Loading...
HomeMy WebLinkAbout1921 PALOMAR OAKS WAY; 300; CB881361; Permito I hereby affirm that I am licensed under provisions of Chapter 9 (commencing with Section 1000) of Division 3 of the Business and Profession. Code, and my license is in lull force and effect I hereby affirm that I am exempt from the Contrite tors License Law for the following reason (Sec 7031 Business and Professions Code Any city or county which, re-quires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance also requires he ap-plicant for such permit to file a siqned statement that he is licensed pursuant to the provisions of the Contractor License Law (Chapter 9 commencing with Sec-lion 7000 of Division 3 of the Business and Professions Code) or that is ex- empt therefrom and the basis for the alleged exemption Any violation of Section 7031 5 by an applicant for a permit sub- ,eels the applicant to a civil penalty of not more than five hun- dred dollars ($500) I I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the Struc- ture is not intended or offered for sale (Sec 7044. Business and Professions Code The Contractor's License Law does not apply to an owner of properly who builds or improves thereon and who does such work himself or through his own emoloyees, provided that such improvements are not intend- ed or offered for sale It, however, the building or improve- ment is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or im- prove for the purpose of sale) I owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec 7044. Business and Professions Code The Contractor's License Law does not apply to an owner Of property who builds or im- proves thereon, and who contracts for each projects with a contractor(s) license pursuant to the Contractor's License Law) ('1 As a homeowner lam improving my home, and the follow ing conditions exist The work is being performed prior to sate 2 I have lived in my home for twelve months prior to completion of this work 3 I have out claimed this exemption during the last three years 0 tamexempt under Sec ________________ - B & P C for this reason IICF RAIl PAINT PflI ANIY t PRFCS MARtS APPLICANT TO FILL IN INFORMATION WITHIN SHADED AREA AND DECLARATIONS. CARLSBAD BUILDING DEPARTMENT APPLICATION & PERMIT 2075 Las Palmas Dr., Carlsbad, C 009-1915(619) 438-1161 APPIcATION BUSINESS LICENSE # VALUATION PERMIT NUMBER lq-.H 2NRY TOF ____ _ 10 ZONE LOT BLOCK J SUBDIVISION ASSESSOR PARCEL NO CONTRACTOR CONTRACTORS PHONE 0 Qti ti,.jdLr t OWNE P'S NAME OWNE A'S PHONE CONTRACTOR'S ADDRESS 3 ,;-1 < STATE LICENSE NO BUILDING SO FOOTAGE OWNER'S MAILING ADDRESS 2B11 PcS ?& (60 DESIGNER QQ 4 7.S'ci 7 :i DESIGNER'S PHONE ) OiLc p c 3281 11/23/88 0001 01 02 DESCRIPTION OF WORK r1' DESIGNER'S ADDRESS STATE LICENSE NO BldPist 57680 I F/P F LA E LE V NO NO p EDU - YO NO CENSUS TRACT PAPKING SPACE RES UNITS GRADING PERMIT ISSUED REDEVELOPMENT I TYPE 0CC LOAD FIRE SPA AREA I S vDND C3 NO YO ND Not Valid Unless Machine Certified - QTY PLUMBING PERMIT - ISSUE 7-A' OTY 1011, MECHANICAL PERMIT - ISSUE 1 SUMMARY/ACCOUNT NUMBER EACH FIXTURE TRAP INSTALL FURN DUCTS UP TO 100,000 BTU BUILDING PERMIT 001-810-00-00-8220 EACH BUILDING SEWER OVER 100,000 BTU , SIGN PERMIT 001-810-00-00-8221 _ EACH WATER HEATER AND/OR VENT #7._J BOILER/COMPRESSOR UP TO 3 HP PLAN CHECK 001-810-00-00-8891 - EACH GAS SYSTEM ITO 4 OUTLETS OILER/COMPRESSOR 315 HP TOTAL PLUMBING 001-810-00-00-8222 EACH GAS SYSTEMS OR MORE - TAL FIREPLACE ELECTRICAL 001-810-00-00-8223 EACH INSTAL ALTER, REPAIR WATER PIPE ENT FAN SINGLE DUCT '7. MECHANICAL 001-810-00-00-8224 ii 4L EACH VACUUM BREAKER ECH EXHAUST HOOD/DUCTS ' MOBILEHOME 001-810-00-00-8225 WATER SOFTNER , rRELOCATION , OF EA FURNACE/HEATER SOLAR 001-810-00-00-8226 EACH ROOF DRAIN (INSIDE) ,RYER VENT ' STRONG MOTION 880-519-92-33 TOTAL MECHANICAL I __, FIRE SPRINKLERS 001-810-00-00-8227 [DIAL PLUMBING P ES FEE e 320-810-00-00-8740 360-810-00-00-8740 QTY ELECTRICAL PERMIT - ISSUE QTY MOBILE HOME SETUP It A PARK-IN-LIEU (AREA NEW CONSU EA AMP'SWI BKR CAR PORT -1F 312-810-00-00-8835 PH 7_9 AWNING fJLA Cd'TA T)F 311-810-00-00-8835 EXIST BLDG EAAMP/SWT'BKR GARAGE TPH 3PH \1 001-810-00-00-8162- REMOOEL'ALTER PER CIRCUIT 880-519-92-57 TEMP POLE 200 AMPS - OVER 200AMPS TEMP OCCUPANCY (30 DAYS) CREDIT DEPOSIT .74Li7 IDEAL ELECTRICAL I — TOTAL TOTAL FEES PAYABLE (HAVE CAREFULLY EXAMINED THE COMPLETED "APPLICATION AND PERMIT - AND DO HEREBY Expiration Every permit issued by the Building Official under the provisions ofthis - * ABsq REGUIR ED FOR EXCAVATIONS OVER de shall expire by limitation and become null and void If the building or work CERTIFY UNDER PENALTY OF PERJURY THAT ALL INFORMATION HEREON INCLUDING THEbhorized by such permit is not commenced Within 180 days from the dale of Ouch DECLARATIONS F 5' 0" DEEP MOLITION OR CONSTRUCTION OF ARE TRUE AND CORRECT AND I FURTHER CERTIFY AND AGREE IF A PERMIT rmit, or if the buildIng or work authorized by Such permit is suspended or STRU0 OvER 3 STORIES IN HEIGHT ISSUED' TO COMPLY WITH ALL CITY COUN'IY AND STATE LAWS GOVERNING BUILDING CON andoned at any time after the work is commenced to, a period of 180 days __________________________________________________ APPROVE D"bY STRUCTION WHETHER SPECIFIED HEREIN OR NOT, I ALSO AGREE TO SAVE INDEMNIFY AND * APPLICANT'S SIGNATURE OWNERD C NTRACTORD KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE 0 THIS PERMIT GRANTING OF BY PHONE 0 t hereby affirm that I have a certificate of connect to sell insure or a certificate of Workers Compensation In- surance or a certified copy thereof (See 3800 Labor Code) POLICY NO COMPANY Copy is riled With the city 0 Certified copy is hereby furnished CERTIFICATE OF EXEMPTION FROM WORKERS COMPENSATION INSURANCE (This section need not be completed if the permit is ton one hundred dollars ($tOO) or less) 0 I certify that in the performance of the work for which this permit is issued I shall not employ any person in any manner so as to become subject to the Workers Compen- sation Laws of California NOTICE TO APPLICANT It after making this Certificate of Exemption you Should become subject to the Workers Compensation provisions of the Labor Code you must forthwith comply with such provisions or this permit shall be deemed revoked 0 I hereby affirm that there is a construction lending Ma agency for the performance of the work for which this per a mit is issued (Sec 3097, Civil Code) Ma Lender s Name -J Lender 5 AddreSs_________________________________ a) C ('3 0 a a. C a- a) 0) C