HomeMy WebLinkAbout1880 CANYON PL; ; CB881651; PermitDECLARATIONSLENDERWORKER'S COMPENSATION OWNER/BUILDER CONTRACTORi r I^Sa-ofg"!^ «»*5" IT ° & ^ a ™~ " —5 atJi" c ftS3*:>•' -J C« -* - "°to H ± z c.! r* > > m,-T, njVSS BO J>*Somn-s-t>l2cK.53,?££3'>zi •_ c i c* i—! —^
g-o o o
• S
EJCr\'J.
Ma
OECTRICAL PERMITo
o
DO
D
O
O
0 TVPCONa
50
Ji-kJ!">-CO
Oto
r-j'^*
COH?
w o
!--• O%£
P-o
0—
6 CARLSBAD BUILDING DEPARTMENT2075 Las Palmas Dr., Carlsbad, CA 92009-1915 (619) 438-116App, ipA«rrui\*«A PPRMIT<x r&nmnWhite — Inspector Green — (1) Finance Yellow — Assessor Pink — Applicant Gold — Temporary File
SPECIAL CONDITIONSN
\BUILDING5-A OCOf..<"2mrIE>zc>rr/•ELECTRICAL?/(X PLUMBING/,j •nZ1-r-r-^**H-0rn_^Co5rn ™fi^r rnCDSm^?sfesi"oX^i-n^
?
L^Jr
4—.
s~
r'
0 VENTILATING SYSTEMSHEAT - AIR COND. SYSTEMSnocoTJ?"n3)m11<2 sm•)X>z5>r-D BONDING D POOLD ELECTRIC SERVICE D TEMPORAR-<3)O~Imr—mO-I3)O a ELECTRIC UNDERGROUND D UFFm3J ELECTRICALD WATER HEATER Q SOLAR WATERoCOHmH TUB AND SHOWER PANO-oOcHDSCOHmD5-4m31 UNDERGROUND D WASTE n WATm31 D SEWER AND BL/CO U PL/COPLUMBINGZH11UOD|->I»oD3)-<>nf-INSULATIONPILES CAISSONS•HIGH STRENGTHBOLTSSPECIAL MASONRY1 FIELD WELDINGi HUbl TENSIONtDCONCRETEPRESTRESSEDCONCRETEEXTERIOR LATHFRAMESHEATHING D ROOF D SHEARcCD•n3JmD~nOO37DOmzo GUNITE OR GROUT213)REINFORCED STEELNoavaNnodSTRUCTURAL CONI, OVER 2000 PSI( .
mHm SOILS COMPLIANCiPRIOR TOFOUNDATION INSPINSPECTIOI^
O13mm00
m T^D
2
~n ^-a ^
|H>o
CO
D
m
UmOc
m
D
U-\n
0
3nO
>
_
Z
mO-t
OZ
Cfl
Z
-am
O
O
3J
Z
O
m FIELD INSPECTIOz
3]mO
O
;"BUILDING-omO5^^mzwmQo37 -i
^-" '
^
^*-
V
^^
DEVELOPMENT PROCESSING SERVICES DIVISION
2075 LAS PALMAS DRIVE
CARLSBAD, CA 92009-4859
(619)438-1161
MISCELLANEOUS FEE RECEIPT
Applicant Please Print And Fill In Shaded Area Only
ASSESSOR'S
PARCEL NQ,
PLAN .0 NO.
OWNER
OWNER'S
MAILING
ADDRESS /H#y#
CITY
3631 12/13/88 0001 01 05
VALIDATION AREA
41-00
CONTRACTOR'S
MAILING
ADDRESS
TEL.
IF THE APPLICANT TAKES NO ACTION
WITHIN 180 DAYS, PLAN CHECK FEES
WILL BE FORFEITED.
STATE
LICENSE NO.
BUSINESS
LICENSrNO.
