HomeMy WebLinkAbout1880 MCCAULEY LN; ; CBRA2018-0021; Permit(City of
Carlsbad
Permit
Print Date: 08/20/2018
Job Address: 1880 Mccauley Ln
Permit Type: BLDG-Associated Permit Residentia Work Class:
Parcel No: 156220S100 Lot#:
Valuation: $610,385.99 Reference #:
Occupancy Group: Construction Type:
# Dwelling Units: 1 Bathrooms:
Bedrooms: 4.00 Orig. Plan Check#:
Plan Check#:
Project Title:
Single Family Detached
9
r:,e,\/ l40tJ1t
VB
4.50
PC2016-00S2
PC2018-0002
Status:
Applied:
Issued:
Permit
Finaled:
Inspector:
Final
Inspection:
Permit No: CBRA2018-0021
Closed -Finaled
01/17/2018
02/13/2018
TFraz
8/20/2018 1:21:17PM
Description: LANAI 11: PHASE 1 // LOT 9 // PLAN 4A // 3,782 SF LIV// 697 SF GARAGE // 275 SF PATIO// 168 SF DECK
Applicant:
SHEA HOMES LIMITED PARTNERSHIP
SARAH MORRELL
858-526-6555
BUILDING PERMIT FEE ($2000+)
BUILDING PLAN CHECK FEE (BLDG)
ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION
MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PARK IN-LIEU FEES SF DETACHED & DUPLEX: NW
PLUMBING BLDG RESIDENTIAL NEW/AOD1TION/REMODEL
PUBLIC FACILITIES FEES -outside CFO
SB1473 GREEN BUILDING STATE STANDARDS FEE
SDCWA SYSTEM CAPACllY CHARGE 3/4" Displacement
SEWER CONNECTION FEE (General Capacity all areas)
STRONG MOTION-RESIDENTIAL
SWPPP INSPECTION FEE TIER 1-Medium BLDG
SWPPP PLAN REVIEW FEE TIER 1-MEDIUM
TRAFFIC IMPACT Residential Single Fam. Outside CFO
TRAFFIC IMPACT Residential Single Fam. Outside CFO
WATER METER FEE 1" Displacement
WATER SERVICE CONNECTION FEE 3/4" DISPLACEMENT (Pl
WATER TREATMENT CAPACITY CHARGE 3/4" Displacement
Total Fees: $52,68S.29 Total Payments To Date: $49,395.29
Co-Applicant:
SHEA HOMES LIMITED PARTNERSHIP
9990 Mesa Rim Rd, 200
San Diego, CA 92121-3932
858-526-6554
Balance Due: $3,290.00
1635 Faraday Avenue, Carlsbad, CA 92008-7314 I 760-602-2700 I 760-602-8560 t I www.carlsbadca.gov
$2,349.00
$1,512.76
$96.00
$170.00
$110.00
$7,649.00
$224.00
$21,127.06
$25.00
$5,099.00
$934.00
$78.47
$238.00
$56.00
$3,290.00
$3,290.00
$352.00
$S,944.00
$141.00
PERMIT INSPECTION HISTORY REPORT (CBRA2018-0021)
Permit Type: BLDG-Associated Permit Residential Application Date: 01/17/2018 Ow11er:
Work Class: Single Family Detached Issue Date: 02/13/2018 Subdivision:
Status: Closed -Finaled Expiration Date: 02/11/2019 Address: 1880 Mccauley Ln
Carlsbad, CA 92008
IVR Number: 8958
Scheduled Actual
Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector Re inspection Complete
06/2912018 06/29/2018 BLDG-Electric Meter 062836-2018 Passed Tim Frazee Complete
Release
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-Gas Meter 062838-2018 Passed Tim Frazee Complete
Release
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
08/15/2018 08/15/2018 BLDG-Final 067045-2018 Failed Michael Collins Reinspection Complete
Inspection
