HomeMy WebLinkAbout1905 CALLE BARCELONA; 100; CB032152; Permit10-03-2003
Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: Project Title:
Applicant:
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Building Inspection Request Line (760) 602-2725
Commercial/lndustrial Permit Permit No: CB032152
1905 CALLE BARCELONA CBAD TI Sub Type: COMM Lot#: 0 Status: ISSUED
$100,000.00 Construction Type: NEW Applied: 08/04/2003
BED BATH & BEYOND-INSTALL Plan Approved: 10/03/2003 STORAGE FIXTURES Issued: 10103/2003
Reference #: Entered By: CB
Inspect Area: Plan Check#: Owner: CHERYL- SEIZMIC ENGINEERING 161 ATLANTIC STREET POMONA CA 91 768
909-869-0989-X 15 5712 10/03/03 0002 01. 02
Pt=c. 567 = 55
Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park Fee LFM Fee Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'l Pot. Water Con. Fee Recl. Water Con. Fee
$546.56
$0.00 $355.26
$0.00
$0.00 $21 .oo
$0.00 $0.00 $0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00 $0.00
Meter Size Add'l Recl. Water Con. Fee Meter Fee SDCWA Fee CFD Payoff Fee PFF PFF (CFD Fund) License Tax License Tax (CFD Fund) Traffic Impact Fee Traffic Impact (CFD Fund) PLUMBING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Master Drainage Fee Sewer Fee Redev Parking Fee Additional Fees TOTAL PERMIT FEES
$0.00 $0.00
$0.00
$0.00
$0.00
$0.00
$0.00 $0.00 $0.00
$0.00
$0.00 $0.00 $0.00
$0.00
$0.00
$0.00
$0.00 $922.82
Total Fees: $922.82 Total Payments To Date: $355.27 Balance Due: $567.55
/-
You are hereby FURTHER NOTIFIED that your right to protest the specified feedexactions DOES NOT APPLY to water and sewer connection fees and capacity
,
PERMIT ApRiCATlON
CITY OF'CARLSBAD BUILDING DEPA~~T
1635 Faraday Ave.. Carisbad. CA 82~
-2
4/03 m02 01 CGP 02
355 8 27
i
PERMIT APPLICATION
CITY OF CARLSBAD BUILDING DEPARTMENT
'1 635 Faraday Ave., Carlsbad, CA 92008
&f I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is
FOR OFFICE USE ONLY
PLAN CHECK NO.
EST. VAL.
Plan Ck. Deposit
Validated By
Date
issued. My worker's compensation insurance carrier and policy number are:
Insurance Company Z ~nr;Ltq Pdicy NO. 2 0 4 72m7 3 Expiration Date
(THIS SECTION NEED NOT BE COMPLETED IF THE PERMIT IS FOR ONE HUNDRED DOLLARS I81001 OR LESS)
0 to become subject to the Workers' Compensation Laws of California.
CERTIFICATE OF EXEMPTION: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as
s up to one hundred , and shall subject an employ
ges as providad for In Section
I hereby affirm that I am exempt from the Contractor's License Law for the following reason:
I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale
(Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does
such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
0 1, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The
Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed
pursuant to the Contractor's License Law).
0
1.
2.
3.
I am exempt under Section
I personally plan to provide the major labor and materials tor construction of the proposed property improvement. 0 YES ON0
I (have / have not) signed an application for a building permit for the proposed work.
I have contracted with the following person (firm) to provide the proposed construction (include name I address / phone number / contractors license number):
Business and Professions Code for this reason:
4. number / contractors license number):
5.
of work):
I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name / address / phone
I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name / address I phone number / type
PROPERTY OWNER SIGNATURE DATE
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention
program under Sections 25505, 25533 or 25634 of the Presley-Tanner Hazardous Substance Account Act? 0 YES 0 NO
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district?
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? 0 YES 0 NO
IF ANY OF THE ANSWERS ARE YES. A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE
REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
0 YES 0 NO
I
I
LENDER'S NAME LENDER'S ADDRESS
cbn
I certify that I have reed the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all
City ordinances and State laws relating to building construction. I hereby authorize representatives of the Citt of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES,
JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT.
OSHA: An OSHA permit is required for excavations over 5'0' deep and demolition or construction of structures over 3 stories in height.
EXPIRATION: Every permit issued by the building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work
authorized by such permit is not commenced within 180 days from the date of such permit or if the building or work authorized by such permit is suspended or abandoned
at any time after the work is commenced for a period of 180 days (Section 106.4.4 Uniform Building Code).
APPLICANT'S SIGNATURE DATE
WHITE: File YELLOW: Applicant PINK: Finance
inspection List
Permit#: CB032152 Type: TI
Date InsDection Item
0211 8/2004 19 Final Structural
10/29/2003 14 FramelSteeVBoltingiWeldin
10/28/2003 14 FramelSteellBoItingNeldin
10/27/2003 14 Frame/SteeUBolting/Weldin
10/24/2003 17 Interior Lath/Drywall
Wednesday, February 18,2004
COMM BED BATH & BEYOND-INSTALL
STORAGE FIXTURES
Inspector Act Comments
PS AP
PS AP
PS co SEISMIC
TP co SEE BOLT INSTAL. SPECS.
PS co OFFICES BEING OCCUPIED
Page 1 of 1
I
.I
City of Carlsbad Bldg Inspection Request
For: 10/29/2003
Permit# CB032152
Title: BED BATH & BEYOND-INSTALL
Description: STORAGE FIXTURES
Type: TI Sub Type: COMM
Job Address: 1905 CALLE BARCELONA
Suite: Lot 0
Location:
APPLICANT CHERYL- SElZMlC ENGINEERING
Owner:
Remarks: SEISMIC INSP
Inspector Assignment: PS
Phone: 7606358600
Total Time: Requested By: NIA
CD Description Act Comment
Entered By: ROBIN
14 Frame/Steel/BoltingNelding
PCR03076
PCR03098
PCR03115
PCR03125
PCR03131
PCR03143
PCR03240
~ ~~ .~___~~ ._______~~~--~
Associated PCRs/CVs
ISSUED FORUM-BLDG 1-ARCH REV,PLUMB,; & ELECTRIC
ISSUED THE FORUM @ CARLSBAD; ADD ESCALATOR
ISSUED
PENDING
FORUM-BLDG 1-REVISE FRAMING; & CONSTRUCTION DETAILS
THE FORUM-LIGHT STANDARDS,CURB; & RAMP REVIS.& ELEC TO MONUMENT SI
ISSUED FORUM @ CARLSBAD BLDG # 1; ADD GREASE INTERCEPTOR
ISSUED FORUM-BLDG I-ELECTRIC REVISION;
PENDING THE FOURM BLDG # 1 REV ELEC; FOR ESCALATORS & ELEVATORS
Inspection His tory
Date Description Act lnsp Comments
10/28/2003 14 Frame/SteellBoltinglWelding CO PS SEISMIC
10/27/2003 14 Frame/SteellBoltinglWelding CO TP SEE BOLT INSTAL. SPECS.
10/24/2003 17 Interior LathlDrywall CO PS OFFICES BEING OCCUPIED
I
6148395804 FlNDREW MRXX CONST 181 P02432 OCT 28 '03 17:oO
P, ,
1
i ,.
\ .. .. r' ..
4 .- .
EsGil Corporation
In %rtnership with Government for Building safety
DATE: 9/ 19/03
JURISDICTION: City of Carlsbad
PLAN CHECK NO.: 03-2152
0 PLAN REVIEWER
0 FILE
SET: I1
PROJECT ADDRESS: 1905 Calle Barcelona
PROJECT NAME: Storage Fixtures for Bed & Bath & Beyond #505
0 The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction’s building codes.
The plans transmitted herewith will substantially comply with the jurisdiction’s building codes
when minor deficiencies identified below are resolved and checked by building department staff.
The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
0 The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
0 The applicant‘s copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
The applicant’s copy of the check list has been sent to:
w
0
w
Esgil Corporation staff did not advise the applicant that the plan check has been completed.
Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone #:
Date contacted: (by: 1
Mail Telephone Fax In Person
REMARKS: 1. City to field verify that the
the rack area and the bathrooms servi
access requirements. 2. Fire Departme
vel from the handicapped parking space to
with all the current disabled
By: DavidYao Enclosures:
Esgil Corporation 0 GA 0 MB 0 EJ 0 PC 9/11 tmsmtl.dot
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576
I.
EsGil Corporation
In Partnership with Government for Builiiing Safety
DATE: 8/20/03
JURISDICTION: City of Carlsbad
PLAN CHECK NO.: 03-2152
:wT
PLAN REVIEWER n FILE
SET: I
PROJECT ADDRESS: 1905 Calle Barcelona
PROJECT NAME: Storage Fixtures for Bed Bath& Beyond #505
0 The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction’s building codes.
0 The plans transmitted herewith will substantially comply with the jurisdiction’s building codes
when minor deficiencies identified below are resolved and checked by building department staff.
0 The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
0 The applicant’s copy of the check list is enclosed for the jurisdiction to forward to the applicant
w The applicant‘s copy of the check list has been sent to:
Seismic 161 Atlantic Street Pomona, CA 91 768
contact person.
0 Esgil Corporation staff did not advise the applicant that the plan check has been completed. w Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Cheryl
Date contacted: gfaik3 (by: e;) Telephone #: (909)869-0989
Fax #: (909)869-0981
MaidTelephone Faxd In Person
REMARKS:
By: DavidYao Enclosures:
Esgil Corporation 0 GA 0 MB 0 EJ PC 817 tmsmtl.dot
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576
City of Carlsbad 03-2152
' 8/20/03
GENERAL PLAN CORRECTION LIST
JURISDICTION: City of Carlsbad PLAN CHECK NO.: 03-2152
PROJECT ADDRESS: 1905 Calle Barcelona
DATE PLAN RECEIVED BY
ESGIL CORPORATION: 8/7
REVIEWED BY: David Yao
DATE REVIEW COMPLETED:
8/20/03
~~
FOREWORD (PLEASE READ):
This plan review is limited to the technical requirements contained in the Uniform Building Code,
Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws
regulating energy conservation, noise attenuation and disabled access. This plan review is
based on regulations enforced by the Building Department. You may have other corrections
based on laws and ordinances enforced by the Planning Department, Engineering Department
or other departments.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3,
1997 Uniform Building Code, the approval of the plans does not permit the violation of any
state, county or city law.
Please make all corrections on the original tracings, as requested in the correction list. Submit
three sets of plans for commercial/industriaI projects (two sets of plans for residential projects).
For expeditious processing, corrected sets can be submitted in one of two ways:
1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad
Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will
route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire
Departments.
2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320
Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets
of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to
their Planning, Engineering and Fire Departments.
NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City
Planning, Engineering and Fire Departments until review by EsGil Corporation is complete.
To facilitate rechecking, please identify, next to each item, the sheet of the plans upon
which each correction on this sheet has been made and return this sheet with the
revised plans.
Please indicate here if any changes have been made to the plans that are not a result of
corrections from this list. If there are other changes, please briefly describe them and where
they are located on the plans. Have changes been made not resulting from this list?
0 Yes 0 No
1.
2.
3.
4.
5.
6.
7.
8.
9.
IO.
11.
12.
13.
14.
City of Carlsbad 03-2152
8/20’/03
Provide a statement on the Title Sheet of the plans that this project shall comply with Title 24.
The tenant space and new and/or existing facilities serving the remodeled area must be
accessible to and functional for the physically disabled. Show a path of travel from the
handicapped parking space to the rack area and the bathrooms serving the rack area comply
with all the current disabled access requirements. Title 24, Part 2.
Obtain Fire Department approval for groups F, M and S occupancy storage per UBC Sections
306.8, 309.8 and 31 I .8.
Indicate the clearance from the new racks to the existing building walls and building columns.
Note on the plans that the rack design loads will be posted per Section 2222.5.
Provide forklift protection or note on the plan that the forklift will not use in this facility.
The calculation shows the weightlLVL for all the light duty fixture appears to more than the
LB/per level. Please clarify.
The beam, column and connections for all the light duty fixture shall be clearly referenced.
Sheet 18 of the calculation shows the dimension for DRC and DRB beams. These dimensions
appears to not complete match the dimension shown on drawing 03-0912B. Please check.
Provide calculation to show foot plate (2A and 2B on 03-0921 B) is adequate to support the
proper load.
Recheck the “pallet” racks as follows:
Recheck all connections on sheet 03-0912D as follows:
The rivet bearing capacity is only dtF, = 0.406(0.0747)65 = 2 kips.
Provide calculations for all beam to bracket weld capacities per Section 2330 (allowable weld
stress is the member thickness times 26 ksi times I .33, or the weld stress, whichever is
low e r) .
Check the bracket maximum weak axis moment. .
Provide calculations for the column weak axis bending plus axial for transverse seismic loading.
The axial load is the maximum compression load at the base from vertical plus seismic
overturning. The column moment will probably be maximum for the lateral load from the base
plate to the first diagonal brace (not only to the first horizontal member).
Check the slab stress for the maximum transverse overturning axial load. Show the slab
thickness on the plans per the calculations. Check the maximum slab stress under the base
plate per Section 191 5.4.2.
The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite
208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan
review for your project. If you have any questions regarding these plan review items, please
contact David Yao at Esgil Corporation. Thank you.
City of Carlsbad 03-2152
8/20/03
VALUATION AND PLAN CHECK FEE
JURISDICTION: City of Carlsbad PLAN CHECK NO.: 03-2152
PREPARED BY: David Yao DATE: 8/20/03
BUILDING ADDRESS: 1905 Calle Barcelona
BUILDING OCCUPANCY: TYPE OF CONSTRUCTION:
Bldg. Permit Fee by Ordinance V
Type of Review: Complete Review 0 Structural Only
0 Repetitive Fee .TI Repeats
Other
0 ~ourly n Hour*
Esgll Plan Review Fee f $306.071
Comments:
Sheet 1 of 1
macvalue.doc
PLANNING/ENGINEERINC APPROVALS
PERMIT NUMBER CB 03 81% DATE
'RESIDENTIAL ( TENANT IMPROVEMENT)
RESIDENTIAL ADDITION MINOR (< $10,000.00)
PLAZA CAMINO REAL
CARLSBAD COMPANY STORES
VILLAGE FAIRE
COMPLETE OFFICE BUILDING
OTHER
ENGINEER
Do~MiSFofmYPlanninp Enginwing AOprOWalS
j 2rrt
P
230 1
,
MATERIAL HANDLING ENGINEERING EST. 1985
TEL : (909) 869-0989 STRUCTURAL REVISIONS FOR Bed Bath & Beyond 1905 Calle Barcelona Carlsbad, Ca 92009
DATE : 08/22/03 03-0921
FAX : (909) 869-0981
Below is the response to your plan check comments:
Please note that responses for items #3,4,5 and 4 will be addressed by the applicant.
1.
2.
3.
4.
5.
6.
7.
Comment: Provide statement on the Title Sheet of the plans that this project shall comply with Title 24.
Response: Please see note #1 on the revised Seizmic detail dwgs 03-0921A, B, C & D regarding compliance to Title 24.
Comment: The tenant space and new and/or existing facilities serving remodeled area must be accessible to A
and functional for the physically disabled. Show a path of travel from the handicapped parking space to th rack area and the bathrooms serving the racks area comply with dl current disabled acces requirements
(Title 24, Part 2).
4-
e4
Response: Will be provided by the tenant. ,@.m.e edmj 4 424 I
Comment: Obtain Fire Department approval for groups F, M and S occupancy storage per UBC Sections 306.8,306.9 and 3 11.8.
Response: Will be provided prior to permit issuance.
Comment: Indicate the clearance from the new racks to the existing building walls and columns.
clear distances between racks and building elements.
Comment: Note on will be posted per Section 2222.5.
Response: Please see note #9 on the revised Seizmic detail dwg 03-0921A, B & D regarding post load signs.
Comment: Provide forklift protection or note on the plan that the forklift will not use in this facility.
Response: Please see note #IO on the revised Seizmic detail dwg 03-092112, B & D regarding non use of forklifts.
Comment: The calculations shows the weightLVL for all light duty fixture appears to more than the LB per level. Please clarify.
Response: Please see loads on the revised Seizmic detail dwg 03-0921C regarding load revisions.
' 8. Comment: The beam, column and connections for all the light duty fixture shall be clearly referenced.
Response: Please see the revised Seizmic detail dwg 03-0921B & C regarding column, beam and connection identification. Please note that singular angle posts are used at ends, T-posts and double angle posts maybe used interchangebly.
Comment: Sheet 18 of the calculations shows the dimension for DRC and DRB beams. These
dimensions appears to not complete match the dimension shown on dwg 03-0921B. Please check. 9.
Response: Please see page #18 of the revised calculation package regarding beam analgsis and using the correct dimensions.
10. Comment: Provide calculation to show foot plate (2A and 2B on 03-0921B) is adequate to support the proper load.
Response: Please see page #20 of the revised calculation package regarding base plate analysis.
11. Comment: Recheck all connections on sheet 03-0912D as follows: The rivet beariag capacity is only dtFu = 0.406 in I( 0.0747 in x 65 ksi = 2 kips. Provide calculations for all beam to bracket weld capacities per Section 2330 (allowable weld stress is the member thickness times 26 ksi times 1.33, or the weld stress, whichever is lower).
Response: Please see pages #47 to 48 of the revised calculation package regarding reanalysis of the connectors and their welds.
12. Comment: Provide calculations for the column weak axis bending plus axial for transverse seismic loading. The axial load is the maximum Compression load at the base from vertical plus seismic overturning. The column moment will probably be maximum for the lateral load from the base plate to the first diagonal brace (not only to the first horizontal member).
Response: Please see pages #44 to 45 of the revised calculation package regarding transverse column analysis.
13. Comment: Check the slab stress for the maximum transverse overturning axial load. Show the slab thickness on the plans per the calculations. Check the maximum slab stress under the base plate per Section 1915.4.2.
Response: Please see pages #21,36 and 35 regarding slab analysis per section 1615.4.2.
Please feel free to call me with any questions you may have.
MYRON ORRES
SElZMlC
MATERIAL HANDLING ENGINEERING
EST. 1985
STORAGERACKS
DRIVE-IN RACKS
CANTILEVER RACKS
MEZZANINES
CONVEYORS
CAROUSELS
PUSHBACKRACKS
RACK BUILDINGS
STkEL SHELVING
MOVABLE SHELVING
STORAGE TANKS
MODULAR OFFICES
GONDOLAS
BOOKSTACKS
FLOW RACKS
FOOTINGS
SEISMIC ANALYSIS
STRUCTURAL DESIGN
CITY APPROVALS
STATE APPROVALS
PRODUCT TESTING
FIELD INSPECTION
SPECIAL FABRICATION
PERMlTING SERVICES
ALASKA
ARIZONA
CALIFORNIA
COLORADO
CONNECTICUT
GEORGIA
IDAHO
ILLINOIS
INDIANA
KANSAS
MICHIGAN
MINNESOTA
MISSOURI
MONTANA
NEVADA
NEW MEXICO
OHIO
OKLAHOMA
OREGON
PENNSYLVANIA
TWS
UTAH
VIRGINIA
WASHINGTON
WISCONSIN
STORAGE FIXTURES
1905 CALLE BARCELONA
CARLSBAD, CA 92009
JOB #:03-0921
SAL E. FATEEN, P.E.
161 ATLANTIC STREET POMONA CA 91 768 TEL : (909)869-0989 FAX : (909)869-0981
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
SHEET NO. 2 OF 52
SElZMlC @ CALCULATED BY M .T. DATE 8/28/03
MATERIAL HANDLING ENGINEERING
TEL: (909) 869-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91768
1'ABLE OF CONTENTS
DESCRIPTION
TITLE PAGE
TABLE OF CONTENTS
RAPID RACK LIGHT DUTY FIXTURE ANALYSIS
PROJECT SCOPE & SPECIFICATIONS
GENERAL CONFIGURATIONS
SUMMARY & ELEVATIONS
LOADS & DlSfRlBUTlON
LONGITUDINAVTRANSVERSE ANALYSI
COLUMN ANALYSIS
BEAM TO COLUMN ANALYSIS
BEAM ANALYSIS
OVERTURNING ANALYSIS
BASE PLATE ANALYSIS
SLAB & SOIL ANALYSIS
1
2
3 TO 20
4
5
6TO 12
13
14
15TO 16
17
18
19
20
21
WIRE WELD LIGHT DUTY FIMURE ANALYSIS ANALYSIS 22 TO 35
PROJECT SCOPE & SPECIFICATIONS
GENERAL CONFIGURATIONS
LOADS & DISTRIBUTION
COLUMN ANALYSIS
BRACE ANALYSIS ANALYSIS
OVERTURNING ANALYSIS
BASE PLATE ANALYSIS
SLAB & SOIL ANALYSIS
SUMMARY & ELEVATIONS
23
24
25 TO 27
28
29 TO 30
31 TO32
33
34 TO 35
36
NSF STORAGE RACK ANALYSIS 37 TO 52
PROJECT SCOPE & PARAMETERS
CONFIGURATIONS
SPECIFICATIONS
LOADS & DISTRIBUTION
LONGITUDINAL ANALYSIS
COLUMN ANALYSIS
BEAM ANALYSIS
BEAM TO COLUMN ANALYSIS
TRANSVERSE BRACE ANALYSIS
OVERTURNING ANALYSIS
BASE PLATE ANALYSIS
SLAB & SOIL ANALYSIS
38
39
40 TO 41
42
43
44 TO 45
46
47 TO 48
49
50
51
52
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
MATERIAL HANDLTNG ENGINEERING
TEL: (909) 869-0969 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91 768
SHEET NO. 3 OF 52
CALCULATED BY M.T. DATE 8/28/03
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
SHEET NO. 4 OF 52
CALCULATED BY M.T. DATE 8/28/03 MATERIAL HANDLING ENGINEERING
TEL: (909) 869-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91 766
LIGHT DUTY STORAGE RACKS
THE PURPOSE OF THIS ANALYSIS IS TO SHOW THAT THE FOLLOWING LIGHT DUTY STORAGE RACK SYSTEM
COMPLIES WITH CHAPTER 22, DIVISION X OF THE 1997 UBC.
