HomeMy WebLinkAbout1921 PALOMAR AIRPORT RD; 200 | 250; PC130022; Permit10-28-2013
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Plan Check Permit No PCI30022
Building Inspection Request Line (760) 602-2725
Job Address
Permit Type
Parcel No
Valuation
Reference #
Project Title
1921 PALOMAR OAKS WY CBAD
PLANCK
2120911800
$0 00
Lot#
Construction Type
NSA & SPEC SUITE - OFF TO OFF
// 3,671 SF FOR NSA IN STE 250 //121 SF SPEC SUITE
Status
Applied
Entered By
Plan Approved
Issued
Inspect Area
PENDING
03/27/2013
SKS
Applicant
VICTORIA MELVIN
STE 207
3160 CAMINO DEL RIO SOUTH
SAN DIEGO CA 92108
619-624-0521 X 14
Owner
COGNAC PLAZA LLC
C/O PRUDENTIAL REAL ESTATE INVEST
4 EMBARCADERO CTR #2700
SAN FRANCISCO CA 94111
Plan Check Fee $599 44
Additional Fees $0 00
Total Fees $599 44 Total Payments To Date $599 44 Balance Due $0 00
Inspector
FINAL APPROVAL
Date Clearance
NOTICE Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions" You have 90 days from the date this permit was issued to protest imposition of these fees/exactions If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
fees/exactions of which vou have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired
-C^l--^^ /( Cy^\^ oYVf.
OLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE LANNING NGINEERING UlLDING •HEALTH ] HAZMAT/APCD
i <W/ CITY OF
, CARLSBAD
Building Permit Application
1635 Faraday Ave , Carlsbad, CA 92008
Ph 760-602-2719 Fax 760-602-8558
email building@cadsbadca gov
www carlsbadca gov ^ t-^
Plan Check No. ^C- | ^ - Z 2-
Est. Value ( 0(p^ 75^^
Plan Ck. Deposit
Datejr/i?
it ^
SWPPP
JOBADDRESS'
9
SUITE#/SPAOE#/UNIT# APN
>^ 0-1/ M^l'n-pt. CT/PR0JECT# LOT# PHASE # tt OF UNITS tt BEDROOMS # BATHROOM^>. TENANT BUSINESSKAljJE CONSTR TYPE OCC GROUP
DESCRIPTION OF WORK Include Square Feet of Affected Areafs)
uA"rttiN^fii uviK> T:!' 3(^11 (^z^o) / / 2-( <:
EXISTING USE PROPOSED USE GARAGE (SF) PATIOS (SF) DECKS (SF) FIREPLACE AIR CONDITIONING FIRESMNKLERS
YESQ* NoQ YES^NOQ YEg^NoQ
APPLICANT NAME (Primary Contact) APPUCANT NAME (Secondary Contact)
ADDRESS ADDRESS
Cny STATE ZIP CITY STATE ZIP
PHONE ^ FAX PHONE FAX
EMAir .« 1 EMAIL
PROPERTY OWNER NAME ' ' CONTRACTOR BUS NAME \ f 1 r
ADDRESS ADDRESS , ' . -t' ft 1
CITY_ STATE ZIP CITY^ STATE ZIP
PHONE _ FAX PHONE ^
EMAIL EMAIL 1 ' ,1
ARCH/DESIGNER NAME & ADDRESS STATE LIC # STATELIOfe •• CLASS CITY BUS LIC #
(Sec 70315 Business and Professions Code Any City or County viihich requires a permit to construct, alter improve demolish or repair any structure prior to its issuance, also requires the
applicant for such permit to file a signed statement that he -' ' " ........ . . - - — ... . ^ . r, „ Business and Professions Code) or tnat he is exempt therel civil penalty of not more than five hundred dollars ($500))
applicant for such permit to file a signed statement that he is licensed pursuant to the provisions ofthe Contractor s License Law (Chapter 9 commending with Section 7000 of Division 3 ofthe Business and Professions Code) or tnat he is exempt therefrom, and the basis for the alleged exemption Any violation of Section 7031 5 by any applicant for a permit subjects the applicant to a
Workers' Compensation Declaration / terehy affirm under penaity of perjury one of the following declarations
i7H I have and will maintain a certificate of consent to self insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued
have and will maintain workers' compensation as required by Section 3700 of the Labor Code for the perfonnance of the work for which this permit is issued My workers compensation insfirance can-er and policy
number are InsuranceCo VlfiA-^r'lC?\Q) C .^rvS UVovi^ Cf* PolicyNo ^ 1 "2- M ?>M Expiration Date "7_ I 7.^ [ | t-|
Th|£ section need not be completed if the permit is for one hundred dollars ($100) or less
Certificate of Exemption I certify that in the perfomiance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers Compensation Laws of
California WARNING Failure to secure workers' compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fmes up to one hundred thousand dollars (&100,000), in
addition to the cost of compensation, damagesa^rovided for in Section 3706 ofthe Labor code, interest and attomey's fees
^eS" CONTRACTOR SIGNATURE f >L>^ ASC^ JSQGENT DATE
fli
/ terefcy affimi fhaf / an'i exempf from Contractor's Ucense Law for the following reason
I I I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec 7044, Business and Professions Code The Contractor s
License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees provided that such improvements are not intended or offered for
sale If, however the building or improvement is sold within one year of completion, the owner builder will have the burden of proving that he did not build or improve for the purpose of sale)
I I I, as owner of the property am exclusively contracting with licensed contractors to construct the project (Sec 7044, Business and Professions Code The Contractor's License Law does not apply to an owner of
property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law)
I I I am exempt under Section Business and Professions Code for this reason
1 I personally plan to provide the major labor and matenals for construction of the proposed property improvement tDYes j |NO
2 I (have / have not) signed an application for a building permit tor the proposed work
3 I have contracted with the following person (firm) to provide the proposed construction (include name address / phone / contractors' license number)
4 I plan to provide portions of the work, but I have hired the following person to coordinate, supen/ise and provide the major work (include name / address / phone / contractors' license number)
5 I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name / address / phone / type of work)
^PROPERTY OWNER SIGNATURE GENT DATE
\ Is the applicant or future building occupant required to submit a^business [jlan^cutely hazardous matenals registration form or nsk management and preventon program under Sections 25505 25533 or 25534 of the
^"resley Tanner Hazardous Substance Account AcP ' Yes cP'''
)m1ne air Yes ^S^o , the applicant or future building occupant required to obtain a permit froniihe air pollution control distnct or air quality management distncP
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site'' , Yes " j^No
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF
EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT
I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec 3097 (i) Civil Code)
Lender's Name Lender's Address
I certi^ that I have isad the application and state thatthe above infomiation is oonBCt and that the infoimation on the plans is accurate I agree to complywith all City oidmances and State laws relating to building consttuction
I hereby authorize representative ofthe City of Carlsbad to enter upon the above mentioned property Ibr inspection purposes I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD
AGAINST ALL LIABILITIES JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT
OSHA An OSHA pennit is required for excavations over S'O deep and demolitKin or constmction of stmctures over 3 stones in height
EXPIRATION Every permit issued by the Building Official under the provisions of this Code shall expire by limitation and become null and void if the building or vwrk authorized by such penrnt is not commenced within
180 days from the date of such pemnit or if the buildiilg or WDri< authonzed by such pennit is suspended or abandoned at any time after the woik is commenced for a penod of 180 days (Section 106 4 4 Unilbnn Building Code)
ygf APPLICANT'S SIGNATURE DATE
STOP: THIS SECTION NOT REQUIRED FOR BUILDING PERMIT ISSUANCE.
Complete the following ONLY if a Certificate of Occupancy will be requested at final inspection.
CERTIFICATE OF OCCUPAMCY fCommercial Projects Onf
Fax (760) 602-8560, Email buildinataicarlsbadca aov or Mail the completed form to Citv of Carlsbad, Buildina Division 16 35 Faraday Avenue, Carlsbad, Califomia 92008
C0# (Office Use Only)
CONTACT NAME OCCUPANT NAME
ADDRESS BUILDING ADDRESS
CITY STATE ZIP CITY STATE ZIP
Carlsbad CA
PHONE FAX
ElVIAIL OCCUPANT'S BUS LIC No
DEUVERY OPTIONS
PICK UP CONTACT (Listed above) OCCUPANT (Listed above)
CONTRACTOR (On Pg 1)
IVIAIL TO CONTACT (Listed above) OCCUPANT (Listed above)
CONTRACTOR (On Pg 1)
MAIL/FAX TO OTHER _
ASSOCIATED CB#
NO CHANGE IN USE / NO CONSTRUCTION
, CHANGE OF USE / NO CONSTRUCTION
^g? APPLICANT S SIGNATURE DATE
City of Carlsbad VALUATION WORKSHEET Building Division
Permit No:
i^ddress AssessoiPc-irccI No.
SFD and Duplexes $110 17 $0 00
Residential Additions $131 73 $0 00
Remodels / Lofts $57 48 $0 00
Apartments & Multi-family $98 20 $0 00
Garages/Sunrooms/Solanums $28 74 $0 00
Patio/Porch/Carport $9 58 $0 00
Enclosed Patio $15 51 $0 00
Decks/Balconies/Stairs $15 57 $0 00
Retaining Walls, concrete,masonry $19 16 $0 00
Pools/Spas-Gunite $40 72 $0 00
Tl/Stores, Offices 3792 $37 12 $140,759 04
Tl/Medical, restaurant, H occupancies $50 30 $0 00
Photovoltaic Systems/ # of panels $400 00 $0 00
$0 00 $0 00
$0 00 $0 00
$0 00 $0 00
$0 00 $0 00
Fire Spnnkler System $3 11 $0 00
Air Conditioning - commercial $5 03 $0 00
Air Conditioning - residential $4 19 $0 00
Fireplace/ concrete, masonry $3,855 98 $0 00
Fireplace/ prefabricated Metal $2,621 34 $0 00
$0 00
$0 00
TOTAL $140,759 04
Valuation: $140,759
Comm/Res (C/R): 0
Building Fee $856 34
Plan Check Fee $599 44
Strong Motion Fee $30 00
Green Bldg Stand Fee $4 00
Green Bldg PC Fee $150 00
License Tax/PFF $4,926 57
License Tax/PFF (in CFD) $2,561 81
CFD
1st hour of Plan CheckFire Expedite
Plumbing TBD
Mechanical TBD
Electncal TBD
CFD
0 Yes (PFF= 1.82%) 0 No (PFF = 3 5%)
Land Use.
Density
Improve Area:
Fiscal Year
Annex Year.
Factor'
CREDITS
PFF and/orCFD
Explanation:
EsGil Corporation
In (Partnership wtth government for (BuiCding Safety
DATE 5/1/13 q.,APPUaANT
JURIS
JURISDICTION City of Carlsbad ^"TtTikPrREViEWER
• FILE
PLAN CHECK NO PC13-22 SET II
PROJECT ADDRESS 192^ Palomar Oaks Way Suites 200 and 250
PROJECT NAME National Search Associates - TI
XI The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes
I I The plans transmitted herewith will substantially comply with the junsdiction's
codes when minor deficiencies identified below are resolved and checked by building
department staff
I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck
I I The check list transmitted herewith is for your information The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck
I I The applicant's copy of the check list is enclosed for the junsdiction to forward to the applicant
contact person
I I The applicant's copy of the check list has been sent to
IAI EsGll Corporation staff did not advise the applicant that the plan check has been completed
I I EsGll Corporation staff did advise the applicant that the plan check has been completed
Person contacted Telephone #
Date contacted (by ) Email Fax #
Mail Telephone Fax In Person
n REMARKS
By Doug Moody (by KC) Enclosures
EsGll Corporation
• GA • EJ • PC 4/25/13
9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576
EsGil Corporation
In (partnership -with government for (BuiCding Safety
DATE 4/9/13 • APPLICANT
JURISDICTION City of Carlsbad • PLAN'REVIEWER
• FILE
PLAN CHECK NO PC13-22 SET I
PROJECT ADDRESS ^i^2S-Palomar Oaks Way Suites 200 and 250
PROJECT NAME National Search Associates - TI
I I The plans transmitted herewith have been corrected where necessary and substantially comply
with the junsdiction's codes
I I The plans transmitted herewith will substantially comply with the junsdiction's
codes when minor deficiencies identified below are resolved and checked by building
department staff
I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck
XI The check list transmitted herewith is for your information The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck
I I The applicant's copy of the check list is enclosed for the junsdiction to fonward to the applicant
contact person
X The applicant's copy of the check list has been sent to
Maggetti Elam / Victona Melvin
3160 Camino Del Rio South Suite 207, San Diego, CA 92108
I I EsGll Corporation staff did not advise the applicant that the plan check has been completed
IX EsGll Corporation staff did advise the applicant that the plan check has been completed
Person contacted Victona Melvin Telephone # 619-624-0512 ext 14
Date contacted '^l/of,5(by fc:^,) Email victona(5).maggettielam com Fax # 619-624-0530
& Mail ^Telephone y^ Fax In Person
• REMARKS
By Doug Moody Enclosures
EsGll Corporation
• GA • EJ • PC 4/1/13
9320 Chesapeake Dnve, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576
City of Carlsbad PC13-22
PLAN REVIEW CORRECTION LIST
TENANT IMPROVEMENTS
PLAN CHECK NO PC13-22 JURISDICTION City of Carlsbad
OCCUPANCY B USE Office
TYPE OF CONSTRUCTION IIIB ACTUAL AREA 3792sf
ALLOWABLE FLOOR AREA STORIES 2
HEIGHT
SPRINKLERS'? Yes OCCUPANT LOAD 87
REMARKS
DATE PLANS RECEIVED BY
JURISDICTION 3/2713
DATE PLANS RECEIVED BY
ESGIL CORPORATION 4/1/13
DATE INITIAL PLAN REVIEW
COMPLETED 4/9/13
PLAN REVIEWER Doug Moody
FOREWORD (PLEASE READ):
This plan review is limited to the technical requirements contained in the California version of
the International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National
Electncal Code and state laws regulating energy conservation, noise attenuation and access for
the disabled This plan review is based on regulations enforced by the Building Department
You may have other corrections based on laws and ordinances enforced by the Planning
Department, Engineenng Department, Fire Department or other departments Clearance from
those departments may be required pnor to the issuance of a building permit
Code sections cited are based on the 2010 CBC, which adopts the 2009 IBC
The following items listed need clarification, modification or change All items must be satisfied
before the plans will be in conformance with the cited codes and regulations Per Sec 105 4 of
the 2009 International Building Code, the approval of the plans does not permit the violation of
any state, county or city law
To speed up the recheck process, please note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet number, specification section, etc.
