Ibs
(.44) (60000) (1.25) l(2) (3710)
4.5 in
38304 Ibs
(BO) (60000) (1.25) / (2) (3710)
6.0 in
48795 Ibs
(.78) (60000) (1.25) 1(2) (3710)
8.0 in
.. . ..
ALL RIGHTS RESERVED. COPM(IGHT 1-0 HWyFil~hlorioW8205 rdIex!B8205.wpd
TiUe Reflex JobR 98206 lhsigner. 88 Date: July's13 lh re rt pt i o n :
Scope New Building
SOLORIO AND ASSOCIATES STRUCTURAL 5 ENGINEERING
5
DESIGN VALUES, cont
CAPACITY OF HOLDOWNS FOR CONCRETE TILTUP PANELS
Detail # 13/SD1
Mark
13 Cap.bar = (1.33) (0.442 in2) (24000 psi) = 14,108 Ibs
= 29,400 Ibs Cap. Weld = (2) (4 in) (1/4 in)( 0.70) (0.3) (70,000 psi)
138 Cap.bar = (1.33) (0.601 in2) (24000 psi) = 19,183 Ibs = 29,400 Ibs Cap. Weld = (2) (4 in) (1/4 in)( 0.70) (0.3) (70,000 psi)
13C Cap.bar = (1.33) (0.786 in2) (24000 psi) = 25,089 Ibs = 40,425 Ibs Cap. weld= (2) (5.5 in) (1/4 in)( 0.70) (0.3) (70,000 psi)
13D Cap.bar= (1.33) (1.0 in2) (24000 psi) = 31,920 Ibs
= 44,100 Ibs Cap. Weld = (2) (6 in) (1/4 in)( 0.70) (0.3) (70,000 psi)
ALL RIGHTS RESERVED, COPYRIGHT lW84 HUlyFIlesblotioWX6 nnWBzo5.wpd
SOLORIO AND ASSOCIATES STRUCTURAL 5 ENGINEERING
THle ReRex Job# 98206 Wlgner: 6s Date: Juiy '98 Description:
scope ~ew Building
L
DESIGN VALUES, cz
CAPACITY OF 8" CONCRETE WALL
Section 1911.1.1
Section 1911.10.3
Section 1921.4.6
Section 1921.6.4.2
Section 1911.10.4
Section 1911.10.5
Section 1911.10.8
Section 1921.2.7
Section 1921.6.5.1
Section 1921.3
V" c tv,
V" = v, + v,
V" = 4vc+ 4vs
Nominal Shear Stmnght, V,
vn = 10 (f'c)05 hd
= (10)(3000)05 (8) (12") (0.8) = 42065 #le
Nominal Shear Stmnght, V,
V" = 8 (f'c)' A,
= (8)(3000)05 (6) (12") = 31548 #/e
=A,[ 2 (f'c)05 + pnf ] = (6x12) [ 2 (3000)0y+ 0.0025 x 60000 ] V"
V" V" = 18687 Ibs
For design for horizontal shear forces in plane of wall, d shall be taken equal to
0.81,
Unless a more detailed calculation is made in accordance with Section 1911.10.6,
shear strenght V, shall not be taken greater than:
VC = 2 (f'c)05 hd = (2)(3000)0 (8") (12") = 10516 Ibs/ft
Should Vu > 4 V, I2 shearwall reinforcing per section 191 1.10.9 of the code
Should Vu > 4 Vc the value of V, should be determined by the following expression:
V,= A,f,d I s2
Load Factors
U = 1.4 (D+L+E)
U = 0.9D + 1.4E
Stmnghf-mduction Factor 4, per Section 1909.3
t = 0.85
ALL RIGHTS RESERVED, COWRIGHTIgBBO n:wyFiles\rolotioo\88X15 rMex\g82OS.wpd
SOLORIO AND ASSOCIATES STRUCTURAL
ENGINEERING
Job# S8ZOS TIUe Reflex
Description: Mgnw: 6s We: JUV '98
Scope New Building
7
DESIGN VALUES, cont
CAPACITY OF 8" CONCRETE WALL, cont.
Section 1921.6 Shear Walls
Section 1921 6.2 Reinforcement
Section 1921 B.2.1 Minimum reinforcing mtio = 0.0025, longitudinal and transverse direction = (0.0025) (8) (12) = 0.24 in2 #5 at 14" O.C. each way minimum pc
(2) #4 at 14" O.C. each way minimum
Section 1921 62.2 Provide two curtains of reinforcement if the in-plane factored shear force exceeds
~ACV(~'C)~
For one layer of reinforcing;
V" = (2)(3000)05 (4") (12") (0.8) = 4207#/n
Provide standard hook engaging the edge reinforcement terminating at the edges
of shear walls if Vu in the plane of the wall exceeds Acv(fc)05
V" = (3000)05 (6.5) (12")(0.8) = 3418#m
Section 1921 6.2.3 Special Transverse reinforcement for sheawalls.
Not required if maximum extreme fiber stress 0.2 fc
FU = (I .4) ( 4889 #/n) ( (8112)
= 130 psi
= 600 psi > 130 psi ;. O.K. No boundary member required 0.2fc = (0.2) (3000)
ALL RIGHTS RESERVED COPYRIGHT 1698 0 H WyFtla\.olono188205 mHW8205 wpd
SOLORIO 7 AND ASSOCIATES STRUCTURAL - 1 E N G ICN-E E R I N G
Title ReW Job% 88208 Wgner: 8s Date: July'% Description:
scope ~ew Building
8
ROOF FRAMING
Sub Purlins
SPAN = 8 R - 3.5" = 7' - 8 I12
SPACING OF JOISTS = 2 ft
TRIBUTARY AREA = 2'x 8 = 16 sq. ft.
w = (11 psf + 20 psf) x2'= 62#/ft ** DL for sub-purlins = 10 psf
S= (1.5) (62) (7.7)21(1312) (1.25) = 3.4 in3
A= (1.5) (62) (7.7) / (95) (1.25) (2) = 3.0 in2
I= (22.5) (62) (7.7)4 I (1.8E6) (0.51) = 5.2 in4
Allowable deflection U180 = 0.51 in
:. use live load = 20 psf
Use: 2x6 #2 at 24" O.C.
SPAN = 10R- 3.5 = 9'- 8 112
SPACING OF JOISTS = 2 ft
TRIBUTARY AREA = 2' x 10 = 20 sq. ft. :. use live load = 20 psf
w = (11 psf + 20 psf) x2 =62#lft
** DL for sub-purlins = 11 psf
S= (1.5) (62) (9.7)'/ (1138) (1.25) = 6.15 in3
A= (1.5) (62) (9.7) / (95) (1.25) (2) = 3.8 in2
I= (22.5) (62) (9.7)4 I (1.8E6) (0.50) = 13.72 in4
Allowable deflection U240 = 0.50 in
Use: 2x6 #2 at 24" O.C.
Sub Purlin for mechanical unit
SPAN = 8 ft Mach. weight = 50W
SPACING OF JOISTS = 2 ft
TRIBUTARY AREA = 2' x 8 = 16 sq. ft.
w = [(I 3 psf + 20 ps9 x 2'1 + 50W I (8) (4') = 82 #lft
S= (1.5) (82) (E)'/ (1500) (1.25) = 5 in3
A= (1.5) (82) (8) l(95) (1.25) (2) = 5 in2
I= (22.5) (82)
:. use live load = 20 psf
/(I .7E6) (0.40) = 11 in4
Use: 4x6 #2 at 24" O.C. under mech. unit
ALL RIGHTS RESERVED, COPYRIGHT 1698 0 H !MyF~lakolon0\88~ rstlsx\g8205 wpd
ROOF FRAMING
Ib pcf := -
fl3
Ib Ib Ib psf := - plf:= - m*-
in2 ttz A
Loads to Purlin, P1
USE 26" SST 444 at 8'4" O.C.
Loads to Purlin, P2
Loads to GLB on line 2
tw = 32.3.R L = 89.R Wdl =15'Pf
ta =tw.L ta = 2875.f?
WII = 12.psf
js l.ft Joist spacing
see computer print out
Loads to GLB on line 4
tw = 32.5.R L = 176.R Wdl = 15.p~f
ta tw.L ta = 5720.f?
w I( = 12.psf
js = 1.R Joist spacing
.. .. .
see computer print out
SOLORIO
And Associates
Span= 16.0011, Beam Width = 3.500111 x Depth = 13.25in, Ends are Pin-Pin
Max Stress Ratio 0.943 : 1
MaAmum Moment 8.8 k-ft MaAmum Shear * 1.5 2.9 k
Allowable 9.3 k-ft Allowable 4.9 k
Max. Positive Moment 8.8Ok-ft a 8.000ft Shear: @! Left 2.20 k Max. Negative Moment 0.OOk-ft a 0.000 fi @! Right 2.20 k
Max @ Len Support 0.OOk-ft Camber: @Left . 0.000in Max @ Right Support 0.OOk-ft @ Center 0.288 in
@! Right 0.000 in Max. M allow 9.33
fb 1,030.95 psi fv 61.47psi Left DL 0.9% Max 2.2m
Fb 1,093.75 psi Fv 106.25psi Right DL 0.92 k Max 2.20 k
Reactions ...
Deflections - I
Job# 98205
me:
Swpe : New Building I\
General Timber Beam c L I
Description P-2
[General Information I Section Name 4x14 Center SDan 16.00 n . . . . .LU 0.00 ft
Len Caniilever ft .. . ..Lu 0.00 ft
Right Cantilever ft . . . ..LU 0.00 ft Beam Width 3.500 in
Beam Depth 13.250 in
Member Type Fb Allow 875.0 psi
Fv Allow 85.0 psi LL 8 ST Act Together
Fc Allow 600.0 psi Load Dur. Factor 1.250
Beam End Fixity Pin-Pin E 1,300.0 ksi
Sawn DOUGLAS FIR-LARCH (North), No2
Wood Density 34.000 pcf
Lstress Calcs I Bendlng Analysis '
Ck 27.960 Rb 0.000 Sxx 102.411 in3 Area 46.375 in2
Allowable fb Cf 1.000
@! Center 8.80 k-ft 96.53 in3 1,093.75 psi
Max Moment Sxr Rea'd
6 Len support 0.00 k-ft 0.00 in3 1,093.75 psi
@ Right S~pp~rt 0.00 k-ft 0.00 in3 1,093.75 psi
Design Shear 2.85 k 2.85 k
Area Required 26.830 in2 26.830 in2
Actual Stress : fv 108.25 psi 106.25 psi
Shear Analysis @ Len support @! Right Support
d:knefcaicrhS8205.w KWo8op84. V5/50.3.27.A~g.1937~iiijm32 2 20 L Bearing Length Req'd 1 047 in
SOLORIO
And Associates
Title : Ranen
Dagnr: sa LMscrlpUon :
Job# 98205
Date:
Scope : New Buildlng 12 I General Timber Beam C
I Query Values I M. V, & D @ Specified Location8 Moment Shear Deflection
@ Center Span Location = 0.00 fl 0.00 k-fl 2.20 k 0.0000 in
@ Right Cant. Location = 0.00 a 0.00 k-fl 0.00 k 0.0000 in
@ Lefl Cant. Location = 0.00 R 0.00 k-fl 0.00 k 0,0000 in
(c) lW97 ENERCALC d:knercaimhWm.ecw Kw-o6M2&1, V5 0 3,27-Aug-1997. Win32
SOLORIO
And Associates
.... ha1 Span" n
Left Cantilever n
Rght Canlileve- n
Bean width I"
Tnk : Reflca
Dsgnr: 8s hriptlon :
21.W ---- 28.W
4.w ---_
4.w ---.
5.125 5.125 5.125
..._ ..__
Job # 98205
Me:
Center DL in
Left Cant. DL ..... Maximum I"
Right Cant DL in
..... Maximum . in in
in ..... Maximum
Swpe : Naw BUlldlng 1'3
Timber Cantilevered Beam Svstem
0.472 -0.607 4.764
0.851 -1.653 -1.377 --.. 0.161 --__ ---- -0.124 .... _-__ 0.12s .... --.. 9.1w ....
Description Line 2
I General Information h
Fb 2,400.0 psi Elastic Modulus 1,800.0 psi Live loads placed fa maximm values
Fv 165.0 Psi Load Duration Factor 1.250 Canllevers assumed baced for Fb calcs
-43.6 ----
45.8 ---- ..._
MaxQFIlghtEnd M ..._
Dead Load un 484.00 484.w 484.w
k:nl Max @ieR End
L Loads c
Live Load MI 1so.w 388.00 1so.w L Stresses
Fb :Actual
Max, Shear
Fv :Allowable
fu ' Acbal Pi
fb :Allowable 2.880.8 2.701.0 2,737.3
2.oM.1 2.332.4 2.371.3
OK OK OK
S,lSS.6 14,077.0 12.207.5
206.25 206.25 206.25
148.87 183.12 158.80 I ShssIOK Shl*rOK ShearOK . . ._ L Reactions
ax. Left ~eaclion lbl 9.155.6 26,9891 12.207.5
(0) 198397 ENERCALC d:'enercalcrhW2X.w W-0802284. V5.0.3.27-Aug-1997, Win32
______ ~~ ~
SOLORIO
And Associates
Cdumn Swing fl
fl
.... Actual Span fl
Left Cantiher RiNf Cantlever n Beam Widlh in Beam Depth in Menk Type j Moments
Mmax @ Centw k-fi
MaxaLeREnd k-fl
Max @ Right End k-fi
Tltle : ReMx
Osgnr: (UI hscriptlon :
15.00 32.W 32.00 32.W 32.W 32.00 _... 23.w ---- 22.w -_.. 28.W ____ 5.w . . . - 5.00 ----
4.003 ---- 5.00 4.w ----
5.125 5.125 5.125 5.125 5.125 5.125 .. . ..
21.m 21.m 24.m 22.500 24.w 22.m
Gluhm GluLm Qiulsm Glulsm Glulsm Qluhm
..__
1
13.3 58.1 78.8 53.1 80.3 86.0 ---- .... 41.5 ---- 49.3 ---. ____ 59.3 .--- -56.2 .... 47.4
Job # BE205
Date:
fb : Allowable pi
Fb : Actual PSI
Max. Shear Ib. Fv : AJlMvabla psi
tu ' Actual cd
Scope : New Building I cl
Timber Cantilevered Beam System i
2833.8 2,811.0 2,Wd 2.8M.1 2.586.8 2,649.0
1,510.3 1,8491 1.922.7 1.474.0 1.958.4 2.387.6 OK OK OK OK OK OK
12,055.1 10.096.6 13.253.0 9.657.6 14,398.6 12.291.5
206.25 206.25 206.25 206.25 20825 206.25
168.02 140.72 161.62 125.03 17559 159.89
Description Line 4
..... Maximum in
i" Left Cant, DL
1" ..... Maximun in Rimt Cant DL ..... Maxhum in
4.053 4.778 -1.251 9.528 -1.281 -1.388
4.328 _--- 4.203 _---
4.004 .--- 0.067 _--. 0,078 _--.
4.222 ___. 4.315 .... 4.209 ....
.... 0.057 .... 0.076 .__- ___. _... ....
.. . . . bhearOK ShasrOK SkrOK ShearOK ShearOK ShewOK
Reactions
Max. MR- Ib.1 4,828.0 10,096.6 29,425.1 W57.6 28.970.9 12.291.5
c
C = 5/g c=l(z L.' I'/g
(c) 198397 ENERCALC dbnercakhMm.em KW-OSOZ64, V5.0.3. 27-Aug-1907, Win32
SOLORIO i AND ASSOCIATES ~~~~ - ~~ - - . . ... . __ \ STRUCTURAL
7 ENGINEERING
Tine Reflex Job# 98206
Description:
Scope New Building
Designer: 8s Date: July '98
I<
TILTUP PANELS
PANEL AT: Line 1 I
DATA
CALCULATIONS
Height of wall = 17 ft
Height of parapet = 2R
Purlin Width = 32 fl
Ledger Width = 3.5 in
Opening Width = ft
Opening Height = ft
Leg Width = 1ft
Wall thickness
Distance to Rebar
Reveal Thickness
Roof Dead Load
Roof Live Load
Wall Dead Load
Floor Dead Load
Floor Dead Load
6.5 in
3.25 in
0.75 in
- -
- -
- -
13 psf - -
20 DSf - -
Joist Width = OR
e= 6.75 in Addt'l lateral = 0 psf
P, = 208 plf Addt'l Vert. D.L. = 0 pif
P, = 320 plf Addt'l Vert. L.L. 0 plf
PANEL AT: Line 1 at girder I
DATA Height of wall = 22.5 ft
Height of parapet = 1.5 ft
Purlin Width = 10 ft
Ledger Width = 3.5 in
Opening Width = 5.5 ft
Opening Height = 19 ft
LegWidth = 1fl
Wall thickness
Distance to Rebar
Reveal Thickness
Roof Dead Load
Roof Live Load
Wall Dead Load
Conc. Beam D.L.
Conc. Beam L.L.
6.5 in - -
5 in - -
0 in
13 psf
- -
- -
20 psf
79 psf
- -
- -
4100 Ibs - -
4100 Ibs - -
CALCULATIONS e= 6.75 in Addt'l lateral = 65 psf
P, = 1957 plf Addt'l Vert. D.L = 1265 plf
P' = 1992 plf Addt'l Vert. L.L. 275 plf
ALL RIGHTS RESERVED. COPYRIGHT lsOa 0 H:\M~IleS\rolodOW6io\e82M rSn&B8205.wpd
SOLORIO AND ASSOCIATES STRUCTURAL ENGINEERING
TNla Reflex Deslgner: 8s DescrlpUon:
Scope New Building
Job# 98206 ..
Date: Juiy '98
TILTUP PANELS
PANEL AT Line 5
DATA Height of wall = 17 R
Height of parapet = 2R
Purlin Width = 32 ff
CALCULATIONS
Ledger Width = 3.5 in
Opening Width = OR
Opening Height = R
Leg Width = 1R
e= 6.75 in
Po = 206 plf
P, = 320 plf
Wall thickness = 65 in
Distance to Rebar = 325 in
Reveal Thickness = 075 in
Roof Dead Load = 13 psf
Roof Live Load = 20 psf
Wall Dead Load = 79 psf
Addt'l lateral =
Addt'l Vert. D.L. =
Addt'l Vert. L.L.
0 psf
0 plf
0 Plf
PANEL AT Line 5 at openings
DATA Height of wall = 17 R Wall thickness = 6.5 in
Height of parapet = 2R Distance to Reber = 3.25 in
Purlin Width = 32 R Reveal Thickness = 0 in
13 . psf . .. . Ledgerwidth = 3.5 in Roof Dead Load =
Opening Width = 7.5 R Roof Live Load = 20 psf
Opening Height = 9.25 R Wall Dead Load = 79 psf
Leg Width = 3R
CALCULATIONS e= 6.75 in Addt'l lateral = 30 psf
Po = 208 plf Addt'l Vert. D.L. = 1223 plf
P, = 320 plf Addt'l Vert. L.L. 400 plf
ALL RIGHTS RESERVED. COPYRIGHT 1808 0 H:\M~lla\.olodo\se2os rd!d98205,wpd
SOLORIO AND ASSOCIATES STRUCTURAL
ENGINEERING
Tine ~et~e~ Job# 88206 oesignar: sa Date: July '98 Description:
Scope New Building
II
TILTUP PANELS
PANEL AT: Line A
DATA
CALCULATIONS
Height of wall
Height of parapet
Purlin Width
Ledger Width
Opening Width
Opening Height
Leg Width
3.5 in - -
e=
P, =
P, =
Wall thickness
Distance to Rebar
Reveal Thickness
Roof Dead Load
Roof Live Load
Wall Dead Load
Floor Dead Load
Floor Dead Load
Joist Width
6.5 .. - -
3.25 - -
0.75 - -
6.75 in Addt'l lateral =
7a pit Addt'l Vert. D.L. =
120 plf Addt'l Vert. L.L.
in
in
in
Psf
Psf
Psf
Psf
PSf
R
0 psf
0 plf
0 plf
PANEL AT: I Line A, at 70-6" opening
DATA
CALCULATIONS
Height of wall = 17 R
Height of parapet = 2R
Purlin Width = 12 ft
Ledger Width = 3.5 in
Opening Width = 7.5 R
Opening Height = 9.25 fl
Leg Width = 3R
e=
Po =
Wall thickness
Distance to Rebar
Reveal Thickness
Roof Dead Load
Roof Live Load
Wall Dead Load
Floor Dead Load
Floor Dead Load
Joist Width
6.5 in
3.25 in
0 in
- -
- -
- -
13 psf - -
6.75 in Addt'i lateral =
7a pif Addt'l Vert. D.L. =
30 psf
1060 plf
P, = 120 plf Addt'l Vert. L.L.
ALL RIGHTS RESERVED. COPYRIGHTlR%O H \MyF8lablono!9820S rsRm88205 wpd
SOLORIO AND ASSOCIATES STRUCTURAL
E N G ICN~E E~R I N G \ -
Title Reflex Job* 88206 Wgner: 8s Date: Juiy 'S3 Description:
Scope New Building
'II
TILTUP PANELS
PANEL AT Line C
DATA
CALCULATIONS
Height of wall = 17 R Wall thickness = 6.5 in
Height of parapet = 2R Distance to Rebar = 3.25 in
Purlin Width = 8ft Reveal Thickness = 0.75 in
Ledger Width = 3.5 in Roof Dead Load = 13 psf
Opening Width = on Roof Live Load = 20 psf
Opening Height = OR Wail Dead Load = 79 psf
Leg Width = 1ft
e= 6.75 in Addt'l lateral =
P, = 52 plt Addt'l Vert. D.L. =
PL = 80 plf Addt'l Vert. L.L.
0 psf
0 plf
0 plf
PANEL AT Line 1 at 12'-0' openings
DATA
CALCULATIONS
Height of wall = 11 R
Height of parapet = 2R
Purlin Width = 32 R
Ledger Width = 3.5 in
Opening Width = 12 n
Opening Height = 12 n
Leg Width = 3R
Wall thickness = 6.5 in
Distance to Rebar = 325 in
Reveal Thickness = 0 in
Roof Dead Load = 13 psf
Roof Live Load = 20 psf
Wall Dead Load = 79 psf
e= 6.75 in Addt'l lateral =
P, = 206 plf Addt'l Vert. D.L. =
PL = 320 plf Addt'l Vert. L.L.