PARAMFTERS
SHELVING UNITS &/OR CATWALK SYSTEMS WILL BE ANALYZED AS AN ELEMENT UTILIZING THE FOLLOWING
FORMULA:
V= ZSxCaxIxW/R <== SECTION 2228.5.2 i51630.2.1
WHERE:
Ca = 0.44
I= 1.0
R = 4.4
R = 5.6
<=== NOTE: Ca = 0.44 x Na, where Na = 1
<== FOR BRACED FRAME
<e= FOR MOMENT FRAMES
W= LL/n+DL
n= 1 <=== SGL ROW
1.4 <=== WORKING STRESS REDUCTION
SPECIFICATIONS
STEEL - Fy = 36000 PSI
BOLTS - A307 UNLESS OTHERWISE NOTED
RIVETS - Fy = 50,000 PSI
ANCHORS - 3/8"0 x 2-1 /2" MIN. EMBD. LDT CONCRETE SCREW ANCHOR ICBO #5890
SHELVES - PARTICLE BOARD OR PLYWOOD
SLAB - 5 IN x 2500 PSI
SOIL - 1,000 PSF
t
.I
I I
.L
MATERIAL HANDKNG ENGINEERING
TEL: (909) 8640989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91 768
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND .
SHEET NO. 5 OF 52
CALCULATED BY M.T. DATE 8/28/03
GENERAL CONFIGURATIONS:
1) POST
2) FOOT PLATE
3) ANCHOR
4 & 5) SHELF SUPPORT
d
NOTE: THIS IS THE TRIBUTARY SYSTEM BEING ANALYZED.
BED BATH & BEYOND PROJECT
FOR BED BATH & BEYOND
SHEET NO. 6 OF 52
SElZMlC e CALCULATED BY M .T. DATE 8/28/03 MATERIAL HANDLING ENGINEERING
TEL: (909) 8694989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA * CA 91768
SUMMARY & ELEVATION
APH = 0.59 STRESS = 0.87 STRESS = 0.51
TP = 0.94 OK OK
ELEVATION: TYPE “G”
NOTE: (2) ANCHOR REQ’d PER INTERIOR FOOT PLATE
1 COLUMN
SEISMIC ZONE - 4
WEIGHT/ LVL - 37 LB
I BEAM #2 DRBLP II BEAM #1 DRBZ I
I OK1 I
OVERTURNING I DOUBLE RIVET CONNECTION I1 SLAB & SOIL 1 I STRESS = 0.54 STRESS = 0.30 STRESS = 0.33
STRESS = 0.22 I OKI
I
MATERIAL HANDL~NG ENGINEERING
I COLUMN II BEAM #2 DRBLP II BEAM #1 DRBZ 1
APH = 0.59 STRESS = 0.93 STRESS = 0.54
TP = 0.94 OK OK
OK
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
SHEET NO. 7 OF 52
CALCULATED BY M.J. DATE 8/28/03
I OVERTURNING
STRESS = 0.55
OK
TEL: (909) 869-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91 768
SUMMARY & ELEVATION
I DOUBLE RIVET CONNECTION I SLAB & SOIL I
STRESS = 0.32 STRESS = 0.29
OK STRESS = 0.1 7
ELEVATION: TYPE "F"
I-- 48---t
SEISMIC ZONE - 4
WEIGHT/ LVL - 40 LB
- MATERIAL HANDLING ENGINEERING
I I . . r
i 16 U2" . I
I
I
i. . 16 1/2" i
I.
i
i
* r . 12" : 1
: 12"
I 1
12" i
* r 12" i : r I 12
F P
16 l/2" .
..
16 U2" . : e
15"
.
.
e d
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
SHEET NO. 8 OF 52
CALCULATED BY M.T. DATE 8/28/03
I- OK1 I I OVERTURN IN G 1 DOUBLE RIVET CONNECTION I SLAB 81 SOIL
TEL: (909) 869-0989 FAX: (909) 8694981
161 ATLANTIC AVENUE POMONA CA 91768
STRESS = 0.30
OK
SUMMARY & ELEVATION
STRESS = 0.53 STRESS = 0.29
OK STRESS = 0.1 7
ELEVATION: TYPE "Eb" SEISMIC ZONE - 4
WEIGHT/ LVL - 175 LB
SUMMARY:
COLUMN Ill BEAM #1 DRBZ
I APH = 0.43 I TP = 0.69 I STRESS = 0.89 I OK
TYPE Ea
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND SElZMlC
SHEET NO. 9 OF 52 @ CALCULATED BY M .T. DATE 8/28/03 MATERLAL HANDLING ENGINEERING
TEL: (909) 8640989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91768
I I
OVERTURNING II DOUBLE RIVET CONNECTION II SLAB 81 SOIL
SUMMARY & ELEVATION
STRESS = 0.26 STRESS = 0.50
OK OK
ELEVATION: TYPE "Ea"
i 48'1-t
I STRESS = 0.1 1
STRESS = 0.01
SEISMIC ZONE - 4
WEIGHT/ LVL - 120 LB I- ""1
COLUMN 11 BEAM #1 DRBZ
APH = 0.55 I TP = 0.88 I STRESS = 0.84 I OK
Page 1
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
SHEET NO. 10 OF 52
SElZMlC @ CALCULATED BY M.T. DATE 8/28/03 MATERIAL HANDLING ENGINEERING
TEL: (909) 869-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91 768
I COLUMN II BEAM #2 DRB II BEAM #1 DRC I
APH = 0.52 STRESS = 0.44 STRESS = 0.20
TP- 0.83 OK OK
OK
SUMMARY & ELEVATION
ELEVATION: TYPE "Cb"
,
SEISMIC ZONE - 4
WEIGHT/ LVL - 100 LB
STRESS = 0.28
OKI
STRESS = 0.56
OKI
STRESS = 0.1 1
STRESS = 0.01
- MATERIAL HANDLING ENGINEERING
I I I
OVERTURNING II DOUBLE RIVET CONNECTION I1 SLAB & SOIL
PROJECT BED BATH & BEYOND
FOR BED BATH 81 BEYOND
SHEET NO. 11 OF 52
CALCULATED BY M.T. DATE 8/28/03
TEL: (909) 669-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91 768
SUMMARY & ELEVATION
ELEVATION: TYPE Ta"
F 96..--1
SEISMIC ZONE - 4
WEIGHT/ LVL - 120 LB
I
22 1/2" I I Y
22 I 1/2"
I I 18"
SUMMARY:
COLUMN II BEAM #2 DRB I1 BEAM #1 DRC
I I
APH = 0.55
TP = 0.88 I STRESS = 0.49
OK I STRESS =I 0.22
OK
STRESS = 0.26 STRESS = 0.61
OK1 OK1
STRESS = 0.1 1
STRESS = 0.01
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
SHEET NO. 12 OF 52
CALCULATED BY M.T. DATE 8/28/03 MATERIAL HANDLING ENGINEERING
TEL: (909) 869-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91 768
I! I I
APH = 0.39 STRESS = 0.58 STRESS = 0.26
TP = 0.63 OK OK
SUMMARY & ELEVATION
I OK1 I I
I I i OVERTURNING II DOUBLE RNET CONNECTION II SLAB & SOIL
ELEVATION: NP E "Bl' SEISMIC ZONE - 4
WEIGHT/ LVL - 175 LB
I STRESS = 0.08 I OK I OK I STRESS = 0.00
STRESS = 0.73 STRESS = 0.06
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
SHEET NO. 13 OF 52
SElZMlC e CALCULATED BY M .T. DATE 8/28/03
MATERIAL HANDLING ENGINEERING
TEL: (909) -9 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91768
LOADS & DISTRIBUTION-TYPE "B"
9
RACK ANALYSIS WILL BE BASED ON CHAPTER 22, DIVISION X OF THE 1997 UBC, WHERE SEISMIC SHEAR IS DERIVED AS:
0 LB 0.0 IN 0
V= 2.5xCaxIxW/R
Ca = 0.44
R = 5.6
1.4 <=== WORKING STRESS REDUCTION
I= 1
R = 4.4
n= 1
<== BRACED FRAMES
<== MOMENT FRAMES
#of SHELF LVLS = 5 <== ACTUAL SHELF LEVELS
<== ACTUAL SHELF LIVE LOAD
<== ACTUAL SHELF DEAD LOAD
SHELF LL = 175 LB/LVL
DVLEVEL = 10 LWLVL
TOTAL LL = 700 LB
TOTAL DL = 50 LB
SEISMIC SHEAR
V = -2.5 x 0.44 x 1 x (700 LB / 1 + 0 LB / 4 + 50 LB) / 5.6 x 1.4
= 105 LB
LEVEL I wx(DL + LL)
1 I 10 LB
185 LB
185 LB
185 LB
185 LB
0 LB
0 LB
0 LB
hx
3.0 IN
36.0 IN
72.0 IN
108.0 IN
144.0 IN
0.0 IN
0.0 IN
0.0 IN
wx hx
30
6,660
13,320
19,980
26,640
0
0
0
750 LB TOTAL= 166,630
Fi
0.0 LB
10.5 LB
21 .O LB
31.6 LB
42.1 LB
0.0 LB
0.0 LB
0.0 LB
0.0 LB
Movt
0 IN-LB
379 IN-LB
1,515 IN-LB
3,408 IN-LB
6,058 IN-LB
0 IN-LB
0 IN-LB
0 IN-LB
0 IN-LB
1 105 LB I 11,360 IN-LB
#OF LVLS
x 0.0
x 1.0
x 1.0
x 1.0
x 1.0
x 0.0
x 0.0
x 0.0
x 0.0
x 4.0
NOTE: THERE ARE ONLY 5 MOMENT RESISTING BEAMS, THE LOADS OF THE 5 SHELVES ARE DISTRIBUTED ACCORDINGLY
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
SHEET NO. 14 OF 52
CALCULATED BY M.T. DATE 8/28/03 MATERIAL HANDLING ENGINEERING
TEL: (909) 869-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91 768
LONGITUDINAL & TRANSVERSE ANALYSIS
Mbase = 0 IN-LB
Pcol(seismic) = MoWd
= 237LB
<==BASE ASSUMED TO BE PINNED
VCOI = V/2 = 53 LB <==PLEASE SEE LOADS ?h DISTRIBUTION PAGE
Mcol( 1-1 ) = Vcol x hi - Mbase PCOl(1-I) = 375 LB
= 53 LB x 3 IN - 0 IN-LB
= 158 IN-LB
Mcd(2-2) = [Vcol - zFi/2] x hi/2
= I53 - 01 LB x 33 IN / 2
= 868IN-LB
PcoI(2-2) = 370 LB <== COLUMN CHECK
McoI(3-3) = 852 IN-LB
McoI(4-4) = 663 IN-LB
McoI(5-5) = 379 IN-LB
McoI(6-6) = 0 IN-LB
PcoI(3-3) = 278 LB
PcoI(4-4) = 1 85 LB
PcoI(5-5) = 93 LB
PcoI(6-6) = 0 LB
BEAM TO COLUMN MOMENTS
Mconn( 1-1 ) = [Mcol( 1-1 ) + Mco1(2-2)] / 2
Mconn(2-2) = 860 IN-LB
Mconn(3-3) = 757 IN-LB
Mconn(4-4) = 521 IN-LB
Mconn(5-5) = 189 IN-LB
Mconn(6-6) = 0 IN-LB
= 51 3 IN-LB
<== CONNECTION CHECK
- MATERIAL HANDLING ENGINEERING
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
SHEET NO. 15 OF 52
CALCULATED BY M .T. DATE 8/28/03
TEL: (909) 669-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91 768
COLUMN ANALYSIS-DBL ANGLE
ANALYZED PER AIS1 & THE 1997 UBC. SECTION PROPERTIES BASED ON THE EFFECTIVE SECTION.
Ptotal= 370 LB
Mmax= 868 IN-LB
KxLx/rx = 1.2*36 IN/0.812 IN
= 53.2 1 -7/8"
KyLy/ry = 1.2*36 lN/0.6364 IN
= 67.9 <=== (Kl/r)max AXIAL
Fe= nA2E/(KL/r)maxA2
= 63.2 KSI
Fy/2= 18.0 KSI
SINCE, Fe > Fy/2
THEN, Fn= Fy( 1 -Fy/4Fe)
= 36 KSI*[l-36 KS1/(4*63.2 KSI)]
= 30.9 KSI
Pn= AefPFn
= 12,313LB
fk= 1.92
Pa= Pn/k
1-7/8" -1
SECTION PROPERTIES
= 1231 3 LB/1.92 t = 0.080 IN = 6,413 LB Aeff = 0.399 INK2
P/Pa= 0.06 < 0.15 IX = 0.263 INA4
SX = 0.1 40 INA3
TX = 0.812 IN
ly = 0.1 62 INA4
Sy = 0.1 18 IN*3
ry = 0.636 IN
LX = 36.0 IN
Ky = 1.20
Ly = 36.0 IN
FLEXURE
CHECK: P/Pa + Mx/Max I 1.33
Pno= Ae*Fy
= 0.399 INA2 *36000 PSI
F 14,358 LB Kx= 1.20 Pao- Pno/nc
= 14358 LB/1.92
= 7,478 LB
= 0.1 18 INA3 * 36000 PSI
= 4,239 IN-LB
Myield=My= Sx*Fy Fy= 36KSI
E= 29,500KSI
Max= My/nf nf= 1.67
= 4239 IN-LW1.67 Cmx- 1.00
= 2,538 IN-LB Cb= 1.0 Pcr= m~ZEI/(KL)rnaxAZ
= 1~A2*29500000 PSI/( 1.2*36 IN)A2 px= { 1 /[ 1 -(nc*P/Pcr) J}A-l
= 41,025 LB = {1/[1-(1.92*370 LW41025 LB)]]A-l = 0.98 THUS,
(370 LB/6413 LB) + (868 IN-LBj2538 IN-LB) = 0.39 < 1.33, OK
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
SHEET NO. 16 OF 52
CALCULATED BY M .T. DATE 8/28/03 MATERIAL HANDLING ENGINEERING
TEL: (909) 869-0989
161 ATLANTIC AVENUE POMONA CA 91 768
COLUMN ANALYSIS-T POST
ANALYZED PER AIS1 & THE 1997 UBC. SECTION PROPERTIES BASED ON THE EFFECTIVE SECTION.
FAX: (909) 869-0981
Ptotal= 370 LB
Mmax= 868 IN-LB
KxUrx = 1.2*36 IN/0.6158 IN
= 70.2
KyLy/ry = 1.2*36 lN/0.5391 IN
= 80.1 <=== (Kl/r)max
AXIAL
Fe= nA2E/(KL/r)maxA2
= 45.3 KSI
Fy/2= 18.0 KSI
~ SINCE, Fe > Fy/2 ' THEN, Fn= Fy( 1 -Fy/4Fe)
= 36 KSI*[l-36 KS1/(4*45.3 KSI)]
= 28.9 KSI
= 7,868 LB
Pn= AeWFn
nc= 1.92
Pa= Pn/nc
SECTION PROPERTIES
t = 0.075 IN = 7868 LB/1.92
= 4,098 LB Aeff = 0.273 INA2
P/Pa= 0.09 < 0.15 IX = 0.1 03 INA4
FLEXURE SX = 0.073 INA3
ly = 0.079 INA4
Sy = 0.076 INA3
ry = 0.539 IN
KX = 1.20
LX = 36.0 IN
Ky = 1.20
Ly= 36.0 IN
CHECK: P/Pa + Mx/Max I 1.33 rx = 0.61 6 IN
Pno= Ae*Fy
= 0.273 INA2 *36000 PSI
= 9,816 LB
= 981 6 LB/1.92
= 5,113 LB
= 0.073 INA3 * 36000 PSI
= 2,613 IN-LB
Pao= Pno/nc
Myield=My= Sx*Fy Fy= 36 KSI
E= 29,500KSI
Max= My/f2f f2f= 1.67
= 261 3 IN-LB/1.67
Pcr= nAZEI/(KL)maxQ
Cmx- 1.00
= 1,564 IN-LB Cb= 1.0
= nA2*29500000 PSI/( 1.2*36 IN)A2 px= { 1 /[ 1 -(nc*P/Pcr)] )A-1
= 16,133 LB = {1/[1-(1.92*370 LB/16133 LB)]]"-l
= 0.96
THUS,
(370 LB/4098 LB) + (868 IN-LB/1564 IN-LB) = 0.63 < 1.33, OK
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
SHEET NO. 17 OF 52
SEIZMIC @ CALCULATED BY M.T. DATE 8/28/03
MATERIAL HANDLING ENGINEERING
TEL: (909) 869-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91768
CHECK CAPACITY OF DOUBLE RIVET BEAM CONNECTION
SINCE THE FRAME IS ASSUMED TO RESIST THE SEISMIC LOADS AS A MOMENT RESISTING FRAME, THE CAPACITY
OF THE RIVET BEAM CONNECTION SHALL BE DETERMINED.
Mconn= Mseismic + Mstatic
= 1,580 IN-LB
GW
Vallow- 0.4 * Fy * AREA * 1.33
= 1,440 LB
Vallow= 0.22* Fu * AREA * 1.33
= 1,440 LB
BEARING CAPACITY OF STUDS
brg.allow= stud 0 x tmin x Fu x 1.33
= 1,625 LB
Mallow= Vallow * d
= 2,160 IN-LB > Mconn OK
.
-t-
-4 1 1/2"
b.3104
PI= 0.250 IN
tmin= 0.075 IN
AREA= 0.049 IN*2
Fy= 55,000 PSI
Fu-METALS 6 5,000 PSI
Fu-RIVET= 100,000 PSI
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
SHEET NO. 18 OF 52
CALCULATED BY M .T. DATE 8/28/03 MATERIAL HANDLING ENGINEERING
TEL: (909) 889-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91 768
SHELF ANALYSIS
THE SHELF SHALL BE ANALYZED TO DETERMINE THE ADEQUACY OF THE COMPONENTS TO CARRY THE GIVEN STATIC
LOADS. ASSUME PARTlALL Y HXfD SUPPORTED END CONDITIONS.
SHELF LOAD(DL+LL)= 180 LB/LVL
p-c
Mmax = wL*2/12
= (1 80 LB * 0.5 * 96)/12
= 720IN-LB
fb= M/S
= 720 IN-LB/0.28121 INA3
= 2,560 PSI
Fb= 0.6*Fy
= 0.6 * 36000 PSI
= 21,600 PSI
f b/F b-stat i c= 0.1 2 < 1.0 BEAM TYPE 1 OK
Mmax(seismic+static) = 1,580 IN-LB
fb/Fb-seismic= [Mrnax(seismic+static)/Sx] / Fb - - 0.26 < 1.33 BEAM TYPE 1 OK
BEAM TYPE 2: DRB
Mmax = wLA2/12
= (1 80 LB * 0.5 * 48)/12
= 360 IN-LB
fb= M/S
= 360 IN-LB/O.12643 INA3
= 2,847 PSI
Fb= 0.6*Fy
= 0.6 * 36000 PSI
= 21,600 PSI
fb/Fb-static= 0.1 3 < 1.0 BEAM TYPE 1 OK
Mrnax(seisrnic+static) = 1,580 IN-LB
fb/Fb-seismic= [Mmax(seismic+static)/Sx] / Fb
0.58 < 1.33 BEAM TYPE 1 OK - -
-075" -
r ""1
2 3/4"
BEAM TYPE 1: DRC
SX= 0.28 INA3
L= 96.0 IN
d= 48.0 IN
Fy = 36,000 PSI
BEAM TYPE 2: DRB
SX= 0.13 INA3
L= 96.0 IN d= 48.0 IN
Fy = 36,000 PSI
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
SHEET NO. 19 OF 52
S ElZM IC a CALCULATED BY M.T. DATE 8/28/03
MATERIAL HANDLING ENGINEERING
TEL: (909) 669-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91768
Fn EL n
EL 5
EL 4
EL 3
FULLY LOADED:
EL 2 Movt = 1 1,360 IN-LB
EL 1 Mst = 5 LVLS x (175 LB + 10 LB) x 48 IN / 2
= 22,200 IN-LB
Puplift = (Movt x 1.1 5 - Mst) / d
= [ 13064 - 222001 IN-LB / 48 IN
= -190 LB
INTERACTION EQN.