Be sure to enclose the marked up list when vou submit the revised plans.
City of Carlsbad PC 13-22
Please make all corrections on the onginal tracings, as requested in the correction
list Submit three sets of plans for commercial/industrial projects (two sets of plans
for residential projects) For expeditious processing, corrected sets can be
submitted in one of two ways
1 Deliver all corrected sets of plans and calculations/reports directly to the City of
Carlsbad Building Department, 1635 Faraday Ave , Carlsbad, CA 92008, (760)
602-2700 The City will route the plans to EsGil Corporation and the Carlsbad
Planning, Engineenng and Fire Departments
2 Bnng one corrected set of plans and calculations/reports to EsGil Corporation,
9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468
Deliver all remaining sets of plans and calculations/reports directly to the City of
Carlsbad Building Department for routing to their Planning, Engineenng and Fire
Departments
NOTE Plans that are submitted directly to EsGil Corporation only will not be
reviewed by the City Planning, Engineenng and Fire Departments until review by
EsGll Corporation is complete
1 Each sheet of the plans must be signed by the person responsible for their
preparation, even though there are no structural changes Business and
Professions Code
2 Provide a section view of all new intenor glazed partitions at conference room
213 Show
a) Please provide the ICC listing and installation information
b) Method of attaching top and bottom plates to structure
c) Show height of partition and suspended ceiling, and height from floor to
roof framing or floor framing
3 Please clarify the mechanical plan to show the new HVAC unit to be installed?
Please provide an equipment schedule Section 107 2
4 Please review the requirements, revise the plans appropnately and impnnt on
the plans the City of Carlsbad Policies and Procedures for Roof Mounted
Equipment to the plans
5 Provide complete energy designs for the proposed changes in the mechanical
systems Provide the completed MECH- forms showing energy compliance
6 The completed and signed MECH-1 forms must be impnnted on the plans
7 Please sign and date the statement on sheet TI-0 2 of the plans that as the
designer the restrooms serving the area of tenant improvement and path of
travel to the area of improvement have been reviewed and fully comply with the
current disabled accessibility requirements if not please provide complete plans
and details showing the restrooms and path of travel to be brought into
compliance
City of Carlsbad PC13-22
To speed up the review process, note on this list (or a copy) where each
correction item has been addressed, i e , plan sheet, note or detail number,
calculation page, etc
Please indicate here if any changes have been made to the plans that are not a
result of corrections from this list If there are other changes, please bnefly
descnbe them and where they are located in the plans
Have changes been made to the plans not resulting from this correction list?
Please indicate
Yes • No •
The junsdiction has contracted with Esgil Corporation located at 9320
Chesapeake Drive, Suite 208, San Diego, California 92123, telephone number of
858/560-1468, to perform the plan review for your project If you have any
questions regarding these plan review items, please contact Doug Moody at
Esgil Corporation Thank you
EsGil Corporation
In (Partnership wtth government for (BuiCding Safety
DATE 04/09/13 • APPLICANT
• JURIS
JURISDICTION Encinitas • PLAN REVIEWER
• FILE
PLAN CHECK NO enl3-405,407 SET I
PROJECT ADDRESS 1951 Avenida Joaquin
PROJECT NAME Pena 4200 Watt Solar Photovoltaic System
I I The plans transmitted herewith have been corrected where necessary and substantially comply
with the junsdiction's building codes
I I The plans transmitted herewith will substantially comply with the junsdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff
I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck
X The check list transmitted herewith is for your information The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck
I I The applicant's copy of the check list is enclosed for the junsdiction to forward to the applicant
contact person.
I I The applicant's copy of the check list has been sent to
I I Esgil Corporation staff did not advise the applicant that the plan check has been completed
Esgil Corporation staff did advise the applicant that the plan check has been completed
Person contacted Alex Sink Telephone # 619-857-9209
Date contacted (by ) Fax #
Mail Telephone Fax In Person E-mail asink@solarcity com
• REMARKS
By John Le Vey Enclosures
EsGll Corporation
• GA • EJ • PC 04/02/13
9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576
Encinitas enl3-405,407
04/09/13
GENERAL PLAN CORRECTION LIST
JURISDICTION Encinitas PLAN CHECK NO enl3-405,407
PROJECT ADDRESS 1951 Avenida Joaquin
DATE PLAN RECEIVED BY DATE REVIEW COMPLETED
ESGIL CORPORATION 04/02/13 04/09/13
REVIEWED BY John Le Vey
FOREWORD (PLEASE READ):
This plan review is limited to the technical requirements contained in the International Building
Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electncal Code and state
laws regulating energy conservation, noise attenuation and disabled access This plan review
IS based on regulations enforced by the Building Department You may have other corrections
based on laws and ordinances enforced by the Planning Department, Engineenng Department
or other departments
The following items listed need clarification, modification or change All items must be satisfied
before the plans will be in conformance with the cited codes and regulations The approval of
the plans does not permit the violation of any state, county or city law
• Please make all corrections and submit two new complete sets of pnnts to
ESGIL CORPORATION
• To facilitate rechecking, please identify, next to each item, the sheet of the plans upon
which each correction on this sheet has been made and return this sheet with the
revised plans
• Please indicate here if any changes have been made to the plans that are not a result of
corrections from this list If there are other changes, please bnefly descnbe them and where
they are located on the plans Have changes been made not resulting from this list?
• Yes • No
Encinitas en13-405,407
04/09/13
ELECTRICAL and ENERGY COMMENTS
PLAN REVIEWER: John Le Vey
ELECTRICAL (2010 CALIFORNIA ELECTRICAL CODE)
1 Please provide an approved method for the re routing of the plumbing vent(s) the
method you are showing is not an approved method, please provide an alternate
method , for approval
Note: If you have any questions regarding this Electncal and Energy plan review list please
contact John Le Vey at (858) 560-1468 To speed the review process, note on this list (or a
copy) where the corrected items have been addressed on the plans
The following note should be given with each correction list
Please make all corrections on the ongmal tracings, as requested in the correction list
Submit two complete sets of plans For expeditious processing, corrected sets can be submitted
in one of two ways
1 Deliver all corrected sets of plans and calculations/reports directly to the City of Encinitas
Building Department, 505 S Vulcan, Encinitas, CA 92024, (760) 633-2730 The City will route
the plans to EsGil Corporation and the Encinitas Planning, Engineenng and Fire Departments
2 Bnng one corrected set of plans and calculations/reports to EsGil Corporation, 9320
Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468 Deliver all remaining sets
of plans and calculations/reports directly to the City of Encinitas Building Department for routing to
their Planning, Engineenng and Fire Departments
NOTE Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City
Planning, Engineenng and Fire Departments until review by EsGil Corporation is complete
City of Carlsbad PC13-22
[DO NOT PAY- THIS IS NOT AN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION City of Carlsbad PLAN CHECK NO PC13-22
PREPARED BY Doug Moody DATE 4/9/13
BUILDING ADDRESS 1925 Palomar Oaks Way Suites 200 and 250
BUILDING OCCUPANCY B TYPE OF CONSTRUCTION IIIB
BUILDING
PORTION
AREA
(Sq Ft)
Valu ation
Multiplier
Reg
Mod
VALUE ($)
Tl 3792 37 12 140,759
Air Conditioning
Fire Spnnklers
TOTAL VALUE 140,759
Junsdction Code cb By Ordinance
Bldg Permit Fee by Ordinance
Plan Check Fee by Ordinance
$856 34
$556.62
Type of Review 0 Complete Review • Structural Only
Q Re petit ve Fee
~ Repeats
• Other
l~l Hourly
EsGfl Fee
Hr @*
$479 55
Comments
Sheet 1 of 1
macvalue doc +
CITY OF
PLAN CHECK
REVIEW
TRANSMITTAL
Community & Economic
Development Department
1635 Faraday Avenue
Carlsbad CA 92008
w/ww carlsbadca gov
DATE: 03/28/13 PROJECT NAME: NATIONAL SEARCH ASSOCIATES
I
PLAN CHECK NO: 1
VALUATION: $140,759
SET#: 1 ADDRESS: 19^ PALOMAR OAKS WY
PROJECT ID: PC 13 22
APN: 212-091-iUr^l ^ '^'^
I I This plan check review is complete and has been APPROVED by the ENGINEERING
J Division.
By: KATHLEEN LAWRENCE 03/28/13
A Final Inspection by the Division is required !.jYes L/JNO
1 This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
—' the attached checklist. Please resubmit amended plans as required.
Plan Check Comments have been sent to:
You may also have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the issuance of a building permit.
Resubmitted plans should include corrections from all divisions.
For questions or clarifications on the attached checklist please contact the following reviewer as marked
te - ,'k '760-602*46101" /
!¥^ENGINlERI!^G-^'Vr!
