Loading...
HomeMy WebLinkAbout1910 PALOMAR POINT WAY; BLDG A; CB050079; PermitCity of Carlsbad 1635 .Faraday Av Carlsbad, CA 92008 02-23-2006 Commercial/Industrial Permit Permit No: CB050079 Building Inspection Request Line (760) 602-2725 Job Address: 1910 PALOMAR POINT WY CBAD Permit Type: COMMIND Sub Type: INDUST Parcel No: 2121203300 Lot #: 0 Status: ISSUED Valuation: $1,003,680.00 Construction Type: VN Applied: 01/06/2005 Occupancy Group: Reference #: Entered By: KG Project.Title: PALOMAR POINT BLDG A 32800 SF Plan Approved: 05/09/2005 SHELL BLDG. Issued: 05/09/2005 Inspect Area: TP Plan Check#: PC040144 Applicant: , .Owner: LUSARDI CONSTRUCTION COMPANY -- JETT T LAWRENCE- .1570 LINDA VISTA DRIVE P.O BOX 455 \ SAN MARCOS, CA 92069 --' SANTA YNEZ CA 93460. 619-744-3133 / ,... Building Permit / . ""$3,092.85 Meter Size ('J FP5/8 AddI Building Permit Fee - / $0.00 -j Add'l Recl'Water Con. Fee' $0.00 Plan Check $2,010.35i / Meter Fee& '\ '. c $740.00 AddI Plan Check Fee /. '" $0.00 / SDCWA Fee $6,012.00 Plan Check Discount / . . . $0.00 CFD Payoff Fee _..,, .. . \ $0.00 Strong Motion Fee " $210 77 PFF (3105540)....1-1;, ,' $,18,266.98 Park Fee . '- .. "\ $000--. PFF (4305540) / $0.00 LFM Fee -. - $13,120.00 License Tax (3104193) ,_ -- $0.00 Bridge Fee ' $0.00 Liene Tax (4304193) ,/ ( ) $0.00 BID #2 Fee '---- $0 00 Traffic Impact Fee (3105541) ., $426400 BTD #3 Fee .-. :$0'00 - Traffic Impact Fee (4305541) ' $0.00 Renewal Fee . --". $0.00 PLUMBING TOTAL\\ - . I $175.00 Add'l Renewal Fee - - z J\' "- $0.00 ELECTRICALTOTAL' ,1 $1,010.00 Other Building Fee $O00 MECHANICALLJOTALY7 / I $60.00 Pot. Water Con. Fee $12,746.O0 Master Drainage Feé" / f $0.00 \ \ - ..i 1.' , Meter Size Dl's -. Sewer Fee , / $6,081.12 Add'l Pot. Water Con. Fee '". so Do Rëdèv Parking Fee / / $0.00 Red. Water Con. Fee '- ,- --.. "-. $0 Additional-,Fees ,/ ' $1,371.00 TOTAL PERMIT FEES,. \ .,) ,' $69,160.07 1 ,,' / - - \ \\ \.) •1 Total Fees: $69,160.07 Total Paymnts"ToDatè:.—' ,. $69,160.07 ' Balance Due: $0.00 Li FINAL APPROVAL Inspector: Date: i/4? Clearance: - NOTICE: Please take NOTICE that approval of your project includes the "Imposition' of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions,' You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other, similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired. City of Carlsbad U-M Final Bulilng.lnspectlofl Dept: Building En n- Planning CMWD ,St Li Fire Plan Check#: PC040144 Permit #: CB050079 l'ermit Project Name: PALOMAR POINT BLDG A 32800 SF . SHELL BLDG. Address: 1910 PALOMAR POINT WY Lot: Contact Person: PAT Phone: 7604972834 Sewer Dist: CA Water Dist: CA Inspected Date By: ______ Inspected: Approved: Inspected Date By: Inspected: Approved: Inspected Date By: Inspected: Approved: Comments: ate: Type: ub Type: 0 $21 02/02/2006 COMMIND INDUST .. Disapproved: Disapproved: - Disapproved: Inspection List. Permit# CB050079 Type COMMIND INDLIST PALOMAR POINT BLDG A 32800 SF SHELL-BLDG. Date Inspection Item Inspector Act Comments 02/24/2006 89 Final Combo TP AP - 02/07/2006 89 Final Combo TP .. CQ 02/06/2006 89 Final Combo • TP NR . .• 02/02/200689 Final Combo TP CO 01/27/2006 23 Gas/Test/Repairs TP AP TO.BOlLER 01/18/2006 16 Insulation TP AP PMTR.WALLS,.. 0.1/18/2006 17 InteriorLath/Drywall TP AP PMTR WALLS • 01/17/200616 Insulation '. TP AP I &2 fir prntr draft stops 01/09/2006 34 Rough Electric TP CO MECH:YARD PUMP' DISCOS 12/28/2005 39 Fin Electrical TP NS RE-SCHD 12/29 - 12/16/2005 18 Exterior Lath/Drywall TP AP - 12/15/2005 18 Exterior Lath/Drywall TP CO . 12/15/2005 34 RoughElectric . TP PA. , MSB, H:,SUBPNLS 12/12/2005 17 Interior Lath/Drywall TP WC 12/12/2065 18. Exterior Lath/Drywall TP AP EXT. LATH @ DENS GLASS 12/09/200518 Exterior Lath/Drywall TP CA RE-SCH 12L12. '-p 12/07/2005 17 Interior Lath/Drywall TP PA LOBBY 1ST FLR" 12/07/2005 1,8 Exterior Lath/Drywall TP NR . N/COMP.. 12/07/2005 34 Rough Electric TP NR MSB . 12/06/2005 18 Exterior Lath/Drywall , TO . PA 11/28/2005 18 Exterior Lath/Drywall PD CA, 11/22/2005 17 Interior Lath/Drywall PY CA 11/22/2005 18 Exterior Lath/Drywall PY CA ' 11/16/2005 14 Frame/Steel/Bolting/Weldin TP CO NEED PLAN, F.C. PENT. ABOVE CElL OK 11/10/2005 14 Frame/Steel/Bolting/Weldin TP NR INT LOBBY SOFFIT 11/10/2005 17 Interior Lath/Drywall • TP PA 1 & 2 FLR N / NRL COM. 11/04/2005 14 Frame/Steel/Bolting/Weldin TP CO INTTNRYSOFFIT . • 11/04/2005 17 Interior Lath/Drywall TP NR CB051907 10/31/2005 18 Exterior Lath/Drywall TP PA DENS GLASS@ EXT. - 10/27/2005 24 Rough/Topout •. TP AP, ..• • 10/26/2005 14 Frame/Steel/Bolting/Weldin TP CO POROTICOL 10/26/2005 24 Rough/Topout TP CO FAILED TEST. - 10/20/2005 14 Frame/Steel/Bolting/Weldin TP AP ENTY LOBBY & STIR. ENCL. 10/20/2005 15 Roof/Reroof TP AP '• - 10/17/200514 Frame/Steel/Bolting/Weldin TP PA • • - • 10/17/2005.15 Roof/Reroof TP NR ' • • 10/17/2005 24 Rough/Topout TP NR '• • - .10/13/2005 14 Frame/Steel/Bolting/Weldin TP PA EXT FRAME N/INCL PORTICOL.SECT' 10/13/2005 15 Roof/Reroof TP CO - - 10/12/2005 15 Roof/Reroof TP CO MTL PAN ROOF. 10/11/2005 14 Frame/Steel/Bolting/Weldin TP WC 10/11/2005 -14 Frame/Steel/Bolting/Weldin TP PA EXT. FMS. SIDE 10/06/2005 12 Steel/Bond Beam RB , WC •• • 10/06/2005 14 Frame/Steel/Bolting/Weldin RB PA OK TO INSTALL DEN'S GLASS LINE A Wednesday, arch 01 2006 - ' Page, 1 of 2 09/16/200511 FtglFoundationlPiers . TP WC . 09/16/2005 12 Steel/Bond Beam 'TP AR , MGB MtL PAN DECK P.G. @ C.B.S 08/15/2005 11. Ftg/Foündation/Piers .TP . .....PA_,._ ....SITE'LITE."FTQS . 08/15/2005 12. Steel/Bond Beam , TP PA 08/.15/2005 31 Underground/Conduit-Wirin TP PA SITE LITES ' 08/15/2005 66 Grout - TP WC • 07/27/2005 11 FtglFoundationlPiers TP AP TSH ENCL. 07/27/2005 12 SteeI/ond Beam TP AR 07/26/200.5 11, Ftg/Foundation/Riers •' ,TP, CO 06/09I2005 22 Sewer/Water Service ' . TP AR 06108/2005 22' Sewer/Water Service TP ' NR - 06/06/2005,12 Steel/Bond Beam ' . TP • AP • S.O.G. •- 06/.03/2005'1.2.- Steel/Bond Beam TP CA: ' .. 105/27/2005 21 . Underground/Under Floor - RB AR ' 2-4" WATER LINES TO'.-EQUIPMENT PAD., 05/27/2005.31 Underground/Conduit-Wirin RB PA 1" LINE to-EQUIPMENT PAD . . 05/27/2005 41 Underground Ducts RB WC '05/25/2005 12' Steel/Bond Beam ' • •' TP •. AR.. ELEV PIT PIP WALS 05/25/2095 2.1 Underground/Under. Floor: TP AP 05/19/200511 Ftg/Foundation/Riers ' TP 'AP' , - CONT. FTG., G.B, SPRD FIG. ' 05/19/2005 12' Steel/Bond Beam • • TP AP , 05/19/2005 14 Fiame/Steel/Bolting/Weldin TP WC - 05/18/2005 12 Steel/Bond Beam , : " 'JR • CO -• 05/16/2005 21 Underground/Under Floor ' . 'TP AR MAIN BLDG SEWER (INT) 05/16/2005 22 Sewer/Water Service •. TO . WC • - Wednesday, March 01', 2006 , : '- . . . ' Page 2 of 2 - , Lk City of 'C ä.rlsbadBldg' Inspection Request For: 022006Lit 04 S Permit# CB050079 Assignment TP Title: 'PALOMAR POINT BLDG A,32800 SF Description: SHELL BLDG. Type: COMMIND Sub Type: INDUST Phone: 7604972 34 Job Address: 1910 PALOMAR POINT WY . Suite; . Lot 0 Location: . - Inspector: APPLICANT LUSARDI CONSTRUCTION COMPANY . Owner: . ,• . - . Remarks: • Total Tirne, .._ Requested By: PAT Entered By: CHRISTINE CD Description •-' Act Cment 19 Final Structural :29 •. Final Plumbing, . . . 39 Final Electrical 49 ' Final Mechanical, Comments/Notices/Hold . . Associated PCRs/CVs. 'Original PC# Pç040144 'lhspectiori- History Date Description ' Act insp Comments 02/02/2006 ' 89 Final Combo ' ' . ' Co TP 01/27/2006 , 23 Gas/Test/Repairs ' AP TP TO BOILER , . ' • 01/18/2006 16 Insulation- AP TP PMTR WALLS 01/18/2006 , 17 Interior Lath/Drywall '. AP TP 01/17/2006 , 16 Insulation . ' ' AP TP 1 &2 fir pmtr.draft stops 01/09/2006 ' 34 Rough Electric . ' ' • CO TP' MECH. YARD PUMP DISCOS 12/28/2005 , 39 Final Eléàtrical NS TP RE-SCHD 12/29 12/16/2005 18 Exterior Lath/Drywall' , .. 