C LL C 0) 0) Lu I-) 0) a In C TYPE DATE INSPECTOR BUILDING FOUNDATION REINFORCED STEEL MASONRY GUN ITE OR GROUT SUB FRAME LI FLOOR LI CEILING SHEATHING LI ROOF LI SHEAR FRAME EXTERIOR LATH INSULATION INTERIOR LATH & DRYWALL PLUMBING LI SEWER AND BL/CO LI PL/CO UNDERGROUND 0 WASTE LI WATER TOP OUT LI WASTE DWATER TUB AND SHOWER PAN GAS TEST O WATER HEATER 0 SOLAR WATER ELECTRICAL LI ELECTRIC UNDERGROUND LI UFFER ROUGH ELECTRIC 0 ELECTRIC SERVICE LI TEMPORARY LI BONDING 0 POOL MECHANICAL o DUCT & PLEM., LI REF. PIPING HEAT - AIRCOND. SYSTEMS VENTILATING SYSTEMS CALL FOR FINAL INSPECTION -WHEN ALL APPROPRIATE ITEMS ABOVE HAVE BEEN APPROVED. FINAL I .1 PLUMBING ELECTRICAL MECHANICAL BUILDING SPECIAL CONDITIONS : FIELD INSPECTION RECORD REQUIRED SPECIAL INSPECTIONS INSPECTOR'S NOTES REQ IF INSPECTOR'S - - INSPECTION DATECHECKED APPROVAL SOILS COMPLIANCE PRIOR TO FOUNDATION INSP STRUCTURAL CONCRETE OVER 2000 PSI PRESTRESSED CONCRETE -POST TENSIONED CONCRETE FIELD WELDING HIGH STRENGTH BOLTS •'- SPECIAL MASONRY MASONRY PILES CAISSONS FINAL BUILDING INSPECTION PLAN CHECK NUMBER: PROJECT NAME: ADDRESS: PROJECT NO.: TYPE OF UNIT: UNIT NUMBER: NUMBER OF UNITS: DATE: PHASE NO.: CONTACT PERSON: • '• CONTACT TELEPHONE: INSPECTED DATE JAN. 1 0 1989 BY: ____ INSPECTED: APPROVED DISAPPROVED, INSPECTED DATE BY: ________________________ INSPECTED: APPROVED ______ DISAPPROVED INSPECTED DATE BY: ________________________ INSPECTED: APPROVED DISAPPROVED. Costa Real Municipal Water District COMMENTS: Engineering Deoartment (619) 438-3367 Rev. 1/86 WHITE: Suspense BLUE: Water District GREEN: Engineering CANARY: Utilities PINK: Planning GOLD: Fire FINAL BUILDING INSPECTION PLAN CHECK NUMBER: DATE: PROJECT NAME: ADDRESS: S PROJECT NO.: UNIT NUMBER: PHASE NO.: TYPE OF UNIT: NUMBER OF UNITS: CONTACT PERSON: CONTACT TELEPHONE:_____________________________________________________________________ INSPECTED 14r DATE BY: IV INSPECTED: ___________ APPROVED ______ DISAPPROVED . INSPECTED DATE BY: INSPECTED: ____________ APPROVED ______ DISAPPROVED INSPECTED DATE BY: INSPECTED: APPROVED DISAPPROVED COMMENTS: Rev. 1186 WHITE: Suspense BLUE: Water District GREEN: Engineering CANARY: Utilities PINK: Planning GOLD: Fire FINAL BUILDING INSPECTION PLAN CHECK NUMBER: DATE: PROJECT NAME: ADDRESS: PROJECT NO.: UNIT NUMBER: __________________ PHASE NO.: TYPE OF UNIT: NUMBER OF UNITS: CONTACT PERSON: CONTACT TELEPHONE: - INSPECTED DATE Ø// INSPECTED: APPROVED DISAPPROVED INSPECTED DATE BY: INSPECTED: ____________ APPROVED ______ DISAPPROVED INSPECTED DATE BY: INSPECTED: APPROVED ______ DISAPPROVED COMMENTS: Rev 1188 WHITE: Suspense BLUE: Water District GREEN: Engineering CANARY Utilities PINK: Planning GOLD: Fire FINAL BUILDING INSPECTION - PLAN CHECK NUMBER: '3 DATE: PROJECT NAME: ADDRESS: PROJECT NO.: UNIT NUMBER: PHASE NO.: TYPE OF UNIT: .' NUMBER OF UNITS: CONTACT PERSON: CONTACT TELEPHONE: INSPECT BY: DATE INSPECTED: APPROVED ,>' DISAPPROVED INSPECTED DATE BY: INSPECTED: APPROVED ______ DISAPPROVED INSPECTED DATE BY: ________________________ INSPECTED: APPROVED ______ DISAPPROVED COMMENTS: Rev. 1186 WHITE: Suspense BLUE: Water District GREEN: Engineering CANARY: Utilities PINK: Planning GOLD: Fire 1 OPUS SOUTHWEST CORPORATION DESIGNERS. BUILDERS. DEVELOPERS January 25, 1989 City of Carlsbad 2075 Las Palmas Drive Carlsbad, CA 92009-4859 Attn: Meredo Camero RE: Carlsbad Office Building Temporary Certificate of Occupancy Dear Meredo: To confirm our telephone conversation of this morning, I agree to complete the following items at the above referenced building as noted by yourself within fifteen (15) working days. Installation of a second hand railing at the exterior concrete stair leading from the building to the parking lot on the north side of the building. Installation of a transition to the threshold from the plaza concrete of approximately 300 in slope. A Temporary Certificate of Occupancy will be issued for the corridors and for Suite #310 at the time all other violations (as noted on the respective punchlist) are completed. If after the fifteen (15) working day time period, the above items are not completed, the Temporary Certificate of Occupancy will expire and a permanent certificate will not be issued. If you have any questions, comments or clarifications regarding this matter, please do not hesitate to call my office. Thank you for your cooperation in this matter. Sincerely, OPUS SOUTHWEST CORPORATION Garret R. Moss Associate Project Manager GRM/laf lgmmccc cc: Wayne Morgan - City of Carlsbad OPUS SOUTHWEST AND INDEPENDENT AFFILIATES IN PHOENIX • MINNEAPOLIS • CHICAGO • MILWAUKEE • TAMPA • PENSACOLA 4742 NORTH 24TH STREET • SUITE 270. PHOENIX, AZ 85016 • (602) 468-7000 wie'f _~111'12'11112'ni!! 1F11TE,J January 3, 1989 Opus Southwest Corporation 4742 North 24th St Suite 270 Phoenix, Ariz 85016 Attention: Benjamin Frantz 1921 PALOMAR OAKS WAY BUILDING PERMIT 87-460 One of our inspectors noticed today that you have never completed the exit on the northeast side of the building. Occupants exiting can get through the door, but they are Immediately faced by a bank approximately 3.5 feet hiqh. No stairs up this bank or sidewalk around the bank have been provided. The Unform Building Code provides that an exit must continue to a public way. In this case that would be to the parking lot or southeasterly to Palomar Oaks Way. Please complete this work by January 27, 1989 so exiting from your building will no longer be impaired. If you have any questions please telephone Carter Darnell in my office. MARTIN ORENYAK, DIRECTOR () c Tony Mata Wayne Morgan Mer Camero copy to Gary Moss 1/10/89 2075 Las Palmas Drive-Carlsbad, California 92009-4859.(619) 438-1161 ESGIL CORPORATION-, 9320 CHESAPEAKE DR., SUITE 208 z. iii to SAN DIEGO, CA 92123 (619) 560-1468 DATE: tilS I-S-Dif 5 ION JURISDICTION: CPLT! - o ;ZAN-CEECKER DFILE COPY PLAN CHECK NO: &S-I(o1 SET: DUPS DDESIGNER PROJECT ADDRESS: YPn-arrPn2 PROJECT NAME: Peij T'.I. The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. The plans transmitted herewith will substantially comply 1 with the jurisdiction's building codes when minor deficien- cies identified are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies U identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. E The check list transmitted herewith is for your information. The plans are being held at Esgil Corp. until corrected plans are submitted for recheck. Ej J The applicant's copy of the check list is enclosed for the jurisdiction to return to the applicant contact person. The applicant's copy of the check list has been sent to: 2_13 Lc-iZ o-p , 'ac U Esgil staff didnot advise the applicant contact person that plan check has been completed o-r-k T* -u-,r fl Esgil staff did advise applicant that the plan check has been completed. Person contacted:_____________________ sate contacted: Telephone #________________ REMARKS1OK ?