"'fi i^%4imQ-602i2750#5t', f- *?! €^^^m^(im665,\:
J:U ''•->;*i''"?r'P,y<'#»'®^ '•^•'f.^Hi.!k/
r Chris Sexton
1 1 760-602-4624
Chris Sexton@carlsbadca fiov
j yl Kathleen Lawrence
760-602-2741
Kathleen Lawrence@carlsbadca fiov
1 1 Greg Ryan
L _ J 760-602-4663
Gregory Rvan@carlsbadca fiov
j j Gina Ruiz
1 760-602-4675
Gma Ruiz@carlsbadca fiov
1 ~l Linda Ontiveros
' ' 760-602-2773
Lmda Ontiveros@carlsbadca fiov
1 1 Cindy Wong
'• — 760-602-4662
Cvnthia WonfiOcarlsbadca fiov
• 1 1 Dominic Fien
' ' 760-602-4664
Dominic Fieri@carisbadca gov
Remarks:
W CITY OF
CARLSBAD
BUILDING PLANCHECK
CHECKLIST
QUICK-CHECK/APPROVAL
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www carlsbadca gov
ENGINEERING Plan Check for PC 13-22 Date 03/28/13
Project Address 1925 PALOMAR OAKS WY APN 212-091-41
Project Description Tl OFFICE TO OFFICE Valuation $140,759
ENGINEERING Contact Kathleen Lawrence
Phone 760-602-2741
Email kathleen.lawrence@carlsbadca.gov
Fax 760-602-1052
] RESIDENTIAL INTERIOR [Zl TENANT IMPROVEMENT
LJ RESIDENTIAL ADDITION MINOR
(<$20,000.00)
PLAZA CAMINO REAL
[ J CARLSBAD PREMIER OUTLETS • COMPLETE OFFICE BUILDING
iOTHER: CELL ANTENNAS
OFFICIAL USE ONLY
ENGINEERING AUTHORIZATION TO ISSUE BUILDING PERMIT
BY. KATHLEEN LAWRENCE DATE- 03/28/13
REMARKS NO ADDITIONAL ENG. FEES-BUILDING AT 100% SEE BOOK
€-36
Notification of Engineering APPROVAL has been sent to
via EMAIL on 03/28/13
Page 1 of 1 REV 4/30/11
^ CITY OF
STORM WATER
COMPLIANCE
ASSESSMENT
B-24
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www carlsbadca gov
am applying to the City of Carlsbad for the following type(s) of construction permit
^ Building Permit • Right-of-Way Permit
Wiviy project IS categorically EXEMPT from
^ ^ the requirement to prepare a storm water
pollution prevention plan (SWPPP) because it
only requires issuance of one or more of the
following permit types
Electrical
Fire Additional
Fire Alarm
Fixed Systems
Mechanical
Mobile Home
Plumbing
Patio/Deck
Photo Voltaic
Re-Roofing
Sign
Spa-Factory
Spnnkler
Water Discharge
Project Storm Water Threat Assessment Criteria*
Wo Theeat Assessment Cnteria
yj My project qualifies as NO THREAT and is exempt from the requirement to prepare a storm water pollution prevention plan (SWPPP) because
it meets the "no threat" assessment criteria on the City s Project Threat Assessment Worksheet for Determination of Construction SWPPP Tier
Level My project does not meet any of the High Moderate or Low Threat cntena descnbed below
Tier1 - Low Threat Assessment Cntena
• My project does not meet any of the Significant or Moderate Threat cntena, is not an exempt permit type (See list above) and the project
meets one or more ofthe following critena
• Results in some soil disturbance and/or
• Includes outdoor construction activities (such as saw cutting, equipment washing, matenal stockpiling, vehicle fueling, waste stockpiling)
Tier 2 - Moderate Threat Assessment Criteria
• My project does not meet any of fhe Significant Threat assessment Cntena descnbed below and meets one or more of the following cntena
• Project requires a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15 16 of the Carlsbad Municipal Code), or,
• Project will result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement
removal, equipment storage, refueling and maintenance areas and project meets one or more of the additional following cntena
• Located within 200 feet of an environmentally sensitive area or the Pacific Ocean, and/or
• Disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical, and/or
• Disturbed area is located along or within 30 feet of a storm dram inlet, an open drainage channel or watercourse, and/or
• Construction will be initiated dunng the rainy season or will extend into the rainy season (Oct 1 through Apnl 30)
T/ef3 - Significant Threat Assessment Critena
• My project includes cleanng, grading or other disturbances to the ground resulting in soil disturbance totaling one or more acres including any
associated construction staging, equipment storage, stockpiling, pavement removal, refueling and maintenance areas and/or
• My project is part of a phased development plan that wili cumulatively result in soil disturbance totaling one or more acres including any
associated construction staging, equipment storage, refueling and maintenance areas or,
• My project is located inside or within 200 feet of an environmentally sensitive area (see City ESA Proximity map) and has a significant
potential for contnbuting pollutants to nearby receiving waters by way of storm water runoff or non-stonn water discharge(s)
/ certify to the best of my knowledge that the above
checked statements are true and correct I understand
and acknowledge that even though this project does
not require preparation of a construction SWPP, I must
still adhere to, and at all times during construction
activities for the permit type(s) check above comply
with the storm water best management practices
pursuant to Title 15 ofthe Carlsbad Municipal Code
and to City Standards
*The City Engineer may authorize minor variances from the Storm
Water Threat Assessment Cnteria in special circumstances where it
can be shown that a lesser or higher Construction SWPPP Tier Level is
warranted
Assessor Parcel No Project Acidress
Owner/Owners Authorized Agent Name
A^^UV/ w
Owner/Owner s Authorized Agejjt^ignature
City Conjwrrence
QNO 3
Title
Dale
Project ID
B-24 Page 1 of 1 Rev 03/09
\
4^1
CITY OF
: ARLSBAD
CONSTRUCTION THREAT
ASSESSMENT WORKSHEET FOR
DETERMINATION OF PROJECT'S
PERCEIVED THREAT TO
STORM WATER QUALITY
E-33
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www carlsbadca gov
Construction
SWPPP Tier
Level
Construction Threat Assessment Criteria*
Perceived
Threat to
Storm Water
Quality
Tiers
Tier 3 - Hiqh Construction Threat Assessment Cntena
XJ Project site is 50 acres or more and grading will occur dunng the rainy season
• Project site is 1 acre or more in size and is located within the Buena Vista or Agua Hedionda
Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or
discharges directly to an ESA
• Soil at site IS moderately to highly erosive (defined as having a predominance of soils with
USDA-NRCS Erosion factors kf greater than or equal to 0 4)
• Site slope IS 5 to 1 or steeper
• Construction is initiated dunng the rainy season or will extend into the rainy season (Oct 1
through Apnl 30)
• Owner/contractor received a Storm Water Notice of Violation within past two years
High
Tiers
Tier 3 - Medium Construction Threat Assessment Cntena
• All projects not meeting Tier 3 High Construction Threat Assessment Cntena Medium
Tier 2
Tier 2 High Construction Threat Assessment Cntena
• Project IS located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or
within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA
• Soil at site IS moderately to highly erosive (defined as having a predominance of soils with
USDA-NRCS Erosion factors kf greater than or equal to 0 4)
• Site slope IS 5 to 1 or steeper
• Construction is initiated dunng the rainy season or will extend into the rainy season (Oct 1
through Apnl 30)
• Owner/contractor received a Storm Water Notice of Violation within past two years
• Site results in one half acre or more of soil disturbance
High
Tier 2
Tier 2 - Medium Construction Threat Assessment Critena Medium
Tier 2
• All projects not meeting Tier 2 High Construction Threat Assessment Cntena Medium
Tier 1
Tier 1 - Medium Inspection Threat Assessment Cntena
• Project IS located within the Buena Vista or Agua Hedionda Lagoon watershed, within or
directly adjacent to an environmentally sensitive area (ESA) or discharges directly to an ESA
• Soil at site is moderately to highly erosive (defined as having a predominance of soils with
USDA-NRCS Erosion factors kf greater than or equal to 0 4)
• Site slope IS 5 to 1 or steeper
• Construction is initiated dunng the rainy season or will extend into the rainy season (Oct 1
through Apnl 30)
• Owner/contractor received a Storm Water Notice of Violation within past two years
• Site results in one half acre or more of soil disturbance
Medium
Tier 1
Tier 1 - Low Insoection Threat Assessment Cntena Low
Tier 1
Q All projects not meeting'Tier 1 Medium Construction Threat Assessment Cntena Low
Exempt , , ' - Not Applicable -Exempt
*The city engineer may authorize minor vanances from the construction threat assessment cntena in special circumstances
where it can be shown that a lesser or higher amount of storm water compliance inspection is warranted in the opinion of
the city engineer
E-33 Page 1 of 1 REV 4/30/10
4.
CITY OF
CARLSBA
PLANNING DIVISION
BUILDING PLAN CHECK
APPROVAL
P-29
Development Services
Planning Division
1535 Faraday Avenue
(760) 602-4610
www carlsbadca eov
DATE: 3-28-13 PROJECT NAME: PROJECT ID:
PLAN CHECK NO: PC 13-22 SET#: 1 ADDRESS: 192^ Palomar Oaks Way APN: 212-091-11
^ This plan check review is complete and has been APPROVED by the Planning
Division.
By: Chris Sexton
A Final Inspection by the Planning Division is required • Yes ^ No
You may also have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the issuance of a building permit.
Resubmitted plans should include corrections from all divisions.
I I This plan check review is NOT COMPLETE, Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check APPROVAL has been sent to: victoria@maggettielam.com
For questions or clarifications on the attached checklist please contact the following reviewer as marked
PLANNING
760-602-4610
ENGINEERING
760-602-2750
FIRE PREVENTION
760-602-4665
X Chns Sexton
760-602-4624
Chris Sexton@carlsbadca gov
1 1 Kathleen Lawrence
760-602-2741
Kathleen Lawrence@carlsbadca gov
1 1 Greg Ryan
760-602-4663
Gregory Rvan@carlsbadca gov
1 1 Gma Ruiz
760-602-4675
Gma Ruiz@carlsbadca gov
1 1 Linda Ontiveros
760-602-2773
Linda Ontiveros@carlsbadca gov
n Cindy Wong
760-602-4662
Cvnthia Wong@carlsbadca gov
• • 1 1 Dominic Fieri
760-602-4664
Dominic Fieri@carlsbadca gov
Remarks: office to office - no new roof mounted HVAC
BUILDING DEPZ
DATE: 05/15/2013 PROJECT NAME: NSA & Spec Suite
PLAN CHECK NO: 2 SET#: 1 ADDRESS: 1921 PALOMAR OAKS WY
PROJECT ID: PC130022
APN:
•
This plan check review is complete and has been APPROVED by the FIRE Division.
By: GR
A Final Inspection by the FIRE Division is required ^ Yes n No
This plan check review is NOT COMPLETE. Items missing ci incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check Comments have been sent to: Applicant
Yow may also have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the Issuance of a building permit.
Resubmitted plans should include corrections from all divisions.
For questions or clarifications on the attached checklist please contact the following reviewer as marked
M,: .--PLANNING'
. ,76^02,46101*^^.^'
-': -iElSlNE^ING^ •
760^02-27,5? .
... ,.<rC^'^
Flf^BRiVENTlON^.
'-*^760-602-4665 i
1 Chris Sexton
760-602-4624
Chns Sexton@carlsbadca gov
1 Kathleen Lawrence
760-602-2741
Kathleen Lawrence@carlsbadca gov
X Greg Ryan
760-602-4663
Gregorv Ryan@carisbadca gov
1 1 Gma Ruiz
760-602-4675
Gma Ruiz@carlsbadca gov
1 1 Linda Ontiveros
760-602-2773
1 -nda Ontiveros@carlsbadca gov
1 1 Cindy Wong
760-602-4662
Cynf^ia Wong@carlsbadca gov
• • 1 Dommic Fieri
760-602-4664
Dommic Fieri@carlsbadca gov
Remarks- SEE ATTACHED
Carlsbad Fire Department
Plan Review
Date of Report
Requirements Category PLANCK
05-15-2013 Reviewed by
Name
Address
VICTORIA MELVIN
3160 CAMINO DEL RIO SOUTH
STE 207
SAN DIEGO CA
92108
Permit # PC130022
Job Name
Job Address
NSA & SPEC SUITE - OFF TO OFF
1921 PALOMAR OAKS WY CBAD
Please review carefully all comments attached.
CITY OF CARLSBAD FIRE DEPARTMENT - APPROVED: w/ COMMENTS
THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUANCE OF
BUILDING PERMIT
THIS APPROVAL IS SUBJECT TO FIELD INSPECTION AND REQUIRED TEST, NOTATIONS HEREON,
CONDITIONS IN CORRESPONDENCE AND CONFORMANCE WITH ALL APPLICABLE REGULATIONS
THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE THE VIOLATION OF ANY LAW
> NOTE Fire Alarm submittals shall be a deferred submittal and this plan shall be approved prior to any ceiling
inspections
> A Pre-dawn or dark-hours test of the emergency lighting shall be conducted by CFD staff prior to FINAL
inspection
Entry 05/15/2013 By GR Action AP
BLDG. DEPT COPY ^'^'^ of 2
CONDITIONAL RECOMMENDATION FOR APPROVAL
OVER THE COUNTER CONDITIONS
Remove Keyed Construction Note 5 sheet T1-2.0 Room was reduced to SSm.
Slip sheet E-1 revised means of egress illumination foot-candles near exit in area 214.
Daryl K. James & Associates, Inc Checked by: Darvl Kit James
205 Co//na Terrace Date: Mav 6, 2013
Vista, CA 92084
T. (760) 724-7001 Email: kitfire@sbcglobal.net
APPLICANT Victoria Melvm JURISDICTION: Carlsbad Fire Department
PROJECT NAME. NSA & Spec Suite ADDRESS: 1921 Palomar Airport R-d 200/250
PROJECT DESCRIPTION: PCI 3-22 1210] Suite 200 (Spec), 3,671 iS Suite 250 (NSA) Tenant Improvement, new
demising partition, intenor partitions, new power & data, new ceiling grid, 2 new sinks, increase in lighting load
Spec Suite
This plan was reviewed in order to venfy conformance to minimum requirements of codes adopted by the
Carlsbad Fire Department The items below require correction, clanfication or additional information before this
plan check can be approved for permit issuance
CORRECTIONS
Each sheet in the plans must signed by the person responsible for their preparation, even if there are no structural
changes Business and Professions Code Engineenng sheet to be stamped and signed
•TI-0.0
Project Data
Justify the omission of Suite 205 It appears that demolition and construction will take place in Suite 250
Building Data
Revise No of Floors to 2
Deferred Submittals
Add Fire Alarm System 2010 CFC 907 including CFC 907 2 sections specific to occupancy groups and 2010
NFPA 72
•T1-0.3
Note the occupant load factor for each area Justify determined occupant loads for Reception areas 200 & 214
and Break/Data 218
T1-2.0
• Denote Storage Room 202 as an incidental, accessory use area and show construction compliance in
accordance with CBC 508 2 5 Room size reduced to SScn N/A
• Provide symbol for full height smoke resistant walls under Construction Plan Legend with a reference to full
height wall details N/A
Remove Keyed Construction Note 5. Room was reduced to 98m Over the counter correction.