47 psf
1522 plf
640 plf
n:wyFilar\rolonoWS mW205.wd ALLRIGKTSRESERVED, COPYRIGHT 18880
TIUe : Reflex Dsgnr: (IS me: Wptlon :
Scop : New Building
Job # 98205
19 L Tilt-Up Wall Panel Design
Description Line I
I General Information I Clear Heioht 17.000 fl fC 3.000.0 Dsi Seismic Zone 4 ~~~~~ ~~~ ~~~~~~ ~
60:OOO.O psi Min Vert Steel % ' 0.0020 Min Horiz Steel % 0.0012 Parapet ieight 2.000 fl FY Thickness 6.500 in Phi 0.900 Bar Size 5 Width 12.000 in Base Fixity 0%
Bar Spacing 14.000 in Wall Seismic Factor 0.3000
Bar Depth 3.250 in Parapet Seismic Factor 0.7500
Max Defl. Ratio 150.0 Concrete Weight
LL 8 ST Not Combined
145.00 pcf Using: UBC Sac. 1914.0 method ... Exact, Non-Iterated
Parapet Does Not Reduce Moments
LLoads I
Lateral Loads Vertlcsl Loads Wind Load 16.000 psf Uniform DL 208.00 Wfl
Uniform LL 320.00 Wfl
Point Load , I bs ... eccentricity 6.750 in
... height R ... load type Seismic Concentric DL #Iff
Lateral Load #Iff ... distance to top fl ... distance to bot fl ... load type Seismic Wind "I" Magnifier 1.000.~- ' ''
Concentric LL #Iff
Seismic "111 Magnifier 1.000
LWall Analysis 1
For Factored Load Stresses For Service Load Deflections Seismic Wind
Basic Defl w/o P-Delta 0.078 0.049 in 0.056 0.039 in
Basic M wlo P-Delta 15,290.3 9,595.8 in# 10,928.1 7.655.0 in#
Moment Excess of Mcr 0.0 0.0 in# 0.0 0.0 in#
Max. P-Deita Deflection 3.742 3.793 in 0.056 0.039 in
Max P-Delta Moment 20,701.3 13.702.3 in# 12,330.3 9,057.2 in#
Maximum Allow Vertical Bar Spacing 18.000 in Parapet Bar Spacing Req'd : SEISMIC 18.000 in
Maximum Aiiow Horizontal Bar Soacino 18.000 in Paraoet Bar SDacino Rea'd : WlWD 18.000 in
17.00fl clear heght, 2.00fl parapet, 6.50in thick with #5 bars at 14.00in on center, d= 3.25i1-1, Pc = 3,OOO.Opsi,
Using: UBC Sec. 1914.0 method ...Emct, Non-Iterated
Factored Load Bending : Seismic Load Governs Service Load Deflection : Seismic Load Governs
Maximum Iterated Moment : Mu 20,701.29 in4 Maximum iterated Deflection 0.056 in
Moment Capacity 46,415.18 in# Deflection Limit 1.360 in
Mn Phi : Moment Capacity
Applied: Mu @! MidSpan Applied: Mu @ Top of Wall
Actual Deflection Ratio
Max,lterated Service Load Deflection
Selsmlc 46,415.18 in#
20,701.29 in# 4,989.60 in#
0.08 in
3,651 : 1
Actual Reinforcing Percentage 0.0068 Allowable Max. Reinf. Percent = 0.5 * Rho Bal 0,0128
Wind 45,540.90 in#
13,702.31 in#
1,474.20 in#
0.04 in
5,190 : 1
0.0068
0.0128
Actual Axial Stress : (RN + Po ) I As 13.24 osi 13.24 psi
Allowable Axial Stress = 0.4 ?m 120.00 psi 120.00 psi
d:bnercalcrhW'205.ecw KWoBM284. V5.0.3,27-Aug-I 997. ' Ku-97 ENERCALC
me : Reflex Dsgnr: 88 Description :
Job # 98205
Date:
Scope : New Building
20 I Tilt-UD Wall Panel Desian c
Description Line 1
LAnalysio Data 1
Seismic
0.290 in
Sgross 84.500 in3
Mcr = S Fr 23,141.3 in#
Rho: Bar Reinf Pct 0.0214
E 3,122,018.8 psi
n = Es I Ec 9.29
Fr = 273.86 psi HI I Thk Ratio 31.38
Values for Mn Calculation...
As:eff= [Pu:tot + AsFyYFy
a : (AsFy + Pu)/(.85 rc b) c = a1 .85 0.669 in 0.655 in
lgross 274.625 in4 274.63 in4
18.88 in4 lcracked 19.13 in4 I-eff (ACI methods only) 0.00 in4 0.00 in4
Mn = As:eff Fv (d - an) 51.572.42 in# 50.601.00 in#
0.568 in
Phi: Capacity Reduction 0.900 0.900
Wind
0.284 in
0.556 in
..
\Additional Values
Wind Load8 used for analysis Factored Loads Wall Weight 78.542 psf Seismic
Wall Wt Wall Seismic Factor 23.562 psf Applied Axial Load 291.20 218.40 #ft
Wall Wt * Parapet Seismic Factor 58.906 psf Lateral Wall Weight 1,154.56 865.92 #ft
Service Applied Axial Load 208.00 #ft Total Lateral Loads 1,445.76 1,084.32 #ft
Service Wt @ Max Mom 824.69 Mt
ACI 9-1 8 9-2 LL 1.700 ACI 9-3 Dead Load Factor 0,900 UBC 1921.2.7 "0.9" Factor 0.900
ACI 9-1 8 9-2 ST 1.700 ACI 9-3 Short Term Factor 1.300 .... seismic = ST : 1.100
(c) 1983-97 ENERCALC dhemicrhWm.ew ~w-og~284, VS.0.3. 27-Aug-1997, Win32
Title : Reh Dsgnr: 88 Description :
Job # 98205
Me:
Scow : Nsw Buiiding ?I
~ Tilt-Up Wall Panel Design c
~ Description Line 5 at openings
[General Information I Clear Height 17.000 R fC 3,000.0 psi Seismic Zone 4
Parapet Height 2.000 n FY 60,000.0 psi Min Vett Steel % 0.0020
Thickness 6.500 in Phi 0.900 Min Horiz Steel % 0.0012
Bar Size 5 Width 12.000 in Base Fixity 0%
Bar Spacing 14.000 in Wall Seismic Factor 0.3000
Bar Depth 3.250 in Parapet Seismic Factor 0.7500
Max Defl. Ratio 150.0 LL 8 ST Not Combined Concrete Weight 145.00 pcf Using: UBC Sec. 1914.0 method ...Exact, Non-Iterated
Parapet Does Not Reduce Moments 1 Loads I
Lateral Loads Vertical Loads Wind Load 16.000 psf Uniform DL 208.00 #/ft
Uniform LL 320.00 #/ft
Point Load , Ibs ... eccentricity 6.750 in ... height n ... load type Seismic Concentric DL i ,223.00 wn
... distance to top ... distance to bot 9.250 n Seismic "I" Magnifier 1.000 ... load type Seis m i c Wind "I" Magnifier 1.000 ~. ,
Concentric LL 400.00 #Iff
Lateral Load 30.00 #/R 17.000 n
1 Wall Analysis 1
For Factored Load Stresses For Service Load Deflections Wind Seismic - Wind
Basic Defl wlo P-Delta 0.118 0.049 in 0.084 0.039 in Basic M wlo P-Delta 23,756.7 9,595.8 in4 16,969.1 7,655.0 in#
Moment Excess of Mcr 12,454.6 0.0 in4 0.0 0.0 in# Max. P-Delta Deflection 3.839 3.941 in 0.084 0.039 in Max P-Delta Moment 35,595.9 18,915.0 in# 19,956.5 10,717.8 in#
Maximum Allow Vertical Bar Spacing 18.000 in Parapet Bar Spacing Req'd : SEISMIC 18.000 in
,Maximum Allow Horizontal Bar Spacing 18.000 in Parapet Bar Spacing Req'd : WIND 18.000 in
Wall Design OK
17.00fl clear heiht. 2.00fl parapet, 8.50in thick with #5 bars at 14.00in on center, d= 3.25in. fc = 3.OOO.Opsi,
Usmg: UBC Sic. 1914.0 method ...Em&, Non-Iterated
Factored Load Bending : Seismic Load Governs Service Load Deflection : Seismic Load Governs
Maximum Iterated Moment : Mu 35,595.92 in# Maximum Iterated Deflection 0.084 in
Moment Capacity 50,504.58 in# Deflection Limit 1.360 in
Mn * Phi : Moment Capacity
Applied: Mu @ MidSpan Applied: Mu @ Top of Wall
Seismic 50,504.58 in#
35,595.92 in# 4,989.60 in#
Max Iterated Service Load Deflection
Actual Reinforcing Percentage 0.0068 Allowable Max. Reinf. Percent = 0.5 Rho Bal 0.0128
0.08 in
Actual Deflection Ratio 2,421 : 1
Wind 48,629.68 in#
18,914.98 in#
1,474.20 in#
0.04 in
5,190 : 1
0.0068
0.0128
Actual Axial Stress : (Pw + Po )I Ag
Allowable Axial Stress = 0.4 * Pm
28.92 psi 28.92 psi 120.00 psi 120.00 psi
(c) 1-97 ENERCALC d:bwrcakrhW205.w KwMw2284. V5.0.3. 27-Aug-1997. \ ___ in32
rnh : Reflex Dtgnr: sa Dercrlptlon :
Job # 98205
Date:
Scape: NewBuildlng 22 L Tilt-Up Wall Panel Design
Description Line 5 at openings
1 Analysis Data 1
E
n=EslEc
Fr =
Ht I Thk Ratio
Valuw for Mn Calculation. .. [Pu:tot + AsFyyFy
a : (AsFy + Pu)/(.85 fc b)
c = a I .85
lgross
lcrecked
I-eff (ACI methods only)
Phi: Capacity Reduction Mn = As:eff Fy (d - an)
3,122,018.6 psi 9.29 273.86 psi
31.38
Sgross
Mcr = S * Fr
84.500 in3
23.141.3 in4
Rho: Bar Reinf Pct 0.0214
Seis m i c Wind
0.318 in 0.305 in
0.624 in 0.598 in
0.734 in 0.704 in
274.625 in4 274.63 in4
20.30 in4 19.77 in4
0.00 in4 0.00 in4
0.900 0.900
56,118.20 in# 54,032.98 in#
LAdUitional Values I
Seism Wind Wall Weight 78.542 psf ic
Wall Wt * Wall Seismic Factor 23.562 psf Applied Axial Load 2,003.40 1,502.55 Wfl Wall Wt * Parapet Seismic Factor 58.906 psf Lateral Wall Weight 1,154.56 865.92 dvfl
Service Applied Axial Load 1,431.00 dvfl Total Lateral Loads 3,157.96 2,368.47Wfl
Service Wt @ Max Mom
Total Service Axial Loads
Loads used for analysis Factored Loads
824.69 Wfl
2.255.69 #Iff I ACI Factors (per ACI, applied internally to entered loads) I ACi 9-1 8 9-2 DL 1.400 ACI 9-2 Group Factor 0.750 UBC 1921.2.7 "1.4 Factor 1 400
ACI 9-1 & 9-2 LL 1.700 ACI 9-3 Dead Load Factor 0.900 UBC 1921.2.7 "0.9" Factor 0.900
ACI 9-1 8 9-2 ST 1.700 ACI 9-3 Short Term Factor 1.300 .... seismic=ST*: 1,100
(C) 1983-97 ENERCALC d:knercaIcrhW2X,em KW-0602284. V5.0.3.27-Aug-lW7, Win32
TiUe : Reflex Job # 982%
Dcqnr: 1)8 Me: Description :
Scope: NSVVBullding 23
Tilt-UD Wall Panel Design
Description Line A
[General Information 1 Clear Height 17.000 fl ?C 3,000.0 psi Seismic Zone 4
Paraoet Heiaht 2.000 fl Fv 60.000.0 osi Min Vert Steel % 0.0020 - Thickness 6.500 in Pii 0.900 Min Horu Steel % 0.0012
Bar Size 5 Width 12.000 in Base Fixity 0%
Bar Spacing 14.000 in Wall Seismic Factor 0.3000
Bar Depth 3.250 in Parapet Seismic Factor 0.7500
Max Den. Ratio 150.0 LL 8 ST Not Combined
Concrete Weight 145.00 pcf Using: UBC Sec. 1914.0 method ... Exact, Non-Iterated
Parapet Does Not Reduce Moments
LLoads I
Lateral Loads Vertical Loads Wind Load 16.000 psf Uniform DL 78.00 Wft
Uniform LL 120.00 Wft
Point Load . Ibs ... eccentricity 6.750 in ... height ft ... load type Seismic Concentric DL . . wft
Lateral Load Wfl ... distance to too ft
Concentric LL Wfl
... distance to bot R ... load Woe Seismic
Seismic "I" Magnifier 1.000 Wind "I" Maonifier 1.000 j
For Service Load Deflections - Wind Seismic Wind
Basic Defl w/o P-Delta 0.074 0.046 in 0.053 0.037 in
Basic M w/o P-Delta 14,668.6 9,119.8 in# 10,477.6 7,199.2 in#
Moment Excess of Mcr 0.0 0.0 in# 0.0 0.0 in#
Max. P-Delta Deflection 3.732 3.777 in 0.053 0.037 in 8,426.9 in# Max P-Delta Moment 19,385.0 12,699.6 in4 11,705.2
Maximum.Allow Vertical Bar Spacing 18.000 in Parapet Bar Spacing Req'd : SEISMIC 18,000 in
Maximum Allow Horizontal Bar Spacing 18.000 in Parapet Bar Spacing Req'd : WIND 18.000 in
Wall Design OH
2.00fl parapet, 6.50in thick with #5 bars at 14.00in on center, d= 3.25ir1, Pc = 3,OOO.Opsi,
Using: UBC Sec. 1914.0 method ...Eract, Non-Iterated
Factored Load Bending : Seismic Load Governs Service Load Deflection : Seismic Load Governs
Maximum Iterated Moment : Mu 19,385.02 in# Maximum Iterated Deflection 0.053 in
Moment Capacity 45,975.42 in# Deflection Limit 1V360 in
Mn Phi : Moment Capacity
Applied: Mu @ Mid-Span
Applied: Mu @ Top of Wall
Maw Iterated Service Load Deflection
Actual Deflection Ratio
Seismic 45,975.42 in#
19,385.02 in#
1,871.10 in,#
0.05 in
3,834 : 1 I Actual Reinforcing Percentage 0.0088 Allowable Max. Reinf. Percent = 0.5 Rho Bal 0.0128
Wind 45,209.72 in#
12,699.58 in# 552.82 in#
0.04 in
5,567 : 1
0.0068
0.0128
Actual Axial Stress : (Fw + Po )/ Ag
Allowable Awial Stress = 0.4 rm
11.57 psi
120.00 psi 1.1.57 psi
120.00 psi
(c) I98347 ENERCALC d:knercalcrhWZO5.w KW4802284. VS.0.3, 27-AUg-1997, '
THIO : Reflax Dsgnr: M Date: Dascrlptlon :
Scope : New Bullding
Job # 98205
1J L Tilt-Up Wall Panel Design I
Description Line A
I Analysis Data I
E 3,122,018.8 psi Sgross 84.500 in3
n = Es I Ec 9.29 Mcr = S ' Fr. 23,141.3 in# . ..
Fr = 273.88 psi Rho: Bar Reinf Pct 0.0214
Ht / Thk Ratio 31.38
Valuea for Mn Calculation... As:efk [Pu:tot + AsFyYFy
a : (AsFy + Pu)/(.85 fc b) c = a I .85
lgross
lcracked
I-eff (ACI methods only)
Phi: Capacity Reduction
Mn = As:eff Fy (d - an)
Seismic
0.287 in
0.562 in 0.662 in
274.625 in4
19.01 in4
0.00 in4
0.900
51,083.81 in#
Wind
0.282 in
0.552 in
0.649 in
274.63 in4
18.78 in4
0.00 in4
0.900
50.233.02 in#
LAdditional Values I
Seismic Wind Loads used for analysis Factored Loads Wall Weight 78.542 psf
Wall Wt Parapet Seismic Factor 58.906 psf Lateral Wall Weight 1,154.56 865.92 #/ft
Service Applied Axial Load 78.00 #/ft Total Lateral Loads 1,263.76 947.82 #/fl
Service Wt @ Max Mom
Total Service Axial Loads
Wall Wt Wall Seismic Factor 23.562 psf Applied Axial Load 109.20 81.90 Wfl
824.69 Wfl
902.69 Wfl
LAC1 Factors (per ACI, applied internally to entered loads)
ACI 9-1 a 9-2 DL 1.400 ACI 9-2 Group Factor 0.750 UBC 1921.2.7"1.4 Factor 1.400
0,900 UBC 1921.2.7 "0.9" Factor 0.900 ACI 9-1 a 9-2 LL 1.700 ACI 9-3 Dead Load Factor
ACI 9-1 8 9-2 ST 1.700 ACI 9-3 Short Term Factor 1.300 .. .
.... seismic = ST : 1.100
.. . .
(c) 198597 ENERCALC d:'anercaIcrhW2%.ecw KW-OW2284, V5.0.3.27-Aug-1997. Win32
~~ ~
Title : Reflex Dagnr: ss mscription :
Job# 98205
mte:
Scop : New Bullding -r
I Tilt-UD Wall Panel Desian C
Description Line A at 7'4" opening
LGeneral Information 1 Clear Height 17.000 R ?C 3,000.0 psi Seismic Zone 4
60,000.0 psi Min Vert Steel % 0.0020
Min Horiz Steel % 0.0012 Parapet Height 2.000 R FY Thickness 6.500 in Phi 0.900 Bar Sue 5 Width 12.000 in Base Fixity 0%
Bar Spacing 14.000 in Wall Seismic Factor 0.3000
Bar Depth 3.250 in Parapet Seismic Factor 0.7500
Max Defl. Ratio 150.0
Concrete Weight
LL & ST Not Combined
145.00 pcf Using: UBC Sec. 1914.0 method ... Exact, Non-Iterated
Parapet Does Not Reduce Moments
LLoads I
Latersl Load8 Vertlcsl Loads Wind Load 16.000 psf Uniform DL 78.00 #R
Uniform LL 120.00 #/R
Point Load . Ibs . . .eccentricitv 6.750 in ... height R ... load type Seismic
Lateral Load 30.00 #/ft ... distance to toD 17.000 R
Concentric DL 1,060.00 #R
Concentric LL 150.00.#/R
... distance to bot 9.250 R Seismic "I" Magnifier 1.000 ... load type Seismic Wind '"I" Magnifier 1.000 I Wall Analysis 1
For Factored Load Stresses For Service Load Deflections Seismic Wind Seismic Wind
Basic Defl wlo P-Delta 0.114 0.046 in 0.082 0.037 in
Basic M wlo P-Delta 23.041.7 9 119.8 in# 16.458.4 7.199.2 in# ~, I Moment Excess of Mcr 10,152.8 0.0 in# 0.0 0.0 in#
Max. P-Delta Deflection 3.816 3.907 in 0.082 0.037 in
Max P-Delta Moment 33.294.1 17.170.5 in# 19,059.3 9,868.5 in#
Maximum Allow Vertical Bar Spacing 18.000 in Parapet Bar Spacing Req'd : SEISMIC 18.000 in
Maximum Allow Horiuontal Bar Spacing 18.000 in Parapet Bar Spacing Req'd : WIND 18.000 in
Wall Design OK
17.00fl clear height, 2.00fl parapet, 6.50in thick wlh #5 bars at 14.00in on center. d= 3.25in, fc = 3.OOO.Opsi,
Using: UBC Sec. 1914.0 method ...Gad, Non-Iterated
Factored Load Bending : Seismic Load Governs Service Load Deflection : Seismic Load Governs
Maximum Iterated Moment : Mu 33,294.12 in# Maximum Iterated Deflection 0.082 in
1.360 in Moment Capacity 49,532.72 in# Deflection Limit, .~.
