Loading...
HomeMy WebLinkAbout1905 CASSIA RD; BLDG 3; CB032637; Permit04-08-2004 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: 04/08/2004 # Dwelling Units: Bedrooms: Project Title: City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Residential Permit Permit No: CB032637 Building Inspection Request Line (760) 602-2725 1905CASSIARDCBAD RESDNTL 2150201300 $818,697.00 8 24 Sub Type: Lot#: Construction Type: Reference #: Structure Type: Bathrooms: APT 0 V1 A9804388 MF5+ 16 MANZANITA APTS-BLDG 3- 8 UNIT 10,264 SF, 776 SF DECKS, UNITS 100-103, 200-203 Status: ISSUED Applied: 07/28/2003 Entered By: RMA Plan Approved: Issued: 04/08/2004 Inspect Area: Orig PC#: PC030036 Plan Check#: Applicant: MANZANITA PARTNERS L L C ATTN: KIM ROTH 1764 SAN DIEGO AVE SAN DIEGO CA 92110 Owner: MANZANITA PARTNERS L L C ATTN: KIM ROTH 1764 SAN DIEGO AVE SAN DIEGO CA 92110 9588 04/08/04 0002 01 02 96294.93 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'l Pot. Water Con. Fee Reel. Water Con. Fee $2,611.15 Meter Size $0.00 Add'l Reel. Water Con. Fee $1,697.25 Meter Fee $0.00 SDCWA Fee $0.00 CFD Payoff Fee $81.87 PFF $0.00 PFF (CFD Fund) $0.00 License Tax $0.00 License Tax (CFD Fund) $0.00 Traffic Impact Fee $0.00 Traffic Impact (CFD Fund) $47,520.00 Sidewalk Fee $0.00 PLUMBING TOTAL $0.00 ELECTRICAL TOTAL $0.00 MECHANICAL TOTAL $0.00 Housing Impact Fee $0.00 Housing InLieu Fee Housing Credit Fee $0.00 Master Drainage Fee $0.00 Sewer Fee Additional Fees TOTAL PERMIT FEES $0.00 $0.00 $0.00 $16,771.37 $14,900.29 $0.00 $0.00 $0.00 $3,072.00 $0.00 $0.00 $770.00 $310.00 $321.00 $0.00 $0.00 $0.00 $0.00 $8,240.00 $0.00 $96,294.93 Total Fees: $96,294.93 Total Payments To Date:$0.00 Balance Due: $96,294.93 Inspector: FINAL APPROVAL Date:t/"Clearance: NOTICE: Please take NOTICE that approval of your project includes the Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired. Final Building Inspection Dept: Building Engineering Planning CMWD St Lite Plan Check #: Permit*:CB032637 Project Name: MANZANITA APTS-BLDG 3- 8 UNIT 10,264 SF, 776 SF DECKS, UNITS 100-103, 200-203 1905 CASSIA RD Lot: 0 Date: 12/21/2004 Permit Type: RESDNTL Sub Type: APT Address: Contact Person: GABERIAL Sewer Dfst: CA Phone: 6197267591 Water Dist: CA Inspecteeb,-,; /I Bv: //I L&f!^ Inspected ^ Bv: Inspected Bv: Comments: . . Date J*%L •Af-tAJ^* Inspected: ^ Date Inspected: Date Inspected: /#y Approved: ^—1 Approved: Approved: Disapproved: Disapproved: Disapproved: UNSCHEDULED BUILDING INSPECTION DATE v^>^o-o^ INSPECTOR PERMIT # fo^SuLgy? PLAN CHECK # JOB ADDRESS 1%)S 0*^*1* .>tJt) DESCRIPTION CODE DESCRIPTION ACT COMMENTS AP Inspection List Permit*: CB032637 Type: RESDNTL APT Date Inspection Item Inspector Act 01/31/2005 31 12/30/2004 89 12/29/2004 89 12/28/2004 39 12/22/2004 39 12/21/2004 39 12/21/2004 89 12/15/2004 17 12/15/2004 39 12/14/2004 39 11/10/2004 23 11/09/2004 23 11/08/2004 23 11/03/2004 17 11/02/2004 17 11/01/2004 17 10/29/2004 34 10/29/2004 44 10/28/2004 34 10/28/2004 44 10/27/2004 34 10/27/2004 44 10/26/2004 34 10/26/2004 44 