Door & Window Schedule
•Rl symbolizes a pair door The floor plan shows doors tagged as Rl are single doors Please revise
• Denote N3 door as being equipped with self-closing device and smoke seals CBC 508 2 5 2 N/A
Floor Plan
• Denote type and location of fire extinguisher(s) CFC 906
Page 2 of 2
•Tl-1-5 0
Provide specifications and California State Fire Marshal listings as well as other acceptance cntena for flame
spread and smoke developed index for new carpet, padding and carpet base CFC 804
Provide specifications and California State Fire Marshal listings and other acceptance critena for flame spread
and smoke developed index for wall finish material and rubber base CBC 803
•Tl-1-6.0
Detail 3
Rated wall detail to include ICC evaluation report #, UL Listing or reference to Item number in 2010 CBC Table
720 1(2)
If penetrating any rated assemblies, provide details including fireproofing product listings
Provide a wall detail in accordance with CBC 508 2 5 2 (Storage Room 202) N/A
E.1
•Add the following note The means of egress system shall be illuminated at all times with a level not less than 1
foot-candle at the walking surface
Indicate means of egress illumination that denotes means of egress illumination throughout the Means of Egress
System, which consists of the Exit Access, Exit and Exit Discharge The exit access is that portion of the means of
egress system that consists of all floor areas that lead from usable spaces within the building to the exit or exits
serving that floor area Exit access begins at the furthest points within each room or space and ends at the entrance
to the exit, that portion of the means of egress system between the exit access and the exit discharge or public way
E-1-EM
Demonstrate that the lighting plan complies with CBC 1006 2 for the means of egress system within the permitted
area from the exit access to the extenor exit discharge Slip sheet revised means of egress illumination foot-
candles near exit in area 214. Deputy Fire Marshal, Greg Ryan can be contacted at 760-602-4665, for clarification
• M0.1 & MO 2
Denote air-moving systems supplying air in excess of 2000 cfm equipped with smoke detectors approved and
listed by the California State Fire Marshal CMC 609 N/A
Denote units provided with smoke detectors on plans N/A
Denote smoke dampers in air transfer openings in Accessory Incidental Use Storage Room 202 CBC 711 7 N/A
END OF COMMENTS
BLDG. DEPT COPY
Page 1 of 2
PLAN CHECK COMMENTS 2
Daryl K. James & Associates, Inc Checked by: Darvl Kit James
205 Co//na Terrace Date: Apnl 26. 2013
Vista, CA 92084
T. (760) 724-7001 Email: kitfire@sbcglobal.net
APPLICANT: Victona Melvin JURISDICTION: Carlsbad Fire Department
PROJECT NAME: NSA & Spec Suite ADDRESS;>9^Palomar,£^arn?d^0^50
PROJECT DESCRIPTION: PCI 3-22 12151 Suite 200 (Spec), 3,671 m Suite 250 (NSA) Tenant Improvement, new
demising partition, intenor partitions, new power & data, new ceiling gnd, 2 new sinks, increase in lighting load
Spec Suite
This plan was reviewed in order to venfy conformance to minimum requirements of codes adopted by the
Carlsbad Fire Department The items below require correction, clanfication or additional information before this
plan check can be approved for permit issuance
PLEASE ADDRESS ALL REMAINING COMMENTS WRITTEN IN BLUE FONT.
RESUTOffALlfSTRUCflQNST
• All corrections or modifications to the plans must be clouded and provided with numbered deltas and revision
dates
• Provide a written response following each comment, on this correction list, explaining how and where each
plan review comment has been addressed
• Provide a copy of original Building Department (EsGil) comments Input fire revisions onto the corrected
Building Dept plan check set
• Please direct any questions regarding this review to Daryl K James 760-724-7001 or kitfire@sbcglobal net
- COMMENTS MUST BE SUBMITTED DIRECTLY TO THE FOLLOWING ADDRESS, NO SIGNATURE
REQUIRED.TO AVOID DELAY:
DARYL K JAMES & ASSOCIATES, INC.
205 COLINA TERRACE
VISTA, CA 92084
CORRECTIONS
Each sheet in the plans must signed by the person responsible for their preparation, even if there are no structural
changes Business and Professions Code Engineering sheet to be stamped and signed
•TI-0.0
Project Data
Justify the omission of Suite 205 It appears that demolition and construction will take place in Suite 250
Building Data
Revise No of Floors to 2
Deferred Submittals
Add Fire Alarm System 2010 CFC 907 including CFC 907 2 sections specific to occupancy groups and 2010
NFPA 72
Page 2 of 2
T1-0.3
Note the occupant load factor for each area Justify determined occupant loads for Reception areas 200 & 214
and Break/Data 218
•T1-2 0
Denote Storage Room 202 as an incidental, accessory use area and show construction compliance in accordance
with CBC 508 2 5 Room size reduced to SSiti N/A
Provide symbol for full height smoke resistant walls under Construction Plan Legend with a reference to full height
wall details N/A
Remove Keyed Construction Note 5 Room was reduce to SBiti |
Door & Window Schedule
• Rl symbolizes a pair door The floor plan shows doors tagged as Rl are single doors Please revise
• Denote N3 door as being equipped with self-closing device and smoke seals CBC 508 2 5 2 N/A
Nl symbolizes double doors on Construction Plan Door & Window Schedule symbols shows door Nl as
a single door Please revise
Floor Plan
• Denote type and location of fire extinguisher(s) CFC 906
•Tl-1-5.0
Provide specifications and California State Fire Marshal listings as well as other acceptance cntena for flame
spread and smoke developed index for new carpet, padding and carpet base CFC 804
Provide specifications and California State Fire Marshal listings and other acceptance cntena for flame spread
and smoke developed index for wall finish matenal and rubber base CBC 803
•Tl-1-6.0
Detail 3
Rated wall detail to include ICC evaluation report #, UL Listing or reference to Item number in 2010 CBC Table
720 1(2)
If penetrating any rated assemblies, provide details including fireproofing product listings
Provide a wall detaii in accordance with CBC 508 2 5 2 (Storage Room 202) N/A
iJ.
•Add the following note The means of egress system shall be illuminated at all times with a level not less than 1
foot-candle at the walking surface
Indicate means of egress illumination that denotes means of egress illumination throughout the Means of Egress
System, which consists of the Exit Access, Exit and Exit Discharge The exit access is that portion of the means of
egress system that consists of ail fioor areas that lead from usable spaces within the building to the exit or exits
serving that floor area Exit access begins at the furthest points within each room or space and ends at the entrance
to the exit, that portion of the means of egress system between the exit access and the exit discharge or public way
E-I-EM
Demonstrate that the lighting plan complies with CBC 1006 2 for the means of egress system within the permitted
area from the exit access to the exterior exit discharge Justify omission of egress illumination foot-candles near
exit m area 214. Deputy Fire Marshal, Greg Ryan can be contacted at 760-602-4665, for clarification
• M0.1 &M0.2
Denote air-moving systems supplying air in excess of 2000 cfm equipped with smoke detectors approved and
listed by the California State'Fire Marshal CMC 609 N/A
Denote units provided with smoke detectors on plans N/A
Denote smoke dampers in air transfer openings in Accessory Incidental Use Storage Room 202 CBC 7117 N/A
END OF COMMENTS
BLDG, DEPT COP V^g^ ^ ^
PLAN CHECK COMMENTS 1
Daryl K. James & Associates, Inc Checked by: Darvl Kit James
205 Co//na Terrace Date: March 29, 2013
Vista, CA 92084
T. (760) 724-7001 Email: kitfire@sbcglobal.net
APPLICANT: Victona Melvin . "^^^^^^^'.jJ JURISDICTION: Carlsbad Fire Department
PROJECT NAME: NSA & Spec Suite /V ^^X^ ADDRESS: J.9^Palomar-/^iirport Rd 200/250
PROJECT DESCRIPTION: PC13-22 1210] Suite 200 (Spec), 3,6710] Suite 250 (NSA) Tenant Improvement, new
demising partition, intenor partitions, new power & data, new ceiling grid, 2 new sinks, increase in lighting load
Spec Suite
This plan was reviewed in order to venfy conformance to minimum requirements of codes adopted by the
Carlsbad Fire Department The items below require correction, clarification or additional information before this
plan check can be approved for permit issuance
„^ ^ .^^^^^^^^^^^ ^^pg-p^YED:^Rl(^HECK sERVl5Eg
• Corrections or modifications to the plans must be clouded and provided with numbered deltas and revision
dates
• Provide a written response following each comment, on this correction list, explaining how and where each
plan review comment has been addressed
• Provide a copy of Building Department (EsGil) comments Input fire revisions onto the corrected Building
Dept plan check set
• Please direct any questions regarding this review to Daryl K James 760-724-7001 or kitfire@sbcglobat net
• COMMENTS MUST BE SUBMITTED DIRECTLY TO THE FOLLOWING ADDRESS, NO SIGNATURE
REQUIRED,TO AVOID DELAY:
DARYL K. JAMES & ASSOCIATES, INC.
205 COLINA TERRACE
VISTA, CA 92084
CORRECTIONS
Each sheet in the plans must signed by the person responsible for their preparation, even if there are no structural
changes Business and Professions Code Engineenng sheet to be stamped and signed
TI-0.0
Project Data
Justify the omission of Suite 205 It appears that demolition and construction will take place in Suite 250
Building Data
Revise No of Floors to 2
Deferred Submittals
Add Fire Alarm System 2010 CFC 907 including CFC 907 2 sections specific to occupancy groups and 2010
NFPA 72
T1-0.3
Note the occupant load factor for each area Justify determined occupant loads for Reception areas 200 & 214
and Break/Data 218
Page 2 of2
T1-2.0
Denote Storage Room 202 as an incidental, accessory use area and show construction compliance in accordance
with CBC 508 2 5
Provide symbol for full height smoke resistant walls under Construction Plan Legend with a reference to full height
wall details
Door & Window Schedule
Rl symbolizes a pair door The floor plan shows doors tagged as Nl are single doors Please revise
Denote Rl doors as being equipped with a rating label, self-closing device and smoke seals
Denote N3 door as being equipped with self-closing device and smoke seals
CBC 508 2 5 2
Floor Plan
Denote type and location of fire extinguisher(s) CFC 906
Tl-1-5.0
Provide specifications and California State Fire Marshal listings as well as other acceptance cntena for flame
spread and smoke developed index for new carpet, padding and carpet base CFC 804
Provide specifications and California State Fire Marshal listings and other acceptance cntena for flame spread
and smoke developed index for wall finish matenal and rubber base CBC 803
Tl-1-6.0
Detail 3
Rated wall detail to include ICC evaluation report #, UL Listing or reference to Item number in 2010 CBC Table
720 1(2)
If penetrating any rated assemblies, provide details including fireproofing product listings
Provide a wall detail in accordance with CBC 508 2 5 2 (Storage Room 202)
EJ.
Add the following note The means of egress system shall be illuminated at all times with a level not less than 1
foot-candle at the walking surface
Indicate means of egress illumination that denotes means of egress illumination throughout the Means of Egress
System, which consists of the Exit Access, Exit and Exit Discharge The exit access is that portion of the means of
egress system that consists of all floor areas that lead from usable spaces within the building to the exit or exits
serving that floor area Exit access begins at the furthest points within each room or space and ends at the entrance
to the exit, that portion of the means of egress system between the exit access and the exit discharge or public way
Provide a PHOTOMETRIC plan of all accessible areas Demonstrate that the lighting plan complies with CBC 1006 2
for the means of egress system within the permitted area from the exit access to the extenor exit discharge
Deputy Fire Marshal, Greg Ryan, is preparing Photometnc Plan Guidelines Please contact Greg for clarification of
this requirement at 760-602-4665
M0.1 & MO 2
Denote air-moving systems supplying air in excess of 2000 cfm equipped with smoke detectors approved and
listed by the California State Fire Marshal CMC 609
Denote units provided with smoke detectors on plans
Denote smoke dampers in air transfer openings in Accessory Incidental Use Storage Room 202 CBC 711 7
End of Comments
BUILDING ENERGY ANALYSIS REPORT
PROJECT:
NSA
1921 Palomar Oaks Wasy Suite 250
Carlsbad, CA 92008
Project Designer:
Maggetti Elam
3160 Camino Del Rio South Suite 207
San Diego, CA 92108
(619)624-0521
Report Prepared by:
Greater San Diego Air Conditioning Co Inc.