-LLi_Dct)1O_-O2 ) _rb ?Do SErL_S--oLc_crb_t'L.QQ DeAirj -kr, o "Dio us o'a. OCCL'9 A,IJCC4 IjT i%1 O 2-DD'2.G. -fl Co az I Oo't. k4vAys 1) Co'r) Z ucxiw u 9 By: _ . _I.- ~ 1 p4 Enclosures: -y? ____S ESGIL CORPORATION OAS ESGIL CORPORATION 9320 CHESAPEAKE DR., SIJITE 208 SAN DIEGO, CA 92123 (619) 560- 1468 DATE: \ O ( 1 f 5 0 APPLICANT - —rrYURISDICTIONT JURISDICTION: C Y, I ITr2.1S, 40 ER DFILE COPY PLAN CHECK NO: 13 t SET: CUPS CJ-DESIGNERPROJECT ADDRESS: tL'Y\AiZ PROJECT NAME: DU% T D The plans transmitted herewith h a v e b e e n c o r r e c t e d w h e r e necessary and substantially com p l y w i t h t h e j u r i s d i c t i o n ' s building codes. The plans transmitted herewith w i l l s u b s t a n t i a l l y c o m p l y D with the jurisdiction's buildin g c o d e s w h e n m i n o r d e f i c i e n - cies identified - - are resolved and checked by building department s t a f f . D The plans transmitted herewith h a v e s i g n i f i c a n t d e f i c i e n c i e s identified on the enclosed chec k l i s t a n d s h o u l d b e c o r r e c t e d and resubmitted for a complete r e c h e c k . . The check list transmitted he r e w i t h i s f o r y o u r i n f o r m a t i o n . The plans are being held at Esgi ] . C o r p . u n t i l c o r r e c t e d - plans are submitted for rechec k . D The applicant's copy of the ch e c k l i s t i s e n c l o s e d f o r t h e jurisdiction to return to the ap p l i c a n t c o n t a c t p e r s o n . The applicant's copy of the che c k l i s t h a s b e e n s e n t t o : -r LEM B u 2Lnuc. -ri IM Esgil staff did not advise the a p p l i c a n t c o n t a c t p e r s o n t h a t plan check has been completeda r I 4 E t a r I - - N Esgil staff did advise applican t t h a t t h e p l a n c h e c k h a s been completed. Person contac t e d : _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Date contacted: Telephone f_______________ REMARKS: By:3W\ GIL -iL Enclosures:DCoZ(?, L\ ESGIL CORPORATION PLJI.I CORRIMON —ll---- FIJI CIUMT RD.: - I 3' ( - Date plans received by jurisdiction: hi" :')(... A !111111 11152 0 ll I" SPR1)OM: OirA1 IflAD: ) L4t _4-4-31 I Date plans received by Esgil Corporation: \ol ó\8P Date initial plan check completed: Applicant contact person: -rEP U4ThW Tel.'4642 Plan check is limited to technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the handicapped. Tha plan check is based on regulations enforced by the Building Inspection Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department or other departments. Code sections cited are based on the 1985 UBC. iPAICT: 1]Th] E: O LL IM a 4. • i(s A&L AM: _1'Z.(1O T(' AU&Z A&: _VU The circled items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 303(c), 1985 Uniform Building Code, the approval of the plans does not permit the violation of any state, county or city law. 0 sreed UD the recheck orocess. note on this us for a copy) _where each correction item has been addressed. i.e.. plan sheet. specification, etc. Be sure to enclose _the marked un_ list _when _you submit the _revised plans, J: ?I4Z AU JKM IN aajuZ AS PAM fl&VDG E MM XMMIM CMMC=GW LIST NO. 90, TflWT DVPT WI7 SPI7IC D(GY Z(E DATA OR POLICY SUPPL(DTS, 1985 UBC -, / 1. Please make all corrections on the original tracings and submit two new sets of prints, and any original pan sets that may have been returned to you by the jurisdiction, to: GP4 Esgil Corporation, 9320 Chesapeake Drive, .C_1. C.Suite 9208, San Diego, CA 92123, (619) 560-l.68. ease make all corrections on the original tracings and submit two new sets of prints, and any original plan sets that may have been returned to you by the jurisdiction, to: The jurisdiction's building department. Indicate on the Title Sheet of the plans, the name of the legal owner and name of person responsible for the preparation of the plans. Section 302(a)7. Each sheet of the plans must be signed by the 7 person responsible for their preparation, even ft though there are no structural changes. Business and Professions Code. / Plans and calculations shall be signed by the California state licensed engineer or architect where there are structural changes to existing buildings or structural additions. Please include the California license number, seal, date of license expiration and date plans are signed. Business and Professions Code. Provide the correct address and suite number of tenant space on the plans. Section 302. Provide a note on the site plan indicating the / previous use of the tenant space or building being remodeled. Section 302. en the character of the occupancy or use changes within a building, the building must be made to comply with current Building Code requirements for the new occupancy. Please provide complete details to show the building with comply. Section 502. UEC Section 304 requires the Building Official to determine the total value of all construction work proposed under this permit. The value shall include all finish work, painting, roofing, electrical, plumbing, heating, air conditioning, elevator, fire extinguishing systems and any other permanent equipment. Please provide a signed copy of the designer's or contractor's construction cost estimate of all work proposed. On the first sheet of the plans indicate: Type of construction of the existing building, present and proposed occupancy classifications of the remodel area and the occupant load of the remodel areas and the floor where the tenant improvement is located. 12 Provide a statement on the itle Sheet of the plans that this project shall comply with Title 24 and 1985 UBC, UMC and UPC and 1987 NEC. Provide a fully dimensioned floor plan showing the size and use of all room or areas within the space being improved or altered. Draw the plans to scale and indicate the scale on the plan. 14 Indicate the use of all spaces adjacent to the area being remodeled or improved. 15 Show any existing fire rated area separation walls, occupancy separation walls, demising walls, shafts or rated corridors. Identify and provide construction details for proposed new fire rated walls. 