Mn * Phi : Moment Capacity
Applied: Mu @ MidSpan
Applied: Mu @ Top of Wall
Max Iterated Service Load Deflection Actual Deflection Ratio
Selwnlc 49,532.72 in#
33,294.12 in#
1,871.10 in#
0.08 in
2,501 : 1 I Actual Reinforcing Percentage 0.0068 Allowable Max. Reinf. Percent = 0.5 * Rho Bal 0.0128
Wind 47,894.11 in#
17,170.53 in#
552.82 in#
0.04 in
5,567 : 1
0.0068
0.0128
Actual Axial Stress : (Pw + Po ) I Ag
Allowable Axial Stress = 0.4 * Pm
25.16 psi 25.16 psi
120.00 psi 120.00 psi
(c) 198597 ENERCALC d:knercalcrhW2U5.ecw KWo6M2&i, V5.0.3, 27-Aug-1997, \i in32
Title : Reflex
Dsgnr: sll Description :
Scop : New Building
Job # 98205
mts:
2b
Tilt-Up Wall Panel Design c L I Description Line A at 7-6 opening
1 Analysis Data I
E 3,122,018.6 psi Sgross 84.500 in3 n = Esl Ec 9.29 Mcr= S * Fr 23,141.3 in4
Fr = 273.86 psi Rho: Bar Reinf Pct 0.0214
Ht I Thk Ratio 31.38
Valuw for Mn Calculatlon... Seismic Wind
As:eff= [Pu:tot + AsFyYFy 0.312 in 0.300 in .. a : (AsFy + Pu)/(.85 fc b) 0.588 in
c = al.85 0.719 in 0.692 in
lgross 274.625 in4 274.63 in4
Icracked 20.03 in4 19.56 in4
I-eff (ACI methods only) 0.00 in4 0.00 in4
Phi: Capacity Reduction 0.900 0.900 . '
Mn = As:eff Fy (d - aQ) 55.038.35 in4 53.215.67 in4
0.811 in
1 Additional Values 1
~~~~ Loads used for analysis Factored Loads Wall Weight 78.542 psf Seismic Wind
Wall Wt Wall Seismic Factor 23.562 psf Applied Axial Load 1,593.20 lt194.90 #/fi Wall Wt Parapet Seismic Factor 58.906 psf Lateral Wall Weight 1,154.56 865.92 #/fi
Service Applied Axial Load 1,138.00 Wfi Total Lateral Loads 2,747.76 2.080.82 #/fi
Service Wt @ Max Mom Total Service Axial Loads 824.69 #/e 1,962.69 #Iff
LAC1 Factors (per ACI, applied internally to entered loads) 1 ACI 9-1 8 9-2 DL 1.400 ACI 9-2 Group Factor 0.750 UBC 1921.2.7"1.4" Factor 1.400
ACI 9-1 & 9-2 LL 1.700 ACI 9-3 Dead Load Factor 0.900 UBC 1921.2.7"0.9 Factor 0.900
ACI 9-1 8 9-2 ST 1.700 ACI 9-3 Short Term Factor 1.300 .... seismic= ST': 1.100
(c) 1-7 ENERCALC d:hercalchWm.ecw Kw-0802284, V5.0.3, 27-Aug-1997, Win32
Titk : Reflex Dsgnr: 68 Description :
Job # 98205
Date:
Scope : New Bullding 21
Tilt-Up Wall Panel Design c
Description Line C
[ General Information I Clear Height 17.000 n PC 3,000.0 psi Seismic Zone 4
60,000.0 psi Min Vert Steel % 0.0020
Min Horiz Steel % 0.0012 Parapet Height 2.000 fl FY Thickness 6.500 in Phi 0.900 Bar Size 5 Width 12.000 in Base Fixity 0%
Bar Spacing 14.000 in Wall Seismic Factor 0.3000
Bar Depth 3.250 in Parapet Seismic Factor 0.7500
Max Den. Ratio 150.0 LL & ST Not Combined
Concrete Weight 145.00 pcf Using: UBC Sec. 1914.0 method ... Exact, Non-Iterated
Parapet Does Not Reduce Moments 1 Loads I
Lateral Loads Vertical Loads Wind Load 16.000 psf Uniform DL
Uniform LL
Point Load I Ibs ... eccentricity
... load type Seismic Concentric DL Concentric LL
... height fl
Lateral Load #/fl
52.00 #/TI
80.00 kvfl
6.750 in
#In
#Iff
... distance to top fl ... distance to bot fl Seismic "I" Magnifier 1.000 ... load type Seismic Wind "I" Magnifier 1,000
Wall Analysis I
Basic Defl w/o P-Delta
For Factored Load Stresses Seismic Wind Seismic
0.074 0.046 in 0.053 0.036 in
Basic M w/o P-Gni 14,545.8 9,027.7 in# 10,389.8 7,111.5 in#
Moment Excess of Mcr 0.0 0.0 in# 0.0 0.0 in#
Max. P-Delta Deflection 3.730 3.774 in 0.053 0.036 in
Max P-Delta Moment 19,123.8 12,501.3 in# 11.582.1 8,303.8 in#
Maximum Allow Vertical Bar Spacing 18.000 in Parapet Bar Spacing Req'd : SEISMIC 18.000 in
Maximum Allow Horizontal Bar Spacing 18,000 in Parapet Bar Spacing Req'd : WIND 18.000 in
Wall Design OW
17.00fl clear height, 2.00ff parapet, 6.50in thick with #5 bars at 14.00in on center. d- 3.25in. fc = 3.00O.Opsl
Using: UBC Sec. 1914.0 method ...Exact, Non-Iterated
Factored Load Bending : Seismic Load Governs Service Load Deflection : Seismic Load Governs
Maximum Iterated Moment : Mu 10,123.77 in4 Maximum Iterated Deflection 0.053 in
Moment Capacity 45,887:36 in# Deflection Limit 1.360 .. . in
I Mn * Phi : Moment Capacity
Applied: Mu @ Mid-Span
Applied: Mu @ Top of Wall
Seismic 45,887.36 in#
19,123.77 in#
1,247.40 in#
Max Iterated Service Load Deflection
Actual Reinforcing Percentage 0.0068 Allowable Max. Reinf. Percent = 0.5 * Rho Bal 0.0128
0.05 in
3.873 : 1 Actual Deflection Ratio
Wind 45,143.42 in#
12,501.30 in# 368.55 in#
0.04 in
5,649 : 1
0.0068
0.0128
Actual Axial Stress : (pw + Po ) / Ag
Allowable Axial Stress = 0.4 f'm 11.24 psi 11.24 psi
120.00 psi 120.00 psi
(C) 198597 ENERCALC d:~nercaIcrhW8205.ecw KW-0802284, V5.0.3, 27-Aug-1997. \ ~ n32
Title : Reflex
bgnr: (u Description :
Scow : New Building
Job # 98205
Date:
. 29
Tilt-UD Wall Panel Desian
Description Line C
LAnalysis Data I
E 3,122,018.6 psi Sgross 84.500 in3
n = Es IEc 9.29 Mcr = S * Fr
Fr = 273.86 psi Rho: Bar Reinf Pct 0.0214
Ht I Thk Ratio 31.38
23,141.3 in#
Values for Mn Calculation. .. Axeft= [Pu:tot + AsFyYFy
a : (AsFy + Pu)1(.85 fc b)
c=a1.85
Seismic
0.286 in
0.561 in
0.660 in
Wind
0.281 in
0.551 in
0.648 in
lgross 274.625 in4. 274.63 in4
lcracked 18.98 in4 18.76 in4
I-aff (ACI methods only) 0.00 in4 0.00 in4
Mn = As:eff Fy (d - aQ) 50,985.95 in# 50.159.36 in#
Phi: Capacity Reduction 0.900 0.900
LAdditional Valuds 1
Wind Loads used for analysis Factored Loads Wall Weight 78.542 psf Seismic
Wall Wt *Wall Seismic Factor 23.562 psf Applied Axial Load 72.80 54.60 Wfl
Wall Wt * Parapet Seismic Factor 58.906 psf Lateral Wall Weight 1,154.56 865.92 #/fl
Service Applied Axial Load 52.00 Wfl Total Lateral Loads 1,227.36 920.52 Wfl
Service Wt @ Max Mom
Total Service Axial Loads
824.69 Wft
876~69 #lft . . - . . . . . . . . _. - _. . . . . . . .. . . .
ACI Factors (per ACI, applied internally to entered loads) 1 ACI 9-1 & 9-2 DL 1.400 ACI 9-2 Group Factor 0.750 UBC 1921.2.7"1.4" Factor 1.400
ACI 9-1 & 9-2 LL 1.700 ACI 9-3 Dead Load Factor 0,900 UBC 1921.2.7"0.9 Factor 0.900
ACI 9-1 & 9-2 ST 1.700 ACI 9-3 Short Term Factor 1.300
.. .. .... seismic= ST': 1.100
(c) 1983-97 ENERCALC d:\enercnlcrhW205.ecw KWo6M284. V5.0.3, 27-Aug-1997. Win32
Mle : Reflex
Dsgnr: as Description :
Job # 98205
Date:
Scope : New Bulldlng 24
Tilt-UD Wall Panel Desian
Description Line 1 at 12-0" opening
LGeneral Information I Clear Height 17.000 R fC 3,000.0 psi Seismic Zone 4
Paranet Heiaht 2.000 ft Fv 60.000.0 Dsi Min Vert Steel % 0.0020 .~~ . ~ ~~ " .- Thiciness 6.500 in Phi 0.900 Min Horiu Steel % 0.0012
Bar Size 5 Width 12.000 in Base Fixity 0%
Bar Spacing 14.000 in Wall Seismic Factor 0.3000
Bar Depth 3.250 in Parapet Seismic Factor 0.7500
Max Defl. Ratio 150.0 LL 8 ST Not Combined
Concrete Weight 145.00 pcf Using: UBC Sec. 1914.0 method ... Exad, Non-Iterated
Parapet Does Not Reduce Moments
~~ ~~~ ~~~~ ~~
Lateral Loads Vertlcal Loads Wind Load 16.000 psf Uniform DL 208.00 #nt
Uniform LL 320.00 #/R
Point Load I I bs ... eccentricity 6.750 in .. . ... height n ... load type Seismic Concentric DL 1,522.00 WR Concentric LL 640.00 #m
Lateral Load 47.00 #/R ... distance to top ... distance to bot 12.000 R Seismic "I" Magnifier 1.000 ... load type Seismic Wind '"I" Magnifier 1.000
17.000 R
1 Wall Analysis 1
For Service Load Deflections Seismic Wind Seismic Wind
Basic Defl wlo P-Delta 0.107 0.049 in 0.076 0.039 in
Basic M w/o P-Delta 20,829.4 9,595.8 in# 14,878.2 7,655.0 in#
Moment Excess of Mcr 11,194.2 0.0 in# 0.0 0.0 in#
Max. P-Delta Deflection 3.862 3.975 in 0.076 0.039 in 11.123.8 in# Max P-Delta Moment 34,335.5 20,244.4 in# 18,241.6
Maximum Allow Vertical Bar Spacing 18.000 in Parapet Bar Spacing Req'd : SEISMIC 18.000 in
Maximum Allow Horizontal Bar Spacing 18.000 in Parapet Bar Spacing Req'd : WIND 18.000 in
Wall Design OM
17.00fl clear height, 2.00fl parapet, 6.50in thickwith #5 ban at 14.00in on center, d= 3.25411, fc = 3.OOO.OpSi,
Using: UBC Sec. 1914.0 method ...bad, Non-Iterated
Factored Load Bending : Seismic Load Governs Service Load Deflection : Seismic Load Governs
Maximum Iterated Moment : Mu 34,335.50 in# Maximum Iterated Deflection O:076 in
Moment Capacity 51,491.25 in# Deflection Limit 1.360 in
Mn Phi : Moment Capacity
Applied: Mu @I Mid-Span
Applied: Mu @Top of Wall 1 Max Iterated Service Load Deflection Actual Deflection Ratio
Seismic 51,491.25 in#
34,335.50 in#
4,989.60 in#
0.08 in
2,679 : 1 I Actual Reinforcing Percentage 0.0068 Allowable Max. Reinf. Percent = 0.5 * Rho Bal 0.0128
Wlnd 49,377.45 in#
20,244.42 in#
1,47420 in#
0.04 in
5,190 : 1
0.0068
0.0128
Actual Axial Stress : (Pw + Po ) IAg
Allowable Axial Stress = 0.4 * fm
32.75 psi 32.75 psi
120.00 psi 120.00 psi
(c) 1983-97 ENERCALC d:knercalcrhW205.enn, W-08Op84. V5.0.3,27-Aug-1997,
Job # 88205 me : Reflex Dsgnr: 88 Date: Description :
Scope : New Buildiw ?o
~
Tilt-Up Wall Panel Design c I
Description Line 1 at 12-0 opening
1 Analysis Data I
E 3,122,018.6 psi Sgross 84.500 in3
23,T41.3 in# n = Esl Ec 9.29 Fr = 273.86 psi Rho: Bar Reinf Pct 0.0214
Ht I Thk Ratio 31.38
Mcr = S Fr
Values for Mn Calculation... As:eff= [Pu:tot + AsFyYFy
a : (AsFy + Pu)/(.85 fc b)
c = a/ .85
igross
lcracked
I-eff (ACI methods only)
Phi: Capacity Reduction
Mn = As:eff Fy (d -an)
Seis m i c
0.325 in
0.638 in
0.750 in
274.625 in4
20.57 in4
0.00 in4
0.900
57,212.40 in#
Wind
0.310 in
0.609 in 0.716 in
274.63 in4
19.98 in4
0.00 in4
0.900 54,883.84 in#
[Additional Values I
~~ ~~~ ~ ~~ ~
Seismic Wind Loads us& for analysle Factored Loads Wall Weight 70.542 psf
Wall Wt Wall Seismic Factor 23.562 psf Applied Axial Load 2,422.00 1,816.50 Wft
Service Applied Axial Load 1,730.00 #Iff Total Lateral Loads 3,576.56 2.682.42Wft
Total Service Axial Loads
Wail Wt * Parapet Seismic Factor 58.906 psf Lateral Wall Weight 1,154.56 865.92 wn
Service Wt @ Max Mom 824.89 wn
2,554.69 wft [ ACI Factors (per ACI, applied internally to entered loads) I
ACI 9-1 8 9-2 DL 1.400 ACI 9-2 Group Factor 0.750 UBC 1921.2.7"1.4" Factor 1.400
ACI 9-1 & 9-2 LL 1.700 ACI 9-3 Dead Load Factor 0,900 UBC 1921.2.7 "0.9" Factor 0.900
ACI 9-1 a 9-2 ST 1.700 ACI 9-3 Short Term Factor 1.300
seismic = ST : 1.100
KW.06M284, V5.0.3, 27-Aug-1997, Win32 (c) 198397 ENERCALC dknercalcrhWZU5,emv
~ ~
TIUn : Reflex Dsgnr: ss wption :
, . Job # %205
Date:
Scop : New Bullding 31
Tilt-UD Wall Panel Desian
Description Line 5 at girder
1 General Information 1 Clear Height 22.500 fl FC 3,000.0 psi Seismic Zone 4
60,000.0 psi Min Vert Steel % 0.0020
Min Horii Steel % 0.0012 Parapet Height 1.500 R FY Thickness 6.500 in Phi 0.900 Bar Size 6 Width 24.000 in Base Fixity 0%
Bar Spacing 6.000 in Wall Seismic Factor 0.3000
Bar Depth 5.000 in Parapet Seismic Factor 0.7500
Max Defl. Ratio 150.0 LL 8 ST Not Combined
Concrete Weight 145.00 pcf Using: ACI Eq. 9-7 for leff 8 Iterating Deflections
ParaDet Does Not Reduce Moments
LLoads I
Lateral Loads Vertlcal Loads
.. Wind Load 15.000 psf Uniform DL 1,957.00 Wfl
Uniform LL 1,992.00 #In Point Load , Ibs .,.eccentricity 6.750 in ... height fl ... load type Seismic
Lateral Load 89.00 #nt ... distance to top 22.500 fi ... distance to bot i9.ooo n
Concentric DL 1,430.00 Wfl
Concentric LL 275.00 #Iff
Seismic "I" Magnifier 1.000 ... load type Seismic Wind "I" Magnker 1.000 ] Wall Analysis I
For Factored Load Stresses For Service Load Deflections Seismic Wind Wind
Basic Defl wlo P-Delta 0.510 0.129 in 0.158 0.101 in
29,386.1 in# Basic M wlo P-Delta 64,863.3 35,981.2 in-# 42,390.4
Moment Excess of Mcr 10,227.4 0.0 in# 299.6 0.0 in#
Max. P-Delta Deflection 0.525 0.168 in 0.213 0.138 in
Max P-Delta Moment 66,737.3 36,844.6 in-# 46,881.7 30,210.3 in#
Maximum Allow Vertical Bar Spacing 18.000 in Parapet Bar Spacing Req'd : SEISMIC 18.000 in
Maximum Allow Horizontal Bar Spacing 18.000 in Parapet Bar Spacing Req'd : WIND 18.000 in
Wall Design OK
22.5M1 clear height, 1.50ft parapet, 6.50in thick wth #6 ban at &Win on center, d= 5.0Oii, Pc = 3.000.0psi. F
Using: ACI Eq: 9-7 for leff & Iterating Deflections .. . ..
Factored Load Bending : Seismic Load Governs Service Load Deflection : Seismic Load Governs
Maximum Iterated Moment : Mu 66,737.32 in# Maximum Iterated Deflection 0.213 in
Moment Capacity 323.141.70 in# Deflection Limit 1.800 in
Seismic Wind
Mn * Phi : Moment Capacity 323.141.70 in# 320,004.18 in-#
Applied: Mu @ Mid-Span 66,737.32 in# 36,644.61 in#
Applied: Mu @ Top of Wall 37,318.04 in# 13,87023 in# I Max,lterated Service Load Deflection
Actual Deflection Ratio
0.21 in
1,265 : 1 I Actual Reinforcing Percentage 0.0110 Allowable Max. Reinf. Percent = 0.5 Rho Bal 0.0126
0.14 in
1,959 : 1
o.oiio
0,0128
Actual Axial Stress : (Pw + Po ) I Ag
Allowable Axial Stress = 0.4 fm
34.55 psi 34.55 psi
120.00 psi 120.00 psi
KW-OSO2Z4. V5.0.3, 27-AUg-1997,\ (C) 198597 ENERCALC d:\enercabrhW98M5.ecw
Title : Reflex
Dsgnr: ss Dererlptlon :
Job # 98205
Date:
Scope: NewBullding --
Tilt-Up Wall Panel Design
Description Line 5 at girder
1 Analysis Data 1
E 3,122,018.6 psi n = Es / Ec 9.29
Fr = 273.86 psi
Ht / Thk Ratio 41.54
Values for Mn Calculatlon ... As:efk (Pu:tot + AsFyyFy
a : (AsFy + Pu)/(.85 fc b)
c = a I .85
Seismic
1.446 in 1.417 in 1.668 in
~~
sgross 169.000 in3
Mcr = S * Fr 46,282.6 in# Rho: Bar Reinf Pct 0.0214
Wind 1.414 in 1.387 in 1.631 in
lgross 549.250 in4 549.25 in4
lcracked 186.23 in4 183.81 in4
I-eff (ACI methods only) 549.25 in4 549.25 in4
Phi: Capacity Reduction 0.900 0.900 Mn = As:eff Fy (d - a/2) 359.046.33 in4 355,560.21 in4 1 Additional Values 1
Loads used for analysls Fd0.4 I find. . --.-.-- ----- Wall Weight 78.542 psf Seismic Wind
Wall Wt * Wall Seismic Factor 23.562 osf Aoolied Axial Load 2.370.90 1.778.17 Wfi , .~~ ~- 7-~ rr - -~~~ Wall Wt Parapet Seismic Factor 58.906 psf Lateral Wall Weight 1,401.97 1,051.48 #m Service Applied Axial Load 1,693.50 Wfi Total Lateral Loads 3,772.87 2.829.65 #/fl
Service Wt @ Max Mom
Total Service Axial Loads
1,001.41 Wff
2,694.91 #lft
[ACl Factors (per ACI. applied internally to entered loads) i ACI 9-1 & 9-2 DL 1.400 ACI 9-2 Group Factor 0.750 UBC 1921.2.7"1.4" Factor 1.400
ACI 9-1 & 9-2 LL 1.700 ACI 9-3 Dead Load Factor 0.900 UBC 1821.2.7 "0.9 Factor 0.900
ACi 9-1 8.9-2 ST 1.700 ACI 9-3 Short Term Factor 1.300 .... seismic=ST*: 1,100
d:bnercalcrhW820S,ecw ~-0602284. VS.0.3. 27-Aug-1997, Win32 07 ENERCALC
Job# 88206 Date: Juiy'98 - Title ReM Designer: ss De sc rl pt i o n :
Scope New Building
SOLORIO AND ASSOCIATES STRUCTURAL ENGINEERING
33
COLUMN REACTIONS
~.wy~il~kolonoW82U5 nlla3is8205 wpd ALL RIGHTS RESERVED, CQPYRIGHT 1908 0
3Y
Constants
Ib pcf := -
R3
Ib psis-
in2
Ib Ib psf := - plf .= - f? R
FOOTINGS
Continuous footing along line I
Continuous footing along line 5
32.A
2 dl + wl" w + Wvvl.H wb P dl := -'
Continuous footing along line A, and G
1O.R
2 dl + wl" w p dl '= _.
Tile : Reflex Dsgnr: 88 Description :
Job # 98205
Date:
Scope: NewBuildii 35
General Footing Analysis & Design h
Description along line 1
[General Information I Allowable Soil Bearing 1,800.0 psf Dimensions ...
Short Term Increase 1.330 in
Base Pedistal Height 0.000 in
Width along X-X Axis Length along Y-Y Axis 1.oooft
2.000 ft
Seismic Zone 4 Footing Thickness 14.50 in
Overburden Weight 0.00 psf Col Dim. Along X-X Axis 6.50 in
Live & Short Term Combined 12.00 in
fC 3,000.0 psi
Concrete Weight 145.00 pcf Rebar Cover 3.00 in
Col Dim. Along Y-Y Axis
60,000.0 psi Min Steel 0.0014 FY
1 Loads I
Applied Vertical Load. .. Dead Load 1.741 k ... ecc along X-XAxis 0.000 in
LiveLoad ' 0.192 k ... ecc along Y-Y Axis 0.000 in
Shori Term Load k
c-s (pressures @ left & right)
Creates Rotation about X-X Axis
(pressures @top & bot) Applied Momen ts...
Dead Load k-ft k-ft
Live Load k-R k-R
Short Term k-ft k-ft
Creates Rotation about X-X Axis
(pressures @top 8 bot) Creates Rotation about Y-Y Axis
(pressures @ left 8 right)
Dead Load k k
Live Load k k
Short Term k k
Applied Shears. ..
Summary Footing Design OK
2.00 fl XI .OO fl Footing, 14.5 in Thick, w6.50 x 12 00 in column 0.0 in high
DL+LL DL+LL+ST &tJ@ Allowable
Max Soil Pressure 1,141 7 1,141 7 psf Max Mu 0 367 k-ft
Allowable 1,800 0 2,394 0 psf Required Steel Area o 193 in2
Vn'Phi "X Ecc, of Resultant 0.000 in 0.000 in
1-Way 0.000 93:113psi "Y' Ecc, of Resultant 0.000 in 0.000 in
X-X Min. Stability Ratio ggg.000 1.500 :1 2-Way 0.689 186.226 psi
Y-Y Min. Stability Ratio ggg.o00:1
Shear Stresses .... &
1 Footing Design I Shear Forces AC19-2 Vn Phi
Two-way Shear 0.69 psi 0.68psi 0.39 psi 186.23 psi
One-way Shears ... Vu @ Left 0.00 psi 0.00 psi 0.00 psi 93.1 1 psi
Vu @ Right 0.00psi 0.OOpsi 0.00 psi 93.11 psi
Vu @ Top 0.OOpsi 0.00 psi 0.00 psi 93.11 psi
Vu @ Bottom 0.00psi 0.00psi 0.00 psi 93.11 psi
Moments &g&l As Rea'd
Mu @ Left 0.37 psi 0.36 k-ft 0.21 k-ft 3.1 psi 0.19in2 perft
Mu ij Right 0.37psi 0.36 k-ft 0.21 k-ft 3.1 psi 0.19in2 perft
Mu @ Top 0.00 psi 0.00 k-ft 0.00 k-ft 0.0 psi 0.02 in2 per ft
MU @ Bottom 0.00 psi 0.00 k-ft 0.00 k-ft 0.0 psi 0.02in2 perft
d:k?nercalcrhW205.ecw W~2284, V5.0.3.27-Aug-1997, Win32 (c) 1983-97 ENERCALC
TMe : Rdex Dsgnr: 88 Description :
Job # 98205
D.te:
Scope : New Building 36
General Footing Analysis 8 Design
Description along line 1
isoil Pressure Summary I
Sewice Load Soil Pressures Left Right TOP Bottom
DL + LL 1,141.71 1,141.71 1,141.71 1,141.71 psf
DL + LL+ ST 1,141.71 1,141.71 1,141.71 1,141.71 psf
ACi Eq. 9-1 1,627.19 1,627.19 1,627.19 1,627.19 psf
941.14 psf ACi Eq. 9-3 941.14 941.14 941.14
Factored Load Soil Pressures
ACi Eq. 9-2 1.598.39 1,598.39 1,598.39 1,598.39 psf
ACi 9-1 & 9-2 DL 1.400 ACI 9-2 Group Factor
ACI 9-1 8 9-2 LL 1.700 ACI 9-3 Dead Load Factor 1.400 UBC 1921.2.7 "0.9" Factor 0.900
ACI 9-1 8 9-2 ST I. 700 ACI 9-3 Short Term Factor 1.400 .... seismic=ST*: 1.100
(C) 1-97 ENERCALC d:knermkrhwm,ecw KW-06M284, V5.0.3. 27-Aug-1997. Win32
Job # 98205 mt.:
Scope : New Building 37
General Footing Analysis 8 Design b L . I
Description along line 5
Allowable Soil Bearing 1.800.0 DSf Dimensions ... - Short Term Increase 1.330 in
Base Pedistal Height 0.000 in
Seismic Zone 4
Overburden Weight 0.00 psf
Live 8 Short Term Combined
fc 3,000.0 psi
FY 60,000.0 psi
Concrete Weight 145.00 pcf
~ ~ ~~~
Width along X-X Axis
Length along Y-Y Axis
2.000 ft
1.000 ft
Footing Thickness 14.50 in
Col Dim. Along X-X Axis 6.50 in
Col Dim. Along Y-Y Axis 12:00 in
Min Steel 0.0014
Rebar Cover 3.00 in
LLoads I
Applied Vertical Load ... Dead Load 2.215 k ... ecc along X-X Axis 0.000 in
LiveLoad
Short Term Load
Applied Momen ts...