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Not ready No
08/20/2018 08/20/2018 BLDG-Final 067434-2018 Passed Tim Frazee Complete
Inspection
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Not ready Yes
August 20, 2018 Page 2 of 2
, PERMIT INSPECTION HISTORY REPORT (CBRA2018-0021}
Pormit Type: BLDG-Associated Permit Residential Application Date: 01/17/2018 Owner:
Work Class: Single Family Detached Issue Date: 02/13/2018 Subdivision:
Status: Closed -Finaled Expiration Date: 02/11/2019 Address: 1880 Mccauley Ln
Carlsbad, CA 92008
IVR Numbor: 8958
Scheduled Actual
Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete
02/14/2018 02/14/2018 BLDG-21 048743-2018 P11ssed Tim Frazee Complete
Underground/Underf
loor Plumbing
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
02/22/2018 02122/2018 BLOG-11 049506-2018 Passed Tim Frazee Complete
Foundatlon/Ftg/Pier
s (Rebar)
Checklist Item COMMENTS Passed
BLOG-Building Deficiency Yes
04/03/2018 04/03/2018 BLDG-15 053587-2018 Partial Pass Michael Collins Re inspection Incomplete
Roof/ReRoof (Patiol
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Sheathing nailing only, need truss walk Yes
04/13/2018 04113/2018 BLDG-13 Shear 055002-2018 Passed Tim Frazee Complete
Panels/HD (Ok to
wrap)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
05/02/2018 05/02/2018 BLDG-84 Rough 056735-2018 Passed Tim Frazee Complete
Combo(14,24,34,44)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-14 Yes
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout Yes
BLDG-34 Rough Electrical Yes
BLDG-44 Yes
Rough-Ducts-Dampers
05/04/2018 05/04/2018 BLDG-16 Insulation 057005-2018 Passed Tim Frazee Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
05110/2018 05/10/2018 BLDG-82 Drywall, 057656-2018 Passed Tim Frazee Complete
Exterior Lath, Gas
Test, Hot Mop
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-17 Interior Lath-Drywall Yes
BLDG-18 Exterior Lath and Yes
Drywall
BLDG-23 Gas-Test-Repairs Yes
August 20, 2018 Page 1 of 2
<(~>
~ CITY o,
CARLSBAD
Building Division
1~1:CORD COPY
INSPECTION RECORD
~INSPECTION RECORD CARD WITH APPROVED
1LANS MUST BE KEPT ON THE .JOB
CBRA2018-0021 L.o+-Cf
1880 MCCAULEY LN
LANAI ll: PHASE 1 fl LOT 9 //PLAN 4A// 3,782 SF LIV //697
SF GARAGE// 275 SF PATIO// 168 SF DECK
~ CALL BEFORE 3:00 pm FOR NEXT WORK DAY INSPECTION 1562205100
0 FOR BUILDING INSPECTION CALL: 760-602-2725 PC2018-0002 3/14/2018
OR GO TO: www.Carlsbadca.gov/BuHding AND CLICK ON
"Request Inspection" CBRA2018-0021
DATE: ,
IF MARKED "YES", IT IS REQUIRED PRIOR TO ANY CONSTRUCTION
STORM WATER PRECON MEETING REQUIRED 760-602-2725 Allow 24 hours
IF MARl<ED "YES", APPROVAL REQUIRED PRIOR TO REQUESTING BUILDING
Fire Prevention
Planning/Landscape
CM&! /Engineering Inspections)
Type of Inspection
cool!# BUILDING
#11 FOUNDATION
#12 REINFORCED STEEL