'AP TP 12/15/2005 ' 18, Exterior Lath/Drywall , CO TP 12/15/2005 34 Rough Electric , ' PA TP MSB, H:SUB PNLS ' 12/12/2005 17 Interior Lath/Drywall , WC TP - - 12/12/2005 • 18 Exterior Lath/Dywa,lI 'AP TP EXT. LATH @'DENS GLASS • , .12/09/2005 ' 18 Exterior Lath/Drywall - CA .TP ' RE-SC1 12-12. ' Geo technical Engineering Construction lAspection. Materials Testing FINAL REPORT FOR Environmental SPECIAL INSPECTION AND MATERIAL TESTING Date: December 5, 2005 To: City of Carlsbad MTGL Project No: 1002-AOl Building Department MTGL LogNo: 05-1734 1635 Faraday Avenue Carlsbad, CA 92008 SUBJECT: SATISFACTORY COMPLETION OF WORK REQUIRING SPECIAL INSPECTION AND MATERIAL TESTING. PERMIT NO: CB 05-0079 PROJECT NAME/ADDRESS: Building "A" 1910 Palomar. Point Way Carlsbad, California I declare under penalty of perjury that, to the best of my knowledge, the work requiring special inspection, material sampling and testing, for the structure/s constructed under the subject permit is in conformance with the approved plans, the inspection and observation program and other construction documents, and the applicable workmanship provisions of the Uniform Building Code. Executed on: December 5, 2005 The work which we provided Special Inspection consisted of: Reinforced Concrete, Lightweight Concrete, Structural Steel Field Welding including Moment Frames, Ultrasonic Testing of C.JP Weld/Moment Frame Connection and Built-Up Roof. A. If the inspection services were provided by an approved material testing laboratory or special inspection agency: TESTING AGENCY: MTGL, Inc. 7313 Carroll Road, Suite G San Diego, CA 92121 RESPONSIBLE MANAGING ENGINEER OF THE TESTING LABORATORY OR SPECIAL INSPECTION AGENCY: NAME (PRINT OR TYPE): Eduardo C. Dizon State of California Registration Number: C 57217 Expiration Date: .12/31/07 B) If the inspection services were provided by an independent certified special inspector: SPECIAL INSPCETOR'S NAME (PRINT OR TYPE): NA Registration lber: j Expiration Date: SIGNATURE: AOFESS/ Exp. 1V31 OF Office Locations Orange County Corporate Branch: 2992 F. La Palma Avenue Suite A -Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 Los Angeles Ventura County 13010 San Fernando Road .Unit 1 Sylmar, CA 91342 Tel: 818.833.8100 Fax: 818.833.0085 San Diego Imperial County 7313 Carroll Road Suite G San Diego, CA 92121 Tel: 858.537:3999 Fax: 858.537.3990 Inland Empire 14320 Elsworth Street Suite C1 01 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Central Dispatch 800.491.2990 www.mtgiinc.com C Corporate: San Diego/Imperial County: Inland Empi 2992 E. La Palma Ave., bte. A 7313 Carroll Road,Suite G 14320 EISWO\ itreet, Ste. C101 Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 714.632.2999 -Tel: 858.537.3999 Tel: 951.653.4999 Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT TYPEA WORK ,,.NSPECTOR 0 TECHNICIAN ( (5111 1VU t( f/tajj44J.4 f AVAILABLE: SOIL REPORT ('I') (N) SPECS (Y( (N) APPROVED PLANS (Y) (N) , APPROVED SHOP DRAWING (Y) IN) AR e4+ FOR WEEK ENDING I PROJECT. NO. I 1190 ENGINEER ,- 15.c I, REPORT NO. PG OF __________ CONTRACTOR MIS 4 . * PLAN FILE NO PERMIT NO. I C&soo7 9 SUB-CONTRACTOR Coii,c PRO*GI NAME fr//JJ14,f l7/f INSPECTION AD1 ADDRESS _•, flF PROJECT q 47) REPORTING REQUIREMENTS: ICSO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON-CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATFACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (,UDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): ii21ecip&ftt 3oS3ôô1 &cç ,"TRACTORS EQUIPMENT! MANPOWER USED- OAn4_ 071 nt 12 DA I ERtE A6RID LINES, PIECES OBSD: e Ck 1r.Yfr vJr. b 1A( 4o)Jw A/ti.- A/ -P/i - Pf - L/ - STR4tTURAL NOTES, DETAIL OR RFIUSED: [f(iVt- RRKS INCLUDING MEETINGS: Uk4t4'1f6{ p I a ' 01) V19 h ab if / o'tn. i c. C'OT C/1 V4 c (v1 MW ?,-4U vi 9 oit (3t'vw4 -tv'(13 L'i;1'4 I&I ow /4 -63 c-7-1 S-5 "T- 75 ' 7 - Q L/IJ e-7r 5-57q' -%LL7L -a97 L -814 11 6 ioJ:T- REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: .p464 4 f4prdt,' - aea-t TEMPERATURE: .- , SAMPLES TAKEN: TESTS REQUIRED: SITE TIME START: ' SITE TIME FINISH: / LUNCH PERIOD: ________________________ TRAVEL TIME: __________________________ VERIFIED BY: 100 CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR VED PLANS SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT /- Date of Report ICBO Certification Number Ill Name City / County Certification Number Rev: 7/97 SITE TIME START: 7"i12- -.. SITE TIME FINISH: .3,.. LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Emp 14320 Elswo'L.. ..(reet, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK - TFSPECTOR 0 TECHNICIAN .; AVAILABLE: SOIL REPORT (Y) (N) SPECS N) APPROVED PLANS)k1I APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEK ENDING I PROJECT. NO. I 11m4 A-el ENGINEER . 1&rs.f REPORT NO. PG OF CONTRACTOR L1.54 /&// PLAN FILE NO. PERMIT NO. SUB-CONTRACTOR 1-4 &/ 'lee PROJECT NAME - INSPECTION ADDRESS //3 2, ADDRESS OF PROJECT REPORTING REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUALIMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON-CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): IF 76 1610;, CONTRACTORS EQUIPMENT / MANPOWER USED: AREA, GRID LINES, PIECES OBSERVED: All / 41/ /le eel STRUCTURAL NOTES, DETAIL. OR S USED: REMARKS, INCLUDING MEETINGS: ,g / A 144 REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: , ,,,, TEMPERATURE: 76 '57 SAMPLES TAKEN: MIA TESTS REQUIRED: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WRTHE SOIL INVESTIGATION RECOMMENDATIONS, PLANS, SPECIFICATIONS A LICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT ure ICBO Certification Number DateofRePort / ber £ Print Name ,/' City / County Certification Number Rev: 7/97 1 Corporate: 2992 E. La Palmá Ave., Ste Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 oaii Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 1? Inland EmpliG; 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK - NSPECTOR 0 TECHNICIAN ,, .y AVAILABLE: SOIL REPORT (V) (N) APPROVED PLANS .Lr(N) SPECS.flN) APPROVED SHOP DRAWING4(N) ARCHITECT FOR WEEK ENDING PROJECT. NO. /c /o/ ENGINEER REPORT NO. PG OF CONTRACTOR . PLAN FILE NO. PERMIT NO. SUB-CONTRACTOR - . PROJECT NAM - INSPECTION ADDRESS / - ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUALJMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON-CONFORMING WORK AT THE END OF THE WORK DAY, OR MISS[NG-MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): E 7/cP CONTRACTORS EQUIPMENT/ MANPOWER USED: Ce/ ôi) AREA, GRID LINES, PIECES OBSERVED: (M' 7L côp/ STRUCTURAL NOTES, DETAIL, OR RFIS USED: REMARKS. INCLUDING MEEflIGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: TEMPERATURE: SAMPLES TAKEN: TESTS REQUIRED: SITE TIME START: 2'- -'-- SITE TIME FINISH: " ? LUNCH PERIOD: - ---- TRAVEL TIME: __________________________ VERIFIED By- 100 CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE A RD 0 PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Dale of Report ICBO Certification Number -57 Print Name / City i County Certification Number ' Rev: 7/97 NINO if MTGL Corporate: 2992 E. La Palma Ave., Ste Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empic: 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK -INSPECTOR 0 TECHNICIAN AVAILABLE: SOIL REPORT)") SPECS 4rcN) APPROVED PLANSTtNI APPROVED SHOP DRAWING (Y) (N) ARCHITECT / ' FOR WEEK ENDING -0 5 PROJECT. NO. / £b 4Q / ENGINEER REPORT NO. PG OF CONTRACTOR PLAN FILE NO. PERMIT NO. ç SUB-CONTRACTOR LL/ s-/ PROJECT NAME P</' -i - INSPECTION ADDRESS ' - ADDRESS DI PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUALJMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON-CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): E7o/f CONTRACTORS EQUIPMENT! MANPOWER USED: AREA, GRID LINES, PIECES OBSERVED: - Aô STRUCTURAL NOTES, DETAIL, OR RFIS USED: REMARKS, INCLUDING MEETiNGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION:. WEATHER: - . TEMPERATURE: . . SAMPLES TAKEN: TESTS REQUIRED: SITE TIME START: "'-'----- SITE TIME FINISH: - - LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: r I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION'RECOMMENDATIONS, AND /OR THE A VED . ' , SPECIFICATIONS AND APPLICA 127 OTHERWISEE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT /ff S 9 18 1 0. S V Date of Report ICBO Certification Number Ji ___________________ Print Name . City / County Certification Number Rev: 7/97 (. Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Emp'.G: 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK. ..J'NSPECTOR 0 TECHNICIAN AVAILABLE: SOIL REPORT (V) (N) APPROVED PLANSf (N) SPECS •(N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT ./ FOR WEEK ENDING 0 5 , PROJECT. NO. 1 /O(2 ,4'/ ENGINEER &c'cx REPORT NO. PG OF CONTRACTOR c, PLAN FILE NO. PERMIT NO. C SUB-CONTRACTOR . ./ PROJECT NAME INSPECTION ADDRESS .: /9.3o ADDRESS OF PROJECT REPORTING REQUIREMENTS': ICBO FIELD INSPECTION iA1NUAUMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON-CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR APREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT/ MANPOWER USED: AREA, GRID LINES, PIECES OBSERVED: j f STRUCTURAL NOTES, DETAIL, OR RFIS USED REMARKS. INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: TEMPERATURE: . SAMPLES TAKEN: TESTS REQUIRED: SITE TIME START: T7.' '- SITE TIME FINISH: . _H II LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE.A1RO,YEVPLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Dale of Report /' ICBO Certification Number J. 5, VPrint Name " City I County Certification Number," Rev: 7/97 Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Dego/ImperiaI County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 8581537.3999 Fax: 858.537.3990 1 Inland 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK ,iNSPECTOR 0 TECHNICIAN AVAILABLE: SOIL REPORT IY> (N) APPROVED PLANS (kiN) SPECS X(N) APPROVED SHOP DRAWING (V) (N) ARCHITECT FOR WEEK ENDING 9- /,'2 -- (7S PROJECT. NO. A 0/ ENGINEER REPORT NO. PG OF CONTRACTOR - LQc7/ PLAN FILE NO. . PERMIT NO. SUB-CONTRACTOR PROJECT NAME . ,'-?/i' A INSPECTION ADDRESS jy ,, /O -.'4/ c .-/s - ADDRESS OF PROJECT ,, e II REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAJJMTGL SOIL MANUAL-. REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON-CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTOS EQUIPMENT/ MANPOWER USED: ' ,,/1 -. AREA. GRID LINES, PIECES OBSERVED: - //_X") ,1441 S40/1? It-IV - / iAJc 2) _Z- STRUCTURAL NOTES, DETAIL, OR RFIS USED: REMARKS. INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: SAMPLES TAKEN: TEMPERATURE: TESTS REQUIRED: SITE TIME START: SITE TIME FINISH: LUNCH PERIOD: _ TRAVEL TIME: VERIFIED BY: DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND I OR THE.yPR9'PLANS SPECIFICATIONSAND AP'PLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT _A 9 /Ir< cnttI Date of Report -- ICBO Certification Number ' -$' ST i/ Print Name / City / County Certification Numb Rev: 7/97 Corporate: 2992 E. La Palma Ave:, Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland EmpIIG. 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 HELD REPORT TYPE OF WORK (INSPECTOR OTECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) APPROVED PLANS (Y) (N) SPECS (Y) (N) - APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEK ENDING PROJECT. NO. tcrD2, AO ENGINEER REPORT NO. PG OF CONTRACTOR . Lt PLAN FILE NO. . PERMIT NO. (18 C) 5C r SUB-CONTRACTOR L A\I.-I r i PROJECT NAME Lc INSPECTION ADDRESS . ADDRESS OF PROJECT AS, REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL S O I L M A N U A L - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON-CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPO R T WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED , S O N O T E O N T H E O R I G I N A L D E F I C I E N C Y R E P O R T A N D SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED -BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR M A T E R I A L T E S T R E P O R T S ) : CONTRACTORS EQUIPMENT/ MANPOWER USED: AREA, GRID LINES, PIECES OBSERVED: STRUCTURAL NOTES. DETAIL. OR RFIS USED: REMAn INCLUDING MEETINGS: c-c -'-4 :rT:: L3\T cA$cm t 'IC'. A Nc. N. -- r r Q ViuS AT Rcc r co r wc& N o \- 'O REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: TEMPERATURE: SAMPLES TAKEN: TESTS REQUIRED: SITE TIME START.J.D- 3 SITE TIME FINISH: LUNCH PERIOD: TRAVEL TIME VERIFIED (DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED AB O V E A N D T H A T T H I S W O R K C O M P L I E S W I T H T H E S O I L I N V f S T I G A T I O N R E C O M M E N D A T I O N S , AND I OR THE APPROVE ~~PECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OT H E R W I S E N O T E D I N T H E D E F I C I E N C Y R E P O R T Signature . ( -... Dale of Report ICBO Certification Number Print Name , .: City/ County Certification Number Corporate: 2992 E. La Palma Ave., Ste Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empi. 14320 Elsworth Street, Ste. Cl-01 Moreno Valley, CA 92553 Tel: 951.653.4999- Fax: 951.653.4666 FIELD REPORT TYPE OF WORK W.INSPECTOR 0 TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS (Y) (N) - APPROVED PLANSN) APPROVED SHOP DRAWING (Y) (N) ARCHITECT 5 NM T \ I3c NL Lt FOR WEEK ENDING . . PAWEd. NO. ENGINEER . C- REPORT NO. PG OF - CONTRACTOR A. ccci PLAN FILE NO. . PERMIT NO. C R perr7 g SUB-CONTRACTOR L Ai . PROJECT NAME ' Pim MR INSPECT! ADDRESS Cwr Avc -C~L-sa&,n,_SA ADDRESS OF PROJECT - As REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAJJMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON-CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, E T C . , F I L L O U T A N D A T T A C H A D E F I C I E N C Y R E P O R T WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DE F I C I E N C Y R E P O R T A N D SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORT S ) : A3 CONTRACTORS EQUIPMENT/ MANPOWER USED: AREA, GRID LINES, PIECES OBSERVED: 2c Lu.s A 1 N,L,]-.° STRUCTURAL NOTES, DETAIL, OR AFIS USED: I\PPRbVo RAs, RE , INCLUDING MEETINGS: -. QFcRAF.D Qc*kC, tAAc . LIM AT 2. N rLX 'ONAMr c - ma A Oct c vz c ALL \LU ZTh VLR ?x) . tS Acc REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: TEMPERATURE: SAMPLES TAKEN: TESTS REQUIRED: SITE TIME START: AtA LUNCH PERIOD: SITE TIME FINISH: 1 2.._ TRAVEL TIME: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THI S W O R K C O M P L I E S W I T H T H E S O I L I N V E S T I G A T I O N R E C O M M E N D A T I O N S , AND/OR THE APPROVED PLANS, SPE IFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, U N L E S S O T H E R W I S E N O T E D I N T H E D E F I C I E N C Y R E P O R T / (_)!Lc o LTIII Signature Date of Report ICBO Certification Number Print Name City / County Certification Number P MTG.L ;i7AL_ C) Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 n Inland Empire:' 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TY F WORK SPECTOR 0 TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS (Y) (N) APPROVED PLANS Y) (N) APPROVED SHOP DRAWING )Y) (N) HITECI 1;.M~Bq - CWOE60 - FOR WEEKENDING P~R .ECT NO W~ / ENGIR - 5 REPORT NO. PG OF IMR lot PLAN FILE NO. IM0057DO AI SUTTQ; QA ('M1 7 TtAME 12 - A ' INSPECTION ADDRESS k OF T TbTh I NwaA TDI kub REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUALJMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON-CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RF1S, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. A 9 IS US BY ONTRACT LU E ES PORT OR MATE AL TEST REPORTS) - M& VC?ATI DO ' TOPEQWPMENTJMojWERUS )aS &tud 1'1 1?1t1- CR1 LINES, PIECE OBSERV D: I oi&jva6(/& 7UAkL9 A 4ST CTIJRAL NOTES, 0 IL, R'RFIS U El,:' 1/WtW't %2 (1.