Dead Load
Live Load
Short Term
Applied Shears ...
Dead Load
Live Load
Short Term
0.192 k
k
Creates Rotation about Y-Y Axis
(pressures @ left 8 right)
k-ft
k-ft
k-ft
Creates Rotation about Y-Y Axis
(pressures @ left & right)
k
k
k
..ecc aloni Y-Y Axis 0.000 in
Creates Rotation about X-X Axis
(pressures @top 8 bot) - k-n
k-n
k-n
Creates Rotation about X-X Axis
(pressures @top 8 bot)
k
k
k
I [ 2.00 flxl.00 flFooting, 14.5 inThick, w/8.50 x12.00 in column 0.0 in high
DL+I L+ST &&I Allowable
Max Soil Pressure 1.378.7 1.378.7 DSf Max Mu 0.455 k-ft 1 Allowable 1,800.0 2;394.0 psf Required Steel Area
'X' Ecc, of Resultant 0.000 in 0.000 in
"Y' Ecc, of Resultant 0.000 in 0.000 in
X-X Min. Stability Ratio ggg.000 :1 1.500 :I 2-Way 0.855
Shear Stresses .... ~
I-Way 0.000 93.113 psi
186.226 psi 1 Y-Y Min. Stability Ratio ggg,ooo :I I
I 1 Footing Design
Shear Forces AC19-2 Vn * Phi
Two-way Shear 0.85 psi 0.84 psi 0.50 psi 186.23 psi
One-way Shears ...
Vu @ Left
Vu @ Right
Vu @ Top
Vu @ Bottom
Moments
Mu @ Left
Mu @ Right
Mu @Top
Mu @ Bottom
(C) 1983.97 ENERCALC
0.00 psi
0.00 psi
0.00psi
0.00 psi
0.46psi
0.46 psi
0.00psi
0.00 mi
0.00 psi 0.00 psi
0.00psi 0.00 psi
0.oopsi 0.00 psi
0.00 psi 0.00 psi
0.45 k-ft 0.26 k-ft
0.45 k-ft 0.26 k-ft
0.00 k-ft 0.00 k-fl
0.00 k-n 0.00 k-ft
d:bnercaicrhW8205.m
93.11 psi
93.1 1 psi
93.11 psi
93.11 psi
As Rea'd
3.8 psi 0.19in2 perft
3.8 psi 0.19in2 perft
0.0 osi 0.02in2 perft
0.0 Psi 0.02~ berft
KW-0602284. vS.0.3,27-Aug-1997. Win32
Title : Reflex Job# WX5 Dsgnr: 8s Date: MscripUon :
Scope : New BulMing
3.P
General Footing Analysis & Design h
Description along line 5
I Soil Pressure Summary I Service Load Soil Pressures Lefl Right TOP Bottom
DL + LL 1.378.71 1,378.71 1,378.71 1,378.71 psf
DL + LL + ST 1,378.71 1,378.71 1,378.71 1,378.71 psf
ACI Eq. 9-1 1,958.99 1,958.99 1,958.99 1,958.99 psf
ACI Eq. 9-2 1.930.19 1,930.19 1,930.19 1,930.19 psf
ACI Eq. 9-3 1,154.44 1,154.44 1,154.44 1,154.44 psf
Factored Load Soil Pressures
[ ACI Factom (per ACI, applied internally to entered loads) I ACI 9-1 8 9-2 DL 1.400 ACI 9-2 Group Factor 0.750 UBC 1921.2.7 "1.4" Factor 1.400
ACI 9-1 8 9-2 LL 1.700 ACI 9-3 Dead Load Factor 1,400 UBC 1921.2.7 "0.9 Factor 0.900
ACI 9-1 8 9-2 ST 1.700 ACI 9-3 Short Term Factor 1.400 .... seismic = ST : 1.100
Job II 98205
Me:
Scope : New Building
39
General Footing Analysis & Design
Description along line A and 0
I General Information I Allowable Soil Bearing 1,800.0 psf Dimensions...
Short Term increase 1.330 in Width along X-X Axis 2.000 ft
Base Pedistal Height 0.000 in Length along Y-Y &is 1.000fl
Seismic Zone 4 Footing Thickness. 14.50 in
Overburden Weight 0.00 psf Col Dim. Along X-X Axis 6.50 in
Live 8 Short Term Combined 12.00 in
fC 3,000.0 psi
Concrete Weight 145.00 pcf Rebar Cover
Col Dim. Along Y-Y Axis
60,000.0 psi Min Steel 0.0014
3.00 in FY
Lloads I
Applied Vertlcai Load ... Dead Load 1.576 k ... ecc along X-XAxk 0.000 in
LiveLoad I
Short Term Load
Applied Momen ta...
Dead Load
Live Load
Short Term
Applied Shears ...
Dead Load
Live Load
Short Term
0.060 k
k
Creates Rotation about Y-Y Axis
(pressures @ left 8 right)
k-ft
k-fl
k-fl
-S
(pressures @ lefl 8 right)
k
k
k
.ecc alona Y-Y Axis 0.000 in
Creates Rotation about X-X Axis
(pressures @top 8 bot)
k-fl
k-fl
k-fl 7
(pressures @top 8 bot)
k
k
k
Footing Design OK
1 2.00 flxl.00 fl Footing, 14.5 in Thick, wB.50 x12.00 in column 0.0 in hgh
DL+LL DL+LL+ST &&&I me I Max Soil Pressure 993.2 993.2 DSf Max Mu 0.307 k-ft 1 Allowable 1,800.0 2,394.0 psf Required Steel Area 0.193 in2 I
"X' Ecc, of Resultant 0.000 in 0.000 in
I-Way 0.000 93.113 psi "Y' Ecc, of Resultant 0.000 in 0.000 in
X-X Min. Stability Ratio ggg.000 :1 1.500 :1 2-Way 0.576 186.226 psi
Y-Y Min. Stability Ratio
Footing Design
Shear Forces &!&j AC19-3 Vn * Phi
Shear Stresses .... &
~~9.000 :I I
Two-way Shear 0.58 psi 0.57 psi 0.35 psi 186.23 psi
One-way Shea e...
Vu @ Left
Vu @ Right
vu @ Top
Vu @ Bottom
Mu @ Left
Mu @Right
Mu @ Top
Mu @ Bottom
rc) 1983-97 ENERCALC
Momenta
0.00psi
0.00 psi
0.00 psi
0.OOpsi
0.31 psi
0.31 psi
0.OOpsi
0.00 psi
0.00psi 0.00 psi
0.00 psi 0.00 psi
0.00 psi 0.00 psi
0.00 psi 0.00 psi
0.30 k-fl 0.19 k-ft
0.30 k-fi 0.19 k-ft
0.00 k-ft 0.00 k-ft
0.00 k-ft 0.00 k-ft
d:'8nercalc~W82C5.ecw
AC19-3
93.11 psi
93.11 psi
93.11 psi
93.11 psi
As Rea'd
2.6 psi O.19inZ perft
2.6 psi 0.19in2 perft
0.0 DSi 0.02 in2 Der ft
0.0 psi 6.b~ in2 piif
Kw4M)2284, V5.0.3, 27-Aug-1997, Win32
Title : Reflex
Dsgnr: M Ducription :
Job# 98205
Date:
scopa : New Building v* L General Footing Analysis & Design .. ..
Description
1 soil ~ressura Summary
along line A and G
I Service Load Soil Pressures Left Right TOP Bottom
DL+ LL 993.21 99321 993.21 993.21 psf
DL + LL+ ST 993.21 993.21 993.21 993.21 psf
ACI Eq. 41 1,399.49 1,399.49 1,399.49 1,399.49 psf
ACI Eq. 9-2 1,390.49 1,390.49 1,390.49 1,390.49 psf
ACI Eq. 9-3 866.89 866.89 866.89 866.89 psf
Factored Load Soil Pressures
ACI 9-1 & 9-2 DL 1.400 ACI 9-2 Group Factor 0.750 UBC 1921.2.7 "1.4" Factor 1.400
ACI 9-1 & 9-2 LL 1.700 ACI 9-3 Dead Load Factor 1.400 UBC 1921.2.7"O.V Factor 0.900
ACI 9-1 & 9-2 ST 1.700 ACI 9-3 Short Term Factor 1.400 .... seismic=ST*: 1.100
.. . ..
(C) 198397 ENERCALC d:bnercalcrhWX5,eew kW-C6OZM4. V5.0.3, 27-Awl 997, Win32
Title : Reflex Job # 98205 Dsgnr: 98 Date: meription :
scope : NSW Building UI
Square Footing Design
Description footing D
I General Information I Dead Load 31 000 k Footina Dimension 4 750 ft
Live Load 0.000 k
Short Term Load 0.000 k
Seismic Zone 4
Overburden Weight 0.000 psf Concrete Weight 145.00 pcf
LL 8 ST Loads Combine
Load Duration Factor
Column Dimension
1.000
8.00 in
Thickness 14.50 in
#of Bars 5
Bar Size 5
Rebar Cover 3.000
TC 3,000.0 psi
FY 60,000.0 psi
Allowable Soil Bearing 1.800.00 Dsf I General I
Rebar Requirement Actual Rebar "6' deoth used 11.188 in As to USE Der foot of Width
20OlFy 0.0033 Total As Req'd
As Req'd by Analysis 0.0007 in2 Min Allow % Reinf
Min. Reinf % to Rea'd 0.0014 %
0.188 in2 0.893 in2
0.0014
4.75R square x 1431 thick weh 5- #5 bars
Max. Static Soil Pressure 1,549.17 psf Vu : Actual One-way 17.92 psi Allow Static Soil Pressure 1,800.00 psf Vn'Phi : Allow One-way 93.11 psi
Max. Short Term Soil Pressure 1,549.17 psf Vu : Actual Two-way 50.53 psi
Ailow Short Term Soil Pressure 1,800.00 psf Vn'Phi : Allow Two-way 186.23 psi
Mu : Actual Mn *Phi : Capacity
Alternate Rebar Selections ...
5 #4's 3. # 5's 3 #6s 4.52 k-R
15.96 k-ft 2 #7'S 2 #as 1 #9S 1 #lo%
(c) 1983-97 ENERCALC d:'.?nercalcrhW83X.ecw ~wd~o2284. V5.0.3.27-Aug-1997, Win32
Mle : REM Dsgnr: M Darcriptlon :
Job # 98205
Date:
Scope : New Building qz .-
Sauare FOC L
1 General Information Dead Load 12.300 k Footing Dimension 3.000 ft
Live Load 0.000 k
Short Term Load o.ooo k
Seismic Zone 4 Overburden Weight 0.000 psf
Concrete Weight 145.00 pcf
LL 8 ST Loads Combine
Load Duration Factor 1.000
Column Dimension 8.00 in
Thickness
# of Ears
14.50 in
4
Bar Sue 5
Rebar Cover 3.000
t-c 3,000.0 psi
FY 60,000.0 psi
Allowable Soil Bearing 1,800.00 psf I General I
Rebar Requirement Actual Rebar "d" deoth used 11.188 in As to USE Der foot of Width
2OO/Fy 0.0033 Total As Req'd
As Req'd by'Anaiysis 0.0002 in2 Min Allow % Reinf
Min. Reinf % to Req'd 0.0014 %
0.188 in2 0.564 in2
0.0014
-Footing OK
3.00fl square x 14.5in thick with 4- #5 bars
Allow Static Soil Pressure 1,800.00 psf Vn'Phi : Allow One-way 93.11 psi
Max. Short Term Soil Pressure 1,541.87 psf Vu : Actual Two-way 16.20 psi
Allow Short Term Soil Pressure 1,800.00 psf Vn'Phi : Allow Two-way 186.23 psi
Max. Static Soil Pressure 1,541.87 psf Vu : Actual One-way 3.77 PSI
Mu : Actual
Mn * Phi : Capacity
Alternate Rebar Selections.. .
3 #4's 2 #SS 2 #6S 1.47 k-ft
20.05 k-ft 1 #7'S 1 #as 1 #9'S 1 #lo's
..
(e) 1983-97 ENERCALC d:bnercalcrhW205.m KW-O~OZM, V5.0.3. 27-Aug-1997. Win32
SOLORIO 7 AND ASSOCIATES STRUCTURAL 2 ENGI-N~EERING
?me Reflen Job# 88206 WgMr: ss Date: July '98 hscription:
scop ~ew Building
u7 -
SEISMIC FORCES
Seismic Zone: 4
v = z I c w, I R, Z= 0.40
I= 1 .oo
C= 2.75
R,= 6
v= 0.183 W,
E-W Direction
[(I3 ps9 (175 ft) + (17/2+ 2)(97 psf)(2) ] (0.183) = 789 Ibs/ft (4312 Ibs/ft)
N-S Direction
[(13 ps9 (90 ft) + (17/2+ 2)(97 psf)(2) ] (0.183) = 587 Ibs/ft (3207 Ibs/ft)
H UAyF~IeskoIo~oW~ rsllsx\98205 we ALL RIGHTSRESERVED, COPM(IGHTls880
SOLORIO
And Associates
TIUe : Reflex
Dsgnr: as oaKription :
Job #
ME:
Scope : New Building YY
Horizontal Plywood Diaphragm
Description diap.
[ General Information I
North-South Length 96.00 fl Diaphrgm Weight 0.00 psf
Ease-West Length 186.00 R Seismic Factor 1.0000
Nort-South Chord 64.00 R Diaphragm is Blocked
East-West Chord 175.00 R Blocking Direction North-South - 1 Boundary Loads Acting North & South 1 #1 587.00 #lft from 0.000fl to 0.000 fl
#2
#3
#lft from 0.000R to 0.000 fl
#fl from 0.000R to 0.000 fl
n4 nnt from O.OOOR to 0 000 R
#2
#3
#fl from 0.000fl to 0.000 fl
#fl from 0.000R to 0.000 R
#4 #R from 0.000R to 0.000 R
esign Data 8 Nalling Requiremen Shear Zone
Value Distance Grade Nail Size SDacina
in
At North Wall 3x 112"
2nd zone 3x 1R"
3rd zone 2x IR"
Centerzone a: 1 E?'
3rd zone 2x 112"
2nd zone 3x 112"
At South Wall 3x 112"
- in
Structural I 1 Od 2.3,12
Structural I 1 Od 2.5,3,12
Structural I 1 Od 4,6,12
Structural I 1 Od 6,6,12
Structural i 1 Od 4,6,12
Structural I 10d 2.5,3.12
Structural I 1 Od 2.3.12
#uR ft
820.0 0.00
720.0 0.00
425.0 0.00
320.0
425.0 0.00
720.0 0.00
820.0 0.00
Shear Zone I Framing
3rd zone
3rd zone
Center zone
2nd zone 3x
At East Wall 3x
I Shear 8 Chord Forces
Thickness Grade
in
112" Structural I
112" Structural I
1 R" Structural I
112" Structural I
1R" Structural I
1/2" Structural I
112' Structural I
Nail Size
1 Od
1 Od
I Od
1 Od
10d
1 Od
1 Od
Spacing Value Distance
in #fl R
2.3,12 820.0 0.00
2.5.3,12 720.0 23.81
4,6,12 425.0 40.92
6,6,12 320.0
4,6,12 425.0 .. 40.92
2.5,3,12 720.0 23.61
2,3,12 820.0 0.00
1 Diaphragm Shears.. . - North South y&t - East
Total Shear 37,872.01bs 37,672.01bs 54,591.01bs 54,591.0 Ibs
Shear per Foot 203.61Wfl 203.61#/R 568.66#ufl 568.66 #fi
Chord Foh...
@! 114 * Length 29,588.5ibs
@! ll2 * Length 39,663.81bs
@! 314 * Length 29,905.9 Ibs
Length I Width Ratio 1.938
3,874.51bs
5,193.9lbs
3.W6.1 Ibs
(c) 1W7 ENERCALC d:\enercalcrhWX5.ecw ~~~84. V5.0.3,27-Aug-1997. Win32
SOLORIO AND ASSOCIATES STRUCTURAL 5 ENGINEERING
Title Rem Job# WZOS De8ignsr: 88 Date: Juiy '38 Description:
Scope New Building
PURLIN SUPPORT CALCULATION
Check Detail 4 on Drawing sheet SD3
Angle Size
Welded Studs:
Welding: Fy: 60,000 psi
fc: 3,000 psi
5" x 3 1/2 x 1/2" (LLV) x 12 long
(2) 3/4" dia. x 5 3/16 long welded Nelson studs
2.5 long 118" fellet wld each side (total length of weld = 5)
Capacity of weld for lateral loads:
Fillet Weld thk. = 1/8"
Length of weld
Capacity
= 2.5 x two sides = ( 0.70 ) ( 1/8 ) ( 0.3 ) ( 70,000 psi ) ( 2.5 in ) ( 2)
= 9188 Ibs
Capacity of welded'studs ( no lateral loads parallel to wall )
Ps = (0.9) (0.44) (60,000 psi) = 23,760 Ibs
e Pc = (0.65) (1) (3000)05(2.8 x 187 + 4 x 1.22) = 18814 Ibs -
Pc = 28,944 Ibs
Vs = (0.75) (0.44) (60,000 psi) = 19,800 Ibs
eVc =(0.65) (800) (0.44) (1) (3000) = 12,531 Ibs
Vc = 19,278 Ibs
Pu = (1.7) (1.3) (6623 10'/8') = 18296 Ibs
Vu = 13,689 Ibs = (1.4) (45/2)(14) (IO) (1.3)+ (1.7) (45/2)(16) (IO) (1.3)
Try (2) 3/4" dia. bolts
Pu
Vu
e Pc > Pu :. O.K.
= 18296 I2 = 9148 Ibs = 13689 I2 = 6845 Ibs
e VC > VU :. O.K.
(V0.65) [ (PulPc)' + (VuNc)' ]
(1/0.65) [ (9148/28944)' + (6845/19278)' ] = 0.348 :. O.K.
[(Pulps)' + (VUNS)' ]
[(9148/23760)' + (6845/19800)' J = 0.268 :. O.K.
Capacity of Angle
M =bxfFb/6
M
F
= 12" x ( 0.5 )' ( 0.75 x 36000) / 6
= 13,500 # - in
= M / e = 13500 / 2" = 6,750 Ibs :. N.G. use 1/4" thk. Stiffener plate
HIMIFilablorioWX6 rM&BBxH wpd ALL RIGHTS RESERVED. COPM(IGK11W80
SOLORIO -
AND ASSOCIATES STRUCTURAL - CONSULTANTS
STRUCTURAL CALCULATIONS FOR:
REFLEX CORPORATION
Carlsbad Research Center
SA Project No. 98205
Carlsbad, California
PREPARED FOR:
ATS Architecture
1094 Cudahy Place, Suite 116
San Diego, CA 921 10
DATE: July 24, 1998
Solorio and Associates expressly reserves its common law copyright and other property rights in this document. This
document shall not be reproduced, copied, changed or disclosed in any form or manner without first obtaining the express
written consent of Solorio and Associates. 1998
I OB WEST 18" SlRELT TLL: 195dI 63 I - I 500
M15510N. TEXAS 78872 FAX: 195~31 584-7407
EYIIL: .OLORIO@*O*."T.COH
SOLORIO 7 AND ASSOCIATES STRUCTURAL
C 0 N S U LTANTS \ -
Title Reflex Job#: 98206 Designer: ss Date: Sept'93 Description:
Scope New Building M
WALL ANCHORAGE
Cp wall
, Typ. Li3rje A,G
Cp parapet
Height of wall
Height of parapet
Thickness of wall
Weight of Concrete
Center one half increase 1.5
Force per foot 306 Ibs
Anchor Force at 8 feet O.C. 2447 Ibs
Anchor Force at 4 feet O.C. 1223 Ibs
Use
Use lpnlzs]
Ibs
At center one half of dia
Force per foot 459 Ibs
Anchor Force at 8 feet O.C. 3670
Use -1
~~~ Anchor Force at 4 feet O.C. 1835 ibs
Use piiq
CROSS-TIES
Depth of diap.
Width of diap.
Diap. Ratio
Max. Diap. Ratio
Total Shear
Shear per foot
Allowable Shear per foot
Chord Force
Use
2.0 o.k
4.0
4894 Ibs
306 wn 13201 #/ft
2447
note on purlin sched.
At center one half of dia
Depth of diap.
Width of diap.
Diap. Ratio 1.3 0.k.
Max. Diap. Ratio 4.0
Total Shear 7341 Ibs
Shear per foot 306 wn
Allowable Shear per foot 3201 wfl Chord Force 2447
Use note on purlin sched.
1.5
306 Ibs
2447 Ibs
1223 Ibs
r-1
Ibs
459 Ibs
3670
1835 Ibs
pq
IPAIJ51
::
1.0 0.k.
4.0
1223 Ibs
153 Wft
wn
306
0.k.
1.0 0.k.
4.0
1835 Ibs
459
0.k.