3883 Ruffin Rd Ste C
San Diego , CA 92123
619-469-7818
Job Number:
4613
Date:
4/18/2013
The EnergyPro computer program has been used to perform the calculations summariEed in this compliance report This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards
This program developed by EnergySoft, LLC - www energysoft com
EnergyPro 5 1 by EnergySoft User Number 6272 RunCode 2013-04-1871033 40 ID 4613
TABLE OF CONTENTS
Cover Page
Table of Contents
Fonn MECH-1-C Certificate of Compliance
Form MECH-2-C Air & Water System Requirements
Form MECH-3-C Mechanical Ventilation
Form MECH-4-C HVAC Misc Prescriptive Requirements
1
2
3
11
14
15
EnergyPro 5 1 by EnergySoft Job Number ID 4613 User Number 6272
CERTIFICATE OF COMPLIANCE and
FIELD INSPECTION ENERGY CHECKLIST
(Parti of5) MECH-IC
Project Name
NSA
Date
4/18/2013
Project Address
1921 Palomar Oaks Wasy Suite 250 Carlsbad
Climate Zone Tolal Cond Floor Area
4,346
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type • Nonresidential • High-Rise Residential • Hotel/Motel Guest Room
• Schools (Public School) • Relocatable Public School Bldg 12 Conditioned Spaces Unconditioned Spaces
(affidavit)
Phase of Construction O New Construction • Addition • Alteration
Approach of Compliance • Component Overall Envelope
Energy
TDV • Unconditioned (file affidavit)
Front Orientation N, E, S, W or m Degrees Odeg
HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST
Equipment^ Inspection Cnteria
Meets Cntena or Requirements
Equipment^ Inspection Cnteria Pass Fail - Describe Reason^
Item or System Tags
(le AC-1, RTU-1, HP-1) DNT-32 • •
Equipment Type^ Packaged DX • •
Number of Systems 1 • •
Max Allowed Heating Capacity' 16,397 Btu/hr • •
Minimum Heating Efficiency' 7.70 HSPF • •
Max Allowed Cooling Capacity' 37,873 Btu/fir • •
Cooling Efficiency' 13 0 SEER/12 8 EER • •
Duct Location/ R-Value Attic, Ceiling Ins, vented/4 2 • •
When duct testing is required, submit
MECH-4A & MECH-4-HERS No • •
Economizer No Economizer • •
Thermostat Setback Required • •
Fan Control Constant Volume • •
Equipment^ Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Equipment^ Inspection Criteria Pass Fail - Descnbe Reason'
Item or System Tags
(le AC-1, RTU-1, HP-1) DWr-33 • •
Equipment Type^ Packaged DX • •
Number of Systems 1 • •
Max Allowed Heating Capacity' 15,419 Btu/hr • •
Mimmum Heating Efficiency' 7 70 HSPF • •
Max Allowed Cooling Capacity' 45,739 Btu/hr • •
Cooling Efficiency' 13 0 SEER/12 5 EER • •
Duct Location/ R-Value Attic, Ceiling Ins, vented/4 2 • •
When duct testing is required, submit
MECH-4A & MECH-4-HERS No • •
Economizer No Economizer • •
Thermostat Setback Required • •
Fan Control Constant Volume • •
1 If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
ihe building plans) the responsible party shall resubmit energy compliance (o include Ihe new changes
2 For additional detailed discrepancy use Page 2 of the Inspection Checklist Form Compliance fails if a Fail box is checked
3 Indicate Equipment Type Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other
EnergyPro 5 1 by EnergySoft User Number 6272 RunCode 2013-04-1ST10.33 40 ID 4613 Page 3 of 21
CERTIFICATE OF COMPLIANCE and
FIELD INSPECTION ENERGY CHECKLIST
(Part 1 of 5) MECH-IC
Project Name
NSA
Date
4/18/2013
Project Address
1921 Palomar Oaks Wasy Suite 250 Carlsbad
Climate Zone Total Cond Floor Area
4,346
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type • Nonresidential • High-Rise Residential • Hotel/Motel Guest Room
• Schools (Public School) • Relocatable Public School Bldg Bl Conditioned Spaces Unconditioned Spaces
(affidavit)
Phase of Construction • New Construction • Addition • Alteration
Approach of Compliance O Component Overall Envelope
Energy
TDV • Unconditioned (file affidavit)
Front Orientation N, E, S, W or in Degrees Odeg
HVAC SYSTEM DETAILS RELD INSPECTION ENERGY CHECKLIST
Equipment^ Inspection Criteria
Meets Cntena or Requirements
Equipment^ Inspection Criteria Pass Fail - Describe Reason'
item or System Tags
(ie AC-1, RTU-1, HP-1) DNT-34 • •
Equipment Type^ Packaged DX • •
IMumber of Systems 1 • •
Max Allowed Heating Capacity' 21,807 Btu/hr • •
Minimum Heating Efficiency' 7.70 HSPF • •
Max Allowed Cooling Capacity' 62,659 Btu/hr • O
Cooling Efficiency' 13 0 SEER/121 EER • •
Duct Location/ R-Value Attic, Ceiling Ins, vented/4 2 • •
When duct testing is required, submit
MECH-4A & MECH-4-HERS No •
Economizer No Economizer • •
Thermostat Setback Required • •
Fan Control Constant Volume • •
Equipment^ Inspection Criteria
RELD INSPECTION ENERGY CHECKLIST
Equipment^ Inspection Criteria Pass Fail - Describe Reason'
Item or System Tags
(le AC-1, RTU-1, HP-1) DNT-35 • •
Equipment Type^ Packaged DX • •
Number of Systems 1 • •
Max Allowed Heating Capacity' 4,821 Btu/hr • •
Minimum Heating Efficiency' 7 70 HSPF • •
Max Allowed Cooling Capacity' 21,015 Btu/hr • •
Cooling Efficiency' 13 0 SEER/IOO EER • •
Duct Location/ R-Value Attic, Ceiling Ins, vented/4 2 •
When duct testing is required, submit
MECH-4A & MECH-4-HERS No • •
Economizer No Economizer • •
Thermostat Setback Required • •
Fan Control Constant Volume • •
1 If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or Irom
the building plans) the responsible parly shall resubmit energy compliance to include the new changes
2 For additional detailed discrepancy use Page 2 of the Inspection Checklist Form Compliance fails if a Fail box is checked
3 Indicate Equipment Type Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other
EnerqyPro 5 1 by EnergySoft User Number 6272 RunCode 2013-04-18T10 33 40 ID 4613 Page 4 of 21
CERTIFICATE OF COMPLIANCE and
FIELD INSPECTION ENERGY CHECKLIST
(Parti of5) MECH-1 C
Project Name
NSA
Date
4/18/2013
Project Address
1921 Palomar Oaks Wasy Suite 250 Cailsbad
Climate Zone Total Cond Floor Area
4,346
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type El Nonresidential • High-Rise Residential O Hotel/Motel Guest Room
• Schools (Public School) • Relocatable Public School Bldg IZl Conditioned Spaces Unconditioned Spaces
(affidavit)
Phase of Construction • New Construction • Addition • Alteration
Approach of Compliance • Component Overall Envelope
Energy
TDV O Unconditioned (file affidavit)
Front Onentation N, E, S, W or in Degrees Odeg
HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST
Equipment' Inspection Critena
Meets Cntena or Requirements
Equipment' Inspection Critena Pass Fall - Describe Reason'
Item or System Tags
(le AC-1, RTU-1, HP-1) DNT-36 • •
Equipment Type' Packaged DX • •
Number of Systems 1 • •
Max Allowed Heating Capacity' 12,882 Btu/hr • •
Minimum Heating Efficiency' 7 70 HSPF • •
Max Allowed Cooling Capacity' 25,333 Btu/hr • •
Cooling Efficiency' 13 0 SEER/12 8 EER • •
Duct Location/ R-Value Attic, Ceiling Ins, vented / 4 2 • •
When duct testing is required, submit
MECH-4A & MECH-4-HERS Wo • •
Economizer No Economizer • •
Thennostat Setback Required • •
Fan Control Constant Volume • •
Equipment' Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Equipment' Inspection Criteria Pass Fail - Describe Reason'
Item or System Tags
(le AC-1, RTU-1, HP-1) DNT-37 • •
Equipment Type^ Packaged DX • n
Number of Systems 1 • •
Max Allowed Heating Capacity' 23.551 Btu/hr • •
Minimum Heating Efficiency' 7 70 HSPF • •
Max Allowed Cooling Capacity' 47,899 Btu/hr • •
Cooling Efficiency' 13 0 SEER/12 5 EER • •
Duct Location/ R-Value Attic, Ceiling Ins, vented/4 2 • •
When duct testing is required, submit
MECH-4A & MECH-4-HERS No • •
Economizer No Economizer 0 •
Thermostat Setback Required • •
Fan Control Constant Volume • •
1 If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes
2 For additional detailed discrepancy use Page 2 of the Inspection Checklist Form Compliance fails if a Fail box is checked
3 Indicate Equipment Type Gas (Pkg or, Split). VAV, HP (Pkg or split), Hydronic, PTAC, or other
EnergyPro 5 1 by EnergySoft User Number 6272 RunCode 2013-04-18T10 33 40 ID 4613 Page 5 of 21
CERTIFICATE OF COMPLIANCE and
FIELD INSPECTION ENERGY CHECKLIST
(Part 1 of 5) MECH-IC
Project Name
NSA
Date
4/18/2013
Project Address
1921 Palomar Oaks Wasy Suite 250 Carlsbad
Climate Zone Total Cond Roor Area
4,346
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type Q Nonresidential • High-Rise Residential • Hotel/Motel Guest Room
• Schools (Public School) • Relocatable Public School Bldg B Conditioned Spaces Unconditioned Spaces
(affidavit)
Phase of Construction • New Construction • Addition D Alteration
Approach of Compliance • Component Overall Envelope
Energy
TDV • Unconditioned (file affidavit)
Front Orientation N, E, S, W or in Degrees Odeg
HVAC SYSTEM DETAILS RELD INSPECTION ENERGY CHECKLIST
Equipment' Inspection Cnteria
Meets Cntena or Requirements
Equipment' Inspection Cnteria Pass Fail - Descnbe Reason'
Item or System Tags
(I.e AC-1, RTU-1, HP-1) AC-1 • •
Equipment Type' Split DX • •
Number of Systems 1 •
Max Allowed Heating Capacity' -570 Btu/hr • •
Minimum Heating Efficiency' n/a • O
Max Allowed Coolinq Capacity' 13,305 Btu/hr • •
Cooling Efficiency' 13 7 SEER/II SEER • •
Duct Location/ R-Value n/a • •
When duct testing is required, submit
MECH-4A & MECH-4-HERS No • •
Economizer No Economizer • •
Thermostat Setback Required • •
Fan Control Constant Volume • •
Equipment' Inspection Cnteria
FIELD INSPECTION ENERGY CHECKLIST
Equipment' Inspection Cnteria Pass Fai! - Descnbe Reason'
Item or System Tags
(le AC-1, RTU-1, HP-1) • •
Equipment Type' • •
Number of Systems • •
Max Allowed Heating Capacity' • •
Minimum Heating Efficiency' • •
Max Allowed Cooling Capacity' • •
Coohng Efficiency' • •
Duct Location/ R-Value • •
When duct testing is required, submit
MECH-4A & MECH-4-HERS • •
Economizer • •
Thermostat • •
Fan Control • •
1 If the Actual installed equipment perfomiance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes
2 For additional detailed discrepancy use Page 2 of the Inspection Checklist Form Compliance fajis if a Fail box is checked
3 Indicate Equipment Type Gas (Pkg or. Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other
EnergyPro 5 1 by EnergySoft User Number 6272 RunCode 2013-04-18T10 33 40 ID 4613 Page 6 of 21
CERTIFICATE OF COMPLIANCE and
FIELD INSPECTION ENERGY CHECKLIST
(Part 2 of 5) MECH-1 C
Project Name
NSA
Date
4/18/2013
Discrepancies
EnergyPro 5 1 by EnergySoft User Number 6272 RunCode 2013-04-18X10 33 40 ID 4613 Page 7 of 21
CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 3 of 5) MECH-1 C
Project Name
NSA
Date
4/18/2013
Required Acceptance Tests
Designer:
This form is to be used by the designer and attached to the plans Listed below are all the acceptance tests for mechanical systems The designer is required to check the applicable
boxes by all acceptance tests that apply and listed all equipment that requires an acceptance test If all equipment of a certain type requires a test, list the equipment descnption and
the number of systems The NA number designates the Section in the Appendix of the Nonresidential Reference Appendices Manual that describes the test Since this form will be
part of the plans, completion of this sechon will allow the responsible party to budget for the scope of work appropnately
Building Departments:
Systems Acceptance: Before occupancy permit is granted for a newly constructed building or space, or a new space-conditioning system serving a building or space is operated for
normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance
Systems Acceptance: Before occupancy permit is granted All newly installed HVAC equipment must be tested using the Acceptance Requirements
The MECH-1 C form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked The equipment requiring testing,
person performing the test (Example HVAC Installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted The following
checked-off forms are required for ALL newly installed equipment In addition a Certificate of Acceptance forms shall be submitted to the building department that certifies plans,
specifications, installation, certificates, and operating and maintenance information meet the requirements of §10-103(b) and Title-24 Part 6 The building inspector must receive the
properly filled out and signed forms before the building can receive final occupancy
TEST DESCRIPTION MECH-2A MECH-3A MECH-4A MECH-5A MECH-6A MECH-7A MEGH-8A MECH-9A MECH-I OA MECH-11A
Equipment Requiring Testing or Venfication Qtv
Outdoor
Ventilation
For
VAV & CAV
Constant
Volume &
Single-Zone
Unitary
Air
Distribution
Ducts
Economizer
Controls
Demand
Control
Ventilation
DCV
Supply
Fan
VAV
Valve
Leakage
Test
Supply
Water
Temp
Reset
Hydronic
System
Vanable
Flow
Control
Automatic
Demand
Shed
Control
Fujitsu 12RL2ASUAOU 1 IZl m • • • • • • • •
• • • • • • • • • •
• • • • • • • • • •
• • • • • • • • • •
• • • • • • • • • •
• • • • • • • • • •
• • • • • • • • • •
• • • • • • • • • •
• • • • • • • • • •
• • • • • • • • • •
• • • • • • • • • •
• • • • • • • • • •
n • • • • • • • • •
• • • • • • • • ! • •
EnerqyPro 5 1 by EnergySoft User Number 6272 RunCode 2013-04-18T10 33 40 ID 4613 Page 8 of 21
CERTIFICATE QF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 4 of 5) MECH-1C
Project Name
NSA
Date
4/18/2013
TEST DESCRIPTION MECH-12A MECH-13A MECH-14A MECH-15A
Equipment Requiring Testing Qty
Fault
Detection &
Diagnostics
for DX Units
Automatic Fault
Detection &
Diagnostics for
Air & Zone
Distnbuted
Energy Storage
DXAC
Systems
Thermal Energy
Storage (TES)
Systems Test Performed By
Fujitsu 12RL2ASUAOU 1 • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
n • • •
• • • •
• • • •
EnerqyPro 5 1 by EnergySoft User Number 6272 RunCode 2013-04-18T10 33 40 ID 4613 Page 9 of 21
CERTIFICATE OF COMPLIANCE (Part 5 of 5) MECH-IC
Project Name
NSA
Date
4/18/2013
Documentation Author's Declaration Statement
certify that this Certificate of Compliance documentation is accurate and complete
Name
Company
CL»^ (^i"lk/^p>y>
Greater San Diego Air Conditioning Co Inc Date ZZZ^. 4/18/2013
Address 3883 Ruffin Rd Ste C GEA#
GEPE#
City/State/Zip San Diego, CA 92123 Phone 619-469-7818
The Principal Mechanical Designer's Declaration Statement
• I am eligible under Division 3 of fhe California Business and Professions Code to accept responsibility for the mechanical
design
• This Certificate of Compliance identifies the mechanical features and performance specifications required for compliance
with Title-24, Parts 1 and 6 ofthe California Code of Regulations
• The design features represented on this Certificate of Compliance are consistent with the information provided to document
this design on the other applicable compliance forms, worksheets, calculations, plans and specifications submitted to the
enforcement agency for approval with this building permit application
Name Ross Baillargeon
Company Greater San Diego Air Conditioning
Signature
Date
Address 3883 Ruffin Rd Suite C License #
Clty/State/Zip san Diego, CA 92123 Phone (619)469-7818
Mandatory Measures
Indicate location on building plans of Note Block for Mandatory Measures.