10/25/2004 44 10/22/2004 17 10/21/2004 17 10/20/2004 44 10/19/2004 27 10/19/2004 44 10/18/2004 27 10/18/2004 44 10/14/2004 44 10/13/2004 17 10/06/2004 16 10/06/2004 24 10/06/2004 34 10/05/2004 16 10/04/2004 16 10/01/2004 16 09/29/2004 14 09/29/2004 18 09/28/2004 14 Underground/Conduit-Wirin Final Combo Final Combo Final Electrical Final Electrical Final Electrical Final Combo Interior Lath/Drywall Final Electrical Final Electrical Gas/Test/Repairs Gas/Test/Repairs Gas/Test/Repairs Interior Lath/Drywall Interior Lath/Drywall Interior Lath/Drywall Rough Electric Rough/Ducts/Dampers Rough Electric Rough/Ducts/Dampers Rough Electric Rough/Ducts/Dampers Rough Electric Rough/Ducts/Dampers Rough/Ducts/Dampers Interior Lath/Drywall Interior Lath/Drywall Rough/Ducts/Dampers Shower Pan/Roman Tubs Rough/Ducts/Dampers Shower Pan/Roman Tubs Rough/Ducts/Dampers Rough/Ducts/Dampers Interior Lath/Drywall Insulation Rough/Topout Rough Electric Insulation Insulation Insulation Frame/Steel/Bolting/Weldin Exterior Lath/Drywall Frame/Steel/Bolting/Weldin RB RB RB RB RB RB RB RB RB RB RB RB BN RB RB RB RB RB RB RB RB RB PD PD RB TP RB RB RB RB RB RB RB RB RB RB RB RB RB RB PD PD RB CO AP CO AP NR CO we AP PA CO AP NS CA PA NR CA AP AP CO CO CA CA NS NS CA AP CO CO AP CO CA CA NS PA AP AP AP NS CO NR AP AP NS MANZANITA APTS-BLDG 3- 8 UNIT 10,264 SF, 776 SF DECKS, UNITS 100-103, Comments COVERED W/OUT INSP EMR NEED PANEL SCHEDULE CHANGE APPROVED SEE NOTICE OK FOR SEO ONLY FOR SEO MISSING FLASH GUARD & PENETRATIONS MISSING FLASH GUARDS AT 9:00 COMPLETED COMPLETED @ DROPS 1ST LAYER CEIL ON 1ST LAYER LID OK @ TUB AREAS 2ND FLR Wednesday, April 20, 2005 Page 1 of 3 09/28/2004 18 09/27/2004 14 09/27/2004 18 09/23/2004 14 09/23/2004 17 09/23/2004 18 09/23/2004 24 09/23/2004 34 09/22/2004 14 09/22/2004 17 09/22/2004 18 09/22/2004 24 09/20/2004 17 09/20/2004 18 09/16/2004 14 09/16/2004 15 09/16/2004 18 09/15/2004 15 09/14/2004 15 09/14/2004 17 09/08/2004 13 09/08/2004 15 09/07/2004 13 09/07/2004 14 08/27/2004 13 08/27/2004 29 08/24/2004 14 08/23/2004 14 08/19/2004 14 08/19/2004 22 08/19/2004 23 08/19/2004 24 08/18/2004 14 08/18/2004 23 08/18/2004 24 08/12/2004 14 08/12/2004 34 08/03/2004 13 08/03/2004 17 07/26/2004 17 07/20/2004 11 07/20/2004 22 07/19/2004 22 07/15/2004 22 07/12/2004 22 07/08/2004 14 07/08/2004 17 07/08/2004 18 07/01/2004 14 06/30/2004 14 Exterior Lath/Drywall Frame/Steel/Bolting/Weldin Exterior Lath/Drywall Frame/Steel/Bolting/Weldin Interior Lath/Drywall Exterior Lath/Drywall Rough/Topout Rough Electric Frame/Steel/Bolting/Weldin Interior Lath/Drywall Exterior Lath/Drywall Rough/Topout Interior Lath/Drywall Exterior Lath/Drywall Frame/Steel/Bolting/Weldin Roof/Reroof Exterior Lath/Drywall Roof/Reroof Roof/Reroof Interior Lath/Drywall Shear Panels/HD's Roof/Reroof Shear Panels/HD's Frame/Steel/Bolting/Weldin Shear Panels/HD's Final Plumbing Frame/Steel/Bolting/Weldin Frame/Steel/Bolting/Weldin Frame/Steel/Bolting/Weldin Sewer/Water Service Gas/Test/Repairs Rough/Topout Frame/Steel/Bolting/Weldin