1 Specify on the plans the fire ratings of assemblies to protect proposed openings in - existing or new fire walls. Identify existing walls to be removed, / existing walls to remain and proposed new walls. Identify bearing walls, non-bearing walls, and shear walls. a section view of all new interior s. Show: Type, sine and spacing of studs. Indicate gauge for metal studs. Specify manufacturer and approval number or indicate "to be ICBO approved". Method of attaching top and bottom plates to structure. (NOTE: Top of partition must be secured to roof or floor framing, unless suspended ceiling has been designed for partition lateral load). Wall sheathing material and details of attachment (size and spacing of fasteners). Show height of partition and suspended ceiling, and height from floor to roof framing or floor framing. Provide a plot plan showing the distance from the building to the property lines and the location of tenant space (or remodel) within the building. I' 1iI Wci14- 6nioat 'Th2-Fr S ttF c..t..o ' - c%j 1/ Provide notes and/or details to show that the If both sexes will be employed and the number floor and wall finish in toilet rooms are 1 of employees exceeds foux, provide separate surfaced with a smooth hard nonabsorbent toilet facilities for men and women. If "both material extending five inches up the wall, sexes will be employed and the total number of Similar surfacing shall be proided on the employees will not exceed four", and only one walls from the floor to a height of 4 feet restroom is provided, note the words in around urinals and within water closet quotation above on the floor plan. Section compartments. Section lO(b). 705. Note on the plans: "All interior finishes must 28 In areas where the occupant load exceeds / comply with Chapter 42 of the 1J3C11. Specify two exits are required. Seet4-n4 "class __f lame spread rating (minimum) 'Table 33-A. for _.,' 29 Provide an exit analysis plan (may be 8 1/2" x (2l' Lateral bracing for suspended ceiling oust be 11" or any convenient size). provided. (UBC Table 23-3) Where ceiling 4 loads are less than 5 PS? and not supporting 30 Exits should have a minimum separation of one- interior partitions, ceiling bracing shall be half the maximum overall diagonal dimension of provided by four No. 12 gauge wires secured to the building or area served. Section 3303(c). the main runner within 2 inches of the cross rmner intersection and splayed 90, from each (31) The maximum nunber of required exits and their other at an angle not exceeding 45_ from the J required separation must be maintained until plane of the ceiling. These horizontal ,fl egress is provided from the structure. restraint points shall be placed 12 feet o.c. Section 3303(a). in both directions with the first point within / 4 feet of each wall. Attachment of restraint 37. Rooms with more than 10 occupants may have one wires to the structure above shall be adequate I exit through one adjoining room. Revise exits for the load_imposed, to comply. Section 3303(e). In buildings having floors and roofs of wood 33 - Exit signs are required for exits serving an frame construction, other than dwelling or occupant load exceeding 49. Show all required hotel occupancies, draft stop the area between exit sign locations. Section 3314(a). the ceiling and floor above so that no j concealed space exceeds 1,000 s.f. and no k. Show that exits are lighted with at least one borir.ontal dimension exceeds 60 L.F. (if space ,J 1 foot candle at floor level. Section 3313(s). has sprinklers, then 3,000 s.f. and 100 L.F.). A%( 5 Show the locations of existing exits from the 23 In buildings having floors and roofs of wood , building and show the path of travel from the frame construction, other than dwelling 0 X ' ' remodel area to the existing exits. hotel occupancies, draft stop the area between 1 1'7j the ceiline and roof a, so that no concealed (p10' 3ft. Note on the plans: "All exits are to be space exceeds 3,000 s.f. and no horizonta y / openable from inside without the use of a key dimension exceeds 60 L.F. (if space has or special knowledge". In lien of the above, sprinklers, then 9,000 s.f. and 300 L.F.). in a Group B occupancy, you may note "Provide a sign on or near the exit doors reading M31S 2 The tenant space and new and/or existing DOOR TO MAIN U1U4CX JRING BUSINESS facilities serving the remodeled area oust be j HOURS" • Section 3304(c). accessible to and functional for the physically / disabled. Sea the attaehed eorrectian sheet 77. Exit doors should be a minima size of 3 feet Title 24, Part 2. by6 feet 8 inches with amlnissns door swing J of 90 degrees. Maximum leaf width is 4 feet. 8. The width of the required level area on the Section 3304(e). / side into which doors swing shall extend 24 Inches past the strike edge for exterior doors 3 • Exit doors should swing in the direction of and 18 inches past the strike edge for interior egress when serving an occupant load of 50 or doors • Section 2-3304, Title 211* more or when serving any hazardous area. /6. Specify lever-type hardware for passage doors Section 3303(b). Applies to door(s)________ on floors accessible to the disabled. Section 2-3304, Title 24. "4. S 7 r2. Regardless of Occupant load, a f l o o r o r l a n d i n g not more than 1/2 inch bel o w t h e t h r e s h o l d i s required on each side of an exit door used for disabled access (may be 1" maximum where not used for disabled access). Section 3304.(b). 4, Doors should not project m o r e t h a n 7 i n c h e s into the required corridor width when fully opened, nor more than one-half of t h e r e q u i r e d corridor width when in any position. Section 3305(d). 411 Revolving, sliding and overh e a d doors are not I permitted as exit doors if the occupant lead exceeds 9 or the exit door serves a hazardous area. Section 330(g). 4/. Exit doors from assembly rooms with 50 or more occupants shall not be provided with a latch or lock unless it is panic hardware. Section 3318. 