MECHANICAL COMPLIANCE FORMS & WORKSHEETS (check box if worksheet is included)
For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, please refer to tha 2008 Nonresidential Manual
Note The Enforcement Agency may require all forms lo be incorporated onto the building plans
IZl MECH-1 C Certificate of Compliance Required on plans for all submittals
Ei MECH-2C Mechanical Equipment Summary is required for all submittals
MEGH-3C Mechanical Ventilation and Reheat is required for all submittals with mechanical ventilatton
El MECH-4C Fan Power Consumption is required for all prescnptive submittals
EnergyPro 5 1 by EnergySoft User Number 6272 RunCode- 2013-04-18T10 33 40 ID 4613 Page 10 of 21
AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C
Project Name
NSA
Dale
4/18/2013
Item or System Tags
(le AC-1, RTU-1, HP-1)
Indicate Air Systems Type (Central, Single Zone, Package, VAV, or etc ) Item or System Tags
(le AC-1, RTU-1, HP-1) DNT-32 DNT-33 DNT-34
Number of Systems 1 1 1
Indicate Paqe Reference on Plans or Schedule and indicate the applicable exception(s)
MANDATORY MEASURES T-24 Sections
Heating Equipment Efficiency 112(a) 7 70 HSPF 7 70 HSPF 7 70 HSPF
Cooling Equipment Efficiency 112(a) 13 0 SEER 712 a EER 130 SEER/12 5 EER 13 0 SEER 7121 EER
HVAC Heat Pump Thermostat 112(b), 112(c) Yes Yes Yes
Furnace Controls/Thermostat 112(c), 115(a) n/a n/a n/a
Natural Ventilation 121(b) No No No
Mechanical Ventilation 121 (b) 58 cfm 164 cfm 94 cfm
VAV Minimum Position Control 121(0 No No No
Demand Control Ventilation 121(c) No No No
Time Control 122(e) Programmable Switch Programmable Switch Programmable Switch
Setback and Setup Control 122(e) Setback Required Setback Required Setback Required
Outdoor Damper Control 122(f) Auto Auto Auto
Isolation Zones 122(3) n/a n/a n/a
Pipe Insulation 123
Duct Location/ R-value 124 Attic, (filing Ins, vented/4 2 Attic, Ceiling Ins, vented/42 Attic, Ceiling Ins, vented/4 2
PRESCRIPTIVE MEASURES
Calculated Design Heating load 144(a&b) 16.397 Btu/hr 15,419 Btu/hr 21,807 Btu/hr
Proposed Heating Capacity 144(a&b) 14,917 Btu/hr 25,321 BtuMr 28,611 Btu/hr
Calculated Design Cooling Load 144(a & b) 26,511 Btu/hr 32,017 Btu/hr 43,862 Btu/hr
Proposed Cooling Capacity 144(a&b) 11,263 Btu/hr 17.202 Btu/hr 23,685 Btu/hr
Fan Control 144(c) Constant Volume Constant Volume Constant Volume
DP Sensor Location 144(c)
Supply Pressure Reset (DDC only) 144(c) Yes Yes Yes
Simultaneous Heat/Cool 144(d) No No No
Economizer 144(e) No Economizer No Economizer No Economizer
Heat Air Supply Reset 144(f) Constant Temp Constant Temp Constant Temp
Cool Air Supply Reset 144(f) Constant Temp Constant Temp Constant Temp
Electnc Resistance Heating' 144(g)
Air Cooled Chiller Limitation 144(0
Duct Leakage Sealing If Yes, a
MECH-4-A must be submitted 144(k) No No No
1 Total installed capacity (MBtu/hr) ol all electnc heat on this project exclusive of electric auxiliary heat for heat pumps If electric heat is used
explain which exception(s) to §144(g) apply
EnergyPro 5 1 by EnergySoft User Number 6272 RunCode. 2013-04-18T10 33 40 ID 4613 Page 11 of 21
AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C
Project Name Date
NSA 4/18/2013
Item or System Tags
(le AC-1, RTU-1, HP-1)
Indicate Air Systems Type (Central, Smgle Zone, Package, VAV, or etc .)
Item or System Tags
(le AC-1, RTU-1, HP-1) DWr-35 DNT-36 DNT-37
Number of Systems 1 1 1
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pips Insulation
Duct Location/ R value
Indicate Pa ge Reference on Plans or Schedule and indicate the applicable exceptlon(s)
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pips Insulation
Duct Location/ R value
T-24 Sections MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pips Insulation
Duct Location/ R value
112(a) 7 70 HSPF 7 70 HSPF 7 70 HSPF
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pips Insulation
Duct Location/ R value
112(a) 13 0 SEER/WO EER 13 0 SEER/12 8 EER 13 0 SEER/12 5 EER
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pips Insulation
Duct Location/ R value
112(b), 112(c) Yes Yes Yes
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pips Insulation
Duct Location/ R value
112(c), 115(a) n/a n/a n/a
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pips Insulation
Duct Location/ R value
121(b) No No No
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pips Insulation
Duct Location/ R value
121(b) 100 cfm 77 cfm 151 cfm
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pips Insulation
Duct Location/ R value
121(c) No No No
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pips Insulation
Duct Location/ R value
121(c) No No No
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pips Insulation
Duct Location/ R value
122(e) Programmable Switch Programmable Switch Programmable Switch
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pips Insulation
Duct Location/ R value
122(e) Setback Required Setback Required Setback Required
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pips Insulation
Duct Location/ R value
122(f) Auto Auto Auto
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pips Insulation
Duct Location/ R value
122{q) n/a n/a n/a
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pips Insulation
Duct Location/ R value
123
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pips Insulation
Duct Location/ R value 124 Attic, Ceiling Ins, vented/4 2 Attic, Ceiling Ins, vented/4 2 Attic, Ceiling Ins, vented/42
PRESCRIPTIVE MEASURES
Calculated Design Healing Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electnc Resistance Heating'
144(3 & b) 4,821 Btu/hr 12,382 Btu/hr 23,551 Btu/hr Calculated Design Healing Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electnc Resistance Heating'
144(a&b) 18,054 Btu/hr 14,917 Btu/hr 25.321 Btu/hr
Calculated Design Healing Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electnc Resistance Heating'
144(a & b) 14,711 Btu/hr 17,733 Btu/hr 33.530 Btu/hr
Calculated Design Healing Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electnc Resistance Heating'
144(a & b) 12,409 Btu/hr 11,150 Btu/hr 17.441 Btu/hr
Calculated Design Healing Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electnc Resistance Heating'
144(c) Constant Volume Constant Volume Constant Volume
Calculated Design Healing Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electnc Resistance Heating'
144(c)
Calculated Design Healing Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electnc Resistance Heating'
144(c) Yes Yes Yes
Calculated Design Healing Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electnc Resistance Heating'
144(d) No No No
Calculated Design Healing Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electnc Resistance Heating'
144(e) No Economizer No Economizer No Economizer
Calculated Design Healing Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electnc Resistance Heating'
144(f) Constant Temp Constant Temp Constant Temp
Calculated Design Healing Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electnc Resistance Heating'
144(f) Constant Temp Constant Temp Constant Temp
Calculated Design Healing Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electnc Resistance Heating' 144(g)
Air Cooled Chiller Limitation 144(l)
Duct Leakage Sealing If Yes, a
MECH-4-A must be submitted 144(k) No No No
1 Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electnc auxiliary heat for heat pumps If electric heat is used
explain which exception(s) to §144(g) apply
EnergyPro 51 by EnergySoft User Number 6272 RunCode. 2013-04-18T10 33 40 ID 4613 Page 12 of 21
AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C
Project Name Date
NSA 4/18/2013
Item or System Tags
(19 AC-1, RTU-1, HP-1)
indicate Air Systems Type (Central, Single Zone, Packac e, VAV, or etc .)
Item or System Tags
(19 AC-1, RTU-1, HP-1) AC-1
Number of Systems 1
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thenmostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and S^up Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
Indicate Page Reference on Plans or Schedule and indicate the applicable exception(s)
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thenmostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and S^up Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
T-24 Sections MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thenmostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and S^up Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
112(a) n/a
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thenmostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and S^up Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
112(a) 137 SEER/11 SEER
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thenmostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and S^up Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
112(b), 112(c) n/a
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thenmostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and S^up Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
112(c). 115(a) n/a
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thenmostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and S^up Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
121(b) No
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thenmostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and S^up Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
121(b) Ocfm
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thenmostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and S^up Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
121(c) No
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thenmostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and S^up Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
121(c) No
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thenmostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and S^up Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
122(6) Programmable Switch
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thenmostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and S^up Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
122(e) Setback Required
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thenmostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and S^up Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
122(f) Auto
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thenmostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and S^up Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
122(g) n/a
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thenmostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and S^up Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
123
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thenmostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and S^up Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value 124 n/a
PRESCRIPTIVE MEASURES
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Coolmg Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electnc Resistance Heating'
Air Cooled Chiller Limitation
144(a& b) -570 Btu/hr Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Coolmg Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electnc Resistance Heating'
Air Cooled Chiller Limitation
144(a&b) 0 Btu/hr
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Coolmg Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electnc Resistance Heating'
Air Cooled Chiller Limitation
144(a & b) 9,313 Btu/hr
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Coolmg Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electnc Resistance Heating'
Air Cooled Chiller Limitation
144(a S b) 8.643 Btu/hr
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Coolmg Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electnc Resistance Heating'
Air Cooled Chiller Limitation
144(c) Constant Volume
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Coolmg Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electnc Resistance Heating'
Air Cooled Chiller Limitation
144(C)
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Coolmg Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electnc Resistance Heating'
Air Cooled Chiller Limitation
144(c) Yes
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Coolmg Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electnc Resistance Heating'
Air Cooled Chiller Limitation
144(d) No
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Coolmg Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electnc Resistance Heating'
Air Cooled Chiller Limitation
144(e) No Economizer
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Coolmg Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electnc Resistance Heating'
Air Cooled Chiller Limitation
144(f) Constant Temp
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Coolmg Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electnc Resistance Heating'
Air Cooled Chiller Limitation
144(f) Constant Temp
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Coolmg Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electnc Resistance Heating'
Air Cooled Chiller Limitation
144(g)
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Coolmg Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electnc Resistance Heating'
Air Cooled Chiller Limitation 144(1)
Duct Leakage Sealing If Yes, a
MECH-4-A must be submitted 144(k) No
1 Total installed capacity (MBtu/hr) of ail sisotnc heat on this projecf exclusive of electric auxiliary heat for heat pumps If electric heat is used
explain which exception(s) lo §144(g) apply
EnergyPro 51 by EnergySoft User Number 6272 RunCode: 2013-04-18T10 33 40 ID 4613 Page13of21
MECHANICAL VENTILATION AND REHEAT MECH-3C
Project Name
NSA
Date
4/^8/20^3
MECHANICAL VENTILATION (§121(b)2) REHEAT LIMITATION {§144(d))
AREA BASIS OCCUPANCY BASIS VAV MINIMUM
A B C D E F G H 1 K L M N
Zone/System
Condition
Area
(ft^)
CFM
per
ft^
Mm CFM
By Area
BXC
Number
Of
People
CFM
per
Person
Mm CFM
by
Occupant
EXF
REQ'D
VA
Max of
DorG
Design
Ventilation
Air
CFM
50% of
Design Zone
Supply
CFM
BX04
CFM/ft^
Max of
Columns
H, J, K,
300 CFM
Design
Minimum
Air
Setpoint
Transfer
Air
Zone 2 385 015 58 58 58
DNT-32 Total 58 68
Zone 3 1,091 015 164 164 164
DNT-33 Total 164 164
Zone 4 625 015 94 94 94
DNT-34 Total 94 94
Zone 5 665 0 15 100 100 100
DNT-35 Total 100 100
Zone 6 512 015 77 77 77
DNT-36 Total 77 77
Zone 7 1,008 015 151 151 151
DNT-37 Total 151 151
Zone 1 60 0 15 9 9 0 9
AC-1 Total 9 0
Totals 1 Column 1 Total Design Ventilation Air
C Minimum ventilation rate per Section §121, Table 121-A
E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load for egress purposes for spaces without fixed seating
H Required Ventilation Air (REQ'D V A) is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS (Column D or G)
I Must be greater than or equal to H, or use Transfer Air (column N) to make up the difference
J Desiqn fan supply CFM (Fan CFM) x 50%, or the design zone outdoor airflow rale per §121.