SUBDIVISION.10T(S)-
Cx/-^-^0
LEGAL DESCRIPTION 1ITTED:
CALCS
SIDENTIAL BLDGS
CALCS
TS
5SED ENVELOPES
. . . . . _ - _,
CONTACT PERSON f\UO&^
ADDRESS ^ V& *'£*'
CITY ZIP TEL
LJArt UIVtIN/ DATF
SENT TO APPLICANT
LA COSTA LETTER
SCHOOL FEE FORM
P & E CORRECTIONS LIST
CERTIFICATE OF OCCUPANCY
APPLICANT'S SIGNATURE
White - File YMlow - Applicant Pink - Finance Gold - Assessor
ESGIL CORPORATION
9320 CHESAPEAKE DR., SUITE 208
SAN DIEGO, CA 92123
(619) 56O-1468
DATE:
JURISDICTION:
PLAN CHECK NO:
PROJECT ADDRESS:
PROJECT NAME:
JURISDICTIO1
HE(
FILE COPY
UPS
DESIGNER
D The plans transmitted herewith have been corrected where
necessary and substantially comply with the jurisdiction's
building codes.
The plans transmitted herewith will substantially comply
with the jurisdiction's building codes when minor deficien
cies identified geugyj are resolved and
a
D
D
checked by building department staff.
The plans transmitted herewith have significant deficiencies
identified on the enclosed check list and should be corrected
and resubmitted for a complete recheck.
The check list transmitted herewith is for your information.
The plans are being held at Esgil Corp. until corrected
plans are submitted for recheck.
The applicant's copy of the check list is enclosed for the
jurisdiction to return to the applicant contact person.
[I The applicant's copy of the check list has been sent to:
[ I Esgil staff did not advise the applicant contact person that
plan check has been completed.
Esgil staff did advise applicant that the plan check has
been completed. Person contacted:
Date contacted:
REMARKS; A
Telephone #_
ESGTLiCORPORATI
Enclosures:
ESGIL CORPORATION
9320 CHESAPEAKE DR., SUITE 2O8
SAN DIEGO. CA 92123
(619)560-1468
DATE: T>^AApi*g' g-g.H^A
IJURISDICTlS^x
JURISDICTION: AAgLAR^ta "" fjPLAN CHECKERQFILE COPY
PLAN CHECK NO: &>&> — \c^&\ SET; .T- QUPS
PjDESIGNER
PROJECT ADDRESS: \&8>O
PROJECT NAME: CgiB»
D The plans transmitted herewith have been corrected where
necessary and substantially comply with the jurisdiction's
building codes.
The plans transmitted herewith will substantially comply
with the jurisdiction's building codes when minor deficien-
cies identified are resolved and
checked by building department staff.
I—| The plans transmitted herewith have significant deficiencies
I I identified on the enclosed check list and should be corrected
and resubmitted for a complete recheck.
check list transmitted herewith is for your information
The plans are being held at Esgil Corp. until corrected
plans are submitted for recheck.
The applicant's copy of the check list is enclosed for the
jurisdiction to return to the applicant contact person.
The applicant's copy of the check list has been sent to:
Avte
1 Esgil staff did not advise the applicant contact person that
plan check has been completed.
Esgil staff did advise applicant that the plan check has
been completed. Person contacted: <Jl
Date contacted: Telephone # "757^ 3l
REMARKS:
Enclosures:
JURISDICTION: &A.RU5BAP
PROJECT ADDRESS; \9&>
TO:
Date
ROPEisA
PLAN CORRECTION SHEET
Planf Check No.
Date plena received by the jurisdiction^|
Date plans received by plan checker 12-15*-£&
Date initial plan check completed 12-2.Z.-I5^^
By Gr, AiiEM AnXSrgL-.
FOREVORD; PLEASE READ
Plan check is limited to technical requirements
contained In the Uniform Building Code, Uniform
Plumbing Code, Uniform Mechanical Code, National
Electrical Code and stats laws regulating energy
conservation, noise attenuation and access foe
the handicapped. The plan check is based on
regulations enforced by the Building Inspection
Department. You may have other corrections
based on laws and ordinances enforced by the
Planning Department, Engineering Department or
other departments.
The items circled below need clarification,
modification or change. All circled items have:
to be satisfied before the plans will be in
confornance with the cited codes and regulations*
Per Sec. 303 (c), of the Uniform Building Code,
. the approval of the plans does not permit the
violation of any state, county or city law.
A* PLANS
1. Please make all corrections on the original
tracings and submit two new sets of prints,
and any original plan sets that may have
been returned to you by the jurisdiction,
to! E*^'
To facilitate rechechlng, please identify,
next to each circled item, the sheet of
the plans upon which each correction on
this sheet has been made and return this
check sheet with lh« revised plans.