[0 LB/ 465 LB]*(l) + [53 LB/ 830 LB]*(l) = 0.06 < 1 .O THEREFORE OK
d = 48.0 IN
ALLOWABLE TENSION = 465 LB
ALLOWABLE SHEAR = 830 LB
# OF ANCHORS/ B.P. = 1
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
SHEET NO. 20 OF 52
fa
MATERIAL HANDLING ENGINEERING
..... ...... ..... ...... ..... ...... ..... ...... ..... ...... ..... ...... ..... ...... ..... ...... ..... ...... .....
... - ...... -.
CALCULATED BY M.T. DATE 8/28/03
TEL: (909) 86-9 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91768
BASE PLATE
P = PCOI + M/d
= 987LB
fa = P/A
= Pcol/[ (Deff .) (Beff.)]
= 75 PSI
M1 base/in = (W/in)(L*2)/2
= (fa)(bl*2)/2
= 21 IN-LB
Sbase/in = (1 )(tA2)/6
= 0.001 INA3
Fbase = (0.75)(Fy)(l.33)
= 36,000 PSI
fb/Fb = Mbase/in/((Sbase/in)(Fbase))
= 0.63 < 1.0 OK
PROPERTIES:
Beff. = 5.250 IN
Deff. = 2.500 IN
b = 3.750 IN
bl = 0.750 IN
t = 0.075 IN
Fy= 36,000 PSI
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND SElZMlC
SHEET NO. 21 OF 52 @ CALCULATED BY M .T. DATE 8/28/03 MATERIAL HANDLING ENGINEERING
TEL: (909) 869-0989 FAX: (909) 869-0961
161 ATLANTIC AVENUE POMONA CA 91 768
SLAB AND SOIL PER THE 1997 UNIFORM BUILDING CODE.
THE SLAB IS CHECKED FOR PUNCTURE STRESS. IF NO PUNCTURE OCCURS THE SLAB IS ASSUMED TO
DISTRIBUTE THE LOAD OVER A LARGER AREA OF SOIL HENCE, ACTING AS A FOOTING. CONCRETE IS REINFORCED.
JA) PUNCTU RE
P = 1.4 x Pco + 1.7 x Mowdepth
= 1.4~ 370 LB + 1.7 x 11360 IN-LB / 48 IN
= 92OLB
..... .......... .. ...... ........... ............ ........... <==(SECTION 1922.5.4) Fpunct = 2.66 x (F'cA0.5)
= 2.66 x (2500 PSl)AO.5
= 133 PSI 7L b ,' B /
\ L
Apunct = [(Weff.+t/Z)+(Deff.+t/Z)] x 2 x t /' L /'
= [(5.25 IN + 5 IN/2) + (2.5 IN + 5 IN/2)] x 2 x 5 IN
= 128 INAZ
fv/Fv = P/[(Apunct)(Fpunct)]
= 920 LB/[128 INK? x 133 PSI'X 0.651
(B) SLAB TENSION
Asoil = P/[1.33 x fs]
= 920 LB/[ 1.33 x 1000 PSF/( 144INA2/FTA2)]
= 99.6 IN*2
= (99.64 INA2)"0.5
= 10.0 IN
= [5.25 IN x 2.5 INlA0.5 + 5
= 8.6 IN
b = (L-B)/2
= (9.98 IN - 8.62 IN)/2
= .7 IN
L = AsoiP0.5
B = [(Weff.)(Deff.)]AO.5 + t
<==(SECTION 1922.7.5 (3))
10.08 < 1.33 OK 1
Mconc = (w)(bA2)/2 = [(1.33)(fs)(bA2)]/[144 (INGYFTA2) x 21
= [1.33 x 1000 PSI x (0.68 IN)A2]/[144 (INAZ/FTAZ) x 21
= 2 IN-LB
Sconc = 1 IN x (tA2)/6
= 1 IN x (5 IN)A2/6
= 4.1 7 IN*3
Fconc = 5 x 0 x f'cA0.5
= 5 x 0.65 x (2500 PS1)AO.S
= 162.5 PSI
(SECTION 1909.3.5) ==>
fb/Fb = Mconc/[(Sconc)(Fconc)]
= 2.1 3 IN-LB/[(4.17 INA3)(162.5 PSI)]
BASE PLATE
Weff. = 5.25 IN
Deff. = 2.50 IN
CONCRETE
t = 5.0 IN f'c = 2,500 PSI
sQ!L
fs = 1,000 PSF
0= 0.65
DEPTH= 48.0 IN
Mot= 1 1,360 IN-LB
Pco~= 370 LB
10.00 4.33 0 K I
MATERIAL HANDLING ENGINEERING
TEL: (909) 869-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91 768
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
CALCULATED BY M.T. DATE 8/28/03
SHEET NO. 22 OF 52
dE WELD LIGHT DUTY FIXTURES
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
SHEET NO. 23 OF 52
CALCULATED BY M.T. DATE 8/28/03 MATERIAL HANDLING ENGINEERING
TEL: (909) 869-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91768
LIGHT DUTY STORAGE RACKS
P
THE PURPOSE OF THIS ANALYSIS IS TO SHOW THAT THE FOLLOWING LIGHT DUTY STORAGE RACK SYSTEM COMPLIES
WITH CHAPTER 22, DIVISION X OF THE 2001 CBC.
PARAMETERS
SHELVING UNITS & CATWALK SYSTEMS WILL BE ANALYZED AS AN ELEMENT UTILIZING THE FOLLOWING
FORMULA.
V= 2.5xCaxIxW/R <== SECTION 2228.5.2 &1630.2.1
WHERE
Ca = 0.44
I= 1.0
R = 4.4
R= 5.6
<=== NOTE: Ca = 0.44 x Na, where Na = 1
<== FOR BRACED FRAME
<== FOR MOMENT FRAMES
W= LL/n+DL
n= 1
1.4 <=== WORKING STRESS REDUCTION
SPECIFICATIONS
STEEL - Fy = 50000 PSI
BOLTS - ASTM A307/GRD. 2 BOLT OR SIMILAR UNLESS OTHERWISE NOTED
ANCHORS - 3/8"0 x 2-1 /2" MIN. EMBD. LDT CONCRETE SCREW ANCHOR ICBO 5890
SLAB - 5 IN x 2500 PSI
SOIL - 1,000 PSF
- MATERIAL HANDLING ENGINEERING
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
SHEET NO. 24 OF 52
CALCULATED BY M.T. DATE 8/28/03
TEL: (909) 869-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91768
GENERAL CONFIGURATIONS:
1) POST
2) FOOTPLATE
3) ANCHOR
4) SHELVES
5) SHELF CLIP
6) PANELS
7) X-BRACES
PROJECT BED BATH & BEYOND
SElZMlC FOR BED BATH & BEYOND
SHEET NO. 25 OF 52 a CALCULATED BY M.T. DATE 8/28/03 MATERIAL HANDLING ENGINEERING
TEL (909) 869-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91768
STRESS = 0.32 STRESS = 0.60 STRESS(L) = 0.98
STRESS = 0.74 STRESS = 0.1 5 STRESS(T) = 0.06
OK OK OK
SUMMARY & ELEVATION
I COLUMN
ELEVATION: A and A3
I BASE PLATE II LONG/TRANS X-BRACE 1
48"
I OVERTURNING 11
7 "
SLAB 81 SOIL I
4
I STRESS = 0.54
j OKI
WEIGHT/ LVL - 64 LB
SEISMIC ZONE - 4
I I
STRESS = 0.1 8
STRESS = 0.06
SEIZMIC @
I 48 I' 13 1/2"
MATERIAL HANDL~NG ENGINEERING
TEL: (909) 869-0989 - FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91768
I COLUMN
STRESS = 0.1 7
STRESS = 0.60
OK
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
CALCULATED BY M.T. DATE 8/28/03
SHEET NO. 26 OF 52
I BASE PLATE I LONG/TRANS X-BRACE
STRESS = 0.32
STRESS = 0.1 2
STRESS(L) = 0.35
STRESS(T) = 0.03
OK
SUMMARY & ELEVATION
I OVERTURNING
STRESS = 0.94
OK
ELEVATION: A1
i SLAB & SOIL
STRESS = 0.1 5
STRESS = 0.04 .
-I----- 12"
12 +-
12
12 IC-- ':" 12" I
12"
r 12"
12
12"
:'"
WEIGHT/ LVL - 32 LB
SEISMIC ZONE - 4
BED BATH & BEYOND PROJECT
FOR BED BATH & BEYOND SEIZMIC
SHEET NO. 27 OF 52 e CALCULATED BY M.T. DATE 8/28/03
MATERIAL HANDLING ENGINEERING
TEL: (909) 869-0989 FAX: (909) 809-0981
161 ATLANTIC AVENUE POMONA CA 91 768
I I 48 f
SUMMARY & ELEVATION
19 l/Z",'
ELEVATION: A2
I OVERTURNING SLAB & SOIL
STRESS = 0.73 STRESS = 0.1 6
OK STRESS = 0.05
WEIGHT/ LVL - 48 LB
SEISMIC ZONE - 4
i f 4 30" I
1 7" d
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND SEIZMIC
SHEET NO. 28 OF 52 @ CALCULATED BY M.T. DATE 8/28/03 MATERIAL HANDLING ENGINEERING
LEVEL wx(DL + LL) hx
1 5 LB 3.0 IN
2 69 LB 15.0 IN
3 69 LB 27.0 IN
4 69 LB 39.0 IN
5 69 LB 51 .O IN
6 69 LB 63.0 IN
7 69 LB 75.0 IN
8 69 LB 87.0 IN
9 69 LB 99.0 IN
10 69 LB 1 1 1 .O IN
11 69 LB 123.0 IN
12 69 LB 135.0 IN
13 69 LB 147.0 IN
833 LB TOTAL =
TEL: (909) 869-0989 9 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91768
LOADS & DISTRIBUTION-A
wx hx Fi Movt
0 IN-LB 15 0.0 LB
1,035 2.1 LB 32 IN-LE
1,863 3.8 LB 102 IN-LB
2,691 5.5 LB 21 3 IN-LB
3,519 7.2 LB 365 IN-LB
4,347 8.8 LB 557 IN-LB
5,175 10.5 LB 789 IN-LB
6,003 12.2 LB 1,062 IN-LB
6,83 1 13.9 LB 1,375 IN-LB
7,659 15.6 LB 1,729 IN-LB
8,487 17.3 LB 2,123 IN-LB
9,315 18.9 LB 2,557 IN-LB
10,143 20.6 LB 3,032 IN-LB
67,1383 136 LB 13,938 IN-LB
RACK ANALYSIS WILL BE BASED ON CHAfTER 22, DIVISION X OF THE 1997 UBC, WHERE SEISMIC SHEAR IS DERIVED AS:
V= 2.5xCaxIxW/R
Ca = 0.44
1.4 <=== WORKING STRESS REDUCTION
I= 1
R = 4.4
n= 1
<== BRACED FRAMES
<== SINGLE ROW UNITS <== SHELF LEVELS
<== SHELF LIVE LOAD
<== SHELF DEAD LOAD
#of SHELF LVLS = 12
SHELF LL = 64 LWLVL
DVLEVEL = 5 LB/LVL
TOTAL LL = 704 LB
TOTAL DL = 60 LB
SEISMIC SHEAR
V = 2.5 x 0.44 x 1 x (704 LB / 1 + 60 LB) / 4.4 x 1.4
= 136 LB
COLUMN 81 BRACE LOADS
COLUMN LOADS:
Pstatic = shelf-total/Z
= 417LB
Pseismic = Movt / dshelf
= 547LB
BRACE LOADS:
Brace Octurence-long = 1.5
Pbrace-long = Vtotal x Brace Occurence
= 205LB
Brace Occurence-trans = 1.5
Ptotal = Pseismic + Pstatic Pbrace-trans = Vtotal x Brace Occurence
= 963 LB = 205 LB
MATERIAL HANDLTNG ENGINEERING
TEL: (909) 8640989 FAX: (909) 869-0931
161 ATLANTIC AVENUE POMONA CA 91768
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
SHEET NO. 29 OF 52
CALCULATED BY M.T. DATE 8/28/03
STATIC COLUMN ANALYSIS :
ANALYZED PER AIS1 & THE 1997 UBC. SECTION PROPERTIES BASED ON THE EFFECTIVE SECTION.
1 ~ Pcol= 41 7 LB I<=== Pstatic
Kxlx/o~ = 1 *12 lN/0.39831 IN
KyLy/y = 1 *12 lN/0.09535 IN
= 30.1
125.9
(KL/r)max = 125.9
ro= (rxA2 + ryA2 + xoA2)AOS
= 0.449 IN
E= 1 -(xo/ro)A2 (EQ. C4.2-3)
0.833
Fe IS TAKEN AS THE SMALLER OF Fel AND Fe2: SECTION PROPERTIES
Fel= nA2E/(KL/r)max42
= 18.4 KSI
(EQ C4.1-1)
O~X= ITAZE/(KXLX/TX)A~ (EQ C3.1.2-7)
= 320.8 KSI
= 11 2.48 KSI
= 104.1 KSI
ut= 1 /AroA2[GJ+(nA2ECw)/(KtLt)h2] (EQ C3.1.2-9)
Fez= ( 1 /2R)*~(uex+ut)-[(uex+ut)~2-(4*E*uex*ut)]~O.5~ (EQC4.1-1)
Fe= 18.4 KSI
Fy/2= 25.0 KSI
SINCE, Fe < Fy/2
THEN, Fn= Fe
= 18.4 KSI
Pn= Aeff*Fn
= 2,494 LB
nc= 1.92
Pa= Pn/nc
= 1,299 LB
(EQ. C4-4)
(EQ C4-2)
(EQC4-1)
t = 0.060 IN
IX = 0.022 INA4
SX = 0.033 INA3
O( = 0.398 IN
ly = 0.001 INA4
Sy = 0.005 INA3
ry = 0.095 IN
X = 0.000 IN
J = 0.0002 IN*4
CW = 0.0006 INA6
j = 1.926 IN
xo = 0.183 IN
Kx= 1.0
LX = 12.0 IN
Ky = 1.00 Ly = 12.0 IN
Kt = 1.0
Lt = 12.0 IN
Fy= 50 KSI
Aeff = 0.1 36 INA2
m = 0.910 IN
Pcol/Pa= 0.32 < 1.0, OK G= 11,300
E= 29,500 KSI
- MATERIAL HANDLING ENGINEERING
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
SHEET NO. 30 OF 52
CALCULATED BY M.T. DATE 8/28/03
EL: (909) 869-0989 FAX: (90s) 869-0981
161 ATLANTIC AVENUE POMONA CA 91768
SEISMIC COLUMN ANALYSIS :
ANALYZED PER AIS1 & THE 1997 UBC. SECTION PROPERTIES BASED ON THE EFFECTIVE SECTION.
Pcol= 963 LB 1 <=== Pstatic + Pseismic
KxlX/r~ = 1 *12 lN/0.39831 IN
KyLy/v = 1 *12 lN/0.09535 IN
= 30.1
= 125.9
(KL/r)max = 125.9
ro= (rxA2 + ryA2 + xoh2)A0.5
= 0.449 IN 1- 1 5/8,'-/
l3= 1 -(xo/ro)A2 (EQ. C4.2-3)
0.833
Fe IS TAKEN AS THE SMALLER OF Fel AND Fe2:
SECTION PROPERTIES
Fel = rrAZE/(KL/r)maxAZ (EQ C4.1-1)
= 18.4 KSI
ax= rrA2E/( KxLx/rx)A2 (EQ C3.1.2-7) t = 0.060 IN
= 320.8 KSI
= 11 2.48 KSI
= 104.1 KSI
Aeff = 0.1 36 INA2
at= 1 /AroA2[GJ+(rrA2ECw)/(KtLt)A2] (EQ C3.1.2-9) IX = 0.022 INA4
SX = 0.033 INA3
ly = 0.001 INA4
Sy = 0.005 INA3
ry = 0.095 IN
X = 0.000 IN
SINCE, Fe < Fy/2 m = 0.910 IN
Fe2= (1 /2R)*{(oex+~t)-[(uex+Ut)~2-(4*R*oex*at)l~0.5) (EQ C4.1-1) rx = 0.398 IN
Fe= 18.4 KSI
Fy/2= 25.0 KSI
THEN, Fn= Fe (EQ. C4-4) J = 0.0002 IN*4
CW = 0.0006 INA6 = 18.4 KSI
j = 1.926 IN
Pn= AefPFn (EQ C4-2) xo = 0.1 83 IN
= 2,494LB Kx= 1.0
nc= 1.92 Ky = 1.00
Lx = 12.0 IN
Ly = 12.0 IN
Kt = 1.0
Pa= Pn/nc (EQ C4-1) Lt =: 12.0 IN
Fy= 50 KSI = 1,299 LB
Pcol/Pa= 0.74 -c 1.33, OK G = 11,300
E= 29,500KSI
PROJECT BED BATH & BEYOND
SElZMlC FOR BED BATH & BEYOND
SHEFT NO. 31 OF 52 @ CALCULATED BY M .T. DATE 8/28/03 MATERIAL HANDLING ENGINEERING
TEL: (909) 8690989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91 768
LONGITUDINAL CROSS BRACE ANALYSIS
11.11111 BRACING CAPACITY IS GOVERNED BY TENSION CAPACITY OF CROSS BRACING.
Veff = Pbrace
= 205 LB
Vdiag = Veff * (Ldiag/Lhoriz)
= 205 LB * 122 IN/48 IN
= 520 LB <=== SEISMIC LOAD IN TENSION
TENSION CAPACITY OF CABL E
Tallow = 0.6 * Fy * AREA(gross)
= 0.6 * 50000 PSI * 0.01 77 IN*2
= 530 LB
Vdiagflallow = 0.98 < 1.33, OK
DIAM.
c-
CABLE 0 = 0.1 50 IN
H= 120.0 IN
AREA(gross)= 0.01 8 IN42
Lhoriz=D= 48.00 IN
Lvert=h= 1 12.0 IN
Ldiag= 121.9 IN
Fy= 50,000 PSI
Fu= 65,000 PSI
- MATERIAL HANDLING ENGINEERING
Veff = Pbrace
TEL: (909) 669-0989 FAX: (909) 8694981
161 ATLANTIC AVENUE POMONA CA 91 768
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
CALCULATED BY M.T. DATE 8/28/03
SHEET NO. 32 OF 52
1 TRANSVERSE CROSS BRACE ANALYSIS
I Vdiag = Veff * (LdiagAhoriz)
I = 205 LB * 38 IN / 24 IN
= 328 LB <=== SEISMIC LOAD IN TENSION
Tallow = 0.6 * Fy * AREA(gross)
I = 0.6 * 55000 PSI * 0.1963 INA2
= 5,890 LB
VdiagfTalIow = 0.06 < 1.33, OK
,--- DIAM. Lhorizontal
CROSS BRACE MEMBER
CABLE 0 = 0.500 IN H= 120.0 IN
AREA(gross)= 0.1 96 lNA2
Lhoriz=D= 24.00 IN
Lvert=h= 30.00 IN
Ldiag= 38.42 IN
Fy= 50,000 PSI
Fu= 65,000 PSI
PROJECT BED BATH & BEYOND
MATERIAL HANDKNG ENGINEERING
TEL: (909) 8640989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91 768
FOR BED BATH & BEYOND
SHEET NO. 33 OF 52
CALCULATED BY M .T. DATE 8/28/03
OVERTURNING ANANLYSIS
Fn
FULLY LOADED:
Movt = 13,938 IN-LB
Mst = 10,621 IN-LB
Puplift = (Movt x 1.1 5 - Mst) / d
d = 25.5 IN
= [13938 x 1.1 5 - 106211 IN-LB / 25.5 IN
= 212LB
INTERACTION EQN.
[212 LB/ 465 LB]A(l) + [68 LB/ 830 LB]A(l) = 0.54 < 1 .O THEREFORE OK
ALLOWABLE TENSION = 465 LB
ALLOWABLE SHEAR = 830 LB
# OF ANCHORS/ B.P. = 1
A A A A A A I Fbase = (0.75)(Fy)
= 27,000 PSI fa
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
SHEET NO. 34 OF 52
SElZMlC e CALCULATED BY M.T. DATE 8/28/03
MATERIAL HANDLING ENGINEERING
TEL: (909) 869-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POWNA CA 91768
"""i ..... ...... ..... ...... ..... ...... ...... ...... ...... ...... ......
LONGITUDINAL BASE PLATE
.......
~ ............ ..... ', /:::::: /:....: ....
P= Pcol+M/d
= 417LB
fa = P/A
= Pcol/[(Deff.)( Beff.)]