K Condition area (ft^) x 0 4 CFM / ft^, or
L Maximum of Columns H, J, K, or 300 CFM
M This must be less than or equal to Column L and greater than or equal to the sum of Columns H plus N
N Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M) Where required, transfer air must be greater than or
equal to the difference between the Required Ventilation Air (Column H) and the Design Minimum Air (Column M), Column H minus M
EnergyPro 51 by EnerqySoft User Number 6272 RunCode. 2013-04-18T10-33.40 ID 4613 Page 14 of 21
FAN POWER CONSUMPTION MECH-4C
Project Name
NSA
Date
4/18/2013
NOTE Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Vanable Air Volume (VAV) Systems when using the Prescnptive Approach See Power Consumption of fan §144(c)
B
Fan Descnption
Design Brake
HP
Efficiency
Motor Dnve
Number of
Fans
Peak Watts
BXEX746/
(CXD)
DWr-32 - Supply Fan 0 150 55 0% 97 0% 1 0 210
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 210 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards
2) SUPPLY DESIGN AIRFLOW (CFM) 600
A) If filter pressure drop (SPa) is greater than 1 inch W C or
245 Pascal then enter SPa on line 4 Enter Total Fan
pressure drop across Ihe fan (SP|) on Line 5
3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W C or
245 Pascal then enter SPa on line 4 Enter Total Fan
pressure drop across Ihe fan (SP|) on Line 5 4) SPa
A) If filter pressure drop (SPa) is greater than 1 inch W C or
245 Pascal then enter SPa on line 4 Enter Total Fan
pressure drop across Ihe fan (SP|) on Line 5
5) SP,
B) Calculate Fan Adiuslment and enter on line 6 6) Fan Adjustment = 1-(SP,-1)/SP|
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0 350 W/CFM
TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0 8 W/CFM for Constant Volume systems or 1 25
W/CFM for VAV systems
EnergyPro 5 1 by EnergySoft User Number 6272 RunCode. 2013-04-18T10-33 40 ID 4613 Page 15 of 21
FAN POWER CONSUMPTION MECH-4C
Project Name
NSA
Date
4/18/2013
NOTE Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Systems when using the Prescnptive Approach See Power Consumption of fan §144(c)
A B
Fan Description
Design Brake
HP
Efficiency
iViotor Dnve
Number of
Fans
Peak Watts
B X E X 746 /
(CXD)
DNT-33 - Supply Fan 0 200 60 0 % 970% 1 0 256
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 256 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards
2) SUPPLY DESIGN AIRFLOW (CFM) ^,000
A) If filter pressure drop (SPa) is greater than 1 inch W C or
245 Pascal then enter SPa on line 4 Enter Total Fan
pressure drop across the fan (SP,) on Line 5
3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W C or
245 Pascal then enter SPa on line 4 Enter Total Fan
pressure drop across the fan (SP,) on Line 5 4) SPa
A) If filter pressure drop (SPa) is greater than 1 inch W C or
245 Pascal then enter SPa on line 4 Enter Total Fan
pressure drop across the fan (SP,) on Line 5
5) SP,
B) Calculate Fan Adjustment and enter on line 6 6) Fan Adjustment = 1-( SPa-1)/SP|
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0 256 W/CFM
1 TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0 8 W/CFM for Constant Volume systems or 1 25
W/CFM for VAV systems
EnergyPro 5 1 by EnergySoft User Number 6272 RunCode 2013-04-18T10 33 40 ID 4613 Page 16 of 21
FAN POWER CONSUMPTION MECH-4C
Project Name
NSA
Date
4/18/2013
NOTE Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Systems when using the Prescnptive Approach See Power Consumption of fan §144(c)
A B
Fan Description
Design Brake
HP
Efficiency
Motor Drive
Number of
Fans
Peak Watts
BXEX746/
(CXD)
DNT-34 - Supply Fan 0220 60 0% 970% 10 282
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 2S2 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards
2) SUPPLY DESIGN AIRFLOW (CFM) 1,200
A) If filter pressure drop (SPa) is greater than 1 inch W C or
245 Pascal thBn enter SPa on line 4 Enter Tolal Fan
pressure drop across the fan (SP,) on Line 5
3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W C or
245 Pascal thBn enter SPa on line 4 Enter Tolal Fan
pressure drop across the fan (SP,) on Line 5 4) SPa
A) If filter pressure drop (SPa) is greater than 1 inch W C or
245 Pascal thBn enter SPa on line 4 Enter Tolal Fan
pressure drop across the fan (SP,) on Line 5
5) SP,
B) Calculate Fan Adjustment and enter on line 6 6) Fan Adjustment = 1-( SPa-1)/SP,
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0 235 W/CFM
1 TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0 8 W/CFM for Constant Volume systems or 1 25
W/CFM for VAV systems
EnergyPro 5 1 by EnergySoft User Number 6272 RunCode- 2013-04-18T10 33 40 ID 4613 Page 17 of 21
FAN POWER CONSUMPTION MECH-4C
Project Name
NSA
Date
4/18/2013
NOTE Provide one copy of this worksheet for each fan system with a tolal fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Vanable Air Volume (VAV) Systems when using the Prescnptive Approach See Power Consumption of tan §144(c)
B
Fan Description
Design Brake
HP
Efficiency
Motor Drive
Number of
Fans
Peak Watts
BXEX746/
(CXD)
DNT-35 - Supply Fan 0150 55 0% 97 0% 10 210
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 210 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards
2) SUPPLY DESIGN AIRFLOW (CFM) 800
A) If filter pressure drop (SPa) is greater than 1 inch W C or
245 Pascal Ihen enter SPa on line 4 Enter Total Fan
pressure drop across the fan (SP,) on Line 5
3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W C or
245 Pascal Ihen enter SPa on line 4 Enter Total Fan
pressure drop across the fan (SP,) on Line 5 4) SPa
A) If filter pressure drop (SPa) is greater than 1 inch W C or
245 Pascal Ihen enter SPa on line 4 Enter Total Fan
pressure drop across the fan (SP,) on Line 5
5) SP,
B) Calculate Fan Adjustment and enter on line 6 6) Fan Adjustment = 1-( SPa-1)/SP,
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0262 W/CFM
1 TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0 8 W/CFM for Constant Volume systems or 1 25
W/CFM for VAV systems
\ EnergyPro 5 1 by EnergySoft User Number 6272 RunCode 2013-04-18X10 33 40 ID 4613 Page 18 of 21
FAN POWER CONSUMPTION MECH-4C
Project Name
NSA
Date
4/18/2013
NOTE Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Systems when using the Prescnptive Approach See Power Consumption of fan §144(c)
B
Fan Description
Design Brake
HP
Efficiency
Motor Dnve
Number of
Fans
Peak Watts
B X E X 746 /
(CXD)
DNT-36 - Supply Fan 0 150 55 0% 97 0% 1 0 210
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 210 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards
2) SUPPLY DESIGN AIRFLOW (CFM) 600
A) If filter pressure drop (SPa) is greater than 1 inch W C or
245 Pascal then enter SPa on line 4 Enter Total Fan
pressure drop across the fan (SP,) on Line 5
3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W C or
245 Pascal then enter SPa on line 4 Enter Total Fan
pressure drop across the fan (SP,) on Line 5 4) SPa
A) If filter pressure drop (SPa) is greater than 1 inch W C or
245 Pascal then enter SPa on line 4 Enter Total Fan
pressure drop across the fan (SP,) on Line 5
5) SP,
B) Calculate Fan Adjustment and enter on line 6 6) Fan Adjustment = 1 -( SP, -1) / SP,
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0350 W/CFM
TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0 8 W/CFM for Constant Volume systems or 1 25
W/CFM for VAV systems
EnergyPro 6 1 by EnergySoft User Number 6272 RunCode. 2013-04-18T10 33 40 ID 4613 Page 19 of 21
FAN POWER CONSUMPTION MECH-4C
Project Name
NSA
Date
4/18/2013
NOTE Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Systems when using Ihe Prescnptive Approach See Power Consumption of tan §144(c)
B
Fan Description
Design Brake
HP
Efficiency
Motor Drive
Number of
Fans
Peak Watts
B X E X 746 /
(CXD)
DNT-37 - Supply Fan 0200 60 0% 970% 10 256
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 256 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards
2) SUPPLY DESIGN AIRFLOW (CFM) 1,000
A) If filter pressure drop (SPa) is greater than 1 inch W C or
245 Pascal then enter SP, on line 4 Enter Total Fan
pressure drop across the fan (SP,) on Line 5
3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W C or
245 Pascal then enter SP, on line 4 Enter Total Fan
pressure drop across the fan (SP,) on Line 5 4) SP,
A) If filter pressure drop (SPa) is greater than 1 inch W C or
245 Pascal then enter SP, on line 4 Enter Total Fan
pressure drop across the fan (SP,) on Line 5
5) SP,
B) Calculate Fan Adjustment and enter on line 6 6) Fan Adjustment = 1 -( SP, -1) / SP,
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0 256 W/CFM
TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0 8 W/CFM for Constant Volume systems or 1 25
W/CFM for VAV systems
EnergyPro 5 1 by EnergySoft User Number 6272 RunCode 2013-04-18T10 33 40 ID 4613 Page 20 of 21
FAN POWER CONSUMPTION MECH-4C
Project Name
NSA
Date
4/18/2013
NOTE Provide one copy of this worksheet for each fan system with a total tan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach See Power Consumption of fan §144(c)
Fan Descnption
Design Brake
HP
Efficiency
Motor Drive
Number of
Fans
Peak Watts
BXEX746/
(CXD)
AC-1 - Supply Fan 0 062 400% 99 0% 10 117
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A m §144(c)
of the Energy Standards 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) ff7 FILTER PRESSURE ADJUSTMENT Equation 144-A m §144(c)
of the Energy Standards
2) SUPPLY DESIGN AIRFLOW (CFM) 400
A) If filter pressure drop (SPa) is greater than 1 inch W C or
245 Pascal then enter SPa on line 4 Enter Total Fan
pressure drop across the tan (SP,) on Line 5
3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W C or
245 Pascal then enter SPa on line 4 Enter Total Fan
pressure drop across the tan (SP,) on Line 5 4) SPa
A) If filter pressure drop (SPa) is greater than 1 inch W C or
245 Pascal then enter SPa on line 4 Enter Total Fan
pressure drop across the tan (SP,) on Line 5
5) SP,
B) Calculate Fan Adjustment and enter on line 6 6) Fan Adjustment = 1-( SPa-1)/SP,
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0 292 W/CFM
1 TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0 8 W/CFM for Constant Volume systems or 1 25
W/CFM for VAV systems
EnergyPro 5 1 by EnergySoft User Number 6272 RunCode- 2013-04-18T10 33 40 ID 4613 Page 21 of 21
^ CITY OF
CARLSBAD
pmMB'JjJnn
ECECTLiGAi.' '
MECjANtjCAD
WDGDSQEET
B-18
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
. www carlsbadca gov
Project Address: ^T& 2.^ PermitNc.; p6 IVZ'^
Informotlon provided bsiovi refers to work baing done on the oboue mentioned permit on^.
This form mast be completed and returned to the Building Division before the permit tan ba issued.
Building Dept Faxi ^60) 602-8538
o
Number of new or relocated fixtures, traps, or floor drains
New building sewer line? Ves No.
Number of new roof drains? 0
Install/alter water line?... ^
Number of new water heaters? ,
Number of new, relocated or replaced gai outlets?
Number of new hose bibs? ^
Residential Permits:
New/expanded seruicei Number of new amps,
Minor Remodel onfs/t Ves No
Commerci al/Induttrl«lt
Tenant Improuementi Number of eKisting amps involved in this pra/ecti
N umber of new amps involved In this proiect.
New Conttructioni Amps per Panel:
Single Phase > , Number of new amperes
Three Phase Numbei of new amperes
Three Phase 480 , Number of new amperes
Number of new furnaces, A/C, or hectt pumps?
New or relocated duct worh? Yes No.
Number of new fireplaces?
Number of new exhaust fans?...... ..„.„.„.,.,
Relocate/install uent?
Number of new exhaust hoods? ..i
Number of new boilers or compressors? Number of HP
B-ie Cage 1 of 1 RBV 03'09
CITY OF
CARLSBAD
PrnMBOUDD
EDECTDECAm
MECDANliiAD
WDDDSDEET
B-18
Deve!oi>ment Services
Building Oivlston
1635 Faraday Avenue
760-602-2719
www carlsbadca gov
Projecl Address: 1>T&E.y^ Permit No,: PC \%-7^
Information provided below refers to work being done on the above mentioned permit only
This lorm must be completed and returned to tho Bvildlna PivisioM before the permit can ba Issued.
Building Dept. Fax! (760) 602-8558
Number of new or relocated fixtures, traps, or floor drains.
New building sewer line?