4/ Double acting doors are not allowed when serving a tributary occupant load of more than 100, or when part of a fire assembly, or part of smoke and draft control, assemblies or when equipped with panic hardwar e . S e c t i o n 3 3 0 4 ( b ) . - 44 Corridors must provide continuous protectio n t o the exterior of the buildin g . Interruptions by an intervening room is not permitted. Foyers, lobbies or reception rooms constructed as required for corridors are not considered intervening roams. Section 3305. vol 44. Corridors and exterior exit balconies servi n g / 10 or more occupants must b e a m i n i m u m 4 4 inches wide and 7 feet high to the lowest projection. Section 3305(b) . When a corridor or exterior exit balcony is accessible to the handicapped, changes in elevations shall be made by means of a ramp. Section 3305(f). When two exits are required, deed end corridors / and exit balconies are li m i t e d to 20 feet. Section 3305(e). Corridors serving 30 or more occupants shall have walls and ceilings of one-hour construction except: Corridors greater than 30 feet wide when the occupants have an exit independent * \ from the corridor. Exterior sides of exterior exit balconies. One story buildings housing Group B, Division 4 occupancies. Section 3305(g). If non-rated corridors are used p e r 1985 UBC, Section 3305(g), Exc. 5, provide a reference to the corridors on the floor pl a n , noting: I. Corridors are non-rated per Section 3305(g), Exception 5, 1985 UBC. Smoke detection system must be listed by the State Fire Marshall and be a supervised low voltage system with combination audible and visual signals with battery backup. Smoke detectors shall be maximum 30' on center. Combined audible/visual signal device(s) shall be installed just inside of each exit door from the corridor, also all locations in the corridor must be in sight of a signal device. Power supply shall be dedicated branch circuit. Circuit disconnecting means shall be accessible only to authorised personnel and shall be clear l y m a r k e d - FIRE ALARM CIRCUIT COWTROL. with a lock-on device. 3985 UBC Section 3305(g), Exception 5, cannot be used for non-rated corridors in a fully sprinklered office space if the occupant load / in the space exceeds 100. 1985 UBC Section 3305(g), Exception 5, is applicable to the office s p a c e but does not apply to the common corridor where the tributary occupant load appe a r s to exceed 100 occupants. When 1985 UBC Section 330 5 ( g ) , E x c e p t i o n 5 , i s applied for corridors on one floor, the corridors on the lower level(s) must be rated if these lower corridors serv e m o r e t h a n 1 0 0 occupants. The tributary load from the upper level(s) shall be the total occupant load from the above level(s). 53 Clearly show where the non-rated corridor system terminates and a rated corridor system comeences. 54 One-hour fire-rated corridors shalt have door openings protected by tight-fitting smoke and draft control assemblies r a t e d 2 0 m i n u t e s , except openings in interior walls of exterio r exit balconies. Doors shall be maintained self-closing or be automatic- c l o s i n g b y a c t i o n of a smoke detector per Section 43 0 6 ( b ) . Doors shall be gasketed to pro v i d e a s m o k e and draft seal where the door meets the stop on sides and top. Section 3305(h). J! i'oo V0L7L47 Usgr - Loj UsgO. Par 4q iN ks ir - 1T24/88 4 5 show rated corridors, lobbies, reception OX foyers cross-hatched on the floor plans. Total area of all openings, except doors, in any portion of an interior corridor, shall not exceed 25 percent of the area of the corridor wall of the room which it is separating from the corridor. Such openings shall be protected by fixed, approved 1/4 inch thick wired glass installed in steel frames. Section 3305(h). 57 Provide a complete architectural section of the corridor, or exterior exit balcony, showing all fire-resistive materials and details of construction for all floors, walls, ceiling and all penetrations. Section 3305(g). 58Show the location of fire dampers. Provide fire dampers at duct penetrations of fire- rated occupancy and area separations, shafts and corridor walls and ceilings. Section 4306(j). #7 (j If building exceeds two stories, show corridor I . is separated from elevator shaft. Sections Ii 3 04(g (h) and 1706(a)(b). (See I.C.3.0. interpretation). 6/. Provide evidence of Health Department approval (for restaurants or for tenants using X-ray equipment). MLEMM fr1 Submit plan showing location of all panels. Submit panels schedules. Submit electrical load calculations Ø. Indicate existing service size. Indicate existing building load. 6/1. Indicate new additional loads. Indicate wiring method. Show exit signs on the electrical lighting plan. Note: Power for exit lights and emergency lighting most conform to the 1985 UBC Sections 3313 and 3314. Provide receptacle(s) within 25' of the roof ,( moumted A/C units. tDC Section 509. Provide multiple switch lighting controls per CAC, Title 24, 2-5319. () Provide an electrical plan for the alarm system showing compliance with criteria described under earlier correction number 49. (/F dPi? o ,) / s 71. Provide mechanical ventilation in all room / capable of supplying a mir.im. of 5 cubic feet per minute of outside air with a total circulation of not less than 15 cubic feet per minute per occupant. Section 605 and 705, UBC. 7,1 Provide mechanical plans thawing existing and proposed HVAC equipment, ducts and access to equipment. 7/. Detail access and working clearances to IIVAC equipment. Cooling coils or cooling units located in attic or furred space, where damage may result from condensate overflow, shall be provided with an additional water tight pan of corrosion resistant material to catch overflow if primary condensate drain becomes clogged. Section 1205, UMC. *Lft 49vw Mølit) (!M)OE7,?1 One-hour corridors shall not be used as an integral part of a duct system. This includes the space above a dropped ceiling within the one-hour corridor. UMC Section 706(b). - 7/. Provide gas line -plans and calculations, / showing pipe lengths and gas demands • UPC Section 1219. S Provide drain, waste and vent plans. Provide water line sizing calculations. UPC Section 1009. 80. Detail how floor drain trap seal istobe maintained. UPC Section 707 (floor drain trap priming). 4.Show P & T valve on water heater and detail I drain line route from P & X valve to the exterior. UPC Section 1007(e). 82 • ow 1/4" per 12" slope on drain and waste lines. UPC Section 407. Provide complete energy design calculations, including all existing design and new energy design for this building. See attached non- residential energy design ecklist. c'-.1 i .vor- (4A) ,nc I'srzwr 0A (J4qJç• ) For remodels in an existing conditioned spaceL2 ) show that the remodeled space will use not more energy than the existing space or show the remodeled space will conform to latest energy design standards. 