= 95 PSI
M1 base/in = (W/in)(LA2)/2
= (fa)(blA2)/2
= 42 IN-LB
Sbase/in = (1 )(tA2)/6
= 0.003 lN*3
// t
- - 0.60 < 1.0 OK
PROPERTIES:
Beff. = 3.50 IN
Deff. = 1.25 IN b = 1.63'IN
bl = 0.94 IN
t = 0.125 IN
Fy = 36,000 PSI
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
SHEET NO. 35 OF 52
CALCULATED BY M .T. DATE 8/28/03 MATERIAL HANDLING ENGINEERING
TEL: (909) 869-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91 768
TRANSVERSE BASE PLATE
P= Pcol+M/d
= 963 LB
fa = P/A
= Pcol/[(Deff.)( Beff.)]
= 220 PSI
M1 base/in = (W/in)(LA2)/2
= (fa)(bl*2)/2
= 11 IN-LB
Sbase/in = (1 )(tA2)/,6
= 0.003 INA3
Fbase = (0.75)(Fy)
= 27,000 PSI
fb/Fb = Mbase/in/((Sbase/in)(Fbase))
- - 0.1 5 < 1.0 OK
..... ...... ..... ...... ..... ...... ..... ...... ..... ...... ..... ...... ..... ...... ..... ...... ...... ......
fa FImI.3 .....
PROPERTIES:
Beff. = 1.25 IN
Deff. = 3.50 IN
b = 0.63 IN
bl = 0.31 IN
t = 0.125 IN
Fy = 36,000 PSI
.
= 2.66 x (2500 PS1)AO.S
= 133 PSI
\
L
Apunct = [(Weff.+t/Z)+(Deff.+t/Z)] x 2 x t /' L /'
PROJECT BED BATH & BEYOND
SElZMlC FOR BED BATH & BEYOND
SHEET NO. 36 OF 52 @ CALCULATED BY M.T. DATE 8/28/03 MATERIAL HANDLING ENGINEERING
TEL: (909) 8694989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91768
= 37.57 IN-LB/[(4.17 IN"3)(162.5 PSI)]
SLAB AND SOIL PER THE 1997 UNIFORM BUILDING CODE.
0.06 < 1.33 OK
THESLABISCHECKEDFORPUNCTURESTRESS. IFNOPUNCTUREOCCURSTHESLABISASSUMEDTO
DISTRIBUTE THE LOAD OVER A LARGER AREA OF SOIL HENCE, ACTING AS A FOOTING. CONCRETE IS REINFORCED.
fv/Fv = P/[(Apunct)(Fpunct)]
= 151 2 LB/[98 INA2 x 133 PSI x 0.651
SLAB TENSION
Asoil = P/[1.33 x fs]
= 1 51 2 LB/[ 1.33 x 1000 PSF/( 144IN4?/FT*2)]
= 163.7 INA2
= (1 63.74 IN*2)A0.5
= 12.8 IN
= [3.5 IN x 1.25 INJA0.5 + 5
= 7.1 IN
b = (L-B)/2
= (1 2.8 IN - 7.09 IN)/2
= 2.9 IN
L = AsoilA0.5
B = [(Weff.)(Deff.)]AO.S + t
<==(SECTION 1922.7.5 (3))
10.1 8 < 1.33 OK I
Mconc = (w)(bA2)/2 = [(I .33)(fs)(bA2)]/[144 (INAZ/FT*Z) x 21
= [1.33 x 1000 PSI x (2.85 IN)A2]/[144 (INAZ/FTAZ) x 21
= 38 IN-LB
Sconc = 1 IN x (tA2)/6
= 1 IN x (5 IN)A2/6
= 4.1 7 INA3
Fconc = 5 x 0 x f'cA0.5
= 5 x 0.65 x (2500 PS1)*0.5
= 162.5 PSI
(SECTION 1909.3.5) ==>
BASE PLATE
Weff. = 3.5 IN
Deff. = 1.3 IN
CONCRETE
t = 5.0 IN
f'c = 2,500 PSI
SOlL
fS = 1,000 PSF
0= 0.65
DEPTH= 25.5 IN
Mot= 13,938 IN-LB
Pco~= 41 7 LB
MATERIAL HANDLTNG ENGINEERING
TEL: (909) 869-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE FOMONA 9 CA 91768
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
SHEET NO. 37 OF 52
CALCULATED BY M.T. DATE 8/28/03
NSF STORAGE RACKS
. c
MATERIAL HANDLING ENGINEERING TEL: (909)869-0989 FAX: (909)869-0981
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
CALCULATED BY M.T. DATE 08/28/03
SHEET NO. OF 52
161 ATLANTIC STREET POMONA CA 91768
PAHAMt I tKS:
STORAGE RACKS CONSIST OF SEVERAL BAYS, INTERCONNECTED IN ONE OR BOTH
DIRECTIONS WITH THE COLUMNS OF THE VERTICAL FRAMES BEING COMMON BETWEEN
ANY ADJACENT BAYS.
THE ANALYSIS WILL FOCUS ON A TRIBUTARY BAY TO BE ANALYZED IN BOTH
STABILITY LONGITUDINALLY IS DEPENDANT ON BEAM TO COLUMN MOMENT,
LONGITUDINAL AND TRANSVERSE DIRECTION.
WHILE THE BRACING ACT TRANSVERSELY.
1. COLUMN.
2. BEAM.
3. BEAM TO COLUMN.
4. BASE PLATE.
5. HORIZONTAL BRACING.
6. DIAGONAL BRACING.
7. BACK CONNECTOR.
P
.-....... .--.*.........-, /
!.. -.*..~........=-..._..I.+ TRANSVERSE
LONGITUDINAL _____)
TOP VIEW
MATERIAL HANDLING ENGINEERING TEL: (909)869-0989 FAX: (909)869-0981
161 ATLANTIC STREET POMONA CA 91768
TYPE K
PROJECT BED BATH & BEYOND
env BED BATH & BEYOND
SHEET NO. 3y OF 52
CALCULATED BY M.T. DATE 08/28/03
c
BASE PLATE
7 x 5 x .375
BASE PINNED
.I
MATERIAL HANDLING ENGINEERING TEL: (909)869-0989 FAX: (909)869-0981
161 ATLANTIC STREET POMONA CA 91768
COLUMN BEAM
.I 3x1 -518x1 3GA. 4 COLUMN STRESS =0.43 3-3/16 x 2-1/2 x 14 ga.
MAX LOAD/LEVEL = 331 5 Ib.
BEAM IS O.K.
PROJECT BED BATH & BEYOND
BED BATH & BEYOND
OVERTURNING
.I ANCHORSTRESS=0.18
# OF ANCHORS = 2
SHEET NO. Au OF 52
CALCULATED BY M.T. DATF 08/28/03
BRACING SLAB & SOIL
HORIZONTAL 4 DIAGONAL .I .I
1 1/2 X 1-114 X 14 GA 1 1/2 X 1-1/4 X 14 GA PUNCT. STRESS=0.30
STRESS = 0.1 0 STRESS= 0.20 BENDING STRESS =0.19
TYPE H
SPECIFICATION
- MAIN STEEL 55000 PSI
- BASE PLATE STEEL 36000 PSI
- ANCHOR - WEDGE TYPE 3/8 x 2-1/2 4lN.
- FLOOR SLAB 5" X 2500 PSI. REINFORCED 144"
- SOIL BEARING PRESSURE
- SEISMIC ZONE 4.
-TYPE = SINGLE ROW UNITS.
16"
1000 PSF
5"
141# -
124# II,
107#
89#
73#
58#
-
4
-D
12#
-' U U U l-, 96" -1 If. 48"4
IU = 96" SEXTION AXIAL FORCE MOMENT BEAM MOMENT I
1,700 Ib.
1,200 Ib.
1,000 Ib.
800 Ib.
600 Ib.
400 Ib.
200 Ib.
716 in.lb.
6,310 in.lb.
1,687 in.lb.
1,455 in.lb.
1,321 in.lb.
942 in.lb.
473 in.lb.
4,413 in.lb. c-std.conn.
4,298 in.lb. e-std.conn.
1,871 in.lb. e-std.conn.
1,688 in.lb. e-std.conn.
1,432 in.lb. e-std.conn.
1,007 in.lb. <-std.conn.
536 in.lb. e-stdxonn.
PROJECT BED BATH & BEYOND
BED BATH & BEYOND SElZMlC
FOR
SHEET NO. 4 OF 5a
M.T. DATE 08/28/03 CALCULATED BY
@
MATERIAL HANDLING ENGINEERING TEL: (909)869-0989 FAX: (909)869-0981
7 TYPE K DESIGN LOAD = VARIES
d
BASE PLATE COLUMN BEAM
d 3x1 -5/8X13GA. .I COLUMN STRESS =0.26 3-3/16 x 2-1/2 x 14 ga. 7 x 5 x .375
BASE PINNED MAX LOAD/LEVEL = 7,695 Ib.
BEAM IS O.K.
OVERTURNING BRACING SLAB & SOIL
4 HORIZONTAL 4 DIAGONAL d d ANCHOR STRESS = 0.59 1 1/2 X 1-1/4 X 14 GA 1 1/2 X 1-1/4 X 14 GA PUNCT. STRESS = 0.27
BENDING STRESS =0.16 # OF ANCHORS = 2 STRESS = 0.0 5 STRESS = 0.1 1
__
161 ATLANTIC STREET POMONA CA 91768
TYPE K
SPEC1 FlCATlON
- MAIN STEEL 55000 PSI
- BASE PLATE STEEL 36000 PSI
- ANCHOR - WEDGE TYPE 3/8 x 2- 12
I 16" - FLOOR SLAB 5" X 2500 PSI. REINFORCED 144" &
116" 5 - SOIL BEARING PRESSURE
- SEISMIC ZONE 4.
1000 PSF
L;t -TYPE = SINGLE ROW UNITS.
85#
I I & 24"4
IU = 48" SECTION AXIAL FORCE MOMENT BEAM MOMENT
~
1,025
750
625
500
375
250
125
Ib.
Ib.
Ib. Ib.
Ib.
Ib.
Ib.
431
3,814
1,020
880
798
569
286
in.lb.
in.lb.
in.lb.
in.lb.
in.lb.
in.lb.
in.lb.
2,373
2,517
1,050
939
784
528
243
in.lb.
in.lb.
in.lb.
in.lb.
in.lb.
in.lb.
in.lb.
e-std.conn.
<-std.conn.
<-std.conn.
<-std.conn.
e-std.conn.
e-std.conn.
e-std .con n .
c
MATERIAL HANDLING ENGINEERING TEL: (909)869-0989 FAX: (909)869-0981
161 ATLANTIC STREET POMONA CA 91768
BED BATH & BEYOND PROJECT
FOR BED BATH & BEYOND
SHEET NO. 42 OF 52
08/28/03 DATF M.T. CALCULATED BY
LOADS & DISTRIBUTION :TYPE H
LIVE LOAD PER SHELF = WII =
DEAD LOAD PER SHELF = Wdl =
VARIES
100 Ib
(BASED ON CLIENT SUPPLIED DATA)
TOTAL LOAD PER FRAME = 3,400 Ib
SEISMIC SHEAR BASED ON SECTION 1630.2.1 OF THE 1997 UBC
WHERE
V = ((2.5 x Ca x I) / R) x Wtotal
Wtotal = (Wll + Wdl) x n
n = # of shelves
Seismic Zone = 4
Ca = 0.44
R(long) = 5.6
R(trans) = 4.4
I=
Soil Coef. =
Na =
1
Sd
1 .o
LONGITUDIAL DIRECTION
Vlong = (2.5 x 0.44 x 1)/(5.6) x W) / 1.4
= 477Ib w/ working stress reduction
Fi= VWhi/ZWh
TRANSVERSE DIRECTION
Vtrans = (2.5 x 0.44 x 1 )/(4.4) x W / 1.4
= 607Ib w/ working stress reduction
IU = 96"
141#
Fi= VWhi/EWh
PROJECT BED BATH & BEYOND
BED BATH & BEYOND SElZMlC
FOR
SHEET NO. 43 OF 52
M.T. DATE 08/28/03 CALCULATED BY
@
MATERIAL HANDLING ENGINEERING TEL: (909)869-0989 FAX: (909)869-0981
161 ATLANTIC STREET POMONA CA 91768
LONGITUDINAL ANALYSIS :TYPE H
THE ANALYSIS IS BASED ON THE PORTAL METHOD, WITH THE POINT OF CONTRA FLEXURE OF THE
THE BASE PLATE PROVIDES ONLY PARTIAL FIXITY, THE CONTRA FLEXURE IS ASSUMED TO OCCUR
CLOSER TO THE BASE.(OR AT THE BASE FOR PINNED CONDITION, WHERE THE BASE PLATE CANNOT
CARRY MOMENT).
COLUMNS ASSUMED AT MID-HEIGHT BETWEEN BEAMS, EXCEPT FOR THE LOWEST PORTION, WHERE
Vlong = 2 * Vcol = 477 Ib.
VCOI = 239 Ib.
F 1 = 5 Ib. F 6 = 49 Ib.
F 2 = 23 Ib. F7= 56 Ib.
F 3 = 29 Ib.
F 4 = 35 Ib.
F 5 = 42 Ib.
BASE ASSUMED PINNED.
Mbase = 0 in.lb.
Mupper + Mlower = Mconn'R' + Mconn'L'
Mconn'R' = Mconn'L'
Mconn * 2 = Mupper + Mlower
Mconn = [Mupper + Mlower]/Z
RESULTING FORCES ON COLUMN
SECTION AXIAL LOAD rvlomvr Mconn
1700
1200
1000
800
600
400
200
71 5
6309
1687
1455
1321
942
472
441 2
4298
1871
1688
1431
1007
I 5 in.
Muppcr
Mconn "L"
Mconn "R" M lower
PROJECT BED BATH & BEYOND
SElZMlC FOR BED BATH & BEYOND
SHEET NO. 44 OF 52 @ CALCULATED BY M .T. DATE 8/28/03 MATERIAL HANDLING ENGINEERING
P- 3,049 LB
M= 6,040 IN-LB
TEL: (909) 889-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91768
IKAibvtrKst L- n
<=== 604 LB x 10 1N
ANALYZED PER AIS1 AND THE 2000 IBC. SECTION PROPERTIES BASED ON THE EFFECTIVE SECTION.
KxlX/m = 1.5*54 IN/I .24 IN
KyLy/ry = 1 *42 lN/0.624 IN
= 65.3
= 67.3 <=== (Kl/r)max
AXlAL Fe= mA2E/(KL/r)maxAZ
= 64.3 KSI
Fy/2= 27.5 KSI
SINCE, Fe > Fy/2
THEN, Fn= Fy( 1 -Fy/4Fe)
= 55 KSI*[ 1-55 KS1/(4*64.3 KSI)]
= 43.2 KSI
Pn= Aeff*Fn A= 3.000 IN
= 23,605LB B= 3.000 IN
flc= 5/3 + (3/8)*R - ( 1 /8)*RA3 C= 0.750 IN
= 1.88 t = 0.897 IN
Pa= Pn/nc Aeff = 0.546 INA2
IX = 0.839 INA4 = 23605 LB/1.87698074938211
SX = 0.559 INA3 = 12,576 LB
ly = 0.21 3 IN*4
Sy = 0.247 INA3
ry = 0.624 IN
LX = 54.0 IN
Ly = 42.0 IN
Fy= 55 KSI
SECTION PROPERTIES
P/Pa= 0.24 > 0.15 rx = 1.240 IN
FLEXURE
CHECK: P/Pa + (Cmx*Mx)/(Max*px) 5 1.33
P/Pao + Mx/Max 5 1.33
Pno= Ae*Fy Kx= 1.5
= 0.546 INA2 *55000 PSI
= 30,030LB Ky= 1.0
= 30030 LB/1.87698074938211
= 15,999 LB
= 0.247 INA3 * 55000 PSI
Pao= Pno/nc
E= 29,500 KSI
Myield=My= SY*Fy nf= 1.67
= 13,585 IN-LB Cmx- 1.00
Max= My/nf Cb= 1.0
= 13585 IN-LW1.67
= 8,135 IN-LB
= 1~*2*29500 KSI/(1.5*54 IN)A2
Pcr= nA2EI/(KL)maxA2 px= { 1 /[ 1 -(nc*P/Pcr)] )A-1
= {l/[l-(1.87698074938211*3049 LB/372
= 37,232LB = 0.85
THUS,
(3049 LB/I 2576 LB) + (1*6040 IN-LB)/(8135 IN-LB*0.85) =
(3049 LB/15999 LB) + (6040 IN-LB/8135 IN-LB) =
1.1 2 < 1.33, OK
0.93 < 1.33, OK
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
SHEET NO. 45 OF 52
CALCULATED BY M.T. DATE 8/28/03 MATERIAL HANDLING ENGINEERING TEL: (909) 869-0989 * FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91768
LVNW I UUINAL LUL- I ~rt n
ANALYZED PER AIS1 AND THE 2000 IBC. SECTION PROPERTIES BASED ON THE EFFECTIVE SECTION.
P- 1,200 LB
M= 6,310 IN-LB
KXWIX = 1.5*54 IN/1.24 IN
KyLy/ry = 1 *42 IN/0.624 IN
= 65.3
= 67.3 <=== (Kl/r)max
AXlAl
Fe= nAZE/(KL/r)rnaxA2
= 64.3 KSI
Fy/2= 27.5 KSI
SINCE, Fe > Fy/2
THEN, Fn= Fy( 1 -Fy/4Fe)
= 55 KSI*[1-55 KS1/(4*64.3 KSI)] SECTION PROPERTIES
= 43.2 KSI
= 23,605 LB
= 1.88
= 23605 LB/1.87698074938211
= 12,576 LB
Pn= Aeff*Fn A= 3.000 IN
B= 3.000 IN
fk= 5/3 + (3/8)*R - (1 /8)*R"3 C= 0.750 IN
t = 0.897 IN
IX = 0.839 INA4
SX = 0.559 INA3
ly = 0.21 3 INA4
Sy = 0.247 INA3
ry = 0.624 IN
LX = 54.0 IN
Ly = 42.0 IN
Fy= 55 KSI
Pa= Pn/f2c Aeff = 0.546 IN*2
P/Pa= 0.10 < 0.15 TX = 1.240 IN
FLEXURE
CHECK: P/Pa + Mx/Max I 1.33
Pno= Ae*Fy Kx = 1.5
= 0.546 INA2 *55000 PSI
= 30,030LB Ky= 1.0
= 30030 LB/1.87698074938211
= 15,999 LB
= 0.559 INA3 * 55000 PSI
Pao= Pno/flc
E= 29,500 KSI
Myield=My= Sx*Fy nf= 1.67
= 30,745 IN-LB Crnx- 1.00
Max= My/f2f Cb= 1.0
= 30745 IN-LW1.67
= 18,410 IN-LB
= nA2*29500 KSI/( 1.5*54 IN)A2
= 37,232LB = 0.94
Pcr= nAZEI/( KL) rnaxA2 px= { 1 /[ 1 -(nc*P/Pcr)] ]A-1
= {1/[1-(1.87698074938211*1200 LB/372
THUS,
(1 200 LB/12576 LB) + (631 0 IN-LB/184l 0 IN-LB) = 0.42 < 1.33, OK
c
1 @ SElZMlC PROJECT BED BATH & BEYOND
BED BATH & BEYOND
SHEET NO. Ab OF 52
08/28/03 CALCULATED BY M.T. DATE MATERIAL HANDLING ENGINEERING TEL: (909)869-0989 FAX: (909)869-0981 161 ATLANTIC STREET POMONA CA 91768
BEAM ANALYSIS :TYPE H
BEAM TO COLUMN CONNECTIONS PROVIDE ADEQUATE MOMENT CAPACITY TO STABLIZE THE SYSTEM,
ALTHOUGH IT DOES NOT PROVIDE 100% FIXITY. THUS, THE BEAMS WILL BE ANALYSED ASSUMING
THEY HAVE PINNED ENDS. FOR THE COMPUTATION OF BEAM TO COL. MOMENT CAPACITY, THE
PARTIAL FIXITY OF THE BEAM,(ASSUMED AT AN ARBITRARY 25% OF THE FIXED END MOMENT OR
2,000 in.lb. WHICH EVER IS SMALLER) WILL BE ADDED.
lact = 96.0 in.
lmax = [1950 + 1200(Ml/M2)]b/Fy
lmax = 3150*b/Fy = 143 in.
SINCE lmax > lact Fb = .60Fy = 33,000 psi.
MAXIMUM STATIC LOAD PER LEVEL DEPENDS ON
t = .0747 in.
SINCE M11M2 = 1 .O
1) BENDING CAPACITY
M = SX* Fb = wIA2/8
= 25971 in.lb.
CAPACITY = 2(8*M/I) = 38471b. Sx = 0.787 in.^3
Ix = 1.287 in.^4 2) MAXIMUM ALLOWABLE DEFLECTION (LI180).
A = 5~1"4/384EI
CAPACITY = 2[(384EI)/(5*180*lA2)] = 351 51b.
MAXIMUM STATIC LOAD PER LEVEL IS 3,515 Ib.