Number of new roof drains?....,
Install/alter water line?„ ,
Number of new water heaters?
Numbsr of new, relocated or reploced gas outlets?..
Number of new hose bibs? „.
Ves No
Residential Permits:
New/expanded service: Number of new amps.
Minor Remodel only: Ves No
€ommereiaiyindu{triali
Tenant Improvement: Number of ssisting amps Involved in this proied;
Number of new amps rnvolvedln this project:
New Construdion: Amps per Panel;
Single Phase Number of new amperes_
Three Phase - Number of new amper6S_
Three Phase 480 Number of new ampere$_
200 amps
125 amps
Number of new furnaces, A/C, or heat pumps?.
New or relocated duct work? ..
Number of new fireplaces? ...........
Number of new exhaust fans? -
Relocate/install vent? ,
Number of new exhaust hoods?
.Ves No
Number of new boilers or compressors? „ Number of HP
B-18 Page 1 of 1 Rev 03/09
CITY O F
Paan/IBENDD
EDECTDQKAm
MECDANaSAD
WnnnSnEET
B-18
Deyei^.oment Services
Building Division
1635 Faraday Avenue
760-602-2719
. www.carlsbadca.gov
Project Address: 1>T& PermitNc; \>C
Infomncllon provided below refers to work being done on the obove mentioned psrmft only
This form must ba completed end relwraed io fhe Building Division before the aennit con faa issued.
Buiiding Dept Fax (760) 602-6533
Number of new or relocated fixtures, traps, or floor drains,
New building sewer line? „ ........ ,....„
Number of new roof drains?....,...,..,™. _
Install/alter water Ime? «
Number of new water heaters? ,.,..„„
Number of new, relocated or replaced gas outlets?
Number of new hose bibs? „_ — „ _
Ves No
Resldenticd Pernittst
New/expanded service: Number of new amps;
Minor Remodel on^ Ves No
Commereial/Induttricsh
Tenant Improwement; Number of existing amps Involved(n ttiis proiect:
Number of new amps invoSvecUti this project:
Kaw Conftrudion: Amp; pet Panel;
Single Phase — „. „.,„.„., Number of new ampenes_
Three Phase..... _ „.. ,...„ Number of new amperes_
Three Phase 480 , ~ ™. Number of new amp6res_
Number of new furnaces, A/C, or heat pumps?.
New or relocated duct work? . „.
Number of new fireplaces?.,,.
Number of new exhaust fans? - .,
Relocate/'Butail uent? .„.,„
Number of new exhaust hoods?.., .
Number of new boilers or compressors?
.Ves No
.Number of HP
B-18 Page 1 of 1 Rev. 03/09
Ac 3 2;V: 3 '•:'V
SAN DIEGO REGIONAL
HAZARDOUS MATERIALS QUESTIONNAIRE
OFFICE use ONLY
UPFPiir
W#
BP DAFE /
Business Manne Business CuiiSact Telephone # - /f>7
Project Address City Stale ^ Zip Code
Willl/ifl Address Cily State Zip Code
Project Contact Telephone*
i )
The foDcwlng questions represent ttie fBclltty's activities, NOT ttie specific project doecrtptlon
PART I. FIRg pePARTMEM- KAZAROOUS MATERIALS OIVISION! OCCUPANCY CLASSIFICATION- Indicate Dy circling itw Hem, whamsr your business
WlH u9e, process or «»tsre any of lha following hszardous mnlsnals If any of Ihe items are circled, applicant must contact Ihe Fire ProiecUon Agency witn
Juflsdlctton prior lo plan subminal Facility's Square Pootage (Including proposed prolecO: Occupancy RatJng.
1 ExplOSnrg or Blssbno Agenls 6 Organic Psrocides
2. Compi»jtiiiid G*s«» S 0)ddli6fS
3 Fbnimeblercombusllble Liquids 7 Pyrottiorics
4 Hsmirabls Solrds B Unalabla Reaclivss
9 Water Reactives
(0. Cryogenics
t1 Highly Toxie or loxicMateraia
12 Rsdloadives
PART n. SAN DIEGO COUMTY DEPARTMBNT OP SNVIR0NIV1EHTA[. HEALTH - HA^AROOUS MATgRIALS PIV13IQN3 fHMDl. If lhe_an3Wcr ta sny of the
aitons Is yas applicant must contact Ina CDL ' quoaitons Is yas applicant must coniacl lTi<j ciounly o( San Oiego Haiardous Matenals bluision 5500 overland Ave, Suite l io, San Dsego, CA 92'r23
Call (BS8) 505-6700 pnor lo the IMuencfl of ff building pemiit,
FEES AR6 RSQgjRED Praject Completion Date. / / EnpectBd Dala of Occupancy '] ' / if)
Dele Initials
• CalARP Required
Date inlUais
(for now consiruciion or mmoaeiina pnjjgcS)
Is your OLislriess listed on ine reverse side at this form' (eneck ail tnai apply)
Will your business dispose of Hazardous Substances or Medical Waste in any amount?
Will your Dusiness store or handle Haxardous Substances In quanllllcs equal ta or groQtcr than 55 gallons soo pounds
200 oifafc feel, or oercinogens'reprodLKlive toxins in any quantity?
WiH your business uso an existing or Install an underground sioraga tank?
Will your boBinesa store or handle Regulated Substances (CalARP)?
Will your business use ot Install a Hazardous Wssia Tank Systani (\\W» 22 Article 10)?
Will your busmees alore petroleum in tanks or container at your fadUty with a tolal atomge capsot/ ecjual lo
or greater ihan 1,320 gallons' (California's Aboveground PatralauTn Storage Act)
PART.JII SAN DIEGO CallNTY AIR POLLUTIQM CONTROL DISTRICT If IhS aniiWBr to sny of ths qusclians below Is yea. applicanl must contact Uie Air
Pollution Control Distnct (APCO), 10-154 6W Srove Road, Sun Diego, CA 92131.1649, telephone (858) S8G-2600 pnorto Ibe Issuance of a huiWing or demolition
permit Note If the answar to quasOons 4 or S Is yes applicanl must also submit an asbeslos nolHlcatlon form to Iho APCD at least 10 working days pncr lo
cominanang demoWlnn or renovation, except ciRmnlibon or fynov^|ipi^ ofrescdenUal structures of (bur units or tees Contact ihe APCD for more infomiatian
• CalAJ^P Exempt
• CalARP Complala
_I
Oala inibala
YES
•
•
•
•
NO
1
will the subject facility or conslruc(io.T activHles Include operations or equlpmcnl (hat emit or are capable of emmtng an aif coiitamlnaftt? (Sea the
APCD rscisnaat ai hltn./iwww agnprd org/infinffBn^^re^rmils ndf. and Ihe list of typical equipment requinng an APCD permil on the ceversc side
of this from. Coniacl APCD If you have any quastloits}
(ANSWER ONLY IF QUESTION 11S YES) Will the subject laciiily be located within 1.000 feet of the outer boundary of a school (K through My
(Search the Califomia School Dlrsclory sl nttpy/wvyw cde ca oov/re/sd/ for public ana private schools or conlaci lha appropnate school distncf)
Has a survey been porformad to dQiarmlna lha presenca of Asbasios ContaInlr\fl Materials'
Wllf there be renovaiJon that Involves handling of any friable asbestos materials or disturbing any material iliai conlalns non-frlabie asbestos?
Will there bo demolition Involving lha ramoval of a load supporting structural mamb*r?
enefly deMtibe business aciivflies
Idi re under peijally of psijuiy that la the best of
Name of Ovmer o( Authorized Agent
flies / ~~. ~TZ' ,/ DfieHy describe proposed projocf ,
lu^avMadge and bsUof the rosponsas msde riareln are true and cori^l
Slgnaiiira af Owner or Aulhoni:a<i Ageni Dale
PWe DB'ARTMErn" OCCUPANCY CUSSIFICATION.
aY._
FOR OFFICIAL USE ONLY-
DATE
EXEMPTOR NO i^URTHERlNFaiWA'nON REQUIRCO RELEASED PORaUILOINC PBRUIT »UT NOf POR OCCUPANCIT neLEASSI FOI^ OCCUPANCY
COUNiTY HI^D' APCO C0UNTY4^M0 APCO COUNTY-HMD APCO
IIM-91?l(0:/ll) Coiint) of San Diego - DEH -Hazflfdoui Materials Division
Serena Sakamoto
From: Victona Melvin <victona(a)maggettielam com>
Sent: Monday, April 08, 2013 2 24 PM
To: Serena Sakamoto
Cc: Janet Altar
Subject: RE PC13-22 / 1925 Palomar Oaks Way
Attachments: Permit Application pdf
Categories: Yellow Category
Hi Serena,
i just noticed that the address is incorrect on the application I had written 1925, but it is actually
1921 Attached is the revised correct address for this project Please let me know if I need to do
anything else to get this corrected at the city The title block on the plans is correct
Thanks,
Victona Melvin
Project Manager/ Intenor Designer
Maggetti Elam
3160 Camino del Rio South
Suite 207
San Diego, Ca 92108
619 624 0521 x14
619 624 0530 fax
victona@maqgettielam com
From: Serena Sakamoto [mailto'Serena.Sakamoto(g)carlsbadca qovl
Sent: Thursday, March 28, 2013 3:28 PM
To: victona(S)maqqettielam.com
Cc: Janet Altar
Subject: PC13-22 / 1925 Palomar Oaks Way
Attn Victoria Melvin
We have 2 issues with the plan check for these 2 suites I left you a message regarding the first question
What IS the total square footage for the spec suite #200 for 1925 Palomar Oaks Way'
Also, the fire expedite fee of $115 has been created under CB130825 Please pay this as soon as possible
Let us know if you have any questions Thank you.
5^ CtTY OF
CARLSBAD
Bui'Wfng Division
Serena Sakamoto
Technical Assistant
City of Carlsbad
INDUSTRIAL WASTEWATER DISCHARGE PERMIT
^ . SCREENING SURVEY
DateV^lH>
Business Name M^h^iA^ S^^r^ A^3<>C^r^-^^
Street Address <*12^ ?tf^(o/v^yA/L Oa|<, Oarti Czr *3'Z-Q06
Email Address U&^rigca f^^y jA^'^jUgfw^cg^
PLEASE CHECK HERE IF YOUR BUSINESS IS EXEIVIPT (ON REVERSE SIDE CHECK TYPE OF BUSINESS)
Check all below that are present at your facility
Acid Cleaning Ink Manufactunng Nutritional Supplement/
Assembly Laboratory Vitamin Manufactunng
Automotive Repair Machining/Milling Painting/Finishing
Battery Manufacturing Manufacturing Paint Manufacturing
Biofuel Manufacturing Membrane Manufactunng Personal Care Products
Biotech Laboratory (i e. water filter membranes) Manufacturing
Bulk Chemical Storage Metal Casting / Forming Pesticide Manufactunng /
Car Wash Metal Fabrication Packaging
Chemical Manufactunng Metal Finishing Pharmaceutical Manufacturing
Chemical Purification Electroplating (including precursors)
Dry Cleaning Electroless plating Porcelain Enameling
Electncal Component Anodizing Power Generation
Manufactunng Coating (i e phosphating) Print Shop
Fertilizer Manufactunng Chemical Etching / Milling Research and Development
Film /X-ray Processing Pnnted Circuit Board Rubber Manufactunng
Food Processing Manufactunng Semiconductor Manufacturing
Glass Manufactunng Metal Powders Forming Soap / Detergent Manufactunng
Industrial Laundry Waste Treatment / Storage
SIC Code(s) (if known):
Brief descnption of business activities (Production / Manufactunng Operations).
Description of operations generating wastewater (discharged to sewer, hauled or evaporated)
Estimated volume of industrial wastewater to be discharged (gal /day)
List hazardous wastes generated (type / volume)
Date operation began/or will begin at this location
Have you applied for a Wastewater Discharge Permit from the Encina Wastewater Authonty'?
Yes No If yes, when
Site Contact
Signature
Title Ac^jCj/^X
Phone No LU\- L1^%-0^'U.
ENCINA WASTEWATER AUTHORITY, 6200 Avenida Enemas Carlsbad, CA 92011 (760)438-3941
FAX (760)476-9852
PC130022 1921 PALOMAR OAKS WY
NSA & SPEC SUITE - OFF TO OFF
CB130823 1921 PALOMAR OAKS WY
200
CB130825
250
1921 PALOMAR OAKS WY
3/2-"^//s. Tf ei^'^, eL-(^<^. e<,o,iu, i'P-iiZ^ ^<o,
f/^/l^
SW •ISSUED •CV
Approved Date, By
BUILDING
PLANNING i ^61]-^
ENGINEERING ^
FIRE Expedite? ( Y/I N ^)l5ll^>
AFS Checked by
HazMat
APCD
Health
Forms/Fees sent Reed Due? By
Encina '3/zn/i-2> Y N
Fire Y N
HazHealthAPCD Y N
PE&M 'kiikU'-^ Y N
School Y N
Sewer
Stormwater
Y N
Y N
Special Inspecfion Y N
CFD Y (N)
LandUse Density ImpArea FY Annex Factor
PFF Y (t^
Comments Date Date Date Date
Building
Planning
Engineering
Fire s/^-J/is
Need? '
• Done
• Done
a Done