Gas/Test/Repairs Rough/Topout Frame/Steel/Bolting/Weldin Rough Electric Shear Panels/HD's Interior Lath/Drywall Interior Lath/Drywall Ftg/Foundation/Piers Sewer/Water Service Sewer/Water Service Sewer/Water Service Sewer/Water Service Frame/Steel/Bolting/Weldin Interior Lath/Drywall Exterior Lath/Drywall Frame/Steel/Bolting/Weldin Frame/Steel/Bolting/Weldin RB RB RB RB RB RB RB RB RB RB RB RB RB RB RB RB RB RB RB RB RB RB RB RB PD PD PD PD RB RB RB RB RB RB RB PD PD RB RB RB RB RB RB RB RB RB RB RB RB RB NS CO CO PA we we PA PA CO NS NS AP NS NS NS AP NS NR NR NS AP PA CO PA AP PA PA CA NR NR NR NR CO CO CO NS NS PA we NR AP AP NR CA NR CA PA we PA CO 1ST FLR OK 1STFLROK 1ST FLR OK ON1STFLRINSP COMPLETED LOADED W/OUT APPROVAL COMPLETE ON EXT. OK TO PAPER ONLY ON 2ND FLOOR OK TO INS. DROPS RB 1ST FLR PARTY WALL 1ST FLR 1ST FLR PARTY WALL FOR PARTY WALL INSP @ party wall OK @ UTILITY RM FOR PRELIM ADD PIER FTGS FOR STAIRS ON TIE IN ELECTRIC ROOM OK STOP - REWALK EVERYTHING ON FLR NAILING Wednesday, April 20, 2005 Page 2 of 3 06/28/2004 13 Shear Panels/HD's RB PA OK TO D.W. SHR. IN ELECTRIC RM 06/24/200413 Shear Panels/HD's RB NR ON PRELIM 06/16/200422 Sewer/Water Service RB AP 05/28/2004 81 Underground Combo RB AP 05/19/2004 31 Underground/Conduit-Wirin RB AP 05/17/200421 Underground/Under Floor RB AP 04/28/2004 21 Underground/Under Floor RB PA UNDRG HORIZONTAL ONLY OK 04/26/2004 21 Underground/Under Floor RB NR Wednesday, April 20, 2005 Page 3 of 3 City of Carlsbad Bldg Inspection Request For: 12/21/2004 Permit* CB032637 Title: MANZANITA APTS-BLDG 3- 8 UNIT Description: 10,264 SF, 776 SF DECKS, UNITS 100-103, 200-203 Type: RESDNTL Sub Type: APT Job Address: 1905 CASSIARD Suite: Lot 0 Location: APPLICANT MANZANITA PARTNERS L L C Owner: Remarks: Inspector Assignment: RB Phone: 6197267591 Inspector: Total Time:Requested By: GABERIAL Entered By: JANEAN CD Description 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Act Comment Associated PCRs/CVs Inspection History Date 12/15/2004 12/15/2004 12/14/2004 11/10/2004 11/09/2004 11/08/2004 11/03/2004 11/02/2004 11/01/2004 10/29/2004 10/29/2004 10/28/2004 10/28/2004 10/27/2004 10/27/2004 10/26/2004 Description 17 39 39 23 23 23 17 17 17 34 44 34 44 34 44 34 Interior Lath/Drywall Final Electrical Final Electrical Gas/Test/Repairs Gas/Test/Repairs Gas/Test/Repairs Interior Lath/Drywall Interior Lath/Drywall Interior Lath/Drywall Rough Electric Rough/Ducts/Dampers Rough Electric Rough/Ducts/Dampers Rough Electric Rough/Ducts/Dampers Rough Electric Act AP PA CO AP NS CA PA NR CA AP AP CO CO CA CA NS Insp RB RB RB RB RB BN RB RB RB RB RB RB RB RB RB PD Comments OK FOR SEO ONLY FOR SEO MISSING FLASH GUARD & PENETRATIONS MISSING FLASH GUARDS AT 9:00 COMPLETED @ DROPS CITY OF CARLSBAD BUILDING DEPARTMENT NOTICE (760) 602-2700 1635 FARADAY AVENUE DATE /? - * X' LOCATION PERMIT NO. TIME f4c <LS p2- C / /" g- gx .-TVV?