ALLOWABLE AND ACTUAL BENDING MOMENT AT EACH LEVEL.
LEVEL
1
2
3
4
5
6
7
Mstatic = wIA2/8 = LIVE.LOAD*L/(2*8) Mallow(static) = Sx * Fb
Mimpact = 1.1 25*Mstatic
Mseismic = Mconn (SEE LONG. ANALYSIS)
Mstatic Mimpact Mallow Mseismic Mallow RESULT
5400 6075 25971 441 2 34627 GCm
5400 6075 25971 4298 34627 GCm
5400 6075 25971 1871 34627 GCm
5400 6075 25971 1688 34627 GCm
5400 6075 25971 1431 34627 Giloco
5400 6075 25971 1007 34627 GCm
5400 6075 25971 536 34627 Goco
Mallow(seismic) = 1.33 * Sx * Fb
1.125 Mstatic (static) (seismic)
-
PROJECT BED BATH & BEYOND
SElZMlC FOR BED BATH & BEYOND
SHEET NO. 47 OF 52 a CALCULATED BY M.T. DATE 8/28/03 MATERIAL HANDLING ENGINEERING
TEL: (909) 869-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91 768
BEAM TO COLUMN ANALYSIS:
Mconn max= Mconn. seismic + Mend
=(5,698 IN-LB 1
CONNECTION CAPACITY DEPENDS ON THE FOLLOWING PARAMETERS:
1 SHF,AR CAPACITY OF STUDS
STUD DIAMETER= 7/16 IN
Fy= 50,000 PSI
Pmax-shear= 0.4 * Fy * Area
= 0.4 * 50000 PSI * (0.4375 IN)*2 *n/4
= 3,006.6 LB
2) BEARING CAPACITY ON COLUMN
Fu= 65,000 PSI
Pmax-brg= Bearing Area * Fbearing
= (tmin * thickness) * (1.2 * Fu)
= 3,071.3 LB > 3006.6 LB
= (0.4375 IN * 0.09 IN) * (1.2 *65000 PSI)
3) MOMENT CAPACITY OF BRACKET
Mcap= Sbracket * Fbending
= 0.1 3 IN*3 * 0.66 * Fy
= 4,290 IN-LB
C= Mcap/0.75 = 1.67 * PI
Mupper
fl(
Mconn Mconn
w 'd Mlower
I/ I 2 "
2 " I
THUS, P1= 0.798 * Mcap - c= P1 + P2 + P3
= P1 +P1*(2.514.5)+P1*(0.5/4.5)
= 1.67*P1
Sbracket= 0.1 30 IN*3
= 3,423 IN-LB > 3006.6 LB
THUS, GOVERNING VALUE IS THE MIN VALUE OF P1,
Pl-eff= 3,007 LB
1-5/8" 4
Mconn-allow= P1*4.5 IN + P2*2.5 IN + P3*0.5 IN
= 5.94 * PI -eff * 1.33
= 23,812 IN-LB > Mconn max, OK
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND . - MATERIAL HANDLING ENGINEERING
SHEET NO. 48 OF 52
CALCULATED BY M .T. DATE 8/28/03
TEL: (909) 869-0989 FAX: (909) 869-0981 161 ATLANTIC AVENUE POMONA CA 91768
SI tr tstD 01 LH~D suxl2 DETERMINE THE EFFECTIVE SECTION PROPERTIES OF THE MEMBER WELD SHOWN
BELOW. THE EFFECT OF THE ROUNDED CORNERS ARE TAKEN INTO ACCOUNT.
TYPE "A" WELD
BEAM & WELD INFO
A= 3.1875 IN
B= 2.5 IN
C= 1.75 IN
D= 0.75 IN
t-weld* = 0.1 25 IN
Fu-weld= 70,000 PSI
Fy-base metal= 50,000 PSI * t-eff= t-weld * 0.7071
TYPE "Bl' WELD TYPE "C" WELD
\ I
I WELD SECTION PROPERTIES 0.1 25 INCH THICK, TYPE "A" WELD
AREA=] 0.497 INA2 I MOMENT CAPACITY= 15,763 IN-LB
TYPE 'ID" WELD
l-c-t E4
SX= 10.21 INA3 I 1
EFFECTIVE SECTION PROPERTY FOR WELD* * TAKES INTO ACCOUNT 0.707 1 REDUCTION FACTOR
ELEMENT I WIDTH I HEIGHT I Y-BAR ELEM. 1 AREA I Y-BAR I I
0.0000 INA2 i i ! i i i i i i i i i i 0.0000 INA4 1 0.0000 IN 0.0000 IN 0.0000 IN
2 0.0884 IN 3.1 875 IN 1.5938 IN
0.0000 INA2 : i : I: i: i: I : i : I : i 0.0000 INA4 3 0.0000 IN 0.0000 IN 0.0000 IN
4 0.0000 IN 0.0000 IN 0.0000 IN 0.0000 INA2 ~:~:;:~:;:~:;:~: . . . . . . . . 0.0000 INA4
0.0000 INA2 i:::::i:::i:!::: 0.0000 INA4 5 0.0000 IN 0.0000 IN 0.0000 IN
6 0.0884 IN 2.4375 IN 1.21 88 IN 0.21 54 INA2 : i: I : i: i: i : : I : i 0.1 1 64 lNA4
I
. . . . . . . . 0.2817 INA2 :::-:.:-:*:.:-:. . . . . . . . , . . . . . . . 0.2460INA4 . . . . . . . . . . . . . . . .
* . . . . . . . ........
.. ...... . . . . . . . .
IAREA= 0.4972 lNA2
y bar= 1.431 IN
WELD MOMENT CAPACITY UN DER SE I S MI C IOADING Ix= 0.3624 INA4
Fbase-metal= 0.6*Fy-base metal
= 30,000 PSI
Fweld= 0.3*Fu
= 21,000 PSI
Feffective= 21,000 PSI
CAPACITY= Feff * Sx-weld * 1.33
= 21 000 PSI * 0.206 INA3 * 1.33
=[5,763 IN-LB ]
MATERIAL HANDLING ENGINEERING TEL: (909)869-0989 FAX: (909)869-0981
PROJECT BED BATH & BEYOND -
FOR BED BATH & BEYOND
SHEET NO. 44 OF 52
CALCULATED BY M.T. DATE 08/28/03
161 ATLANTIC STREET POMONA CA 91768
TRANSVERSE ANALYSIS : BRACING :TYPE H ' IT IS ASSUMED THAT THE LOWER PANEL RESISTS THE FRAME SHEAR IN TENSION AND
COMPRESSION. IF HORIZONTAL AND DIAGONAL MEMBERS ARE THE SAME, ANALYSIS WILL BE DONE
ON THE DIAGONAL MEMBER AS IT WILL GOVERN.
DIAGONAL BRACING : COMPRESSION MEMBER
L diag. = [ ( L-6)A2+(D-2*Bco1)A2]A.5
= 55.3
Vdiag =Vtrans * Ldiag. / D
kl/rmin = [ 1 * 55.3 1 / 505
= 699#
= 109.5
Fa =E1 2~~~2El/[23(kl/r)~2]
= 12445 psi.
fa/Fa =Vdiag/(Area*Fa)
= 0.20
DI= 55.3" H -
D= 48" 4
T
L= 42"
L 1
DIAGONAL AND HORIZONTAL BRACING
Area= .288 'IA2
w= 1.5 " H= 1.25 "
-f rmin= .505 " t= .0747 "
c
/
SEIZMIC
MATERIAL HANDLING ENGINEERING TEL: (909)869-0989 FAX: (909)869-0981
161 ATLANTIC STREET POMONA CA 91768
PROJECT BED BATH & BEYOND
en m BED BATH & BEYOND
OF 52 SHEET NO.
CALCULATED BY M.T. DATF 08/28/03
OVERTURNING :TYPE H
ANALYSIS OF OVERTURNING WILL BE BASED ON SECTION 2228.7.1 OF THE 1997 Uniform Building
code.
FULLY LOADED
TOTALSHEAR = 607 Ib.
Mot = Vtrans * ht * 1.15
= 607 * 107 * 1.15
= 74848 in.lb.
Mst = z(Wp+.85wDL) * d/2
= ( 2700+.85 * 700) * 4812
= 79080 in.lb.
Puplift = l(Mot - Mst)ld
Puplift e= 0 NO UPLIFT
TOP SHELF LOADED
SHEAR = 71 Ib.
Mot = Vtop * h * 1.15
= 71 * 144 * 1.15
= 11828 in.lb.
Mst = (Wp+wDL) * d/2
= ( 300+.85 * 700) * 48/2
= 21480 in.lb.
Puplift = l(Mot - Mst)/d
Puplift <= 0 NO UPLIFT
USE 2 ea. 3/8 x 2-1/2 MIN. EMBED. MIN. EMBED. ANCHOR.
t t- L
141# w
124# -
107#
89#
73#
58#
II+ -
I,
--.
12#
CAPACITY OF 318 x 2-1/2 MIN. EMBED. = 640 Ib. PULLOUT & 830 Ib. SHEAR
COMBINED STRESS1 = 0 / 1280 + 303 / 1660 = 0.1 8
COMBINED STRESS2 = 0 / 1280 + 35 I1660 = 0.02
MATERIAL HANDLING ENGINEERING TEL: (909)869-0989 FAX: (909)869-0981
BED BATH & BEYOND
FOR BED BATH & BEYOND
CALCULATED BY M.T. DATE 08/28/03
PROJECT .
SHEET NO. si OF 52
161 ATLANTIC STREET POMONA CA 91768
BASE PLATE :TYPE H
BASE PLATE WILL BE ANALYZED WITH THE RECTANGULAR STRESS RESULTING FROM THE VERTICAL
LOAD P, COMBINED WITH THE TRIANGULAR STRESSES RESULTING FROM THE MOMENT Mb (IF ANY).
THERE ARE 3 CRITERIA IN DETERMINING Mb. THEY ARE 1) MOMENT CAPACITY OF THE BASE PLATE,
2) MOMENT CAPACITY OF THE ANCHOR BOLTS, AND 3) Vh12 (FULL FIXITY). Mb IS THE SMALLEST
VALUE OBTAINED FROM THE 3 CRITERIA ABOVE.
PCOI = 3259 Ib. B = 7 in. D = 5 in.
b = 3 in. bl = 2 in.
t = .375 in.
P/A = Pcol/(D*B) = 93.12 psi.
Mbase = wIA2/2 = IA2/2(fa)
Mbase = 186.2 in.lb.
Sbase = 1*tA2/6 = 0.023 in.*3
fb/Fb = M base/(S base*Fbase) = 0.2 2 1
Fbase = .75Fy * 1.33 = 36000 psi.
fa
i
.-"
MATERIAL HANDLING ENGINEERING TEL: (909)869-0989 FAX: (909)869-0981
161 ATLANTIC STREET POMONA CA 91768
PROJECT BED BATH & BEYOND
en D BED BATH & BEYOND run
SHEET NO. 52. OF 52
CALCULATED BY M .T. DATE 08/28/03
SLAB AND SOIL :TYPE H
THE SLAB WILL BE CHECKED FOR PUNCTURE STRESS. IF NO PUNCTURE OCCURS, IT WILL BE
ASSUMED TO DISTRIBUTE THE LOAD OVER A LARGER AREA OF SOIL AND WILL ACT AS A FOOTING.
(a) PUNCTURE
Pmax = 1.4 DEAD LOAD + 1.7 LIVE LOAD
Pmax = 1.4 * Pcol + 1.7 * (Motld)
= 5,031 Ib.
Fpunct = 2*sqrt(f'c) = 100.0 psi.
Apunct = [(w+t/2)+(d+t/2)]*2*t = 170.0 in."2
fv/Fv = Pmax/(Apunct*Fpunct) = 0.3 0
(b) SLAB TENSION
Asoil = Pmax/(1.33 * fsoil) = 3.77 ft.^2
= 543 in."2
L = sqrt(Asoi1) = 23.3 in.
B = sqrt(w*d) + t = 10.9 in.
b = (L-B)/2 = 6.2 in.
Mconc = wbA2/2 = (1 .33*fsoil*bA2)/(144*2)
= 177.8 in.lb.
Sconc = 1*tA2/6 = 4.17 in."3
Fconc = 50 *sqrt(f'c) = 225.00 psi.
fb/Fb = Mconc/(Sconc*Fconc) = 0.1 9
BASE PLATE
w = 7 in.
d = 5 in.
CONCRETE
t = 5 in.
f'c = 2500 psi.
- SOIL
fs = 1000 psf.
SEIZMIC
MATERIAL HANDLING ENGINEERING
EST. 1985
STORAGE RACKS
DRIVE-IN RACKS
CANTILEVER RACKS
MEZZANINES
CONVEYORS
CAROUSELS
PUSHBACKRACKS
RACK BUILDINGS
STEEL SHELVING
MOVABLE SHELVING
STORAGE TANKS
MODULAR OFFICES
GONDOLAS
BOOKSTACKS
FLOW RACKS
FOOTINGS
SEISMIC ANALYSIS
STRUCTURAL DESIGN
CITY APPROVALS
STATE APPROVALS
PRODUCT TESTING
FIELD INSPECTION
SPECIAL FABRICATION
PERMITTING SERVICES
ALASKA
ARIZONA
CALIFORNIA
COLORADO
CoNNEcTlCUT
GEORGIA
IDAHO
ILLINOIS
INDIANA
KANSAS
MICHIGAN
MINNESOTA
MISSOURI
MONTANA
NEVADA
NEW MEXICO
OHIO
OKLAHOMA
OREGON
PENNSYLVANIA
TEXAS
UTAH
VIRGINIA
WASHINGTON
WISCONSIN
STORAGE FIXTURES
BED BATH & BEYOND
1905 CALLE BARCELONA
CARLSBAD, CA 92009
JOB #03-0921
161 ATLANTIC STREET POMONA CA 91768 EL : (909)869-0989 FAX : (909)869-0981
BED BATH & BEYOND PROJECT
FOR BED BATH & BEYOND
CALCULATED BY M.T. DATE 7/14/03
SHEET NO. 2 OF 49
MATERIAL HANDLING ENGINEERING
TEL: (909) 8694989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91768
TABLE OF CONTENTS
TITLE PAGE
TABLE OF CONTENTS
RAPID RACK LIGHT DUTY FIXTURE ANALYSIS
PROJECT SCOPE & SPECIFICATIONS
GENERAL CONFIGURATIONS
SUMMARY & ELEVATIONS
LOADS & DISTRIBUTION
LONGTTCIDINAL/TRANSVERSE ANALYSIS
COLUMN ANALYSIS
BEAM TO COLUMN ANALYSIS
BEAM ANALYSIS
OVERTURNING ANALYSIS
SLAB & SOIL ANALYSIS
WIRE WELD LIGHT DUTY FIXTURE ANALYSIS ANALYSIS
PROJECT SCOPE & SPECIFICATIONS
GENERAL CONFIGURATIONS
SUMMARY & ELEVATIONS
LOADS & DISTRIBUTION
COLUMN ANALYSIS
BRACE ANALYSIS ANALYSIS
OVERTURNING ANALYSIS
BASE PLATE ANALYSIS
SLAB & SOIL ANALYSIS
NSF STORAGE RACK ANALYSIS
PROJECT SCOPE & PARAMETERS
CONFIGURATIONS
SPECIFICATIONS
LOADS & DISTRIBUTION
LONGITUDINAL ANALYSIS
COLUMN ANALYSIS
BEAM ANALYSIS
BEAM TO COLUMN ANALYSIS
TRANSVERSE BRACE ANALYSIS
OVERTURNING ANALYSIS
BASE PLATE ANALYSIS
SLAB & SOIL ANALYSIS
PAGE
1
2
3 TO 20
4
5
6T0 12
13
14
15TO 16
17
18
19
20
21 TO35
22
23
24 TO 26
27
28 TO 29
30 TO 31
32
33 TO 34
35
36 TO 49
37
38
39 TO 40
41
42
43
44
45
46
47
48
49
MATERIAL HANDLING ENGINEERING
EL: (909) 869-0989 FAX: (909) 869-0981
161 ATLANTtC AVENUE POMONA CA 91768
BED BATH & BEYOND PROJECT
FOR BED BATH & BEYOND
CALCULATED BY M.T. DATE 7/14/03
SHEET NO. 3 OF 49
RAPID RACK LIGHT DUTY FIXTURES
BED BATH & BEYOND
BED BATH & BEYOND
PROJECT
FOR
CALCULATED BY M.T. DATE 7/14/03
SHEET NO. 4 OF 49
MATERIAL HANDLING ENGINEERING
TEL: (909) 8640989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91768
LIGHT DUTY STORAGE RACKS
PROJECT SCOPE
THE PURPOSE OF THIS ANALYSIS-IS TO SHOW THAT THE FOLLOWING L~GHT DUTY STORAGE RACK SYSTEM
COMPLIES WITH CHAPTER 22, DIVISION X OF THE 1997 UBC.
PARAMETERS
SHELVING UNITS &/OR CATWALK SYSTEMS WILL BE ANALYZED AS AN ELEMENT UTILIZING THE FOLLOWING
FORMULA
V= 2.5xCaxIxW/R <== SECTION 2228.5.2 811 630.2.1
WHERE:
Ca = 0.44
I= 1.0
R = 4.4 <== FORBRACEDFRAME
R= 5.6
W = LL/n + DL
<=== NOTE: Ca = 0.44 x Na, where Na = 1
<== FOR MOMENT FRAMES
n= 1 <=== SGL ROW
1.4 <=== WORKING STRESS REDUCTION
SPECIFICATIONS
STEEL - Fy = 36000 PSI
BOLTS - A307 UNLESS OTHERWISE NOTED
RIVETS - Fy = 50,000 PSI
ANCHORS - 3/8"0 x 2-1 /2" MIN. EMBD. LDT CONCRETE SCREW ANCHOR ICBO #5890
SHELVES - PARTICLE BOARD OR PLYWOOD
SLAB - 5 IN x 2500 PSI
SOIL - 1,000 PSF
MATERIAL HANDLTNG ENGINEERING
TEL: (909) 8640989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91768
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
CALCULATED BY M.T. DATE 7/14/03
SHEET NO. 5 OF 49
NOTE: THIS IS THE TRIBUTARY SYSTEM BEING ANALYZED.
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND SEIZMIC
SHEET NO. 6 OF 49 @ CALCULATED BY M.T. DATE 7/14/03 MATE RIAL HANDLING ENGINEERING
TEL: (909) 869-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91768
OVERTURNING I1 DOUBLE RIVET CONNECTION
STRESS = 0.06 STRESS = 0.73
OK OK
ELEVATION: TYPE "B"
I---- 9611 I
I SLAB & SOIL
STRESS = 0.1 0
STRESS = 0.01
SEISMIC ZONE - 4
WEIGHT/ LVL - 17 5 LB
t- "'1
SUMMARY: I II COLUMN BEAM #2 DRB II BEAM #1 DRC 1J
APH = 0.39
TP = 0.63 I STRESS = 0.26 I OK OK
STRESS = 0.58
BED BATH & BEYOND
BED BATH & BEYOND
PROJECT
FOR
CALCULATED BY M.T. DATE 7/14/03
SHEET NO. 7 OF 49
MATERIAL HANDLING ENGINEERING
L 96"
EL: (909) 669-0989 FAX: (909) 669-0981
161 ATLANTIC AVENUE POMONA CA 91 768
I'
SUMMARY & ELEVATION
APH = 0.55
TP = 0.88
OK
ELEVATION: TYPE "Ca"
STRESS = 0.49 STRESS = 0.22
OK OK
22 1/2" I
I OVERTURNING I DOUBLE RIVET CONNECTION
STRESS = 0.26 STRESS = 0.61
OK OK
I SLAB & SOIL
STRESS = 0.1 2
STRESS = 0.02
SEISMIC ZONE - 4
WEIGHT/ LVL - 120 LB I- ""1
- MATERIAL HANDLING ENGINEERING
OVERTURNING II DOUBLE RIVET CONNECTION I
TEL: (909) 869-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91768
I SLAB & SOIL
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
CALCULATED BY M.T. DATE 7/14/03
SHEET NO. 8 OF 49
SUMMARY & ELEVATION
ELEVATION: TYPE "Cb"
9'
SEISMIC ZONE - 4
WEIGHT/ LVL - 100 LB
f 24"+
SUMMARY:
COLUMN II BEAM #2 DRB II BEAM #1 DRC
I I
APH = 0.52
TP = 0.83 I STRESS = 0.44
OK I STRESS = 0.20
OK
STRESS = 0.28 ou I STRESS = 0.56
OK
STRESS = 0.1 2
STRESS = 0.02
I.
J I I
OVERTURNING II DOUBLE RIVET CONNECTION II SLAB & SOIL
- MATERIAL HANDLING ENGINEERING
PROJECT BED BATH 81 BEYOND
FOR BED BATH & BEYOND
CALCULATED BY M.T. DATE 7/14/03
SHEET NO. 9 OF 49
TEL: (909) 869-0989 FAX: (909) 869-0981
161 ATlANTfC AVENUE POMONA CA 91768
SUMMARY & ELEVATION
ELEVATION: TYPE “Ea“
I 22 1/2”
22 1 1/2”
22 -1 1/2“
rl
I 55 1/2”
.
i
i
I
i
.:
.