KASIS /9F APPROVAL-
USE &=WAUL.
SHotO
CftlP, VufcU- f_ftjJ£TKUCTto/vJ
AiJ
Date i Jurisdiction
Prepared byi
VALUATION AND PLAN CHECK FEE
Bldg. Dept,
Esgil
PLAN CHECK NO.
BUILDING ADDRESS _
APPLICANT/CONTACT .
BUILDING OCCUPANCY
PHONE NO.
DESIGNER PHONE
TYPE OF CONSTRUCTION CONTRACTOR PHONE
BUILDING PORTION
-
Cht WAUO
Air Conditioning
Commercial
Residential
Res. or Comm.
Fire Sprinklers
Total Value
BUILDING AREA VALUATION
MULTIPLIER
e
@
@
VALUE
^B&a&
Building Permit Tee $.
Plan Check Fee $
COM HENTSt
SHEET I OF (
12/87
May 27, 1987
Alton L. Ruden
2733 Mesa Drive
Oceanside, California
KETCHUM ENGINEERING INC.
io1!!"11*0* LIHULE' CA««-SBAD)944-1836 CALIF.,92009
KE 8738
Report Ho. 1
Subject: Geotechnical Investigation for a Proposed Eight Lot
Subdivision, Canyon Street, Carlsbad, California.
Gentlemen:
We are pleased to present the results of our geotechnical invest-
igations for the subject project. This study was performed in
accordance with your request and our proposal dated April 1, 1987
The results of our field investigation and laboratory tests, as
well as our conclusions and recommendations, are presented in
the accompanying report.
We appreciate this opportunity to be of professional service.
If you have any queations, you are welcome to contact this office
at your convenience*
Respectfully Submitted,
KETCHUM ENGINEERING, INC, ,- '
E. N. Ketchum, R.C.E. 26267
President
ENK/ct
cc: (5) Submitted
TABLE OF CONTENTS
' Page Number
INTRODUCTION AND PROJECT DESCRIPTION 2
PURPOSE AND SCOPE OF PROJECT 2
FIELD INVESTIGATION ' 3
LABORATORY TESTING 4
FINDINGS 5
Site Description 5
Subsurface Soil Conditions 6
Groundwater • 6
CONCLUSIONS 6
RECOMMENDATIONS 7
Site Preparation 7
Cut and Fill Slopes 9
. Foundations and Concrete Slabs-On-Grade 10\
Pavement 12
Drainage 12
Earth Retaining Structures 12
LIMITATIONS 15
f
PLATS 1 -Vicinity Map . '
PLATE 2 Site Plan
PLATE 3 . Unified Soil Classification
PLATES 4-8 Trench Logs
PLATE 9 Maximum Density & Optimum Moisture
Content/Direct Shear Test Results/
Expansion Test Results
PLATE 10 Recommendation for Filling on Sloping
Ground
APPENDIX A Recommended Grading Specifications
KE 8738 Page 9
AREAS TO BE PAVED: All areas to be paved should have the sub-
grade soils densified to at least 90% relative compaction to a
minimum depth of 12 inches. It is suggested that the upper 12
inches of subgrade soils be comprised of granular select, non-
expansive materials.
IMPORT MATERIALS; Any fill material to be imported on-site should
consist of granular, non-expansive soil that contains no organic
or deleterious materials. It should have sufficient cohesion to
hold a vertical or near vertical cut for footing excavations*
It should have at least 85% of the material passing the Number
4* sieve with no rocks or chunks larger than one and one-half
(14) inches. The import fill should be approved by our office
prior to on-site delivery.
CUT AND FILL SLOPES
It is our opinion that the cut and fill slopes constructed from
the native on-site materials will be stable with relation to deep-
seated failures if constructed at or flatter than the following
recommended slope ratios expressed in the horizontal or vertical
units for the indicated heights:
Gut Slopes to 20 Feet in Height, 2:1
Fill Slopes toj20 Feet in Height 2:1
The above maximum heights were determined by using a factor of
safety of 1.5.