#66 MASONRY PRE GROUT
□GROUT □ WALL DRAINS
~o TILT PANELS
,,11 POUR STRIPS
#11 COLUMN FOOTINGS
#14 SUBFRAME □ FLOOR O CEILING
#15 ROOF SHEATHING
#13 EXT. SHEAR PANELS
#16 INSULATION
#18 EXTERIOR LATH
#17 INTERIOR LATH & DRYWALL
0 SEWER & BL/CO
#21 UNDERGROUND 18WASTE ~
#24 TOP OUT O WASTE □ WTR
#27 TUB & SHOWER PAN
#23 12( GAS TEST O GAS PIPING
#25 WATER HEATER
#28 SOLAR WATER
BLDG-FINAL
COOi!# POOLS
#51 POOL EXCAV / STEEL
#52 PLUMBING
#53 ELEC / CONDUIT/ WIRING
#54 EQUIPOTENTIAL BOND
#55 PREPlASTER / FENCE/ ALARMS
'""\7 GUNITE
oLDG-FINAL
REV9/17
760-602-4660
760-944-8463
760-438-389 J
Date Inspector
Date Ins ector
Allow 48 hours
Allow 48 hours
call before 2 pm
#31 □ ELECTRIC UNDERGROUND □ UFER
#34 ROUGH ELECTRIC/ EV CHARGER
#33 ELEC SERVICE #32OTEMP0RARY
#35 PHOTO VOLTAIC
#38 SIGNS
UNDERGROUND (11,12,21,31)
DRYWALL,EXT LATH, GAS TES (17,18,23)
ROOF SHEATING, EXT SHEAR (13,15)
#84 FRAME ROUGH COMBO (14,24,34,44)
A/S UNDERGROUND VISUAL
A/S UNDERGROUND HYDRO
A/S UNDERGROUND FLUSH
A/S OVERHEAD VISUAL
A/S OVERHEAD HYDROSTATIC
A/SFINAL
F/AR0UGH·IN
F/AFINAL
FIXED EXTINGUISHING SYSTEM ROUGH-IN
FIXED EXltNG SYSTEM HYDROSTATIC TEST
FIXED EXTINGUISHING SYSTEM ANAL
MEDICAL GAS PRESSURE TEST
MEDICAL GAS FINAL
Date
Date
COPY OF CARD
REQUIRED
Inspector
Ins ector
SEE BACK FOR SPECIAL NOTES
Southwest !nspecUon and Testing, Inc.
441 Commercial Way, La Habra, Ca 90631
(562) 941-2990 o· (714) 526-8441 • Fax (562) 946-0026
REGISTERED INSPECTOR'S DAILY REPORT
TYPE OF· 0 Reinforced Concrete D Welding
iNSPECTION D Post Tensioned Concrete D Fireproofing
REQUIRED . 0 □ Reinforced Masonry O Asphalt
Job Address 'g'. .. ,;/ff) J/f?t· ;-,
Job Nam~/Q.,,./A:' / ~ c,U t.li..f'Y
Type of Structure
Contractor
Subcontractor
SWIT Job No. /~ oott1
0 DIA/ ~ Wood Framing
t
INSPECTION SUMMARY-LOCATIONS OF WORK INSPECTED, TEST SAMPLES TAKEN, WORK REJECTED, JOB PROBLEMS, PROGRESS,
REMARKS, ETC. INCLUDES INFORMATION ABOUT· AMOUNTS OF MATERIAL PLACED OR WORK PERFORMED, NUMBER, TYPE & !DENT. NO'S OF
T CONNECT! OE H.T. BOL
CERTIFICATION OF COMPLIANCE
I HEREBY CERTIFY THAT I HAVE OBSERVED TO THE BEST OF MY KNOWLEDGE
ALL OF THE ABOVE REPORTED WORK UNLESS OTHERWISE NOTED. I HAVE
FOUND THIS WORK TO COMPLY WITH T NS, SPECIFICATION,
AND APPLICABLE SECTION OFTH • AWS.
SIGNATURE OF REG INSPECTOR
~Dv.O »IE/1/t _fc /D6f ✓21/
SPECIALTY NO. AGENCY
CONTINUED ON NEXT PAGE 0 PAGE
TIMEIN TIME OUT SAMPLES
Project Superintendent
White -Office Copy o Canary -Accounting Copy e Pink -Inspector's Copy @ Goldenrod -Jobsite Copy
PLANNINC-
tNCilNEERING
SURVEYING
IRVINE
SANDIECO
RIVERSIDE
PALM DESERT
LOSANCELES
DAVE HAMMAR"
ALISA.YIALPAN0O
RAV MARTIN
CHUCl<CATER
D()UGi STROUP
9707Waplc~ Strt."11
S,m D.iego, CA 92121
(858) 550°4500 PH
/058) 5·50,1414 FX
www.HunsalcerSD.com
-IMfn@H11n~11keiSO.com
HUNSAKER
:&ASSOCIATES
,S A N D 1 E G_ :O, I N C.:.