: :
e . . i
i
I
i
i
i
-!
: . .
. b .
:
SEISMIC ZONE - 4
WEIGHT/ LVL - 120 LB
SUMMARY:
COLUMN II II BEAM #1 DRBZ I I
APH = 0.55 I TP = 0.88 I STRESS = 0.84 I OK
I STRESS = 0.26 STRESS = 0.50 STRESS = 0.1 2
STRESS = 0.02 I
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
SHEET NO. 10 OF 49
CALCULATED BY M.T. DATE 7/14/03 MATERIAL HANDLING ENGINEERING
. : r
i J i 12"
! 12" 1
12" I
12" :
i . r
t 12" - s"
:
r
*
TEL: (909) 869-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91 768
SUMMARY & ELEVATION
I OK1 I
OVERTURNING II DOUBLE RIVET CONNECTION SLAB & SOIL
ELEVATION: TYPE "Eb"
STRESS = 0.60
OK
SEISMIC, ZONE - 4
WEIGHT/ LVL - 175 LB
STRESS = 0.53 STRESS = 0.32
OK STRESS = 0.1 8
SUMMARY:
COLUMN 1'1 BEAM #1 DRBZ
I APH = 0.43 I TP = 0.69 I STRESS = 0-89 OK I
..
r 9" .I
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
CALCULATED BY M.T. DATE 7/14/03
SHEET NO. 11 OF 49
MATERIAL HANDLING ENGINEERING
TEL: (909) 669-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91768
. . I
SUMMARY & ELEVATION
OVERTURNING II DOUBLE RIVET CONNECTION
STRESS = 0.55 STRESS = 0.32 OK OK
ELEVATION: TYPE "F"
L
48" 1
1 SLAB & SOIL
STRESS = 0.33
STRESS = 0.1 9
i
i
. : .
t
:
.
i
I
:
SEISMIC ZONE - 4
WEIGHT/ LVL - 40 LB
SUMMARY: I1 COLUMN II BEAM #2 DRBLP II BEAM #1 DRBZ Jl
APH = 0.59
TP = 0.94 I STRESS = 0.93
OK I STRESS = 0.54
OK
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND SElZMlC
SHEET NO. 12 OF 49 e CALCULATED BY M.T. DATE 7/14/03
MATERIAL HANDLING ENGINEERING
TEL: (909) 869-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91768
I COLUMN II BEAM #2 DRBLP II BEAM #1 DRBZ 1
APH = 0.59 STRESS = 0.87 STRESS = 0.51
TP- 0.94 OK OK
OK
SUMMARY & ELEVATION
1 OVERTURNING
STRESS = 0.54
OK
ELEVATION: TYPE "G"
NOTE: (2) ANCHOR REQ'd PER INTERIOR FOOT PLATE
I DOUBLE RIVET CONNECTION II SLAB & SOIL I
STRESS = 0.30 STRESS = 0.38
OK STRESS = 0.24
12" I
3'"
SEISMIC ZONE - 4
WEIGHT/ LVL - 37 LB
I
34 1/2"
..
LEVEL wx(DL + LL) hx wx hx
1 10 LB 3.0 IN 30
2 185 LB 36.0 IN 6,660
3 185 LB 72.0 IN 13,320
4 185 LB 108.0 IN 19,980
5 185 LB 144.0 IN 26,640
6 0 LB 0.0 IN 0
7 0 LB 0.0 IN 0
8 0 LB 0.0 IN 0
9 0 LB 0.0 IN 0
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
CALCULATED BY M.T. DATE 7/14/03
SHEET NO. 13 OF 49
MATERIAL HANDLING ENGINEERING
TEL: (909) 669-0989 FAX: (909) 669-0981
161 ATLANTIC AVENUE POMONA CA 91768
LOADS 81 DISTRIBUTION-TYPE 'IB"
Fi Movt
0.0 LB 0 IN-LB
10.5 LB 379 IN-LB
21.0 LB 1,515 IN-LB
31.6 LB 3,408 IN-LB
42.1 LB 6,058 IN-LB
0.0 LB 0 IN-LB
0.0 LB 0 IN-LB
0.0 LB 0 IN-LB
0.0 LB 0 IN-LB
RACK ANALYSIS WILL BE BASED ON CHAPTER 22, DIVISION X OF THE 1997 UBC, WHERE SEISMIC SHEAR IS DERIVED AS:
.750 LB TOTAL =
V= 2.5xCaxIxW/R 1.4 <=== WORKING STRESS REDUCTION
Ca= 0.44
I= 1
R= 4.4 <== BRACED FRAMES R= 5.6 <== MOMENT FRAMES
n= 1
#of SHELF LVLS = 5 <== ACTUAL SHELF LEVELS
<== ACTUAL SHELF LIVE LOAD
<== ACTUAL SHELF DEAD LOAD
SHELF LL = 175 LB/LVL
DULEVEL = 10 LB/LVL
TOTAL LL = 700 LB
TOTAL DL = 50 LB
SnR
V = 2.5 x 0.44 x 1 x (700 LB / 1 + 0 LB / 4 + 50 LB) / 5.6 x 1.4
= 105 LB
I 1 66,630 105 LB I 11,360 IN-LB
#OF LVLS
x 0.0
x 1.0
x 1.0
x 1.0
x 1.0
x 0.0
x 0.0
x 0.0
x 0.0
x 4.0
NOTE: THERE ARE ONLY 5 MOMENT RESISTING BEAMS, THE LOADS OF THE 5 SHELVES ARE DISTRIBUTED ACCORDINGLY
- MATERIAL HANDLING ENGINEERING TEL: (909) 869-0969 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91 768
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
CALCULATED BY M.T. DATE 7/14/03
SHEET NO. 14 OF 49
LONGITUDINAL & TRANSVERSE ANALYSIS
a UMN FORCES
Mbase = 0 IN-LB
Pcol(seismic) = MoWd
= 237LB
<==BASE ASSUMED TO BE PINNED
VCOI = V/2 = 53 LB <==PLEASE SEE LOADS & DISTRIBUTION PAGE
Mcol( 1-1 ) = Vcol x hi - Mbase PCOl(1-1) = 375 LB
= 53 LB x 3 IN - 0 IN-LB
= 158 IN-LB
McoI(2-2) = [Vcol - zFi/2] x hi/2
= [53 - 01 LB x 33 IN / 2
= 868 IN-LB
PcoI(2-2) = 370 LB SJMN CHE
McoI(3-3) = 852 IN-LB
McoI(4-4) = 663 IN-LB
McoI(5-5) = 379 IN-LB
McoI(6-6) = 0 IN-LB
BEAM TO COLUMN MOMENTS
Mconn( 1-1 ) = [Mcol( 1-1 ) + Mco1(2-2)] / 2
Mconn(2-2) = 860 IN-LB
Mconn(3-3) = 757 IN-LB
Mconn(4-4) = 521 IN-LB
Mconn(5-5) = 189 IN-LB
Mconn(6-6) = 0 IN-LB
= 51 3 IN-LB
PcoI(3-3) = 278 LB
PcoI(4-4) = 1 8 5 LB
PcoI(5-5) = 93 LB
PcoI(6-6) = 0 LB
<== CONNECTION CHECK
..
PROJECT BED BATH 81 BEYOND
SEIZMIC FOR BED BATH 8I BEYOND
SHEET NO. 15 OF 49 e CALCULATED BY M .T. DATE 7/14/03
MATERIAL HANDLING ENGINEERING
TEL: (909) 869-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA * CA 91 768
COLUMN ANALYSIS-DBL ANGLE
ANALYZED PER AIS1 & THE 1997 UBC. SECTION PROPERTIES BASED ON THE EFFECTIVE SECTION.
Ptotal= 370 LB
Mmax= 868 IN-LB
KXWIX = 1.2*36 INl0.812 IN
KyLy/v = 1.2*36 lNl0.6364 IN
= 53.2 . 1 -7/8"
= 67.9 <=== (Kl/r)max
Fe= nA2E/(KUr)maxA2
= 63.2 KSI
I Fy/2= 18.0 KSI 1 SINCE, Fe > Fy/2
THEN, Fn= Fy( 1 -Fy/4Fe)
= 36 KSI*[1-36 KS1/(4*63.2 KSI)]
= 30.9 KSI
Pn= Aeff*Fn
= 12,313 LB
fk= 1.92
SECTION PROPERTIES
t = 0.080 IN Pa= Pn/k
= 72313 LB/1.92
= 6,413 LB Aeff = 0.399 INA2
P/Pa- 0.06 < 0.15 IX = 0.263 INA4
SX = 0.1 40 INA3
ly = 0.1 62 INA4
Sy = 0.1 1 8 INA3
ry = 0.636 IN
LX = 36.0 IN
Ly = 36.0 IN
FLEXURE
CHECK P/Pa + Mx/Max I 1.33 rx = 0.81 2 IN
Pno= Ae*Fy
= 0.399 INA2 *36000 PSI
= 14,358 LB Kx= 1.20
Pao= Pno/nc
= 14358 LB/1.92 Ky= 1.20
= 7,478 LB
= 0.1 18 lNA3 * 36000 PSI
= 4,239 IN-LB
Myield=My= Sx*Fy Fy= 36 KSI
E= 29,500KSI
Max= My/nf Of= 1.67
= 4239 IN-LB/1.67 Cmx- 1.00
= 2,538 IN-LB Cb= 1.0
Pcr- nA2EI/(KL)maxA2
= 1~A2*29500000 PSI/( 1.2*36 IN)A2 px= I 1 /[ 1 -( nc*P/Pcr)] ]A-1
= 41,025 LB = {1/[1-(1.92*370 LB/41025 LB)])A-l
= 0.98
THUS, (370 LB/6413 LB) + (868 IN-LBI2538 IN-LB) = 0.39 < 1.33, OK
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND SElZMlC
SHEET NO. 16 OF 49 @ CALCULATED BY M.T. DATE 7/14/03 MATERIAL HANDLING ENGINEERING
EL: (909) 869-0989 FAX: (909) 868-0981
161 ATLANTIC AVENUE POMONA 9 CA 91768
COLUMN ANALYSIS-T POST
ANALYZED PER AIS1 & THE 1997 UBC. SECTION PROPEPTIES BASED ON THE EFFECTIVE SECTION.
Ptotal= 370 LB
Mmax= 868 IN-LB
Kxlx/r~ = 1.2*36 IN/0.6158 IN
= 70.2
I
1-1 /2" 14 GA. I KyLy/v = 1.2*36 IN/0.5391 IN
= 80.1 <=== (Kl/r)max
AXIAL
Fe= nA2E/( KL/r)maxA2
= 45.3 KSI
Fy/2= 18.0 KSI
SINCE, Fe > Fy/2
-I-
1-3/8" - I- I- 3"
THEN, Fn= Fy( 1 -Fy/4Fe)
= 36 KSI*[l-36 KS1/(4*45.3 KSI)]
= 28.9 KSI
= 7,868 LB
Pn= Aeff*Fn
nc= 1.92
Pa= Pn/nc
SECTION PROPERTIES
t = 0.075 IN = 7868 LB/1.92
= 4,098 LB Aeff = 0.273 INA2
P/Pa= 0.09 < 0.15 IX = 0.1 03 INA4
FLU(URE SX = 0.073 IN*3
ly = 0.079 INA4
Sy = 0.076 INA3
ry = 0.539 IN
Kx = 1.20
Lx = 36.0 IN
Ky= 1.20
Ly = 36.0 IN
CHECK: P/Pa + Mx/Max I 1.33 rx = 0.61 6 IN
Pno= Ae*Fy
= 0.273 INA2 "36000 PSI
= 9,816 LB
= 981 6 LBt'1.92
= 5,113 LB
= 0.073 INA3 * 36000 PSI
= 2,613 IN-LB
Pao= Pno/nc
Myield=My= Sx*Fy Fy= 36 KSI
E= 29,500 KSI
Max= My/fZf f2f= 1.67
= 261 3 IN-LB/1.67
Pcr= nAZEI/(KL)maxAZ
Cmx= 1.00
= 1,564 IN-LB Cb= 1.0
= nA2*29500000 PSI/(1.2*36 IN)"2 w= { 1 /[ 1 -(nc*P/Pcr)] ]A-1
= 16,133 LB = {1/[1-(1.92*370LB/16133 LB)]]A-l
= 0.96
THUS,
(370 LB/4098 LB) + (868 IN-LB/1564 IN-LB) = 0.63 < 1.33, OK
PROJECT BED BATH & BEYOND
BED BATH & BEYOND FOR
CALCULATED BY M.T. DATE 7/14/03
SHEET NO. 17 OF 49
MATERIAL HANDLING ENGINEERING
TEL: (909) 889-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91 768
CHECK CAPACITY OF DOUBLE RIVET BEAM CONNECTION
SINCE THE FRAME IS ASSUMED TO RESIST THE SEISMIC LOADS AS A MOMENT RESISTING FRAME, THE CAPACITY
OF THE RIVET BEAM CONNECTION SHALL BE DETERMINED.
Mconn= Mseismic + Mstatic
= 1,580 IN-LB
CAPACITY OF STUD IN SHEAR
Vallow= 0.4 * Fy * AREA * 1.33
= 1,440 LB
Vallow= 0.22* Fu * AREA * 1.33
= 1,440 LB
BEARING CAPACITY OF STUDS
brg.allow= stud 0 x tmin x Fu x 1.33
= 1,625 LB
Mallow= Vallow * d
= 2,160 IN-LB > Mconn OK
-t
4 1 1/2"
0= 0.250IN
tmin= 0.075 IN
AREA= 0.049 INK!
Fy= 55,000 PSI
Fu-METAL= 65,000 PSI
Fu-RIVETI 100,000 PSI
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND SElZMlC
SHEET NO. 18 OF 49 e CALCULATED BY M .T. DATE 7/14/03
MATERIAL HANDLING ENGINEERING
TEL: (909) 869-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA - CA 91 768
SHELF ANALYSIS
THE SHELF SHALL BE ANALYZED TO DETERMINE THE ADEQUACY OF THE COMPONENTS TO CARRY THE GIVEN STATIC
LOADS. ASSUME PARTlALL Y F/X€D SUPPORTED END CONDITIONS.
SHELF LOAD(DL+LL)= 180 LB/LVL
BEAM TYPE 1: DRC
Mmax = wLA2/12
= (1 80 LB * 0.5 * 96)/12
= 720IN-LB
fb= M/S
= 720 lN-LB/0.28121 INA3
= 2,560 PSI
Fb= 0.6*Fy
= 0.6 * 36000 PSI
= 21,600 PSI
fb/Fb-static= 0.1 2 < 1.0 BEAM TYPE 1 OK
Mmax(seismic+static) = 1,580 IN-LB
fb/Fb-seismic= [Mmax(seismic+static)/Sx] / Fb - - 0.26 < 1.33 BEAM TYPE 1 OK
BEAM TYPE 2: DRB
Mmax = wLA2/12
= (1 80 LB * 0.5 * 48)/12
= 360 IN-LB
fb= M/S
= 360 IN-LWO.12643 INA3
= 2,847 PSI
Fb= 0.6*Fy
= 0.6 * 36000 PSI
= 21,600 PSI
fb/Fb-static= 0.1 3 < 1.0 BEAM TYPE 1 OK
Mmax(seismic+static) = 1,580 IN-LB
fb/Fb-seismic= [Mmax(seismic+static)/Sx] / Fb
0.58 < 1.33 BEAM TYPE 1 OK - -
t 3'3"'1
.075" -
BEAM TYPE 1: DRC
SX= 0.28INA3
L= 96.0 IN d= 48.0 IN
Fy = 36,000 PSI
BEAM TYPE 2: DRB
SX- 0.13 INA3
L= 96.0 IN
d= 48.0 IN
Fy = 36,000 PSI
..
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
CALCULATED BY M.T. DATE 7/14/03
SHEET NO. 19 OF 49
MATERIAL HANDLING ENGINEERING
TEL: (909) 889-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91 768
OVERTURNING ANANLYSWSTATIC UNITS
Fn
FULLY LOADED:
Movt = 1 1,360 IN-LB
Mst = 5 LVLS x (175 LB + 10 LB) x 48 IN / 2
= 22,200 IN-LB
Puplift = (Movt x 1.1 5 - Mst) / d
= [13064 - 222001 IN-LB / 48 IN
= -190 LB
INTERACTION EQN.
[0 LB/ 465 LB]*(l) + [53 LB/ 830 LB]*(l) = 0.06 < 1 .O THEREFORE OK
d = 48.0 IN
ALLOWABLE TENSION = 465 LB
ALLOWABLE SHEAR = 830 LB
## OF ANCHORS/ B.P. = 1
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
CALCULATED BY M.T. DATE 7/14/03
SHEET NO. 20 OF 49
MATERIAL HANDLING ENGINEERING
EL: (909) 869-0969 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91768
= 2.66 x (2500 PSl)AO.5
= 133 PSI 7L b /'
SLAB AND SOlL PER THE 7997 UNIFORM BUILDING CODE.
........... ............ ....................... ........... -
B /A
THE SLAB IS CHECKED FOR PUNCTURE STRESS. IF NO PUNCTURE OCCURS THE SLAB IS ASSUMED TO
DISTRIBUTE THE LOAD OVER A LARGER AREA OF SOIL HENCE, ACTING AS A FOOTING. CONCRETE IS REINFORCED.
Apunct = [(Weff.+t/Z)+(Deff.+t/Z)] x 2 x t /' L I'
fv/Fv = P/[(Apunct)(Fpunct)]
= 920 LB/[1 1 1 INA2 x 133 PSI x 0.651 10.10 < 1.33 OK
lB) SLAB TENSION
Asoil = P/[ 1.33 x fs]
= 920 LB/[ 1.33 x 1 000 PSF/( 144lNA2/FTA2)]
= 99.6INA2
L = AsoilA0.5
= (99.64 INA2)AO.S
= 10.0 IN
= r3.75 IN x 2.375 INlA0.5 + 5
B = [(Weff.)(Deff.)]A0.5 + t
= 8.0 IN
b = (L-B)/2 <==(SECTION 1922.& (3))
= (9.98 IN - 7.98 IN)/2
= 1.0 IN
Mconc = (w)(bA2)/2 = [(1.33)(fs)(bA2)]/[144 (INA2/FTA2) x 21
= [ 1.33 x 1000 PSI x (1 IN)A2]/[144 (1NA2/FTA2) x 21
= 5 IN-LB
Sconc = 1 IN x (tA2)/6
= 1 IN x (5 IN)*2/6
= 4.1 7 INA3
Weff. = 3.8 IN
Deff. = 2.4 IN
CONCRETE
t = 5.0 IN
fc= 2,500PSI
SOlL
fs = 1,000 PSF
Fconc = 5 x 0 x f'cA0.5 (SECTION 1909.3.5) ==> 0- 0.65
= 5 x 0.65 x (2500 PSl)AO.5 DEPTH= 48.0 IN
PcoI- 370LB
- = 162.5 PSI Mot= 1 1,360 IN-LB
fb/Fb = Mconc/[(Sconc)(Fconc)]
= 4.61 IN-LB/[(4.17 IN"3)(162.5 PSI)] 111 <1. 3 OK
- MATERIAL HANDLING ENGINEERING
TEL: (909) 8694989 FAX: (909) 869-0981 161 ATLANTIC AVENUE POMONA CA 91768
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
CALCULATED BY M.T. DATE 7/14/03
SHEET NO. 21 OF 49
WIRE WELD LIGHT DUTY FIXTURES
.. - MATERIAL HANDLING ENGINEERING
PROJECT BED BATH 81 BEYOND
FOR BED BATH 81 BEYOND
CALCULATED BY M.T. DATE 7/14/03
SHEET NO. 22 OF 49
TEL: (909) 669-0989 FAX: (909) 869-0931
161 ATLANTIC AVENUE POMONA CA 91768
PRO IFC T SCOP E
THE PURPOSE OF THIS ANALYSIS IS TO SHOW THAT THE FOLLOWING LIGHT DUTY STORAGE RACK SYSTEM COMPLIES
WITH CHAPTER 22, DIVISION X OF THE 2001 CBC.