(1(ds. kt&wf, nkiA aAwt. %1AMI, )7ço51j /9173 L5.2 //E ; /041? icii L -s REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: (44tt't.1 c1.a.'V SAMPLES TAKEN: 2%!4 TEMPERATURE: TESTS REQUIRED: zz SITE TIME START: SITE TIME FINISH: LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH SECTION OF THE BUILDING CODE, UNLESS OTHERWISE I Signature Date of Report Print Nam OIL INVESTIGATION RECOMMENDATIONS, IN THE DEFICIENCY REPORT 6M001 ~~H ICBO Certification Number City / County Certification Number Rev: 7/97 Corporate: 2992 E. La Palma Ave., Ste Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 n Inland Empire: 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT ,,DE ,.OF WORK 1NSPECTOR 0 TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS (V) IN APPROVED PLANS (Y) (N) APPROVED SHOP DRAWING (Y) (N) AeHITECT r-'k Cmsl+r FOR WEEK ENDING I PROJECT. NO ENGER REPORT NO. PG OF COCTOR A . C LC M ______________________ PLAN FILE NO. PER IT NO SUB-C1ONTRACTOR iAcaA (ti C PR /yCT NAME INSPECTION ADDRESS L_- ADDRESS OF PROECI /q,'( / W't ?o L4/ REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUATJMTGi, SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON-CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. A MATERIALS USED BVCONTRACTOR pt4[Is1 (INCLUDE RESEARCH R,PORT NO. OR MATERIAL TST REPORTS): CONTRACTORS EOUIPMENT/ MANPOWER USED: ARID I NES, PIECES OBSERVED- QIARI STRCTURAL NOTES, DETAIL. OR RFIS USED: /17provd c 1D/2h E4ARKS, INL7JUD!NGMEEflNGS: /l V,/A,g ith t1?eI ct/,i 4t'v ,vr/,'d di, /4 5p/f/ .pe ovdp/ ic/J-Dpi /' e7 V r-' REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: 44 $i#z..#14-/ TEMPERATURE: SAMPLES TAKEN: TESTS REQUIRED: A SITE TIME START: t'70 ,' SITE TIME FINISH: 3t37 1/JV//, _..- •1 LUNCH PERIOD: TRAVEL TIME: VERIFIED A THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES PRO P S, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERI ig nature Data of Report Print Name E SOIL INVESTIGATION RECOMMENDATIONS, ED IN THE DEFICIENCY REPORT 2oo7c çfy ICBO Certification Number City / County Certification Number Rev: 7/97 (H Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 I Inland Empire: 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAIJMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON-CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. IAIS USED BY CONTRACTO INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): 9fr1 Sco, 000pc, 04 I4ailsovLs ,.4eTRACTORS EQUIPMENT/ MANPOWER USED- MOM -EMA JU Dt j,DJP GRID )LIVES, PIECES OBSERVED: ?p -- -uuc Poita 1.717— X ]M xi4/(,c 1 Qifp:k -l/c -FlI -- x/D-if-4/I/E//_1 1o/L -ciM- - @ G/7 Ai/ IiA'i'in Joohnt16 1 '/t4 (d/Ufli,i pcLS. UCTIJRAL NOTES, 0 TAIL, OR RFIS S Appvciea wtN.,2kqh 2TIat ioti4tth f i'-s' a4& ci'ft, rvi, irt avi& o*aoe. 2sds Lf Lvu1ttS C4videA kc -vcLd't tAst'( IN -73C-i 5-9 " T-1,112- •In -,6,1? /—'/L 4 77 ) 5..4L7 -'7- /3L?IL/ 1-16 REWORK AS PERCENT OF ALL WORK TODAY' ' PECENT PROJECT COMPLETION: WEATHER: EU.VIvlLf TEMPERATURE: Paa ....._b SAMPLES TAKEN: 2-5_74S 4 TESTS REQUIRED: SITE TIME START: 0603 0 SITE TIME FINISH: LUNCH PERIOD: ________________________ TRAVEL TIME: __________________________ VERIFIED ___________________________ c. 0 CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AN THE APP SECTION OF THE BUILDING CODE UNLESS OTHERWISE NOTED sPEcIFIcATIsAND APPLICABLE SEC 0 95 / . IN THE DEFICIENCY REPORT /N SIgnature Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 Corporate:' San Diego/Imperial County: 2992 E. La Palma Ave., Ste. A 7313 Carroll Road, Suite 9 Anaheim, CA 92806 San Diego, CA 92121 Tel: 714.632.2999 Tel: 858.537.3999 Fax: 714.632.2974 Fax: 858.537.3990 Inland Empire:' 6F 14320 Elsworth Street, Ste. Cl 01 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK JVQ INSPECTOR OTCHNICIAN 2e. oi... AVAILABLE: SOIL REPORT (Y) (N) SPECS (Y) (N) APPROVED PLANS (Y) (N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT ir'( FOR WEEK ENDING Z 1U'O$ PROJECT. N ,J 1(f'r)f-C4 ENGINEER REPORT NO. PG 1 OF CONTRACTOR L PLAN FILE NO. - 4114 PERMIT NO. C oSOO75) kg cic,o SUB-CONTRACTOR 4-1%.4 j A—S PROJECT NAME vv INSPECTION ADDRESS ADDRESS OF PROJECT COLLE.0 CJQLS AbJ tfW4Q. REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUALJMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON-CONFORMING WORK AT THE END OF THE WORKDAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATE IALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): ,4Si-vw 45 ii o, TWS A 6.rs , Au4Iz,i. z,o4-S: ASiiA5 't CONTRACTORS EQUIPMENT/ MANPOWER USED: AREA, GRID LINES, PIECES OBSERVED: iiii4. ,jtJ -rE-b I24L J84zvi 5; o.'/r. PjZ &/f 4F 5. CJ fo7 —/,ir1 ,toj P" t2' Ic. 4MtJkI2 i,€C/i-J / STRECThIM.L FJ8O1AIL,OLBFI -N8BC,: -r'oJf. ,44 REMARKS. JNCLUOING MEETINGS: -)4t cJ $Z-4/ ,4. 4,ot' i.t C/y REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: I 4#412.. SAMPLES TAKEN: TEMPERATURE: 7 TESTS REQUIRED: - SITE TIME START: 1 4:e Pr\ SITE TIME FINISH: '6W. 60 ---Pon LUNCH PERIOD: ____________________ TRAVEL TIME: ' VERIFIED I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIEH THE SOIL INVESTIGATION RECOMMENDATIONS. AND / APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report ICBO Certification Number ",/ /2, ___________ Print Name City / County Certification Number Rev: 7/97 1 Corporate: San Diego/Imperial County: Inland Empi, Los Angeles/ventura County: 2992 E. La Palma Ave., Ste. A 7313 Carroll Road, Suite G 14320 Elsworth Street, Ste. C101 13010 San Fernando Rd., Unit 1 Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley, CA 92553 Sylmar, CA 91342 Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 Tel: 818.833.8100 Fax: 714.632.2974 F,x 858.537.3990 Fax 951 653.4666 Fax: 818.833.0085 -4 L 5PE.cflO. FIELD REPORT TYPE OF WORK INSPECTOR 0 TECHNICIAN €a bp4ç7.',J AVAILABLE: SOIL REPORT ('4') (N) SPECS (Y) (N) APPROVED PLANS (Y) (N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT . 15n..%L C o FOR WEEK ENDING _z_t_o1 PROJECT. NO. D4L ENGINEER 4 &tL. REPORT NO. PG ' OF D -ZoøS (:i3" CONTRACTOR Lu c.t.D1 Cor- r 66 41 7 Z PLAN FILE NO. PERMIT NO.0 la O'S CQ79 9 o5 C0e ) SUB-CONTRACTOR PROJECtAE tôAd fota INSPECTION ADDRESS ADDRESS OF PROJECT Col le I CQLM) — T%V1 C-2_ REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUALJMTGi. SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON-CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MAT8.4ALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT/ MANPOWER USED: AREA, GRID LINES, PIECES OBSERVED: . Cb)t14y0uc Fouub A'r,o.-) ( PZI o6'rL4-S'Foe- 4. 4 . c4&.-so ws Col tkwo-c-U.-I t4- 4L50 )S%410(t2C4 ,.'62--- QJ2_ SfQkti(t$. S S'b'b ls1 'zol f L a eei r-c 9c- 0U2.4 - 2e-- C.26 - REMARKS. INCLUDING MEETINGS: I sJ del Cof k4 4j t,o 4\6L1 4 O'Z- 4 -t-i +I1ec cc n-k CS±oçec1 • '-- +- k ref-J tLI t REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: (2) ,8B— 2_3 WEATHER: TEMPERATURE SAMPLES TAKEN: TESTS REQUIRED: 11 SITE TIME START: - SITE TIME FINISH: . . II LUNCH PERIOD: TRAVEL TIME: -5 VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, ANDeR4Q,E APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT / 1(Q / ZS ________ Signature Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 Corporate: San Diego/Imperial County: Inland Emp( 2992 E. La Palma Ave., Ste. A 7313 Carroll Road, Suite G 14320 Elsworth Street, Ste. C1 01 Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 714.632.2974 F 858.537.3990 Fax: 951.653.466 L 3Pcic. FI ELD REPORT Los AngelesNentura County: 13010 San Fernando Rd., Unit 1 Sylmar, CA 91342 Tel: 818.833.8100 Fax: 818.833.0085 TYPE OF WORK INSPECTOR 0 TECHNICIAN 1:g4 '"-4', AVAILABLE: SOIL REPORT )Y) (N) SPECS (Y) (N) APPROVED PLANS (Y) (N) APPROVED SHOP DRAWING )Y) (N) ARCHITECT d5 ,L Cd FOR WEEK ENDING —Zt —o"5' PROJECT. NO. Dt4( ENGINEER REPORT NO. PG ' OF CONTRACTOR ?'r L Ll 5-A 9-01 (.o,r- 497 2.f PLAN FILE NO. _r PERMIT NO.0 05 0090 ) SUB-CONTRACTOR , PROJEC ME ?etrg INSPECTION ADDRESS ADDRESS OF PROJECT Coll eq gl4D. L) 4. T-o:t2-1 c.-1-- REPORTING REQUIREMENTS: ECBO FIELD INSPECTION MANUAIJMTGi. SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON-CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MA IALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): fP% f4U.Ot?_ .3 6go CONTRACTORS EQUIPMENT/ MANPOWER USED: AREA, GRID LINES, PIECES OBSERVED: FOIJ PJbA'NG 1(,-S ( ?re-,I.x %oo rt11,S 'Foe- 4 p C6pJTh4 uouj 'rj.'t.. ' €A.iL.., 42 r-vZ.-'r-x — ?l A4i t', ii.i • pa..ojtc 4 ,k tc.4e'~ 8 '4-i Col .. 41SOf p.cc4-ef +I 4r cJoz.c I'Q.2. cku15. S ULIUkAL rwt BA4...2PrI irr, ,&1I +tk sb-b C-Ie1 0p c Ioo.e Sol f? S 4.. a V REMARKS, INLUDINO MEETiNGS: B.. i C-. VA c i r4 r )pc t'o 4b\ 4, OQ-. 