It is also recommended that footings not be founded nearer than
eight (8) feet measured horizontally inward from the face of the
slopes. Slopes should be planted with erosion resisting plants
and natural drainage should be directed away from the top of all
slopes such that no water is allowed to flow over the top.
KETCHUM ENGINEERING INC.
KE 8V3B Page 10
TEMPORARY SLOPE STABILITY; The following table presents recom-
mendations relative to temporary construction excavations. These
slopes should be relatively stable against deep-seated failures
but may experience localized sloughing.
Slope Ratio
(Horizontal to Vertical)
Maximum Height of Temporary
Excavation (Feet)
0.25 : 1
Vertical
12
5
It should be the contractor's responsibility to provide safe
support for the excavation. No heavy equipment should be al-
lowed adjacent to the top of the temporary cuts.
FOUNDATIONS AND CONCRETE SLABS-ON-GRADE:
GENERAL:. We recommend the structure proposed for this project
be supported by a continuous spread footing foundation system
as recommended below. The following recommendations are sub-
mitted provided the soils within the upper three (3) feet from
finish grade have a low expansive potential.
a) All footings for one and two story structures should
i*
be founded a minimum of 12 and 18 inches, respectively,*
below adjacent "finish grade. Footings should have a
minimum width of 12 inches.
b) Both exterior and interior continuous footings should
be reinforced with on.e No. 4 bar positioned three (3)
*inches above the bottom of the footings and one No. 4
bar positioned three (3) inches clear below finish '
floor.
KETCHUM ENGINEERING INC
KE-8738 Page 11
c) Interior slabs should be hot less than three and
one-half (3i) inches in thickness, underlain by
a four (4) inch blanket of clean concrete sand
or crushed rock, reinforced with 6"x6"-#10/#10
welded wire mesh and completely surrounded with a
continuous footing. Number 3 ties should be placed
at 48 inches on center from the slab to the footing.
d) Exterior slabs should be a minimum of three and
one-half (3i) inches in thickness and should be
reinforced with 6"x6n-#10/#10 welded wire mesh.
e) Surface drainage should be directed away from the
proposed foundation. Planters should be constructed
so that water is not allowed to seep beneath founda-
tions or slabs. Over-irrigation of areas adjacent
to foundations and slabs should be avoided.
; f) Prior to placing steel or concrete, the foundation
excavations should be inspected by a representative
of this office to insure that the above recommenda-
tions have been followed.
BEARING VALUE; An allowable soil bearing value of 2000 pounds
per square foot for spread footing foundations may be used for
design of the on-site structures. This bearing value should
be verified for all soil conditions under all building pads.
In our opinion this value can be increased by one-third for
loads that include wind or seismic forces.
*
SETTLEMENT CHARACTERISTICS; The anticipated total and/or dif-
ferential settlements for the proposed structure may be consid-
ered to be,; within tolerable limits provided the recommendations
in this report are followed.
KETCHUM ENGINEERING INC
Ke '8738 Page 12
PAVEMENT
After the site is graded and the subgrade soils are exposed in
the parking and driveway areas, we recommend that these soils
be sampled and tested so that pavement recommendations may be
made.
However, the following recommendations are submitted as prelim-
inary guidelines for pavement construction. The subgrade soils
to a depth of at least 12 inches should be densified to at least
90%. Paved areas should be protected from moisture migrating
under the pavement from adjacent water sources such as planted
or grass areas. Saturation of the subbase soils could result
in pavement failures*
Further, all paving materials and methods of construction should
conform with good grading practices and with the minimum require-
ments of the governing agency.
\
DRAINAGE
We recommend that positive measures be taken to properly finish
grade the pads once improvements and landscape are in place so
that drainage waters are directed off tne pads and away from
possible foundations, -floor slabs, and slope tops. No areas
of ponded w.ater should be allowed to exist.'
EARTH RETAINING STRUCTURES
GENERAL: It is our understanding that the small retaining struc-
tures that are proposed for this project will be of masonry con-
struction.