PARAMETERS
SHELVING UNITS & CATWALK SYSTEMS WILL BE ANALYZED AS AN ELEMENT UTILIZING THE FOLLOWING
FORMULA:
V= 2.5xCaxIxW/R <== SECTION 2228.5.2 dt1630.2.1
WHERE:
Ca = 0.44
I= 1.0
R = 4.4
R = 5.6 <== FOR MOMENT FRAMES
W= LL/n+DL
n= 1
1.4 <=== WORKING STRESS REDUCTION
<=== NOTE: Ca = 0.44 x Na, where Na = 1
<== FOR BRACED FRAME
SPECIFICATIONS
STEEL - Fy = 50000 PSI
BOLTS - ASTM A307/GRD. 2 BOLT OR SIMILAR UNLESS OTHERWISE NOTED
ANCHORS - 3/8"0 x 2-1 /2" MIN. EMBD. LDT CONCRETE SCREW ANCHOR ICBO 5890
SLAB - 5 IN x 2500 PSI
SOIL - 1,000 PSF
.. - MATERIAL HANDLING ENGINEERING
TEL: (909) 869-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91768
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
CALCULATED BY M .T. DATE 7/14/03
SHEET NO. 23 OF 49
MATERIAL HANDL~NG ENGINEERING
EL: (909) 869-0989 FAX: (909) 869-0981
161 ATIANTIC AVENUE POMONA CA 91768
OK
OVERTURNING
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
OK1 OK .It SLAB & SOIL
SHEET NO. 24 OF 49
CALCULATED BY M.T. DATE 7/14/03
SUMMARY & ELEVATION
ELEVATION: A and A3
I 1
48"
112" 1 --+ 7"
WEIGHT/ LVL - 64 LB
SEISMIC ZONE - 4
I COLUMN II BASE PLATE II LONG/TRANS X-BRACE I I
STRESS = 0.32
STRESS = 0.74
STRESS = 0.60
STRESS = 0.1 5
STRESS(L) = 0.98 I STRESSU) = 0.06
STRESS = 0.54
OK STRESS = 0.1 8
STRESS = 0.06
..
STRESS = 0.1 7 STRESS = 0.32 STRESS(L) = 0.35
STRESS = 0.60 STRESS = 0.1 2 STRESS(T) = 0.03
PROJECT BED BATH 81 BEYOND
FOR BED BATH & BEYOND
CALCULATED BY M.T. DATE 7/14/03
SHEET NO. 25 OF 49
MATERIAL HANDLING ENGINEERING
TEL: (909) 869-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91 768
I OK1 , OK1 OK OVERTURNING It1 SLAB & SOIL
SUMMARY & ELEVATION
ELEVATION: A1
I- 18.-l
-
1
WEIGHT/ LVL - 32 LB
SEISMIC ZONE - 4
I STRESS = 0.1 5
STRESS = 0.04 I STRESS = 0.94 I OKI
- MATERIAL HANDLING ENGINEERING
TEL: (909) 669-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91768
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
CALCULATED BY M .T. DATE 7/14/03
SHCET NO. 26 OF 49
SUMMARY & ELEVATION i
ELEVATION: A2
1
t- 48"
' COLUMN II BASE PL
I
WEIGHT/ LVL - 48 LB
SEISMIC ZONE - 4
rE II LONG/TRANS X-BRACE I
STRESS = 0.25 STRESS = 0.46 SfRESS(L) = 0.50
STRESS = 0.67 STRESS = 0.1 4 STRESS(T) = 0.03
OK OK OK r OVERTURNING I* SLAB & SOIL
STRESS = 0.73 STRESS = 0.1 6
OK STRESS = 0.05
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND SElZMlC
SHEET NO. 27 OF 49 @ CALCULATED BY M .T. MATERIAL HANDLING ENGINEERING
TEL: (909) 669-0989 FAX: (909) 669-0981
161 ATLANTIC AVENUE POMONA CA 91 768
LB
RACK’ANALYSIS WILL BE BASED ON CHAPTER 22, DIVISION X OF THE 1997 UBC, WHERE SEISMIC SHEAR IS DERIVED AS:
V= ZSxCaxIxW/R
1.4 <=== WORKING STRESS REDUCTION
I= 1
R = 4.4
n= 1 <== SINGLE ROW UNITS
Ca= 0.44
<== BRACED FRAMES
<== SHELF LEVELS
<== SHELF LIVE LOAD
<== SHELF DEAD LOAD
#of SHELF LVLS = 12
SHELF LL = 64 LB/LVL
DULEVEL = 5 LB/LVL
TOTAL LL = 704 LB
TOTAL DL = 60 LB
SEISMIC SHEAR
V = 2.5 x 0.44 x 1 x (704 LB / 1 + 60 LB) / 4.4 x 1.4
= 136LB
LEVEL I wx(DL + LL) I hx I wx hx
1 I 5 LB I 3.0 IN 15
2
3
4
5
6
7
8
9
10
11
12
13
69 LB
69 LB
69 LB
69 LB
69 LB
69 LB
69 LB
69 LB
69 LB
69 LB
69 LB
69 LB
15.0 IN
27.0 IN
39.0 IN
51 .O IN
63.0 IN
75.0 IN
87.0 IN
99.0 IN
1 1 1 .O IN
123.0 IN
135.0 IN
147.0 IN
1,035
1,863
2,691
3,519.
4,347
5,175
6,003
6,83 1
7,659
8,487
9,315
10,143
I I I 833 LB TOTAL= I 67,083
a) AD
Fi
0.0 LB
2.1 LB
3.8 LB
5.5 LB
7.2 LB
8.8 LB
10.5 LB
12.2 LB
13.9 LB
15.6 LB
17.3 LB
18.9 LB
20.6 LB
Movt
0 IN-LB
32 IN-LB
102 IN-LB
21 3 IN-LB
365 IN-LB
557 IN-LB
789 IN-LB
1,062 IN-LB
1,375 IN-LB
1,729 IN-LB
2,123 IN-LB
2,557 IN-LB
3,032 IN-LB I 136 LB I 13,938 IN-LB
COLUMN LOADS:
Pstatic = shelf-total/Z
= 417 LB
Pseismic = Movt / dshelf
= 547 LB
BRACE LOADS:
Brace Occurence-long = 1.5
Pbrace-long = Vtotal x Brace Occurence
= 205LB
Brace Occurence-trans = 1.5
Ptotal = Pseisnlic + Pstatic Pbrace-trans = Vtotal x Brace Occurence
= 963 LB = 205LB
- MATERIAL HANDLING ENGINEERING
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
CALCULATED BY M .T. DATE 7/14/03
SHEET NO. 28 OF 49
TEL: (909) 8694989 FAX: (909) 869-0981
161 ATIANTIC AVENUE POMONA CA 91 768
STATIC COLUMN ANALYSIS :
ANALYZED PER AIS1 & THE 1997 UBC. SECTION PROPERTIES BASED ON THE EFFECTIVE SECTION.
I Pcol= 41 7 LB I<=== Pstatic
KX~/IX = 1 *12 lN/0.39831 IN
KyLy/w = 1 *I 2 IN/0.09535 IN
= 30.1
125.9
(KVr)max = 125.9
ro= (rxW + ryA2 + xoA2)AO.S
= 0.449 IN
E= 1 -(xo/ro)A2 (EQ. C4.2-3)
0.833
Fe IS TAKEN AS THE SMALLER OF Fel AND Fe2:
SECTION PROPERTIES
Fel= rrfQE/(KL/r)maxA2
= 18.4 KSI
(EQ C4.1-1)
ex= n*ZE/(KxLx/rx)A2 (EQ C3.1.2-7)
= 320.8 KSI
= 11 2.48 KSI
= 104.1 KSI
at= 1 /AroA2[GJ+(nA2ECw)/(KtLt)h2] (EQ C3.1.2-9)
Fe2= (1 /2R)*{(uex+at)-[(~ex+t~t)~2-(4*R*~ex*t~t) JA0.5 1
Fe= 18.4 KSI
Fy/2= 25.0 KSI
SINCE, Fe .c Fy/2
THEN, Fn= Fe
= 18.4 KSI
Pn- Aeff*Fn
= 2,494LB
ll~= 1.92
Pa= Pn/nc
= 1,299 LB
(EQ. C4-4)
(EQ C4-2)
(EQ C4- 1 )
t = 0.060 IN
Aeff = 0.1 36 INA2 IX = 0.022 INA4
SX = 0.033 INA3 rx = 0.398 IN
ly = 0.001 INA4
Sy = 0.005 INA3
ry = 0.095 IN
X = 0.000 IN
J = 0.0002 INA4
CW = 0.0006 IN*6
j = 1.926 IN
xo = 0.1 83 IN
Kx= 1.0
Lx = 12.0 IN
Ky = 1.00 Ly = 12.0 IN
Kt = 1 .O
Lt = 12.0 IN
Fy= 50 KSI
(EQ C4.1-1)
m = 0.910 IN
Pcol/Pa= 0.32 < 1.0, OK G= 11,300
E= 29,500 KSI
PROJECT BED BATH & BEYOND
SElZMlC FOR BED BATH & BEYOND
SHEET NO. 29 OF 49
MATERIAL a HANDLING ENGINEERING CALCULATED BY M.T. DATE 7/14/03
TEL: (909) 869-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE = POMONA CA 91768
SEISMIC COLUMN ANALYSIS :
ANALYZED PER AIS1 81 THE 1997 UBC. SECTION PROPERTIES BASED ON THE EFFECTIVE SECTION.
I Pcol= 963 LB I<=== Pstatic + Pseismic
KxWm = 1 *12 lN/0.39831 IN
KyLy/v = 1 *12 lNl0.09535 IN
= 30.1
= 125.9
(KVr)max = 125.9
ro= (rxA2 + ryA2 + xoA2)AO.S
= 0.449 IN I 1 f----- 1 5/8" -4
R= 1 -(xo/ro)A2 (EQ. C4.2-3)
0.833
Fe IS TAKEN AS THE SMALLER OF Fel AND Fe2:
SECTION PROPERTIES Fel = wVE/(KL/r)rnaxAZ
= 18.4 KSI
(EQ C4.1-1)
.ex= ~rA2E/(KxLx/rx)A2 (EQC3.1.2-7)
= 320.8 KSI
= 11 2.48 KSI
= 104.1 KSI
st= 1 /AroA2[GJ+(+ZECw)/(KtLt)h2] (EQ C3.1.2-9)
Fez= ( 1 /2R)*{ (ex+&)-[ (uex+d) * 2-( 4*R*uex*~t)]~0.5}
Fe= 18.4 KSI
Fy/2= 25.0 KSI
SINCE, Fe < Fy/2
THEN, Fn= Fe
= 18.4 KSI
Pn= Aeff*Fn
= 2,494 LB
fk= 1.92
Pa= Pn/nc
= 1,299 LB
Pcol/Pa= 0.74 < 1.33, OK
(EQ. C4-4)
(EQ C4-2)
(EQ C4-1)
t = 0.060 IN
Aeff = 0.1 36 INA2
IX = 0.022 INA4
SX = 0.033 INA3
O( = 0.398 IN
ly = 0.001 lNA4
ry = 0.095 IN
X = 0.000 IN
m = 0.910 IN
J = 0.0002 INA4
CW = 0.0006 IN*6
j = 1.926 IN
XO = 0.1 83 IN
Kx= 1.0
Lx = 12.0 IN
Ky = 1 .OO Ly = 12.0 IN
Kt= 1.0
Lt = 12.0 IN
Fy- 50 KSI
(EQ C4.1-1)
Sy OiO05 lN"3
G= 11,300
E= 29,500 KSI
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
CALCULATED BY M.T. DATE 71.1 4/03
SHEET NO. 30 OF 49
MATERIAL HANDLING ENGINEERING
TEL: (909) 869-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA 9 CA 91 768
LONGITUDINAL CROSS BRACE ANALYSIS
BRACING CAPACITY IS GOVERNED BY TENSION CAPACITY OF CROSS BRACING.
Veff = Pbrace
= 205 LB
Vdiag = Veff * (Ldiag/Lhoriz)
= 205 LB * 122 IN / 48 IN
= 520 LB <=== SEISMIC LOAD IN TENSION
TENSION CAPACITY 0 F CABLE
Tallow = 0.6 * Fy * AREA(gross)
= 0.6 * 50000 PSI * 0.01 77 INA2
= 530 LB
Vdiagflallow = 0.98 < 1.33, OK
,-- DIAM.
Lv
CROSS BRACE MEMBER
CABLE 0 = 0.1 50 IN
H= 120.0 IN
AREA(gross)= 0.01 8 INA2
Lhoriz=D= 48.00 IN
Lvert=h= 11 2.0 IN
Ldiag= 121.9 IN
Fy= 50,000 PSI
Fu= 65,000 PSI
I.
MATERIAL HANDL~NG ENGINEERING
TEL: (909) 869-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91 768
PROJECT BED BATH 81 BEYOND
FOR BED BATH & BEYOND
CALCULATED BY M .T. DATE 7/14/03
SHEET NO. 31 OF 49
TRANSVERSE CROSS BRACE ANALYSIS
BRACING CAPACITY IS GOVERNED BY TENSION CAPACITY OF CROSS BRACING.
Veff= Pbrace
= 205 LB
Vdiag = Veff * (Ldiag/Lhoriz)
= 205LB*38IN/24IN
= 328 LB <=== SEISMIC LOAD IN TENSION
TENSION CAPACITY OF CABLE
Tallow = 0.6 * Fy * AREA(gross)
= 0.6 * 55000 PSI * 0.1 963 IN*2
= 5,890 LB
Vdiagflallow = 0.06 -c 1.33, OK
r-- DIAM.
cal
M
CROSS BRACE MEMBER
CABLE 0 = 0.500 IN H= 120.0 IN
AREA(gross)= 0.1 96 IN*2
Lhoriz=D= 24.00 IN
Lvert=h= 30.00 IN
Ldiag= 38.42 IN
Fy= 50,000 PSI
Fu= 65,000 PSI
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND SElZMlC
SHEET NO. 32 OF 49 @ CALCULATED BY M .T. DATE 7/14/03
MATERIAL HANDLING ENGINEERING
TEL: (909) 869-0989 FAX: (909) 869-0981
-
EL 4
EL 3
EL 2
EL 1
Fl 0"
161 ATIANTIC AVENUE POMbNA CA 91 768
OVERTURNING ANANLYSIS
-
-
-
-
-
FULLY LOADED:
Movt = 13,938 IN-LB
Mst = 10,621 IN-LB
Puplift = (Movt x 1.15
= [13938~ 1.15-10621]IN-LB/25.5lN
= 212LB
Mst) / d
INTERACTION EQN.
[212 LB/ 465 LB]*(l) + [68 LB/ 830 LB]*(l) =
I
I
I
I
d = 25.5 IN
t- d-i
0.54 < 1 .O THEREFORE OK
ALLOWABLE TENSION = 465 LB ALLOWABLE SHEAR = 830 LB
# OF ANCHORS/ B.P. = 1
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND SElZMlC
SHEET NO. 33 OF 49 e CALCULATED BY M .T. DATE 7/14/03 MATERIAL HANDLING ENGINEERING
fa
TEL: (909) 869-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91 768
CONGlTUDlNAL BASE PLATE
..... ...... ..... ...... ..... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... .....
P = Pcol+M/d
= 417LB
fa = P/A
= Pcol/[( Deff.)(Beff.)]
= 95 PSI
MI base/in = (W/in)(LA2)/2
= (fa)(bl A2)/2
= 42 IN-LB
Sbase/in = (l)(t*2)/6
= 0.003 IN*3
Fbase = (0.75)(Fy)
= 27,000 PSI
fb/Fb = Mbase/in/((Sbase/in)(Fbase))
- - 0.60 < 1.0 OK
h A A A h )"''''~
/
PROPERTIES:
Beff. = 3.50 IN
Deff. = 1.25 IN
b= 1.63 IN
bl = 0.94IN
t = 0.125 IN
Fy = 36,000 PSI
PROJECT BED BATH & BEYOND
BED BATH & BEYOND FOR
CALCULATED BY M .T. DATE 7/14/03
SHEET NO. 34 OF 49
MATERIAL HANDLING ENGINEERING
TEL: (909) 669-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91 768
TRANSVERSEBASE PLATE
P = Pcol+M/d
= 963 LB
fa= P/A
= Pcol/[(Deff .)(Beff.)]
= 220 PSI
M1 base/in = (W/in)(LAZ)bZ
= (fa)(bl
= 11 IN-LB
Sbase/in = (l)(tA2)/6
= 0.003 1NA3
Fbase = (0.75)(Fy)
= 27,000 PSI
fb/Fb = Mbase/in/( (Sbase/in)( Fbare))
- - 0.1 5 -e 1.0 OK
I I
I ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... .....
AAAAA.
fa
PROPERTIES
Beff. = 1.25 IN
Deff. = 3.50 IN b = 0.63 IN
bl = 0.31 IN
t = 0.1 25 IN
Fy = 36,000 PSI
PROJECT BED BATH & BEYOND
FOR BED BATH 81 BEYOND
CALCULATED BY M.T. DATE 7/14/03
SHEET NO. 35 OF 49
MATERIAL HANDLING ENGINEERING
TEL: (909) 869-0989 FAX: (909) 869-0981
161 ATLANTIC AVENUE POMONA CA 91768
SLAB AND SOIL PER THE 7 997 UNIFORM BUILDING CODE.
THE SLAB IS CHECKED FOR PUNCTURE STRESS. IF NO PUNCTURE OCCURS THE SLAB IS ASSUMED TO
DISTRIBUTE THE LOAD OVER A LARGER AREA OF SOIL HENCE, ACTING AS A FOOTING. CONCRETE IS REINFORCED.
fA) PUNCTURF
P = 1.4 x Pco + 1.7 x Moddepth
1.4 x 41 6.5 LB + 1.7 x 13938 IN-LB / 25.5 IN
= 1,512 LB
Fpunct = 2.66 x (F'cA0.5)
= 2.66 x (2500 PS1)AO.S
= 133 PSI
<==(SECTION 1922.5.4)
Apunct = [(Weff.+t/2)+(Deff.+t/2)] x 2 x t / L 7'
= [(3.5 IN + 5 IN/2) + (1.25 IN + 5 IN/2)] x 2 x 5 IN
= 98 INA2
fv/Fv = P/[(Apunct)(Fpunct)]
= 151 2 LB/r98 INA2 x 133 PSI x 0.651 10.1 8 < 1.33 OK I 1 I
/B) SLAB TENSION
Asoil = P/[1.33 x fs] = 1 51 2 LB/[ 1.33 x 1000 PSF/( 1441NA2/FTA2)]
= 163.7 INA2
= (1 63.74 INA2)AO.S
= 12.8 IN
= C3.5 IN x 1.25 INlA0.5 + 5
= 7.1 IN
b = (L-B)/2
= 2.9 IN
L = AsoiPO.5
B = [(Weff.)(Deff.)]A0.5 + t
<==(SECTION 1922.7.5 (3))
= (1 2.8 IN - 7.09 IN)/2
Mconc = (w)(bA2)/2 = [(1.33)(fs)(bh2)]/[144 (INA2/FTA2) x 21
= [1.33 x 1000 PSI x (2.85 IN)A2]/[144 (INA2/FTA2) x 21
= 38 IN-LB
Sconc= 1 INx(tA2)/6
= 1 IN x (5 IN)*Z/6
= 4.1 7 INA3
Fconc = 5 x 0 x f'cAO.5
= 5 x 0.65 x (2500 PS1)AO.S
= 162.5 PSI
(SECTION 1909.3.5) ==>
$-
Weff. = 3.5 IN
Deff. = 1.3 IN
CONCRETE
t = 5.0 IN
f'c = 2,500 PSI
sa!=
fs = 1,000 PSF
0- 0.65
DE!TH= 25.5 IN
Mot= 13,938 IN-LB
Pco~= 41 7 4B ,
fb/Fb = Mconc/[(Sconc)(Fconc)]
= 37.57 IN-LB/[(4.17 INA3)( 1 62.5 PSI)] 0.06 c 1.33 OK I
w MATERIAL HANDLING ENGINEERING
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
SHEET NO. 36 OF 49
CALCULATED BY M.T. DATE 7/14/03
TEL: (909) 869-0989 * FAX: (909) 869-0981
NSF STORAGE RACKS
..
MATERIAL HANDLING ENGINEERING TEL: (909)869-0989 FAX: (909)869-0981 161 ATLANTIC STREET POMONA CA 91768
P R 0 JECT BED BATH & BEYOND
ena BED BATH & BEYOND
SHEET NO. 39 OF&
CALCULATED BY M.T. DATF 07/14/03
PARAIIIIETERS:
STORAGE RACKS CONSIST OF SEVERAL BAYS, INTERCONNECTED IN ONE OR BOTH
DIRECTIONS WITH THE COLUMNS OF THE VERTICAL FRAMES BEING COMMON BETWEEN
ANY ADJACENT BAYS.
THE ANALYSIS WILL FOCUS ON A TRIBUTARY BAY TO BE ANALYZED IN BOTH
STABILITY LONGITUDINALLY IS DEPENDANT ON BEAM TO COLUMN MOMENT,
LONGITUDINAL AND TRANSVERSE DIRECTION.
WHILE THE BRACING ACT TRANSVERSELY.
1. COLUMN.
2. BEAM.
3. BEAM TO COLUMN.
4. BASE PLATE.
5. HORIZONTAL BRACING.
6. DIAGONAL BRACING.
7. BACK CONNECTOR.
TRIBUTARY AREA
....................... TRANSVERSE ....