ALL RIGHTS RESERVED. COPYRIGHT 1990 0 H:w~iilrr\roiorio\ssZOS ran-.rPd
SOLORIO 7 AND ASSOCIATES STRUCTURAL \ - CON 5 U LTANTS
Title Reflex Job#: 88206 Designer: 68 Date: Sept'SE Description:
Scope New Building Pz-
DESIGN VALUES, cont
CAPACITY OF 6 112" CONCRETE WALL
Section 1911.1.1
Section 191 1.10.3
Section 1921.4.6
Section 1921.6.4.2
Section 1911.10.4
Section 1911.10.5
Section 191 1.10.8
Section 1921.2.7
Section 1921.6.5.1
Section 1921.3
V" 4V"
vn =vc+vs vu = +v,+ 4vs
Nominal Shear Strenght, V,
V" = 10 (f'c)05 hd
= (10)(3000)05 (6.5") (12") (0.8)
= 34178 #lft
Nominal Shear Sfrenghf, V,
v, = 8 (f'c)05 A,
= (8)(3000)05 (3.625") (12")
= 19061 #in
v, V, =A, [ 2 (f'c)05 + pn fv] = (3.625~12) I 2 (3000)05 + 0.0025 x 60000 I .- . Vn = 11290 Ibs
For design for horizontal shear forces in plane of wall, d shall be taken equal to
0.81,
Unless a more detailed calculation is made in accordance with Section 1911.10.6,
shear strenght V, shall not be taken greater than:
vc = 2 (f'c)05 hd = (2)(3000)05 (6.5") (12") = 8544 Ibslft
Should Vu > 4 V, I2 shearwall reinforcing per section 191 1.10.9 of the code
Should Vu
V,= A,f,d I s2
Load Factors
U = 1.4 (D+L+E)
U = 0.9D + 1.4E
Strenght-reduction factor 43 per Section 1909.3
4 = 0.85
4 V, the value of V, should be determined by the following expression:
ALL RIGHTS RESERVED, COPYRIGHT 1638 0 H:UIpilssb%tioWZ6 dar(g8205.W
-~
SOLORIO AND ASSOCIATES STRUCTURAL - CONSULTANTS
Title Reflex Job# 88206 Designer: ss Date: Sept'98 Description:
123 Scope New Building
DESIGN VALUES, cont
CAPACITY OF 6 1/2" CONCRETE WALL, cont.
Section 1921.6 Shear Walls
Section 1921.6.2 Reinforcement
Section 1921.6.2.1 Minimum reinforcing ratio = 0.0025, longitudinal and transverse direction
= (0.0025) (6.5) (12)
= 0.195 in2 #4 at 14" O.C. each way minimum
(2) #4 at 14" O.C. each way minimum
Section 1921 6.2.2 Provide two curtains of reinforcement if the in-plane factored shear force exceeds
2Acv(fc)05
For one layer of reinforcing;
V" = (2)(3000)05 (3.625") (12") (0.8) = 3812#1n
Provide standard hook engaging the edge reinforcement terminating at the edges
of shear walls if Vu in the plane of the wall exceeds Acv(fc)' vu = (3000)05 (5") (12")(0.8)
= 2629 #in
Section 1921.6.2.3 Special Transverse reinforcement for sheanvalls.
Not required if maximum extreme fiber stress < 0.2 fc
FU = (1.4) ( 4889 #in) ( ) I (8112)
= 130 psi
= 600 psi > 130 psi :. O.K. No boundary member required
0.2fc = (0.2) (3000)
ALL RIGHTS RESERVED, COPYRIGHT 1008 0 H:wlleaMe.m rsn*fg82cd.w
SOLORIO AND ASSOCIATES STRUCTURAL
CONSULTANTS
Title Reflex Job#: 88205 Designer: ss Date: Sept'98 Description:
Scope New Building
SHEARWALLS
t := 6.5.in d := 12.h f := 3OOO.psi f := 6OOOO.psi
Ib Q := 0.85 V := 2.6.d.; v = 8544.- n
Line A,
V = 47397,lb V f '= O.Ib Seismic Load
Lp = 36.5.n Total length shearwalls
Vf V uf := 1.4.- Vr V := 1.4. L p.o.80 L p.o.8
v = 2272.plf v "f = 0-plf
V = 2272.plf < VSS ; O.K. Vr+Vf
L p.o.8 Vu := 1.4.
v ss '= 0.v V ss = 7263 -plf
\
HlMy5ilr\rolm~oWxX r.nexW8rn.M ALL RIGHTS RESERVED, COPYRIGHT 1898 0
SOLORIO AND ASSOCIATES STRUCTURAL - CONSULTANTS
Title Reflex Job#: SS206 Designer: ss Date: Sept'gO Description:
Scope New Building
Line A
Individual Panel Shear
L~~ = 28.n
H = 19.R Height of panel
H ps = 17.n H psf = 0.n
Section 1911.10.9 Design of Horizontal Reinforcing
A = 0.31.si Area of steel
A, =I Number of layers
Individual Panel Length
Height of lateral force at floor/roof
Rebar Area's
3 0.11
4 0.20
5 0.31
6 0.44
& Area in in-2
0.f y.A ,.A s2 :=
V,-@V, s 2 = -38.017 .in
7 0.60
8 0.79
9 1 .oo
Sh = 14.h horizontal spacing of Rebar
ro = 0.0034 >0.0025 min. permitted per code, O.K. An.Av roh =- t's h
Use #5 horizontal at 14" O.C.
Design of Vertical Reinforcing
ro , := 0.0025 + 0.5. 2.5 - - . (m ,, - 0.0025) ( L"P9
L ps = 28.R
ro , = 0.0033
ro , = 0.0025
0.0026 min. permitted per code, O.K.
Rebar Area's A = 0.31.si s& Area in inAZ
A, =I Number of layers 3 0.1 1
4 0.20
5 0.31
6 0.44
s 1 = 19.08-in 7 0.60
8 0.79
9 1 .oo
Av.An SI =- t.ro ,
Use #5 vertical at 14" O.C.
ALL RIGHTS RESERVED, COPYRIGHT lag80
SOLORIO AND ASSOCIATES STRUCTURAL CONSULTANTS
Title Reflex Job# 98208 Designer: 5s Date: Sept '98 Description:
Scope New Building
Line A
Check Panel Overturning
L '= 28.R
H := 19.R
H ps 'z 17.R
P'
H psf := 0.R
L rp .= 8.n Lfp := 0.R
L := 15.R L pof := 0.n
H := 7.5.~ H pof := 0.R
Lps := L -Lpo L ps = 13.R
w := 82.psf
w := 15.psf Wf .= 0.psf
0.8O.v 0.8O.v ur.L ps.H ps + uf.L .H 1.4 PS Psf OT = 1.4
Total Panel Length
Height of panel
Height of lateral force at floor/roof
Length of purlins supported by wall
Height of openings
Length of openings
Panel Length available for shearwall
Weight of panel
Weight of roof, floor
OT = 286979.1.lb*R
RM = 505106.lb-R
OT - 0.85.RM UPL =
LP
UPL = -5084-lb
Upli O.K.
H:Wyfibsbkio!SXX n(lons82M.W ALL RIGHTS RESERVED, COPYRIGHT 1908 0
SOLORIO AND ASSOCIATES STRUCTURAL - CONSULTANTS
Title Reflex Job#: 09106 Designer: ss Date: Sept'98 Description:
Scope New Building
Line& G
Individual Panel Shear
Lps = 13.R
H = I9.fl Height of panel
H ps = 17.R H psf O.fl Height of lateral force at floor/roof
Section 1911.10.9 Design of Horizontal Reinforcing
A, = 0.31.4 Area of steel
A, :I Number of layers
Individual Panel Length
Rebar Area's
3 0.1 1
4 0.20
5 0.31
6 0.44
7 0.60
0 0.79
9 1 .oo
- Size Area in in*2
s := 14.in horizontal spacing of Rebar
ro h = 0.0034 >0.0025 min. permitted per code, O.K.
Use #5 horizontal at 14" O.C.
A ,.A v ro := __ t's h
Design of Vertical Reinforcing
ro = 0.0025 + 0.5. 2.5 - - . (ro ,, ~ 0.0025) ( 3 L ps = 13-fl
ro , = 0.003 0.0025 min. permitted per code, O.K.
ro , := 0.003
A,:= 0.31.si
A,:=I Number of layers
s 1 = 15.9-in
Rebar Area's
si.8 Area in in-2
3 0.11
4 0.20
5 0.31
6 0.44
7 0.60
8 0.79 '
9 1 .oo
Use #5 vertical at IC O.C.
ALL RIGHTS RESERVED, COPYRIGHT 1888 0 H:WMyFilesblaio\88205 rwlexWZC5wpd
SOLORIO AND ASSOCIATES STRUCTURAL - CONSULTANTS
Tile Reflex Job# SS206 Designer: ss Date: Sept'98 Description:
Scope New Building
1213
G Line R
. Check Panel Overturning
Lp := 13.R
H := 19.R
H ps := 17.R H psf := 0.R
L rp := 8.R Lrp := 0.R
L := 0.R L pof := 0.R
L ps := L
w := Spsf w f := O.psf
H :: 0.R H pof := 0.R
L ps = 13-R PO ~ L
W '= 82,psf P'
0.80.V 0.80,~
1.4 .L ps.H ps t 1.4 uf4. ps+ psf OT :=
Total Panel Length
Height of panel
Height of lateral force at floorlroof
Length of purlins supported by wall
Height of openings
Length of openings
Panel Length available for sheatwall
Weight of panel
Weight of roof, floor
OT = 253702.184b*R
Wp.(Hp.Lp- Hpo.Lpo- Hpo~Lpo~)~Lp+Wr~Lrp~0.5~Lp~Lp+ WfLfp.0.5.Lp.Lp
2 RM :=
RM = 136721*1bsR
OT - 0.85.RM UPL :=
LP
UPL = 10576.lb
USE 13AISD1 min.
ALL RIGHTS RESERVED. COPYRIGHT 1898 0 H:!MyFils.!sob,iowm mn-.*rpd
SOLORIO AND ASSOCIATES STRUCTURAL - CONSULTANTS
Title Reflex Job#: 88206 Designer: s Date: Sept'98 Description:
Scope New Building
PI
G
Line &
Section 1921.6.5 Design of Shearwalls for Flexural and Axial Loads
A = 507 *in2
P := 0.10.A g.(f c) P ua = 152100.lb
OT + RM
- 0.8.Lp P = 37541 -lb
Pu Pua ; O.K. Item 2
Or
item 3
Vu 3"lw*h*fcA0.5
t 12 0.5 V '7 3.--.--3000 .Ib in ft
Ib
ft v ua = 12av-
Ib V = 2009.- R .. Vu < Vua; O.K.
No Shear wall boundary zone detail requirements as defined in Section 1921.6.5.6
not required.
ALL RiGKlS RESERVED, COPYRiGHT 1888 0 H:WyfilnblonaW82C6 r4W2aS.*rpd
SOLORIO AND ASSOCIATES STRUCTURAL - CONSULTANTS
Title Reflex Job# 98206 Designer: ss Date: Sept'98 Description:
Scope New Building
PI z
SHEARWALLS
Ib Ib . Ib Ib Ib Ib Ib Ib pcf := - psf := - plf := - psi=- pcf := - si := in.in psf := - plf:= - p,s-
f? fl in2 f13 n2 fl in2 f13
t := 65in d := 12.in f := 3000.psi f := 60000.psi
Q := 0.85 V := 2.6.d.- Vc=8544-- Ib
n fl
I Line A,
V := 37873,lb V f := O.Ib
L := 156.R
Seismic Load
Total length shearwalls
v = 425.plf v "f = O*plf
V ss := Q.V V ss = 7263 -plf
ALL RIGHTS RESERVED, COPYRIGHT 1998 0 HWyFilerkolomWDX r#h!S82oS.rrpd
SOLORIO AND ASSOCIATES STRUCTURAL - CONSULTANTS
Title Reflex Job#: 98206 Designer: ss Date: Sept'98 Description:
Scope New Building
I
Line 4
Individual Panel Shear
Lps = 32.R
Hp = 19.R
H ps = 17.ft
Section 1911.10.9 Design of Horizontal Reinforcing
Individual Panel Length
Height of panel
Height of lateral force at floorlroof H psf = 0.R
Rebar Area's
A := 0.31 .si Area of steel
A, =I Number of layers
rn Area in in2
3 0.1 1
4 0.20
5 0.31
6 0.44
7 0.60
0 0.79
9 1 .oo
s = 14.in horizontal spacing of Rebar
Design of Vertical Reinforcing
ro h = 0.0034 20.0025 min. permitted per code, O.K.
Use #5 horizontal at 14" O.C.
ro = 0.0034 0.0025 min. permitted per code, O.K.
ro , := 0.0034
A := 0.31.si
A,:=I Number of layers
s 1 = 14.03-in
Rebar Area's
3 0.1 1
4 0.20
5 0.31
6 0.44
7 0.60
6 0.79 '
9 1 .oo
& Area in in'2
Use #5 vertical at 14" O.C.
ALL RIGHTS RESERVED, COPYRIGHT 1898 0 H:\MyFil~!sob~io\88205 M&S32Q5wpd
SOLORIO AND ASSOCIATES STRUCTURAL - C 0 N S U LTANTS
Title Reflex Job# 88206 Oesigner: ss We: Sept'98 Description:
Scope New Building
I
Line P:
. Check Panel Overturning
L := 32.R
H .= 19.R
H ps := 17.R H psf := 0.R
L rp := 8.R Lfp := 0.R
Lpo := 12.R L pof := 0.R
Lps := Lp- Lpo L ps = 20.R
w := 15.psf w f := O.psf
H := 12.A H pof := 0.R
W := 82.psf
0.80.v 0.8O.v OT = 1.4
Total Panel Length
'Height of panel
Height of lateral force at floorlroof
Length of purlins supported by wall
Height of openings
Length of openings
Panel Length available for sheanvall
Weight of panel
Weight of roof, floor
OT = 82543.72-lb-A
Wp~(Hp~Lp-Hpo~Lpo-Hpo~Lpo~).Lp+W .L ,0.5.L .L +Wf.Lf .05.L .L
2
RM = r rp PP P' PP
RM = 6394884b-R
OT - 0.85.RM UPL '=
LP
UPL = -14407.lb
Uplift O.K.
ALL RIGHTS RESERVED. COPYRIGHT 1988 0 H:WyFilas\lobrio\gSM5 da882a5.W
SOLORIO AND ASSOCIATES
STRUCTURAL CONSULTANTS
Title Reflex Job# 88206 Designer: as Description: Date: Sept'98
Scope New Building
pcs-
I
Line d
Section 1921.6.5 Design of Shearwalls for Flexural and Axial Loads
Item I
A := t.- PS
2
P ua := 0.10.A g.(f c) ,, ~= or + RM
0.8.L
Item 2
Or
Item 3
Vu < 3"lWh*f'cA0.5
. A = 780-in2
P ua = 234000-lb
P = 282044b
Pu < Pua ; O.K.
Ib V = 12817.- fi
Vu=425-- Ib
fl .. Vu c Vua; O.K.
No Shear wall boundary zone detail requirements as defined in Section 1921.6.5.6
not required.
ALL RIGHTS RESERVED, COPYRIGHT 1998 0 H:IMyFileskolo~oWX5 rdla\O8205.wpd
SOLORIO AND ASSOCIATES STRUCTURAL - CONSULTANTS
Title Reflex Job#: 88205 Designer: M Date: Sept'98 Description:
Scope NewBuilding
SHEARWALLS
Ib Ib . Ib Ib Ib Ib Ib Ib pcf :: - psf ,= ~ plf := - pie- pcf := - si := in.in psf :: - plf:. - p,=-
f? n in2 f13 fl* fl in2 f13
t := 65in d '= 12,in f = 3OOO.psi f := 6OOOO.psi
Q := 0.85 V := 2.p.d.- v = a544.- Ib
fl n
Line 5,
V := 37873,Ib V := 0.lb
L := 124.R
v = 534 .plf vuf=O.plf
Seismic Load
Total length shearwalls
v ss := 0.v V ss = 7263 'plf
ALLRIGHTS RESERVED, COPYRIGHT 19980
SOLORIO AND ASSOCIATES STRUCTURAL - C 0 N S U LTANTS
Title Reflex Job#: 88206 Designer: 66 Date: Sept'98 Description:
Scope New Building
Line 5
Individual Panel Shear
Lps = 32.n
H = 19.R Height of panel
H ps = 17.R
Section 1911.10.9 Design of Horizontal Reinforcing
A 0.31.si Area of steel
A, -1 Number of layers
Individual Panel Length
H psf = 0.R Height of lateral force at floodroof
Rebar Area's
3 0.1 1
4 0.20
5 0.31
6 0.44
7 0.60
6 0.79
9 1 .oo
Area in in-2
s '= 14.in horizontal spacing of Rebar
ro h = 0.0034 >0.0025 min. permitted per code, O.K.
Use #5 horizontal at 14" o.c,
An'Av roh =- t's h
Design of Vertical Reinforcing
ro = 0.0034 0.0025 min. permitted per code, O.K.
ro := 0.0034
AU:=0.31.si
A, =I Number of layers
s 1 = 14.03.in
Rebar Area'$
3 0.1 1
4 0.20
5 0.31
6 0.44
7 0.60
6 0.79 '
9 1 .oo
& Area in in-2
Use #5 vertical at 14" O.C.
ALL RIGHTS RESERVED, COPYRIGHT 1098 0 H:!MyFilas\lobrio\ss2m r-2m.W
SOLORIO -
AND ASSOCIATES STRUCTURAL
CONSULTANTS
Job# S8206 Date: Sept'98
Scope New Building
Line 5
Check Panel Overturning
L := 28.R
H := 19.R
H ps := 17.A H psf := Qfl
L rp := 32.R
Lpo := 15.R
Lfp .= 0.R
Lpof := 0.R
H '= 7.R H pof := 0.R
Lps := Lp- Lpo
W := 82.psf
L ps = 13.fl
w := 15.psf w f := O.psf
0.80,~ 0.80.~ OT := 1.4
Total Panel Length
Height of panel
Height of lateral force at floorhoof
Length of purlins supported by wall
Height of openings
Length of openings
Panel Length available for shearwall
Weight of panel
Weight of roof, floor
OT = 67499.46qlb.R
RM = 584276.lb.R
OT - 0.85.RM UPL :=
LP
UPL = -15326-1b
Uplift O.K.
ALL RIGHTS RESERVED. COPYRIGHT 1888 0 H:!M~ilesblonoW205 ra(leX\88205,wpd
SOLORIO AND ASSOCIATES STRUCTURAL C 0 N S U LTA NTS
Title Reflex Job#: 99206 Designer: IS Description: Date: Sept'98
Scope New Building
Line 5
Section 1921.6.5 Design of Shearwalls for Flexural and Axial Loads
Item 1
A := t.- PS
2 A = 507 -in2
P ua := 0.10.A . f P ua = 152100-Ib 9( c>
OT + RM
= 0.8.Lp P = 290974b
Pu < Pua ; O.K.
Item 2
Or
Item 3
Vu < 3"hv*h"f'c~0.5
t 12 0.5 V ua 3,----.3000 .Ib in ft
Ib v ua = 12817'- ft
Ib vu = 534.- ft Vu < Vua: O.K.
No Shear wall boundary zone detail requirements as defined in Section 1921.6.5.6
not required.
ALL RIGHTS RESERVED. COPYRIGHT 1-8 0 H:!h+yFilar~l~W8205 r.(lu\gBMJ.W
SOLORIO AND ASSOCIATES STRUCTURAL - C 0 N S U LTA NTS
Title Reflex Job# 98206 Designer: ss Date: Sept'gB Description:
Scope New Building
p2D
SEISMIC FORCES
Seismic Zone: 4
V=ZICW,/R,
Z= 0.40
I= 1 .oo
C= 2.75
R,= 6
V= 0.183 W,
E-W Direction
[(I3 ps9 (175 fl) + (17/2+ 2)(82 psf)(2) ] (0.183) = 731 Ibdfl(3997 Ibs/fl)
N-S Direction
[(I3 PSf) (96 ft) + (17/2+ 2)(82 psQ(2) ] (0.183) = 543 Ibs/ft (2970 Ibs/ft)
[(I3 ps9 (40 fl) + (17/2+ 2)(82 psf)(2) ] (0.183) = 411 Ibs/ft (2242 Ibs/fl)
ALL RlGHTS RESERVED, COPYRIGHT 1898 0
FlROUZl
CONSULTING
ENGINEERS, INC.
Title : Reflex Dsgnr: 65 Description :
Scope : New Building
Job#9B205
Date:
Horizontal Plywood Diaphragm h L - I Description diap.
. I General Information I North-South Length 96.00 ft Diaphrgm Weight 0.00 psf
EaseWest Length 186.00 ft Seismic Factor 1.0000
Nod-South Chord 64.00 ft Diaphragm is Blocked
East-West Chord 175.00 ft Blockina Direction North-South - 1 Boundary Loads Acting North 8 South L #I 587.00 #in from 0.ooofl to 0.000 ft
#2 Wft from 0.oooft to 0.000 ft
#3 Wft from 0.000ft to 0.000 ft
#4 Wn from 0.000ft to 0.000 ft
#1 789.00 Wft from o.oooft to 0.000 ft
#2
#3
Wft from 0.oooft to 0.000 ft wft from OOOOft to 0.000 ft
#4 Wft from 0.oooft to 0.000 R
Shear Zone Design Data 8 Nailing Requirement
Framing Thickness Grade Nail Size Spacing Value Distance
in in Nft ft
At North Wall 3x 112” Structural I 1 Od 2.3,12 820.0 0.00
2nd zone 3x 112” Structural I 1 Od 2.5,3,12 720.0 0.00
3rd zone 2x 112’ Structural I 1Ud 4,6,12 425.0 0.00
3rd zone 2x 112” Structural I 1 Od 4,6.12 425.0 0.00
2nd zone 3x 1 /2‘ Structural I 1 Od 2.5,3.12 720.0 0.00
At South Wall 3x 112” Structural I 1 Od 2,3,12 820.0 0.00
Center zone 2x 112” Structural I 10d 6,6,12 320.0
ailing Requirement
Shear Zone
Framing Thickness Grade Nail Size Spacing Value Distance
in in wn ft
At West Wall 3x 112 Structural I 1 Od 2,3,12 820.0 0.00
2nd zone 3x 112” Structural I 1 Od 2.5,3,12 720.0 23.81
3rd zone 2x 1 12” Structural I 1 Od 4,612 425.0 40.92
3rd zone 2x 1 12” Structural I 1 Od 4,6.12 425.0 40.92
2nd zone 3x 112” Structural I 10d 2.5,3.12 720.0 23.81
Center zone 2x 112” Structural I 1 Od 6.6,12 320.0
At East Wall 3x 1 12” Structural I 1 Od 2.3,12 820.0 0.00
LShear & Chord Forces
Diaphragm Shears ... - North - South - West - East
Total Shear 37,872.01bs 37.872.01bs 54,591 .Olbs 54,591.0 Ibs
Shear per Foot 203.61#1ft 203.61#1ft 568.66Wft 568.66 #Ift
@ 114 * Length 29,588.51bs 3,874.51bs
@ 1R * Length 39,663.81bs 5,193.91bs ,
@ 314 * Length 29,905.9 Ibs 3,916.1 Ibs
Chord Forces ...