-? XtX tg fo M. —' FOR INSPECTION CALL (760) 602-2725. RE-INSPECTION FEE DUE? FOR FURTHER INFORMATION, CONTACT YES B6lLDrFJ&TT3sPECTOR CODE ENFORCEMENT OFFICER IVIAIMITOU ENGINEERING COMRAIMY PLANNING • CIVIL ENGINEERING -SURVEYING May 12,2004 Gene Roper Project Manager Manzanita Apartments 1901 Cassia Road Carlsbad, CA 92009 Dear Mr. Roper, Manitou's surveyors located the forms for Building #3 at 1905 Cassia Road shown as Building #3-102 on the Grading Plan for Project No. SDP 98-19, DWG 389-9A, approved by the City of Carlsbad Engineering and Planning Departments on September 23, 2003. The forms were located on May 12,2004. The location of the forms is in substantial conformance with the horizontal location shown on the above Grading Plan, DWG 389-9A. The finish floor elevation shown on the approved plan is 323.07 feet above Mean Sea Level and the elevation of the forms was measured at 323.12 feet above Mean Sea Level. Please call if you have any questions concerning the above information. Thank you for requesting Manitou Engineering Company to assist you with the Manzanita Project. Sincerely, Francis W, Fitzpatfick, PLS 4539 350 WEST NINTH AVENUE • SUITE B • ESCONDIDO, CALIFORNIA 92025 • (760) 741-9921 • FAX (760) 745-7487 GEOTECHNICAL EXPLORATION, INC. SOIL & FOUNDATION ENGINEERING GROUNDWATER • ENGINEERING GEOLOGY FIELD REPORT ON OBSERVATION OF FOUNDATIONS CLIENT: PROJECT NAME: PROJECT ADDRESS: The footing excavations listed below were bottomed on material for which the bearing values recommended in the foundation report are applicable. The cast-in-place drilled friction piles listed below penetrated material for which the allowable supporting capacities recommended in the foundation report are applicable. The piles were excavated to diameters at least as large as specified and the excavations extended at least to the depths indicated on the Foundation Plans. The excavations for the cast-in-place belled piers listed below were bottomed on material for which the bearing values recommended in the foundation report are applicable. The excavations were at least as large as specified on the Foundation Plans. The driven piles listed below were observed to be driven to the specified lengths and/or driving resistances to obtain the supporting capacities recommended in the foundation report. Based upon observations, it is our opinion tha report of the foundation investigation, Job No, recom dated not) applicable to the conditions observed. Foundation Plans hy pro /a (iJ/rf_ \( _ were used as a reference for our observations. ^presented Jn the '(are toldh hlJ 3'7 NOTE: 1. The observations reported above do not constitute an approval of foundation location, footing size or depth, reinforcement, or foundation design. 2. Loose, soft, or disturbed soils must be removed prior to placement of reinforcement or concrete. 3. The opinions and recommendations presented in this report were based upon our observa- tions and are presented in accordance with generally accepted professional engineering practice. We make no other warranty, either express or implied. BY: 7420 Trade St. San Diego, Ca. 92121 • (858) 549-7222 • FAX: (858) 549-1604 ^ M99CS001128M 1/00