LONG ITU DlNAL -
TOP VIEW
a SElZMlC
MATERIAL HANDLING ENGINEERING TEL: (909)869-0989 FAX: (909)869-0981
161 ATLANTIC STREET POMONA CA 91768
PROJECT BED BATH & BEYOND
cns BED BATH & BEYOND
SHEET NO. 250 0 FA
CALCULATED BY M .T. DATE 0711 4/03
CONFIGURATIONS
TYPE H
TYPE K
*.
#- 96" -$ & 48"-
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
SHEET NO. m OFL
'
MATERIAL HANDLING ENGINEERING CALCULATED BY M .T. DATE 07/14/03 TEL: (909)869-0989 FAX: (909)869-0981
300 Ib.
300 Ib.
300 Ib.
300 Ib.
300 Ib.
300 Ib.
~.
7
6
5
4
2
3
900 Ib.
1
I I
161 ATLANTIC STREET POMONA CA 91768
98#+ r
;; 1 ib F 57#
-bg# L
TYPE H
SPECIFICATION
- MAIN STEEL 55000 PSI
- BASE PLATE STEEL 36000 PSI
- ANCHOR - WEDGE TYPE
- FLOOR SLAB 5" X 2500 PSI. REINFORCED 144"
318 x 2-112 MIN.
16"
f - SOIL BEARING PRESSURE
- SEISMIC ZONE 4.
-TYPE = SINGLE ROW UNITS.
1000 PSF
9'
OVERTURNING d ANCHORSTRESS=0.18
# OF ANCHORS = 2
BRACING SLAB & SOIL
HORIZONTAL 4 DIAGONAL d
1 112 X 1-114 X 14 GA 1 112 X 1-1/4 X 14 GA PUNCT. STRESS=0.30
STRESS = 0.2 0 BENDING STRESS =0.19 STRESS = 0.1 0
141#
124#
107#
89#
73#
58#
7 - - -
-+
12# b
1 1,700 Ib.
2 1,200 Ib.
3 1,000 Ib.
4 800 Ib. 5 600 Ib.
6 400 Ib.
7 200 Ib.
716 in.lb.
6,310 in.lb.
1,687 in.lb.
1,455 in.lb.
1,321 in.lb.
942 in.lb.
473 in.lb.
4,413 in.lb. <-std.conn.
4,298 in.lb. c-std.conn.
1,871 in.lb. c-std.conn.
1,688 in.lb. <-std.conn.
1,432 in.lb. c-std.conn.
1,007 in.lb. <-std.conn.
536 in.lb. <-std.conn.
TYPE H DESIGN LOAD = VARIES
BASE PLATE I COLUMN I BEAM
~~ ~
3x1 -5/8X13GA. d COLUMN STRESS =0.43 3-3/16 x 2-1/2 x 14 ga.
MAXLOAD/LEVEL= 3,515 Ib.
BEAM IS O.K.
7 x 5 x .375
BASE PINNED
PROJECT BED BATH & BEYOND
BED BATH & BEYOND SElZMlC
FOR
SHEET NO. @ OF 44
CALCULATED BY M.T. DATE 07/14/03 a MATERIAL HANDLING ENGINEERING TEL: (909)869-0989 FAX: (909)869-0981
BASE PLATE
7 x 5 x .375
BASE PINNED
4
161 ATLANTIC STREET POMONA CA 91768
COLUMN BEAM
COLUMN STRESS =0.26 3-3/16 x 2-1/2 x 14 ga. .I 3x1 -518x1 3GA. 4
MAX LOAD/LEVEL= 7,695 Ib.
BEAM IS O.K.
TYPE K
OVERTURNING
.I ANCHOR STRESS =OS
# OF ANCHORS = 2
1 8"
16"
f
SPECIFICATION
- MAIN STEEL 55000 PSI
- BASE PLATE STEEL 36000 PSI
- ANCHOR - WEDGE TYPE
- FLOOR SLAB 5" X 2500 PSI. REINFORCED 144"
318 x 2-1/2 MIN. EM
- SOIL BEARING PRESSURE
- SEISMIC ZONE 4.
- TYPE = SINGLE ROW UNITS.
1000 PSF
BRACING SLAB & SOIL
HORIZONTAL 4 DIAGONAL 4 .i
1 1/2 X 1 -1/4 X 14 GA 1 112 X 1-1/4 X 14 GA PUNCT. STRESS = 0.27
STRESS= 0.05 STRESS = 0.1 1 BENDING STRESS =0.16
200 Ib. 67#
200 Ib.
200 Ib.
200 Ib.
200 Ib.
200 Ib.
59k r 7
6
5
4
2
3
35#
'~ !I
i7# I- 42 "
85#
75#
64#
54#
44#
35#
- -
L - -
--+
6# #
48" 4 4 24"$/
IU = 48" SECTION AXIAL FORCE MOMENT BEAM MOMENT
1,025 Ib.
750 Ib.
625 Ib.
500 Ib.
375 Ib.
250 Ib.
125 Ib.
431 in.lb.
3,814 in.lb.
1,020 in.lb.
880 in.lb.
798 in.lb.
569 in.lb.
286 in.lb.
2,373 in.lb. e-std.conn.
2,517 in.lb. e-std.conn.
1,050 in.lb. c-std.conn.
939 in.lb. c-std.conn.
784 in.lb. e-std.conn.
528 in.lb. e-std.conn.
243 in.lb. c-std.conn.
I TYPE K DESIGN LOAD = VARIES
MATERIAL HANDLING ENGINEERING TEL: (909)869-0989 FAX: (909)869-0981
PROJECT BED BATH & BEYOND
FOR BED BATH & BEYOND
CALCULATED BY M.T. DATE 0711 4/03 SHEET NO. 4.1 OF&
161 ATLANTIC STREET POMONA CA 91768
LOrADS & DISTRIBUTION :TYPE K
VARES
50 Ib
-- LIVE LOAD PER SHELF = WII =
_I
I (BASED OM ClIEPlT SUPPLIED DATA)
DEAD LOAD PER SHELF = Wdl =
TOTAL LOAD PER FRAME = 2,050 Ib
SEISMIC SHEAR BASED ON SECTION 1630.2.1 OF THE 1997 UBC
WHERE
V = ((2.5 x Ca x I) / R) x Wtotal
Wtotal = (WII + Wdl) x n
n = # of shelves
Seismic Zone = 4 I= 1
Ca = 0.44 Soil Coef. = Sd
R(iong) = 5.6
R(trans) = 4.4
200 Ib. 67#
59# 200 Ib.
200 Ib. 50#
200 Ib. 42#
200 Ib. 35#
200 Ib. 27#
5 7
6
5
4
3
2
LONGITUDIAL DIRECTION
Vlong = (2.5 x 0.44 x
= 288Ib
Fi= VWhi/XWh
TRANSVERSE DIRECTION
Vtrans = (2.5 x 0.44 x
= 366Ib
Fi= VWhi/XWh
1)/(5-6) x W) / 1.4
w/ working
1)/(4.4) x w / 1.4
w/ working
I ..
Na =, 1.0 1- 48" -4
IU = 48"
stress
stress
-
reduction
reduction
4 24"-
85# 4
75# L
64#
54#
44#
35#
L
--..,
L
*
6#
-
MATERIAL HANDLING ENGINEERING TEL: (909)869-0989 FAX: (909)869-0981
161 ATLANTIC STREET POMONA CA 91 768
PR 0 J ECT BED BATH & BEYOND
EnD BED BATH & BEYOND
SHEET NO. 44 OFA
CALCULATED BY 07/14/03 DATE M.T.
LONGITUDINAL ANALYSIS :TYPE K
THE ANALYSIS IS BASED ON THE PORTAL METHOD, WITH THE POINT OF CONTRA FLEXURE OF THE
THE BASE PLATE PROVIDES ONLY PARTIAL FIXITY, THE CONTRA FLEXURE IS ASSUMED TO OCCUR
CLOSER TO THE BASE.(OR ATTHE BASE FOR PINNED CONDITION, WHERE THE BASE PLATE CANNOT
CARRY MOMENT).
COLUMNS ASSUMED AT MID-HEIGHT BETWEEN BEAMS, EXCEPT FOR THE LOWEST PORTION, WHERE
Vlong = 2 * Vcol = 288 Ib.
VCOI = 144 Ib.
F 1 = 3 Ib. F 6 = 30 Ib.
F2 = 14 Ib. F 7 = 34 Ib.
F3 = 18 Ib.
F4 = 21 Ib.
F 5 = 25 Ib. 5 In.
BASE ASSUMED PINNED.
Mbase = 0 in.lb.
Mupper + Mlower = Mconn'R' + Mconn'L'
Mconn'R' = Mconn'L'
Mconn * 2 = Mupper + Mlower
Mconn = [Mupper + Mlower]/2
RESULTING FORCES ON COLUMN
SECTION AXIAL LOAD MOMENT Mconn
1025
750
625
500
375
250
125
431
381 3
1019
879
798
569
285
2372
251 6
1049
939
783
527
Mupper
Mconn "L"
Mconn "R'
Mbase +ski- //// // 101 11 // 1
'.
MATERIAL HANDLING ENGINEERING TEL: (909)869-0989 FAX: (909)869-0981 161 ATLANTIC STREET POMONA CA 91768
PROJECT BED BATH & BEYOND
BED BATH & BEYOND
SHEET NO.
CALCULATED BY M.T. DATE 07/14/03
COLUMN IS ANALYZED PER AIS1 COLD-FORMED STEEL DESIGN MANUAL.
Pmax = 750 Ib. Mmax = 3,814 in.lb.
Kxlx/rx = 1.2 * 54 / 1.24 = 52.3
Kyly/ry = .8 * 42 / .624 = 53.8 <-GOVERNS
= 102.0
CC = (2~*2E/Fy)".5
SINCE Kl/r <= Cc,
Fa = .522Fy - [(kl/r*Fy)/14941A2
= 24,781 psi.
fa = Pmax/Area
= 1,374 psi.
fb = MmaxlSx
= 6,822 psi.
fa/Fa+fb/Fb <= 1.33
fa/Fa = 0.06 <=.15
Fb = .6*Fy = 33,000 psi.
fb/Fb = 0.21
COMBINED STRESS = 0.26
t-*I
SECTION PROPERTIES
A = 3" c = .75"
E = 0" Wt. = O#
B = 1.625"
D = 0"
tl = .0897" t2 = 0"
IX = .839"^4 ly = .213"^4
SX = .559""3 Sy = .247"^3
Area = .546"*2
rx = 1.24"^2 ry = .624""2 El Vi
42"
Side View
PROJECT BED BATH & BEYOND
BED BATH & BEYOND
SHEET NO. OF I
SElZMlC
FOR
M .T. DATE 0711 4103 CALCULATED BY a MATERIAL HANDLING ENGINEERING TEL: (909)869-0989 FAX: (909)869-0981
161 ATLANTIC STREET POMONA CA 91768
BEAM ANALYSIS :TYPE K
BEAM TO COLUMN CONNECTIONS PROVIDE ADEQUATE MOMENT CAPACITY TO STABUZE THE SYSTEM,
ALTHOUGH IT DOES NOT PROVIDE 100% FIXITY. THUS, THE BEAMS WILL BE ANALYSED ASSUMING
THEY HAVE PINNED ENDS. FOR THE COMPUTATION OF BEAM TO COL. MOMENT CAPACITY, THE
PARTIAL FIXITY OF THE BEAM,(ASSUMED AT AN ARBITRARY 25% OF THE FIXED END MOMENT OR
2,000 in.lb. WHICH EVER IS SMALLER) WILL BE ADDED.
lact = 48.0 in.
lmax = [1950 + 1200(Ml/M2)]b/Fy
lmax = 3150*b/Fy = 143 in.
SINCE lmax > lact Fb = .60Fy = 33,000 psi.
MAXIMUM STATIC LOAD PER LEVEL DEPENDS ON
SINCE M11M2 = 1.0
t = .0747 in. 1) BENDING CAPACITY
M = SX* Fb = wIA2/8
= 25971 in.lb.
CAPACITY = 2(8*M/I) = 76951b. Sx = 0.787 in."3
Ix = 1.287 in.^4 2) MAXIMUM ALLOWABLE DEFLECTION (U180).
A = 5wIA4/384EI
CAPACITY = 2[(384E1)/(5*1 80*lA2)] = 14061 Ib.
MAXIMUM STATIC LOAD PER LEVEL IS 7,695 Ib.
ALLOWABLE AND ACTUAL BENDING MOMENT AT EACH LEVEL.
LEVEL
1
2
3
4
5
6
7
Mstatic = w1"2/8 = LIVE.LOAD*L/(2*8) Mallow(static) = Sx * Fb
Mimpact = 1.1 25"Mstatic Mallow(seismic) = 1.33 * Sx * Fb Mseismic = Mconn (SEE LONG. ANALYSIS)
Mstatic Mimpact Mallow Mseismic Mallow RESULT
1499 1687 25971 2372 34627 GCCD
1499 1687 25971 2516 34627 an3
1499 1687 25971 1049 34627 GxD
1499 1687 25971 939 34627 Gcxx)
1499 1687 25971 783 34627 GxD
1499 1687 25971 527 34627 am
1499 1687 25971 242 34627 accD
1.125 Mstatic (static) (seismic)
'.
MATERIAL HANDLING ENGINEERING TEL: (909)869-0989 FAX: (909)869-0981
161 ATLANTIC STREET POMONA CA 91768
PROJECT BED BATH & BEYOND
EnQ BED BATH & BEYOND
SHEET NO. E OF 4s
CALCULATED BY M .T. DATE 0711 4/03
BEAM TO COLUMN CONNECTION
Mconn= ( Mlower + Mupper )/2 + Mend
Mupper
Mconn. r-l Mconn.
CAPACITY OF CONNECTOR
a) SHEAR CAPACITY OF 7/16" DIA. STUD
Area = .4375^2x/4 = .150 "^2
Pmax = 3,000#
Fy = 50,000 psi
b) BEARING ON COLUMN
(PER UBC SEC. 27-11 E3.3)
Abrg. = t * D
= .5 * t Fu = 65,000 psi min.
t = .0747 min.
Pmax brg. = Area * Fbearing
= .5t * 2.22 * FU
=5,390# > 3,000#
c) MOMENT CAPACITY OF BRACKET
S bracket = .1 lO""3
Mcap = S * Fbending
= .I 10 * .66 * Fy
C = Mcap/.75 = 1.67 PI
P1 = .798 Mcap
= .0872 Fy = 4,360# > 3,000#
SINCE PLUG GOVERNS PI =3,000#
Mconn. cap.= P1 * 4.5 + P2 * 2.5 + P3 * .5
= 5.94 * 3,000# *1.33
= 23,778 "#
a Mlower
BEAM TO COLUMN
CONNECTION
1 " 4w-T
112" C
c = P1 + P2 + P3
= P1 + (2.514.5)Pl + (.5/4.5)Pl
= 1.67 P1
Sbracket = .I 10"^3
MATERIAL HANDLING ENGINEERING TEL: (909)869-0989 FAX: (909)869-0981
PROJECT BED BATH & BEYOND
cnm BED BATH & BEYOND I un
SHEET NO. 4b OF
CALCULATED BY M.T. DATE 0 7 / 1'4 I 0 3
161 ATLANTIC STREET POMONA CA 91768
TRANSVERSE ANALYSIS : BRACING :TYPE K
IT IS ASSUMED THAT THE LOWER PANEL RESISTS THE FRAME SHEAR IN TENSION AND
COMPRESSION. IF HORIZONTAL AND DIAGONAL MEMBERS ARE THE SAME, ANALYSIS WILL BE DONE
ON THE DIAGONAL MEMBER AS IT WILL GOVERN.
DIAGONAL BRACING : COMPRESSION MEMBER
L diag. = C(L-6)A2+(D-2*Bco1)"2]A.5
= 40.2
Vdiag =Vtrans * Ldiag. / D
kl/rmin = 1 1 * 40.2 1 / 505
= 613#
= 79.70
Fa =.522Fy-[kl/r*Fy/1494lA2
= 20100 psi.
fa/Fa =Vdiag/(Area*Fa)
= 0.11
L= 42"
L 1
DIAGONAL AND HORIZONTAL BRACING
Area= .288 "A2
w= 1.5 " H= 1.25 "
-f rmin= .505 " t= .0747 '
PROJECT BED BATH & BEYOND
BED BATH & BEYOND
SHEET NO. 4/1 OF
07/14/03 CALCULATED BY M'.T. DATE MATERIAL HANDLING ENGINEERING TEL: (909)869-0989 FAX: (909)869-0981 -~
161 ATLANTIC STREET POMONA CA 91768
OVERTURNING :TYPE K
ANALYSIS OF OVERTURNING WILL BE BASED ON SECTION 2228.7.1 OF THE 1997 Uniform Building
code.
FULLY LOADED
TOTALSHEAR = 366 Ib.
Mot = Vtrans * ht * 1.15
= 366 * 107 * 1.15
= 45233 in.lb.
Mst = Z(Wp+.85wDL) * d12
= ( 1700+.85 * 350) * 2412
= 23970 in.lb.
Puplift = 1 (Mot - Mst)/d
= 885 Ib. <-CRITICAL
TOP SHELF LOADED
SHEAR = 44 Ib.
Mot = Vtop * h * 1.15
= 44 * 144 * 1.15
= 7392 in.lb.
Mst = (Wp+wDL) * d/2
= ( 200+.85 * 350) * 24/2
= 5970 in.lb.
Puplift = 1 (Mot - Mst)/d
= 59 Ib.
USE 2 ea. 3/8 x 2-1/2 MIN. EMBED. MIN. EMBED. ANCHOR.
CAPACITY OF 318 x 2-1/2 MIN. EMBED. = 930 Ib. PULLOUT & 830 Ib. SHEAR
COMBINED STRESS1 = 885 / 1860 + 183 / 1660 = 0.59
COMBINED STRESS2 = 59 / 1860 + 22 / 1660 = 0.05
MATERIAL HANDLING ENGINEERING TEL: (909)869-0989 FAX: (909)869-0981
161 ATLANTIC STREET POMONA CA 91768
PROJECT BED BATH & BEYOND
enm BED BATH & BEYOND
SHEET NO.
CALCULATED BY
BASE PLATE :TYPE K
BASE PLATE WILL BE ANALYZED WITH THE RECTANGULAR STRESS RESULTING FROM THE VERTICAL
LOAD P, COMBINED WITH THE TRIANGULAR STRESSES RESULTING FROM THE MOMENT Mb (IF ANY).
THERE ARE 3 CRITERIA IN DETERMINING Mb. THEY ARE 1) MOMENT CAPACITY OF THE BASE PLATE,
2) MOMENT CAPACITY OF THE ANCHOR BOLTS, AND 3) Vh/2 (FULL FIXITY). Mb IS THE SMALLEST
VALUE OBTAINED FROM THE 3 CRITERIA ABOVE.
PCOI = 2909 Ib. B = 7 in. D = 5 in. t = .375 in.
b = 3 in. bl = 2 in.
PIA = Pcol/(D*B) = 83.13 psi.
Mbase = w1"2/2 = 1"2/2(fa)
Mbase = 166.3 in.lb.
Sbase = l*t^2/6 = 0.023 in."3
Fbase = .75Fy * 1.33 = 36000 psi.
fbIFb = MbaseI(Sbase*Fbase) = 0.1 97
fa
** c
PROJECT BED BATH & BEYOND
BED BATH & BEYOND SEiZMlC
FOR
SHEET NO. 4a\ OF
CALCULATED BY & DATE M.T. a MATERIAL HANDLING ENGINEERING TEL: (909)869-0989 FAX: (909)869-0981
161 ATLANTIC STREET POMONA CA 91768
SLAB AND SOIL :TYPE K
THE SLAB WILL BE CHECKED FOR PUNCTURE STRESS. IF NO PUNCTURE OCCURS, IT WILL BE
ASSUMED TO DISTRIBUTE THE LOAD OVER A LARGER AREA OF SOIL AND WILL ACT AS A FOOTING.
(a) PUNCTURE
Pmax = 1.4 DEAD LOAD + 1.7 LIVE LOAD
Pmax = 1.4 * Pcol + 1.7 * (MoVd)
= 4,639 Ib.
Fpunct = 2*sqrt(f'c) = 100.0 psi.
punct = [(w+t/2)+(d+t/2)]*2*t = 170.0 in.^2
Iv/Fv = Pmax/(Apunct*Fpunct) = 0.2 7
ib) SLAB TENSION
Asoil = Pmax/(1.33 * fsoil) = 3.48 ft.^2
= 501 in.^2
L = sqrt(Asoi1) = 22.4 in.
B = sqrt(w*d) + t = 10.9 in.
b = (L-B)/2 = 5.7 in.
Mconc = wb"2/2 = (1 .33*fsoiI*bA2)/(144*2)
= 152.2 in.lb.
Sconc = 1*tA2/6 = 4.17 in.^3
Fconc = 50 *sqrt(f'c) = 225.00 psi.
fb/Fb = Mconc/(Sconc*Fconc) = 0.1 6
BASE PLATE
w = 7 in.
d = 5 in.
corKRm
t = 5 in.
f'c = 2500 psi.
SOIL
fs = 1000 psf.
z
P
K W W z
W
d 9