Length I Width Ratio 1.938
(c) 1983-97 ENERCALC d:!enercalcrh@8205.ecw Kw-060n84, V5.0.3, 27-Aug-1997. Win32
SOLORIO AND ASSOCIATES STRUCTURAL - CONSULTANTS
Title Reflex Job# 88206 Designer: ss Date: Sept’98 Description:
Scope New Building
e22
LATERAL LOAD
ALL RIGHTS RESERVED, COPYRIGHT lSSa 0 H:WyFiles!solorio\ae2m ntlU108M5.rrpd
Title : Reflex
Dsgnr: 58 Description :
Scope : NW Buildma
Job # 98%
Date:
- (22 3 L Single Span Beam Analysis
Description : REACTIONS FOR HORIZONTAL DlAP
I General Information I
1
Center Span 185 oo n Moment of Inertia 1000 in4
Len Cantilever n Elastic Modulus 1 ksi
Right Cantilever R Beam End Fixity Fix-Fix
[Trapezoidal Loads
Magnitude @ Left o 543 wn wn wn wn
Magnitude @ Right 0441 wn un wn klff
Dist To Len Side n n n n
Dist To Right Side 185 ooo n n n n 1 Query Values 1
Center Location 92.ooo n Left Cant 0.000 n
Moment 701.82 k-ft 0.00 k-n
Shear -0.11 k 0.00 k
Deflection #.##### in 0.00000 in
Summary
Moments ... Shears. ..
Max + @ Center 701.82 k-ft at 91.76 n @ Len 47.40 k
Max - @ Center -1,432.33 k-ft at 0.00 n @ Right 43.62 k
@ Len Cant -1.432.33 k-n Deflections ...
@ Right Cant -1,374.14 k-ft @ Center ####.#M in I Maximum = 1,432.33 k-n @ Len Cant. 0.000 in
@ Right Cant 0.000 in
Right Cant 0.000 ft
0.00 k-n
0.00 k
0.00000 in
Reaction E...
@ Len 47.40 k
@ Right 43.62 k
at 91.76n
at o.oon
at 0.00n
(C) 1983-97 ENERCALC d:knercaIcrhL982a5.w KW0602284. V5.0.3.27-Aug-1997, Win32
Qpk?&qBkwwm 16" TJS" OPEN WEB TRUSS @ 96.0" olc
..hmzm~~ 6 3p final Number E!&l3lISZ 'rL,r,zN SlWl Pd It www duMmmt
Member Slops: 0 Roof Slope: .25/12
THtS PRODUCT MEETS OR EXCEEDSTHE SET OESIGN CONTROLS FOR THE APPLICATION AND LOADS LISTED -- r'
I .' 20'
All dimensions are horizontal. Product Diaflram is Conceptual.
LOADS;
Aoalycis for JOIST MEMBER Suppoeing ROOF Application. LeadqpsO: 20 Live at 125% duratien, 15 Dead
5UPPORTS: REACTIONS(lha.)
WOW JUSTIFICATION LIVE/ DEADlTOTAL DETAIL OTHER
1 Zxdplale 3.50 LefcFace 16001120012800 24 Blocking
2 2x4 plate 3.50" Right Face 1600 / 1200 I2800 2x4 Blockina
~ Let support: TOpAlI. Approx. clip heiahl: 3.5", Appmx. clip width: 5". Mowed choieep): TOP (STANDARD) - Right support: TnPAII, Approx. clip height: 3.5, Approx, clip width: 5. Mowed choice@): TOP (STANDARD)
DESIGN CONTROLS:
MAXIMUM DESIGN CONTROL CONTROL LOCATION
Shear(tb) 2754 2754 2?54 Passed(10046) LT. end Span 1 under Roof loading
Moment(R-lb) . f3802 13532 17724 Paraed(TB%) MID Span 1 under Roof IOW~IRQ
Live Defl.(in) 0.451 0.983 Passed(U523) MID Span 1 under Roof loading
Total Dsfl.(in) 0.789 1.31 1 Passed(UZ99) MID Span 1 under Roof loading - Oeflection Criteria: STANDARR(tL:U240, TL:UtdO). - EracingLu): All compression ndges (top and boltern) must be braced at 3' 1" o/c unless detailed otherwise. Proper attachment and
positioning of lateral bracing is required to achieve member stability.
ADDITlONAL NOTES
- IMPORTAM! The analysls presented is output from soRware develbped by TNS Joist MacMlUan(TJM). AlhwableprDducr values shown are in accordance Mh current TJM materials and code accepted design values. The speciflo pmduct application, input design
leads and stated dimensions have been provided by others ( sphoua -0 ASS 0 . , have not been checked for
conformance with the design drawings of fhe building, and have not been reviewed by TJM Engineering. - THIS ANALYSIS FOR TRUS JOIST MacMlLLAN PRODUCTS ONLY! - Wowahte Stress Design methodology was usad for Code NER analydna the TJM Commercial product listed above.
the open web INS$ analysis presented Is appraxirnate. All open web trussee Bra cuslnm designed to car@ the specific deslgn
- Pricing Load(pl9 = 280
PRODUCT SUBSTlTUTiON VOIR5 MIS ANALYSIS,
leads for each project. Aclual truss capacily whon fabricsled is limited to that required lo resist the specified loads.
PROJFCT INFORMATION OPERATOR INFORMATION:
Wex Bldg. TJM
Jay LOW
300 Carlsbad Vllhoe Dr. xZ1B
596
leas 29" TJS" OPEN WE0 TRUSS @ 46.0'' olc a is.*#"#" dB SrnriNurnb" Zwxm
~a~.idi nvldiohliii U'-T'tI srmt yIX* 11 mm*
THIS PRODUCT MEETS OR EXCEEDS THE SET DESIGN CONTROLS FOR THE APPtlCATlON AND LOADS LISTED
-7 Member Slope: a Roof Stope: ,25112 r- I - .I
L. -a' _. -4
Product Dignm is Conceptual. AU dimensions ye horizontal.
Q&l&
Analysis for JOlSTMEMBER SupporIing ROOF Application. Loads(ps0: 16 Live at 125% duration, 15 Dead
REACTIONS(1bs.) SUPPORTS:
WlDTH JUSTIFICATION LlVW DWXTOTAL DETAIL OTHER
1 2x4plate 3.50" Len Face , 2112 I1880 14002 2x4 Blocking
2 2x4 plate 3.50 Right Face 21121 lB8014002 ht4 BlocMng - Le17 suppolt: Top-All, Approx. clip height: 3.6', Approx. clip width: 5'. mowed choice(s): TOP (STANDARD)
~ Right supDott: TopAll, ADgrox. clip height: 39, Approx. CUP width: 5'. Allowed choice(s): TOP (STANDARD)
DESIGN CONTROLS:
MAXIMUM DESIGN CONTROL CONTROL LOCATION
Sheaqlb) 4051 4051 4050 Parsed(10096) LT. end Span 1 under Roof loading
Momant(%-lbJ 33472 32810 34543 Passed(=%) MID Span f under Roof loading
Live Defl.iin) 0.745 1.533 PasseqU526) MID Span 1 under Roof loading
Total Defl.(in) 1,444 2.178 Passed(U271) MID Span 1 under Roofloading
- Deflection Criteria: STANDARD(LL:LR40. TL:LHBO).
~ ∾ng(Lu): AH om press ion edges (top and bottom) mud be braced at Z 9" olc unless detailad otherwise. Proper attachment and
positioning of lateral bracing is required to achieve member stability.
ADDITIONAL NOTES! - IMPORTANT! me analysis wesenled Is output from soRware developed by Trus Joist MacMillan(TJM). Wxrwabb product value$ shown
are in accordance wrth cumnt TJM materials and code accepted design vakres. The specific pmduc! application. input design
loads and stated dimensions have been provided by others ( SomW ow 0
conformance WM the design drawings oflhe building, and have not been reviewed by TJM Engineering.
-THIS PNALYSlS FOR TRUS JOIST MacMlLLAFl PRODUCTS ONLY! PRODUCT SUBSTITWON VOIDS THIS ANALYSIS. - Allowable Stress Design methodolopy was used for Code NER analyzing the TJM Commercial product listed abova -me open Web truse analysis presented is approximate. All open web truesss are cuatom designed to carry the specinc design
. Pricing Load(plf) = 248
Ass OU AT%% ),have not been checked for
loads for each proieot. Aclual truss capacity when fabricated is limited to that reauired lo rmsia the specified load&
’h. # 760-745-8618 Fax # 760-745-9817
S.A.W. Construction CO. Inc.
P.O. Box 300498 Escondido, Ca. 92030
I - -
Reflex Corp
1825 Aston Ave., Carlsbad, Ca.
SDecif icat ions
APA or AlTC Certification sq Ct Wild Douglas Fir or approved equal
Tension lams @ Cantilevers
V8 @ Cantilever beams
V4 @ Simple beams
Load wrapped
~
61 - 5.125 x 18 x21 1 req
69 - 5.125 x 22 112 x 28‘ 1 req
C=314”
C=118
sq Ct 1
67 - 5.125 X 22 112 X 22’ 1 req
B5 - 5.125 X21 X23 1 req
C=1/2”
C=518
610 - 5.125 x 24 x 32’ 2 req
H=114” C=l” Cant=lO’
Dap 3/4”x6 114“ Dap 3/4“x6 114‘ Dap 314x6 114“
antilever Cantilever sqcfll Cantilever H= - H=
1 req
Cant=@
62 - 5.125 x 22 112 x 40’ 1 req
.Cant=4‘ Cant=4’
66 - 5.125 x 24 x 42’ 1 req
Cant=5’ Cant=5”
68 - 5.125 x 24 x 41’ 1 req
Cant=5’ Cant=4’
H=ll4” C=7/8” H=114”
H=118“ C=518” H=118”
H=l18” C=518” H=l18”
I ... -
1248-199B 8:lW FROM PACIFIC SW STFdXTJE 1 619 d69 6868 P. 2
Willamette Industries, Inc. Pacific Southwest Structures, Inc. Engineered Wood Products
E-Z Calc (v3.07) PROJECT: Rdex Building
LOCATION: Carlsbad. CA 12M81E JOB NO.: 2812.08 DESIGNER: ORF SHEET:
MARK PI Roof Joist TRIE.: 96 in. MEMBER SLOPE: 0112 Input reflects horizontal center to cenler spans.
Wl= 248 plf LL = 16 psf DL = 15 psf Duration= 125%
PI= 500 Ibs @ 15.83 h LL= 0 Ibs DL= 500 Ibs Duration= 100% 50W mechanical load
TOTAL APPLIED LOAD, SHEAR AND MOMENT DIAGRAMS
Maximum Reactions Support 1 Support 2
Dead Load: 21 56 2154 Live Load: (DOL) 2032 (125) 2032 (125)
X Allow. Maximum Allow. DOL - Control
End Reaction: (Ibs) 95% 4188 4425 125% -Total Load
Shear: (tbs) 80% 4188 5213 125% -Total Load
Positive Moment: (ft-lbs) 95% 3521 6 37250 125% -Total Load
Deflection LL Ratio TL Ratio
Span: 0.52 1/72Q 1.12 11341 El = 6495 x 10' K = 22.08 x 10' - USE 32 INCH WSl565(2.OE) -
Min end bearing = 1.75 Inches -web stiffeners required. Continuous lateral suppoit required at top edge. Lateral support required at bearings for bottom edge.
........ . .. .. .- .__.__ __ -- ....... . .... -
The pmdudr nded am intended for Interior Use. normal temperatures, untreated appliwlions and must W installed in accordance wdh local buildlng code (Bqui(BmenLI and Willemene indurlrier. inc. recommendations. This cslwialion reiledr the specific design information and produn deienlnalian for engineera wood products manufactured t+j Willamens Indurtries. Inc. The loads, spans and spacings have been provided by others and all infomalion noled should be cxefuliy examined and verified for the accuracy and ruilabilily of all design perarrmlers and pOdUcl seiecliona.
L
-
Date:
To:
December 24. 1998
Bob Sukup
Sea Bright Company
4322 Sea Bright Place
Carlsbad, CA 92008
Re: Carlsbad Research Center - Reflex II -1825 Aston Avenue
Subject: Compaction Report
Reference: “Geotechnical Investigation and Foundation Recommendations, for the Proposed
Carlsbad Research Center - Reflex 11, to be Located on Lot 64,1825 Aston Avenue,
Carlsbad, CA,” dated June 30,1998, prepared by Engineering Design Group.
INTRODUCTION
In accordance with your request and authorization, we have provided geotechnical
observation and compaction testing services during the grading and re-compaction of soils
at the above referenced site, in association with the construction of the proposed Carlsbad
Research Center - Reflex II building. The results of our quality control and compaction
testing operations are summarized below.
GRADING OPERATIONS
Grading operations began on December 17, 1998 and were completed on December
22,1998. Prior to the commencement of grading, all low lying grass and other vegetation
was removed from the site. Grading procedures consisted of the removal of the upper4-6
feet of soil material, per the recommendations of the referenced geotechnical report. The
bottom of the removal was then scarified to a depth of 12 inches, whereby refill and
compaction began. The excavated material was moisture conditioned and used forgraded
fill. Fill soils were placed under the part time observation and testing of our personnel.
Compaction was accomplished by track walking utilizing two bulldozers. Moisture
conditioning was by means of a water hose.
Page No. I
Job NO. 981771-1
DUOBSU JOBS\98\98 1771-4. Reflex II. COMPACTION RPT.wpd
r
r
r
t
FIELD AND LABORATORY TESTING
The approximate locations and results of our field density tests are noted on the attached
Figure 1: ”Location of Compaction Tests”.
Field density tests were performed in accordance with ASTM D2922-91. Our test results
indicate that the fill placed, under our observation and testing in the areas indicated, have
been compacted to at least 90 percent relative compaction, as determined by ASTM
D1557-91, (Procedure A). The reported test results are representative of the soil
conditions at the locations tested. Our observation and field density testing methods are
in accordance with normally accepted procedures. The accuracy of the relative
compaction values are subject to the precision limitations of the ASTM test methods. The
accuracy of the maximum dry density determination (ASTM D1557-91) is discussed in the
1998 Annual Book of ASTM Standards, Section 4, Volume 04.08, entitled, Soil and Rock;
Buildina Stones. Variations of relative compaction values should be expected, laterally and
vertically, from the actual test locations.
SUMMARY
In general, it is our opinion onsite grading operations met the requirements of the
referenced project soils report. The soils placed, at the depths and locations specified,
were compacted to a minimum of 90% relative compaction based on the placement
procedure and the test data collected, the upper4-6 feet of graded and re-compacted soils,
at the locations tested, were compacted to a minimum of 90 percent relative compaction
(based on ASTM D1557-91, Procedure A).
If you have any questions regarding the enclosed information, please do not hesitate to
-:/- Attachments: 1) Table 1: “Labor&&m
2) Figure #1 “1 -
Page No. 2
Job NO. 981771-1
DUOBSU JOBSWM 17714. Renex 11- COMPACTION RPT.wpd
P
SOIL TYPE
Brown, Dense Sandy Clay
-
OPTIMUM U.S.C.S. MAXIMUM DENSITY
(PCF) MOISTURE CLASSIFICATION
108 18.0 CL
c
TEST
NO:
r
FINISH SOIL DRY FIELD RELATIVE
DATE MINUS (#) (PCF) (PERCENT) (PERCENT)
PAD TYPE DENSITY MOISTURE COMPACTION
r
CF-1
CF-2
CF-3
CF-4
!-
12-21 -98 2 1 92 20.0 86 (See Retest #3)
1 2-2 1-98 4 1 97 18.7 90
12-21 -98 2 1 95 16.7 90
12-22-98 FG 1 105.5 16.7 98
TABLE NO. I
LABORATORY AND FIELD TEST RESULTS
WTest Results
Page No. 3
Job NO. 981771-1
O:WOBSG( JOBS\88\88 17714-Refiex 11- COMPACTION RPT.wpd
mCCESS w-2-----,
h o -I- H In
0 0
c\l M
W W"
$( LOCATION OF COMPACTION TESTS
ENGI"G IGN GROUP
C,Y,L m"cT"IAI d liiC",ltCl"RLLCWdiTlNii
810 W. LosVallecitos, Ste A -Sari Marcos CA.92069 (760) 752-7010.Fax (760) 752-7092
Date:
To:
November 24,1998
Sea Bright Company
Attn: Bob Sukup
4322 Sea Bright Place
Carlsbad, CA. 92008
Re:
Subject: Plan Review Letter
Reflex I1 Building Located at 1825 Aston Avenue, Carlsbad, CA.
Reference: I) "Geotechnical Investigation and Foundation Recommendations for the
Proposed Carlsbad Research Center-Reflex II to be Located on Lot 64,1825
Aston Avenue, Carlsbad, CA", Project No. 981771-1, dated June 30, 1998,
prepared by Engineering Design Group.
"Project Plans for Reflex Corporation Located at 1825 Aston Avenue,
Carlsbad, CA: Sheets SISV, Job No. 97187, dated April 15,1998, prepared by
ATS Architecture.
2)
Dear Bob,
In accordance with your request, we have reviewed the above referenced plans to confirm
general conformance with the recommendations provided in the soils report for the
proposed Reflex I1 development. Based on our discussions, we understand the proposed
method of mitigating expansive onsite soils will generally involve structural upgrade of
building foundation elements and pre-saturation of subgrade soils. Pre- saturation of soil
subgrade should be 5 percent above optimum moisture to a depth of 24 inches below slab
subgrade. Pre-soaking levels should be tested by our firm to confirm pre-saturation levels.
Based or review of the above referenced structural plans, it is our opinion the plans
generally conform the recommendations of our soils report.
It should be noted, the presoaking of subgrade soils opinion is not as effective as
import of a non expansive cap materials. As such, a higher level of cosmetic
concrete cracking may be anticipated in the building slab, driveway and flatwork
Page No. 1
Job No. 981771-1
I~~ndy\llWLETTER\REFLEX II PLAN REVIEW LTR.wpd
- .. .
improvements. The extent of cracking may be minimized by adhering to the
following recommendations.
The proper performance of below ground plumbing systems will play a critical role on the
performance of the superstructure and foundation. In general, the detailing and
construction of below grade plumbing elements should be conservative, with good quality
materials and proper wrapping of lines. Where possible, water lines should be plumbed
overhead.
All site grading should conform to the recommendations of the project soils report As a
matter of our review, we would like to restate the following recommendations:
1) The proper performance of below ground plumbing systems will play a critical role
on the performance of the superstructure and foundation. In general, the detailing
and construction of below grade plumbing elements should be conservative, with
good quality materials and proper wrapping of lines. Where possible, water lines
should be plumbed overhead.
Under no circumstances are expansive materials to be used as backfill behind
onsite retaining walls.
General site drainage conditions will play a critical role on the performance of onsite
improvements. Onsite drainage facilities shall be detailed and constructed whereby
no ponding of water occurs onsite.
2)
3)
questions regarding this letter, please feel free to contact our office.
teven Norris
P :<., :
Page No. 2
Job No. 981771-1
\\SmdyVlleLElTER\REFLEX II PLAN REVIEW LTR.4
..*05:E.,:., j:ll"i.i.L.//a r.,
810 w. Los Vallscitos. Sta A. San Marcos CA-92069 (760) 752-7010.i;aX (760) 752-7092
GEOTECHNICAL INVESTIGATION AND FOUNDATION RECOMMENDATIONS,
TO BE LOCATED ON LOT 64,1825 ASTON AVENUE,
CARLSBAD, CALIFORNIA.
FOR THE PROPOSED CARLSBAD RESEARCH CENTER-REFLEX II,
PREPARED FOR:
Bob Sukup
SEA BRIGHT COMPANY
4322 Sea Bright Place
Carlsbad. CA. 92008
Project No.: 981771-1
June 30. 1998
TABLE OF CONTENTS
SCOPE .......................................
Pape
.. 3
SITE AND PROJECT DESCRIPTION .................................... 3
FIELD INVESTIGATION ............................................... 3
............ ~ .................................... 4 . SUBSOIL CONDITIONS .... _.
GEOLOGIC HAZARDS AND SEISMICITY .................................. 4
CONCLUSIONS AND RECOMMENDATIONS ............................... 6
GENERAL .......................................................... 6
EARTHWORK ....................................................... 6
FOUNDATIONS ...................................................... 8
CONCRETE SLABS ON GRADE ......................................... 9
RETAININGWALLS .................................................. 10
PAVEMENT DESIGN ................................................. 12
SURFACE DRAINAGE ................................................ 13
CONSTRUCTION OBSERVATION AND TESTING .......................... 13
MISCELLANEOUS ................................................... 14
.. .. ........... * ...
..
ATTACHMENTS
Site Vicinity Map ............................................ Figure No . 1
Site Location Map ........................................... Figure No . 2
Site Plan/Location of Test Pit Excavations ........................ Figure No . 3
Test Pit Logs .............................................. .Figures No . 4-6
References ................................................ AppendixA
Grading Specifications ....................................... Appendix B
Homeowners Maintenance Guidelines ........................... Appendix C
SCOPE
This report presents the results of our geotechnical investigation and evaluation for the
Carlsbad Research Center-Reflex 11, to be located at Lot 64, 1825 Aston Avenue, in the
City of Carlsbad, California. Please see Figure No. 1, "Site Vicinity Map", and Figure No.
2. "Site Location Map". The scope of our work, conducted on-site to date, has included a
visual reconnaissance of the property and neighboring sites, review of prior geotechnical
reports for the lot and neighboring lot (see References), a limited subsurface investigation
, of.the property, 1.aboratory.testjng. and pieparation of this report presenting otrfindings;.' . ' .'"'
conclusions, and recommendations.
,. . .
SITE AND PROJECT DESCRIPTION
The subject property consists of an rectangular shaped lot located on the south side of
Aston Avenue, in the City of Carlsbad, California. The subject site is bordered to the north
by Aston Avenue, to the west and south by a vacant commercial lot, and to the east by an
existing commercial building. Currently, the lot consists of a relatively flat building pad.
flanked along the north and west sides by descending fill slopes of variable height (4:l
gradient; 15' maximum height). The lot was created during the mass grading of the
Carlsbad Research Center commercial development.