2/2/88 5 85 Please see additional corrections or remarks that follow. The jurisdiction has cont.ranted with Eagil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone nber of 619/560-168, to perform the plan check for your project. - If you have any questions regarding these plan check items, please content__________________ at Esgil Corporation Thank you. Enclosures: 144t2 C.. 1 2. C LO M4WjJ 1 1n1 tThr- u ô u ' .0 foa-r rWQL ' i 'i uc ..*1 y) (_ t..) Si. ñ 62. Chv i r U.) H-fti- r\)r 01, I 1 fl) - f,1..'iD (fl O 12.i2, I 0c2. rwT.L rTH 5 S (r) i QO i eC flU A-'L)f Fr -tD &-iuO &. (p0 Ui -r n iJ w o u i-.i C,o (L(2 iy Mrs OCCIU9 r,'ijT t.o&Qf5< C.O S \ 00, 2/2/88 6 SHELL BUILDING FIRST GENERATION NONRESIDENTI A L E N E R G Y FOREWORD If any part of the energy desi g n f o r t h e - s h e l l b u i l d i n g had previously been approved u n d e r t h e F i r s t G e n e r a t i o n N o n - residential .Standards, the res t o f t h e e n e r g y d e s i g n can be completed for each of th e f i r s t t e n a n t s u n d e r the standard design originall y u s e d f o r t h e s h e l l b u i l d i n g , as long as copies of the orig i n a l a p p r o v e d e n e r g y d e s i g n are provided and the new design f o l l o w s t h e o r i g i n a l approved design. / pr6vide all new, and existing, e n e r signs subject to this building and this Complete the Certificate of Com p l i a 1) (See attached "Guideline for Comple t i n g F o r m Cr-i w en rirs Generation Nonresidential Sta n d a r d s a r e used"). 140 SECOND GENERATION NON_RESIDENTIAL STANDARDS (APPLICABLE TO PERMIT me lMT AFTER JANUARY 1, 1987 FOR OCCUPANCIES A, 3, -,',-,.'-- ---- - E, OR H FOR NEW BUILDINGS, INCLUDING "SHELL AND "SPECULATIVE" BUILDINGS, AND TENANT IMPROVEMENTS AND OTHER ALTERATIONS AND ADDITIONS). APPLICATION OF THE STANDARD A. A Certificate of Compliance (Form CF-I) eust be included wIth all buildino nermlt 1, 1987, /. Construction that does not increase condL- tioned space n an existing building, applications for the existing building where i2p1icat1on1 submitted after .lanuary subject to energy conservation i.e., second permit was before January 1, 97, cannot generation non esdent2al standards, first increase the overall U-value or overall generation non-re dejtal Standards adopted thermal transfer value, new irvc systems In 1912, stngle family homes and apartment or equipment must comply with the prescriptu;e buildings and other low-rise residential requirements of the second generation buildings of three storIes or less and first non-residential standards including the generation residential standards for )otels HVAC power indices that may apply and and motels and high-rIse residential buildings when improvements or modifIcations to of four stories or mc:e. the lighting system Increase the connected load, then the proposed improvements 2 The Certificate of Co..- pliance m.st be signed mast comply with the set of standards by the professional (Cr professionals) respozsible that are in effect for the occupancy for design and the owner. These signatures type at the time the permit application represent a commI.er.t to make future building for the lighting improvements are proposed. Improvements or modifications according to This has special significance for speculative the standards indicated on the Certificate buildings that are originally permitted of Compliance, under the first generation standards, but -for which tenant improvements are made Section 1403(a)1 of the standards requires after the second generation energy standards that the energy calculations be signed by have become mandatory. (See attached - a person eligible to sign the plans under examples 1-1 and 1-2) the Business and Professions Code. Under the terms and restrictions of some licenses, Fe: construction in an existing building, for example, an electrical engineer may be that increases the conditioned floor able to sign some documents and specifications area, the set of standards that are in such as electrical plans and lighting energy effect at the time of the permit application documentation, but no EVAC plans and documenta- apply to the increased conditioned floor tion. area as though it were a separate new - building. The conditioned floor area The section does net require that the documen- of a building is usually increased im tatien be prepared by a licensed person, one of two ways, only that the documentation be signed by an authorized person who will take responsibi-lity for their correctness in showing compliance Space is added to the building, such with the building energy efficiency standards. as additional floors or a new wing. For example, computer runs and calculations that are prepared by an unlicensed energy Consultant most be signed by the responsible Heating and/or cooling systems are person, such as a registered architect or extended to spaces that were previously civil engineer, unconditioned. A copy of Form CT-I, complete and signed. When either of these two events occur, must be permanently printed on the plans, tho lighting envelope and requirements This enables the code enforcement official of the prescriptive standard apply to to verify that the copies of form CF-i submitted the increased conditioned space only. with future permit applications (for modifications It is not necessary to upgrade the envelope to the building) are consistent with the or lighting system of the existing building. Original Form (See attached example 1-1 and 1-2) The mandatory measures apply to all new / d. Note on the plans that a separate copy of construction, regardless of the date Term CF-1 was retained by the building of the original permit or whether conditioned owner to be passed on to future owners space is increased. The mandatory measures OT tenants of the building so that they only apply to building components, systems will have a record of the energy efficiency or specific pieces of equipment that standards that will apply to future modifi- are part of the construction project. cations. It is the responsibility of The mandatory switching requirements, futute building permit applicants to for instance, would only apply if recir- resubmit the previously approved Form CF-1 cuiting were proposed as part of the Q If with subsequent permit applications. the building applicant does not have a copy of the energy standards compliance forms originally approved, the applicant must comply with the standards presently In effect. // iÔ. ts11tfn9 build.ncs. for which the original permit a pplication was cads after :ani,ary 1. 