February 21, 2018
City of Carlsbad
Engineering Department
1635 Faraday Avenue
Carlsbad, CA ·92008-7314
Re: Building Form: s·etback Certification
Lanai 11 -Miles, Buena Vista
Carlsbad Tract No. -CT 14-04
Drawing No. 496..SA
Lots 8 through 10
Dear City Inspector:
Please be advised the· building foundation forms are in conformance with the
precise grading plans as to horizontal and vertical location. The building
setbacks were measured in relation to the property lines .and were found to be
in conformance with the approved precise grading ·plans for this property.
Sincerely,
Hunsaker & Associates
San Diego, Inc.
C. ~ ~--P....-r.Cs. 8770
Principal, Director ofSutvey
.. '' i ___ .:
-,_ .:-~ . --_----•·---. .
. -
No.:a770
BH:llo •,11101u121111w12uoe11
wol1~94 Z/11/201'2,.a PM
I' t
I
GEOCON 0
GEOTECHNICAL ■ENVIRONMENTAL ■ MATERIALS 0~
SANDIEGO,CALIFORNIA92121 -2974 ■ TEL l858)558-690 0 ■ FAX (858)558-6159 ,~
IN.CO RPO R ATED
6960 FLANDERS DR IVE ■
FOUNDATION OBSERVATION REPORT
L l'-.•'" I -il' PROJECT NAME : ~'---"...__=--',~"-=!c:!>"-'-'---=.'.l.=--------------PROJECT NO. (_"' 'Z.O 3 7 --!. l-(..) 1..
LOCATION : \· .. v1u:>1 ... Jf:'.l ?l\r:,~ t,-10
AGENCY PROJECT NO : APPROVAL / PERMIT NOS : "2..-Zo-1 'd-DATE L, .,, (. C 17-:,17. /\ .:. ., i .~ • t.Y,"tC
FOUNDATION TYPE : ( ,..,. ~ C r',I? A Z -:.:it f) -o > "l:. I 0 ADDITIONAL OBSERVATION REQUIRED
□ CONVENTIONAL (' f"Sf7/\ "2..o It, · '> O 'ZS
~ POST-TENSIONED L-,,.,. IV -(1:,,l:".A 201,.?, "·->2. "l... E5J SUBSTANTIAL CONFORMANCE
• PURPOSE OF OBSERVATION
1ST Check soil conditions exposed are similar to those expected
CT Check footing excavations extend to minimum depth recommended in soil report
~ Check footings have been extended to on appropriate bearing strata
D Other ----------------------------------------
~-~, ~ • APPLICABLE SOIL REPORT : TITLE : ' ._. -r 5 "n •.... <-y-r ➔=---r ,· 0 :..eii v, < 'l S 1 _)v '? 1 ·-• L..
~ 1 ~\. C-:ii f\A.,-, • J l., , \J.\. ...J Do. , -rL f t=°~t'u--1::: ·yu_' l · t<,.~r,ru ·r ,t\r1. L€ r ~ v n '), -..J .-: • ., ... , \
DATE : _____ _
• SOIL REPORT RECOMMENDATIONS BASED ON :
!Sr Expansion Condition _g Very Low (0-20) D Low (21-50) D Medium (51-90) D High (91-130) D Very High (>130)
□ Fill Geometry -------------------------------------
□ Other : -------------------------...,,....--~-----------{_p-r--:!:-
• MINIMUM FOUNDATION RECOMMENDATIONS :
Footing Depth : D 12 Inches D 18 Inches D 24 Inches OTHER \. \ E: )( -r . Z ' ,~ •--'
Footing Reinforcement : D No.4 T&B D 2-No.4 T&B D 2-No.5 T&B D Post-Tensioned OTHER : _______ _
Interior Slab Reinforcement: D 6x6-10/10 D 6x6-6/6 D No.3@24Inches D No.3@18Inches D Post-Tensioned
• FOUNDATION CATEGORY :
0 NA _________________ _ r;i I S -JO ~ ---------------------
□ 1[ 0 m
• OBSERVATIONS :
@ Substantial conformance with Soil Report.