4 -f- (ç+d?HebC 4 C2oçeo _. L)aat g4J i.i I' c Co- 2t( #v111oJ?: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION& C2)bgS _13 WEATHER: TEMPERATURE: SAMPLES TAKEN: TESTS REQUIRED: SITE TIME START: 4'ø SITE TIME FINISH: LUNCH PERIOD: ________________________ TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND E APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT _______ i iz*s Signature Date of Report ICBO Certification Number Prinf Name City / County Certification Number Rev: 7/97 bi Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: - 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite CI01, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909)653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel:(818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH-CONCRETE ASTM C39 ** CITY OF CARLSBAD-BLDG INSPECTION DEPT. 1635 FARADAY AVENUE CARLSBAD, CA 92008 File No.: Permit No.: Project No.: 1002A01 Project Name: PALOMAR POINTE COLLEGE BLVD & ASTON AVE CARLSBAD, CA Client: LANIKAI MANAGEMENT CORP. A Set No.: 5-14655 Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 8/18/2005 6X 12 28.27 55,570 1,970 Cone& Split 28 9/8/2005 6X12 28.27 81,120 2,870 Shear 28 9/8/2005 6X 12 28.27 81,750 2,890 Cone A Specified Strength: 3,000 PSI Sampled By: JEFF WINTER Location: BUILDING C PERIMETER POUR STRIP-EAST WALL Concrete Supplier: HANSON AGGREGATES Mix No.: 3039 Ticket No.: 846272 Water added at Site: 10.00 gal. By DRIVER Cement Type: 11/V Mix Time: 45 mm. Remarks: Distribution: LANLKAI MANAGEMENT CORP. LUSARDI CONSTRUCTION COMPANY CITY OF CARLSBAD-BLDG INSPECTION DEPT. LUSARDI CONSTRUCTION COMPANY **LAB COPY** Date Sampled: 8/11/2005 Date Received: 8/16/2005 Concrete Temp: 73 OF Ambient Temp: 75 OF Slump: 4.00 .in. Tested at: San Diego Respectfully Submitted, MTGL, Inc. cL4 c Eduardo Dizon, R.C.E. 2880 PSI 28-day compression test does not comply with the specified strength. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999. Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite Cl 01, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH-CONCRETE ASTM C39 ** CITY OF CARLSBAD-BLDG INSPECTION DEPT. 1635 FARADAY AVENUE CARLSBAD, CA 92008 File No.: Permit No.: Project No.: 1002A01 Project Name: PALOMAR POINTE COLLEGE BLVD & ASTON AVE CARLSBAD, CA Client:. LANIKAI MANAGEMENT CORP. A Set No.: 5-14293 Age . (Days) Date Tested Nominal Size Actual Area (Sq. Inch) . Load (lbs.) Strength (psi) Type of Fracture 3 7/15/2005 6X12 28.27 98,020 .3,470 Cone &Split 7 7/19/2005 6X 12 28.27 95,430 3,380 Cone & Split 7 7/19/2005 6X 12 28.27 96,420 3,410 Cone& Split 28 8/9/2005 6X12 28.27 A Specified Strength: 4,000 PSI Sampled By: JESSE RANDOLPH Location: PANEL S5 Concrete Supplier: HANSON AGGREGATES Mix No.: 4033000 Ticket No.: 832505 Water added at Site: 10.00 gal. By LUSARDI Cement Type: IIJV Mix Time: 56 mm. Remarks: Distribution: LANIKAI MANAGEMENT CORP. LUSARDI CONSTRUCTION COMPANY CITY OF CARLSBAD-BLDG INSPECTION DEPT. LUSARDI CONSTRUCTION COMPANY **LAB COPY** Date Sampled: 7/12/2005 Date Received: 7/13/2005 Concrete Temp: 90 OF Ambient Temp: 82 OF Slump: 4.50 in. Tested at: San Diego Respectfully Submitted, MTGL, Inc. Eduardo Dizon, R.C.E. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite CIOI, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH-CONCRETE ASTM C39 ** CITY OF CARLSBAD-BLDG INSPECTION DEPT 1635 FARADAY AVENUE CARLSBAD, CA 92008 Client: SUMMIT BUILDERS A Set No.: 5-13972 File No.: Permit No.: Project No.: 8900A01 Project Name: ANTHROPOLOGY SHELL REMODEL 1911 CALLE BARCELONA CARLSBAD, CA A Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 6/17/2005 6X12 28:27 101,130 3,580 Cone &Split 28 7/8/2005 6 X 12 28.27 28 7/8/2005 6 X 12 28.27 28H 7/8/2005 1 6X12 • 28.27 Specified Strength: 3,000 PSI Sampled By: JESSE RANDOLPH Location: FOOTING AT GRID LINE 6/B - 6/13 Concrete Supplier: VULCAN MATERIALS COMPANY Mix No.: 303005 Ticket No.: 127140 Water added at Site: gal. By Cement Type: Il/V Mix Time: 59 mm. Remarks Distribution: THOMAS ENTERPRISES CITY OF CARLSBAD-BLDG INSPECTION DEPT. **LAB COPY** Date Sampled: 6/10/2005 Date Received: 6/14/2005 Concrete Temp: 76 OF Ambient Temp: 64 OF Slump: 4.00 in. Tested at: San Diego Respectfully Submitted, MTGL, Inc. QAt Eduardo Dizon, R.C.E. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH-CONCRETE ASTM C39 ** CITY OF CARLSBAD-BLDG INSPECTION DEPT. 1635 FARADAY AVENUE CARLSBAD, CA 92008 Client: LANIKAI MANAGEMENT CORP. A Set No.: 5-13932 File No.: Permit No.: Project No.: 1002A01 Project Name: PALOMAR POINTE COLLEGE BLVD & ASTON AVE CARLSBAD, CA A Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 6/15/2005 6 X 12 28.27 66,730 2,360 Shear- 28 7/6/2005 6 X 12 28.27 28 7/6/2005 6X12 28.27 28H 7/6/2005 6X12 28.27 Specified Strength: 3,000 PSI Sampled By: JESSE RANDOLPH Location: SLAB ON GRADE AT GRID LINE 16/E Concrete Supplier: HANSON AGGREGATES Mix No.: 3033500 Ticket No.: 8144773 Water added at Site: 5.00 gal. By LUSARDI Cement Type: Il/V Mix Time: 50 mm. Remarks: Date Sampled: 6/8/2005 Date Received: 6/9/2005 Concrete Temp: 75 OF Ambient Temp: 70 OF Slump: 4.75 in. Tested at: San Diego Distribution: LANIKAI MANAGEMENT CORP. LUSARDI CONSTRUCTION COMPANY CITY OF CARLSBAD-BLDG INSPECTION DEPT. **LAB COPY** Respectfully Submitted, MTGL, Inc. Eduardo Dizon, R.C.E. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite 0, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite CIOI, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax:(818) 833-0085 Report of: COMPRESSIVE STRENGTH-CONCRETE ASTM C39 ** CITY OF CARLSBAD-BLDG INSPECTION DEPT. 1635 FARADAY AVENUE. CARLSBAD, CA 92008 File No,: Permit No.: Project No.: 1002A01 Project Name: PALOMAR PO[NTE COLLEGE BLVD & ASTON AVE CARLSBAD, CA Client: LANIKAI MANAGEMENT CORP. A A Set No.: 5-13931 Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 6/15/2005 6 X 12 28.27 48,360 1,710 Cone 28 7/6/2005 6X12 28.27 28 7/6/2005 6X12 28.27 28H 7/6/2005 6X 12 28.27 Specified Strength: 3,000 PSI. Sampled By: JESSE RANDOLPH Location: SLAB ON GRADE AT GRID LINE E/7 Concrete Supplier: HANSON AGGREGATES Mix No.: 3033500 - Ticket No.: 815121 Water added at Site: gal. By Cement Type: LI/V Mix Time: 32 mm. Remarks: Date Sampled: 6/8/2005 Date Received: 6/9/2005 Concrete Temp: 81 OF Ambient Temp: 77 OF Slump: 4.50 in. Tested at: San Diego Distribution: LANIKAI MANAGEMENT CORP. LUSARDI CONSTRUCTION COMPANY CITY OF CARLSBAD-BLDG INSPECTION DEPT. **LAB COPY** Respectfully Submitted, MTGL, Inc. Eduardo Dizon, R.C.E. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street,,Suite C101, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit I, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH-CONCRETE ASTM C39 ** - CITY OF CARLSBAD-BLDG INSPECTION DEPT. 1635 FARADAY AVENUE CARLSBAD, CA 92008 File No.: Permit No.: Project No.: 1002A01 Project Name: PALOMAR POINTE COLLEGE BLVD & ASTON AVE CARLSBAD, CA Client: LANIKAT MANAGEMENT CORP. A Set No.: 5-13891 Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 6/14/2005 6X 12 28.27 72,620 2,570 Cone & Split 28 7/5/2005 6X12 . 28.27 28 7/5/2005 6X 12 28.27 28H 7/5/2005 6X12 .28.27 A Specified Strength: 3,000 PSI Sampled By: JESSE RANDOLPH Location: SLAB ON GRADE AT GRID LINE 2.6/B.5 Concrete Supplier: HANSON AGGREGATES Mix No.: 3033500 Ticket No.: 814017 Water added at Site: gal. By Cement Type: IIJV Mix Time: 54 mm. Remarks: Date Sampled: 6/7/2005 Date Received: 6/8/2005 Concrete Temp: 74 °F Ambient Temp: 67 °F Slump: 4.75 in. Tested at: San Diego Distribution: LANIKAI MANAGEMENT CORP. LUSARDI CONSTRUCTION COMPANY CITY OF CARLSBAD-BLDG INSPECTION DEPT. **LAB COPY** Respectfully Submitted, MTGL, Inc. Eduardo Dizon, R.C.E. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite CI01, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH-CONCRETE ASTM C39 ** CITY OF CARLSBAD-BLDG INSPECTION DEPT. 1635 FARADAY AVENUE CARLSBAD, CA 92008 File No.: Permit No.: Project No.: 1002A01 Project Name: PALOMAR POINTE COLLEGE BLVD & ASTON AVE CARLSBAD, CA Client: LANIKAI MANAGEMENT CORP. A Set No.: 5-13892 Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 6/14/2005 6X 12 "28.27 45,570 1,610 Cone 28 7/5/2005 6X12 28.27 28 7/5/2005 6X 12 28.27 28H 7/5/2005 6 X 12 28.27 A Specified Strength: 3,000 PSI Sampled By: JESSE RANDOLPH Location: SLAB ON GRADE AT GRID LINE 1.51D.5 Concrete Supplier: HANSON AGGREGATES Mix No.: 3033500 Ticket No.: 814304 Water added at Site: gal. By Cement Type: lily Mix Time: 20 mm. Remarks: Distribution: LAI'fflCki MANAGEMENT CORP. LUSARDI CONSTRUCTION COMPANY CITY OF CARLSBAD-BLDG INSPECTION DEPT **LAB COPY** Date Sampled: 6/7/2005 Date Received: 6/8/2005 Concrete Temp: 78 OF Ambient Temp: 74 OF Slump: 4.50 in. Tested at: San Diego Respectfully Submitted, MTGL, Inc. cL4 c Eduardo Dizon, R.C.E. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite CIOI, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH-CONCRETE ASTM C39 ** CITY OF CARLSBAD-BLDG INSPECTION DEPT. 1635 FARADAY AVENUE CARLSBAD, CA 92008 File No.: Permit No.: Project No.: 1002A01 Project Name: PALOMAR POINTE COLLEGE BLVD & ASTON AVE CARLSBAD, CA Client: LANJKAI MANAGEMENT CORP A A Set No.: 5-13709 Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 5/31/2005 6X 12 28.27 57,010 2,020 Cone 28 6/21/2005 6X12 28.27 28 6/21/2005 6X12 28.27 28H 6/21/2005 6X12 28.27 Specified Strength:. 3,000 PSI Sampled By: JESSE RANDOLPH Location: FOOTING AT X ! - B/I Concrete Supplier: HANSON AGGREGATES Mix No.: 3033500 Ticket No.: 807681 Water added at Site: 5.00 gal. By LUSARDI Cement Type: lI/V Mix Time: 42 mm. Remarks: Date Sampled: 5/24/2005 Date Received: 5/25/2005 Concrete Temp: 80 OF Ambient Temp: 68 OF Slump:. 4.50 in. Tested at: San Diego Distribution: LANIKAI MANAGEMENT CORP. LUSARDI CONSTRUCTION COMPANY CITY OF CARLSBAD-BLDG INSPECTION DEPT. **LAB COPY** Respectfully Submitted, MTGL, Inc. Eduardo Dizon, R.C.E. Respectfully Submitted, MTGL, Inc. Eduardo Dizon, R.C.E. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH-CONCRETE ASTM C39 ** CITY OF CARLSBAD-BLDG INSPECTION DEPT. 1635 FARADAY AVENUE CARLSBAD, CA 92008 File No.: Permit No.: Project No.: 1002A01 Project Name: PALOMAR POINTE COLLEGE BLVD & ASTON AVE CARLSBAD, CA Client: LANIKAI MANAGEMENT CORP. A Set No.: 5-13708 Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 5/31/2005 6 X 12 28.27 81,800 2,890 Shear 28 6/21/2005 6 X 12 28.27 76,270 2,700 Cone & Split 28 6/21/2005 6 X 12 28.27 80,010 2,830 - Cone & Split 56 7/19/2005 6X12 28.27 A Specified Strength: 3,000 PSI Sampled By: JESSE RANDOLPH Location: FOOTING AT 3/G - 3/17 Concrete Supplier: HANSON AGGREGATES Mix No.: 3033500 Ticket No.: 807485 Water added at Site: 5.00 gal. By LUSARDI Cement Type: Il/V Mix Time: 42 mm. Remarks: Distribution: LANIKAI MANAGEMENT CORP. LUSARDI CONSTRUCTION COMPANY CITY OF CARLSBAD-BLDG INSPECTION DEPT. **LAB COPY** Date Sampled: 5/24/2005 Date Received: 5/25/2005 Concrete Temp: 80 OF Ambient Temp: 63 OF Slump: 4.75. in. Tested at: San Diego 2760 PSI 28-day compression test does not comply with the specified strength. Respectfully Submitted, MTGL, Inc. Eduardo Dijon, R.C.E. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 - Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite CIOI, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH-CONCRETE ASTM C39 ** CITY OF CARLSBAD-BLDG INSPECTION DEPT. 1635 FARADAY AVENUE CARLSBAD, CA 92008 File No.: Permit No.: Project No.: 1002A01 Project Name: PALOMAR POINTE COLLEGE BLVD & ASTON AVE CARLSBAD, CA Client: LANIKAI MANAGEMENT CORP. A Set No.: 5-13709 Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 5/31/2005 6 X 12 28.27 57,010 2,020 Cone 28 6/21/2005 6X12 28.27 74,160 2,620 Cone 28 6/21/2005 6'X 12 28.27 75,570 2,670 Cone 56 7/19/2005 6X12 28.27 A Specified Strength: 3,000 PSI Sampled By: JESSE RANDOLPH Location: FOOTING AT Xl/ - B/I Concrete Supplier: HANSON AGGREGATES Mix No.: 3033500 Ticket No.: 807681 Water added at Site: 5.00 gal. By LUSARDI Cement Type: TI/V Mix Time: 42 mm. Remarks: Distribution: LANIKAT MANAGEMENT CORP. LUSARDI CONSTRUCTION COMPANY CITY OF CARLSBAD-BLDG INSPECTION DEPT. **LAB COPY** Date Sampled: 5/24/2005 Date Received: 5/25/2005 Concrete Temp: 80 °F Ambient Temp: 68 °F Slump: 4.50 in. Tested at: San Diego 2640 PSI 28-day compression test does not comply with the specified strength. Respectfully Submitted, MTGL, Inc. Eduardo Dizon, R.C.E. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite CIOI, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH-CONCRETE ASTM C39 ** CITY OF CARLSBAD-BLDG INSPECTION DEPT. 1635 FARADAY AVENUE CARLSBAD, CA 92008 File No.: Permit No.: Project'No.: 1002A01 Project Name: PALOMAR POINTE COLLEGE BLVD & ASTON AVE CARLSBAD, 'CA Client: LANIKAI MANAGEMENT CORP. A Set No.: 5-13708 Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs) Strength (psi) . Type of Fracture 7 5/31/2005 6 X 12 28.27 81,800 2,890 Shear 28 6/21/2005 6X 12 ' 28.27 76,270 2,700 Cone &Split 28 6/21/2005 6 X 12 28.27 1 80,010 1 2,830 Cone & Split 56 7/19/2005 6 X 12 28.27 89,570 3,170 Cone & Split A Specified Strength: 3,000 PSI Sampled By: JESSE RANDOLPH Location: FOOTING AT 3/G - 3/F Concrete Supplier: HANSON AGGREGATES Mix No.: 3033500 Ticket No.: 807485 - Water added at Site: 5.00 gal. By LUSARDI Cement Type: Il/V . Mix Time: 42 mm. Remarks: Distribution: LANIKAI MANAGEMENT CORP. LUSARDI CONSTRUCTION COMPANY CITY OF CARLSBAD-BLDG INSPECTION DEPT.' LUSARDI CONSTRUCTION 'COMPANY **LAB COPY** Date Sampled: 5/24/2005 Date Received: 5/25/2005 Concrete Temp: 80 oF Ambient Temp: 63 °F Slump: 4.75 in.' Tested at: San Diego 2760 PSI 28-day compression test does not comply with the specified strength. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit I, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH-CONCRETE ASTM C39 ** CITY OF CARLSBAD-BLDG INSPECTION DEPT. 1635 FARADAY AVENUE CARLSBAD, CA 92008 File No.: Permit No.: Project No.: 1002A01 Project Name: PALOMAR POINTE COLLEGE BLVD & ASTON AVE CARLSBAD, CA Client: LANIKAI MANAGEMENT CORP. A Set No.: 5-13708 Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 5/31/2005 6 X 12 28.27 81,800 2,890 Shear 28 6/21/2005 6X 12 28.27 28 6/21/2005 6X 12 28.27 28H 6/21/2005 6X 12 28.27 A Specified Strength: 3,000 PSI Sampled By: JESSE RANDOLPH Location: FOOTING AT 3/G - 3/F Concrete Supplier: HANSON AGGREGATES Mix No.: 3033500 Ticket No.: 807485 Water added at Site: 5.00 gal. By LUSARDI Cement Type: I11V Mix Time: 42 mm. Remarks: Date Sampled: 5/24/2005 Date Received: 5/25/2005 Concrete Temp: 80 OF Ambient Temp: 63 OF Slump: 4.75 in. Tested at: San Diego Distribution: LAJ"4IKAI MANAGEMENT CORP. LUSARDI CONSTRUCTION COMPANY CITY OF CARLSBAD-BLDG INSPECTION DEPT. **LAB COPY** Respectfully Submitted, MTGL, Inc. QAt Eduardo Dizon, R.C.E. Corporate: 1 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 6534666 Branch: 13010 San' Fernando Road, Unit I, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH-CONCRETE ASTM C39 ** CITY OF CARLSBAD-BLDG INSPECTION DEPT. 1635 FARADAY AVENUE CARLSBAD, CA 92008 File No.: Permit No.: Project No.: 1002A01 Project Name: PALOMAR POINTE COLLEGE BLVD & ASTON AVE CARLSBAD, CA Client: LANIKAI MANAGEMENT CORP. A Set No.: 5-13709 Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 5/31/2005 6 X 12 28.27 57,010 2,020 Cone 28 6/21/2005 6X12 28.27 74,160 2,620 Cone 28 6/21/2005 6 X 12 28.27 75,570 2,670 Cone 56 7/19/2005 6X 12 28.27 93,760 3,320 Cone & Split A Specified Strength: 3,000 PSI Sampled By: JESSE RANDOLPH Location: FOOTING AT XI/ - B/I Concrete Supplier: HANSON AGGREGATES Mix No.: 3033500 Ticket No.: 807681 Water added at Site: 5.00 gal. By LUSARDI Cement Type: Il/V Mix Time: 42 mm. Remarks: Date Sampled: 5/24/2005 Date Received: 5/25/2005 Concrete Temp: 80 °F - Ambient Temp: 68 °F Slump: 4.50 in. Tested at: San Diego Distribution: LANIKAI MANAGEMENT CORP. LUSARDI CONSTRUCTION COMPANY CITY OF CARLSBAD-BLDG INSPECTION DEPT. LUSARDI CONSTRUCTION COMPANY **LAB COPY** Respectfully Submitted, MTGL, Inc. QAt Eduardo Dizon, R.C.E. 2640 PSI 28-day compression test does not comply with the specified strength. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite CIOI, Moreno Valley, CA 92553 Tel: (90,9) 653-4999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH-CONCRETE ASTM C39 ** CITY OF CARLSBAD-BLDG INSPECTION DEPT. 1635 FARADAY AVENUE CARLSBAD, CA 92008 File No.: Permit No.: Project No.: I002A0I Project Name: PALOMAR POINTE COLLEGE BLVD &ASTON AVE CARLSBAD, CA Client: LANIKAI MANAGEMENT CORP. A Set No.: 5-13703 Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 5/30/2005 6 X 12 28.27 83,390 2,950 Cone & Split 28 6/20/2005 6 X 12 28.27 28 6/20/2005 6X12 28.27 28H 6/20/2005 6X12 28.27 A Specified Strength: 3,000 PSI Sampled By: JESSE RANDOLPH Location: GRADE BEAM AT XI /I - B/I Concrete Supplier: HANSON AGGREGATES Mix No.: 3033500 Ticket No.: 806750 Water added at Site: gal. By Cement Type: Il/V Mix Time: 70 mm. Remarks: Distribution: LANIKAI MANAGEMENT CORP. LUSARDI CONSTRUCTION COMPANY CITY OF CARLSBAD-BLDG INSPECTION DEPT. **LAB COPY** Date Sampled: 5/23/2005 Date Received: 5/24/2005 Concrete Temp: 75 OF Ambient Temp: 66 OF Slump: 4.25 in. Tested at: San Diego Respectfully Submitted, MTGL, Inc. c Eduardo Dizon, R.C.E. Respectfully Submitted, MTGL, Inc. Eduardo Dizon, R.C.E. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714)632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit I, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH-CONCRETE ASTM C39 ** CITY OF CARLSBAD-BLDG INSPECTION DEPT. 1635 FARADAY AVENUE CARLSBAD, CA 92008 File No.: Permit No.: Project No.: 1002A01 Project Name: PALOMAR POINTE COLLEGE BLVD & ASTON AVE CARLSBAD, CA Client: LANIKAI MANAGEMENT CORP. A Set No.: 5-13703 Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 5/30/2005 6X 12 28.27 83,390 2,950 Cone & Split 28 6/20/2005 6X 12 28.27 114,410 4,050 Cone & Split 28 6/20/2005 6 X 12 28.27 102,980 3,640 Cone & Split 28H 6/20/2005 6X12 28.27 A Specified Strength: 3,000 PSI Sampled By: JESSE RANDOLPH Location: GRADE BEAM AT XI /I - B/I Concrete Supplier: HANSON AGGREGATES Mix No.: 3033500 Ticket No.: 806750 Water added at Site: gal. By Cement Type: IIJV Mix Time: 70 mm. Remarks: Distribution: LANIKAI MANAGEMENT CORP. LUSARDI CONSTRUCTION COMPANY• CITY OF CARLSBAD-BLDG INSPECTION DEPT. **LAB COPY** Date Sampled: 5/23/2005 Date Received: 5/24/2005 Concrete Temp: 75 OF Ambient Temp: 66 OF Slump: 4.25 in. Tested at: San Diego 3840 PSI 28-day compression test complies with the specified strength. Respectfully Submitted, MTGL, Inc. Eduardo Dixon, R.C.E. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite CI01, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit I, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH-CONCRETE ASTM C39 ** CITY OF CARLSBAD-BLDG INSPECTION DEPT. 1635 FARADKtAVENUE CARLSBAD, CA 92008 File No.: Permit No.: Project No.: 1002A01 Project Name: PALOMAR POINTE COLLEGE BLVD & ASTON AVE CARLSBAD, CA Client: LANIKAI MANAGEMENT CORP. A Set No.: 5-13690 Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 5/27/2005 6 X 12 28.27 46,130 1,630 Shear 28 6/17/2005 6X 12 28.27 74,370 2,630 Cone & Split 28 1 6/17/2005 1 6X 12 1 28.27 72,690 2,570 1 Cone & Split 56 1 7/15/2005 1 6X12 1 28.27 A Specified Strength: 3,000 PSI Sampled By: JESSE RANDOLPH Location: FOOTING AT GRID LINE A19 - A16 Concrete Supplier: HANSON AGGREGATES Mix No.: 3033500 Ticket No.: 806402 Water added at Site: gal.. By Cement Type: Mix Time: mm. Remarks: Distribution: LANIKAI MANAGEMENT CORP. LUSARDI CONSTRUCTION COMPANY CITY OF CARLSBAD-BLDG INSPECTION DEPT. **LAB COPY** Date Sampled: 5/20/2005 Date Received: 5/23/2005 Concrete Temp: 82 OF Ambient Temp: 77 OF Slump: 4.50 in. Tested at: San Diego 2600 PSI 28-day compression test does not comply with the specified strength. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite Cl0l, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit I, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH-CONCRETE ASTM C39 ** CITY OF CARLSBAD-BLDG INSPECTION DEPT.. 1635 FARADAY AVENUE CARLSBAD, CA 92008 File No.: Permit No.: Project No.: I002A0l Project Name: PALOMAR POINTE COLLEGE BLVD & ASTON AVE CARLSBAD, CA Client: LANIKAI MANAGEMENT CORP. A Set No.: 5-13689 Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 5/27/2005 6 X 12 28.27 56,630 2,000 Shear 28 6/17/2005 6 X 12 28.27 82,220 2,910 Cone & Split 28 6/17/2005 6X 12 1 28.27 80,270 2,840 Shear 56 7/15/2005 6X 12 28.27 A Distribution: LANIKAI MANAGEMENT CORP. LUSARDI CONSTRUCTION COMPANY CITY OF CARLSBAD-BLDG INSPECTION DEPT **LAB COPY** Date Sampled: 5/20/2005 Date Received: 5/23/2005 Concrete Temp: 81 °F Ambient Temp: 73 Slump: 5.00 in.. Tested at: Sari Diego Respectfully Submitted, MTGL, Inc. I. QAt Eduardo Dizon, R.C.E. Specified Strength: 3,000 PSI Sampled By: JESSE RANDOLPH Location: FOOTING AT GRID LINE 9/H - 9/L Concrete Supplier: HANSON AGGREGATES Mix No.: 3033500 Ticket No.: 806252 Water added at Site: gal. By Cement Type: Mix Time: mm. Remarks: 2880 PSI 28-day compression test does not comply with the specified strength. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll-Road, Suite G, San Diego, CA 92121 - Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite CI01, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH-CONCRETE ASTM C39 ** CITY OF CARLSBAD-BLDG INSPECTION DEPT. 1635 FARADAY AVENUE CARLSBAD, CA 92008 File No.: Permit No.: Project No.: 1002A01 Project Name: PALOMAR POINTE COLLEGE BLVD & ASTON AVE CARLSBAD, CA Client: LANIKAI MANAGEMENT CORP. A Set No.: 5-13690 Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) . Strength (psi) Type of Fracture 7 5/27/2005 6X 12 28.27 46,130 1,630 Shear 28 6/17/2005 6 X 12 28.27 74,370 2,630 Cone & Split 28 6/17/2005 6 X 12 28.27 72,690 2,570 . Cone & Split 56 7/15/2005 6X 12 28.27 87,850 3,110 Cone & Split A Specified Strength: 3,000 PSI Sampled By: JESSE RANDOLPH Location: FOOTING AT GRID LINE A/9 - A16 Concrete Supplier: HANSON AGGREGATES Mix No.: 3033500 Ticket No.: 806402 Water added at Site: gal. By Cement Type: Mix Time: mm. Remarks Date Sampled: 5/20/2005 Date Received: 5/23/2005 Concrete Temp: 82 OF Ambient Temp: 77 OF Slump: 4.50 in. Tested at: San Diego ri Distribution: LANIKAI MANAGEMENT CORP. LUSARDI CONSTRUCTION COMPANY CITY OF CARLSBAD-BLDG INSPECTION DEPT. LUSARDI CONSTRUCTION COMPANY *.*LAB COPY** Respectfully Submitted, MTGL, Inc. Eduardo Dixon, R.C.E. 2600 PSI 28-day compression test does not comply with the specified strength. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit I, Sylmar, CA 91342 Tel: (818) 833-8100 Fax:(818) 833-0085 Report of: COMPRESSIVE STRENGTH-CONCRETE ASTM C39 ** CITY OF CARLSBAD-BLDG INSPECTION DEPT. 1635 FARADAY AVENUE CARLSBAD, CA 92008 File No.: Permit No.: Project No.: 1002A01 Project Name: PALOMAR POINTE COLLEGE BLVD & ASTON AVE CARLSBAD, CA Client: LANIKAI MANAGEMENT CORP. A A Set No.: 5-13690 Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 5/27/2005 6 X 12 28.27 46,130 1,630 Shear 28 6/17/2005 6X12 28.27 28 6/17/2005 6X12 .28.27 ___ 28H 6/17/2005 6X 12 28.27 ___ Specified Strength: 3,000 PSI Sampled By: JESSE RANDOLPH Date Sampled: 5/20/2005 Date Received: 5/23/2005 Location: FOOTING AT GRID LINE A19 - A16 Concrete Supplier: 1-LANSON AGGREGATES Concrete Temp: 82 OF Mix No.: 3033500 Ambient Temp: 77 OF Ticket No.: 806402 Water added at Site: gal. By Slump: 4.50 in. Cement Type: Mix Time: mm. Tested at: San Diego Remarks: - Respectfully Submitted, Distribution: LAJ'4IKAI MANAGEMENT CORP. - - MTGL, Inc. LUSARDI CONSTRUCTION COMPANY CITY OF CARLSBAD-BLDG INSPECTION DEPT. - **LAB COPY** QAt - Eduardo Dizon, R.C.E. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH-CONCRETE ASTM C39 ** CITY OF CARLSBAD-BLDG INSPECTION DEPT. 1635 FARADAY AVENUE CARLSBAD, CA 92008 File No.: Permit No.: Project No.: 1002A01 Project Name: PALOMAR POINTE COLLEGE BLVD & ASTON AVE CARLSBAD, CA Client: LANIKAI MANAGEMENT CORP. A Set No.: 5-13689 Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 5/27/2005 6 X 12 28.27 56,630 2,000 Shear 28 6/17/2005 6X12 28.27 28 6/17/2005 6X12 28.27 28H 6/17/2005 6X12 28.27 A Specified Strength: 3,000 PSI Sampled By: JESSE RANDOLPH Location: FOOTING AT GRID LINE 9/H - 9/L Concrete Supplier: HANSON AGGREGATES Mix No.: 3033500 Ticket No.: 806252 Water added at Site: gal. By Cement Type: Mix Time: mm. Remarks Date Sampled: 5/20/2005 Date Received: 5/23/2005 Concrete Temp: 81 OF Ambient Temp: 73 OF Slump: 5.00 in. Tested at: San Diego Distribution: LANIKAL MANAGEMENT CORP. LUSARDI CONSTRUCTION COMPANY CITY OF CARLSBAD-BLDG INSPECTION DEPT. **LAB COPY** Respectfully Submitted, MTGL, Inc. QAt Eduardo Dizon, R.C.E. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite CI01, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit I, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH-CONCRETE ASTM C39 ** CITY OF CARLSBAD-BLDG INSPECTION DEPT. 1635 FARADAY AVENUE CARLSBAD, CA 92008 Client: LAN IKAl MANAGEMENT CORP. A Set No.: 5-13689 File No.: Permit No.: Project No.: 1002A01 Project Name: PALOMAR POINTE COLLEGE BLVD & ASTON AVE CARLSBAD, CA A Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 5/27/2005 6 X 12 28.27 56,630 2,000 Shear 28 6/17/2005 6 X 12 28.27 82,220 2,910 Cone & Split 28 6/17/2005 6 X 12 28.27 80,270 2,840 Shear 56 7/15/2005 1 6 X 12 28.27 96,090 3,400. Cone Specified Strength: 3,000 PSI Sampled By: JESSE RANDOLPH Location: FOOTING AT GRID LINE 9/H- 9/L Concrete Supplier: HANSON AGGREGATES Mix No.: 3033500 Ticket No.: 806252 Water added at Site: gal By Cement Type: Mix Time: mm. Remarks: Distribution: LANIKAI MANAGEMENT CORP. LUSARDI CONSTRUCTION COMPANY CITY OF CARLSBAD-BLDG INSPECTION DEPT. LUSARDI CONSTRUCTION COMPANY **LAB COPY** Date Sampled: 5/20/2005 Date Received: 5/23/2005 Concrete Temp: 81 OF Ambient Temp: 73 OF Slump: 5.00 in. Tested at: San Diego Respectfully Submitted, MTGL, Inc. Eduardo Dixon, R.C.E. 2880-PSI 28-day compression test does not comply with the specified strength. Nov-10-2005 08:32prn From-GSSI ENGINEERS 619-687-3814 1-987 P.009/010 F-250 Proiect - PALOMAR POINTE CARL SBAD, CALIFORNIA CONSTRTJCTION OBSERVATION REPORT October 7, 2005 Met with: Pat Timmons, Project Manager with Lu.sardi Construction The site visit was to observe the framing in progress The structural work for buildings. A, B and C has been completed and the erection of the metal stud exterior wall framing was in progress on building A The moment frame connections and welding appear to have been completed. The overall quality of the construction appeared to be very good and in conformance with the plans and specifications Structural observation as required by the contract documents and CBC Section 1702 for the moment frame welding was performed. Please note that our observations are based on occasional. visits to the site. These should not be construed as the result of complete inspection services. The superintendent should assure that the work fully complies with the plans and specifications As always, we would be pleased to provide any clarifications when so requested. Bill Schell, S.E. OSSI Engineers Nov-10-2005 08:33pni From-GSSI ENGINEERS 619-687-3814 T-987 P.010/010 F-250 Project: -: PALOMARPOINTE CARLSBAD, CALIFORNIA CONSTRUCTION OBSERVATION REPORT August 29,2005 Met with.- Pat Timmons, Project Manager with Lusardi Construction The site visit was to observe the framing in progress. The fo'tindation work has been completed and the erection of the steel framing was in progress. Several of the moment frame connections appear to have been completed. The overall quality of the construction appeared to be very good and in conformance with the plans and specifications. Structural observation as required by the contract documents and CBC Section 1702 for the moment frame welding was performed Please note that our observations are based on occasional visits to the site. These - should not be construed as the rãult of complete inspection services. The superintendent should assure that the work fully àomplies with the plans and specifications. As always, we would be pleased to provide any clarifications when so requested: - - - / Bill Schell, S.E. -, GSSI Engineers . . . .. \ 4av710-2005 08 29pm Frani-GSSI ENGINEERS 619-687-3814 1-987 P001/010 F-250 V GSSI Facsimile Structural Engineers Fax: (619) 687-3814 Date: November 10, 2005 Attn: Craig Liorwat Tel: 1-858-793-4777 Company Smith Consulting Architects Fax 1-858-793-4787 Project: Palomar Pointe Project Number :4107A From Bill Schell, S E bschell®gssi-se corn Comments: - Craig, COR with metal stud details, and previous CORs for your file Bill V V Number of copies including this cover: & c2 2445 Fifth Avenue Surte 300 San Diego California 92101. Tel (62.9) 687-3810 Fax. (619) 687-381-4 Nov-10-2005 08:29pm From-OSSI ENGINEERS . 619-687-3814 1-987 P.002/010 F250 Protect:-- PALOMAR POINTE CARLSBAD, CALIFORNIA CONSTRUCTION OBSERVATION REPORT October. 28, 2005. Met with: . . Pat Timmons, Project Manager with Lusardi Construction The site visit was to observe the framingiñ progress. The structural work for buildings A, B, and C has been completed with the exception of the exterior wall framing. The details for the exterior wall framing, including the front lobby wall, were reviewed at the site and appeared acceptable. Enclosed are stamped details reflecting the as-built condition to supplement the construction documents. The overall quality of the construction appeared to be -very good and in conformance with the plans and specifications. Structural observation as re quired by the contract documents and CBC Section 1,702 forthe moment frame welding was also completed. Please note that our observations are based on occasional visits to the site. These should not be construed as the result of complete inspection services. The superintendent should assure that the work fully complies with the plans and specifications. As always, we would be pleased to provide any clarifications when so requested. : Bill Schell, S.E. . .. GSSI Engineers . . Nov-10-2005 08:29prn From-GSSI ENGINEERS 619-687-3814 1-987 P.003/010 F-250 IAIIS Nkihef % O GSSI PROJT______r_(L P _ *..- Ossi NC).__________ Structural Engineers GR B. Schell DATE 4-1 _____________ -4i / ', - ---H- LIL' iJ ._...1_.Tr: •l•'• itfI .. . ... I J. I - I 1 t1J T1.. T1T:7::. T . H*... .±...... . TJ:{ 1Ir IlIL I I I ii 1 ii II I i I) 1 I II Nov-10-2005 08:29pm From-GSSI ENGINEERS 619-687-3814 1-987 P004/010 F-250 OGSSI PROJECFfD& P-_- i _Vt A -. OSSIN0.£fr1f Structural Engineers B. Schell DAI1______________ . ' ---:.........' HH - ..... i. '. .. ... - . ........... . ... . . . - ...._. - - . :1 : . •. 1 I I : H - rrFr:J IJ Li4 10 177. - -L L ILI L L4: iIU Ill ; tr I *371 2 ' r I Te H LkL '1 1 t±1 -' H 1 ti r l 1 ' [I - - 4 I -I rj1 I1t1I1-1 II II- ii ¶ I ' I I I Nov-10-2005 08:30pni From-GSSI ENGINEERS 619-687-3814 T-987 P.005/010 F-250 O GSSI PROW ?A._A-fl-r"ci _A c3SSI ND, _________ Structural Engineers roii B.Schell - DATB___________ I : ""'! •_{l___; H 7t:.f: I1;*4i •;Y J. . 1 r1 fi r-44 i_i._. .1 •• r ....;•• f.Li .. .......... ._ .{L.J....;. I LJ 't iJL'1L I I f c- '--.-,---- •--J-U__ I rf HH Nov-10-2005 08:30pm From-GSSI ENGINEERS 619-687-3814 1-987 P.006/010 F-250 SET_i\"9 Or GSS1 PROJECT (7P'cOkm & go .,J OSSI NC).L(. Structural Engineers ENGR.. B. Schell - DATE_____________ L1.. ji Hti! _1 - '.j\ " ' HT TFt.:.: L . : HL1 H -H---4- j. ..I . I A cj ' II ' -HH I I I I Ic4r 1 1 I "r TT T -I . - •—r------- - .:...iI III -F I, - I liii 'I r - :1 . I Nov-10-2005 08:31pm From-GSSI ENGINEERS 619-687-3814 T-987 P.007/010 F-250 II f OP GSSI - A OSSINO._________ Structural Engineers ENGR.B. Schell DATE______________ 1 _1 L (t jDA- FF -Ht .. .. ........ .....I.......... L' L rr I 1 fPsi HtTr qfiA 4 Y L 1 L 4L L4 171 II f III ................... L.y... ...I....-. '.... ... t L r i 1 II I 1' II I II I 1 ii II II I Ii 1! 619-687-3814 T-987 PROJECT pA -A__._ ENGR. B.Schefl No-10-2005 08:32pm From-GSSI ENGINEERS GSSI Structural Engineers P.008/010 F-250 SHIFF — I — OSSINC,.. DA1____________