1517, should have the Certificate of Compliance v lobe to allow comparing the d.sgn of p:cprsed alterations. (no increase n conditioned spore) -or additions(carte itDned spare increased) with the o;ignal design assumed when the building vat constructed, the alerationi or addLticins rust be eor.slstenit with the original desIgn assumptions. The designer may choose to modify the original Certificate of Compliance by showing the modified design complies with the standards. The new Certificate of Compliance would govern any future modifications or additions. 11 the original Certificate of Compliance cannot be located then the entire building, including the proposed alterations or edditlors, must be shown to comply with the current standads. 1. Speculative buildings are defined as those buildings where the occupancy type is known at the time of building permit ppiIcatLan but the plans and specifications do not include desig n details about the lighting system and/or the final MVAC improvements. The lightin g and/or final IlVAC improvements are to be made by the tenants on a space-by-space basis as the building is leased. At the time of the original building permit, assumptions regarding future lighting and SVAC improvements must be node to determine if the building will comply with the standards. This is especially important with the performance approach. When the oricinal plans for a speculative building are submitted to the enforcement agency, the Certificate of Compliance should specify the assumptions require d about future building Improvements. When using the prescriptive approach, the Certificate of Compliance should specify the alternative component packag e used to show compliance at the time of the initial permit application. This am package would be applied to any future work that is performed on the building, unless compliance is redenon-strated for the whole building at the time of the future work. 2. Shell buildings are defined as those struc-tures where the ultimate occupancy of / the building is net known when the original ( building permit application Is filed. The structure, for example could eventually be used as an office, warehouse, restaurant or retail space, depending on market demand. This means that the building could be covered by the first generation nonresidential energy standards or the - second. To address this potential problem, It In recommended that multiple compliance documentation be submitted for shell buildings. Multiple documentation ensures that the structure will comply with what e v e r energy conservation standards are applicable to the eventual occupancy type. Subsequent permit applications for com p l e t i o n of the building should also be submi t t e d with multiple documentation unless th e Occupancy has been clearly Identified and falls within a single set of standards. Puturs changes of occupancy would req u i r e documentation that verifies satisfaction Of the appropriate set of standards . As with speculative buildIng.. a Certificate of Compliance would be submitted to document assumptions sad, about future building Improvements. In the case of shell buildings. multiple Certificates of Compliance may be required along with multIple documentation . It Is also suggested that performance calculation., which specify less than 1.4 Watts/sf be accepted only when the designer can demonstrate a capabili t y to construct a building with lIghtIng loads of the proposed level. Also air Conditioning units with an tttft greater than 10 should be accepted only when there is documentation of at east two available brands meeting the proposed requirements. Mixed use buildings must comply with the specific standards pertinent to t h e various occupancies with the building. If mixed use building design has a single predominant occupancy with other small e r subordinate occupancIes the building need only meet the provisions of the predominant occupancy so long as: the subordinate occupancies total less than 1,000 square feet and are less than 30 percent of the total conditioned floor area or the subordinate occupancies constitute less than 10 percent of the total -- - conditioned floor area. When one of the above exceptions do not apply, either the prescriptive or perfo r m a n c e approach may be applied according to the following guideliness With the prescriptive approach, each occupancy must be analyzed and shown to comply separately. The appropriate compliance documentation should be completed for each occupancy. No trade-Offs are allowed between occupancLes under this approach. With the performance approach, the o c c u p a n c i e s may be analyzed together or separate l y , depending on special circumstance,. It La generally necessary to analyse the occ u p a n - cies separately when they are covered by different standards. For instance low- rise residential and office apace within the same building would have to be analy s e d separately since they are covered by two separate standard., each with its own approved calculation methods, operating assumpti o n s , etc. If retail and office were together In the same building, it would be possible to analyse both occupancies together since they are covered by the same standard. When occupancies are analyzed together, there may be tradeoffs between occupancies; otherwise, tradeoffs are not possible. J4. Processing for fast-track processing is a mechanism established through cooper a t i o n between the developer and the local j u r i s d i c - tion to speed development review time and to facilitate the ability to apply for and receive approval for permits in stages. The enforcement issue with fast-tract b u i l d i n g s Is much the same as for speculative buildings. Assumptions muse be made early on a b o u t lighting and/or ltVAC designs that have not yet been drawn up. The problem is slightly less Complicated since fast-track buildings erg often carried to completion by the sages design/develo p e r team. Sinc* the issu.s are similar, the recommendations for shell and speculative buildings would generally apply. S PHONE NO. S4-2 DESIGNER PHONE 14 ____________ CONTRACTOR PHONE__________ Date Jun sd Prepared byi Bldg. Dept. VALUATION AND PLAN crEcx FEE o Esgil PLAN CHECK N0._ 08-1 3c91 - BUILDING ADDRESS ?frLow1 APPLICANT/CONTACT fen avcwP-M,)-09-~ BUILDING OCCUPANCY _ch TYPE OF CONSTRUCTION =sj BUILDING PORTION BUILDING AREA VALUATION MULTIPLIER VALUE leb 1.W Air Conditionine Commercial • - Residential Res. or Comm. -Fire SiDninklers