-
Based on our discussions with the property owner and construction manager, we
understand the proposed site development will consist of a new 12,000 sf. building of tilt-up
concrete panel construction with associated improvements.
FIELD INVESTIGATION
Our field investigation of the property. conducted May 18. 1998, consisted of a site
reconnaissance, site field measurements, observation of existing conditions onsite and on
adjacent sites, and a limited subsurface investigation of soil conditions. Our subsurface
investigation consisted of visual observation of two test pit excavations, logging of soil
types encountered, and sampling of soils for laboratory testing; logs of the test pit
excavations are presented in Figures 4-6 of this report. The test pits were excavated under
the direction of a registered civil engineer from our firm. The locations of the test pit
excavations is given in Figure No. 3 "Site Plan/Location of Test Pit Excavations".
Page No. 3
Job No. 981771-1
IIS~~~~ICIFILNOBSI~ Jo8Sl9111981771-1 . SUKUP, CARLSBAD RESEARCH CENTER-REFLEX 11, CARLSBAD RPT.wpd
SUBSOIL CONDITIONS
Fill materials were encountered to full depth within our test pits. Soil types encountered
within our test pit excavations are described as follows:
- Fill:
Fill materials were found to the underlie the site to the full depth (approximately 8' below
.existing site grade) of our subsurface investlgation. These materials-consist .of-grey-brown,
moist, sandy clay and silt, with pockets of clayey sand. The surficial weathered zone
(approximately 34 feet below existing site grade) of the fill unit is not considered
suitable for the support of structures and structural improvements, however soil
materials may be utilized as re-compacted fill during grading, provided the
recommendations of this report are followed. Fill materials generally classify as CL-CH
according to the Unified Classification System, and based on visual observation and review
of past test results by others (see References), possess expansion potentials in the high
to very high range.
GEOLOGIC HAZARDS AND SEISMICITY
A review of pertinent published geologic maps, suggests that no geologic hazards such as
faults, potential landslides, or areas of suspected soils liquefaction exist within the project
boundaries. Based on this information, it appears that no active or potentially active fault
exists at or in the immediate vicinity (250 ft.) of the site, and none were observed during
our investigation.
It is our opinion that the site could be subjected to moderate to severe ground shaking in
the event of a major earthquake along any of the faults mentioned above or other faults in
the Southern California region. However, the seismic risk at this site is not significantly
greater than that of the surrounding developed area. We believe that the proposed
development will have no more negative geologic consequence than the existing or
surrounding development if the guidelines in this report are followed, and current standard
construction techniques are utilized.
The seismic hazard most likely to impact the site is ground shaking resulting from an
earthquake on one of the major active regional faults. The adverse effects of seismic
shaking can be reduced by adhering to code requirements given in the most recent edition
of the Uniform Building Code, and design parameters of the Structural Engineers
Association of California.
Page No. 4
Job No. 981771-1
\ISmdy\clFILE!JOBS\1 JOBS\98\981771-I . SUKUP. CARLSBAD RESEARCH CENTER-REFLEX 11, CARLSBAD RPT.wpd
Liquefaction of cohesion leSS soils can be caused by strong vibratory motion due to
earthquakes. Research and historical data indicate that loose. granular soils underlain by
a near-surface ground water table are most susceptible to liquefaction, while the stability of
most silty clays and clays is not adversely affected by vibratory motion. Because of the fine
grain nature of the onsite soil (Le clay), and the absence of near surface groundwater, it is
our opinion the potential for liquefaction or seismically-induced dynamic settlement at the
site due to earthquake shaking is considered low. The effects of seismic shaking can be
reduced by adhering to the most recent edition of the Uniform Building Code and current
--.-. design parameters of the Structural Engineers Association of California.. , , .,. .
Page No. 5
Job No. 961771-1
\lSamiy\c\FlLEUOBSl7 JOBSl981981771-I . SUKUP. CARLSBAD RESEARCH CENTER-REFLEX 11. CARLSBAD RPT.Wpd
CONCLUSIONS AND RECOMMENDATIONS
GENERAL
In general, it is our opinion that site improvements, as described herein, are feasible from
a geotechnical standpoint. provided the recommendations of this report and generally
accepted construction practices are followed.
The following recommendations should be considered as minimum design parameters, and
shall be incorporated within the project plans and utilized during construction, as
applicable.
EARTHWORK
Site earthwork will require removal and re-compaction of the upper weathered zone of the
existing onsite fill. Based on our subsurface investigation, the weathered zone is
anticipated to extend to a depth of 3-4 ft. below existing site grade.
As identified in prior geotechnical reports for the lot. and confirmed during our field
investigation, the site is underlain by highly expansive soil. Without proper mitigation,
expansive soil can result in significant damage to the proposed onsite development. In the
prior report for the lot by IGC Incorporated, three methods of mitigation were given to
lessen the effects of expansive soil movement, they include: 1. Import of soil, 2. Post-
tensioned slabs, and 3. Pre-saturation of soil. Based on our experience, we recommend
the import of a non-expansive fill mat, as the most effective way to mitigate the detrimental
effects of expansive soil. The import mat should be a minimum of 3’ thick and extend to
a minimum distance of 5’ outside the perimeter footprint of the building. For driveways,
Ratwork and other non- building improvements, the fill mat should be a minimum of 2’ thick
and extend to a horizontal distance of 3‘ outside the perimeter footprint of the improvement.
I. Site PreDaration:
Prior to grading, areas of proposed improvement should be cleared of surface
and subsurface debris. Removed vegetation and debris shall be properly
disposed of prior to the commencement of any fill operations. Holes resulting
from the removal of debris, existing structures, or other improvements which
extend below the undercut depths noted, are to be filled and compacted using
an onsite material or a non-expansive import material.
Page No. 6
Job No. 981771-1
\\SanayklFILNOBS\l JOBS\98\981771-1. SUKUP. CARLSBAD RESEARCH CENTER-REFLU II, CARLSBAD RPT.WFd
.
FOUNDATIONS
In deriving foundation recommendations for this site, the subsoil conditions encountered
during our limited subsurface evaluation were evaluated. We anticipate that the proposed
building foundation system will utilize continuous perimeter footings and concrete slab on
grade floor systems. The following foundation recommendations assume a non to low -
expansive subsoil condition within the upper 3’ of the site (Le., Expansive Index less than
50). Minimum design parameters for foundations are as follows:
1. Footings bearing in competent non expansive fill materials may be designed based
on a maximum allowable soils pressure of 1800 psf.
2. Bearing values may be increased by 3394 when considering wind, seismic. or
other short duration loadings.
All loose soil found at the base of footings, when the excavation is opened, shall
be removed and extended to firm, undisturbed soils. The owner and/or contractor
should carefully locate the foundation so that no isolated pads or corners of
footings are located over loose subgrade material.
The following parameters should be used as a minimum for designing footing
width and depth below lowest adjacent grade:
3.
4.
Depth Below
Lowest Adjacent
Floors SuDDorted Width Grade
1 15 inches 18 inches
2 15 inches 18 inches
3 18 inches 24 inches
5. For footings adjacent to slopes, a minimum 10 feet horizontal setback, as
measured horizontally from the bottom of the footing to slope daylight in
formational materials or properly compacted fill, should be maintained.
6. All footings should be reinforced with a minimum of two #5 bars at the top and two
$5 bars at the bottom (3 inches above the ground).
All isolated spread footings should be designed utilizing the above given bearing
values and footing depths, and be reinforced with #5 bars at 12 inches O.C. in each
direction (3 inches above the ground). Isolated spread footings should have a
minimum width of 24 inches.
7.
Page No. 8
Job NO. 981771-1
\\Slndy\c\FILNOBS\I JOBS\98\9817771-1 ~ SUKUP. CARLSBAD RESEARCH CENTER-REFLEX 11. CARLSBAD RPT.WPd
8. Grading should be performed in general accordance with the contents of this
report, applicable city andlor county standards, and Appendix B of this report.
9. Concrete for the building foundation should have a minimum compressive strength
in 28 days of 2500 psi. A large rock pump mix (Le.. 314 inch aggregate) should be
utilized with a fiber mix additive in an amount specified by the supplier.
.. ,, , ,_ . . . .. .. . , " -
Concrete slabs on grade are anticipated for the proposed construction. Minimum design
parameters for concrete slabs on grade are as follows:
1,
2.
3.
4.
5.
Concrete slabs on grade should have a minimum thickness of 6 inches, and
should be reinforced with #4 bars at 18 inches O.C. placed at the midpoint of the
slab.
All concrete shall be poured per the following: . Slump: Between 3 and 4 inches maximum
Aggregate Size: 314 - 1 inch
Air Content: 5 to 8 percent
Moisture retarding additive in concrete at moisture sensitive
areas. (Example Sika Red Label)
Water to cement Ratio - .5 maximum
. . .
All required fills used to support slabs, should be placed in accordance with the
grading section of this report and the attached Appendix B. and compacted to 90
percent Modified Proctor Density, ASTM D-1557.
A uniform layer of 6 inches of clean sand is recommended under the slab in order
to more uniformly support the slab, help distribute loads to the soils beneath the
slab, and act as a capillary break. In addition, a visqueen layer (10 mil) should be
placed mid height in the sand bed to act as a vapor retarder.
Adequate control joints should be installed to control the unavoidable cracking of
concrete that takes place when undergoing its natural shrinkage during curing.
The control joints should be well located to direct unavoidable slab cracking to
areas that are desirable by the designer.
All subgrade soils to receive concrete flatwork are to be pre-soaked to 2 percent
over optimum moisture content to a depth of 24 inches.
Page No. 9
Job No. 981771-1
\\Smdy\dFILNOBSU JOBS\98\981771-1 . SUKUP. CARLSBAD RESEARCH CENTER-REFLEX 11. CARLSBAD RPT.wpd
6. Brittle floor finishes placed directly on slab on grade floors may crack if concrete
is not adequately cured prior to installing the finish or if there is minor slab
movement. To minimize potential damage to movement sensitive flooring, we
recommend the use of slip sheeting techniques (linoleum type) which allows for
foundation and slab movement without transmitting this movement to the floor
finishes.
7. Exterior concrete flatwork and dr!veway slabs, due to the nature of concrete
hydration and minor subgrade soil movement, are subject to normal minor concrete
cracking. To minimize expected concrete cracking, the following may be
implemented: - Concrete slump should not exceed 4 inches.
Concrete should be poured during "cool" (40 - 65 degrees) weather if
possible. If concrete is poured in hotter weather, a set retarding additive
should be included in the mix, and the slump kept to a minimum.
Concrete subgrade should be presoaked prior to the pouring of concrete.
The level of presoaking should be a minimum of 2% over optimum moisture
to a depth of 24 inches.
Concrete may be poured with a 10 inch deep thickened edge.
Concrete should be constructed with tooled joints or sawcuts (1 inch deep)
creating concrete sections no larger than 225 sf. For sidewalks, the
maximum run between joints should not exceed 5 feet. For rectangular
shapes of concrete, the ratio of length to width should generally not exceed
.6 (Le.. 5 ft. long by 3 ft. wide). Joints should be cut at expected points of
concrete shrinkage (such as male corners), with diagonal reinforcement
placed in accordance with industry standards.
Drainage adjacent to concrete flatwork should direct water away from the
improvement. Concrete subgrade should be sloped and directed to the
collective drainage system, such that water is not trapped below the flatwork.
The recommendations set forth herein are intended to reduce cosmetic
nuisance cracking. The project concrete contractor is ultimately responsible
for concrete quality and performance, and should pursue a cost-benefit
analysis of these recommendations, and other options available in the
industry, prior to the pouring of concrete.
RETAINING WALLS
Retaining walls may be designed and constructed in accordance with the following
recommendations and minimum design parameters:
Page No. 10
Job No. 901771-1
!!Sandy!c!FlLEUO0S\l JOBS!98\981771-1- SUKUP. CARLSBAD RESEARCH CENTER-REFLEX 11. CARLSBAD RPT.wpd
c
1.
2.
3.
4.
5.
6.
7.
Fietaining wall footings should be designed in accordance with the allowable
bearing criteria given in the "Foundations" section of this report.
Unrestrained cantilever retaining walls should be designed using an active
equivalent fluid pressure of 35 pcf. This assumes that granular, nonexpansive
free draining material will be used for backfill, the and that the backfill
surface will be level. It additionally assumes the non expansive material will
extend to ba minimum distance of 8 feet behind the face of wall. For sloping
backfill, the following parameters may be utilized:
Condition 2:l Slope 1.51 Slope
Active 50 65
Any other surcharge loadings shall be analyzed in addition to the above values.
If the tops of retaining walls are restrained from movement, they should be
designed for an additional uniform soil pressure of 7XH psf, where H is the height
of the wall in feet.
Passive soil resistance may be calculated using an equivalent fluid pressure of
300 pcf. This value assumes that the soil being utilized to resist passive pressures,
extends horizontally 2.5 times the height of the passive pressure wedge of the soil.
Where the horizontal distance of the available passive pressure wedge is less than
2.5 times the height of the soil, the passive pressure value must be reduced by the
percent reduction in available horizontal length.
A coefficient of friction of ,351 between the soil and concrete footings may be
utilized to resist lateral loads in addition to the passive earth pressures above.
Retaining walls should be braced and monitored during compaction. If this cannot
be accomplished, the compactive effort should be included as a surcharge load
when designing the wall.
All walls shall be provided with adequate back drainage to relieve hydrostatic
pressure, and be designed in accordance with the minimum standards contained
in the "Retaining Wall Drainage Detail", Appendix 6. All wall waterproofing
systems shall be designed by the project designer - architect. The waterproofing
elements shown on our details are minimums, and are intended to be
supplemented by the project designer-architect. Engineering Design Group
accepts no responsibility for design or quality control of waterproofing elements of
the building.
Page No. 11
Job No. 981771-1
\lSandy\c~FILNOBSllJOBS~98\981771-1 - SUKUP. CARLSBAD RESEARCH CENTER-REFL€X It. CARLSBAD RPT.wpd
.
8. Retaining wall backfill should be placed and compacted in accordance with the
"Earthwork" section of this report. Backfill shall consist of a non-expansive
granular, free draining material.
PAVEMENT DESIGN
The appropriate pavement design section depends primarily on the soil shear strength,
traffic4oad: and: planned pavement. life. Assuming an R-vatue of 30 (2.import.fill mat); we
provide the following pavement design sections for a 20-year design life based on a T.I.
(traffic index) of 6.0.
' .' '. . . .
Recommended Pavement Desion
Traffic Index
A.C. Thickness (inches)
Class 2 Base Thickness (inches)
6.0 6.0
4 5
6 4
This pavement section may be reduced by site specific R-value testing and selective
grading at the site to place the more sandy soils below the pavement to increase the
design R-value. For pavement areas subject to unusually heavy truck loadings (trash
enclosures, loading docks, etc.), we recommend a Portland Cement Concrete (P.C.C.)
section of 6 inches with appropriate steel reinforcement and crack control joints as
designed by the project structural engineer. We recommend that sections be as nearly
square as possible. A 3,500 psi mix may be utilized. This should be underlain by 6 inches
of Class 2 aggregate base. Asphalt Concrete (A.C.), Portland Cement Concrete (P.C.C.).
and Class 2 aggregate base should conform to and be placed in accordance with the latest
revision of the California Department of Transportation Standard Specifications and
American Concrete Institute (ACI) codes. Prior to placing the pavement section, the
subgrade soil should have a relative compaction of at least 95 percent (based on ASTM
D1557-78) to a minimum depth of 12 inches. Base should be compacted to a 97 percent
relative compaction (based on ASTM 01557-78) prior to placement of A.C. If pavement
areas are planned adjacent to landscape areas, we recommend that the amount of
irrigation be kept to a minimum to reduce the possible adverse effects of water on
pavement subgrade. As an alternate, sub-drains or deepened curb "cut-offs" may be
designed to reduce the amount of water that is allowed to saturate the pavement subgrade.
Concrete swales and gutters should be designed if the asphaltic concrete is utilized for
drainage of surface waters.
Page No. 12
Job NO. 901771-1
\\Sandy\c\FILEUOBS\1 JOBS\98\98f771-1. SUKUP. CARLSBAD RESEARCH CENTER-REFLEX !I. CARLSBAD RPT.wpd
SURFACE DRAINAGE
Adequate drainage precautions at this site are imperative and will play a critical role on the
future performance of the dwelling and improvements. Under no circumstances should
water be allowed to pond against or adjacent to footings, foundation walls, or tops of slopes.
The ground surface surrounding proposed improvements should be relatively impervious
in nature, and slope to drain away from the structure in all directions, with a minimum slope
.- of 3% for.a,horizontal distance of 7 feet (where possible). Area dFains or surface swales
should then be provided to accommodate runoff and avoid any ponding of water. Roof
gutters and downspouts shall be installed on the new structure and tightlined to the area
drain system. All drains should be kept clean and unclogged, including gutters and
downspouts. Area drains should be kept free of debris to allow for proper drainage. During
periods of heavy rain, the performance of all drainage systems should be inspected.
Problems such as gullying or ponding should be corrected as soon as possible. Any
leakage from sources such as water lines should also be repaired as soon as possible. In
addition, irrigation of planter areas, lawns, or other vegetation, located adjacent to the
foundation or exterior flat work improvements, should be strictly controlled or avoided.
The recommendations provided in this report are based on subsurface conditions disclosed
by our investigation of the project area. Interpolated subsurface conditions should be
verified in the field during construction. The following items shall be conducted prior/during
construction by a representative of Engineering Design Group in order to verify compliance
with the geotechnical and civil engineering recommendations provided herein, as
applicable. The project structural and geotechnical engineers may upgrade any condition
as deemed necessary during the development of the proposed improvernent(s).
1.
2. Observation of removal/scarification bottom.
3.
4.
5.
6.
7.
Review of final approved project grading and structural plans prior to start of work.
Observation and testing of any fill placed, including retaining wall backfill and
pavement subgrade.
Foundation excavation observation prior to placement of reinforcement.
Observation during placement of surface and subsurface drainage systems,
including, retaining wall back drains.
Field obsewation of any "field change" condition involving soils.
Walk through prior to final approval of proposed improvement(s).
Page No. 13
Job No. 981771-1
\\Sandy\s\FILEUOBS\l JOBS\98\981771-I . SUKUP. CARLSBAD RESEARCH CENTER-REFLEX 11. CARLSBAD RPT.wPd
.
The project soils engineer may at their discretion deepen footings or locally recommend
additional steel reinforcement to upgrade any condition as deemed necessary during site
observations.
Engineering Design Group shall, prior to the issuance of the certificate of occupancy, issue
in writing that the above inspections have been conducted by a representative of their firm,
and the design considerations of the project soils report have been met. The field
inspection protocol specified herein is considered the minimum necessary for Engineering
Design Group.to have exercised "due diligence" in the soils engineering design aspect of
this building. Engineering Design Group assumes no liability for structures constructed
utilizing this report not meeting this protocol.
MISCELLANEOUS
It must be noted that no structure or slab should be expected to remain totaljy free of cracks
and minor signs of cosmetic distress. The flexible nature of wood and steel structures
allows them to respond to movements resulting from minor unavoidable settlement of fill or
natural soils, the swelling of clay soils, or the motions induced from seismic activity. All of
the above can induce movement that frequently results in cosmetic cracking of brittle wall
surfaces, such as stucco or interior plaster or interior brittle slab finishes.
Data for this report was derived from surface observations at the site, knowledge of local
conditions, and a visual observation of the soils exposed in the exploratory test pits. The
recommendations in this report are based on our experience in conjunction with the limited
soils exposed at this site and neighboring sites. We believe that this information gives an
acceptable degree of reliability for anticipating the behavior of the proposed structure:
hawever, our recommendations are professional opinions and cannot control nature, nor
can they assure the soils profiles beneath or adjacent to those observed. Therefore, no
warranties of the accuracy of these recommendations, beyond the limits of the obtained
data, is herein expressed or implied. This report is based on the investigation at the
described site and on the specific anticipated construction as stated herein. If either of
these conditions is changed, the results would also most likely change.
Man-made or natural changes in the conditions of a property can occur over a period of
time. In addition, changes in requirements due to state of the art knowledge and/or
legislation, are rapidly occurring. As a result, the findings of this report may become invalid
due to these changes. Therefore, this report for the specific site, is subject to review and
not considered valid after a period of one year, or if conditions as stated above are altered.
Page No. 14
Job NO. 9am1-1
\\Sandy\c!FILNOBS\l JOBS\98\981771-1. SUKUP. CARLSBAO RESEARCH CENTER-REFLEX II, CARLSBAO RPT.wPd
!
It is the responsibility of the owner or his representative to ensure that the information in this
report be incorporated into the plans and/or specifications and construction of the project.
It is advisable that a contractor familiar with construction details typically used to deal with
the local subsoil and seismic conditions, be retained to build the structure.
If you have any questions regarding this report, or if we can be of further service, please do
not hesitate to contact us. We hope the report provides you with necessary information to
continue with the development of the project.
~ --7 /
sincered- /”
,i
Page No. 15
Job No. 981771-1
lUandyk!fILNOBS\g JOBS\SlllW?TIl-1. SUKUP, CARLSBAD RESEARCH CENTER-REFLEX 11, CARLSBAD RPT.upd
NOT TO SCALE
SITE VICINITY MAP
JOB NO. 904771-1 BY: RD FIGURE NO. I
SITE
JOB NO. 981771-1
% NORTH
BY: RD I FlGUREN0.2
NOT TO SCALE
I THE ENGINEERING DESIGN GROUP I SITE LOCATION MAP I
!I
in io r 0 -1. 0
W - n a s v C m
W >
Is1
J
W
m
-
m
?! - - x 1, !
I
~ 1 u 0 i
a o! ;I b ul@ & ', . ,'
APPENDIX A
REFERENCES
1. California Department of Conservation, Division of Mines and Geology, Fault-
Rupture Zones in California, Special Publication 42, Revised 1990.
Greensfelder, R.W., 1974, Maximum Credible Rock Acceleration from
Earthquakes in California: California Division of Mines and Geology, Map Sheet
23.
Tan, S.S., 1995, Landslide Hazards in the Northern San Diego Metropolitan
Area, California: California Division of Mines and Geology, Open File Report.
2.
3.
4.
5.
Engineering Design Group, Unpublished In-House Data.
Ploessel. M.R., and Slosson. J.E., 1974, Repeatable High Ground Acceleration
from Earthquakes: California Geology, Vol. 27, No. 9, P. 195-199.
State of California, 1994, Fault Activity Map of California: California Division
Mines and Geology, Geologic Data, Map No. 6.