KETCHUM ENGINEERING INC
KB. 8738 Page 13
ULTIMATE ACTIVE PRESSURE; The ultimate soil pressure for the
design of earth retaining structures with level backfills may
be assumed to be equivalent to the pressure of a fluid weighing
36 pounds per cubic foot for walls free to yield at the top
(unrestrained walls). For walls restrained at the top, a fluid
pressure of 46 p.c.f. may be used. These pressures do not con-
sider any surcharge loading. If any surcharge loadings are
anticipated, this office should be contacted for the necessary
increase in soil pressure. All earth retaining structures should
have adequate weep holes or a subdrain system to prevent the
buildup of hydrostatic pressure behind the wall.
ULTIMATE PASSIVE PRESSURE; The passive pressure for prevailing
soil conditions may be considered to be 360 pounds per square
foot per foot of depth. This pressure may be increased one-
third for seismic loading. The coefficient of friction for
concrete to soil may be assumed to be 0.40 for the resistance
to lateral movement. When combining frictional and passive
resistance, the latter should be reduced by one-third.
ALLOWABLE SOIL BEARING PRESSURE: The foundation for the proposed
retaining structures should consist of spread footings founded
in the firm, native soils or compacted fill. Firm, natural ground
is defined as soil having an in-situ density of at least 85% of
its maximum dry density.. Footings may be designed for an allow-
able bearing pressure of 2000 p.s.f. •
FACTOR OF SAFETY: The above values, with the exception of the
allowable soil bearing pressure, do not include a factor of
safety. Appropriate factors»of safety should be incorporated
into the design of all earth retaining structures to reduce the
possibility of overturning and sliding.
KETCHUM ENGINEERING INC
KE 8738 Page U
BACKFILL! All backfill soils should be compacted to at least
90% relative compaction. Expansive or clayey soils should not
be used for backfill material within a distance of five (5)
feet fron the back of the wall. The retaining structure should
not be backfilled until the Materials in the wall have reached
an adequate strength.
KETCHUM ENGINEERING INC.
Backhoe Trench
SITE PLAN BV: ENK
KETCHUM ENGINEERING INC.[TH[
7618 QUEBRADA CIRCLE. C A RLSBADi| fe-j
(619)944-1636 9200 8 IJLJS
JOB NO. 8738
DATE: 6/1/87
PLATE NO. 2
X
0.uo
.1 -
2 -
3 -
*
•
5 -
6 -
7 -
8 -
? *
M
10 -
11 -
1 _
12 -
L3 -
U-SAMPLE TYPEA
D
-SOIL . 1CLASSIFICATIONSM
SM
•
TRENCH NUMBER T-1
ELEVATtQ,N
DESCRIPTION
Red. fine sands
(slight day bird.) QAF
Red. med. sands
w/ferous nodules
BOTTOM
•
.-*
*APPARENTMOISTURE1Dry
Moist
Humid
-APPARENT |CONSISTENCT 'OR DENSITY !Med. Dens
Med. Dens
Dense
t
M
X -HI ,.
0 I
K
O
1H.1
•MOISTURECONTENT l%!8.8 RELATIVECOMPACTION 1*1-
1 ."
-
—
—
-?
-
-
•V
..V
•M
*•*
^v
••
^
•••
f^
BY: ENK JOB NO. 8738
KETCHUM ENGINEERING INC.TTJ DATE: 6/1/8?
7818 QUEBRADA CIRCLE. C ARLSBADi Mj55I
(619)944-1836 920Ofly IB PLATE NO. 4
\
MAXIMUM DENSITY & OPTIMUM MOISTURE CONTENT
Sample ,
T1 @ 3-4
Description
Reddish brown silty fine to med. sand
1
Maximum
Density
Ipcl)
116.0
Optimumffi"""'
12.0
-
DIRECT SHEAR TEST RESULTS
Sample
T1 @ 3-4
Description
Remolded to 90%
AngU of
Internal
Friction (*)
31
Cohttlon
InUrctpt
(p.l)
50
EXPANSION TEST RESULTS
Sample
CONDITION
INITIAL M.C.U)
INITIAL DENSITY (pel)
FINAL M£. (X)
NORMAL STRESS l|>tl)
EXPANSION . INDEX
T1 @ 3-4
17
«•
»
*-
•
BY:ENK JOB NO.8738
K ETC HUM ENGINEERING INC.
7818 QUEBRADA CIRCLE* C ARLSBAD
(619)944-1836 92006
DATE: 6/1/87
PLATE NO. 9