Total Value 1 3 1 6 Building Permit Fee s_ 2 '(.70 Plan Check Fee t 41LS cD COMflCNTSj_ - in SHEET OF_____ P2/b. W1 ENGINEERING CHECKLIST , , LEGEND Date:______________________ Plan Check No. ,(p j Project Address: letzl 0 Project Name: 6,,E Field Check Date: 1,2,3 By: 00 LEGAL REQUIREMENTS .IV w LD > > > Site Plan w g a Item Complete Item Incomplete - Needs Your Action Number in circle indicates plancheck number that deficiency was identified Provide a fully dimensioned site plan drawn to scale. Show: North ,, o arrow, property lines, easements, existing and proposed structures, streets, existing street improvements, right-of-way width and dimensioned setbacks. Show on Site Plan: Finish floor elevations, elevations of finish grade adjacent to building, existing topographical lines, existing and proposed slopes, driveway and percent (%) grade and drainage patterns. E:;--1:: fl Provide legal description of property. Provide assessor's parcel number. PERMITS REQUIRED Grading J fl Grading permit required. (Separate submittal to Engineering Department required for Grading Permit). LI Grading plans in plan check PE___________ El Need the following completed prior to building permit issuance: Grading plans signed. Grading permit issued. Grading completed. 21 El U Certification letter and compaction reports submitted. 911, El Grading inspected and permit signed off by City Inspector. U B. Right-of-Way Permit required for work in public right-of-way (e.g., driveway approach, sidewalk, connection to water main, etc). LI U 9. Industrial Waste Permit application required. To be filled out completely and returned to Development Processing. DD -D 0. DD FEES REQUIRED Park-in--Lieu fees required. Quadrant: 405 __, Fee Per Unit: $ , Total Fee: Traffic impact fee required. Fee Per Unit: 0 • Total Fee: Bridge and Thoroughfare fee required. Fee Per Unit: 4 , Total Fee: Public facilities fee required. Facilities management fee required. Fee: d Additional EDU's required: -'i aI24dm4 '-wøtO Sewer connection fee: __- Sewer permit no. Sewer lateral required: REMARKS: AS -r Or-Fr. O.K. to issue te. zz/c1 If you have any questions about any of the above items identified on this plan check, please call the Development Processing Department at 438-1161. c.i m 4t 41= 4 000 Q_ Q. c_ ai w w - - - M 0) PLANNING CHECKLIST Plan Check No. Type of Project and Use Zone Use Allowed? YES Setback: Front Side Rear Facilities Management Zone School District: San Dieguito Carlsbad Discretionary Action Required Environmental Required Landscape Plan Required Comments Address NO Type Encinitas - San Marcos YES NO YES NO YES NO "UI. Coastal Permit Required YES NO LI Additional Comments OK TO DATE / 2560 ORION WAY CARLSBAD, CA 92008 TELEPHONE (619) 931-2121 Qtitp of (arbab FIRE DEPARTMENT PLAN CHECK REPORT PAGE 1 OF .L APPROVED -A DISAPPROVED PLAN CHECK# j• /. / i;iJ / PROJECT ( "I /'. t '-" 'f-' ) '."t ADDRESS ARCHITECT I'- •" .t t•ii" .4•/ ADDRESS OWNER' ,'i,i,,v •1 r(' ")'i ADDRESS OCCUPANCY •1 CONST. 121 i"./ TOTI dSPRINKLEREDa TENANT imp. ' L PHONE - , •,•;: PHONE /-. 2j -. SQ.FT. STORIES APPROVAL OF PLANS IS PREDICATED ON CONFORMING TO THE FOLLOWING CONDITIONS AND/OR MAKING THE FOLLOWING CORRECTIONS: PLANS, SPECIFICATIONS, AND PERMITS Provide one copy of: floor plan(s); site plan; sheets Provide two site plans showing the location of all existing fire hydrants within 200 feet of the project. - 3. Provide specifications for the following: 4. Permits are required for the installation of all fire protection systems (sprinklers stand pipes, dry chemical, halon, CO, alarms, hydrants). Plan must be approved by the fire department prior to installation. - 5. The business owner shall complete a building information letter and return it to the fire department. FIRE PROTECTION SYSTEMS AND EQUIPMENT _. 6. The following fire protection systems are required: - ,EJAutomatic fire sprinklers (Design Criteria: / / A' / 0 Dry Chemical, Halon, CO2 (Location: LJStandPipes(Type: EL,Fire Alarm (Type/Location: /? f,) ' )'tf Ji4i L._.. 7. Fire Extinguisher Requirements: 0 One 2A rated ABC extinguisher for each 4 '") sq. ft. or portion thereof with a travel distance to the nearest extinguisher not to exceed 75 feet of travel. 0 An extinguisher with a minimum rating of ________ to be located: 0 Other: 8. Additional fire hydrant(s) shall be provided EXITS - 9. Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort. '.10. A sign stating, This door to remain unlocked during business hours" shall be placed above the main exit and doors ',, , J- '• / a' • / ,, , J, 4,), , ( / ', f-_ /.'L .1 /'• _11. EXIT signs (6" x 3%" letters) shall be placed over all required exits and directional signs located as necessary to clearly indicate the location of exit doors. GENERAL __12. Storage, dispensing or use of any flammable or combustible liquids, flammable liquids, flammable gases and hazardous chemicals shall comply with Uniform Fire Code. _13. Building(s) not approved for high piled combustible stock. Storage in closely packed piles shall not exceed 15 feet in height, 12 feet on pallets or in racks and 6 feet for tires, plastics and some flammable liquids. If high stock pil- ing is to be done, comply with Uniform Fire Code, Article 81. Additional Requirements. ' -- ' / - " - e - 'S L>/ '_) l '.aa. ç ,7,t,.') 't,I.(/t,- / '• Comply with regulations on attached sheet(s). Plan Examiner "4 - Date t • / Report mailed to architect _______ Met with -Attach to Plans COMMERCIAL/INDUSTRIAL APPLICATION FORM FOR INDUSTRIAL WASTE DISCHARGE PERMIT - - - ciy OF CARLäAD -- APPLICATION: NEW BUILDING P.C. NO.: (CHECK ONE) REVISED APPLICATION NO.:____________ T NDUSTRIAL CLASS: 3) BYf e 11/8/89 Signature of City Representative APPLICATION FOR INDUSTRIAL WASTE DISCHARGE PERMIT A. GENERAL: SITE Vi APPLICANT: OU4 ADDRESS: - TYPE OF BUSINESS: APPLICANT'S ADDRESS: (ci it_¶_k1 _ Cti [, 1 c1frs B. WASTES AND PROCESSING: (Check where applicable) O 7't'4*v1 '7iA/1 1:4/Domestic Waste Only - 1-1 Industrial Waste J Industrial Waste NOT Discharged to Sewer - Discharged to Sewer GENERAL DESCRIPTION OF WASTE (Chemical and Physical Characteristics of proposed waste): GENERAL DESCRIPTION OF PROCESS (If Applicable):_________________________ C. WASTES TO BE DISCHARGED TO SEWER: WASTE: TREATED:_______ (Check One) UNTREATED: U I : vcLv ~ -Z QUANTITY: AVERAGE GPD (Daily) MAXIMUM GPD (Gallons Per Day) APPLICANT OR REPRESENTATIVE OF FIRM:tilJO (Print) TITLE: ho ' I u& / ' jj \ \ i SIGNATURE: __t'JcL_ --<'J" DATE: O (jo 00