State of California, Geologic Map of California, Map No. 2, Dated 1977.
Southern California Soil and Testing, Inc., Report of Geotechnical Investigation:
Proposed Office Building, Lot Number 63, Carlsbad Research Center, Rutherford
Road, Carlsbad. California, Project Number 971 1261.1, Dated November 18,
1997.
ICG, Inc.. Foundation Investigation: Proposed Commercial Development Lot 64,
Carlsbad Research Center, Carlsbad, California, Job Number 05-7497-010-01-
00, Log Number 9-2496, Dated January 9, 1990.
6.
7.
8.
9.
GFNFRAI F. 4RTHWORK AND G R.?DING SPECIFICATIONS
1 .o General Intent
These specifications are presented as general procedures and recommendations for
grading and earthwork to be utilized in conjunction with the approved grading plans.
These general earthwork and grading specifications are a part of the
recommendations contained in the geotechnical report and shall be superseded by
the recommendations in the geotecnnical reiorl in the case of conflict. Evaluations
... peiformed by t5e consultant during the 'c3urse of .grading may result in new
recommendations which could supersede these specifications or the
recornmendations cf ;he geotechnical repofi. It shall be the responsibility of the
cznrractor io read and undersand these saeafications, as well as the georechnical
report and approved Grading pians.
..
2.0 Earthwork Observation and Testing
Prior to the commencement of grading, a qualified geotechnical consultant should be
employed for the purpose of observing earlhwork procedures and testing the fills for
conformance with the recommendations of ihe geotecnnical report and these
specifications. It shall be the responsibility of the contractor to assist the consultant
and keep him apprised of work schedules and changes, at least 24 hours in advance.
so that he may schedule his personnel accordingly. No grading operations should be
performed without the knowledge of the geotechnical consultant. The contractor shall
not assume that the geotechnical consultant is aware of all grading operations.
It shall be the sole responsibility of the contractor to provide adequate equipment and
agency ordinances, recommendations in the geotechnical report. and the approved
grading plans not withstanding the testing and observation of the geotechnical
consultant. If. in the opinion of the consultant. unsatisfactory conditions. such as
unsuitabie soil, poor moisture condition, inadequate compaction, adverse weather.
Sic., are resulting ip, 2 quality sf work less :kan recmnmended in the geotechnical
report ana the specifications. the consultant will be empowered to reject the work and
recommend that construction be stopped until the conditions are rectified.
Maximum dry density tests used io evaluate the degree of compaction should be
performed in general accordance with the latest version of the American Society for
Testing and Materials test method ASTM D1557.
methods to accomplish the work in accordance with applicable grading codes and I
t
-1 -
3.0
..
3.1 Clearina and G rubbinq: Sufficient brush, vegetation, roots and all other
deleterious material should be removed or properly disposed of in a method
acceptable to the owner. design engineer. governing agencies and the
geotechnical consultant.
The geotechnical consultant should evaluate the extent of these removals
depending on specific site conditions. In general. nc more than 1 percent (by
volume) of the fill material should consis: of these materials and nesting of
these materials should not be allowed.
3.2 -q: The existing ground which ks been evaluated by the
geotecnnical consultant to be satisfactory for support of fill. should be scarfied
to a minimum depth of 6 inches. Existing ground which is not satisfactory
should be overexcavated as specified in the following section. Scarification
should continue until the soils are broken down and free of large clay lumps or
clods and until the working surface is reasonably uniform, flat, and free of
uneven features which would inhibit uniform compaction.
3.3 Overexcavation: Soft. dry, organic-rich. spongy, highly fractured. or otherwise
unsuitable ground, extending to such a depth that surface processing cannot
adequately improve the condition, should be overexcavated down to
czmpetent ground, as evaluated by the geotechnical consultant. For purposes
of determining quantities of materials overexcavated, a licensed land
surveyorkivil engineer should be utilized.
3.4 Moisture Conditioning: Overexcavated and processed soils should be watered,
dried-back, blended. andlor mixed, as necessary to attain a uniform moisture
content near optimum.
3.5 Recomoaction: Overexcavated and processed soils which have been properly
mixed. screened of deleterious materia!, and moisture-conditioned should be
rtconpacted to a minimum relative compaction of 90 percent or as otherwise
recommended by the geotechnical consultant.
-2-
bt IN1 MUM RETAIN IN G WALL WAT'ERPROOFING
& DRAINAGE DET,AiL
?CJECT ADDRESS
?AWN BY:
;, ... w--- ...... \..: ....;....I ....... ...... . .,I .. .....
I
- I-Yb- (45d) 35NCRE;i CANT
0 .'OCTING/YIALL CCUNEZTION
(UNDER WATER PROOFING)
?XEC- VUMBES
7.3dEC- NAME
-
:ALE 7 -= I '-0''
ZYC UIEGRAIN '3::::- i /
EN GIN EERl N G DESIGN GROUP 810 WEST LOS VALLECITOS BLVD
SUITE "A.
SAN MARCOS CA 92069
(760) 752-7010 FAX (760) 752-7092 E DATE
OESIGN CDNOITIONS. INSPECTIONS.
w*lh Ira !o 91 und lor tha lhdinp conditions shown tor Call for impecmns P follow ~~
,acn rypt "I. Oaign H shali noi bn exceedad:
!ound unnrcrnarf by rho Engineer. Soeual Iootq dairy IS f8Quired where foundation material
%s unc3oaoIe ai supporting toe grenura listed in table.
JESiGN JATA:
'?emiorced Cancnrc:
Faoting key 18 fequired IxCID1 a( shown Othewtse or when A.
9.
Fr = I200 Jd i'c = 3000 psi 5s = iO.000 pi n = 10
i'm = SO0 psi Fm = 200 psi
.=s = iO.DO0 psi n = 50
3cn = 720 jcf ma Equivalent iiuid Pressure = 36 psi ;er ioot 01 heignr iValls inown :or 1%:1 unlimited siooinq surcnarqn ara dmgned in ac:ardance with
2anrline's ?ormula ior uniimitea sloping surcharge with
2 a= 330 42: " c. SEiNFJRCiMENT:
intermediate grade. hard grade. or rail steel deiormalion shall :anform !o ASM A615 A616, A617. Sarr shall lap 40 ciameten. wnere spliced, unless otherwise shown on the plans. Bends :hall cmiorm :(I the Manual af Standard Practice. A.C.I.
Backing for hooxs is ?our diameters. All bar embedmenu are ::ear :iStancer :o autside ol bar. Spaang for parallel ban is
:enter :o Center 31 3an.
UPJONRY:
u.
When the looting ha been lormad. wtth tho stael fled
Murely in final posirion. and is ready lor thn concretn
IO be placed.
Where :leanour holes are not 3rovided:
t1) After the blocks have been laid uo Io a height of 4'. or lull height ?or walls uo 10 5'. with srenl in
21acn but before the grout is poured. and . . . . ,
A?ter !ne lint Iih is properly grouted. the blocis
ilave Seen laid ?IO :a :he :OD ai me wall wtth !ne
sbel tied ~uraly in place out Selore the upper iifr is grouted.
21
'Where cleanout 301~ are 3rovioec:
Attar :he blocks have Sean iatd UP :o ihs !OD oi
:he wall. with :nu Iteel :lea securely in placn. but
Selora grouting.
Aflw grouting is :omplea and aher rock or xbble wall drains ara in place but before earth backfill is placed.
Final msoecrion when all work has been completed.
..
CONCRETE GaO(JT AN0 MCRTAR MIXES:
Concnte grout shall attain a minimum comprenivc srringth of
2.000 Psi in 20 days and monar shall at:ain 1,800 psi in 28 dlyL
All calls shall be lilled with grour Roo or vibrate grout
within 10 minutes of pouring to insure consolidation. Bring
grout to a point 2" lrom :he iop 01 maronrf unils when grouting of wcond lift is to be continued at another :ha.
MORTAR KEY:
To insure proper bonding bemen the footing and the first coune of block. a mortar key shall be formed by embedding a !la1 2 X 4 flush with and at thn top a1 the frnshly pOuced
footing. The 2 X 4 snould be removed aiter the concrete has naned 10 harden iapproximarelq 1 hour).
A monar key may be omittea il :ne firs: course ai block is
~t inlo the fresh concrete when the looiinq IS poured, and a
good bond is oolained.
WALL caAiNs.
Wall drain: snail x provmeo in ac:sr:ancc wm Stanaam
Orawmq C.8.
SOIL
All loatmgs shall extend at Iem I2 inches Into undisturbed narural soil or approved cOrnpac:ed fill.
pnor 10 plaanq :oncrete ,n looimp.
Soil should be dampened
I ME ENQlNEERlHO DESJQN QROUP
i
i 112 : i ilooing backfill or
/ ;ive .oaa wcharge
j' . J" 3' . a-
~ H lmaxl ,
l w lrnd , s. rl- 1'. 9"
! T (rninl ! 0'- lo" 0'. lo"
Edge of Footing r.
'
1 I
!
.
*\ ban i 16816" Y4@16"
PLAN
(I.. 5h
TYPICAL SECTION
over 3' . 8"
llCUtl *o
NOTES
I. See Stanoard Drawing C.7 and C.8 for
aoditionai notes and derails.
2. Fill all bioCK :ells wzth grout.
/ 1 112 : 1 riobing backfill ai
250 vi. :ive load mrcnarge ,,
TYPICAL SECTION
3' . 8" rnax.
ELEVATION
, .. ,....... . - - ..
SIDE HILL STABILITY FILL DETAIL
I. EXISTIN0 QROUND SURFACE / I
/ 0
-\
I I'
>'
/ I / I
I . I- FINISHE0 SLOPE FACE 7 /
\ I~ ,/ '/FINISHE0 CUT PA> \
~
PROJECT 1 TO 1 LINE
FROM TOP OF SLOPE TO
OUTSIOE EDGE OF KEY r
.I/<;, 15 , 'E, 11'1, I,
PA0 OVEREXCAVATION DEPTH
AN0 RECOMPACTlON MAY BE
GEOTECHNICAL CONSULTANT BASED ON ACTUAL FIELD CONDITIONS ENCOUNTERED.
OVERaURDEN OR UNSUITAI1LE
RECOMMENDED ay THE
COMPETENT BEDROCK OR
MATERIAL AS EVALUATED BY THE QEOTECHNICAL CONSULTANT
2' I 15' MIN~I
LO WEST KEY BENCH
DEPTH (KEY1
-~ _z CANYON SUB6RAIN DETAILS
UNSUITABLE
MATERIAL
TaENcn
9EE JELOW
SUaDRAlN TRENCH DETAiLS
ilLxa FABRIC ENVELOPE
(UIRAFI l4ON OR APPROVE3
/8* UIN. OVERLA?
, 7 6' WIN. OVERLAP
EQUIVALENT)*
3/4'-1-1/2' CLEAN
GRAVEL
4' MIN. SEDOING
,I c:;,-- /" ' '!F CALTRANS CLASS 2 PERMEA3LE
MATERIAL IS USED IN PLACE OF
3/4'-1-1/2* GRAVEL. FILTER FABRIC
MAY BE DELETED
3/4'-1-1/2* CLEAN
GRAVEL (Oft?/?:. MIN.)
PERFORATED
PIPE
DETAIL OF CANYON SUaORAlN TERMINAL
,S'MIH. - PER FOR ATE0
8' ,0 MIN. PIPE i IS' MIN.
STA81LITY FILL I' BUTTRESS DETAIL
KEY WIDTH I AS NOTED OH GRADING PLANS1
7 S' MIN.
SEE T-CONNECTION
DETAIL
3/4'-1-1/2'
TER FABRIC I A' MIN.
BECDIHG VELOPE (MIAAFI
IN OR APPROVE3
QUIVALENT)*
SUBDRAIN TRENCH DETAIL 1
.. NOH-PERFORATE1
OL'7CET PIPE /,;
T- C 0 N N E CTlO N D ETAiL
- IF CALTRAHS CLASS 2 PERMEA3LE
MATERIAL IS USED IN PLACE OF
3/4'-1*1/2* GRAVEL. FILTER FABR!:
MAY BE DELETED
I
I- KEY AND 8EHCHlNG DETAILS - PROJECT 1 TO 1 Lime FILL SLOPE
PROY TOE oc SLOPS
EXlSTlNa OFIOUND SURFACE
UNSUITABLE MATERIAL
2' MiN.I-75. h4IN.-
KEY I LOWEST
DEPTH BENCH
, A \ D€FTH , ,.pJ
CUT SLOPE
(TO BE EXCAVATED
PRIOR TO FILL PLACEMENT)
CUT-OVER-FILL SLOPE PRIOR TO FILL
PLACEMENT)
PROJECT 1 TO 1
LINE FROM TOE
OF SLOPE TO
COMPETENT
MATERIAL
NOTE: Back drain may be recommended by the geotechnical consultant based on actual field Condltjona encountered. Bench dimensiofl recommendations may ai80 be altered baaed on field condition3 encountered.
'I
- ~
ROCK DISPOSAL DETAIL
SLOPE FACE
--
--
GRANULAR SOIL ($.E,? 30) TO BE DENSIFIED IH PLACE BY FLOOOIWG
DETAIL
-------________ ------________
-----_-I____L_-
- -------_-__---- ----_--_-_----- -.------___---e
TYPICAL PROFiLE ALONG W!NDROW
Rock with maximum dimensions greater than 6 inches should no: be used within 10 fee?
Vertically of finiah grade (or 2 feet below depth of ICWBS: utility whichever is Greater), and 15 feet horirsntally of slope faces.
' Rocks with maximum dimensions greater than 4 fee: s?~culc not be u:ilized in fills.
' Rock Dlacement, flooding of granular sail, and till ;la;er,;en! s3cuId >e observed by
Beotechnical consultant.
Maximum Size and spacing of windrows should be in accordance with the above detaiis
Width Of windrow should not exceed 4 feet. Windrows should be Staggered vertically (as depicted).
Rock Should be placed in excavated trenches. Granular soil (S.E. greater than Or equa'
to 30) should be flooded in the windrow to completely fill voids around and beneath rocks.
t
APPENDIX 4-
HOMFOWNERS MAIN TFNANCE GU IDELINES
Residential home sites require pericdic maintenance of irrigation and drainage systems to
insure proper performance and overall retention of property value. Often, homeowners are
not aware of the importance of these systems and allow them to deteriorate
During the csnstructicn pcasz cf developmen:. governing ageccies require propecy
developers tc utilize specific methods sf engineering and construction to protect the 7ublic
interest. For instance. the developer may be required to grade the property in such a
manner that rainwater vill be 3raired away from the building cad. ks:alf brow ditches ar?d
teriace drains. am to plant sicczs :o rnicimize srosion. Kcwaver, once the lot is
purchased, it becomes the Duyer's responsibility to maintain these safety features by
observing a prudent program of lot care and maintenance. Failure to make regular
inspections and perform necessarj maintenance of drainage devices and sloping areas
may cause severe financial loss. in addition to hisher own properry damage, the property
owner may be subject to civil liability for damage occurring to neighboring properties as a
result of negligence.
The following maintenance r;uideiices are provided for the protec1icn cf the homecwner's
investment:
A. All roof gutter and downspout systems, installed on the residence, should be
tightlined to a suitable outlet away from the structure. Under no
circumstances should water be allowed to pond onsite, particularly against
the perimeter foundation system.
Soils grades adjacent to the foundation of the structure should be sloped to
direct water away from the foundation and into a collective drainage system.
Soil grades should slope a minimum of 2% for a horizontal distance of 5 feet
away from the structure.
The irrigation of Elanter systems located immediately adjacent to the
foundation should be strictly controlled to avoid over watering. Saturation of
soils in these planters may result in soil settlemenffexpansion and associated
distress.
Care should be taken to ensure that slopes, terraces, berm, and proper lot
drainage are not disturbed.
In general, roof and yard runoff should be directed to either the street or
storm drain by non-erosive devices such a sidewalks, drainage pipes, ground
gutters, and driveways. Drainage systems should not be altered without
expert consultation.
8.
C.
D.
E.
Page No. I
1
1
I
I
1
1
1
1
I
I
I
1
1
I
1
1
I
1
F.
G.
H.
I.
J.
K.
L.
FOWNFRS MAINTENANCF GlllpFl INFS
All drains should be kept clean and unclogged. including gutters and
downspouts. Terrace drains or gunite ditches should be kept free of debris
:o allow proper drainage. During periods of heavy rain. the performance of
the drainage systems shculd be hstected. Problems. such as sullying and
poncing. if obsewed. shculd ce cnrrtcted as socn as possible.
Any leakage from pools, waterlines. etc. or surface runoff bypassing drains
should be repaired as soon as 7cssible
Animal burrows 'should be slininared since rney may cause diversion of
surface runoff, promote accelerated erosion. and even trigger shallow slope
failures.
Sropes should not be altered without expert consultation. Whenever a
homeowner plans a topographic modification of a lot or slope. a qualified
geotecnnical consultant should be contacted.
If unusual cracking. settling. or earth slippage occurs on the property, the
owner should consult a qualified geotechnical consultant immediately.
The most common causes of slope erosion and shallow slope failures are as
follows:
0 Gross neglect of the care and maintenance of onsite slopes and
drainage devices.
0 Inadequate andlor improper planting. Barren areas should be
replanted as soon as possible.
0 Excessive or insuificient irrigation or diversion of runoff over the slope.
Property owners should not let conditions on their property adversely impact
their neighbors. Cooperation with neighbors could prevent problems and
increase the aesthetic attractiveness of the community.
Page No. 2
FROM : THE KR BRIWT CO WNE No. : 619 720 0098 Jan. 05 1999 07:26RM P3
fled- /
NON-RESIDENflAL CERTIFICATE
CATE OF COMPLIANCF
FFFS OR OTHER MITIGATION
This form must be completed by the City and the appropriate school districts and returned to the City prior to
issuing a building permit. The City will not issue any building permit without a completed school fee form.
Project Name:
Building Permit
Plan Check Number: 78- ZCYS
Project Address: 18Ls AdQ
A.P.N. : Llt- \tu- LL-03
Project Applicant
(Owner’(s’) Name(s)
Project Description:
Buildina Tvpe:
Residential: Numbe r of New Dwelliu Units
Square Feet of Living Area in New Dwelling
Second Dwelling Unit: Square Feet of Living Area in SDU
Res. Additions: Net Square Feet New Area
Comerc./ Ind.: Square Feet Floor Area \2, goo
City Certification: Date: \7.122/4 !4
mTRlCTS WITIWIHE CITY OF CA&S&W
Carlsbad Unified School District
801 Pine Ave.
Carlsbad CA 92009 (434-0661)
Encinitas Union School District
101 South Ranch Santa Fe Rd
Encinitas. CA 92024 (944-4300)
Certification of Applicant /Owners. The person executing this declaration (“Owner) certifies under penally of perjury that (1)
the information provided is correct and true to the best of the Owner‘s knowledge and that the Owner will file an amended
certification of payment and pay the additional fee if Owner requests an increase in the number of dwelling units or square
footage after the building permit is issued or if the initial determination of units or square footage is found to be incorrect,
and that (2) the Owner is the owner/ developer of the above described project@), or that the person executing this
declaration is authorized to sign on behalf of the Owner.
San Marcos Unified School District
215 Mata Way San Marcos. CA 92069 (736-2200)
San Dieguito Union High School District
710 Encinitas Blvd.
Encinitas. CA 92024 (753-6491)
Signature: Date: 1/6/99
\
@ 2075 Las Palmas Dr. - Carlsbad, CA 92009-1 576 - (760) 438-11 61 - FAX (760) 438-0894
Gov. Code Gov. Code Government Prior Existing
53080/65995 65970 Code 5331 1 Mitigation Agreement
(AB 181) (SB 201) (Mello - Roos) Note:
I I I I I I
Exempt from
fee
requirements
I 1 I I of Agreement)]
I ?-..I3OQ 3:~ d.,'"(SI) Total amount of (new) floor area within the building
Fee Amount per Square Foot
Amount Collected
-Or if subject to Prior Existing Mitigation Agreement:
For Detached Residential Dwelling Units or Attached Dwelling Units > 1600 Square Feet
Total Number of Dwelling Units
Amount per Dwelling Unit
Amount Collected
For Attached and Detached Dwelling Units < 1600 square feet/ per dwelling (If applicable)
Total Number of Dwelling Units
Amount per Dwelling Unit
Amount Collected
SCHOOL DISTRICT:
This is to certify that the applicant listed on page 1 has paid all amounts or completed other applicable school
mitigation determined by the information presented above and due to the School District. The City may issue
buildina Dermits for this Droiect.
-and/or-
-. ..
SIGNATURE OF SCHOOL DISTRICT OFFICIAL
DATE
TITLE
PHONE NUMBER
The Carlsbad Unified School District has elected to imposed the fees andlor amounts herein upon a finding that those
facilities described in the School ImDact Mitiaation Fee Justification Studv for Carlsbad Unified School District. DreDared bv
NOTICE OF 90 DAY PER IOD FOR PROTFST 0 F FEES
David Taussig & Associates for the.District. Section 66020 of the Govemment Code enacted as Assembly Bili 3081, set .
forth as Chapter 549, Statutes of the State of California. requires that all school districts, including the Carlsbad Unified and
the Encinitas Union School Districts, provide a written notice to the project applicant at the time of payment of the school
fees, mitigation payments, or other exaction. This notice is to advise the project applicant that the protest period regard to
such amounts or the validity thereof in accordance with Section 66020 of the Government Code and other applicable law,
commences with such payment or performance of any other requirement as described in Section 66020 of the Government
Code. Additionally, this notice advises that the protest thereof must occur within 90 calendar days thereafter.
Jan. 08 1999 02:06PM P2 : THE SEQ BRIGHT CO PHOM NO. : 619 720 0098 -- the Sea Bright p/iy m-c o m p a n y
/e66/v /
January 8. 1999
City of Carlsbad
2075 Las Palmas Drive
Carlsbad, CA 92009
Att. Gary Wayne
Ref: 1835 Aston Ave
Lot 64 - Carlsbad Research Center
Dear Gary,
Per our meeting today I understand that your release of the above mentioned
project for Building Permit purposes in no way relieves us of landscaping responsibilities.
I submitted final landscape corrections today and we will diligently pursue
obtaining landscape plan approval within the next 30 days, if not sooner.
We understand that Building occupancy will not be issued until all landscape
improvements are installed and signed off by the City.
Your assistance on this Is greatly appreciated
Sincerely,
Robeti 0. Sukup
RCE 28302
Engim'ng Managemen1 Qeneml Cantmcfing Dowlopment
4322 Sea Bright Place Carlsbad, CA 92008 Telephone/FAX 760-720-0098
. ..