D Substantial conformance with Foundation Plans. Identify : ---------------------
D Other
Lu-r-lo-/.~lb f-~L Ci..u'-.1:.."-( (c,-rz..,:•
lJ-r Io J '?>"7 r'-'u?..'4,~
NOTE : FOOTING EXCAVATIONS SHOULD BE CLEANED OF LOOSE MATERIAL PRIOR TO PLACING CONCRETE AND THE SOIL MOISTURE CONTENT SHOULD BE MAINTAINED, -1 ~~, L I -
GEOCON REPRESENTATIV? FOR2011 FIELD COPIES TO
,,
Southwest Inspection and Testin g, Inc.
441 Commercial Way, La Habra, Ca 90631
(562) 941-2990 • (714) 526-8441 • Fax (562) 946-0026
REGISTERED INSPECTOR'S DAILY REPORT I ~~-1~-Jo~--No. L _
I Date I -~ I-~ .:_
TYPE OF 0 Reinforced Concrete □ Welding □ DIA/Epoxy
INSPECTION le] Post Tensioned Concrete □ Fireproofing □ Wood Framing
REQUIRED □ Reinforced Masonry □ Asphalt □ Other
Job Address_'-¥_ -Tract No. Lot No. ~ / C. .. _,. I
Job Name (_ 1 \ ' ' Perm~~o. --Issued ~Y ---.,... . ---.... ,
Type of Structure Architect ... ~ I.. (~ ...
Material Description (type, grade, source) Engineer I -'· . -·'
-T ~/ /. Contractor
( __ ( ' , -' -
Inspector's Name ' I Subcontractor _ __,. .. ' ,.__; '. ,_
-.. ..) TESTS PERFORMED
SAMPLE AIR CONC WATER TIME
SET# TRUCK# TICKET# LOCATION SLUMP TEMP TEMP ADDED CAST MIX# REMARKS
I
INSPECTION SUMMARY-LOCATIONS OF WORK INSPECTED, TEST SAMPLES TAKEN, WORK REJECTED, JOB PROBLEMS, PROGRESS,
REMARKS, ETC. INCLUDES INFORMATION ABOUT -AMOUNTS OF MATERIAL PLACED OR WORK PERFORMED, NUMBER, TYPE & !DENT. NO'S OF
TEST SAMPLES TAKEN: STRUCT. CONNECTIONS (WELD MADE H.T. BOLTS TORQUED) CHECKED, ETC. -: .. ? --' ' 'c ...__ --.... ~ ~ ~ -., ·.~ §;-1 _J t ' -, ,...;-· 1.,..( -<_ I ' -~ ........ .... ' I
-( i---\ -.. ( , : -~ ·--~ vt ( _ .. -( --_., .. -
~ ~ ( f --,_.;. (._ ~ -l. ' -
·r .. '.-;; __j \ -~ 7 .... ::. ,-~ ,;; '-• 4 ' ' ----'• , .. -, ,. -' _,
,. 1 \ 1' ,;: '· J ----~-., I_ '
-( (_ ·-..__ -. t ...... ·-t ~
I '-· '·
,C J l. /' 4-°'
CERTIFICATION OF COMPLIANCE
I HEREBY CERTIFY THAT I HAVE..,OBSERVED TO THE_ BEST OF MY KNOWLEDGE
ALL OF THE ABOVE As.e.~~6 WORK UNLESS OTHERWISE NOTED. I HAVE
FOUND THIS WOR •cf,eOMPL Y WITH T~ OVED PLANS, SPECIFICATION,
AND APPLICABLE, ECf l N·SF·T-ME GO)LE;R~IN B ILQ.lNJ WS. . ..,_ ~-
-_, , --~
SPECIALTY NO. AGENCY
--
1-. . (_ _>' C" .... , I '--
;:.· -
\ . l <_ ... . " ' .: '
CONTINUED ON NEXT PAGE 0 PAGE
TIME IN TIMEOUT
/ / ,· //.L /
Approved By ' ...4
Project Superintendent
White -Office Copy• Canary-Accounting Copy• Pink -Inspector's Copy • Goldenrod -Jobsite Copy
..,
(._
' '
.
'-
OF
SAMPLES
..